Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 60920
MIX y LIJ Ll. FORT WORT A SRY CONTRACT FOR THE CONSTRUCTION OF SANITARY SEWER REHABILITATION, CONTRACT 113, PART 2 Mattie Parker Mayor City Project Nos.102785 Chris Harder, P.E. Director, Water Department Prepared for The City of Fort Worth Water Department 2023 Prepared by: Texas Registered Engineering Firm F-493 825 W. Vickery Blvd., Suite 105 Fort Worth, Texas 76104 RLG Project No. 2123.004 David Cooke City Manager t +t r+1 .� BRENT E. LEWIS .............................. r + 92662 �Q,; CE j ONAL ENG' I.Ct RECORD CITY SECRETARY FT. WORTH, TX CS-0 RECD FORTWORTH CONTRACT FOR THE CONSTRUCTION OF SANITARY SEWER REHABILITATION, CONTRACT 113, PART 2 Mattie Parker Mayor City Project Nos. 102785 Chris Harder, P.E. Director, Water Department Prepared for The City of Fort Worth Water Department 2023 Prepared by: Texas Registered Engineering Firm F-493 Amok 825 W. Vickery Blvd., Suite 105 Fort Worth, Texas 76104 RLG Project No. 2 12 3.004 David Cooke City Manager r t .. ERENT E. LPAIS L t1 FORTWORTH. 4* City of Fort Worth Standard Construction Specification Atoww Documents Adopted September 2011 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Pagel of5 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 00 11 13 Invitation to Bidders 07/19/2021 0021 13 Instructions to Bidders 11/02/2021 0035 13 Conflict of Interest Statement 02/24/2020 0041 00 Bid Form 09/30/2021 00 42 43 Proposal Form Unit Price 01/20/2012 0043 13 Bid Bond 09/11/2017 0043 37 Vendor Compliance to State Law Nonresident Bidder 06/27/2011 0045 11 Bidders Prequalifications 08/13/2021 0045 12 Prequalification Statement 09/30/2021 0045 13 Prequalification Application 08/13/2021 004526 Contractor Compliance with Workers' Compensation Law 07/01/2011 004540 Business Equity Goal 10/27/2021 00 52 43 Agreement 11/23/2021 0061 13 Performance Bond 07/01/2011 0061 14 Payment Bond 07/01/2011 0061 19 Maintenance Bond 07/01/2011 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 08/23/2021 0073 00 Supplementary Conditions 03/09/2020 Division 01- General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012 01 2500 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 013120 ProjectMeetings 07/01/2011 01 3216 Construction Schedule 08/13/2021 01 3233 Preconstruction Video 07/01/2011 01 33 00 Submittals 12/20/201.2 01 35 13 Special Project Procedures 03/11/2022 01 4523 Testing and Inspection Services 03/09/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 03/22/2021 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 58 13 Temporary Project Signage 07/01/2011 01 6000 Product Requirements 03/09/2020 01 6600 Product Storage and Handling Requirements 07/01/2011 01 70 00 Mobilization and Remobilization 11/22/2016 01 7123 Construction Staking and Survey 02/14/2018 01 74 23 Cleaning 07/01/2011 0177 19 Closeout Requirements 03/22/2021 01 78 23 Operation and Maintenance Data 12/20/2012 01 7839 Project Record Documents 07/01/2011 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 9, 2022 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents None Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: http://fortworthtexas.Eov/tnw/contractors/ or httijs://avus.fortworthtexas.gov/ProlectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 03/11/2022 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 3000 Cast -In -Place Concrete 03/11/2022 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 Division 26 - Electrical 260500 Gonffnon Work Restilts for Eieetiieal 0341/2GN 26 05-1-0 DemaKtium f,,r E1wtri a Systems 4WQL204-2 26 n� Raee., ays -a Boxes fer 1~'leet iea System 1 2/7zzrz 0/2012 26 05 43 UndffffeundT' tu-and 1 seways Dr > lleet..isal Syste 07/01/2011 26 05 50 i-Befit C$ndui 02/-26/204-6 Division 31 - Earthwork 31 0000 Site Clearing 03/22/2021 31 23 16 Unclassified Excavation 01/28/2013 31 2323 Beffem 0V28M4-3 31 24 00 Embaftlanents 0198"-3 31 2500 Erosion and Sediment Control 04/29/2021 313600 Gabiens 12/20/204-2 313700 leap 42/20 04-2 Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 12/20/2012 3201 18 Temporary Asphalt Paving Repair 12/20/2012 3201 29 Concrete Paving Repair 12/20/2012 32 1123 Flexible Base Courses 12/20/2012 32 11 29 Lime Treated Base Courses 12/20/2012 32 11 33 Cement Treated Base Courses 06/10/2022 32 11 37 Liquid Treated Soil Stabilizer 08/21/2015 32 12 16 Asphalt Paving 12/20/2012 32 1273 Asphalt Paving Crack Sealants 12/20/2012 32 13 13 Concrete Paving 06/10/2022 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 9, 2022 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of5 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 12/09/2022 32 13 73 Concrete Paving Joint Sealants 12/20/2012 32 14-16 E1�lc Unit Pavifxg i 2/20 32 16 13 Concrete Curb and Gutters and Valley Gutters 12/09/2022 324-7- Pavement M 3Aditgs 05/1W02-2 32 1725 Curb Address Painting 11/04/2013 32-34- -3 Chain e=ees and Cites 12/2090n 3-234-M `„'-ire Fe;'=eesand Gates I 12/20/20� 32 31 29 Wood Fences and Gates I 12/20/2012 32 32-13 in Place G r,.rete Reta nhig Walls is I 064-5401$ 3291 19 Topsoil Placement and Finishing of Roadway Right-of-ways 03/11/2022 3292 13 Sodding 05/13/2021 32-)244 TATe Native Seeding I 05A13/2024 329343 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 0130 Sewer and Manhole Testing 09/07/2018 33 01 31 Closed Circuit Television (CCTV) Inspection - Sanitary Sewer 03/11/2022 3301 32 Closed Circuit Television (CCTV) Inspection - Storm Drain 03/11/2022 33 03 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 33 041 T. m, B widing and glestriea-1, 7 i' 4-=04042 3-3044 Cerfesierl-C-en�&I-Test Stations 12/20/2012 33 04-12 Maruzi m kne&-Gadhodiz Ai'ateefi . Sy4e.,., 12/20/2042 33 0430 Temporary Water Services 07/01/2011 33 0440 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 0450 Cleaning of Pipes 03/11/2022 33 05 10 Utility Trench Excavation, Embedment, and Backfill 04/02/2021 3305 12 Water Line Lowering 12/2012012 33 05 13 Frame, Cover and Grade Rings 09/09/2022 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 03/11/2022 Grade 33 05 1 Conerete Water- Vaults 12/2812042 33 05 17 Concrete Collars I 03/11/2022 33 05 20 Aiuge Ber-ire I 12g0/2042 33-/0�52��1 Tr�unnel Liner Plate � 42�n'.�0n44 -05 22 '] 1� Steel C%mL1t Dll- I Tunneling I 4-=0404-2 1 '7 Mr /20/zvri 330524. IYaftd _.. htstallatie"f Cartes Pipe :~ C2ji:~,,- v T -12109 022 33 0526 Utility Markers/Locators 12/20/2012 33 0530 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 1110 Ductile Iron Pipe 12/09/2022 33 11 11 Ductile Iron Fittings 09/20/2017 33 1112 Polyvinyl Chloride (PVC) Pressure Pipe I 09/09/2022 33-11 13 Gon6rete PressurePipeBar- ".1rap d, ft�� ry'.i erType 1212OA2042 33-44-44 died Stems P:p^✓;.-nd Fittings I 2/201201-2 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 12 11 7 .,rge Watu morn..- 32/204012 33 1220 Resilient Seated Gate Valve 05/06/2015 33--12-21 .AIA71WA Rubber Se.,,-.��dBu -; IlyVahes 04/23a049 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 9, 2022 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 1225 Connection to Existing Water Mains 02/06/2013 33 12 39 Combination n; Valve n intbZi►c fa 0 « 1,1� �x�utcr 12/20/2012 33 1240 Fire Hydrants 01/03/2014 33 4 ; 50 Water Sa le Station 1-2/20/2012 33 1260 Stan&rg Blow gfff Valve Assembly 06119/2014 33--34-4-2 Qatv,� in Place Pipe (GDP) - 42/28/2M 33-3443 Fibergless4kcinforaed Pi Ro GmAty c t ee.,.ew 121202012 3331 15 High ensity Pelyethy ne RIDPO, P' far Sanitary Sew 04/23/-2043 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 09/09/2022 Pc ;rnrrjll Chlertde (PV�E ed-We&e-Grayitjj Fib -Sewer 33-34- 24. PiRe 4_140/204-2 33-31-22 12/20/204-2 33 3123 Samna., C+ewe f Pipe E larg me 12/20/2012 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 3-3-34-70 G. nombiiin ad Ran n;.. Valve f y Sanitary Sewe. Fere M •as 12/20/2012 33 39- 40 Cast -in rla6L ��� Manholes I 4-2nW01-2 33 39 20 Precast Concrete Manholes I 12/20/2012 33393,0 Fiberglass ,4anheles I 12/20/2012 3339 4,0 Waste ater-r eoessQa ber (WAG) 12/�,20/201i 33 39 60 Liners for Sanitary Sewer Structures 04/29/2021 33 41--10 Reinfewedzene-rete item 0W01/2014 33 41�11, TS ghDe z`•' 2t11y!3rza'-14DPE) Pipe faf Stor.v. Di:a n 17�'Izar2012W2 33-41-4-2 Rei feree,l Pelyethylene (SRPE) Pipe i iA3/�a15 33 4-1-1-3 Polypropylene Pipe f6r Ster,r Drat O6/i8/2M 33 46 00 Subdrainage I 12/20/2012 33-46 01 Slatted Storm Drains I 07/01/2011 33-44 -N Treri 4iris I 07/01/2014 334940 Cast in Plaee Ma eles and ietien Sexes 12/20/204-2 33 492,0 Curb- and Tr-dnlet� 33-•43-40 Storm Drairlage Headwalls and txr,,....>,,,1 � O7/81�2011 Division 34 - Transportation 34 41 1 Tr-aF-V S*&1,c 03AV202-2 3 n� r ,i . 1 A#aehment A G6l}2i-Gabine 12 /,�� o l�5 34 41-1-0�3 A#E l : D CqnbFoller Speeifioatie OMO12 34 41 10 ceRwar-e Speraffication 01/2012 34 41 11I. To„- pe-afy T- -.,f e Signals 11122 013 34 41 I A o -.... ing Tw f-f e Signals I 03/112022 34 412 Readw , Rluminction Assemblies I 1220/2012 34 4 1 LOV4 Aft-mrial 1ED ILaadway huminaires I 06/15/2015 3444-2"2 I Freeway LED Read L.u.,,,,,........, I 06/15/245 3 ^ ^�� 41- 20.03 I Residvr,iQ1 U D4' ea(Wta / 11.tt: maffes I 06/15/2015 34 41 30 min uyn E igm& I 11/12AQ13 34 44 59 Single Me c Cit,:-ie-Cable I 02-/26/2016 3471 13 Traffic Control I 03/22/2021 CITY OF FORT WORTH Sanitary Sever Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 9, 2022 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 5 Appendix GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 9, 2022 Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 12/14/23, 3:50 PM M&C - Council Agenda City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, December 12, 2023 LOG NAME: 60SSRC113P2-CIRCLEC REFERENCE NO.: **M&C 23-1077 SUBJECT: (CD 6) Authorize Execution of a Contract with William J. Schultz, Inc. dba Circle C Construction Company, in the Amount of $2,804,299.00, for the Sanitary Sewer Rehabilitation Contract 113 Project Part 2 and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2024- 2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with William J. Schultz, Inc. dba Circle C Construction Company, in the amount of $2,804,299.00, for the Sanitary Sewer Rehabilitation Contract 113 project Part 2; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $3,296,107.00, transferred from available funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Rehabilitation Contract 113 project (City Project No. 102785) to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize a construction contract for the replacement of deteriorated cast iron water and sanitary sewer mains on the following street and easements: Street II From To I Scope of Work Autumn Drive South cul-de-sac Autumn �Water/Sewer Court Easement north 660 feet north of the Ranch West of Ranch View View Road / Autumn Drive 180 feet Sewer Road Intersection Easement west 970 feet north and 180 feet of Autumn west of the Ranch View North Sewer Drive Road / Autumn Drive 283 feet Intersection The project was advertised for bids on August 31, 2023, and September 7, 2023, in the Fort Worth Star - Telegram. On September 28, 2023, the following bids were received: i __1 rerrM William J. Schultz, Inc. dba Circle C Construction Company Gra-Tex Utilities, Inc. R&D Burns Brothers, Inc. Amount Time of Completion II$2,804,299.00IIY 30 s Calendar 1$3,281,261.001[ 11$4,758,310.0011 apps.cfwnet.org/ecouncil/printmc.asp?id=31702&print=true&DocType=Print 1 /3 12/14/23, 3:50 PM M&C - Council Agenda In addition to the contract amount, $323,550.00 (Water: $175,519.00; Sewer: $148,031.00) is required for project management, material testing and inspection, and $168,258.00 (Water: $90,313.00; Sewer: $77,945.00) is provided for project contingencies. The sanitary sewer component of this project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. Approximately 2,910 linear feet of cast iron water pipe will be replaced as part of this project. This project will have no impact on the Water or Transportation & Public Works' Department's operating budget when completed. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60SSRC113P2-CIRCLEC Capital Project FY2024 CIP Budget Revised Fund Name Appropriations Authority Adjustment FY2024 Name Budget W&S 102785 Capital -SS Projects Rehab $0.00 This M&C $3,296,107.00 $3,296,107.00 — Fund Contract 56002 113 Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the SS Rehab Contract 113 project within the Water & Sewer Capital Projects Fund. Appropriations for the Sanitary Sewer Rehabilitation, Contract 113 project are as depicted below: Fund Water & Sewer Capital Projects Fund 56002 General Capital Projects — Fund 30100 Project Total Existing Additional Project Total* Appropriations I Appropriations $7,494,479.00 $3,296,107.00 $10,790,586.00 $1,292,045.00 $0.00 $1,292,045.00 $8,786,524.001 $3,296,107.00 $12,082,631.00 *Numbers rounded for presentation purposes. Business Equity: William J. Schultz, Inc. dba Circle C Construction Company, is in compliance with the City's Business Equity Ordinance by committing to 15 percent MWBE participation on this project. The City's MWBE goal on this project is 15 percent. The project is located in COUNCIL DISTRICT 6. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the Water & Sewer Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available apps.cfwnet.org/ecouncil/printmc.asp?id=31702&print=true&DocType=Print 2/3 12/14/23, 3:50 PM M&C - Council Agenda in the W&S Capital Projects Fund for the SS Rehab Contract 113 project to support the above recommendations and execution of the contract. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs); TO Fund Department ccoun Project ctivit Budget Reference # mount ID 1 ID �Programy l Year ( (Chartfield 2) FROM Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for Citv Manaqer's Office bw Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Dena Johnson (7866) ATTACHMENTS 1. 60SSRC113P2-CIRCLEC Compliance Memo. pdf (CFW Internal) 2. 60SSRC113P2-CIRCLEC FID Table (WCF 11.10.23).xlsx (CFW Internal) 3. 60SSRC113P2-CIRCLEC Form 1295.Ddf (CFW Internal) 4. 60SSRC113P2-CIRCLEC Map.Ddf (Public) 5. 60SSRC113P2-CIRCLEC.docx (CFW Internal) 6. ORD.APP 60SSRC113P2-CIRCLEC 56002 A024(r2).docx (Public) 7. PBS CPN 102785.pdf (CFW Internal) 8. SAM.gov Search.pdf (CFW Internal) apps.cfwnet.org/ecouncil/printmc.asp?id=31702&print=true&DocType=Print 3/3 60SSRC113P2-CIRCLEC FID Table 2 56002 0600430 102785 2024 $1,771,050.00 2 56002 0700430 4956001 102785 2024 $1,525,057.00 2 56002 0700430 102785 2024 $1,525,057.00 2 56002 0600430 4956001 102785 1780 9999 ($1,771,050.00) 2 56001 0709020 5956001 $1,525,057.00 2 56002 0700430 4956001 102785 1780 9999 ($1,525,057.00) 2 2 1 2 2 2 2 2 2 1 2 2 2 2 56002 0600430 4956001 102785 001780 9999 ($1,771,050.00) 56002 0600430 5110101 102785 001780 9999 $23,933.00 Water Staff Costs 56002 0600430 5540101 102785 001780 9999 $4,000.00 Public Outreach 56002 0600430 5740010 102785 001780 9999 $1,505,218.00 Pay to contractor 56002 0600430 5740010 102785 001780 9999 $90,313.00 Contract Contingency 56002 0600430 5330500 102785 001784 9999 $39,888.00 Soil Lab Consultant 56002 0600430 5310350 102785 001784 9999 $11,966.00 Soil Lab TPW Staff Cost 56002 0600430 5310350 102785 001785 9999 $95,732.00 TPW Inspection Staff 56002 0700430 4956001 102785 001780 9999 ($1,525,057.00) 56002 0700430 5110101 102785 001780 9999 $20,655.00 Water Staff Costs 56002 0700430 5740010 102785 001780 9999 $1,299,081.00 Pay to contractor 56002 0700430 5740010 102785 001780 9999 $77,945.00 Contract Contingency 56002 0700430 5330500 102785 001784 9999 $34,426.00 Soil Lab Consultant 56002 0700430 5310350 102785 001784 9999 $10,328.00 Soil Lab TPW Staff Cost 56002 0700430 5310350 102785 001785 9999 $82,622.00 TPW Inspection Staff 000510-1 MAYOR AND COUNCIL COMMUNICATION (M&C) Page 1 of 1 1 SECTION 00 05 10 2 MAYOR AND COUNCIL COMMUNICATION (M&C) 3 4 5 6 [Assembler: For Contract Document execution, remove this page and replace with the approved 7 M&Cfor the award of the project. M&C insert shall be on blue paper.] 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 CITY OF FORT WORTH WATER DEPARTMENT SANITARY SEWER REHABILITATION CONTRACT 113, PART 2 City Project No. 102785 ADDENDUM NO. 1 Unit 1— Water Improvements Unit 2 — Sanitary Sewer Improvements Unit 3 — Paving Improvements Addendum No. 1 issued: September 25, 2023 Bid Opening Date: September 28.2023 This Addendum forms part of the Specifications and Contract Documents and modifies the original Specifications and Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The Specifications and Contract Documents for City Project No. 102785 are hereby revised by this Addendum No. 1 as follows: 1. Specifications Section 00 41 00 — BID FORM, Item 4. Time of Completion, 4.1 is intended to be 150 Calendar days. 2. Specifications Section 00 52 43 — AGREEMENT to be REPLACED in its entirety with the attached revised Agreement. Changes to the original include: • Contract time revised to 150 Calendar Days This Addendum No. 1 forms part of the Specifications and Contract Documents for the above referenced project and modifies the original Project Manual & Contract documents of same. Acknowledge your receipt of Addendum No. 1 by completing the requested information at the following locations: (1) in the space provided in Section 00 41 00, Bid Form, Page 3 of 3, and (2) indicate in upper case letters on the outside of your sealed bid envelope "RECEIVED AND ACKNOWLEDGED ADDENDUM NO. 1" Include a signed copy of Addendum No. 1 in the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 1 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. Addendum No. 1 Contract 113, Part 2 Al-1 City Project No. 102785 Addendum No. 1 Christopher Harder; P.E. RECEIPT ACK�WLEDGED: Director, Water Depart e By: 1—"4t eo4 cJ By: T � Sflo V ,i Tony Sholola, P.E. Company: 411"iic/ L Assistant Director, Water Department Addendum No. 1 Contract 113, Part 2 Al-2 City Project No. 102785 CITY OF FORT WORTH WATER DEPARTMENT SANITARY SEWER REHABILITATION CONTRACT 113, PART 2 City Project No. 102785 ADDENDUM NO.2 Unit 1— Water Improvements Unit 2 — Sanitary Sewer Improvements Unit 3 — Paving Improvements Addendum No.1 issued: September 25, 2023 Addendum No. 2 issued: September 27,2023 Bid Opening Date: September 28, 2023 This Addendum forms part of the Specifications and Contract Documents and modifies the original Specifications and Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The Specifications and Contract Documents for City Project No. 102785 are hereby revised by this Addendum No. 2 as follows: 1. Bid Proposal Workbook: The Bid Proposal Workbook [Contract 113, Part 2 Bid Proposal Workbook.xls] is hereby REPLACED in its entirety within the Bid Documents Package Folder to [Contract 113, Part 2 Bid Proposal Workbook (Add. No. 2).xls. Changes to the original include: • Corrections to formatting and summation of bid totals This Addendum No. 2 forms part of the Specifications and Contract Documents for the above referenced project and modifies the original Project Manual & Contract documents of same. Acknowledge your receipt of Addendum No. 2 by completing the requested information at the following locations: (1) in the space provided in Section 00 41 00, Bid Form, Page 3 of 3, and (2) indicate in upper case letters on the outside of your sealed bid envelope "RECEIVED AND ACKNOWLEDGED ADDENDUM NO. 2" Include a signed copy of Addendum No. 2 in the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 2 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. Addendum No. 2 Contract 113, Part 2 A2-1 City Project No. 102785 Addendum No. 2 RECEIPT ACKlq WLEDGED: By: Company: zrc/ C �dns Tru �/, Christopher Harder, P.E. Director, To-N, Water s epart e By: o V I1 Tony Sholola, P.E. G r\ Assistant Director, Water Department A2-2 Addendum No. 2 Contract 113, Part 2 City Project No. 102785 UNIT PRICE BID SECTION 00 42 43 PROPOSALFORM Project Item Information Pay Bldlist Description I Specification I Item Item No. Section No. Unit 1 - ater Improvements 1 3311.0141 6" Water Pipe 2 3311,0241 8"Water Pipe 3 3311,0441 12" Water Pipe 4 3311.0001 Ductile Iron Water Fittings wl Restraint (6-Inch through 12-Inch pipe) 5 3312.3002 6" Gate Valve 6 3312.3003 8" Gate Valve 7 3312.3005 12" Gate Valve 8 3312.0001 Fire Hydrant 9 3312.0117 Connection to Existing 4"-12" Water Main 10 33122001 1" Water Service, Meter Reconnection 11 33122003 1" Water Service 12 3312.2004 1" Private Water Service 13 3312.2101 1 1/2" Water Service, Meter Reconnection 14 3312.2103 11/2"Water Service 15 3312,2201 2" Water Service, Meter Reconnection 16 3312,2203 2" Water Service 17 0241.1118 4"-12" Pressure Plug 18 0241.1302 (Remove 6" Water Valve 19 0241.1305 (Remove 12" Water Valve 20 0241.1510 [Salvage Fire Hydrant 21 0241,1512 ISalvage 1" Water Meter 22 0241.1513 ISalvage 1 1/2" Water Meter 23 0241.1514 'ISalvage 2" Water Meter 24 3201.0400 ITemporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 25 0241.1300 RRemove Concrete Curb & Gutter (60/50) 26 0241.0401 RRemove Existing Concrete Driveway (50/50) 27 3213.0451 IRemove & Replace 6-Inch Exposed Aggregate Driveway (50/50) 28 1 3213.0351 IRemove & Replace Brick Sidewalk (50/50) 29 I 0241.1700 I11-Inch Pavement Pulverization (50/50) 30 1 3211,3300 ICem-Lime Stabilization @ 32Lbs/SY (50/50) 31 1 3123.0101 (Unclassified Street Excavation (50/50) 32 1 3212.0303 3-Inch Surface Course Asphalt, Type" D" (50/50) 33 I 3216.0102 6" Concrete Curb & Gutter (50/50) 34 I 3213,0301 14" Concrete Sidewalk (50/50) 35 I 3213.0401 I Install New 6-Inch Concrete Driveway 36 1 3304.0101 ITemporary Water Services 37 1 3305.0005 112" Waterline Lowering 38 1 3305.0109 (Trench Safety (Water) 39 [ 3305.0202 1Imported Embedment/Backfill, CSS (Water) 40 I 3305.0203 JImported Embedment/Backfill, CLSM (Water) 41 I 3305.0207 1 Imported Embedment/Backfill, Select Fill (Water) 42 I 3471.0001 Traffic Control (Water) 43 1 3125.0101 SWPPP A 1 acre (Water) 44 1 9999,0001 IConstrucction Surveying (Water) 45 1 9999,0002 [Construction Staking (Water) 46 1 9999,0003 I Water Construction Allowance Bidder's Application Bidder's Proposal Unit of I Bid Quantity Unit Price I Bid Value Measure LF 36 LF 475 LF 2.520 TN 1 EA 3 EA 1 EA 2 EA 3 I 1 EA 2 EA 6 EA 6 LF 30 EA 33 I EA 33 EA 4 I EA 4 1 EA 3 1 EA 3 I EA 1 EA 3 I EA 6 I I EA 33 I I EA 4 I I LF 3,690 I I LF 1,125 I I SF 1,625 I SF 125 I SF 25 I SY 2,625 I TN 40 I [ CY 25 I I SY 2,625 I LF I 1,125 I I SF 1 25 I I SF 1 1,625 I I LS I 1 I EA I 1 LF I 3,031 I i CY I 50 [ CY I 50 I CY 50 I I MO 4 I I LS I 1 I I LS I 1 I I LS I 1 I I LS 1 I $%000.001 Unit 1 -Water Improvements Subtotal 00 42 43 BID PROPOSAL Poge I or3 $50.000.00 CRY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Re .d V3012021 00 4100 aid Proposal Workbook (9-30-21) Project Item Information Pay Bidlist Description Specification Item Item No. Section No, Unit 2 - kanitary Sewer mprovements 1 3331.4115 8 Sewer Pipe 2 3331.3311 4" Sewer Service, Reconnection 3 3301.0001 Pre -CCTV Inspection 4 3301.0002 PoSFCCTV Inspection 5 0241.2201 [Remove 4' Sewer Manhole 6 3339.1001 14' Manhole 7 3339.1002 4' Drop Manhole a 3339.1003 4' Extra Depth Manhole 9 3301.0101 Manhole Vacuum Testing 10 3339.0001 Epoxy Manhole Liner 11 3305.0112 Concrete Collar 12 3201.0400 ITemporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 13 0241.1300 Remove Concrete Curb & Gutter (50/50) 14 0241.0401 Remove Existing Concrete Driveway (50150) 15 3213.0451 Remove & Replace 6-Inch Exposed Aggregate Driveway (50150) 16 3213.0351 Remove & Replace Brick Sidewalk (50/50) 17 0241.1700 11-Inch Pavement Pulverization (50/50) 18 3211.3300 Cem-Lime Stabilization @ 32LbsISY (50/50) 19 3123,0101 [Unclassified Street Excavation (50160) 20 3212.0303 I3-Inch Surface Course Asphalt, Type" D" (50150) 21 3216.0102 16" Concrete Curb & Gutter (50/50) 22 3213.0301 4" Concrete Sidewalk (50/50) 23 3213.0401 Install New 6-Inch Concrete Driveway 24 3291.0100 Topsoil (Sanitary Sewer) 25 3292.0100 Black Sod Replacement (Sanitary Sewer) 26 3305.0109 Trench Safety (Sanitary Sewer) 27 3305.0202 IImported Embedment/Backfill, CSS (Sanitary Sewer) 28 3305.0203 IImported Embedment/Backfill, CLSM (Sanitary Sewer) 29 3305.0207 IImported Embedment/Backfill, Select Fill (Sanitary Sewer) 30 3471.0001 (Traffic Control (Sanitary Sewer) 31 3125.0101 ISWPPP t 1 acre (Sanitary Sewer1 32 9999.0004 (Construction Surveying (Sanitary Sewer) 33 9999.0006 [Construction Staking (Sanitary Sewer) 34 9999.0006 (Sanitary Sewer Construction Allowance Bidder's Proposal Unit of Bid Quantity Unit Price Bid Value Measure LF 2,082 EA 29 LF 2,082 LF 2,082 EA 6 I EA 14 EA 2 VF 45 EA 16 SF 615 I EA 16 [ LF 1,572 LF 1,125 SF 1,625 SF 125 SF 25 SY 2,625 TN 40 CY 25 SY 2,625 I I LF 1,125 I I SF 25 I I SF 1,625 I I CY 204 I SY 749 LF 2,082 I CY 50 I CY 50 I I CY 50 I [ MO 3 I I LS 1 LS 1 LS 1 LS 1 I $30,000.001 Unit 2 - Sanitary Sewer Improvements Subtotal 004243 BID PROPOSAL Page 2 .0 $30,000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30r2021 00 4100 Bid Pmp-I Warkbaak (9-30.21) Project Item Information Pa Y Bidlist Description Specification P Item Item No. Section No. Unit 3 - aving Improvements 1 0241.1300 Remove Concrete Curb & Gutter (50150) 2 3216.0102 6" Concrete Curb & Gutter (50/50) 3 241.0401 Remove Existing Concrete Driveway (50/50) 4 3213.0451 Remove & Replace 6-Inch Exposed Aggregate Driveway (50/50) 5 3213.0401 Install New 6-Inch Concrete Driveway (50/50) 6 3213.0351 Remove & Replace Brick Sldewalk (50150) 7 3213.0301 4" Concrete Sidewalk (50150) 8 0241.1700 11-Inch Pavement Pulverization (50/50) 9 3211.3300 Cem-Lime Stabilization @ 32Lbs/SY (50/50) 10 3123.0101 Unclassified Street Excavation (50/60) 11 3212.0303 3-Inch Surface Course Asphalt, Type" D" (50/50) 12 3346.0008 4" PVC underdraln pipe 13 3305.0111 Water Valve Box Adjustment with Concrete Collar 14 3217.5001 Painting Curb Addresses 15 3291.0100 Topsoil 16 3292.0100 Block Sod Replacement 17 9999.0007 Remove and Replace Inlet Top 18 3471.0001 Traffic Control 19 3125.0101 SWPPP 21 acre 20 3212.0404 HMAC Transition 21 0241.1400 Remove Cone Valley Gutter 22 3216.0301 7" Cone Valley Gutter, Residential 23 3346.0006 4" Pipe Underdrain, Type 6" 24 9999.0008 Paving Construction Allowance END OF SECTION Bidder's Proposal Unit of Bid Quantity Unit Price Bid Value Measure LF 2,250 LF 2.250 SF 3,250 SF 250 SF 3,250 SF 50 SF 50 SY 5,250 TN 80 CY 50 SY 5.250 LF 200 EA 7 EA 44 CY 55 BY 1,030 EA 3 MO 2 LS 1 TN 30 SY 5 SY 5 LF 200 LS 1 $60,000.00 Un 13 - Paving Improvements Subtotal Subtotal Unit 1 - Water Improvements Subtotal Unit 2 - Sanitary Sewer Improvements Subtotal Unit 3 - Paving Improvements Total Bid 00 42 43 BID PROPOSAL Page 3 or3 $60,000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Reviled 950/2021 00 41 00 Bid P.N,, l Wohbaok (9-30-21) 00 11 13 INVITATION TO BIDDERS Pagel of 3 SECTION 00 11 13 INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bids for the construction of Sanitary Sewer Rehabilitation. Contract 113, Part 2. City Proiect No. 102785 ("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST, Thursday, September 28, 2023 as further described below: City of Fort Worth Purchasing Division 200 Texas Street Fort Worth, Texas 76102 Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above; Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers. In lieu of delivering completed Business Equity (M/WBE) forms for the project to the Purchasing Office, bidders shall e-mail the completed Business Equity forms to the City Project Manager no later than 2:00 PM on the second City Business day after the bid opening date, exclusive of the bid opening date. GENERAL DESCRIPTION OF WORK Atak The major work will consist of the (approximate) following: UNIT 1: Water Improvements: 475 LF of 8-inch water pipe by open cut 2,520 LF of 12-inch water pipe by open cut 6 EA 1-inch water services 33 EA 1 '/2 -inch water services 4 EA 2-inch water services 2,625 SY of asphalt pavement (POL) (50150) 1,125 LF of concrete curb and gutter (50150) 1,625 SF of 6-inch concrete driveway (50150) UNIT 2: Sanitary Sewer Improvements: 2,082 LF of 8-inch sanitary sewer pipe by open cut 14 EA 4-foot diameter sanitary sewer manholes 2 EA 4-foot diameter (Drop) sanitary sewer manholes 29 EA 4-inch sewer services 81 LF of concrete curb and gutter 2,625 SY of asphalt pavement (POL) (50/50) 1,125 LF of concrete curb and gutter (50150) 1,625 SF of 6-inch concrete driveway (50150) UNIT 3: Pavin2 Improvements: 5,250 SY of asphalt pavement (POL) (50150) Aonkk 2,250 LF of concrete curb and gutter (50150) 3,250 SF of 6-inch concrete driveway (50150) CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised 7/19/2021 0011 13 INVITATION TO BIDDERS Page 2 of 3 PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS TO BIDDERS. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at httt)://www.fortworthtexas.gov/t)urchasine/ and clicking on the link to the advertised project folders on the City's electronic document management and collaboration system site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. Bid Documents Package Link: httos://docs. b360.autodesk.com/sha res/a3efeae7-14ld-4194-93lb-8882b912dc6f Addenda Link: httos://docs.b360.autodesk.com/shares/4c26f5aO-f9cl-44b5-8eOb-caO4ef58345c Copies of the Bidding and Contract Documents may be purchased from RLG Consulting Engineers. Contact Brent E. Lewis at blewisaa,rlginc.com to make arrangements to pick up plans. The Cost of the Bidding and Contract Documents is $100. EXPRESSION OF INTEREST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties are requested to email Expressions of Interest in this procurement to the City Project Manager and the Design Engineer. The email should include the company's name, contact person and that individual's email address and phone number. All Addenda will be distributed directly to those who have expressed an interest in the procurement and will also be posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/ PREBID CONFERENCE — Web Conference A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: September 18, 2023 TIME: 10:00 a.m. Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. If a prebid conference is held, the presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not being held, prospective bidders can e-mail questions or comments in accordance with Section 6 of the Instructions to Bidders referenced above to the project manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in writing." If necessary, Addenda will be issued pursuant to the Instructions to Bidders. CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised 7/19/2021 0011 13 INVITATION TO BIDDERS Page 3 of 3 AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. FUNDING Any Contract awarded under this INVITATION TO BIDDERS will be funded with Community Development Block Grant (CDBG) funds provided by the U.S. Department of Housing and Urban Development to the City of Fort Worth. As such, the Contract is subject to compliance with CDBG rules and regulations further detailed in this INVITATION TO BIDDERS. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: Dena Johnson, PE, City of Fort Worth Email: Dena.JohnsonafortworthtexaS.2ov Phone: (817) 392-7866 AND/OR Attn: Brent E. Lewis, PE, RLG Consulting Engineers Email: blewis(a,rl2inc.com Phone: (817) 687-0080 ADVERTISEMENT DATES August 31, 2023 September 7, 2023 END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised 7/19/2021 SECTION 00 2113 INSTRUCTIONS TO BIDDERS 1. Defined Terms 0021 13 INSTRUCTIONS TO BIDDERS Page 1 of 10 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 3.1. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms seeking pre -qualification, must submit the documentation identified in Section 00 45 11 on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7) calendar days prior to Bid opening for review and, if qualified, acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate work types. Subcontractors must follow the same timelines as Bidders for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. Prequalification requirement work types and documentation are available by accessing all required files through the City's website at: httDs: //apps.fortworthtexas. aov/Proi ectResources/ CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 10 3.1.1. Paving — Requirements document located at: httDs://a DDs.fortworthtexas.eov/Proi ectResources/ResourcesP/02%20- %20Construction%20Documents/Contractor%20Preaualification/TP W%20Pavin a%20Contractor%2OPrequalification%2OPro izram/PREQUALIFICATION %20R EQUIREMENTS%20FOR%20PAVING%2000NTRACTORS.Udf 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at: httDs://arms. fortworthtexas.2ov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocutnents/Contractor%2OPrecivalification/TP W%2ORoad wav%20and%20Pedestrian%20Li 2htin2%20Prequalificati on%20Pro Rram/STRE ET%20LIGHT%20PREQUAL%20REQMNTS.Ddf 3.1.3. Water and Sanitary Sewer — Requirements document located at: httDs://aDr)s.fortworthtexas.gov/Proi ectResources/ResourcesP/02%20- %20Construction%2ODocutnents/Contractor%2OPrecivalification/Water%20and %20Sanitarv%2OSewer%2OContractor%2OPrequalification%2OProjzram[W S S% 20Dreaual%20requirements.Ddf 3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2.1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule to assist the City in evaluating and assessing the ability of the apparent low bidder to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents, 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder: CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 10 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.5. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.6. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.7. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 10 4.1.8. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4. Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 10 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Address questions to: City of Fort Worth Attn: Dena Johnson, PE, Water Department Email: Dena.Johnson@forworthtexas.gov Phone: (817) 392-7866 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications may be posted via the City's electronic document management and collaboration system at httt)s://docs.b360.autodesk.com/shares/4c26f5aO-f9cl-44b5- 8eOb-ca04ef58345c CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 10 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors, Suppliers and Others I I. I. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City has goals for the participation of minority business and/or women business enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the M/WBE Project Goals and additional requirements. Failure to comply shall render the Bidder as non- responsive. Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance No. 24534-11-2020), codified at: httvs:Hcodelibrarv.amle2al.com/codes/ftworth/latest/ftworth tx/0-0-0-22593 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Pmject No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 10 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor or City has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents; additional copies may be obtained from the City. 12.2. All blanks on the Bid Form must be completed and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. All entries shall be legible. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12,10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 10 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed envelope, marked with the City Project Number, Project title, the name and address of Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 14. Withdrawal of Bids 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office may be withdrawn prior to the time set for bid opening. A request for withdrawal must be made in writing and delivered to the Purchasing Office to receive a time stamp prior to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if the request is within one hour of bid opening, will not be read aloud and will thereafter be returned unopened. 14.2. In the event any Bid for which a withdrawal request has been timely filed has been inadvertently opened, said Bid and any record thereof will subsequently be marked "Withdrawn" and will be given no further consideration for the award of contract. 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 9 of 10 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at httvs://www.ethics.state.tx.us/data/forms/1295/1295.ndf 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 10 of 10 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102785 Revised/Updated November 2, 2021 00 35 13 CONFLICT OF INTEREST STATEMENT Page 1 of 11 SECTION 00 35 13 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's Office pursuant to state law. If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant City Managers, or an agent of the City who exercise discretion in the planning, recommending, selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. You are urged to consult with counsel regarding the applicability of these forms and Local Government Code Chapter 176 to your company. The referenced forms may be downloaded from the links provided below. httr)://www.ethics.state.tx.us/forms/CIQ.i)df hfti)://www.ethics.state.tx.us/forms/CIS.Pdf ❑ CIQ Form does not apply o CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form does not apply o CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: 4,�/;�.0m �c1Sc�,a��Z `// Cle 0! eGnST.,<i Soo � TOinmQ%� l END OF SECTION Signature: Title: '06" CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised February 24, 2020 00 41 00 Bid Proposal Workbook (Add. No. 2).xlsx 0041 00 BID FORM Page 2 of 11 SECTION 00 4100 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No.: 102785 Units/Sections: Unit 1: Water Improvements Unit 2: Sanitary Sewer Improvements 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non- competitive levels. d. 'coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook (Add. No. 2).xlsx 00 41 00 BID FORM Page 3 of 11 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Distribution, Urban/Renewal, 24-inches and smaller b. Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards) C. d. - e. - f. - 9-- h. - 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 150 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones} within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 'If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 4100 Bid Proposal Workbook (Add. No. 2).xlsx Total Bid $0.0C) 2 , y Z 9 9. OG 7. Bid Submittal This Bid is submitted on September 27, 2023 by the entity named below. Respectfuiiysubmitted, By: (Signature) �i✓s A sue,.