Loading...
HomeMy WebLinkAboutContract 59073-CO2pO�oonnIl foRT*ddA F~° 1.O91AAd PdOn TFXAso4d Attest: Facility and Project Forest Park Pool Description: FORT WORTH,.: City Of Fort Worth Change Order Request Funding (FID) No.(s)152002-0200431-5740010-100092-002880-9999 Contractor: I Steele & Freeman City Project Mgr. IRonnie Clements Phone Number:1(817) 392- 8014 Change Order # City Inspector: CSC No. 59073-0O2 City Sec No.159073 City Proj. No. I103326 1 02 Date:1 1/26/2024 1 (John Fowler Phone Number: 1(682) 201-1918 Contract Time (CD) Original Contract Amount--------------------------------------------------------------- 9,497,625.00 282 Extras to Date--------------------------------------------- '3,537,203.00 0 Creditsto Date--------------------------------------------------------------------------------------------------------------------------------------------- 0.00 0 Pending Change Orders (In Contract Routing) '0.00 0 Contract Cost to Date---------------------------------------------- 1 513,034,828.00 282 Amount of Proposed Change Order------------------------------------------------------------------------------------------------------------------1 47,793.84 0 Revised Contract Amount I $13, 82,621.84 282 Original Funds Available for Change Orders-----------------------------------------------------------------------j 0.00 Remaining Funds Available for this CO--------------------------------------------------------------------{ '0.00 Additional Fundinq (if necessary)---------------------------------------------------------------------------------------------------------------------j '0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 37• � 1% JUSTIFICATION (REASONS) FOR CHANGE ORDER The purpose of Change Order #2 is to add funds to the Guaranteed Maximum Price (GMP) of the construction contract for the Forest Park Pool. Steele & Freeman was selected as Construction Manager at Risk (CMAR) in March 2023. Change Order No. 2 ($47,793.84) increases the original contract amount ($9,497,625.00) plus Change Order #1 ($3,537,203.00) for a revised contract amount of $13,082,621.84, a 37.75% increase to the total original contract. No additional contract time is approved in this change order. Change Order #2 will provide the replacement of an existing storm water line on site that was unknown during the origninal accessment of the property. During demolition and soil stabilization of the existing parking lot, as part of the original scope to replace the parking lot, a storm water line was unearthed and found to be in poor condition. Replacement was needed in order to provide a product to sustain new and existing conditions. Based off PCO #04 and PR #02. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incindental to the above Change Order. Contractor's Company Name I Contractor Name Contractor Siqnature Date Steele & Freeman I Reilly R. Freeman Ise K A8 199-11 IJan 26, 2024I PMD Inspector Date Sr. Project Controls Date Jan 26, 2024 Jan 29, 2024 PMD Superintendent Date Director/Property Management Department Date Tac,kson Tonos Jan 26, 2024 Jan 29, 2024 Project Manager Date Assistant City Attorney Date �N� Jan 26, 2024 sc o Jan 30, 2024 IL Project Architect Date Assistant City Manager Darte ,`(f;�;;X1trr, Jan 26, 2024 «<an30 zo �ni Jan 30, 2024 M&C Number In/a Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and adminstration of this contract, including ensuring all performance and reporting requirements. M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX n/a 4;62 Nikita Watts Sr. Project Controls Officer STEELE & FREEMAN, INC. l Uiva i nuU i iON MANAGERS Project: Forest Park Pools SFI Job No.: 5509 2850 Park Place Ave Fort Worth, TX 76110 Proposed Change SFI Office Use Only: PD PC P Proposed Change No: 004 Date: 10/17/2023 Submitted To Stephen Springs BSW Architects 5000 Quorom Dr, Suite 600 Dallas, TX 75254 Subject Submitted By Justin Clifton Steele & Freeman, Inc. 1301 Lawson Road Fort Worth, Texas 76131 PC 004 - Parking Lot Strom Drain Repairs - The Existing 24" Storm Drain located in the parking lot was damaged by others. Per the City of Fort Worth cost pricing was requested to fix the storm drain piping and associated items. Pricing Submitted from our Utility Subcontractor Wildstone Construction. Repairs will be made in accordance with City of Fort Worth Standards. *We are not asking for additional days at this time because this is not currently in the critical path of completing the pool. Cost Impact Qty I Unit I Rate I Labor (A) I Material (B) Equip (C) Sub (D) Wildstone Construction - Parking Lot Storm Drain Repairs 1 LS $45,005.75 Sub guard Insurance 1.50% $675.09 SUBTOTAL 0.00 0.00 0.00 45,680.84 SUBTOTAL A,B,C,D * 45,680.84 I TOTAL AMOUNT DEDUCTED/CREDITED TO CONTINGENCY J*THIS ADDITIONAL COST TO BE INCLUDED ONLY IF PROCESSED AS CHANGE ORDER TO PRIME CONTRACT* Mark-up 3.41% 1,534.70 Payment/Pert. Bond Fee 0.81% 387.13 General Liability Fee 0.24% 114.71 Builder's Risk Insurance Fee 0.16% 76.47 SUBTOTAL Owner Protective Ins., Liability & Builders Risk Insurance, CM Fee TOTAL CHANGE ORDER AMOUNT IThe Contract Time will be Unchanged by 0 Days SUBMITTED BY: - ;1W 2,113.00 47,793.84 AUTHORIZED BY: AUTHORIZED BY: BSW Architects City of Fort Worth Wildstone Construction, LLC 12850 Hwy 287 Fort Worth, Texas 76052 Phone: 817-847-8660 Fax: 817-847-8019 Quote To: Steele Freeman 1301 Lawson Rd. Fort Worth Texas Phone: 817.232.4742 Fax: Project: Forest Park Pool Fort Worth Texas Item No. Quantity Unit 1 305 FT 2 305 FT 5 2 EA 6 225 CY 7 4 HR 8 305 LS 9 305 FT Change Order #1 - 24" RCP Description Demo Existing RCP 24" CL III RCP Field Storm Connections Haul Off Spoils Additional Survey Additional Trench Safety Additional CCVT TOTAL QUOTE: WILDSTONE CONSTRUCTION, LLC Date: 10/4/2023 Attn: Justin Shelley Unit Price $14.50 $108.00 $1,503.50 $13.75 $195.00 $1.25 $1.25 Price covers removing existing RCP and installing 24" RCP. Will add 3 days to overall schedule. Extension $4,422.50 $32,940.00 $3,007.00 $3,093.75 $780.00 $381.25 $381.25 $45,005.75 Change Order #1 - Parking Lot Changes Page 1 of 1