HomeMy WebLinkAboutContract 59439-A1CSC No. 59439-A1
AMENDMENT No .1
TO CITY SECRETARY CONTRACT No. 59439
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 59439, (the
CONTRACT) which was administratively authorized on the 20th day of May,
2023 in the amount of $ 99,780; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Owner's Representation Services - Everman Parkway, CPN 103271; and
WHEREAS, it has become necessary to execute Amendment No. 1 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $896,440. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $996,220.00.
OFFICIAL RECORD
CITY SECRETARY
3. FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Owner's Representation Services-Everman Parkway
Prof Services Agreement Amendment Template CPN 103271
Revision Date: 12/08/2023
Page 1 of 4
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
op��
.Tes1ca McEachern
Assistant City Manager
DATE: Jan 18, 2024
d440Uq�
ATTEST: p�s°�°�ost _f*
p �`o %
Ovo 0o
=0
��4uaa'd'O'
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
of the date subscribed by the City's
ENGINEER
Freese and Nichols, Inc
Chris Bo ;o (Jan 5, 2024 08:36 CST)
Chris B. Bosco, P.E.
Principal
DATE: Jan 5, 2024
X—
Lauren Prieur (Jan 18, 202409:57 CST)
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Bradley M Radovich, P.E.
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Owner's Representation Services-Everman Parkway
Prof Services Agreement Amendment Template CPN 103271
Revision Date: 12/08/2023
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
Mack (Jan 18, 202414:27 CST)
Douglas W. Black
Sr. Assistant City Attorney
M&C No.#: 23-1053
M&C Date: 12-12-2023
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 3 of 4
Owner's Representation Services-Everman Parkway
CPN 103271
FUNDING BREAKDOWN SHEET
City Secretary No. 59439
Amendment No. 1
Fund
Dept ID
Account
Project
ID
39008
020
5330500
103271
30108
020
5330500
103271
30104
020
5330500
103271
Total:
CF1- CF2 -
Activity Bond
Reference
002330
002330
002330
Amount
296,685.24
400,000.00
199,754.76
$896,440.00
City of Fort Worth, Texas Owner's Representation Services-Everman Parkway
Prof Services Agreement Amendment Template CPN 103271
Revision Date: 12/08/2023
Page 4 of 4
ATTACHMENT A
Scope for Enaineerina Desian Related Services for
Owner's Representative Services for Everman Parkwav — CPN 103271
The scope set forth herein defines the work to be performed by the ENGINEER in completing the project.
Both the City of Fort Worth (CITY) and Freese and Nichols, Inc. (ENGINEER) have attempted to clearly
define the work to be performed and address the needs of the Project. The purpose of the Project is to
provide consulting services for the development of Design Build contracts and preparation of design
criteria packages for Everman Parkway. The Engineer and the City agreed to expedite administratively a
contract for Owner's Representative Services to advance the project activities and this amendment
supplements that contract to account for all activities contemplated for this project.
The purpose of this amendment is to augment the scope of the original administratively approved contract
with the remainder of the required services not included in it and as described in this attachment.
WORK TO BE PERFORMED
Task 1.
Project Management
Task 2.
Design Build Team Selection
Task 3.
Design Criteria Package
Task 4.
Survey, SUE and Geotechnical
Task 5.
Right-of-way Acquisition Services
Task 6. Construction Phase Owner's Representation Services
TASK 1. PROJECT MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of
ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively,
coordinate internally and externally as needed, and proactively address issues with the CITY's Project
Manager and others as necessary to make progress on the work. Additionally, project management will
include the following tasks.
1.1. Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit
monthly in the format requested by the CITY.
1.2. ENGINEER shall prepare monthly briefing reports for the CITY (for thirty-eight (38) months).
1.3. Prepare and maintain detailed Owner's Representative program schedule.
1.4. Project team coordination and Project Meetings
ASSUMPTIONS
• Project duration is assumed to be thirty-six (36) months for the entire project and fourteen (14)
months for Owner Representative project development until the DB team begins final design
and construction activities.
DELIVERABLES
A. Monthly invoices with progress summary reports
B. Program Schedule
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
TASK 2. DESIGN BUILD TEAM SELECTION.
ENGINEER will provide consulting services for the design build team selection of the project as follows.
2.1. The ENGINEER will coordinate City Attorney's office on DB contract and RFQ and RFP
documents for DB team selection.
2.2. The ENGINEER will review and prepare comments on the existing City DB Contract for City
Attorney review.
2.3. The ENGINEER will prepare and conduct contractor outreach pre -solicitation meeting.
2.4. The ENGINEER will prepare request for qualification to solicitate letters of interest from DB
Teams.
2.5. The ENGINEER will support the City in reviewing RFQs and developing the shortlisted DB Teams.
2.6. The ENGINEER will prepare the RFP documents including providing the design criteria packages
included as part of task 3.
2.7. The ENGINEER will respond to DB Team questions during the development of DB team
proposals.
2.8. The ENGINEER will work with the City on developing the selection criteria for DB team interview
evaluations.
2.9. The ENGINEER will attend and support the City in the interview and selection process.
2.10. The ENGINEER will notify and participate in debriefings for the teams not selected.
2.11. The ENGINEER will advise and support the City through the DB team negotiations.
ASSUMPTIONS
DB Team selection will be a two-step process
DELIVERABLES
A. Draft Design Build Contract Document
B. Contractor Outreach Pre -solicitation presentation
C. Request for Qualifications
D. Request for Proposals
E. Selection Criteria Document
TASK 3. DESIGN CRITERIA PACKAGE
ENGINEER will prepared the design criteria package for Everman Parkway project to include the following
scope.
3.1. The ENGINEER will visit the project site to prepare 20% design package that include typical
sections, plan & profile, ROW needs, and identify project risks.
3.2. The ENGINEER will coordinate meeting with TPW Project managers to review and discuss
conceptual design schematic (10 Meetings)
3.3. The ENGINEER will prepare an updated total project cost estimate
3.4. The ENGINEER will work with the City to determine the project limits, pavement transitions, define
the typical sections, and project right-of-way and easement limits.
3.5. The ENGINEER will prepare and maintain a project risk register and identify possible solutions to
reduce risks that our team will incorporate into the design criteria package
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
3.6. The ENGINEER will initiate coordination with the franchise utility companies, collect record
drawings, delineate private easement, and develop a utility contact list
3.7. The ENGINEER will meet with the City Water Department to verify existing utilities and determine
if the department plans for additional or upsized facilities.
3.8. The ENGINEER will prepare the design criteria package that includes the electronic data files,
record drawings within the project limits, utility coordination status report with responsibility matrix,
permit status report with responsibility matrix, design schematic (20% design level), typical
sections, SUE Utility plan sheets, ROW/Easement Map, survey documents, drainage memo and
models.
• The ENGINEER will review and comment on up to 2 full plan set submittals developed by the
DB team. Comments will be provided to the City and DB Team for consideration.
3.9. The ENGINEER will prepare hydraulic models of the proposed project to identify a viable hydraulic
design which meets the City's floodplain criteria.
