Loading...
HomeMy WebLinkAboutContract 57027-A1AMENDMENT No . 1 CSC No. 57027-A1 TO CITY SECRETARY CONTRACT No. 57027 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 57027, (the CONTRACT) which was authorized by M&C 22-0042 on the llth day of January, 2022 in the amount of $1,454,775.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Marine Creek Sanitary Sewer Parallel Interceptor; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $683,930.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $2,138,705.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Marine Creek Sanitary Sewer Parallel Interceptor Prof Services Agreement Amendment Template 103497 Revision Date: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth '3��C4-- Fernando Costa Assistant City Manager DATE: Feb 14, 2024 APPROVAL RECOMMENDED: Chris�o�her FFarder Chnsto oher HarderlFeb 8, 202� 15 �5 CST) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Kimley-Horn Associates, Inc. ,/,P, 4. -, ,, Join Atkins, P.E. Vice President DATE: 02/07/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. i cam, 1" Liam Conlon Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Feb 14. 2024 21:21 CST) Douglas W. Black Sr. Assistant City Attorney poFanIln Foam°a ATTEST: \ A OaIIn nEXASao Jannette Goodall City Secretary City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 M&C: 24-0066 Date: 01/23/2024 Form 1295: 2023-1083860 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Marine Creek Sanitary Sewer Parallel Interceptor 103497 Kimley»>Horn October 19, 2023 Mr. Liam Conlon Project Manager City of Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Re: Marine Creek Sanitary Sewer Parallel Interceptor M-279 and M-245B Amendment No. 1 —Additional Bid Packages, Water, and Sanitary Sewer Services KHA No. 061018412 City Project No. 103497 Dear Liam: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. ("Engineer" or "Kimley-Horn") and the City of Fort Worth (the City) dated 01-13-2022 referred herein as the "Contract". The City has requested that Kimley-Horn perform additional services under Amendment Number 1 for the Marine Creek Sanitary Sewer Parallel Interceptor M-279 and M-245B project which are out of the scope of services as defined in the Contract. These services include design of an additional —1,360 LF of 72/60-inch sanitary sewer line, —2,830 LF of 36/12-inch water line, —3,210 LF of 68/48/45-inch CIPP, —400 LF of 30-inch siphon slipline, four (4) additional siphon structures, six (6) additional railroad crossings, TRWD permitting, and compiling three (3) construction contracts. Service details are further described as follows: CONTRACT TASK 1 — DESIGN MANAGEMENT: (Water$3,564, Sewer$6,336) 9,90 Kimley-Horn $ 9,900 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: Prepare and submit invoices for six (6) additional months of design Prepare and submit monthly progress reports and updated schedule for six (6) additional months of design Prepare and submit monthly M/WBE reports for six (6) additional months of design Kimley>>> Horn Page 2 CONTRACT TASK 3 — PRELIMINARY DESIGN (60%): (Water$68,500, Sewer$104,680) $ 126,380 Kimley-Horn $ 10,400 Geotechnical Sub $ 25,000 Tunneling Sub $ 11,400 Structural Sub $ 173,180 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Prepare two (2) additional construction contracts • Preliminary design of —1,460 LF of 72/60-inch sanitary sewer line • Preliminary design of --3,210 LF of 68/48/45-inch