AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.3�- Al
(M&C Needed)
COUNTY OF TARRANT 6
WHEREAS, the City of Fort Worth (City) and Jacobs Engineering
Group Inc., (Engineer) made and entered into City Secretary Contract No.
39252, (the Contract) which was authorized by the City Council by M&C C-
23735 on the 18th day of August 2009; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering Services for the Design of Alliance Airport Runway Extension
Project, Phase VIII, Project No. 00960
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to change scope of work in order to allow Engineer to
provide additional program management activities from the completion of
the original phase VIII work to the completion of the land acquisition;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the additional
engineering services specified in a proposal letter dated March 9, 2010,
copies of which are both attached hereto and incorporated herein.
2
Article II, of the Contract is amended to add language for
Compensation as specified in Attachment B to this amendment. The result
will be an increase in the Lump Sum contract amount of $471,179.70, so
that, as amended, the total Lump Sum contract amount is $1,794,209.59.
911
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
OFFICIAL RECOR[
CITY SECRETARY
IFT, WORTH, TX
01 LEXECUTED on this the 1�0 day of 2010, in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
K nneth L. enney, Jr., A.A.E.
Airport Systems Director
Jacobs Engineering Group, INC
Engineer
By:
.
Name: , eSO
VIf
Title
APPROVED JS TO FORM D LEGALITY:
Assistant Ciy Attorney
APPROVED:
ppg FOR nab Fernando Costa
aOo00�1 assistant City Manager
�o 0 o�Q�+���
ATTEST:
'r o Cl
oQv o°'
* a�000000°°o
a 5-" G 4
Authorization: C p�
Date:
OFFICIAL REC
CITY SECRET,
FT WORTH,
F
.J/ACOBS
March 9, 2010
Mr. Tim Ward
Alliance Air Services
2221 Alliance Blvd, Suite 100
Fort Worth, TX 76177
Re: Alliance Airport Runway Extension Project, Phase VIII
Amendment No. 1
Dear Mr. Ward:
777 Main St.
Fort Worth, TX 76102 U.S.A.
1.817.735.6000 Fax 1.817.7'35.6148
I am requesting an amendment to the Alliance Airport Runway Extension Project Phase VIII contract. This
amendment is for additional work that was not part of the original contract. The City of Fort Worth has
requested the Jacobs Team to provide professional services for the land acquisition associated with the
relocation of the BNSF main line and connector track. A summary of the additional work items are shown
below. The detailed scope of work, fee proposals and schedule are attached for your information.
The additional scope items are:
Jacobs — Program Management
Transystem — Appraisal and Acquisition of 31 Parcels
A.N.A — Survey Services
Total cost increase for contract modification #1
DBE Participation Amount for Amendment No. 1
DBE Participation % for Amendment No. 1
Original Contract Amount
MOD #1
New Contract Amount
DBE Participation Amount for New Contract Amount
DBE Participation % for New Contract Amount
$110,489.70
$229,400.00
$131,290.00
$471,179.70
$131,290.00
27.86%
$1,323,029.89
$471,179.70
$1,794,209.59
$409,177.48
22.81 %
Thank you for your attention to this request. Should you have any questions or comments regarding this
matter please feel free to contact me at 817-735-7004 or by email at Jeff.Toner(aJacobs.com .
Sincerely,
Jeffrey J. Toner, P.E.
Program Manager
JJT/ss
cc: Patrick Buckley — City of Fort Worth
Aya Ealy — City of Fort Worth
Jacobs Engineering Group Inc.
,, JACOBS
77 At91 `sirco
} 9i Worth, 1' 760 t
March 9, 2010
Alliance Runway Extension Project - Phase VIII
Amendment No. 1
Program Management
Scope of Work
The schedule for the land acquisition extends beyond the scheduled completion date of the
original scope of work for Phase VH. Therefore, Jacobs will provide additional program
management activities from the completion of the original Phase VIII work to the
completion of the land acquisition. The estimated duration for these services is an
additional 17 weeks. During this time Jacobs will:
• Conduct bi-weekly project coordination meetings
• Conduct additional stake holder meetings
• Prepare and distribute meeting minutes
• Monitor and adjust the program schedule
• Monitor and adjust the program budget
• Maintain the document control system
• Administer the prime and subcontract agreements\
• Provide technical and graphic support for the program
• Provide technical reviews of the land acquisition documents
• Coordinate with BNSF, FAA, Alliance Airport and City of Fort Worth
• Amend City of Fort Worth Master Thoroughfare Plan for John Day Road
Jacobs will also provide program management services associated with tasks identified in
City of Fort Worth / Burlington Northern Santa Fe Relocation Agreement. The work
identified below is for a 270 calendar day period associated with the design of the Main
Line Relocation and Connector Track. During this time Jacobs will:
• Prepare monthly status reports
• Review BNSF monthly status reports
• Review BNSF monthly pay request
• Provide a technical review of the Final Relocation Plans (Main Line and Connector
Track)
JACO BS
JAlliance Airport Runway Extension Project - Phase Vlll
Relocation of Utilities and Land Acquisition for the BNSF Relocation
Task List and Summary of Fees
9-Mar-10
Jacobs
I
Tab Task
I�
Consultant
Task Amount
DBE Amount
1 Program Management
I
I
Jacobs
$
110,489.70
i
2 ROW Acquisition
I
Field Surveys, Legal Descriptions and Exhibitsl
A.N.A
$
131,290.00 1 $
131,2190.00
Appraisals & Acquisitions)
I
I
TranSystems
$
I
229,400.00
I
I
( I
Total Fee
I
$
I
I
471,179.70 $
I
!
