HomeMy WebLinkAboutContract 58111-CO2CSC No. 58111-0O2
FOR, TRH® City of Fort Worth
T Change Order Request
Project Namel 103396 Comanche Trail Hazardous Road Overtopping Mitigation Project
Client Project #(s)l 103396
I City Sec # I 58111
Project Description) Roadway and culvert improvements to improve drainage at crossing, associated water & sewer realignments
Contractorl Klutz Contractors, LLC Change Order#1 2 1 Datel 1/9/2024 l
City Project Mgr.l Bert Guidry City Inspectorl Stan Sutterfield l
Dept
TPW
Contract Time
Totals
(CD)
Original Contract Amount
$1,894,090.00
$1,894,090.00
365
Extras to Date
$44,500.00
$44,500.00
0
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$1,938,590.00
$1,938,590.00
365
Amount of Proposed Change Order
$43,790.75
$43,790.75
90
Revised Contract Amount
$1,982,380.75
$1,982,380.75
455
Original Funds Available for Change Orders
$94,704.50
$94,704.50
Remaining Funds Available for this CO
$50,204.50
$50,204.50
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 4.66%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25% $2,367,612.50
USTIFICATION (REASONS) FOR CHANGE ORDER
Concrete footings for the proposed precast arch culvert have been constructed along with concrete rip -rap over the top of portions of the footings. After construction of
these items, deficiencies were discovered in the concrete strength, in the footing bedding, in documentation and observation of the bearing stratum, and in documentation of
the reinforcing steel. For these reasons, the structural engineer will not accept the structural adequacy of these footings and they will need to be removed and replaced. The
cost for removal and reconstruction of new footings and rip -rap is being shared equally between the contractor and the City due to shared responsibilities. An additional 90
days is being added to the contract duration to account for time needed for this process. The bid quantity for traffic control was inadequate for the construction duration.
Traffic control quantities have been added to accommodate the construction duration and road closure duration, plus half of the additional 90 days. Additional low strength
concrete is being added to allow full perimeter encompassment of the new footings after removal of the existing footings. Quantities and costs for added items without bid
amounts were reviewed with inspectors for reasonableness.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature
Klutz Contractors, LLC Charlie Klutz I Jan 12, 2024
Inspector/Inspection Supervisor
�
ate
Jan 12, 2024
Project and Contract Compliance Manager
-
Date
Jan 11, 2024
Program Manager
Date
Senior Capital Project Officer
Date
Jan 12, 2024
Jan 16, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Jan 16, 2024
A-Z—
Jan 17, 2024
Assistant City Attorney
Date
Assistant City Manager
Date
k
Jan 18, 2024
L x_
Jan 18, 2024
Council Action (if required)
Qaq
>^ A
°9d
Pve =Sd
Jannette Goodall, City Secretary
dan�a;�X65aa
M&C Number I N/A I M&C Date Approved IN/A I
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
"V1— Change Order Additions
Project Name 103396 Comanche Trail Hazardous Road Overtopping Mitigation Project City Sec # 58111
Client Project# 103396 1
Contractorl Klutz Contractors, LLC I PMI Bert Guidry I Inspector Stan Sutter6eld
Change Order Submittal # 0 Date 1 1/9/2024 1
ADDITIONS
ITEM
