Loading...
HomeMy WebLinkAboutContract 42246-A1~,:v 4ZZ4(g -r+ I FIRST AMENDMENT TO CITY SECRET ARY CONTRACT NO. 42246 WHEREAS , on August 23 , 2011 , the City of Fort Worth ("City") and Peachtree Construction , Ltd. ("Contractor") made and entered into City Secretary Contract No . 42246 (the "Contra c t") for the HMA C Surface Overla y 2011-8 CDB G -Infra stru cture Proj ect/2010 Street Reconstruction Project to Recon struct Residential Streets ("Proj ect "); and WHEREAS, the Project is being funded with C ity grant monies from the United States Department of Housing and Urban Development ("HUD") through the Community Development Block Grant Program ("CDBG"), Program No .B-1O-MC-48-0010 , Catalog of Federal Domestic Assistance No . 14 .218; and WHEREAS, the City discovered that incorrect wage determinations classified as "Heavy and Highway" were provided to the Contractor and included in Section 4 of the contract documents ; and WHEREAS, City and Contractor desire to amend the contract by revising applicable certified payrolls and invoices to comply with the required prevailing wage rates. In order for this contract amount to not exceed $1,296,950.00, the scope of work may be reduced. NOW, THEREFORE, the Parties , do hereby agree as follows: I. a. Contract No . 42246 , Table of Contents, Section 4, "Prevailing Wage Rates" is deleted in its entirety and replaced with the attached wage determination rates classified as "Highway" construction type. b. This amendment is effective immediately and the proper wage rate classification shall be retroactive and applied back to August 23, 2011. II . a . All other terms and conditions of the Contract not amended herein remain unaffected and in full force and effect, are binding on the Parties and are hereby ratified by the Parties. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] CONTRACT AMENDMENT CSC NO . 42246 HMAC SURFACE OVERLAY 2011-8 CDBG 06-19-12 All :06 IN OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 TN WITNESS TH E R E O F , th e C ity of Fo rt Worth has ca u se d thi s a m e ndm e nt to b e s ig ned in it s n a m e and on it s b e half by th e A ss is ta nt C ity Manager and a tteste d b y it s Secre ta ry , with th e c orporate se al of th e C ity of Fort Worth affi x ed hereto . The C ontractor ha s ex e cute d thi s in strum e nt through it s dul y authori ze d officers with its c orporate seal affi x ed hereto . D o ne in Fo rt Worth , Tex a s, thi s th e _Jj_ da y of Ju t'.\.R, 20 I 2 . AL REC OMM E NDE D: l).W DOUGL SW. WIERSIG, P.E . DIREC TOR, DEPARTMENT TRANPORTA TI ON/PUBLIC WORKS CONTRACTOR Peachtree Construction, Ltd. BY l 11 _ L PRESIDENT TITLE 5801 Park Vista Circle Keller, TX 76244 ADDRESS CONTRACT AMENDMENT CSC NO . 42246 HMAC SURFACE OVERLAY 2011-8 CDBG C ITY O F F ORT WORTH ~CL- FERNANDO COST A , ASSISTANT CITY MANAGER ATTEST: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 2 -' TX100043 MOD 1 REVISED 09/16/11 TX43 ******** T HIS WAGE DETERMINATION WAS REPLACED ON 09/16/11******** General Decision Number: TX100043 08/27/2010 Superseded General Decision Number: TX 20080043 State: Texas Construction Types : Heavy and Highway Counties: Collin , Dallas, Denton, Ellis, Grayson , Johnson, Kaufman , Parker , Rockwal l, Tarrant and Wichita Counties in Texas. HEAVY CONS TRUCTION -WICHITA COUNTY ONLY; HIGHWAY CONST RUCTION -ALL COUNTIES Modification Number 0 1 Publication Date 03/12/2010 08/27/2010 * SUTX2004 -004 11/09/2004 Rates Air Tool Operator ................ $ 10.06 Asphalt Distributor Operator ..... $ 13.99 Asphalt paving machine operator ......................... $ 1 2 . 78 Asphalt Raker .................... $ 11.0 1 Asphalt Shoveler ................. $ 8 .80 Batching Plant Weigher ........... $ 1 4 .15 Broom or Sweeper Ope rator ........ $ 9.88 Bulldozer o perator ............... $ 13.22 CARPENTER ........................ $ 1 2. 80 Concrete Finisher , Paving ........ $ 12 .85 Co ncrete Finisher, Structures .... $ 13 .27 Concrete Paving Curbing Machine Operator ................. $ 12.00 Concrete Paving Finishing Maching Operator ................. $ 13 .63 Concrete Paving Joint Sealer Operator ......................... $ 12 .50 Co ncret e Paving Saw Operator ..... $ 13.56 Fri nges 0 .0 0 0.00 0.00 0 .0 0 0.00 0.00 0 .00 0 .00 0 .00 0 .00 0.00 0.00 0 .00 0 .00 0 .00 http ://www.wdol.gov /wdol/scafi les /archive/davisbacon/201 O/tx43 .r 1 Page 1 of 4 5/17/2012 ; Concrete Paving Spreader Operator ......................... $ 14.50 Concrete Rubber .................. $ 1 0 .61 Crane, Clamshe l l , Backhoe , Derrick , Dragl i ne , Shovel Operator ......................... $ 14 .12 ELE CTRICI AN ...................... $ 18.12 Flagger .......................... $ 8.43 Form Builde r /Setter , Structure s ....................... S 11. 