HomeMy WebLinkAboutContract 42205-CO2' DISTRIBUTION:
WHlTE-FJLE CITY OF FORT WORTH
CHANGE ORDER REQUEST
CITY SECRETARY 4-1 ~os -Co Z-CONTRACT NO . vv K
CANARY· CONSTRUCTION flLE
PINK· PROJECT MANAG ER
GOLDENROD-CONTRACTOR
CHANGEORDERNO . 2 I DATE: 5/10/12 I D.O .E.NO. I PROJECT NO. WTR-2010-2000~1
PROJECT DESCRIPTION ; Riverside Wastewater Treatment Plan Digester Sludge Treatment, Removal, and Disposal Project I CITY SECRETARY CON TRACT NO.
42205
ORIGrNAL CONTRACT AMOUNT .............................................................. $ ___ __,$ .. s,.,.2,.,.s,.,5 • .,,04:r,O,.,OO.,.
EXTRAS TO DATE .............................................................. S ______ _,$ .. 0,.00,.
CREDITS TO DATE ............................................................. $ _____ __,$._.7_,.,6...,2.=00
CONTRACT <.."'OST TO DATE ........................................................ . . ............................................................................................................... $ ___ ~5=2=5UllilQ
AMOUNT OF PROPOSED CHANGE ORDER ............................................................................................................................................................................ $ 293 .50
REVISED CONTRACT AMOUNT ............................................................................................................................................................................................... $ ___ ~5=25~4..,.5=7.,_,l.=50
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ..................................................................................................................................................... $ ____ ........,.7,,.62..,00...:
ADDn10NAL FUNDING(JF NECESSARY) .............................................................................................................................................................................. $. ______ ~-0~-
REMAINING FUNDS A YAILABLE FOR CHANGE ORDER .................................................................................................................................................... $ _____ ~46=8=5=0
IN ACCORDANCE WITH THIS CHANGE ORDER, TIIB CONTRACTOR SHALL:
Complete nil portions of the contract work os approved in the original contract documents Md Change Order No. I.
Schedule of completion is revised per this change order as described in supporting documenting submitted to City by AUi on April 5 and May 9, 20 12 (sec Attachment 1).
Contract quantities and unit costs are revised per this change order as shown in Table l (attached). I
TOTAL COST FOR CHANGE ORDER NUMBER 2
It is uAdcr.tlooti and agrocd tbiSl the aicceptanco of this Chango Order by th o contractor constih1tcs Rft accord 4nd satisf:ictl on
ond represents paymi,Jnl in full {bo<'9 in time and mo1i<:y) for nil t osts ar •siog out of, or incident al to, the. Change Order .
ORIGINAL CONTRACT 11ME
180 days
ADDITIONAL APPROVED TIME TO DATE
30days
OFFICIAL RECORD
CITY SECRETARY
FT, WORTH, TX
L
$
DDITIONAI. TIME FOR IBIS CHANGE ORD£k
124 days
DATE
DATE COUNClL ACTIO N (IF REQIJ]RED):
a AIPROVED a DISAPPROVED 0 OllJER. _______ _
FTWl 1231\T:\Digester Removal\Construction Contract Managcmcn igester Sludge Removal Change Order No . 2.doc
0.00
05-23-12 A09:14 I N NO M&C REQUIRED
DISTRIBUTION:
-WHITE -FlLE
CANARY· CONSTRUCTION FILE
PINK -PROJECT MANAG ER
GOLDENROD -CONTRACTOR
t
CITf OF FORT WORTH
CHAN'GE ORDER REQUEST ..
CHANGEORDERNO . 2 I DATE: S/10/12 I D.O.E .NO. I PROJECTNO. WTR-2010 -2000~1
PROJECT DESCRIPTION : Riverside Wastewalel' Treatment Plan Digester Sludge Treatment, Removal, and Disposal Project I CITY SECRETARY CONTRACT NO .
