HomeMy WebLinkAboutContract 58801-A1CSC No. 58801-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 58801
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc,
(ENGINEER) made and entered into City Secretary Contract No. 58801, (the
CONTRACT) which was authorized by M&C 22-1041 on the 13th day of December,
2022 in the amount of $ 198,855.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
2024 Bridge Maintenance, CPN 104485; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $68,920. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $267,775.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
City of Fort Worth, Texas OFFICIAL RECORD 2024 Bridge Maintenance
Prof Services Agreement Amendment Template CITY SECRETARY CPN 104485
Revision Date: 12/08/2023
Page 1 of 4 FT. WORTH, TX
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
op�
Jesica McEachern
Assistant City Manager
DATE: Feb 2, 2024
4.Dggpppn�
ATTEST: FF�Rto°a�
09-10
duo o=o°
� ,,yam /1� P0�'t• °°° °° �.vd
��^^A. /V Paan nEp4 �J4,04b
JU/a� nnette Goodall
City Secretary
APPROVAL RECOMMENDED:
of the date subscribed by the City's
Freese and Nichols, Inc
(X
Vimal Nair
Vice President
DATE: Jan 26, 2024
Lauren Prieu r (Jan 31, 2024 09:04 CST)
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Tariqul Islam (Jan 18, 202413:07 CST)
Tariqul Islam
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas 2024 Bridge Maintenance
Prof Services Agreement Amendment Template CPN 104485
Revision Date: 12/08/2023
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
Rt�
DBlack (Feb 1, 202417:34 CST)
Douglas W. Black
Sr. Assistant City Attorney
M&C No.#: N/A
M&C Date: N/A
City of Fort Worth, Texas 2024 Bridge Maintenance
Prof Services Agreement Amendment Template CPN 104485
Revision Date: 12/08/2023
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 58801
Amendment No. 1
Fund Dept ID Account project CFl- CF2 - Bond Amount
ID Activity Reference
30100 0200431 5330500 104485 E02630 9999 68920.00
Total: $
68,920.00
City of Fort Worth, Texas 2024 Bridge Maintenance
Prof Services Agreement Amendment Template CPN 104485
Revision Date: 12/08/2023
Page 4 of 4
FORT WORTH.
ATTACHMENT "A"
Scope for Enaineerina Desian Related Services for 2024 Bridae Maintenance
The scope set forth herein defines the work to be performed by the ENGINEER. Both the
CITY and ENGINEER have attempted to clearly define the work to be performed and
address the needs of the Project.
OBJECTIVE
The professional services set out herein are associated with preparing the Project Manual
and providing bidding services for the two (2) bridge maintenance packages provided for FY
24 in the Previous Agreement. The services are also associated with providing
compensation to Freese and Nichols, Inc. (ENGINEER) for out -of -scope requests during the
Previous Agreement and to set aside funds for future miscellaneous requests.
The professional services set out herein are additionally associated with selection of City of
Fort Worth owned bridges to be considered for rehabilitation or replacement utilizing the
2024 Capital Improvement Programs Bond funds. ENGINEER will review and prioritize and
prepare a list of bridges for rehabilitation or replacement with a conceptual estimate of
probable construction cost (Refer to Task 8 below).
WORK TO BE PERFORMED
Task 1. Project Management
Task 2. Conceptual Design (30%) — Not Used (Included in Previous Agreement)
Task 3. Preliminary Design (60%) — Not Used (Included in Previous Agreement)
Task 4. Final Design (90% and 100%)
Task 5. Bid Phase Services
Task 6. Construction Phase Services — Not Used (Included in Previous Agreement)
Task 7. Miscellaneous Engineering Review Requests
Task 8. Capital Improvement Program (CIP) 2024 Bond Package Bridge Shortlist
Selection and OPCC
TASK 1. PROJECT MANAGEMENT.
1.1. Managing the Team:
A. Lead, manage and direct design team activities.
B. Quality Control / Quality Assurance (QC/QA) is practiced in performance of the
work.
C. Communicate internally among team members.
D. Task and allocate team resources.
1.2. Communications and Reporting:
A. Attend a CIP Bridge Selection kickoff/charter meeting with CITY staff to confirm
and clarify scope, understand CITY objectives, and provide selections that meet
CITY requirements.