131, 0.00
DBE Participation
I
I
I
I
I
I
I
.86%
I
i
JACOBS
Jacobs Fee Proposal
Alliance Airport Runway Extension Project
Program Management and Land Acquisition for BNSF Main Line & Connector Track 9-Mar-10
Program Management Services
Labor Hour Estimate
Program I
Deputy
Senior
Project CADD Technical
Admin
Manager I Program Mgr
Engineer
Controls Mgr. Tech Assistant Assistant
1
Land Acquisition
1
Conduct Bi-Weekly Progress Meetings
91
181
18
181
Conduct Stakeholder Coordination Meetings
181
91
1
Prepare & Distribute Meeting Minutes
1
161
9 1
Develop & Maintain Project Schedules
141
18
Develop & Maintain Project Budgets
91
181
18
Maintain Document Control System
1
18 24 1
Administer Contracts & Sub -Contracts
11
18 20 1
4echnical & Graphic Support
181
40 20 1
;Technical Review - ROW Acquisition
1
40
;Coordinate with BNSF
361
361
Coordinate with FAA, Alliance, Ft. Worth
361
361
Amend Thoroughfare Plan - John Day Road
1
401
1 16
COFW / BNSF Agreement
�repare
I
I
1
I I I
1 1
Monthly Status Report
24
24
Review BNSF Monthly Status Report
18
18
Review BNSF Monthly Pa Request
"rechnical
1 18
18 I
Review of FinaNelocation Plans
8
I
401
I
I I I
Total Hours
176
I
1651
I
1201
I I I
721 56 151 1 181
Fee Proposal
Hourly
Hours
Labor
Rate
Cost
Program Manager
$ 85.00
176 $
14,960.00
Deputy Program Manager
$ 63.00
165 $
10,395.00
Senior Engineer
$ 57.00
120 $
6,840.00
Project Controls Manager
$ 30.00
72 $
2,160.00
CADD Technician
$ 31.00
56 $
1,736.00
Technical Assistant
$ 24.00
151 $
3,624.00
Administrative Assistant
$ 19.00
18 $
342.00
Salary Cost
$
40,057.00
Overhead Rate @
126.85%
$
50,812.30
Sub - Total
$
90,869.30
Profit @
15%
$
13,630.40
JEG Labor Cost
$104,499.70
Expenses
Mileage
$
500.00
Courier/Express Mail
$
90.00
Printing & Plotting
$
200.00
Reproduction
$
500.00
BNSF Geotechnical Drilling Permit
$
2,100.00
BNSF Survey Permit
$
2,100.00
City of Fort Worth Thoroughfare Plan Amendment Fee
$
500.00
Total Expenses
$
5,990.00
Total Program Management Cost
$110,489.70
ENGINEERS��:.
SURVEYORS`
PLANNERS ;_
1701 River Run
Suite 610
Fort Worth, Texas 76107
(817) 335-9900
Fax (817) 335-9955
AUTHORIZATION FOR PROFESSIONAL SERVICES
PROJECT NAME: Alliance Runway Extension — BNSF Mainline Relocation —
Property Map Survey
PROJECT No.: 09-0590
CLIENT: Jeff Toner, P.E.
Jacobs Engineering
ADDRESS: 777 Main St.
Fort Worth, Texas76102
SCOPE OF SERVICES:
See attached Exhibit `A' and layouts for detail Scope of Services.
COMPENSATION:
PROFESSIONAL SERVICES
1 Task 1: Deed Research (not to exceed 31 parcels), Task 2: Property Corner $53,790.00
Location, and Task 3: Miscellaneous Surveying Services
2. Right -of -Way Document Preparation (not to exceed 31 parcels) $77,500.00
3.
14.
1 Total $131,290.00
TOTAL ENGINEERING COMPENSATION: $131,290.00 jLump Sum
Additional services not covered in this authorization and its attachments will be provided
on an hourly basis per Exhibit'B'.
Services covered by this authorization shall be performed in accordance with
PROVISIONS stated on the attached form.
Approved for CLIENT Accepted f -r A.N Cons `rants, L.L.C.
By: By:
Mark aad, P.E.
Title: Title:
Date: Date:
ANA Scope - Phase 8 - MOD I. doc
Vice President
04/23/2010
CLIENT SA7ISFAC77ON IS OUR BUSINESS
A.N.A. Consultants, L.L.C.
Exhibit A - Scope of Services
A.N.A. Consultants, L.L.C. (herein referred to as ANA) is prepared to provide specific
civil engineering services for the Alliance Runwav Extension - BNSF Mainline
Relocation (herein refer to as PROJECT) for Jacobs Enaineerina
(herein called JACOBS).
1.0 INTRODUCTION
The purpose of this scope of work (SOW) is to provide engineering services, technical
manpower, and deliverables for the preparation of Right -of -Way Documents to be
implemented for the PROJECT.
1.1 Project Summary
ANA will provide survey services for the preparation of Right -of -Way
documents along the proposed 11 mile BNSF Mainline relocation. The
scope also includes limited miscellaneous survey services on an as -
needed basis. The basis of this proposal is the BNSF Mainline Relocation
Alignment dated February 1, 2010.
The BNSF Mainline Relocation adjacent to the Fort Worth Alliance Airport
will be relocated for the proposed runway extension.