// (Printed y Name) Title: President Company: William J Schultz Inc dba Circle C Construction Comp, Address: 500 W Trammell Avenue Fort Worth, Texas 76140 State of Incorporation: Texas Email: t.skelly@circlecconstruction.com Phone: 817-293-1863 END OF SECTION Receipt is acknowledged of the Initial following Addenda: jAddendum No. 1: ?S'S jAddendum No. 2: TSl jAddendum No. 3: jAddendum No. 4: Corporate Seal: 00 41 00 BID FORM Page 4 of 11 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook (Add. No. 2).xlsx SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Project Item Information Pay Bidlist Description Specification Item ItNo. Section No. Unit 1 - ater Improvements 1 3311.0141 6" Water Pipe 2 3311.0241 8" Water Pipe 3 3311.0441 12" Water Pipe 4 3311.0001 Ductile Iron Water Fittings w/ Restraint (6-inch through 12-inch pipe) 5 3312.3002 6' Gate Valve 6 3312.3003 8" Gate Valve 7 3312.3005 12" Gate Valve 8 3312.0001 Fire Hydrant 9 3312.0117 Connection to Existing 4"-12" Water Main 10 3312.2001 1" Water Service, Meter Reconnection 11 3312,2003 1" Water Service 12 3312.2004 1" Private Water Service 13 3312.2101 1 1/2" Water Service, Meter Reconnection 14 3312.2103 1 1/2" Water Service 15 I 3312.2201 2" Water Service, Meter Reconnection 16 3312.2203 2" Water Service 17 0241.1118 4"-12' Pressure Plug 18 0241.1302 Remove 6" Water Valve 19 0241.1305 'iemove 12" Water Valve 20 0241.1510 ISalvage Fire Hydrant 21 0241.1512 JSalvage 1" Water Meter 22 0241.1513 ISalvage 1 1/2" Water Meter 23 1 0241.1514 ISalvage 2" Water Meter 24 1 3201.0400 ITemporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) 25 0241A,300 Remove Concrete Curb & Gutter (50/50) 26 0241.0401 Remove Existing Concrete Driveway (50150) 27 3213.0451 Remove & Replace 6-Inch Exposed Aggregate Driveway (50/50) 28 3213.0351 Remove & Replace Brick Sidewalk (50160) 29 0241.1700 11-Inch Pavement Pulverization (50150) 30 3211.3300 Cent -Lime Stabilization @ 32Lbs/SY (50/50) 31 3123.0101 1Unclassified Street Excavation (50/50) 32 3212.0303 3-Inch Surface Course Asphalt, Type" D" (50/50) 33 1 3216.0102 16" Concrete Curb & Gutter (50/50) 34 1 3213.0301 14" Concrete Sidewalk (50/50) 35 1 3213.0401 ] Install New 6-Inch Concrete Driveway 36 3304.0101 ITemporary Water Services 37 3305.0005 112" Waterline Lowering 38 3305,0109 JTrench Safety (Water) 39 3305.0202 Jimported EmbedmentBackfill, CSS (Water) 40 3305.0203 1Imported EmbedmenUBackfill, CLSM (Water) 41 3305.0207 Imported EmbedmenUBackfill, Select Fill (Water) 42 3471.0001 Traffic Control (Water) 43 1 3125.0101 JSWPPP t 1 acre (Water) 44 1 9999.0001 lConstruction Surveying (Water) 45 1 9999.0002 lConstruction Staking (Water) 46 1 9999.0003 lWater Construction Allowance 00 42 43 BID PROPOSAL Page 5 of] I Bidder's Application Bidder's Proposal Unit of I Bid Quantity Unit Price I Bid Value Measure LF 36 $95.00 $3,420.00 LF 475 $102.00 $48,450.00 LF 2,520 $140.00 $352,800.00 TN 1 $12,500.00 $12,500.00 EA 3 $1,800.00 $5.400.00 EA 1 $2.200.00 $2,200.00 EA 2 $3,800.00 $7,600.00 EA 3 $5,600.00 $16,500.00 EA 2 $5,500.00 $11,000.00 EA 6 $1,000.00 $6.000.00 EA 6 $2,200.00 $13,200.00 LF 30 $125.00 $3,750.00 EA 33 $2,750.00 $90,750.00 EA 33 $1,000.00 $33,000.00 EA 4 $3,500.00 $14,000.00 EA 4 1 $1.000.001 $4,000.00 EA 3 1 $2,000.001 $6,000.00 EA 3 1 $300.001 $900.00 EA 1 $500.001 $500.00 EA 3 $800.00 1 $2,400.00 EA 6 $300.001 $1,800.00 EA 33 $300.001 $9.900.00 EA 4 1 $300.001 $1.200.00 LF 3,690 1 $32.001 $118,080.00 LF 1,125 I $10.001 $11,250,00 SF 1,625 $10.001 $16,250.00 SF 125 I $55.001 $6,875.00 SF 25 I $45.001 $1,125.00 SY 2,625 I $18.501 $48,562.50 TN I 40 1 $412.501 $16,500.00 CY I 25 1 $60.001 $1,500.00 SY I 2,625 1 $36.501 $95,812.50 LF I 1.125 1 $55.001 $61,875.00 SF I 25 1 $20.001 $500.00 SF I 1,625 1 $25.001 $40,625.00 LS I 1 $35,000.001 $35.000.00 EA 1 $12,500.001 $12,500.00 LF 3,031 $3.00 $9,093.00 CY I 50 $250.00 $12,500.00 CY 50 $250.00 $12,500.00 CY 50 $30.00 $1,500.00 MO 4 $3,500.00 $14,000.00 LS I 1 1 $5.000.001 $5,000.00 LS I 1 1 $5,000.001 $5,000.00 LS I 1 I $5,000.001 $5,000.00 LS I 1 1 $50,000.001 $50,000.00 Unit 1 - Water Improvements Subtotal $1.228,318.00 CRY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Pmposel Workbmk (Add. No. 2)..M 004243 BRSPROPOSAL Page 6 of I Project Item Information Bidder's Proposal Pay Bidlist I Descri lion p Specification Unit of Bid Quanlit y Unit Price Bid Value Item Item No. I Section No. Measure Unit 2 - anitary Sewer Improvements 1 3331.4115 8" Sewer Pipe LF 2,082 $150.00 $312.300,00 2 3331.3311 4" Sewer Service, Reconnection EA 29 $1,500.00 $43,500.00 3 3301.0001 Pre -CCTV Inspection LF 2,OB2 $10.00 $20,820.00 4 3301.0002 Post -CCTV Inspection LF 2,082 $10.00 $20,820.00 5 0241.2201 Remove 4' Sewer Manhole EA 6 $1,000.00 $6,000.00 6 3339.1001 4' Manhole EA 14 $6.500.00 $91.000.00 7 3339.1002 4' Drop Manhole EA 2 $8,500.00 $17,000.00 8 3339.1003 4' Extra Depth Manhole VF 45 $350.00 $15.750.00 9 3301.0101 Manhole Vacuum Testing EA 16 $200.00 $3,200.00 10 3339.0001 Epoxy Manhole Liner SF 615 $35.00 $21,525.00 11 3305.0112 Concrete Collar EA 16 $500.00 $8,000.00 12 3201.0400 Temporary Asphalt Paving Repair (2" HMAC on 6" Flexbase) LF 1,572 $35.00 $55,020.00 13 0241.1300 Remove Concrete Curb & Gutter (50/50) LF 1,125 i $10.00 $11,250.00 14 0241.0401 Remove Existing Concrete Driveway (50/50) SF 1,625 $10.00 $16,250.00 15 3213.0451 Remove & Replace 6-Inch Exposed Aggregate Driveway (50/50) SF 125 $55.00 $6,875.00 16 3213.0351 Remove & Replace Brick Sidewalk (50/50) SF 25 $45.00 $1,125.00 17 0241.1700 11-Inch Pavement Pulverization (50/50) SY 2,625 $18.50 $48,562.50 18 3211.3300 Cem-Lime Stabilization @ 32Lbs/SY (50150) TN 40 $412.50 $16,500,00 19 3123.0101 Unclassified Street Excavation (50/50) CY 25 $60.00 $1.500.00 20 3212.0303 3-Inch Surface Course Asphalt, Type" D" (50150) SY 2,625 $36.50 $95,812.50 21 3216.0102 6" Concrete Curb & Gutter (50/50) LF 1,125 $55.00 $61,875.00 22 3213.0301 4" Concrete Sidewalk (50/50) SF 25 $20.00 $500.00 23 3213.0401 Install New 6-Inch Concrete Driveway I SF 1,625 1 $25.001 $40,625.00 24 3291.0100 Topsoil (Sanitary Sewer) CY 204 $35.001 $7.140.00 25 3292.0100 Block Sod Replacement (Sanitary Sewer) SY 749 $15.00 $11,235.00 26 3305.0109 Trench Safety (Sanitary Sewerl LF 2,082 $3.001 $6,246.00 27 3305.0202 Imported Embedment/Backfill, CSS (Sanitary Sewer) CY 50 $250.00f $12,500.00 28 3305.0203 Imported Embedment/Backfill, CLSM (Sanitary Sewer) CY 50 1 $250.001 $12,500.00 29 3305.0207 Imported Embedment/Backfill, Select Fill (Sanitary Sewer) I CY 50 1 $25.001 $1,250.00 30 3471.0001 Traffic Control (Sanitary Sewer) I MO 3 1 $3,500.001 $10,500.00 31 3125.0101 SWPPP Z 1 acre (Sanitary Sewer) I LS 1 1 $5,000.001 $5,000.00 32 9999.0004 Construction Surveying (Sanitary Sewer) LS 1 1 $5,000.001 $5,000.00 33 9999.0005 Construction Staking (Sanitary Sewer) LS 1 1 $5.000.001 $5,000.00 34 9999.0006 Sanitary Sewer Construction Allowance LS 1 1 $30,000.001 $30,000.00 Unit 2 - San tary Sewer Improvements Subtotal $1,022,181.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 4100 Bid Proposal Workbook (Add. No. 2).xlsx 00 42 43 BID PROPOSAL Page 7 of 11 Project Item Information Bidders Proposal Pay Bldlist I Description Specification Unit of I Bid Quantity Unit Price Bid Value Item Item No. taving Section No. Measure Unit 3 Improvements 1 0241.1300 Remove Concrete Curb & Gutter (50/50) LF 2,250 $10.00 $22,500.00 2 3216.0102 6" Concrete Curb 8 Gutter (50/50) LF 2,250 $10.00 $22,500.00 3 241.0401 Remove Existing Concrete Driveway (50/50) SF 3,250 $10.00 $32,500.00 4 3213.0451 Remove & Replace 6-Inch Exposed Aggregate Driveway (50/50) SF 250 $10.00 $2,500.00 5 3213.0401 Install New 6-Inch Concrete Driveway (50/50) SF 3,250 $25.00 $81,250.00 6 3213.0351 Remove & Replace Brick Sidewalk (50/50) SF 50 $35.00 $1,750.00 7 3213.0301 4" Concrete Sidewalk (50/50) SF 50 $20.00 $1,000.00 8 0241.1700 11-Inch Pavement Pulverization (50/50) SY 5,250 $18.50 $97,125.00 9 3211,3300 Cem-Lime Stabilization @ 32Lbs/SY (50150) TN 80 $412.50 $33,000.00 10 3123.0101 Unclassified Street Excavation (50/50) CY 50 $60.00 $3,000.00 11 3212.0303 3-Inch Surface Course Asphalt, Type" D" (50/50) SY 5,250 $18.50 $97,125.00 12 3346.0008 4" PVC underdrain pipe LF 200 $100.00 $20,000.00 13 3305.0111 Water Valve Box Adjustment with Concrete Collar EA 7 $800.00 $5,600.00 14 3217.5001 Painting Curb Addresses EA 44 $100.00 $4,400.00 15 3291.0100 Topsoil CY 55 $35.00 $1,925.00 16 3292.0100 Block Sod Replacement BY 1,030 $15.00 $15,450.00 17 9999.0007 Remove and Replace Inlet Top EA 3 $5,500.00 $16,500.00 18 3471.0001 Traffic Control MO 2 $3,500.00 $7,000.00 19 3125.0101 SWPPP a 1 acre LS 1 $2,000.00 $2,000.00 20 3212.0404 HMAC Transition TN 30 $200.00 $6,000.00 21 0241.1400 Remove Conc Valley Gutter SY 5 $10.00 $50.00 22 3216.0301 7" Conc Valley Gutter, Residential SY 5 $125.00 $625.00 23 3346.0006 4" Pipe Underdrain, Type 6" LF 200 $100.00 $20,000.00 24 9999.0008 Paving Construction Allowance LS 1 $60,000.00 $60,000.00 Unit 3 - Paving Improvements Subtotal $553,800.00 Subtotal Unit 1 - Water Improvements $1,228,318.00 Subtotal Unit 2 - Sanitary Sewer Improvements $1,022,181.00 Subtotal Unit 3 - Paving Improvements $553,800.00 Total Bid _ $2,804,299.00 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Re -ad 9/302021 00 41 00 Bid Proposal workbook (Add No 2).,dsx MERCHANT�S� BONDING COMPANY. MERCHANTS BONDING COMPANY (MUTUAL) P.O. BOX 14498, DES MOINES, IOWA 50306-3498 PHONE: (800) 678-8171 FAX: (515) 243-3854 v KNOW ALL PERSONS BY THESE PRESENTS: BID BOND PUBLIC WORK Bond No. N/A That William J. Schultz, Inc. dba Circle C Construction Company, P. O. Box 40328, Fort Worth, TX 76140 (hereinafter called the Principal) as Principal, and the Merchants Bonding Company (Mutual) (hereinafter called Surety), as Surety, are held and firmly bound to City of Fort Worth, Purchasinq Division, 200 Texas Street, Fort Worth, TX 76102 (hereinafter called the Obligee) in the full and just sum of ( Five Per Cent of Greatest Amount Bid 5% of G.A.B. Dollars good and lawful money of the United States of America, to the payment of which sum of money well and truly to be made, the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Signed and dated this 28th day of September 2023 THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Obligee shall make any award to the Principal for Construction of Sanitary Sewer Rehabilitation, Contract 113, Part 2, City Project No. 102785 according to the terms of the proposal or bid made by the Principal therefore, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award, and shall give bond for the faithful performance thereof with the Merchants Bondine ComDanv (Mutual) , as Surety, or with other Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure to do so, pay to the Obligee the damages which the Obligee may suffer by reason of such failure, not exceeding the penalty of this bond, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect. IN TESTIMONY WHEREOF, the Principal and Surety have caused these presents to be duly signed and sealed. William J. Schultz, Inc. dba Witness: Circle C Construction Company Principal X By per; ess as to Surety: X By John A. Miller, Witne CON 0333 (2/15) MERCY-IANTS%k BONDING COMPANY,. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, John A Miller; Sheryl A Klutts their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 20th day of March 2023 •......... �.• 0 •., . • ..... MERCHANTS BONDING COMPANY (MUTUAL) I ...... MERCHANTS NATIONAL BONDING, INC. 'RPOR' �0 ; ; �O,•ORP09q.9y d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY ;Z; Viz:" :3• 2003 ;:�; :s • 1933 :cy� By •'.dJ� .. :��1�� ••�b�kr �1a• • President STATE OF IOWA '•.,,•••f`!•��•..•• '••. • • •.•' COUNTY OF DALLAS ss. On this 20th day of March 2023 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. 04A� Kimome Cnmmissfon Number t ber 7td2737 Ii Commission Expires luyql�i April 14, 2(i14 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 28th day of September, 2023. ,.......... 9 .•---•. ...PpR ;,o?-RP09�-f . :p�: .0 •y:2 cn. 2003 a . 1933 secretary .'jJ. Cam: POA 0018 (10/22) •• '4" MERCHANTS BONDING COMPANY. MERCHANTS BONDING COMPANY (MUTUAL.) • MERCHANTS NATIONAL. BONDING, INC. P.O. Box 14498 - DES MOINES, IOWA 50306-3498 • (800) 678-8171 • (515) 243-3854 FAX Please send all notices of claim on this bond to: Merchants Bonding Company (Mutual) / Merchants National Bonding, Inc. P.O. Box 14498 Des Moines, Iowa 50306-3498 (515) 243-8171 (800) 678-8171 Physical Address: 6700 Westown Parkway, West Des Moines, Iowa 50266 SUP 0073 TX (2/15) 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 10 of 11 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. L'1 BIDDER: William J Schultz Inc dba Circle C Construction 500 W Trammell Ave Fort Worth, Texas 76140 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 By: Teresa S Skelly (Signature) Title: President Date: 27-Sep-23 00 41 00 Bid Proposal Workbook (Add. No. 2).xlsx 004511 -1 BIDDERS PREQUALIFICATIONS Page 1 of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 4 1. Summary. ABidder or their designated subcontractors are required to be prequalified or 5 have applied for prequalification by the City for the work types requiring prequalification 6 prior to submitting bids. To be considered for award of contract the Bidder must submit 7 Section 00 45 12, PREQUALIFI CATION STATEMENT for the work type(s) listed with 8 their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed 9 must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with 10 the requirements below. The information must be submitted seven (7) days prior to the 11 date of the opening of bids. Subcontractors must follow the same timelines as contractors 12 for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at 13 the time bids are opened and reviewed may cause the bid to be rejected. 14 15 16 The prequalification process will establish a bid limit based on a technical evaluation and 17 financial analysis of the contractor. For example, a contractor wishing to submit bids on 18 projects to be opened on the 7th of April must file the information by the 31 st day of March 19 in order to eligible to work on these projects. In order to facilitate the approval of a Bidder's 20 Prequalification Application, the following must accompany the submission. 21 a. A complete set of audited or reviewed financial statements. 22 (1) Classified Balance Sheet 23 (2) Income Statement 24 (3) Statement of Cash Flows 25 (4) Statement of Retained Earnings 26 (5) Notes to the Financial Statements, if any 27 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 28 of Incorporation, Articles of Organization, Certificate of Formation, LLC 29 Regulations, and Certificate of Limited Partnership Agreement). 30 c. A completed Bidder Prequalification Application. 31 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 32 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 33 number visit the Texas Comptroller of Public Accounts online at the 34 following web address www.window.state.tK-us/taxl)ermit/ and fill out the 35 application to apply for your Texas tax ID. 36 (2) The firm's e-mail address and fax number. 37 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 38 is used by the City for required reporting on Federal Aid projects. The DUNS 39 number may be obtained at www.dnb.com. 40 d. Resumes reflecting the construction experience of the principles of the firm for firms 41 submitting their initial prequalification. These resumes should include the size and 42 scope of the work performed. 43 e. Other information as requested by the City. 44 45 2. Pre qualification Requirements 46 a. Financial Statements. Financial statement submission must be provided in 47 accordance with the following: 48 (1) The City requires that the original Financial Statement or a certified copy 49 be submitted for consideration. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 004511 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting frnn registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require anew statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital= current assets— current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. ABidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility for Award of Contract 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 2 3 4 9 004511 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 d. If a contractor has a valid prequalification letter, the contractor will be eligible to perform the prequalified work types until the expiration date stated in the letter, END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 00 45 12 PREQUALIFICATION STATEMENT Page 11 of 11 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Water Distribution, Urban/Renewal, 24-inches and smaller Hspnalt raving Construction/Reconstruction (LESS THAN 15,000 square vnrris) N Contractor/Subcontractor Company Name Prequalification Expiration Date Circle C Construction 4/30/2024 Texas Bit 4/30/2024 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: William J Schultz Inc dba Circle C Construction Company 500 W Trammell Avenue Fort Worth, Texas 76140 0 By:0 ���SQ ✓�`� �e�li (Signal kb) END OF SECTION Title: President Date: 9-Z 7-Z3 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 09/30/2021 00 41 00 Bid Proposal Workbook (Add. No. 2).xlsx FoRTWORTH SECTION 00 4513 PREQUALIFICATION APPLICATION Date of Balance Sheet Name underwhich you wish to qualify Post Office Box Street Address (required) Telephone Mark only one: City City Fax Individual Limited Partnership General Partnership Corporation Limited Liability Company State State Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) Zip Code Zip Code Email/mail this questionnaire along with financial statements to the appropriate group below. A separate submittal is required for water/sewer, paving, and lighting: Work Category — WaterDept- Water/sewer WorkCategory — TPWPaving Work Category — TPWPed/RdwyLighting 1ohn.kasavich(a,FortWorthTexas.2ov Alicia. Garcia(a fortworthtexas. 2ov clint.hoover(a fortworthtexas.eov Fwmh�VorthWater Department Engineering and City of Fort Worth Transportation and Public City of Fort Worth TPW Transportation il Services Division 200 Texas St. Fort Works Dept. 8851 Camp Bowie West Blvd. Fort Management Attn: Clint Hoover, P.E. 5001 Worth, TX 76102 Worth, Texas 761 16Attn: Alicia Garcia James Ave. Fort Worth, TX 7 6115 *Financial Statements must be mailed. Mark the envelope: "Bidder Prequalification Application" 004513-2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may property classify your firm: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or ❑ Has less than $6,000,000.00 in annual gross receipts OR 1-1 Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. Select major work categories forwhich you would like to be prequalified (City may deem you are not qualified for selected category or may approve you at a lesser size/length and maximum size may not be listed specifically under a major work category): MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and greater, 350 LF or Less _ Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller _ Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller _ Water Distribution, Urban and Renewal, 12-inch diameter and smaller _ Water Transmission, Development, 24-inches and smaller _ Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller _ Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development, All Sizes _ Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger _ CCTV, 8-inches and smaller _ CCTV, 12-inches and smaller _ CCTV, 18-inches and smaller CCTV, 24-inches and smaller CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 00 45 13 - 3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED _ CCTV, 42-inches and smaller _ CCTV, 48-inches and smaller _ Sewer CIPP, 12-inches and smaller _ Sewer CIPP, 24-inches and smaller _ Sewer CIPP, 42-inches and smaller _ Sewer CIPP, All Sizes _ Sewer Collection System, Development, 8-inches and smaller _ Sewer Collection System, Urban/Renewal, 8-inches and smaller _ Sewer Collection System, Development, 12-inches and smaller _ Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller _ Sewer Interceptors, Urban/Renewal, 24-inches and smaller _ Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller _ Sewer Interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes _ Sewer Cleaning , 24-inches and smaller Sewer Cleaning , 42-inches and smaller _ Sewer Cleaning, All Sizes Sewer Cleaning, 8-inches and smaller _ Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes _ Transportation Public Works Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards) Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER $1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 15,000 square yards)* Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER)* Roadway and Pedestrian Lighting NOTE *There is not a prequalification requirement for installation of concrete sidewalk, curb & gutter, driveways, and panel replacement, only concrete paving CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 00 45 13 -4 BIDDER PREQUALIFICATION APPLICATION Page 4of8 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in construction work has your organization had: (a) As a General Contractor: (b) As a Sub -Contractor. 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAILED CONTRACT OF DATE CITY -COUNTY- ADDRESS OF OFFICIAL TO AMOUNT WORK COMPLETED STATE WHOM YOU REFER *If requalifying only show work performed since last statement. 5.Have you ever failed to complete any work awarded to you? If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 0045 13 -5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance fromthat person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 CORPORATION BLOCK If a corporation: Date of Incorporation Charter/File No. President Vice Presidents Secretary Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) 0045 13 - 6 BIDDER PREQUALIFICATION APPLICATION Page 6of8 PARTNERSHIP BLOCK If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Limited Partners (if applic able) Individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 00 45 13 -7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 100%� 14. Equipment TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. ITEM QUANTITY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various - ITEM DESCRIPTION TOTAL BALANCE SHEET VALUE CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 00 45 13 -8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. . being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 00 45 26 -1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Proiect No. 102785 Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 CONTRACTOR: C, clt C c o/�s"Ti t/i �oaPav�gy; Company Address 7,r4s 76 City/State/Zip THE STATE OF TEXAS o, COUNTY OF TARRANT (Please Print) Signature: Title: (Please Print) MICHE[-E S LAN'�c." ' Notary public � STATE OF TEX AS _ wary tD # 11T5345 ocaobw BEFORE ME, the undersigned authority, on this day personally appeared tit. , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of 1?,r@ G_,� i"�c for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this -;r-6 day of 0,." , 20Z4 Notary Public in and for the St a of Texas END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 004540-1 Business Equity Goal Page 1 of 2 /Wft� 1 SECTION 00 4S 40 2 Business Equity Goal 3 4 APPLICATION OF POLICY S If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable. 6 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises 7 (M/WBEs). 8 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity 11 Firms when applicable, in the procurement of all goods and services. All requirements and regulations 12 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11- 13 2020 (codified at: https://codelibrarv.amlegaI.com/codes/ftworth/latest/ftworth tx/0-0-0-22593) apply 14 to this bid. 15 16 BUSINESS EQUITY PROJECT GOAL 17 The City's Business Equity goal on this project is 15% of the total bid value of the contract (Base bid 18 applies to Parks and Community Services). 19 20 METHODS TO COMPLY WITH THE GOAL 21 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's A`2 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the -3 ordinance through one of the following methods: 1. Commercially useful services performed by a 24 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination of 25 Business Equity prime services and Business Equity subcontracting participation, 4. Business Equity 26 Joint Venture/Mentor-Protege participation, S. Good Faith Effort documentation, or 6. Prime 27 contractor Waiver documentation. 28 29 SUBMITTAL OF REQUIRED DOCUMENTATION 30 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall 31 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or 32 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City business 33 day after the bid opening date, exclusive of the bid opening date. 34 35 The Offeror must submit one or more of the following documents: 36 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded; 37 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if participation is 38 less than stated goal, or no Business Equity participation is accomplished; 39 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform all 40 subcontracting/supplier opportunities; or 41 4. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor- 42 Protege participation. 43 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised October 27, 2021 1 These forms can be found at: 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 004540-2 Business Equity Goal Page 2 of 2 Business Equity Utilization Form and Letter of Intent https://a pps.fortworthtexas.Rov/ProiectResources/ResourcesP/60/ 20- %20MWBE/NEW%20Business%20Equity%200rdinance/Business%20Equity%20Utilization%20Form.pdf Letter of Intent https://apps.fortworthtexas.Rov/ProiectResources/ResourcesP/60 - MWBE/NEW Business Equitv Ordinance/Letter of Intent-2021.pdf Business Equity Good Faith Effort Form httos://apps.fortworthtexas.gov/ProiectResources/ResourcesP/60/o20- %20MWBE/NEW%20Business%20Equity%200rdinance/Business%20Equity%20Good%2OFaith%20Effort %20Form.r)df Business Equity Prime Contractor Waiver Form httos://apps.fortworthtexas.eov/ProiectResources/ResourcesP/60%20- %20MWBE/NEW%20Business%20Equity%200rdinance/Business%20Equity%20Prime%20Contractor%20 Waiver.odf Business Equity Joint Venture Form httos://apps.fortworthtexas.eov/ProiectResources/ResourcesP/60%20- %20MWBE/NEW%20Business%20Equity%200rdinance/Business%20Equity%20Joint%20Venture.pdf FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND THE BID REJECTED. FAILURE TO SUBMIT THE REQUIRED BUSINESS EQUTY DOCUMENTATION OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON -RESPONSIVE, THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE. For Questions, Please Contact The Business Equity Division of the Department of Diversity and Inclusion at (817) 392-2674. 36 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised October 27, 2021 Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 005243-1 Agreement Page I of 6 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 1 a) I , „3 , is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and William J. Schultz, Inc. dba Circle C Construction COmDanv authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor''). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration ofthe mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 Article 3. CONTRACT PRICE City agrees to pay Contractor for performaye o� Wor i11 a ordanQ$yvith- e Contract wo i ion fight tiun re our ous Documents an amount, in current funds, ofiw Hundred-.N nen' and 1 90 — allars ($ *2,804,299.00* }. Contract price may be adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within 150 calendar days after the date when the Contract 'Time commences to run, as provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred and Fifly Dollars ($659.00 for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised 8/22/2022 005243-2 Agreement Page 2 of 6 Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attaclunents to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specie) b. Current Prevailing Wage Rate Table c. Insurance ACORD Fonn(s) d. Payment Bond e. Performance Bond f Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3_ General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification nrovision is slecifically intended to ouerate and be effective even if it is alle€zed or proven that all or some of the damages being sought were caused, in whole or in tart, by anv act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Pail 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pru ect No. 102785 Revised 8/22/2022 005243-3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is svecifically intended to overate and be effective even if it is alleged or uroven that all or some of the damages being sought were caused, in whole or in part, by anv act, omission or ne lieence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors andAssigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other parry hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Alaiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Non -appropriation of Funds. In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised 8/22/2022 005243-4 Agreement Page 4 of 5 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808,001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2274 of the Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1.) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," `Tirearm entity" and "fireann trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised 8/22/2022 005243-5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENT'S, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Pad 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised 8/22/2022 0 005243-6 Amemerd Page 6 of 6 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"), Contractor: City of Fort Worth William J. Schultz, Inc. dba By: Circle C Construction Company By: Signature Fernando Costa Assistant City Manager Teresa S. Skelly Feb 1, 2024 nted (Priame) Date Ptesident 'Lytle Attest: 500 W. Trammell - P. O. Box 40328 ��� f[!s' Lys . Address Doodal , CitySecretory -Fort worth, Tx 76140City/State/Zip 7nne6 at) Date Date: l ;). Form 1295 No.: _?a 0 ate e Q31 qkl Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 7-ohli 5tlolvj�6- for Dena Jddnson, P.E. Project Manager Approved as to Form and Legality: Qcdor— D8111k (Feb 1, 202411:45 C� Douglas W. Black Sr. Assistant City Attorney APPROVAL RECOMMENDED: Chris Harder, P.E., Director, Water Department CITY OF FORT WORTH Sudtery Sewer Aeb&WUwlie�oq@td-tt3,t=r2 — STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS citl pnject ReAsed8/22/1022 OFFK16 I FTARY FTJ WORTH', TX 006113 1 PERFORMANCE BOND Page 1 of 2 BOND NO. 100161576 1 SECTION 00 61.13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, William J. Schultz, Inc. dba Circle C Constructiol �oJp,n�__,.,,,,_,,,_, known as 8 "Principal" herein and Merchants Bondina Comnanv (Mutual) a corporate 9 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 11 municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal Two Million, Eight Hundred Four Thousand, 12 sum of, Two Hundred. Ninety -Nine and W.1 Dollars 13 ($ *2.804,299.00* _J, lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the 12th day of December _, 2023 , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 20 labor and other accessories defined by law, in the prosecution of the Work, including any Change 21 Orders, as provided for in said Contract designated as Sanitary Sewer Rehabilitation, Contract 22 113, Part 2, City Project No. 1.02785. 23 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City, then this obligation shall be 28 and become null and void, otherwise to remain in full force and effect. 29 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 30 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 31 Worth Division. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION [DOCUMENTS City Project No. 102785 Revised July 1, 2011 006113-2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 28th day of 6 December ., 20 23 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 ATTEST: K ,��r.9 (Principal) Secretary Michele . Lankfor Witness as to Principal Xfileler Witness as to Surety John A PRINCIPAL: William J. Schultz, Inc. dba Circle C Cons ru:, ion Company BY:- a sue _ Signature Teresa S. Skelly, President Name and Title Address: _500 W. Trammell P. O. Box 40328 Fort Worth,._TX 76140 Sheryl A. Klutts, Attorney -in -Fact Name and `Title Address: 6700 Westown Parkway West Des Moines, IA 50266-7754 Telephone Number: (800)678-8171 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011, Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 MERCHANT"S%, BONDING COMPANY,. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, John A Miller; Sheryl A Klutts their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 20th day of March 2023 ••P- 10 Nq y �oEiPOR <•�o v 2003 MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING, INC. d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY By President STATE OFIOWA '•.•,���1?•���■.•' '•.••�••.• COUNTY OF DALLAS ss. On this 20th day of March 2023 , before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. CO,j�•. •moo •QAPOq •A9y alt. 1933 .y: c. • •Cti. 0.:.a Kim Lee a r Cr Commission Number 7i}2737 14ty Go ` miss�n Expr�es & Svr. A0114, 2024 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 28th day of December, 2023. +"+PZ10Nq�'•.. .•�O�N ca�fo• h G ON 2003 1933 o'y • Secretary POA0018 (10/22) ""'• ••••••• 0061 14-1 PAYMENT BOND Page I of 2 BOND NO. 100161576 1 SECTION 00 61 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRA.NT § 7 That we, William J. Schultz, Inc. dba Circle C Construction Comnanv known as 8 "Principal" herein, and Merchants Bonding„CpiipavX..(M�l) a _.._. _� 9 corporate surety (sureties), duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 11 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, Two Million, Eight Hundred Four Thousand, Two 12 in the penal sum of.Ji,cdN-Nine.audl�iaL1.0I1************* Dollars 13 ($ *? 804,,299.00*............__................_), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, 15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 16 presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 12th day of December , 2023 , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as Sanitary Sewer Rehabilitation, Contract 113, Part 2, City Project 22 No.102785. 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 24 Principal shalt pay all monies owing to any (and all) payment bond beneficiary (as defined in 25 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 26 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 27 force and effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 30 accordance with the provisions of said statute. 31 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 0061 J4-2 PAYMF,Nr BOND Page 2 of 2 1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 28th,,,,._. day of 3 December. — _ , 2023 ki ATTEST: (Principal) Secretary Michele S. 4ankford Witness as to Principal PRINCIPAL: William J. Schultz, Inc. dba BY: Signature Teresa S. Skelly, President Name and Title Address: 500 W. Trammell P. O. Box 40.328............... _.....__ _ Fort._Worth, TX 76140,,,._.. SURETY: Merchants B z R Company (Mutual) ATTEST: BY: _....... _. .......... Signature _............... ........ (Surety) Sec --et' _ u• _ Witness as to Surety John A. Miller 61 Sheryl A. Klutts, Attorney -in -Fact Name and Title Address: 6700 Westown Parkway West Des Moinesa IA 50266-7754 Telephone Number: 800 (78-8171 6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address, both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. 11 END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10278S Revised July 1, 2011 MERCHANTS ', BONDING COMPANY. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, John A Miller; Sheryl A Klutts their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seat when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 20th day of March 2023 .... ••.•PI % Nq .� .DEtPOR••�p:, 2003 MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING, INC. d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY By President STATE OF IOWA ' • '. �7 .. •• .' COUNTY OF DALLAS ss. '•.. ...`• On this 20th day of March 2023 , before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. .•��NG.Coy�•. t= :3• : a'• 1933 ; c; .s�. A. •am. 6; :A . «�.Kim Lee tag s"„ Commismn Nunes 702737 z a ti My Commissi m Expires ApM 14, 2024 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 28th day of December, 2023. _ y1933 Secretary 2003;'ti . .d' �� . •. 6,i •.. A . POA 0018 (10/22) "'`��•• 006119-1 MAINTENANCE BOND Page 1 of 3 BOND NO. 100161576 1 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we William J._Schultz, Inc. dba Circle C Construction Comnanv. .�, known as 9 "Principal" herein and Merchants Bondi ,Cotnpauy Mutual , a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 12 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, Two Million, Eight Hundred Four Thousand Two 13 in the sum of Eundred_Ninety-Nin �nt1Nn/1(1(1*************Dollars 14 ($ *2,804,299.00* _ _.... ,), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its 16 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 17 and severally, firmly by these presents. 18 19 WHEREAS, the Principal has entered into a certain written contract with the City awarded 20 the 12th day of December , 20?1._, which Contract is hereby 21 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 22 materials, equipment labor and other accessories as defined by law, in the prosecution of the 23 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 24 the "Work") as provided for in said contract and designated as Sanitary Sewer Rehabilitation, 25 Contract 113, Part 2, City Project No. 102785; and 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two (2) years 30 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 31 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 006119-2 MAINTENANCE BOND Page 2 of 3 1 WHEREAS Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the City of the need therefor at any time within the Maintenance 3 Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work, for which timely notice was provided by City, to a completion 7 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 8 full force and effect. X 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 11 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 12 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 13 the Surety under this Maintenance bond; and 14 15 PROVIDED FURTHER, that if any legal action be fiLed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 006119-3 MAINTENANCE BOND Page of3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 3 December , 20 23 . 