CIPP • Preliminary design of —2,830 LF of 36/12-inch water line • Preliminary design of two (2) siphon structures • Prepare and submit three (3) additional Utility Clearance packages • Prepare and attend up to two (2) meetings with the City • Prepare and attend up to one (1) meeting with Field Operations on 36-inch water line CONTRACT TASK 4 — FINAL DESIGN (90% AND 100%) ( Water $53,250, Sewer $256,090) $ 250,940 Kimley-Horn $ 10,400 Geotechnical Sub $ 15,000 Tunneling Sub $ 33,000 Structural Sub $ 309,340 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Prepare two (2) additional construction contracts • Final design of —1,460 LF of 72/60-inch sanitary sewer line • Final design of —3,210 LF of 68/48/45-inch CIPP • Final design of —2,830 LF of 36/12-inch water line • Final design of —400 LF of 30-inch siphon slipline • Final design of four (4) siphon structures • Final design of butterfly valve vault structures • Prepare two (2) additional project manuals • Prepare additional specifications for 36-inch water line • Prepare additional specifications for 30-inch siphon slipline • Prepare and submit park conversion for 36-inch water line • Prepare and attend up to two (2) meetings with the City • Prepare exhibits and attend two (2) public meetings Kimley»>Horn Page 3 CONTRACT TASK 5 — BID PHASE SERVICES (Water$0, Sewer$48,200) $ 48,200 Kimley-Horn $ 48,200 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: Provide Bid Support for two (2) additional construction contracts. o The Engineer will upload all plans and contract documents to BIM360 for access to potential bidders. o The Engineer will sell contract documents and maintain a plan holders list on BIM360 from documents sold and from Contractor's uploaded Plan Holder Registrations in BIM360. o The Engineer will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's BIM360 folder titled Request for Information. The Engineer will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The Engineer shall upload all approved addenda onto BIM360 and mail addenda to all plan holders. o Attend the prebid conferences in support of the City. o Assist the City in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers o When substitution prior to award of contracts is allowed in the contract documents, the Engineer will advise the City as to the acceptability of alternate materials and equipment proposed by bidders. o Attend the bid opening in support of the City. o Tabulate and review all bids received for the construction project, assist the Cit yin evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on BIM360. o Incorporate all addenda into the contract documents and issue conformed set. Provide Final Design Drawings for three (3) additional construction contracts. o Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format. There shall be one (1) PDF file for the Water plan set. Each PDF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Singular PDF files for each sheet of a Dian set will not be acceated. PDF files shall conform to naming conventions as follows: • Water and Sewer file name example - "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Kimley>>> Horn Page 4 Example: X-12755_orgl8.pdf ■ PDF files shall be uploaded to the project's Final Drawing folder on BIM360. CONTRACT TASK 7 — ROW/EASEMENT SERVICES (Water$16,884, Sewer$8,316) $7,200 Kimley-Horn 18 000 Survey Sub $25,200 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Prepare