1.2 Information to be Provided by JACOBS
Upon receiving a notice to proceed (NTP), JACOBS shall furnish the
necessary hardcopy and electronic copy of the PROJECT CADD files
necessary for or incidental to the performance of work set forth herein for
the completion of the Right -of -Way Parcel Documents. These files
include but are not limited to the following:
• Project Border Sheet
• Project CADD Standards
• Overall alignment and aerial photo with alignment layout
• Existing and Proposed BNSF Rail Plan and Profile plan sheets
including drainage. (All phases during the construction plan
preparation)
• All Design Sheets (Plan -Plan Sheets and/or Plan -Profile sheets; ie.
cut sheets) as required by the client to prepare signing and striping
sheets with all necessary reference files attached for reference use.
(All phases during the construction plan preparation)
• Any property documents including right-of-way, deed sketch, field
notes, title research, etc. previously used on any projects
associated with the Alliance Airport Runway Extension. (All phases
during the construction plan preparation)
• All Right -of -Way and property map electronic files in MicroStation
format related to any project associated with the Alliance Runway
Extension project. (All phases during the construction plan
preparation)
ANA No. 09-0590 Alliance Runway Ext. - BNSF Reloc. -MOD 1
Confidential Page 2 4/27/2010
A.N.A. Consultants, L.L.C.
Exhibit A — Scope of Services
• All field notes, field sketches, MicroStation CADD files, ASCII files,
electronic files related to the project benchmarks and project control
points. (All phases during the construction plan preparation)
• All information needed to establish GPS equipment on appropriate
project coordinate base.
2.0 SCOPE
ENGINEER will support and perform activities related to ROW and land as outlined
below, per direction and guidance from the JACOB's Project Manager.
Task 1: Deed Research
Deed research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal District (TAD) and Denton
County Appraisal District (DCAD) information available at the start of the
project and available on -ground property information (i.e. iron rods, fences,
stakes, etc.) for the right-of-way acquisition of proposed BNSF mainline
relocation (not to exceed 31 potentially affected parcels).
• It does not include effort for chain of title research, parent track research,
additional research for easements not included in the TAD or DCAD data
base, right-of-way takings, easement vacations and abandonments, right-of-
way vacations, and street closures.
Task 2: Field Location of Property Corners
• ANA will perform field investigation to locate and survey readily available
property corners for the potentially affected 31 properties. ANA will not
provide services to reestablishing missing property corners unless need for
the preparation of the right-of-way acquisition documents.
Task 3: Miscellaneous Services
ANA will perform field surveys to collect field horizontal and vertical elevations
and other field information needed by JACOBS in design and preparation of
plans for the project. The field topographic survey will be limited to creek
cross sections with in the project limits. Temporary Construction Easements
(TCE) will be prepared on an as needed basis and will be billed at $1,000 per
document for a Metes and Bounds parcel and $600 per document for a Lot
and Block parcel. (This task will be performed on an as needed basis and
will only be performed if budget is available. For estimating purposes
this task may use upto$20,000 of the budgeted lump sum)
Task 4: Right -of -Way Document Preparation
• The JACOBS shall determine rights -of -way areas needed for construction of
the project. ANA is not responsible for determining right-of-way parcel size or
area.
ANA No. 09-0590 Alliance Runway Ext. — BNSF Reloc. —MOD 1
Confidential Page 3 4/27/2010
A.N.A. Consultants, L.L.C.
Exhibit A — Scope of Services
• ANA shall prepare documents to be used to obtain right-of-way required to
construct the improvements.
• ANA shall submit the right-of-way acquisition documents to JACOBS PM for
real property acquisition. ANA will not perform any services related property
acquisition.
• The documentation shall be provided in conformance with the checklists and
templates available on the City of Fort Worth's Buzzsaw site as of the NTP.
3.0 MEETINGS
The ANA members will attend one kickoff meeting with the JACOBS to review
project requirements, design criteria, communication procedures, project
scheduling, personnel, and other pertinent matters that may impact the project.
ANA will provide one member to attend monthly meetings associated with the
Project, not to exceed 10 meetings.
4.0 ADDITIONAL SERVICES
If authorized by JACOBS to perform any other services not included in the basic
services listed above, ANA may perform Optional services for additional
compensation on a reimbursable hourly basis or by amendment to current
contract.
3. COMPENSATION
Lump Sum Fee
The ENGINEER will accomplish the Basic Services for a lump sum fee of
$131,290.00 , plus "Additional Expenses not included in Fee
Proposal" and required sales taxes on certain related services (if any).
The following "Additional Expenses not included in Fee Proposal" will be billed at
our cost plus 10%; for both Basic and Optional Services:
a) Platting, application, inspection, filing, review or other fees paid directly by
ANA on behalf of JACOBS at the prerogative of ANA so as to expedite
submittals, rather than waiting for JACOBS to provide check for these fees
prior to the time of submittal.
b) Any cost related to purchasing and maintaining additional insurance
requirements required by railroad in order to enter and work on railroad
property to complete the project.
c) Any costs related to preparing Temporary Right -of -Entry Documents for
surveying or construction purposes.
d) All courier delivery including but not limited to local couriers, FedEX, UPS,
and Express US postal Mail. (This will be billed at Direct Cost)
ANA No. 09-0590 Alliance Runway Ext. — BNSF Reloc. —MOD 1
Confidential Page 4 4/27/2010
A.N.A. Consultants, L.L.C.
Exhibit A - Scope of Services
e) All Reproduction costs, excluding in house plotting and data processing.
Billing for Basic and/or Optional Services: will be made monthly on a "percent
complete" basis for fees listed as lump sums, or on an hourly reimbursable basis
for other Optional Additional Services. Payment of each invoice will be due within
15 days of receipt by JACOBS of invoice from ANA. Compensation and payment
thereof is not contingent upon the consummation of any closing, loan, real estate
transaction, zoning, plat or plans approval, or any other permit or condition. An
interest charge at the rate of 1.5% per month will be assessed to any amounts
outstanding more than 30 days from the invoice date. ANA may suspend its
services without liability for consequential or other damages if payment is not
received within 30 days of any billing.
