Loading...
HomeMy WebLinkAboutContract 39252-A7CITY SIXIMARY CONTRACT NO. AMENDMENT No.7 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, Inc, (ENGINEER) made and entered into City Secretary Contract No. 39252, (the CONTRACT) which was authorized by M&C C-23735 on the 18th day of August, 2010 in the amount of $ 1,323,029.89; and WHEREAS, the CONTRACT was subsequently revised by: Amendment 1 in the amount of $471,179.70 which was authorized by M&C C-24187 on April 20, 2010, Amendment 2 in the amount of $49,708.63 which was authorized administratively, Amendment 3 in the amount of $546,621.29 which was authorized by M&C C-24855, Amendment 4 in the amount of $369,544.82 which was authorized by M&C C-24909, Amendment 5 in the amount of $544,787.59 which was authorized by M&C C-25025 and Amendment 6 in the amount of $440,677.00 which was authorized by M&C C-25354; and WHEREAS, the CONTRACT involves engineering services for the following project: ALLIANCE RUNWAY EXTENSION PHASE 8, Project No. 00960; and WHEREAS, it has become necessary to execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CON T RACT: Article 1 Article I of the CONTRACT is amended to include the additional engineering (services specified in a proposal dated November 8, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be perfo ed by Engineer totals $44, 948.45. Article II Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $3, 790,497.37. City of Fort Worth, Texas OFFICIAL R 0K Amendment to Engineering Agreement PMO Official Release Date: 11/29/2011 CITY SECR AR Page 1 of 2 FT. WORT", TX i Article III All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. Executed and effective this the VD day of JM , 20VL. A ST: #.-City Secretary 0 Douglas W. Black Assistant City Attorney TY OF FORT WORTH Fernando Costa Assistant City Manager APPROVAL RECOMMENDED M /Z--< //'Z- 'kent Pennery Director, Aviation INO M&C REQUIRED Jacobs Engineering Group, Inc Brad Davis Operations Manager — Southern Region City of Fort Worth, Texas Amendment to Engineering Agreement PMO OfFicial Release Date: 11/29/2011 Page 2 of 2 OFFICIAL RECORD CITY SECRE ARY FT. WORTH, TX INA14CC s November 8, 2011 Mr. Tim Ward Alliance Air Services 2221 Alliance Blvd, Suite 100 Fort Worth, TX 76177 Re: Alliance Airport Runway Extension Project Phase VIII — Contract Amendment No. 6 Eminent Domain Dear Mr. Ward: I am requesting an amendment to the Alliance Airport Runway Extension Project - Phase VIII contract for supporting the City of Fort Worth with eminent domain proceedings associated with land acquisition for John Day Road, Keller Haslet Road and the BNSF Main Line and Connector Track. The fee proposal is. an estimate of the work to be performed as the actual number of eminent domain proceedings is unknown. We will only invoice the city of Fort Worth for actual labor and expenses incurred. The attached schedule reflects the City of Fort Worth's desire to expand the time frame for land acquisition to March 15, 2012. A summary of the work items is shown below. The detailed scopes of work, fee proposals and schedule are attached for your information. Transystems — Eminent Domain $440,677.00 MOD 6 Jacobs — Eminent Domain Support ( $44.948.45 MOD 7 Total cost increase for Contract Amendment No. 6 $485,625.45 DBE Participation for Contract Amendment No. 6 $0.00 0.00% Original Contract Amount $1,323,029.89 Previous Amendments $1,981,842.03 Contract Amendment No. 6 $485.625.45 New Contract Amount $3,790,497.37 DBE Participation Amount for New Contract Amount $1,056,333.67 DBE Participation % for New Contract Amount 27.87% Thank you for your attention to this request. Should you have any questions or comments regarding this matter please feel free to contact me at 817-735-7004 or by email at Jeff.Toner(@Jacobs.com . Sincerely, Jeffrey J. Toner, P. E. Program Manager cc: Patrick Buckley — City of Fort Worth Ruseena Johnson — City of Fort Worth Aya Ealy — City of Fort Worth JACOBS' Alliance Airport Runway Extension Project - Phase Vill Contract Amendment No. 6 lEminent Domain I I Task List and Summary of Fees I I Task I I I Eminent Domain Proceedings �minent Domain Support I I I I Total Fee I I DBE Participation I � I I I I I Consultant Transystems Jacobs 8-Nov-11 Task Amount I DBE Amount I 440,677.00 44,948.45 I 485,625.45' I 0.00% IIAT�cc'�M November 8, 2011 Alliance Airport Runway Extension Project Phase VIII - Contract Amendment No. 6 Eminent Domain Services Scope of Work Jacobs has attended the condemnation hearing for the Lennar property, in which the City of Fort Worth (City) is appealing. In addition to attending the hearing Jacobs will need to attend a second hearing for the appeal. Jacobs also attended a condemnation hearing for the Weir Brother's property, where at that time it was discovered that the property had been split into two parcels, resulting in the City having to file another condemnation hearing for the second parcel. Jacobs will have to attend the second hearing as well. The Lennar and Weir Brother's hearings are for obtaining Right -of -Way for John Day Road and Keller Haslet Roads. Jacobs will also be supporting the City by preparing exhibits for the condemnation hearings for land acquisition for the BNSF Main Line and Connector Track. We have estimated 45 exhibits in support of this activity. Jacobs Fee Proposal Alliance Airport Runway Extension Project - Phase Vill Contract Amendment No. 6 Eminent Domain Proceedings Labor Hour Estimate Program Senior Manager Engineer Attend Eminent Domain Hearings 46 Meetings 50 Prepare Exhibits for ED 30 Parcels QC Review Exhibits 45 Total Hours 0 141 Fee Proposal Hourly Hours Program Manager Sr. Engineer Project Engineer E.I.T. Rate $ 112.00 $ 67.17 $ 40.00 $ 32.25 Salary Cost Overhead Rate @ 126.85% Sub - Total Profit @ 15% JEG Labor Cost Expenses Mileage Courier/Express Mail Printing & Plotting Total Expenses Total Program Management Cost 8-Nov-11 Project E.I.T. Engineer 50 175 50 175 Labor Cost 0 $ - 141 $ 9,470.97 50 $ 2,000.00 175 $ 5,643.75 $ 17,114.72 $ 21,710.02 $ 38,824.74 $ 5,823.71 $ 44,648.45 $ 100.00 $ 200.00 $ 300.00 I $ 44,948.45 Total Jacobs Portion MOD 7