HomeMy WebLinkAboutContract 57860-A1CSC No. 57860-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 57860
WHEREAS, the City of Fort Worth (CITY) and LJA Engineering, Inc,
(ENGINEER) made and entered into City Secretary Contract No. 57860, (the
CONTRACT) which was administratively authorized on the 20th day of July,
2022 in the amount of $ 96,395.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail, CPN
103998; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $34,724.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $131,119.00.
OFFICIAL RECORD
3. CITY SECRETARY
FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
Prof Services Agreement Amendment Template 103998
Revision Date: 12/08/2023
Page 1 of 4
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Opp
Jesica McEachern
Assistant City Manager
DATE: Feb 2, 2024
4 nay
ATTEST: po�Fo►rr°o
0
Ovo Aso
Qm�a /S �x °adIl oEXA?4a
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
of the date subscribed by the City's
ENGINEER
LJA Engineering, Inc.
4.t�,7&;*�
Anthony Kimmey, PE
Sr. Vice President
DATE: Jan 13, 2024
AV.
Lauren Prieur (Jan 31, 2024 09:05 CST)
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Pavcfw KAba
Fanta Kaba, PE
Professional Engineer
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
Prof Services Agreement Amendment Template 103998
Revision Date: 12/08/2023
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C No.#: M&C 23-1056
M&C Date:
Mack (Feb 1, 2024 17:35 CST)
Douglas W. Black
Sr. Assistant City Attorney
12/12/2023
City of Fort Worth, Texas Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
Prof Services Agreement Amendment Template 103998
Revision Date: 12/08/2023
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 57860
Fund Dept ID Account
30100 0200431 5330500
52002 0200431 5330500
Total:
Amendment No. 1
CF2 -
Project
CF1-
Bond
ID
Activity
Reference
103998
007130
103998
007130
Amount
22,342.40
12,381.60
$34,724.00
City of Fort Worth, Texas Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
Prof Services Agreement Amendment Template 103998
Revision Date: 12/08/2023
Page 4 of 4
FORT WORTH
ATTACHMENT "A"
Scope for Enqineerinq Desiqn Related Services for Supplemental Services to Include
Illumination Desian, SUE and Drainaae Desian
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of the Basswood Blvd and Old Santa Fe Trail Intersection Project is project is
to improve capacity of intersection by Signalization of the intersection. In addition to
signalization, drainage design to reducing ponding of water in roadway just east of the
intersection.
WORK TO BE PERFORMED
Task 1.
Design Management (Drainage)
Twit ?.
Coaeoptusl _os; ai
Toole 3,
PFelirninar„ Design (600 4
Task 4.
Final Design (90% and 100%) (Drainage)
Task 5.
Bid Phase Services (Drainage)
Task 6.
Construction Phase Services (Drainage)
Task 7.
ROW/Easement Services (Drainage)
Task 8.
Survey and Subsurface Utility Engineering Services
Task 9.
Permitting (Drainage)
Task 10.
Quality Control/ Quality Assurance
City of Fort Worth, Texas Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
Attachment A 103998
PMO Release Date: 07.23.2012
Page 1 of 26
FORT WORTU.,
TASK 1. DESIGN MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use
of ENGINEER's and CITY's time and resources. ENGINEER will manage change,
communicate effectively, coordinate internally and externally as needed, and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
1.1. Managing the Team:
• Lead, manage and direct design team activities
• Ensure Quality Control / Quality Assurance (QC/QA) is practiced in performance
of the work. Refer to Task 10 for further details.
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting:
• Attend a pre design project kinLnff/charter mooting with CITY otnff +e nenfirm aryl
dooigno thaw meet CITY requirements
• Attend two (2) field meetings with CITY representatives' innli irding Tr
`affin
Management, prier to the 01 and 90 oubmlttclo.
• Conduct and document monthly project update meetings with CITY Project
Manager
• Conduct review meetings with the CITY at the end of each design phase
• Conduct and document biweekly design team meetings
• Conduct QC/QA reviews and document those activities. Refer to Task 10 for
further details
• Prepare invoices, in accordance with Attachment B to this Standard Agreement
and submit monthly in the format requested by the CITY.
• Prepare and submit monthly Project Status Reports in the format provided by the
respective Transportation and Public Works Department.
• Prepare and oubmit beeline RrefeGt SGhed�e OR�tW, and Project Schedule
updates with a schedule narrative monthly, as required in Attachment D to this
Standard Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule. This PROJECT requires a Tier 3 schedule as
defined in the City's Specification 00 31 15 entitled Engineer Project Schedule.
• Prepare any cv mit S' preliminary Rreieat Rlok Register, preliminary Stakehollde
d r
Register, aR pr0minilry PrejeGt Gammunisa4ono PISn. r
fin
• Complete Monthly M/WBE Report Form and Final Summary Payment Report
Form at the end of the project
City of Fort Worth, Texas Page 2 of 26
Attachment A Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 2 of 26
FORT WORTH
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare
the design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements
are appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to
meet their requirements, as part of the design scope.
Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company
representative.
ASSUMPTIONS
• One (2) field review meetings
• One (1) plan review meetings
• Three (3) biweekly design team meetings
• All submittals to the City will be Quality checked prior to submission.
• PFejent r7ocign phwo is eI ntic-ir»ted to take fide (5) MORthc.
• Project construction phase is anticipated to take six (6) months.
• Twelve (12) monthly updates of Project Status Reports, MWBE forms, TPBE,
Risk Register, and project Schedule.
DELIVERABLES
A. Meeting summaries with action items
B. QC/QA documentation
C. Baseline design schedule
D. Preliminary Project Risk Register, preliminary Stakeholder Register, and
preliminary Project Communications Plan
E. Monthly Schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly Project Status Reports
G. Monthly TPBE spreadsheet updates
H. Monthly Project Risk Register updates
Plan Submittal Checklists (See Task 10)
City of Fort worth, Texas Page 3 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 3 of 26
FORT WORTH
J. Monthly invoices
K. Monthly M/WBE Report Form and Final Summary Payment Report Form
City of Fort worth, Texas Page 4 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 4 of 26
FORT WORTU.,
TASK 7. f`f1NCEPPTrIoIAI DESIGN !30 PERCENT).
The CORtioptU&I Dacia submitted to CITY r the approved DrecnGShediMe.
The purpese of the sencept iol design is fer the EIS10NEER tq idea#ify, develop
si iccessf lly addresses the design problem and to obtain the CITY's epdersement of #his
song
ENG1,NEER Will develop the cnnsepti al design of the infrastri Intl ire as fellews.
7 Cellertien
• TraffiG Count " U:t.&N Minresef# Cvnel spreadsheet of Raw 24 hei it and Turnin.`g.
Meyement Count data gathered at 15 minute interyala at a m;nimum ` n all rravr
data GGI!eEted. Provide Daily S/immaries by Approach and Peak Peried
F/immaries by Approaoh. Spreadsheet suploaded
hall he to the Iinsi amen+
nagement�fnldder'TPW Traffic Geunt nUts' (GUrrently RIBA 360)
• In addition to data obtained from the CITY ENGINEER \.sill research and mope
efforts #e ehtain pertinent ipferma#ien #e aid in neerdina#ien of the prepesed
imprn�mments with any planner) fi t ire the mcy ipfli fence the
nrniect ENGINEER will also identify and seek to obtain data fer existing
Gend'tiona that mad° i�mparvt the project inGli ding• utilities,
aggeRG!es (TxDOT d
City ar Plana, andorsNp cs cvailahl�„�T Tax
Assesser''s office
• Th�GINEER Will censu It with the CITY'-. Transp-
Department, Water Departmentand other CITY depar#monto, ps Iutilities, s
private utilities, utilities private and government agencies to determine the
a.proximate Incatien of abode and underground Ind utilitiesand other facilities
e
(current and a) that hSvs &n iMpr,nt Or influence on the project
• The data cellectien efforts will alse include sends acting special ceerdina#fen
meetings with affeGted property owners and businesses aS ReGessary to develop
sewer re_re„#ing plcno.