up to twelve (12) additional easement documents used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. CONTRACT TASK 8 — SURVEY AND SUE SERVICES (Water$13,450, Sewer$40,050) $ 9,900 Kimley-Horn $ 43,600 Survey Sub $ 53,500 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Provide field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees 6- in and larger (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: o A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400: o The following information about each Control Point: ■ Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod). ■ X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. ■ Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). o Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. Kimley>>> Horn Page 5 o No less than two horizontal benchmarks, per line or location. o Bearings given on all proposed centerlines, or baselines. o Station equations relating utilities to paving, when appropriate. CONTRACT TASK 9 — PERMITTING SERVICES: (Water$11,900, Sewer$52,710) $ 64,610 Kimley-Horn $ 64,610 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Coordinate up to six (6) railroad crossings • Coordinate up to one (1) railroad encroachment agreement • Obtain Railroad crossing requirements • Submit one (1) plan sheet to each railroad owner for each proposed utility crossing. • Plan sheets will be formatted per the AREMA guidelines • Proposed utilities crossing railroads will be designed in accordance with the railroad owner and AREMA guidelines • The Engineer will attend up to two (2) coordination meetings with the City Project Manager and/or a Representative from each Railroad for each crossing. • The Engineer will make up to one (1) visit to each proposed utility crossing with the City Project Manager and/or a Representative from the Railroad to convey the design intent. • Coordinate with TRWD for M-248 siphon slipline Kimley»>Horn Page 6 We recommend that the City increase the budget by $683,930 for these additional services. The following tables summarize our recommended budget revisions, water and sanitary sewer design fees, and revised contract amount: Description Water Sewer Total Task 1 — Design Management $3,564 $6,336 $9,900 Task 2 — Conceptual Design (30%) $0 $0 $0 Task 3 — Preliminary Design (60%) $68,500 $104,680 $173,180 Task 4 — Final Design (90% and 100%) $53,250 $256,090 $309,340 Task 5 — Bid Phase Services $0 $48,200 $48,200 Task 6 — Construction Phase Services $0 $0 $0 Task 7 — ROW/Easement Services $16,884 $8,316 $25,200 Task 8 — Survey and SUE Services $13,450 $40,050 $53,500 Task 9 — Permitting $11,900 $52,710 $64,610 Total $167,548 $516,382 $683,930 The following table summarizes the Fee per Work Phase breakdown: Work Phase Water Sewer Total 30 $167,548 $516,382 $683,930 Kimley»>Horn Page The following table summarizes our recommended budget revisions and shows the revised contract amount: Original Contract Amendment No. 1 Revised Contract Task 1 $57,100 $9,900 $67,000 Task 2 $208,100 $0 $208,100 Task 3 $354,850 $173,180 $528,030 Task 4 $363,730 $309,340 $673,070 Task 5 $31,640 $48,200 $79,840 Task 6 $0 $0 $0 Task 7 $55,370 $25,200 $80,570 Task 8 $176,830 $53,500 $230,330 Task 9 $207,155 $64,610 $271,765 Total Project $1,454,775 $683,930 $2,138,705 The following breakdown for water and sewer services is recommended: Water Fee Sewer Fee Survey Total Fee Original Contract $345,045 $932,900 $176,830 $1,454,775 Amendment