HomeMy WebLinkAboutContract 60909CSC No. 60909 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Raymond L. Goodson, Jr., Inc. d/b/a RLG Consulting Engineers, authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Water and Sanitary Sewer Replacements Contract 2023, WSM-M — Project No. 105108. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to. $527,990.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [105108] Revised Date: November 23, 2021 Page 1 of 15 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [105108] Revised Date: November 23, 2021 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 3 of 15 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 4 of 15 Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), the City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. Engineer acknowledges the MBE and WBE goals established for this contract and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 5 of 15 effect as of the time copying is performed. K. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 6 of 15 P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 7 of 15 F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 8 of 15 Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 9 of 15 D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 10 of 15 property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 11 of 15 The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 12 of 15 Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 13 of 15 The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [1051081 Revised Date: November 23, 2021 Page 14 of 15 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH Fernando Costa Assistant City Manager Date: Feb 7, 2024 ATTEST: Jannette S. Goodall City Secretary BY: ENGINEER Raymond L. Goodson, Jr., Consulting Engineers Brent E. Lewis, P.E. Senior Associate 4� nib aA °°�'s°° Date: p ate° o°*g oaaIl 5N(Ai-c APPROVAL RECOMMENDED: By; Christopher Harter (Feb 2, 202414:09 CST) Chris Harder, P. E. Director, Water Department APPROVED AS TO FORM AND LEGALITY By: Douglas Black (Feb 7, 2024 09:45 CST) Douglas W. Black Sr. Assistant City Attorney Contract Compliance Manager: Inc. d/b/a RLG Form 1295 No. 2023-1093710 M&C No.: 24-0076 M&C Date: 01/23/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Dena Johns , P.E. Project Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [W/SS Repl. Contract 2023, WSM-M] Standard Agreement for Engineering Related Design Services [105108] Revised Date: November 23, 2021 Page 15 of 15 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 ATTACHMENT A Scope for Enaineerina Desiqn Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACEMENT Street Limits CD Water and Water Water Sewer Sewer Notes: Sewer Map No LF Size LF Size Barnett St. (Montclair Dr. to 11 2070-392 1,668 8" 406 8" L-6477, L-6377 Watson St.) Holt St. (Barnett SSt. toKemble 11 2070-392 693 8" Junius St. (Normandy Rd. to 11 2070-392 1099 8" Barnett St.) Queen St. (Barnett St. to 125' NE 11 2070-392 620 8" 701 8" L-8663 of Dead End) Queen Ct. (Queen E . o Dead 11 2070-392 187 8" (100' SW of Queen Ct. Queen Ct./ Dead -End, through 11 2070-392 581 8" L-8667, L-6080 Easement Lots 15 & 8 to Watson St.) Watson St. (Barnett St. to Dead 11 2070-392 894 8" 713 8„ L-7541, L-7540, End) L-6081, L-6080 W. Watson Rd. (Watson Stt..)to Dead 11 2070-392 384 8" 315 8" L-7540 En Kemble St. (75' W of Watson St. 11 2070-392 50 8" to Watson St.) Watson Ct. (Watson St. to Dead 11 2070-392/ 270 8" 292 8" L-6080A End) 2078-392 N. Tierney Ct. (TierneyE dd.)to Dead 11 2078-396 288 8" Cliffview Dr. (Tierney RRdd. jo Jenson 11 2078-396 343 8" 240 8" L-5650 City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 1 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 Blue Valley Ct. (Wilson d. to Dead 11 2078-396 916 8" 1,032 8" L-6241 E Existing Easements (Jenson Rd. to Wilson between Lots 4&14 Rd) 11 2078-392 534 8" L-5571, L-4570 and 5&13 Existing Easements (Pyron Ave. to 165' N in Rear of Lots of of Wilson Ave.) 11 2078-392 812 8" L-4571, L-4570 Golf Crest Addition Blue Ridge Ct. (Wilson d. to Dead 11 2078-396 363 8" 353 8" L-5779 E Parham Ct. (130' E of Wilson Rd. 11 2078-396/ 400 8" 514 8" L-6476, L-7120 to Dead End) 2078-392 Wilson Rd. (Briarwood Ln. to 240, 11 2078-392 865 8" 1,090 8" L-5780, L-4569 S of Timberwilde Cir.) Colony Hill Rd. (Wilson Rd. to both 11 2078-396 1,123 8" 872 8 L-7200, Dead Ends) L-7201, L-7198 Timberwilde Cir. (Wilson Rd. to 160' E 11 2078-392 502 8" 415 8" L-5221 of Dead End) Rear of Lots along (Sutton Place Block 1 11 R to Schmickle 2078-396/ L-5221, MeadoLot brook Golf Maurice Subdivision 11 2078 392 1,070 8" L-7196, L-7197 Course Course Lot 1 RA) Total Water 10,665 LF Total Sanitary Sewer 9,940 LF WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Plan Submittal Checklists TASK 1. DESIGN MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, ■ communicate effectively, ■ coordinate internally and externally as needed, and ■ proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 2 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements. • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • 10 MWBE reports will be prepared • 4 meetings with city staff • 10 monthly water department progress reports will be prepared • 10 monthly project schedule updates will be prepared City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 3 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 9) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to ■ Study the project, ■ Identify and develop alternatives that enhance the system, ■ Present (through the defined deliverables) these alternatives to the CITY ■ Recommend the alternatives that successfully addresses the design problem, and ■ Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2. Geotechnical Investigations • ENGINEER shall advise the CITY of test borings and other subsurface investigations that may be needed for the project. If the CITY determines that City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 4 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 such borings or investigations are needed, then the ENGINEER shall work with the CITY and CITY's geotechnical consultant to draw up specifications for such testing program. The cost of such testing will be paid for by the CITY. 2.3. Fire Line Reconnection 2.4. The Conceptual Design Package shall include the following: • Cover Sheet • Graphic exhibits and written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept. • Proposed phasing of any water and sanitary sewer work that is included in this project documented in both the project schedule and narrative form. • Documentation of key design decisions. • Estimates of probable construction cost. ASSUMPTIONS • 0 Geotechnical borings are expected for this project. • 2 copies of the conceptual design package (30% design) will be delivered. Report shall be letter sized and comb -bound with a clear plastic cover. Drawings will be 11"x17" size fold outs bound in the report • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw • ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 5 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Overall proiect easement lavout sheet(s) with property owner information. Overall proiect water and/or sanitary sewer lavout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. • Overall water and/or sanitary sewer abandonment sheet. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Benchmarks per 1,000 ft of plan/profile sheet — two or more. • Bearings given on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 6 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de - hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. • Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2. Geotechnical Investigation • Soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions will be made. 3.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Utility Clearance The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in Buzzsaw for forwarding to all utility companies which have facilities within the limits of the project. The DWF files should be created directly from the CAD files as opposed to PDF files. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 7 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 3.5. Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's Buzzsaw website. The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. ASSUMPTIONS • 1 public meeting(s) will be conducted or attended during the preliminary design phase. • 0 borings at an average bore depth of N/A feet each will be provided. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional 1 project specific traffic control sheets will be developed. • 2 sets of 11 "x17" size plans will be delivered for the Constructability Review. • 2 sets of 11 "x17" size plans will be delivered for the Preliminary Design (60% design). • 2 sets of specifications will be delivered for the Preliminary Design (60% design). • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • 1 set of 11 "x17" size drawings will be delivered for Utility Clearance. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Clearance drawings C. Traffic Control Plan D. Storm Water Pollution Prevention Plan E. Estimates of probable construction cost F. Data Base listing names and addresses of residents and businesses affected by the project. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 8 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: For projects that disturb an area greater than one (1) acre, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM Construction Plan according to the current CITY iSWM Criteria Manual for Site Development and Construction which will be incorporated into the SWPPP by the contractor. • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS • 2 sets of 11"x17" size drawings and 1 set of 22"x34" size drawings and 1 set of specifications will be delivered for the 90% Design package. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. • 2 sets of 11"x17" size drawings and 2 sets of specifications will be delivered for the 100% Design package. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. DELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 9 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. • Contract documents shall be uploaded in a .xIs file. Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The .dwf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders' questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on Buzzsaw. • Incorporate all addenda into the contract documents and issue conformed sets. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 10 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 5.2 Final Design Drawings 1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Sinqular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053—org3.pdf and K-0320—org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755—org18.pdf Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in Buzzsaw. 2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name — "W-1956—SHT01.dwg", "W- 1956—SHT02.dwg", etc. II. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155—SHT01.dwg", "X-12755—SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 11 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • 5 sets of construction documents will be sold to and made available on Buzzsaw for plan holders and/or given to plan viewing rooms. • 5 sets of 11"x17" size and 5 sets of 22"x34" size drawing plans and 5 sets of specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to Buzzsaw. DELIVERABLES A. Addenda B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the "Final' project walk through and assist with preparation of final punch list. 6.2 Record Drawings • The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 12 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 o As -Built Survey o Red -Line Markups from Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the mylars. 1) Record Drawings shall also be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Sinqular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_rec47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "47" shall be the total number of sheets in this file. Example: W-0053—rec3.pdf and K-0320—org5.pdf II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "36" shall be the total number of sheets in this file. Example: X-12755—rec18.pdf City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 13 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 Both PDF and DWF files shall be uploaded to the project's Record Drawings folder in Buzzsaw. ASSUMPTIONS • 3 RFI is assumed. • 0 Change Orders are assumed • One copy of full size (22"x34") mylars will be delivered to the CITY. DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Final Punch List items F. Record Drawings on Mylar TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way, easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. 7.3. Temporary Right of Entry Preparation and Submittal • Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry documents for landowners to CITY PM for real property acquisition. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 14 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS 12 Easements or right-of-way documents will be necessary. 36 Temporary right -of -entry documents will be necessary. • Right -of -Way research and mapping includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES A. Easement exhibits and meets and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: — A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400: — The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 15 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). — Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. — No less than two horizontal bench marks, per line or location. — Bearings given on all proposed centerlines, or baselines. — Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal • Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of Entry for landowners to CITY PM. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS • Topographic survey at intersection will include no more than 100 ft. in each direction. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 9. PLAN SUBMITTAL CHECKLISTS Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: Attachment "A" Type Street Storm Water PLAN SUBMITTAL CHECKLIST REQUIREMENTS Traffic Traffic Traffic Street Water Control Control Control Traffic Storm Storm Lights /Sewer Traffic 30% 60% 90% Signal Water Water (Submit (Submit Engineering (Submiitt All 30% 60% All @ All @ (Submit All ° 30% 60%) ° ° Required for all work in City ROW X X X X V X X X X X X X X X City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 16 of 17 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT NO.: 105108 Water / Sewer I I I X *If included in street project X I X Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary right -of -entries. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to Subsurface Utility Engineering Levels A, B, C or D • Services related to Survey Construction Staking • Services related to acquiring real property including but not limited to easements, right-of-way, and/or temporary right -of -entries. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 17 of 17 ATTACHMENT B COMPENSATION Engineering Design Services for: WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M City Project No. 105108 Lump Sum Project Compensation A. The ENGINEER shall be compensated a total lump sum fee of $ 527,990.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item 111. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of TPW and the Water Departments monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 1 of 3 AN ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility I Water Dept. Fee Amount Prime Consultant RLG Consulting Engineers Surveying, Paving, Water I $ 461,990.00 87.5% d Sanitary Sewer Design Proposed MWBE Sub -Consultants Multatech Paving, Water and Sanitary $ 65,000.00 12.3% Sewer Design PIC Printing Reproduction $ 1,000.00 0.2% Non-MWBE Consultants TOTAL $ 66,000.00 100.0% TOTALS $ COMBINED GRAND TOTAL Project Number & Name Total Fee WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2022, WSM-T $ 527,990.00 City Project No. 104836 City MWBE Goal = 12.0% City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 2 of 3 - 1 0.0% 527,990.001 100% MBE/SBE % 12.5% Consultant Committed Goal = 12.5% AM EXHIBIT "13-1" ENGINEER INVOICE (Supplement to Attachment B) Engineering Design Services for: WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M City Project No. 105108 City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 3 of 3 AM Professional Services Invoice Project Manager: IDena Johnson, P.E. Project: IWATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M City Project #: 1105108 City Sec Number: Company Name: IRLG Consulting Engineers Suppliers PM: Brent E. Lewis, P.E. Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Supplier Instructions: Summary Fill in green cells including Invoice Number, From and To Dates and the included worksheets When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. email: r(817)687-0800 nc.com Office Addresskery Boulevard, Suite 105, Fort Worth, TX 76104 Telephone: Fax: 805 Remit Address Agreement LTD Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance Work Type 1 Water Improvements I $273,284.00 $273,284.00 $273,284.00 Work Type 2 Sanitary Sewer Improvements $254,706.001 $254,706.00 $254,706.00 Totals This Invoice $527,990.00 $527,990.00 $527,990.00 Overall Percentage Spent: Professional Services Invoice Project Manager: Dena Johnson, P.E Project: WATER AND SANITARY SEWER REPLACEME City Project M 105108 Work Type Desc: lWater Improvements Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name' Ri Consulting Engineers Suppliers PM: Brent E. Lewis, P.E. email: blewis@rlginc.com Supplier Invoice M Office Address: 825 W. Vickery Boulevard, Suite 105, Fort Worth, TX 76104 Payment Request M Telephone: (817) 687-0800 Service Date:From Fax: (817) 687-0805 Service Dati Remit Invoice Date: Address: Pay Items Agreement LTD Agreement Amendment Amendment Amount to Completed Description Amount Number Amount Date Amount 30 - Design $273,284.00 $273,284.00 Percent ($) Invoiced Spent Previously Current Invoice Remaining Balance $273,284.00 Totals This Unit: $273,284.00 $273,284.00 $273,284.00 Overall Percentage Spent: Professional Services Invoice Project Manager: Dena Johnson, RE Project: WATER AND SANITARY SEWER REPLACEM City Project #: 105108 Work Type Desc: Sanitary Sewer Improvements Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: RLG Consulting Engineers Supplier's PM: Brent E. Lewis, P.E. Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Pay Items 30 - Design Description Totals This Unit: email: blewis@rlginc.com Office Addressl825 W. Vickery Boulevard, Suite 105, Fort Worth, TX 76104 Telephone: (817) 687-0800 Fax: (817) 687-0805 Remit Address: Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $254,706.00 $254,706.00 $254,706.00 $254,706.00 Overall Percentage Spent: Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance $254,706.00 $254,706.00 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Water Department Design Services for WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M City Project No. 105108 Task Description Project Project Task No. Principal Maniap@@ Engineer Rate $2u' S2� $160 EIT $140 Labor (hours CADD RPLS $13 $220 Survey Tech $130 Survey Admin. Crew $14 $80 Total Labor Cost Subconsultant Expense Subconsultant Reproduction MWBE Non-MWBE Total Expense Cost Task Sub Total Remaining % Complete Budget 1.0 Project ManiQ�ment 0 14 34 0 0 0 0 0 20 1.1 Managing the TTeam 1.1.2 QA/QC 1.2 Communications and Reporting 1.2.1 Pre -Design Coordination Meeting (assumes 1 meeting) 2 2 1.2.2 Design Submittal Review Meeti (( umes 3 meeti9,p�) 12 12 1.2.3 Prepare Monthly Progress Repor�(assumes 10 months) 10 10 1.2.4 Prepare Monthly MBE/SBE Reports (assumes 10 months) 10 10 2.0 Conceptual Design (30Fercent� 0 46 92 136 240 0 0 0 16 2.1 Data Collection assumes 20,605 F Total) 2 4 8 8 2.2 Conceptual Design Package (assumes 2 ,605 LF total) 40 80 120 240 2.3 Construction Estimate (30%) 4 8 8 8 13.0 Preliminar`(Des'N(60-Percent) 2 70 116 160 312 0 0 0 2 3.1 Preliminary Designbrawmas 60 110 150 300 3.2 Constiuctability Review 2 3.3 Public Meeting 4 4 8 3.4 Utility Clearance 2 4 3.5 Traffic Control Plan 2 2 4 3.6 Construction Estimate (60%) 2 4 2 2 4.0 'Final Deal to 0 30 70 134 260 0 0 0 52 4.1 Final Dra1i190%) Construction Plans and Specifications 20 50 90 180 34 4.2 Final (100/ ) Plans and Specifications 8 16 40 80 14 4.3 Construction Estimates (90% and 100%) 2 4 4 4 $10,120 $ $0 $0 $0 $10,120 $10,120 $760 $4,560 $2,400 $2,400 $94,360 $2,840 $87,600 $3,920 $115,610 $108,800 $530 $2,480 $1,000 $1,280 $1,520 $760 $760 $4,560 $2,400 $4,560 $2,400 $2,400 $2,400 $76,360 E 18,000 $0 $0 $18,000 $94,360 $2,840 $69,600 $ 18,000 $2,840 $18,000 $87,600 $3,926 $3,920 $97,610 $ 18,000 $0 $0 $18,000 $115,610 $90,800 $530 $ 18,000 $ 26,000 $0 $0 $18,000 $108,800 $530 $2,480 $1,000 $2,4801 $1,000 $1,280 $1,520 $1,280 $1,520 $74,520 $26,000 $100,520 $100,520 $51,120 $21,445 $ 18.000 $ 8,000 $18,000 $69,120 $69,120 $29,440 $1,960 $8,000 $29,440 $1,960 $1,960 5.0 'Bid Phase 0 5.1 Bid Support 5.1.1 Upload and Sell Contract Documents and Maintain Plan Holders List 5.1.2 Issue Addenda (assumes 3) 5.1.3 Attend Pre-bitl onference 5.1.4 Tabulate Bids and Recommend Award 5.1.5 Is sue Conformed Contract Documents 9 0 21 6 0 0 0 11 $6,580 $ $0 $1,000 $1,000 $7,580 $7,580 $1,320 $2,100 $720 $940 $2,500 2 3 2 1 1 4 3 2 4 8 6 4 3 2 2 $1,320 $1,000 $1,320 $2,100 $726 $2,100 $720 $940 $1,500 $940 $1,000 $2,500 6.0 Construction Phase Services 0 46 4 62 24 0 0 0 11 6.1 Construction Support 6.1.1 Attend Precenstruction Conference 2 2 6.1.2 Attend Public Meeting 2 2 1 6.1.3 Project Site Visits (assumes 15 mo of censtr & 1 visit per wk) 30 30 1 6.1.4 Shop Drawir)Submittal Review 2 4 8 8 1 6.1.5 Request for Iyynformation Review (assumes 3) 6 12 3 1 6.2 Record Drawings 4 8 24 17.0 ROW/Easement Services 0 4 0 0 60 36 68 68 72 7.1 Right -of -Way Research 8 16 7.2 Right-of-Way/Easement Prarration and Submittal (assumes 12 permanent) 60 36 60 60 24 7.3 temporary Right of Entry Submittal (assumes 36) 4 8 32 6.0 urve`�.( 0 12 0 0 280 40 120 280 0 8.1 Desi n 7 12 280 40 120 280 $23,440 $3,000 $0 $0 $3,000 $26,440 $26,440 $720 $720 $10,800 $2,840 $3,240 $8,120 $40,720 $2,320 $33.840 $4,560 $102,640 $102,640 $726 $3,000 $720 $720 $10,800 $720 $10,800 $2,840 $3,240 $2,840 $3,240 $5,120 $3,000 $8,120 $40,720 $ $0 $0 $0 $40,720 $2,320 33,840 $4,560 E112,641 E $0 $0 $0 E102,640 $102,640 $102,640 9.0 Pdditi 1 Cif� Directed Services g.1 Additional so%iices as Requested by the City $30,000 $0 $0 $0 $30,000 $30,000 $30,000 $30,000 $30,000 Totaisl 2 231 316 Foot pp %Foot p DestJpJ� Fee Waterl �10,66 �5 ° $ 273,284 Sewed 9,940J 48%J $ 254,706 Totall 20,60'1 100°01 $ 527,990 1 513 1,182 1 76 188 348 184 1 $461,9901 $ 65,000 $0 $1,000 $65,000 E527,990 0% $527,990 Project Summary Total Hours 3,040 Total Labor $461,990 Total Expense $68,000 MBE/SBE Subconsultanf $66,000 Contract TOTAL Water and Sewer Water Foo� % $ 10,665I 52%J $ 273,284 10,665 52°0 $ 273,284 Design Breakdown Sanitary Sewer LF� % 9,940J 48%J $ 254,706 9,94 1 48°0l $ 254,706 Total Cost $ 527,990 $ 527,990 % Complete Remaininq Budge 0° J $ 527,990 0°0l $ 527,990 Non-MBE/SBE Subconsultant $0 5% PSub Markup M� �Prollc�ptp 1 $527,990 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 EXHIBIT "B-3" ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST SUMMARY Water Line Sanitary LOCATION Improvements Sewer Line Improvements Barnett St. $568,950 $170,529 (Montclair Dr. to Watson St.) Holt St. $339,706 (Barnett St. to Kemble St.) Junius St. $568,950 - (Normandy Rd. to Barnett St.) Queen St. $304,862 $282,089 (Barnett St. to North Dead End) Queen Ct. $96,414 $165,726 (Queen St. to East Dead End) Watson St. $350,876 $258,885 (Barnett St. to Dead End) W. Watson Rd. $145,198 $119,823 (Watson St. to West Dead End) Kemble St. $24,244 - (Watson St. to West) Watson Ct. $83,849 $101,913 (Watson St. to East Dead End) N. Tierney Ct. $164,469 - (Tierney Rd. to West Dead End) Blue Valley Ct. $345,887 $328,213 (Brentwood Stair Rd. to West Dead End) Cliffview Dr. $132,607 $111,514 (Tierney Rd. to Jenson Rd.) Wilson Rd. $281,017 $584,177 (S. of Timberwilde Cir. to Briarwood Ln.) Blue Ridge Ct. $367,123 $136,212 (Wilson Rd. to West Dead End) Colony Hill Rd. $418,187 $393,837 (Wilson Rd. to East Dead Ends) Parham Ct. $123,690 $137,041 (Wilson Rd. to West Dead End) Timberwilde Cir. $181,686 $283,539 (Wilson Rd. to MeadowbroOK GOIf Course) Pyron Ave. to Barnett St. _ $211,926 (Rear and Side of Properties between Jenson Rd. and Wilson Rd.) TOTAL $4,497,716 $3,285,423 Project Total $739,478 $339,706 $568,950 $586,951 $262,140 $609,761 $265,021 $24,244 $185,763 $164,469 $674,100 $244,121 $865,195 $503,334 $812,024 $260,731 $465,226 $211,926 $7,783,139 B3-1 EXHIBIT "B-4" ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST WATER LINE IMPROVEMENTS CPMS Barnett St. Holt St. Junius St. Queen St. Queen Ct. Watson St. DESCRIPTION OF ITEM BID No. UNITS Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost 6" Water Pipe 3311 0141 LF 0 $0.00 0 $0.00 20 $1,400.00 10 $700.00 0 $0.00 20 $1,400.00 8"Water Pipe 33110241 LF 1,670 $125,25000 690 $51,750.00 1,100 $82,50000 620 $46,500.00 185 $13,875.00 895 $67,125.00 Ductile Iron Water Fittings w/ Restraint (6-inch through 12-inch pipe) 3311 0001 TN 167 $10,855 00 0.69 $4,485.00 1 10 $7,150.00 0.62 $4,030.00 0.19 $1,202.50 0.90 $5,817.50 6" Gate Valve 3312 3002 EA - $0.00 - $0.00 2 $2,400.00 1 $1,200.00 - $0.00 5 $6,000.00 8"Gate Valve 33123003 EA 15 $22,50000 3 $4,500.00 1 $1,500.00 3 $4,500.00 - $0.00 3 $4,500.00 Fire Hydrant 33120001 EA - $0.00 - $0.00 2 $10,00000 1 $5,000.00 - $0.00 2 $10,000.00 Connection to Existing 4"-12" Water Main 3312 0117 EA 11 $38,500 00 2 $7,000.00 1 $3,500.00 1 $3,500.00 - $0.00 - $0.00 1" Water Service, Meter Reconnection 3312 2001 EA 15 $4,500.00 12 $3,600.00 30 $9,000.00 18 $5,400.00 7 $2,100.00 20 $6,000.00 1" Water Service 33122003 EA 15 $18,00000 12 $14,400.00 30 $36,00000 18 $21,600.00 7 $8,400.00 20 $24,000.00 Remove Concrete Curb & Gutter (Water) 0241 1300 LF 45 $450.00 36 $360 00 96 $960.00 57 $570 00 21 $210.00 66 $660 00 Remove 6" Water Valve 0241 1302 EA 2 $400.00 1 $200 00 2 $400.00 2 $400 00 - $0.00 4 $800.00 Remove 8" Water Valve 0241 1303 EA 13 $3,250.00 1 $250 00 1 $250.00 - $0.00 - $0.00 - $0.00 Salvage Fire Hydrant 0241 1510 EA - $0.00 - $0.00 2 $1,000.00 1 $500.00 - $0.00 2 $1,000.00 Salvage 3/4" Water Meter 0241 1511 EA 15 $1,500.00 12 $1,200.00 30 $3,000.00 18 $1,800.00 7 $700.00 20 $2,000.00 Temporary Asphalt Paving Repair (2" HMAC on 6"Flexbose) 32010400 LF 1,895 $37,90000 870 $17,400.00 1,550 $31,00000 890 $17,800.00 290 $5,80000 1,195 $23,900.00 11-inch Pavement Pulverization 241.1700 SY 4,564 $45,64000 2,147 $21,466.67 