Utility
2.2. Cubourfase Engineering
ace Utility Engineering C I
a C ...a au . ETookQ par .,.
2.3. Utility Glea�,rRGe
#-voIl\CCE Will develep the design of CITY facilities to avoid or minimize
UtilityGenfliGtS with existing utilities, and where known and possible Gensider potential
future utilities 'R designs. Where c;enfliGtS Gannet be aveldedGoerdiRati9n 0
Genfkts will begin at the GOR optual Design � '
In the case of S publis Utility nonflict the EN INEER Will design CITY facilities to
utilities, censider petential future utilities in desirvns i i
In the case of a private Utility Genflis# the ENG1NFaGR MHx-G�a S P-[,\C oat-ef
Utility
plans with the conflicts highlighted and a Utility Genf oto Table of these
conflicts to he included in da Utility ClearanGe LettererfGF GGerdina#inn The
City of Fort Worth, Texas Page 5 of 26
Attachment A Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 5 of 26
FORT WORTH
PIEER may y need +e neerdina+inn direntl y with the private utility preender if
. ,
that preyider needs to undertake design to adjust their utility's Iona+inn
Th�yInCCC ahszll� PDF file of the nnnreyerd preliminary plan set to
the designated preient folder in the Cit y's dens imnnt mcnagement system (BIM 360) far forwarding to all Utility companies which have facilities within tho llmlto Of
the -PrcJcFtThe PDF= file should be Greated dipeGtly 49M the CAD files.
2.The-GORGOpt�Nal Q96inn DaGkane shall iRGI irde the fnl'GWinn• DreliminaF y GGVer anrd
i ndev of sheets 0mr-h-ding prninnt limits, area Inn mcp and beginnrding and nerd
station limite.
—Qt~`entity l;smmsry pane and each design sheot ohsll ins
table.
Irltersnn+inn Cen+rel Evaluation Revert /ICC\ nerrider analysis� s+. �d�y er
alignment/feasibility sty i4y
- (;9RG0ptUCl Design C?epnrt (Arterials)
* GGRsWa&� ii\nrnn�ec* Ilot In scnnr,danne with the c irre n+ CITY iSWM-Gr4er4a
kbnucl feY Site Development and Gonotruotigo
* —OWE Plan Sheets sealer) by a licensed prefessinnal engineer registered in the
C+ate of Texas. +
Tr�Count L\&\* 1. Misrnsnf+ Cvsel spreadsheet of Raw 24 hour and Turning
Meyemen+ Cni ant data gathered s; 15 mirA4e4Rt&RsIc st s m:nimNm enall Fa
s
data GOI!eGted Dreyide Daily &jmmaries by Appreanh and DeaL_Derind
✓immaries by Appreaoh. Spreadsh et ahcll li�e .pleaded +e the B zzsaw folder
'TD\n/ Traffic Count C\sts'.
* CMIOting typical sections of the rnadway to he cnnstF acted along With prepesed
typinal see+ions �eyhinh GUtline the prepesed impreyemonto. Typir— & k\nc C 1ag
e
direetinn arrews existing and prepesed ourbo, Clidewalks and re+airing walls
* COR wva IiAwi &nd prefile sheets shE)Wing evicting and proposed intersection,
existing and 'p Fepesed ROW, prepesed existing
and sidewalks and drivs
I
prp ran oejed lane dimeRsions and lane arrews, existing drainage stri IG Tres, nity
e
floy+i amentatien of Levy design denisinns
* C&Aimates of probable nnnstFUGtinn nest
ASSUMPTIONS
*tree /2\ sets of 11 "xi 7" siz,C plan.`] Vvill he delivered for the 30- design
* DI\C files nreated frem design CAD drawings will he upleaded to the designated
prefect folder in the City's dnr+i im t gement system (BIM 46 0) CIUG ICCR
can. mc�n+1 �I���..
the CITY of the CeRGoptucl Pasign DaGkage
City of Fort worth, Texas Page 6 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 6 of 26
FORT WORTH
DELIVERABLES
B. GeRGOPtUd ^ooip RepGA
Q. Traffu,T; Count "ts
C\ Trsff*^ F=RgiRee FiRg Study
City of Fort worth, Texas Page 7 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 7 of 26
FORT WORTU.,
'ASK 3. PRELIMINARY DESIGN /RA PERCENT).
Drelimi� p sea snrspegifinationo o a o oumit}erto CITY per the approved Dreiegt
S n hv4--
ENGINEER Will rdeyelep the preliminary design of the infrastrl igti ire as fellews
-1-1. The Preliminary Resign Drawings and Spegifigationq ohsll inslu/de the fellewing•
Preliminary cover and index of sheets innli aiding proieet lirrlb, area
and beginning and end station limits
JJEPlan oheets soalerd by a linenserd professional engineer registered in the
State of Texas
Quantity Summary page and eagh design sheot ohall include a quantity take off
taab
Preliminary iSWM Ghenklist in annorrdange with the ni irrent CITY iS\VM-G#ter4a
Manual fer Site Development aR d Censtrl igtion
Traffin Gantral Plan inGl, u-ding all nenstn intien cigpage and pavemont markings
wh'Gh will be in aGGOrdanGe with the latest edotmen of the Texas Manual on Uniform
■e
• A ProjeGt Centro! Sheet, showing all Control -pointa, uoled or set while gathering
i rl
bo ondiGated for eaGh Control Point: Identified (existing Gity Menumenti
DroveNam!, 518" iron Red); X, Y snd Z Goordinatoo, in an identified GOOrdinate s ' I
(i.e. set iR the Genterline ef the inlet iR the Seuth GUrb line of Nerth Side
East end of a1 1 Drove11
Updated roadway plan and profile sheets displaying station and coordinate data
all horizontal alignment P.G.'s, T.'o, P.L'o; otatien and elevation data ef -
GUrves, grades, K values, e, and vert'Gal GlearanGes where required.
Ne 1
Bearings
StatiOR equatiens relating utilities te paving, when apprepri
GUrbs, sidewalks, driveways, lane dimensions and arrows, and existing and
� Preliminary trafk signal and roadway details to innli ii-de eurhs sUrb vip-aniren
joints driveways, sidewalks and pavement details.
City of Fort Worth, Texas Page 8 of 26
Attachment A Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 8 of 26
FORT WORTH
DoGUmentatien of Levi design rdenis ions
t Eotlmstes of prebable GGnGtn lGtien nest
3.2. G'eeteGhnlGal Inyestigatlel9/Pavement Design
The EN EER ohsll prepare a detailed geo+eshniGal engineering study avid
pavernent desigp OR ^epformanoe with the City of Fort 1 dFM ayement Design
StapdaFda h4apua 05 a study shall in 1d a^^mm da+i^nc r arrlinry
murrunr, z c�c�.murrrrT 2—rccvrrmTe�lvuavrr,» e_urm,,g
3.3. 9enstn iGtability Review
Prier to the 60 percept review meeting with the C' TY, the EN INEER ohall
s Gherdi ile anrd attend a proie^t site visit with the CITY Dreie^t Manager anrd
GenStF6149R peFseRRel to walk pvJe^MThe €NGIN&EP :hall-,wmmsrize4he
C'ITY'S Gemments frem the field visit and oubmit this to the GITV in
YVi'i'ti R g .
