HomeMy WebLinkAboutContract 42286-CO1FORT WORTH . ----..,..---City of Fort Worth
Change Order Request
Project Name! Summercrest Ct Drainage Improvements
Cl ient Project #(s)! P227-541200-203280102383 (DOE# 6000)
CITY SECRETARY
CONTRACT NO. L\a29$'.Le -CQ\
City Sec # 42286 .__ _____ ___,
Install new storm drain system and P.O.L. from Briarhaven@ Summercrest to Sarita Rd . to existing concrete culvert and Project Description from Summercrest@ Briarhaven to Cloudview ; then from 3928 Trails Edge Rd . to Arroyo Rd .
Contractor! RKM Utility Services , Inc . Change Order # Date 2/13/2012
City Inspector Joe Rogers City Project Mgr.! Michael Owen ____________ ___,
Dept. TPW Water Sewer
Original Contract Amount $741 ,269 .00
Extras to Date
Credits to Date
Pend ing Change Orders (in M&C Process)
Contract Cost to Date $741 ,269 .00
!Amount of Proposed Change Order $4 ,300.00 $0.00 $0.00
Revised Contract Amount $745 ,569 .00
Original Funds Available for Change Orders $25 ,000 .00
Remaining Funds Ava ilable fo r this CO $25 ,000 .00
Additiona l Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$741 ,269 .00 180
$741 ,269 .00 180
$4 ,300 .00 2
$745 ,569.00 182
$25 ,000.00
$25 ,000 .00
0.58%
$926 ,586 .25
Removed and replaced 4-6 " and 1-15" RCP storm dra ins (pr ivate system) which were not shown on plans . Removed and rep laced by re-routing
(behind new curb inlet) a 4" sanitary serv ice which was in conflict with new storm drain pipi ng and installed 2 way clean-out at 3820 Trails Edge
Rd .
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Date
~/1 °1 /cl..l.
Date
~:===l=~~~~~~~~~-+-___;;-=-~f--=-l~~~~~=-=~::..:.Ll-~+-~~--1 ~~
l-~~~~:::::......,--~~~~~~--+J..::&..~~,M-.-=~~~~~~~=---=:;_--14,;>-1-=-..:..,....:.:..::..:::~G~ ~~~~~~~---+-:-:-~~~~~~ilti"""11:~~~~~/
M&C Number
FORT WORTH -----,....--
Project Name
Client Project#
City of Fort Worth
Change Order Additions
Summercrest Ct Drainage Improvements
P227-541200-203280102383 (DOE# 6000)
City Sec#
Install new storm drain system and P.O.L. from Briarhaven@ Summercrest to Sarita Rd . to existing concrete culvert and from
Summercrest @ Briarhaven to Cloudview ; then from 3928 Trails Edge Rd . to Arroyo Rd .
RKM Utility Services , Inc . Change Order# I 1 Date 2/13/2012
42286
Project Description
Contractor
City Project Mgr. Michael Owen City Inspector!,_ _J_oe_Ro_,,g'-e_rs ________ __.
ADDITIONS
11 t.M Uc:vvn.1r I IUN Ut.t"' I Wty Unit un1t cost IOtal
oU o· t"'Vv drain pipe -t<emove and replace I t"'VV 4.UU t:A ~ouu .uu $£,UUU .UU
01 1 o" K~I-' pipe tie into new 4£" t<CI-' pipe fPW 1.UU EA $800 .UU $1:lUU .uu
0£ 4" ::;ewer ::;erv1ce wt L way cto-route behind Curo Inlet-Jl:lLU I rails t:dge fPW 1.UU EA $1 ,oUU .UU $1 ,0UU .UU
Change Order Additions Page 1 of 2
TPW $4 ,300 .00
Water $0 .00
Sewer $0 .00
Sub Total Add 1t1ons $4 ,JUU .UU
Change Order Additions Page 2 of 2
FORT WORTH ---..,.....--City of Fort Worth
Change Order Deletions
Project Name Summercrest Ct Drainage Improvements City Sec#
Client Project# P227 -541200-203280102383 (DOE# 6000)
Install new storm drain system and P.O.L. from Briarhaven @ Summercrest to Sarita Rd . to existing concrete culvert and from
Summercrest@ Briarhaven to Cloudview ; then from 3928 Trails Edge Rd. to Arroyo Rd .
RKM Utility Services , Inc . Change Order# I 1 Date 2/13/2012
42286
Project Description
Contractor
City Project Mgr . Michael Owen City Inspector .__J_oe_Ro_,g._e_rs ________ ____.
DELETIONS
111::.M Ul::.~(.;Klt-' I IUN Ut:r' I Qty Unit Unit 1.,;ost IOtal
Change Order Deletions Page 1 of 2
TPW $0.00
Water $0 .00
Sewer $0 .00
Sub Total Deletions
Change Order Deletions Page 2 of 2
, • l •
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
PROJECT SUMMARY SHEET
(Change Order Attachment)
PROJECT NAME : Summercrest Court Drainage Improvements
BuySpeed No (T/PW):
City Project No :
Contract No :
D.O .E. No :
Attachment to Change Order No :
Today's Date :
Original Contract Amount:
Extras to Date :
Credits to Date :
Contract Amount to Date :
P0-12-00068844
01023
CS42286
6000
1
3/7/12
Amount of Proposed Change Order:
Revised Contract Amount:
Contingency Funds Avail. for Admin . Change Orders :
Remaining Funds Available for Change Orders:
Additional Funding (if necessary):
Original M & C approved 08-09-11, C-25094
TOTAL
$ 741,269.00
$
$
$ 741,269.00
$ 4,300.00
$ 745,569.00
$ 25,000.00
$ 25,000.00
$
Prepared By : Christy Ezernack T/PW Construction Services
City of Fort Worth
Change Order Request
l.\dd 'g (.p-( 0 \
Project Name! Summercrest Ct Drainage Improvements City Sec# 42286 ~-----~
Cl ient Project #(s)j P227-541200-203280102383 (DOE# 6000)
Install new storm drain system and P.O.L. from Briarhaven @ Summercrest to Sarita Rd . to existing concrete culvert and Project Description from Summercrest@ Br iarhaven to Cloudview ; then from 3928 Trails Edge Rd . to Arroyo Rd .
