Loading...
HomeMy WebLinkAboutContract 47707-A3CSC No. 47707-A3 AMENDMENT No . 3 TO CITY SECRETARY CONTRACT No. 47707 WHEREAS, the City of Fort Worth (CITY) and Multatech Engineering, Inc., (ENGINEER) made and entered into City Secretary Contract No. 47707, (the CONTRACT) which was authorized by M&C C-27724 on the 17th day of May, 2016 in the amount of $ 950,000.00; and WHERAS, the CONTRACT was subsequently revised by amendment Number 1 in the amount of $47,780 and administratively approved on June 02, 2021, and WHERAS, the CONTRACT was subsequently revised by amendment Number 2 in the amount of $51,595.00 and administratively approved on May 28, 2022, and WHEREAS, the CONTRACT involves engineering services for the following project: Keller Hicks Road from Lauren Way to East ROW of Katy Road, CPN 100146; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $17,940.00. (See Attached Funding Breakdown Sheet, Page -4-) OFFICIAL RECORD CITY SECRETARY 2. FT. WORTH, TX Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under City of Fort Worth, Texas Keller Hicks Road Prof Services Agreement Amendment Template CPN 100146 Revision Date: 12/08/2023 Page 1 of 4 the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,067,315.00. 1911 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth C>� Jesica McEachern Assistant City Manager DATE: Feb 8, 2024 ATTEST: Qom, j� ns Jeannette Goodall City Secretary 4,d44UUn�� ppFoF�R . �� o d ��-+o Pa°moo vo o o =d n00000 o APPROVAL RECOMMENDED: of the date subscribed by the City's ENGINEER: Multat E gin ring, Inc. Paul J Padilla Vice President DATE: 1-02-2024 Ar- Lauren Prieur (Feb 6, 202413:40 CST) Lauren Prieur Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY Keller Hicks Road Prof Services Agreement Amendment Template CPN 100146 Revision Date: 12/08/2023 FT. WORTH, TX Page 2 of 4 Mifch Aiton Mitch Aiton (Jan 29, 202411:16 CST) Mitch Aiton Senior Professional Engineer APPROVED AS TO FORM AND LEGALITY: Douglas Black (Feb 7, 202410:14 CST) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 3 of 4 M&C No.#: 24-0037 M&C Date: 1-23-2024 Keller Hicks Road CPN 100146 FUNDING BREAKDOWN SHEET City Secretary No. 47707 Amendment No. 3 Project CF1- CF2 - Fund Dept ID Account Bond Amount ID Activity Reference 34018 0200431 5330500 100146 002330 18010199 $17,940.00 Total: $17, 940.00 City of Fort Worth, Texas Keller Hicks Road Prof Services Agreement Amendment Template CPN 100146 Revision Date: 12/08/2023 Page 4 of 4 ATTACHMENT "A" SCOPE OF WORK Keller Hicks Road Lauren Way to Katy Road City Project Amendment 3 No. 100146 City of Fort Worth, Texas Attachment A PMO Release Date:05.19.2010 Keller Hicks Road CPN 100146 ATTACHMENT "A" Scope for Enqineerinq Desiqn Related Services for Street Improvements Additional Services Amendment 3 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The purpose of this task order is to provide for moving the storm drain north to allow for one- way traffic and eliminate the need for temporary pavement on Keller Hicks Road.Segment 1- East Right of Way Line of Katy Road to US 377 (under separate agreement with City of Keller) The existing roadway is currently a two-lane asphalt roadway with narrow shoulders and open ditch drainage. There are numerous drives and businesses along this portion of Keller Hicks including one major intersections; Katy Road. This section of roadway is identified in the City of Fort Worth Master Thoroughfare Plan as a Commercial Collector with the following future designation, one lane (each direction), no transit facility, 2-way continuous left turn lane, no parking, off street side path within an 80 foot right of way- CCO-L 1-TO-TWLT-PO-BOP (80'). WORK TO BE PERFORMED TT,a,,s,Ik' 1. Design Management Segment 2 Task 2. GORGJptURI DlaSigR Corvmont 2 (previously authorized by Task Order 1 Task 3. Preliminary Design Segment 2 (previously ai itherized by Tack Order 1 Task 4. Final Design Segment 1 and 2 T&EA 5. I?id P+h,as Ser eeG Sege ens Task6. Go StruGtion Ph-,e SeWiees Common+ 2 T&EA S. Sun'ey and SubourfaGeJJW eVeeptlen of Level 4 Sue_) Tack O Permitting Comment 2 Ta�0. Plcn cnd Submittcl 9heGkInsts TASK 1. DESIGN MANAGEMENT. Segment 2 r_` IEER ge the work e� itline Gene to eRs ire efficient and effective use of ��.. will mcnc in this s ENGI IEER's and-CITY's time and resieeurGes. ENGINEER Willmanage Gan�GOmmani ate 4� i�x%mqs with the-CITY's PrA1eet Manager and ethorJ" ar, necessaFy to make preeress OR the werk 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members Keller Hicks Road CPN 100146 • Task and allocate team resources 1.2. CemmUpiga+iens and Reporting Attend