Loading...
HomeMy WebLinkAboutContract 42144-CO1FO'RT WORTH ... ----..,..---City of Fort Worth Change Order Request Project Namej Paving Improvements for Ryan Place Traffic calming Client Project #(s) DOE 6627 CITY SECRETARY CONTRACT NO. 4?.. \ 44 -g} \ City Sec# 42144 ------~ --------------------------------------' Project Description Construction of three traffic control circle s on El izabeth Blvd . and paving improvements at James Ave ., .and Ryan Place/5th. Ave Contractor! McClendon Construction , Co ., Inc . Change Order # Date City Project Mgr. I Lissette Acevedo City Ins pector Adilda Cazorla Dept. TPW Water Sewer Original Contract Amount $183,510 .00 Extra s to Date Credits to Date Pend ing Change Orders (in M&C Process) Cont ra ct Cost to Da te $183,510 .00 !Amount of Proposed Change Order $4,978.50 $0.00 $0.00 Revised Contract Amount $188,488.50 Original Funds Avail ab le for Change Orders Remaining Funds Available for this CO $0 .00 Addit iona l Fund ing (i f necessary) $4 ,978 .50 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25 %) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $183 ,510 .00 $183 ,510 .00 $4,978.50 $188,488 .50 $0 .00 $4 ,978 .50 2.71% $229 ,387 .50 9/16/2011 Contract Time (WD) Project manager has approved install ing extra depth of concrete instead of lim ing subgrade . This increa ses line item s for concrete and excavation while deleting items for lime stabilization . The Arts Council is requesting th e base for the statue which will be funde d by the Art s Council. Attested by: ~~~ It is unde rstood and agreed tha t the acceptance of this Change Order by the contractor constitu tes an accord and sat isfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order . Contracto r's Company Name McClendon Construction , Co ., Inc . It ·J O -// Date 1 1 -1 5 -1 1 A 1 1 : 1 T, fORTH, TX Fo·Rr WORTH . ~ ' ' M&C Number City of Fort Worth Change Order Request Council Action (if required) M&C Date Approved , •. .o/c '··' ~ "'»j. FORT WORTH ---.-----City of Fort Worth Change Order Additions Project Name Paving Improvements for Ryan Place Traffic calming City Sec# 42144 ~===::::::::========:::::::::::==========================::::::'._~_-=::::::::::; Clien t Project# DOE 6627 '------------------------------------------' Project Description Construction of three traffic control circles on Elizabeth Blvd . and paving improvements at James Ave ., .and Ryan Place/5th . Ave 11-EM 4Z 43 3 44 McClendon Construction , Co ., Inc . Change Order# I 1 Date 9/1 6/2011 Contractor City Project Mgr . Lissette Acevedo City Inspector Adilda Cazorla ADDITIONS Ui::SCRIP flON Dl:r'I Qty Unit Unit Cost Concre te footing tor art piece at Elizabeth Blvd I tJW 1.UU l:a :i;z ,ouu .uu 3" extra deep concrete on Elizabeth Blvd ., and James Ave . to el iminate sub-gra< TPW 430 .00 SY $8 .50 Pavement-Unclassified street excavation remove TPW 37.00 CY $22 .00 Removal of tracks and concrete base at Elizabeth Blvd . TPW 1.00 LS $1 ,929 .50 TPW Water Sewer Sub Total Additions Change Order Additions Page 1 of 1 Total :i;z,ouu .uu $3,655.00 $li14 .UL $1,!W:l.SC $8,898.50 $0 .00 $0 .00 $8,898 .50 FORT WORTH ---.---- Project Name Cl ient Project # Proje ct Des cription Contractor City Project Mgr. City of Fort Worth Change Order Deletions Paving Improvements for Ryan Place Traffic calming DOE 6627 Cit y Sec# Construction of three traffic control circles on Elizabeth Blvd . and paving improvements at James Ave ., .and Ryan Place/5th . Ave McClendon Construct ion , Co ., Inc. Lissette Acevedo DELETIONS Change Order# D=:J City Inspector I Adilda Cazorla Date 9/16/2011 11 cM -'!:~-,,, I IUN DEP1 Qty Unit Unit cost 17 1Subgrade lime for stao111zat1on install fPW 430 .00 :,y $7 .UU 18 Sub -grade lime for stabilization insta ll (30 lbs/sv) TPW 6.50 TON $14 0.00 TPW Water Sewer Sub Total Deletions Change Order Deletions Page 1 of 1 42144 1otal $3 ,010 .0C ~~10.0C $3 ,920 .00 $0 .00 $0.00 $3 ,920.00 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00