HomeMy WebLinkAboutContract 50018-A5CSC No. 50018-A5 AMENDMENT No . 5 TO CITY SECRETARY CONTRACT No. 50018 WHEREAS, the City of Fort Worth (CITY) and CH2M Hill Engineers, Inc, (ENGINEER) made and entered into City Secretary Contract No. 50018, (the CONTRACT) which was authorized by M&C C-28475 on the 14th day of November, 2017 in the amount of $282,822.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $77,296.00, administratively authorized on September 4, 2018, Amendment No. 2 in the amount of $245,461.00 which was authorized by M&C C-29039 on February 12, 2019, Amendment No. 3 in the amount of $539,620.00 which was authorized by M&C 20-0463 on June 23, 2020, Amendment No 4 in the amount of $50,000.00 administratively authorized on October 16, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Village Creek Biosolids Management and Beneficial Reuse Facility Project Owner On -Site Representation; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 6, 2023, a copy of which is attached hereto and incorporated herein. The cost to City for the additional engineering services to be performed by Engineer totals $54,144.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,249,343.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [VCWRF Bicsolids Management & Beneficial Reuse] Page 1 of 2 [CPN 1019611 EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Jan 29, 2024 APPROVAL RECOMMENDED: Lalgl-a F WiGson, ko - clt Laura R Wi[son, for CH (Jan 25, 202417:40 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER CH2M Hill Engineers, Inc. bra Douglas Smith Designated Manager DATE: 1 /25/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. for Ste,,Z, Nutter Environmental Project Manager APPROVED AS TO FORM AND LEGALITY: DBlack (Jan 29, 202412:43 Douglas W. Black Senior Assistant City Attorney an 9Fonr °�a ATTEST: .+�.�sm aaaa nE��°psg4a Jannette S. Goodall City Secretary M&C : 24-0071 Date: 01 /23/2024 N/A Form 1295: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [VCWRF Bicsolids Management & Beneficial Reuse] Page 2 of 2 [CPN 1019611 JACOBS ChZM, October 6, 2023 Mr. Christopher Harder, P.E. Director Fort Worth Water Department City of Fort Worth, Texas 200 Texas Street Fort Worth, Texas 76102 IACOBS 777 Main St. Fort Worth, Texas 76102 O +1 817 735 6000 F +1 817 735 6148 www.jacobs.com Subject: Village Creek Biosolids Management and Beneficial Reuse Facility Project Update, Amendment No. 5 (City Secretary Contract No. 50018, M&C C-28475) Dear Mr. Harder: Please find enclosed CH2M's proposal for Amendment No. 5 to the Subject project. Should you have any questions, please do not hesitate to contact me at 512-314-3180. Fee Proposal for Amendment No. 5: $54,144.00 CH2M HILL Engineers, Inc. proposes a total fee of $54,144.00 to accomplish the scope of services proposed. A breakdown of the fee is included in Attachment A. Summary of Contract Fee: Original Contract Amount $282,822.00 Amendment No. 1 $77,296.00 Amendment No. 2 $245,461.00 Amendment No. 3 $539,620.00 Amendment No. 4 (not yet executed) $50,000.00 Amendment No. 5 $54,144.00 Revised Contract Amount $1,249,343.00 Regards, CH2M Matthew Berg, P.E. Project Manager ATTACHMENT A ENGINEERING SERVICES FOR VILLAGE CREEK BIOSOLIDS MANAGEMENT AND BENEFICIAL REUSE FACILITY PROJECT CITY PROJECT NO.: 101961 ATTACHMENT A SCOPE OF SERVICES FOR VILLAGE CREEK BIOSOLIDS MANAGEMENT AND BENEFICIAL REUSE FACILITY PROJECT CITY PROJECT NO.: 101961 AMENDMENT 5 The scope set forth herein defines the work to be performed by the ENGINEER in completing Amendment 5 related to the Village Creek Biosolids Management and Beneficial Reuse Facility Project (Project). Both the CITY and ENGINEER have worked to clearly define the work to be performed and address the needs of the Project. WORK TO BE PERFORMED The purpose of this Amendment 5 is for the ENGINEER to perform additional services to support the City's Project: Village Creek Biosolids Management and Beneficial Reuse Facility Project Owner