Loading...
HomeMy WebLinkAboutContract 57712-A1CSC No. 57712-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 57712 WHEREAS, the City of Fort Worth (CITY) and Plummer Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 57712, (the CONTRACT) which was authorized by M&C 22-0412 on the 14th day of June, 2022 in the amount of $1,761,590.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Mary's Creek Water Reclamation Facility Lift Station Site Selection and Force Main Alignment Study; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $99,851.00 (Sewer). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,861,441.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [Mary's Creek Lift Station & Force Main Alignment] [CPN: 103648] Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort worth '5�;C4 — Fernando Costa Assistant City Manager DATE: Feb 7, 2024 APPROVAL RECOMMENDED: C6rtk& llte HardeIr Christopher Harder (Feb 2, 202409:14 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER PlummerAssoci ates, Inc. aZ'& Clete Martin, P.E. Principal DATE: D�J �� 7,1Z q By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Suzanne be, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A fj� Date: N/A Douglas Black (Feb 7, 202409:42 CST) Douglas W. Black Form 1295 N/A Senior Assistant City Attorney on Qg40aq�Il ATTEST : >a �o OVA o=d 16 o � U� C OFFICIAL RECORD Jannette S. Goodall CITY SECRETARY City Secretary FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 (Mary's Creek Lift Station & Force Main Alignment] (CPN: 103648] Page 2 of 2 PLUMMER January 24, 2024 Mrs. Suzanne Abbe, P.E. City of Fort Worth Water Department — Engineering Services Division 200 Texas Street Fort Worth, Texas 76102 Re: Mary's Creek Lift Station Site Selection and Force Main Alignment Preliminary Design City Project No. 103648 Contract Amendment No. 1 Additional Survey and Archaeological Services Plummer Project No.0318-052-01 Dear Mrs. Abbe: This Contract Amendment No. 1 is provided for additional service related to Mary's Creek Lift Station Site Selection and Force Main Alignment Preliminary Design. The scope is described below. This amendment is necessary to allow Plummer Associates, inc. (Plummer) to provide additional survey and archaeological services. A summary of this amendment is as follows. 1) Additional Project Management, Coordination, and direction of Sub -Consultants: a. Project Management b. Right of Entry Coordination c. Perform topographic survey at six locations. d. Perform archaeological investigation. This amendment compensation summary is as follows: No. Description Amount 1 Survey and Archaeological Services $ 99,851 Total (Lump Sum) $ 99,851 Page 1 of 2 1320 S University Drive, Suite 300 Fart Worth, TX 76107 Phone 817.806.1700 plummer.com TBPE Firm No. 13 Abbe 01/24/2024 The following table identifies the original contract and amendments. Amount Original Contract $ 1,761,590 Amendment No. 1 $ 99,851 Total Contract Council Amount Approved $ 1,761,590 06/14/2022 $ 1,861,441 If you have any questions concerning this Amendment, please let me know. Sincerely yours, Clete Martin, P.E., TX 81507 Plummer Associates, Inc. CM/rh Attachment cc: Ellen McDonald, P.E., Principal in Charge, Plummer Associates, Inc. Page 2 of 2 Level of Effort Spreadsheet Sub Consultant Legend TASK/HOUR BREAKDOWN I MWBE ISurveyor Design Services for I MWBE Archaeological Mary's Creek Water Reclamation Facility Lift Station Site Selection and Force Main Alignment Study City Project No. 103648 Contract Amendment No. 1 (DRAFT, 01/23/2024) Labor (hours) Expense Pro/. ro(. Director/ Sr. Proj. Eng./Sc Task Description Principal Manager ntist CADD Admin. MWBE Non-MWBE Repro. Task No. Rate $388 $313 $249 $168 $128 Total Labor Cost Travel (Inhouse) Total Expense CosAt Task Subtotal / complete Remaininq Butet 1.0 Project Management 0 16 0 0 0 55009 '009 $01 $0 $0 $0 $0 $5:009 $ 1.1 Managing the Team 0 16 7.1 TROE Coordination for Survey and Archeological due to expirations 8 2 16 1 1 $8,003 1 and remobilizations $8,003 $8,003 $8,003 8.0 Topographic Survey 6 6 17 5 0 $9,274 $16,860 $0 0 $0 16,860 26,134 $26,1341 8.1.a Alignment Change Bass/Leonard Property Line (360 LF) 1 1 1 $869 $2,500 12,500 13,369 $3,3691 8.1.b Alignment Change at Cook TeamfFruck Driving School (400 LF) 1 1 1 $869 $2,8001 $2,800 $3,669 $3,6691 8.1.c Add'I Topo and Tree Surveyy at zBoaz Park (incl. arborist) (800 LF) 2 2 17 2 $5,964 $5,6001 $5,600 $11,564 $11,5641 8.1.d Add'I Topo at Confluence &0 LF) 1 1 1 $869 $1,9601 $1,960 $2,829 $2,8291 8.1.e Add'I topo at 2 existing gravity mains for , abion structures 1 1 $701 $1,8001 $1,800 $1,800 $1,8001 8.1.f update I ree Survey on Vinson Propergl.(greater than 3" oia) 1 1 0 1 $869 -$2,2001 $2,200 $2,200 $2,200 10.0 Permit' 16 16 6 4 0 3 $9,463 $48,000 $0 $0 $0 $48,000 $57:463 $57,463 10.1 �C:UItural Asource Services - Archeological 16 6 4 3 $9,46" $48,000 $ $48,00 $57,46 $57,463 Totals) 30 1 30 1 37 1 6 1 4 1 $31,748 $64,860 $0 $0 $0 $64,8601 $96,6081, Water and Sewer Design Breakdown Project Summary (No Special Services) Water ftSanitarySeer Total Cost % Complete Remaining BudgetTotal Hours 107 Footage i LF$Total Labor $31,748 0 44350$ 99,851 $ 99,851 Total Expense $64,860 MBE/SBE Subconsultant $64,860 TOTAL Non-MBE/SBE Subconsultant $0 5/ Sub Markup $ 3,243 3,243 MBE/SBE Participation 1 64.96% Total Project Cost $99,851 99,851 F:\projects\0318\052-01\0 Opportunity\0-3 Project\0-3-1 Negotiations - Scope_ Schedule_ Fee\0-3-1-1 Client\Addendum No. 1 - Mini\LOE for Marys Creek WRF LS FM Alignment_DRAFTI_January_2024 Page 1 of 1