No. 1 $154,098 $476,332 $53,500 $683,930 Total $499,143 $1,409,232 $230,330 $2,138,705 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES /I. P - John R. Atkins, P.E. Vice President WAW/jra Copy to: Tony Sholola, P.E., City of Fort Worth Attachments - Level of Effort Spreadsheet K:\FTW ment-1 \Amend ment-No-1 _Marine-Creek-SS-M279-M245B.doe Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Marine Creek Sanitary Sewer Parallel Interceptor - Amendment No. 1 City Project No. 103497 Task No. Task Description Rate Principal $370.00 Labor Project Manager $350.00 (hours) Project Engineer $295.00 EIT $245.00 Admin $145.00 Total Labor Cost Expense Subconsultant MWBE Non-MWBE Markup Travel/ Reproduction / _ ees / Permitting Total Expense Cost Task Sub Total Design Management - Additional 6 Months 01 61 131 101 9 $9,900 $0 $0 $0 $0 $0 $9,900 1.2 1.2.2 1.2.4 1.2.5 Communications and Reporting Monthly Design Coordination Meetings Prepare Monthly Progress Reports with Schedule Prepare Monthly MBE/SBE Reports 6 6 4 3 6 4 6 3 $0 $0 $0 $51,400 $0 $5,400 $3,100 $0 $3,100 $1,4001 $0 $1,406 3.0 Preliminary Design (60%) - Part 1 01Z 8 151Z 231 2 $13,700 $0 $01 $0 $200 $200 $13,900 3.1 Preliminary Design Drawings Cover Sheet Index and General Notes Control and Benchmarks Overall Loc & Prop Sht Ref (1) Overall Existing Map (W&SS) (2) Utility Clearance OPCC Deliverables (Two Sets) Review with City/Meeting Notes 1 1 1 1 1 1 2 1 2 2 1 1 2 2 2 2 2 2 4 2 2 4 4 3 2 $0 S200 $0 $0 $800 $0 $800 $1,500 $0 $1,500 $2,000 $0 $2,000 $1,200 $0 $1,200 $800 $0 $800 $1,000 $0 $1,000 $2,000 $0 $2,000 $2,300 $200 $2,500 $2,100 $0 $2,100 3.0 Preliminary Design (60%) - Part 2 0 26 88 130 0 $67,300 $11,400 $35,4001Z $4,680 $0 $51,480 $118,780 3.1 3.2 3.3 3.4 3.5 3.6 Preliminary Design Drawings Sewer Prop Plan & Prof (2) 36" WL Prop Plan & Prof (4) 12" WL Prop Plan & Prof (1) 36" WL Marine Creek Crossing Geotechnical Tunneling Special Structures Civil/Mechanical Plan and Section (2) Structural Siphon Design (2) 36" WL Utility Clearance 36" WL Review Meeting with Field Operations 2 10 1 1 2 5 1 4 12 40 6 5 4 15 2 4 20 60 10 4 2 30 4 $0 $11,400 $10,400 $25,000 $1,040 $2,500 $1,140 $0 $0 $9,200 $0 $9,200 $30,000 $0 $30,000 $4,600 $0 $4,600 $2,900 $11,440 $14,340 $2,400 $27,500 $29,900 $0 $0 $0 $13,600 $0 $13,600 $0 $12,540 $12,540 $1,000 $0 $1,000 $3,600 $0 $3,606 City of Fort Worth, Texas Amendment 1 - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 11/10/2023 Page 1 of 7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Marine Creek Sanitary Sewer Parallel Interceptor - Amendment No. 1 City Project No. 103497 I Labor (hours) Expense Task Description Project Project Total Labor Subconsultant Travel TotalTask Sub Task No. Principal EIT Admin Expense Manager Engineer Cost Reproduction / MWBE Non-MWBE Markup -ees Cost Total Rate $370.00 $350.00 $295.00 $245.00 $145.00 / Permitting - (Preliminary Design (60%) - Part 3 15 55 73 2 $40,30 $ $ $ $200I $20 I $40,51 3.1 Preliminary Design Drawings $0 Cover 1 2 $800 Sheet Index and General Notes 1 2 2 $1,500 Shutdown & Phasing Notes 1 4 2 $2,100 Control and Benchmarks 1 2 $800 Overall Loc & Prop Sht Ref (1) 1 1 2 $1,200 Overall Existing Map (W&SS) (2) 1 2 $800 Prop Easement Layout (2) 1 1 2 $1,200 Prop Plan & Prof (6) 6 36 48 $24,500 3.2 Utility Clearance 1 2 $1,000 3.3 OPCC 1 2 4 $2,000 3.4 Deliverables <Two Sets) 1 2 4 2 $2,300 3.5 Review with City/Meeting Notes 2 2 3 $2,100 JFinal Design (90% and 