Loading...
HomeMy WebLinkAboutContract 43299-CO1fORTWORTH ® ....... ,.....,. .. Arr SE CRETARY CONTRACT NO. ~ 31-CJ~ -CO \ Change Order No . Date City of Fort Worth Change Order Request TPW Project No. Funding (FAG ) One (1) 8/20/12 Brennan Drainage R101-539410-020212009000 Repair : ENV 12-09 BSC Facility and Project Description Repair of French Drain for De-watering the Northern Slope , East of Improved Drainage Channel ORIGINAL CONTRACT AMOUNT ............................................................... . EXTRAS TO DATE .................................................................... . CREDITS TO DATE ................................................................... . City Secretary Contract No . 43299 $ $ $ 4,850.00 0.00 0.00 CONTRACT COST TO DATE.................................................................................................. $ AMOUNT OF PROPOSED CHANGE ORDER ............................................. (ADD)....................... $ BALANCE CONTRACT REMAINING....................................................................................... $ REVISED CONTRACT AMOUNT............................................................................................. $ IN ACCORDANCE WITH THIS CHANGE ORDER , THE CONTRACTOR SHALL: • Provide two additional cleanouts along replaced drainage ; • Cap line from east of collection sump ; 4,833.00 1,212.50 1,229.50 6,062.50 • Provide a bentonite barrier at capped location within the gravel pack surrounding the installed French Drain ; and • Provide an inlet seal into sump and increase the size of the discharge line from 2"0D to 4"0D. All work to be performed in accordance with the Proposal specifications. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to , the above Change Order. Contractor's Name Effective Environmental, Inc (WWW.EFF-ENV.COM) Original Contract Time Addi tional Approved Ti me To Date Approved Contract Time To Date Addit ional Time For Th is Change Order NA NA NA NA Date 8'-JD -/'). Date JO ·lf .J Date 10/t /1 i.. Environmental Supervi - Roger Grantham Assistant Director/ TPW - Michael A . Gange Assistant City Attorne Art N. Bashor ~ Council Action (If Required) D Approved D Disapproved N/A D Othe Date /O•J.-1z. Date Jlr!tt-- .:;.z~~~~~~-----;-OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX