Change Order Request
Proj ect Name! Eastern Hills Storm System Improvements Phase 1
Client Project #(s) 01363
City Sec # 42077 .__ _____ ___.
'-----------.,-------~-------------------l
Project Description! Storm Water Detention Basin
Contractor! Conatser Construction TX , L.P .
City Project Mgr. I Chad Simmons
Dept. TPW
Original Contract Amount $1 ,674 ,006 .00
Extras to Date
Credits to Date
Pend ing Change Orders (in M&C Process)
Contract Cost to Date $1 ,674 ,006.00
!Amount of Proposed Change Order $209,967.50
Revised Contract Amount $1 ,883,973.50
Original Funds Available for Change Orders $50,'220 .00
Remaining Funds Availab le for this CO $50,220.00
Additional Funding (if necessary) $159,747 .50
Change Order # Date
City Inspector Donald Watson
Water Sewer Totals
$1 ,674 ,006.00
.,
$1 ,674 ,006 .00
$0.00 $0.00 . '$209 ;967.50
$1 ,883 ,973 .50
$50 ,220 .00
$50 ,220 .00
$159 ,747.50
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
12 .54%
$2 ,092,507.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Miss ing bid items and incorrect bid quantities ·in the Bid Form , unforeseen site conditions .
OFFICIAL RECORD
CITY SECRETARY .
FT. WORTH, TX
1/3/2012
Contract Time
(CD)
150
150
80
230
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfact ion and represents payment
in full (both time and money) for all costs arising out of , or incidental to , the above Change Order.
Contractor's Com an Name
I&
M&C Number IC-2 5"s:c1B I
FO R T W O R T H ----.---City of Fort Worth
Change Order Additions
Project Name Eastern Hills Storm System Improvements Phase 1 City Sec# 42077
Client Project# 01363 '-----------------------------------------'
Project Description Storm Water Detention Basin
Contractor Conatser Construction TX , L.P. Change Order # Date 1/3/2012
City Project Mgr . Chad Simmons City Inspector Donald Watson
ADDITIONS
11 t:M u1:::;CKIP flON DEPl uty Unit Unit ~OS! I otal
t)j '"lype4" MH TPW 1.UU' tA :!ilL ,bUU .UL :!ilL ,oUU .UC
64 12'' HMAC on 2:'2.7 Concrete-10' Width (SD Repai0 rTPW 580 .00 LF $45 .uu :liL6 ,10U .OC
65 I Curb & Gutter TPW 175 .00 LF $20.uu $J ,OUU ,UL
66 Dr iveway Repair TPW 65 .00 SF $9.uu $080 .UL
67 I ::i::i Paving Repair TPW 233.00 LF $38.5U $8 ,8/U :::>l.i
68 I Haul-UTT Asphalt Material TPW 7,HUU .00 CY $LL.SU "$1 ( {,(OU .VU"
68 18" HOPE TPW 153.00 LF $43.uu $6 ,b/8 .Ul.i
24 IKetairnng Wall -Modu lar (Type II) TPW 740 .QO ::it-$LU.OU "$14 ,800.UU
25 I Retaining Wall -Modular (Type I) TPW 790.00 SF $22 .UL $l/,J8U.UU
27 I Sidewalk TPW 3,tsz?.uu ::it-$4 .UL $1b,JUtl .UU
42 Miscellaneous Concrete Structure (Diversion Weir Slab) lPW 41 .oo : CY :libUU .UL, "$24 ,oUlJ .UU
TPW $308 ,072.50.
Water $0 .00
Sewer $0 .00:
Sub Total Additions $308 ,072.50
Change Order Additions Page 1 of 1
..... '
fORTWORTH ----..,..---City of Fort Worth
Change Order Deletions
Project Name Eastern Hills Storm System Improvements Phase 1 City Sec# -1~ __ 4_20_7_7 -~
Client Project # 01363 ,...._ ____________________________________ ___.
Project Description Storm Water Detention Bas in
Contractor Conatser Construction TX , L.P . Change Order # Date 1/3/2012
City Project Mgr . Chad Simmons City Inspector Donald Watson
DELETIONS
11 t:M Ut:::;CKlr' 1 IUN Ut:r' I Uty Unit Unit ·Cost Total
'JI Pavement-l Inch Min HMAC Keplacement on t:x1st1ng tlase IPW 13 ,~t>Z .00 ::iY :i,z .::>u $34 ,905 .UU
3 Channel-Unclassit1ied Excavation TPW 7.~uu .uu CY $8.00 ;J,O.l ,LUU .UU
TPW $98 ,105 .00
Wa ter $0 .00
Sewer $0 .00
Sub Total Deletions $98 ,105 .uu
Change Order Deletions Page 1 of 1
. ~, ,< •
: '
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Cowtown Redi-Mix Supply Redi-Mix Concrete $8 ,800.00
..
Robert Granados Truck Supply Trucking-Hauling $8 ,000 .00
..
Total $16,800.00
Previous Change Orders
CO# DATE AMOUNT
..
. . .
Total $0.00
•
Otf1c1dl s,k of th1c c,ty uf I urt \'forth, T cxas
FORT WORTH
~
DATE: 5/8/2012 REFERENCE **C-25598 LOG
NO.: NAME: 20CHANGE ORDER EASTERN HILLS -- -
CODE: PUBLIC
C TYPE: CONSENT HEARING: NO
SUBJECT: Authorize Execution of Change Order No. 1 with Conatser Construction TX, LP, in the
Amount of $209,967 .50 to City Secretary Contract No. 42077 for the Eastern Hills Storm
System Improvements -Phase 1 Multi-Use Storm Water Detention Basin for a Total
Contract Amount of $1,883,973.50 (COUNCIL DISTRICT 4)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Change Order No. 1 with Conatser
Construction TX, LP, in the amount of $209,967.50 to City Secretary Contract No . 42077 thereby
revising the total contract amount of $1,883,973 .50.
DISCUSSION:
On July 26 , 2011 , (M&C C-25075) the City Council authorized the award of a contract to Conatser
Construction TX, LP, (Conatser) for this project.
The change order recommended by this Mayor and Council Communication will provide
compensation for the removal and disposal of 7,900 cubic yards of buried asphalt material discovered
at the site when excavation began . This material was not encountered in the soil borings conducted
as a part of the design process to assess existing soil conditions and, so, was not accounted for in
the documents used by contractors to prepare their bids. The unforeseen material resulted in
additional hauling and disposal costs to Conatser.
The net effect of the proposed Change Order is as follows :
Original Contract Amount
Proposed Change Order No. 1
Revised Contract Amount
AMOUNT
$1,674,006.00
$ 209,967.50
$1,883,973.50
Costs for the implementation of Change Order No. 1 will be funded by the Storm Water Capital
Project Bond Fund.
Conatser Construction TX, LP, is in compliance with the City's M/WBE Ordinance by committing to an
additional eight percent M/WBE participation on this Change Order. The City's goal on this change
order is eight percent.
This project is located in COUNCIL DISTRICT 4, Mapsco 79C.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated , of the Storm Water Capital Project Bond Fund .
TO Fund/Account/Centers FROM Fund/Account/Centers
P227 541200 204280136383 $209,967.50