NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: East Offsite Sanitary Sewer to Serve Tradition
City Project No.:103493
Improvement Type(s): Water ❑
Original Contract Price:
Amount of Approved Change Orders(s)
Revised Contract Amount:
Total Cost of Work Complete:
'yAfm W ZG " od
Jason Williford (Dec 21, 2 23 09:20 CST)
Contractor
Project Manager
Title
Mountain Cascade of Texas
Company Name
Jasec 21. 202312:23 CST)
Project Inspector
44'� 1 sd", Pia., PC —
Project Manager
—W^
Rebecca Diane owen fDec 26.2023 08:19 CST)
CFA Manager
Lauren Prieur (Dec 26, 2023 10:25 CST)
TPW Director
Asst. City Manager
Sewer x❑
Developer Cost City Cost
$1,887,270.00 $5,427,730.00
-$55,939.30-$160,879.70
$1,831,330.70 $5,266,850.30
$1,831,330.70 $5,266,850.30
Dec 21, 2023
Date
Dec 21, 2023
Date
Dec 21, 2023
Date
Dec 26, 2023
Date
Dec 26, 2023
Date
Jan 18, 2024
Date
Total Cost
$7,315,000.00
-$216,819.00
$7,098,181.00
$7,098,181.00
OFFICIAL RECORD Page 1 of 2
CITY SECRETARY
FT. WORTH, TX
Notice of Project Completion
Project Name: East Offsite Sanitary Sewer to Serve Tradition
City Project No.: 103493
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Pipe Report: ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 200 WD Days Charged: 261
Work Start Date: 9/28/2022 Work Complete Date: 11/9/2023
Completed number of Soil Lab Test: 202
Completed number of Water Test: 0
Page 2of2
FORT WO 1T H
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name EAST OFFSITE SANITARY SEWER TO SERVE TRADITION
Contract Limits
Project Type SEWER
City Project Numbers 103493
DOE Number 3493
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date
Project Manager NA
Contractor Mountain Cascade of Texas
11729 E FM 917
Inspectors
For Period Ending 11/9/2023
WD
Contract Time 20WD
Days Charged to Date 261
Contract is 100.00 Complete
Alvarado, TX 76009
D. WATSON / J. BRADLEY
Thursday, December 14, 2023 Pagel of 5
City Project Numbers 103493 DOE Number 3493
Contract Name EAST OFFSITE SANITARY SEWER TO SERVE TRADITION Estimate Number I
Contract Limits Payment Number 1
Project Type SEWER For Period Ending 11/9/2023
Project Funding
UNIT I: EAST OFFSHE SEWER LINE FACILITIES
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
REMOVE Y SEWER MANHOLE
2 EA
$3,600.00
$7,200.00
2
$7,200.00
2
REMOVE 12" SEWER LINE
25 LF
$60.00
$1,500.00
25
$1,500.00
