CHANGEORDERNO. ONE DATE : July 18 , 2012
CITY OF FORT WORTH
CHANGE ORDER REQUEST
D .O .E. NO . (NIA) PROJECT NO . 00574
PROJECT DESCRIPTION: SOUTHSIDE PUMP STATION REPLACEMENT PROJECT CITY SECRETARY CONTRACT NO .
42065
ORIGINAL CONTRACT AMOUNT ..................................................... $ .,__77~6=3=5=0 .=00"------
EXTRAS TO DATE ......................... ·······.······· .......... $ =O=.o-"-o _____ _
CREDITS TO DATE ....................................................... $ =0=.0=-0 _____ _
CONTRACT COST TO DATE ...................................................................................................................... . . ................................................... $ 776 350 .00
AMOUNT OF PROPOSED CHANGE ORDER .......................................................................................................................................................... $ 3 947 .63
REVISED CONTRACT AMOUNT ............................................................................................................................................................................... $ 780 297 .63
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS .......................................................................................................................... $ 23 650.00
ADDITIONAL FUNDING (IF NECESSARY) ................................................................................................................................................................ $ =0.=00,__
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER ...................................................................................................................................... $~
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a comp lete, functional , and
operat ional pump station .
Change Order# I includes extra work to relocate an existing pipeline and fire hydrant in conflict with the proposed Southside Pump Station . The additional cost of this work
is $3,947 .63. In addition , due to the late delivery of electrical switchgear, the contractor requests that l l l additional calendar days be added to the contract time, which
would extend the substantial completion date from March 28 to Ju ly 17 , 2012, and the final completion date from April 27 to August 16 , 2012 .
Staff has reviewed this change order and is in agreement with the scope of work, the costs associated with the wo rk, and the request for a time extension . Documentation
providing additional information for each change is attached to and made part of this change orde r.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both in time and money) for all costs arising out of, or incidental to , the Change O rd er .
ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DA TE
CONTRACTOR
MANAGER/CONST. SER.
DIRECTOR/CONTRACTING DEPT.
CITY MANAGER
5~CL
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
NO M&C REQUIRED
None
DATE
DATE
DATE
a/t/,2.
APPROVED CONTRACT TIME ADDITIONAL TIME FOR THIS CHANGE
TO DATE ORDER
270 Calendar Da s 111 Calendar Da s
(. PROJECT MANAGER a 11 ~
DIRECTO DAT~
DATE
7-31-/2.
DATE
Ou -01 -1 2 A"I0 :02 I N
DISTRIBUTION:
WHI'FE-FILE
CANARY-~ STRUCTION FIL E
PINK -l'MlECT MANAG ER
GOLDENROD-CONTRACTOR
CITY OF FORT WORTH
CHANGE ORDER REQUEST
CHANGE ORDER NO. ONE DATE : July 18 , 2012 D.O .E. NO . (N I A) PROJECT NO. 00574
'
PROJECT DESCRIPTION : SOUTHSIDE PUMP STATION REPLACEMENT PROJECT
i .
•
ORIGINAL CONTRACT AMOUNT ..................................................... $ ~77~6=3=5=0 .=0-"-0 ___ _
,.if I EXTRAS TO DATE ........................................ 1.-:,.,. ·r:.,_$ =0 .=00"-------
CREDITS TO DATE ....................................................... $ =0 .~00~------
CITY SECRETARY CONTRACT NO .
42065
CONTRACT COST TO DATE ....................................................................................................................................................................................... $ 776 350 .00
AMOUNT OF PROPOSED CHANGE ORDER. ............................................................................................................................................................ $ 3 947.63
REVISED CONTRACT AMOUNT. ................................................................................................................................................................................ $ 780,297 .63
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ....................................................................................................................................... $ 23 ,650 .00
ADDITIONAL FUNDING (IF NECESSARY) ................................................................................................................................................................ $ =0.=00._• __
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER ...................................................................................................................................... $ ilQ_Q_
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete , functional , and
operational pump station .