3.1. Publi^ nn�ee+in,^g
After the preliminarplsno hsVe been reviewed aR d appreved by the CITY, the
ENGINEER ohall p A exhibits, � �repnre preie and attend ene (I \ pbliG meeting to help
���. EER ,
o)cplain the prepe^er. . r eG+ to resirlonto. The -CITY ohall oeleot a ouitahl^ IGGatio,T
time anrd date. The-ERg„ineer needs to Geerdinate with the Git y!�prect manatee
format the mrailin^ list of all affeG+erd preperty ewRers ao^eF dingly
-ENcINFiFoP Will develop the design of GITV fasili+ins to aaeird or minimize
utilities,
future utilities in desigRG Where GepfliGts Gannet he ayeildeld GeerdiRation of
,
Utility GenfliGts will he identified at the i'enG jZtW pheCse aa'nRd begin at the
Preliminary Design ph338-
In the Gase of a pi ibliG Utility GenfliGt, the ENGINEER %Y&u CITY fs^ilitia�mn^st^c utilities,
Gens "ontisl Uwe „+ili+ieG in ,designs
In the Gase of a private Utility GenfliG+ the E C INSFoP wi�e s P'r-.\C cat
e
plans with the Utility G^nfliGts highlighted and a Utility Genfli3tSl Table of these
GonfllGts to he ind vde`d In s Utility Clearan^e I e+ter for Geerrdinatien at each
daoig.n milestone. The ENGINEER mS\i Reed to GooridinatiGn rdire^tly With the
pFivate utility or if that pr^•,ider needs to undertake design +e adjust themr
i tility'S 19Gatiep
City of Fort worth, Texas Page 9 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 9 of 26
FORT WORTH
The CAIr'_IAIEER ohall uploa� S DDC file of the approved preliminary plan set to
the designated preien+ felyder in the Gi+a's rdenument mansgemen+ system (91M
360) for feFwarrdino to all Utility sempanies which have facilities within thO limits 9#
thepFe}eGt The PDF= file sheul d he created rdirec+hi from the (`Afl files
CCU ENGI utility as_bi lilts anid/er de fiend Visits to n is
=gym ��. , ta-a tarn at an irm relecatien�
nemp�le+ee a,Rd thst the utility has been relena+erd in annerldanne With the pIixr10'
repert any discrepancies fGURd and preyi de rdoc. Fnentatiop to s. upper+ findings
- N INEER to upload all bNilts in the nt management
system (RIBA 360)
revn�eTdins&n.
• (ine (9 ) set of specifications• will he delivered for the 6601 rdec•ion
+ pnC
prefect felyder in the Git y's i-deci imn,nt mcnagernent system (QIM QGUI)
• A I oubmitterd rdoc. Imnnts aped nheGkliStS will he uplearderd +e the i-designaterd
prefect felyder in the Git y's rdeci imcnt mcr,coement system (RIBA 360),
• The GITy'sfrept-e�rd and- te�hninal Speeifina�ns ,A.411 be i i�e�. The ��INGER
ter- a-a„� r,,,r- ,,,ocr n��r,.,--tea
shall supplement the technical spenifisa+ions if neerderd
• GRe (9 ) Public MeetiN lic. N3C'Nm94-.
• ENGINEER '-'hShc net nreceeIth Final `lessen activities without w4#on sppr�^,'^'
al
by the GITV of the Preliminary liosign plano.
DELIVERABLES
A Preliminary Design drawings aR d spenlflocVbno in
B. Utility Gkage
G. GeoteGiR+Gal Report
B. Pre"MiRary iSVVM Gheckl+st
E. Cytlmates of probable nunstri action nos+
F. PUblic Meeting exhibits
City of Fort worth, Texas Page 10 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 10 of 26
FORT WORTH
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
• Upon — be sure to track changes. approval of the Preliminary plans, ENGINEER will
prepare construction plans as follows:
• Final draft construction plans (90%) including specifications shall be submitted to CITY
per the approved Project Schedule.
• The ENGINEER will provide a PDF set of plans with the utility conflicts highlighted and a
Utility Conflicts Table of those conflicts to be included in a Utility Clearance Letter for
final coordination.
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Final Plans (100%) to the CITY per the approved Project Schedule. Each plan
sheet shall be stamped, dated, and signed by the ENGINEER registered in State of
Texas.
Final iS\ eoldist in QGGOrdaRGe with the-G61rren 'cW-44 Gr#eFi 44anual fe Site
I eon Iepmon4 and GODS n GUQP
• A Quantity Summary page will be included in both the 90% and 100% design packages.
Each design sheet of those package shall include a quantity take off table.
• The ENGINEER shall submit an estimate of probable construction cost with both the
90% and 100% design packages. This estimate shall use standard CITY or TxDOT bid
items, as applicable.
ASSUMPTIONS
• Three (3) sets of 11"x17" size drawings and one (1) set of specifications will be delivered
for the 90% Design package.
• A PDF and DWF file for the 90% Design will be created from design CAD drawings and
will be uploaded to the project folder in the City's document management system (BIM
360).
• Ten (10) sets of 11"x17" size drawings and two (2) set of specifications will be delivered
for the 100% Design package.
• A PDF and DWF file for the 100% Design will be created from design CAD drawings and
will be uploaded to the project folder in City's document management system (BIM 360).
DELIVERABLES
A. 90% construction plans and specifications including QC/QA documentation.
B. Utility relocation documentation.
C. Fin1 iS\VIM pIaR ( Final nheGk 1064)
D. 100% construction plans and specifications including QC/QA documentation.
E. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's or TxDOT's standard bid items and format, as applicable
F. Original 11 "x17" size cover mylar for the signatures of authorized CITY officials.
City of Fort worth, Texas Page 11 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 11 of 26
FORT WORTH
TASK 5. BID PHASE SERVICES.
The CITY reserves the right to bid the project either via traditional project bid to via unit price
alternative delivery. ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto the City's
document management system (BIM 360) for access to potential bidders.
• Contract documents shall be uploaded in a .xIs file.
Unit Price Proposal documents are to be created utilizing the city's unit price tool
only and combined in a specified spreadsheet workbook, Bid Proposal
Worksheet Template, that will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to the City's document management system (BIM
360) in two formats, .pdf and .dwf files. The .pdf will consist of one file of the
entire plan set. The Awf will consist of individual files, one for each plan sheet,
and will be numbered and named in a manner similar to that of the plan set
index.
• The ENGINEER from Contractor's uploaded Plan Holder Registrations in the
City's document management system (BIM 360).
The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's folder titled Request for Information. The ENGINEER will provide
technical interpretation of the contract bid documents and will prepare proposed
responses to all bidder's questions and requests, in the form of addenda. The
ENGINEER shall upload all approved addenda onto the City's document
management system (BIM 360) and mail addenda to all plan holders.
• Attend the pre -bid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet are to be uploaded into the project's
Bid Results folder on the City's document management system (BIM 360)
Incorporate all addenda into the contract documents and issue conformed sets.