On -Site Representation, specifically to assist with sludge quality testing and evaluation at the City's sludge storage lagoons. Specific work tasks are as follows: 1. Original Task 1 (not used) 2. Original Task 2 (not used) 3. Original Task 3 (not used) 4. Original Task 4 (not used) 5. Original Task 5 (not used) 6. Contract Claims Assistance (not used) 7. Pond Sampling ENGINEER shall develop a plan to sample and test solids from sludge ponds at the Village Creek Biosolids and Beneficial Reuse facilities, currently operated by Synagro for the City. The samples will be pulled from the ponds based on the developed sample plan after incorporating input from the City and Synagro. Samples will be taken from the North and South Lagoons, and 5 MG tank overflow pond, over a maximum of 3 days.. Anticipated sample locations and quantities are estimated as follows: • South Pond: 10 locations within the pond, from 2 elevations per location for a total of 20 samples. • North Pond: 16 locations within the pond, from 2 elevations per location for a total of 32 samples • Overflow Pond: 3 sample locations, one grab sample per location. ENGINEER will be onsite during the sampling and will work with the City's contractor that will be providing and operating an excavator from the shoreline that will be used to perform the sampling of the north and south ATTACHMENT A ENGINEERING SERVICES FOR VILLAGE CREEK BIOSOLIDS MANAGEMENT AND BENEFICIAL REUSE FACILITY PROJECT CITY PROJECT NO.: 101961 ponds. ENGINEER will not provide or operate equipment. ENGINEER will perform the collection of samples from the excavator bucket and assist the City in transport of the samples to the lab facility that will be selected by and contracted to the City. The lab will test for solids content and molybdenum content of the samples. The City will provide all sampling bottles. ENGINEER will receive test results from the City and summarize the results in a Technical Memorandum (TM)that will be presented to the City. Jacobs will be responsible for the safety practices of Jacobs staff but is not responsible for the safety practices of the excavator operator, City, or any non -Jacobs personnel. The anticipated schedule is as follows: • NTP (based on confirmation from City of excavator/sampling date) to field sampling: 5 calendar days • Field sampling to receipt of lab data (by City): 7 calendar days • Lab data to Draft TM: 7 calendar days • Receipt of City comments (including any Synagro input) to Final TM: 7 calendar days. Followup meetings will be provided as requested. A budget of 10 hours for each of three staff has been allocated. ENGINEER shall also manage the team to promote efficient and effective use of ENGINEER's time and resources. ENGINEER shall manage change, communicate effectively, coordinate internally and externally, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. Budget Proposed Time and Materials budget for this Amendment 5: $54,144.00. City of Fort Worth, Texas Mayor and Council Communication DATE: 01/23/24 M&C FILE NUMBER: M&C 24-0071 LOG NAME: 60VCWRF MASTER PLAN UPDATE AMEND 5 SUBJECT (CD 5) Authorize the Execution of Amendment No. 5 to an Engineering Agreement with CH2M Hill Engineers, Inc., in the Amount of $54,144.00 for Village Creek Biosolids Management and Beneficial Reuse Facility Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City 1. Authorize the execution of Amendment No. 5 to City Secretary Contract No. 50018, an Engineering Agreement with CH2M Hill Engineers, Inc. in the amount of $54,144.00, for a revised contract amount of $1,249,343.00, for the Village Creek Biosolids Management and Beneficial Reuse Facility project (City Project No. 101961); and 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in Water & Sewer Capital Project 2019 Fund by increasing estimated receipts and appropriations in the Village Creek Water Reclamation Facility Biosolids Management and Reuse project (City Project No. 101961) in the amount of $54,144.00 