Loading...
HomeMy WebLinkAboutContract 42069-Co14. • C..cJP.f ?. 0 f " FORT WORTH . ~ City of Fort Worth Change Order Request c,TY sEcRETAR"llt?rJpq -e o 1 CONTRACT NO • ..::::i:::LLI.:lJIJ_Jf-__ J--.-- Project Name! 2007 Critical Capital Project for Reconstruction of Premature Failed Streets ! City Sec# I 42069 ! Client Project #(s)! C295-541200-202240129083 DOE# 6181 Concrete Replacement on Red Birch, Sugar Maple , Water Oak , White Willow , Smokethorn , Bluewood , Green Ash , Project Description Maplewood , Redgum , Silver Maple , Sweet Birch , Sweet Cherry , Sweet Leaf, Yellow Birch . Contractor! McClendon Construction , Inc . Change Order# Date 3/2/2012 City Project Mgr.! Kristian Sugrim City Inspector Thomas Miller Dept. TPW Water Sewer Contract Time Original Contract Amount $869 ,975.00 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $869 ,975 .00 !Amount of Proposed Change Order $20,697.80 $0.00 $0.00 Revised Contract Amount $890,672.80 Original Funds Available for Change Orders Remaining Funds Available for this CO $0 .00 Additional Funding (if necessary) $20 ,697.80 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals (CD) $869 ,975 .00 154 $869 ,975 .00 154 $20,697.80 30 $890 ,672.80 184 $0 .00 $20 ,697 .80 2.38% $1 ,087,468 .75 This Change Order is to add new line items to the contract for additional full width subgrade compaction and remobilizat ion of demolition crew . Full width subgrade compaction was needed on Sugar Maple Dr . where excessive moisture in the subgrade outside of the trenches was encountered . The remobilization of demolition crews was necessary due to the fact that the designed grade taken from old profiles for Sugar Maple Drive was approximately 18" lower than the actual gr~~~e it impossible to transition the adjacent properties to the top of curb. As a result , approximately 515 square yards of co~-~d and re-poured at the correct elevation . This remobilizat ion cost is for the contractor's demolition crew . Also , an ::i&iiln~o da fs>~,~"d for this additional work . -a-~~~-io~ r--------, r:1::1 'i,-.1~ ~""'o o::;~ OFFICIAL RECORD ~~\ /~g CITY SECRETARY ~ OO OQ ,:i -.J-WJC:.~.;s;,~~~-----~~000000° "1c ~ FT. WORTH, TX ~li11.l'lt~~"'v.(y,Q' It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change rder. I ti 1__ __ M_&c_Nu_mb_er--==:::::::=:=:===----------....::::::::====:::....--~__J ~l 06-01-12 P04 : 1 O IN \..'t,Y "<)- .-~~-City of Fort Worth Change Order Request I J City Sec # 42069 Project Namel 2007 Cr itical Cap ital Project for Reconstruction of Premature Fa iled Streets ~-------' Client Project #(s)I C295-541200 -202240129083 DOE# 6181 Project Description Concrete Replacement on Red Birch , Sugar Maple , Water Oak , White Willow , Smokethorn , Bluewood , Green Ash , Maplewood , Redgum , Silver Maple , Sweet Birch , Sweet Cherry , Sweet Leaf, Yellow Birch. Contractor! McClendon Construction , Inc . Change Order # Date City Project Mgr.! Kristian Sugrim City Inspector Thomas Miller Dept. TPW Water Sewer Original Con tract Amount $869 ,975 .00 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $869 ,975 .00 !Amount of Proposed Change Order $20,697.80 $0.00 $0.00 Revised Contract Amount $890 ,672.80 Original Funds Available for Change Orders Rema ining Funds Ava ilable for this CO $0 .00 Additional Funding (if necessary) $20 ,697 .80 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $869 ,975 .00 $869 ,975 .00 $20,697.80 $890 ,672.80 $0 .00 $20 ,697 .80 2.38% $1 ,087 ,468 .75 3/2/2012 Contract Time (CD) 154 154 30 184 Th is Change Order is to add new line items to the contract for add itional full width subgrade compaction and remobiliza ti on of demolition crew . Full width su bgrade compaction was needed on Sugar Maple Dr . where excess ive mo isture in the subgrade outside of the trenches was encountered . The remobilization of demolition crews was necessary due to the fact that the designed grade taken from old profiles for Sugar Maple Drive was approximately 18" lower than the actual grade , which made it imposs ible to trans ition the adjacent properties to the top of curb . As a result , approximately 515 square yards of concrete had to be removed and re-poured at the correct elevation. Th is remobilization cost is for