Data Collection
• Conduct one (1) site visit to evaluate the topography at each of the proposed crossings and
general stream hydraulic conditions such as vegetation and roughness.
• ENGINEER will obtain the best available model from the CITY. If necessary, ENGINEER will
obtain the latest model from Federal Emergency Management Agency (FEMA).
• ENGINEER will obtain field topographic survey to define the existing crossing and the adjacent
stream channel. Available LIDAR topography will be obtained for use in defining overbank
areas and areas further from the crossing.
Hvdraulic Model Analvsis
• ENGINEER will review the models to evaluate the adequacy of the geospatial reference of the
model as well as topography, roughness, and other parameters. Corrections deemed
necessary to adequately model the project area will be made to develop a Corrected Effective
model.
• ENGINEER will add a minimum of four (4) hydraulic cross sections per crossing and/or update
topography for existing cross sections in the vicinity of the proposed crossings to create the
Existing Conditions model. The Everman Parkway site is assumed to include analysis of the
future Hemphill Street extension crossing of Sycamore Creek in addition to the Everman
Parkway crossing of Sycamore Creek.
• ENGINEER will create a Proposed Conditions model by adding the creek crossings to the
Existing Conditions model. Culvert crossings at roadways will be located with the goal of
passing the 100-year event. Comparisons will be made to the Existing Conditions model to
identify hydraulic impacts in accordance with the current City of Fort Worth Stormwater Criteria
Manual.
• For each of the crossings, ENGINEER will provide an estimated minimum roadway elevation,
conceptual cross culvert or bridge size, and evaluate up to two (2) general alternatives to
minimize or eliminate hydraulic impacts. The evaluation of any alternative will be abandoned if
it is identified the implementation of the solution is not feasible in the ENGINEER's opinion. If
impacts cannot be feasibly mitigated, it is expected that a FEMA Conditional Letter of Map
Revision (CLOMR) and Letter of Map Revision (LOMR) may be required by the design team.
• Based on City standards and the analysis performed at each crossing, ENGINEER will identify
the pertinent design standards, City permits, and anticipated FEMA submittals required for the
project. It is understood this may not be all-inclusive and the DB team must satisfy themselves
that all necessary permits have been obtained. This does not include an assessment of local,
state, or federal environmental permitting requirements.
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
• ENGINEER will prepare a draft memorandum including hydraulic workmaps, hydraulic results
tables, and schematic figures of the crossing alternatives (bridge and culvert options) based on
the work described above for each site.
• After draft results are prepared, ENGINEER will attend up to two (2) meetings with the CITY to
discuss the alternatives to finalize the hydraulic concept.
• A final memorandum describing the hydraulic modeling and the selected alternatives and final
models will be provided after receipt of CITY comments.
ASSUMPTIONS
• Utility Coordination will be initiated, and the DB team will finalize the relocation coordination
activities
• Assumes acceptable hydrology has been performed and will be provided by the CITY including
fully developed conditions.
• It is understood the identified alternatives are conceptual in nature and will need to be finalized
by the DB Team.
• If necessary, LOMR or CLOMR submittals to FEMA submittals will be completed by the DB
team of the project and are not included in this scope.
DELIVERABLES
F. Electronic Data Files
G. Schematic Design (20% Level)
H. Utility Coordination Status Report
I. Permitting Coordination Status Report
J. ROW/Easement Map and Survey Documents
K. Conceptual Hydraulic Evaluation Memorandum and Models
TASK 4. Survey, SUE, and Geotechnical
ENGINEER will provide survey, SUE and Geotechnical services
4.1 Easement meets and bounds descriptions for the following parcels. This work will begin once the
DB team is under contract and the DB team and City agree on the ROW/Easement limits.
• (14) Right-of-way documents
• (4) Drainage Easements
• (4) Grading Easements
• (4) Temporary Construction Easements
4.2 Subsurface Utility Engineering (Level "B") designating including gas, telecommunication, traffic
signals, storm, water, and sanitary sewer within the project limits from High Summit Trail to
Quicksilver Trail.
4.3 The ENGINEER will provide geotechnical investigation services to the City as follows
Field Exploration
• Select and mark up to nine (9) boring locations to obtain subsurface information for roadway
subgrade, bridge and Sycamore Creek, bridge at UPRR and an MSE retaining wall at the
eastern end of the project. Notify Texas 811, appropriate CITY Department(s) to request
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
location and marking of existing underground utilities prior to the field exploration. Access to
the selected boring locations will be verified with the CITY prior to accessing the site with a
core drilling rig.
• Subcontract with a geotechnical drilling contractor to drill up to nine (9) borings. Four borings
will be drilled to 40 feet; two borings will be drilled to 25 feet; and three borings will be drilled to
20 feet. Samples will be collected intermittently using hollow stem augers and either split -spoon
or tube samplers. Rock and rock -like materials will be tested insitu using a Texas Department
of Transportation (TxDOT) Cone Penetration Test, or NX sized rock core samples obtained as
appropriate for the material. At completion, the boreholes will be backfilled with auger cuttings
and the pavement surfaces patched.
• Provide an Engineer or Geologist experienced in logging borings to direct the drilling, log the
borings, and handle and transport the samples. Visual classification of the subsurface
stratigraphy shall be provided per the Unified Soil Classification System (USCS).
Laboratory Testing
• Perform testing on samples obtained from the borings to determine soil classification and
pertinent engineering properties of the subsurface materials. ENGINEER will select samples
for laboratory testing, assign tests, and review the test results. Testing will be performed by a
geotechnical testing subcontractor.
• Laboratory tests will be assigned based on the specific subsurface materials encountered
during exploration. Test type and quantity may vary, but are expected to include:
O Classification tests (liquid and plastic limits and percent passing the No. 200 sieve or
gradation)
o Moisture content
O Dry unit weight
O Unconfined compressive strength
o pH lime series
o Soluble sulfate content
Engineering Analysis and Reporting
• Prepare a technical memorandum (in compliance with City of Fort Worth Pavement Design
Manual, 2015) of the geotechnical investigation to include:
O Boring locations, boring logs, laboratory test results, and a key to the symbols used.
o Discussion of subsurface conditions and soil properties indicated by the field and laboratory
work, and the implications for design.
O Recommendations for pavement subgrade treatment
O Foundation and site preparation recommendations for the two bridges and the retaining walls.
O Earthwork related recommendations for use during development of the plans and
specifications
ASSUMPTIONS
• ENGINEER will complete subsurface utility information prior to Geotechnical borings being
drilled.
• Traffic control has not been included since the project is located along undeveloped greenfield.
• It is assumed that a truck -mounted drilling rig can access the drill locations. If drilling with a
track -mounted rig is necessary, it will be considered an additional service to this contract. If
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
clearing of brush and trees is required to access borings, it will be considered an additional
service.
• ENGINEER will coordinate with CITY to obtain the necessary permits for core drilling within the
roadway. At this time, it is anticipated that drilling permits will not be required.
