HomeMy WebLinkAboutContract 60160-A1AMENDMENT No.l CSC No. 60160-A1
TO CITY SECRETARY CONTRACT No. 60160
WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 60160,
(the CONTRACT) which was authorized by M&C 23-0666 on the 8 day of
August, 2023 in the amount of $ 228,000.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
CentrePort Trail Phase II, CPN 102130; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $22,000.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $250,000.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
City of Fort Worth, Texas CentrePort Trail Phase II
Prof Services Agreement Amendment Template CITY SECRETARY Project Number 102130
Revision Date: 12/08/2023
Page 1 of 3 FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: Jan 26, 2024
go4vvpp��
a1. fORt��add
ATTEST: o�° N.
Q n � pia %%
/) aaan aExA?a4a
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
ENGINEER
Halff Associates, Inc.
Todd Woodson
Vice President
DATE: Jan 11, 2024
Rva
Rpg '
7h SP
JY '
Richard Zavala
Director, Park & Recreation Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Carlos M. Gonzalez
Park Planner
APPROVED AS TO FORM AND LEGALITY:
74V4
Jeremy Anato Mensah
Assistant City Attorney I
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 3
M&C No.#:
M&C Date:
N/A
N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Centre Port Trail Phase II
Project Number 102130
FUNDING BREAKDOWN SHEET
City Secretary No. 60160
Amendment No. 1
Fund Dept ID Account Project
ID
31001 0800450 5330500 102130
Total:
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 3 of 3
CF1- CF2 -
Activity Bond
Reference
005030
Amount
$22,000.00
$22,000.00
CentrePort Trail Phase II
Project Number 102130
. e haLff
Halff Associates, Inc.
1201 North Bowser Road
Richardson, Texas 75081
(214)346-6200
Fax (214) 739-0095
Exhibit "A"
Centreport Trail Phase 2 — Amendment No. 1
Scope of Work
I. Alignment Modification
Halff (Engineer) will modify the Centreport Phase 2 horizontal and vertical alignment between Station
19+00 and Station 24+00 to avoid a permanent easement across an existing gas -line easement. A station
equation will be utilized to address the alignment change and to avoid restationing the entire trail.
II. Retaininq Walls
Engineer will modify the Wall G layout and design to address the alignment changes. Engineer will also
modify the Wall G footings design to remain outside of the gas easement.
III. Associated Chanqes
Engineer will revise and/or update the following items that are impacted by the alignment change:
• Update cross -sections
• Update typical sections
• Update grading/contours
• Update Horizontal Alignment Sheets
• Update quantities
• Update drainage areas and storm calculations
• Update striping
• Update seeding and sodding limits