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ATTEST: (Principal) Secretary Witness as to Principal ATTEST: 2.81 day of PRINCIPAL: William J. Schultz, Inc. dba BY:_ Signature Teresa„S. Skelly, President Name and Title Address: 500 W. Trammell P. O. Box 4032$ Fort Worth, T, 76140 SURETY: Merchants Company_t,MAmal Signatur Sheryl A. Klutts. Attornev-in-F4 Name and Title Address: 6700 Westown Parkway (Sure Secretary West Des Moines A 50266-7754 %i �' Z4101%— Witness as to Surety John A, filler Telephone Number: (800)678-8171 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCT ION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 MERCY-iANTS %$ ; BONDING COMPANY. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, John A Miller; Sheryl A Klutts their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 201h day of March 2023 ••"�""••. ........ MERCHANTS BONDING COMPANY (MUTUAL) o•••�Q►A1P�q�•6 o�p�NP.CQ�1jp.• MERCHANTS NATIONAL BONDING, INC. h ; �El IQ9 . p ,.OQI Oq�.9y d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY 2003 1933 By •'dV� • .. ; �t•. �jy...... • 11a . President STATE OF IOWA �'•. % •'• fil .•• COUNTY OF DALLAS ss. "o"" On this 20th day of March 2023 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. S',jjx!A° Kim Lee o r Cornrnissm Number 7f)2T37 My Commission Expires AP6114,2024 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 28th day of December, 2023. G.�ppRq ��• ;00,04tPUAq�9y�� i%✓ s�I' _ 1933 gip 2003 :: �a C; Secretary ;Q•. .y�. ,r. POA0018 (10/22) "' •�•••� '4"� MERCHANTS BONDING COMPANY,. MERCHANTS BONDING COMPANY (MUTUAL) • MERCHANTS NATIONAL BONDING, INC. P.O. BOX 14498 - DES MOINES, IOWA 50306-3498 • (800) 678-8171 , (515) 243-3854 FAX Please send all notices of claim on this bond to: Merchants Bonding Company (Mutual) / Merchants National Bonding, Inc. P.O. Box 14498 Des Moines, Iowa 50306-3498 (515) 243-8171 (800) 678-8171 Physical Address: 6700 Westown Parkway, West Des Moines, Iowa 50266 SUP 0073 TX (2/15) POLICY NUMBER: CPP100051064 COMMERCIAL GENERAL LIABILITY CGL 121 (02 21) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONTRACT OR AGREEMENT - ONGOING OPERATIONS AND PRODUCTS -COMPLETED OPERATIONS (TEXAS LIMITED SOLE NEGLIGENCE) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE (OPTIONAL) Name of Additional Insured Persons or Organizations (As required by written contract or agreement per Paragraph A. below.) Locations of Covered Operations (As per the written contract or agreement, provided the location is within the "coverage territory".) (Information required to complete this Schedule, if not shown above, will be shown in the Declarations.) A. Section II —Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement in effect during the term of this policy that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above; and 3. The particular person or organization, if any, scheduled above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury' occurring after the execution of the contract or agreement described in Paragraph 1. above and caused, in whole or in part, by: a. Your acts or omissions; or b. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured; or c. "Your work" performed for the additional insured and included in the "products -completed operations hazard" if such coverage is specifically required in the written contract or agreement. With respect to liability of the additional insured for "bodily injury" of an employee or agent of a named insured or the employee of a named insured's subcontractor, coverage shall apply for the partial or sole negligence of the additional insured, but only if such coverage is specifically required in the written contract or agreement. However, the insurance afforded to such additional insured(s) described above: a. Only applies to the extent permitted by law; b. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured; CGL 121 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 2 Copyright 2020 FCCI Insurance Group. QUOTE POLICY NUMBER: CPP100051064 COMMERCIAL GENERAL LIABILITY CGL 121 (02 21) c. Will not be broader than that which is afforded to you under this policy; and d. Nothing herein shall extend the term of this policy. B. The insurance provided to the additional insured does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: 1. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or 2. Supervisory, inspection, architectural or engineering activities. C. This insurance is excess over any other valid and collectible insurance available to the additional insured whether on a primary, excess, contingent or any other basis; unless the written contract or agreement requires that this insurance be primary and non-contributory, in which case this insurance will be primary and non-contributory relative to insurance on which the additional insured is a Named Insured. D. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement described in Paragraph A.1.; or 2. Available under the applicable Limits of Insurance; whichever is less. This endorsement shall not increase the applicable Limits of Insurance. E. Section IV — Commercial General Liability Conditions is amended as follows: The Duties In The Event of Occurrence, Offense, Claim or Suit condition is amended to add the following additional conditions applicable to the additional insured: An additional insured under this endorsement must as soon as practicable: 1. Give us written notice of an `occurrence" or an offense which may result in a claim or "suit" under this insurance, and of any claim or "suit' that does result; 2. Send us copies of all legal papers received in connection with the claim or "suit', cooperate with us in the investigation or settlement of the claim or defense against the "suit', and otherwise comply with all policy conditions; and 3. Tender the defense and indemnity of any claim or "suit" to any provider of other insurance which would cover the additional insured for a loss we cover under this endorsement and agree to make available all such other insurance. However, this condition does not affect Paragraph C. above. We have no duty to defend or indemnify an additional insured under this endorsement until we receive from the additional insured written notice of a claim or "suit'. F. This endorsement does not apply to any additional insured or project that is specifically identified in any other additional insured endorsement attached to the Commercial General Liability Coverage Form. CGL 121 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 2 of 2 Copyright 2020 FCCI Insurance Group. QUOTE Policy #CPP100051064 FIRST CHOICE CONTRACTORS LIABILITY ENDORSEMENT TABLE OF CONTENTS DESCRIPTION PAGE AdditionalInsured Coverage ............. ....... ........................... ........ ......... ............................ ..... _.... ........ ..............,........9 BailBonds....... ......................................................�.,......,......,......... ,.......p..............,,...........,.....:..........9 BlanketWaiver of Subrogation ................. ............... ................................... .... ..... .... ......... ....... ...... <...... ..... ,...:..........14 BodilyInjury and Property Damage .......................a .... ............. .,...................................... ............... ...... .......... I......... 1 Care, Custody or Control.............................................................. ....................................... ............................... 3 ContractorsErrors and Omissions....,...................................................................................................,..................... 6 Contractual Liability (Personal & Advertising Injury).................................................................................................. 2 Electronic Data Liability.............................................................................................................................................. 1 GeneralLiability Conditions........................................................................................................................»............ 13 IncidentalMalpractice .................................... ......... .............................w................................. ...............................9 Insured..................................................... .,............................................................................. .................................... 9 LimitedProduct Withdrawal Expense........................................................................................................................ 3 Limitsof Insurance ..................... I......................4..... 11 Lossof Earnings. .................................. .............. ............ ................................................. .. .................... 9 LostKey Coverage...........................................................................................,...,.......,....,........................................ 8 NewlyFormed or Acquired Organizations........................................................................ I ..... ... ........... _ .......11 Non -Owned Watercraft.....................................................................,.........................................................:..:.::::....... 1 Property Damage Liability — Borrowed Equipment..................................................................................... ........ 1 Tenant's Property and Premises Rented To You......................................................................,............................... 8 VoluntaryProperty Damage....................................................................................................................................... 2 QUOTE Policy #CPP100051064 COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. FIRST CHOICE CONTRACTORS LIABILITY ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM NOTE: The following are additions, replacements and amendments to the Commercial General Liability Coverage Form, and will apply unless excluded by separate endorsement(s) to the Commercial General Liability Coverage Form. The COMMERCIAL GENERAL LIABILITY COVERAGE FORM is amended as follows: SECTION I - COVERAGES, COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE is amended as follows: 1. Extended "Property Damage" Exclusion 2.a., Expected or Intended Injury, is replaced with the following: a. "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. 2. Non -owned Watercraft Exclusion 2.g. (2) (a) is replaced with the following: (a) Less than 51 feet long; and 3. Property Damage Liability— Borrowed Equipment The following is added to Exclusion 2.j. (4): Paragraph (4) of this exclusion does not apply to "property damage" to borrowed equipment while at a jobsite and not being used to perform operations. The most we will pay for "property damage" to any one borrowed equipment item under this coverage is $25,000 per `occurrence". The insurance afforded under this provision is excess over any other valid and collectible property insurance (including deductible) available to the insured, whether primary, excess, contingent or on any other basis. 4. Limited Electronic Data Liability Exclusion 2.p. is replaced with the following: p. Electronic Data Damages arising out of the loss of, loss of use of, damage to, corruption of, inability to access, or inability to manipulate "electronic data" that does not result from physical injury to tangible property. The most we will pay under Coverage A for "property damage" because of all loss of "electronic data" arising out of any one "occurrence" is $10,000. We have no duty to investigate or defend claims or "suits" covered by this Limited Electronic Data Liability coverage. The following definition is added to SECTION V — DEFINITIONS of the Coverage Form: "Electronic data" means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software (including systems and applications software), hard or floppy disks, CD- ROMS, tapes, drives, cells, data processing devices or any other media which are used with electronically controlled equipment. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) For purposes of this Limited Electronic Data Liability coverage, the definition of "Property Damage" in SECTION V — DEFINITIONS of the Coverage Form is replaced by the following: 17. "Property damage" means: a. Physical injury to tangible property, including all resulting loss of use of that property. All such loss of use shall be deemed to occur at the time of the physical injury that caused it; b. Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the "occurrence" that caused it; c. Loss of, loss of use of, damage to, corruption of, inability to access, or inability to properly manipulate "electronic data", resulting from physical injury to tangible property. All such loss of "electronic data" shall be deemed to occur at the time of the `occurrence" that caused it. For purposes of this insurance, "electronic data" is not tangible property. SECTION I — COVERAGES, COVERAGE B. PERSONAL AND ADVERTISING INJURY LIABILITY is amended as follows: Paragraph 2.e. Exclusions — the Contractual Liability Exclusion is deleted. SECTION I — COVERAGES, the following coverages are added: COVERAGE D. VOLUNTARY PROPERTY DAMAGE Insuring Agreement We will pay, at your request, for "property damage" caused by an `occurrence", to property of others caused by you, or while in your possession, arising out of your business operations. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. 2. Exclusions This insurance does not apply to: "Property Damage" to: a. Property at premises owned, rented, leased or occupied by you; b. Property while in transit; c. Property owned by, rented to, leased to, loaned to, borrowed by, or used by you; d. Premises you sell, give away, or abandon, if the "property damage" arises out of any part of those premises; e. Property caused by or arising out of the "products -completed operations hazard"; f. Motor vehicles; g. "Your product" arising out of it or any part of it; or h. "Your work" arising out of it or any part of it. 3. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. We will then pay the amount of loss in excess of $250 up to the applicable limit of insurance. 4. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 2 of 14 Copyright 2020 FCC[ Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) The insurance afforded under COVERAGE D is excess over any other valid and collectible property or inland marine insurance (including the deductible applicable to the property or inland marine coverage) available to you whether primary, excess, contingent or any other basis. Coverage D covers unintentional damage or destruction, but does not cover disappearance, theft, or loss of use. The insurance under COVERAGE D does not apply if a loss is paid under COVERAGE E. COVERAGE E. CARE, CUSTODY OR CONTROL 1. Insuring Agreement We will pay those sums that the insured becomes legally obligated to pay as damages because of "property damage" caused by an "occurrence", to property of others while in your care, custody, or control or property of others as to which you are exercising physical control if the "property damage" arises out of your business operations. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. 2. Exclusions This insurance does not apply to: "Property Damage" to: a. Property at premises owned, rented, leased or occupied by you; b. Property while in transit; c. Premises you sell, give away, or abandon, if the "property damage" arises out of any part of those premises; d. Property caused by or arising out of the "products -completed operations hazard": e. Motor vehicles; f. "Your product" arising out of it or any part of it; or g. "Your work" arising out of it or any part of it. 3. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. We will then pay the amount of loss in excess of $250 up to the applicable limit of insurance. 4. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance afforded under COVERAGE E is excess over any other valid and collectible property or inland marine insurance (including the deductible applicable to the property or inland marine coverage) available to you whether primary, excess, contingent or any other basis. The insurance under COVERAGE E does not apply if a loss is paid under COVERAGE D. COVERAGE F. LIMITED PRODUCT WITHDRAWAL EXPENSE 1. Insuring Agreement a. If you are a "seller', we will reimburse you for "product withdrawal expenses" associated with "your product" incurred because of a "product withdrawal" to which this insurance applies. The amount of such reimbursement is limited as described in SECTION III - LIMITS OF INSURANCE. No other obligation or liability to pay sums or perform acts or services is covered. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 3 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) a. This insurance applies to a "product withdrawal" only if the "product withdrawal" is initiated in the "coverage territory" during the policy period because: (1) You determine that the "product withdrawal" is necessary; or (2) An authorized government entity has ordered you to conduct a "product withdrawal". c. We will reimburse only those "product withdrawal expenses" which are incurred and reported to us within one year of the date the "product withdrawal" was initiated. d. The initiation of a "product withdrawal" will be deemed to have been made only at the earliest of the following times: (1) When you have announced, in any manner, to the general public, your vendors or to your employees (other than those employees directly involved in making the determination) your decision to conduct a "product withdrawal" This applies regardless of whether the determination to conduct a "product withdrawal" is made by you or is requested by a third party; (2) When you received, either orally or in writing, notification of an order from an authorized government entity to conduct a "product withdrawal; or (3) When a third party has initiated a "product withdrawal" and you communicate agreement with the "product withdrawal", or you announce to the general public, your vendors or to your employees (other than those employees directly involved in making the determination) your decision to participate in the "product withdrawal", whichever comes first. e. "Product withdrawal expenses" incurred to withdraw "your products" which contain: (1) The same "defect" will be deemed to have arisen out of the same "product withdrawal'; or (2) A different "defect" will be deemed to have arisen out of a separate "product withdrawal" if newly determined or ordered in accordance with paragraph 1.b of this coverage. 2. Exclusions This insurance does not apply to "product withdrawal" expenses" arising out of: a. Any "product withdrawal" initiated due to: (1) The failure of "your products" to accomplish their intended purpose, including any breach of warranty of fitness, whether written or implied. This exclusion does not apply if such failure has caused or is reasonably expected to cause "bodily injury" or physical damage to tangible property. (2) Copyright, patent, trade secret or trademark infringements; (3) Transformation of a chemical nature, deterioration or decomposition of "your product", except if it is caused by: (a) An error in manufacturing, design, processing or transportation of "your product'; or (b) "Product tampering". (4) Expiration of the designated shelf life of "your product". b. A "product withdrawal", initiated because of a "defect" in "your product" known to exist by the Named Insured or the Named Insured's "executive officers", prior to the inception date of this Coverage Part or prior to the time "your product" leaves your control or possession. c. Recall of any specific products for which "bodily injury" or "property damage" is excluded under Coverage A - Bodily Injury And Property Damage Liability by endorsement. d. Recall of "your products" which have been banned from the market by an authorized government entity prior to the policy period. e. The defense of a claim or "suit" against you for "product withdrawal expenses". CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 4 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) 3. For the purposes of the insurance afforded under COVERAGE F, the following is added to 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit Condition under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS: e. Duties In The Event Of A "Defect" Or A "Product Withdrawal" (1) You must see to it that we are notified as soon as practicable of any actual, suspected or threatened "defect" in "your products", or any governmental investigation, that may result in a "product withdrawal". To the extent possible, notice should include: (a) How, when and where the "defect" was discovered; (b) The names and addresses of any injured persons and witnesses; and (c) The nature, location and circumstances of any injury or damage arising out of use or consumption of "your product". (2) If a "product withdrawal" is initiated, you must: (a) Immediately record the specifics of the "product withdrawal" and the date it was initiated; (b) Send us written notice of the "product withdrawal" as soon as practicable; and (c) Not release, consign, ship or distribute by any other method, any product, or like or similar products, with an actual, suspected or threatened defect. (3) You and any other involved insured must: (a) Immediately send us copies of pertinent correspondence received in connection with the "product withdrawal"; (b) Authorize us to obtain records and other information; and (c) Cooperate with us in our investigation of the "product withdrawal". 4. For the purposes of this Coverage F, the following definitions are added to the Definitions Section: a. "Defect" means a defect, deficiency or inadequacy that creates a dangerous condition. b. "Product tampering" is an act of intentional alteration of "your product" which may cause or has caused "bodily injury' or physical injury to tangible property. When "product tampering" is known, suspected or threatened, a "product withdrawal' will not be limited to those batches of "your product" which are known or suspected to have been tampered with. c. "Product withdrawal" means the recall or withdrawal of "your products", or products which contain "your products", from the market or from use, by any other person or organization, because of a known or suspected "defect" in "your product", or a known or suspected "product tampering", which has caused or is reasonably expected to cause "bodily injury" or physical injury to tangible property. d. "Product withdrawal expenses" means those reasonable and necessary extra expenses, listed below paid and directly related to a "product withdrawal": (1) Costs of notification; (2) Costs of stationery, envelopes, production of announcements and postage or facsimiles; (3) Costs of overtime paid to your regular non -salaried employees and costs incurred by your employees, including costs of transportation and accommodations; (4) Costs of computer time; (5) Costs of hiring independent contractors and other temporary employees; (6) Costs of transportation, shipping or packaging; (7) Costs of warehouse or storage space; or CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 5 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) (8) Costs of proper disposal of "your products", or products that contain "your products", that cannot be reused, not exceeding your purchase price or your cost to produce the products; but "product withdrawal expenses" does not include costs of the replacement, repair or redesign of "your product", or the costs of regaining your market share, goodwill, revenue or profit. e. "Seller" means a person or organization that manufactures, sells or distributes goods or products. "Seller" does not include a "contractor" as defined elsewhere in this endorsement. The insurance under COVERAGE F does not apply if a loss is paid under COVERAGE G. COVERAGE G. CONTRACTORS ERRORS AND OMISSIONS 1. Insuring Agreement If you are a "contractor", we will pay those sums that you become legally obligated to pay as damages because of "property damage" to "your product", "your work" or "impaired property", due to faulty workmanship, material or design, or products including consequential loss, to which this insurance applies. The damages must have resulted from your negligent act, error or omission while acting in your business capacity as a contractor or subcontractor or from a defect in material or a product sold or installed by you while acting in this capacity. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. We have no duty to investigate or defend claims or "suits" covered by this Contractors Errors or Omissions coverage. This coverage applies only if the "property damage" occurs in the "coverage territory" during the policy period. This coverage does not apply to additional insureds, if any. Supplementary Payments — Coverage A and B do not apply to Coverage G. Contractors Errors and Omissions. 2. Exclusions This insurance does not apply to: a. "Bodily injury" or "personal and advertising injury". b. Liability or penalties arising from a delay or failure to complete a contract or project, or to complete a contract or project on time. c. Liability because of an error or omission: (1) In the preparation of estimates or job costs; (2) Where cost estimates are exceeded; (3) In the preparation of estimates of profit or return on capital; (4) In advising or failure to advise on financing of the work or project; or (5) In advising or failing to advise on any legal work, title checks, form of insurance or suretyship. d. Any liability which arises out of any actual or alleged infringement of copyright or trademark or trade dress or patent, unfair competition or piracy, or theft or wrongful taking of concepts or intellectual property. e. Any liability for damages: (1) From the intentional dishonest, fraudulent, malicious or criminal acts of the Named Insured, or by any partner, member of a limited liability company, or executive officer, or at the direction of any of them; or (2) Which is in fact expected or intended by the insured, even if the injury or damage is of a different degree or type than actually expected or intended. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission_ Page 6 of 14 Copyright 2020 FCC[ Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) f. Any liability arising out of manufacturer's warranties or guarantees whether express or implied. g. Any liability arising from "property damage" to property owned by, rented or leased to the insured. h. Any liability incurred or "property damage" which occurs, in whole or in part, before you have completed "your work." "Your work" will be deemed completed at the earliest of the following times: (1) When all of the work called for in your contract or work order has been completed; (2) When all the work to be done at the job site has been completed if your contract calls for work at more than one job site; or (3) When that part of the work done at a job site has been put to its intended use by any person or organization other than another contractor or subcontractor working on the same project. Work that may need service or maintenance, correction, repair or replacement, but which is otherwise complete, will be treated as complete. i. Any liability arising from "property damage" to products that are still in your physical possession. j. Any liability arising out of the rendering of or failure to render any professional services by you or on your behalf, but only with respect to either or both of the following operations: (1) Providing engineering, architectural or surveying services to others; and (2) Providing or hiring independent professionals to provide engineering, architectural or surveying services in connection with construction work you perform. Professional services include the preparing, approving or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders, or drawings and specifications. Professional services also include supervisory or inspection activities performed as part of any related architectural or engineering activities. But, professional services do not include services within construction means, methods, techniques, sequences and procedures employed by you in connection with construction work you perform. k. Your loss of profit or expected profit and any liability arising therefrom. I. "Property damage" to property other than "your product," "your work" or "impaired property." m. Any liability arising from claims or "suits" where the right of action against the insured has been relinquished or waived. n. Any liability for "property damage" to "your work" if the damaged work or the work out of which the damage arises was performed on your behalf by a subcontractor. o. Any liability arising from the substitution of a material or product for one specified on blueprints, work orders, contracts or engineering specifications unless there has been written authorization, or unless the blueprints, work orders, contracts or engineering specifications were written by you, and you have authorized the changes. p. Liability of others assumed by the insured under any contract or agreement, whether oral or in writing. This exclusion does not apply to liability for damages that the insured would have in the absence of the contract or agreement. 3. For the purposes of Coverage G, the following definition is added to the Definitions section: a. "Contractor" means a person or organization engaged in activities of building, clearing, filing, excavating or improvement in the size, use or appearance of any structure or land. "Contractor" does not include a "seller" as defined elsewhere in this endorsement. 4. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. The limits of insurance will not be reduced by the application of the deductible amount. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 7 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) We may pay any part or all of the deductible amount to effect settlement of any claim or "suit", and upon notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as has been paid by us. 5. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance under COVERAGE G does not apply if a loss is paid under COVERAGE F. COVERAGE H. LOST KEY COVERAGE 1. Insuring Agreement We will pay those sums, subject to the limits of liability described in SECTION III LIMITS OF INSURANCE in this endorsement and the deductible shown below, that you become legally obligated to pay as damages caused by an "occurrence" and due to the loss or mysterious disappearance of keys entrusted to or in the care, custody or control of you or your "employees" or anyone acting on your behalf. The damages covered by this endorsement are limited to the: a. Actual cost of the keys; b. Cost to adjust locks to accept new keys; or c. Cost of new locks, if required, including the cost of installation. 2. Exclusions This insurance does not apply to: a. Keys owned by any insured, employees of any insured, or anyone acting on behalf of any insured; b. Any resulting loss of use; or c. Any of the following acts by any insured, employees of any insured, or anyone acting on behalf of any insured: 1) Misappropriation; 2) Concealment; 3) Conversion; 4) Fraud; or 5) Dishonesty. 3. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $1,000. The limits of insurance will not be reduced by the application of the deductible amount. We may pay any part or all of the deductible amount to effect settlement of any claim or "suit" and, upon notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as has been paid by us. EXPANDED COVERAGE FOR TENANT'S PROPERTY AND PREMISES RENTED TO YOU The first paragraph after subparagraph (6) in Exclusion j., Damage to Property is amended to read as follows: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire) to premises, including the contents of such premises, rented to you. A separate limit of insurance applies to Damage To Premises Rented To You as described in Section III — Limits Of Insurance. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission_ Page 8 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) SECTION I - COVERAGES, SUPPLEMENTARY PAYMENTS — COVERAGE A and B is amended as follows: All references to SUPPLEMENTARY PAYMENTS — COVERAGES A and B are amended to SUPPLEMENTARY PAYMENTS —COVERAGES A, B, D, E, G, and H. 1. Cost of Bail Bonds Paragraph 1.b. is replaced with the following: b. Up to $2,500 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. 2. Loss of Earnings Paragraph 1.d. is replaced with the following: d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or "suit", including actual loss of earnings up to $500 a day because of time off from work. SECTION II — WHO IS AN INSURED is amended as follows: 1. Incidental Malpractice Paragraph 2.a.(1)(d) is replaced with the following: (d) Arising out of his or her providing or failing to provide professional health care services. However, this exclusion does not apply to a nurse, emergency medical technician or paramedic employed by you to provide medical services, unless: (i) You are engaged in the occupation or business of providing or offering medical, surgical, dental, x-ray or nursing services, treatment, advice or instruction; or (ii) The "employee" has another insurance that would also cover claims arising under this provision, whether the other insurance is primary, excess, contingent or on any other basis. 2. Broadened Who Is An Insured The following are added to Paragraph 2.: Subsidiaries e. Your subsidiaries if: (1) They are legally incorporated entities; and (2) You own more than 50% of the voting stock in such subsidiaries as of the effective date of this policy. If such subsidiaries are not shown in the Declarations, you must report them to us within 180 days of the inception of your original policy. Additional Insureds f. Any person or organization described in paragraphs g. through k. below whom you are required to add as an additional insured on this policy under a written contract or agreement in effect during the term of this policy, provided the written contract or agreement was executed prior to the "bodily injury', "property damage" or "personal and advertising injury" for which the additional insured seeks coverage. However, the insurance afforded to such additional insured(s): (1) Only applies to the extent permitted by law; (2) Will not be broader than that which you are required by the contract or agreement to provide for such additional insured; (3) Will not be broader than that which is afforded to you under this policy; (4) Is subject to the conditions described in paragraphs g. through k. below; and (5) Nothing herein shall extend the term of this policy. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 9 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) g. Owner, Lessor or Manager of Premises If the additional insured is an owner, lessor or manager of premises, such person or organization shall be covered only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by you or those acting on your behalf in connection with the ownership, maintenance or use of that part of any premises leased to you and subject to the following additional exclusions: (1) Any "occurrence" that takes place after you cease to occupy those premises; or (2) Structural alterations, new construction or demolition operations performed by or on behalf of such person or organization. h. State or Governmental Agency or Subdivision or Political Subdivision — Permits or Authorizations If the additional insured is the state or any political subdivision, the state or political subdivision shall be covered only with respect to operations performed by you or on your behalf for which the state or political subdivision has issued a permit or authorization. This insurance does not apply to: (1) "Bodily injury", "property damage", or "personal and advertising injury" arising out of operations performed for the federal government, state or municipality; or (2) "Bodily injury" or "property damage" included within the "products -completed operations hazard". i. Lessor of Leased Equipment If the additional insured is a lessor of leased equipment, such lessor shall be covered only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). With respect to the insurance afforded to these additional insureds, this insurance does not apply to any "occurrence" which takes place after the equipment lease expires. j. Mortgagee, Assignee, or Receiver If the additional Insured is a mortgagee, assignee, or receiver of premises, such mortgagee, assignee or receiver of premises is an additional insured only with respect to their liability as mortgagee, assignee, or receiver and arising out of the ownership, maintenance, or use of the premises by you. This insurance does not apply to structural alterations, new construction and demolition operations performed by or for that person or organization. k. Vendor If the additional insured is a vendor, such vendor is an additional insured only with respect to liability for "bodily injury" or "property damage" caused by "your products" which are distributed or sold in the regular course of the vendor's business, subject to the following additional exclusions: (1) The insurance afforded to the vendor does not apply to: (a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in absence of the contract or agreement. (b) Any express warranty unauthorized by you, (c) Any physical or chemical change in "your product" made intentionally by the vendor; (d) Repackaging, unless unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container: (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 10 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) (f) Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; (g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or (h) "Bodily injury' or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: i. The exceptions contained in Subparagraphs d. or f.; or ii. Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products. 3. Newly Formed or Acquired Organizations Paragraph 3, is amended as follows: a. Coverage under this provision is afforded until the end of the policy period. d. Coverage A does not apply to product recall expense arising out of any withdrawal or recall that occurred before you acquired or formed the organization. SECTION III — LIMITS OF INSURANCE is amended as follows: 1. Paragraph 2. is replaced with the following: 2. The General Aggregate Limit is the most we will pay for the sum of: a. Medical expenses under Coverage C; b. Damages under Coverage A, except damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard"; c. Damages under Coverage B; d. Voluntary "property damage" payments under Coverage D; e. Care, Custody or Control damages under Coverage E.; and f. Lost Key Coverage under Coverage H. 2. Paragraph 5. is replaced with the following: 5. Subject to Paragraph 2. or 3. above, whichever applies, the Each Occurrence Limit is the most we will pay for the sum of: a. Damages under Coverage A; b. Medical expenses under Coverage C; c. Voluntary "property damage" payments under Coverage D; d. Care, Custody or Control damages under Coverage E; e. Limited Product Withdrawal Expense under Coverage F; f. Contractors Errors and Omissions under Coverage G.; and, g. Lost Key Coverage under Coverage H. because of all "bodily injury" and "property damage" arising out of any one "occurrence". 3. Paragraph 6. is replaced with the following: CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 11 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) 6. Subject to Paragraph 5. above the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire or explosion, while rented to you or temporarily occupied by you with permission of the owner. The Damage to Premises Rented to You Limit is the higher of the Each Occurrence Limit shown in the Declarations or the amount shown in the Declarations as Damage To Premises Rented To You Limit. 4. Paragraph 7. is replaced with the following: 7. Subject to Paragraph 5. above, the higher of $10,000 or the Medical Expense Limit shown in the Declarations is the most we will pay under Coverage C for all medical expenses because of "bodily injury" sustained by any one person. 5. Paragraph 8. is added as follows: 8. Subject to Paragraph 5. above, the most we will pay under Coverage D. Voluntary Property Damage for loss arising out of any one "occurrence" is $1,500. The most we will pay in any one -policy period, regardless of the number of claims made or suits brought, is $3,000. 6. Paragraph 9. is added as follows: 9. Subject to Paragraph 5. above, the most we will pay under Coverage E. Care, Custody or Control for "property damage" arising out of any one "occurrence" is $1,000. The most we will pay in any one -policy period, regardless of the number of claims made or suits brought, is $5,000. 7. Paragraph 10. is added as follows: 10. Subject to Paragraph 5. above, the most we will pay under Coverage F. Limited Product Withdrawal Expense for "product withdrawal expenses" in any one -policy period, regardless of the number of insureds, "product withdrawals" initiated or number of "your products" withdrawn is $10,000. 8. Paragraph 11. is added as follows: 11. Subject to Paragraph 5. above, the most we will pay under Coverage G. Contractors Errors and Omissions for damage in any one -policy period, regardless of the number of insureds, claims or "suits" brought, or persons or organizations making claim or bringing "suits" is $10,000. For errors in contract or job specifications or in recommendations of products or materials to be used, this policy will not pay for additional costs of products and materials to be used that would not have been incurred had the correct recommendations or specifications been made. 9. Paragraph 12. is added as follows: 12. Subject to Paragraph 5. above, the most we will pay under Coverage H., Lost Key Coverage for damages arising out of any one occurrence is $50,000. 10. Paragraph 13. is added as follows: 13. The General Aggregate Limit applies separately to: a. Each of your projects away from premises owned by or rented to you; or b. Each "location" owned by or rented to you. "Location" as used in this paragraph means premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad. 11. Paragraph 14. is added as follows: 14. With respect to the insurance afforded to any additional insured provided coverage under this endorsement: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 12 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) a. Required by the contract or agreement; or b. Available under the applicable Limits of Insurance; whichever is less. This endorsement shall not increase the applicable Limits of Insurance. SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: 1. Subparagraph 2.a. of Duties In The Event Of Occurrence, Offense, Claim, or Suit is replaced with the following: a. You must see to it that we are notified as soon as practicable of an 'occurrence" or an offense which may result in a claim. This requirement applies only when the "occurrence" or offense is known to the following: (1) An individual who is the sole owner; (2) A partner, if you are a partnership or joint venture; (3) An "executive officer" or insurance manager, if you are a corporation; (4) A manager, if you are a limited liability company; (5) A person or organization having proper temporary custody of your property if you die; (6) The legal representative of you if you die; or (7) A person (other than an "employee") or an organization while acting as your real estate manager. To the extent possible, notice should include: (1) How, when and where the "occurrence" or offense took place; (2) The names and addresses of any injured persons and witnesses; and (3) The nature and location of any injury or damage arising out of the 'occurrence" or offense. 2. The following is added to Subparagraph 2.b. of Duties In The Event Of Occurrence, Offense, Claim, or Suit: The requirement in 2.b.applies only when the "occurrence" or offense is known to the following: (1) An individual who is the sole owner; (2) A partner or insurance manager, if you are a partnership or joint venture; (3) An "executive officer or insurance manager, if you are a corporation; (4) A manager or insurance manager, if you are a limited liability company; (5) Your officials, trustees, board members or insurance manager, if you are a not -for -profit organization; (6) A person or organization having proper temporary custody of your property if you die; (7) The legal representative of you if you die; or (8) A person (other than an "employee") or an organization while acting as your real estate manager. 3. The following is added to paragraph 2. of Duties in the Event of Occurrence, Offense, Claim or Suit: e. If you report an `occurrence" to your workers compensation carrier that develops into a liability claim for which coverage is provided by the Coverage Form, failure to report such an "occurrence" to us at the time of the "occurrence" shall not be deemed a violation of paragraphs a., b., and c. above. However, you shall give written notice of this "occurrence" to us as soon as you become aware that this `occurrence" may be a liability claim rather than a workers compensation claim. CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 13 of 14 Copyright 2020 FCCI Insurance Group QUOTE COMMERCIAL GENERAL LIABILITY CGL 088 (02 21) 4. Paragraph 6. is replaced with the following: 6. Representations By accepting this policy, you agree: a. The statements in the Declarations are accurate and complete; b. Those statements are based upon representations you made to us; and c. We have issued this policy in reliance upon your representations. Any error or omission in the description of, or failure to completely describe or disclose any premises, operations or products intended to be covered by the Coverage Form will not invalidate or affect coverage for those premises, operations or products, provided such error or omission or failure to completely describe or disclose premises, operations or products was not intentional. You must report such error or omission to us as soon as practicable after its discovery. However, this provision does not affect our right to collect additional premium charges or exercise our right of cancellation or nonrenewal. 5. The following is added to paragraph 8. Transfer Of Rights Of Recovery Against Others To Us: We waive any right of recovery against any person or organization, because of any payment we make under this Coverage Part, to whom the insured has waived its right of recovery in a written contract or agreement. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person or organization prior to loss. 6. Paragraph 10. is added as follows: 10. Liberalization If we revise this Coverage Form to provide more coverage without additional premium charge, your policy will automatically provide the additional coverage as of the day the revision is effective in the applicable state(s). CGL 088 (02 21) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 14 of 14 Copyright 2020 FCCI Insurance Group QUOTE Policy #CPP100051064 COMMERCIAL GENERAL LIABILITY CG20011219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed in writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the additional insured. This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Insured Copy POLICY NUMBER_ CA100051065 AUTO FIRST CHOICE COVERAGE ENDORSEMENT TABLE OF CONTENTS DESCRIPTION PAGE AirbagCoverage........................................................................................................................................................3 AutoLoan/Lease Gap Coverage...............................................................................................................................3 BroadForm Insured...................................................................................................................................................1 Concealment, Misrepresentation or Fraud................................................................................................................4 Deductible.................................................................................................................................................................. 3 Duties in the Event of Accident, Claim, Suit or Loss.................................................................................................4 FellowEmployee.......................................................................................................................................................2 FireDepartment Service Charge...............................................................................................................................2 Other Insurance for Hired Auto Physical Damage Coverage...................................................................................4 Lossof Earnings........................................................................................................................................................2 Lossof Use Expenses...............................................................................................................................................2 SupplementaryPayments.........................................................................................................................................2 Transfer of Rights of Recovery against Others to Us...............................................................................................4 TransportationExpenses..........................................................................................................................................2 Policy #CA100051065 COMMERCIAL AUTO CAU 058 (10 22) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTO FIRST CHOICE COVERAGE ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM NOTE: The following are additions, replacements and amendments to the Business Auto Coverage Form, and will apply unless excluded by separate endorsement(s) to the Business Auto Coverage Form. With respect to coverages provided by this endorsement, the provisions of the Business Auto Coverage Form apply unless modified by this endorsement. The Business Auto Coverage Form is amended as follows: SECTION II — COVERED AUTOS LIABILITY COVERAGE is amended as follows: A. Paragraph 1. Who Is An Insured in section A. Coverage is amended by the addition of the following: d. Any legally incorporated subsidiary of yours in which you own more than 50% of the voting stock on the effective date of this coverage form. However, "insured" does not include any subsidiary that is an "insured" under any other liability policy or would be an "insured" under such a policy but for its termination or the exhaustion of its limits of insurance. In order for such subsidiaries to be considered insured under this policy, you must notify us of such subsidiaries within 60 days of policy effective date. e. Any organization you newly acquire or form during the policy period, other than a partnership or joint venture, and over which you maintain sole ownership or a majority interest. However, coverage under this provision: (1) Does not apply if the organization you acquire or form is an "insured" under another liability policy or would be an "insured" under such a policy but for its termination or the exhaustion of its limits of insurance; (2) Does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; and (3) Is afforded only for the first 90 days after you acquire or form the organization or until the end of the policy period, whichever comes first. f. Any person or organization who is required under a written contract or agreement between you and that person or organization, that is signed and executed by you before the "bodily injury" or "property damage" occurs and that is in effect during the policy period, to be named as an additional insured is an "insured" for Liability Coverage, but only for damages to which this insurance applies and only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Section II. g. Any "employee" of yours using: (1) a covered "auto" you do not own, hire or borrow, or a covered "auto" not owned by an "employee" or a member of his or her household, while performing duties related to the conduct of your business or your personal affairs; or (2) an "auto" hired or rented under a contract or agreement in that "employee's" name, with your permission, while performing duties related to the conduct of your business. However, your "employee" does not qualify as an insured under this paragraph (2) while using a covered "auto" rented from you or from any member of the "employee's" household h. Your members, if you are a limited liability company, while using a covered "auto" you do not own, hire or borrow, while performing duties related to the conduct of your business or your personal affairs. CAU 058 (10 22) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 4 Copyright 2021 FCCI Insurance Group COMMERCIAL AUTO CAU 058 (10 22) B. Paragraphs (2) and (4) under section 2. Coverage Extensions, a. Supplementary Payments are deleted and replaced by the following: (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" solely at our request, including actual loss of earnings up to $500 a day because of time off from work. C. Paragraph 5. under section B. Exclusions is deleted and replaced by the following: 5. Fellow Employee "Bodily injury" to: a. Any fellow "employee' of the "insured" arising out of and in the course of a fellow "employee's" employment or while performing duties related to the conduct of your business. However, this exclusion does not apply to your "employees" that are officers or managers if the "bodily injury" results from the use of a covered "auto" you own, hire or borrow. Coverage is excess over any other collectible insurance; or b. The spouse, child, parent, brother or sister of that fellow "employee" as a consequence of Paragraph a. above. SECTION III — PHYSICAL DAMAGE COVERAGE is amended as follows: A. Paragraph 4. Coverage Extensions under section A. Coverage is deleted and replaced by the following: 4. Coverage Extensions a. Transportation Expenses We will pay up to $50 per day to a total maximum of $1,500 for temporary transportation expense incurred by you due to covered loss to any covered auto. We will pay only for those covered "autos" for which you carry either Comprehensive or Specked Causes Of Loss Coverage. We will pay for temporary transportation expenses incurred during the period beginning 24 hours after a loss and ending, regardless of the policy's expiration, when the covered "auto" is returned to use or we pay for its "loss". b. Loss of Use Expenses For Hired Auto Physical Damage, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a vehicle rented or hired without a driver under a written rental contract or agreement. We will pay for loss of use expenses if caused by: (1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for hired "autos"; (2) Specified Causes of Loss only if the Declarations indicate that Specified Causes of Loss Coverage is provided for hired "autos'; or (3) Collision only if the Declarations indicate that Collision Coverage is provided for hired "autos". However, the most we will pay for any expenses for loss of use to any one vehicle is $75 per day, to a total maximum of $1,500. B. The following is added to paragraph 4. Coverage Extensions under section A. Coverage: c. Fire Department Service Charge When a fire department is called to save or protect a covered "auto", its equipment, its contents, or occupants from a covered cause of loss, we will pay up to $1,000 for your liability for fire department service charges assumed by contractor or agreement prior to loss. No deductible applies to this additional coverage. CAU 058 (10 22) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 2 of 4 Copyright 2021 FCC[ Insurance Group COMMERCIAL AUTO CAU 058 (10 22) d. Auto Loan/Lease Gap Coverage The following provisions apply: (1) If a long term leased "auto", under an original lease agreement, is a covered "auto" under this coverage form and the lessor of the covered "auto" is named as an additional insured under this policy, in the event of a total loss to the leased covered "auto", we will pay any unpaid amount due on the lease, less the amount paid under the Physical Damage Coverage Section of the policy; and less any: (a) Overdue lease or loan payments including penalties, interest, or other charges resulting from overdue payments at the time of the "loss": (b) Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; (c) Security deposits not refunded by the lessor; (d) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance purchased with the loan or lease; and (e) Carry-over balances from previous loans or leases. (2) If an owned "auto" is a covered "auto" under this coverage form and the loss payee of the covered "auto" is named a loss payee under this policy, in the event of a total loss to the covered "auto", we will pay any unpaid amount due on the loan, less the amount paid under the Physical Damage Coverage Section of the policy; and less any; (a) Overdue loan payments at the time of the "loss": (b) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance purchased with the loan; and (c) Carry-over balances from previous loans. C. Paragraph 3. under section B. Exclusions is deleted and replaced by the following: 3. We will not pay for "loss" due and confined to: a. Wear and tear, freezing, mechanical or electrical breakdown b. Blowouts, punctures or other road damage to tires This exclusion does not apply to such 'loss" resulting from the total theft of a covered "auto". However, this exclusion does not include the discharge of an airbag in a covered "auto" you own that inflates due to a cause other than a cause of "loss" set forth in Paragraphs A.1.b and A.1.c.but only: a. If that "auto" is a covered "auto" for Comprehensive Coverage under this policy; b. The airbags are not covered under any warranty; and c. The airbags were not intentionally inflated We will pay up to a maximum of $1,000 for any one "loss". D. Section D. Deductible is deleted and replaced by the following: D. Deductible For each covered "auto", our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by the applicable deductible shown in the Declarations prior to the application of the Limit of Insurance provided that: 1. The Comprehensive or Specified Causes of Loss Coverage deductible applies only to "loss" caused by: a. Theft or mischief or vandalism; or b. All perils. CAU 058 (10 22) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 3 of 4 Copyright 2021 FCCI Insurance Group COMMERCIAL AUTO CAU 058 (10 22) 2. Regardless of the number of covered "autos" damaged or stolen, the maximum deductible applicable for all "loss" in any one event caused by: a. Theft or mischief or vandalism; or b. All perils; will be equal to five times the highest deductible applicable to any one covered "auto" on the Policy for Comprehensive or Specified Causes of Loss Coverage. The application of the highest deductible used to calculate the maximum deductible will be made regardless of which covered "autos" were damaged or stolen in the "loss". 3. Any Comprehensive Coverage deductible shown in the Declarations does not apply to: a. "Loss" arising out of theft of your vehicle if your vehicle is equipped with an active GPS tracking system. b. Glass damage if repaired rather than replaced. SECTION IV — BUSINESS AUTO CONDITIONS is amended as follows: A. The following is added to paragraph a. under section A. Loss Conditions, 2. Duties in the Event of Accident, Claim, Suit or Loss: This duty applies when the "accident", claim, "suit" or "loss" is first known to: (a) You, if you are an individual; (b) A partner, if you are a partnership; (c) An executive officer or insurance manager, if you are a corporation; or (d) A member or manager, if you are a limited liability company. B. Condition 5. Transfer of Rights of Recovery against Others to Us under section A. Loss Conditions is deleted and replaced by the following: 5. Transfer of Rights of Recovery against Others to Us If a person or organization to or for whom we make payment under this coverage form has rights to recover damages from another, those rights are transferred to us. That person or organization must do everything necessary to secure our rights and must do nothing after "accident" or "loss" to impair them. However, if the insured has waived rights to recover through a written contract, or if your work was commenced under a letter of intent or work order, subject to a subsequent reduction in writing of such a waiver with customers whose customary contracts require a waiver, we waive any right of recovery we may have under this coverage form. C. The following is added to Condition 2. Concealment, Misrepresentation or Fraud under section B. General Conditions: However, if you unintentionally fail to disclose any hazards at the inception of your policy, we will not deny coverage under this coverage form because of such failure. This provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. D. Paragraph b. of Condition 5. Other Insurance under section B. General Conditions is deleted and replaced by the following: b. For Hired Auto Physical Damage Coverage, the following are deemed to be covered "autos" you own; (1) Any covered "auto" you lease, hire, rent or borrow; and (2) Any covered "auto" hired or rented by your "employee" under a contract in that individual "employee's" name, with your permission, while performing duties related to the conduct of your business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto", nor is any "auto" you hire from any of your "employees", partners (if you are a partnership), members (if you are a limited liability company), or members of their households. CAU 058 (10 22) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 4 of 4 Copyright 2021 FCCI Insurance Group Policy #CA100051065 COMMERCIAL AUTOMOBILE Y CAU 082 (01 15) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTOMATIC INSURED - BUSINESS AUTO POLICY PRIMARY/NON-CONTRIBUTING WHEN REQUIRED BY CONTRACT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM This endorsement is subject to the terms, conditions, exclusions and any other provisions of the BUSINESS AUTO COVERAGE FORM or any endorsement attached thereto unless changes or additions are indicated below. For the purpose of this endorsement, Section II.A.1. Who Is An Insured is amended by adding the following: 1. Any person or organization when you and such person have agreed in writing in a contract signed and executed by you prior to the loss for which coverage is sought, that such person or organization be added as an "insured" on your auto policy. Such person or organization shall be an "insured" to the extent your negligent actions or omissions impose liability on such "insured" without fault on its part. 2. This insurance is primary and non-contributory to other liability coverages of the person or organization being added to this policy as an "insured" when so required in a written contract or agreement that is executed prior to the loss for which coverage is sought. CAU 082 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 1 Copyright 2015 FCCI Insurance Group. GRE ..exasMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 03 04 B EMPLOYERS LIABILITY POLICY Insured copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. () Specific Waiver Name of person or organization (X)Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: All Texas operations 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see Information Page This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 8/12/23 at 12:01 a.m. standard time, forms a part of: Policy no. 0002051085 of Texas Mutual Insurance Company effective on 8/12/23 Issued to: WILLIAM J SCHULTZ INC DBA: CIRCLE C CONSTRUCTION COMPANY This is not a bill NCCI Carrier Code: 29939 G1 r•i Authorized representative 8/11 /23 PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com 1(800) 859-5995 1 Fax (800) 359-0650 WC420304B lft% 00 61 25 - 1 CERTIFICATE OF INSURANCE Page 1 of I 1 SECTION 00 6125 2 CERTIFICATE OF INSURANCE 3 4 5 6 [Assembler: For Contract Document execution, remove this page and replace with standard 7 ACORD Certificate oflnsurance form.] 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Aomftk STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STAINDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8/2MI � ������ ,�^^^�,"�^^^~^� ~�"�^,^�^^^"^� ~��^^,^°�^�,�^,^^ ,�^ ^^^"� CONSTRUCTION CONTRACT TABLE OF CONTENTS Articlel—I)efinition;uod Terminology -----------------------------------.l LUlDefined Terms ............................................................................................................................... l 1.02 Terminology ----.---'--'—''----'----'-----------'----'6 Article2— Preliminary Matters ......................................................................................................................... 7 IUlCopies ofDocuments .................................................................................................................... 7 2U� � Cmuzou�occzocotof(�ootroc�Tbzu:'I�o���to�roc��d 7 , --------------------- 2-U3 Starting the Work .......................................................................................................................... 8 I04 Before StartingConstruction ........................................................................................................ 8 I05 PrecooatnuctiooConference ----------------------------------'8 2-06 Public Meeting --.-----'----'----'--'------'-----------.8 Article 3—Contract Documents: Intent, Amending, Reuse ............................................................................ 8 3.01 Intent .............................................................................................................................................. 8 3.02 Reference Standards ---------------------------------------A ^~-^ 3.03 and Resolving Discrepancies ----------'—'--'-------'—'—'g 3.04 Amending and Supplementing Contract Documents ................................................................. lO I05Reuse ofDocuments ................................................................................................................... lO 3.06 Electronic Data ............................................................................................................................ ll Article 4— Availability ofLands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points ........................................................................................................... ll 4.01 Availability ofLands .................................................................................................................. ll 4.02 Subsurface and Physical Conditions ------------------------------l2 4.03 Differing Subsurface orPhysical Conditions -------------------------..l2 4.04 Underground Facilities ----.----'------'—.--------.—'----'l3 4.05 Reference Points ......................................................................................................................... l4 Article 5—Bonds and Insurance ..................................................................................................................... l6 5.01 Licensed Sureties and Insurers ................................................................................................... l8 5.02 Performance, Payment, and Maintenance Bonds ....................................................................... l8 5.03 Certificates ofInsurance ............................................................................................................. l6 Article 8—Contractor's Responsibilities ....... IONIAN, 6.01 Supervision and Superintendence CITY o,FORT WORTH yr^�NnxnncmmTnocT/ox mnc/r/cxTmm oocmwsNru .................................................l9 ---------------'l9 6.02 Labor; Working Hours ................................................................................................................ 2Q 6.03 Services, Materials, and Equipment .---'----,.___---.-._--_.-'----.._.2O 6.04 Pro eutSchedule .......................................................................................................................... 2l 6.05 Substitutes ond^ °....................................................................................................... 2l 6.06 Concerning Subcontractors, Suppliers, and Others .................................................................... 24 8.07 Wage Rates .................................................................................................................................. 25 6.08 Patent Fees and Royalties ---''----''''''--'__--'''_-''_-'.'''-_'-'''--._-26 6.09 Permits and Utilities .................................................................................................................... 27 6.10 Laws and Regulations .---'_'.'-'.'-'-'_--'''''.-''''..'.'.'-._''.'''-'.'_'''..-.27 6.11 Taxes ........................................................................................................................................... 28 6.12 Use of Site and Other Areas --''-.'''-''-'.-'.''''-'-'''..-''''--'''..---_'-_''.''2@ 6.13 Record Documents ...................................................................................................................... 2g 6.14 Safety and Protection .................................................................................................................. 2g 6.15 Safety Representative .^..-'-.---.--^''--'-'--'-^.-'-'--'-'--'.,--'-'--'-'--'-'--._-''...-'-3Q 6.16 Hazard Communication Programs ............................................................................................. 3D 6.17 Emergencies and/or Rectification ............................................................................................... 3U 6.18 Submittals .................................................................................................................................... 3l 6.19 Continuing the Work ................................................................................................................... 32 6.20 Contractor's General Warranty and Guarantee .......................................................................... 33 6.21 Indemnification .-------.-_.-_'--.-..-.'..----..'--.-'--..--'_--.._'33 6.22 Delegation of Professional Design Services .............................................................................. 34 6.23 Right to Audit ..------''.--''-'''---''''-.-'--_'-'''-..-.'-'--''-''_---.'''-'--34 6.24 --.---....-'--.-'--'-'--'-'--'-'--'-'--'-'--'-'--'-'--'-'--'-'--.-.-_-35 Article 7-Other Work aithe Site ................................................................................................................... 35 7[01 Related Work e1Site -----'-'''--_'-'---...'..-'---''..-,-~-.-''''.__--'.--.'''.35 Article 0-City`mRem.---.------'----.--._-.--'-__._-----__------''38 8.01 Communications boContractor ................................................................................................... 36 8.02 Furnish Data ................................................................................................................................ 36 0'03 Pay When Due -.---''-'--'-'--'-'--'-'-''-.--'-'-.'-'--'-'..'-'--'-'--'-'.-'---'-.--'-'--36 0.04 Lands and Easements; Reports and Tests ................................................................................... 36 8.05 Change Orders ............................................................................................................................. 38 8.06 Inspections, Tests, and Approvals -.--'''-.-.''.'.--''''-.---'-''-'-'---'''''''-_'..---38 0.07 Limitations ooCity`m Responsibilities ---__..--___-.----__---_----..--37 8.08 Undisclosed Hazardous Condition -.-.-_-...--...--_-,..--.'..._----37 8i09 Compliance with Safety Program -.-'-----'-'''-_'-'..'_-'''-'~'-'---'.-._-37 Article 9-Ci'y"u Observation Stobza During Construction ........................................................................... 37 9.01 City,mPrmeot Manager --------'--'-'--'-'--'-'--'-'--'-'..'-'--'-'~-'...--.-'--'-''-.-.-37 9\02 Visits hnSite ................................................................................................................................ 37 9\03 Authorized Variations ioWork .................................................................................................. 38 9.04 Rejecting Defective Work .......................................................................................................... 38 9.05 Determinations for Work Performed --''-'.'-''-'''''--.'''''''-''''--'---'.'-38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPccnnxrmn cxOcnMsmTm ArticlelO— Changesiothe Work; Claim; Extra Work ................................................................................ 3Q lO.OlAuutborized Changes iuthe Work ............................................................................................... 3Q look, 10i02 Unauthorized Changes iuthe Work ........................................................................................... 39 lO.O3Execution of Change Orders ....................................................................................................... 39 l[iO4Extra Work .................................................................................................................................. 34 10.05 Notification toSurety .................................................................................................................. 3@ Article ll —CmatofdueWork;ADowoauoeo;lJoit Price Work; Plans Quantity Mcamoremueo1-------4l ll.0lCost ofthe Work ......................................................................................................................... 4l ll.02Allowances .................................................................................................................................. 43 11.03Uuit Price Work .......................................................................................................................... 44 11.04Plaoa Quantity Measurement --------'------'-----------'---.45 Article l2— Change of Contract Price; Change ofContract Time ................................................................. 46 12.01 Change ofContract Price ............................................................................................................ 46 12.02 Change ofContract Time ............................................................................................................ 47 12.03 Delays -----..—.--'.---'------'-----------'---.-----47 Article l3—Tests and ; Correction, Removal orAcceptance ofDefective Work ...................... 4Q 13.01 Notice ofDefects ........................................................................................................................ 48 l3.02Access toWork ........................................................................................................................... 48 l3.O3Tests and Inspections .................................................................................................................. 4Q l3.O4Uncovering\mo6c---------------------------------------..4Q lowftk 13.05Chy May Stop the Work ............................................................................................................. 4Q l3.O6Correction orRemoval ofDefective Work ................................................................................ 5O 13.07CQrrcction Period ........................................................................................................................ 5O l3.OQAcceptance ofDefective Work ................................................................................................... 