3
LARGE STOINE RIPRAP, DRY
47 SY
$100.00
$4,700.00
47
$4,700.00
4
SWPPP> 1 ACRE
1 LS
$40,000.00
$40,000.00
1
$40,000.00
5
SITE CLEARING
5.7 AC
$7,000.00
$39,900.00
5.7
$39,900.00
6
TOPSOIL
1629 SY
$7.00
$11,403.00
1629
$11,403.00
7
BLOCK SOD PLACEMENT (GOLF COURSE)
1629 SY
$6.00
$9,774.00
1629
$9,774.00
8
SEEDING, BROADCAST (BERMUDA GRASS)
67666 SY
$1.00
$67,666.00
67666
$67,666.00
9
POST CCTV INSPECTION
13165 LF
$1.00
$13,165.00
13165
$13,165.00
10
VACUUM TEST MANHOLES
35 EA
$190.00
$6,650.00
35
$6,650.00
11
BYPASS PUMPING
1 EA
S170,946.00
$170,946.00
1
$170,946.00
12
TRENCH SAFETY
13165 LF
$1.00
$13,165.00
13165
$13,165.00
13
UTILITY MARKERS
1 LS
$2,800.00
$2,800.00
1
$2,800.00
14
CONCRETE COLLAR
31 EA
$700.00
$21,700.00
31
$21,700.00
15
TRENCH WATER STOPS
4 EA
$650.00
$2,600.00
4
$2,600.00
16
48" CASING BY OPEN CUT
230 LF
$950.00
$218,500.00
230
$218,500.00
17
42" CASING BY OTHER THAN OPEN CUT
748 LF
$1,100.00
$822,800.00
748
$822,800.00
18
48" CASING BY OTHER THAN OPEN CUT
1025 LF
$1,500.00
537,500.00
1025 1,537,500.00
19
24" DIP SEWER (CLASS 200) (CO #1)
0 LF
$280.00
$0.00
0
$0.00
20
30" DIP SEWER (CLASS 150) (CO #1)
0 LF
$340.00
$0.00
0
$0.00
21
4' STD DIA MANHOLE
1 EA
$9,500.00
$9,500.00
1
$9,500.00
22
4' EXTRA DEPTH MANHOLE
2 VF
$190.00
$380.00
2
$380.00
23
5' STD DIA MANHOLE
30 EA
$12,000.00
$360,000.00
30
$360,000.00
24
5' DROP MANHOLE
1 EA
$12,400.00
$12,400.00
1
$12,400.00
25
5' EXTRA DEPTH MANHOLE
213 VF
$275.00
$58,575.00
213
$58,575.00
26
6'MANHOLE
2 EA
$18,000.00
$36,000.00
2
$36,000.00
27
6' EXTRA DEPTH MANHOLE
11 VF
$400.00
$4,400.00
11
$4,400.00
28
TRAFFIC CONTROL
4 MO
$2,200.00
$8,800.00
4
$8,800.00
29
SANITARY SEWER JUNCTION STRUCTURE W/
1 EA
$42,000.00
$42,000.00
1
$42,000.00
4' RISER
30
SANITARY SEWER JUNCTION STRUCTURE
1 EA
$16,500.00
$16,500.00
1
$16,500.00
COATING
Thursday, December 14, 2023 Page 2 of 5
City Project Numbers 103493
Contract Name EAST OFFSITE SANITARY SEWER TO SERVE TRADITION
Contract Limits
Project Type SEWER
Project Funding
DOE Number 3493
Estimate Number I
Payment Number 1
For Period Ending 11/9/2023
31 ODOR CONTROL - WAGER 2050 OR EQUAL W/
21 EA
$11,000.00
$231,000.00
21
$231,000.00
BALL VALVE
32 INSTALL EPDXY MANHOLE LINER
430 VF
$365.00
$156,950.00
430
$156,950.00
33 REMOVE & REPLACE CONCRETE DRIVE
284 SY
$85.00
$24,140.00
284
$24,140.00
(CART PATH)
