NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Hampton Trace Phase 1
City Project No.: 104144
Improvement Type(s): ❑ Paving ❑x Drainage
Original Contract Price:
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
❑ Street Lights ❑ Traffic Signals
-mArd-z� Feb 1, 2024
W. IN —h (Feb L 202414:01 CST)
Contractor Date
President
Title
Wright Construction
Company Name
Feb 2, 2024
Jeer K -e (Feb 2,2024 07:28 CST)
Project Inspector
Date
7 la
Feb 2, 2024
Project Manager
Date
Feb 5, 2024
Rebecca Omren (Feb 5. 202408:06 CST)
CFA Manager
Date
Feb 5, 2024
L�nrenRrieui�'b'2o2408:25 CST)
TPW Director
Date
C�6)�
Feb 5, 2024
Asst. City Manager
Date
$751,584.00
$751,584.00
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: Hampton Trace Face Phase 1
City Project No.: 104144
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑ Yes ❑x N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 194 WD
Work Start Date: 4/6/2023
Completed number of Soil Lab Test: 693
Completed number of Water Test: 14
Days Charged: 174
Work Complete Date: 1/19/2024
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name HAMPTON TRACE PHASE 1
Contract Limits
Project Type DRAINAGE IMPROVEMENTS
City Project Numbers 104144
DOE Number 4144
Estimate Number 1 Payment Number 1 For Period Ending 1/19/2024
WD
City Secretary Contract Number 58892 Contract Time 11YdD
Contract Date 2/9/2023 Days Charged to Date 174
Project Manager NA Contract is 100.00 Complete
Contractor WRIGHT CONSTRUCTION COMPANY, INC.
601 W. WALL ST.
GRAPEVINE, TX 76051-
Inspectors J. KOONCE / G. DEYON
Thursday, January 25, 2024 Page 1 of 4
City Project Numbers 104144 DOE Number 4144
Contract Name HAMPTON TRACE PHASE 1 Estimate Number 1
Contract Limits Payment Number 1
Project Type DRAINAGE IMPROVEMENTS For Period Ending 1/19/2024
Project Funding
UNIT MI: DRAINAGE IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
3137.0102 Large Stone Riprap, Dry
238 SY
$132.00
$31,416.00
238
$31,416.00
2
3305.0109 Trench Safety
2360 LF
$1.00
$2,360.00
2360
$2,360.00
3
3341.0201 21" RCP, Class III
38 LF
$95.00
$3,610.00
38
$3,610.00
4
3341.0205 24" RCP, Class III
84 LF
$106.00
$8,904.00
84
$8,904.00
5
3341.0302 30" RCP, Class III
384 LF
$118.00
$45,312.00
384
$45,312.00
6
3341.0305 33" RCP, Class III
695 LF
$135.00
$93,825.00
695
$93,825.00
7
3341.0309 36" RCP, Class III
137 LF
$150.00
$20,550.00
137
$20,550.00
8
3341.0402 42" RCP, Class III
414 LF
$193.00
$79,902.00
414
$79,902.00
9
3341.1303 6 x 4 Box Culvert
608 LF
$434.00
$263,872.00
608
$263,872.00
10
3349.0001 4' Storm Junction Box
4 EA
$6,561.00
$26,244.00
4
$26,244.00
11
3349.0002 5' Storm Junction Box
2 EA
$6,968.00
$13,936.00
2
$13,936.00
12
3349.0003 7' Storm Junction Box
1 EA
$12,155.00
$12,155.00
1
$12,155.00
13
3349.5003 20' Curb Inlet
4 EA
$12,155.00
$48,620.00
4
$48,620.00
14
3349.5003 15' Curb Inlet
6 EA
$11,165.00
$66,990.00
6
$66,990.00
15
3349.6002 15' Recessed Inlet
I EA
$13,970.00
$13,970.00
1
$13,970.00
16
3349.XXXX 42" Sloping Headwall
2 EA
$5,411.00
$10,822.00
2
$10,822.00
17
3349.XXXX SW-0 Skew Winged Head Wall
1 EA
$9,096.00
$9,096.00
1
$9,096.00
Sub -Total of Previous Unit
$751,584.00
$751,584.00
Thursday, January 25, 2024 Page 2 of 4
City Project Numbers 104144
Contract Name HAMPTON TRACE PHASE 1
Contract Limits
Project Type DRAINAGE IMPROVEMENTS
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Total Contract Price
DOE Number 4144
Estimate Number 1
Payment Number 1
For Period Ending 1/19/2024
$751,584.00
$751,584.00
Total Cost of Work Completed $751,584.00
Less % Retained $0.00
Net Earned $751,584.00
Earned This Period $751,584.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$751,584.00
Thursday, January 25, 2024 Page 3 of 4
City Project Numbers 104144
Contract Name HAMPTON TRACE PHASE 1
Contract Limits
Project Type DRAINAGE IMPROVEMENTS
Project Funding
Project Manager NA
Inspectors J. KOONCE / G. DEYON
Contractor WRIGHT CONSTRUCTION COMPANY, INC.
