HomeMy WebLinkAboutContract 59151-CO1DEVELOPER -AWARDED -PROJECT CHANGE ORDER
IPROJECT NAME:
North Beach Street SH 170 To Saratoga Downs Way I CHANGE
(CONTRACT:
Storm Drain, Paving, Water, Sanitary Sewer and Street Light Improvements ORDER No:
ICFA#
CFA22-0024 I CITY PARTICIPATION:( YES
ICITY PROJECT #
103773
ICITY SECRETARY CONTRACT #
59151 I 1
IFID #
30114-0200431-103773-EO7685 I
(FILE #
K-2878 I
INSPECTOR:
Dennis Rodgers Phone No: 817-471-9351
PROJECT MANAGER:
Victor V. Tornero Jr., P.E. Phone No: 817-247-5378
WATER
Developer
I
Cost Cit
IORIGINAL CONTRACT
$346,140.00 I $15(
I EXTRAS TO DATE
I
ICREDITS TO DATE
I
ICONTRACT TO DATE
$346,140.00 I $15(
(AMOUNT OF PROP. CHANGE ORDER
$52,500.00 I ($52
I REVISED CONTRACT AMOUNT
$398,640.00 I $98
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$496,920.00
REVISED COST SHARE
Dev. Cost:
TOTAL REVISED CONTRACT
SEWER
eveloper Developei
ost City Cost Cost
$52,960.00 1 $73,150.00 $0.00
CSC No. 59151-CO1
TxDOT* STREET LIGHTS CONTRACT
Developer Developer DAYS
Cost City Cost Cost City Cost
$174,430.00 I $0.00 $0.00 $249,250.00 95
I I �
I I �
$52,960.00 $73,150.00 $0.00 $1,209,599.00 I $0.00 I $2,230,868.25 I $174,430.00 I $0.00 $0.00 $249,250.00 I 95
$869,51 ($869,564.00) I I I I 0
$52,960.00 $73,150.00 $869,564.00 $340,035.00 I $0.00 I $2,230,868.25 I $174,430.00 I $0.00 $0.00 1 $249,250.00 95
$126,110.00 $1,209,599.00 I $2,230,868.25 $174,430.00 $249,250.00
$1,495,594.00 City Cost: $2,991,583.25
$4,487,177.25
CONTRACT UNIT
DRAINAGE I PAVING
$0.00
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Revised: 12-17-2018 Page 1
You are directed to make the following -.hanges in the contract documents
CITY BID
PAY ITEM #
ITEM #
QUANTITY
UNIT
CFW - Water Improvements
2
3312.5000
-1
EA
Hillwood - Water Improvements
6*
3312.5000
1
EA
CFW - Storm Drain Improvements
1
3137.0102
-699
SY
2
3305.0109
-2644
LF
3
3341.0201
-978
LF
4
3341.0205
-194
LF
6
3341.0305
-41
LF
7
3341.1102
-630
LF
8
9999.0009
-13
LF
9
3341.1201
-14
LF
10
3341.1501
-345
LF
11
3349.0011
-5
EA
12
3349.0003
-2
EA
13
3349.0003
-2
EA
14
3349.6001
-11
EA
15
3349.6003
-1
EA
16
3349.7003
-1
EA
17
9999.0012
-2
EA
18
9999.0013
-2
EA
19
9999.0014
-3
EA
20
9999.0015
-2996
SY
Hillwood - Storm Drain Improvements*
1*
3137.0102
699
SY
2*
3305.0109
2644
LF
3*
3341.0201
978
LF
4*
3341.0205
194
LF
5*
3341.0305
41
LF
6*
3341.1102
630
LF
7*
9999.0009
13
LF
8*
3341.1201
14
LF
9*
3341.1501
345
LF
10*
3349.0011
5
EA
11*
3349.0003
2
EA
12*
3349.0003
2
EA
13*
3349.6001
11
EA
14*
3349.6003
1
EA
15*
3349.7003
1
EA
16*
9999.0012
2
EA
17*
9999.0013
2
EA
18*
9999.0014
3
EA
19*
9999.0015
2996
SY
GRAND TOTAL
Asterisk (*) indicates New Unit or Pay Item
REASONS FOR CHANGE ORDER
ITEM DESCRIPTION
36" AW WA Butterfly Valve
36" AW WA Butterfly Valve
Large Stone Ripprap,D y
Trench SaNey
21" RCP, Class III
