Loading...
HomeMy WebLinkAboutOrdinance 26678-01-2024 Ordinance No. 26678-01-2024 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE GRANTS OPERATING FEDERAL FUND,SUBJECT TO RECEIPT OF THE GRANT, IN THE AMOUNT UP TO $157,400.00,FOR THE PURPOSE OF FUNDING STATE HOMELAND SECURITY PROGRAM PROJECTS; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2023-2024 in the Budget of the City Manager,there shall also be increased estimated receipts and appropriations in the Grants Operating Federal Fund,subject to the receipt of the grant, in the amount up to$157,400.00,for the purpose of funding State Homeland Security Program projects. SECTION 2. That should any portion,section or part of a section of this ordinance be declared invalid,inoperative or void for any reason by a court of competent jurisdiction,such decision,opinion or judgment shall in no way impair the remaining portions,sections,or parts of sections of this ordinance,which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance 26453-09-2023 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations,in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. 'Cyk000aoo� APPROVED AS TO FORM AND LEGALITY: CITY SECRETARY 0®o 00 o®;p A "0 0 0"000 Assistant City Attorney Jannette S.Goodall *° 0 0 ` 0 00 City Secretary aa�n�n���► ADOPTED AND EFFECTIVE:January 23,2024 \Nw.efa01\wat4AGroupslStrotepic Opeeaeona\Public\WnDleule Teehnlml I,Ia\HaalDt Fort We,h TRA\La P alle\Torma\Eahibk A-110.122O23.pdf r Population Population Lot POPulatlon Ooludy let POPMatlon Density Quad Acrcppa Number DensM/ Par Acro Quad III A.-tio Number Density Per Acre Rosldotalal 257 474 1,422 5.53 Roald.nUal 231 246 730 3.19 J fnFaY4P11i11 ,,,I Muklhmlly 0 0 0 am Multifamily 14 160 40D 28.57 N�II'1 „� � N-Roslda.1.1 19 259 13.63 hf-aabf..l 235 D 3,290 14A0 r 1 M'.Cy� Water Tank Slto 0 0 0 am Water Tank Sit. 1 1 0 0.06 ` '^� ""� 1`• d1' Road Plain 36 0 0 am Flood Plain 154 0 0 0.00 �I Go.Wall. 137 0 0 G00 Gas Wells 242 0 0 0.00 Fk�l r Undawmpable Subtotal' 449 474 1,681 174 Unif.uala oblo Subtotal' 877 407 4,428 5.05 STATION Dav Raaldamlal 28 100 300 10.71 Dov Rosidentll "1 129 357 0.12 t' jl (FUTURE)"N-R.1d..1.1 0 0 am Dov Nutl6mlltl 0 0 0.00 \ � - , lvl 893!�t4 9,695 1359 DevNonRnitlen0al 0 17,d]e t0.00 J6 b0a t4.00 Flood Plain 0 •2156 14.00 QUA' I •137 -1,918 14.OD Gas We1Is 0 J.3B8 14.DD 256 a rnTnT 1169 Ca OVERSIZING otal'• sae7.573 73.82 Dawlopablo subtota 129 12,32t I3.02 QUAD I ) ..y, 15"-24"9979.254 9.28 Tatal 536 16,749 9.18 _ 997 aC : UMawlopablo Subtotal•Lot auras already dewlopoo plus la.plain plus Dos-11 a-.. -� ••Dmlopabl.Subtotal a lot areas not desolpotl or planned for d,wI,p-minus Good plain and pee well butom and their aasoclted am population octlmat,. I 9254 ca 16" 2 SOUTH MAIN PARTICIPATION PERCENTAGES )`�\ �Iy "' -I-r�- -- B QUAD IV y floe Se ment Fort Worth Hazlet Fort Worth re m Haslet Ora m Fart Werth% Haslet% .f 1 402 I Se mantD PDIntF.0 Quad 30% uatlll 192034 91A2 95.46% 4.54% Se mpntC PointAtoit uad 111 IaTaro 3175.31 284.70 91.77% 9.23% 2613 Cap Se mentB POInt BtoC Quad 111 uvtl lV&L.eTaro 317531 633.77 8336% 16.64% QUAD III O Se mEA POIntCtoD uadl&III Ouad,11&IV&LeTara 509556 93852 84.45% 15.55% 18138C H Pro owed lm rovment l5"24`-1012 023 PointD.E 5,096.00 3.221.00 GL27% 38.73% 16749 COP TaAMotnr Lorotlonrevlsedfrom o1n[A toG PalntG 300.00% 0.00% S G 1 LoTara quad l•• Quad ll uad III" Ouad IV In,LeTara uad,I&II Load,III&IV ,ad,I thru IV Total Draina Be Are.1(all.) T.