CHANGE ORDER NO. DATE
2 9 I 2 9 / 2 0 I 5
PROJ ECT D ESCRIPT ION
A lert Notification and Security Improvements
ORIGINAL CONTRACT AMOUNT
EXTRAS TO DATE
CREDITS TO DA TE
D.O.E. NO PROJECT NO.
0496
CITY SECRETARY CONTRACT NO.
No i~!~tt
$2,197,095.00
$243 ,916
0
CONTRACT COST TO DA TE $
AMOUNT oF PRoPosEo cHA·Nc '1i"orii:>ER·--·-------·----------··-·------------··--·······--········-·· $
2,441,011.00
302,011.00 . --..... ------.... ------. -.. ----------.. --.. --------------.... -..... -·
REVISED CONTRACT AMOUNT $
0R1G1NAL FuNDs AVAILABLE FoR ·c-.:i .. (N·c-E-oiii:iER.s·--------------··----·-·--···················· $
--.. --------------.. ---.. -.... ---.......... ----.. ---.. -.
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS $
ITEM
].
DESCRIPTION
Provide and install various security
equip ment, wiring and so ftw are at the
Lake Worth Dam.
RECE\
Total
$
QUANTITY UNJTCOST
LS $302,0 11.00
2,743,022.00
549,273.75
305,357.75
302,011.00
fi 46,31>8. 1.5~
T OTALS
$302,011.00
$ 302,011.00
It is understood a nd agreed that the acceptance of this C hange Order by the con tractor constitu tes an accord and satisfacti on and represents payment in
full (both time and mone ) for a ll costs aris in out oC or incidental to , the above Chan°c Order.
CONTRACTOR'S NAME:
Schneider Electric Company
ORI GINAL CONTRACT TIME
300 da ys
ADD ITIONAL APPROVED TIME TO DATE A PPROVED CONTRACT TIME TO DATE AD DITIONAL TIME FOR TIIIS C HANGE ORDER
CONTRACTOR
~P-<-'-2
392 days 692 da ys 1,025 days
DATE
, "Its/ ,r
DATE
0 DISAPPROVED
SCANNED
IJATE
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH. TX
M&CReview Page 1 of2
CITY COUNCIL AGENDA
Offi cial site of the City of Fort Worth, Texas
FoRTWORTH
~
COUNCIL ACTION: Approved on 8/25/2015
DATE: 8/25/2015 REFERENCE **C-27430 LOG NAME: 60SCHNEIDERELECTC02 NO.:
CODE: C TYPE: PUBLIC
CONSENT HEARING: NO
SUBJECT : Authorize Execution of Change Order No . 2 to City Secretary Contract No . 42116 with
Schneider Electric Buildings Americas , Inc ., for Lake Worth Dam Security Improvements in
the Amount of $302 ,011 .00 for a Total Contract in the Amount of $2 ,743 ,022 .00 and a
Total Project in the Amount of $4 ,749 ,946 .45 (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Change Order No . 2 to City Secretary Contract No .
42116 with Schneider Electric Buildings Americas, Inc., for Lake Worth Dam Secur ity Improvements in the amount of
$302 ,011 .00 for a total contract amount of $2 ,743,022 .00 .
DISCUSSION:
On April 12 , 2011 , (M&C C-24865) the City Council awarded City Secretary Contract No . 42116 in the amount of
$2 ,197 ,095.00 to Schneider Electric Buildings Americas , Inc . (Schneider Electric), for the installation of alert
notification and security improvements at the Rolling Hills and Westside Water Treatment Plants . On July 10 , 2012 ,
(M&C C-25707) the City Council authorized the approval of Change Order No . 1 in the amount of $243 ,916 .00 for alert
notification improvements at the Village Creek Wastewater Treatment Plant. Total amended contract amount was
then $2 ,441 ,011.00 .