meetings with CITY Ot&fif ivGOnfirrnTm- and Glarify SGOpe i Rderstand CITY nhion#iyes and ensure enonominal anld fi mn+innal rdesigno that meet CITY req uirements •--Send of and 0I9""men# nrnient update meeting with f ITV Rrnien+ Manager CeR dUn+ review meetings with the JTY at the end of eanh design phooe • Seot and d9GUment biweekly design teem mee+ns Prepare . ioi rd nes in aggeranoe with /�ttaohment R to thio Standard agreement and oubmit monthly in the format requested by the CITY Prepare -and sAmit monthly progress reporto in the-formst provided by the respeGti„e CITY Department Prepare ai4dI m � t &\q cline Project v urle initially, aviPrelept Q ulre update s St �niith a snherd� ilu nurr�i"�e mnnthhi as required in 4ttanhment fl +n this C+a nrdarrd Complete Monthly MWBE Report Corm and Final ✓immory Payment Report Corm at the end of the proieg# 0fraaStFU ire and preyirde and obtain information needed to prepare the rdesinn With respen# to geerrdina#ien with permitting ai theri#ies ENGINEER II oemmiinioate �niith permitting ai itherities si �oh^Ithat thair rent ilater real iiremen4s are appropriately reflenterd in the rdesi.9ns. CI\dIl\CCR �h&1I wArk W41. rerviila#oni aii#herities to nh#ain appreval ef the designs, and make Ghanges neGessary te meet their requirements, as part of the design snnpe ' the INEER rgr any of ito oub c-anoultonto ohall carry readily visible information ' dent4fying the name of the oempany and the Gempany representative DELIVERABLES A—. — ee" s...mmsries with ao#ien items B. Men#hly inyei es C. Menthly pregre�ss reeds D. Baseline design h antinipa#erd ssherdi ile changes F. nn ,yM/VVBE Teper# Cvr Fermrranr Final Summary Payment Report Germ G. Plan SAmittal heGkIiStS (moo T&\sIc 194 Keller Hicks Road CPN 100146 TASK 4. FINAL DESIGN Segment 2 (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). uUpon sppreyal of the Preliminary plano, ENGINEER will prepare nens+rU In+ion plane 39 follows- Fin-; draft pens+rUn+ion plane ° ion Plan cnd cpenifina+ienc shall-ho oubmitt Fincl iS\VM-G4E Development a ° 'on plcn review mee+ipe With the CITY, th?E-14GINGGP, chat aubmit Fines Pla-mc (1000/) +e the MTV per approved Dre'eGt SGheE ule. Eanh plan ��wrv�-cam �rrrP tl�G�pprv-P �--rvJ p crrPTaiT sheet ohcll be Mwnpsd, dated aR d sienerd by the CAIt'•_`INEER rveryl�d in St�'te off The 04CINEER shall submit a final design estimate of probable cons+rUn+inn nest with both the 1% and 100% deSigR PaGkagoo. Thio estimato choll vcs-ON! Y otr-,ndard CITY bid Revisions to Storm Sewer Alignment • This contract modification provides for engineering services related to moving the proposed storm sewer north. The use of one-way traffic has been approved. The movement of the storm sewer will allow for the maintenance of one-way traffic without the use of temporary pavement. • This modification also provides for the structural modifications to plug and fill the 10 x 6 box culvert. This contract modification will provide for: o Modify Sheet 27 to identify the two end pugs (upstream entrance and downstream exit) o Create Structural design sheet (Sheet 34A) for the two end plugs o Redesign SD B! SD C1 and associated laterals to move north and allow for the maintenance of one way traffic on Keller Hicks Road. ASSUMPTIONS 3 sets of 11" x 17" size drawings and 2 specifications will be delivered for the 90% Design package and uploaded to BIM360 in PDF format • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. 3 sets of 11" x 17" size drawings and 2 specifications will be delivered for the 100% Design package and uploaded to BIM360 in PDF format. Keller Hicks Road CPN 100146 • A DWF file for the 100 % Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. DELIVERABLES A. GeRStrUGtien plans and sneGifiGa+i IZ. Fincl iS AW GheGLlis+ G. 1 nnoi Gonc+rUGtion plsno and spenifiGa+inns D. Detailed estimates of prebahle Gen,�Un+�rGes+�^I,I oummsriss of hid items and quantities ,icing the CITY'o otcn.darfd bird items and format E. Original Geyer m ylar fer the signatures of autherized CI�ni Gi TASK 5. BID PHASE SERVICES. - ENGIIEER Will support th a of the preieG+ as fellews .���.. � a bid phao., • Th�GINEER ohsll Lplead all plena rand f.en+ran+ fdeni,men+s eRto 5l.z--',Ocw40F anness to pntial tidders. ntc chcIl "e-uploaded in a .)