Change Order Request CITY SECRETARY
CONTRACT HO L\7 Plg 4 CO2-
Project Name :! Cultural OistricUWill Rogers Water & Sanitary Sewer Imp . Pt. 2 j City Sec No .: [ 42064 j
Project No.(s):I P265-607170146887 and P275-DOE No.j .--6-60-9--,j City Proj . No .: I 01486 I
Project Description: Water and Sanitary Sewer Improvements Ahead of the Proposed Kimball Art Museum Expansion
Contractor:! S.J. Loius Construction ofTexas Change Order# I 2 Date :
City Project Mgr. I John Kasavich
Phone Number:! 817-392-8480
City Inspector: I Ron Cordova
Phone Number:! 817-223-2278
Dept. TPW Water Sewer
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary) $4,386 .60
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals
3.44%
1,850,436.31
1/24/2013
Contract Time
(Calender days)
180
180
199
Change order No. 2 will provide increased and additional pay item quantities of 8-inch sewer pipe, 8-inch water
pipe, permanent concrete paving repair and concrete sidewalk repair, that were necessary on the project.
Staff recommends the approval of 19 additional calendar days for this change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Com Name Contractor Name Contractor s· nature Date
S.J. Loius Construction ofTexas Justin Whitman
Date
M&C Number
i
ORTWORTH City of Fort Worth
Change Order Additions
<
roject Name
Project No.(s):
••
Cultural District/Will Rogers Water & Sanitary Sewer Imp. Pt. 2
P265-607170146887 and P275 -707170146887
City Sec No .: 42064
DOE No .! 6609 I City Proj . No .: I 01468
Project
Description Water and Sanitary Sewer Improvements Ahead of the Proposed Kimball Art Museum Expansion
Contractor S.J. Loius Construction of Texas
City Project Mgr. John Kasavich .__ _______________ __,
ADDITIONS
11cm ··--· ... IIUN
9 Pipe Pressure DR 14 Water By Open Cut
12 Pipe Pressure DR 14 Water By Open Cut
34 Pavement Concrete on 2/27 Concrete Base
41 Walk (Concrete Sidewalk Repair) Install
77 8" Gate Valve
78 Meter Vault with 8" turbo (no bypass) with sampling station
1 Pipe-Sewer 8" Class 350 DI
7 Inspection -Post Construction Cleaning & TV
13 Trench Safety
Pa e 1 of 1 g
I Chane Order# [TI Date : I 1/24/2013
City Inspector l Ron Cordova
DEt"I l.llY Umt Umtcost Total
Water 150.00 LF $91 .00 $13,650 .00
Water 50.00 LF $50.00 $2 ,500 .00
Water 30.22 LF $100 .00 $3 ,022.00
Water 866.00 SF $10.00 $8 ,660.00
Water 2.00 EA $2,000.00 $4 ,000 .00
Water 1.00 EA $28,779 .60 $28 ,779 .60
Sewer 10.00 LF $112 .00 $1 ,120 .00
Sewer 10.00 LF $1 .25 $12.50
Sewer 10.00 LF $0 .01 $0 .10
TPW
Water $60 ,611.60
Sewer $1 ,132.60
Additions Sub Total $61 ,744 .20
•
'FORT WORTH City of Fort Worth
Change Order Deletions ' •.
Project Name j'-::c:-ul:-tu-ra".'-:1 D::"'.'is-tri".'"",ctNJ'""."'.":'.il:-1 R:-og_e_rs_W:-a-ter---:-&-S-an-ita_ry_Se_w-er-lm-p-. -Pt_2 ______ ___, City Sec No.: 42064
Project No.(s): I P265-607170146887 and P275-707170146887 DOE No . 6609 ! City Proj . No .: -1468
Project Description Water and Sanitary Sewer Improvements Ahead of the Proposed Kimball Art Museum Expansion
Contractor S.J. Loius Construction ofTexas Chane Order# [JJ Date! 1/24/2013
City Project Mgr. John Kasavich .__ ___________ __, City Inspector l Ron Cordova
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
8 Pipe Pressure 12" DR 14 Water Pipe Water 140.00 LF $131.00
11 Pipe Pressure 12" DI Water Pipe Water 14.00 LF $138.00
28 Fire Hydrant Barrel & Stem Extension Install Water 12.00 VF $360.00
31 Meter Vault with 6" Turbo (no bypass) with sampling station Water 1.00 EA $25,000.00
32 Pavement-2" HMAC Temporary Water 154.00 LF $25.00
36 Pavement -Paver on Concrete Base Water 48 .00 LF $25.00
42 Curb and Gutter Replacement Water 105.00 SF $15.00
43 Trench Safety System For Depths Exceeding 5' Water 8.00 LF $1.00
8 Inspection-Pre Construction TV Sewer 1000.00 LF $1 .75
15 Topsoil Sewer 60 .00 SY $0 .25
16 Grass Hydromulch Seeding Sewer 60.00 SY $1.00
20 Concrete Encasement Sewer 20.00 LF $55.00
-TPW
$18,340 .00
$1 ,932.00
$4 ,320 .00
$25 ,000 .00
$3,850.00
$1,200.00
$1,575 .00
$8 .00
$1 ,750 .00
$15 .00
$60.00
$1 ,100.00
Water $56,225.00
Sewer $2,925.00
Deletions Sub Total $59,150.00
Page 1 of 1
.-..
M/WBE Breakdown for this Change Order
MWBESub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00