B. Conduct and document monthly project updates with CITY Project Manager.
City of Fort Worth, Texas 2024 Bridge Maintenance
Attachment A CPN 104485
Release Date: 07.22.2021
Page 1 of 6
FORT WORTH:,
C. Prepare invoices, in accordance with Attachment B to this Standard Agreement
and submit monthly in the format requested by the CITY.
D. Prepare and submit monthly Project Status Reports in the format provided by the
respective Transportation and Public Works Department.
E. Complete Monthly M/WBE Report Form and Final Summary Payment Report
Form at the end of the project.
ASSUMPTIONS
A. One (1) pre -selection project kickoff meeting
B. All submittals to the CITY will be Quality checked prior to submission.
C. Four (4) additional monthly updates of Project Status Reports, MWBE forms, and
project Schedule beyond original Contract Schedule.
DELIVERABLES
A. Meeting summaries with action items
B. Monthly Project Status Reports Monthly invoices
C. Monthly M/WBE Report Form and Final Summary Payment Report Form
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
Not Used (Included in Previous Agreement)
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Not Used (Included in Previous Agreement)
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
4.3. Design Project Manual (Contract and Specifications)
A. CITY will prepare Project Manuals (Contract and Specifications) for both design
plan packages already submitted by ENGINEER to CITY for FY24 Bridge
Maintenance.
B. ENGINEER will review the Project Manuals (Contract and Specifications) prepared
by CITY. The ENGINEER will provide comments to be addressed if necessary
and seal finalized Project Manuals.
ASSUMPTIONS
A. All deliverables will be electronic PDF format.
B. The CITY's front end specifications will be used and TxDOT 2014 Standard
Specifications will be referenced, but not provided. The ENGINEER shall
supplement the technical specifications, if needed.
City of Fort Worth, Texas Page 2 of 6
Attachment A 2024 Bridge Maintenance
Release Date: 07.22.2021 CPN 104485
Page 2 of 6
FORT WORTH.
C. Final Drawings have already been submitted and will not be updated as part of
this amendment.
DELIVERABLES
A. Electronic copy (PDF) of the preliminary project manual
B. Electronic copy (PDF) of the final project manual
TASK 5. BID PHASE SERVICES.
The CITY reserves the right to bid the project either via traditional project bid to via unit price
alternative delivery. ENGINEER will support the bid phase of the project for both FY24
Bridge Maintenance design packages as follows.
5.1. Bid Support
A. The CITY shall upload all plans and contract documents onto the City's
document management system (BIM 360) for access to potential bidders.
B. Contract documents shall be provided by ENGINEER in a single PDF file.
C. The CITY PM to obtain received "Expressions of Interest" from prospective
bidders. CITY will maintain a plan holders list.
D. The CITY will develop and implement procedures for receiving and answering
bidders' questions and requests for additional information. The procedures shall
include a log of all significant bidders questions and requests and the response
thereto. The log shall be housed and maintained in the project's folder titled
Request for Information. The ENGINEER will provide technical interpretation of
the contract bid documents and will prepare proposed responses to all bidder's
questions and requests, in the form of addenda. The CITY shall upload all
approved addenda onto the City's document management system (BIM 360) and
mail addenda to all plan holders.
E. Attend the pre -bid conference in support of the CITY.
F. Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
G. When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
H. Attend the bid opening in support of the CITY.
I. The CITY will evaluate bids and recommend award of the contract.
J. Incorporate all addenda into the contract documents and issue conformed sets.
ASSUMPTIONS
A. All Deliverables will be electronic (PDF) format.
City of Fort Worth, Texas Page 3 of 6
Attachment A 2024 Bridge Maintenance
Release Date: 07.22.2021 CPN 104485
Page 3 of 6
FORT WORTH.
B. Each individual design package for FY24 will be bid only once and awarded to
one contractor.
C. No bid alternates will be included in bidding process.
DELIVERABLES
A. Addenda (up to one (1) per design package)
B. Conformed Plans and Project Manual for both design packages
TASK 6. CONSTRUCTION PHASE SERVICES.
Not Used (Included in Previous Agreement)
TASK 7. MISCELLANEOUS ITEM REVIEWS AND REQUESTS.
This task is intended to provide review and limited production for miscellaneous requests
from CITY to assist CITY in responding to citizen requests or assisting with planning
decisions.