and decreasing estimated receipts and appropriations in the Unspecified -All Funds project (City Project No. UNSPEC) by the same amount for the purpose of funding Village Creek Water Reclamation Facility Biosolids Management and Reuse project (City Project No. 101961) and effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On November 14, 2017 (Mayor and Council Communication (M&C) C-28475), the City Council authorized an Engineering Agreement in the amount of $282,822.00 with CH2M Hill Engineers, Inc., for the Village Creek Biosolids Management and Beneficial Reuse Facility project. The agreement was subsequently revised by Amendment No. 1, in the amount of $77,296.00, administratively authorized September 4, 2018, that provided for additional wastewater solids process modeling work, long-term growth projections and additional alternatives analysis, as well as the preparation of an engineering feasibility report submitted to the Texas Water Development Board (TWDB) as part of a Clean Water State Revolving Fund (CWSRF) Loan application. Amendment No. 2, in the amount of $245,461.00, authorized February 12, 2019 (M&C C-29039) that provided for the development of a the Request for Qualifications (RFQ) and Request for Proposals (RFP) as part of the procurement process for a design -build -operate contract for biosolids management project and responding to requests for information (RFIs) during the procurement process, for providing technical analysis and recommendations during the evaluation of vendor submittals and during the negotiation of the agreement. Amendment No. 3 authorized June 23, 2020 (M&C 20-0463) in the amount of $539,620.00 that provided for inspection, testing, and construction administration for the biosolids dryer facility and Amendment No. 4, in the amount of $50,000.00, administratively authorized October 12, 2023, provided for claims review and technical assistance. Amendment No. 5 provides for of the necessary services to develop sludge lagoon residuals field sampling, testing, and quality assurance plan for the facility site. This work is necessary to determine appropriate disposal methods for accumulated residuals located in the two sludge lagoons at the Village Creek Biosolids Management and Beneficial Reuse Facility. Funding for the Village Creek Water Reclamation Facility Biosolids Management & Reuse project is depicted below: Fund W&S Capital Projects Fund 56002 WS Capital Project 2019 Fund 56016 WS Capital Project 2020 Fund 56018 W&S Bond 2020A Fund 56017 (Project Total Existing Additional Appropriations Appropriations Project Total* $1,112,098.25 $0.00 $1,112,098.25 $245,461.00 $54,144.00 $299,605.00 $60,000,000.00 $0.00 $60,000,000.00 $715,000.00 $0.00 $715,000.00 $62,072,559.251 $54,144.00I$62,126,703.25 *Numbers rounded for presentation purposes. Funding is available for appropriations in the Unspecified -All Funds project within the WS Capital Project 2019 Fund for the purpose of funding the Village Creek Water Reclamation Facility Biosolids Management & Reuse project. This project serves the entire City and is located in COUNCIL DISTRICT 5. A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified -All Funds project within the WS Capital Project 2019 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the WS Capital Project 2019 Fund for the VCWRF Biosolids Mgmt & Reuse project to support the above recommendations and execution of the contract. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: Chris Harder 5020 Additional Information Contact: David Townsend 8430 60VCWRF MASTER PLAN UPDATE AMEND 5 FID Table 2 56016 0700430 4905427 101961 2024 $54,144.00 2 56016 0600430 UNSPEC 2024 ($54,144.00) 2 56016 0700430 101961 2024 $54,144.00 Mnd 1.1141 4•1 •••• 4411 1 1141 4•1 1 11 1 1 •••• 4411 FIDs REVENUE or EXPENSE - No KK or GL Entries Needec Rer # FuDent it Arrmint Prniert ID 1 Artivity RudPet rF 7 PrnPram Amount 1 1 56016 1 0700430 1 5330500 1 101961 1 003030 1 9999 1 1 1 $54,144.00