3,422 $34,22222 1,696 $16,955.56 576 $5,75556 1,675 $16,753.33 Cement-Lime(32lb/SY) 32110601 TN 63 $18,87573 34 $10,304.00 55 $16,42667 27 $8,138.67 9 $2,762.67 27 $8,041.60 3-inch Asphalt Pavement Type"D" 32120303 SY 4,564 $342,30000 2,147 $161,000.00 3,422 $256,66667 1,696 $127,166.67 576 $43,16667 1,675 $125,650.00 6-inch Concrete Curb and 18-inch Gutter (Match Existing) 3216 0102 LF 45 $2,250.00 36 $1,800.00 96 $4,800.00 57 $2,850.00 21 $1,050.00 66 $3,300.00 Topsoil (Water) 3292.0100 CY 3.3 $133.33 27 $10667 6.7 $266.67 40 $16000 1.6 $62.22 44 $17778 Block Sod Replacement (Water) 3292.0200 SY 30 $600.00 24 $48000 60 $1,200.00 36 $72000 14 $280.00 40 $800.00 Temporary Water Services 33040101 LS 015 $5,207.13 0.06 $2,151.45 010 $3,429.84 0.06 $1,933.18 002 $576.84 0.08 $2,790.65 Traffic Control (Water) 3471 0001 Mo 167 $8,350.00 0.69 $3,450.00 1 10 $5,500.00 0.62 $3,100.00 019 $925.00 0.90 $4,475.00 SWPPP z 1 acre (Water) 31250101 LS 015 $371.94 0.06 $15367 010 $244.99 0.06 $13808 002 $41.20 0.08 $19933 Construction Surveying (Water) 99990001 LS 015 $743.88 0.06 $30735 010 $489.98 0.06 $27617 002 $82.41 0.08 $39866 Construction Staking (Water) 99990002 LS 015 $1,487.75 0.06 $61470 010 $979.96 0.06 $55234 0.02 $164.81 0.08 $797.33 Water Construction Allowance 99990003 LS 015 $4,463.25 0.06 $1,844.10 010 $2,939.87 0.06 $1,657.02 002 $494.43 0.08 $2,391.98 Subtotal Cost $693,528 $308,824 $517,227 $277,148 $87,649 $318,978 10% Contingency $69,353 $30,882 $51,723 $27,715 $8,765 $31,898 TOTAL Cost $762,881 $339,706 $568,950 $304,862 $96,414 $350,876 UNIT TOTAL TOTAL COST COST 50 $70.00 $3,500 5,160 $75.00 $387,000 5 $6,500.00 $33,540 8 $1,200.00 $9,600 25 $1,500.00 $37,500 5 $5,000.00 $25,000 15 $3,500.00 $52,500 102 $30000 $30,600 102 $1,200.00 $122,400 321 $1000 $3,210 11 $200.00 $2,200 15 $250.00 $3,750 5 $500.00 $2,500 102 $10000 $10,200 6,690 $2000 $133,800 14,079 $1000 $140,793 215 $300 00 $64,549 14,079 $7500 $1,055,950 321 $5000 $16,050 23 $40 00 $907 204 $20.00 $4,080 0.46 $35,000.00 $16,089 5 $5,000.00 $25,800 046 $2,500.00 $1,149 046 $5,000.00 $2,298 0.46 $10,000.00 $4,597 0.46 $30,000.00 $13,791 Subtotal Water $2,203,354 10% Contingency $220,335 TOTAL Water $2,423,689 B4-1 EXHIBIT "B-4" ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST WATER LINE IMPROVEMENTS CPMS W. Watson Rd. Kemble St. Watson Ct. N. Tierney Ct. Blue Valley Ct. Cliffview Dr. UNIT TOTAL DESCRIPTION OF ITEM BID No. UNITS TOTAL COST COST oty. Cost oty. Cost Qty. Cost oty. Cost oty. Cost oty. Cost 6" Water Pipe 3311 0141 LF 10 $700.00 0 $0.00 0 $0.00 10 $700.00 20 $1,400.00 0 $0.00 40 $70.00 $2,800 8"Water Pipe 33110241 LF 390 $29,25000 50 $3,750.00 270 $20,25000 288 $21,600.00 920 $69,000.00 340 $25,500.00 2,258 $75.00 $169,350 Ductile Iron Water Fittings w/ Restraint (6-inch through 12-inch pipe) 3311 0001 TN 039 $2,535.00 0.05 $325 00 027 $1,755.00 0.29 $1,872.00 092 $5,980.00 0.34 $2,210.00 2 $6,500.00 $14,677 6" Gate Valve 33123002 EA 1 $1,200.00 - $0.00 - $0.00 1 $1,200.00 2 $2,400.00 - $0.00 4 $1,200.00 $4,800 8" Gate Valve 33123003 EA - $0.00 - $0.00 - $0.00 1 $1,500.00 1 $1,500.00 2 $3,000.00 4 $1,500.00 $6,000 Fire Hydrant 33120001 EA 1 $5,000.00 - $0.00 - $0.00 1 $5,000.00 2 $10,000.00 - $0.00 4 $5,000.00 $20,000 Connection to Existing 4"-12" Water Main 3312 0117 EA - $0.00 - $0.00 - $0.00 1 $3,500.00 1 $3,500.00 2 $7,000.00 4 $3,500.00 $14,000 1" Water Service, Meter Reconnection 33122001 EA 7 $2,100.00 1 $30000 5 $1,500.00 11 $3,300.00 20 $6,000.00 6 $1,800.00 50 $30000 $15,000 1" Water Service 33122003 EA 7 $8,400.00 1 $1,200.00 5 $6,000.00 11 $13,200.00 20 $24,000.00 6 $7,200.00 50 $1,200.00 $60,000 Remove Concrete Curb & Gutter (Water) 02411300 LF 21 $210.00 3 $3000 15 $150.00 33 $330.00 60 $600.00 18 $18000 150 $1000 $1,500 Remove 6" Water Valve 02411302 EA 1 $200.00 - $0.00 1 $200.00 1 $20000 2 $400.00 2 $40000 7 $20000 $1,400 Remove 8" Water Valve 0241 1303 EA - $0.00 1 $250 00 - $0.00 1 $250 00 1 $250.00 - $0.00 3 $250.00 $750 Salvage Fire Hydrant 0241 1510 EA 1 $500.00 - $0.00 - $0.00 1 $500 00 2 $1,000.00 - $0.00 4 $500.00 $2,000 Salvage 3/4"Water Meter 02411511 EA 7 $700.00 1 $10000 5 $500.00 11 $1,100.00 20 $2,000.00 6 $600.00 50 $100.00 $5,000 Temporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 3201 0400 LF 495 $9,900.00 65 $1,300.00 345 $6,900.00 453 $9,060.00 1,220 $24,400 00 430 $8,600.00 3,008 $20 00 $60,160 11-inch Pavement Pulverization 241.1700 SY 725 $7,248.89 156 $1,555.56 386 $3,857.78 896 $8,960.00 1,633 $16,33333 653 $6,533.33 4,449 $1000 $44,489 Cement-Lime(32lb/SY) 32110601 TN 12 $3,479.47 2 $74667 6 $1,851.73 14 $4,300.80 26 $7,840.00 10 $3,136.00 71 $30000 $21,355 3-inch Asphalt Pavement Type"D" 32120303 SY 725 $54,36667 156 $11,666.67 386 $28,93333 896 $67,200.00 1,633 $122,500.00 653 $49,000.00 4,449 $7500 $333,667 6-inch Concrete Curb and 18-inch Gutter (Match Existing) 3216 0102 LF 21 $1,050.00 3 $150 00 15 $750.00 33 $1,650.00 60 $3,000.00 18 $900 00 150 $50 00 $7,500 Topsoil (Water) 32920100 CY 1.6 $62.22 02 $8.89 1.1 $44.44 24 $9778 4.4 $177.78 1.3 $53.33 11 $40.00 $444 Block Sod Replacement (Water) 32920200 SY 14 $280.00 2 $4000 10 $200.00 22 $44000 40 $800.00 12 $240.00 100 $2000 $2,000 Temporary Water Services 33040101 LS 003 $1,216.04 0.00 $15590 002 $841.87 0.03 $89800 008 $2,868.60 0.03 $1,060.13 020 $35,000.00 $7,041 Traffic Control (Water) 34710001 MG 039 $1,950.00 0.05 $25000 027 $1,350.00 0.29 $1,440.00 0.92 $4,600.00 0.34 $1,700.00 2 $5,000.00 $11,290 SWPPP z 1 acre (Water) 31250101 LS 003 $86.86 0.00 $1114 002 $60.13 0.03 $6414 0.08 $204.90 0.03 $75.72 0.20 $2,500.00 $503 Construction Surveying (Water) 99990001 LS 003 $173.72 0.00 $2227 002 $120.27 0.03 $12829 008 $409.80 0.03 $15145 020 $5,000.00 $1,006 Construction Staking (Water) 99990002 LS 003 $347.44 0.00 $4454 002 $240.53 0.03 $25657 008 $819.60 0.03 $30290 0.20 $10,000.00 $2,012 Water Construction Allowance 9999.0003 LS 003 $1,042.32 0.00 $13363 002 $721.60 0.03 $76971 008 $2,458.80 0.03 $90869 020 $30,000.00 $6,035 Suototal Cost $131,999 $22,040 $76,227 $149,517 $314,443 $120,552 Subtotal Water $814,777 10% Contingency $13,200 $2,204 $7,623 $14,952 $31,444 $12,055 10% Contingency $81,478 TOTAL Cost $145,198 $24,244 $83,849 $164,469 $345,887 $132,607 TOTAL Water $896,255 B4-2 EXHIBIT " B-4" ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST WATER LINE IMPROVEMENTS CPMS Wilson Rd. Blue Ridge Ct. Colony Hill Rd. Parham Ct. Timberwilde Cir. UNIT TOTAL ITEM DESCRIPTION OF ITEM BID No. UNITS TOTAL COST COST city. Cost city. Cost Qty. Cost Qty. Cost Qty. Cost 1 6" Water Pipe 3311.0141 LF 0 $0.00 0 $0.00 20 $1,400.00 0 $0.00 10 $700.00 30 $70.00 $2,100 2 8" Water Pipe 3311.0241 LF 865 $64,875.00 920 $69,000.00 1,122 $84,150.00 400 $30,000.00 500 $37,500.00 3,807 $75.00 $285,525 3 Ductile Iron Water Fittings w/ Restraint (6-inch through 12-inch pipe) 3311.0001 TN 0.87 $5,622.50 0.92 $5,980.00 1.12 $7,293.00 0.40 $2,600.00 0.50 $3,250.00 4 $6,500.00 $24,746 4 6" Gate Valve 3312.3002 EA - $0.00 - $0.00 2 $2,400.00 - $0.00 1 $1,200.00 3 $1,200.00 $3,600 5 8" Gate Valve 3312.3003 EA 5 $7,500.00 - $0.00 2 $3,000.00 - $0.00 - $0.00 7 $1,500.00 $10,500 6 Fire Hydrant 3312.0001 EA - $0.00 - $0.00 2 $10,000.00 - $0.00 1 $5,000.00 3 $5,000.00 $15,000 7 Connection to Existing 4"-12" Water Main 3312.0117 EA 3 $10,500.00 - $0.00 - $0.00 - $0.00 - $0.00 3 $3,500.00 $10,500 8 1" Water Service, Meter Reconnection 3312.2001 EA 5 $1,500.00 10 $3,000.00 20 $6,000.00 4 $1,200.00 8 $2,400.00 47 $300.00 $14,100 9 1" Water Service 3312.2003 EA 5 $6,000.00 10 $12,000.00 20 $24,000.00 4 $4,800.00 8 $9,600.00 47 $1,200.00 $56,400 10 Remove Concrete Curb & Gutter (Water) 0241.1300 LF 15 $150.00 30 $300.00 60 $600.00 12 $120.00 24 $240.00 141 $10.00 $1,410 11 Remove 6" Water Valve 0241.1302 EA - $0.00 - $0.00 2 $400.00 - $0.00 - $0.00 2 $200.00 $400 12 Remove 8" Water Valve 0241.1303 EA 3 $750.00 - $0.00 - $0.00 - $0.00 - $0.00 3 $250.00 $750 13 Salvage Fire Hydrant 0241.1510 EA - $0.00 - $0.00 2 $1,000.00 - $0.00 1 $500.00 3 $500.00 $1,500 14 Salvage 3/4" Water Meter 0241.1511 EA 5 $500.00 10 $1,000.00 20 $2,000.00 4 $400.00 8 $800.00 47 $100.00 $4,700 15 Temporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 3201.0400 LF 940 $18,800.00 1,070 $21,400.00 1,422 $28,440.00 460 $9,200.00 620 $12,400.00 4,512 $20.00 $90,240 16 11-inch Pavement Pulverization 241.1700 SY 1,421 $14,208.89 2,313 $23,131.11 2,134 $21,342.22 650 $6,502.22 933 $9,333.33 7,452 $10.00 $74,518 17 Cement-Lime(32lb/SY) 3211.0601 TN 23 $6,820.27 37 $11,102.93 34 $10,244.27 10 $3,121.07 15 $4,480.00 119 $300.00 $35,769 18 3-inch Asphalt Pavement Type "D" 3212.0303 SY 1,421 $106,566.67 2,313 $173,483.33 2,134 $160,066.67 650 $48,766.67 933 $70,000.00 7,452 $75.00 $558,883 19 6-inch Concrete Curb and 18-inch Gutter (Match Existing) 3216.0102 LF 15 $750.00 30 $1,500.00 60 $3,000.00 12 $600.00 24 $1,200.00 141 $50.00 $7,050 20 Topsoil (Water) 3292.0100 CY 1.1 $44.44 2.2 $88.89 4.4 $177.78 0.9 $35.56 1.8 $71.11 10 $40.00 $418 21 Block Sod Replacement (Water) 3292.0200 SY 10 $200.00 20 $400.00 40 $800.00 8 $160.00 16 $320.00 94 $20.00 $1,880 22 Temporary Water Services 3304.0101 LS 0.08 $2,697.10 0.08 $2,868.60 0.10 $3,498.44 0.04 $1,247.22 0.04 $1,559.02 0.34 $35,000.00 $11,870 23 Traffic Control (Water) 3471.0001 MO 0.87 $4,325.00 0.92 $4,600.00 1.12 $5,610.00 0.40 $2,000.00 0.50 $2,500.00 4 $5,000.00 $19,035 24 SWPPP 21 acre (Water) 3125.0101 LS 0.08 $192.65 0.08 $204.90 0.10 $249.89 0.04 $89.09 0.04 $111.36 0.34 $2,500.00 $848 25 Construction Surveying (Water) 9999.0001 LS 0.08 $385.30 0.08 $409.80 0.10 $499.78 0.04 $178.17 0.04 $222.72 0.34 $5,000.00 $1,696 26 Construction Staking (Water) 9999.0002 LS 0.08 $770.60 0.08 $819.60 0.10 $999.55 0.04 $356.35 0.04 $445.43 0.34 $10,000.00 $3,392 27 Water Construction Allowance 9999.0003 LS 0.08 $2,311.80 0.08 $2,458.80 0.10 $2,998.66 0.04 $1,069.04 0.04 $1,336.30 0.34 $30,000.00 $10,175 Subtotal Cost $255,470 $333,748 $380,170 $112,445 $165,169 Subtotal Water $1,247,003 10%Contingency $25,547 $33,375 $38,017 $11,245 $16,517 10%Contingency $124,700 TOTAL Cost $281,017 $367,123 $418,187 $123,690 $181,686 TOTAL Water $1,371,703 B4-3 EXHIBIT " B-4" ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST SANITARY SEWER LINE IMPROVEMENTS Barnett St. Queen St. Queen Ct. Watson St. ITEM DESCRIPTION OF ITEM CPMS UNITS L-477 L •377 L.o63 L -•O80 L-tS67 L ABO L BID No. Qty, Cost Qty. Cost CRY. Cost Qty. Cost CRY. Cost Qty. Cost Qty. 1 8" Sewer Pipe 3331.4115 LF 138 $8,280.00 268 $16,080.00 701 $42,060.00 254 $15,240.00 327 $19,620.00 268 $16,080.00 100 2 8" Pipe Enlargement 3331.1102 LF - $0.00 - $0.06 - $0.00 - $0.0 $0.00 $0.0 0 - 3 Service Reinstatement, Pipe Enlargement 3331.1201 EA - $0.00 - $0.06 - $0.00 - $0ti - $0.00 - $0.0� - 4 4" Sewer Service, Reconnection 3331.3311 EA 2 $4,000.00 4 $8,000.06 19 $38,000.00 7 $14,000.0� 7 $14,000.00 4 $8,000.0 4 5 Pre -CCTV Inspection 3301.0001 LF 138 $690.00 268 $1,340.06 701 $3,505.00 254 $1,270.0 i 327 $1,635.00 268 $1,340.06 100 6 Post -CCTV Inspection 3301.0002 LF 138 $414.00 268 $804.06 701 $2,103.00 254 $762.00 327 $981.00 268 $804.06 100 7 Remove 4'Sewer Manhole 0241.2201 EA 2 $2,000.00 1 $1,000.06 3 $3,000.00 2 $2,000.049 1 $1,000.00 1 $1,000.06 - 8 4' Manhole 3339.1001 EA 3 $15,000.00 3 $15,000.06 5 $25,000.00 3 $15,000.0d 3 $15,000.00 2 $10,000.06 1 9 4' Extra Depth Manhole 3339.1003 VF - $0.00 - $0.06 12 $3,000.00 - $O.OA 12 $3,000.00 - $0.00 10 Manhole Vacuum Testing 3301.0101 EA 3 $900.00 3 $900.06 5 $1,500.00 3 $900.0d 3 $900.00 2 $600.06 1 11 Epoxy Manhole Liner 3339.0001 VF - $0.00 - $0.06 10 $200.00 12 $240.0d 30 $600.00 - $0.0 6 12 Concrete Collar 3305.0112 EA 3 $3,000.00 3 $3,000.06 5 $5,000.00 3 $3,000.001 3 $3,000.00 2 $2,000.06 1 13 Remove Concrete Curb & Gutter (Sanitary Sewer) 0241.1300 LF 6 $60.00 12 $120.06 57 $570.00 21 $210.0� 21 $210.00 12 $120.06 12 14 Temporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 3201.0400 LF 168 $3,360.00 328 $6,560.06 986 $19,720.00 - $0.0� 255 $5,100.00 328 $6,560.Ot1 160 15 11 inch Pavement Pulverization 241.1700 SY 215 $2,146.67 417 $4,168.86 1,090 $10,904.44 - $0.0J 233 $2,333.36 417 $4,168.81J 156 16 Cement-Lime(32lb/SY) 3211.0601 TN 3 $1,030.40 7 $2,001.07 17 $5,234.13 0 $0.00J 4 $1,120.06 7 $2,001.0-,' 2 17 3-inch Asphalt Pavement Type"D" 3212.0303 SY 215 $16,100.00 417 $31,266.67 1,090 $81,783.33 - $0.0� 233 $17,500.00 417 $31,266.6-,' 156 18 6-inch Concrete Curb and 18-inch Gutter (Match Existing) 3216.0102 LF 6 $300.00 12 $600.06 57 $2,850.00 21 $1,050.0 21 $1,050.00 12 $600.O1 12 19 Topsoil (Sanitary Sewer) 3292.0100 CY 0.1 $4.94 0.2 $9.88 1.2 $46.91 0.4 $17.2 0.4 $17.26 0.2 $9.86 0.2 20 Block Sod Replacement (Sanitary Sewer) 3292.0200 SY 1.1 $16.67 2.2 $33.33 10.6 $158.33 3.9 $58.3 1 3.9 $58.33 2.2 $33.3 1 2.2 21 Trench Safety (Sanitary Sewer) 3305.0109 LF 138 $345.00 268 $670.06 701 $1,752.50 254 $635.001 327 $817.56 268 $67021 100 22 Traffic Control (Sanitary Sewer) 3471.0001 M 0.14 $1,035.00 0.27 $2,010.06 0.70 $5,257.50 0.25 $1,905.0 0.33 $2,452.50 0.27 $2,010.0 0.10 23 SWPPP z 1 acre (Sanitary Sewer) 3125.0101 LS 0.01 $104.97 0.03 $203.85 0.07 $533.2x2 0.03 $193.2 0.03 $248.73 0.03 $203.85 0.01 24 Construction Surveying (Sanitary Sewer) 9999.0004 LS 0.01 $69.96 0.03 $135.96 0.07 $355.46 0.03 $128.8 1 0.03 $165.Sx2 0.03 $135.9 1 0.01 25 Construction Staking (Sanitary Sewer) 9999.0005 LS 0.01 $69.96 0.03 $135.96 0.07 $355.46 0.03 $128.80J 0.03 $165.Sx2 0.03 $135.90J 0.01 26 Sanitary Sewer Construction Allowance 9999.0006 LS 0.01 $699.80 0.03 $1,359.03 0.07 $3,554.77 0.03 $1,288.0 1 0.03 $1,658.2x2 0.03 $1,359.0 11 0.01 Su )total Cost $59,627 $95,399 $256,444 $58,026 $92,634 $89,099 10%Contingency $5,963 $9,540 $25,644 $5,803 $9,263 $8,910 TOTAL Cost $65,590 $104,938 $282,089 $63,829 $101,897 $98,008 •081 I SUB UNIT TOTAL cost TOTAL COST COST $6,000.00 2,056 $60.00 $123,360 $0.00 0 $120.00 S01 $0.0 0 $500.00 S01 $8,000.00 47 $2,000.00 $94,0001 $500.00 2,056 $5.00 $10,2801 $300.00 2,056 $3.00 $6,1681 $0.0l 10 $1,000.00 $10,0001 $5,000.0� 20 $5,000.00 $100,0001 $0.00 24 $250.00 $6,0001 $300.00 20 $300.00 $6,0001 $120.0 58 $20.00 $1,1601 $1,000.00 20 $1,000.00 $20,0001 $120.00 141 $10.00 $1,4101 $3,200.00 2,225 $20.00 $44,5001 $1,555.5 2,528 $10.00 $25,2781 $746.67 40 $300.00 $12,1331 $11,666.67 2,528 $75.00 $189,5831 $600.0 f 141 $50.00 $7,0501 $9.8 3 $40.00 $1161 $33.33 26 $15.00 $3921 $250.0� 2,056 $2.50 $5,1401 $750.0 1 2 $7,500.00 $15,4201 $76.06 0.21 $7,500.00 $1,5641 $50.71 0.21 $5,000.00 $1,0431 $50.71 0.21 $5,000.00 $1,0431 $507.10 0.21 $50,000.00 $10,4261 $40,837 Subtotal Sewer $692,0651 $4,084 10 % Contingency $69,2071 $44,920 SUBTOTAL Sewer $761,2721 B4-4 EXHIBIT "B-4" ITEM DESCRIPTION OF ITEM 2 8" Pipe Enlargement 3 Service Reinstatement, Pipe Enlargement 4 4" Sewer Service, Reconnection 5 Pre -CCTV Inspection 6 Post -CCTV Inspection 7 Remove 4' Sewer Manhole 8 4' Manhole 9 4'Extra Depth Manhole 10 Manhole Vacuum Testing 11 Epoxy Manhole Liner 12 Concrete Collar 13 Remove Concrete Curb & Gutter (Sanitary Sewer) 14 Temporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 15 11-inch Pavement Pulver-tion 16 Cement -Lime (32lb/SY) 17 3-inch Asphalt Pavement Type "D" 18 6-inch Concrete Curb and 18-inch Gutter (Match Existing) 19 Topsoil (Sanitary Sewer) 20 Block Sod Replacement (Sanitary Sewer) 21 Trench Safety (Sanitary Sewer) 22 Traffic Control (Sanitary Sewer) 23 SWPPP t 1 acre (Sanitary Sewer) 24 Construction Surveying (Sanitary Sewer) 25 Construction Staking (Sanitary Sewer) 26 Sanitary Sewer Construction Allowance CPMS UNITS BID No. 3331.4115 LF 3331 1102 LF 3331.1201 EA 33313311 EA 3301.0001 LF 33010002 LF 0241.2201 EA 33391001 EA 3339.1003 VF 33010101 EA 3339.0001 VF 33050112 EA 0241.1300 LF 3201 0400 LF 241.1700 SY 32110601 TN 3212.0303 SY 32160102 LF 3292.0100 CY 3292 0200 SY 3305.0109 LF 34710001 MG 3125.0101 LS 9999 0004 LS 9999.0005 LS 9999.0006 LS Subtotal Cost 10% Contingency TOTAL Cost ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST SANITARY SEWER LINE IMPROVEMENTS Wads m St. L-7540 L-7541 Qty. Cost Qty. Cost 213 $12,780.00 132 $7,920.00 - $0.00 - $0 00 - $0.00 - $0.00 - $0.00 3 $6,000.00 213 $1,065.00 132 $660.00 213 $639 00 132 $396.00 1 $1,000.00 - $0.00 1 $5,00000 1 $5,000.00 - $0.00 - $0.00 1 $300 00 1 $300.00 6 $120.00 - $0.00 1 $1,00000 1 $1,000.00 0 $0.00 9 $90.00 213 $4,26000 177 $3,540.00 331 $3,313.33 205 $2,053.33 5 $1,59040 3 $985.60 331 $24,850.00 205 $15,400.00 0 $0.00 9 $450.00 0.0 $0.00 0.2 $7.41 0 $0.00 2 $25 00 213 $532.50 132 $330.00 0.21 $1,59750 0.13 $990.00 0.02 $152.24 0.01 $94.35 0.02 $10150 0.01 $6290 0.02 $101.50 0.01 $62.90 0.02 $1,01496 0.01 $628.99 $59,418 $45,996 $5,942 $4,600 $65,360 $50,596 W. Watson Rd. Watson Ct. Blue Valley Ct. L-7540 L-6080 "A" LA241 Qty. Cost Qty. Cost Qty. Cost 314 $18,840.00 292 $17,520,00 790 $47,400.00 - $0.00 - $0 00 242 $29,040 00 - $0.00 - $0.00 2 $1.000.00 7 $14,00000 6 $12,000.00 17 $34,00000 314 $1.570.00 292 $1,460.00 1,032 $5.160.00 314 $94200 292 $876.00 1,032 $3,09600 2 $2,000.00 - $0.00 4 $4.000.00 2 $10,00000 1 $5,000.00 4 $20,00000 - $0.00 - $0.00 8 $2.000.00 2 $60000 1 $300.00 4 $1,20000 12 $240.00 6 $120.00 - $0.00 2 $2,000.00 1 $1,000.00 4 $4,000.00 21 $210.00 18 $180.00 51 $510.00 419 $8,380.00 382 $7,640.00 1,045 $20,900.00 488 $4.884.44 454 $4,542.22 1,229 $12,288.89 8 $2,344.63 7 $2,180.27 20 $5,898.67 488 $36,633.33 454 $34,066.67 1,229 $92,166.67 21 $1,05000 18 $900.00 51 $2,55000 0.4 $17.28 0.4 $14.81 1.0 $41.98 4 $58.33 3 $5000 9 $14167 314 $785.00 292 $730.00 790 $1.975.00 0.31 $2,35500 0.29 $2,190.00 0.79 $5,92500 0.03 $224.44 0.03 $208.71 0.08 $564.66 0.03 $149.62 0.03 $139.14 0.08 $376.44 0.03 $149.62 0.03 $139.14 0.08 $376.44 0.03 $1,49624 0.03 $1,391.40 0.08 $3,764.41 $108,930 $92,648 $298,376 $10,893 $9,265 $29,838 $119,823 $101,913 $328,213 Cliffview Dr. L-E50 Wilson Rd. L-9780 SUB UNIT TOTAL Qty. Cost Qty. Cost TOTAL COST COST 260 $15,600.00 688 $41,280.00 2,689 $60.00 $161,340 - $000 - $0.00 242 $120.00 $29,040 - $0.00 - $0.00 2 $500.00 $1,000 6 $12,000.00 - $0.00 39 $2,00000 $78,000 260 $1,300.00 688 $3,440.00 