• Shear strength properties of the subsurface strata will be determined using correlations with
soil classifications for the global stability calculations for the retaining wall. Triaxial shear tests
are not included in this scope of service. If unexpected subsurface conditions are encountered
that would necessitate specific shear tests, such tests will be additional services and performed
only after concurrence with the City.
• The geotechnical scope of work does not include labor hours for design of the MSE wall,
although global stability calculations will be performed.
• Pavement analysis including design traffic volumes and pavement thickness calculations will
be provided in a report/memorandum separate from the Geotechnical Report.
DELIVERABLES
A. Survey meets and bounds description documents
B. Subsurface Utility Engineering electronic files for Level B SUE
C. Geotechnical report: One (1) hard copy and one (1) electronic copy of geotechnical technical
memorandum (including exhibits, soil boring results, summary of observations and pavement
(surface and subgrade) recommendations.
TASK 5. ROW Acquisition Services
5.1. The ENGINEER will provide appraisal services
• This scope of services is based on providing appraisals for up to 10 parcels
• Conduct a pre -appraisal contact with the property owner
• Afford the property owner or their representative the opportunity to accompany the appraiser
during their inspection of the property.
• The appraisal report shall conform to the Uniform Standards of Professional Appraisal
Practices.
• When the Appraisal is finalized, the Appraisal will be submitted to City for final approval prior to
making an offer.
5.2. The ENGINEER will provide right of way title and negotiation services
• This scope of services is based on obtaining easements for up to 10 parcels
• All acquisitions will comply with CFR Part 24 and the Uniform Relocation Assistance and Real
Property Act of 1970 (Uniform Act).
• Prepare and send an Introduction letter along with the Landowners' Bill of Rights by Certified
Mail -Return Receipt Requested (CMRRR)
• A written offer, appraisal report and required brochures will be sent to each property owner or
the property owner's designated representative.
• Up to five follow-up contacts will be made with each property owner with a goal to reach an
agreement conducive to all parties.
• If the property owner choses to make a counteroffer, we will advise them to provide a written
and signed letter along with the appropriate backup documentation in support of the
counteroffer.
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
• Once an agreement has been reached, the necessary instruments (Memorandum of Agreement
(MOA), Deed and W9) will be secured and provided to the title company in request of a closing
statement
• If after 30 days of negotiations and an impasse has been determined or the property owner is
non -responsive, a Final Offer Letter (FOL) will be delivered along with the draft conveyance
document and MOA.
ASSUMPTIONS
• Project includes acquisition of up to 10 parcels of right-of-way, drainage easements, grading
easements, and temporary construction easements.
• Our team will coordinate and obtain approval from the City Property Management department
prior to making offers.
• The scope of work does not include condemnation services
TASK 6. Construction Phase Owner's Representation Services
The ENGINEER will provide owner's representative services for the construction phase
6.1 As the Owner's Designated Representative, FNI will support Fort Worth during final design and
construction
• Construction Kickoff and Progress Meetings
o Attendance (in person or virtual) at monthly meetings led by Design Builder. (Up to 18
meetings)
• Submittal Review
o Support as requested by the City to review of submittals (i.e., shop drawings, RFIs,
etc.). These reviews are intended to be cursory in nature to verify submittal contents
are in general conformance with the construction documents. Note that it is the DB
Team's responsibility to prepare and verify that submittal contents strictly conform to
the construction documents. The DB Team must identify all components in the
submittal necessary for a complete the work in accordance with all applicable codes
and regulations, and that will have the aesthetic and operational characteristics that
meets the overall intent of the form and function of the roadway facility.
• Baseline Schedule Review
o Review the baseline construction schedule for compliance with the General
Conditions of the Construction Agreement.
• Cost Management
o At the City PM Request, FNI will review the schedule of values prepared by the DB
Team for acceptance. Review the monthly cash flow projections provided by the DB
Team. Review the monthly payment requests and supporting documentation and
provide Fort Worth with an opinion of alignment between the payment requested and
the actual work completed, and a recommendation for payment as appropriate.
• Issue Management
o At the City PM Request, FNI will review the Issues Log developed by DB Team. Build
and facilitate the resolution of any issue that requires City of Fort Worth input or
involvement. If necessary, provide an interpretation of the drawings and specifications
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
when questions arise concerning the meaning or intent as it pertains to Owner defined
items.
• Change Management
o At the City PM Request, FNI will review the documentation of requested contract
modifications for justification and compliance with the General Conditions of the
Construction Agreement. Provide recommendations to City of Fort Worth on subsequent
change order documents for approved changes.
• Project Completion
o When the DB Team requests that substantial completion be granted for the Project (or
applicable portions thereof), FNI will conduct a walk-through of the Project with Fort
Worth and prepare a punch list of observed items requiring completion or correction
prior to Substantial Completion and again prior to Final Completion.
o Verify with DB Team that all inspections have been performed as required by
regulations, ordinances, and codes applicable to the Work, including those to be
performed by public agencies having authority over the Work.
o Conduct a final review of the Project with Fort Worth and the DB Team for
conformance with all the Project documents. FNI will confirm work is complete and in
accordance with the Project documents prior to recommending final payment.
o At the City PM request, FNI will review and confirm that the DB Team has submitted all
required documents to Fort Worth prior to recommending the final payment.
• Construction field issue resolution
o At the City PM request, FNI will work with the DB Team, working principally through the
superintendent to address field issues and assist in understanding the intent of Contract
Documents.
o Assist in obtaining from the City additional details or information, when required for
proper execution of the Work.
ASSUMPTIONS
• The City of Fort Worth is responsible for construction management and inspection
services. FNI is serving in an advisory role during construction to support the City PM as
needed.
• FNI will not authorize any deviation from the contract documents or substitution of
materials or equipment (including "or -equal" items) without authorization from the City.
• FNI will not undertake any of the responsibilities of the DB Team.
• FNI does not guarantee the DB Team's performance.
• FNI will not advise on, issue directions relative to or assume control over any aspect
of the means, methods, techniques, sequences, or procedures of construction unless
such advice or directions are specifically required by the contract documents.
• FNI will not advise on, issue directions regarding or assume control over safety
precautions and programs in connection with the work or any activities or operations by
the DB Team.
OWNER'S REPRESENTATIVE SERVICES - EVERMAN PARKWAY
CPN 103271
FORT WORTH,
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services —_CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Full Design Services in addition to the 20% level design included in this scope
• Condemnation Services
• Construction management and inspection services
• Materials testing
• Additional Topographic survey for extend project limits
• Level "A" Subsurface Utility Engineering
• Legal Representation for property acquisition
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Services necessary due to the default of the Design Build Team.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Permitting will be executed by the DB Team
• Effort exceeding those outlined in the "Assumptions" section of each task description.