5l Article l4—Payments UnContractor and Completion ---------------------------..52 14`01 Schedule of Values ...................................................................................................................... 52 l4`O2Progress Payments ----.—'-----------------'-------'----52 14`03Curtrmctor`o Warranty ofTitle ................................................................................................... 54 l4.U4Partial Utilization ........................................................................................................................ 55 14`05FinuL Inspection � -----.—.—.----'-----------------------.—'55 14`06 Final Acceptance ......................................................................................................................... 55 14`07Final P-------..------'------------------------.-56 l4.O8F��al o��d Partial i Release ........................................................ 56 Article l5—Suspension ofWork and Termination ........................................................................................ 57 l5.OlCity May Suspend Work ............................................................................................................. 57 l5.O2City May Terminate for Cause ................................................................................................... 5Q Article l6—Dispute Resolution ...................................................................................................................... 6l CITY opFORT WORTH STANDARD CONSTRUCTION mmcrcAnom oocnmENTu Article17 — Miscellaneous .............................................................................................................................. 6Z 17.01 Giving Notice .............................................................................................................................. 82 17,02 Computation mfTimmu ----'_---''''—'''_—'-'-.-'_'_--'''''-.---_''''''-'—'--6Z '� 17.03 Cumulative Remedies ................................................................................................................. 82 17.04 Survival of0bligations .---_—_--_—_.—_—_--_----_-.___—.—''—_-63 17.05 Headings .----'''-''__'-.-.---''_-''—_'-.---'''_---'''-.----.-'.-''—_--'—''83 CITY orFORT WORTH STANDARD CONSTRUCTION macmncATmw oncUMcrTo 007200-1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment —The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. Atank 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award— Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents —The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements —The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. CalendarDay —A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STXNDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 007200-1 GENERAL CONDITION S Page 2 of 63 12. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 13. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 14. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 15. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 16. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 17. Contract Claim ---A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 18. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 19. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 20. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 21. Contract Time —The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (n) complete the Work so that it is ready for Final Acceptance. 22. Contractor —The individual or entity with whom City has entered into the Agreement. 23. Cost of the Work —See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS Revision: 923/ I 007200-1 GENERAL CONDITION S Page 3 of 63 24. Damage Claims — A demand for money or services arising from the Project or Site from a third Ih' C' or Contractor exclusive of a Contract Claim. party, 25. Day or day— A day, unless otherwise defined, shall mean a Calendar Day. 26. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 27. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 32. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 33. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 34. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 35. Field Order —A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: RQ32021 007200-1 GENERAL CONDITION S Page 4 of 63 37. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in ' conformance with the Contract Documents. 38. General Requirements —Sections of Division 1 of the Contract Documents. 39. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 40. Hazardous Waste Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 41. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 42. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 43. Major Item —An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 44. Milestone —A principal event specified in the Contract Documents relating to an intermediate R Contract Time prior to Final Acceptance of the Work. 45. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 46. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 47. PCBs —Polychlorinated biphenyls. 48. Petroleum —Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 49. Plans — See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 9232021 00 72 00 -1 GENERAL CONDITION S Page 5 of 63 50. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 51. Project —The Work to be performed under the Contract Documents. 52. Project Manager —The authorized representative of the City who will be assigned to the Site. 53. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 54. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 55. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 56. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 57. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required Ankk submittals and the time requirements to support scheduled performance of related construction activities. 58. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 59. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 60. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 61. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 92MI 007200-I GENERAL CONDITIONS Page 6 of 63 62. Submittals —All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor y' to illustrate some portion of the Work. 63. Substantial Completion — The stage in the progress of the Project when the Work is sufficiently complete in accordance with the Contract Documents for Final Inspection. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent— The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities —All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69 UnitPrice Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2021 007200-1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as Aomftdirected" or terms of hike effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of hike effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given no earlier than 14 days after the Effective Date of the Agreement, unless agreed Aamft� to by both parties in writing. CIPYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823 I 007200-1 GENERAL CONDITION S Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 In itia 1 Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by at B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823=1 007200-I GENERAL CONDITION S Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in '� making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/1021 007200-1 GENERAL CONDITION S Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and%1 deviations in the Work not mvolving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82'32Q21 007200-1 GENERAL CONDITION S Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's on-line electronic document management and collaboration system site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. Ifthere is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS ^4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8/LI/1021 007200-I GENERAL CONDITION S Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 9232 I 007200-1 GENERAL CONDITION S Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the Aomwk subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respectto existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown orindicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONST RU CT ION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITION S Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property -� monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONST RU CT ION SPECIFICATION DOCUMENTS Revision: 82i✓ I 00 72 00 -1 GENERAL CONDITION S Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractoror by anyoneforwhom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 821J I 007200-1 GENERAL CONDITION S Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and o,, Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (other evidence of insurance requested by City or any other additional insured) in at least the minimum amount as specified in the Supplementary Conditions which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2021 007200-1 GENERAL CONDITION S Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", Amkl endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. Amk� 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823W] 007200-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82?2021 007200-1 GENERAL CONDITION S Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal 'injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has i► been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds andlnsurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days afterreceipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITYOF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 921/202I 007200-1 GENERAL CONDITION S Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and 'incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/?A21 007200-1 GENERAL CONDITION S Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, lamkk connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 0132 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. ^6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or-Equal"Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STA.NDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 00 72 00 -1 GENERAL CONDITION S Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equar, item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8rL3/1021 007200-1 GENERAL CONDITION S Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods orProcedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. City may require Contractor -Oak, to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal" City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by themfrom and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82'i2021 007200-1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 007200-1 GENERAL CONDITION S Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates, The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITYOF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2021 007200-1 GENERAL CONDITION S Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreementbefore the 15th day afterthe date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (n) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and otherprofessionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resultingfrom CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8/L32021 007200-1 GENERAL CONDITION S Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified Agoftk in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.13. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtainedpermits and licenses. Citywill obtain andpay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRU CTIO N SPECIFICATION DOCUMENTS Revision: 82i/202I 007200-I GENERAL CONDITION S Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. httpY/www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 803/1A2I 007200-1 GENERAL CONDITION S Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance �` of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning.- Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property .■kk disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8aMl 007200-1 GENERAL CONDITION S Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who maybe affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referredto in Paragraph 6.14.A.2 or 6.14.A.3 caused,% directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: W232021 007200-1 GENERAL CONDITION S Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 1000*� 2. Data shown on the Submittals will be complete with respectto quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 812Y2021 007200-1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for — complying with the requirements of the Contract Documents. 6.19 Continuingthe Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 923/ I 007200-I GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years ~ from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE, DAMAGES BRING SOUGHT WERE CAUSED, IN WHOLE OR IN PART- BY ANY ACT- OMISSION OR NF.GI.IGF.NCF, OF THE. CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out oi, or alleged to arise out of the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION M CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823202I 007200-1 GENERAL CONDITIONS Page 34 of 63 ./ 1 1 ► ► ►I 1 ► 1 \ 1 • 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carryout Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. ~~ D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 007200-1 GENERAL CONDITION S Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision; 82vZ021 007200-1 GENERAL CONDITION S Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 92"12021 007200-1 GENERAL CONDITION S Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Prof ectMan age r City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is identified in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82?✓202I 007200-1 GENERAL CONDITION S Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 007200-1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Amok Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (1) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/1 I 007200-1 GENERAL CONDITION S Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 912MI 007200-1 GENERAL CONDITION S Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE I I — COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Costof the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.0l.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the ,00kk Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 92=1 007200-1 GENERAL CONDITION S Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. C. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 00 72 00 -1 GENERAL CONDITION S Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Atook Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.01.A.1 or specifically covered by Paragraph 11.0l.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly �.� supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.0l.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 007200-1 GENERAL CONDITION S Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Q32MI 007200-1 GENERAL CONDITION S Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the 'A%N� Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not representthe exact quantity of work performed or material moved, Aaftk handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under `Trice and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correctan error, or to correctanerror on the plans, the plans quantity will be increasedor decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823rMl 007200-1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reachedunder Paragraph 12.01.13.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.0l.A.4 and 11.0l.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 52MI 007200-1 GENERAL CONDIT IONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under i•. Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82v2021 007200-1 GENERAL CONDITION S Page 48 of 63 ARTICLE 13 —TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail', "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82'i2021 007200-I GENERAL CONDITION S Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available Aomkfor observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/202I 007200-1 GENERAL CONDITION S Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction orRemoval of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 812MI 007200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the dimiished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued ruk incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82"i/7.021 007200-1 GENERAL CONDITION S Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the y` necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as described in subsection C. unless otherwise stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 921/J1121 007200-1 GENERAL CONDITION S Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved Aook detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor; or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective or completed Work has been damaged by the Contractor or subcontractors requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or r CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82M] 007200-1 GENERAL CONDITION S Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement will be assessed against the monies due the Contractor, not as a penalty, but as damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 00 72 00 -1 GENERAL CONDITION S Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any part of the Work which has specifically been identified in the Contract Documents, or which City determines constitutes a separately functioning and usable part of the Work that can be used for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is Substantially Complete in accordance with the Contract Documents: AM., 1. Within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective ("Punch List Items"). Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification to the City of Substantial Completion and the date of Final Inspection. 1. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 2. Should the City concur that Substantial Completion has been achieved with the exception of any Punch List Items, Contract Time will resume for the duration it takes for Contractor to achieve Final Acceptance. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONST RU CT ION SPECIFICATION DOCUMENTS Revision: &Q32021 007200-1 GENERAL CONDITION S Page 56 of 63 14.07 Final Payment A. ApplicationforPayment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. PaymentBecomesDue: 1. After City's acceptance of the Application for Payment and accompanying documentation,^ requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 007200-1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with A-00k. the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STA.NDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8?3/ I 007200-1 GENERAL CONDITION S Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2021 007200-1 GENERAL CONDITION S Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right awk to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.B, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITION S Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effectedby mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 007200-1 GENERAL CONDITION S Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list .•W^l submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.13 shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/Z02I 007200-1 GENERAL CONDITION S Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if. 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and 'include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 9/2M1 00 72 00 - I GENERAL CONDITION S Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82MI 00 73 00 SUPPLEMENTARY CONDITIONS SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions Page 1 of 4 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of August 31, 2023: Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION 6 Morton and Barbara Herman 9/7/23 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 00 73 00 SUPPLEMENTARY CONDITIONS Page 2 of 4 SC-4.01A.2, "Availability of Lands" Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of May 26, 2022: EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT None The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: None The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: None SC-4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: None SC-5.03A., "Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: RLG Consulting Engineers (3) Other: NONE SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100,000 each accident/occurrence $100,000 Disease - each employee $500,000 Disease - policy limit CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 4 SC-5.04B., "Contractor's Insurance" 5.04B. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / Ataft� $100,000 Property Damage SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: Heavy and Highway Construction Projects 2013 A copy of the table is also available by accessing the City's website at: htti)s://apes.fortworthtexas.p-ov/ProiectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/DivOO — General Conditions SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: 1. NPDES Stormwater Pollution Prevention Plan (SWPPP) CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 4 SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: None SC-6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of May 26, 2022 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: Vendor Scoae of Work Coordination Authority None SC-8.01, "Communications to Contractor" None SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is Ms. Dena Johnson, P.E. or his/her successor pursuant to written notification from the Water Department Director. SC-13.03C., "Tests and Inspections" None SC-16.01C.1, "Methods and Procedures" None END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager. 3/9/2020 D.V. Magana SC-6.07, Updated the link such that files can be accessed via the City's website. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 011100-1 SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 011100-2 SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 11 00 - 3 SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 2s 00 - 1 SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 25 00 - 2 SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, the resulting cost and/or time reduction will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 25 00 - 3 SUBSTITUTION PROCEDURES Page 3 of 4 4. No additional contract time will be given for substitution. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the City's opinion, acceptance will require substantial revision of the original design d. In the City's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: 01 25 00 - 4 SUBSTITUTION PROCEDURES Page 4 of 4 PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Recommended Recommended Not recommended Received late By Date Remarks Date Rejected SECTION 0131 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: 0131 19- 1 PRECONSTRUCTION MEETING Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Project Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 17, 2012 01 31 19 - 2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 01 32 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 17, 2012 0131 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10278S Revised August 17, 2012 SECTION 013120 PROJECT MEETINGS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013120-1 PROJECT MEETINGS Page 1 of 3 1. Provisions for project meetings throughout the construction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre -Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location a. Location of meeting to be determined by the City. 3. Attendees CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 31 20 - 2 PROJECT MEETINGS Page 2 of 3 a. Contractor b. Project Representative c. Other City representatives 4. Meeting Schedule a. In general, the neighborhood meeting will occur within the 2 weeks following the pre -construction conference. b. In no case will construction be allowed to begin until this meeting is held. C. Progress Meetings 1. Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. 2. Additional progress meetings to discuss specific topics will be conducted on an as - needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the beginning of each meeting. 4. Attendance shall include: a. Contractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request d. Engineer's representatives e. City's representatives f. Others, as requested by the Project Representative 5. Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off -site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Maintenance of quality standards 1. Pending changes and substitutions m. Review proposed changes for: 1) Effect on construction schedule and on completion date 2) Effect on other contracts of the Project n. Review Record Documents o. Review monthly pay request CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 0131 20 - 3 PROJECT MEETINGS Page 3 of 3 p. Review status of Requests for Information 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 32 16 -1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 10 1 SECTION 0132 16 2 CONSTRUCTION SCHEDULE 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Speck requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 15 D. Purpose 16 The City of Fort Worth (City) is committed to delivering quality, cost-effective 17 infrastructure to its citizens in a timely manner. A key tool to achieve this purpose is a 18 properly structured schedule with accurate updates. This supports effective monitoring 19 of progress and is input to critical decision making by the project manager throughout 20 the life of the project. Data from the updated project schedule is utilized in status 21 reporting to various levels of the City organization and the citizenry. 22 23 This Document complements the City's Standard Agreement to guide the construction 24 contractor (Contractor) in preparing and submitting acceptable schedules for use by the 25 City in project delivery. The expectation is the performance of the work follows the 26 accepted schedule and adhere to the contractual timeline. 27 28 The Contractor will designate a qualified representative (Project Scheduler) responsible 29 for developing and updating the schedule and preparing status reporting as required by 30 the City. 31 1.2 PRICE AND PAYMENT PROCEDURES 32 A Measurement and Payment 33 1. Work associated with this Item is considered subsidiary to the various items bid. 34 No separate payment will be allowed for this Item. 35 2. Non-compliance with this specification is grounds for City to withhold payment of 36 the Contractor's invoices until Contractor achieves said compliance. 37 1.3 REFERENCES 38 A Project Schedules CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 01 32 16 -2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 10 1 Each project is represented by City's master project schedule that encompasses the 2 entire scope of activities envisioned by the City to properly deliver the work. When the 3 City contracts with a Contractor to perform construction of the Work, the Contractor 4 will develop and maintain a schedule for their scope of work in alignment with the 5 City's standard schedule requirements as defined herein. The data and information of 6 each such schedule will be leveraged and become integral in the master project 7 schedule as deemed appropriate by the City's Project Control Specialist and approved 8 by the City's Project Manager. 9 10 1. Master Project Schedule 11 The master project schedule is a holistic representation of the scheduled activities 12 and milestones for the total project and be Critical Path Method (CPM) based. The 13 City's Project Manager is accountable for oversight of the development and 14 maintaining a master project schedule for each project. When the City contracts for 15 the design and/or construction of the project, the master project schedule will 16 incorporate elements of the Design and Construction schedules as deemed 17 appropriate by the City's Project Control Specialist. The assigned City Project 18 Control Specialist creates and maintains the master project schedule in P6 (City's 19 scheduling software). 20 21 2. Construction Schedule 22 The Contractor is responsible for developing and maintaining a schedule for the 23 scope of the Contractor's contractual requirements. The Contractor will issue an 24 initial schedule for review and acceptance by the City's Project Control Specialist 25 and the City's Project Manager as a baseline schedule for Contractor's scope of 26 work. Contractor will issue current, accurate updates of their schedule (Progress 27 Schedule) to the City at the end of each month throughout the life of their work. 28 B. Schedule Tiers 29 The City has a portfolio of projects that vary widely in size, complexity and content 30 requiring different scheduling to effectively deliver each project. The City uses a 31 "tiered" approach to align the proper schedule with the criteria for each project. The 32 City's Project Manager determines the appropriate schedule tier for each project, and 33 includes that designation and the associated requirements in the Contractor's scope of 34 work. The following is a summary of the "tiers". 35 36 1. Tier 1: Small Size and Short Duration Project (design not required) 37 The City develops and maintains a Master Project Schedule for the project. No 38 schedule submittal is required from Contractor. City's Project Control Specialist 39 acquires any necessary schedule status data or information through discussions with 40 the respective party on an as -needed basis. 41 42 2. Tier 2: Small Size and Short to Medium Duration Project 43 The City develops and maintains a Master Project Schedule for the project. The 44 Contractor identifies "start" and "finish" milestone dates on key elements of their 45 work as agreed with the City's Project Manager at the kickoff of their work effort. 46 The Contractor issues to the City, updates to the "start" and "finish" dates for such 47 milestones at the end of each month throughout the life of their work on the project. 48 49 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 01 32 16 - 3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 10 1 The City develops and maintains a Master Project Schedule for the project. The 2 Contractor develops a Baseline Schedule and maintains the schedule of their 3 respective scope of work on the project at a level of detail (generally Level 3) and in 4 alignment with the WBS structure in Section I AH as agreed by the Project 5 Manager. The Contractor issues to the City, updates of their respective schedule 6 (Progress Schedule) at the end of each month throughout the life of their work on the 7 project. 8 C. Schedule Types 9 Project delivery for the City utilizes two types of schedules as noted below. The City 10 develops and maintains a Master Project Schedule as a "baseline" schedule and issue 11 monthly updates to the City Project Manager (end of each month) as a "progress" 12 schedule. The Contractor prepares and submits each schedule type to fulfill their 13 contractual requirements. 14 15 1. Baseline Schedule 16 The Contractor develops and submits to the City, an initial schedule for their scope 17 of work in alignment with this specification. Once reviewed and accepted by the 18 City, it becomes the "Baseline" schedule and is the basis against which all progress 19 is measured. The baseline schedule willbe updated when there is a change or 20 addition to the scope of work impacting the duration of the work, and only after 21 receipt of a duly authorized change order issued by the City. In the event progress is 22 significantly behind schedule, the City's Project Manager may authorize an update 23 to the baseline schedule to facilitate a more practical evaluation of progress. An 24 example of a Baseline Schedule is provided in Specification 0132 16.1 25 Construction Project Schedule Baseline Example. 26 27 2. Progress Schedule 28 The Contractor updates their schedule at the end of each month to represent the 29 progress achieved in the work which includes any impact from authorized changes 30 in the work. The updated schedule must accurately reflect the current status of the 31 work at that point in time and is referred to as the "Progress Schedule". The City's 32 Project Manager and Project Control Specialist reviews and accepts each progress 33 schedule. In the event a progress schedule is deemed not acceptable, the 34 unacceptable issues are identified by the City within 5 working days and the 35 Contractor must provide an acceptable progress schedule within 5 working days 36 after receipt of non -acceptance notification. An example of a Progress Schedule is 37 provided in Specification 01 32 16.2 Construction Project Schedule Progress 38 Example. 39 D. City Standard Schedule requirements 40 The following is an overview of the methodology for developing and maintaining a 41 schedule for delivery of a project. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 01 32 16 - 4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 10 1. Schedule Framework - The schedule willbe based on the defined scope of work and follow the (Critical Path Methodology) CPM method. The Contractor's schedule will align with the requirements of this specification and will be cost loaded to reflect their plan for execution. Compliance with cost loading can be provided with traditional cost loading of line items OR a projected cost per month for the project when the initial schedule is submitted, updated on a quarterly basis is significant change is anticipated. Overall schedule duration will align with the contractual requirements for the respective scope of work and be reflected in City's Master Project Schedule. The Project Number and Name of the Project is required on each schedule and must match the City's project data. E. Schedule File Name All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of the project followed by baseline (if a baseline schedule) or the year and month (if a progress schedule), as shownbelow. • Baseline Schedule File Name Format: City Project Number _Project Name _Baseline Example: 101376 North Montgomery Street HMAC Baseline • Progress Schedule File Name Format: City Project Number _Project Name _YYYY MM Example: 101376 North Montgomery Street HMAC 2018_01 • Project Schedule Progress Narrative File Name Format: City Project Number —Project Name PN_YYYY MM Example: 101376 North Montgomery Street HMAC PN 2018_01 F. Schedule Templates The Contractor will utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) • Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water 48 G. Schedule Calendar CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 01 32 16 - 5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 10 Aowftl 1 The City's standard calendar for schedule development purposes is based on a 5-day 2 workweek and accounts for the City's eight standard holidays (New Years, Martin 3 Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving, 4 Christmas). The Contractor will establish a schedule calendar as part of the schedule 5 development process and provide to the Project Control Specialist as part of the basis 6 for their schedule. Variations between the City's calendar and the Contractor's 7 calendar must be resolved prior to the City's acceptance of their Baseline project 8 schedule. 9 10 R WBS & Milestone Standards for Schedule Development 11 The scope of work to be accomplished by the Contractor is represented in the schedule 12 in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the 13 development of the schedule activities and shall be imbedded and depicted in the 14 schedule. 15 16 The following is a summary of the standards to be followed in preparing and 17 maintaining a schedule for project delivery. 18 19 1. Contractor is required to utilize the City's WBS structure and respective 20 project type template for "Construction" as shown in Section 1.4.1-1below. 21 Additional activities may be added to Levels 1 - 4 to accommodate the needs 22 of the organization executing the work. Specifically the Contractor will add 23 activities under WBS XXXXXX.80.83 "Construction Execution" that 24 delineates the activities associated with the various components of the work. 25 26 2. Contractor is required to adhere to the City's Standard Milestones as shown 27 in Section 1.4.I below. Contractor will include additional milestones 28 representing intermediate deliverables as required to accurately reflect their 29 scope of work. 30 31 I. Schedule Activities 32 Activities are the discrete elements of work that make up the schedule. They will be 33 organized under the umbrella of the WBS. Activity descriptions should adequately 34 describe the activity, and in some cases the extent of the activity. All activities are 35 logically tied with a predecessor and a successor. The only exception to this rule is for 36 "project start" and "project finish" milestones. 37 38 The activity duration is based on the physical amount of work to be performed for the 39 stated activity, with a maximum duration of 20 working days OR a continuous activity 40 in one location. If the work for any one activity exceeds 20 days, break that activity 41 down incrementally to achieve this duration constraint. Any exception to this requires 42 review and acceptance by the City's Project Control Specialist. 43 44 J. Change Orders 45 When a Change Order is issued by the City, the impact is incorporated into the 46 previously accepted baseline schedule as an update, to clearly show impact to the 47 project timeline. The Contractor submits this updated baseline schedule to the City for CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 01 32 16 - 6 CONSTRUCTION PROGRESS SCHEDULE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 Page 6 of 10 review and acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the following: 1. Time extensions associated with approved contract modifications are limited to the actual amount of time the project activities are anticipated to be delayed, unless otherwise approved by the Program Manager. 