HomeMy WebLinkAboutContract 35099-A1 AMENDMENT NO. 1 TO
COMMUNITY FACILITIES AGREEMENT
STATE OF TEXAS § CITY SECRETARY CONTRACT NO. aLjL) 9—�I
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and KB Home Lone Star, LP,
subsequently merged into KB Lone Star Inc., (Developer) entered into Community
Facility Agreement, City Secretary Contract No. 35099, a copy of which is attached
hereto as Exhibit "A" wherein Developer is to make certain improvements to Amber
Trails Phase 3, within the City; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA
to extend the time within which the Developer is to complete the construction of the
infrastructure contemplated by the CFA to November 30, 2009.
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the CFA:
1.
The CFA is amended to extend the Developer's time within which to complete the
construction of the infrastructure contemplated by the CFA to November 31, 2009.
2.
All other provisions of the CFA, which are not expressly amended herein, shall
remain in full force and effect.
(Remainder of Page Intentionally Left Blank)
RD
Ry
7- t
CFA AMENDMENT NO
WiLLOW SPRINGS RANCH
Page I of 2
EXECUTED on this the c�B day of A ' 2008.
ATTEST: CITY OF FORT WORTH:
Marty Hendrix! Fernando Costa
City Secretary Assistant City Manager
Recommended by:
LNO M&C REjUIRED
Name, Title
Department
APPROVED AS TO FORM
AND LE
Amy J.
Assistant City Attorney DEVELOPER
Name
Title
CFA AMENDMENT NO,1
Page 2 of 2
COMM L N- ITY EACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUTINITY OF TARRANT § Contract No.3q
WHERE-AS, KB Home Lonegar, L.P., hereinafter called "Developer", desires to
make certain improvements to Amber Trails Phase 3, an addition to the City of Fort
Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE,KNOW ALL BY THESE PRESENTS_
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
1. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section 11, of the Policy,
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E, The Developer shall award all contracts for the construction of
community facilities in accordance with Section 11.
paragraph '17 of the
Policy.
Amber Timi's Nhase IN CFA
1k
*+
�& A�
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section 11, of the
Policy,
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damyges are caused. in whole or in part, bg the alleged neglikence o
the Cio of Fort Worth, its officers,servants, or emploEees,
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
1. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104,100, Ordinance 7234),
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed(Articie 104.100, Ordinance 71-34).
K. Developer hereby releases and agrees to indemnify and hold the City
hannIess for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easernents across property wkmed by Developer required to
Amber Trails Phase III CFA
41
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-l) None; Paving (B)Attached
Storm Drain(B-1)Attached, Street Lights and Signs (C)Attached.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
11. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, I and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, BI,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $471,682.66.
Amber Trails Phase 111 CFA 3
SUMMARY OF
COST
Amber Trails Phase Ill
Item Developer City Cost Total Cost
Cost
A. Construction $
1. Streets $351,895.02 351,895.02
$
2. Storm Drainage $62,499.00 62,499.00
3. Street Ughts $31,200.00 31,200.00
4. Street Name Signs $1,225.00 1,225,00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
(4%) 16,575.76 16,575.76
D. Materials Testing by DOE $ $
8,287.88 8,287,88
TOTALS 471,682.66 471,682.66
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all Streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%)of paving and storm drain
costs for materials testing.
5. Streets cost includes Academy Boulevard.
Amber Traflls Phase III CFA 4
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, an aid Developer has
executed this Instrument in triplicate, at Fort Worth,Texas this the AU15ay of
200J.1 iu C"
Approval Recommended:
Transportation and Public Works
Department
Robert 6=ode,P.NO M&C REQUIRED Director
Lio—M8-1C-11—E*11U-1R—E-1DJ
ATTEST: City of rt h
"-t' Marc Ott
Assistant City Manager
Marty Hendrix
City Secretary
Approve o Form:
A 'sta at Att mey
ATTEST: f DEVELOPER
KB Home Lone tar,L.P.
a Texas Limited Partnership
By: KBSA, Inc.
a Texas Corporation
its_qeneral Partner
By:
Corporate Secretary Michael Slack
Senior Director
Amber Trails Phis e ill CFA 5
?77;N1 ....>.F,,QR'f..............x.........•........,.: ..,.��...,....,..-,.,...,...<-:.:.:.:.:.:.....:.:.:.:...:.:-:.:.:...:.