24" RCP, Class III
33" RCP, Class III
4x3 Box Culvert
5x2 Box Culvert
5x3 Box Culvert
8'x4' Box Culvert
4' Storm Junction Box
5' Storm Junction Box
6' Storm Junction Box
10' Recessed Inlet
20' Recessed Inlet
6' Drop Inlet
TXDOT PW Headwall
Gabion Basket 3ft wide by 2' tall
Gabion Basket aft wide b_( 2.5' tal
Erosion Control Blanket (RollmaxVmax S 250)
Large Stone RippRap, Dry
Trench Saftey
21" RCP, Class III
24" RCP, Class III
33" RCP, Class III
4x3 Box Culvert
5x2 Box Culvert
5x3 Box Culvert
8'x4' Box Culvert
4' Storm Junction Box
5' Storm Junction Box
6' Storm Junction Box
10' Recessed Inlet
20' Recessed Inlet
6' Drop Inlet
TxDOT PW Headwall
Gabion Baskets aft wide b_( 2' tall
Gabion Baskets aft wide b� 2.5' tal `
Erosion Control Blanket (RollmaxVmax SC250)
A change order is required to align the executed bid proposal in the project manual with the executed CFA.
*The Hillwood TxDOT Improvements in the project manual will not be owned by the City and are not be part of the CFA.
UNIT PRICE TOTAL
$52,500.00 ($52,500.00)1
TOTAL ($52,500.00)I
1
$52,500.00 $52,500.00 1
TOTAL $52,500.001
1
$125.00 ($87,375.00%1
$2.00 f$5,288.001
$75.00 (73,350311
$80.00 $15,520.00
$115.00 ($4,715.0 �
$250.00 ($157,500.00)�
$285.00 ($3,705.0 �1
$325.00 ($4,550.001
$585.00 ($201,825.0 �
$6,000.00 $30,000.001
$7,000.00 $14,000.0 %
$9,000.00 $18,000.001
$5,400.00 $59,400.0
$7,400.00 f$7,400.001
$10, 500.00 10, 500.01 1
$42,500.00 $85,000.00
$7,500.00 $15,000.0 %%�
$9,500.00 $28,500.00)�
$16.00 $47,936.0 )l
TOTAL N869,564.00)1
1
$125.00 $87,375.001
$2.00 $5,288.001
$75.00 $73,350.001
$80.00 $15,520.001
$115.00 $4,715.001
$250.00 $157,500.001
$285.00 $3,705.001
$325.00 $4,550.001
$585.00 $201,825.001
$6,000.00 $30,000.001
$7,000.00 $14,000.001
$9,000.00 $18,000.001
$5,400.00 $59,400.001
$7,400.00 $7,400.001
$10,500.00 $10,500.001
$42,500.00 $85,000.001
$7,500.00 $15,000.001
$9,500.00 $28,500.001
$16.00 $47,936.001
TOTAL $869,564.001
$0.00 1
Revised: 12-17-2018 Page 2
RECOMMENDED:
Peloton Land Solutions
KOIP Weber
By; Kole Webe,(Feb 7,20241316 CST(
Name: Kole Weber
Title: Project Manaqer
APPROVAL RECOMMENDED:
CFW - Sponsoring Department
B �l®O ���
y; Sub V P.E Fe 8, 30241327 CST)
Name: Subv Varuqhese, PE
Title: Interim Engineer Manager - DSWS
RECOMMENDED:
CFW - *Contract Compliance Manager
By: V,M,V.Tornero Jr., P.E.(Feb 7, 202418.02 CST
Name: Victor V. Tornero Jr., PE
Title: Sr. Capital Projects Officer
M&C Number: 21-0945; 23-0294
M&C Date Approved: 12/14/2021; 4/25/2023
APPROVED:
Hillwood Alliance Services, LLC
---- -Z 1/
By: Eric Elrotl (Feb 7, 202413.23 CST)
Name: Eric Elrod
Title: Senior Vice President
APPROVAL RECOMMENDED:
CFW- SponsonnngJDepa tment
By; i�s(Feb9,202409:26CST(
Name: Jennifer H. Roberts, PE, PMP, CMQ/QE
Title: Assistant Director - Development Services
APPROVED
Conatser Construction TjC, L.P.