34 INSTALL TEMPORARY GRAVEL DRIVE (TEMP.
353 SY
$20.00
$7,060.00
353
$7,060.00
CART PATH)
35 REMOVE & REPLACE 4' SIDEWALK
32 SU
$85.00
$2,720.00
32
$2,720.00
36 CUT&PLUG EX10"SS
1 EA
$1,500.00
$1,500.00
1
$1,500.00
37 GROUT ABANDONMENT OF 10" SS
--------------------------------------
3 CY
$500.00
$1,500.00
3
$1,500.00
Sub-Total of Previous Unit
$3,965,394.00
$3,965,394.00
UNIT II: ALTERNATE TRADITION - EAST OFFSITE SE
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
38A
18" SOLID WALL PVC PER ASTM F679
189 LF
$0.00
$0.00
189
$0.00
38B
18" FIBERGLASS SEWER PIPE
189 LF
$200.00
$37,800.00
189
$37,800.00
39A
21" SOLID WALL PVC PER ASTM F679
301 LF
$0.00
$0.00
301
$0.00
39B
21" FIBERGLASS SEWER PIPE
301 LF
$220.00
$66,220.00
301
$66,220.00
40A
24" SOLID WALL PVC PER ASTM F679
4566 LF
$0.00
$0.00
4566
$0.00
40B
24" FIBERGLASS SEWER PIPE (CO #1)
5937 LF
$226.00
341,762.00
5937 1,341,762.00
41A
27" SOLID WALL PVC PER ASTM F679
4113 LF
$0.00
$0.00
4113
$0.00
41B
27" FIBERGLASS SEWER PIPE
4113 LF
$230.00
$945,990.00
4113
$945,990.00
42A
21" SOLID WALL PVC PER ASTM F679, CLSM
20 LF
$0.00
$0.00
20
$0.00
BACKFILL
42B
21" FIBERGLASS SEWER PIPE, CLSM BACKFILL
20 LF
$245.00
$4,900.00
20
$4,900.00
43A
24" SOLID WALL PVC PER ASTM F679, CLSM
60 LF
$0.00
$0.00
60
$0.00
BACKFILL
43B
24" FIBERGLASS SEWER PIPE, CLSM BACKFILL
60 LF
$260.00
$15,600.00
60
$15,600.00
44A
27" SOLID WALL PVC PER ASTM F679, CLSM
40 LF
$0.00
$0.00
40
$0.00
BACKFILL
44B
27" FIBERGLASS SEWER PIPE, CLSM BACKFILL
40 LF
$290.00
$11,600.00
40
$11,600.00
45
--------------------------------------
30" FIBERGLASS SEWER PIPE (CO #1)
2505 LF
$283.00
$708,915.00
2505
$708,915.00
Sub-Total of Previous Unit
$3,132,787.00
$3,132,787.00
Thursday, December 14, 2023 Page 3 of 5
City Project Numbers 103493
Contract Name EAST OFFSITE SANITARY SEWER TO SERVE TRADITION
Contract Limits
Project Type SEWER
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number 1
DOE Number 3493
Estimate Number I
Payment Number 1
For Period Ending 11/9/2023
$7,315,000.00
($55,939.30)
($160,879.70)
Total Contract Price $7,098,181.00
Total Cost of Work Completed $7,098,181.00
Less % Retained $0.00
Net Earned $7,098,181.00
Earned This Period $7,098,181.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$7,098,181.00
Thursday, December 14, 2023 Page 4 of 5
City Project Numbers 103493 DOE Number 3493
Contract Name EAST OFFSITE SANITARY SEWER TO SERVE TRADITION Estimate Number I
Contract Limits Payment Number 1
Project Type SEWER For Period Ending 11/9/2023
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors D. WATSON / J. BRADLEY Contract Date
Contractor Mountain Cascade of Texas Contract Time 200 WD
11729 E FM 917 Days Charged to Date 261 WD
Alvarado, TX 76009 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $7,098,181.00
Less % Retained $0.00
Net Earned $7,098,181.00
Earned This Period $7,098,181.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$7,098,181.00
Thursday, December 14, 2023 Page 5 of 5
CSC No. 57779-CO1
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME: Tradition Offsite Sanitary Sewer Main CHANGE
CONTRACT: (A) Sewer ORDER No:
CFA# 22-0049 I CITY PARTICIPATION: YES (74.2%)
CITY PROJECT # 103493
CITY SECRETARY CONTRACT # 1
FID # 30114-0200431-103493-EO7685
FILE # X-27009
INSPECTOR: Jason Bradley Phone No: 214-883-5921
PROJECT MANAGER: Yogesh Patel Phone No: 817-392-2373
CONTRACT UNIT
WATER SEWER DRAINAGE PAVING STREET LIGHTS
Developer Developer Developer
Cost City Cost Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost
ORIGINAL CONTRACT
$0.00
$0.00
$1,887,270.00
$5,427,730.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0X0
EXTRAS TO DATE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
-
ICREDITS
a
TO DATE
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
CONTRACT TO DATE
$0.00
$0.00
$1,887,270.00 $5,427,730.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
AMOUNT OF PROP. CHANGE ORDER
$0.00
($55,939.30) 1W,r,'i's. ;'T?