Change Order# I includes extra work to relocate an existing pipeline and fire hydrant in conflict with the proposed Southside Pump Station. The additional cost of this work
is $3 ,947 .63. In addition , due to the late delivery of electrical switchgear, the contractor requests that 111 additional calendar days be added to the contract time , which
would extend the substantial completion date from March 28 to July 17 , 2012 , and the final completion date from Apri l 27 to August 16 , 2012 .
Staff has reviewed this change order and is in agreement with the scope of work, the costs associated with the work, and the request for a time extension . Documentation
providing additional information for each change is attached to and made part of this change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both in time and money) for all costs ar ising out of, or incidental to , the C h a nge Order.
ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE
270 Calendar Da s None
CONTRACTOR .At-hi~J;;;_...
MANAGER/CONST . SER. DATE
DIRECTOR/CONTRACTING DEPT . DATE
CIT~~Q__ DATE
a/tft.
APPROVED CONTRACT TIME
TO DATE
270 Calendar Da s
DIRECTO
ADDITIONAL TIME FOR TH IS CHANGE
ORDER
111 Calendar Da s
COUNCIL ACTION (lF REQUIRED~~
0 APPROVED O DISAPPROVED O O~J ·
DATE
DISTRIBUTION:
WHITE-FILE
CANARY-j:0 NS TRUCTlON FIL E
PINK · ~OJECT MAN AG ER
GOLD EN ROD-CONTRA CTOR
CHANGE ORDER NO . ONE DATE: July 18, 2012
C ITY OF FORT WORTH
CHANGE ORDER RE QUEST
D.O .E. NO . (N I A) PROJ ECT NO . 00574
.
l/(t(I; ({)
PROJECT DESCRIPTION : SOUTHSIDE PUMP STATION REPLACEM ENT PROJECT CITY SECRETARY CONTRACT NO .
.
ORIGINAL CONTRACT AMOUNT ..................................................... $ ~77~6=3-5~0.~00~----
EXTRAS TO DATE .................................... ./. ...... , ... $ =0 .=00,,_ ____ _
I I
CREDIT S TO DATE ...................................................... $ ~0 .~00~------
42065
CONTRACT COST TO DA TE ........................................................................................................................................................................................ $ 77 6 3 50 .00
AMOUN T O F PROPOS ED C HANG E ORDER .............................................................................................................................................................. $ 3 947 .63
REVI SED CONTRACT AMOUNT ................................................................................................................................................................................. $ 780,297 .63
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................................................................................................ $ 23 650 .00
ADDITIONAL FUNDING (IF NECESSARY) ................................................................................................................................................................ $ =0 .-00~-
REMA INING FUNDS AVAILABLE FOR CHANG E ORDER ...................................................................................................................................... $ QJill_
IN ACCORDANCE WITH THlS C HAN G E O RD ER, TH E CONT RA CTOR SHALL : modi fy/change th e contract as shown below to provide a co mpl ete, fun ction al, and
operati onal pump station .
Chan ge Order # I includes extra work to re locate an ex isting pipe line and fir e hydrant in conflict with the proposed Southside Pump Stati on. The addition al cost of thi s work
is $3 ,947 .63 . In addition , due to th e late delivery of electrical switchgear, th e contractor requests that 111 additional calendar days be added to the co ntract t ime, whi ch
wou ld extend th e substantial compl etion date fr om March 28 to Jul y 17 , 2012, and th e fin al completion date from Apri l 27 to Au g ust 16 , 20 12 .
Staff has revi e wed thi s ch a nge ord e r and is in agreement with the scope of work, the costs as sociated with the work , and the request for a time extension . Documentation
providin g addition al information for each change is attached to and made part of this chan ge order.
It is understood a nd a gree d th at the accepta n ce o f thi s Cha ng e Orde r by the contractor constitutes an accord a nd satisfaction and repres e nts payment in full
(bo th in time a nd money) for a ll costs ari s ing out o f , or in c idental to , the Change Order.