City of Fort worth, Texas Page 12 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 12 of 26
FORT WORTH
Engineer will provide 10 full sets and 3 full sets after bid opening - conformed set
with all approved addenda
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• Construction documents will only be made available on the City's document
management system (BIM 360) for plan holders and/or given to plan viewing
rooms.
• Construction documents will not be printed and made available for purchase by
plan holders and/or given to plan viewing rooms.
• PDF, DWF and DWG files will be uploaded to the City's document management
system (BIM 360).
DELIVERABLES
A. Addenda
B. Bid tabulations
C. Recommendation of award
C\ Finsl ic\VM rheGkInst
E. Construction documents (conformed)
F. CFW Data Spreadsheet
City of Fort worth, Texas Page 13 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 13 of 26
FORT WORTH
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1. Construction Support
• The ENGINEER shall prepare one (1) task order package for the CITY's Unit
Price Contractor.
• The ENGINEER shall attend the pre -construction conference.
• After the pre -construction conference, the ENGINEER shall provide project
exhibits and attend one (1) public meeting to help explain the proposed project to
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall attend bi-weekly construction progress meetings during the
duration of construction. The ENGINEER will prepare meeting notes with action
items and distribute there to the project team.
• The ENGINEER will prepare a Construction Communication Plan detailing the
procedure for communicating between the Project Delivery Team members and
the Contractors.
• The ENGINEER will meet with concerned citizens as needed.
• The ENGINEER shall review shop drawings, samples and other submittals
submitted by the contractor for general conformance with the design concepts and
general compliance with the requirements of the contract for construction. Such
review shall not relieve the Contractor from its responsibility for performance in
accordance with the contract for construction, nor is such review a guarantee that
the work covered by the shop drawings, samples and submittals is free of errors,
inconsistencies or omissions. The ENGINEER shall log and track all shop
drawings, samples and other submittals in Buzzsaw.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, respond to Request for Information (RIF)
from the contractor, review change orders, and make recommendations as to the
acceptability of the work.
• The ENGIENER will meet with the Project Delivery Team and Contractor on -site
to review any field changes.
• The ENGINEER will coordinate with the TPW department as necessary
• The Engineer will update and submit monthly the Project Status Report, Risk
Register, TPBE and Project Schedule.
• The ENGINEER shall attend the "Final" project walk through and assist with
preparation of final punch list.
6.2 Record Drawings
• The ENGINEER shall prepare record drawings from information provided by the
CITY depicting any changes made to the Final Drawings during construction.
Information provided by the CITY may include, but is not limited to the following:
City of Fort worth, Texas Page 14 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 14 of 26
FORT WORTH
o As -Built Survey
o Red -Line Markups from the Contractor
o Red -Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
These Record Drawings were prepared using information
provided by others and represent the as constructed
conditions to the extent that documented changes were
provided for recording. The ENGINEER assumes no liability
for undocumented changes and certifies only that the
documented changes are accurately depicted on these
drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, in Adobe Acrobat PDF format (version 6.0 or
higher) and in DWF format. The ENGINEER may keep copies of the
information provided by the CITY for their files, but all original red -lined drawings
shall be returned to the CITY with the digital files.
• There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a
separate PDF and DWF file for the Water plan set, if required. Each PDF and
DWF file shall contain all associated sheets of the particular plan set. Singular
PDF and DWF files for each sheet of a plan set will not be accepted. PDF
and DWF files shall conform to naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number of
sheets in this file.
Example: X-12755_orgl8.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawing folder
in the City's document management system (BIM 360).
City of Fort worth, Texas Page 15 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 15 of 26
FORT WORTH
For information on the proper manner to submit files and to obtain a file number for
the project, the ENGINEER should coordinate with the City project manager. File
numbers will not be issued to a project unless the appropriate project numbers and
fund codes have been assigned and are in the Department of Transportation and
Public Works database.
ASSUMPTIONS
• One (1) Public Meeting is assumed.
• Four (4) site visits are assumed.
• Two (2) submittal reviews are assumed.
• Two (2) RFI's are assumed.
• One (1) Change Order is assumed.
DELIVERABLES
ERABLES
A. N— bli^ meeting exhibits
B. Construction Communication Plan
C. Response to Contractor's Request for Information
D. Review of Change Orders
E. Review of shop drawings
F. Final Punch List items
G. Record Drawings in digital format
City of Fort worth, Texas Page 16 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 16 of 26
FORT WORTH
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1. Right -of -Way Research
• The ENGINEER shall determine rights -of -way, easements needs for construction
of the project. Required temporary and permanent easements will be identified
based on available information and recommendations will be made for approval
by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The documentation shall be provided in conformance with the checklists and
templates available on the City's document management system (BIM 360)
resources folder.
7.3. Temporary Right of Entry Preparation and Submittal
Prior to construction, the ENGINEER should coordinate with the City project
manager to identify all needed Temporary Right of Entries from landowners. It is
assumed that letters will only be required for land owners adjacent to temporary
construction easements or who are directly affected by the project and no
easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and
templates available on the City's document management system (BIM 360)
resources folder.
ASSUMPTIONS
Right -of -Way research includes review of property/right-of-way records based on
current internet based Tarrant Appraisal District (TAD) information available at
the start of the project and available on -ground property information (i.e. iron
rods, fences, stakes, etc.). It does not include effort for chain of title research,
parent track research, additional research for easements not included in the TAD
records, right-of-way takings, easement vacations and abandonments, right-of-
way vacations, and street closures.
DELIVERABLES
A. Four (4) Easement exhibits and meets and bounds provided on CITY forms.
B. One (1) Temporary Right of Entry cover letters
C. One (1) Temporary Right of Entry documents
City of Fort worth, Texas Page 17 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 17 of 26
FORT WORTH
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project. Information gathered during the survey shall include topographic
data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations,
location of buried utilities, structures, trees (measure caliper, identify overall
canopy, and have qualified arborist identify species of trees), and other features
relevant to the final plan sheets. Existing drainage at intersections will be verified
by field surveys. Spot elevations will be shown on intersection layouts with cross
slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the
following:
— A Project Control Sheet, showing ALL Control Points, used or set while
gathering data. Generally on a scale of not less than 1:400:
— The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the
same coordinate system, as the Control.
— No less than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
— Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall coordinate with the City's project
manager to identify, mail and obtain Temporary Right of Entry from landowners.
• The documentation shall be provided in conformance with the checklists and
templates available on the City's document management system resources
folder.
8.3. Subsurface Utility Engineering
Provide Subsurface Utility Engineering (SUE) to Quality Level D, C, B, and A, as
described below. The SUE shall be performed in accordance with Cl/ASCE 38-02.
City of Fort worth, Texas Page 18 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 18 of 26
FORT WORTH
Qualitv Level D
• Conduct appropriate investigations (e.g., owner records, County/CITY records,
personal interviews, visual inspections, etc.), to help identify utility owners that
may have facilities within the project limits or that may be affected by the project.
• Collect applicable records (e.g., utility owner base maps, "as built" or record
drawings, permit records, field notes, geographic information system data, oral
histories, etc.) on the existence and approximate location of existing involved
utilities.
• Review records for: evidence or indication of additional available records;
duplicate or conflicting information; need for clarification.