100%) - Part 1 I 01 451 1281 1701 $97,100 $22,0001 $10,4001 $3,2401 4.1 Preliminary Design (60%) Comments 2 6 10 $5,000 4.2 90% Design Drawings $0 Cover 1 $300 Sheet Index and General Notes 1 1 $600 Shutdown & Phasing Notes 1 2 4 $2,000 Control and Benchmarks 1 1 $600 Overall Loc & Prop Sht Ref (1) 1 1 $600 Overall Existing Map (W&SS) (2) 1 1 $600 M-248 Siphon Plan and Prof (1) 5 15 25 $12,300 M-248 Siphon Structure Replacement Geotechnical 1 5 4 $2,900 $10,400 $1,040 Civil/Mechanical Plan and Section (2) 10 30 60 $27,100 Structural Siphon Design (2) $0 $22,000 $2,200 Standard Details 2 4 $1,600 Surface Repair Sheet and TPW Coordination 1 4 10 $4,000 Erosion Control and Details 2 5 8 $4,200 90% Project Manual $0 Division 00 2 8 $3,100 Division 01 1 1 $700 Divisions 02-49 2 8 $3,100 Appendix 2 8 $3,100 Quantities/OPCC 1 1 2 $1,200 Deliverables (Two Sets) 1 2 4 2 $2,300 City of Fort Worth, Texas Amendment 1 - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 $2,1 $2,1 $01 $12,2 $11,440 $14,2 $0 $27,1 $24,200 $24,2 $0 $1,E $0 $4,C $0 $4,2 $0 $0 $3,1 $0 $7 $0 $3,1 $0 $3,1 11/10/2023 Completed I Percent Amount Complete Page 2 of 7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Marine Creek Sanitary Sewer Parallel Interceptor - Amendment No. 1 City Project No. 103497 Labor(hours) Expense Task Description Project Project Total Labor Subconsultant Travel/ TotalTask Sub Task No. Principal Manager Engineer EIT Admin Cost Reproduction / Expense Total MWBE Non-MWBE Markup _ Cost Rate $370.00 $350.00 $295.00 $245.00 $145.00 ees / Permitting Public Meeting Prep/Exhibits 1 2 4 $2,000 $0 $2,000 Attend Public Meeting 2 2 $1,300 $0 $1,300 Review 90% City Design Comments 2 4 4 $2,900 $0 $2,900 4.3 100% Design Drawings 5 10 20 $9,600 $0 $9,600 100% OPCC 1 1 2 $1,200 $0 $1,200 100% Pro)'ectManual 2 6 $2,500 $0 $2,500 Deliverables (Two Sets) 1 2 4 2 $2.300 $200 $200 $2.500 4.2 90% Design Drawings $0 $01 $0 Sewer Prop Plan & Prof (2) 4 10 16 $8,300 $0 $8,300 36" WL Prop Plan & Prof (4) 8 20 40 $18,500 $0 $18,500 36" WL Restraint/Thickness Calcs 5 20 20 $12,600 $0 $12,600 36" WL Park Conversion 1 5 10 $4,300 $0 $4,300 12" WL Prop Plan & Prof (1) 1 4 8 $3,500 $0 $3,500 Project Spec. Details $0 $0 $0 Civil/Mechanical Plan and Section (2) 5 15 30 $13,600 $0 $13,600 Structural Siphon Design (2) $0 $11,000 $1,100 $12,100 $12100 Water -Tight Shaft Details (2) 5 20 30 $15,000 $0 $15:000 36" WL Butterfly Vault Structural Design 4 4, 8 $4,600 $0 $4,600 Tunneling 16 $3.000 $15.000 $1.500 1 $16.5001 $19.500 4.1 Preliminary Design (60%) Comments 1 4 8 4.2 90% Design Drawings Cover 1 Sheet Index and General Notes 1 2 Shutdown & Phasing Notes 1 1 2 Control and Benchmarks 1 2 Overall Loc & Prop Sht Ref (1) 1 1 2 Overall Existing Map (W&SS) (2) 1 1 2 Prop Plan & Prof (6) 3 24 36 Standard Details 1 2 Surface Repair Sheet and TPW Coordination 1 2 Erosion Control and Details 1 2 6 90% Project Manual Division 00 1 8 Division 01 1 8 Divisions 20-49 1 6 Appendix 1 8 City of Fort Worth, Texas Amendment 1 - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 11/10/2023 Page 3 of 7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Marine Creek Sanitary Sewer Parallel Interceptor - Amendment No. 1 City Project No. 103497 Task No. 4.3 Task Description Quantities/OPCC Deliverables (Two Sets) Public Meeting Prep/Exhibits Attend Public Meeting Review 90% City Design Comments 100% Design Drawings 100% OPCC 100% Pro)'ectManual Deliverables (Two