$0.00
$0.00
$0.00
REVISED CONTRACT AMOUNT
$0.00
$0.00
$1,831,330.70-6,850.30
$0.00
$0.00
$0.00
$0.00 $0.00
$0.0o
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$0.00
$7,098,181.00
$0.00
$0.00
$0.00
REVISED COST SHARE
Dev. Cost:
$1,831,330.70
City Cost:
$5,266,850.30
TOTAL REVISED CONTRACT
I
$7,098,181.00
You are directed to make the following changes in the contract docunents
CITY PAY
CITY BID ITEM #
ITEM #
QUANTITY
UNIT
ITEM DESCRIPTION
19
3331.4321
(1.371)
LF
24" DIP Sewer (Class 200)
20
3331.4405
(2.505)
LF
30" DIP Sewer (Class 150)
40B
1 3331.4324
1.371
LF
24" Fiberglass Sewer Pipe
I 45'
1 3331.4408
2,505
LF
30" Fiberalass Sewer Pioe
Asterisk (") indicates New Pay Item
REASONS FOR CHANGE ORDER Change of pipe material inside casing from DIP to Fiberglass per approved variance request
CONTRACT
DAYS
200
I
200
0
200
UNIT PRICE
TOTAL f
$280.00
($383.880.00)1
$340.00
($851.700.00)j
$226.00
$309,846.001
$283.00
$708,915.001
Subtotal
($216.819.00)f
Revised: 12-17-2018 Page 1
RECOMMENDED:
dlaftEaas&r �..
Name: Matt Baacke
Title: Civil Enqineer
APPROVAL RECOMMENDED
CFW
--Sponsoring Department
By:
Name: Taylor Gunderman
Title: Engineerinq Manager
RECOMMENDED:
CFW - 'Contract Compliance Manager
By: Y7—.,A+4Pl-
Name: Yooesh Patel
Title: Senior Professional Enqineer
M&C Number. 23-0340
M&C Date Approved: 4/25/2023
APPROVED: APPROVED:
Ccu Eir AtEawati Tgso� Wrlllf�C
By: icon By: m
Name: CurtisAttawav Name: Jason Williford
Title: VP of Construction Title: Proiect Manaaer
APPROVED:
APPROVED AS TO FORM AND LEGALITY:
CFW - Assistant City Manager
CFW - Assistant City Attorney
27-1
Name: Dana Burghdoff
Name: Richard McCracken
Title: Assistant Citv Manaaer
Title: Senior Assistant City Attorney
ATTEST " Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
ax for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
Jannette Goodall
City Secretary ['here are NO City Funds associated with this Contract
Ethere are City Funds associated with this Contract
Revised: 12-17-2018 Page 2
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
PIPE LAID
FIRE HYDRANTS:
PIPE ABANDONED
DENSITIES:
NEW SERVICES:
PIPE LAID
18" Fiberglass Sewer Pipe
21" Fiberglass Sewer Pipe
24" Fiberglass Sewer Pipe
27" Fiberglass Sewer Pipe
30" Fiberglass Sewer Pipe
PIPE ABANDONED
DENSITIES:
NEW SERVICES:
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
East Offsite Sanitary Sewer to Serve Tradition
103493
WATER
SIZE TYPE OF PIPE LF
VALVES (16" OR LARGER)
SIZE TYPE OF PIPE LF
SEWER
SIZE
TYPE OF PIPE
LF
18"
Fiberglass
189
21"
Fiberglass
321
24"
Fiberglass
5997
27"
Fiberglass
4153
30"
Fiberglass
2505
SIZE TYPE OF PIPE
TRANSPORTATION AND PUBLIC WORKS
LF
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
September 15, 2016
Mountain Cascade of Texas, LLC
5340 East US Highway 67
Alvarado, TX 76009
RE: Acceptance Letter
Project Name: East Offsite Sanitary Sewer to Serve Tradition
Project Type: Sewer
City Project No.: 103493
To Whom It May Concern:
On November 21, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on December 8, 2023. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on December 8, 2023, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2372.