The original bid package in 2011 included a bid item for Lake Worth Dam Security Improvements . Due to budget
constraints at that time , the Lake Worth Dam Security Improvements were not included in the original award of
contract. Since then , the funding has been identified and the Staff would like to award that part of the original bid
package at this time . Proposed Change Order No . 2 provides for the installation of additional cameras , video analytic
software and the integration of all cameras into our monitoring system . Proposed Change Order No . 2 , in the amount
of $302 ,011 .00 will increase the amended contract amount from $2 ,441 ,0 1 1.00 to $2,743 ,022 .00 .
Upon approval of this Mayor and Council Communication, appropriations for the Water and Sewer Alert Notification
System will consist of the following :
Chiang , Patel & Yerby Engineering
Agreements
I Schneider Electric Construction Contracts
I Johnson Controls Construction Contracts
Construction Staking, Proj ect Management , Inspection , Material Testing and
Contingencies
Project Appropriations
Existing Additional Revised FUND Appropriations Appropriations Appropriat ions
Water Capital $337 ,235 .00 G $337 ,235 .00
Projects Fund
$424 ,085 .00
$2 ,743 ,022 .00
$929 ,236.45
$653 ,603 .00
$4 ,749 ,946.45
Encumbrances Remaining and
Expenditures Balance
$166 ,785 .00 $170,450.00
http://apps.cfwnet.org/council packet/me review.as p?ID=20758... 9/16/2015
. M&CReview Page 2 of2
i(P264)
Water Capital $2 ,538 ,485.00 $0 .00 $2 ,538,485 .00 $2 ,373,484 .91 $165 ,000 .09 Projects Fund
Sewer Capital $257 ,300 .00 $0 .00 $257 ,300 .00 $257 ,300 .00 $0 .00 Pro·ects Fund (P27 4
Sewer Capital $0 .00 $1 ,194 ,552.45 $1 , 194 ,552.451 $0.001 Pro ·ects Fund (P275)
Grants Fund GR? $0 .00 $ .00 $0 .00
Project Total $0 .00 $4,414,496 .36 $335 ,450.09
Construction is scheduled to begin in September 2015 with project completion by April 2016 . Upon completion of this
capital project, there will be no annual operating impact to the Water Department's operating budget.
M/WBE OFFICE -Schneider Electric is in compliance with the City's M/WBE Ordinance by committing to an overall 42
percent M/WBE participation on this contract inclusive of this Change Order No . 2.
This project is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are avai lable , as appropriated in the Wate r Capital
Projects Fund as shown above , to fund Change Order No . 2 with Schneider Electric for security improvements at the
Lake Worth Dam .
TO Fund/Account/Centers
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
FROM Fund/Account/Centers
P264 541200 601560049683 $14 2 ,011 .00
P265 541200 601560049683 $160 ,000.00
Fernando Costa (6122)
John Carman (8246)
Paul Bounds (8567)
60 SCHEIDER ELECT CHANGE ORDER NO 2 map .pdf
http://apps.cfwnet.org/council packet/me review.asp ?ID =20758... 9/16/2015
Sc~11eider
c, Electric
1650 WEST CROSBY RD, CARROLLTON, TX 75006
PHONE: 972-323-1111 FAX: 972-245-0996
December 19 , 2014
To : Ft. Worth Water Department
Attn : Juan Reyes/ Paul Bounds
From : Shawn Hanrahan
Direct: 972-323-3008
Cell : 972 -207-4831
Shawn.Hanrahan@schneider-electric .com
Ref: Ft. Worth Water Dept -Lake Worth Spillway
Video Surveillance System
Rev 1
Scope of Work
Schneider Electric is pleased to offer the following proposal for the "Security System " work
associated with the referenced Ft. Worth Water Dept proj ect as described below . Pricing is based
upon the scope discussed on the site walk conducted on 11 /11/1 4 as well as the services
detailed below. Pricing includes all associated material , labor, comm issioning , and warranty for a
turnkey project.
ITEM SERVICES
1 Submittal package including installation drawings , data sheets , and system architecture
2 Provide and install a new Puretech front end at the Lake Worth facil ity including
associated software licensing and hardware components to integrate the new and
existing cameras into the overall Puretech CCTV system already deployed at other Ft.