42205
ORIGINAL CONTRACT AMOUNT .............................................................. S ---~$=5=2=5""-5.=04~0=.00=
EXTRAS TO DATE .............................................................. S ______ $~Q=OO=
CREDITS TO DATE ............................................................. $ ______ $~26-2~.QO~
CONTRACT <.."OST TO DATE ................................................................................................................................................................................................... $. ___ ~5=2-54..1lli)Q
AMOUNT OF PROPOSED CHANGE ORDER ...................................................................................................................... : ..................................................... $ _____ -"'29'-"'3""'5""0
REVISED CONTRACT AMOUNT .................................................................................... , ............................ , ............................................................................. $ ___ ~5-2~S4,..,.S=7~1.S=O
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS .................... r. ............ Jr... ....... .1.. ..................................................................................... 1 ......... $ 762 QO
'
ADDmONAL FUNDING (]F NECESSARY) ........................................................................................................................................... ~.: ...................... $. ______ "".Q"°.
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER ................................................................................................................................................... $. _____ -"'46><>8"-"5""0
IN ACCORDANCE WITH THIS CHANGE ORDER, Tiffi CONTRACTOR SHALL:
Complete nil portions of the contract work as awrovcd in the original contract documents 1111d Change Order No. I.
Schedule of completion is revised per this change order as described in supporting documenting submitted to City by AUi on April 5 and May 9, 20 12 (see Attachment I).
Contract quantities and un it costs are revised )le{ th is change order as shown in Table l (attached).
M/WBE participation goal for the project remains unchanged at 13 .00o/o ,
TOT AL COST FOR CHANGE ORDER NUMBER 2
It i s oltdorstood and aarocd that the acctp1 .. co of this Ch•n• Order hy tho contrutor c:onstit11tcs Aft •~~ord 11nd satlsfa.cti oo
and rcprcsc.ets paym«1l in lu.U {bo(h in time and PWttC)') (o r all •ods ari:1io1 o•t of, or incidcnt •l to, tk Cha nce Order.
ORJOINAL CONTRACT TIME
180 days
ADDl110NAL APPROVED TIME TO DATE
30doys
DDITIONAI. TIMI! FOR TlllS CHANGE OROJ!Jl
124 days
DAT6
0.00
5,,r, 1z..
DIRF.CTOIVCOMTRACTINO Dl!PT. ~
S. Frank Crumb. P .E., Water Director
COUN(.1L ACTION (IF ltE:QUTREDJ:
a A.PPROVEI> a DISA.PPROVED 0 Oll!Ell _____ _
FTWl 1231\T:\Digester Removal\Construction Contract Managcmc \Digester Sludge Removal Change Order No. 2.doc
DAT!!
DATE
DATE
DISTRIBUTION :
WHIT8-FJLE
CANARY· CONSTRUCTION FILE
PlNK -PROJECT MANAG ER
GOLDENROD -CONTRACTOR
CITY OF FORT WORTH
CHANGE ORDER REQUEST
CHANGE ORDER NO . 2 I DATE: 5/1 0/12 I D.O E. NO. I PROJECT NO. WTR-2010 -200051
PROJECT DESCRIPTION; Riverside Wastewater Tre atment Plan Diges ter Sludge Treatment, Removal, and Disposal Project I CITY SE CRETARY CO NTRACT NO .
42 205
ORIGINAL CONTRACT AMOUNT .............................................................. S ___ ___,,SscS,.,,25""5"'.04"""0 ""00
EXTRAS TO DATE .............................................................. $. ______ .,..,$0..,00.,.
CREDITS TO DATE ............................................................. $ $762.00
CONTRA CT COST TO DATE .................................................................................................................................................................................................... $, ___ ~5..,2""-Sw_too
AMOU NT OF PROPOSED CHANGE ORDER ............................................................................................................................................................................ $ _____ ...,2«.93"-''"'-"so
REVISED CONTRACT AMOUNT ............................................................................................................................................................................................... $ ___ ~5-25~4-.S~7~1.=S0
ORIGlNAL FUNDS AVAILABLE FOR CHANGE ORDERS ...................................................................................................................................................... $ 76200
ADDITIONAL FUNDING (]F NECESSARY) .............................................................................................................................................................................. $. ______ =
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER .................................................................................................................................................... $ _____ ~46=8=5=0
IN ACCORDANCE WITH rms CHANGE ORDER, TIIE CONTRAC TOR SHALL:
Complete all portions of the contract work as approved in th e orig inal contract do cuments 1111d Change Order No. I.
Schedule of completion is revised per this change order as described in supporting docum enting submitted to City by AUl on Apr il 5 and May 9, 20 12 (sec Attachm ent I).