Sincerely,
.w� If _M4.191s Pia., PC'
Arash Emami Saleh, Project Manager
Cc: Jason Bradley, Inspector
Don Watson, Inspection Supervisor
Oscar Aguillon, Senior Inspector
Victor Tornero, Program Manager
GM Civil Matt Baacke, Consultant
Mountain Cascade of Texas , Contractor
Hines, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
141018101was) orfla1R�l
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Andrew L.
McCulloch, Vice President Of Mountain Cascade of Texas, LLC, known
to me to be a credible person, who being by me duly sworn, upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
East Offsite Sanitary Sewer to Serve Tradition
BY
Andre. McCulloch, Vice President
Subscribed and sworn before me on this date 13th of December, 2023.
teary Public �—
Johnson County, Texas ,
�e� SONIA GONZALES
Notary ID #134431925
0 r My Commission Expires
June 29, 2027
CONSENT OF SURETY
TO FINAL PAYMENT
"Document G707
Bond-Un n7ng1a1F7
TO OWNER:
(Name emdaddrrn)
HT Hwy 114 Development, LP
TX
PROJECT:
(Name and addr&% /
OWNER
❑
ARCHITECT
o
CONTRACTOR
❑
SURfi't'Y
X)
OTMR
D
ARCHITECT'S PROJECT NO.:
CONTRACT FOR: East Offsite Sanitary Sewer to Serve
Tradition, City Project #103493
CONTRACT DATED:
East Offsite Sanitary Sewer to Serve Tradition, City Project #103493
In accordance with the provisions of the Contract between the Owner and the Contractor as indicted above, the
film" name and a(&)c-vr 01,%d elv1
Liberty Mutual Insurance Company
175 Berkeley Street
Boston, MA 02116
, SURFTY,
on bond of
(Inowl name and addhmr (?%Ca+crraaor)
Mountain Cascade of Texas LLC
5340 East US Highway 67
Alvarado, TX 76009
, CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shalt not relieve the Surery of
any of its obligations to
(bw n mn+aand addnea of04.04 r)
HT Hwy 114 Development, LP
TX
as set forth in said Surety s bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: December 20, 2023
(JPMrl N U011049 rbe nromb jo(kM4ftf bV be munerir dare aerd wr.)
*�trtsun�s Libertv Mutual Insurance Comoanv
J �psw0 -4, n (S)mv)
a �
1912 ;
�'� 9Ss��`�,' �`� (.Sl(gnant�rafau�bor� irp+rxinarrrrl
Attest: lG #
Seat r�//' Sarah Murtha, Attorney -in -Fact
Melvin Gillus, WitneSS (Aintednameaudtkla)
, OWNER,
G707-1994
l_ This Power of Attorney limits the acts of those named heroin, and they have no authority to
Ll betty bind the Company except in the manner and to the extant herein stated.
Muttia11 Liberty Mutual Insurance Company
SURETY The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duty organized udder the laws of tle Slate of Massachusetts, and West American Insurance Company is a corporation duty
organized under the laws of the State of Indiana (herein collectively called the 'Companies'), pursuant to and by authority herein set forth. does hereby name, constitute and appoint
Sarah Murtha all of the city of San Francisco , state of CA its true and lawful attomery-in-fad, with full power and authority hereby conferred to sign, execute and
acknowledge the following surety bond:
Principal Name: Mountain Cascade of Texas LLC
Obligee Nome: HT Hwv 114 Development. LP
Surety Bond Number: 070214357 Bond Amount: See Bond Form
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 20th day of December 2023
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
P4INstt� POSY I1VgGR 1NStr4q West American Insurance Company
Fd [n !