��OG�f h�GlAA161,f
By: Brock Huggins (Feb 7;16'1413:39 CST)
Name: Brock Huggins
Title: President
APPROVED AS TO FORM AND LEGALITY:
CFW- Senior Assistant City Attorney
By: nlcN,tl MCC2cken(Feb%20240952 CST(
Name: Richard A. McCracken
Title: Senior Assistant City Attorney
APPROVED:
ATTEST:
CFW - Assistant City Manager
CFW - City Secretary pORr°o�ad
�N�����
A
a
By: DanaBure4(Feb9. 02411:0 CST)
By: pin °-10
Ov8 g�C
FAQ`°°
Name: Dana Burghdoff, AICP
Name: Jannette S. Goodall
aaaa.....
ag44
Title: Assistant Citv Manaqer
Title: City Secretary
* Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
❑ There are NO City Funds associated with this Contract
❑' There are City Funds associated with this Contract
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Revised: 12-17-2018 Page 3
Table 3.6-Uldmale On -Site Channel
RIVER I 1DDHYEAR
STATION( Q(dQ IWSELIR)IVEL(fps)
MA% MA%
Ch-11 A
732 J75 675.59 4.6
700 ]JS 675.52 47
650 ])5 P 3 AT
600 ]l5 B7115 A6
550 775 6)4.97 4.4
YJD 775 fi74.80 L3
65D 775 .4.63 4.3
400 775 V4.a7 40
350 775 V4.32 SS
300 ]75 674.28 36
250 ]JS 674.05 35
222 775 674.03 3.2
210 ]75 fi72.80 83
200 ]75 673.81 R2
]94 ]l5 6%%3.53 12
]33 ]75 673.53 L3
.2 I 775 673.53 QB
59 I ]75 613.54 QS
B I 775 673.54 0.3
/ -PROP POND
BY OTHERS-
SC-ArS LA D+Od/yl
BEGIN (3)8k4' MBC
INSTALL'
SAFETY END TREATMENT
0
I/ POND
7
\
PROJECT BENCHMARKS
rDnKPb'6Fa�h"Q�4TAM1
Ex j
G--ROUNO
GROVND� BM NO. 1
BM NO. 2
J
1 S
lHB..WA�w
YR W EL NORTHEAST CORNER OF WATER VAULT +1-120'
NORTHEAST CORNER DEAN INLET
IN THE EAST
\/
J
MIN S'DEPTH
SOUTHWESTOF A SIGN IN
IS D AT THE SOUTHWEST NTERSECTON OF FUTURE
THE SOUTHWEST
OF THE
NORTH BEACH STREET
CURB LINE OF NORTH BEACH STRET+/-18'
BEACH STREET-6'NER
FROM THE END OF I NORTH OFSTING INSARATOGAG
OF TH
'
AND STATE HIGHWAY 170.+1-
65'NORTH OF THE END
DOWN WAYS
S
1
0= 7751 fs _
OF EXISTING PAVING
n=SEE TABLE
= 1.035 (V)
n=005 (ND) SECTION IA'
NOTE I: FLOW ELEVATION 8]]98
WAS TAKEN
AIL INVESTMENT, L.P.
