HomeMy WebLinkAboutContract 59073-CO2pO�oonnIl
foRT*ddA
F~° 1.O91AAd
PdOn TFXAso4d
Attest:
Facility and Project Forest Park Pool
Description:
FORT WORTH,.:
City Of Fort Worth
Change Order Request
Funding (FID) No.(s)152002-0200431-5740010-100092-002880-9999
Contractor: I Steele & Freeman
City Project Mgr. IRonnie Clements
Phone Number:1(817) 392- 8014
Change Order #
City Inspector:
CSC No. 59073-0O2
City Sec No.159073
City Proj. No. I103326 1
02 Date:1 1/26/2024 1
(John Fowler
Phone Number: 1(682) 201-1918
Contract Time
(CD)
Original Contract Amount---------------------------------------------------------------
9,497,625.00
282
Extras to Date---------------------------------------------
'3,537,203.00
0
Creditsto Date---------------------------------------------------------------------------------------------------------------------------------------------
0.00
0
Pending Change Orders (In Contract Routing)
'0.00
0
Contract Cost to Date---------------------------------------------- 1
513,034,828.00
282
Amount of Proposed Change Order------------------------------------------------------------------------------------------------------------------1
47,793.84
0
Revised Contract Amount I
$13, 82,621.84
282
Original Funds Available for Change Orders-----------------------------------------------------------------------j
0.00
Remaining Funds Available for this CO--------------------------------------------------------------------{
'0.00
Additional Fundinq (if necessary)---------------------------------------------------------------------------------------------------------------------j
'0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1
37• � 1%
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The purpose of Change Order #2 is to add funds to the Guaranteed Maximum Price (GMP) of the construction contract for the Forest Park Pool. Steele &
Freeman was selected as Construction Manager at Risk (CMAR) in March 2023. Change Order No. 2 ($47,793.84) increases the original contract amount
($9,497,625.00) plus Change Order #1 ($3,537,203.00) for a revised contract amount of $13,082,621.84, a 37.75% increase to the total original contract. No
additional contract time is approved in this change order.
Change Order #2 will provide the replacement of an existing storm water line on site that was unknown during the origninal accessment of the property. During
demolition and soil stabilization of the existing parking lot, as part of the original scope to replace the parking lot, a storm water line was unearthed and found to
be in poor condition. Replacement was needed in order to provide a product to sustain new and existing conditions. Based off PCO #04 and PR #02.
It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both
time and money) for all costs arising out of, or incindental to the above Change Order.
Contractor's Company Name I Contractor Name Contractor Siqnature Date
Steele & Freeman I Reilly R. Freeman Ise K A8 199-11 IJan 26, 2024I
PMD Inspector
Date
Sr. Project Controls
Date
Jan 26, 2024
Jan 29, 2024
PMD Superintendent
Date
Director/Property Management Department
Date
Tac,kson Tonos
Jan 26, 2024
Jan 29, 2024
Project Manager
Date
Assistant City Attorney
Date
�N�
Jan 26, 2024
sc o
Jan 30, 2024
IL Project Architect
Date
Assistant City Manager
Darte
,`(f;�;;X1trr,
Jan 26, 2024
«<an30 zo �ni
Jan 30, 2024
M&C Number In/a
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and adminstration of this contract, including
ensuring all performance and reporting requirements.
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
n/a
4;62
Nikita Watts
Sr. Project Controls Officer
STEELE & FREEMAN, INC.
l Uiva i nuU i iON MANAGERS
Project: Forest Park Pools
SFI Job No.: 5509
2850 Park Place Ave
Fort Worth, TX 76110
Proposed Change
SFI Office Use Only:
PD PC P
Proposed Change No: 004 Date: 10/17/2023
Submitted To
Stephen Springs
BSW Architects
5000 Quorom Dr, Suite 600
Dallas, TX 75254
Subject
Submitted By
Justin Clifton
Steele & Freeman, Inc.
1301 Lawson Road
Fort Worth, Texas 76131
PC 004 - Parking Lot Strom Drain Repairs - The Existing 24" Storm Drain located in the parking lot was damaged by others. Per the City of Fort Worth cost
pricing was requested to fix the storm drain piping and associated items. Pricing Submitted from our Utility Subcontractor Wildstone Construction. Repairs
will be made in accordance with City of Fort Worth Standards. *We are not asking for additional days at this time because this is not currently in the critical
path of completing the pool.
Cost Impact Qty I Unit I Rate I Labor (A) I Material (B) Equip (C) Sub (D)
Wildstone Construction
- Parking Lot Storm Drain Repairs 1 LS $45,005.75
Sub guard Insurance 1.50% $675.09
SUBTOTAL 0.00 0.00 0.00 45,680.84
SUBTOTAL A,B,C,D * 45,680.84 I
TOTAL AMOUNT DEDUCTED/CREDITED TO CONTINGENCY
J*THIS ADDITIONAL COST TO BE INCLUDED ONLY IF PROCESSED AS CHANGE ORDER TO PRIME CONTRACT*
Mark-up
3.41%
1,534.70
Payment/Pert. Bond Fee
0.81%
387.13
General Liability Fee
0.24%
114.71
Builder's Risk Insurance Fee
0.16%
76.47
SUBTOTAL Owner Protective Ins., Liability & Builders Risk Insurance, CM Fee
TOTAL CHANGE ORDER AMOUNT
IThe Contract Time will be Unchanged by 0 Days
SUBMITTED BY: - ;1W
2,113.00
47,793.84
AUTHORIZED BY: AUTHORIZED BY:
BSW Architects City of Fort Worth
Wildstone Construction, LLC
12850 Hwy 287
Fort Worth, Texas 76052
Phone: 817-847-8660
Fax: 817-847-8019
Quote To: Steele Freeman
1301 Lawson Rd.
Fort Worth Texas
Phone: 817.232.4742
Fax:
Project: Forest Park Pool
Fort Worth Texas
Item No.
Quantity
Unit
1
305
FT
2
305
FT
5
2
EA
6
225
CY
7
4
HR
8
305
LS
9
305
FT
Change Order #1 - 24" RCP
Description
Demo Existing RCP
24" CL III RCP
Field Storm Connections
Haul Off Spoils
Additional Survey
Additional Trench Safety
Additional CCVT
TOTAL QUOTE:
WILDSTONE
CONSTRUCTION, LLC
Date: 10/4/2023
Attn: Justin Shelley
Unit Price
$14.50
$108.00
$1,503.50
$13.75
$195.00
$1.25
$1.25
Price covers removing existing RCP and installing 24" RCP. Will add 3 days to overall schedule.
Extension
$4,422.50
$32,940.00
$3,007.00
$3,093.75
$780.00
$381.25
$381.25
$45,005.75
Change Order #1 - Parking Lot Changes Page 1 of 1