ORIGIN AL CONTRACT TIME ADDlTIONAL APPROVED TIM E TO DAT E
None
CONT RACTOR j
MAN AGER/CONST . SER. DAT E
DIRE CTOR/CONTRACTING DEPT. DAT E
DAT E a/t/t1.
APPROVED CONTRACT TIME ADDITIONAL TIME FOR THIS CHANGE
TO DAT E ORDER
270 Calendar Da s 111 Calendar Da s
PROJECT MANAG ER a J.t().i
COUNCIL ACTION (IF REQUIRED):,,.
D AP PROVED D DISAPPROVED
-... I
/
.,,....:-
0 OTHER
DAT>E
L
DATE
?l-12..
DATE
DISTRfBUTION:
WHITE -FILE
CAN ARY -CONSTRUCTION FILE
PINK -~OJECT MAN AG ER
GOLDENROD-CONT RA CTOR
CITY OF FORT WORTH
CHANGE ORDER REQUEST
CHANGEORDERNO. ONE DATE: July 18 , 2012 D.O.E. NO . (N I A) PROJECT NO . 00574
PROJECT DESCRIPTION : SOUTHSID E PUMP STATION REPLACEMENT PROJECT
ORIGINAL CONTRACT AMOUNT.. ..................................................... $ ~77~6=3=5~0.=0~0 ___ _
EXTRAS TO DATE ........................................................ $ =o.=o"-o _____ _
CREDITS TO DA TE ....................................................... $ ~O.=O~O _____ _
CITY SECRETARY CONTRACT NO .
42065
CONTRACT COST TO DATE ...................................................................................................................................................................................... $ 77 6 350 .00
AMOUNT OF PROPOS ED CHANGE ORDER .............................................................................................................................................................. $ 3 947 .63
REVISED CONTRACT AMOUNT ................................................................................................................................................................................. $ 780 ,297 .63
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORD ERS .................................................. : ..................................................................................... $ 23 650 .00
ADDITIONAL FUNDING (IF NECESSARY) ................................................................................................................................................................ $ =o.o~o __
REMAJNING FUNDS AVAILABLE FOR CHANGE ORDER ...................................................................................................................................... $ QJ!Q_
IN ACCORDANCE WITH THIS CHANG E ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a comp lete , fu nctional , and
operational pum p station.
Change Order# I includes extra work to relocate an existing pipeli ne and fire hydrant in co nflict with the proposed Southside Pump Station . The addit ional cost of this work
is $3 ,947 .63 . In addition , due to the late delivery of electrical switchgear, the co ntractor req uests that 111 additiona l ca lendar days be added to the contract time , which
wo uld extend the substantial completion date from March 28 to July 17, 2012 , and the fina l comp letion date from April 27 to August 16, 2012 .
Staff has reviewe d this change order and is in ag reement with the scope of wo rk, the costs associated with the work , and the req uest for a time extension . Documentation
provi ding additiona l information fo r each change is attac hed to and made part of this change order.
It is understood and agreed that t he acce ptance of th is Change Order by the contracto r constitutes an accord and satisfaction and represents payment in full
(both in time and money) for all costs arising out of, or incidental to , the Change Order .
ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT TIME ADDITIONAL TIME FOR THIS CHANG E
TO DATE ORDER
270 Calen dar Days No ne 270 Calendar Days 111 Calendar Days
CONTRACTOR~ .. -[}1. DAT~/: lh to l"l.. PROJEC T MANAGER a µ?,. l.. DATE r/2.o//2-
I ,
MANAGER/CONST . SER . DATE DIRECTOR/MANAGING DEPT . DATE
DIRECTOR/CONTRACTING DEPT . DATE CITY ATTORNEY DATE
CITY MANAGER DATE COUNC IL ACTION (IF REQUIRE D): DATE
0 APPROVED 0 DISAPPROVED 0 OTHER
D AKE CONST RUCT IO N
July 17, 2012
To: City of Fort Worth
Water Department -Production Division
1511 11 th Ave
Fort Worth, TX 76102
Attn: Mr. Chris Harder
Ref: Southside Pump Station -Additional Time Request
Dear Mr. Harder:
Please accept this letter as an official request to add an additional 111 days to the project for a new
substantial completion date of July 16 , 2012 and a new final completion date of August 16 , 2012.