- 167.00 .,.0 255.00 1,823.00 402.00 1,252.00 2,225.00 3,477.00 Dwellln unit,PttAcrc U• 2.00 2.96 1.41 2.83 2.00 256 2.68 2.64 METER STATION(FUTURE) _ Toll Dwellin Unlis T„�n,= 334.00 2.8473e 35955 5,15354 804.00 3,206413 5,95754 9.164.47 tt0'--L--"A"RELOCATED TO Ca it Dwa lln Unit C. 325 3.25 3.25 3.25 325 325 325 3.25 - (FUTURE)POINT"Ga Legend Toll Ca Dlb Population Tea 1,08550 9254.00 1,16854 16,749.00 2.613.00 10,42254 19362.00 39,78454 ii SEGMENT E CFW(A.G.H) Aver.Blond( I/cxplb•da) A..e• 100.00 100.0D 10a00 100.00 100.00 100.00 100.00 100.00 TRA M513_ONC toad L. 7538 642.64 81.15 1163.13 191A6 723.79 1 4458 206937 .• ALIGNMENT REVISED Toll po ul0on in Thous.nds Ca ita 1000 P. 1.09 9.25 1.17 16.75 2.61 1a42 1936 29.78 De,l nlon Multi le M. 3.78 2.99 31. 2.73 3A9 234 1.67 2.4B Haslet Sewer Main Deal load Re ulrod Dm C.e " 294J0 1,92029 3D4.74 3,17531 533.77 2375.62 33B5A9 5,13U.19 M North Une(Future) -An toad Required(MGD) Q.ga.msD• 0.41 2.77 0.44 a57 031 3.06 SAS 739 South Mal,D.]ah Slo a ft S. 050% 030% O50% 057% 0.50% OSO% 0.50% D.50% OCFW Pamela South Main Desl goPi at,11nches 0• 8 18 a 18 10 18 21 24 Revised Basin Areas H droulle Radlui Inches Rh. 2 45 2 4.5 2.5 45 525 6 Diher basin area Mannin CoeHiclrnt 0.013 OM13 0.013 0.013 0.013 0.013 0.013 0.013 AVallable flow Ill O.,n.ou . 386.66 2.603A9 386.66 3 88.66 70L06 3361.09 5.069.96 7.23852 Quad I area Available Flow IMGDI 056 3.75 056 5.17 1.01 4.84 730 10.42 QQuad It area •'NDM:Quad,I&II a„ume 10 people/acre QQlmd III area QQuad IV area 1 0/1 22 02 3 a lTa LeTara Basin Area Collaboration Foal_ «'os� xap.:Fl_ wR....l EXHIBIT A """� o „oo ,mo Ic� i1� Lip�M:-1,ECAA ' RNWppO Z I W =O `'�,� I I m ♦ OJ e .gip u,1 z GuNsnAr�H Y�{70 z ..L v, :��, INTER .RDA _`i/�r[ J� / NCH I I< I O S �R�)• �7,j.�; ,�j�• L �> 8,.•-. k _NA�D"97 ..H�n� 12"�- M-�2"!� •�' 75" .r5"'�'^'�11-535r 1'�181%Nnv�,�` �� or S 8�T8 B. :ct�tYc 0 t---------' m76 FALLING I -- I •V._-�- ` Fort Worth 0 ,S e , 9L19t 2°Rov�' "� _ 31 12311 o J� .36 N Fort Worth vy co w Y i Q�vJINp SEGMENT 1 (POINT D-E) v 7s I 3 e Z WESTPORT WESTPORT ESTP D`a p 24 o WIRT 30 r- INTERMODAL L^ LEWIS INTERMODAL AVONDALE HASLET AVONDALE HASLET w O INTERMODAL p Haslet TRANSPORT O ^4� 12856 i RESEARC`" I 0 I ODESSA i z I; w SCHREIBER WO Q BERRY U) 8 Legend I, ® —TRAS-er M.In Wholesale Customer Sewer Meter TAMIAMI r 1 All Sewer Mains Ill CEDAR n v STYPE .)rCFW Grawty VO BLUE STEM B Z o 13201 —Low Pressure } 0 Lu O ll OOD u) C. W �F— ISIzTI Z 1� Adjacent City CFW City Unit s m ASH °a tT THISTLE K Mater CCN 9/15/2023 EXHIBIT A Fox_ TH COPYRIGHT 2r23M1 SA—FORTl'DFAFORTH / UIIAUTHORI?E❑REPRODUCT NJ`!SA VIOLATIOII OF APPLICABLE LA'NS TH 15 DATA IS TO BE USED FOR AGRAFH:'CAL REPRFSENTATIGN ONLY WATER THE ACCURACY IS NOT TO BE T-EN r USED AS DATA PRODUCED FOR ENGINEERING FURFOE ES CR aYAREGISTERED PROFESSOIIAL IAND SURVEYOR THECnYOF FORT WORTH ASSUMES NO R EEFOtlSIBILITV FOR THEACCURACYOF SAID DATA 0 550 