Contract quantities and unit costs are revised per thi s change order as shown in Table 1 (attached).
M/WBE participation goal for the proj ect remnins unchanged at 13.00%.
TOTAL COST FOR CHANGE ORDER NUMBER 2
ll i, olldo nitood and agrocd that the acetplHCO of thb Chang,o Order by th o contractor con.sti hlt cs a11 accord Qll d satisfa ctioo
and reprcsi;nts pa)'l1wat io fu.U (boch in time and ~icy) (or all cods arising o•t of, or incident al to, tk Ch ange Order .
$
OJUOJNAL CONTRACT 11ME
180 days
ADDITIONALAPPROVBDTIMB TO DATE
30 days
DDITIONA I. TIMF. FOR nus CHANGE OROE!t
124 days
CONTRACTOR _ ,;":f,/~ -
AUi Contractors, Inc . /./;y··/" 7 /~
DATE DlRECTOMl DATE 5'-1!i _,,._
CITY ATTORNI!'< .
\ ",, ' ( ",< Christa Reynolds, Senior sistant City Attorney ·l,
DATB DATll s
COUNUL ACTIO N (IF REQIJIRE.D): DATE
/'~ a AIPROVBI> a DISAPPROVED a OTllEk ______ _
FTWI 1231\T:\Digester Removal\Construction Contract Manage !\Digester Sludge Removal Change Order No. 2.doc
0.00
I
I
,,----------~---------~-----~
DISTRIBUTION :
WHITE-FILE
CANARY -CONSTRUCTION FILE
PlN)( -PROJECT MANAG ER
GOLDENROD -CON1RACTOR
CITY OF FORT WORTH
CHANGE ORDER REQUEST
CHANGE ORDER NO . 2 I DATE; 5/10/12 I D.O .E. NO. I PROJECT NO. WTR-2010-200051
PROJECT DESCRIPTION; Riverside Wastewater Treatment Plan Digester Sludge Treatment, Removal, and Disposal Proje,;t I CITY SECRETARY CONTRACT NO.
42205
ORIGINAL CONTRACT AMOUNT .............................................................. $ ___ ~$ .. S""2""5.,,,S,.,,.04:u0~.00.,.
EXTRAS TO DATE ........................................................... S ______ ...,$0.,.,00.,,.
CREDITS TO DA TE ............................................................. $. _____ __..$ .... 76..,2..,00.,.
CONTRACT<..'OSTTO DATE ............................................................. . .. ....................................................................................................................... $ ____ 5-2~54..21.t®
AMOUNT OF PROPOSED CHA NOE ORDER ............................................................................................................................................................................ $ _____ ~2=93=·=50
REVISED CONTRACT AMOUNT ............................................................................................................................................................................................... $ ___ ~5-25~4..,.5=7..,1.=SO
ORIGINAL FUNDS AV All.ABLE FOR CHANGE ORDERS ..................................................................................................................................................... $ 76200
ADDmONAL JUNDING (JF NECESSARY) .............................................................................................................................................................................. $. ______ ~-0~-
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER ................................................................................................................................................... $. _____ ~468=50""
IN ACCORDANCE WITH THIS CHANGE ORDER, TIIB CONTRACTOR SHALL:
Complete oil portions of the contract work as approved in the original contract documents and Change Order No . I.
Schedule of completion is revised per this change order as described in supporting documenting submitted to City by AUi on April 5 and May 9, 20 12 (see Attachm ent I).
Contract quantities and unit costs are revised per this change order as shown in Table l (attached).
M/WBE participation goal for the project remains unchanged at 13 .00%.
/'
(
} I ---
TOT AL COST FOR CHANGE ORDER NUMBF.Jl 2
It i s oadoralood and a,roed that the ac«plHCO 0£ this Chan,o Order b)' tho contractor cons1ihltc, H H$0rd and u tis (action
•nd NIPl'OScatl i,.,yttWOl in f\aU {bolh in time ind mottoy) fo r all 40IIJ •ri1la1 end of, or incidat•l to, tk Cflaqe Order .
ORIOINAL CONT1tACT mm
180 days
ADDmONALAPPRm'BD TIMB TO DA11l
30 days
DDITIONA!, TIMI! FOil llllS (:HANGS ORDllJl
124 days
DAT6
0.00
CONTRACTOR .. ,;7,/ ~ .