City of Fort Worth, Texas Page 9 of 9
Attachment A
PMO RELEASE DATE: 02.06.2015 OWNER'S REPRESENTATIVE SERVICES— EVERMAN PARKWAY
CPN 103271
Legend:
"Effort Split bet 'een Wagley Robertson & Everman Parkway
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for
Owner's Representation Services - Everman Parkway (CPN 103271)
Labor] Houma
Task Task Description
Ift
R�
1.0 Task 1 . P.J-t Management
tI�t��d�, :1 Months)
jes�20
rolecl32
PMMr$Re$
Chuck WaH
PM
reMexmM
18
Chris Bosco
APMRaak Lxtl
P,eknWWa
E295
132
R000weV
Fahad Rajaball
FlT
Pmlaaelonwx
$1'�
Buc Sham
QC Rwiew
ProM1salones /
$2T1
.load, Oswald
QC Reriew
Pmlaaalaiwl5
$2T
Drelnsua
Emily Sestak
Task Lead
Pmkesla.al3
$20
halyels
Ella Peni n,ml
EIT
Pnroealoaalx
E1Y
Hamelwrghl Tony Bosecker
C43 Talk Lead
P,sroaslonall P,Wasslaml6
$147 $295
Glote.h.1101
Aaron Brewer
Erruineer
nhesioaal]
$200/
ad -se
Margo Knapp
Admin
8 p onx
p $14
Mark THnnea
GIs
ealonall
$14]
Total Labor Coct
Subwnsu"'m
MWBE
Non-MWBE!
Travel
Toll Expense
Cwt Task Sub Tool
Reproduction
16
0
3
1 3
0
0
O
0
1
$48,450
$0�142
$4
$42
$48,8m$11,81
M
16
3
$11,81
$5,91
$18,92
$$1181ipip`(Brda,
1 $C
E11,811.3
I $1.4
1 $62
! $
$19,
k 2. Des( BUII d Contractor SeleNon
21 Ninafion Ih c, Atto Ys oBice f
2.0 Iii-ader
2.2 1 f��p�i�ggt iiev7
z3 �ap fPle-Brits' natonng)
2.4 of Interest RFO
2.5 )8 T. RFO Ev peon an9 ShortliM
2.8 'repare ilequest �l mfmposels(RFP)
2.7 lespOnd to Q.., g /� DB Team During Prapasal DevebPmenl
2.8 'rep...Selactlon Mena
2.9 )B Teaml �per�w�e�ws tl I��tW�
2.10 dolly 3elec[etl T¢am ar( nducl�bnef MletInge
2.11 )B Team Contest s
1
1
/A
24f
1
1
1
4a
82
5
�'
4
$71,720
$0
EO
$180
E
$1
$71,9
4
• 9
2
I 18
4
4
ifi
8
4
$1,7
$4,]
$4,9
$186
I
$1,780
$4,]3
14,
42,96
$2,
$9.4
$9A
$8,2]
$8.2]
$7,0
$$
$],
S41
$4,14
$9,4
$1N
$9,8
s5,91
$5.91
$12,9
$12,99
I
I
30 'ask 3. Deaign Criteria Package
kaadwar
3.1 mlect sitevlsM
B2 A W, Rep Design Devebpmenl Meetings
3.& 'otal Prolecl Estimate
3.4 'rep ne Design Concepts and Evaluate Coal Impacts
3.5 5sk isury
n11{fas
3.8 Initial Frenchise Utility COordinallon
37 City Water Department Coordination
peaignC1riI @n P p@l @m\s)
Ekmmnk�t�a e urvey , Geolecn)
lalM Asbui-curd Drgs
Utility S.W. Repel and Responsiba8y Mebc
Permitting Steals Report and Responsiblity Mete
Sc1Mme5c Design (20%) Plan & Pmflle
Retaining"WA Pt per Gedech Re-rnmandahans
Prepare Tyykal Sections
SMtility PMn Sheets
Rightof-ofEasement Map
Rightof-wayB Easement DOouments
J:R P-I Su11- end Caordinatbn
pesgn B0Teem PMn Reviews (2 Reviews)
DM Team1b Plan Reviews (Up to 2)
3.9 Drel, Memos ModNs
Data L'dle Yion (Available Hytl2Jic Modeling)
Conecled Effecbi Model (2 crossings)
Revi.d Existing Condition Models (2 crossings)
Altemagwis Analysis (2 Altemati-)
bemiy P��ggppryrylI�� uij�J�R
Draft CorwepWa� ullc Eveluatlan Memorandum
Review Meeting with CITY Stonnwater Depaitment(2)
It Final Coactual Hydraulic Evaluation Memorandum
1�
4
ZO
2681
a
24
40
20
4
12
8
8
80
12
iG
4
10
4
20
10
10
WA
1z
24
16
100
SO
B
$
26
tyL
A
166
30
26
20
40
16
30
1
41
20
4
24I
d
O
4
40I
2
I
2
A
9
2
8
4
2
8
8
4
4
18
8
12
8
4
11
4
18
18
32
8
24
4
a
12
12
16
2
8
I
$2W,080
$1
$0
$220
E
$2
$288,301
$5,9
$22D
$220
$o
$6,201
$14,8
$6.2
$14,
S&Z6
536,0
fB,i]
$36,00
"$114
I $1.41
$3,
1
$4,8
55,91
I
$1, 110
S3,S2
� S-a..�
1 4
1 $58,2
$9,91
$7.5
E11,D
$1,1
1 $7,
1
$4,
S4,48
I
$58,2
$9,91
1
$7,
$11,OB
$1,1
1
$7,8]
$13,784
$13.
$3,
$3,W
$5,0
$5
$4,
E9
$4,700
$10,
$10,
$3,
$9
( $0
$3,56
$10,61
$10,6
$3,3
$3,0
$0
$3,39
$3,
0.O sk 4. Survry, SUE, Gaohchnical
u vey
4.1 oWtDsamenl Documents
(14) RgMof+wey Documents
(4) Drainage Easements
(4) Grading Easements
L (4)Tef^pq try qE Fie
az pub$urFace Ufffffy end Merins'l
I[L'x nagW"nt, Research, Survey
el"B"SUE
2
10
1 10
1
2
$27,T90
$89,5M
$23,000
Sol
$
$112, 5$1
$14q
$1.76
$35,000
$1G,000
$10,6oa
$10,000
15,500
$15'000
E
$1,
$0
$35,
$10,000
$35,0
E70,
$10,000
$10,000
sE
E10,
$1,7
$9,5
$15,
$15,0
City of Fort Worth, Texas
Attachment B - Level of Effwt Supplement
PMO =lei Release Dell: 8.09.2012
M' C°
Level of Effort Spreadsheet
Legend:
TASKIHOUR BREAKDOWN
-Effor[ Spit between Wagley Robertson 8 Everman Parkway
Design Services for
Owner's Representation Servi es -Everman Parkway (CPN 103271)
Labdt;Hoff
r
Owna's Reo
Roadway Drainaue nalnia
Cal Services
pt on
Task Task DesCrt i
Chuck Wolf
I
Chris Bosco Fahad Rajabali Todd Jualln DSwald Emily Sestak Ella PeHichord Bryce Tony Bosecker AarontBrewer
Buckingham HameIwsri9M1t
Margo
Knapp Mark TM1innea
No.