UESURIPIIUN
UEPI
Uty
Unit
Unit Uost
total
9
34/1.0001
Irathcl:ontrol
IPW
6.000UUUUU
MU
$1,8UU.UU
$14,4UU.UU
11
3471.0010
City Streets / Residential Streets Closure
TPW
1.00000000
MO
$2,700.00'
$2,700.00
17
3137.0101
Concrete Riprap
TPW
47.80000000
SY
$95.06
$4,541.00
37
9999.0080
Cast -in -Place Concrete Retaining Wall & Footing
TPW
58.25000000
CY
$663.0(r
$38,619.75
61
9999.0140
Concrete Footing Removals
TPW
1.50000000
EA
$13,000.06
$19,500.00
62
9999.0150
Concrete Rip -Rap Removals
TPW
2.00000000
EA
$3,900.00
$7,800.00
63
9999.0160
Low Strength Concrete
TPW
90.00000000
CY
$347.06
$31,230.00
THW $118,790.75
Sub Total Additions $118,790.75
Change Order Additions Page 1 of 1
FOR_ T�RTH City of Fort Worth
Change Order Deletions
Project Name 1 103396 Comanche Trail Hazardous Road Overtopping Mitigation Project City Sec # 1 58111
Client Project # 1 103396 1
Contractor Klutz Contractors, LLC I PMI Bert Guidry Inspectorl Stan Sutterfield l
Change Order Submittal # 0 Date 1 11912024 1
DELETIONS
I I LM ULSUKIP I ION ULP I (Ay Unit Unit Cost I otal
13 9999.0100 PavementlUramage Construction Allowance I HW /5,000.UUUUUUUU to $1.UU $f5'000.00
TNW $75,000.00
Sub Total Deletions $75,000.00
Change Order Deletions Page 1 of 1
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Signature:
Email: Lissette.Acevedo@fortworthtexas.gov
103396 Comanche Trail HROM CO 2
Final Audit Report 2024-01-16
Created: 2024-01-11
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAA20pDgSgvip-SJSg6AoVRmjaosozcKTDt
"103396 Comanche Trail HROM CO 2" History
Document created by Sadie.Ishmael@fortworthtexas.gov
2024-01-11 - 6:51:46 PM GMT- IP address: 204.10.90.100
Signer Sadie.Ishmael@fortworthtexas.gov entered name at signing as Sadie Ishmael
2024-01-11 - 7:04:02 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Approval Date: 2024-01-11 - 7:04:04 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to berton.guidry@fortworthtexas.gov for signature
2024-01-11 - 7:04:06 PM GMT
Email viewed by berton.guidry@fortworthtexas.gov
2024-01-11 - 7:35:34 PM GMT- IP address: 204.10.90.100
�a Signer berton.guidry@fortworthtexas.gov entered name at signing as Berton F. Guidry, Jr.
2024-01-11 - 7:36:49 PM GMT- IP address: 204.10.90.100
a Document e-signed by Berton F. Guidry, Jr.(berton.guidry@fortworthtexas.gov)
Signature Date: 2024-01-11 - 7:36:51 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Charles Klutz (charlie@klutzconstruction.com) for signature
2024-01-11 - 7:36:53 PM GMT
Email viewed by Charles Klutz (charlie@klutzconstruction.com)
2024-01-12 - 9:16:49 PM GMT- IP address: 47.51.211.209
Document e-signed by Charles Klutz (charlie@klutzconstruction.com)
Signature Date: 2024-01-12 - 9:17:32 PM GMT - Time Source: server- IP address: 47.51.211.209
Document emailed to Stanley.Sutterfield@fortworthtexas.gov for signature
2024-01-12 - 9:17:34 PM GMT
FORTWORTHg I Pp1N "edby
Adobe
Acrobat Sign
Email viewed by Stanley.Sutterfield@fortworthtexas.gov
2024-01-12 - 10:14:23 PM GMT- IP address: 104.47.64.254
Signer Stanley.Sutterfield@fortworthtexas.gov entered name at signing as Hershel Stanley Sutterfield
2024-01-12 - 10:17:26 PM GMT- IP address: 97.75.108.6
Document e-signed by Hershel Stanley Sutterfield (Stanley.Sutterfield@fortworthtexas.gov)
Signature Date: 2024-01-12 - 10:17:28 PM GMT - Time Source: server- IP address: 97.75.108.6