Sets) Principal Rate $370.00 Labor(hours) Project Project Manager Engineer EIT $350.06 $295.00 $245.o6 1 1 2 1 2 4 1 2 4 2 2 2 6 10 2 5 10 1 1 2 2 8 1 2 4 Admin $145.00 2 2 Total Labor Cost $1,200 $2,300 $2,000 $1,300 $5,000 $4,700 $1,200 $3,100 $2,300 Expense Subconsultant MWBE Non-MWBE Markup Travel/ Reproduction / _ ees / Permitting $200 $200 TotalTask Expense Cost $0 $200 $0 $0 $0 $0 $0 $0 $200 Sub Total $1,200 $2,500 $2,000 $1,300 $5,000 $4,700 $1,200 $3,100 $2,500 5.0 113id Phase Services - Part 1 0 17 33 8 10 $19,400 sol $0 $0 $500 $500 $19,700 5.1 5.2 Bid Support Upload Plans to BIM 360 Print Hardcopies (6) Maintain Plan holders List Answer/Respond to Bidding Questions Issue Addenda Prepare for and Attend Pre -Bid Meeting Tabulate bids and review Recommend/References Precertification Requirements Final Design Drawings 3 4 4 2 2 2 2 2 1 5 4 4 2 2 6 5 8 6 4 $0 $500 $0 $0 $600 $0 $600 $600 $500 $1,100 $1,200 $0 $1,200 $2,600 $0 $2,600 $2,600 $0 $2,600 $2,600 $0 $2,600 $1,200 $0 $1,200 $1,300 $0 $1,300 $2,500 $0 $2,500 $4,200 $0 $4,200 5.0 Bid Phase Services - Part 2 Included in Original Contract 0 J J J 0 $0 $0 $0 $0 $0 $0 $0 5.0 Bid Phase Services - Part 3 0 10 $27,800 $0 $0 $0 $500 $500 $28,300 5.1 52 Bid Support Upload Plans to BIM 360 Print Hardcopies (6) Maintain Plan holders List Answer/Respond to Bidding Questions Issue Addenda Prepare for and Attend Pre -Bid Meeting Tabulate bids and review Recommend/References Precertification Requirements Final Design Drawings 6 4 4 4 2 2 2 2 1 10 4 8 2 4 6 10 16 6 4 $0 $500 $0 $0 $600 $0 $600 $600 $500 $1,100 $1,200 $0 $1,200 $5,100 $0 $5,100 $2,600 $0 $2,600 $3,800 $0 $3,800 $1,200 $0 $1,200 $2,600 $0 $2,600 $2,500 $0 $2,500 $7,600 $0 $7,600 6.0 Construction Phase Services - Part 2 To be Included in Future Contract 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 6.0 Construction Phase Services - Part 3 To be Included in Future Contract 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 7.0 ROW/Easement Services - Part 2 0 6 6 6 0 $5,400 $18,000 $0 $1,800 $0 $19,800 $25,205 7.1 7.2 7.3 ROW Research (See Task 8.1) ROW/Easement Preparation/Submittal Permanent (6) Temporaryy 16 Temporary }2igh of Entry (See Task 8.1) 3 3 3 3 3 3 $0 $9,000 $9,000 $900 $900 $0 $o $0 $0 $0 $2,700 $9,900 $12,600 $2,700 $9,900 $12,600 $0 sol $0 8.0 Survey and SUE Services - Part 1 0 1 2 2 0 $1,500 $11,800 $0 $1,200 $0 $13,000 $14,500 8.1 82 Design Survey (M-248 Siphon) Temporary Right of Entry (see Task 8.1) 1 2 2 $1,500 $11,800 $1,200 $13,000 $14,500 $0 $0 $0 City of Fort Worth, Texas Amendment 1 - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 11/10/2023 Page 4 of 7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Marine Creek Sanitary Sewer Parallel Interceptor - Amendment No. City Project No. 103497 Task No. Task Description Rate principal $370.0 Labor Project Manager $350.0 (hours) Project Engineer $295.00 EIT $245.0 Admin $145.00 Total Labor Cost Expense Subconsultant Travel/ MWBE Non-MWBE Markup Reproduction I ees I Permitting Expense Cost Task Sub Total 8.0 Survey and SUE Services - Part 2 0 1 2 4 0 $2,000 $22,600 $0 $2,300 $0 $24,900 $26,900 8.1 8.2 Design Survey JM-245B Parallel and 36" WL) Temporary Rig t of Entry (see Task 8.1) 1 2 4 $2,000 $22,600 $2,300 $24,900 $26,900 $0 $0 $0 8.0 Survey and SUE Services - Part 3 0 1 2 4 0 $2,0001 $9,200 $0 $900 $0 $10,100 $12,100 8.1 8.2 Design Survey Temporary Right of Entry (see Task 8.1) 1 2 4 1 $2,000 $9,200 $900 $10,100 $12,100 $01 $0 $0 City of Fort Worth, Texas Amendment 1 - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 11/10/2023 Page 5 of 7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Marine Creek Sanitary Sewer Parallel Interceptor - Amendment No. 1 City Project No. 103497 I Labor (hours) Expense Task Description Task No. Principal Project Project EIT Admin Total Labor Subconsultant Travel / TotalTask Sub Expense Manager Engineer Cost MWBE Non-MWBE Markup Reproduction I Total Cost Rate $370.00 $350.00 $295.00 $245.00 $145.00 '-ees I Permitting - Permitting - Part 1 1 15 2 $12,900 $ $ $ $2,855 $2,855 $15,71 9.1 BNSF Permitting $0 $2, 100 $2,100 $2,11 9.2 UPRR Permitting $0 $755 $755 $7! 9.3 TRWD Coordination (M-248 Siphon) 10 15 20 $12,900 $0 $12,91 - Permitting - Part 2 0 1 41 37 0 $26,500 $0 $0 $0 $2,855 $2,855 $29,3! 9.1 BNSF Permitting (M-24513 Parallel) $0 $2,100 $2,100 $2,11 Exhibit Prep 1 2 4 $2,000 Application 1 5 $1,900 Meetings (up to 2) and Coordination 2 5 5 $3,400 9.2 FWWR Permitting (36" WL) $0 Exhibit Prep (2) 1 4 8 $3,500 Application 1 5 $1,900 Reimbursement Agreement PE Services 2 3 6 $3,100 Meetings (up to 2) and Coordination 2 5 5 $3,400 9.3 UPRR Permitting (M-24513 Parallel) $0 Exhibit Prep 1 2 4 $2,000 Application 1 5 $1,900 Meetings (up to 2) and Coordination 2 5 5 $3,400 City of Fort Worth, Texas Amendment 1 - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 $3,1 11/10/2023 Completed I Percent Amount Complete Page 6 of 7 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Marine Creek Sanitary Sewer Parallel Interceptor - Amendment No. 1 City Project No. 103497 Task No. Task Description Rate Principal $370.0 Labor Project Manager $350.0 (hours) Project Engineer $295.00 EIT $245.0 Admin $145.00 Total Labor Cost Expense Subconsultant MWBE Non-MWBE Markup Travel/ Reproduction I ees I Permitting E pense Cost Task Sub Total 9.0 Permitting - Part 3 9.1 FWWR Permitting Exhibit Prep Application Reimbursement Agreement PE Services Meetings (up to 2) and Coordination 9.2 BNSF Permitting Exhibit Prep Application Meetings (up to 2) and Coordination 01 91 271 1 2 1 5 1 3 2 5 1 2 1 5 2 5 241 4 6 5 4 5 0 $17,400 $0 $0 $0 $2,100 $2,100 $19,500 $0 $2,100 $0 $0 $2,000 $0 $2,000 $1,900 $0 $1,900 $2,800 $0 $2,800 $3,400 $0 $3,400 $0 $2,100 $2,100 $2,000 $0 $2,000 $1,900 $0 $1,900 $3,400 $0 $3,400 Subtotall 0 239 680 790 41 $490,4001 $106,000 $60,800 $16,720 $10,010 $193,530 $683,930 Description Des,n Totalg City of Fort Worth, Texas Amendment 1 - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 I Water Line Footage 2,800 36% Sewer Line Footage 5,000 64 7,800 100% (A) Total Fee $683,930 (B) Survey Fee $53,500 (C) Total Fee (-) survey Fee $630,430 Water Fee Sewer Fee $160,823.00 $523,107.00 WP Water Sewer 30 $160,823.00 $523,107.00 1 $683, 30.00 I 11/10/2023 Completed Percent Amount Complete Totals: 1 $683,9301 F $0,001 0.00% Project Summary Total Hours 1,750 Total Labor $490,400 Total Expense $193,530 MWBE Subconsultant 1 1 $106,000 Non-MWBE Subconsultantl $60,800 MWBE Participationj 15.5% Page 7 of 7 City of Fort Worth, Texas Mayor and Council Communication DATE: 01/23/24 M&C FILE NUMBER: M&C 24-0066 LOG NAME: 60MARINECSSPIAl-KHA SUBJECT (CD 2, CD 8 and CD 9) Authorize Execution of Amendment No. 1 in the Amount of $683,930.00 to an Engineering Agreement with Kimley-Horn & Associates, Inc., for the Marine Creek Sanitary Sewer Parallel Interceptor and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 