1,100 2,200 Feet Payt Item Unit BID QTY UNIT PRICE BID VALUE 1 Site Clearing&Grubbing LS 1 15,000.00 $15,000.00 4"Solid Wall PVC Sewer Pipe(Installed by 2 Licensed Plumber) LS 1 16,000.00 $16,000.00 3 6"Solid Wall PVC Sewer Pipe(BOC) LF 42 120.00 $5,040.00 4 24"Solid Wall PVC Sewer Pipe(BOC) LF 2150 430.00 $924,500.00 5 24"Solid Wall PVC Sewer Pipe Carrier Pipe LF 640 500.00 $320,000.00 6 42"Casing/Tunnel Liner Plate(BOTOC) EA 640 1,200.00 $768,000.00 7 4'Standard Manhole EA 1 10,000.00 $10,000.00 8 5'FRP Manhole EA 4 20,000.00 $80,000.00 5'FRP Manhole w/Wager 2050-450 Odor Control(Including Connections,Valves, 9 Stainless Steel pipes and fittings,etc.) EA 1 30,000.00 $30,000.00 10 CCTV/MSI Inspection LF 2790 8.00 $22,320.06 11 Bypass Pumping LS 1 15,000.00 $15,000.00 12 Trench Safety LF 2150 2.00 $4,300.00 13 Exploratory Excavation of Existing Utilities EA 2 2,000.00 $4,000.00 14 Manhole Vacuum Testing EA 5 300.00 $1,500.00 15 Ground Water Control LS 1 15,000.00 $15,000.00 16 Utility Markers LS 1 2,000.00 $2,000.00 17 SWPP>1 acre LS 1 20,000.00 $20,000.00 18 Traffice Control LS 1 5,000,00 $5,000.00 19 Hydromulch Seeding SY 19400 1.00 $19,400.00 20 Concrete Driveway Replacement/Repair SY 280 68.00 $19,040.00 21 Remove Fence&Install New Fence LF 400 10.00 $4,000.00 22 Install Double Swing 12'Gate EA 5 1,500.00 $7,500.00 Subtotal $2,307,600.05 Construction Contingency(30%) $692,280.00 Materials Testing/Geotech $17,000,00 Permits $2,000.00 TRA Field inspection Fee $60,000.00 Construction TOTAL $3,078,880.00 Easements $16,000.00 Engineering $289,945.00 TRA Engineering Review Fee $17,000.00 TRA Management Review Fee $17,000.00 $20k Per Month to Not delay MS13_OHC-3MONTHS New TRA Pipe Alignment $60,000.00 Haslet Upsize$20k per month 18 Estimated Project Management,Design,Survey months $360,000.00 Easement Cost Total $759,945.00 Total Project Cost $3,838,825.00 COST SHARE CFW Qpk(gpm) Qcap 24"(gpm) %Capacity Cost-Share Fort Worth 5,096 8,317 61.27% $2,352,048.08 Haslet 3,221 8,317 38.73% $1,486,776.92 Estimated Project Management,Design, Survey Easement Cost Consturction Estimated Project Management,Design,Survey Easemetn Cost $759,945.00 CFW $465,618.30 $1,886,429.78 Haslet $294,326.70 $1,192,450.22 $20k Per Month to Not delay MS13_OHC- 3MONTHS CFW-ONLY CFW $60,000.00 CFW Total Particpaiton $2,412,048.08 Total Project Cost $3,898,825.00 Total Project Cost Share $3,838,825.00 City of Fort Worth, Texas Mayor and Council Communication DATE: 01/23/24 M&C FILE NUMBER: M&C 24-0065 LOG NAME: 60HASLET SECOND AGREEMENT AMENDMENT SUBJECT (CD 7)Authorize Execution of Amendment No.2 to the Interlocal Agreement for Construction of Certain Wastewater Collection Mains and Transportation of Wastewater Contract between the City of Haslet,City of Fort Worth and the Trinity River Authority to Construct Improvements to Segment(Point D to Point E)that has Exceeded 75%Capacity;and Fort Worth is Funding 61.27%and The City of Haslet is Funding 38.73%of this project and Adopt Appropriation Ordinance to Effect a Portion of Waters Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council 1. Authorize execution of Amendment No.2 to the Interlocal Agreement for Construction of certain