2. The re-baselined schedule is submitted by the Contractor within ten workdays after the date of receipt of the approved Change Order. 3. The changes in logic or durations approved by the City are used to analyze the impact of the change and is included in the Change Order. The coding for a new activity(s) added to the schedule for the Change Order includes the Change Order number in the Activity ID. Use as many activities as needed to accurately show the work of the Change Order. Revisions to the baseline schedule are not effective until accepted by the City. K City's Work Breakdown Structure WBS Code WBS Name XXXXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXXXX.30.20 Conceptual Design (30%) XXXX X.30.30 Preliminary Design (60%) X3XXXX.30.40 Final Design XXXXXX.30.50 Environmental XX)=.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXYX.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XX, �O .70.10 Utility Relocation Co-ordination XXXXXX.80 Construction XXXXXX.80.81 Bid and Award XX,'=.80.83 Construction Execution XXXXXX. 80. 85 Inspection XX'<Y,XX.80.86 Landscaping XXXXXX.90 Closeout XXXXXX.90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure L. City's Standard Milestones The following milestone activities (ie., important events on a project that mark critical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 32 16 - 7 CONSTRUCTION PROGRESS SCHEDULE Page 7 of 10 Activity ID Activity Name Design 3020 Award Design Agreement 3040 Issue Notice to Proceed - Design Engineer 3100 Design Kick-off Meeting 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3150 Peer Review Meeting/Design Review meeting (technical) 3160 Conduct Design Public Meeting #1 (required) 3170 Conceptual Design Complete 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3250 Conduct Design Public Meeting #2 (required) 3260 Preliminary Design Complete 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3330 Conduct Design Public Meeting #3 (if required) 3360 Final Design Complete ROW & Easements 4000 Right of Way Start 4230 Right of Way Complete Utility Relocation 7000 Utilities Start 7120 Utilities Cleared/Complete Construction Bid and Award 8110 Start Advertisement 8150 Conduct Bid Opening 8240 Award Construction Contract Construction Execution 8330 Conduct Construction Public Meeting #4 Pre -Construction 8350 Construction Start 8370 Substantial Completion 8540 Construction Completion 9130 Notice of Completion/Green Sheet 9150 Construction Contract Closed 9420 Design Contract Closed 38 39 1.4 SUBNHTTALS 40 A Schedule Submittal & Review 41 The City's Project Manager is responsible for reviews and acceptance of the Contractor's 42 schedule. The City's Project Control Specialist is responsible for ensuring alignment of 43 the Contractor's baseline and progress schedules with the Master Project Schedule as 44 support to the City's Project Manager. The City reviews and accepts or rejects the 45 schedule within ten workdays of Contractor's submittal. 46 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 01 32 16 - 8 CONSTRUCTION PROGRESS SCHEDULE Page 8 of 10 1 1. Schedule Format 2 The Contractor will submit each schedule in two electronic forms, one in native file 3 format (.xer, .xml, .mpx) and the second in apdf format, in the City's document 4 management system in the location dedicated for this purpose and identified by the 5 Project Manager. In the event the Contractor does not use Primavera P6 or MS 6 Project for scheduling purposes, the schedule information must be submitted in .xls or 7 .xlsx format in compliance with the sample layout (See Specification 0132 16.1 8 Construction Project Schedule Baseline Example), including activity predecessors, 9 successors and total float. 10 11 2. Initial & Baseline Schedule 12 The Contractor will develop their schedule for their scope of work and submit their 13 initial schedule in electronic form (in the Be formats noted above), in the City's 14 document management system in the location dedicated for this purpose at least S 15 working days prior to Pre Construction Meeting. 16 17 The City's Project Manager and Project Control Specialist review this initial schedule 18 to determine alignment with the City's Master Project Schedule, including format & 19 WBS structure. Following the City's review, feedback is provided to the Contractor 20 for their use in finalizing their initial schedule and issuing (within five workdays) their 21 Baseline Schedule for final review and acceptance by the City. 22 23 3. Progress Schedule 24 The Contractor willupdate and issue their project schedule (Progress Schedule) by the 25 last day of each month throughout the life of their work on the project. The Progress 26 Schedule is submitted in electronic form as noted above, in the City's document 27 management system in the location dedicated for this purpose. 28 29 The City's Project Control team reviews each Progress Schedule for data and 30 information that support the assessment of the update to the schedule. In the event 31 data or information is missing or incomplete, the Project Controls Specialist 32 communicates directly with the Contractor's scheduler for providing same. The 33 Contractor re -submits the corrected Progress Schedule within S workdays, following 34 the submittal process noted above. The City's ProjectManager and Project Control 35 Specialist review the Contractor's progress schedule for acceptance and to monitor 36 performance and progress. 37 38 The following list of items are required to ensure proper status information is 39 contained in the Progress Schedule. 40 • Baseline Start date 41 • Baseline Finish Date 42 • % Complete 43 • Float 44 • Activity Logic (dependencies) 45 • Critical Path 46 • Activities added or deleted 47 • Expected Baseline Finish date 48 • Variance to the Baseline Finish Date 49 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 01 32 16 - 9 CONSTRUCTION PROGRESS SCHEDULE Page 9 of 10 1 B. Monthly Construction Status Report 2 The Contractor submits a written status report (referred to as a progress narrative) at the 3 monthly progress meeting (if monthly meetings are held) or at the end of each month to 4 accompany the Progress Schedule submittal, using the standard format provided in 5 Specification 0132 16.3 Construction Project Schedule Progress Narrative. The content 6 of the Construction Project Schedule Progress Narrative should be concise and complete 7 to include only changes, delays, and anticipated problems. 8 9 C. Submittal Process 10 • Schedules and Monthly Construction Status Reports are submitted in in the City's 11 document management system in the location dedicated for this purpose. 12 • Once the project has been completed and Final Acceptance has been issued by the 13 City, no further progress schedules or construction status reports are required from 14 the Contractor. 15 1. 16 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 17 1.6 CLOSEOUT SUBMITTALS [NOT USED] 18 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.8 QUALITY ASSURANCE 20 A. The person preparing and revising the construction Progress Schedule shall be ,00%. 21 experienced in the preparation of schedules of similar complexity. 22 B. Schedule and supporting documents addressed in this Specification shallbe prepared, 23 updated and revised to accurately reflect the performance of the construction. 24 C. Contractor is responsible for the quality of all submittals in this section meeting the 25 standard of care for the construction industry for similar projects. 26 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 27 1.10 FIELD [SITE] CONDITIONS [NOT USED] 28 1.11 WARRANTY [NOT USED] 29 1.12 ATTACHMENTS 30 Spec 01 32 16.1 Construction Project Schedule Baseline Example 31 Spec 01 32 16.2 Construction Project Schedule Progress Example 32 Spec 01 32 16.3 Construction Project Schedule Progress Narrative 33 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 I 01 32 16 -10 CONSTRUCTION PROGRESS SCHEDULE Page 10 of 10 2 PART 2 - PRODUCTS [NOT USED] 3 PART 3 - EXECUTION [NOT USED] 4 5 R END OF SECTION Revision Log DATE NAME SUMMARY OF CHANCE 8/13/2021 Michael Owen Revised to update specification requirements and eliminate duplicate schedule specifications. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 0) 01 3216.1 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Page 1 of 5 SECTION 0132 16.1 CONSTRUCTION SCHEDULE — BASELINE EXAMPLE 3 PART 1 - GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the baseline for the project. This version of the schedule is referred to as a "baseline" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a baseline schedule. See CFW Specification 01 32 16 Construction Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 lL n ,0 �0O O ,may m Z r O � N y 00 00 Ln N TPW - Capital Delivery I Project ID: CIP-01 B ReDcrt Print Date: 20-Jun 20'8 yo Laut: Baseline Template 'age 1 of 3 , roily O CO'I?lsoxx IH 3 19M 0! I F MH 4I210I"•I2I Fd 342U oCIPdM8-Naighbohaod StreetConstFactian EaselnSchedue EN 438 I�1 L 1i-DeC�J'014 i D U He-Vor"Werm C200 rwdid Cwm11U;W*C "111f L t210 9eV PulkwurPeverlrrel Ftdn(Cumm;ll P epmeam:w 4229 21r W,9K 1vu"1L U14 Mtuteis FhuoteUPle-cul'IuL•tLNl1leetiry C240 Fre-Corstruten-Putft Meetim - 1264 1Jolammau0m E3 Co r1t074ri Street i Water & Uxi* 3070 CarM40041113rt 3010 ii4 twaii 3d2l1 --ii eiiiiiaiiaservCec 3030 7" NVIfy RePAF P2ri1q 3040 E=arato0 3050 !tabtzaton 3050 Faving 3070 flat Norr 300 Cleany ]030 tmt 1 co v** Street 2 W"abw 8 SDrm 3170 Temp UA1ei 3116 60-rataard6emes 3120 Terryf Pa111q Repair 313C Lay 11SeweraM8em1m ]14G TemfPiN�gPoepdr - 3150 sbm 0ralr 6 Stitt bm Pawng ... 3150 rwaeatoo 3170 Smblzaton 3130 Falving 41-U Malwo1[ J1Ju tseanL4 ... - .... 3210 3ueel.2ew1wmer Sweet I ,Th � )ff t ,iG i 1!-ApfitUtif l.'-May-i1010 D ; 0 ( 42-h1n,2016 ! ? 6210 5220 D O 10 12-hy13016 IS-Ap1 21118 6200 424 1 I t2-W-2015 02fryl-2D I 6200 ' ; 02" D 1 1 IT,Iy1rry2D I8 C�1p1-261-0 6220 t W40 j 0 1 1 ; S Apr-ZO1D Pihpr-2710 I0230 ;360%62:0 � D , h0... 20 -IS Apr 2016 ._. ...__. ... ._ ....._ 22 May 2014 ! r240 .._ _ z., t 3410 -__t_ 67 ' 230 : Well i30 R C3-May-2018 01-APr-2019 ' D . . 1 90 90 43Yary-211111 10-UPr2011 ,,.... ..._ _.140 I flo 40 M 0ay-2015 28-AW201a o D 6 ...-64ay4016 _ : 8240 : 3414, 8:00 D ' ' 'G 10 6-4ay-2016 le-May-2 20 3000 342Vi D ' i ..+ 25 - 77-Mdy-2018 21-J4J�2C'16 'a010 3p36 D 5 5 22-JUD4018 28-JU►2918 3020 3440,3too D AS AS D9-1N-2018 10-31p•-7014 "14D 5 5 79-JU-201A 13-JU-3018 M30 345G _1.111 -L-y--' ------- -�-----`------------- ------ � 5 5 16-JU-301A 2341-2018 3040 3660 11D ! 30 30 23-1U-201A 3"-ktg-2014 M5D 3470,3150 11D :D 20 06-M1g-208 3'-A4q-2014 3060 ,3480 740 '0 10 27-Atg•20'A 10-slp-2018 3070 3490 D 0 10 sep 018 msa `Oslo 14D 113 113 29-IIN►2018 111-DeP7014 77 i 63 63 2941n4018 2i-S1p-4016. I 87 i ;7 It _ 'D 10 294urveo18 13-J11-281a 3030 3110 . - � D - �-i . - — - ------- 1............. ------+ 5 Is 16-J11-2018 03-A&9-M i 4' 3100 3120 D 5 5 054llg-20'8 1D-Mg-201! .3110 3130 D 5 B 3-AW20'8 22 AWM14 '3120 -3140 D 5 5 3-AUg-2(1 A 29-M¢2018 3130 131150, 3220 D �; :D 20 3,644id a 2i-s6p s016 y 3i40 _. , 3150 67 i i i i i 45 40 I15-64L` m10 104MO.291I : /l 5 5 05-004018 11-M-2310 3150 !3170.3250 - - 87 - — - ___.------ 4 ¢_.--.f_. ..+.. 5 5 ' 12-4cMIS 14-0*016 3160 ; 3180 77 1 i 10 20 19-00-2018 16-NDY-2014 ` 3170, 3761 13190 ? 77 i ! :'u lu € ue-nov-Luits urue0.1u1C 111 uu J2W it ! 'U lu 2!-IIMIilU78 111•u!O-lulG i S7yU ' JI10 it i ! i i i i D D I 10-De"a 14 i 320D ' DS 10 I 1T + Do - 40 , i0-IWj2D.a 20-Dormse , 1 i OT i . ____.<.__._..._.,._____._.._.........__....._.... .._....... 1. s Actual 'Work i ♦ Milestone ® Rttiminhit; Wu k i i CriULdl M leslutte Critical Remaining 1Vcrk O Completed Milestone CIP-0113 - Neighborhood Street Construction Baseline Schedule Example FORT WORTH 9- L � � n 8. o n y W z� oz rn ro tt'1 n n H oz O n Ln M F r� T rr u+ n 0 n O O M rC Z O 1~+ f+ w O N y 00 00 In N IV .-. TPW - Capital Delivery Laycut: Baselile Terrolate +aJraiff'to Acltrtty varte Water t SWm 3:20 env Wafer 3.30 LaY8' xater aid seneet 3:40 eriq p3ma P.epair Farvin r 3'50 Exc3'ealon W60 SM1=101 3,70 Pavnq 3' 60 fla1Wa1 3_9G Ctean lD 3:00 Street 3 Car"le II1J*d 4 Water JL SbWM 3,t0 erm Wafer 3d20 La98'wateraVsweet 3--30 erMPaAogP,epalr.. .. 3240 lay8' Sewer Lbtes L-3203 L LA346 a10 SenWes 31--50 Lay8-Seleer Llnes L-1212 L LA355 and Unless 3-60 eup Nwag P•epalr FmhM 3.70 EmavalDD 3-'SG Smb[INM1 3i90 Pang 3e00 flatwl7t 3420 S7eet4CQ11Q*1e^=,star4al CtmpleM C Project ID: CIP-01 B Repert Prat Date. 20-Jun-1,018 Iaye 2 of 3 01) PD I= I FF11sh I keoecfsaa UCCO NS I km I 2(J1! 1Lra1 Fl— JJ Sgq,IFMNUil•IAISlgmDJIM 13 13 30,A1 ME1 f6-3ep-2015 D 4 b 30-AW201 a 05-Sep-2015 , 31 b) i MO D ' r 8 8 06-Sev4l[118 ` 1'-Sep-2013 ? 322) ± 3240 - D `T 1 1 I8-Sep-2018 18-Sep-2013 3233 + 3250. 3316 ' D i 50 Sli f2_ad_"18 24_DeC_2019 67 t 5 5 12,70MIS ` 13-0eF21)11 `- 3243, 3160 . 326d i _ frT - -¢-----F -.-{...---.._..t 5 5 19 DCF20i8 , 25-OCEW 3 3253 '3F70 67 20 20 26-3a2016 26-NOW-2013j326) 3250 67 ---' -'- ---' -- . • ----- ---- F0 '0 ,...16-Nar-2018 . 11-DeD-2013 327) i, W94 67 1 -- i IG 10 11-0eF2015 21-Deo-2013 :3263 -: 330{Y 67 0 0 241)m-2013'3297 85to 67 134 134 . 19Sep20113I OlAp - F2I111 • D 69 69 19Sep 201 fa " 27-Dea-2019 _D 6 6 �, 19-Sep•201 B , 26-Sep- 013 3243, 8250 3120 D 1 ' FD 20 27-WV-2018 ' 2d-0c-201d 331] 3330 ' d� ' ' € — ._ 3 3 25-3CM18 - 23-0CI-Wit 3323 3,340 D W t 20 i 303Yt-2016 2"DW--M13 3333 `3550 D i 15 15 2"OY2018'. 119-Der?,2013 3.3360 @ _ 6 5 2D-Dei>2Gf8 p 27-Deo-2013 3353 3370 D 60 60 J7-fark20t9 01-Apr-201f D f.-....�---- -..-._.-- fo 10 H-Jarl•2019 13-"FI-2010 3363 i 33M D ID 10 22-JarrF019 IN -Feb -A 19 3373 •; 3398 D 20 20 05-Feb-2019 04 M)r-,019 3387 1340D - D _ 26 20 26-Feb-2019 25•N3r-'a19:3393 3410 D i t6 10 19-Mar-MIS 01,+5pr-2d19 :3403 •3120 0 D 0 GI,Apr--2M :3413 WIG D n.,..I IT-. ---- -------+ a3 Wp -AW 276 276 03-May•2018 05-Jv�-2019 225 225 03-May-2018 25-Mir-S019 300) -B:f0 d510 Prier Irmee-Mi 10 10 12-Apr-2019 1&-Apr-2D7! 3423,3300.311r 8-320 d523 Compiep Pwm Llet-Aga 30 3G 16,W-2019 28-Mjy-2013 8513 853.0 d530 PnaWeIKRmugnto- COmFletdFLrKhL151Tasks 1 1 35-Juh2019 05-JW201) 6523 6540 a540 CO rsIrLulon Fhat Compl=-Ctrt 0 0 05ti1wi-2011 _8533 9100, 9110 an CJMA" 135 ii5 n6-iiom10 n_n►martla I"nmdnwAm Clewd arf flepm mot 05 135 064UW2019 1 T-Dee-2013 ls$uiIt UwwW S. S nf.-hn2t110 /7-.N�►71116 9100 As-btdt Svtrap(subff Cod bf C*tllncbrl 5 5 76-JUn3010 12-JM761e IS43 Ot10 Conlrmt closccut 135 135 06-hiw3D19 17_0ee..1312 0110 CA rtf,R Arooto tlen -., 3D a0 ... 06 Jtn2010 16 At 201! 0103,6640 0t'W i� AdIal Work. • Remaining Work • Critical R-rrainirq Work • ♦ M lestJcrte ♦ Critical Milestone ♦ CompletEd Milestone CIP-01B - Neighborhood Street Construction Baseline Schedule Example FORT WORM m TPW -Capital Delivery Layout: Baseline Template Kmvq• w AM" V M 'J12U AIDTIM3f6 WFgeeC1 UK5e(U UOAMeMtOf1) 913O Vane ofCofe mp*1;rVOtm 3hee[ . ............. .. 9140 -Iml com tLkuftm Cortaa WmW F%W 0150 COtrii O MwLrUDl caxl CFOd O1fi0 otutn f aamrrl Project ID: CIP-01 B vv I fua I sa[ I `II116m Ii+fe]eCf6aQf5 m JO 1V-JL*-2J1'J 11d#veU.9 v11U 0 0 2,1-1*201% SIM 1 1 14 Nov 201) 14 MOV 2010 0130 0 0 14-MOV-2019 9110 1 1 17-nw:-nIt, 17-nOkN!o110 4/i11 Report Print Cate: 20-Jun-2018 Page 3 of 3 ya�66aa foa ZU11 ZUTV ��W area r..MJI.I 1y1"lu JI �I 1� 1 �yNIJ�J 17S I lslu-Ji1-LT 9140 U -- - - -- - - 0160 p Gibd D I I I 1 I I ',dual Work ♦ ♦ Miksbn.a Kernaiiing Wcrk ♦ i Lrmcal Westin. C"TP-01 R - Neighbnr•hnnd Stt•eet Constimetim Q-itica Rarraining work 6 a Cornpletd Milestone Bmeli.ue Schedule Example FOB WORTH ro A 0 Lh 1 2 3 4 5 G 01 3216.1 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Page 5of5 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 01 32 16.2 CONSTRUCTION PROGRESS SCHEDULE —PROGRESS EXAMPLE Page 1 of 4 1 SECTION 0132 16.2 2 CONSTRUCTION SCHEDULE — PROGRESS EXAMPLE 3 PART 1 - GENERAL 4 The following is an example of a Contractor's project schedule that illustrates the data and 5 expectation for schedule content depicting the progress for the project. This version of the 6 schedule is referred to as a "progress" schedule. This example is intended to provide 7 guidance for the Contractor when developing and submitting a progress schedule. See 8 CFW Specification 0132 16 Construction Schedule for details and requirements regarding 9 the Contractor's project schedule. 10 11 12 13 14 Amk 15 16 17 18 19 20 21 22 23 24 25 26 Amk 27 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10278S Revised August 13, 2021 7 1n r0 :E r r0 v d f1 0 0 0 0 3 TPW - Capital Delivery Project ID: CIP-01P Report Print Data: 20-,Jun-2C18 Laymt: Progrcer. Tcmplatc ACM, IC .Acr, r, nsm 03 Rfl PWtd %I X ft71ed 3u1 I& Prdeo FnhC; uxt j FnM Tdaj l*,m I I ca,Welr I I I E B J CIP-01 P - Neigtborhood Street Constructicm Progress Schedule E,, 4 :2 411 ; a2-Ax-N 16 1 -DeC-eat 9 U-Ap 101 BA 13-)ea2019 a U PrfA0116UUNID11 Stl 11 0%;•Y1-A8rZV1t5 ;Z•f-Mi11`ZAIJ :1.1-AFfi nbAl 7*40"U1g n e .8270 Aaa1ti CsncTuybn ContraCl C 0 ., S00%} k7JUr-18/B C2J1Fr 2018A C 6210 SYf Poflltlot Prevenron Plan tCafrfaClor Preparz arv1 Subntli 10 8 100%1 ]2 !lx 201 B Apr,205 ; C2 AFr 2018A„ 13 Rpr 20j,. C 8220 Sot Wit Thmtlfn 1 0 1 ta0%t 7�+ Ax 2t1 B M13 102 /*-20-8 C2-,5Fr,2D18A 0 ,q4f-40181 C G1.fU fi01Cf OMNCM•T'fk+-C: CI6TIICWP MBlal9 1 U tUOb 1l�Nf�WC 1f- LU'If id-AFf-MIUA 1-Aprdllnl ' L MO Pre ��n6W�lon • P1nao Neetnp 1 0 100%3 25 Ax 21118 2i ARi 20 8 Sf 2016Aj 14403C1181 4 am 1.161111abon 20 11 ; 58%, 26111r•2®18 F3 Aiey 2018 (tB /4Fr Z816A 15 Ma�2019 BSy E 8trod 1 ftbr astam 300a ca1611LCllor Sot 3010 TetQ i0aiier-- 3020 L7i8 WYL•t.7I4Ca/YOCa 303a Tiq F"M9 RI. a i Paring 3040 ElwaAn 3050 :tvims0R 306o Pa11np 307a Flalvat 3000 Lkui 1.1r _ 3M -40 M 1 coepll* Skeet2 N*r d Stam 300 Tk!sp We1r1 ..'i-tA 3 of fl" WfPr.1M'I FOIYI`PF 3'20 Te*V PaAr4 P*>31r 3' 3o Lai 7' Sewu and SefOcec 3"40 Tesp PSNn3 remir.. 3'50 Skim italn8^tuCU*s Parng 3'60 Enavalm 3'70 S:Cblt�ton 3180 Padlly 3190 Fat WTI; J:w ratan Lp WIG - SYee12Coffelei Vhbr E stmn wzj Imp Paw M30 iaf 8" v7lwantl &wvcoc Page 1 of 2 m e ¢1? 20ID 21 1111111111 II 230 230 ; W MAOy-M18 01-Apr-20'9 { 614iby 2318 , 2&Uar-Fa11 ` ' tq OO � 303.4tay.1118 tb-5�..71018 _ N�lta 06RaP.lOtB 1�R1; 7 4040 034WMIS 18 811��D18 i 2FKKW IS ; i`1 4 7 1 1 C 0 0%, )3-113r.2J1a . - b1� -ZIYa - 0 . i0 1U ,.,.. 076;•)3-Nay-mta .. tb wy-ma._- 01-key-mia 14-Miy Gi9.T . . cl". .__. 2 2d 6 0% 17 Nby 2018 21 Jun 2018 16 hey 2318 14 Jun 201 i 0 5 9% 22-ATI-201a 44ft 4018 .lun-2•)1B , 2&JUI'M13 0 45 _ 45 s—J*2L118 10SEp-2018 05,U-N18 66-6i •2019 uc's 2 5 0% Y3,111-2a18 , 13-Jul-201B . . .. 05,IU{-2018 : t t�llt-2016 110; 2 ? 5 0% 16-J•1-201 a 20-Ju42I}i9 12-1U1-1018 16-J11I,1D114 ( 110; ' ' ' '• 3r) 30 0%-23,AII-2018 31-PL9-2018 19-dtl-2915 26AU9.20191 14 i I I I I I I 20 20 0%ilb-Ag-231B 31•Aug,'W18 -. 7¢alg-271& 29At19•2019: 130 2 � I Ir 1D a�:;tzAy�iirr ro-grmlo :a,+;y2ili'aarzDrt; C 0 0% /0-SeP-2018 a6,XWO19 . 14ai 113 113 29-Jr-2D18 ; /0#a2= 27�2lia y O&De 018 771 2 63 63 39 dM -nls :2r-sep 2018 27,MI-2318 ' 253Pp018 57, 7 i i i i r i 10 10 0%4"f-•Zegi 4i.iwz016 27Jw6-2)16 - 11JUR-W It 0. 2 h 1+ - --15 ' IRG 16-.In-7A1R fL-M NJ-7MR i 17_111-W 15 ._ n1.A rJ- m �: ni i -i ` 5 # 0%�-7fi-A1g-2715 11G*J* O1B 32-ixr2718 aBJUeg2019 A; E B 1 0% 13-A1g-2D 18 Z?-J41g 261 B 39 l q 2718 20,Urg3019 ` 0 7 i F F S s ! 0% EJ-/ug-7J10 ! zi-A1,g4010 ............ r1�4g a:110 , 27•/wg20t0 o .. - . -�-•. 20 20 0%,A X Q-23IB -2--Sep-2018 aWU(-?:Ila ?.S, 252D19 GT 2 45 45 05-01-201a 10-01ID-MB 03-�21118 VDeo3018 771 2 i 8 0%-%-0c42G1B j 11.0r-208 03{d-2016 09-C1cE241g �._. � _2 _�. -.T-T-.T f 6 0%112 Cb12018 118 CM 2018 10 Cat 2018 160at2DI8 77' �. I i 20 20 i 0%i 19-MI2018 j 1$-Nvt-201B 17-CCE2016 134i v-2D19 7V 2 20 20 ? OV02-fir-2J18 (al--0 2018 314ct2018 291Qow2D19I 77i 2 f 1U 1U U%1L!-MY EJIb 'lU-UBO-Lt/Itl L1�AY-fJ ltl UbAmoiun ! J C 0 07G 10-De1`2015 064>�2019 T' 3 e 80 BD JD-Ag-2D18 12L)eo-2018 MAii-2018 ; �Deo2D18 671 2 is 13 34-Au¢?418 :18•S!p-Ma 28Ag•2818 1:445.pW18 0 7 4 6- 0%1iLhAlg-Lilff IUS-SBp;tUtC m4ug-mia I JI-NWU10 U 4 8 I 0%. ]d-Sip:YJ 18 i 7T.g 2010 •M-sap-m is . 1 Actual'Nork ♦ ♦ Milestrw YOIDT OUTH ISM Rernainirtg Wark ♦ • Critical Mleebona CTP-01P - Ne-Igbborhood Street Cmstruetton 9 ® Critical Remaining Work ♦ ♦ Completed Milestone Progress Schedule Example a d TPVV - Capital Delivery Project ID. CIP-01P I Report Pont Date: 20-Jun-2016 rayauc Nrogress template Page 2of2 !1lmt 1O AC%fy%WM I C0 rt0 i fhf ml %I B- W*d3rm7 i eL Pmjtt Frith I Start Fhhh I" lara 2019 2019 � 3210 Tam P3vitq Fap71r Paring 3260 St10 trawl 3270 PWne 32na rinwsnf 3:00 Cam up 33D0 Wrel3 ComOpk Street 3 Wabr b StCFM 3310 .T. _.. liT u I.dy 1!"1Bilf arO SHN�6 33M TbM f-avlt9ftpar XAM lap -.L?R.i An AREfi Wrf:.Mn 3,60 LzyI'SererWon L-3212dL4M and Senlees 3,60 Trf1p Pahlg Fir Pawng J.HU t)Caiaw 33ea S�baf n Y590 Pa IrKi _ 3 M Flat WOrf 3410 Clean up 3420 srw 4 C0m 3Utsa'fw" cmyeb? Foatl -81. 1 1 1 OK i8-;ap-771E :8-.ap-241F 11 .--4p-771a 1 yq7-2019 C w 56 12-04-21118 24-cer-MI6 10-0162018 2043eo-2016 67 i E 0% tz-OA-21.18 15-0ct-m18 15-Oct-M8 67? i 0%, O-CKA-2115 25-M-M18 '7-Oct-J15 23-0CFX18 67 M 21 0%.25-Lt�-2618 :5-Nor-21DIt 24-0et-2018 2D-Wif-1018 67 2 20 20 0* WMV-2210 17-0er Wtn 14-044W2310 11.Oec491a C M if OK tf-0Y_+-SNB 11 ZL -213It L7-041IN 18 2644C�2018 67 0 C 0%' Yd-UectiaDt6 20.4sFG2018 6? 134 134 0hp-2718 614pi-2M9 17-Sep-MI8 MW2t19 a 7'- fig 69 ' A-Sep-2£t18 -17-DeoM1F 17-3ep-M18 2e0E0-alla 0 7 gyp- P-= rSeg- 2:.5Gp-201/! (3, "e :V Lf U%21-:iep-lJ1G £i 4Jf1-A!iG YS-Iilp-IJ I 'L'-LKFsL'i t1 U 3 3 OK X OX 2G18 .M oat M18 23 Oat 2018 N 04t 2918 0, ;YI 94 RK M14'ri-NAR ,M-Nr MlF If-nto11R ;&wv4n1A n; t5 1S 0% 23-WV-2318 19-0eo-Wlf= 2741r-Mla 17-040-2018- 5 5 0%-2G-63(-271B 27-Dev'�Ml VA)eo-Ola 24,14c,2018 0 2 60 N i M7 6f-2019.. 414{r,2Dt9._ C&,M-2)19 2bAUr-Z19 ©' - 2 lV 111 U%(Oi•.FR-zml 18-BR-,1UI1J U. i - 10 if Z22-J.; -2019 '@4-Fab-.]O1Q ? 17-Janwig 31-JAI-]L14 0;, 26 0%'CS-Fe6-2)19 ,04-Mar-2915 Otfe0�2)19 6 �-FHa2C19 0 2 . 2i1 .- 20 .. 0%;25-Feta2)19 1.. _.... . ,TSalar- DtS F- ............. .._ ... . T1fie -2319 2 44ar419 0; .... r TCI 11f 0%, N-wf-2)l9 01-flpf-2019 15•ittt-2Y19 ; 28�MM-2C19 0 i1-Apr-2w9 2Shcar2f14 0 t1: 114p2mDf1 Z1b Lit Uww-e Ajl0 :4TJ,INt-:L79 E Ut-MY-2iln w-Jul-A19 6640 lntpctllort 226 226 01CC3 FOy SIB �26 Wr3D1C OI lLiy ^J"18 2' Mar 2[17 6; RSIR Final a'Irpslilm 91 is III&;ff7-Apr-7a 14 ? 14J{r-miq 744ty-,7114 11A(r7n14 n; I - 55:0 CgRQlete auRm Lit TaaIS 30 31 D%" 76ayr 2019 `, 28-Nay-tt119 12-Apf-Mg 2.-f&y 2Q19 D e 85;D Mal W3lkTN%ghbrCorpe:edPmMUstU" 1 1 D%105-An-2019 '4O-JM-2D19 C3-Jua-2)19 03-dub-Z19 0! i 85d0 Corlsaictlm Foal --raepletDn � 0 0 ()%i .... ii�11r1-yJ19- _. ....... Cl3-Jut-2Ci..9 . �.CI.' . .� . 9G 0Y.leevut 1S3 IJ,1 � O%96-,1tm24 t3 IT-De1r£D 19 [4-JwrMl9 IS-0t1�20 t9 0: 2 iCglfkfudiop Z.6ad cb.,.A 136 tab .. 06 dtn -NIS 17 Dc0 MM U Jun.Mta to DCO 2017 0,.. . A &at4u r.y 5 5 rK-.Yna810 17_tM_MlQ rA, ft"i4 is-hr-7mb 7A 7 41M Jtf-fiftt 4rfw� girNtw111y!`HlhXlcrf ,. .; s RY'.,rK-.rn-?Ot0 -1'J..tef-�t11G rd.-.lane-3114 141,11 -7C14 15� i god na9110 C]aeetwt 135 135 O& W I-2019 17-DegD-M9 C4.tmf2319 13-OW-HIS 01 7 - CDn! d P2ooed0.t0w 30 34 O% 05,k 1-2019 18'11-2Y19 C4-Iun-2919 1 i Al-2019 0 "e 9120 SMMt31er.PnkeVCIc6eDltOoanerMmj 38 31 0%;19•Jt1-2019 11-:pp-2D15 7-Al-2419 , 09-SAV-2019 D 2 9130 HvafxuY Cun aldlvf f'Cyeea 5lfx: 7 G 0\; -£ati]ta-r919 21 19 0 2- 71C0 f11v1 Contaudton �artrw4 lnvNoc naic I 1 OK i 11 47v =17 1A Nov 21311, In WV 2210 12 tk", 9010 C 9150 .9150V tkr6tuc0fnCY)ntaKlCbfetl .lammLeaft'd .._�__-... 0 O D%, O, 1 I 1 0%-T7-�c-2719 1i-0e4:^619 13-Ne-2319 �fl, 2 - � Actual Work +► ® Rerrlalning work Critical Rernaininq Work �► . Mr12e Four o.TH • crtical Muestane CIP-01P - Neiglibo><�hood S#Meet Construction ♦ Cow[etled Mile tone Progress Schedule Example Ali Cr1 ro tr1 .1y tr1 0 tCD UJ W N ro -- A Cr1 N 1 2 3 4 5 J 01 32 16.2 CONSTRUCTION PROGRESS SCHEDULE —PROGRESS EXAMPLE Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised August 13, 2021 0132 16.3 —PROGRESS NARRATIVE Page 1 of 1 SECTION 0132 16.3 CONSTRUCTION PROJECT SCHEDULE PROGRESS NARRATIVE Reporting Period: I Date Issued: Project Name: I Contractor Company Name: City Project No: I Contractor Schedule Contact: City Project Manager: A List of activities changed in the reporting period. 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) B. List any potential delays and provide mitigation actions 1. (insert text here) 2. (insert text here) 3. (insert text here) C. List any actual delays and provide recovery actions 1. (insert text here) 2. (insert text here) 3. (insert text here) City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 113, Part 2 Construction Project Schedule Narrative Report for CFW Projects City Project No. 10278S Revised August 13, 2021 Page 1 of 1 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 32 33 - 2 PRECONSTRUCTION VIDEO PART 3 - EXECUTION [NOT USED] Page 2 of 2 END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 SECTION 0133 00 SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 SUBMITTALS Page 1 of 8 1. General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 33 00 - 2 SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/x inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 33 00 - 3 SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 33 00 - 4 SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 0133 00 - 5 SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 33 00 - 6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Reuubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 013300-7 SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without further information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 33 00 - 8 SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 013513-1 SPECIAL PROJECT PROCEDURES Page 1 of 7 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Use of Explosives, Drop Weight, Etc. 11 e. Water Department Notification 12 f. Public Notification Prior to Beginning Construction 13 g. Coordination with United States Army Corps of Engineers 14 h. Coordination within Railroad permits areas 15 i. Dust Control 16 J. Employee Parking 17 B. Deviations from this City of Fort Worth Standard Specification 18 1. None. 19 C. Related Specification Sections include, but are not necessarily limited to: 20 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 21 2. Division 1 — General Requirements 22 3. Section 33 12 25 — Connection to Existing Water Mains 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 1. Coordination within Railroad permit areas 26 a. Measurement 27 1) Measurement for this Item will be by lump sum. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 will be paid for at the lump sum price bid for Railroad Coordination. 31 c. The price bid shall include: 32 1) Mobilization 33 2) Inspection 34 3) Safety training 35 4) Additional Insurance 36 5) Insurance Certificates 37 6) Other requirements associated with general coordination with Railroad, 38 including additional employees required to protect the right-of-way and 39 property of the Railroad from damage arising out of and/or from the 40 construction of the Project. 41 2. Railroad Flagmen 42 a. Measurement CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 11, 2022 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 7 1 1) Measurement for this Item will be per working day. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 will be paid for each working day that Railroad Flagmen are present at the 5 Site. 6 a. The price bid shall include: 7 1) Coordination for scheduling flagmen 8 2) Flagmen 9 3) Other requirements associated with Railroad 10 3. All other items 11 a. Work associated with these Items is considered subsidiary to the various Items 12 bid. No separate payment will be allowed for this Item. 13 1.3 REFERENCES 14 A. Reference Standards 15 1. Reference standards cited in this Specification refer to the current reference 16 standard published at the time of the latest revision date logged at the end of this 17 Specification, unless a date is specifically cited. 18 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 19 High Voltage Overhead Lines. 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. Coordination with the Texas Department of Transportation 22 1. When work in the right-of-way which is under the jurisdiction of the Texas 23 Department of Transportation (TxDOT): 24 a. Notify the Texas Department of Transportation prior to commencing any work 25 therein in accordance with the provisions of the permit 26 b. All work performed in the TxDOT right-of-way shall be performed in 27 compliance with and subject to approval from the Texas Department of 28 Transportation 29 B. Work near High Voltage Lines 30 1. Regulatory Requirements 31 a. All Work near High Voltage Lines (more than 600 volts measured between 32 conductors or between a conductor and the ground) shall be in accordance with 33 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 34 2. Warning sign 35 a. Provide sign of sufficient size meeting all OSHA requirements. 36 3. Equipment operating within 10 feet of high voltage lines will require the following 37 safety features 38 a. Insulating cage -type of guard about the boom or arm 39 b. Insulator links on the lift hook connections for back hoes or dippers 40 c. Equipment must meet the safety requirements as set forth by OSHA and the 41 safety requirements of the owner of the high voltage lines 42 4. Work within 6 feet of high voltage electric lines 43 a. Notification shall be given to: 44 1) The power company (example: ONCOR) 45 a) Maintain an accurate log of all such calls to power company and record 46 action taken in each case. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 11, 2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 0135 13-3 SPECIAL PROJECT PROCEDURES Page 3 of 7 b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 0131 13 E. Water Department Coordination 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. 2. Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. F. Public Notification Prior to Beginning Construction 1. Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer and City of Fort Worth Door Hangers, 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 11, 2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 35 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 7 a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) City of Fort Worth Door Hangers will be provided to the Contractor for distribution with their notice. 4) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 5) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer and door hangers are delivered to all residents of the block. G. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 11, 2022 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 7 1 b. Inspectors 2 c. Safety training 3 d. Additional insurance 4 e. Insurance certificates 5 f. Other employees required to protect the right-of-way and property of the 6 Railroad Company from damage arising out of and/or from the construction of 7 the project. Proper utility clearance procedures shall be used in accordance 8 with the permit guidelines. 9 2. Obtain any supplemental information needed to comply with the railroad's 10 requirements. 11 3. Railroad Flagmen 12 a. Submit receipts to City for verification of working days that railroad flagmen 13 were present on Site. 14 J. Dust Control 15 1. Use acceptable measures to control dust at the Site. 16 a. If water is used to control dust, capture and properly dispose of waste water. 17 b. If wet saw cutting is performed, capture and properly dispose of slurry. 18 K. Employee Parking 19 1. Provide parking for employees at locations approved by the City. 20 1.5 SUBMITTALS [NOT USED] 21 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 22 1.7 CLOSEOUT SUBMITTALS [NOT USED] 23 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 24 1.9 QUALITY ASSURANCE [NOT USED] 25 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 26 1.11 FIELD [SITE] CONDITIONS [NOT USED] 27 1.12 WARRANTY [NOT USED] 28 PART 2 - PRODUCTS [NOT USED] 29 30 31 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.4.B — Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit Remove references to Air Pollution watch Days and NCTCOG Clean construction 3/11/2022 M Owen Specification requirements. Clarify need for Door Hangers under in addition to contractor notification of public. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 11, 2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102795 Revised March 11, 2022 1 EXHIBIT B 01 3 4 FORT WORTH Dme: 01 35 13 -7 SPECIAL PROJECT PROCEDURES Page 7 of 7 DOE no. XXXX Project Name - NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Pan 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 11, 2022 01 45 23 TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another external FTP site approved by the City. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 01 45 23 TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/9/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 01 50 00 - 1 TEMPORARY FACILITIES AND CONTROLS Pagel of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10278S Revised July 1, 2011 01 50 00 - 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 015000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 01 55 26 -1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 1 SECTION 01 55 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. Contractor shall minimize lane closures and impact to vehicular/pedestrian 30 traffic. 31 b. When traffic control plans are included in the Drawings, provide Traffic 32 Control in accordance with Drawings and Section 34 71 13. 33 c. When traffic controlplans are not included in the Drawings, prepare traffic 34 control plans in accordance with Section 34 71 13 and submit to City for 35 review. 36 1) Allow minimum 10 working days for review of proposed Traffic Control. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 22, 2021 01 5526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 2) A traffic control "Typical" published by City of Fort Worth, the Texas 2 Manual Unified Traffic Control Devices (TMUTCD) or Texas Department 3 of Transportation (TxDOT) canbe used as an alternative to preparing 4 project/site specific traffic control plan if the typical is applicable to the 5 speck project/site. 6 B. Street Use Permit 7 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 8 a. To obtain Street Use Permit, submit Traffic Control Plans to City 9 Transportation and Public Works Department. 10 1) Allow a minimum of 5 working days for permit review. 11 2) It is the Contractor's responsibility to coordinate review of Traffic Control 12 plans for Street Use Permit, such that construction is not delayed. 13 C. Modification to Approved Traffic Control 14 1. Prior to installation traffic control: 15 a. Submit revised traffic control plans to City Department Transportation and 16 Public Works Department. 17 1) Revise Traffic Control plans in accordance with Section 34 71 13. 18 2) Allow minimum 5 working days for review of revised Traffic Control. 19 3) It is the Contractor's responsibility to coordinate review of Traffic Control 20 plans for Street Use Permit, such that construction is not delayed. 21 D. Removal of Street Sign 22 1. If it is determined that a street sign must be removed for construction, then contact 23 City Transportation and Public Works Department, Signs and Markings Division to 24 remove the sign. 25 E. Temporary Signage 26 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 27 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 28 Devices (MUTCD). 29 2. Install temporary sign before the removal of permanent sign. 30 3. When construction is complete, to the extent that the permanent sign can be 31 reinstalled, contact the City Transportation and Public Works Department, Signs 32 and Markings Division, to reinstall the permanent sign. 33 F. Traffic Control Standards 34 1. Traffic Control Standards can be found on the City's website. 35 1.5 SUBMITTALS [NOT USED] 36 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 22, 2021 /'► 1 2 3 4 5 6 7 8 01 55 26 - 3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3of3 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 11 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.4 A. Added language to emphasize minimizing of lane closures and impact to traffic. 1.4 A. 1. c. Added language to allow for use of published traffic control "Typicals" if 3/22/2021 M Owen applicable to specific project/site. 1.4 F. 1) Removed reference to Buzzsaw 1.5 Added language re: submittal of permit CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 22, 2021 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance ON%. a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 015713-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 57 13-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME I SUMMARY OF CHANGE 1 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 SECTION 01 5813 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 1.1 SUMMARY 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 58 13 - 2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 0158 13 -3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 SECTION 01 60 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 6000 PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is available through the City's website at: https://apps.fortworthtexas.gov/ProjectResources/ and following the directory path; 02 - Construction Documents/Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section 01 33 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 01 60 00 PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 3/9/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 9, 2020 01 66 00- 1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Pagel of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 017000-1 MOBILIZATION AND REMOBILIZATION Page 1 of 5 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel, equipment, and operating 9 supplies to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel, equipment, and operating 14 supplies to another location within the designated Site AtOok 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel, equipment, and operating 19 supplies away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for 22 this Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel, equipment, and operating Atalkh. 