CFA Estimate for:
AMBER TRAILS PRASE 111
August 31,2006
PROJECT NO.: 013784
AMBER TRAILS PH11t PREPARED FOR: KB Home Lonestar,LP
City of Fort Worth DATE: 31-Aug-06
83 LOTS
18.0 ACRES
PAVING
ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 6"Lime Stabilized Subgra de 11,042 S.Y. 2.251 24,844.50
2 Hydrated Lime 301b.ISY 166 TON 105.00 17,391.15
3 6"R.C.Street Pavement 10,373 S.Y. 22,00 228,211.94
4 Handicap Ramps 8 E.A. 450.00 3,600,00
5 Remove End of Road Barricade 3 E.A. 850.00 2,550.00
6 End of Road Barricade 2 E.A, 850.00 1,700.00
7 7"Concrete Curb 1 6,0901 L.F. 2.001 12,180.00
TOTAL PAVING $290,477,59
ACADEMY BOULEVARD
€TEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 6"Lime Stabilized Sub grade 1,519 S.Y. 2.25 3,417.75
2 Hydrated Lime 301b.ISY 23 TON 105.00 2,392.43
3 7"R.C.Street Pavement 1,482 S.Y. 25.00 37,05125
4 Total 4'Sidewalk 398 L.F. 14.00 5,572.00
5 T "A"Pavement Markings 500 L,R 3.50 1,750.00
6 Temporary Transition Pavement 300 1 S,Y. 20.001 6,000.00
7 4"White Strip 252 1 L.F. 4.00 1,008,00
8 Handicap Rams 2 E.A. 450,00 900,00
9 Remove End of Road Barricade 1 E.A. 850.001 850.00
10 End of Road Barricade 1 E.A. 850.001 850.00
11 7"Concrete Curb 813 L.F. 2.00 1 1,626.00
TOTAL ACADEMY BOULEVARD $61,417.43
+a.Xtl,{111,Ell,
it
�.? .�Ci°` ` -!• {
=BAR
lwi
G`
`��' ... T......
xr, "^" T
:i ..;i;i-i;iiiiiiiis'E:i2's;E;sis-idi>i:isi;i;i!ipi::i.;:-.-:::-:•.y-:.:.:,:.,:.:.:.-.• �p
CFA Estimate for:
AMBER TRAILS PHASE 111
August 31,2006
PROJECT NO.: 013784
AMBER TRAILS PH.III PREPARED FOR: KB Home Lonestar,LP
City of Fort Worth DATE:: 31-Aug-06
83 LOTS
18.0 ACRES
STORM DRAIN SYSTEM
ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 42"RCP 25 L.F. 84.00 2,100.00
2 33"RCP 254 L.F. 58.00 14,732.00
3 30"RCP 144 L.F. 52.00 7,488.00
4 24"RCP 154 L.F. 44.00 6,776.00
5 21"RCP 61 L.F. 40.00 2,440.00
6 ITrench Safety 638 L.F. 1 1.00 638.00
7 lStd.15'Curb Inlet 1 EA. 3,200.00 3,200.00
8 iStd,10'Curb Inlet 4 EA, 2,200.00 8,800.00
9 4'Square Manhole 1 EA. 2,500.00 21500,00
10 30"Sloping Headwall 1 EA. 2,500.00 2,500.00
11 Rock Rubble Rip Rap-Facing 120 S.Y. 35.00 4,200.00
12 Remove Existing 24"Headwall 1 EA. 2,000,00 2,000.00
13 Remove Existing 36"Headwall 1 EA. 2,500.00 2,500.00
14 Remove 36"RCP 25 L.F. 25.00 625.00
15 Remove Existing Manhole 1 EA. 2,000.00 2,000.00
TOTAL STORM DRAIN SYSTEM $62,499.00
V: .V . e,4-,p GW6 . t Est <
::::;:;J;�S:�YIt}s�:'t-T,F,I;1�G;ly:� :i:::t7cVFS:i:(1/:::I:��.••..:.:.................:.......:.:.:.:.:.:.:.:.:.:.:.:.:......:.....:.:.:.:.:..yy
y�} . 5
�••� y,�y �{':'Y1i�>VVLrV::il�;::./.�.(�,..�.-��.y.:7Li"..,}� V..y.YI.. ..............................
.,..I�k!l�.•...,..:4,1.3;.�.............................1..�....-......,..................,......,...,..........•............