Contractor! RKM Utility Services , Inc . Change Order # Date 2/13/2012
City Project Mgr.! Michael Owen City Inspector Joe Rogers ,.__ _ ___;; _________ ___.
Dept. TPW Water Sewer
Original Contract Amount $741 ,269 .00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process )
Contract Cost to Date $741 ,269 .00
IAmount of Proposed Change Order $4,300.00 $0.00 $0.00
Revised Contract Amount $745 ,569 .00
Original Funds Available for Change Orders $25 ,000 .00
Remaining Funds Available for th is CO $25 ,000.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$741 ,269.00 180
$741 ,269 .00 180
$4 ,300.00 2
$745 ,569 .00 182
$25 ,000 .00
$25 ,000 .00
0.58%
$926 ,586 .25
Removed and replaced 4-6" and 1-15 " RCP storm drains (private system) which were not shown on plans . Removed and rep laced by re-routing
(behind new curb inlet) a 4" sanitary service which was in conflict with new storm drain piping and installed 2 way clean-out at 3820 Trails Edge
Rd .
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Date Date
5 .J."j/
Date
Date
,I. '.1. 12
M&C Number Nit,. M&C Date Approved
t\}
\
FORT WORTH .
~
City of Fort Worth
Change Order Request
Project Namel Summercrest Ct Drainage Improvements
Client Project #(s)I P227-541200-203280102383 (DOE# 6000)
City Sec# 42286 ______ ___.
Install new storm drain system and P.O.L. from Briarhaven @ Summercrest to Sarita Rd. to existing concrete culvert and Project Description from Summercrest@ Briarhaven to Cloudview ; then from 3928 Trails Edge Rd . to Arroyo Rd .
Contractor! RKM Utility Services , Inc . Change Order# Date 2/13/2012
City Project Mgr. I Michael Owen City Inspector ~J_oe_Ro~g_e_rs ________ ___,
Dept. TPW Water Sewer
Original Contract Amount $741 ,269 .00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $741 ,269 .00
!Amount of Proposed Change Order $4,300.00 $0 .00 $0.00
Revised Contract Amount $745 ,569 .00
Original Funds Available for Change Orders $25 ,000 .00
Remaining Funds Available for this CO $25 ,000 .00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$741 ,269 .00 180
$741 ,269 .00 180
$4,300.00 2
$745 ,569 .00 182
$25 ,000 .00
$25 ,000 .00
0.58%
$926 ,586 .25
Removed and replaced 4-6 " and 1-15 " RCP storm drains (private system) which were not shown on plans . Removed and replaced by re-routing
(behind new curb inlet) a 4" sanitary service which was in conflict with new storm drain piping and installed 2 way clean-out at 3820 Trails Edge
Rd .
I) {J(l0 /
J
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of , or incidental to , the above Change Order .
isor Date Date
'< I J
.. _ / .Jf. /,
Date
I
/ -'/ J/
Date
~ '.J. :12
M&C Number tJI ..
I
t" \ ,.
~ ..
FORT WORTH .
~
1•
City of Fort Worth
Change Order Request
Project Name! Summercrest Ct Drainage Improvements
Client Project #(s)! P227-541200-203280102383 (DOE# 6000)
City Sec # 42286 .__ _____ ___,
Install new storm drain system and P.O.L. from Briarhaven @ Summercrest to Sarita Rd . to existing concrete culvert and Project Description from Summercrest@ Briarhaven to Cloudview ; then from 3928 Trails Edge Rd. to Arroyo Rd .
Contractor! RKM Utility Services , Inc . Change Order# Date 2/13/2012
City Project Mgr. I Michael Owen City Inspector Joe Rogers
'-------'"-------------'
Dept. TPW Water Sewer
Orig inal Contract Amount $741 ,269 .00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $741 ,269 .00
!Amount of Proposed Change Order $4,300.00 $0.00 $0.00
Revised Contract Amount $745 ,569 .00
Original Funds Available for Change Orders $25 ,000 .00
Remaining Funds Available for this CO $25 ,000.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
Totals (CD)
$741 ,269 .00 180
$741 ,269 .00 180
$4,300.00 2
$745 ,569.00 182
$25 ,000 .00
$25,000 .00
0.58%
$926 ,586 .25
Removed and replaced 4-6 " and 1-15" RCP storm drains (private system) which were not shown on plans . Removed and replaced by re-routing
(behind new curb inlet) a 4" sanitary service which was in conflict with new storm drain piping and installed 2 way clean-out at 3820 Trails Edge
Rd .
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to , the above Change Order.
Contractor's Com an Name Contractor Name Contract Si nature Date
RKM Utilit Services , Inc . / J
lnsoector/lnspection Suoervisor Date Project Manager/Program Manager Date
Assistant Director (Dept) Date Director, Contracting Department (Dept) Date
Assistam,6ity Atto.meY Date Assistant City ManaQer Date
// J_ ,J .--,,,,,_. .. ' I ~~ -. -..,/ .. ~ /,I. -
\ _A .J' l
Council Action if reQuired)
M&C Number I /11' I M&C Date Approved I I