Total labor cost
PM
PPYIN— Teak Leed DT
Leatl EIT DC Rwiew aReview Lee4 Ea�ineer
Tesx
Aemm
cls
_
PretauNna
P.o+...loaals P,oro.aloaaz P.oroseioaas P,vro.alo.a P,ar..olanals r,oro.ai.nalx P,wveeloaal P,aa.elanals Pmrosaioaall
$29� $1T� $2]+ $2i♦1 f2RC $1]@ $14i $29=_
520E
1"PPon Ar...loaal1
$144 P
$1.1
4.3
i
Field t,.n
q$s0I
rAExplaraool I take)B��I
Mse2TMu sulien,
I
$8$R1f
CooNin�etwn
4
9
1 B{
Field Log BoWgs
20
laboratory TestingAssign
end Revlew Lab Testing
Dm0 and Review Bonng Logs
Engineedrg Analysis aM Reporting
Cak:ulafi nand Analysis
12
20
$zss
Geolechniwl Investigation TeGWcal Memorandum
to
iS
R
9
$],89c
Task 5, Ri9M1tbi-waY AC9uisiT'on Serviees
52
0
0 R
0
0
e
0
0
9
f15.3T$
protect Management. Agent Coordination, MeeSngs
II`
20
$5.91{{
5.1
�aisaIs(Up to 14 parcels)
16
S2
Ition le and ROW Negotias
`
1
is
$4.]
Sub conaultent s TraV01 Reproduction
MWBE Non-M a
$10,oad
$7,Sod
$5,5od
Tout Expense Talk Sub Total
Cost
crtlryen1 9$ 1T8 1201 q q q q
$111,au1
$DI $o $420 $01$4
$111,8901
6.1 palings me p to l8 meetlngs) 20 60 20
ae pde ag agues (sReviews) 20
�I"
$35,9
$420
1 $42
$36,40ass
$51
$5,91tlne
$phedJe fiev�ew f 1
$2,37
$2,3T
Cost Management Review ( 10 40
$11.1
Al
Issue Management 2 12
$9,4
$9.4
$9,
$9.4
Change Management 11 12
Proa.ct Completlgn 1 40
Construction Field Issue Resolution 2 20 66
$14,7
$22,37
$14,]6
Project Contingency (10%)
P.J.q /rmmsry
t L
Total L
Tot
MWBE Su
NojrBE Subconsault f
10% SubM rl(rf/r-
.BE Perticij9
Total PmMct I:
City M Fort Worth, Tsuas
ADachmaM B- Level of Effort Supplement
PMO =at Release Dete: 8.09.2012
I
1,391'
],1]0
74,440
S225,250
E2f24.M
251%5.1
SB96A40
2 of
ATTACHMENT B
COMPENSATION
Design Services for
Owner's Representative Services
City Project No. 103271
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A
as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
LABOR CATEGORY
RATE
($/HOUR) **
Professional 1
$147
Professional 2
$176
Professional 3
$200
Professional 4
$231
Professional 5
$271
Professional 6
$295
CAD Technician/Designer 1
$124
CAD Technician/Designer 2
$163
CAD Technician/Designer 3
$199
Intern / Coop
$73
Senior Advisor
$193
** Provided rates are 2023 rates, which will be adjusted annually in February. Both parties agree that
amendments are not warranted if budget deficits were to result due to rate changes.
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 4
ATTACHMENT B
COMPENSATION
iv. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 2 of 4
AM
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount
Prime Consultant
Freese and Nichols, Inc. Owner's Representative
Services $648,190.00
Prime Consultant Total: $648,190.00 72.3%
MBE/WBE Sub -Consultants
Pinnacle Consulting Management Group Inc. $135,750.00
The Rios Group $24,500.00
PJB Surveying, LLC $65,000.00
MBE/WBE Sub -Consultants Total: $225,250.00 25.1 %
Non-MBE/WBE Consultants
Texplor, Inc. $10,000.00
Beyond Engineering and Testing $13,000.00
Non-MBE/WBE Consultants Total: $23,000.00 2.6%
TOTAL $896,440.00 1 100.0%
Everman Parkway (CPN 103271) Total Fee MBE/WBE Fee MBE/ WBE
Owner's Representative Services $896,440.00 $225,250.00 25.1 %
City MBE/WBE Goal = 0% Consultant Commtted MBE/WBE Goal = 0%
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 4
AM
EXHIBIT "13-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 4 of 4
Professional Services Invoice Project Manager: I Bradley Radovich J Summary
Project: IOwner's Representative Services - Everman Pkwy
City Project #: 1103271
City Sec Number: i I Supplier Instructions
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
Company Name: IFreese and Nichols, Inc.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Suppliers PM: Chris Bosco, P.E.
email: Chris.bosco@freese.com
Supplier Invoice #:
Office Address 801 Cherry Street # 2800Fort Worth, Texas 76102
Payment Request #:
Telephone: 817-735-7359
Service Date: From
Fax:
Service Date:To
Invoice Date:
Remit Address 801 Cherry Street # 2800Fort Worth, Texas 76102
Agreement LTD
Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance
Work Type 1 Design Services $996,220.00 $996,220.00 $996,220.00
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Totals This Invoice $996,220.00 $996,220.00 $996,220.00
Overall Percentage Spent:
Freese and Nichols, Inc.
817-735-7359
801 Cherry Street # 2800
I801 Cherry Street # 2800
Fort Worth, Texas 76102
Fort Worth, Texas 76102
CFW Project Manager
Bradley Radovich
Supplier's Project Manager. I Chris Bosco, P.E.
Supplier's PM email: Chris.bosco(cDfreese.com
Name of Project:
Labor Category
Professional - 1
lProfessional - 2
Professional - 3
Professional - 4
Professional - 5
Professional - 6
Construction Manager- 1
`Construction Manager - 2
`Construction Manaqer - 3
Construction Manager - 4
Construction Manager - 5
Construction Manager - 6
!Construction Representative - 1
I[j Construction epresen`alive - 2
Construction representative - 3
Construction Revsgntative - 4
CAD Technician/Designer - 1
`CAD Technician/Designer - 2
CAD Technician/Designer - 3
Corporate Project Su000rt - 1
Corporate Project Support - 2
Corporate Project Support - 3
Intern/ Coop
Senior Advisor
Total Labor
!Subcontract Service
i
I
)
Owner's Representative Services - Everman
Pkwy
Name
Subcontractor Subtotal
10 Percent Markup on Subcontract Services
Nonlabor Expenses
)
Invoice
Supplier Project No.1
Proj. Invoice No.
l
Invoice date:
Period Service Date:Froml
Service nato•Tni
City Secretary Contract M
P.O. Number:
Hours Rate ($/hr)
$
147
$
176
$
200
$
231
$
271
$
295
$
127
$
158
$
168
$
213
$
257
$
295
$
114
$
127
$
158
$
168
$
124
$
163
$
199
$
120
$
143
$
191
$
73
$
193
0.0
Nonlabor Expense Subtotal
Total Expenses (Subcontract Services+Markup+Non labor Expenses)
Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL DUE THIS INVOICE $0.00
Professional Services Invoice Project Manager: Bradley Radovich
Project: Owner's Representative Services - Everman P
City Project #: 103271
Work Type Desc: iDesign Services j Supplier Instructions:
FID: ij
City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: ` When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Name: Freese and Nichols, Inc.