(Is file. 4C Unit Prise Prepesal ,dens,men+s are +e he pre . utilizing GOrnbinod in a op96fiefd spreadsheet workbook, Bid Proposal Werksheet Template, and will be pepulated and Genfigured se that all pages are Gernplete and tho Summary Werkshee+/s\ in the werkbeek detail and autema+finally oummori'e the totals from the inserted Unit PriGe Prepesal fdoG,,men+ worksheets. Plan Sets are +e he uploaded to Buz-\,,\o � i� ormato, .pdf and rdwf files.The pfdf will Gensis+ of ene file of the en+i ry -s &n c9t. The if Will nGeenSst of individual filed one for eaplan ohee+ and will he numbered and named in c mannor similar to that of +ho plan cat '�T • Th�GINEER 3hSll sell Gen+rant fdeG„ments and maintain s plan holder lost en Ruxicv-W from fdnGi invents seld and from Gen+raG+Gr's uploaded Plan Holder R(eg+straf+ono in iuzm&w-. Th�GINEER %v&4ev lop and impl thereto Thn Ing ohall ba �hv"ased and mcintcinefd in the prnieot'o Bu'zaaw folder titled Request fer Inferma+ien The ENGINEER Will preyifde +enhninal in+erpreta+inn of thGOntraGt bid dOGUrnents and will prepare proposed respeRses to all bidders questions and requooto, in tha-form of addenda. The E-NIr,Ir.IEED ohall upload all approved addenda enta RNzzasw and mail addenda o ell plan holders. •Attend the pre bid GenferenGo in oupper+ of the GITV Keller Hicks Road CPN 100146 • Assist the CITY in rdetermining the q ialifipa#iens and aGGeptahility of prespep#ive gentrac-toro, oubgentragters and-d oupplief-&-. • When su bstit i#iep prier to award of sentrauto io allowed On the sentragt rdeeyments the 0 €NGlMGGR Will advise the CITY &\o to the appep#ahidity of alternate matwiglll Pnd egii�irpmeenptt prepesed by bidder,,. • Attend the bird epeninS in oupport of the CITY • Tabulate and review all birds regenierd for the Genstri Gtien premeut, 000iot the CITY alp eating birds and r mm d award of the n#rant /� psi of the Ri I E�bids, and C�rrcrcrc�rr-C-Apy-vi-crr�vr S S.�S'tl thel�z&\�a 9-reardsheet greaten utilizing GFW Rirdteels only are to he uploaded into the premegt's Rind Res-es its felyder on 1iuzz,cw-. E.? Final C' Final Design lira niingo ohall be submitted cd ao on Adobe Acrobat DIIC format (version 6.0 or higher) file and DWF format. TrC ohall Lee ene_\1) P-DC file ene /1 \ DVVF file (Ereated frem CAD appliGa#ien of drawing) fer the TPVV plan set and a separate RI1C and DVVF file for the Wat-,r L-m ceT€agh R11C and DVVF file shall he Greaterd from the original CAD drawing files and shall gentain all assegiaterd sheets of the par#m ram# qular DIDF and DWF files for each sheet of a ou cr p Ian o� ram, ,�,yy,, ��.�,�„���,--�. plan set ��� ..,ll of be aGmated. RI1C and DWF fil►` Gholl Gonfermto naming Genventmens ac f9liews: 1. T\A/ file name example "W= O ja_orrg47.pdf" ere "W---1r956�" is the assigned f4o number eb#amnerd from the CITY, "_o Mg" designating the file is of an erigmnal set, all he the plan as total number m er of sheets in this file ��� am ,1 MEMMIMMMENWIVE.UpI .i II Water and Sewer file name example "X 35667 org36 nidf" where "X 35667" rr.-rraccr-wrrcrvc v�crnrc�-ramp-cfmpr��c vv-r—veyvv�m--av��c,��c v-r— Is th�viigned file number obtain the CITY, " designating t file is� of an original plan o�3�i" ohall b otal number of `ot'o" in thio f4e- .1T.fiRMPAWFi Roth DIIC and DWF file6 ohall be uploaded to the premegt's Reeerrd DFawing fedrder in In ardrdm#men #e #ho I7a1C and DVVF files the ENGINEER ohall os:bmit eanh plan sheet as an ineloy'rdi ial fl\/VG file with all reference fi��on�r�a�te��� the sheet If the O- Cis x�e zrrc�n corm ... prepared 'R ormSt, they shall he genyerterd 4e f VVG prier to i ipleardinry The naming penyen#men #e he used fer the DVVG files J-iall be as f��ellews: Keller Hicks Road CPN 100146 is TPI fav-, Q�y� 11 Wca yh VV number -her c for PDF= and n\A/Gilm f, but chall in�e +hit r%vrber in the name "1A/ '1956 SHTOII-dNg" "W I I 1A/ teF and Sewer file names` ohA ixa4hc Y nwrnl;ar as fer Pf1C ncd DVVF= file , but oh--�l the shoe\+ n`ML8F OR the R- Fne "Y '17455 SHTAI1 d w g" "Y- For Or fer... alien OR the r,repor mannwAo oubmit file and tec0--..in & file number fer +he Alt Qt tale e Rumber 1-7) 292 91216. appmpriate-pfelec+ numbers and fund ' node have been assigned and are —1—,,-;ets Of GGRStFUGtiE)R GIGGUmeRtS will be sold to and made available on E!uz ,n,xv-fer plcn h ce+c of nenc+ illbe -ri-+ea and made ^vailable fer E cefs-ef 22" rc ✓1" sip a mflmll he delivered to the CITY onF DVVF ncd I,VVG files upleaded to Su nG1 1VCRAB CC A Addenda B. Bi t&bwlatisrrs TASK 6. Segment 2 CONSTRUCTION P14ASE SERVICES. EE R on phae 6.1 C;enc+r„r+inn 'SwPF Keller Hicks Road CPN 100146 • After thepre-EenStrMtieR GenferenGe, the E14G ICCR II previrde prefect exhibits and attend public meeting to help orcplain the proposed prniec+ to re onto. The-GITY shall se!eGt a suitable IOGatiOR and mail the iRvitatieR letters to the affeGted Gustemers-. • Th�GINEER ohs!! .visit the project site at requested intervals as cnnstr,ction preceerds