ANA No. 09-0590 Alliance Runway Ext. - BNSF Reloc. -MOD 1
Confidential Page 5 4/27/2010
A.N.A. Consultants, L.L.C.
Exhibit B - Hourly Rates
EXHIBIT B
Hourly Rate Schedule
Work Title Hourly Rate
' Principal
$185.00
Controller
$165.00
Quality Control Manager
$150.00
Project Manager / Project Engineer
$135.00
Project Manager / Project Surveyor
$130.00
Engineer Intern / Survey Intern
$95.00
Engineering Designer / Survey Technician
$98.00 j
2-Man Survey Crew
$130.00
GPS Survey Crew
$150.00
Specification Writer
$60.00
Reproduction
$30.00
Word Processor / Secretary $38.00
Any extra work that is not in the Scope of Work, the Consultant fees will be
on the above hourly rates schedule.
ANA No. 09-0590 Alliance Runway Ext. -, BNSF Reloc. -MOD 1
Confidential Page 6 4/27/2010
+ TranSystems
• 500 West Seventh Street
Suite 1100
.art Wort? TX 76102
rel 817-339-8950
Fax 817 336-2247
,N,wvv trarsystems com
February 22, 2010
Shaun South
Jacobs Engineering
777 Main Street
Fort Worth, Texas 76102
Re: Contract Modification — Addition of 31 parcels (BNSF)
WFXJ2000 Alliance Airport Phase VIII
John Day and Keller -Haslet Road Projects
Dear Ms, South:
Acquisition — 31 Parcels @ $4,250/Parcel.......................................................................................... $131, 750
Appraisals — 31 Parcels @ $2,500/Parcel................................................................................ $77, 300
Appraisal Review — 31 Parcels @ $650/Parcel.................................................................................. $20,150
Relocation (if applicable) $4,600 per parcel
Condemnation support Hourly (per rate schedule attached
Rate Schedule
COMPENSATION FOR ADDITIONAL SERVICES: Compensation to TranSystems for additional services as
previously defined shall be based on actual hourly rates and costs in accordance with the schedule shown below.
I Staff Appraiser
$200.00 per hour
Project Manager
$110.00 per hour
Senior Right -of -Way Agent
$ 85.00 per hour j
j Landman
$ 65.00 per hour
Admin. Assistant
$ 50.00 per hour
Mileage
Current IRS rates
Office Expense (Telephone,
Actual cost
copies, postage, etc.)
I Travel Expense over night Actual cost
Testimony in court and/or Commissioner Hearings and preparation will be billed at the rate of $225.00 per hour.
Should the number of parcels for acquisition be reduced or increased, the acquisition, appraisal arc;
appraisal review is subject to review and/or adjustment.
The proposed fee does not include any costs paid for properties acquired, incidental expenses (filing
fee and copy fees), title examinations, or attorney expenses or court cost.
MILESTONE SCHEDULE
Acquisition (BNSF) $4,250 per parcel
No. 1— Initial Offer Made 40% $1,700.00
No. 2 — Signed M.O.A. or 30% $1,275.00
Final Offer Letter
No. 3 — Closing or 30% $1,275,00
E.D. Package submitted
2
ATTACHMENT "B"
COMPENSATION AND SCHEDULE
Design Services for
Alliance Airport Runway Extension Phase Vill AMD1
City Project No. 00960
Compensation
A. For the additional services, The ENGINEER shall be compensated a total lump
sum fee of $471,179.70 as summarized in Task List and Summary of Fees of
Engineer's proposal dated March 9, 2010. Payment of the total lump sum fee of
$1,794,209.59 shall be considered full compensation for the services described
in Article I of the Contract.
B. The ENGINEER shall be paid monthly payments as described in Exhibit "13-1"
Section 1 - Method of Payment.
Each invoice is to be verified as to its accuracy and compliance with the terms of
this contract by an authorized representative of the ENGINEER.
Rev 8-7-08
EXHIBIT "13-1"
Design Services for
Alliance Airport Runway Extension Phase VIII AMD1
City Project No. 00960
I. Method of Payment
Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice from the ENGINEER outlining the estimated current percent complete
of the total project.
The aggregate of such monthly partial fee payments shall not exceed the
following:
1. Program Management $110,489.70 23%
2. ROW Acquisition
Field Surveys, Legal Descriptions and Exhibits $131,290.00 28%
Appraisals and Acquisitions $ 229,400.00 49%
Totals $471,179.70
Payments shall be made in accordance with Article III of the Contract.
II. Progress Reports
A. The ENGINEER shall submit to the designated representative of the
Director of the Department of Aviation monthly progress reports covering
all phases of design in the format required by the City.
B. If ENGINEER determines in the course of making design drawings and
specifications that the opinion of probable construction cost of
$106,693,459.00 (as estimated in Attachment "C") will be exceeded,
whether by change in the scope of the project, increased cost or other
conditions, the ENGINEER shall immediately report such fact to the City's
Director of the Department of Aviation and, if so instructed by the Director
of the Department of Aviation shall suspend all work hereunder.
Rev 8-7-09
Attachment "C"
OPINION OF PROBABLE CONSTRUCTION COST
Design Services for
Alliance Airport Runway Extension Phase VIII AMD1
City Project No. 00960
MEMO
Correction to the main line cost estimate, add $1,338,750.00 to the total cost for quiet
zones. Total for main line will be $81,698,044.00.