601 W. WALL ST.
GRAPEVINE, TX 76051-
DOE Number 4144
Estimate Number 1
Payment Number 1
For Period Ending 1/19/2024
City Secretary Contract Number 58892
Contract Date
2/9/2023
Contract Time
119 WD
Days Charged to Date
174 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $751,584.00
Less % Retained
$0.00
Net Earned
$751,584.00
Earned This Period $751,584.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$751,584.00
Thursday, January 25, 2024 Page 4 of 4
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
January 19, 2024
Wright Construction Company, Inc.
601 W. Wall St.
Grapevine, TX 76051
RE: Acceptance Letter
Project Name: Hampton Tract Phase 1
Project Type: Water, Sanitary Sewer, Storm Drainage
City Project No.: 104144
To Whom It May Concern:
On January 11, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on January 19, 2024. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on January 19, 2024, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (832)
527-5406.
Sincerely,
George Marquez, Project Manager
Cc: Jeremy Koonce, Inspector
Troy Gardner, Inspection Supervisor
Gary Deyon, Senior Inspector
Andrew Goodman, Program Manager
Shield Engineering Group, Consultant
Wright Construction Company, Inc, Contractor
D.R. Horton, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Kevin Littlefield,
Controller Of Wright Construction Co, Inc., known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
City Project No: 104144 to serve Sunny Creek Phase I Drainage,
CFA Number CFA23-002 f
BY'lri'%
tevinLittlefield
Subscribed and sworn before me on this date 30th of January, 2024.
DORIS L ELIAS MENDOZA
My Notary ID # 133483149
' Expires December 9, 2025
Notary Public `' t F of t • „ ..
Tarrant County, Texas
BILLS PAID AFFIDAVIT FOR CONTRACTOR
State of Texas
County of Tarrant
BEFORE ME, the undersigned authority, on this day personally appeared Kevin Littlefield, known to me
to be a credible person and officer of Wright Construction Co., Inc., and who, being duly sworn, upon his
oath declares and acknowledges as follows:
1. I am a duly authorized agent of Wright Construction Co., Inc., which has authorized me to make
this affidavit, and all of the recitations herein are true and correct.
2. Pursuant to City Project No 104144 between DR Horton — Texas, Ltd. and Wright Construction
Co., Inc. for Drainage Improvements to serve Sunny Creek Phase 1, Wright Construction Co., Inc.
has supplied materials and performed labor in connection with the construction of improvements
on real property owned by DR Horton — Texas, Ltd. in the City of Fort Worth ("the
improvements").
3. Wright Construction Co., Inc. has actual knowledge that all bills owed by DR Horton — Texas,
Ltd. to Wright Construction Co., Inc. for materials supplied or labor performed in connection
with the improvements have been fully paid and satisfied.
4. Wright Construction Co., Inc. has actual knowledge that all bills owed by DR Horton — Texas,
Ltd. to others for materials supplied or labor performed in connection with the improvements
have been fully paid and satisfied.
5. Wright Construction Co., Inc. has actual knowledge that there are no claims or liens for materials
supplied or labor performed in connection with the Private Development Contract.