AUI Contractors, Inc .. /-.-/,,···;/ /' /~ 5,,.r, 1t
DATE DIRECTOR/M DATE
DIRECTOIVCONTRACTINO Dl!PT. DATIi I I, CflY ATIORNl!Y
Christa Reynolds, Senior Assistant City Attorney
DATB
DATE COUN(.1L ACTIO N (IF llEQUIRED): DATE
/-a APPROVED Q DISAPPROVED O OlllER _______ ·-··
4055 Inte rnational Plaza , Suite 200 • Fort W orth, Texa s 76109 • 817-735 -7300 • fax 817 -735-7491 • www.freese.com
May 10, 2012
Mr. Richard Talley
Regulatory/Environmental Coordinator
City of Fort Worth Water Department
P. 0.Box870
Fort Worth, Texas 76101-0870
Re: City of Fort Worth
Riverside Wastewater Treatment Plan Digester Sludge Treatment, Removal, and Disposal
Project
FN1 Project No. FTWl 1231
Change Order Request No. 2 (C0-02)
Dear Mr. Talley:
Enclosed please find a copy of Change Order No. 2 for work to be performed by AUI Contractors,
Inc. on the above referenced project.
This change order increases the overall contract value by $293.50 to $5,254,571.50. The purpose of
this change order is to amend the contract quantities for liquid treatment and sludge disposal and
extend the contract time for the project by 124 calendar days due to inclement weather and additional
liquid treatment processing time. These revisions are a result of Change Order No. 1 and the use of a
belt press in the removal process.
Robert W. Chambers, P.G.
Principal
Enclosure
cc : Fil e
FTW 11231\C:\Users\02171\AppDatalLocal\Microsoft\Windows\Temporary Internet Rles\Content.Outtook\TVQIV5RB\Change Order No 2 Submittal
Letter.doc
Riverside Wastewater Treatment Plant Digester Sludge Treatment, Removal, and Disposal Project
AUi Original Contract vs. Value Engineering Modification
$90.00 80
58 $35 .00 $2,030.00 0 $35.00
58 $40.00 $2,320.00 0 Samples $40.00 $0 .00
Aqueous Sludge/liquid Removal, Treatment, & Disposal 750,000 Gallons $0.25 $187,500.00 2,800,000 Gallons $0.25 $700,000 .00
Class F FJyash 2,500 Tons $49.00 $122,500.00 3,010 Tons $49.00 $147,490.00
Transportation of Stabilizaed Solid Sludge/Contaminated Debris to Disposal Site 23,500 Tons $27 .00 $634,500.00 22 ,750 Tons $27.00 $614,250.00
Stabilized Sludge/Contaminated Debris Disposal 23,500 Tons $80.25 $1,885,875.00 22 ,750 Tons $80.25 $1,825,687 .so
Utilize belt press method for sludge solidification. 8 Di esters $114,920.38 $919,363.00 8 Digesters $48 ,985.00 $391 ,880 .00
RUSH Water Testing (PCB, Metals, Cyanide) N/A N/A NIA S0.00 176 Samples $474.00 $83,424.00
1 Quanriries for bid items shown In green revised per Change Order No. 1. Total Change Order Amount:
RIVERSIDE WWTP • DIGESTER SLUDGE REMOVAL
DAY OF THE MONTH TOTAL
MONTH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DAYS
2011
September
October
November
December
2012
January
February
March
I I I I I I I I I I I I I I I I I 11 1 1111111 1 11 1 1 i I
11 1 1 1 1 1 11 1 1 11 1 1 1111 111 1 11 1 1 11 1 1 1: I
TOTAL CONTRACT RAIN DAYS 54 I
NOTE: Precipitation can be verified at www.wunderground.com
WORK ACTIVITY
DIGESTER&
Remove/treat water
Install fly ash
Transport sol ids to landfill
Demo
Fi ll dirt & regrade
DIGESTER 7
Remove/treat water