'NATION 69522
SGA SETA 8+8680=
1
C NOT TO SCALE
FROM
HMS MODEL /
FORMERLY KNOWN AS
HILLWOODIFREEWAV, LTD
SI-ASTA 0-0000
TRACT 3
TC VOL 9527 PG 1011
CONST33'xT
JUNCTION BOX
S
/
VARIABLE WIDTH PERMANENT
DRAINAGE UBLIC EASEMENT BY
RIM =687 D0
SEPARATE INSTRUMENT I-
/
END (3) 8'x4' MBC / I I I y
INSTALL 173 SY OF18' THICK
/
ROCK RIP RAP ON 6'BEDDING
1
S'
PROPOSED
N703]4621ZMETER
E2340]6656/
0+62 ]fi
SC -A
+(1)MII
t
MAINTENANCE RAMP
,CON TT3
INI ti m
JUNCTION
RIM=675.50
N 703727006
INSTALL,
SAFETY END TREATMENT
SETB-CD.
,•
E23.16171
176 SY OF RIP RAP PN 6' BEDDING
8'DIAMETER a
BEGIN CHANNEL
'.�F
\\
f N70372]55��1
•. •'��
��........
.. ...
g(23401955��
L
.....�.:. ..... SC -A ,*
+
-
al: � JLL gl`
o+Da 1+00
A SETA 8+20 70 I
GIN (3) 8'x4' MBC /
INSTALL'
V ti f SAFETY END TREATMEM 1
N 703748
D /
E 234069218
EX 24- SANITARY
FILE NO X-153N
SGA
NOTE THECONTRACTORSHALLCONTACTTHEFOLLOWINGATLEAST
d8 HOURS PRIOR TO EXCAVATING IN THIS AREA
TEXAS 811
1-.0.--8377
FORT WORTH WATER DEPARTMENT
617-392-8296
ATMOS GAS
1-8X0344-8377
TXU ELECTRIC DELIVERY
1-800-344-8377
uueeroaEvau oic
CHARTER COMMUNICATIONS
1-600-344-8377
FORT WORTH TRANSPORTATIOWPUBLIC WORKS
817-392-8100
FOR OTHER FACILITIES
1-800-344-8377
PROPOSED
CHANNELSC-C
REVIEWED
`"
By Victor V Tornero Jr. at 9:51 am, Oct 27, 2023
cl _ Li
SD -AI
3)-8'X 4'MBC \
III c il'
_ LU 3 i -'m` 121' S+A4a
Y�
2+00 3+00 4+00 5+00 6+00 7+00 8+00
690
I 680
I3a! Z3:M
�o
Q0= F
—MOPOSED
ANNELSC-B
� 40 BD 120
GRAPHIC SCALE IN FEET
PROFILE SCALES I
1"=40'HORZ. +II
1— 4' VERT
11111121
o� mt� aowmemwa: apmo.aea
by —Taw eer,FE rvo I--
AMrzOonofeuale0 tlocunwv4 x,tlroN proper no0fira0on _
engineer is an oMense untleriM1e
Tex sIEn9 neenln9 PmcAce Act
X
670 REV SATE (REMARKS GCHANNEL ALIGNMENT �� DssIG
NORTH BEACH STREET
SH 170 TO SARATOGA
STORM DRAIN PLAN & PROFILE
CHANNEL SC -A -
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPT. '
DEVELOPMENT SERVICES
li!I! PELOTON
-� .........,..I DATE I FRE neMaa, 9HEEF
CHECKED — I APR— x.11 C701 z
2+00 3+00 4+00 5+00 6+00 7+00 8+00
690
I 680
I3a! Z3:M
�o
Q0= F
—MOPOSED
ANNELSC-B
� 40 BD 120
GRAPHIC SCALE IN FEET
PROFILE SCALES I
1"=40'HORZ. +II
1— 4' VERT
11111121
o� mt� aowmemwa: apmo.aea
by —Taw eer,FE rvo I--
AMrzOonofeuale0 tlocunwv4 x,tlroN proper no0fira0on _
engineer is an oMense untleriM1e
Tex sIEn9 neenln9 PmcAce Act
X
670 REV SATE (REMARKS GCHANNEL ALIGNMENT �� DssIG
NORTH BEACH STREET
SH 170 TO SARATOGA
STORM DRAIN PLAN & PROFILE
CHANNEL SC -A -
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPT. '
DEVELOPMENT SERVICES
li!I! PELOTON
-� .........,..I DATE I FRE neMaa, 9HEEF
CHECKED — I APR— x.11 C701 z
11111121
o� mt� aowmemwa: apmo.aea
by —Taw eer,FE rvo I--
AMrzOonofeuale0 tlocunwv4 x,tlroN proper no0fira0on _
engineer is an oMense untleriM1e
Tex sIEn9 neenln9 PmcAce Act
X
670 REV SATE (REMARKS GCHANNEL ALIGNMENT �� DssIG
NORTH BEACH STREET
SH 170 TO SARATOGA
STORM DRAIN PLAN & PROFILE
CHANNEL SC -A -
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPT. '
DEVELOPMENT SERVICES
li!I! PELOTON
-� .........,..I DATE I FRE neMaa, 9HEEF
CHECKED — I APR— x.11 C701 z
AIL INVESTMENT, L.P.