Supplier's PM: Chris Bosco, P.E.
Supplier Invoice #: Chris Bosco, P.E.
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Pay Items
31 - Conceptual Design
31 - Conceptual Design
Description
Totals This Unit:
email: Chris.bosco@freese.com
Office Address 801 Cherry Street # 2800Fort Worth, Texas 76102
Telephone: 817- 73 5-7 359
Fax:
Remit Address 801 Cherry Street # 2800Fort Worth, Texas 76102
Agreement LTD
Agreement Amendment Amendment
Amount to Completed
Amount Number Amount
Date Amount
$99,780.00
$99,780.0(
$896,440.00
$896,440.01
$996,220.00
$996,220.00
Overall Percentage Spent:
Percent ($) Invoiced Current
Spent Previously Invoice
Remaining
Balance
$99,780.00
$896,440.00
$996,220.00
0 T WORTH Owner's Representation Program Schedule
(Everman Parkway)
FIB
.A4. 01 oz 93 fl9 0t y ca y co M L 91 02 y 6l 9± ue
1Everman Parkway IDS ProjectEverman Parkway DB Project
S.1, Oanara Rep Cawad Amen-wA
0aya Thu&323
Thu-3
Submit Owners Rep Contract Amendment + 8/3
1 City Councl Appmvel Owners Rap Canoed
39 daya Thu&=3
Tue9 -2
City Council Approval Owner's Rep Contract
City Council Meeting -Amestlment Approval
Otlaya Tua 9R8123
Tua 9126r!]3
City Council Meeting- Amendment Approval j'9R6
• ` I' '
Owner's Rep Services (Contract Amendment)
240 daysI
1.0 Project Management
-'/ 1 1.1 A.3 Montldy Rep-antlS .0-
12- W. 92712S
Tucfi-f44
a 1A Pruj Cowdinagon Meetings Phase)
12 Wetl 92)Y13
Tua &2T244
1.1.1.3 Monthly Reports and Schedules
ant (P-gn
moln
1.4 Project Coordination and Meetings (PreMM9n Phase)
a
2.0 pesign Build Team Selection
10
2.1 Coun indionwth City Adunwy Onw
20 days
Thu 525'23
W-1-
oro I �
2.1Cnaralna n with City Attorney Office
2.2 Fon Won, Design Build C-huh Development
M daya
Fn 61M3
Thu W4y 3
21
nWOIM Design Build Contract Development
2.2.1C,,MI,wion Meeting W Review D9 Conrad
0daya
Fd0H8r23
Fd 8Ha23
I Coordination Meeting to Review DB Contrac(e $HB
_
ti
2.3 DB Tat, OWaesh (Pro8G141Wtbn Meetlne)
0 tlsya
I'd wars]
Fd 9iM]
2.3 DB Team Outreach (P-Solicitation Meeting)
2.408 Team Solkitation'LeOerG lnterest'(RFD)(Mlksrone)
25 tleys
Th. 11/23I23
WW 12/2T/23
2.4 OB Team Solicitation "Laver of Interest"(RFD)(Mileetone)
•+
2.5 DB Tesma RFO Evaluation&S,owtat
25 days
Thu 12/2&23
Wed 11312414
2.5 DB Teams RFD Evaluation 8 Shortllat
K
2.6 be Taam. RFP Co. pletlon(Mile-1)
0daya
Wed 1131124
Wad 113112415
2.6 DB Team- RF1P Compitlon(Milestone) 1131
2.7 OB Teams TechnlcalPmposM DevdopmeG (Ouestlon Responses)
d5 tleys
TM1u 2/1124
Wetl dr312016
2.7 DB Teams Technical Proposal De elopment (Question Responses)
2a DB Team Sdedion Cmena
20 Uays
Thu 211124
Wetl 2R Is
2.8 DB Team Selection Crnerla
2.9 DB Team lnlarviews&Evaluation
25 d-
TM1u 4NR4
Wetl WW417
1
19gB{Qq 2.9 DB Team Interviews 8 Evauatlon
a
2.10 UB Taam SGedlon (Mlastone)
0daya
Wed&&24
Wetl&012419
2.101DB Team Selection (Milestone) J 518
th
2.11 Conrad Ne0Mt,,
30dys
TM1u5 4
WW611912420
figion 2.It Contract Negorlatlon
22
Contrecl AvreN -dExeation
44 days
Thu B2N29
Tue 8202421
Co. Award and Execution
�3
Cityoauncll ComnG 1ppmvei
0 days
Tue 8�Orz4
Tua 6120M22
City Council Contract Approval �T 8YL0
3.0 Design Criteria Package
IN dare
T!wMM
Wad linauIut
3.0 Design Criteria Package
Data cal-h(Survey)
UdaW
Thu &1O123
TMr fill&23
fly"
Alignment and Concept Development
30 d-
TM1u W1023
Wetl 91.325
Prepare Design CdWria PWAI,w(DCP)
114 days
TM1..=3
Tue 111624
a
3.6 Franchise Utility Conflid AWp,
10daya
TM1u 6/1023
W.-.325
is
3.8 Roadway Design Packaga (a Deatgn)
60 days
Thu gr21123
Wed 1.13-.
3.8 Prepare ROW and [Eat,. t Fodpnnt
10 days
Thu 12/1-3
Wed 12/21/2329
3.9 Prepare H&H Drainage Modd.
40 days
Wed 1111Q3
Tue 1212&23
City DCP Review Maating
0days
Tue112/24
Tue11a2431-
drys
CompM.d DCP
10daye
Wetl 1-4
Tue 1/162432
Frawhh, Utilities
240 days
Thu 1V1,V23
Wed 11/13124
as
Uft Cco-wo,
12 mom
Thu 12d14/23
Wed 11113R429
Data Collection (Survey) ♦ W10
(IAlignment and Concept Development
ElPrepare esigd Criteria Package (DCP)
�3 3.8 �armhiae Utility Con8lG Anatyeis
i'`rd T9 3.8 Roadway Design Package (20%Desi In)
4i: Prepare ROW and Easement Foobirint
Prepare MH Drainage Models
City DCP Resew 112
1 Completed DCP
Franchise Utilities
4.0 SurWey, SUE and Geotechnical
e Is
Utility Coordination
FORT WORTH,
Owner's Representation Program Schedule
(Everman Parkway)