to Observe and report On pregress The ENGINEER II review shop drawin s and eth i } } •tea ��.. a c go, da:.mp error o�, mites o ou mit. by the GentraGtOF fOF general GenfermanGe with the design GenGepts and general cempliance with the requirements of the contract fer censtr, action. Cuoh review shall +t h,e ^entrant fer censtr„ctien ner is si,ch review a `"v S6�crcnteo that the erk ce�vererl by the shop rgo, o\amples and oubmittalo io frpe Of errors innnnsistennies or ernosorono. The €NG NEER ohSll log and all shep drawings, samples and ether oubmittc!o in • As requested by the CITY, the -EG-!NEER shall provide necessary interpretatiens anrd nlarifinatinns of centred rdec„ments, re�vieW change orders,and mand recnmmenrdationo ao to the acceptability of the wort • The GAI166P chSll Ste s "Final" project walk through and &-ai3t With preparatinp of-fin&I pun h list. 2 Record Drawings Th�GINEER oholl prepare rened drawings from infermatien provided by the CITY depicting any changes merle to th C' Drawings „ring nstr„c�n The a, Final S „c�„�a� T,--r,T� fellewing on ohSll be previrderd by the CITY: e As_Built Survey y e Red _Line Markups from the Centracter e Red _Line Markups from City Inspector e Appreved &ubotCtu'tSel-s Th�GINEER aholl m9dify tho Final Drawings eleGtrenically and ohall plate a stamp on the plans inrdieatinS that they represent Record Drawings of the preieet as eenStFLJEted k►a otomp ohrall be,+r! signeand dated by the Cd�l(`_INCCR and shall rd planeon eac i plan atwhether herth are an�... ns OR the sheet or not Canh sheet shall glearly inrdigate all changes whioh apply -to that ohpet by ele„rding and numbering, or ether ✓.,li "IN19 means. The following disclaimer shall he inel„rderd with the [?extend Drawing otamp: e These ReGerd Drawings were prepared LJSiRg iRfoFmatieR previded by ethers and represent the as cnnstr,cterd conrditinps to the extont that ''d^cavca neni-ted changes were previrderd fer recerrding The ENGINEER ss no liability are aeei,rately rdepieterd on these rdraings The Col (_If `I CCR ahSll 3ubmlt C coot n�edl Find +rawinns'merdifierd ar! Rnd stamped as eG rd on mylar for reanrstorage The ENGalNEFoP mo; Leep copies Keller Hicks Road CPN 100146 ReGGrd Drawinn chcll alse be submi##od a`o an Adobe Anrehaf DIIC format (version 6.0 or `Nigher) file and DWIF format. Trc eohPII Le a :1) P-DF file one (1 ) DVVF= file for the TPVV plan su11 and a oar'arate Df1C and DVVF= file for the Wator plan oats ac and .DWF file shell Genicin ull a5..ne+iaterl sheets of the ram# quiar DY1C and DWF files for each shoot of a plan cot will �a�t+o �,� r p, s n o � r� ��. �,�„ ����--a--p.����-.,rr.T follows: �``.. 'e^ acceptedDIDF and I� VVF files shall #e naming �nven#ie? fo'l lows: 1. TIPWflenaimeexample "W-1956�erg4-7 nmf-" where "W-1956" the assigned file number eb#ainerd from the CITY, "_o Mg" designating the file is of an erirvinal plan set, "47" ohall be the otal number of sheets in this file mgma an, .. Il Water Sewer file name example «X 35667�36.n�f" ere "X-3566 Is th�?iigned file number obtained frreern the CITY, designating ""giatting theme is -- Grane4Sir,--1 p!wn set, "3 " shell b f s total number o a" in thio fil- C)campla: Y 12755—Grrv18prdf Beth DY1C and DWF file ohall be i iplearderd to the preient's I7eGorrd Drawing felyder in Cer infermatinn ep the prorior manner -to oubmit file,-and to obtain a file n„mher fer the preieG# Gen#aG# the Department of Tranoportatien and Di ibliG Werl(s \ &%-It at t o i-r nF raper (R��9i-8TG6. File lumbers willbe issued #"�v--a projcG-U!e$"h'� �"� � appropriate proient numbers and fund Gerles have been assigned and are in the Department of Tranop"�ation anrd Di ibliG Works database. .CZ�7P1kSid- I 10 oubmi##al reviews ari. ocvurned-. •�J RFI'o arc ncc►-mom ''_ Change Orders vrdeers arc cmumqd-. rape GGPy of f ill size (`k'-)")(?A") m`elars will he delivered to the GITV Keller Hicks Road CPN 100146 G. Review of Change Orders Re D. Review of chop drainos E. Finsl FUnoh ! iot itams F. Reeerrd Drawings v ings TASK 7. ROW/EASEMENT SERVICES. Segment 2 ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. The EN(`_IAIEER shall determine rights _of_way, easements needs for ennstr v+tien othe prejeGt. Required temporary and permaReRt easemeRtS will be identified based on available information andrennmmendatiens will he made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. The EN(`_IN6ER cfall prepare dOG invents to he used to obtain right _of_way and The rdeGumentation ohall be previded in nen'feFinapne with the sheoldioto and templates available OR the 1.ITY'o • ROW documents were prepared for the proposed Keller Hicks Road improvements which did not include a 10 foot shared path for the entire south side of Keller Hicks Road. It was later decided to include the 10 foot shared path along both the north and south side of Keller Hicks. This required addition of permanent ROW acquisition documents. The downstream improvements of the RCB installation were modified several times to accommodate the changes in discharges and water surface elevations (see below for discussion on H&H revisions). 