CFA Estimate for:
AMBER TRAILS PHASE 111
August 31,2606
PROJECT NO.: 013784
AMBER TRAMS PH,III PREPARED FOR: KB Horne Lonestar,LP
City of Fart Worth DATE: 31-Aug-06
83 LOTS
18.0 ACRES
STREET LIGHTS&SIGNS
ITEM# DESCRIPTION QTY I UNIT PRICEI AMOUNT
1 Street Light.Base,Pole Inc.Conduit 11 I EA. 1 2,600.001 28,600.00
2 Street Signs 5 1 EA. 1 245k0j 1,225.00
TOTAL STREET LIGHTS AND SIGNS $29,825.00
~
III STREETLIGHTS
1. STREETLIGHTS COST ESTIMATE:
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 5 E $ 2.800 $13.000.00
'
MID-BLOCK RESIDENTIAL 3 E $2.600 $7.800�00
CHANGE OF DIRECTION RESIDENTIAL 4 E $ 2`800 $10,400.00
MID-BLOCK COLLECTOR 0 E $ 2.800 $00.000.00
MID-BLOCK ARTERIAL 0 E $ 3.200 $00,000.00
MID-BLOCK ARTERIAL MEDIAN 6 EA $ 3.20} $18.200.00
RELOCATE EXISTING LIGHT 0 E $ 1.850 $00,000.00
Subtotal $31.200�00
City's Cost $00.000.00
Developer's Subtotal $OO.ODO�DO
4Y6 inspection fee $0,000.00
Project Total $00.000.00
Adjacent Developer's Cost $DQ.00ODO
Developer's Cost $31,208.00
DEVELOPERS COST: $31/200.00
CFA CODE # 2006094
Amber Trails, Phase III
Fort Worth, Texas July 28, 2000
PAGE I OF EXHIBIT r1cly
'
DESCRIPTION:11. STREETLIGHTS WORK
1. The Developer shall provide for the installation of streetlights sd the approximate locations
shown in exhibit"C", immediately after final acceptance of the street construction, in
accordance with engineering plans and specifications approved by the Transportation and
Public Works Department.
2� Streetlights onresidential and/or collector streets can beinstalled using overhead or
underground conductors with the approval of the director of transportation and Public
Works,
3 The City of Fort Worth will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to pay the City nf
Fort Worth the amount shown below prior to the City starting its design efforts, at the option
of the developer and at their expense they may purchase the poles, fixtures, and mast arms
from the City in order to assure compliance with city material standards
4� Street lights on arterial streets shall be installed with underground conductors
5. The developer agrees to dedicate all easements required for the installation and
maintenance ofthe street h0htaand to provide for the installation nf any electrical
transformers required for the proper operations cf the street light syateDl
& The estimated cost of this streetlight installation is detailed on page (1) of exhibit ^C" and is
aurnnnarbced below. The streetlights will remain the property of, and will be maintained by
the City of Fort Worth.
DEVELOPERS COST: $31'2OD.08
July 37, 2DQ6
C[c/\ CODE # 2006094
Amber Trails Phase||i
PAGE 2 OF EXHIBIT f�rcll
Ill. STREETLIGHTS LOCATIONS:
INTERSECTIONS
Academy Blvd & Thunderbolt Tr 1
Good Streak Way & Thunderbolt Tr 1
Good Streak Way & Pronghorn Lane 1
Crass Timbers Dr& Pronghorn Lane 1
Revelle Rd & Pronghorn Lane 1
CHANGE — OF - DIRECTION
Pronghorn Lane 2
Thunderbolt Tr 2
MID - BLOCK
Pronghorn Lane 2
Thunderbolt Tr
CFA CODE # 2006094
Amber Trails Phase Ill
PAGE 3 OF E'X'HIBIT ;'VI
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following five (5) intersections at a cost
to the Developer of$1,226.00:
Pronghorn Lane & Revelle Rd
Pronghorn Lane & Good Streak Way
Pronghorn Lane & Cross Timbers Dr
Thunderbolt Tr& Good Streak Way
Thunderbolt Tr & Academy Blvd
Amber Trails, Phase III
CFA code: 2006094 July 27, 2006
il! w o
uj
0
Xwo
OR
u
n
cu O
�}gG
4
w �h� CL
LLJ
e� -
rj
4�1
M
9
�._
W�m
i
� u
o
c 0--.( �
H
LZ
<c tU CC
s as 8 w
LLI ui C1��h'x
N
'x t�vGy
6 ~ R J
r ti
ry r
v u'
<r
SL9E1
uj
c1 j cc -1 uj
E ez c 0
r _ .1
m— 0
�. . CV
t uj 0
M
tII
N
t-
cn
co Q ci
Mfg U G
LLI
f"�. wtWq W
o �
�
°
Sdui
CL
W LU
i d
f
sv yr �, „r'""�► i
C7 �
U
s qtnAT
r
LLj
to LLI
i crs <
CL LU Lll cc
n CL
t
r s
w CLC� CLZ CL
ma,' mcr_ cr-m
w
w
co
co
cc 0
c
z
p x
w
s tL
1
Li
UJ
CD
W z
0 Gt t C3
CL
UJ
o
Cti
C7 0 0
CL CC y{
CL CL CL CL UJ .J
,rte pir�c v� t •. .r. '' tr t!
P
r
n
2
�#t Ifj j{jJ(Cv t€
------------
F _..�_.._.._ ,........_,�
zi
IL
ry
iLlx _ ! -- -°-
} Volt
.+..�»,
7n zh, ern
a
V)
LAJ
«�
CID cn °
w X W rM
d
uj
tz
WS x
b�
N
tr j
m
i
1
,+y
z
0
1tz� 4
4dM(a
Xuj
J V 0 uj
C S
rw � uj C —-' z C h U
i .". � C 3:.Q C° i I
Z — U-
°"' 0 tai�,�-. 's°— '€
W