2,931 $5.00 $14,655 260 $780.00 688 $2,06400 2,931 $3.00 $8,793 1 $1,000.00 5 $5,000.00 13 $1,000.00 $13,000 3 $15,000.00 5 $25,000.00 17 $5,000.00 $85,000 10 $2,500.00 - $0.00 18 $250.00 $4,500 3 $900.00 5 $1,50000 17 $30000 $5,100 28 $560.00 - $0.00 52 $20.00 $1,040 3 $3,000.00 5 $5,000.00 17 $1,000.00 $17,000 18 $180.00 0 $0.00 117 $10.00 $1,170 350 $7,000.00 688 $13,760.00 3,274 $20.00 $65,480 404 $4,044.44 1,070 $10,702.22 4,183 $10.00 $41,829 6 $1,941.33 17 $5,137.07 67 $300.00 $20,078 404 $30,333.33 1,070 $80,266.67 4,183 $75.00 $313,717 18 $900.00 0 $0.00 117 $50.00 $5,850 0.4 $14.81 0.0 $0.00 2 $40.00 $96 3 $5000 0 $0.00 22 $15.00 $325 260 $650.00 688 $1,720.00 2,689 $2.50 $6,723 0.26 $1,950.00 0.69 $5,160.00 3 $7,600.00 $20,168 0.02 $185.84 0.07 $491.76 0.26 $7,500.00 $1,922 0.02 $123.89 0.07 $32784 026 $5,00000 $1,281 0.02 $123.89 0.07 $327.84 0.26 $5,000.00 $1,281 0.02 $1,238.92 0.07 $3,278.38 0.26 $12,813 $101,376 $204,456 Subtotal Sewer $911,201 $10,138 $20,446 10%Contingency $91,120 $111,514 $224,901 SUBTOTAL Sewer $1,002,321 B4-5 EXHIBIT "B-4" ITEM DESCRIPTION OF ITEM I 1 8" Sewer Pipe 2 8" Pipe Enlargement 3 Service Reinstatement, Pipe Enlargement 4 4" Sewer Service, Reconnection 5 Pre -CCTV Inspection 6 Post -CCTV Inspection 7 Remove 4' Sewer Manhole 8 4' Manhole 9 4' Extra Depth Manhole 10 Manhole Vacuum Testing 11 Epoxy Manhole Liner 12 Concrete Collar 13 Remove Concrete Curb 8 Gutter (Sanitary Sewer) 14 Temporary Asphalt Paving Repair (2" HMAC on 6" Flexb 15 11-inch Pavement Pulverization 16 Cement -Lime (32lb/SY) 17 3-inch Asphalt Pavement Type "D" 18 6-inch Concrete Curb and 18-inch Gutter (Match Existing 19 Topsoil (Sanitary Sewer) 20 Block Sod Replacement (Sanitary Sewer) 21 Trench Safety (Sanitary Sewer) 22 Traffic Control (Sanitary Sewer) 23 SWPPP >_ 1 acre (Sanitary Sewer) 24 Construction Surveying (Sanitary Sewer) 25 Construction Staking (Sanitary Sewer) 26 Sanitary Sewer Construction Allowance CPMS UNITS BID No. 3331.4115 LF 3331.1102 LF 3331.1201 EA 3331.3311 EA 3301.0001 LF 3301.0002 LF 0241.2201 EA 3339.1001 EA 3339.1003 VF 3301.0101 EA 3339.0001 VF 3305.0112 EA 0241.1300 LF a.) 3201.0400 LF 241.1700 SY 3211.0601 TN 3212.0303 SY ) 3216.0102 LF 3292.0100 CY 3292.0200 SY 3305.0109 LF 3471.0001 MO 3125.0101 LS 9999.0004 LS 9999.0005 LS 9999.0006 LS Su Aotal Cost 10% Contingency TOTAL Cost ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST SANITARY SEWER LINE IMPROVEMENTS Wilson Rd. Blue Ridge Ct. L-5780 L-4569 L-5779 L-7200 Qty. Cost City. Cost Qty. cost Qty. Cost 688 $41,280.00 403 $24,180.00 353 $21,180.00 339 $20,340.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 9 $18,000.00 - $0.00 10 $20,000.00 8 $16,000.00 688 $3,440.00 403 $2,015.00 353 $1,765.00 339 $1,695.00 688 $2,064.00 403 $1,209.00 353 $1,059.00 339 $1,017.00 4 $4,000.00 1 $1,000.00 - $0.00 2 $2,000.00 3 $15,000.00 2 $10,000.00 2 $10,000.00 3 $15,000.00 - $0.00 3 $750.00 - $0.00 - $0.00 3 $900.00 2 $600.00 2 $600.00 3 $900.00 - $0.00 8 $160.00 - $0.00 - $0.00 3 $3,000.00 2 $2,000.00 2 $2,000.00 3 $3,000.00 27 $270.00 0 $0.00 30 $300.00 24 $240.00 823 $16,460.00 403 $8,060.00 503 $10,060.00 459 $9,180.00 1,070 $10,702.22 627 $6,268.89 549 $5,491.11 527 $5,273.33 17 $5,137.07 10 $3,009.07 9 $2,635.73 8 $2,531.20 1,070 $80,266.67 627 $47,016.67 549 $41,183.33 527 $39,550.00 27 $1,350.00 0 $0.00 30 $1,500.00 24 $1,200.00 0.6 $22.22 0.0 $0.00 0.6 $24.69 0.5 20 5 $75.00 0 $0.00 6 $83.33 4 $66.67 688 $1,720.00 403 $1,007.50 353 $882.50 339 $847.50 0.69 $5,160.00 0.40 $3,022.50 0.35 $2,647.50 0.34 $2,542.50 0.07 $523.33 0.04 $306.54 0.04 $268.51 0.03 $257.86 0.07 $348.88 0.04 $204.36 0.04 $179.01 0.03 $171.91 0.07 $348.88 0.04 $204.36 0.04 $179.01 0.03 $171.91 0.07 $3,488.84 0.04 $2,043.61 0.04 $1,790.06 0.03 $1,719.07 $213,557 $113,057 $123,829 $123,724 $21,356 $11,306 $12,383 $12,372 $234,913 $124,363 $136,212 $136,096 Colony Hill Rd. L-7201 Qty. cost Qty, L-7198 Cost 153 $9,180.00 380 $22,800.00 - $0.00 - $0.00 - $0.00 - $0.00 6 $12,000.00 8 $16,000.00 153 $765.00 380 $1,900.00 153 $459.00 380 $1,140.00 - $0.00 1 $1,000.00 1 $5,000.00 4 $20,000.00 - $0.00 - $0.00 1 $300.00 4 $1,200.00 - $0.00 - $0.00 1 $1,000.00 4 $4,000.00 18 $180.00 24 $240.00 243 $4,860.00 500 $10,000.00 238 $2,380.00 591 $5,911.11 4 $1,142.40 9 $2,837.33 238 $17,850.00 591 $44,333.33 18 $900.00 24 $1,200.00 0.4 $14.81 0.5 $19.75 3 $50.00 4 $66.67 153 $382.50 380 $950.00 0.15 $1,147.50 0.38 $2,850.00 0.02 $116.38 0.04 $289.05 0.02 $77.59 0.04 $192.70 0.02 $77.59 0.04 $192.70 0.02 $775.86 0.04 $1,926.98 $58,659 $139,050 $5,866 $13,905 $64,524 $152,955 SUB UNIT TOTAL TOTAL COST COST 2,316 $60.00 $138,960 0 $120.00 $01 0 $500.00 $01 41 $2,000.00 $82,0001 2,316 $5.00 $11,5801 2,316 $3.00 $6,9481 8 $1,000.00 $8,0001 15 $5,000.00 $75,0001 3 $250.00 $7501 15 $300.00 $4,5001 8 $20.00 $1601 15 $1,000.00 $15,0001 123 $10.00 $1,2301 2,931 $20.00 $58,6201 3,603 $10.00 $36,0271 58 $300.00 $17,2931 3,603 $75.00 $270,2001 123 $50.00 $6,1501 3 $40.00 $1011 23 $15.00 $3421 2,316 $2.50 $5,7901 2 $7,500.00 $17,3701 0.23 $7,500.00 $1,7621 0.23 $5,000.00 $1,1741 0.23 $5,000.00 $1,1741 0.23 $50,000.00 $11,7441 Subtotal Sewer $771,8751 10% Contingency $77,1881 TOTAL Sewer $849,0631 B4-6 EXHIBIT "B-4" ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST SANITARY SEWER LINE IMPROVEMENTS Colony Hill Rd. Parh-CL Timberwilde Cir. Rear of Properties REM DESCRIPTION OF REM CPMS UNITS L-.780 L-6476 L-7120 L-227 L-7197 L-4570 L-4571 L371 SUB UNIT TOTAL BID No. car. cost city. Cost Oty. cost Dry. Cost Oty. Cost car. Coat Oty. Cost car. Coat TOTAL COST COST "Sewer Pipe 33314115 LF - $000 382 $22,92000 132 $7,92000 1202 $72,12000 90 $5,400.00 715 $42,90000 - $000 278 $16,68000 2,799 $60.00 $167,940 2 8" Pipe Enlargement 3331.1102 LF 195 $23,400.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 352 $42,240.00 - $0.00 547 $12000 $65,640 3 Ser4ce Reinstatement, Pipe Enlargement 3331.1201 EA 7 $3,500.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 6 3,000.00 - $0.00 13 $500.00 $6,500 4 4" Seger SeMce, Reconnection 3331.3311 EA - $0.00 5 $10,000.00 2 $4,000.00 7 $14,000.00 1 $2,000.00 9 $18,000.00 - $0.00 - $0.00 24 $2,000.00 $48,000 5 Pre -CCTV Inspection 3301.0001 LF 195 $975.00 382 $1,910.00 132 $660.00 1,202 $6,010.00 90 $450.00 715 $3,575.00 352 $1,760.00 278 $1,390.00 3.346 $5.00 $16,730 6 Post -CCTV Inspection 3301.0002 LF 195 $585.00 382 $1,146.00 132 $396.00 1202 $3,606.00 90 $270.00 715 $2,14500 352 $1,05600 278 $83400 3,346 $300 $10,038 7 Remove 4' Seger Manhde 0241.2201 EA - $0.00 - $0.00 - $0.00 4 $4,000.00 - $0.00 2 $2,000.00 - $0.00 1 $1,000.00 7 $1,00000 $7,000 8 4'Manhole 3339.1001 EA 1 $5,000.00 3 $15,000.00 1 $5,000.00 8 $40,00000 1 $5,000.00 3 $15,000.00 1 $5,000.00 1 $5,000.00 19 $5,000.00 $95,000 9 4' Extra Depth Manhole 3339.1003 VF - $0.00 - $0.00 - $0.00 16 $4,000.00 - $0.00 5 $1,250.00 2 $500.00 2 $500.00 25 $250.00 $6,250 10 M.M.I. Vacuum Testing 33010101 EA 1 $300.00 3 $900.00 1 $300.00 8 $2,400.00 1 $300.00 3 $900.00 1 $300.00 1 $300.00 19 $300.00 $5,700 11 Epoxy Manhole Liner 33390001 VF - $0.00 - $0.00 - $0.00 28 $560.00 - $0.00 17 $340.00 8 $160.00 8 $160.00 61 $20.00 $1,220 12 Concrete Collar 3305.0112 EA 1 $1,000.00 3 $3,000.00 1 $1,000.00 8 $8,000.00 1 $1,000.00 3 $3,000.00 1 $1,000.00 1 $1,000.00 19 $1,000.00 $19,000 13 Remove Concrete Curb B Gutter(Sanitary Seger) 0241.1300 LF 0 $000 15 $150.00 6 60.00 21 $210.00 3 $30.00 27 $270.00 0 $0.00 0 $0.00 72 $10.00 $720 14 Temporary Asphalt Paving Repair (2" HMAC on 6" Fle base) 3201.0400 LF 30 $600.00 457 $9,140.00 162 $3,240.00 505 $10,100.00 - $0.00 20 $400.00 28 $560.00 25 $500.00 1,227 $20.00 $24,540 15 1 linch Pavement Puly H-bn 241.1700 SY 0 $0.00 594 $5,942.22 411 $4,106.67 622 $6,222.22 - $0.00 - $0.00 0 $0.00 - $0.00 1,627 $10.00 $16,271 16 Cement-Lime(32US1) 3211.0601 TN 0 $0.00 10 $2,852.27 7 $1,971.20 10 $2,986.67 0 $0.00 0 $0.00 0 $0.00 0 $0.00 26 $300.00 $7,810 17 3-inch Asph ft P-menl Type"D" 3212.0303 SY 0 $0.00 594 S44,566.67 411 $30,800.00 622 $46,666.67 - $0.00 - $0.00 0 $0.00 - $0.00 1,627 $7500 $122,033 18 6-1hch Concrete Curb and 18-inch Gu.r(M-h E)isting) 3216.0102 LF 0 $0.00 15 $750.00 6 300.00 21 $1,050.00 3 $150.00 27 $1,350.00 0 $0.00 0 $0.00 72 MOM $3,600 19 Topsoil(Sanitary Seger) 3292.0100 CY 0 $0.00 0.3 $12.35 0.1 $4.94 0.4 $17.28 0.1 2 0.6 $22.22 0 $0.00 0 $0.00 1 $40.00 $59 20 Block Sod Replacement (Sanitary Seger) 3292.0200 SY 0 $0.00 3 $41.67 1 $16.67 4 $58.33 1 $8.33 5 $75.00 0 $0.00 0 $0.00 13 $15.00 $200 21 Trench Sefety(S,,Ra Sewer) 3305.0109 LF - $0.00 382 $955.00 132 $330.00 1202 $3,005.00 90 $225.00 715 $1,787.50 - $0.00 278 $695.00 2,799 $250 $6,998 22 Trefc Contre1(Sanitan• Serer) 3471.0001 MO 000 $0.00 038 $2,865.00 013 $990.00 120 $9,015.00 009 $675.00 072 $5,362.50 000 $0.00 028 $2,085.00 3 $7,500.00 $20,993 23 SWPPP 11 cre(San1tary Seger) 31250101 LS 002 $137.93 004 $270.21 001 $93.37 0.11 $850.23 0.01 $63.66 0.07 $505.75 0.03 $248.99 0.03 $196.64 0.32 $7,500.00 $2,367 24 Construction Surreying(Sanitary Sewer) 99990004 LS 002 $91.96 0.04 $180.14 