30 supplies from the Site including disassembly or temporarily securing CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised November 22, 2016 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 5 1 equipment, supplies, and other facilities as designated by the Contract 2 Documents necessary to suspend the Work. 3 b) Site Clean-up as designated in the Contract Documents 4 2) Remobilization 5 a) Transportation of Contractor's personnel, equipment, and operating 6 supplies to the Site necessary to resume the Work. 7 b) Establishment of necessary general facilities for the Contractor's 8 operation at the Site necessary to resume the Work. 9 3) No Payments will be made for: 10 a) Mobilization and Demobilization from one location to another on the 11 Site in the normal progress of performing the Work. 12 b) Stand-by or idle time 13 c) Lost profits 14 3. Mobilizations and Demobilization for Miscellaneous Projects 15 a. Mobilization and Demobilization 16 1) Mobilization shall consist of the activities and cost on a Work Order basis 17 necessary for: 18 a) Transportation of Contractor's personnel, equipment, and operating 19 supplies to the Site for the issued Work Order. 20 b) Establishment of necessary general facilities for the Contractor's 21 operation at the Site for the issued Work Order 22 2) Demobilization shall consist of the activities and cost necessary for: 23 a) Transportation of Contractor's personnel, equipment, and operating 24 supplies from the Site including disassembly for each issued Work 25 Order 26 b) Site Clean-up for each issued Work Order 27 c) Removal of all buildings or other facilities assembled at the Site for 28 each Work Oder 29 b. Mobilization and Demobilization do not include activities for specific items of 30 work for which payment is provided elsewhere in the contract. 31 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised November 22, 2016 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 5 1 a. A Mobilization for Miscellaneous Projects when directed by the City and the 2 mobilization occurs within 24 hours of the issuance of the Work Order. 3 B. Deviations from this City of Fort Worth Standard Specification 4 1. None. 5 C. Related Specification Sections include, but are not necessarily limited to: 6 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 7 2. Division 1— General Requirements 8 1.2 PRICE AND PAYMENT PROCEDURES 9 A. Measurement and Payment [Consult City Department/Division for direction on if 10 Mobilization pay item to be included or the item should be subsidiary. Include the 11 appropriate Section 1.2 A. 1.] 12 1. Mobilization and Demobilization 13 a. Measure 14 1) This Item is considered subsidiary to the various Items bid. 15 b. Payment 16 1) The work performed and materials furnished in accordance with this Item 17 are subsidiary to the various Items bid and no other compensation will be 18 allowed. 19 2. Remobilization for suspension of Work as specifically required in the Contract 20 Documents 21 a. Measurement 22 1) Measurement for this Item shall be per each remobilization performed. 23 b. Payment 24 1) The work performed and materials furnished in accordance with this Item 25 and measured as provided under "Measurement" will be paid for at the 26 unit price per each "Specified Remobilization" in accordance with 27 Contract Documents. 28 c. The price shall include: 29 1) Demobilization as described in Section 1.1.A.2.a.1) 30 2) Remobilization as described in Section 1.1.A.2.a.2) CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised November 22, 2016 017000-4 MOBILIZATION AND REMOBILIZATION Page 4 of 5 1 d. No payments will be made for standby, idle time, or lost profits associated this 2 Item. 3 3. Remobilization for suspension of Work as required by City 4 a. Measurement and Payment 5 1) This shall be submitted as a Contract Claim in accordance with Article 10 6 of Section 00 72 00. 7 2) No payments will be made for standby, idle time, or lost profits associated 8 with this Item. 9 4. Mobilizations and Demobilizations for Miscellaneous Projects 10 a. Measurement 11 1) Measurement for this Item shall be for each Mobilization and 12 Demobilization required by the Contract Documents 13 b. Payment 14 1) The Work performed and materials furnished in accordance with this Item 15 and measured as provided under "Measurement" will be paid for at the 16 unit price per each "Work Order Mobilization" in accordance with 17 Contract Documents. Demobilization shall be considered subsidiary to 18 mobilization and shall not be paid for separately. 19 c. The price shall include: 20 1) Mobilization as described in Section 1.1.A.3.a.1) 21 2) Demobilization as described in Section 1.1.A.3.a.2) 22 d. No payments will be made for standby, idle time, or lost profits associated this 23 Item. 24 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 25 a. Measurement 26 1) Measurement for this Item shall be for each Mobilization and 27 Demobilization required by the Contract Documents 28 b. Payment 29 1) The Work performed and materials furnished in accordance with this Item 30 and measured as provided under "Measurement" will be paid for at the 31 unit price per each "Work Order Emergency Mobilization" in accordance 32 with Contract Documents. Demobilization shall be considered subsidiary 33 to mobilization and shall not be paid for separately. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised November 22, 2016 01 70 00 - 5 MOBILIZATION AND REMOBILIZATION Page 5 of 5 1 c. The price shall include 2 1) Mobilization as described in Section 1.1.A.4.a) 3 2) Demobilization as described in Section 1.1.A.3.a.2) 4 d. No payments will be made for standby, idle time, or lost profits associated this 5 Item. 6 1.3 REFERENCES [NOT USED] 7 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 8 1.5 SUBMITTALS [NOT USED] 9 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 19 20 END OF SECTION Revision Log DATE I NAME SUMMARY OF CHANGE 11/22/16 I Michael Owen I1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised November 22, 2016 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking" 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised February 14, 2018 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following:: 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as -built survey data onto contractor redline plans and digital survey files. 1.3 REFERENCES A. Definitions 1. Construction Survev - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survev "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A —Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 1.4 ADMINISTRATIVE REQUIREMENTS A. The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 01 33 00. B. All submittals shall be received and reviewed by the City prior to delivery of work. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.102785 Revised February 14, 2018 0171 23 -3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 -- 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plans do not indicate grid or ground coordinates. 2. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 1.7 CLOSEOUT SUBMITTALS B. As -built Redline Drawing Submittal 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and sealed by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards) . 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination a. Contact City's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised February 14, 2018 017I23-4 CONSTRUCTION STAKING AND SURVEY Page 4 0£ 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notesused to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 25O linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves t) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater — Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY PART2- PRODUCTS A. A construction survey will produce, but will not be limited to: 1. Recovery of relevant control points, points of curvature and points of intersection. 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions PART 3 - EXECUTION 3.1 INSTALLERS A. Tolerances: 1. The staked location of any improvement or facility should be as accurate as practical and necessary. The degree of precision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific requirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances. a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical tolerance. Horizontal alignment for earthwork and rough cut should not exceed 1.0 ft. tolerance. b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways shall be located within the confines of the site boundaries and, occasionally, along a boundary or any other restrictive line. Away from any restrictive line, these facilities should be staked with an accuracy producing no more than 0.05ft. tolerance from their specified locations. d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric lines, shall be located horizontally within their prescribed areas or easements. Within assigned areas, these utilities should be staked with an accuracy producing no more than 0.1 ft tolerance from a specified location. e. The accuracy required for the vertical location of utilities varies widely. Many underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be maintained. Underground and overhead utilities on planned profile, but not depending on gravity flow for performance, should not exceed 0.1 ft. tolerance. B. Surveying instruments shall be kept in close adjustment according to manufacturer's specifications or in compliance to standards. The City reserves the right to request a calibration report at any time and recommends regular maintenance schedule be performed by a certified technician every 6 months. 1. Field measurements of angles and distances shall be done in such fashion as to satisfy the closures and tolerances expressed in Part 3.1.A. 2. Vertical locations shall be established from a pre -established benchmark and checked by closing to a different bench mark on the same datum. 3. Construction survey field work shall correspond to the client's plans. Irregularities or conflicts found shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be logged for future reference. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised February 14, 2018 017t23-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION A. If the Contractor's work damages or destroys one or more of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restorations. b. The City may require at any time a survey "Field Check" of any monument or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 2. Checks by City personnel or 3`d party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised February 14, 2018 01 71 23 - 8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised February 14, 2018 Section 01 71 23.01- Attachment A Survey Staking Standards February 2017 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 1 of 22 These procedures are intended to provide a standard method for construction staking services associated with the City of Fort Worth projects. These are not to be considered all inclusive, but only as a general guideline. For projects on TXDOT right-of-way or through joint TXDOT participation, adherence to the TXDOT Survey Manual shall be followed and if a discrepancy arises, the TXDOT manual shall prevail. (http://onlinemanuals.txdot.gov/txdotmanuals/ess/ess.odf) If you have a unique circumstance, please consult with the project manager, inspector, or survey department at 817-392-7925. Table of Contents I. City of Fort Worth Contact Information II. Construction Colors III. Standard Staking Supplies IV. Survey Equipment, Control, and Datum Standards V. Water Staking VI. Sanitary Sewer Staking VII. Storm Staking VIII. Curb and Gutter Staking IX. Cut Sheets X. As -built Survey 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 2 of 22 I. Survey Department Contact Information Physical and mailing address: 8851 Camp Bowie West Boulevard Suite 300 Fort Worth, Texas 76116 Office: (817) 392-7925 Survey Superintendent, direct line: (817) 392-8971 II. Construction Colors The following colors shall be used for staking or identifying features in the field. This includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags if necessary. Utility PROPOSED EXCAVATION ALL ELECTRIC AND CONDUITS POTABLE WATER GAS OR OIL TELEPHONE/FIBER OPTIC SURVEY CONTROL POINTS, BENCHMARKS, PROPERTY CORNERS, RIGHT-OF-WAYS, AND ALL PAVING INCLUDING CURB, SIDEWALK, BUILDING CORNERS SANITARY SEWER IRRIGATION AND RECLAIMED WATER III. Standard Staking Supplies Color WHITE YELLOW PINK Item Minimum size Lath/Stake I 36" tall Wooden Hub (2"x2" min. square preferred) 6" tall Pin Flags (2.5" x 3.5" preferred) 21" long Guard Stakes I Not required PK or Mag nails I 1" long Iron Rods (1/2" or greater diameter) 18" long Survey Marking Paint Water -based Flagging I 1" wide Marking Whiskers (feathers) I 6" long Tacks (for marking hubs) I 3/4" long 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 3 of 22 IV. Survev Equipment, Control, and Datum Standards A. City Benchmarks All city benchmarks can be found here: httD://fortworthtexas.gov/itsolutions/GIS/ Look for 'Zoning Maps'. Under 'Layers' , expand 'Basemap Layers', and check on 'Benchmarks'. B. Conventional or Robotic Total Station Equipment I. A minimum of a 10 arc -second instrument is required. ll. A copy of the latest calibration report may be requested by the City at any time. It is recommended that an instrument be calibrated by certified technician at least 1 occurrence every 6 months. C. Network/V.R.S. and static GPS Equipment I. It is critical that the surveyor verify the correct horizontal and vertical datum prior commencing work. A site calibration may be required and shall consist of at least 4 control points spaced evenly apart and in varying quadrants. Additional field checks of the horizontal and vertical accuracies shall be completed and the City may ask for a copy of the calibration report at any time. II. Network GPS such as the Western Data Systems or SmartNet systems may be used for staking of property/R.O.W, forced -main water lines, and rough -grade only. No GPS staking for concrete, sanitary sewer, storm drain. final grade. or anvthine that needs vertical grading with a tolerance of 0.25' or less is allowed. D. Control Points Set I. All control points set shall be accompanied by a lath with the appropriate Northing, Easting, and Elevation (if applicable) of the point set. Control points can be set rebar, T in concrete, or any other appropriate item with a stable base and of a semi -permanent nature. A rebar cap is optional, but preferred if the cap is marked 'control point' or similar wording. II. Datasheets are required for all control points set. Datasheet should include: A. Horizontal and Vertical Datum used, Example: N.A.D.83, North Central Zone 4202, NAVD 88 Elevations B. Grid or ground distance. — If ground, provide scale factor used and base point coordinate, Example: C.S.F.=0.999125, Base point=North: 0, East=O C. Geoid model used, Example: GEOID12A 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01—Attachment A_Survey Staking Standards.docx Page 4 of 22 E. Preferred Grid Datum Although many plan sets can be in surface coordinates, the City's preferred grid datum is listed below. Careful consideration must be taken to verify what datum each project is in prior to beginning work. It is essential the surveyor be familiar with coordinate transformations and how a grid/surface/assumed coordinate system affect a project. Proiected Coordinate System: NAD_1983_StatePlane_Texas_North_Central_FIPS_4202_Feet Projection: Lambert_ Conformal_ Conic False_Easting: 1968500.00000000 False —Northing: 6561666.66666667 Central Meridian:-98.50000000 Standard Parallel 1: 32.13333333 Standard Parallel 2: 33.96666667 Latitude —Of —Origin: 31.66666667 Linear Unit: Foot US Geographic Coordinate System: GCS_ North_American_1983 Datum: D North American 1983 Prime Meridian: Greenwich Angular Unit: Degree Note: Regardless of what datum each particular project is in, deliverables to the City must be converted/translated into this preferred grid datum. 1 copy of the deliverable should be in the project datum (whatever it may be) and 1 copy should be in the NAD83, TX North Central 4202 zone. See Preferred File Nominq Convention below F. Preferred Deliverable Format txt csv dwg .job G. Preferred Data Format P,N,E,Z,D,N Point Number, Northing, Easting, Elevation, Description, Notes (if applicable) H. Preferred File Naming Convention This is the preferred format: City Project Number_Description_Datum.csv Example for a proiect that has surface coordinates which must be translated: Amuk File 1: C1234 As -built of Water on Main Street Grid NAD83 TXSP 4202.csv O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 5 of 22 File 2: C1234_As-built of Water on Main Street —Project Specific Datum.csv Example Control Stakes O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 6 of 22 U Q m Y d w Ui d z o W a y > o_ o W --- - - ------ ...... ...... 1 016 EL. = 100.00' J W � W 0LljZ Q 0_ L1 r 0C m 0— Y J = LL- JU) W a_J t U7 ~ Q �— m 0' O CD U CP #1 N=5000.00 E=5000.00 p W W � U d U 0' 0 0 O = U z 2 � LLJ U J � W < X 07 W V. Water Staking Standards O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A Survey Staking Standards.docx Page 7 of 22 A. Centerline Staking — Straight Line Tangents I. Offset lath/stakes every 200' on even stations II. Painted blue lath/stake only, no hub is required III. Grade is to top of pipe (T/P) for 12" diameter pipes or smaller IV. Grade to flow line (F/L) for 16" and larger diameter pipes V. Grade should be 3.50' below the proposed top of curb line for 10" and smaller diameter pipes VI. Grade should be 4.00' below the proposed top of curb line for 12" and larger diameter pipes VII. Cut Sheets are required on all staking and a copy can be received from the survey superintendent Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking - Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Same grading guidelines as above III. Staking of radius points of greater than 100' may be omitted C. Water Meter Boxes I. 7.0' perpendicular offset is preferred to the center of the box II. Center of the meter should be 3.0' behind the proposed face of curb III. Meter should be staked a minimum of 4.5' away from the edge of a driveway IV. Grade is to top of box and should be +0.06' higher than the proposed top of curb unless shown otherwise on the plans D. Fire Hydrants I. Center of Hydrant should be 3.0' behind proposed face of curb II. Survey offset stake should be 7.0' from the center and perpendicular to the curb line or water main III. Grade of hydrants should be +0.30 higher than the adjacent top of curb E. Water Valves & Vaults I. Offsets should be perpendicular to the proposed water main II. RIM grades should only be provided if on plans Example Water Stakes 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 8 of 22 0 M n cn Q c� 0 CD N � W n rD Q o o 3 �, I r' D � N a � n rD S rD E E rD o rr p� ago D � m n O< � (D T N L CD or i X- n ao � N r�f rr � � 0 Q rD nr Q m �n Q i o n n a x -p 0 rD m F. 0 0 LM d e-F n� N m m N r-r d I• NO FLAC;DING REQUIRED IN LIEU OF BLUE PAINTED LATH FRONT (SIDE FACING} BACK Io it OFFSET DI`_ AANCE (SIDE FACING R.G.W.) I j POINT # •) CENTERIJNE OF WATER LINE ,T- HUS ELE'VATIC?l o i P{ N STPTI-DNIN' t,4 J� IDENTIFIES,: TOP OF PIPE +n`t IDENTIFIES CU'f - t OR FILL + t HUE PAINTED BLUE, FLUSH MTH 'GROUND, '.+JITH TACK OR BLACK DOT HUB PAINTED BLUE WITH �- BLUE 'WHISKERS OR 60D r NAIL VIITH @LUE FRONT FRONT (SIDE FACING �) (SIDE FACING} o N ti BACK 0 {SIDE FACING R_O_W.) R r P r 1 CONTINUE STAkJNG IDENTIFY ANY FH I EVERY 200' o TEES, METERS o E� GATE VALb'ES, Mr.)5SES, ETC. n T/P n + `> I N W m rn N T/P r_ A. Centerline Staking — Straight Line Tangents I. Inverts shall be field verified and compared against the plans before staking II. Painted green lath/stake WITH hub and tack or marker dot, no flagging required III. 1 offset stake between manholes if manholes are 400' or less apart IV. Offset stakes should be located at even distances and perpendicular to the centerline V. Grades will be per plan and the date of the plans used should be noted VI. If multiple lines are at one manhole, each line shall have a cut/fill and direction noted VII. Stakes at every grade break Vill. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking— Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Sanitary Sewer Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans ^ 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 10 of 22 W, LA 'O N n w LA CL LA cT O ro N W 3 n i� m 01 -V o, O CD I n D O1 � n M =r3 (�D 0 3 O Im ID Z M N Ln ~ n < TI NLn &A � n d oa �. d � v n m CL m n i O n X v m FONT (SIOL FACING �) "_nd CFF9ET STAKE FOR 4L13NdENT FJH b3MH'S GULF STA'n(%IN; lR =1FM OFF`ET STAKE F/L w N rAL s E FRONT (tiI1F Fb,0W(, ( ) 2rd CF"SET STAKE FOR ALIGNMENT FOR SW H'S FROf\T UI (90E FAGING NO FLL.GGING F'=GUIRED IN LIEU OF GR=EN PAIVTED _ATH M1 a� w CrrXT TaEC F SON T (SIDE FACING ) -at OFFfET SAKE \ l rce, AUINMEPT aN U 33AiH'J MM a)k.�,� FUE PAINTED ER=EN, FLUSH WITH 4 ;. VOLK, WTI TACK OF. ELACFt DOT ZANIIAM kW:tt UWL IOETtTFlES MANHOLE 3Tr.TIONIN G ID04TI`IES FLCMMINE CF NOPTF PIPE INADE DENTS® -W- - 4R FILL +FOR NORTH FIPE ICEhT ILS FLOWUVE Or 5]UTH PPE GP.ADE IDDIVIES CUT - LTt rIL - FflF 30LRH PPE ICENTIFIES HIM GFALE ICENTIFIES CUT- 04 FILL - TO TOf 4- MA14II7LC n4-- w Jh (OPTIOVA_) HUH FAINILL) UNttV 'M IH CLJC Vd113fC73 Of. DOV i NAIL VATH 9LLE NWSVERS t -rQ s.LINMEIJT ZCV SSWH S cn V � a to 140 2ND OFFSET STAGE FrL F F.. CENT=RUNE E iH VEEDED FRO\IT 1 1 %/ TIDE FACING I F/t IA Wa S I FAL s 4 _ w NIM rF) a a u K FA N[ n a i 1 " 4 �. v OV ECAUSE �i�TIDNIhG N� FFT,IF=N SSiAH'fi VAR F/L LESS -HAN 4C0% SPLIT ti R THE DIFFERENCE Af,D SET I STAKE IN THE MIDDLE r �, M1IFy1" V r,.-.- "ter ~��e7• C�tiIW' OUi� VII. Storm Sewer & Inlet Staking 100*41 A. Centerline Staking — Straight Line Tangents I. 1 offset stake every 200' on even stations II. Grades are to flowline of pipe unless otherwise shown on plans III. Stakes at every grade break IV. Cut sheets are required on all staking Optional. Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Storm Drain Inlets I. Staking distances should be measured from end of wing II. Standard 10' Inlet = 16.00' total length III. Recessed 10' Inlet = 20.00' total length IV. Standard double 10' inlet = 26.67' total length V. Recessed double 10' inlet = 30.67' total length D. Storm Drain Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 12 of 22 BACK (9oE FACIM R.MW.) POINT y ,I HL13 E1FMMW c ) Example Storm Inlet Stakes FRONT (SIDE FACING (�) Q i NO FLAGGING REQUIRED IN LIEU OF PINKPAINTED LA1}I n M m 0 m r i z IDENTIFIES MICR END OF THE WN0 BEING STAKED p� II INLET STATION (IF NOTED ON PLANS) 'l "• IDENTIFIES GRADE TO TOP OF CURB O r4 IDENTIFIES GRADE TO FL04AJNE C7 1 A DISTANCES FOR INLETS STANDARD 10' - 10' RECESSED W - 2{f STANDARD DOUBLE 1G' - 26.6Y BACK (513E FA13NN7C R.QW.) PKIINT 0 1i HLIS ELEVXTON u 1' 4 !!i FRONT (SIDE FACING Q �i z r 3� ,�q1 I' ' IDENTIFIES YMICH END OF THE YANG Vp BEING STAYED 1 I-� T/C n �I f� HUB WTH TACK — — RECESSED DOUBLE 1U=•_36-67 I BAD". OF INLET I FI IAARHOLE c bI °I I BACK. OF WFO - BACK OF CURB— — — — y — — — FLOMNE FACE OF INLET FACE OF INLET FLOWUNE EDGE OF PA'•fEMENT — EDGE OF PY',-5AENT I EDGE OF PA'vEMENT EDGE # FA.�FAENf O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 13 of 22 VIII. Curb and Gutter Staking A. Centerline Staking — Straight Line Tangents V. 1 offset stake every 50' on even stations VI. Grades are to top of curb unless otherwise shown on plans VII. Stakes at every grade break VIII. Cut sheets are required on all staking Optional. Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IV. Staking of radius points of greater than 100' may be omitted O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 14 of 22 Example Curb & Gutter Stakes FRONT (SIDE FACING CL) FRONT IDENnFlEq ND 4S�E FACINPOINT OFFF FRONT Tsovr FRONT it !J START (:SIDE FACING �) i o (SIDE FACING) IDEww, Pc PO9lJRYANRE N c i9C�� � I, d A iPT �ACI� I Gi j p TA IDDJnFIFS OFFSET 15 TO SACCR (SIDE FACING R.O.W.) FOR FhC cuFBE 4F CUFH F/c T/C' �I FOR I E T `!E FaNT ,� s $ i o i I{ III I ,( �� f ICQJ17FlE5thOE IS III I II TJ�ils T6 rOP OF CURB o I NO SIT ON HUB ELEVATION o * j i RADIUS PCINTS 1 i�0 �jl r'yti (4 ( _��"S�7st`i�ii_-MIM M I it IN i!Eli _..CIF PIf�Jf i AIINTEC� LATH I? � t t TOP OF CURB I r BACK OF CURB FACE OF CURB FLO WLI NE EDGE OF PA`..[IdENT Example Curb & Gutter Stakes at Intersection 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01—Attachment A_Survey Staking Standards.docx Page 15 of 22 n to m 1p to .r CA 61 3 N � w 3 n F+ fD 01 �p C3 O F+ 0 ID Ili+ d � n �D 3 eD 0 3 v �* d go (D Vf tn I.- C cn 0 m n Is -< = N H �D N N x n 00 T� N tu 3 v a fu a m N d / X 61 v 10' C/S STAKE ID' O/S STAKE W/4HALL AI W/GMAUL Al EM STATION EVEN STATION Q Q Q Q Q 5O' MAX, DISTANCE � 50' MAX. DISTANCE � 50' MAX. DISTANCE ( 50' MAX DISTANCE � HD' MAX DISTANCE � EO' MAX. D13TA40E �- �� 0 I I I I I I I RAI7( CIF C1JRR OAS{ 3r yla IF ARG LENGI-I IS IAQ< Cr CURE;,_ _. GREATER THAN 100'. 0 O A PCC -OFFSET STAKE 0 50' MAX, 015TANCE r \ SHOLLD BE SET � � TI1i'� 50' MAX. DISTANCE i 10 0% \ STAKE �l ~\ 1STAKE r rT 10' 0/5 A NGRADE \ A T A / �/ •� GRADE AT rr / To' SD E WjGnARADC AT Gj i \� STAKE KE EVEN STAION �.�/ �0�} O WJGRADE AT E'1EN STATIOG SSTAKE ` / W/GRAD- f /GRAE 'M AT PT AT PC. AT 1 �' AST PG '\ \ 31 RAOIIS „ i 30' RADIUS PDIVT j POINT W/NO OWE F '¢ WWI GRADE _ u Lei 2r n 4 4 O o � a o I l 0 /5 L9 m '7 1 U, UlL.' STAKE I j� STAKE w; GRAD_ ,aT ' Tor- W/GRADE XT E',fiN STATION =VER STATION TYP . FRONT (SIDE FACING �) n I O 9/C\ of seIES ro CURB OF 4 0 J jt; n N A00►. IX. Cut Sheets A. Date of field work B. Staking Method (GPS, total station) C. Project Name D. City Project Number (Example: C01234) E. Location (Address, cross streets, GPS coordinate) F. Survey company name G. Crew chief name H. A blank template can be obtained from the survey superintendent (see item I above) Standard City Cut Sheet City Project Date: Number: Project Name: ❑ TOTAL Staking Method: ❑ GPS STATION ❑ OTHER LOCATION: CONSULTANT/CONTRACTOR SURVEY CREW INITIALS �. ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS OTHERWISE NOTED. PT # STATION OFFSET DESCRIPTION PROP. STAKED -CUT + FILL -LT/+RT GRADE: ELEV. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 17 of 22 X. As -built Survev A. Definition and Purpose The purpose of an as -built survey is to verify the asset was installed in the proper location and grade. Furthermore, the information gathered will be used to supplement the City's GIS data and must be in the proper format when submitted. See section IV. As -built survey should include the following (additional items may be requested): Manholes Top of pipe elevations every 250 feet Horizontal and vertical points of inflection, curvature, etc. (All Fittings) Cathodic protection test stations Sampling stations Meter boxes/vaults (All sizes) Fire lines Fire hydrants Gate valves (rim and top of nut) Plugs, stub -outs, dead-end lines Air Release valves (Manhole rim and vent pipe) Blow off valves (Manhole rim and valve lid) Pressure plane valves Cleaning wyes Clean outs Casing pipe (each end) Inverts of pipes Turbo Meters O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 18 of 22 B. Example Deliverable A hand written red line by the field surveyor is acceptable in most cases. This should be a copy of the plans with the point number noted by each asset. If the asset is missing, then the surveyor should write "NOT FOUND" to notify the City. O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 19 of 22 jp%� if - 1 I I H mat Ll T2� t4- A 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01—Attachment A —Survey Staking Standards.docx Page 20 of 22 nr.C.MQY nA� s7A oslm - t�Wta9/D tYtl W ST A O- r, sdtvA�' Exrsr. i BEGM pry 12WQEA ry wEn ari Fn PiD scx 6 LGT Z PEUME E lJW,PE)? Fly MO.& Shy ♦V TOM v6 M'STAw F lrxA SY[.!0 S(EE.v£ 9 LR CF IPWATER P(FE _ CM-CLT TD DOST. /QM WO? *�&gI45-94n � E'P.LAi:1D9.?/36 STA Onr'5 - 8*IM' 1K.•TAU, t z x a AWJCA TEE f 96ATE h fine ffYdtA v— # LF LT RYU AYf LEAD F 12' �IUE VAWt N �dJQO£�9 ! Lor! vM � a�1Pea^WP i �r f l21PVEAT. AND r IP �f'Y"OPI. Bad 2 A+6wa5-9 s / E-2,?9G3Q3,2R/3 �•72%3Cv8T7G r Y b fj=------- — PF OM!;ED SAH1rAM So SEE SHEV 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 21 of 22 D - 23.16.01—Attachment A —Survey Staking Standards.docx Page 22 of 22 9 --- 2f— Uffft BY 29 LOT 2 Wr 3 'W- 4'5AITAW SEWER E W1 CLEAVff -_j �LAYTON RD. W. 0 RD k IA C) wy ----- ------- 90 ,a 12'WATER NO . t�I%ER E- --,LINE A L-3654 ' Cw REMOVE mf I «�Y Ka STA 117.0 FSS LAE A yy Ex/sr. STA O-M L-3(7,- EXIST STA)67IL-3654 • LOT 2 REMOVE EXIST-3SUH I I OF ISS -f DIA SSMH IhCWDE COM5T. CW-COLLAR & MH NSERF UXE �wl cams rAorccTkw CONNE' T PROP. 8SS rAr#) CONNECT ~. 8' SS (NE&SW) 'TO I'mr. ssmil. N39466f5.6252 E-2-4IS532 31 C= MAP NO. 2018-380,2018-3' MAPSCO PAGE NO. 74N, S, T, W 23.16.01—Attachment A —Survey Staking Standards.docx Page 23 of 23 )1\01 71 Obviously the .csv or Axt file cannot be signed/sealed by a surveyor in the format requested. This is just an example and all this information should be noted when delivered to the City so it is clear to what coordinate system the data is in. POINT NO. NORTHING EASTING ELEV. OESCHIP110N 1 6946257.189 2296079,165 726.09 SSMH RIM 2 6946260,893 2296062.141 725.668 GV RIPA 3 6946307399 2296038,306 726.85 GV RIM COLT--b!!- {}ice s 4 6946220.582 2296011.025 723.358 SSMH RIM 5 6946195.23 2296015.116 722.123 GV RIM 6 6946190528 2296022.721 722.325 FH q r �� 7 6946136.012 2295992.115 719.448 WM RIM 8 6946002.267 2295919.133 713.331 WM RIM -rx 0 pd L 9 6946003.056 2295933.418 713.652 CO RIM 10 6945984.677 2295880.52 711.652 SSMH RIM 11 6945996.473 229.5869.892 710.046 WM RIM 12 G945895.077 2295660.962 707.72 WM RIM 13 6945896.591 2295662.198 708.20S WM RIM p_ 14 6945934.286 2295841.925 709.467 WM RIM 15 6945936.727 2295830.441 710.084 CO RIM C CG n f�j S 16 6945835.678 2295799.707 707.774 SSNIH RIM 17 6945817.498 2295827.011 i08.392 SSMH RIM 18 6945759.776 2295758.643 711.218 SSMH RIM 19 6945768.563 2295778.424 710.086 GV RIM 20 6945743.318 2295788.392 710.631 GV RIM 21 6945723.219 2295754.394 712.849 GV RIM 22 6945682.21 2295744.22 716.686 WM RIM 23 6945621.902 2295669.471 723.76 WM RIM 24 6945643.407 2.295736.03 719,737 CO RIM //1L ,} CA-L(�J,ntK+T-C-6 25 6945571.059 2295655.195 727.514 SSMH RIM 26 6945539.498 2295667.803 729.123 WM RIM 7D 27 6945519.934 2295619.49 732.689 WM RIM } 28 6945417,879 2295580.27 740.521 WM RIM 29 6945456.557 2295643.145 736.451 CO RIM i,1 ST&b r N 30 6945387.356 2295597.101 740.756 GV RIM -T rW- '? (, f }} 3 S 31 6945370.588 2295606.793 740.976 GV RIM �� t Ic 32 6945383.53 2295610.559 740.408 FFI 33 6945321.228 2295551,105 746.34 WM RIM 34 6945319.365 2295539.728 746.777 CO RIM 35 6945242.289 2295570.715 748.454 WM RIM 36 6945233.624 2295544.626 749.59 SSMH RIM Q 37 6945206.483 2295529.305 751058 WM RIM 38 6945142.015 2295557.666 750.853 WM RIM 39 6945113.445 2295520.335 751.871 WM RIM 40 6945049.02 2295527.345 752.257 SSMH RIM f'G 41 6945C41.024 2295552.675 751.79 WM RIM` 42 43 G945038.878 6945C06.397 2295552.147 2295518,135 751.88 WM RIM 752.615 WM RIM 5/ 44 6944944.797 2295520.635 752.801 WM RIM 45 6944943.432 2295556.479 752.156 WM RIM 46 6944860.416 2295534.397 752.986 SSMH RIM , / S ,p _Vr0(` IZ J4fb O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\0171 23.16.01_Attachment A_Survey Staking Standards.docx Page 24 of 24 l� C. Other preferred as -built deliverable Some vendors have indicated that it is easier to deliver this information in a different format. Below is an example spreadsheet that is also acceptable and can be obtained by request from the survey superintendent. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 25 of 25 W, ro M fn LAJ fD c) 0 M r+ rD 3ro fD 0 :3 -0 1+ Doi W > = I M (,n CA c 'a (D 0 M G T7 0- rD In 0 r) How lmt• zo;tj?-.4 F.rm.$ii Detz Rrvic+t Viva An:A .. .. ... ... .. . . ... .... ......... ... .... ......... .. . I .................. Ca bol •:1 4r, wz p T 0A L.. -.., BaO Gocd Ntutrzi rakula"On AAq)v - Passe B 1 iQrwl It *l Av i4e� 3r—dit4ffl�Emr... Flpwej Hi... Hip- " I bud D, deW9FACtrk .OF 'wm,.no ir�bk f-.W. Iuwbt- I 431 . — - - — -------- -- --- ---- - ---- -- -- - - --- . . ..... ..... . . ...... ........ .. . . .... . . .. .... . ....... ... . ....... . . .............. ------------- ------------ - - ------- ------ --- Pfojed Name and Number- ISIreetName) Meter Boxes rare Wdrants Teles Ekoi.,Vl AC 02 Slay FX4ZR I kc 4= Al KV W4M Ekrvalim 4:i"34791IJ313D O.M.03 0.2!.03 0,3312 ;16.1.iS WPK.W-0,1450 IEIX1=232CR'.45751- I Elio=L 204`_4.7650-(X-132095' 56a3, 1: V .5319 1 it.939 O.W.01, U."ill 32-1--" 714A3_ 24M.76 ;0-9c23 10,31' j E174-r-KI604630 2X-232)Y,042ST I00-2:1*0121tr 4:("93-491.6" 10 .9253 2I.1..33 E0D-2Z21,FA070 12 12-ii.17 7L.03'- O-Wo? 13, EM-2:2[%lU8D' 14. 2O-51.69 704.35 149.-.95 ]s: fNQ=23H4'5,3070 PgV:*9E74945297' 16 27-55.20 &K.OK :71 e0Q-Z!ZCIPAL5430 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 CLEANING Pagel of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. r► No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 74 23 - 2 CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 017423-3 CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other foreign materials from sight -exposed surfaces. 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 0177 19 CLOSEOUT REQUIREMENTS 01 7719-1 CLOSEOUT REQUIREMENTS Page 1 of 3 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. 27 28 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 29 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 PART 2 - PRODUCTS [NOT USED] 32 CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 22, 2021 01 7719 - 2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 PART 3 - EXECUTION 2 3.1 INSTALLERS [NOT USED] 3 3.2 EXAMINATION [NOT USED] 4 3.3 PREPARATION [NOT USED] 5 3.4 CLOSEOUT PROCEDURE 6 A. Prior to requesting Final Inspection, submit: 7 1. Project Record Documents in accordance with Section 0178 39 8 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 9 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 10 01 74 23. 11 C. Final Inspection 12 1. After final cleaning, provide notice to the City Project Representative that the Work 13 is completed. 14 a. The City will make an initial Final Inspection with the Contractor present 15 b. Upon completion of this inspection, the City will notify the Contractor, in 16 writing within 10 business days, of any particulars in which this inspection 17 reveals that the Work is defective or incomplete. 18 2. Upon receiving written notice from the City, immediately undertake the Work 19 required to remedy deficiencies and complete the Work to the satisfaction of the 20 City. 21 3. The Right-of-way shall be cleared of all construction materials, barricades, and 22 temporary signage. 23 4. Upon completion of Work associated with the items listed in the City's written 24 notice, inform the City that the required Work has been completed. Upon receipt of 25 this notice, the City, in the presence of the Contractor, will make a subsequent Final 26 Inspection of the project. 27 5. Provide all special accessories required to place each item of equipment in full 28 operation. These special accessory items include, but are not limited to: 29 a. Specified spare parts 30 b. Adequate oil and grease as required for the first lubrication of the equipment 31 c. Initial fill up of all c hemic al tanks and fuel tanks 32 d. Light bulbs 33 e. Fuses 34 f. Vault keys 35 g. Handwheels 36 h. Other expendable items as required for initial start-up and operation of all 37 equipment 38 D. Notice of Project Completion 39 1. Once the City Project Representative finds the Work subsequent to Final Inspection 40 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 41 E. Supporting Documentation CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 22, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 01 77 19 -3 CLOSEOUT REQUIREMENTS Page 3 of 3 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/22/2021 M Owen 3.4 C. Added language to clarify and emphasize requirement to "Clearing ROW" CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised March 22, 2021 017823-1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00 . All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 'h inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 017823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10278S Revised December 20, 2012 01 78 23 - 3 OPERATION AND MAINTENANCE DATA Page 3 of 5 ,amillilkh. 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised December 20, 2012 01 7823 -5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME 8/31 /2012 D. Johnson CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 SUMMARY OF CHANGE 1.5.A.1 —title of section removed Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page 1 of 4 A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 100*4 A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract 000*4 Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 78 39 - 2 PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3- EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 APPENDIX GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GR-01 60 00 Product Requirements CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 GC-6.06.1) Minority and Women Owned Business Enterprise Compliance THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Sanitary Sewer Rehabilitation, Contract 113, Part 2 City Project No. 102785 i V 1\ 1 • V V/ 1\ 1 1 1 City of Fort Worth Minority/Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR OFFERORS APPLICATION OF POLICY I If the total dollar value of the contract is $50,000.01 or more, then a M/WBE subcontracting goal is applicable. I POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. M[WBE PROJECT GOALS The City's M/WBE goal on this project is 15 % of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts $50,000.01 or more where a M/WBE subcontracting goal is applied, Offerors are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated M/WBE goal through M/WBE subcontracting participation, or 2. Meet or exceed the above stated M/WBE goal through M/WBE Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Prime Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Purchasing Division, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the M/WBE documentation in person to the appropriate employee of the purchasing division and obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the time allocated. A faxed and/or emailed copy will not be accepted. 