Iu .^w•4.1&
Oi
az oa Ca g1 42 pxa !D 44 ou zoxa ga M ur
41 Prepare ROW and Freemem.—en.
45Eays
Thu 1=8123
Wed 212&2430
r� 4.1 & 4.2 Propane ROW and hand Documents
4.3 & 4A Sub— Unity EngineedW
45 days
Wed B 23
Tue I InW34
4.3 &4.45ubs rface Utllky Engineeringpq
7e 4.5 Geoloohnicallmes,bon
45days
Wed W7/23
Tue 1112&234
aS Geotachn II.—thganon
5.0 Rightof-w y Acqulstlon Services
41 5.1 Appeleab
Wiles
Thu WQ24
Wed 5722/2431
5.1 Awaissis
40 51 ROW NegWetiona and gwinp
12 more
Thu 52320
Wed 4/2&2541
5.2 ROW Npodatlonsand Closing
8.0 Construction Phase Services
44 -I Osnere Repmsen6gpn
1a hams
Mon 7114/25
Fd leM 50
Genarel Owners Repreaentatlon
- -
Design Build Tepm (Design and Construction)
ss Des, Devalopmem(20%to 70%)
Wdleys
W. W1/24
Tue tv1on422
Design Develophand(20%to 70%
•' Cwrere Rein &City Plan Review
15 days
Wool IVI1/24
rue 1MI3 446
A 01y neA Rap & City Wan R.A—
PublicMMing
0deye
Wad 111&25
Wad 11IMS 47
Public Meeting 1115
Flna1100% Design JSlgnedand Sealed)
No-
Wed 1/125
Tue&112541
jagassisse Find 100%Design signed and sealed)
'-a Way Coorohahon & Rebwtion
10 mom
Wed &2124
Tue &27/2522
Utility l:oorelnetlon 6 Relocation
5 DB Team Prepares Fm l GMP
30 days
Wed 11125
Tue 211112547
0e Team Prepares FIn.MP
to Review and Collabomlmn on GMP
Nu_
Wed 2y12125
Tue 3I112551
i
Review and Collabendion on GMP
GMP and Funding Appmpria0om and Counul Approval
45 d_
Wed &1 L25
Too 5/132552
313 GMP and Funding APpropnatlanaand Council Approval
u Clty Council Connaot Approval
0dsya
Mon III—
Mon 7114D5
City Council Contract approval • 7114
'-& Con —on
16m0m
Mon 7/14125
FM 101WS&I
Construction
-----tweday
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 12/12/23 M&C FILE NUMBER: M&C 23-1053
LOG NAME: 2023 FREESE AND NICHOLS ARTERIAL PROJECTS
SUBJECT
(CD 7, CD 8, and CD 10) Authorize Execution of Amendments to Two Engineering Services Agreements, Each with Freese and Nichols, Inc for
the Everman Parkway and Wagley Robertson Arterial Roadway Projects, Adopt Appropriation Ordinances and Amend the Fiscal Years 2024-
2028 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Amendment No. 1 to City Secretary Contract Number 59439, an Engineering Services Agreement with Freese and
Nichols, Inc. in an amount of $896,440.00, for additional professional services associated with the Everman Parkway Project, for a total
contract amount of $996,220.00 (City Project No. 103271);
2. Authorize execution of Amendment No. 1 to City Secretary Contract Number 59368, an Engineering Services Agreement with Freese and
Nichols, Inc. in an amount of $771,850.00, for additional professional services associated with the Wagley Robertson Project, for a total
contract amount of $871,500.00 (City Project No. 104154);
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Drainage Rev Bonds Series 2023 Fund,
by increasing estimated receipts and appropriations in the Wagley Robertson Arterial Project (City Project No. 104154), in the amount of
$2,000,000.00 and decreasing estimated receipts and appropriations in the SW Hazardous Rd Overtopping Programmable project (City
Project No. P00120) by the same amount;
4. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Stormwater Capital Projects Fund, by
increasing estimated receipts and appropriations in the Wagley Robertson Arterial Project (City Project No. 104154),in the amount of
$3,000,000.00 and decreasing estimated receipts and appropriations in the SW Hazardous Rd Overtopping Programmable project (City
Project No. P00120) by the same amount; and
5. Amend the Fiscal Years 2024-2028 Capital Improvement Program.
,DISCUSSION:
In May 2023, kickoff engineering services contracts with Freese & Nichols, Inc. were administratively approved for a limited scope of work for
Design -Build Owner's Representative services associated with the Everman Parkway and Wagley Robertson arterial roadway projects. The
contracts are intended to expedite critical early project activities while the remainder of the contract scope is negotiated. The purpose of this
Mayor and Council Communication (M&C) is to authorize the execution of Amendment No. 1 to each of the engineering services contracts with
Freese and Nichols, Inc. for the remainder of the required services not included in the kickoff contracts as follows:
1. Contract No. 59439 for the Everman Parkway Arterial Project, between Cameron Hill Point and Rosedale Springs Drive, which was
administratively approved on May 20, 2023 in the amount of $99,780.00, is being amended in the amount of $896,440.00 for a total
contract amount of $996,220.00 and,
2. Contract No. 59368 for the Wagley Robertson Road Project between Coneflower Trail and Quicksilver Trail, which was administratively
approved on May 9, 2023 in the amount of $99,650.00, is being amended in the amount of $771,850.00 for a total contract amount of
$871,500.00.
Amendment No. 1 for each project revises the contract scope to include services relating to the development of Design -Build procurement
documents and processes, preliminary engineering services, assistance and advisory roles in procurement, and implementation of the Design -
Build contract.
The Everman Parkway project, contemplates the design and construction of a four -lane divided arterial with associated stormwater improvements,
wide sidewalks, and street lighting, and includes a railroad overpass.
The Wagley-Robertson Road project will replace a two-lane rural road with a four -lane divided arterial, stormwater infrastructure, and street lighting.
The project contemplates significant drainage improvements to remove the existing roadway from the floodplain and to reduce the chances of
roadway overtopping currently experienced. In 2022, when the project was added to the 2022 Bond Program, Transportation Public Work's
Stormwater Division agreed to participate in the project with a contribution of $5,000,000.00. This M&C will appropriate those funds into the
project. The following table summarizes previous contract actions and amendments:
The additional Stormwater funding for this project was not included in the FY2024-2028 Capital Improvement Program because the sources of the
additional funding were unknown at the time of the CIP development. The action in this M&C will amend the FY2024-2028 Capital Improvement
Program as approved in connection with Ordinance 26453-09-2023.
Funding is budgeted in the TPW Dept Highway & Streets Department's Stormwater Capital Projects and Drainage Rev Bonds Series 2023 Funds
for the purpose of funding the Wagley Robertson project.
Everman Parkway
Initial Contract 59439, May 20, 2023, administratively approved, $99,780.00, CPN 103271
Wagley-Robertson
Initial Contract 59368, May 9, 2023, administratively approved, $99,650.00, CPN 104154
The following table summarizes the total project funding for Everman Parkway:
Fund Existing Additional Project Total
Funding Funding
34027- 2022 Bond Program Fund $11,100,000.00 0.00 $11,100,000.00
30108- Transportation Impact Fee $400,000.00 0.00 $400,000.00
Cap Fund
0.00
30104 — Developer Contribution Fund $3,066,876.54 $3,066,876.54
30106 — Intergovemmental $15,350,000.00 0.00 $15,350,000.00
Contribution Fund
39008 — Trans Impact Fee Cap $400,000.00 0.00 $400,000.00
Legacy Fund
Project Total $30,316,876.54 $0.00 $30,316,876.54
DVIN-BE Office: Freese and Nichols, Inc is in compliance with the City's Business Equity Ordinance by committing to 30% MWBE participation
on this project. The City's MWBE goal on this project is 13%.