Based primarily on the production time of the MCC equipment for this project, which should have
been delivered on or before February 2, 2012, but was not completed and delivered until May 23,
2012, we were unable to demo the old pump station and complete the startup by the original
substantial completion date of the contract. This delay was beyond the control of Dake
Construction.
Secondary, but included in this same time period , the building supplier was not able to construct,
deliver and install the precast building according to hi s original estimated schedule shown on the
proposal. Again, this delay was beyond the control of Dake Construction.
Thirdly, there was a 3.5 day delay related to the rerouting of the fire hydrant line (CO#l). This did
not impact the substantial completion date, as it was completed during the manufacturing time of the
p umps.
I trust that this request is sufficient for the stated purpose. Should additional information or a
different format be required to achieve this, please let me know and 1 wi ll be glad to accommodate.
Thanks in advance for your efforts and consideration; should you ha ve any questions or concerns ,
please feel free to contact me at your convenience.
Sincerel y,
Scott Lewis
Dake Construction
2200 Smith Barry Rd #207 • Pantego, TX 76013 • Office (8 17) 303-711 I • Fax (888) 250-8351 • slewis@dakeconstruction.net
-·
Fort Worth
1964 • 1993 • 2011
July 17 , 2012
Dake Construction
3911 Blue Feather Court
Arlington , Texas 76016
Attn.: Mr. Scott Lewis
FORT WORTH @
SOUTHSIDE PUMP STATION REPLACEMENT PROJECT
RE: CPR-1, Fire Hydrant Relocation
Dear Mr. Lewis:
CPR-I consists of the labor and materials to relocate the existing fire hydrant and water
line in conflict with the proposed Southside Pump Station.
The Fort Worth Water Department recommends CPR-I for approval. Total cost for the
proposed change amounts to $3 ,947.63 with no additional time requested. This change
will be incorporated into Change Order # 1 to the contract.
Sincerely,
6{_ ti L
Chris Harder, P. E.
Engineer
Xe: Mike Hill , Project Inspector
Project File
WATER DEPARTMENT
P RODUCTION DIVISION
T HE: CITY OF FORT WORTH * 1511 11 TH AVENUE * FORT WORTH , TEXAS 76102
817 -392 -8258 * FAX 817-392-8410
C, Printed on recycled paper
-..
Dake Co n struction
3911 Bl ue Feather Co urt
Arlingto n , TX 760 16
8 17 454 6508
Na me I Ad dr ess
City ofFt Worth
1511 11th Ave
Fo rt Worth , TX 76102
Project: So uth side Pump Statio n
Periodi cal Es ti ma te No .
NA
Item Descri ptio n Qty
Relocation of Fire Hydrant water lin e
2 6" C900 DR14 PVC Pipe -Markings PC 200 or
PC305
3 6" MJ 90 Bend -CP DI C 15 3
4 6" PVC 4006 Stargrip Restraint Glands Only
5 6" MJ Reg Ace Set UGiand
6 Ernbedmen t Materials
7 Labor & Burden
8 Com pa ct ion Testing
9 Bonds & Insurance (2.5%)
10 OH&P (20%)
Terms
Net 30
JOO
4
8
8
1
3.5
1
I
1
Estimate
Date Estim ate #
8/29/20 11 66
Project Pa y Peri od
21101 -Southsid ... NA
Co st Un it To ta l
0.00 0.00
5.46 FT 546.00
57.60 EA 230.40
25.76 EA 206.08
11.94 EA 95.52
400.00 LS 400.00
378.00 DA 1,323.00
400.00 LS 400.00
86.43 LS 86.43
660 .20 LS 660.20
Total $3,947 .63