7.3. Temporary Right of Entry Preparation and Submittal Drier to senstrUntien the CA 0.l`JEEP ohalll prepafo, moil and -obtain Tempera Fy Rvrht Of Entries from Ianrdewnoro. It io caoumerd that letters will only he required for Ianydewners adjacent to temporary GE)nstn irtien easements or whe are d. Feetly affeeteyd by the prejeet and no easement is required yd to enter their prnpertay The ydneUmentatinn shall he provided in enntt�fGrmanee With the Gheedfllatv rind templates available en the �'ITY'o Buzzaaaw-,c Temporary easement documents were prepared for the proposed Keller Hicks Road improvements which did not include a 10 foot shared path for the entire south side of Keller Hicks Road. It was later decided to include the 10 foot shared path along both the north and south side of Keller Hicks. This required the revision of the temporary easement along the south ROW. The downstream improvements of the RCB installation were modified several times to accommodate the changes in discharges and water surface elevations. Keller Hicks Road CPN 100146 ASSUMPTIONS Right -of -Way research includes review of property/right-of-way records based on current internet-based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES A. Easement exhibits and metes and bounds provided on CITY forms. B. Temporary Right of Entry Letters 8.1. Design Survey ENGINEER will perform field surveys to nnllent horizontal and` ertiGal el evativ^,'i-rys�-and rd other information neeerd by CAIG NEER in !design avid preparation of plane fgr— e prejeGt. Information gathered during the suFvey shall inGlude topegraphiG , elevationsof all unitary and adjanent storm sei. voro, rim invert elevations Iogatien of buried ufil'fies, StrUGWres, trees (measure Galiper, Identify overall GaRepy, and have qualified arberist ideRtify speGieS ef trees), and other features relevaRt to the fiRal plaR shee `J. E)(ioting drai�uRagC at will he verified by fiel�aryeys. SppGt elevat4ens will be sheWR en iRterseGtieR layouts with Gress slope to fit 'nterseGt'Rg grade lines ^�� 9T�� • The m4rnr?mum a�:rvay information to be pre„irderd en tho plaina ahall inGlude the following ProjeSheet, ash wing ALL Centre! Deints, used r set while gathering data Generally on a shale of not leoc then 1.�� a Identifier! (Existing CITY Monument - 8901 Dk Nksil, l;/� iron Rod) bb��andan7 Geerrlinato3, in an identified Geerrdinate system and a referred bearing base % goorrlinate on CITY Daturn only. z .E u..>< z i � E I- -Irs.�R Coordinates on all D (` 's D T 's D I 's Manheles Valves eti. 'n he same 'T �TT�,�VTLTTfpilJ� j �QTPG�, �Tr• �LLTrfri ceer,dinate s„&tam, &\3 the GeRtrel. ---Ne lc : then twe herizental hen marks per line er lenatien Keller Hicks Road CPN 100146 flWtlon equations relating utilities to paving, whon appropriate. 8.7 Terrmperary Right of Entnl Rreparatien and ✓.abm4a4 Rrlor to entering property, the Enl(_I ICCR ��.. a s prepara, mail and Right of ERtfy fr.Jm landowners.. • The GIOGUmentation ohcll be provided in ngn'fOr�monne With the nheohlists and templates available en t'ITY'o gY`a f��ihos�irfare I Itility Engineering T-ho SUE oholl�performed OR aGpordanoe with GI/SCE 38 0-2 • EVpose and Ionate i itiliti,C ili t Wenifin Ignatigns. • T�zont�al an T . Rreymde utility size and senfigWa4G �Provide paving IhmGI'cRess and type where appliGahle PFevmde geReral semi type and Site GendmtmGRs and SUGh ether pertinent infermatmen r nabiy a ainahle from nh test hole site FS� 22�v9�ci�2r� 22c�-r-c�.rca-rvrc�rc� Keller Hicks Road CPN 100146 Q."I. v ThS nenstri,n#ini.n _j ,mill he perfermerd by the GITV Be available +n the CITY on matters nnnnerning the layout of the prnien+ during its _ens#ri ,n#inn cvrr�cracnvrr � N INNER Will set Geentrel pn�;i.e ♦in survey to permanent monument si inh as prnient\ fer the prnient these pein+o ii�t be indivisible. Streets ever 500 f+ in Iepgth , er streets on n, iryes may r_11—ent lire a nrea+er density of Gen+rel points +o maintain inte-r- ihilifii bet ,-- non.