This project is located in COUNCIL DISTRICT 8.
The following table summarizes the total project funding for Wagley-Robertson:
Fund Existing Additional Project Total
Funding Funding
34014- 2014 Bond Program Fund $4,500,000.00 0.00 $4,500,000.00
34027- 2022 Bond Program Fund $11,000,000.00 0.00 $11,000,000.00
52008 — Drainage Rev Bond Series $2,000,000.00 $2,000,000.00
2023 Fund
52002 — Stormwater Capital $3,000,000.00 $3,000,000.00
Projects Fund
Project Total $15,500,000.00 $5,000,000.00 $20,500,000.00
DVIN-BE Office: Freese and Nichols, Inc is in compliance with the City's Business Equity Ordinance by committing to 23% MWBE participation
on this project. The City's MWBE goal on this project is 20%.
This project is located in COUNCIL DISTRICT 7 and 10.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the SW Hazardous Rd Overtopping project within the Stormwater Capital
Projects and the Drainage Rev Bonds Series 2023 Funds and upon approval of the above recommendations and adoption of the attached
appropriation ordinances, funds will be available in the Stormwater Capital Projects and the Drainage Rev Bonds Series 2023 for the Wagley
Robertson project to support the above recommendations and execution of the amendments. Prior to an expenditure being incurred, the
Transportation and Public Works Department has the responsibility of verifying the availability of funds.
Submitted for Citv Manaaer's Office bv: William Johnson 5806
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
103271-EPAM-Everman Parkway- DB Services
rNl Amend.#1
Interim Agreement Report
Created: 2024-01-05
By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
Status: Out for Approval
Transaction ID: CBJCHBCAABAAZtP_nJaPYyuOLFJ9mF1BZe0BHgYl2F6d
Agreement History
2024-01-06
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"103271-EPAM-Everman Parkway- DB Services FNI Amend.#1"
History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-01-05 - 2:05:51 AM GMT- IP address: 204.10.90.100
Document emailed to jaylyn.harrelson@fortworthtexas.gov for approval
2024-01-05 - 2:29:19 PM GMT
Document emailed to Chris Bosco (cb@freese.com) for signature
2024-01-05 - 2:29:19 PM GMT
Document emailed to Bradley.Radovich@fortworthtexas.gov for signature
2024-01-05 - 2:29:19 PM GMT
Email viewed by Chris Bosco (cb@freese.com)
2024-01-05 - 2:33:42 PM GMT- IP address: 97.75.108.6
Document e-signed by Chris Bosco (cb@freese.com)
Signature Date: 2024-01-05 - 2:36:37 PM GMT - Time Source: server- IP address: 97.75.108.6
Email viewed by Bradley.Radovich@fortworthtexas.gov
2024-01-05 - 2:44:51 PM GMT- IP address: 204.10.90.100
Signer Bradley.Radovich@fortworthtexas.gov entered name at signing as Bradley M Radovich
2024-01-05 - 2:45:27 PM GMT- IP address: 204.10.90.100
FORTWORTH_. Powered by
Adobe
Acrobat Sign
Document e-signed by Bradley M Radovich (Bradley.Radovich@fortworthtexas.gov)
Signature Date: 2024-01-05 - 2:45:29 PM GMT -Time Source: server- I address: 204.10.90.100
Email viewed by jaylyn.harrelson@fortworthtexas.gov
2024-01-05 - 2:52:01 PM GMT- IP address: 204.10.90.100
FORTWORTH_. Powered by
Adobe
Acrobat Sign
103271-EPAM-Everman Parkway- DB Services
FNI Amend.#1
Final Audit Report 2024-01-10
Created: 2024-01-06
By: Andrea Munoz (And rea.M u noz@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAAkEyrXcrosC3hxtgdWTaKNZEBx104L2Ztg
"103271-EPAM-Everman Parkway- DB Services FNI Amend.#1"
History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-01-06 - 4:35:34 AM GMT- IP address: 204.10.90.100
Document emailed to jaylyn.harrelson@fortworthtexas.gov for approval
2024-01-08 - 4:34:57 PM GMT
Email viewed by jaylyn.harrelson@fortworthtexas.gov
2024-01-08 - 4:46:34 PM GMT- IP address: 204.10.90.100
Signer jaylyn.harrelson@fortworthtexas.gov entered name at signing as Jaylyn Harrelson
2024-01-08 - 4:53:47 PM GMT- IP address: 204.10.90.100
Document approved by Jaylyn Harrelson (jaylyn.harrelson@fortworthtexas.gov)
Approval Date: 2024-01-08 - 4:53:49 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Raul.LopezRoura@fortworthtexas.gov for filling
2024-01-08 - 4:53:52 PM GMT
Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) added alternate form filler
Alejandra.Ayala@fortworthtexas.gov. The original form filler Raul.LopezRoura@fortworthtexas.gov can still fill
the form.
2024-01-08 - 5:07:22 PM GMT- IP address: 204.10.90.100
P+ Document emailed to Alejandra.Ayala@fortworthtexas.gov for filling
2024-01-08 - 5:07:22 PM GMT
Email viewed by Alejandra.Ayala@fortworthtexas.gov
2024-01-08 - 5:09:02 PM GMT- IP address: 204.10.90.100
FORT WORTH, Powered by
Adobe
Acrobat Sign
Document declined by Alejandra.Ayala@fortworthtexas.gov
Decline reason: Update Attachment B with the correct amount. Attach justification form.
2024-01-10 - 10:02:32 PM GMT- IP address: 204.10.90.100
FORT WORTH, Powered by
Adobe
Acrobat Sign
FORT WORTH
t
Routing and Transmittal Slip: TPW-Cap Delivery
DOCUMENT TITLE: Everman Parkway- DB Services FNI Amend.#1
M&C: 23-1053 CPN: 103271 CSO: 59439 DOC#:
Date:
To: Name
Department
Initials
Date Out
1. Chris Bosco-CB@freese.com
FNI
CB
Jan 5, 2024
2. Bradley Radovich-PM, Sig
TPW
BM�
Jan 5, 2024
3. Raul Lopez -Review
TPW
-,ce-z
Jan 17, 2024
4. Lissette Acevedo -Review
TPW
o�v
Jan 18, 2024
5. Patricia Wadsack-Review
TPW
PLW
Jan 18, 2024
6. Lauren Prieur- Signature
TPW
MLLP
Jan 18, 2024
7. Doug Black -Signature
Legal
,b
Jan 18, 2024
8. Jesica McEachern-Signature
CMO
JLM
Jan 18, 2024
9. Jannette Goodall
CSO
Jan 19, 2024
10. TPW Contracts
TPW
CC: TPW BSPAP Recon Team, TPW Records
Room, Jaylyn Harrelson
DOCUMENTS FOR CITY MANAGER'S SIGNATURE:
All documents received from any and
all City Departments requesting City Manager's signature for
approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has
signed the routing slip,
David will
review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(a)fortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!