wastewater collection mains and transportation of wastewater contract between the City of Haslet,City of Fort Worth and Trinity River Authority,City Secretary Contract No. 41774 and 41774-A1,to continue to provide for the transportation of wastewater through sewer system extending from Fort Worth's city limits through Haslet and then connect to Trinity River Authority's Denton Creek Wastewater Interceptor System,the improvement are to serve Haslet and Fort Worth service areas;and 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water&Sewer Bond 2015A Fund by increasing receipts and appropriations in the CFW/HasletfTRA/CM Agreement project(City Project No. 105258)in the amount of $2,412,048.08 and decreasing receipts and appropriations in the Unspecified-All Funds project(City Project No. UNSPEC)by the same amount and to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On April 27,2011 the City of Haslet(Haslet),the City of Fort Worth(Fort Worth)and the Trinity River Authority(TRA)(collectively the Parties) entered into a Interlocal Agreement for the construction of certain wastewater collection mains and the transportation of wastewater(City Secretary No.41774)which established the duties and responsibilities of the Parties as they are related to the construction of a sanitary sewer line that will extend from Fort Worth's city limits through Haslet and then connect into TRA's Denton Creek Wastewater Interceptor System Improvements,to serve Haslet and Fort Worth's service areas. On August 18,2018,the first amendment to the agreement was executed to revise the preliminary cost estimates for the improvements and the cost sharing percentages due to development changes. Haslet has now notified Fort Worth that the combined volume of Haslet's and Fort Worth's wastewater flow in Haslet's existing main(Point D to Point E)exceeds 75%of Haslet's 15"existing wastewater main. The agreement requires Fort Worth, at Fort Worth's sole cost and expense,to construct a relief main to divert Fort Worth's wastewater flow from Haslet's existing main which will ultimately become part of the TRA system. Fort Worth and Haslet desire to participate in the cost of replacing and oversizing a portion of Haslet's 15"existing wastewater main in lieu of Fort Worth constructing the relief main. TThe City of Fort Worth is proposing to cost participate in 61.27%of the estimated cost with project managment,design,survey and easement costs in an amount not to exceed of$465,618.30 and estimated future construction costs in an amount of$1,886,429.78 for a total cost of $2,352,048.08. In addition,TRA anticipated$60,000.00 that the City of Fort Worth will be 100%responsible related to estimated cost of engineering review,labor, inspection and material testing of a meter station for a total cost not to exceed of$2,412,048.08 The City of Haslet has agreed to cost participate in 38.73%of the estimated amount of project managment,design,survey and easement costs in the amount of$294,326.70 and estimated future construction costs in the amount of$1,192,450.22 for a total of$1,486,776.92.The total estimated project cost is$3,898,825.00 Upon completion of improvements the relief main shall provide