• Develop SUE plan sheets and transfer information on all involved utilities to
appropriate design plan sheets, electronic files, and/or other documents as
required. Exercise professional judgment to resolve conflicting information. For
information depicted, indicate: utility type and ownership; date of depiction;
quality level(s); end points of any utility data; line status (e.g., active, abandoned,
out of service); line size and condition; number of jointly buried cables; and
encasement.
Qualitv Level C (includes tasks as described for Qualitv Level D)
• Identify surface features, from project topographic data and from field
observations, that are surface appurtenances of subsurface utilities.
• Include survey and correlation of aerial or ground -mounted utility facilities in
Quality Level C tasks.
• Survey surface features of subsurface utility facilities or systems, if such features
have not already been surveyed by a professional surveyor. If previously
surveyed, check survey data for accuracy and completeness.
• The survey shall also include (in addition to subsurface utility features visible at
the ground surface): determination of invert elevations of any manholes and
vaults; sketches showing interior dimensions and line connections of such
manholes and vaults; any surface markings denoting subsurface utilities,
furnished by utility owners for design purposes.
• Exercise professional judgment to correlate data from different sources, and to
resolve conflicting information.
• Update (or prepare) plan sheets, electronic files, and/or other documents to
reflect the integration of Quality Level D and Quality Level C information.
• Recommend follow-up investigations (e.g., additional surveys, consultation with
utility owners, etc.) as may be needed to further resolve discrepancies.
• Provide Quality Level C to identify overhead utilities on the project and provide
the overhead utility information on the SUE plan sheets.
City of Fort worth, Texas Page 19 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 19 of 26
FORT WORTH
Level B (includes tasks as described for Quality Level C)
• Select and apply appropriate surface geophysical method(s) to search for and
detect subsurface utilities within the project limits, and/or to trace a particular
utility line or system.
• Based on an interpretation of data, mark the indications of utilities on the ground
surface for subsequent survey. Utilize paint or other method acceptable for
marking of lines.
• Unless otherwise directed, mark centerline of single -conduit lines, and outside
edges of multi -conduit systems.
• Resolve differences between designated utilities and utility records and surveyed
appurtenances.
• Recommend additional measures to resolve differences if they still exist.
Recommendations may include additional or different surface geophysical
methods, exploratory excavation, or upgrade to Quality Level A data.
• As an alternative to the physical marking of lines, the ENGINEER may, with
CITY's approval, utilize other means of data collection, storage, retrieval, and
reduction, that enables the correlation of surface geophysical data to the project's
survey control.
Level A
• Expose and locate utilities at specific locations.
• Tie horizontal and vertical location of utility to survey control.
• Provide utility size and configuration.
• Provide paving thickness and type, where applicable.
• Provide general soil type and site conditions and such other pertinent information
as is reasonably ascertainable from each test hole site.
ASSUMPTIONS
Up to Four (4) Level A test holes are included.
DELIVERABLES
A. Drawing of the project layout with dimensions and coordinate list.
B. SUE plan drawings sealed by a professional engineer registered in the State of
Texas.
City of Fort worth, Texas Page 20 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 20 of 26
FORT WORTH
TASK 9. PERMITTING.
ENGINEER will provide permitting support for the CITY to obtain any and all agreements
and/or permits normally required for a project of this size and type, as follows
9.1 Texas department ^f Trsnsp^rta+inn /TxDQT\ Permit
Meet, negetiate and eoorrdina+e to 3btsin sppre„al of the ageneY icci jinn +he
agreement andier permits.
( empleting all fnrms/applleatlens necessary.
* ✓ibmitt' JTY snd TxDQT re.,i e,e,
* ✓ibmitting revised forms for agene„ reyiei.y
Pespenrding to agency eemments+ and requests
Q\2. PaiIrnad- Permit
Meet, ,d negetiate apeeerrdinate to 3btain spproval of the agepey issi iipg fhn
agreement anrd/nr permits
(Completing all forms/applinatinpc necessary,
* 8abmittiRg fermc/applinatinpc for (CITY review
* 9UbMitting revised farms for agepn„ re.,ie,e,
* PespeR ding to agency comments anrd requests.
Identify and anal" Texas ArehlteetUFal Barriers+ Aet
-una-arrc�rye�e�iFFK2�efi t�iG�ei�us��rcnrcccc�n-crrvarncrs�zcr
Ghapter 68 Texas A�ministrs&e Gede0 d aR heceme familiar with the
gevePR ntel "ith^rities having iurisdietinn to appFave the ,design of the PFejeet.
NG ;'5GR is resPGRsible fer previdin Plans ths: ith TD! !R
requirements
* Submit GGR6tFUGti0R dOGUmea#S to the TDI=R
Gempletipg all Tr\R forms/applinatinnc neneccary
—Obtain the "'e ^ref ✓ibotantial S3mplianse from the Tnl P
Requvot an incrl
3m T�I'l�.P 3r s T�I'approvedovally approvePegiste re rd
. �..
Accessibility Specialist ne lat3r than 30 calendar ,days after cepstn intien
substantial gem pintiep A,d"isn the UTY in Writing of the results of the inspentien
QMocia� ith TD R plsn review and inspeetiens are to he paid by the
ENGINS&R ,dUring the nni 1rse of the prefect
City of Fort worth, Texas Page 21 of 26
Attachment A Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 21 of 26
FORT WORTH
Fo�jeoto the 4�qturb an area greator than 9n (I) aGre, the r�act"r will be
respnnsihle fnr preparing an`d oubmitting the Storm Water Pelli Minn PFeVentinn
Dlap /C\A/DDD\ Lei ith &pp r9prirute r egcJ„utAFy ag og C3s. The vino pr 2pare
the !SWM GnnstFUntion Plan SGnnrding to the ni FFeR • CITY iQIA/,�AA,I Gr#eyria AAonlcol
f r Ciite�o� nmept and Ge rTtFucnition-tlVi-iich will be"Irnr aced i Lo-the
SWPPP by the eontrastor
El♦n\iirnmmnnfnl Cervices hnrnWde a detailed soone if US A my i'orn of Engineers
Qentien 404 Natie wide Permit er inrliWd rol norm it is requkerll
Negetiating anld nnorrdinating to obtsin sppreval of the agennY issi ping +he
agreement anther permits.
(completing all forms/applioatinns neoessaryi
* Submitting fnrms/applinatieRG fnr CITY review
* ✓Jbmittipg revised fnrms fnr ageRGY reyiei.y
Resperl Piing to agensY semmepts and req costs
/:TT.1+>l/:TITL7►TISJTTfl��7MrSITU YIMMM,i-�sr.�rn
Meet, ri pegetiate apsoerriinate to ��
obtain spprnal of the ageRGY issi iinrr the
agreement andiep permits
(Gnmpleting all ferms/applioatinns nenessary.
* Submitting ferms/applinatinns for CITY review
* Submitting revised fnrms fer ageRGY reyiev^i
Qespnnrding to ageRGY r+nmmepts aR d requests
ASSUMPTIONS
* 1 T&'�-R pormit an4+ne aulcmittal
*Obtain "designated Agent" from Git y of Cert 1A/erth for TRL- p
*---omit preparatiGR will begiR after appFeval of the GOR optual C'
GRe /9 \ rneetiRg ld with lil R In3p9Gtien
- to a:r�umeT���
City of Fort worth, Texas Page 22 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 22 of 26
FORT WORTH
ASSUMPTIONS
•Permit preparatien will begin after appFe inl of the i;eneOpV of De'>
• GRe (1) meeting is assumed with DAS iRspeetor for the Tnl R p t.