Document emailed to Linda Young(linda.young@fortworthtexas.gov) for signature
2024-01-12 - 10:17:30 PM GMT
Email viewed by Linda Young(linda.young@fortworthtexas.gov)
2024-01-12 - 10:57:53 PM GMT- IP address: 204.10.90.100
J' Document e-signed by Linda Young (linda.young@fortworthtexas.gov)
Signature Date: 2024-01-12 - 10:58:20 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Lissette.Acevedo@fortworthtexas.gov for signature
2024-01-12 - 10:58:22 PM GMT
Email viewed by Lissette.Acevedo@fortworthtexas.gov
2024-01-16 - 5:09:49 PM GMT- IP address: 204.10.90.100
Document canceled by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-01-16 - 5:16:32 PM GMT- IP address: 204.10.90.100
FDRTW❑RTHg I P—"ed"y
Adobe
Acrobat Sign
103396 CS 58111 CO 2
Final Audit Report
Created: 2024-01-16
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAAS8MS1GDEoDDUgf9D5_yT2ZgC1LgGsleC
"103396 CS 58111 CO 2" History
Document created by Sadie.Ishmael@fortworthtexas.gov
2024-01-16 - 5:26:40 PM GMT- IP address: 204.10.90.100
2024-01-22
J' Signer Sadie.Ishmael@fortworthtexas.gov entered name at signing as Sadie Ishmael
2024-01-16 - 5:36:25 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Approval Date: 2024-01-16 - 5:36:27 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Lissette.Acevedo@fortworthtexas.gov for signature
2024-01-16 - 5:36:29 PM GMT
Email viewed by Lissette.Acevedo@fortworthtexas.gov
2024-01-16 - 5:49:38 PM GMT- IP address: 204.10.90.100
Signer Lissette.Acevedo@fortworthtexas.gov entered name at signing as Lissette Acevedo, P.E.
2024-01-16 - 5:50:11 PM GMT- IP address: 204.10.90.100
Document e-signed by Lissette Acevedo, P.E. (Lissette.Acevedo@fortworthtexas.gov)
Signature Date: 2024-01-16 - 5:50:13 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to patricia.wadsack@fortworthtexas.gov for signature
2024-01-16 - 5:50:15 PM GMT
Email viewed by patricia.wadsack@fortworthtexas.gov
2024-01-16 - 6:11:48 PM GMT- IP address: 204.10.90.100
J Signer patricia.wadsack@fortworthtexas.gov entered name at signing as Patricia L. Wadsack
2024-01-16 - 6:20:28 PM GMT- IP address: 204.10.90.100
Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Signature Date: 2024-01-16 - 6:20:30 PM GMT - Time Source: server- IP address: 204.10.90.100
FDRTWORTHs I P°`4'y
Adobe
Acrobat Sign
Document emailed to Lauren.Prieur@fortworthtexas.gov for signature
2024-01-16 - 6:20:32 PM GMT
Email viewed by Lauren.Prieur@fortworthtexas.gov
2024-01-17 - 9:22:41 PM GMT- IP address: 166.205.58.41
J Signer Lauren.Prieur@fortworthtexas.gov entered name at signing as Lauren Prieur
2024-01-17 - 9:23:17 PM GMT- IP address: 166.205.58.41
J Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2024-01-17 - 9:23:19 PM GMT - Time Source: server- IP address: 166.205.58.41
Document emailed to doug.black@fortworthtexas.gov for signature
2024-01-17 - 9:23:21 PM GMT
Email viewed by doug.black@fortworthtexas.gov
2024-01-18 - 8:18:11 PM GMT- IP address: 204.10.90.100
Signer doug.black@fortworthtexas.gov entered name at signing as DBlack
2024-01-18 - 8:23:19 PM GMT- IP address: 204.10.90.100
Document e-signed by DBlack (doug.black@fortworthtexas.gov)
Signature Date: 2024-01-18 - 8:23:21 PM GMT - Time Source: server- IP address: 204.10.90.100- Signature captured from device with
phone number XXXXXXX4583