the cont ractor's demolition crew . Also , an additional 30 days is requested for this additional work . \ I I) ifo~1yur J) ltltJ/17_ It is unde rstood and agreed that the acceptance of th is Change Order by the contractor const itutes an accord and satisfact ion and represents pay ment in full (both time and money) for all costs arising out of, or incidenta l to , the above Change rder. ~ M ~~=-=-------+'---"'-'--~~--"'T'l"'---~--'-'------f ~ttJ M&C Number , ·,."' c_Cfl/ ~ of A • ~ FORT WORTH .. ~ City of Fort Worth Change Order Request LJf ClP9 to J I Project Namel 2007 Critical Capital Project for Reconstruction 'of Premature Failed Streets City Sec # 42069 ~------_. Client Project #(s)I C295-541200-202240129083 DOE# 6181 Project Descript ion Concrete Replacement on Red Birch , Sugar Maple , Water Oak , White Willow , Smokethorn , Bluewood , Green Ash , Maplewood , Redgum , Silver Maple , Sweet Birch , Sweet Cherry , Sweet Leaf, Yellow Birch . Contractor! McClendon Construction , Inc . Change Order # Date City Project Mgr. I Kristian Sugrim City Inspector Thomas Miller Dept. TPW Water Sewer Original Contract Amount $869 ,975 .00 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $869 ,975.00 IAmount of Proposed Change Order $20,697 .80 $0 .00 $0.00 Revised Contract Amount $890 ,672.80 Original Funds Available for Change Orders Remaining Funds Available for this CO $0 .00 Additional Funding (if necessary) $20 ,697.80 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $869 ,975 .00 $869 ,975 .00 $20 ,697.80 $890 ,672.80 $0 .00 $20 ,697 .80 2.38 % $1 ,087 ,468 .75 3/2/2012 Contract Time (CD) 154 154 30 184 This Change· Order is to add new line items to the contract for add itional full width subgrade compaction and remobilization of demolition crew . Full width su bgrade compaction was needed on Sugar Maple Dr. where excessive mo isture in the subg rade outs ide of the tre nches was encountered . The remobilization of demolition crews was necessary due to the fact that the designed grade taken from old profiles for Sugar Maple Drive was approximately 18" lower than the actual grade , which made it impossible to transition the adjacent properties to the top of curb. As a result , approximately 515 square yards of concrete had to be removed and re-poured at the correct elevation. This remobilization cost is for the contractor 's demolition crew . Also , an additional 30 days is requested for this additional work . I I t (I t'V \ j L/ ' tr ltl Iii It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs aris ing out of, or incidental to , the above Change Orde r. Date J-.,,,,, -u.1 ll.. Date -, ' 71 Date SJ 'JI 12,. M&C Number vi ~ ~ ~ J~ \. ~ . ~ FORT WORTH .. ~ City of Fort Worth Change Order Request City Sec # 42069 '({( 1 re Project Name! 2007 Critical Capi tal Project fo r Reconstruction of Premature Failed Stree ts .__ ______ __. Client Project #(s)! C295-541200 -20224012908 3 DOE# 6181 Project Descript ion Conc rete Replacement on Red Birch , Sugar Maple , Water Oak , White Willow , Smokethorn , Bluewood , Green Ash , Maplewood , Redgum , Silver Maple , Sweet Birch , Sweet Cherry, Sweet Leaf , Yellow Birch . Contractor! McClendon Construction , Inc . Change Order # Date City Project Mgr.! Kristian Sugr im City Inspecto r Thomas Mille r Dept. TPW Water Sewer Original Contract Amount $869 ,975 .00 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $869 ,975.00 IAmount of Proposed Change Order $20 ,697.80 $0 .00 $0.00 Revised Contract Amount $890 ,672.80 Orig inal Funds Available for Change Orde rs Remaining Funds Available for this CO $0 .00 Addi tional Funding (if necessary) $20 ,697.80 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $869 ,975 .00 $869 ,975 .00 $20 ,697.80 $890 ,672.80 $0 .00 $20 ,697 .80 2.38 % $1 ,087,468 .75 3/2/2012 Contract Time (CD) 154 154 30 184 This Change Order is to add new line items to the contra ct for add itional full width subgrade compact ion and remobil ization of demolition crew. Full width subgrade compaction was needed on Sugar Maple Dr . where excessive moisture in the subgrade outside of the tr enches was encountered. The remobilizat ion of demolition crews was necessary due to the fact that the designed grade taken from old