DELIVERABLES
A Genies of Permit Applinntions
B. Copies of AppFeved Permits
City of Fort worth, Texas Page 23 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 23 of 26
FORT WORTH
TASK 10. QUALITY CONTROL / QUALITY ASSURANCE
ENGINEER to provide to the City a Quality Control/ Quality Assurance Plan (QC/QA Plan)
outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are
incorporated into the calculations, plans, specifications, and estimates.
ENGINEER is responsible for and shall coordinate all subconsultant activity to include
quality and consistency of plans.
If, at any time, during the course of reviewing a submittal of any item it becomes apparent to
the CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may
cease its review and return the submittal to the ENGINEER immediately for appropriate
action. A submittal returned to the ENGINEER for this reason may be rejected by the CITY
Project Manager.
10.1. QC/QA of Survey and SUE Data
• The ENGINEER's Surveyor shall perform Quality Control/ Quality Assurance on
all procedures, field surveys, data, and products prior to delivery to the CITY. The
CITY may also require the ENGINEER's Surveyor to perform a Quality
Assurance review of the survey and/or subsurface utility engineering (SUE) work
performed by other surveyors and SUE providers.
• ENGINEER's Surveyor shall certify in writing via a letter that the survey
information provided has undergone a Quality Control/ Quality Assurance
process.
• ENGINEER's Subsurface Utility Engineering provider shall certify in writing via a
letter that the SUE information provided has undergone a Quality Control/ Quality
Assurance process.
10.2. QC/QA of Design Documentation
• ENGINEER shall perform a QC/QA review of all documents being submitted for
review at all stages of the design including the 30%, 60%, and 90% and Final
Document design review submittals. QA should be performed by an individual
within the firm who is not on the design team.
ENGINEER is to acknowledge that each item on the Detailed Checklist has been
included by checking "done" on the checklist. If a particular checklist item is not
applicable, this should be indicated by checking "N/A". If an entire checklist is
not applicable, this should be indicated by checking every item on the list as
"N/A" and still included with the submittal. The ENGINEER shall use the Detailed
Checklist provided by CITY.
• A Comment Resolution Log must be used to document conflicting comments
between reviewers and to highlight comments made by the CITY that the
ENGINEER is not incorporating into the design documents along with the
associated explanation. The ENGINEER shall use the Comment Resolution Log
provided by CITY.
• The documentation of a QC/QA review includes (1) a copy of the color -coded,
original marked -up document (or "check print") developed during the QA
checking process and/or review forms which sequentially list documents and
associated comments; and (2) a QC sign -off sheet with signatures of the
City of Fort worth, Texas Page 24 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 24 of 26
FORT WORTH
personnel involved in the checking process. Mark-ups may also be documented
using the Comment Resolution Log.
• Evidence of the QC/QA review will be required to accompany all submittals.
Documentation shall include, but is not limited to, the following items:
- PDF of the completed Detailed Checklists
- PDF of the QC/QA check print of the calculations, plans, specifications, and
estimates demonstrating that a review has been undertaken;
- PDF of previous review comments (if any) and the ENGINERR's responses
to those comments in the Comment Resolution Log.
• If any of the above information is missing, is incomplete or if any comments are
not adequately addressed; the CITY may contact the ENGINEER and request
the missing information. If the ENGINEER does not respond to the request
within 24 hours, the CITY shall reject the submittal. No additional time will be
granted for a returned submittal.
• If the ENGINEER has not adequately addressed the comments, the submittal
shall be rejected and returned to the ENGINEER immediately to address the
issues.
ASSUMPTIONS
• All submittals to the City will be Quality checked prior to submission.
• A PDF of the QC/QA documentation will be uploaded to the project folder in
Buzzsaw.
DELIVERABLES
A. QC/QA documentation
City of Fort worth, Texas Page 25 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 25 of 26
FORT WORTH
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon — be sure
to track changes. the CITY's written request. Any additional amounts paid to the ENGINEER
as a result of any material change to the Scope of the Project shall be agreed upon — be sure
to track changes. in writing by both parties before the services are performed. These
additional services include the following:
• Negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort worth, Texas Page 26 of 26
Attachment A Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
PMO Release Date: 02.06.2015 103998
Page 26 of 26
ATTACHMENT B
COMPENSATION (AMENDMENT NO. 1)
Amendment No. 1 - Supplemental Design Services for
Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
City Project No. 103998
Time and Materials with Multiplier Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A
as follows:
Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by Direct Salaries
multiplied by a factor of 3.25.
Direct Salaries are the amount of wages or salaries paid ENGINEER's
employees for work directly performed on the PROJECT, exclusive of all payroll -
related taxes, payments, premiums, and benefits.
Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 4
Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
103998
AN
ATTACHMENT B
COMPENSATION (AMENDMENT NO. 1)
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 2 of 4
Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
103998
AM
ATTACHMENT B
COMPENSATION (AMENDMENT NO. 1)
IV. Summary of Total Project Fees
Firm
Primary Responsibility
Fee Amount
%
Prime Consultant
LJA Engineering
Original Agreement
$50,720.00
Amendment No. 1
$24,724.00
Supplemental Design
Combined
$75,444.00
57.4%
Proposed MBE/SBE Sub -Consultants
Lamb -Star Engineering
Original Agreement
$22,050.00
Amendment No. 1
$4,000.00
Supplemental SUE (LVL A)
Combined
$26,050.00
19.9%
GRAM NTX
Traffic Data
$525.00
Amendment No. 1
$0.00
Combined
$525.00
0.4%
Altura Solutions
TDLR Review/Inspections
$2,100.00
Amendment No. 1
$0.00
Combined
$2,100.00
1.6%
Non-MBE/SBE Consultants
LJA Survey
4 ROW/4 Easements
$21,000.00
Amendment No. 1
$6,000.00
Survey (Drainage)
Combined
$27,000.00
20.6%
TOTAL (ORIGINAL)
$96,395.00
TOTAL AMENDMENT NO. 1
$34,724.00
100%
TOTAL COMBINED
$131,119.00
Project Number & Name Total Fee
MBE/SBE Fee
MBE/SBE
Basswood Blvd and Old Santa Fe Trail, $96,395.00
$24,675
25.6 %
Project No. 103998.
Amendment No. 1
$34,724.00
$4,000
11.5 %
Combined
$131,119.00
$28,675
21.9 %
City MBE/SBE Goal = 0 %
Consultant Committed Goal = 15
%
City of Fort Worth, Texas Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
Attachment B 103998
PMO Official Release Date: 8.09.2012
Page 3 of 4
AKI
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Engineer invoice sample attached
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 4 of 4
Traffic Signal Design - Basswood Blvd and Old Santa Fe Trail
103998
Task No.