Station Description of Work
Grading Mobilization
Clearing and Grubbing
Embankment
Excavation, Common
Excavation of Unsuitable Material (10 % Exc.)
Furnish & Place 12" Subballast
6 % Lime Stabilized Subgrade (12")
Road Demolition
Bridges 15+72 Culvert 358.5 - 2 @ 8' x 2.6 RC AR - Extend 44'
27+34 Br 358.7 :Crash Wall, Both lanes SH #287
40+45 Culvert 359.0.3 @ 6' x 4' RCB - Extend 45'
95+09 Culvert 360.0 - 6' X 3' RCB - Extend 41'
123+50 Culvert 360.5 - 9.5' X 4' C BX TA TOP - Extend 51
133+26 Br 360.7 30' DBL BX BM
194+26 Br 361.7 231' DBL BX BM
248+50 Br 362.4 - 180' DBL BX BM
259+50 Culvert 363.0 3 @ 10' x 19 X 13T RCB
270+11 Br 363.3 Barnwood Drive 1271 Beam
305+00 Culvert 363.7X 6'x6'x4l' RCB
340+65 Culvert 364.2-8'x8'x59' RCB
369+39 Culvert 364.7 - 3 @ 7'x5'x57' RCB
381+55 Culvert 364.8-2@6'x6 RCB - extend 33.5'
402+44 Br 365.26 600' BD PC on C COL
440+17 Br 365.81 :Crash Wall, SH #114
479+69 Br 366.53 - 264' BD PC on C COL - new 265'
500+11 Culvert 366.83 - 3 @ 8' X 8' RCB - Extend 37'
540+45 Br 367.52 -Pvt Xing - New 200' PC overpass
582+00 Culvert 368.2 - 2@6'x6' RCB - Extend 39'
583+05 Br 368.3 - FM156 - 300' BD PC
595+72 Culvert 368.5 - 3@10'x10' RCB - extend 35'
Note: Signal cost estimates are based on historical data
Unit cost for track construction is based on BNSF doing the work
PRELIMINARY TRACK / GRADING COST ESTIMATE
RELOCATION OF BNSF MAINLINE TRACK
Unit Quantity Unit Price
LS
AC
CY
CY
CY
CY
SY
Sy
CY
CY
CY
CY
CY
TF
TF
TF
CY
TF
CY
CY
CY
CY
TF
CY
TF
CY
SF
CY
TF
CY
1.0
90.0
410,000
480,000
48,000
63,500
208,000
13,000
Subtotal
159
150
106
35
47
30
231
180
1,240
127
67
232
210
75
600
70
265
188
4,000
84
300
274
'Subtotal
$100,000.00
$3,000.00
$8.00
$5.00
$8.00
$40.00
$5.00
$5.00
$1,200.00
$1,200.00
$1,200.00
$1,200.00
$1,200.00
$13,000.00
$5,730.00
$5,730.00
$1,200.00
$6,710.00
$1,200.00
$1,200.00
$1,200.00
$1,200.00
$7,140.00
$1,200.00
$7,140.00
$1,200.00
$99.00
$1,200.00
$6,805.00
$1,200.00
Amount
$100,000
$270,000
$3,280,000
$2,400,000
$384,000
$2,540,000
$1,040,000
$65,000
$10,079,000
$190,800
$180,000
$127,200
$42,000
$56,400
$390,000
$1,323,630
$1,031,400
$1,488,000
$852,170
$80,400
$278,400
$252,000
$90,000
$4,284,000
$84,000
$1,892,100
$225,600
$396,000
$100,800
$2,041,500
$328,800
$15,735,200
Station Description of Work
Misc. Grade Crossings Panels
Utility Relocation
Wetland Mitigation
Storm Water Erosion Control
& Restoration/Seeding
ROW Fence
Track #136 rail, tie, OTM, Ballast
3+00 MP 358ANc. 20 DBL Crossover - Power
124+00 MP 360.5 No. 20 DBL Crossover - Power
390+00 MP 365.0 No. 15 SGL Crossover - Power
466+00 MP 366.3 No. 20 DBL Crossover - Power
606+00 MP 368.6 No 20 LH Power Turn -out
Remove Turnout
Signal 3+00 MP 358 Control Point
9+00 MP 358 Relocate Faulty Equipment Detector
16+40 MP 358.4 Relocate Crossing Signals Bonds Ranch Rd
95+00 MP 358.4 Relocate AEI Card Reader
96+00 MP 360 Relocate Crossing Signals Blue Mound Rd
124+00 MP 360.5 Control Point
185+00 MP 361.6 Relocate Crossing Signals Avondale-Hasiet
390+00 MP 365.0 Single Crossover Signal
466+00 MP 366.3 Control Point
488+00 MP 366.6 Relocate Signal
488+00 MP 366.6 Relocate Communication Tower
606+00 MP 368.6 Relocate Control Point
Unit Quantity Unit Price
EA
3
$15,000.00
LS
1
$8,328,250.00
AC
0
$0.00
AC
40
$2,700.00
LF
80,000
$4.00
Subtotal
TF
61,000
$250.00
EA
3
$325,000.00
EA
4
$325,000.00
EA
2
$300,000.00
EA
4
$325,000.00
EA
1
$325,000.00
EA
2
$15,000.00
Subtotal
LS
1
$1,500,000.00
LS
1
$100,000.00
LS
1
$75,000.00
LS
1
$40,000.00
LS
1
$75.000.00
LS
1
$1,500,000.00
LS
1
$75,000.00
LS
1
$150,000.00
LS
1
$1,500,000.00
LS
1
$50,000.00
LS
1
$35,000.00
LS
1
$75,000.00
Subtotal
Subtotal
Deslgn7Engfneering - 5%