e 1912 a 1919
o y n i 1991
rd3�fr4cuu6` ya; Sp r�N�rr a D� rs �alre* AL+T By: ? �A
81 r • �� �ti1 • �M ` t� David M. Carey, Assistant Secretary
LO STATE OF PENNSYLVANIA ss
ru COUNTY OF MONTGOMERY
o On this 20th day of December 2023, before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual
0.2 Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the
> purposes therein contained by signing on behalf of the corporations by himself as a duty authorized officer
gi ( IN WITNESS WHEREOF, I have hereunto subscribed my naive and affixed my notarial seal al Plymouth Meeting, Pennsylvania, on the day and year first above written.
rCp � �gP Pggr�
O wQ �►jy0"~fyr C� Commorwealth of Pennsylvanio - Nolary Sec
O 4 or s t TeresaP stella, Notary Public �//%j,'� �I
igonenyCounry fZA'1.Qpti
O vyeT My oommisscri expires Mardi 2e, 2025 By: -
C: tpr41 #' Conossor number 1126044 Teresa Paslella, Notary Public
'Aember. Psnnsh2vnNe ALxbeban Of I+araaes
N This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
c a Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows'
E •� ARTICLE IV - OFFICERS: Sedan 12 Power of Attorney
` Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such bmdalion as the Chairman or the
o M President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
p >1 any and all undertakings, bonds, moognizances and other surety obligations. Such atomeys-in-tact, subject to the limitations set forth in their respective powers of atomey,
c shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
> N instruments shall be as binding as if signed by the President and attested to by the Secretary Any power or authority granted to any representative or atomey-in-fact under the
0 provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granling such power or authority.
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such affomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bords, recognizances and other surely obligations Such atomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind
the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company When so executed such instruments shall be as binding
as if signed by the president and attested by the secretary
Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M Carey, Assistant Secretary to appoint such atornM-
infact as may be necessary to act on behalf of the Company to make, execute, seal, acuhoWedge and deliver as surety any and all undertakings, bonds, recognizances and other
surety obligations
Authorization - By wmirrnus consent of the Company's Board of Directors, the Company consents thal facsim3a of mechanically reproduced signature of any assistant secretary
of the Company, wherever appearing upon a certified copy of any power of allomey issued by the Company in connection with steely bonds, shall be valid and binding upon the
Company with the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, of Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company
do hereby cerlity, that this power of attorney executed by said Companies is In full force and effect and has not been revoked
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 20th day of December 2023
` INS(& 0*4 INS&qd INSUq
J P4oaroq{rogn� Q 3��pro+y�ro`9yA 4*[op"°gsr"9yC+
r * 19121y i = 1919 o a 1991 o By:
j•+rn rss as o k��.b`deat rs rkmre" .4 1 erlee C Llewellyn, Assistant Secmary
'�9jT � 1•N �'41 � !.N 3,tt � td
m o
'C U
c
.c
cE
�r
U 41
m�
Q �
a0
T_
C @
00
Q O
oa
CV
�CV
00
0- M
00
od
r
a�
Co
a
0 N
f° a
LNUC OCIC WAIL - ISBA 092023
Telephone: +1 949-885-1206
Website: wlwco.com
E-mail: vicky m.campbell@wtwco corn
December 20, 2023
Mountain Cascade of Texas, LLC
Attn: Cody Sears
5340 East US Hwy 67
Alvarado, TX 76009
RE: Bond Number: 070214357
Obligee: HT Hwy 114 Development, LP
Description: East Offsite Sanitary Sewer to Serve Tradition, City Project #103493
Attached is the completed document per your request. This was issued based upon the information you
provided to our office, and we urge you to check all of the information for accuracy (i.e. Power of Attorney,
signatures, dates, amounts, description, etc.).
Please verify that the form attached is the form required and complete the execution with the proper
signature(s) and seal, if applicable.
If a premium is charged, our invoice will follow under a separate cover. Please note the
premium payment for this bond is due upon receipt.
Thank you for the opportunity to service your surety needs. Should you have any questions, please do not
hesitate to contact any member of your Willis Towers Watson Surety Team.
Sincerely,
Vicky Campbell
Willis Towers Watson Insurance Services West, Inc.
2010 Main Street, Suite 1050
Irvine, CA 92614