Worth facilities .
3 Provide and install a new Dell CCTV server for video storage . The new hard drives will
provide approximately 30 days of storage . A new network switch will be installed in the
existing rack to support the new video servers and analoq encoders .
4 Provide and install (4) new Pelco Thermal fixed came ras to monitor the spillway area as
detailed on the camera layout drawing . Each thermal camera will receive an analytic from
the Puretech system for detection . The existing PTZ camera at the end of the levee will
be proqrammed to slew & cue when an alarm is triqqered by one of the thermal cameras .
5 Provide and install a new LRAD unit including spot light and camera to monitor the
spillway area as detailed on the camera layout drawing . The LRAD will be integrated with
the thermal cameras for detection . The camera on the LRAD will be used for auto-follow
once an intrusion is detected .
6 Provide and install a new 1 O' pole at the end of the spillway . The pole will be attached to
the existing concrete ledge as shown in detail 602F . The new LRAD will be mounted on
the top of the pole .
7 Provide and install a replacement 15 ' pole at the end of the spillway on the existing
concrete pad to replace the existing pole . The existing PTZ and enclosure will be re-
installed on the new pole . The new thermal fixed cameras will also be mounted on the
top of the pole .
8 Provide and install a new panel rack with canopy at the end of the spillway as shown on
detail 604 . A new NEMA 4x enclosure will be mounted on the pole to house a new
network switch , encoders , fiber breakout , and power suoolies .
Copyright 2007 , Schneider Electric Proposal Page 1 of 5
Sc~11eider
c;Electric
... ..
9 Provide and install a new concrete pull box / hand hole at the end of the levee to support
the existing cable connection back to the electrical building .
10 Provide and install a new 6 strand multi-mode fiber connect ion between the new pole
base and the electrical bu i lding . The fiber will be installed in the existing underground
conduit raceway .
11 Provide a new Puretech software analytic for the existing fixed camera at the entrance
gate to the facility for intrusion detection .
12 Integrate the existing PTZ camera in the middle of the levee into the new Puretech front
end for viewinq and control. This camera will not have any analytic functionality .
13 120V power will be tapped into from the existing source at the camera pole at the end of
the levee to support the new CCTV equipment.
14 Commissioning and check-out of field devices for proper functionality .
15 Programming / integration of the video surveillance system. The cameras at Lake Worth
will be viewed and controlled remotely from the other Ft. Worth facilities on the Puretech
system.
16 Warranty Services - 2 year parts and labor on all new equipment provided by Schneider
as part of this project
17 Software Maintenance -Pricing includes 2 years of software maintenance of the
Puretech system at the Lake Worth Dam .
ITEM QTY EQUIPMENT DESCRIPTION
1 1 Hoffman NEMA 4X SS enclosure for the new pole
2 1 Hirschmann Eiqht Port network switch for the new pole
3 2 Hirschmann SFP fibe r modules
4 3 Verint sinqle channel analog to IP encoder
5 1 Pelco Fixed Thermal 50mm IP came ra
6 3 Pelco Fixed Thermal 35mm IP camera
7 1 Camera Power Suooly -multichannel
8 1 LRAD-500RX Unit with spotlight and camera
9 1 LRAD power supply
10 1 Hirschmann Eight Port network switch for the electrical building
11 2 Hirschmann SFP fiber modules
12 1 UPS battery back -up for the equipment on the new pole
13 1 UPS battery back-up for the CCTV equipment i n the electrical buildinq
14 1 Dell CCTV Server with 16TB of storage
15 1 1 Oft square tube pole with associated bracing suooorts
16 1 15ft square tube pole with associated re-inforcement
17 1 Panel Rack Canopy with uni-strut
18 LOT 6 Strand Multi-mode Fiber outdoor rated
19 2 Fiber Patch Panel
20 LOT Fiber Patch Cables
2 1 LOT CAT6 Patch Cables
22 LOT Conduit , backboxes , electrical rough-in
I Lake Worth Project Pricing I $ 302,011.00 I