1. Subcontractor Utilization Form, if goal is met or exceeded: 2. Good Faith Effort and Subcontractor Utilization Form, if participation is less than stated goal: 3. Good Faith Effort and Subcontractor Utilization Form, if no M/WBE participation: 4. Prime Contractor Waiver Form, if you will perform all subcontracting/supplier work: 5. Joint Venture Form, if goal is met or exceeded: received no later than 2:00 p.m., on the second City business day after the bid opening date, exclusive of the bid opening date. received no later than 2:00 p.m., on the second City business day after the bid opening date, exclusive of the bid opening date. received no later than 2:00 p.m., on the second City business day after the bid opening date, exclusive of the bid opening date. received no later than 2:00 p.m., on the second City business day after the bid opening date, exclusive of the bid opening date. received no later than 2:00 p.m., on the second City business day after the bid opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE, WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE TO SPECIFICATIONS. FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE. A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICATION PERIOD OF THREE YEARS. Any questions, please contact the Office of Business Diversity at (817) 392-2674. Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Rev. 5/15/19 Phone: (817) 392-2674 _111r- Disadvantaged Business Enterprise Utilization Form (Applicable if Federallv-Funded) PRIM E/OFFE RORIOWN ER COMPANY NAME: PROJECT NAME: Sanitary Sewer Rehabilitation, Contract 113, Part 2 )JECT NUMBER: BID DATE: City's Business Equity Goal: I Offeror's Business Equity (or DBE) 102785 1 9/28/23 ❑ (Check if addressing DBE Goal) 15 % Commitment: % (Check all applicable boxes to describe ❑ Not Certified MBE WBE DBE HUB ❑VOSB Section 3 Prime/Offeror/Owners Classification: Certifying Agency: ❑NCTRCA []D/FW MSDC []TX DOT WBCS Other. Ethnicity: ❑African American Hispanic Caucasian Asian El Native American Gender: ❑ Male ❑Female ❑ Non -Binary Definitions: Business Equity Firm: Certified MBE Minority Business Enterprise or WBE Women Business Enterprise DBE: Disadvantaged Business Enterprise HUB: Historically Under Utilized Business VOSB: Veteran Owned Small Business Section 3: Certified Housing Urban Development Vendors ALL BUSINESS EQUITY FIRMS MUST BE CERTIFIED BEFORE CONTRACT AWARD Failure to complete this form, in its entirety, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG proiects, documents will be submitted to the City Proiect Manaqer if oublicly bid or to the Developer if Drivatelv bid. The undersigned Prime/Offeror agrees to enter into a formal agreement with the Business Equity firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth (Exception: Developer proiects),. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specifications. Business Equity firms listed toward meeting the project goal must be located in the City's marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. The marketplace is the Citv of Fort Worth including portions of Denton, Parker, Wise, and all of Tarrant. Dallas, and Johnson Qm inties Certified means those firms, located within the Marketplace, that have been determined to be a bona -fide minority or women business enterprise by the North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC) and Women's Business Council -Southwest (WBCS). If hauling services are utilized, the Prime/Offeror will be given credit as long as the Business Equity firm listed owns and operates at least one fully licensed and operational truck to be used on the contract. The Business Equity firms may lease trucks from another Business Equity firm, including Business Equity owner -operated, and receive full Business Equity credit. The Business Equity firm may lease trucks from non -Business Equity firms, including owner -operated, but will only receive credit for the fees and commissions earned by the Business Equity as outlined in the lease agreement. Note: For DBE Goals, 60% of the services count towards the goal. Please see below. C,9jjQ,ng DBE Participation: If materials or supplies are obtained from a DBE manufacturer, count 100 percent of the cost of the materials or supplies towards the goal. If the materials or are purchased from a DBE regular dealer, count 60 percent of the cost of the materials and supplies toward the DBE goal. When materials or supplies are purchased from a DBE n a manufacturer nor a regular dealer, count the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies or fees or transportation charges for the delivery of the materials or supplies delivered to the job site. In all cases, the Prime/Offeror is responsible to identify the amounts to be used toward the committed DBE goal. Effective 01/01/2021 Updated 06/28/2021 Please note that only certified Business Equity firms will be counted to meet the Business Equity goal. Prime/Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Business Equity fines and non -Business Equity firms. Prime/Offerors must identify by tier level all subcontractors/suppliers. Tier: means the level of subcontracting below the Prime/Offeror i.e. a direct payment from the Prime/Offeror to a subcontractor is considered 1st tier, a payment by a subcontractor to its supplier is considered 2nd tier. Business Equity firms are to be listed before non -Business Equity firms. The Prime/Offeror is responsible to provide proof of payment of all tiered sub-contractors/suppliers identified as a Business Equity fine and counting those dollars towards meeting the contract committed goal. Certified Business Equity Prime/Offeror Contractors counting their self -performance towards meeting the contract goal, must be certified within those NAICS commodity codes with a certifying agency acceptable by the City of Fort Worth. Certified Business Equity Prime/Offeror counting self -performing services towards the goal, the service(s) to be ed should be listed first on the Utilization form. Check this box ❑if certified Prime Contractor services will be counting towards the Business Equity contracting goal. Please list services first below. Please list certified Business Equitv firm names as listed on their certification, including DBA names. NAMES AND ADDRESSES OF TYPE OF SERVICES/SUPPLIES Specify Tier CONTRACTORS/SUPPLIERS PROVIDED (NAICS Required) Name tat Tier Certification Agency Gender and Ethnicity: Type of Service/Supplies: Certified By: ❑ N B• Business Name. ❑Male ❑Female on- mary ::]D/FW MSDC Address: ❑African American ❑Hispanic ❑NCTRCA Phone: Email: NAICS Code: ❑Asian ❑TXDOT ❑WBCS ❑Caucasian ❑Native ❑Other: Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: ❑ Male ❑ Female ❑ Non -Binary ❑DFW MSDC Address: ❑NCTRCA African American ❑Hispanic Phone: NAICS Code: ❑TXDOT ❑WBCS ❑Asian Email: ]Other: Caucasian ❑Native Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: ❑ Male ❑ Female ❑ Non -Binary Address: ❑DFW MSDC ❑NCTRCA ❑ African American ❑ Hispanic Phone: NAICS Code: ❑TXDOT ❑WBCS Asian Email: ❑Other: ❑ Caucasian ❑ Native Contact Person: $ AMOUNT: American ,,-IN Effective 01/01/2021 Updated 06/28/2021 rage a or a Business Equity Utilization Form Please include multiple copies of this page if needed to list all contractors and suppliers. NAMES AND ADDRESSES OF CONTRACTORS/SUPPLIERS TYPE OF SERVICES/SUPPLIES Specify Tier PROVIDED NAICS Required) 4 ) Name let Tier Certification Agency Gender and Ethnicity: isiness Name: Type of Service/Supplies: Certified By: ❑ Male ❑Female ❑Non -Binary ❑D/FW MSDC Address: NCTRCA ❑African American ElHispanic Phone: NAICS Code: ❑TXDOT ❑WBCS ❑Asian Email: Other: ❑ Caucasian ❑Native Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: ❑ Male ❑Female ❑Non -Binary ❑DFW MSDC Address: ❑NCTRCA African American ❑Hispanic Phone: NAICS Code: ❑'TXDOT ❑yt/gCS ❑Asian Email: ❑Other: ❑ Caucasian ❑ Native Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: ❑ Male ❑Female Don -Binary Address: ❑DFW MSDC ❑NCTRCA ❑African American ❑Hispanic Phone: NAICS Code: ❑TXDOT ❑WBCS ❑Asian Email: ❑Other: ❑Caucasian ❑Native Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: ❑ Male ❑Female ❑Non -Binary DFW MSDC Address: ]NCTRCA ❑African American ❑Hispanic Phone: NAICS Code: ]TXDOT ❑WBCS ❑Asian Email: ]Other: ❑Caucasian ❑Native -intact Person: $ AMOUNT: American Effective O1101/2021 Updated 06128/2021 FORT WORTH Business Equity Utilization Form Page 4 of 4 Total Dollar Amount of Certified Prime/Offeror Services towards contract goal $ Total Dollar Amount of Business Equity (or DBE if applicable) Subcontractors/Suppliers $ Total Dollar Amount of Non -Business Equity Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF CERTIFIED PRIME/ALL SUBCONTRACTORS/SUPPLIERS $ The Prime/Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Business Equity Division through the submittal of a Request for Approval of Change/Addition online. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Prime/Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed Business Equity goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including non -Business Equity firms. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Prime/Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the Business Equity firms on this contract, by an authorized officer or employee of the City. A Prime/Offerer who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Authorized Signature Title Company Name Address City/StatslZip Code Department of Diversity and Inclusion - Business Equity Division Email: DVIN_BEOffice®fortworthtexas.gov Ph: 817-392-2674 Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Effective 01/01/2021 Updated 06/2H/2021 rvtti rrvtci t1,, ATTACHMENT 1 B Page 1 of 1 City of Fort Worth Business Equity Division Prime Contractor Waiver Form PRIME/OFFEROR I Check applicable box to describe Prime/ { COMPANY NAME: Offeror's Certification Business 1 Non -Business PROJECT NAME: Equity firm I Equityfirm BID DATE Sanitary Sewer Rehabilitation, Contract 113, Part 2 9/28/23 City's Business Equity Goal: Offeror's Business Equity Project Commitment: PROJECT NUMBER 15 ova ova 102785 If both answers to this form are YES, do not complete ATTACHMENT 1 C (Good Faith Effort Form). All questions on this form must be completed and provide a detailed explanation. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Purchasinq Division no later than 2:00 p.m., on the second City business day after bid opening, exclusive of the bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG projects, documents will be submitted to the City Project Manager if publicly bid or to the Developer if privately bid. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? ❑ YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including Business Equity firms on this contract, the payment thereof and any proposed changes to the original Business Equity firm arrangements submitted with this bid. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the Business Equity firms on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract and may result in a determination of an irresponsible Prime/ Offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Title Company Name Address /\ City/State/Zip Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Printed Signature Contact Name (if different) Phone Number Email Address Date Effective 01/01/2021 tORT WORTH,., City of Fort Worth ATTACHMENT 1C Business Equity Division Page 1 of 4 Good Faith Effort Form PRIME/OFFEROR COMPANY NAME: PROJECT NAME: Sanitary Sewer Rehabilitation, Contract 113, Part 2 Business Equity Goal: 15 Offeror's Business Equity Goal Commitment: Check applicable box to describe Prime/Offeror's Certification 71 Business Equity I ❑ I Non -Business Firm I Equity Firm BID DATE 9/28/23 PROJECT NUMBER 102785 If the Offeror did not meet or exceed the Business Equity Goal for this project, the Prime/Offeror must complete this form. If the Prime/Offeror's method of compliance with the Business Equity Goal is based upon demonstration of a "Good Faith Effort", the Prime/Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 10 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Prime/Offeror. Failure to complete this form, in its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG projects, documents will be submitted to the City Project Manager if publicly bid or to the Developer if privately bid. Awftk 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a Business Equity firm or non -Business Equity firm. (DO NOT LIST NAMES OF FIRMS). On all projects, the Prime/Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Effective 01/01/2021 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than two (2) months old from the bid open date) list of Business Equity subcontractors and/or suppliers from the City's Business Equity Division. Yes No Date of Listing 3.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes (If yes, attach list to include name of Business Equity firm, person contacted, phone number and date and time of contact.) No 4.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by fax, exclusive of the day the bids are opened? Yes (If yes, attach list to include name of Business Equity firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undeliverable confirmation" documentation may render the NO GFE non -responsive.) 5.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? Yes (If yes, attach email confirmation to include name of Business Equity firm, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" No documentation may render the GFE non -responsive.) NOTE: The three methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Prime/Offeror must document that either at least two attempts were made using two of the three methods or that at least one successful contact was made using one of the three methods in order to deemed responsive to the Good Faith Effort requirement. NOTE: The Prime/Offeror must contact the entire Business Equity list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 thru 5. 6.) Did you provide plans and specifications to potential Business Equity firms? Yes No 7.) Did you provide the information regarding the location of plans and specifications in order to assist the Business Equity firms? Yes ❑ No Effective 01/01/2021 rage s or '+ 8.) Did you prepare a quotation for the Business Equity firms to bid on goods/services specific to their skill set? ❑ Yes (If yes, attach all copies of quotations.) ❑ No 9.) Was the contact information on any of the listings not valid? (If yes, attach the information that was not valid in order for the Business Equity Division to address Yes the corrections needed.) ❑ No 10.) Submit documentation if Business Equity firms quotes were rejected. The documentation submitted should be in the firms forms of an affidavit, include a detailed explanation of why the Business Equity firms was rejected and any supporting documentation the Prime/Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Prime/Offeror will provide for confidential in -camera access to an inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone � ADDITIONAL INFORMATION: Contact Person Scope of Work Reason for Rejection Please provide additional information you feel will further explain your good and honest efforts to obtain Business Equity firm participation on this project. The Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. A Prime/Offeror who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Effective 01/01/2021 ATTACHMENT 1C Page 4 of 4 The undersigned certifies that the information provided and the Business Equity firms listed was/were contacted in good faith. It is understood that any Business Equity firms listed in Attachment 1 C will be contacted and the reasons for not using them will be verified by the City's Business Equity Division. Authorized Signature Printed Signature Title Company Name Address City/State/Zip Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Contact Name and Title (if different) Phone Number Email Address Date Effective 01/01/2021 FORT WORM, CITY OF FORT WORTH Joint Venture Eligibility Form AU questions must be answered; use "N/A" if not applicable. Name of City project: Sanitary Sewer Rehabilitation, Contract 113, Part 2 A joint venture form must be completed on =gh project UP/Bid/Project Number: 102785 1. Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) (Telephone: E-mail: �ax: Joint Venture Page 1 of 3 Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the Joint venture Business Equity Non -Business 9 l Firm Name: Equity Firm Name: Business Firm Business Firm Contact Name: Contact Name: i!1 Business Business Address: Address: Telephone: I Fax: Telephone: I Fax: E-mail Certification Status: Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the Business Equity firm: E-mail: Describe the scope of work of the non -Business Equity firm: Effective 01 /01 /2021 Joint Venture Page 2 of 3 3. What is the percentage of Business Equity firm participation on this joint venture counting towards the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating ----------------------- b. Marketing and Sales ------------------------ c. Hiring and Firing of management personnel ------------------------ d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Business Equity Division will review your joint venture submission and will have final approval of the Business Equity percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's Business Equity Division immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's Business Equity Ordinance. Effective 01 /01 /2021 Joint Venture Page 3 of 3 AFFIDAVIT Ank The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts. Name of Business Equity Finn: Name of Non -Business Equity Finn: Name of Owner: Signature of Owner Printed Name of Owner Signature of Owner /0%k Title Date State of On this Name of Owner: Signature of Owner Printed Name of Owner Signature of Owner Title Date Notarization County of day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public .Ampk Signature Commission Expires (seat) Business Equity Division Email: DVlN_BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Fff—ti— ni mi i,)n9i GC-6.07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102785 Revised July 1, 2011 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page 1 of 1 laftk GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH Sanitary Sewer Rehabilitation, Contract 113, Part 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10278S Revised July 1, 2011 CITY OF FORT WORTH WATER DEPARTMENTS STANDARD PRODUCTS LIST WASTEWATER Manhole Inserts • E1.14 Manholelnsert Kmnaon Enterprises • E1-14 Manhole Insert South Western Packaging ' E1-14 Manhole Insert Noflow-Inflow I 09/23/96 E1-14 Manhole Insert Southwestern Packing A Seals, Inc. I 09/23/96 I E1-14 Manhole insert Southwestern Packing & Seals, Inc. I Manholes & Bases/Frames & Covers/Rectangular I Manhole Frames and Covers Western Iron Works, Bus & Hays Foundry I I Manhole Frames and Coven Vulcan Foundry I Manholes & Bases/Frames & Covers/Standard (Round) I E1-14 Manhole Frames and Coven Western Iron Works, Bass & Hays Foundry • E1-14 Manhole Frames and Coven McKinley Iran Works Inc. I E1-14 Manhole Frames and Coven Neenah Casting I • E1-14 Manhole Frames and Coven Vulcan Foundry E1-14 Manhole Frames and Coven Sigma Corporation E1-14 Manhole Fratoes and Covers Sigma Corporation E1-14 Manhole Frames and Covens Pont-A-Mousson E1-14 Manhole Frames and Covers Neenah Casting I 725/03 EI-14 Manhole Frame and Coven Saint-Gobain Pipelines (Pa mex/rexus) 01/11/06 EI -14 30" DI MH Ring and Cover Fast Jordan iron Works I 11/02/10 El-14 DI MH Ring and Cover Sigma Corporation I 07/19/1) EI-14 I30" 30" DI MH Ring and Cover Star Pipe Products I 08110/1) HI-14 130" DI MH Ring aid Cover Accucast Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight I • EI-14 Manhole Feamea and Covers Pont-A-Mcm- 1 E1-14 Manhole Frames and Covers Neenah Casting I E1-14 Manhole Fractions; aid Coven Vulcan Foundry EI.14 Manhole Frame and Coven Wwtenn Imn Wodrs,Baw & Hays Foundry E1-14 Manhole Frame and Covers McKinley Iron Works Inc. )fl E1-14 Manhole Frames and Coven Accucast u„ <tl/Ol I E1-14 Manhole Frees and Covers Serampo e, Industries Private W. Manholes & Bases/New/Comppnents I 0723/97 Urethane Hydrophilic Waterstop 1 Asshi Kogyo KK. I 0426/00 Offset Joint for 4' Diam. MH Hanson Concrete Products 04/26/00 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. I 12&99 HOPE Manhole adjustment Ring Ladterh, Inc 5/13105 Manhole External Wrap Canusa - CPS Manholes & Bases/New/Precast Concrete I E1-14 Manhole, Precast Concrete Hydro Conduit Corp I E1-14 Manhole, Precast Concrete _ Was Concrete Pipe Co. Inc. I E1-14 Manhole, Precast Concrete Hanson (formerly Gifford -Hill) 0426/00 E-14 MH, Single Offset Seal Joint Hanson 1 0923/96 E1.14 Manhole, Precast Concrete Concrete Product Inc. 1 08/30/06 EI -14 Manhole, Precast Concrete The Turner Compar y 1 10/27/06 EI-14 Manhole, Precast Concrete Oldcastle Precast Inc. 1 06/09/10 I EI-14 Manhole, Precast (Reinforce Polyma)Concrete US Composite Pipe Manholes & Bases/New/Fiberelass 126/99 1 Fiberglass Manhole Fluid Containment, Inc. 1 08/30/06 I ,Fiberglass Manhole I L.F. Manufacturing Manholes & Bases/Rehab Svstems/CFmentitious I E1-14 Manhole Rehab Systems Quadea I 0423/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. I EI-14 R ehab Systems AP/M Perraderm I 420/01 (Manhole 4 Manhole E1-1Rehab System Strong -Seal Systems 5112/03 E1-14 i Manhole Rehab System Poly -triplex Technologies 08/30/06 I Gencral Concrete Repair I Fl-Krcte, Technologies Manholes & Bases/Rehab Svstems/NonCementitious I 05/20/96 E1-14 Manhole Rehab Systems Sprayroq, I E1-14 Manhole Rehab Systems Son Coast I 03/31/06 Coatings for Corrosion Protection Chesterton I 8/2R/2006 Coatings for Corrosion Protection Warren Environmental OQW06 '�, Coatings for Cortosirm Protection Citadel 71121/91 Pioe/New/Centrifugally Cast Fiberglass Reinforced ..Eke/Polvmer Modified Concrete 'Cent. Cast Fiberglass Hobm Pipe USA, Inc. 1 10/30/03 Flownts Amitwh USA Made to Order - Plastic Made to Order - Plastic Made to Order - Plastic Lifesaver- Stainless Steel Tel-Lok - Stainless Steel 1001 6780 UPDATED: 2-29-2012 . ...�. n.y-...."-..... k_ ,�No wl ASTM D 1248 For 24" dia. 30024 A24AM 1342 MH-144N MH-143N GTS-STD 1 RE32-R8FS V 1432-2 and VI 483 Designs MH1651FWN & MH16502 1 MH32FTWSS-DC 220700 Heavy Duty with Gasket Ring Fortnight I 2342 300.24P ASTM D 1248 For 24' dim ASTM D 1248 For 24" dim For 24" dia, For 24" d . 24"x40"WD 24"x40"WD 24" Dim. 24" Dim. 24" Dim. ASTM A 48 24" Dim. AASHTO M306-04 ASTM A 48 WPA24AM I RC-2100 ASTM A48 300-24-23.75 Ring and Cover I ASTM A 48 1 I I Adeka Ultra -Seal P-201 ASTM D2240/D4lVD792 1 Drawing No. 35.0048.001 250-4G Gasket ASTM C443/C-361 HOPE Adjwmww Ring WrmpidSeal Manhole Encapsulation Systcmt I I I 24" diet. 24" dia. 30' Di 30" Din 30"Dia 30" Din 30" Dia 24"Dia. 24"Dia. 24" Dia. 24"Dia. 24"Dia. 24' Dim. 24' Dim. SS MH Non-owTiic are SPL Item #49 ASTM C 478 48" ASTM C-443 48" ASTM C 478 48" Type F Dwg 35-0048-001 ASTM C 478 48" Dian MH 48" I.D. Manhole w/ 32" Coin ASTM C 478 48" w/32" cone 48" J.D. Manhole w/ 24' Corte ASTM C 478 48" 48" I.D. Manhole w/ 24" Cone I ASTM C 478 48" Diam w 24' Ring Reinforced Polymer Concrete ASTM C-76 _ 48" to 72" Flownte _ASTM 3753 I Non -traffic area I Non -traffic arw_ I I Reimer MSP I I I I Strong Seal MS2A Rehab System MH repair product to stop infiltration ASTM D5813 Vinyl Polyester Repair Product i Misc Use Spray Will Polyurethane Coating I I ASTM D639/D790 i Am 791. SIRB, Sl, S2 Arid Resistance Test Sc.,, Applications S-301 and M-301 Sewer Applications SLS-30 Solids Epoxy Sewer Applications I Hoban Pip. (Non -Pressure) I ASTM D326VW754 Prepared 2/29/2012 Page 1 CITY OF FORT WORTH WATER DEPARTMENTS UPDATED: 2-29-2012 STANDARD PRODUCTS LIST Approval Spec Nor i'laa gMeatitln 03/22/10 Fiberglass Pipe Amerso ._... ._. Bondstrand RPMP Pipe ASTM D3262/1)3754 4/14/05 Polvo— Modilied Concrete Pine Amdtech USA Meyer Polycrete Pipe ASTM C33. A276. F477 8" to 102' .Class V 06/09/10 I El-9 Reinforced Polymer Concrete Pipe US Composite Pipe I Reinforced Polymer Concrete Pipe I ASTM C-76 I I Pipes/New/Concrete I E1.04 Con.. Pipe, Reinforced Wag Concrete Pipe Co. Inc. ASTM C 76 I I EI-D4 Conc. Pipe, Reinforced Hydro Condtdt Capaatim Class III T&G, SPL Item #77 I ASTM C 76 I I EI-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL Item 1i95-Manhole, p98- Pipe ASTM C 76 I EI.04 Conc. Pipe, Reinforce Concrete Pipe & Products Co. Inc. ASTM C 76 �Pioes/New/Ductile Iron i ' I El-D6 Ductile Iron Pipe Griffin Pipe Products, Co. I j Super Bell-Tite Ductile Iron Pressure Pipe, I AW WA C150, C151 3" than I" • El -06 Ductile Iron Pipe Ameican Ductile boo Pi Co. American Futite Pipe A W W A C150, C151 4", 8" & 10" I El -06 Ductile lion Pipe U.S. Pipe and Fotmdry Co. AW WA C150, C151 I E1.06 Ductile bat Pipe McW sue Cant bon Pipe Co. AW WA C150, C151 Pi oe s/New/P V C1pre s sllrel I 12/02/11 I E1-24 DR44 PVC Proadoc Pipe I I Pipelne Jwnwn PVC Pressure Pipe I I I AWWA C900 I I 4"than 12" Pioes/New/HDPE Wine Bursting/Slinlininpl I High -density polyethylene tdpe Phillips Driteovipe, Inc. I Opticae Ductile Polyethylene Pipe I ASTM D 1248 8" I • High-desity polyethylene pipe Plain Inc. ASTM D 1248 8" I ` High -density polyethylene pipe Potty Pipe- Inc. ASTM D 1248 8" I I High -density polyethylene pipe CSR Hydro Cmduit(Pipe ine Syncrrs McConnell Pipe Enlargement ASTM D 1249 I : Pines/New/PVC* I 11/04/99 E1-31 IPVC Comtgatd Sewer Pipe Cwte& Construction Products, loc. Ccetech A-2000 Sewer Pipe ASTM F 949 8" thru 36" I E1-31 PVC Corrugated Sewer Pipe Upmor EIT Company Ultra car ASTM F 949 24" to 36" Only I 05/04/09 E1-31 PVC Corrugated Sewer Pipe Dwmmd Plastics Corporation CORR 21 ASTM F 949 24" to 36" only I E1-25 PVC Sewer Ape C—Tex, Industries ASTM D 3034 4" thin 12' I E1-25 PVC Sewer Pipe Cortaro -Teed Products Carp I ASTM D 3034 4" th u 15" I EI-25 PVC Sewer Pipe Nation Manufacturing Cam ASTM D 3034. D 1794 4" & 8" I E1-25 PVC Sews Pia 1-M Mamdadwing Coronary, Inc. ASTM D 3034 4"- 15" I 12n3/97` EI.27 PVC Sewer Pipe I Diamond Hulks Corporation SDR-26 ad SDR-35 ASTM F 789, ASTM D 3034 4" ding 1Y I EI-27 PVC Sewer Pipe I L um Won Pipe ASTM F 789 4" thou IS I EI-25 IPVC Sewer Pipe I Extrusion Tnasnologirs, Inc ASTM D 3034 8", 10" I 11/11/98 E1-28 PVC Sewer Pipe I Diamond d Ratio Corporator "S" Gravity Sewer Pipe I ASTM F 679 18" to 27" I I E1-28 PVC Sewn Pipe I I-M M tradactudng C�a�ej�DmY' ton. ASTM F 679 I 18" - 27" I I 11/12/99 ! E1-29 PVC Truss Pipe Co uteth Consuuetm Ptoducta, Inc Conterh PVC Truss Pipe ASTM D 2680 i 8" through 15" I I 09/26/91 E 100-2 Closed Profile PVC Pipe Lamson VvIon Pipe Carton Vvlon H.C. Close Profile ASTM F 794 18"to 48" 11/17/99 E100-2 Clad Profile PVC Pipe Diannpd Plants Corporation ASTM 18031F/94 18" to 48" 05/061o5 E1-28 PVC Solid Wall ps m Diamond Plastics Corpmrim PS 46 ASTM F-679 18" to 48" 04/27/06 E1-25 PVC Scwer Fittin s BI Harco SDR-26 and SDR-35 Gasker Finis i .ASTM D3034, D 1784, etc 4'- 15' • EI-25 PVC Sewer Fittings Plutic Trends, In.c Gasketed PVC Sewer Main Fittings ASTM D 3034 PiAes/New/Ri )bed 00on Profile Large Diameter I 09/26/91 E100-2 PVC Sewer Pipe- Ribbed I lsrnam Vylm Pipe Carlm Vylon H.C. Closed Profile Pipe, A. 1679 18" to 48" I I 09/26/91 EI00-2 PVC Sewer Piny Ribbed Extrusion Tedinoloxies, Inc. ultra Rib Open Profile Smver Pipe ASTM F 679 18" to 48' I E100-2 PVC Sewer Pipe, Ribbed Upmor EST Company I I 1 I/10/10 (EI00-2) Polypropylene (PP) Seaver Pipe, Double Wall Advanced Drainage Systems (ADS) S—Titc HP Double Wall (Corrugated) ASTM F 2736 1"-30" I I 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wag Advanced Dramsge Systtma (ADS) SaruTite HP Triple Wall Pipe ASTM F 2764 30" to 60" I I 05/16/11 Steel Reinforced Polyethylene Pipe CooTech Construction Products Do—. I ASTM F 2562 I 24" to 72" I Pioes/Rehab/CIPP I Cured in Place Pipe Inapdrsm Texark. Inc ASTM F 1216 I j I 05/03199 Cured in Place Pipe National Envirotedn Group Nat onal Liner, (SPL) Item #27 ASTM F- 1216/65813 I I I 05/29/96 Cured in Piece Pipe Relw1ds L dlnliner Twitnoigy Rnh- USA) Witter Technology ASi'M F 1216 I I Pines/Rehab/Fold & Form Fold and I— Pipe Cullu n Pipe Systems, Inc. I 11 /03199 Fold and Form Pipe Insituform Technologies, Inc. Inaituform "NuPlpe" ASTM F-1504 I I Fold and Form Pipe Ameican Pipe & Ratio. Inc. Demo. Purpose Only I I 17104/00 Fold and Form Pipe Uhralinar Ultraliner PVC AlloPipeliner ASTM F-15114, 1871, 1867 I 06/09/03 Fold and Form Pipe Miller Pipeline Corp. EX M= ASTM F-1504, F-1947 Up to 18" diameter I Pine Enlarement Tvstem (Method) IRM System I PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously I I McConnell Systems I Melw t Construction Polyethylene Houston, Texas Approved Prev ously TRS Systems Tremchless Replacernmt System Po Yens Calgary. Canada Approved Previously Pine Casing Snacers I 11/04/02 Str l Ifand Casing Spaoers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI I I 02/02/93 Stainless Steel Cuing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI I 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Cuing Spacers I 09/14/10 Stainless Steel Cuing spacer Pipeline Seal and Insulator stainless St.[ Casing Spaces Up to 48" 4><2> I 09114/10 Coated Steel Casio Spacers Pipeline Seal and Insulator Coated Steel Coin Spaces Up to 48" <1 �11 V 05/10/11 Stainless Steel Cuing Spacer I Powe 1 4810 Powerchock Up to 49" <1 Coatings I 02/25/02 Epoxy Lining Systern Sauereis-, Inc Scwc Gard 210RS LA County g210-1.33 I Prepared 2/29/2012 Page 2 CITY OF FORT WORTH WATER DEPARTMENTS STANDARD PRODUCTS LIST 04/14/05 Interior Ductile Iron Pipe Coating I Induron I WATER PiDes/Valves & Fittines/Combination Air Release I • E1.11 Combination Air Release Valve GA Industries, Tue. I • E1-I I Combination Air Release Valve Multiplex Manufacturing Co. • El-I1 Combination Air Release Valve Valve and Primer Corp. Pioes[Valves & Fittin¢s/Ductile Iron Fittings I 07/23/92 EI-07 Dmtile bar Fittings Star Pipe Products, Inc. I E1-07 Ductile bmt Fittings Griffin Pipe Products, Co. I E1-07 Ductile Imm Fittings McWww ryler Pipe/ Union Utilities Division I 05/14/98 E1-07 Ductile Lon Fittings Um -Flange 08/10/98 E1.07 MJ Fittings Sigma, Co. I 05/14/98 E1-07 Ductile Imn Joint Restroota Ford Meter Box Co. I 11/09/04 El •07 Ductile Iron Joint Restraints One Bolt, Inc. I 02/29/12 33-11-11 Ductile Iron Pipe Mechanics] Joint Restraint EBAA Iron, Inc. I 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iran, Inc. I 08/05/04 E1-07 Mechanical Joint Retainer Glands Sigma, Co. 10/12/10 E1-24 Interim Restrained Joint System S & B Tedmcial Products I 09/16/06 I EI-07 Mechanical Joint Fittings SIP Industries Piges/Valves & Fittinyc/jtesilient Seated Gate Valve* I Resilient Wedged Gate Vxive w/no Gars American Flow Control I 121I NO2 Resilient Wedge Gate Valve American Flow Control 08/31/99 Resilient Wedge Gate Valve American Flow Control I 05/18/99 Resilient Wedge Gate Valve American Flaw Control 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control I 08/05/04 Resilient Wedge Gate Valve American Flow Control I 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company I Ol/24/m E1-26 Resilient Wedge Gate Valve American AVK Company E1-26 (Resilient Sated Gate Valve Kennedy 1 E1-26 Resilient Sated Gate Valve M&H EI-26 Resilient Sated Gate Valve Mueuer Co. 1 I/08199 Resilient Wedge Gate Valve Mueller Co. I 01/23/03 Resilient Wedge Gate Valve I Mueller Co. I 05/13/05 Resilient Wedge Gate Valve Mueller Co. I 01/31/06 Resilient Wedge Gate Valve I Mueller Co. I 01/28/88 Et-26 Resihem Wedge Gate Valve I Clow Valve Co. I10/04/94 Resilient Wedge Gat. Valve I Clow Valve Co. I1/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. 44/29164 Note d> 61ewA+dveCs I 06/21/10 Resilient Wedge Gate Valve Clow Valve Co. I 05/01/11 EI-26 Resilient Sated Gate Valve Stockham Valves & Fittings I I EI-26 .Resilient Sated Gate Valve I U.S. Pipe and Foundry Co. Pioes/Valves & Firt(nps/Rubber Seated Butterflv Valve I E1-30 Rubber Sated Butterfly Valve Henry Pratt Co. I E1-30 Rubber Sated Butterfly Valve Mueller Co. I 1/1I/99 E1-30 Rubber Sated Butterfly Valve De—* Valves Co. I 0&12J03 E1-30 Valmatic American Butterfly Valve Vabnatic Valve and Manufacturing Corp. I 0410M E1-30 Rubber Sated Butterfly Valve I I M&H Valve I SamDline Station I 3/12/96 I WaterSampling Station I Water Plus Dry Barrel Fire Hvdrants I 10/01/87 E-1-12 16 jet American -Darling Valve I 03/31/88 E-1-12 Aroerian Darling Valve 09/30/87 E-1-12 flarrel unt Fve H t Clow CppJ)ppyyJ�]y{ion01/12/93 4VKCe�m—y E-1-12 arnJ Fire t American I 0824/88 &]-12 pry BarrelPnes t Cl'C on I E-1-12 (r�.,,', Barrel Fin H ant TI-r K alve 1 09/24/87 E-1-12 Dry Barrel Fines t M&H a ompany 10/14/87 E-1-12 Dry Bartel Fire Hydrant Mueller Company 01/15/88 EI-12 Q�'Barrel Fire t Mueller Companyy I 10/09/87 E-1-12 jhy Barrel Fire H jit U.S. Pipe & Famdry 09/16/87 I E-1-12 ,Barrel Fire t Waterous Company Water Anourtrr)Ajgc,(!s I 09/08/02 El-18A Plasticlv%er Boxes Fast Jordan Iron Works, Inc. 2 Double Sono Saddle Smith Blair SS Tan a e I JCM brdustdes, Inc. 70229/12 Tappi.'.gadNt JCM Industries, Ine. t Taooin Sleeve (Stainless Steel Powaseat 33-12-25 Tapping )eevc(Coined Steel) Roinac 02/29/12 33-12-25 Taonine Sleeve (Stainless Steel Romac UPDATED: 2-29-2012 a`� •. ?�. ... ; .,:... ,,. .pew.•. -err ".- _.... .,. --. �, _..,...,... _*e,.,,._,.. Erteph 2030 and 2100 Series Protecto 401 4S'i'ilf B-117 Ducal, Tom Ape Only I Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A V & 2" I Crispin Air and Vacuum Valves, Model No, 112", 1" & 2" I APCO g143C, N145C and #147C 1 ", 2" & 3" I I I I Malunical Joint Fittings I AW WA C153 & C110 Mechanical Joint ' AW WA C 110 Mechanical Joint Fittings, SSH CLaa 350 AW WA C 153, C 110, C 111 Series 1500 Circle Lock Pipe Restraints Class 350 C-153 W Fittings AW WA C153 Um-FLn Series 1500 Cird Lock AW WA CI I I/C153 One flo e—Shained Joint Fitting I AWWACIII/C116/C153 Me.Ng Serrs 1101)(for DI Pipe) I AWWAC111/C116/C153 Megalu� Seics 2000 (for PVC Pipe) AWWA WA CI I t/Ci 16/C153 Sigma Ono-Ldt Mechanical Joint Restrainer I AW WA CI I VC153 Bulldog System ( Diamond LAt 21 At JM Eagle I= 900) ASTM F-1624 Mechanical Joint fittings I I AWWA C153 Saim 2500 Dewing d 94-20247 I Series 2530 and Series 2536 AW WA C515 Sena 2520 & 2524 (SD 94-20255) I AWWA C515 Series 2516 SD 94-20247) AW WA C515 Soria 2500 AWWA C509 42" and 48" AFC 2500 AWWA C515 American AVK Resilient Seaded Gv I I AWWA C509 Soria A2361 (SD 6647) AWWA WA C515 Series A2360 for 18"-24" (SD 6709) AW WA C515 MudLa 30" & 36", C-515 AW WA C515 Mueller 42" & 48", C-515 AWWA C515 AWWA C509 16" RS GV (SD D-20995) AWWA C515 Clow RW Vain (So D-21652) n,_...... _"�... ... AWWAC515 I rrSa5 Clow Valve Model 2638 AWWA AW WA C515 AWWAC 509,A S1420-awq ASTM 4" - 24" 4" to 12" 4" to 12" 4" to 42" 4" to 24" 4" to 24" 4" to 12" 4" to 24' 16" 30" and 36" 20" and 24" 16" 4" to 12" 42" and 48" 4" to 12" 20" and smaller 4" - 12" 4"-12' 4". 12" 16" 24" and smaller ")! and 36" 42" end 48" 4" - 12" 16" 24" and smaller 30" and -36- 30" to 48" 4" - 12" Mevo" 250, muirernmu SPLe74 I 3" to 16" I I AWWA C-504 24" I AWWA C-504 I., AWWA C-504 24" and large I Valmatic American Butterfly Valve. AWWA C-504 Up to 84" diameter M&H Style 4500 At 1450 I AWWA C-504 24" to 48" I I I 1320 Water Sampling Station I I Drawin Na. 90-19608,94-18560 AWWA C-502 I Ir"No. 94-18791 AWWA C-502 1 Dnwmjj No. D-19895 I AWWA C-502 I I Maok12700 AWWA C-502 I DrawalD20435, D20436, H2O506 I AW WA C-502 Sh Drawing No. D-80783FW AWWA C-502 Drawing No. 13476 AWWA C-502 Drawings No. 6461 14. Centurion AWWA C.'. Shop Drawing F7f-12 A-425 Supv Centurion 200 AWWA C-502 Shgp Drawing No. 960250 AWWA C-502 I Shoo Drawing No. SK740803 I AWWA C-502 I I Meta Box (Plane) w/ CI lid I I Class A, B, C I I #317 Coaled Double S[� Saddle #406 Double Band SS Saddle I - - -- I 1" to 12" taps 0405 Coate/ TiQP�{Saddle I 1" to 12" j 3490AS�} & j490M7 I i+ 4"-8" and FTS 240 AWWA C•223 U p m 42" w24" Out I SST Stainless Steel AWWA C-223 Up to 24" w/212" Out i Prepared 2/29/2012 Page 3 CITY OF FORT WORTH WATER DEPARTMENTS UPDATED: 2.29-2012 STANDARD PRODUCTS LIST IM _,- 02/29/12 33-12-25 Ter- 9 Sleeve (Stainless §tech amac SST IQ Stnn reel AW WA C-223 UD to 30" w/212" Out I 05/10/11 Joint i{�yty imp j Powerseal 3232 Be11 Joint R�av Clfimy 4" to 30" I I 08/28/06 Plastic MirrBox w CI I 'd ACCUCAST Class "A" Plastic ox w/ Ci Ud Class "A" I 08/30/06 Plastic Meter Box w/ Plastic Lid DPW' Plastics Inc. Class' A' Plastic Box w/ Plasw Lid (lass "A" I I I I Polvethvlene Encasement OS/12/OS E1-13 eoYc IY+ene tasmem Flexsol Packs $ Fulton time rises AWWA CiDS 8nut LLD 05/12/05 E1-13 Yn�yetlt�lene-ncasment Mountain Satre Plastics (M) and AEP Ind. Standard Hware .4W WA CI05 I 8 ,it L[.0 I I 05/12/05 EI-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt &Gasket AWWA C105 8mil LLD I Meters 02I053 EI01-5 Ds odor Check Meter Ames Company Model 1000 Detector Check Valve AW WA C550 I 4" - 10" Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AW WA C701, Class 1 3/4" - 6" I /9 I 08/OS/04 ' k�hddSYaiuuuLdilJMl:.,.i:._...r'i..'���.11L�1r '.,e _°r..,s .� - � C .•t -+.+ill, NOTES • From Origial Standard Products lid ..-.r...,,.s__.. I <I> Carrier Pipe LD. I I Q> Above 48" ADD�'Q� pIq Cry by case basis I I d> Product Suapeoded 1-i 2-12 I I I r ne tort worm voter uepum¢nt s canasta rroauaa use as Deco aevnopea m men®u tax; iuormau review or pronucu wmrn urea me ran wow water uepartment s atanaara apecuncaoaa nvmg umq on prq .xs, i w�ucu Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the TaJnural Specification will override the Fort Worth Water Department's Standard Specifications and the Fart Worth Water Deparmtent's Standard Products List and approval of the specific products will be band on the requirements of the Technical Specification waster or nor the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Part Worth Water II Department's Standard Products List. WEA Prepared 2/29/2012 Page 4