Document emailed to jesica.mceachern@fortworthtexas.gov for signature
2024-01-18 - 8:23:23 PM GMT
-, Signer jesica.mceachern@fortworthtexas.gov entered name at signing as Jesica McEachern
2024-01-19 - 4:10:51 AM GMT- IP address: 204.10.90.100
j Document e-signed by Jesica McEachern (jesica.mceachern@fortworthtexas.gov)
Signature Date: 2024-01-19 - 4:10:53 AM GMT - Time Source: server- IP address: 204.10.90.100
Document approval automatically delegated to Katherine.Cenicola@fortworthtexas.gov by
Ronald.Gonzales@fortworthtexas.gov
2024-01-19 - 4:10:55 AM GMT
P4 Document emailed to Ronald.Gonzales@fortworthtexas.gov for approval
2024-01-19 - 4:10:55 AM GMT
P-. Document emailed to Katherine.Cenicola@fortworthtexas.gov for approval
2024-01-19 - 4:10:55 AM GMT
5 Email viewed by Katherine.Cenicola@fortworthtexas.gov
2024-01-19 - 2:22:01 PM GMT- IP address: 104.47.65.254
FoRTWORTHs I P°`4'y
Adobe
Acrobat Sign
J Signer Katherine.Cenicola@fortworthtexas.gov entered name at signing as Katherine Cenicola
2024-01-19 - 2:22:25 PM GMT- IP address: 204.10.90.100
Document approved by Katherine Cenicola (Katherine.Cenicola@fortworthtexas.gov)
Approval Date: 2024-01-19 - 2:22:28 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to jannette.goodall@fortworthtexas.gov for signature
2024-01-19 - 2:22:29 PM GMT
Email viewed by jannette.goodall@fortworthtexas.gov
2024-01-19 - 2:26:25 PM GMT- IP address: 204.10.90.100
Signer jannette.goodall@fortworthtexas.gov entered name at signing as Jannette S. Goodall
2024-01-19 - 2:26:43 PM GMT- IP address: 204.10.90.100
Document e-signed by Jannette S. Goodall Qannette.goodall@fortworthtexas.gov)
Signature Date: 2024-01-19 - 2:26:45 PM GMT - Time Source: server- IP address: 204.10.90.100
Form filling automatically delegated to Elisa.Winterrowd@fortworthtexas.gov by Allison Tidwell
(allison.tidwell@fortworthtexas.gov)
2024-01-19 - 2:26:46 PM GMT
Document emailed to Elisa.Winterrowd@fortworthtexas.gov for filling
2024-01-19 - 2:26:47 PM GMT
Document emailed to Allison Tidwell (allison.tidwell@fortworthtexas.gov) for filling
2024-01-19 - 2:26:47 PM GMT
Document declined by Allison Tidwell (allison.tidwell@fortworthtexas.gov)
Decline reason: Please add a text box in the upper right-hand corner of the second page, so that I can add a contract number.
2024-01-22 - 6:09:16 PM GMT- IP address: 204.10.90.100
FoRTWORTHs I P°`4'y
Adobe
Acrobat Sign
FORT WORTH,
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Comanche Trail HROM — Change Order 2
M&C: 22-0634 CPN: 103396
CSO: CS58111
Date:
To:
Name
Department
Charlie Klutz
1.
Contractor
2.
Stanley Sutterfield
TPW - Inspector
3.
Bert Guidry
TPW - Project Manager
4.
Linda Young
TPW - Program Manager
5.
Lissette Acevedo
TPW — Sr. CPO
6.
Patricia Wadsack
TPW —Assistant Director
7.
Lauren Prieur
TPW - Director
8.
Doug Black
Legal - Assistant City Attorney
9.
Jesica McEachern
CMO— Assistant City Manager
10.
Ronald Gonzales
CSO — City Secretary
11.
Jannette Goodall
CSO — City Secretary
12.
Allison Tidwell
CSO — City Secretary
13.
Tpw—SW—Contract
TPW Stormwater
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑ YES ❑No
ROUTING TO CSO: ®YES ❑No
DOC#:
Initials Date Out
Jan 12, 2024
HSS
SFG
BFG
L Gl
pL1N'
�lwb
Oh
KC
_T G
I
Jan 12, 2024
Jan 11, 2024
Jan 12, 2024
Jan 16, 2024
Jan 16, 2024
Jan 17, 2024
Jan 18, 2024
Jan 18, 2024
Jan 19, 2024
Jan 19, 2024
NEXT DAY: ❑YES ❑Nc