6. Wright Construction Co., Inc. further warrants that should any claim or lien be filed for material
supplied or labor performed in connection with the Private Development Contract, Wright
Construction Co., Inc. will immediately furnish a bond pursuant to Texas Property Code Sections
53.236 through 53.238 for release of each the claim or lien, obtain settlement of any claim or lien,
and furnish the City of Fort Worth written full release. Wright Construction Co., Inc. agrees to
fully indemnify and hold harmless the City of Fort Worth from any and all costs that may occur
by reason of such claims or liens.
EXECUTED this 30th day of January, 2024.
Wright C nstructio4Co. c.
By:NAME: evin Litt
TITLE: Controller
STATE OF TEXAS
COUNTY OF TARRANT
This instrument was acknowledged before me on 01/30/2024 by Kevin Littlefield, Controller, of Wright
Construction Co., Inc. a Texas Corporation, on behalf of sa' poration.
2 Az� q �-
_Y P DORIS L ELIAS MENDOZA
*: *: My Notary lD # 133483149
Expires December 9, 2025
MERCHANTS�
BONDING COMPANY.
MERCHANTS BONDING COMPANY (MUTUAL) P.O. BOX 14498, DES MOINES,
IOWA 50306-3498
PHONE: (800) 678-8171 FAX: (515) 243-3854
OWNER
CONSENT OF SURETY
ARCHITECT
CONTRACTOR —,
TO FINAL PAYMENT
SURETY
OTHER
TO OWNER:
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
PROJECT:
Hampton Tract Phase 1 / Utilities
Bond No. TXC616043
ARCHITECT'S PROJECT NO.:
CONTRACT FOR: drainage
CONTRACT DATED:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Insert name and address of Surety)
Merchants Bonding Company (Mutual)
P.O. Box 14498
Des Moines, Iowa 50306-3498
, SURETY,
on bond of
(Insert name and address of Contractor)
Wright Construction Co., Inc.
601 W. Wall Street
Grapevine, TX 76051
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not
relieve the Surety of any of its obligations to
(Insert name and address of Owner)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: February 9, 2023
(Insert in writing the month followed by the numeric date and year.)
Merchants Bonding Company (Mutual)
(Sure
Attest: ekm �.�
(Seal): Kim Bracamonte (Signature oftauthorized representative)
Crystal Langhom Attorney -In -Fact
(Printed name and title)
Printed in cooperation with American Institute of Architects (AIA). The
language in this document conforms exactly to the language used in
CON 0405 (4/15) AIA Document G707-1994 Consent Of Surety to Final Payment.
MERCHA TS"t'%,
BONDING COMPANY -
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the
"Companies' do hereby make, constitute and appoint, individually,
Adam Syswerda; Andrea Nix; Brad Johnson; Crystal Langhorn; Kim Bracamonte; Steven W Lewis
their true and lawful Attomey(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of
persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions
or proceedings allowed by law.
This Power-of-Attomey is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of
Merchants National Bonding, Inc., on October 16, 2015.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,
bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 25th day of July 2023
•K;0 •. .---•.
�. •., . • MERCHANTS BONDING COMPANY (MUTUAL)
•.•'�Q. ,......'qC �., ••�Q�
...... MERCHANTS NATIONAL BONDING, INC.
�Ir* y9 A. d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY
t0 •
2003 1933 ' c : By
�d'•.
STATE OF IOWA ••��'• �,.��'•', •••� • •;1d• President
COUNTY OF DALLAS ss. `"""'•
On this 25th day of July 2023 before me appeared Larry Taylor, to me personally known, who being by me duty sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards of Directors.
,0 IGM Lee
CommwiionismaNumber fires 1/
Commission Wires
rr R April 14, X24 1
Notary Public
(Expiration of notary's commission does not invalidate this instrument)
I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby
certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full
force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 30th day of January 2024
��•.�PtIPpA�•9�' •�aO�JkG PPQ q�'o. 9'•
:a at
-O — •a:— �.
1933 rc' Secretary
;v. 2003
• d' . •• d . _ a0.
:,�.��... � ...',���: � ••day•. � :. \1 •.•
POA 0018 (10/22) """