- nni n+ EnIG_ ICCP of fin,n hennh E" . a s oots is a minimum marko par plan ohee+�FFoh marks oholl be Innatei-d adjanent to preinn+N SPECIAL CONDITIONS: a The Enl(_Ih`EER'o SurVe yer shall attend the pre_nens#ri,n#ien nenferenne rob. A member of EN INEEP'o f4m-fomiliur With proien# shall he available at all times to ASSUMPTIONS F Quality Level A (Test Hole) Iona+inns DELIVERABLES A. Cepies ef field survey data and netes signed and sealed by a InGensed surveyor. B. Drawing ef he projen#�u# with rdimensiens and Geer�aa#telst. C. SWE plan drawings sealed by a prefessienal enginee.engineer rervistererd in the State of Texas. TASK 9. PERMITTING, IT,.NG, ENGINEER will provide permitting r ermit+inn support for the CITY to obtain any and all agreements and/nr parmito normally required fe�c proojeGt of this size type, as fellews 9.1.Storm Water DellutLen Prevention Plan • Neer prejeoto that d:.oturb on areaca-grr-eeator than one (9) agrn the Gen+ranter will he respensihle fer preparing andd submitting the S#erm Water Pellutien Prevention Plan (S\A/�vc h appropriate regulatory agendes The Engineer will prepare the iSVVM GenSt.rraetien Plan raeGGrrli�o the G i�Tt`ITV iCIAW Griteria Manual fnr Site Deveiepment and GGn8tFUGtiGP which will be the SVVPPP by the nn nn t v�rnractvT 0.2\ Env'renmen#al Ser„roes • Geerrdinatien with US Army Gerps of Engineers #e determine if the Unnamed Tributary 4 to Rig Rear Greek is ii irisrdintional • Negetlating and neerrdina#ing #e obtain approval of the agen Gy iss,,inry the agreement anrd/er perm,+C Keller Hicks Road CPN 100146 Completing all forms/anpliga+inns negessary. Submitting forms/applina+inns for CITY review Submitting revised farms far agenn�i Myie_w d7esnenrding to agenoY oemments and requests 9.3. Flaoi0j:!sin S-_Pv+ov-, Qnr,sm&d TriL►.`-_ry n to Rig rrnnL Thio tributary6currently GlassnTedby =""aT2GRe A witheut a detailed study. The prepeserd impreyements will require the preparation of a I OMR to supnor+ rdewns+ream nhannel impreyemonto. The I QMR wound address the propnserd or base mnrdel QnGe the zene of influenGe is determined and improvements are designed a revised prnieg+ model will he nrenared. Thio m9 del will delineate the new wa+v G-rfcse eleiatien and fleerdplain vvi+bin the-^je�drea. n QMR will he prpY"'�par� rd�fno� submissien to GFVV fleeplain ardmini`'strater. �" • Meet negetiate and geerrdinate to obtain approval of the agnnny issuing the agreement and/or permits • Gempleting all forms/app"Ga+inns negessary. • Submitting forms/applioa+ions fer CITY review • Submitting revised forms fer agen,-y review • d7esnenrding to agent y oemments and requests permit(s) are require • Meet negetiate and geerrdinate to obtain approval of the agnnny issuing the agreement and/or permits • Gempleting all forms/appliga+inns negessary. • Submitting forms/applioa+ions fer ('ITY and TxDQT re�ii e�ni • Submitting revised forms fer agens�i review • d7esnenrding to agent y oemments and requests Jf. Railroad Per Tmm • Meet, negotiate and goordina+e to obtain approval of the agnng�i iss, ping +hn agreement and/er permits • Gempleting all forms/app"Ga+lens neoessary. • Submitting forms/applioa+ions fer CITY review • Submitting revised farms fer ag-..-, re lie ni Keller Hicks Road CPN 100146 Responding Department9.6. Texas •_ ■ • AFGhiteoturnl Bf Gemnlo4inry all TbtiR forms/annliGations neGessan, Obtain the NGtiGe ef otantial (`emnlianse from tho Two • Requo& cn inW9GtiGR f om TD P, or c TE'! R 19Gally approved Registe I Annessihilit" Cnervallst no Iator than 40 calendar days after nonstn Untien swk�cntial- Gomnletion Advise the CITY in wFitiRg of the results of the incnontinn. • Qesnonrllnn to anenoY oomments anrd rent jests 0Pormit praparatiOR will begiR Aep approval Of the CORGOPV-'Cl P&& •0PReetiRgs- are assumed with T)(DOT for the —Driveway— per 00rneet+ogs are assumed with lkP-PP. for the Ran! rOSS+rgpermi LEM TASK SUBMITTAL CHECKLISTS -Segment 7 0%, Segment 3 30% Cnnineer shall nmmplete anld submit PIsn eNbmittsl Qhekliote in sanorrdanne with the fellewinn table: PLAN SURI% TTA =CJo,L IcT REQUIREMENTS r Tfaffor Traff Tfa€€is L " ,spimp, r Tfa€€is sen#fe4 soRttfrol GORttF91 Attanh en+ "A"A'r TSigR'I Sub ^ F=Rg'Reer'nn �B 6"o 9"0 Type (Submit All - 3 tl7B v-YB 0% dvi�i't�� c+moo+ X x x X X x x X Sterm WateF x x x x x *If inslUrderd in street nroient ADDITK)NAL SERVICES nl�zCL6CE^ IN THE EXISTING SCOPEtiF JE. ED /Q Keller Hicks Road CPN 100146 Additional Services not included in the existina Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re -bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. Keller Hicks Road CPN 100146 ATTACHMENT "B" COMPENSATION Keller Hicks Road Lauren Way to Katy Road City Project Amendment 3 No. 100146 Keller Hicks Road CPN 100146 