FORMERLY KNOWN AS
HILLWOODIFREEWAY, LTD
TRACT 3
PC
VOL. 9527 PG 1011
EX 24' SANITARY SEWER
FILE NO X-15369
1
I'M. 0
n CONNECTION
PERMANENT PUBLIC N 7037481.2I
DRAINAGE EASEMENT E2340783.92
BY SEPARATE INSTRUMENT SD -A STA 0-0000
SGA STA "`6 60 \
CONST 33-
JUNCTION BOX
CONTINUE WITH
N7oB
MAINTENANCEMBC
' `1J ACCEMS RAM E 210 556 56
Oa2439.727 RT=
S1"LAl TSTAALOtCON00 Off
21LA ERNECTION
,.
!
53
E 2340755.04 / )
E2s4o7aso4
l
SAUNA ARY bIWfR CROSSING
INSTALL
37 LF OF 4Y' STEEL ENCASEMENT
OVER EXISTING - SEWER LINE
N ]037471.4B
E 2340798.70
PROJECT BENCHMARKS
BM NO. 1 BM NO. 2
NORTHEAST CORNER OF WATER VAULT+1-12U NORTHEASTCORNEROFANINLETINTHEEAST
SOUTHWESTOF A SIGN IN THE SOUTHWEST CURB LINE OF NORTH BEACH STREET.1-18'
ISLAND AT THE SOUTHWEST CORNER OF THE FROM THE END OF EXISTING PAVING OF NORTH
INTERSECTION OF FUTURE NORTH BEACH STREET BEACH STREET 11-6- NORTH OF SARATOGA
AND STATE HIGHWAY 170.+-65NORTH OF THE END DOWN WAYS
2ETE OF EXISTING PAVING
LINE ELEVATION 67798 ELEVATION 69522
�
LU , I <I
Q 1 SII a,-///Vy��
m .� EX 36' WATER ,
FILE NO x-15369
SD -A
7-1
----------------- i(
—�� — 16
—I_ n I "n�leeaA=�690
fiRD
670
a
-------------
0+00 1+00
NOTE THECON1HOURS PRIOR TO HALLCOTI1Q I THE FOLLOWING
d8 HOURS PRIOR TO EXCAVATING IN THIS AREA
AT LEAST
TEXAS 811
1-800.344-83]7
FORT WORTH WATER DEPARTMENT
617-392-8296
AT OS GAS
1-800344-8377
TXU ELECTRIC DELIVERY
1-800-344-8377
cueErwEvau oia
CHARTER COMMUNICATIONS
1-600-344-837]
FORT WORTH TRANSPORTATIONIPUBUC WORKS
817-392-8100
FOR OTHER FACILITIES
1-8o03 377
Culvert Outfall Protection
D50=(v/(1.8(29(VS-Yw)/YW))AO.5))AO.5
v= 10.45
lsB.uo=
Vs= 160 IWft°
a STA
OtW.00
Do
l 1
( 62.4 IWft'
1ST �,
,OF STRUCTURE =687.00
2n ` jJ
/ S
YW=
13-Gx4'MBC (
FALL
�- S^r 1 j
I
2
9= 32.2 iUS
n SyOF 18' THICK r-'•�
,N RIP BAR ON 6' BEDDING
Dee = 9.13 m
=8" DIAMETER �•''
S
18a Thick 6" Bed ing
.KS0136
w090]9a'T 1�
/�
_
FORt�nNE
T1
VARIABLE WIDTH
_SB DRAINAGE PRI
DRAINAGE EASEMENT
YKNOWN AS
HI LLWOOOIFREEWAY, LTD.