Fort Worth with 5,096 gallons per minute(GPM)and Haslet with 3,221 (GPM).The project participation cost includes design,survey,land acquisition,franchise utility fees, public notifications,permits from outside entities material testing and inspection,public bidding and advertisement cost.The City of Haslet will publicly procure the construction project. Funding for the improvements proposed by the second amendment are depicted in the table below: City of Fort FRiver City Of Haslet Worth Total Capacity 3,221 GPM 5,096 GPM N/A Total Gallons of Wastewater N/A N/A 8,317 ----- Treated ----- - - - ----1I------- ----��._GPM .� Cost Participation Percentage 38.73% rr 61.27% 0.00% Estimated Project Management, Design,Survey, F$294.326.70 $465,618.30 $0.00 Easement Costs Estimated Future Construction $1,192,450.22$1,886,429.78 $0.00 Costs I _ TRA estimates$20,000.00 per month to cover engineering review,labor, inspection,and material testing required $0.00 $60,000.00 $0.00 during construction for Point G future meter station(covered by City of Fort Worth) Total Costs $1,486,776.92 $2,412,048.08 It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year,instead of within the annual budget ordinance,as projects commence,additional funding needs are identified,and to comply with bond covenants.The actions in the M&C will appropriate funds in support of the Waters portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program,as follows: CFW/HASLET/TRA/CM AGREEMENT Capital Revised FY2024 CIP Budget Change Fund Project Name Authority FY2024 Name Appropriations (Increase/Decrease) g Bud et Water& 105258- Sewer CFW/HASLET/ Bond TRA/CM $0.00 This M&C $2,412,048.08 2015A AGREEMENT -Fund 56007L-1 This contract will be with a governmental entity,state agency or public institution of higher education: (City of Haslet,Trinity River Authority). Fund Existing Additional Project Total* Appropriations Appropriations Water&Sewer Bond $0.00 $2,412,048.08 $2,412,048.08 2015A-Fund 56007 Project Total $0.00 $2,412,048.08 $2,412,048.08 This contract will be with a governmental entity,state agency or public institution of higher education:(City of Haslet,Trinity River Authority). The reimbursement of the participation,excluding inspection and material testing fees,is not a lump-sum amount and may be different than the stated amount depending upon the actual quantities and unit prices from the Notice of Final Completion package,commonly referred to as the Green Sheet package. This development is located in Council District 7. A Form 1295 is not required because:This contract will be with a governmental entity,state agency or public institution of higher education:City of Haslet FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified-All Funds project within the Water&Sewer Bond 2015A Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the Water& Sewer Bond 2015A Fund for the Haslet CFW/HASLET/TRA/CM AGREEMENTproject to support the above recommendations and execution of the amendment.Prior to any expenditure being incurred,the Water Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office W. Dana Burghdoff 8018 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: Chris Harder 5020