ATTACHMENT B COMPENSATION Design Services for Keller Hicks Road City Project No. 100146 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateaory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2022 Rate 2023 Rate ($/hour) ($/hour) Principal $235.00 $235.00 Project Manager $200.00 $200.00 Senior Engineer $170.00 $170.00 Engineer $140.00 $140.00 Senior Designer $135.00 $135.00 CAD $90.00 $90.00 ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). Keller Hicks Road CPN 100146 ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. Keller Hicks Road CPN 100146 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant MULTATECH, Design, Management 2,440.00 13.60 Engineering, Inc. DBE Proposed MBE/SBE Sub -Consultants Shield Engineering Survey & Right -of -Way $0.00 0.00 Group The CK Group Traffic Engineering $0.00 0.00 RLG Consulting Storm Sewer Modifications - $15,500.00 86.40 Engineers Box Culvert Plug and Fill Non-MBE/SBE Consultants TOTAL $17,940.00 100% Project Number & Name Keller Hicks 60% Design Task Order 1 Keller Hicks 100% Design Task Order 2 Keller Hicks Amendment 1 Keller Hicks Amendment 2 Keller Hicks Amendment 3 Total both Task Orders 1 and 2 Amendments 1,2 & 3 City MBE/SBE Goal = 20.00 % Total Fee MBE/SBE Fee MBE/SBE $409,971.00 $129,537.00 31.60% $540,029.00 $76,785.00 14.22% 47,780.00 30,860.00 64.59% $51,595.00 $26,540.00 51.44% 17,940.00 15,500.00 86.40% $1,067,315.00 $279,222.00.00 25.13% Consultant Committed Goal = 20.00 % Keller Hicks Road CPN 100146 ATTACHMENT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Keller Hicks Road-Ammendment-3, Storm Drain B-1 and C-1 Modifications, Culvert Plug 10/31/2023 Labor(hours) Task No. Task Description Principal Project Senior Senior CADD Administrative Total Labor Manager Engineer Designer Cost Rate $235 $200 $170 $135 $90 $85 1.0 Project Management 0 0 8 8 0 0 $2,440 1.1 Managing the Team 1.1 Design Coordiantion 8 $2,440 4.0 —Final Design 0 0 0 0 0 0 $0 4.1 Storm Drain B-1 Modifications $0 4.2 Storm Drain C-1 Modifications $0 4.3 10 x10 Culvert Plug and Fill details $0 4.4 $0 4.5 $0 $0 Totalsi 0 0 81 81 01 0 $2,440 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 EX ense Subconsultant Total Expense Task Sub Total Travel Reproduction Cost MWBE Non-MWBE $0 $0 $0 $0 $0 $2,440 $0 $2,440 $0 $15//500 $0 $0 $15500 $15``500 $3,500 $3,500 $3,500 $5,500 $5,500 $5,500 $6,500 $6,500 $6,500 $0 $0 $0 $0 $0 $0 $0 $15,500 $0 $0 $15,500 $17,940 Project Summary Total Hours Total Labor Total Expense MBE/SBE Subconsultant Non-MBE/SBE Subconsultant 0% Sub Markup MBE/SBE Participation Total Project Cost 16 $2,440 $15,500 $0 $15,500 $0 0.0 $17,940 Keller Hicks Road CPN 100146 1 of ATTACHMENT "D" SCHEDULE Amendment 3 No. 100146 Keller Hicks Road Lauren Way to Katy Road City Project SCHEDULE: All plan revision required by this amendment were completed on 11-10-23. Keller Hicks Road CPN 100146 1 /29/24, 11:13 AM M&C Review Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FflR Create New From This M&C DATE: 1/23/2024 REFERENCE NO.: **M&C 24-0037 LOG NAME: 20KELLER HICKS ENG AMEND 3 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 10) Authorize Execution of Amendment Number 3 in the Amount of $17,940.00 to an Engineering Services Agreement with Multatech Engineering, Inc. for the Keller Hicks - Lauren Way to US 377 Project for a Revised Contract Amount of $1,067,315.00 (2018 Bond Program) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment Number 3, in an amount not to exceed $17,940.00 to City Secretary Contract Number 47707 with Multatech Engineering, Inc., thereby increasing the contract amount to $1,067,315.00 (City Project No. 100146). DISCUSSION: The 2018 Bond Program allocated funds for the roadway widening of Keller Hicks Road from Lauren Way to US 377. An Engineering Services Agreement, City Secretary No. 47707 with Multatech Engineering, Inc. (Consultant) was authorized for the design of the project that included widening a two-lane asphalt road to a three -lane arterial that includes a traffic signal and 10 foot shared used paths. Amendment Number 3 provides compensation to the Consultant for constructability changes to the drainage plans. The changes to the plans are recommended by the contractor to make the construction phasing simpler and will result in construction cost savings by requiring less temporary asphalt. The following table summarizes previous contract action and amendments: M&C Amount Justification Number Date Initial Contract $950,000.00 Initial contract to develop M&C C-27724 5-17-2016 design and construction documents Amendment No. 1 $47,780.00 Additional engineering and