63 Form Setter, Paving & Curb ....... $ 11.83 Foundation Drill Operator , Crawler Mounted .................. $ 13.67 Foundation Drill Operat o r , Truck Mounted .................... $ 16 .30 Front End Loader Operator ........ $ 12.62 Laborer, comm o n .................. $ 9.18 Laborer , Utility ................. $ 1 0 .65 ME CHANI C ......................... $ 16 . 97 Milling Ma chi ne Operat o r , Fine Grade ....................... $ 11 .83 Mixer operator ................... $ 11 .58 Mot or Grader Ope rat or , Fine Grade ............................ $ 15.20 Mo to r Grader Operator , Rough ..... $ 1 4.50 Oiler ............................ $ 14.98 Painter, Structures .............. $ 13 .17 Pavement Marking Machine Operator .. , ...................... $ 10, 04 Pipe layer ........................ S 11 . 04 Reinforcing Steel Setter , Paving ........................... $ 14 .86 Reinforcing Steel Sette r , Structure ........................ $ 16.29 Roller Ope rator , Pn euma tic , Self -P r opel led ................... $ 11.07 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 htt p://www .wdol.gov/wdol /sc afile s/archive /davi sbacon /201O /t x4 3 .r I Page 2 of 4 5/17 /201 2 .. Roller Ope rat or , Steel Wheel, Flat Whee l/Tamping ............... $ 10.92 Roller Operator , Steel Wheel, Plant Mix Paveme n t ............... $ 1 1 .28 Scraper Operator ................. $ 1 1 .42 Servicer ......................... $ 1 2 . 32 Slip Form Machine Operator ....... $ 12 .33 Spreader Box o perator ............ $ 10 .92 Tractor operator , Crawler Type ... $ 12.60 Tractor operator , Pneumatic ...... $ 1 2.9 1 Traveling Mixer Ope r ator ......... $ 12.03 Truck driver , lowboy -Float ....... $ 14.93 Truck driver , Single Axle , Heavy ............................ $ 11.47 Truck driver, Single Axle , Light ............................ $ 10.91 Truck Driver , Tandem Axle , Semi -Trailer ..................... $ 11.75 Truck Driver , Transit -Mix ........ $ 1 2 .08 Wagon Drill , Boring Ma c hine , Post Hole Driller Operator ....... $ 14.00 WELDER ........................... $ 13. 5 7 Work Zone Barricade Service r ..... $ 10 .09 0.00 0 .00 0 .00 0 .00 0.00 0.00 0 .00 0.00 0 .00 0.00 0 .00 0.00 0.00 0.00 0 .00 0.00 0 .00 Unlisted classificat ions needed f or work n ot included wit hin the scope o f the classifications listed may be added afte r award only as provided in the labor standards co ntract c lauses (29CFR 5 .5 (a) (1) (ii)). In the listing above , the "SU " designation means that ra te s listed under the identifier do not reflect co l lectivel y bargained wage and fr inge benefit r ates . Ot h er designations indicate unions whose rates have been determi ned to be prevailing . WAGE DETER MINATI ON APPEALS PROCESS 1 .) Has there been an initial decisi on in the matter? This can be: http ://www .wdol.gov/wdol/scafiles/archive/davisbacon/2010/tx43 .rl Page 3 of 4 5/17 /2 012 * * * * an existing pub li shed wa ge determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter a conformance (add i t i o n al classificati o n and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys , should b e wi th the Wage and Hour Regional Office for the area in wh ich the surv e y was conducted because those Regional Of fi ce s have respon sibi lity fo r t he Davis -Ba con s urvey program. If the response fr om thi s initial contact is not satisfactory , then the process described in 2.) and 3.) should be followed . With regard to any other matter not yet ripe for the formal pro cess described here, initial contact should be with the Branch of Const ru ction Wage Determinations. Write t o : Branch of Co ns t r uction Wage Determinations Wage and Hour Division U .S. Department of Labor 200 Constitution Avenue, N.W . Washington , DC 20210 2 .) If the answer to the question in 1.) i s yes, then an interested p a rty (those affected by the action) can request review and reconsideration f r o m the Wage and Hour Administrat o r (See 29 C FR Part 1 .8 a nd 29 CFR Part 7). Write t o : Wage and Hour Administrator U.S . Depart ment of Labor 200 Co nstitution Avenue, N.W. Washington , DC 20210 The request should be accompanied by a full statement o f the int erested party 's position and by any information (wage payment data , project description, area practice material, etc.) that the requestor considers relevant to the issue. 3 .) If the decision o f t he Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U .S. De pa rtment of Labor 200 Constitution Avenue , N.W. Washing t on , DC 20210 4.) Al l decisions by the Administrative Revi e w Board are final. END OF GENERAL DECISION http://www . wdol .gov/wdol/scafiles/arc hive/d avisbacon/201O /tx 43 .r I Page 4 of 4 5/17/2012