0.01 $62.25 0.11 $566.82 0.01 S42.44 0.07 $337.17 0.03 $165.99 0.03 $131.09 032 $5,000.00 $1,578 25 Construction Staking(Sanitary Seger) 99990005 LS 002 $91.96 004 $180.14 001 $62.25 011 $566.82 001 S42.44 007 $337.17 003 $165.99 0.03 $131.09 0.32 $5,000.00 $1,578 26 Sanitary Sewer Construction Allowance 9999.0006 LS 002 $919.55 004 $1,801.38 001 $622.47 011 $5,668.21 0.01 S424.41 0.07 $3,371.69 0.03 $1,659.91 0.03 $1,310.95 0.32 $50,000.00 $15,779 $uototal Cost $36,601 $124,583 $61,936 $241,679 $16,om $102,929 $57,817 $31,914 Subtotal Sewer $673,543 10%Contingency $3,660 $12,458 $6,194 $24,168 $1,608 $10,293 $5,782 $3,191 10%Contingency $67,354 TOTAL Cost $40,262 $137,041 $68,129 $265,847 $17,692 $113,222 $63,599 $35,105 TOTAL Sewer $740,897 B47 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Engineering Design Services for: WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M City Project No. 105108 None. City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page I of I FORT WORTH ATTACHMENT "D" PROJECT SCHEDULE A. ENGINEER Project Schedule Development ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the requirements of the Agreement and encompassing the Scope of Work defined in Attachment A to the Agreement. ENGINEER shall prepare and maintain project schedule throughout the life of the project as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned sequencing of the work activity and timing of the work. B. Schedule "Tier" Selection City has identified three "Tier" levels for project schedules as defined in City's Specification 00 31 15, to align with the size and complexity of the project as a basis for schedule development. City's Project Manager will determine the "Tier" level for the ENGINEER's project schedule as part of the negotiation of the Agreement. C. Project Baseline Schedule ENGINEER will produce an initial project schedule and submit as a "baseline" for review and acceptance by City's Project Manager as defined in City's Specification 00 31 15 which will be referred to as the Project Baseline Schedule. Updates to the baseline schedule follow the requirements of City's Specification 00 31 15. D. Project Progress Schedule ENGINEER will provide to the City, monthly updates to their project schedule indicating progress of the Work in compliance with the requirements of City's Specification 00 31 15 and said schedule will be referred to as the Project Progress Schedule. E. Master Project Schedule City will develop and maintain a master project schedule for the overall project. ENGINEER's project baseline and progress schedule submittals will be an integral part of the development and updating process of City's Master Project Schedule. City of Fort Worth, Texas Attachment D Revision Date: 07.20.2018 Page 1 of 1 Attachment D: Baseline Schedule Water and Sanitary Sewer Replacements Contract 2023, WSM-M City Project No. 105108 ID 8(Task Mode (Task Name (Predecessors Dunition (Start Fnish %Complete 1 7r Design 319 days Tue 12/12/23 Mon 3/17/25 0% 2 fflr-i," ti Design 45F 269 days Tue 12/12/23 Fri 1/3/25 0% 3 W, Design Engineer Agreement 15 days Tue 12/12/23 Wed 1/3/24 D% 4 .i K Issue Notice To Proceed - Engineer 6 0days Wed 1/3/24 Wed 1/3/24 0% 5 IT] wa Award Design Agreement 0 days Tue 12/12/23 Tue 12/12/23 0% 6 7 Execute Contract Documents 5 15 days Tue 12/12/23 Wed 1/3/24 0% 7 Conceptual Design(30%) 85 days Thu 1/4/24 Thu 5/2/24 0% 8 F n Site Survey 4 50 days Thu 1/4/24 Thu 3/14/24 0% 9 Prepare Conceptual Design Drawings & Documents 8FS-15 days 35 days Fri 2/23/24 Thu 4/11/24 0% `�,_-._.. 10 r Review Conceptual Plansand Report(CFW) 9 15 days Fri 4/12/24 Thu 5/2/24 0% 11 > Conceptual Design Complete 30 0 days Thu 5/2/24 Thu 5/2/24 0% 12 . Preliminary Design(.%) 67 days Fri 5/3/24 Wed 8/7/24 0% 13 w. Prepare Preliminary Design Drawings and Specifications 1155 40 days Fri 5/3/24 Fri 6/28/24 0% 'r, Half22n2d HaIfL2025 Haag, 2025 Half 1, 2026 Haag. 2026 J-__D 1 F M A M J 1 A 5 O I N I D I J I F I M A M J I 1 A 5 O N D I J I F I M A M f3 12 12 14 M. Conduct Constructability Review (Walk Through) 13 1day Mon 7/1/24 Mon 7/1/24 0% 15 ! Submit Preliminary Plans to Utilities, ROW, Traffic, Parks, 14 0 days Mon 7/1/24 Mon 7/1/24 0% Storm Water, Water &Sewer i��� 16 'wa 9 Review Preliminary Plans and Specifications(CFW) 15 IS days Tue 7/2/24 Tue 7/23/24 0% 17 Ewa Incorporate Comments and Submit Revised Preliminary 16,10 10 days Wed 7/24/24 Tue 8/6/24 0% Design Drawings 18 1 jiw. Conduct Design Public Meeting %1 (regd) 17 1 day Wed 8/7/24 Wed 8/7/24 0% 18/7 19 ;,.( aIw. Preliminary Design Complete 18 0hrs Wed 8/7/24 Wed 8/7/24 0% 8 20 w. Final Design 234 days Fri 4/12/24 Mon 3/17/25 0% 21 Prepare Final Design Plans and Specifications 19 40 days Thu 8/8/24 Thu 10/3/24 0% 22 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm 21 0 hrs Thu 10/3/24 Thu 30/3/24 0% + Water, Water & Sewer z3 7 4 Review Final Plans and Specifications (CFW) 22 15 days Fri 10/4/24 Thu 10/24/24 0% 24 lbw, Conduct Design Public Meeting p2 (if regd) 23 1 day Fri 10/25/24 Fri 10/25/24 0% 13 25 C�3w Incorporate Final Comments and Submit Final Design 24 15 days Mon 10/28/24 Frill/15/24 0% 26 1�1-> Approve Final Plans and Specifications and Route for 25 10 days Mon 11/18/24 Tue 12/3/24 0% Signatures 27 Final Design Complete 26 1 day Wed 12/4/24 Wed 12/4/24 0% 1 28 w-, Establish MBE Goal for Construction Contract 26FS+1 day 5 days Thu 12/5/24 Wed 22/12/24 0% 29 1�1ra Prepare Bid Package 28 10 days Thu 12/12/24 Thu 12/26/24 0% 30 L�j r-a Permits 104 days Fri 5/3/24 Mon 9/30/24 0% 31 a Identify Required Permits 11 20 days Fri 5/3/24 Fri 5/31/24 0% 32 , TX DOT Permit (Engineer Prepare and Submit) 31 20 days Mon 6/3/24 Fri 6/28/24 0% 33 L� w. Review and Approve Permits 32 64 days Mon 7/1/24 Mon 9/30/24 0% �j 34 ., All Permits Approved 33 0 days Mon 9/30/24 Mon 9/30/24 0% ♦19/30 35 L6 W. ROW/Land Acquisition 234 days Fri 4/12/24 Mon 3/17/25 0% , 36 > Identify ROW Requirements 9 10 days Fri 4/12/24 Thu 4/25/24 0% 37 L,6 w, Submit land Acquisition/Easement Requirements to Propert36,15 5 days Tue 7/2/24 Tue 7/9/24 0% 39 M. Right of Way Start 37 I day Wed 7/10/24 Wed 7/10/24 0% 39 Order Appraisal 38 31 days Thu 7/11/24 Thu 8/22/24 0% S Order Title Commitment 38 31 days Thu 7/11/24 Thu 8/22/24 0% 41 lLf� w. Order Environmental Report (if needed) 38 31 days Thu 7/11/24 Thu 8/22/24 0% f 42 , Send Introduction Letter with Land Owner Bill of Rights 38 1 day Thu 7/11/24 Thu 7/11/24 0% I— — 43 W. Appraisal Received date 39,40,41 1 day Fri 8/23/24 Fri 8/23/24 0% Il M Review Appraisals and Prepare Initial Offer 42,43 10 days Mon 8/26/24 Mon 9/9/24 0% 45 Present Initial Offer to Property Owner 44 1 day Tue 9/10/24 Tue 9/10/24 0% -,o y] �a Negotiation/Acceptance Period 45 40 days Wed 9/11/24 Tue 11/5/24 0% 47 L� Present Final Offer to Property Owner 46 1 day Wed 11/6/24 Wed 11/6/24 0% 48 L Conduct Final Negotiations (Acceptance/Rejection Period) (1147 22 days Thu 11/7/24 Tue 12/10/24 0% 49­11 w. Prepare M&C for Purchase (if>IOOK)/Condemnation 48 5 days Wed 12/11/24 Tue 12/17/24 0% 50 it Review M&C for Purchase/Condemnation by PM 48,49 5 days Wed 12/18/24 Tue 12/24/24 0% City ProfMNo. 105108 Task Milertone ♦ Pisa Summary n Imttive MAenane Manual Task Manuel Summary �� Finish -only ] Fxtemal Mges[one♦ Progress Date: Wed 11/15/23 Split .......................... Summary �1 Inactive Task Inactive Summary B 1 Duration -only !� Duration—ly C EMenal Tasks � Deadline i Manuai Progress Page 1 IID a (Task Mode (Task Name Pretlecessors 51 'GJLI ConductM&C Process- Building/Land Purchase/Easement 50 52 GyJ a Submit Documents to title Co. for Closeout 48,54 53 W, Conduct M&C Process for Condemnation 50 54 a M&C Approval for Land Purchase/Condemnation 51,53 55 lyij ., Submit Condemnation packet to Legal Dept. 49 56 l , File Condemnation Petition in Court 54,55 57 ]�I a Court Hearing and Award by Commissioners for Acquisition 56 58 W. Conduct Deposit Check into Registry of Court for Possession 57 59 , Right of Way Complete 52,58 60 a Utility Relocation 19 6t(� Utilities 15 62 ., Utility Relocation Co-ordination 63j . Submit Cover Letter and 60% Drwgs to Utility Co-ordonator 15 L� (CFW/Engineer) 64 .,kw, Submit CFW 60% Design Drwgs to Franchise Utilities(CFW 63SS Utility Co-ordinator) 65 -1 Utility Clearance 15 66 7� Utilities Start 64 67 7Lra Review 60% CFW Design Drwgs and Respond to CFW (Utility 15 68 7w. Prepare and Submit Relocation Design to CFW/Engineer 67 (Utility) 69 I'1J Review and Approve Utility Relocation Design (CFW/Engineer) 70 �?I- Review 90% CFW Design Drwgs and Respond to CFW (Utility 22 71 1�1-> Revise Utility Design and get Approval (if Reqd) 70,69 72 C�3rr Request Utility Relocation Permit from CFW (Utility) 71 73 15i4 Issue Permit to Utility (CFW) 72 Perform Relocation Construction (Utility) 73 75 'gn Utility Clearance (after ROW if any) 74,59 76 Q1-, Utilities Cleared/Complete 74,75 77 w. Atmos Clearance 76 78 . AT&T Clearance 76 79 a Frontier Clearance 76 an ., ONCOR Clearance 76 81 w, One Source Clearance 76 82 w, Spectrum Clearance 76 83 M. Tri-County Electric Clearance 76 84 ., Construction es Ley Construction 90,59,76 86 ., Bid and Award 87 Bid and Award 29 88 W. Start Advertisement 29 89 W Award Construction Contract 87 90 8 w. Construction, Material testing and Landscaping Execution 89 91 > Closeout 92 Closeout 85 93 a AS Built Plans 94 �S Receive As -Built Survey from Contractor 85 95 Engineer Prepare As -Built Plans 94 96 .a Close Design Agreement 97 rr Receive Final Invoice for Design Contract 95 98 [�Jrra Final Design Contract Invoice Paid 97 99 I-_:C{3w. Design Contract Closed 98 Duration 40 days 5 days 40 days 0 days 1 day I day 5 days 10 days 0 days 180 days 180 days 252 days 0 hrs 152 days 0 hrs 10 days 60 days a'. 