HomeMy WebLinkAboutContract 56972-A2CSC No. 56972-A2
AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 56972
WHEREAS, the City of Fort Worth (CITY) and Plummer Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 56972,
(the CONTRACT) which was authorized by M&C 21-0995 on the 14t' day of
December, 2021 in the amount of $405,642.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in
the amount of $49,464.00 administratively authorized on October 2, 2023;
and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2020, WSM-I; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $8,540.00 (Water).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $463,646.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 1 of 2
[W&SS Repl. Contract 2020, WSM-I]
[CPN: 1034201
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort worth
7;14C4.__
Fernando Costa
Assistant City Manager
DATE: Jan 22, 2024
APPROVAL RECOMMENDED:
I-aum R Wilson, for CH
Laura R Wilson, for CH (Jan 19, 202413:36 CST)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Plummer Associates, Inc.
/,&b
Lna,4,�
Clete Martin, P.E.
Principal
DATE: 01 1 1 R f ?i 0 z y
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Liam Con I on
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Mack (Jan 22, 2024 10:52 CST)
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
q �xXTu
yb0°FORTdd
�0
o
Jannette S. Goodall
o
��° .
a�a�
City Secretary
nEaA5app
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 2 of 2
M&C: N/A
Date: N/A
Form 1295 N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
[W&SS Repl. Contract 2020, WSM-I]
[CPN: 1034201
7t
PLUMMER
7�W
December 11, 2023
Mr. Liam Conlon
City of Fort Worth
Water Department - Engineering Services Division
311 W. 1011h Street
Fort Worth, Texas 76102
Re: WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020, WSM-I, CPN 103420
Contract Amendment No. 2.
Design Services for Replacement of 8-Inch Waterline.
Plummer Project #0318-072-01
Dear Mr. Conlon:
This Contract Amendment No. 2 is provided for additional service related to Water and Sanitary
Sewer Replacements Contract 2020, WSM-I. The detailed scope is described below. This
amendment is necessary to allow Plummer Associates, Inc (Plummer) to provide additional
design phase services.
The scope of work adds 1,200 linear feet of 8-inch waterline replacement along Willis Dr. to the
intersection with Penrose Ave.
1) Additional Project Management, Design and Coordination of 8-inch Waterline:
a) Perform the design of 1,200 LF of 8-inch Cast Iron pipe to be removed and replaced
in the same trench.
b) Perform the utility coordination review with the City of Fort Worth Utility
Coordinator.
This amendment compensation summary is as follows:
No. Description Amount
1 Additional Design Services (60, 90 and Final) of 8-inch WL $ 8,540.00
Total (Lump Sum) $ 8,540.00
1320 South University Drive, Suite 300
Fort Worth, Texas 76107
Phone 817.806.1700
Fax 817.870.2536
Plummer.com
TBPE Firm No. 13
Page 1 of 2
Conlon
12/11/2023
The following table identifies the original contract, and amendments.
Amount
Original Contract $405,642
Amendment 1 $49,464
Amendment 2 $8,540
Contract Council Approved
Amount
$405,642 12/14/2021
$455,106 10/02/2023
$463,646
We anticipate completing the additional design effort in two months after the signing of this
amendment.
If you have any questions concerning this Amendment, please let me know.
Sincerely yours,
Geovge fah
George I Farah, P.E., TX 97448
Project Manager
Plummer Associates, Inc.
cc: Clete Martin, P.E. Principal in Charge, Plummer Associates, Inc.
Page 2 of 2
F:\projects\0318\072-01\1 Contracts\1-1 Client\Amendment 2\Amendment_Itr 2.docx
Task No. Task Description
1.0 Project Management
1.1 ManaginIthe Team
1.1.1 Internal Team Plummer Coordination
1.1.2 CA/QC
1.2 Communications and Reporting
1.2.1 Scoping / Pre -Design Coordination Meeting (3)
12 Monthly Project Update Meetings (Design
1.2.2 Phase only) (Not Included)
Design Submittal Review Meetings (3 @ 2 hrs.
1.2.3 ea. 3 ppl) & Notes
1.2.4 Prepare Baseline Schedule
Prepare Monthly Progress Reports with
1.2.5 Schedule (30 Mon 1 hr./mon.)
Prepare onthly MBE/SBE Reports (Not
1.2.6 Included)
1.2.7 Invoicing
1.3 Review and Direct Survey
I
2.0 Conceptual Design (30-Percent)
2.1 Data Collection/Review
2.2 One Site Visit
Subsurface Utility Engineering, and Deliverable
2.3 Review (NOT Included)
2.4 Design Drawings (309/6) (3 new sheets)
2AA Update G-Sheets(7l
2.7 Construction Estima(e
3.1 Preliminary Design Drawings (3 sheets)
Utility Clearance Coordination and Backcheck
3.2 (NOT INCLUDED)
3.3 Contract Documents and Specifications
4.0 Final Design
4.1 Final Draft (90%) Construction Plans
4.3 Final (100%) Plans
4.8 Contract Documents and Specifications Updal
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020, WSM-1
City Project No. 103382 (12/08/2023) Amendment No. 2
abor lhours) Ij I Expense
project Project Project I CADD Admin I Total Labor Cost ISubconsultant INon-MWBE I Travel Reproduction I Total Expense Cost I Task Sub Total
rector Manager Engineer MWBE Sub
01 0 0 0 0 $0 $0 $0 $0 $0 $01 $f
8
2
21 6
21 12
1 2I 3
1 2 3
$1
8.0 ISurvey 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0
8.1 Design Survey Topographic $0 $0 $0
9.0 Permitting 1 01 01 01 0 1 0 $0 $0 $0 $0 $0 $01 $0
Water line Footage
200
100%
I Project Summary
Sewer line Footage
0
"200
0%
Total Hours
39
100%
1 Total Labor $
8,392.00
1 Total Expense $
148.00
Fee
1 MBE Subconsultant $
-
Water Fee
$8,540.00
1 on MBE Subconsultant $
ESummary
Sewer Fee
$0.00
I
1 5% Sub Markup $
Total Fee
$8,540.00
1 1 MBE/SBE Participation
0
Total Project Cost $ 8,540.00
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
F:\projects\0318\072-01\1 Contracts\1-1 Client\Amendment 2\LOE Spreadsheets_Typical Design Amend 2 12072023
1 of 1