Administratively 6-2-2021 ROW services Approved Amendment No. 2 $51,595.00 Additional engineering Administratively 5-28-2022 services added Approved Amendment No. 3 $17,940.00 See above Contract Total $1,067,315.00 No additional funding is needed for Amendment 3. The funding for the Keller Hicks - Lauren Way to US 377 project is below: M&C Fund Total M&C G-19306, M&C 23- 34018 - 2018 Bond $2,255,067.00 0886 Program Fund M&C 21-0904 30106 - I ntergoven mental $1,499,303.60 Contribution Fund apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31745&counci ddate=1 /23/2024 1 /2 1 /29/24, 11:13 AM M&C 20-0623 M&C C-27715 M&C C-27715, M&C 20- 0623 M&C 23-0886 30108 - Transportation Impact Fee Cap Fund 34017 - TaxNote 2017 Fund 39008 - Transportation Impact Fee Legacy Fund 30100 - General Capital Projects Fund M&C Review $2,998,523.13 $100,000.00 $411,476.87 $2,744,933.00 Total Project Funding $10,009,303.60 M/WBE — Multatech Engineering, Inc. agrees to maintain its initial M/WBE commitment of 20\% that it made on the original agreement and extend and maintain that same M/WBE commitment of 20\% to all prior amendments up to and inclusive of this Amendment No. 3. The project is located in COUNCIL DISTRICT 10. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the 2018 Bond Program Fund for the Keller Hicks - Lauren Way to US 377 project to support the approval of the above recommendation and execution of the amendment to the contract. Prior to any expenditure being incurred, the Transportation and Publc Works Department has the responsibility to validate the availability of funds. TO Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) Submitted for Citv Manaqer's Office by: William Johnson (5806) Originating Department Head: Additional Information Contact: ATTACHMENTS Lauren Prieur (6035) Monty Hall (8662) 100146 Keller Hicks Rd FID Table.xlsx (CFW Internal) 100146 KellerHicks Map Lauren Wav to 377.pdf (CFW Internal) 1295-Multatech.PDF (CFW Internal) 20KELLER HICKS ENG AMEND 3 funds availabilitv..pdf (CFW Internal) Entitvinformation 20231204-044301.pdf (CFW Internal) apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31745&counci ddate=1 /23/2024 2/2 FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Keller Hicks - Multatech Design Amendment #3 M&C: 24-0037 CPN: 100146 CSO: 47707 DOC#: N/A Date: 1/23/2024 To: Name Department Initials Date Out 1. Jessica Rodriguez TPW - Review Jan 29, 2024 2. Mitch Aiton TPW - Signature MA MA Jan 29, 2024 3. Raul Lopez TPW — Approval -cz. Feb 1, 2024 4. Lissette Acevedo TPW — Approval o�v Feb 6, 2024 5. Patricia L. Wadsack TPW — Approval Feb 6, 2024 6. Lauren Prieur TPW — Signature LP Feb 6, 2024 7. Doug Black Legal — Signature d� Feb 7, 2024 8. Jesica McEachern CMO — Signature a` Feb 8, 2024 9. Jannette Goodall CSO - Signature 7 Feb 9, 2024 10. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: [—]YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ® For Your Information ® Signature/Routing and or Recording ® Comment ❑ File Return To: Please notify TPWContracts(c fortworthtexas.tiov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! ICPN: (Project Name: l Consultant: l Contract CSN 47707 M&C C-27724 5/17/2016 Amendment No. 1 CSN 47707-A1 Administratively Approved Amendment No. 2 CSN 47707-A2 Administratively Approved Amendment No. 3 CSN 47707-A3 M&C #24-0037 01/23/2024 JUSTIFICATION OF CONTRACT CHANGES 100146 1 Keller Hicks - Lauren Way to US 377 Multatech Contract Change Total to Date $950,000.00 $ 47,780.00 $ 997,780.00 $ 51,595.00 $ 1,049,375.00 $ 17,940.00 $ 1,067,315.00 Justification Initial contract to develop design and construction documents for construction of Keller Hicks from Lauren Way to US 377. Amendment to add design and ROW services. Scope changes were made that related to sidewalk, drainage and adjacent developer changes that required changes to the design and ROW documents previously completed. Amendment to add design services related to phasing and drainage revision. The revisions will allow the contractor to phase the construction and keep traffic open to specific property owners. The revisions were also made to accommodate drainage design recently completed by adjacent developer. Amendment to add design servies related to the drainage and construction phasing. The selected contractor proposed some revisions to the location of the storm drain that will improve the construction phasing and not require as much temporary asphalt as previously needed. The revisions will result in an overall cost savings in construction. City Project #: 100146 Keller Hicks (Lauren Way to US 377)- Amendment 3