Install fly ash/cure
Transport solids to landfill
Demo
Fill dirt & regrade
DIGESTER 6
Remove/treat water
Install fly ash/cure
Transport solids to landfill
Demo
Fill dirt & regrade
DIGESTERS
Remove/treat water
Install f ly ash/cure
Transport sol ids to landfill
Demo
Fi ll dirt & regrade
D1GESTER4
Remove/treat water
Install fly ash/cu re
Transport solids to landfill
Demo
Fill dirt & regrade
RIVERSIDE WWTP -DIGESTER SLUDGE REMOVAL
APRIL MAY JUNE JULY AUGUST
WEEK WEEK WEEK WEEK WEEK
1 2 I 4 1 2 I'' 4 s 1 2 r s 4 1 z I 4 1 z • 4
I I I I I I I 1 11 1 111111111 1 1
I I I I I I I 11 1 11 1 11 1 1 1 1 1 1 1
I I I I I I I 1 1 11111 1 1111 1 11
I I I I I I I 1 1 11 1 11 1 1111 1 11
APRIL I MAY JUNE JULY I AUGUST I
DIGESTER 3
R,mo,rejt,.,t watec I
Install fly ash/cure
T""'port rol~, to laodflll
Demo
Fill dirt & regrade
DIGESTER2
Remo,e/t"at watec I
Install fly ash/cure
T""'port rolld, to 1,"dflll
Demo
Fill dirt & regrade
DIGESTER l
R,m~ejtreat =te, I
Install fly ash/cure
T ""'Port ,oHd, to laodfill
Demo
Fill dirt & regrade
111111111111111 I I I I I I
111111111111111 I I I I I I
111111111111111 I I I I I I
RIVERSIDE WWTP -DIGESTER SLUDGE REMOVAL
WATER PROCESSING
CONTRACT QUANTITIES ACTUAL QUANTITIES
Estimated Quantities Total Gallons -per #8 I 600000 I GAL I 2800000 1 GAL
Estimated Per Digester Actual Per Digester I 750001 GAL I 3500001 GAL
Processing Speed Processing Speed I 400001 Ga l per Day I 400001 Ga l pe r Day I
Total Days per Digester Total Days per Digester
I 2 I Days I 9 I Days
NOTE: (8 Digesters x 7 extra days per digester to process = 56 days
of overall extra water processing time)
•
RIVERSIDE WWTP-BELT PRESS COST
(5-09-12)
ITEM TIME UOM UNIT$
Belt Press -2M Unit (Jan 2012 -Aug 2012) 8 MO $ 15,100
Belt Press Mobilization (1 in/ 1 out) 1 EA $ 3,750
Replace Hoses & Belt on Press incl labor 1 EA $ 33,475
SOOOW Generator (1 ea x 8mo) 8 MO $ 1,650
Fuel for Generator (60gal/day) x lea 10560 GAL $ 3.95
Belt Press Certified Operators 8 MO $ 15,588
(4m x 40hrs/wk@ $22.50/hr)
Hydraulic Trash Pumps 8 MO $ 1,775
Misc. Piping & Hoses 1 LS $ 4,411
GRAND TOTAL COST
MARKUP (10%)
TOTAL w/ MARKUP
Sample Collection (Liquid & Solid Samples) 256 EA $ 55
PCB Analysis 80 EA $ 90
Total RCRA Metal Analysis 80 EA $ 35
Rush Water Testing (PCB, Metals, Cyanide) 176 EA $ 427
Aqueous Sludge Treatment 2,050,000 EA $ 0.25
(2,800,000 -750,000gallons)
EXTENSION
$ 120,800
$ 3,750
$ 33,475
$ 13,200
$ 41,712
$ 124,704
$ 14,200
$ 4,411
$ 356,252
$ 35,625
$ 391,877
$ 14,080
$ 7,200
$ 2,800
$ 75,082
$ 512,500
r ,.
FORT WORTH
TO: Richard Talley, Water Department
DATE: August 20, 2012
FROM: Stephanie Mills, Administrative Technician, City Secretary's Office
SUBJECT: CONTRACT NUMBERED INCORRECTLY -HAS BEEN CORRECTED
On May 23 , 2012 , Change Order No. 2 to City Secretary Contract 42205 was incorrectly numbered
as Change Order No. 3 .
This mistake was found and corrected on August 20, 2012 .
I have included corrected copies of this contract for distribution.
Thank you for your attention to this matter,
Stephanie Mills
City Secretary's Office