Change Order Request
Project Name: Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor
Project No.(s):I 56016 0700430 5740010 CO2515 I DOE No. I N/A
CSC No. 52102-0O3
City Sec No.: 52102
City Proj. No.: 02515
Project Description: Construct Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386
Contractor:I William J. Schultz, Inc. dba Circle C Const. Co.
City Project Mgr.1 Walter Norwood I
Phone Number: (817) 392-5026
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Change Order # 3 1 Date:
City Inspector: I John Robinson I
Phone Number: (817) 392-8452 I
1 /22/2024
Water
Sewer
I
$13,006,286.25
$89,305.00
Totals
$13,006,286.25
Contract Time
(Calender days)
546
0360
$13 095.59115
$13,095,591.25
816
395.00
$395.00
480
$1 ,095,986.25
$13,095,986.25
1,296
$260,125.00
$260,125.00
$170,820.00
$170.820,00
CHANGE ORDERS to DATE (I
MAX ALLOWABLE CON
JUSTIFICATION (REASONS) FOR CHANGE ORDER
(INCLUDING
Change Order No. 3 provides for the folllowing:
• Rehabilitation of existing manholes since the existing pipeline is being rehabilitated via CIPP and the manholes
are in good condition.
• Epoxy lining in existing manholes (250 mil Thickness).
• The deletion of pay item quantities that are no longer needed on the project.
Staff recommends the addition of 480 calendar days to the project for the additional work and delays resulting
from repeated failure during heavy rain events of a temporary creek crossing that required replacement. No
work could be done on the other side of the creek until the creek crossing was restored subsequent to the rin
events.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
aCtDftCompany N Contractor N3rt� _ (�t,, sr;ictor Signature Date
William J. SOO?, Inc dba Circla C �nsl Cc � Teri Skelly � .�r � J � /— Z3 -2
Mans er Date
1 ^?1, Zvi
nstructiori Supervisor a%r ep11 Date
]hrrs"21- ' Feb 2, 2024
+=s,!stanl ;ity Manager Date
Feb 7, 2024 �G Feb 7, 2024
ugla
M&C Number I NIA
M&C Date Approved I
N/A I
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WO RTH City of Fort Worth
Change Order Additions
Project Name Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor City Sec No.: 1 52102
Project No,(s): 56016 0700430 5740010 CO2515 , DOE No.1 N/A I City Proj, No.: 1 02515
Project Construct Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilitate Existing M-347 and M-386.
Description
Contractor William J. Schultz, Inc. dba Circle C Const. Co. Change Order: l 3 J Date: j 11/13/2022
City Project Mgr. j Walter Norwood City Inspector I John Robinson
ADDITIONS
HEM EM - UhbL;KIP I IUN DEPT
116 MFI AdIust/MH Repair including New Ring/Cover & 250 mil epoxy liner Sewer
117 250 mil Epoxy Liner in MH Extra Depth Sewer
118 250 mil Epoxy Liner In MH in Beach Sta. 370+92 Sewer
Unit Unit Cost 1 Total
13.00 EA $9,300.00 $120,900.00
181.00 VF $350.00 $63,350.00
8.00 VF $350.00 $2,800.00
lwater
Sewer $187,050,00
0
Page i oi' 1 jAdditions Sub Total $187,050.00
FORT WORTH City of Fort Worth
-� Change Order Deletions
Project Name Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor I
City Sec No.: 52102
Project No.(s): 56016 0700430 5740010 CO2515 I DOE No. I N/A
City Proj. No.: 02515
Project Description
I Construct Parallel Relief Interceptor in Upper Big Fossil Basin and Rehabilitate Existing
M-347 and M-386.
Contractor I William J. Schultz, Inc. dba Circle C Const. Co. I Change Order: FT]
Date I 11/13/2022
City Project Mgr. Walter Norwood City Inspector: I John Robinson
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit
Unit Cost Total
6 48" Fiberglass Sewer Pipe, CLSM Backfill Sewer 13.00 LF
$535.00 $6,955.00
22 5' Manhole Sewer 13.00 EA
$7,500,00 $97.500.00
23 5' Extra Depth MH Sewer 168.00 VF
$250.00 $42,000.00
101 Conshield Antimicrobial in 5' Manhole Extra Depth Sewer 13.00 EA
$1,800.00 $23,400.00
102 Conshield Antimicrobial in 5' Extra Depth Manhole Sewer 168.00 VF
$100,00 $16,800.00
Water
Sewer $186,655.00
I
Page 1 of 1 IDeletions Sub Total $186,655.00
MIWBE Breakdown for this Change Order
MWBE Sub I Type of Service _( Amount for this CO
Total $0.00
Previous Change Orders
co tt DATE I AMOUNT
Total $0.00
Page 1 of 1
1/22/2024
Upper Big Fossil Creek Drainage Basin Parallel Relief Interceptor Project
CPN CO2515
Change Order 3 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Walter Norwood
Name of Employee
Project Manager