TRACT it
1 TC VOL 9527 PG 1011
I(
;1 REVIEWED
S
f/ BV SEPARATE INSTRUMENT � �
,
c !
By Victor V Tornero Jr. at 9:51 am, Oct 21, 2023
1
fr
NOTES.
SA 1104. 14127 RT=
4 STA Op toT
PROTECTION IN -PLACE REQUIRED FOR THE EXISTING 24-INCH FORCE MAIN WHERE
E PROPOSED BOX CULVERTS REXISTING INCH
ATERAL CONNECTION /f �J
D472.55 ) /
STEELPLIIT CASING IS REQUIRED THE CASING SHOULDBE FIT CUTBEVELED2
AND
10862.96 ) i
LONGTUONALLY AND WELDED BOTH AT THE JOINTS ALONG THE LONGITUDINAL
SEAMS AFTER IT IS FIT IN THEFIRLD.
If 7
THEE EXISTING SANITARY ER CE MAIN E SPLIT CASING
IED
EVERY OTHER STORM ROSSIN LOCATION
NSTAL THEW VW DCM (2 OTHER STORMCROSSIET HORIZONTAL FO STORM,
NJW DCM (2 FEET VERTICALLY,EQUIR HORIZONTAL FOR STORM, ETC)
CASING
THE EX 2ON, ALL MTE PRESSURE PIPE REQUIRED SEALS,
IN ADDITION. ALL MORTAR BANDS, SPACERS, END SEALS, ETC SHOULD BE INSTALLED
I Y
PER CFW
STANDARD CONSTRUCTION DETAILS
0 40 80 120
—_j 690
GRAPHIC SCALE IN FEET
PROFILE SCALES I
1'=40'HORZ. +II
1' = 4' VERT
(5/w
05/OS/23
---_-/---------
— -------------
—_=--
—._--_--=------_---__ —
— — _
saPFeadn9 on iM1s tlocumaM was auNonzeU
by KdeTo aaaeE No 120316ba
T Ma respons161eleP.-Is en offense uMer Me
Tteral'on / tltlocumentw8 ut proper ndlikallon 5.
exas dlro Ad
-�lr
-1—
—.�---
9 9
--�-----
-----
------
;3!9.YY �'fl7__�---
----------==—
—==
FRO REV I "All
A DEN
9TnRM
•c—,1-------------------------------------------=
6BAT
RE �ESDIG EG LINE
NORTH BEACH STREET
`
SH 170 TO SARATOGA
-------
— ----
STORM DRAIN NPROFILE
----
DD_A
CITY RT WORTH, TEXAS&
670 TRANSPORTATION AND PUBLIC WORKS DEPT. '
--i��----------I
—•�---I�--'-------I�—I— --
DEVELOPMENT SERVICES
PELOTON ww 59
PRp o E I , a, I C702 6
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 12/14/21 M&C FILE NUMBER: M&C 21-0945
LOG NAME: 06N. BEACH ST (SH170 TO SARATOGA)
SUBJECT
(CD 7) Authorize Execution of a Community Facilities Agreement with Hillwood Alliance Services, LLC, with City Participation in an Amount Up to
$3,100,000.00 for the Construction of Roadway Improvements and Water and Sewer Transmission Line Lowering for North Beach Street from
Alliance Gateway State Highway (SH 170) to Saratoga Drive, Adopt Attached Appropriation Ordinances, and Amend the Fiscal Years 2022-
2026 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of a community facilities agreement with Hillwood Alliance Services, LLC, with City participation in an amount up to
$3,100,000.00 for construction of roadway improvements and water and sewer line lowering for North Beach Street between Alliance
Gateway (SH 170) and Saratoga Drive;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Transportation Impact Fee Capital
Fund, in the amount of $1,445,275.00, from available funds within the Revenue - Service Area A Transportation Impact Fees project (City
Project No. UN9911) and $1,445,275.00, from available funds within the Revenue - Service Area D Transportation Impact Fees project (City
Project No. UN9914) for the purpose of funding a portion ofthe Community Facilities Agreement North Beach Street (SH 170 to
Saratoga) (City Project No. 103773);
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water/Sewer Bond 2016 Fund, in the
amount of $209,450.00 by increasing appropriations in the Community Facilities Agreement -North Beach Street (SH 170 to Saratoga) (City
Project No. 103773) and decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount; and