0 hrs 10 days 0 days 5 days 90 days 0 days 0 days 0 days 0 days 0 days 0 days 0 days 0 days 0 days 279 days 210 days 69 days 60 days 0 hrs 1 day 10 days 45 days 20 days 30 days 20 days 10 days 15 days 5 days 10 days 0 hrs Attachment D: Baseline Schedule Water and Sanitary Sewer Replacements Contract 2023, WSM-M City Project No. 105108 (Finish %Complete 2024 Har22n24 Half 1,-1 Ha11. 11 Half 1, 2026 HaH2, 2026 N D I F M A M l l l A 1 5 0 I N I D 1 J I F ). M a M J l I A 5 o I N I D I l I F M A M Thu 12/26/24 Fri 2/21/25 0% Mon 2/24/25 Fri 2/28/25 0% Thu 22/26/24 Fri 2/21/25 0% Fri 2/21/25 Fri 2/21/25 0% Wed 12/18/24 Wed 12/18/24 0% Mon 2/24/25 Mon 2/24/25 0% Tue 2/25/25 Mon 3/3/25 0% Tue 3/4/25 Mon 3/17/25 0% Mon 3/17/25 Mon 3/17/25 0% Wed 8/7/24 Thu 4/24/25 0% Thu 8/8/24 Thu 4/24/25 0% Wed 8/7/24 Mon 3/17/25 0% Wed 8/7/24 Wed 8/7/24 0% Thu 8/8/24 Wed 8/14/24 0% Thu 8/8/24 Wed 8/14/24 Thu 8/8/24 Thu 8/22/24 Thu 8/8/24 Thu 10/3/24 Fri 10/4/24 Thu 10/17/24 Fri 10/18/24 Fri 10/25/24 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Thu 22/26/24 Mon 4/7/25 Thu 12/26/24 Fri 12/27/24 Thu 12/26/24 Tue 3/25/25 Wed 3/26/25 Thu 2/5/26 Thu 2/5/26 Thu 2/5/26 Thu 2/5/26 Thu 3/5/26 Thu 3119/26 Thu 3/19/26 Thu 3/26/26 Wed 4/8/26 Mon 3/17/25 Wed 8/14/24 Wed 8/21/24 Thu 11/14/24 Wed 9/21/24 Thu 30/3/24 Thu 10/17/24 Thu 10/17/24 Thu 10/24/24 Thu 3/6/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Mon 3/17/25 Wed 2/4/26 Wed 2/4/26 Fri 4/4/25 Mon 3/24/25 Thu 12/26/24 Tue 3/25/25 Fri 4/4/25 Wed 4/8/26 Wed 3/4/26 Wed 3/19/26 Wed 3/4/26 Wed 3/18/26 Wed 4/8/26 Wed 3/25/26 Wed 4/8/26 Wed 4/8/26 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 8/7 City Project No. 105108 Task Mile ne ♦ P iellummary — Inactive Mllmone Manual Task Manual Summary — Flnnh-only 3 -,-,1 Mllertone 0 Progress Date: Wed 11/15/23 SPIrt Summary t----------- I Inactive Task Inactive Summary 9 9 Duraaon-oniy Start -only C Erternal Tasks ' Deadline ♦ Manual Vrogress Page 2 s w r VYPFRf�� ATTACHMENT E co " 0. Of., :` z `'y� `CLIFFVIEW DR m. J - BRIARWOOD lei a !g -_ t!0 00 0 0 C!i�sR•ir�1yt 411 � a y tom} # PROP. WL ATTACHMENT E-2 PROP. SS PROJECT LOCATION MAP WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M CITY PROJECT No. 105108 COUNCIL DISTRICT No. 11 MAPSCO Nos. 65X, 79A, 79B & 79C RL G CONSULTING ENGINEERS FORT WORTH, BLVD. SUITE 105 FRLG FOR TB25 WORTH�TEXASCKERY76104 8171687 — 0080080 www.rlginc.com FIRM REG: F-49J ATTACHMENT "F" CERTIFICATE OF INSURANCE Engineering Design Services for: WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-M City Project No. 105108 City of Fort Worth, Texas Attachment F Page I of I City of Fort Worth, Texas Mayor and Council Communication DATE: 01/23/24 M&C FILE NUMBER: M&C 24-0076 LOG NAME: 60WSSC23WSMM-RLG SUBJECT (CD 11) Authorize Execution of an Engineering Agreement with Raymond L. Goodson, Jr., Inc. d/b/a RLG Consulting Engineers, in the Amount of $527,990.00, for the Water and Sanitary Sewer Replacement Contract 2023 WSM-M Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Raymond L. Goodson, Jr., Inc. d/b/a RLG Consulting Engineers, in the amount of $527,990.00, for Water and Sanitary Sewer Replacement Contract 2023 WSM-M project; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $799,926.00, transferred from available funds within the Water and Sewer Fund, for the Water and Sanitary Sewer Replacements Contract 2023 WSM-M (City Project No. 105108) to effect a portion of Water's contribution to Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize execution of an engineering agreement with Raymond L. Goodson, Jr., Inc. d/b/a RLG Consulting Engineers, in the amount of $527,990.00, for Water and Sanitary Sewer Replacement Contract 2023, WSM-M project for the preparation of plans and specifications for sanitary sewer and water main replacements on the following streets, alleys and easements: Street From Barnett Street Monclair Drive Holt Street Barnett Street Junius Street Normandy Road Queen Street Barnett Street IQueen Court Queen Street (Watson Street Barnett Street )Watson Court Watson Street IlWatson Road W Watson Street IIN. Tierney Court Tierney Road lCliffview Drive Tierney Road t e Valley Wilson Road urt Easement Between Jenson Pyron Avenue Road/ Wilson Road ��Easement south Jenson Road of Pyron Avenue Wilson Road Briarwood Lane 113lueridge Court Colony Hills Road (Colony Hill Road Blue Ridge Court Scope of To Work Watson Water/Sewer Street Kemble Water Street Barnett Water Street North 400 feet then Water/Sewer northwest 280 feet i Cul-de-sac Water/Sewer) Cul-de-sac Water/Sewer' Cul-de-sac Water/Sewer Cul-de-sac Water/Sewer Cul-de-sac (Water Jenson Road (Water/Sewer Cul-de-sac Water/Sewer 400 feet South then Sewer Southwest 400 feet Wilson Road Sewer South 1,100 feet Cul-de-sac Cul-de-sac Water/Sewer Water/Sewer (Water/Sewer South 11500 Wilson Road Briarwood Lane Water/Sewer) feet (Parham Court Wilson Road Cul-de-sac Water/Sewer Timberwilde Wilson Road Cul-de-sac Water/Sewer Circle Easement north of Timberwilde Wilson Road 120 feet east Sewer Circle Parham Court Wilson Road Cul-de-sac Water/Sewer Easement West East 160 feet Meadowbrook Timberwilde Circle then north Sewer Golf Course 720 feet Easement West 400 feet east and 120 of Blueridge feet south of Blueridge Northeast Sewer Drive Court/ Colony Hill Road 120 feet Intersection In addition to the contract amount, $271,936.00 (Water: $127,940.00; Sewer: $143,996.00) is required for project management, real property acquisition, utility coordination, and material testing. This project will have no impact on the Water Department's operating budget when completed. The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60WSSC23WSMM-RLG Capital Project Revised FY2023 CIP Budget Change Fund Name Appropriations Authority (Increase/Decrease) FY2024 Name Budget W&S 105108 Capital W/SS Projects Contract $0.00 This M&C $799,926.00 $799,926.00 - Fund 56002 2023 WSM-M Funding is budgeted in the Transfer to Water/Sewer account in the Water and Sewer Fund for the purpose of funding the W/SS Repl Contract, 2023 WSM-M within the Water & Sewer Capital Projects Fund. Appropriations for Water and Sanitary Sewer Replacement, Contract 2023, WSM-M are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital Projects - Fund $0.00 $799,926.00 $799,926.00 56002 (Project Total $0.00 $799,926.00 $799,926.00 *Numbers rounded for presentation purposes. Business Equity: Raymond L. Goodson, Jr., Inc. d/b/a RLG Consulting Engineers, is in compliance with the City's Business Equity Ordinance by committing to 13 percent MWBE participation on this project. The City's MWBE goal on this project is 12 percent. The project is located in COUNCIL DISTRICT 11. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water and Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the W/SS Repl Contract 2023 WSM-M project to support the approval of the above recommendations and execution of the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: Chris Harder 5020 Additional Information Contact: Dena Johnson 7866 60WSSC23WSMM-RLG FED Table 2 56002 0600430 105108 2024 $401,224.00 2 56002 0700430 4956001 105108 2024 $398,702.00 2 56002 0700430 105108 2024 $398,702.00 2 56002 0600430 4956001 105108 001730 9999 ($401,224.00) 2 56001 0709020 5956001 $398,702.00 2 56002 0700430 4956001 105108 001730 9999 ($398,702.00) 2 56002 0600430 5110101 105108 001730 9999 $38,220.00 Water Staff Cost 2 56002 0600430 5550102 105108 001730 9999 $4,000.00 Public Outreach 1 56002 0600430 5330500 105108 001730 9999 $273,284.00 Contract 2 56002 0600430 5310350 105108 001770 9999 $2,000.00 Utility Coordination 2 56002 0600430 5330500 105108 001784 9999 $63,700.00 Soil Lab Consultant 2 56002 0600430 5310350 105108 001784 9999 $20,020.00 Soil Lab TPW Staff 2 56002 0700430 4956001 105108 001730 9999 ($398,702.00) 2 56002 0700430 5110101 105108 001730 9999 $41,496.00 Water Staff Cost 1 56002 0700430 5330500 105108 001730 9999 $254,706.00 Contract 2 56002 0700430 5710010 105108 001740 9999 $70,000.00 Easement Acquisition 2 56002 0700430 5110101 105108 001740 9999 $20,000.00 Easement Acquisition 2 56002 0700430 5330500 105108 001740 9999 $5,000.00 Easement Acquisition 2 56002 0700430 5740010 105108 001780 9999 $5,000.00 Easement Acquisition 2 56002 0700430 9999 $2,500.00 Utility Coordination 56002 2060000 I 105108 RETAIN I I I Retainage Combo Code