7.1 Future Miscellaneous Engineering Reviews and Requests:
A. At approval and request of CITY, ENGINEER to provide review and response to
CITY for miscellaneous items related to CITY owned bridges not otherwise
covered in the scope of the Previous Agreement or this Amendment.
TASK 8. CAPITAL IMPROVEMENT PROGRAM (CIP) 2024 BOND PACKAGE BRIDGE
SHORTLIST SELECTION AND OPCC.
8.1. Preliminary Bridge Selection:
A. ENGINEER will conduct kickoff meeting with CITY to determine priorities of
bridges to be included in Shortlist Selection for consideration and desired total
OPCC of selected bridges to align with CITY overall project goals.
B. ENGINEER will analyze National Bridge Inventory (NBI) data and condition
ratings for CITY owned bridges provided in original contract. ENGINEER will
prioritize and select bridges to be considered for rehabilitation or replacement for
2024 Bond Package.
C. ENGINEER will prepare Preliminary Bridge Selection and preliminary conceptual
OPCC and submit to CITY for review.
D. ENGINEER will conduct meeting with CITY to discuss Preliminary Bridge
Selection List.
8.2. Final Bridge Selection:
A. ENGINEER to perform site visits to up to six (6) bridges if necessary.
B. ENGINEER to prepare Final Bridge Selection based on comments received from
CITY.
City of Fort Worth, Texas Page 4 of 6
Attachment A 2024 Bridge Maintenance
Release Date: 07.22.2021 CPN 104485
Page 4 of 6
FORT WORTH.
C. ENGINEER to provide conceptual OPCC for selected bridges.
ASSUMPTIONS
A. All Deliverables will be electronic (PDF or Excel) format.
DELIVERABLES
A. Preliminary Bridge Selection List
B. Final Bridge Selection List
C. Conceptual OPCC for rehabilitation or replacement of selected bridges
City of Fort Worth, Texas Page 5 of 6
Attachment A 2024 Bridge Maintenance
Release Date: 07.22.2021 CPN 104485
Page 5 of 6
FORT WORTH.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
A. Negotiation of easements or property acquisition.
B. Services related to development of the CITY's project financing and/or budget.
C. Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
D. Construction management and inspection services
E. Performance of materials testing or specialty testing services.
F. Services necessary due to the default of the contractor.
G. Services related to damages caused by fire, flood, earthquake or other acts of God.
H. Services related to warranty claims, enforcement and inspection after final
completion.
Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
J. Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
K. Effort exceeding those outlined in the "Assumptions" section of each task description.
City of Fort Worth, Texas Page 6 of 6
Attachment A 2024 Bridge Maintenance
Release Date: 07.22.2021 CPN 104485
Page 6 of 6
ATTACHMENT B
COMPENSATION
Engineering Services for
2024 Bridge Maintenance
City Project No. 104485
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A
as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
Labor Category
Rate
($/Hour)**
Professional 1
146
Professional 2
174
Professional 3
197
Professional 4
228
Professional 5
264
Professional 6
303
Construction Manager 1
125
Construction Manager 2
156
Construction Manager 3
167
Construction Manager 4
210
Construction Manager 5
252
Construction Manager 6
288
Construction Representative 1
113
Construction Representative 2
125
Construction Representative 3
156
Construction Representative 4
167
CAD Technician/Designer 1
124
CAD Technician/Designer 2
160
CAD Technician/Designer 3
196
Corporate Project Support 1
118
Corporate Project Support 2
141
Corporate Project Support 3
188
Intern / Coop
73
Senior Advisor
175
** Provided rates are 2023 rates, which will be adjusted annually in February.
City of Fort Worth, Texas
Attachment B 2024 Bridge Maintenance
Revised Date: 12/9/2022 CPN 104485
Page 1 of 4
B-1
ATTACHMENT B
COMPENSATION
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
2024 Bridge Maintenance
CPN 104485
AM
ATTACHMENT B
COMPENSATION
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Freese and Nichols, Inc. Project Management and $53,020.00 76.9%
Design Services
Prime Consultant Total: $53,020.00 76.9%
Proposed MWBE Sub -Consultants
MV Engineering, Inc. Bond Program Bridge $15,900.00 23.1%
Selection
MWBE Sub -Consultants Total: $15,900.00 23.1%
Non-MWBE Consultants
Non-MWBE Consultants Total: $0.00 0.0%
TOTAL $68,920.00 100.0%
Project Number & Name
(CPN 104485 — 2024 Bridge Maintenance)
Original Agreement
Addendum No. 1
Total (Original Agreement + Addendum No. 1)
City MWBE Goal = 13.0%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
Total Fee
MWBE Fee
MWBE %
$198,855.00
$25,990.00
13.1%
$68,920.00
$15,900.00
23.1%
$267,775.00
$41,890.00
15.6%
Consultant Commtted Goal = 13.0%
2024 Bridge Maintenance
CPN 104485
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
2024 Bridge Maintenance
CPN 104485
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
City rf Fort Worth - 2024 Bridge Maintenance (CPN 104485) - A^ endment #1
Task Task Description Baslc or
No special
Services
I 1.0 Task 1.oBSlgn Management
I External J5lckrl�flGjror�lllrallon Meebres
Basic
I Internal (: dd 66 iivvii
Basic
I Maintain and monitor scope Ischedule l budnet
Basic
I One Page Reports I Penotlic diem—nasucabons
Basic
I Senior Advisor
Basic
I Qualyyyy Assurance reviews
Basic
I Subi;onlractor Task Aut n.bon
I
Basic
I 2.0 Task 2. Conceptual Design (31)%1
I 3.0 Task 3. Prellminary Deslgn (5)%)
I 4.0 Task 4. Final Desiyyf//,90%and 100%1
Basic
I Review of Prpiecl lvlanuals
Basic
I
Basic
I 5.0 Task 5. Bid Phace Services
I Add.nda un to 1 pp bid backagel
Basic
I Aft-d a-kSid Nis,
Basic
I RespQntl [o Pm-Bitl (]uesbpns
I Attend Bid Ocemna Meebnas
Basic
Basic
6.0 Task 6. Construction Phase Services
7.0 Task T. Miscellaneous Engineering Review Requests
Future Miscellaneous Enp—r- Review Recuests Special
Task 8. Capital Improvement Program 20M Bond Package Bridge Shortlist
8.0 rSelectlon and OPCC
IntemallEA-1 Meetings for Coordination Basic
np�elop rvPly" Shortlist Basic
4& UYL Basic
Site . is Basic
Develop CC Shortlist Basic
Final Basic
OC Review.— Basic
Cdy of Fort WOM, Texas
A—hment B - Level of Effort Supplement
PMO Of —I Release Date 8 09 2012
P"T...umm��jj'
Total
243
-.Jr
Total Labor
130
$51.130
I R (,�yj Totth I Ex
$16.2o0
$15.90$00
I Non-�li�)Ly(i� SuESE'It
I 10% Sub Markv
$1.590
I MBEWBE Pa tici(I b
23.1%
1 Total ProieAhost
$68,920
11M 24
1 oil
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Amendment 1 - 2024 Bridge Maintenance Agreement
M&C: N/A
D ate:
CPN: 104485 CSO:
DOC#:
To:
Name
Department
Initials
Date Out
1.
Alexandra Ripley
TPW - initial
Jan 23, 2024
2.
Consultant — Vimal Nair
FNI - Signature
VN
VN
Jan 26, 2024
3.
Tariqul Islam - PM
TPW - Signature
�a
Jan 18, 2024
4.
Mary Hanna — Sc CPO/PgM
TPW - initial
79/'
Jan 29, 2024
5.
Patricia Wadsack —TPW AD
TPW - initial
Jan 30, 2024
6.
Lauren Prieur
TPW - Signatures
Jan 31, 2024
7
Doug Black
Legal - Signature
Ob
Feb 1, 2024
d.b
8
Jesica McEachern
CMO - Signature
a`
Feb 2, 2024
9
Jannette Goodall
CSO - Signature
,GTG
Feb 2, 2024
10.
TPW Contracts
TPW
DOCUMENTS FOR CITYMANAGER'S SIGNATURE: All documents received
from any and all
City Departments requesting City Manager's signature for approval MUST BE
ROUTED TO THE
APPROPRIATE ACM for approval first.
Once the ACM has signed the routing slip,
David will review
and take the next steps.
NEEDS TO BE NOTARIZED: DYES NNo
RUSH: ❑YES NNo SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: NYES ❑No
Action Reauired:
❑ As Requested
❑ For Your Information
N Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(&,fortworthtexas.2ov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!