GA Testing & Survey - 2 %
Construction Management - 5 %
Contingency- 10%
Subtotal
ROW (Land Value Only) 150 AC @ $40,000.00 per AC
ROW - Acquisition Services
ROW Contingency
ROW Total
Total
Amount
$45,000
$8,328,250
$0
$108,000
$320,000
$8,801,250
$15,250,000
$975,000
$1,300,000
$600.000
$1,300,000
$325,000
$30,000
$19,780,000
$1,500,000
$100,000
$75,000
$40,000
$75,000
$1.500,000
$75,000
$150,000
$1,500,000
$50,000
$35,000
$75.000
$6,175,000
$59,570,450
$2,978,523
$1,191,409
$2,978,523
$6,671,890
$73,390,794
$6,000,000
$335,000
$633,500
$6,968,500
$80,359,294
pT p�1�,� ��/� /'��� ALLIANCE AIRPORT RUNWAY EXTENSION
Alliance FO �r■LSO RELOCATION OF EN MAIN TRACK w",wn�
am,d waM PRELIMINARY ENOINEERINO avgce Cr/n'
nm11011M.nfma I 1 a J7
&COMPANY ��'^m ' ao� aµnmm COST ESTIMATE rxa
oar RdO1g7J0 A98HOWN
Opinion of Probable Construction Cost
John Day Road - 8,300 LF
Barnwood Drive -1,100 LF
ask Item Quantity
cad"
Unit
Unit Price
Cost
T,y9k Item
Quantity Unit Unit Price
Cost
Clearing and Grubbing
23
AC
$3,000.00
$e9.000
Storm Drain and Cross Drainage Structures
RoadrayS/orm Drain
ObWarats Abandoned Road
30,000
SY
$3.50
$105,000
w" RCP
850 LF
$036,000
Undass"Ied Excavation
15,000
CY
$7.00
$105,000
Vr RCP
4500 LF $230.00
$
Fmbanlanent
9,000
CY
$8.00
S72,D00
54" RCP
750 LF $225.00
S14'''00
$168,750
Topsoll(4")
3,200
CY
51e.00
$51,200
48"RCP
1185 LF
$163,100
5$70,000
Seeding
26,800
SY
$0.25
S7,2D0
3e"RCP
700 LF $100.00
5$56-00
370,000
Ferfiker
6
AC
5540.00
$3,213
24" RCP
2200 LF
$$12,600
vegetative Watering
1,400
MG
$9.50
$13,300
Type Y D Inlet
3 EA 200.00
8" Ume Stabilized subgrade
32,000
SY
S78'�
b
1e EA $2.400.00
$38.400
538,400
Hydrated Ume(35#/S.Y. )
600
TON
30.00
5130.00
$76,D00
Manhole
TypeMManhole
Type
13 EA $3,500.00
53,500.00
6" Asphalt Concrete Pavement
3,8o0
SY
$30.00
$114,000
Headwalls (Outlets)
3 EA
�_ � �_
$18,000
6" Reinforced Connate Pavement (4000 PSI)
26.800
Sy
$45.00
$1,197,0D0
Subtotal
11 91n,130
7" Concrete Curb
16,000
LF
$2.00
$32,000
Utility Relocadons
_ _
_
Remove Exist Structure (Large)
2
FJ1
$30.000.00
$60,000
Telecom Utilities Relocaion
1 LS
Bantcades, Signs and Traffic Handling
1
LS
$30,000.00
$30,000
Gas Utllltles Relocation
1 LS 210,600.00
52$7,650.00
210,800
$2$7,850
InstallatloNYalydenance of Strrrmwater Management
1
LS
$95.000.00
$95,000
Electric U811tes Relocation
1 LS S7,e50.00
Construction Entrance
2
EA
$1,250.00
$2,500
Subtotal
32378 ON
Dd-Yo
2
EA
$5,000.00
$10,D00
Subtotal
$5,148,293
Gas Well Gated Entrances
2
FA
$30,000.00
$60,000
DeslgnlEngineering
$640,912
5' Wide Sidewalks
6,920
LF
$19.00
$131,480
CA Testing & Surrey - 2%
i102,98e
Sheet LlpM and Condult
1
LS
$250,000.00
$250,000
Construction Man Ye
$
Pavement Striping and Pavement Marldngs
1
LS
$19,500.00
$19,500
nment-tO52
Program Management
8088
Subtotal
S2.WJ 393
Contingency- 10%
$039,501
CROSS DRAT WAGE
Subtotal
$7,036,169
CLA'arls
ROW Acquisition -Land Value Only • $40,000 per AC
S940,000
Culvert (6.8W' MBC) Bridge Class
330
LF
$350.00
$116,500
ROW-Aqulstltlon Services
$105,824
Wingwalia
2
FA
$9,500.00
$19,000
ROW Program Management
$17,336
RCP Pipe (48')
200
LF
$140.00
$28AW
Contingency
$106.316
Safety End Trestments(3:1)
6
EA
$6,000.00
$W,000
Subtotal
$1,189,476
Emalon Control at Culvert InIWOutfall
1
LS
$200,000.00
$200,0Dg
Total
18.204,@�
Subtotal
S398 Soo
e
aeons ALLIANCE AIRPORT RUNWAY EXTENSION
Fou oRm Alliance
--,.,,�,(ooa
JACOBS
REWQTION OF JOHN DAY ROALD
"1 FRELIYINARY ENOINEFJUNO
n
kvrel
a_ Air Sonri=
wac+ COST ESTIMATE
, a"
°fLlaeHowa
Scom
sax saram
Station Description of Work
Grading Mobilization
Clearing and Grubbing
Embankment
Excavation, Common
Excavation of Unsuitable Material (10 % Exc.)