Task Description
Rate
1.0
Additional Design Services
1.1
Signal Design
1.2
Illumination Design
1.3
Additional SUE level A (Overage from
$20,000 ROW)
1.4
Drainage Review (from Public Meeting)
1.5
Addiional Utility Coordination
2.0
Drainage Design Services
2.1
Drainage Design
2.2
Survey for Drainage Design
City of Fort Worth, Texas
Attachment C - Level of Effort Amendment 1
PMO Official Release Date: 8.09.2012
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Additional Design Services for
Basswood at Santa Fe Traffic Signal Design
City Project No. 103998
Project Project
Director Manager
$290 $235
Labor(hours)
Project
Engineer
EIT
CADD
Administrative
Total Labor
Cost
Expense
Subconsultant
MWBE I Non -"BE
Travel
Reproduction
Total Expense
Cost
Task Sub Total
$185
$115
$110
$100
01
61
48
102
16
2
$23,980
$4,001
$6,232
$0
$0
$10,232
$34,212
2
6 31
2 20
4
8 8
8
31 36 16
$4,000
$6,232
$5,260
$0
$5,260
2
$3,140
$0
$3,140
1
$695
$4,000
$4,695
1
$2,635
$0
$2,635
2
$1,390
$0
$1,390
$0
$0
$0
$0
$0
$0
4
$12,070
$0
$12,070
$0
$6,232
$6,232
$0
$0
$0
$0
$0
$0
Project Summary
Total Hours
174
Total Labor
$23,980
Total Expense
$10,744
MBE/SBE Subconsultant
$4,000
Non-MBE/SBE Subconsultant
$6,232
5% Sub Markup
$512
MBE/SBE Participation
11.7%
Total Project Cost
$34,724
1of1
Attachement D
UPDATED SIGNAL PROJECT SCHEDULE
TASK week
Aug Sep Oct Nov Dec Jan Feb March April May June July Aug Sep Oct Nov Dec Jan 24 Feb Mar Apr May Jun Jul
N.T.
Site investiagtion/Due Diligence L�=L
Topographic/Design Survey
SUE Level B
SUE Level A
Public Involvement
Traffic Signal Design • • • • • • • • • • M • • • • • • • • • • • • M • • • • • • • • • • • •
30 percent submittal
In field/30 percent review
Public Meeting
60 percent submittal
60 percent review
90 percent submittal �♦
90 percent review
Supplemental Drainage Design
Public Meeting
Final Bid Documents .
Construction Phase Services
Traffic Signal Design — Basswood Blvd and Old Santa Fe Trail
City Project No. 103998
12/12/23. 11:20 AM M&C Review
CITY COUNCIL AGENDA
Create New From This M&C
Official site of the City of Fort Worth, Texas
FoRTWoRTH
REFERENCE **M&C 23- 20BASSWOOD BLVD AT OLD
DATE: 12/12/2023 NO.: 1056 LOG NAME: SANTA FE TRL
ENGINEERING CONTRACT
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: (CD 2 and CD 7) Authorize Execution of Amendment No. 1 in the Amount of $35,000.00 to
an Engineering Services Agreement with LJA Engineering Inc. for a Revised Contract
Amount of $131,395.00 for the Basswood Boulevard at Old Santa Fe Trail Traffic Signal
Project, Adopt Appropriation Ordinance, and Amend the Fiscal Years 2024-2028 Capital
Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Amendment No. 1 to City Secretary Contract Number 57860, an
Engineering Services Agreement with LJA Engineering Inc., to increase the contract amount
by $35,000.00 for a revised contract amount of $131,395.00 for the Basswood Boulevard at
Old Santa Fe Trail Traffic Signal project (City Project No. 103998);
2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations
in the Stormwater Capital Projects Fund in the amount of $80,000.00 by increasing
estimated receipts and appropriations in the Basswood Boulevard at Old Santa Fe Trail Traffic
Signal project (City Project No. 103998) and by decreasing estimated receipts and
appropriations in the Drainage Improvement Projects programmable project (City Project No.
P00043) by the same amount; and
3. Amend the Fiscal Years 2024-2028 Capital Improvement Program.
DISCUSSION:
In July 2022, City Secretary Contract Number 57860 was administratively approved authorizing LJA
Engineering Inc. to provide engineering services for the design and construction of the Basswood
Boulevard at Old Santa Fe Trail Traffic Signal project (City Project No. 103998). This project was
identified as part of the 2022 Bond Traffic Signals Program with initial project funding authorized by
City Council in January 2021 with Mayor and Council Communication (M&C) 21-0076. The scope of
this project includes design and construction of a new traffic signal, accessible pedestrian signals
(APS), and Americans with Disabilities Act (ADA) ramps. The design for this project is close to
completion, and the City will be issuing a task order using the existing on -call contract with Bean
Electrical, Inc. for construction of the project. During one of the community outreach meetings for this
project, residents requested to improve drainage conditions near the intersection. The City reviewed
the request and made the decision to update the scope of this project to include drainage
improvements. This Amendment No. 1 and additional funding appropriated with this M&C will be used
for engineering and construction services related to the drainage improvements.
The following table summarizes previous contract action and amendments:
Engineering Contract Date Amount
Original Contract Amount (CSC 57860) 07/19/2022 $96,395.00
Amendment Number 1 This M&C $35,000.00
Revised Contract Amount - $131,395.00
The following table summarizes the funding for the Basswood Boulevard at Old Santa Fe Trail Traffic
Signal project:
apps.cfwnet.org/council_packet/mc_review.asp?ID=31681 &councildate=12/12/2023 1 /3
12/12/23, 11:20 AM
M&C Review
Fund
Existing
Additional
Project
Funding
Funding
Total
30100 - General
$600,000.00
$0.00
$600,000.00
Capital Projects
30104 - Developer
$71,245.00
$0.00
$71,245.00
Contribution
34014 - 2014 Bond
Program $231,834.43 $0.00 $231,834.43
52002 - Stormwater
Capital Projects $0.00 $80,000.00 $80,000.00
Project Total $903,079.43 $80,000.00 $983,079.43
Funding for this project was not included in the Fiscal Years (FY) 2024-2028 Capital Improvement
Program due to scope of the work was unknown at the time of the development of the Capital
Improvement Program. The action in this M&C will amend the FY2024-2028 Capital Improvement
Program as approved in connection with Ordinance 26453-09-2023.
Funding is budgeted in the TPW Dept Highway & Streets Department's Drainage Improvement
Projects programmable project within the Stormwater Capital Projects Fund for the purpose of funding
the Basswood & Old San Fe Traff Signal project, as appropriated
This project is located in COUNCIL DISTRICT 2 and COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Drainage Improvement
Projects programmable project within the Stormwater Capital Projects Fund and upon approval of the
above recommendations and adoption of the attached appropriation ordinance, funds will be available
in the current capital budget, as appropriated, in the Stormwater Capital Projects Fund for the
Basswood &Old San Fe Traff Sig project. Prior to an expenditure being incurred, the Transportation &
Public Works Department has the responsibility to validate the availability of funds.