profiles for Sugar Maple Dr ive was approximately 18" lowe r than the actual grade , which made it impossible to transit ion the adjacent properties to the top of curb. As a resu lt, approximately 515 square yards of concrete had to be removed and re-poured at the co rrec t eleva tion . This remobilization cost is for the contractor 's demolition crew . Also , an additional 30 days is requested for this additional work. ' ,, It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction an d represents payment in full (both time and money) for all costs aris ing out of, or incidental to , the above Change Order. Contractor's Com an Name Contractor Name Contract Si nature Date McClendon Construction , Inc . '- /' Inspector/Inspection Supervisor ' I Date Project Manager/Program Manager Date '" ,, .r;: er~· l J_ • :""lV',.~ J ,/ µ.. I" -I - Assistant Director (Dept) Date Director, Contracting Department (Dept) Date Assistant City Attorney Date Assistant City Manager Date .,/ ( ... -, I --· - Council Action if required) M&C Number I VI 1-I M&C Date Approved I I FORT WORTH ---,---City of Fort Worth Change Order Additions Project Name Client Project # 2007 Critical Capital Project for Reconstruction of Premature Fai led Streets City Sec# 42069 :=::;c:;29;:5_::;54:;:;1::;20;:;:o::;_2:;;02;:24::;0=12;;:9;;0a:;3==:;D::;0E;:#:::6;;1:;:a1======================-....:_-~==:=::; Project Description Contractor City Project Mgr. Concrete Replacement on Red Birch , Sugar Maple , Water Oak , White Willow , Smokethorn , Bluewood , Green Ash , Maplewood , Redgum , Silver Maple , Sweet Birch , Sweet Cherry , Sweet Leaf, Yellow Birch . McClendon Construction , Inc. Change Order # I 1 Date 3/2/2012 Kristian Sugrim City Inspector Thomas Miller ADDITIONS 11 t:M Ut:::,l..,Klt' I JUN DEPT Wty Unit Unit (.;OSt :ltl-New 1.:1eot;nd Under Panels 1 t'VV 1,l:ll:lU .JU ::,y ~ti .UL :ll:l -New t-uu vv1ath Subgrade Compaction TPW 1.00 LS $5 ,l:ltiti .UU Ju-New Hemoo111zation of Demolition Crew 1PW 1.UU LS ~Z ,/l:lU .UU Change Order Additions Page 1 of 2 lotal $11 ,l:141 .1.SU ~o ,l:ltiti .UU :j)Z ,/l:IU .UU TPW $20 ,697 .80 Water $0 .00 Sewer $0 .00 Sub Total Add 1t1ons $20 ,oH/.tlU Change Order Additions Page 2 of 2 FORT WORTH ---..,--- Project Name Client Project # Project Description Contractor City of Fort Worth Change Order Deletions 2007 Critical Capital Project for Reconstruction of Premature Failed Streets City Sec# 42069 ~C:;:29;:;5:::;-5:;:41::;:20;:;0:;-2~02;;:24::;::;0::::12;;9:;:;08:;:3==:;D:;O;:E ::# 6:;1::;81::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::===============-_:__---~==::::; Concrete Replacement on Red Birch, Sugar Maple , Water Oak, White Willow , Smokethom, Bluewood, Green Ash, Maplewood, Redgum, Silver Maple , Sweet Birch, Sweet Cherry, Sweet Leaf, Yellow Birch . McClendon Construction, Inc. Change Order# I 1 Date 3/2/2012 City Project Mgr. .__K_ri_st_ia_n _Su_..g'-rim ___________ ....J City Inspector Thomas Miller DELETIONS 1 IE:M Ut:-:i\.it<lt' 1 IVN DEPT Wty Unit Unit \.iOSt 1otal Change Order Deletions Page 1 of 2 TPW $0 .00 Water $0.00 Sewer $0 .00 ::;uo I otal uelet1ons Change Order Deletions Page 2 of 2 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 PROJECT NAME : PROJECT LIMITS : BuySpeed No (T/PW): BuySpeed No (Water): City Project No: Contract No : D.0 .E. No : Attachment to Change Order No : Today's Date : Original Contract Amount: Extras to Date : Credi ts to Date : Contract Amount to Date: PROJECT SUMM ARY SHEET (Change Order Atta ch ment) 2007 CO's Reconstruction of P re m ature Failed Streets @ 16 Loc :ations Red Birch, Sugar Maple, Water O ak, White Willow, Sm o ketlhorn, Bl uewo,od, Gre e n Ash, Maplewood, Redgum, Silver Maple, Sweet Bi r ch, Sweet Cherry, Sweet L eaf, Yell o w Birc:h P0-11-00067255 N/A 01290 CS42069 Original M & C sapproved 07-26-11, C-25055 6181 1 5/23/12 $ $ $ TOTAL 869,975.00 $ $ $ C295 86 9,975 .00 Amount of Proposed Change Order: $ $ $ 869,975.00 $ 20,697.00 $ 890,672.00 $ 869 ,975 .00 20,697 .00 890 ,672 .00 Revised Contract Amount: Contingency Funds Avail. for Admin . Change Orders : Remaining Funds Available for Change Orders : Additional Funding (if necessary): $ $ $ $ $ $ Prepared By: Christy Eze rn ack T/PW Constru ction Services