4. Amend the Fiscal Years 2022-2026 Capital Improvement Program.
DISCUSSION:
Hillwood Alliance Services, LLC (Developer) is partnering with the City of Fort Worth to construct four lanes of North Beach Street from Alliance
Gateway (SH 170 to Saratoga Drive) (City Project Number 103773). These lanes are being constructed to allow traffic to cross Alliance Gateway
(SH 170) as the existing Alta Vista Drive crossing is being reconfigured as a part of the Texas Department of Transportation (TxDOT) widening
project.
The costs stated herein are estimated and the project will follow the public bid process. The project includes an 20% MWBE requirement for the
project. The cost of the design and construction of the road improvements is estimated to be $4,017,350.00 with City participation as shown in the
table below.
Components Hillwood City Estimated
Alliance Services, LLC Participation Cost
Construction Costs
Paving $300,000.00 $2,187,600.00$2,487,600.00
Storm Drain
$0.00
$267,000.00
$267,000.00
Sanitary Sewer
$36,000.00
$101,500.00
$137,500.00
Water
$66,000.00
$76,000.00
$142,000.00
Construction Cost
$402,000.00
$2,632,100.00$3,034,100.00
Estimate
10% Contingency
$40,200.00
$263,210.00
$303,410.00
Construction Subtotal $442,200.00 $2,895,310.00$3,337,510.00
Soft Costs
Material Testing &
Inspection $19,019.00 $102,345.00 $121,364.00
Engineering & Design $359,112.00 $0.00 $359,112.00
Permitting $19,019.00 $102,345.00 $121,364.00
Platting $78,000.00 $0.00 $78,000.00
Soft Cost Subtotal $475,150.00 $204,690.00 $679,840.00
Project Total Cost $917,350.00 $3,100,000.00 $4,017,350.00
This project is located on the boundary between Transportation Impact Fee Service Areas A and D and was identified as impact fee eligible in the
2017 Transportation Impact Fee Study. The transportation impact fee funding provides a portion of the City participation in the developer
project. Revenues from Service Area A (City Project No. UN9911) and Service Area D (City Project No. UN9914) of the Transportation Impact Fee
Capital Fund will fund the City's participation in the construction of these improvements. Any residual funds left after project completion and
acceptance will be returned to the Service Area A and D revenues. Any expenses exceeding the City's participation amount, items that are
ineligible for transportation impact fee or water department funding will be funded by Hillwood Alliance Services, LLC.
Transportation Impact Fee funding for this project was not included in the Fiscal Years (FY) 2022-2026 Capital Improvement Program. City funds
were added to provide regional connectivity to the area. The action of this Mayor and Council Communication (M&C) will amend the FY2022-2026
Capital Improvement Program as approved in connection with Ordinance No. 25073-09-2021.