Furnish & Place 12" Subballast
6 % Lime Stabilized Subgrade (12")
Bridges 15+08 184' 1 Beam Underpass - Keller Haslet Road
27+94 14 Span 639'•1" DBL BX BM
39+75 2 @ 6'x6' 125' RCB
Note: Signal cost estimates are based on historical data
PRELIMINARY TRACK / GRADING COST ESTIMATE
Connector - Haslet, TX 0.88 Miles
Unit
Quantity Unit Price
Amount
Misc.
LS
1.0 $
60,000
$60,000
AC
9.0 $
3,000
$27,000
CY
138,000 $
8.00
$1,104,000
CY
9,200 $
5.00
$46,000
CY
1,000 $
8.0
$8,000
CY
5,000 $
40
$200,000 Track
SY
14,455 $
5.0
$72,275
Subtotal
$1,517,275
TF
184 $
6,710
$1,234,640
TF
688 $
5,730
$3,942,240
CY
338 $
1,200
$405,600
Subtotal
$5,582,480
Station Description of Work
Utility Relocation
Wetland Mitigation
Storm Water Erosion Control
& Restoration/Seeding
ROW Fence
#136 rail, fie, OTM, Ballast
#11 Turnout
Remove Trackage
Unit
Quantity Unit Price
Amount
LS
1 $
771,750
$771,750
AC
0 $
-
$0
AC
5 $
2,700
$13,500
LF
8800 $
4.00
$35,200
Subtotal
$820,450
TF
4,384 $
325
$1,424,800
EA
3 $
250,000
$750.000
TF
1,300 $
30
$39,000
Subtotal
$2,213,800
Subtotal
$10,134,005
Design/Engineering - 5 %
$506,700
CA Testing & Survey - 2%
$202,680
Construction Management - 5 %
$506,700
Contingency -10 %
$1,135,009
Subtotal
$12,485,094
ROW (Land Value Only) 18 AC @ $40,000.00 per AC
$720,000
ROW - Acquisition Services
$116,000
ROW Contingency-10%
$83,500
ROW Total
$918,500
Total
$13,403,594
ALLIANCE AIRPORT RUNWAY EXTENSION
RELOCATION OF BNSF MAIN TRACK wwxono
ua,u ovsw PRELIMINARY ENOINEERINO C�f
rarwom�ntea
&COMPANY ` m'° CONNECTORTRACK
COST ESTIMATE cvt
� ovr ®u>Gvro Aesxovm
Opinion of Probable Construction Cost
Keller Haslet Road @ Connector Track -1200 LF
Task item
Quantity
Unit
Unit Price
Cos,
Task Item
Quantity Unit Unit Price
Cost
Roadway
Storm Drain and Cross Drainage Structures
Clearing and Grubbing
3.D0
AC
S5,DD0,00
$15,000
48" RCP
129.00 LF $140,00
$16,800
Remove Edst Pavement
2,950,00
SY
$5.00
$14,750
24' RCP
1,400,00 LF $55.00
S77,000
Unclassified Excavation
33,571.00
CY
$1D.00 •
$335,710
Type M Manholes
3.00 EA
$$7,200
Embankment
23.00
Cy
88 00
$184
Curb Inlet
$2,400.00
3.00 EA 32,400oo
Topsoil (41
3,800.00
CY
518.00
$57,800
He11Y
Headwalls (Outfam
1.00 EA SBA00.00
$8,000
S8,o00
Seeding
97,200.00
SY
$0.25
$24,30C
Erosion Control at lnlettOulfall
1.D0 LS $4,000.00
$4,000
Fertilizer
20.08
AC
$540.00
$101845
Subtotal
3121.500
Vegetative Watsirq
4,45e.35
MG
$9.50
$42,354
Utility Relocation
8" Lime Stabilized Subgrede
4,000.00
SY
$3.00
$12,000
Sewer
1 LS $127,500.00
$127,500
Hydrated Ume (3WS.Y.)