TO
Fund Department I Account Project Program Activity Budget I Reference # Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project
ID ID
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
Program Activity Budget
Year
William Johnson (5806)
Lauren Prieur (6035)
Monty Hall (8662)
Reference # Amount
(Chartfield 2)
OBASSWOOD BLVD AT OLD SANTA FE TRL ENGINEERING CONTRACT.docx (Public)
103998 Proj Budget Summan/ 10.31.2023.pdf (CFW Internal)
20BASSWOOD BLVD AT OLD SANTA FE TRL ENGINEERING CONTRACT funds availabilitv.pdf (CFW Internal)
20BASSWOOD BLVD AT OLD SANTA FE TRL ENGINEERING CONTRACT Undated FID (1).xlsx (CFW Internal)
apps.cfwnet.org/council_packet/mc_review.asp?ID=31681 &councildate=12/12/2023 2/3
12/12/23. 11:20 AM
M&C Review
Form 1295 Certificate 103998.pdf (CFW Internal)
M&C Map BasswoodSantaFe CPN103998.pdf (Public)
SAM.gov LJA Engineering 10.31.2023.pdf (CFW Internal)
apps.cfwnet.org/council_packet/mc_review.asp?ID=31681 &councildate=12/12/2023 3/3
103998-EPAM-Basswood Blvd & Old Santa Fe
Trail Traffic Signal Project Amendment #1
Final Audit Report 2024-02-02
Created: 2024-01-12
By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAA01ZLyeQ-B32KW4LVvdcm6wXwjYfesrl1
"103998-EPAM-Basswood Blvd & Old Santa Fe Trail Traffic Sig
nal Project Amendment #1" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-01-12 - 9:56:55 PM GMT- IP address: 204.10.90.100
Document emailed to ann.estes@fortworthtexas.gov for filling
2024-01-12 - 10:10:52 PM GMT
Document emailed to fanta.kaba@fortworthtexas.gov for signature
2024-01-12 - 10:10:52 PM GMT
Document emailed to Tony Kimmey (tkimmey@lja.com) for signature
2024-01-12 - 10:10:52 PM GMT
Email viewed by fanta.kaba@fortworthtexas.gov
2024-01-12 - 10:11:29 PM GMT- IP address: 204.10.90.100
Signer fanta.kaba@fortworthtexas.gov entered name at signing as Fanta Kaba
2024-01-12 - 10:12:55 PM GMT- IP address: 204.10.90.100
s Document e-signed by Fanta Kaba (fanta.kaba@fortworthtexas.gov)
Signature Date: 2024-01-12 - 10:12:57 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by Tony Kimmey (tkimmey@lja.com)
2024-01-12 - 10:52:58 PM GMT- IP address: 209.133.67.114
Document e-signed by Tony Kimmey (tkimmey@lja.com)
Signature Date: 2024-01-13 - 1:52:50 PM GMT - Time Source: server- IP address: 209.133.67.114
Email viewed by ann.estes@fortworthtexas.gov
2024-01-16 - 5:20:15 PM GMT- IP address: 204.10.90.100
FORTW❑RTHg I P°He1 "Y
Adobe
Acrobat Sign
- Signer ann.estes@fortworthtexas.gov entered name at signing as Ann Estes
2024-01-16 - 5:27:43 PM GMT- IP address: 204.10.90.100
Form filled by Ann Estes (ann.estes@fortworthtexas.gov)
Form filling Date: 2024-01-16 - 5:27:45 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Chad.Allen@fortworthtexas.gov for filling
2024-01-16 - 5:27:47 PM GMT
Signer Chad.Allen@fortworthtexas.gov entered name at signing as Chad Allen
2024-01-26 - 2:10:33 AM GMT- IP address: 204.10.90.100
6,6 Form filled by Chad Allen (Chad.Allen@fortworthtexas.gov)
Form filling Date: 2024-01-26 - 2:10:35 AM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Lissette.Acevedo@fortworthtexas.gov for filling
2024-01-26 - 2:10:37 AM GMT
Email viewed by Lissette.Acevedo@fortworthtexas.gov
2024-01-26 - 3:09:56 AM GMT- IP address: 66.190.71.244
:, Signer Lissette.Acevedo@fortworthtexas.gov entered name at signing as Lissette Acevedo, P.E.
2024-01-26 - 3:10:46 AM GMT- IP address: 66.190.71.244
=, Form filled by Lissette Acevedo, P.E. (Lissette.Acevedo@fortworthtexas.gov)
Form filling Date: 2024-01-26 - 3:10:48 AM GMT - Time Source: server- IP address: 66.190.71.244
Document emailed to patricia.wadsack@fortworthtexas.gov for filling
2024-01-26 - 3:10:50 AM GMT
Signer patricia.wadsack@fortworthtexas.gov entered name at signing as Patricia L. Wadsack
2024-01-31 - 2:18:09 AM GMT- IP address: 71.15.98.20
Form filled by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Form filling Date: 2024-01-31 - 2:18:11 AM GMT - Time Source: server- IP address: 71.15.98.20
Document emailed to Lauren.Prieur@fortworthtexas.gov for signature
2024-01-31 - 2:18:13 AM GMT
Signer Lauren.Prieur@fortworthtexas.gov entered name at signing as Lauren Prieur
2024-01-31 - 3:05:40 PM GMT- IP address: 108.209.194.42
arse Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2024-01-31 - 3:05:42 PM GMT - Time Source: server- IP address: 108.209.194.42
124 Document emailed to Priscilla.Ramirez@fortworthtexas.gov for approval
2024-01-31 - 3:05:44 PM GMT
FORTW❑RTHg I Paweredbv
Adobe
Acrobat Sign
Email viewed by Priscilla.Ramirez@fortworthtexas.gov
2024-01-31 - 4:15:40 PM GMT- IP address: 204.10.90.100
Signer Priscilla.Ramirez@fortworthtexas.gov entered name at signing as Priscilla Ramirez
2024-01-31 - 4:17:20 PM GMT- IP address: 204.10.90.100
Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov)
Approval Date: 2024-01-31 - 4:17:22 PM GMT -Time Source: server- IP address: 204.10.90.100
Document emailed to Douglas.Black@fortworthtexas.gov for signature
2024-01-31 - 4:17:24 PM GMT
Email viewed by Douglas.Black@fortworthtexas.gov
2024-02-01 - 11:34:39 PM GMT- IP address: 204.10.90.100
Signer Douglas.Black@fortworthtexas.gov entered name at signing as DBlack
2024-02-01 - 11:35:57 PM GMT- IP address: 204.10.90.100
Document e-signed by DBlack (Douglas.Black@fortworthtexas.gov)
Signature Date: 2024-02-01 - 11:35:59 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to jesica.mceachern@fortworthtexas.gov for signature
2024-02-01 - 11:36:01 PM GMT
Email viewed by jesica.mceachern@fortworthtexas.gov
2024-02-02 - 5:23:55 PM GMT- IP address: 204.10.90.100
Document canceled by Andrea Munoz (Andrea. M u noz@fortworthtexas.gov)
2024-02-02 - 5:38:01 PM GMT- IP address: 204.10.90.100
FORTW❑RTHg I P°He1� Y
Adobe
Acrobat Sign
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Basswood Blvd & Old Santa Fe Trail Traffic Signal Project
Engineering Contract Amendment #1
M&C: 23- CPN: 103998 CSO: 57860 DOC#:
1056
Date:
To:
Name
Department
Initials
Date Out
1.
Ann Estes
TPW - initial
Jan 16, 2024
2.
Fanta Kaba
TPW - signature
FK
Jan 12, 2024
3.
Anthony Kimmey, Consultant
Consultant
_dH
AT
Jan 13, 2024
4.
Chad Allen
TPW - initial
Jan 25, 2024
5.
Lissette Acevedo
TPW -initial
Jan 25, 2024
6.
Patricia Wadsack
TPW - initial
PLW
Jan 30, 2024
7
Lauren Prieur
TPW - signatures
Jan 31, 2024
8
Doug Black
Legal - signature
dl dwb
Feb 1, 2024
9
Jesica McEachern
CMO - signature
,or
Feb 2, 2024
10.
Jannette Goodall
CSO - signatures
Feb 5, 2024
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE: All documents received
from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE
ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES [—]No NEXT DAY: [—]YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a)FortWorthTexas.aov at ext. 7233 or 8363, for pick up when
completed. Thank you!