This project is located in COUNCIL DISTRICT 7
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified -All Funds within the Water/Sewer Bond 2016 Fund and the
Revenue - SA A and D Transp Imp Fees projects within the Transportation Impact Fee Cap Fund; and upon approval of the above
recommendations and adoption of the attached appropriation ordinances, funds will be available in the Water/Sewer Bond 2016 Fund and the
Transportation Impact Fee Cap Fund for the CFA-N Beach St (SH170 to Sarat) project to support the approval of the above recommendations and
execution of the community facilities agreement. Prior to an expenditure being incurred, the Development Services, Water Department, and the
Transportation and Public Works Departments have the responsibility of verifying the availability of funds.
Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018
Oriainatina Business Unit Head: D.J. Harrell 8032
Additional Information Contact: Mirian Spencer 2677
M&C Review Page 1 of 2
A
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGEND Fo
RT WORTH
Create New From This M&C
DATE: 4/25/2023 REFERENCE **M&C 23- LOG NAME: 06N. BEACH ST (SH170
NO.: 0294 TO SARATOGA) #2
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: (CD 7 / Future CD 10) Adopt Appropriation Ordinance Increasing Estimated Receipts and
Appropriations in the Community Facilities Agreement Developer Fund in the Amount of
$37,075.00 for the Construction of Roadway Improvements and Water and Sewer
Transmission Line Lowering for North Beach Street from Alliance Gateway State
Highway to Saratoga Downs Way, and Amend the Fiscal Years 2023-2027 Capital
Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations
in the Community Facilities Agreement Developer Fund in the amount of $37,075.00 from
available funds, for the purpose of funding the CFA-N Beach St (SH170 to Saratoga Downs
Way) project (City Project No. 103773); and
2. Amend the Fiscal Years 2023-2027 Capital Improvement Program.
DISCUSSION:
On December 14, 2021 Mayor & Council Communication (M&C) (21-0945), the City Council
authorized execution of a Community Facilities Agreement with Hillwood Alliance Services, LLC, with
City participation, adopted an ordinance increasing estimated receipts and appropriations in the
Transportation Impact Fee Capital Fund, and adopted an ordinance adjusting estimated receipts and
appropriations in the Water/Sewer Bond 2016 Fund.
The purpose of this M&C is to take actions associated with appropriating new developer funds from
CFA Developer (30114) Fund. A fund level summary of the appropriations needed are shown in the
table below.
Project Number
103443
Fund Fund Name
30114 CFA Developer
Total:
Receipts/Revenue Actuals
$37,075.00
$37,075.00
Funding for this project was not included in the FY2023-2027 Capital Improvement Program because
the amount of developer fees to be appropriated was not known at the time of CIP development. The
action of this M&C will amend the FY2023-2027 Capital Improvement Program as approved in
connection with Ordinance No. 25773-09-2022.
Funding is budgeted in the CFA Developer Fund for the purpose of funding the CFA-N Beach St
(SH170 to Saratoga Downs Way) project.
This project is located in COUNCIL DISTRICT 7/FUTURE COUNCIL DISTRICT 10.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the CFA-N Beach St (SH170 to
Saratoga Downs Way) project within the CFA Developer Fund and upon approval of the above
http://apps.cfwnet.org/council_packet/mc—review.asp?ID=3092 I &councildate=4/25/2023 11/7/2023
M&C Review
Page 2 of 2
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
CFA Developer Fund for the CFA-N Beach St (SH170 to Saratoga Downs Way) project. Prior to an
expenditure being incurred the Development Services department has the responsibility of verifying
the availability of funds.
TO
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID , Year (Chartfield 2)
Submitted for Citv Manaqer's Office bv: Dana Burghdoff (8018)
Originating Department Head: D.J. Harrell (8032)
Additional Information Contact: Victor Tornero (7830)
ATTACHMENTS
06N BEACH ST (SH170 TO SARATOGA) #2 LOCATION MAP. Ddf (Public)
06N Beach St (SH170 to Saratoga) #2.docx (CFW Internal)
CFA N BEACH FID TABLE.xlsx (CFW Internal)
ORD.APP06N. BEACH ST (SH170 TO SARATOGA) #2 30114 A0230r).docx (Public)
http://apps.cfwnet.org/council_packet/mc—review.asp?ID=3092 I &councildate=4/25/2023 11/7/2023