100
TON
5130.D0
S13,D00
Telecom Utilities Relocation
1 LS S283,050.00
$283,050
8"Asphaft Concrete Pavement
2,300.00
SY
$30.00
$69,000
Gas Utilities Relocation
1 LS $421 00
0
8" Reinforoed Concrete Pavement
1,410.00
SY
$45.00
$63,450
Electric LPolltles Relocation
1 LS $130,050.00
50ar
$130 05
7"Concrete, Curb
00.00
LF
$2,00
$1,820
Subtotal
mpph
Temporary Shoring
8,5p0,00
SF
$25.00
$212,500
Subtotal
$2.276,835
Banlodes, Signs and TrofSo Handling
1.00
LS
$5,800.00
$5,800
Design/Engineedng
$290,773
InstallationlMaintenance of Stormweter Management
1.00
LS
$12,000.00
$12,0D0
CIA Testing 8 Survey- 2%
$45,537
Construction Entrance
200
LS
$1,250.00
$2,500
Construction Management -10%
$227,684
Constructing Detours
4,333.00
SY
Moo
$238,315
Program Management
$47,632
5' Wide Sidewalks
453.00
LF
$%Oo
$8,607
Contingency -10%
$2B8,848
Street Light and Conduit
1
LS
$50,000.00
$50,000
Subtotal
$3,177,307
Pavement Striping and Pavement Markings
1.00
LS
$3,800,00
$3,800
ROW Acqulsttion-Land Value Only-$40,000 per AC
$160,000
Subtotal
$1.193535
ROW- Acquistitlon Services
$26.456
• UNIT PRICE REFLECTS POSSIBLE ROCK STRATA
ROW Program Management
$4,33qROW
Contingency -10%
S19,o79
ROW Subtotal
$209,889
Total
E3.387.178
ALLIANCE AIRPORT RUNWAY EXTENSION
FORTWORTx Alliance
II
ouoo NEumNASLEYROAn
aara
JAcom
4
PRELIMINARY ENOINEERINO
'�
es�s► Air Services
I I
aaia, ®Maas, COST ESTIMATE
ICE
ptvsax an
° a' M
, �
aat aaeraaro
¢
Aesrioali
JAC052020,157
M
Task Marne
Duration
Stan
Fa
F_ebniary Ntarh
January
Febfkar
1
,ion
2
Phase VIII MOD No. 1
206 days
Mon 8!l110
Wei
3
Program Management
206 days
Monwilo
Wet
4
5
-ROW Acquisition
206 days
Thu 9/2/10
F
6
Pre§M ROW Acquisition
22 days
Thu 91V10
Tr
"
7
BNSF 60% Design
0 days
Thu V73110
Tk
8
Identify Parcels for Acpuisftfons
3 days
Thu 913,10
51
9
Prepare M&C for Land Acquisition
3 days
Sun WV 10
TU
10
M&C Review and Approval
21 days
Wed 9129r10
Tug
11
M & C Council Action
0 days
rue r0Vt91f0
Tue
02
Field I Office Work
31 days
rhu 923r10
Sat
t3
Prepare Legal Descriptions &
12 days
Sun IW4/10
Th
Exhibits
14
Prepare Appraisal Reports
26 days
Sun MUM
Thu
1s
Independent Appraisal Review
14 days
Fri 11126/10
TI1t
16
C4yApproves Value
8days
Fd121lOit0
Fill
17
Send out Offer Letters
6 days
Sat 12N 8110
Thu
!e
Negotiations
30 days
FA 12,24110
Sa
19 i
r
Condemnation c.c.}
G2 days ays
Sun 1/23Ii f
CPS
Fr
�,1122
��Ir
Condemnation (c.c,)
UFW i-S)b TlmosponatlenUob\oloe'Mptlasa VIII - WF)W20W\4WPRJPC%4WSCMMOO Schedule U
March 9, 2.10
Apnl
Apr
M&C Review
Page 1 of 2
CITY COUNCIL AGENDA
COUNCIL ACTION: Approved on 4/20/2010
DATE: 4/20/2010 REFERENCE NO.: **C-24187 LOG NAME:
CODE: C TYPE: CONSENT PUBLIC
HEARING:
Official site of the City of =:- . Worth, Texas
FLIRT Won I
1-
-I
55AFW PHASEIII
AMD1
NO
SUBJECT: Authorize Amendment No. 1 with Jacobs Engineering Group Inc., for Program
Management Services for the Fort Worth Alliance Airport Runway Extension in the Amount
of $471,179.70 for Professional Services for the Acquisition of Land Necessary for the
Burlington Northern Santa Fe Railroad Connector Track and Relocation of Their Main Line
(COUNCIL DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Council authorize Amendment No.1 to Phase VIII of Jacobs
Engineering Group, Inc., contract for program management services for the Fort Worth Alliance
Airport Runway Extension in the amount of $471,179.70 for professional services for the acquisition
of land necessary for the Burlington Northern Santa Fe Railroad connector track and relocation of
their main line.
DISCUSSION:
On March 27, 2001, (M&C C-18528) the City Council approved an agreement with Carter and
Burgess, Inc., (now Jacobs Engineering Group Inc.,) for Phase I program management services for
the Runway Extension Project at Fort Worth Alliance Airport. Subsequently, similar services have
been performed in multiple phases under individual agreements as funds became available.
On December 8, 2009, (M&C C-23944) the City Council approved a contract with Jacobs Engineering
Group Inc., for phase VIII of the program management services for the runway extension project
which included program management Design Earthwork Package No. 3, Design John Day Road,
Design Keller Haslet Road and ALP Update at Fort Worth Alliance Airport. This agreement will be for
Amendment No 1. to the Phase VIII program management and design services.
Jacobs Engineering Group Inc., has submitted a fee proposal in the amount of $471,179.70 to
accomplish professional services for the acquisition of land necessary for the Burlington Northern
Santa Fe Railroad connector track and relocation of their main line in conjunction with the Fort Worth
Alliance Airport Runway Extension Project.
FAA funds from Runway Extension Grant 3-48-0296-34-2008 will be used for this project. Existing
land credits that remain from the original land donation for Alliance Airport will be used for the City's
five percent in -kind match.
M/WBE — Jacobs Engineering Group Inc., is in compliance with City's DBE Program by committing to
an additional 28 percent DBE participation on this Amendment No. 1. The City's goal on this
amendment is 28 percent.
This project is located in COUNCIL DISTRICT 2, Mapsco 7P.
FISCAL INFORMATION/CERTIFICATION:
http://apps.cfwnet.org/council_packet/mc review.asp?ID=13343&councildate=412012010 2/2010
r
M&C Review Page 2 of 2
The Financial Management Services Director certifies that funds are available in the current capi I
budget, as appropriated, of the Airports Grant Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
GR14 539120 055218265300 $471.179.70
Submitted for Citv Manaaer's Office bv:
Oriainatina Department Head:
Additional Information Contact:
ATTACHMENTS
Fernando Costa (6122)
Kent Penney (5403)
Ruseena Johnson (5407)
http://apps.cfwnet.org/council_packet/mc review.asp?ID=13343&councildate=412012O10
/12/2010