HomeMy WebLinkAboutContract 56483-A2CSC No. 56483-A2
AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 56483
WHEREAS, the City of Fort Worth (CITY) and Teague Nall & Perkins,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 56483,
(the CONTRACT) which was authorized by M&C 21-0756 on the 28th day of
September, 2021 in the amount of $456,745.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in
the amount of $10,440.00 administratively authorized on September 5,
2023; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Historic Southside Improvements; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $7,500.00 (Sewer).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $474,685.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Historic Southside Improvements]
Page 1 of 2 [CPN 102932]
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Dana Bu andoff
Dana Burghdoff (Jan M 202410:08 CST)
Dana Burghdoff
Assistant City Manager
DATE: Jan 19, 2024
APPROVAL RECOMMENDED:
CGc�<irto,�l�eY tta.��fe�
Christopher Harder (Jan 17, 2024 07:02 CST)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
of the date subscribed by the City's
ENGINEER
Teague Nall & Perkins, Inc.
Jonathan Bengfort, P.E.
Director of Engineering
Services, Associate Principal
DATE: 1 /12/2024
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Preeti KC, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Mack (Jan 18, 2024 14:11 CST)
Douglas W. Black
Senior Assistant City Attorney
�44�o�Q
ppF FORT �p
° °Lo�lO
aP,
ATTEST:
*o.-�"
���o=0°°
�
.' /�
d��� �EXA?oa
v
Jannette S. Goodall
City Secretary
M&C : N/A
Date: N/A
Form 1295: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 2 of 2
[Historic Southside Improvements]
[CPN 1029321
Contract Amendment No. 2
To: Preeti KC, PE — City of Fort Worth
From: Jonathan Bengfort, CFM, PE
CC: Jessica Hilscher, PE; Ryan Jones, PE
Date: October 26, 2023
RE: Additional Professional Services
Historic Southside Improvements (Project No. 102932)
�tnp
1W I Iwww.tnpinc.com
engineers
surveyors
landscape architects
TEXAS
FORT WORTH
DENTON
ALLEN
HEATH
KATY
GEORGIA
BLAIRSVILLE
Preeti, per the City's request, we offer this contract amendment for additional sanitary sewer design
services associated with the Historic Southside Improvements project. The City has requested TNP to
expand the scope of the project to include additional sewer line replacement along Vickery Blvd from
IH35 frontage road to approximately 150 ft east of Missouri Ave. The additional efforts associated
with this contract amendment include the following:
SEWER - 300 LF
1. Vickery_ Blvd: Final Design and plan preparation for approximately 300 LF of 18" sanitary
sewer line replacement with 8' sanitary sewer. ($7,500)
FEE ADJUSTMENT
Based on the additional effort identified above, TNP is requesting a contract fixed fee amendment
amount of $7,500:
ORIGINAL CONTRACT AMOUNT:
CONTRACT AMENDMENT #1 AMOUNT:
CONTRACT AMENDMENT #2 AMOUNT:
TOTAL REVISED CONTRACT AMOUNT:
Sincerely,
tnp
League nail & perkins
Jonathan Beng ort, P.E.
$456,745.00
Lump Sum Services
$10,440.00
Lump Sum Services
$7,500.00
Lump Sum Services
$474,685.00
Lump Sum Services
TNP Firm * Registrations
Texas Board of Professional Engineers and Land Surveyors I Engineering Firm No. F-230 I Surveying Firm No. 1001 1600 1 101 94381 1 10011601
Georgia Board of Professional Engineers Firm No. PEF007431 I Texas Board of Architectural Examiners Firm No. BR 2673
Level of Effort Spreadsheet
AMENDMENT 2-TASK/HOUR BREAKDOWN
Water Department Additional Design Services for (Vickery Blvd 18" Sanitary Sewer)
HISTORIC SOUTHSIDE IMPROVEMENTS
City Project No. 102932
Labor (hours) Survey Survey
Project Project �
-
Task No. Task Description Principal Manager Engineer
Rate EIT CADD I RPLS I SUE Crew Total
5250 $175 $160 E7:
I4.0 —al ueslgn 0 4 a 1
I Sewer Design Final Construction Plans and Specs
4.2 IVickery Blvd 18" SS Replacement (300 LF) 1
I !
Totals 0 4
1
I Sub consultant Expense
Labor Cost! Subconsultant Total Expense Task Sub Total %Complete Remaining
Reprotluelion I Cost Budget
I MWBE INon-MWBEI
$7,5061 0% $7.500
E7,500 0%
$7,500
Project Summary
1 Total Hours
52
Total Labor
$7,500
1 Total Expense
$0
MNUBE Subconsultanf
$0
1 Non-MIWBE Subconsultanf
$0
1 5% Sub Markup
$0.00
MBE/SBE Participation
0.0%
I Total Project Cost
$7,500
Design Services
LOE Spreadsheet - Amendment 2