1 in the amount of $683,930.00, to City Secretary Contract No. 57027, an engineering agreement with Kimley-Horn & Associates, Inc., for the Marine Creek Sanitary Sewer Parallel Interceptor project for a revised contract amount of $2,138,705.00; and 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water & Sewer Bond 2015A Fund by increasing estimated receipts and appropriations in the Marine Creek Sanitary Sewer Parallel Interceptor (Sanitary Sewer M-245B & M-279 Replacement) project (City Project No. 103497) in the amount of $683,930.00 and decreasing estimated receipts and appropriations in the Unspecified -All Funds project (City Project No. UNSPEC) by the same amount and effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On January 11, 2022, Mayor and Council Communication (M&C) 22-0042, the City Council authorized an engineering agreement in the amount of $1,454,775.00 with Kimley-Horn & Associates, Inc., (City Secretary Contract No. 57027) for the Marine Creek Sanitary Sewer Parallel Interceptor project. Amendment No.1 will provide design services for the replacement and for rehabilitation of the deteriorated existing 45/48/68/60/70-inch sanitary sewer mains and 12/36 — inch water mains that are located in close proximity for this project on the following streets, easements and river crossing: SCOPE COUNCIL STREET FROM TO OF DISTRICT WORK NE 23rd Street N. Calhoun Street Samuels Water 2 Avenue Easement South Mule Alley Samuels Sewer 2 of NE 23rd Street Avenue River Crossing North South of E South bank of West bank of Northside Drive Fork Trinity River Trinity Sewer 2,9 and East of N. River Main Street South 350 feet and South Easement west 850 feet south of the 150 feet of Union Pacific NE 23rd Street and Sewer 2, 8 Railroad Samuels Avenue South intersection 350 feet East NE 16th Street Samuels Avenue 1,050 Sewer 8 feet Easement east of 1,050 feet east of the NE 16th Street / South Union Pacific Sewer 8 Railroad Samuels Avenue 300 feet Intersection Easement between NE 16th I East 450 Street and NE Samuels Avenue feet Sewer 9 1411 Street It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60MARINECSSPIAl-KHA Capital Project Fund Name Name Fund 103497 56007 _SS Water Main & M- Sewer 245B & Bond M-279 2015A REPL FY2024 CIP Budget Change Revised Appropriations Authority (Increase/Decrease) FY2024 Budget $0.00 This M&C, $683,930.00 $683,930.00 Funding is available in the Unspecified -All Funds project within the Water & Sewer Bond 2015A Fund for the purpose of funding the Sanitary Sewer M-245B & M-279 Replacement project. Funding for the Marine Creek Sanitary Sewer Parallel Interceptor (Sanitary Sewer M-245B & M-279 Replacement) project is depicted below: Fund Existing Additional Project Total* Appropriations Appropriations Water & Sewer Bond 2015A — Fund $0.00 $683,930.00 $683,930.00 56007 W&S Commercial Paper- Fund 56020 $2,824,580.00 $0.00 $2,824,580.00 (Project Total $2,824,580.00 $683,930.00 $3,508,510.00 *Numbers rounded for presentation purposes. Business Equity: Kimley-Horn & Associates, Inc. agrees to maintain its initial M/WBE commitment of 10 percent that it made on the original agreement and extend and maintain that same M/WBE commitment of 10 percent to this first amendment. Therefore, Kimley-Horn & Associates, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICTS 2, 8 and 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified -All Funds project within the Water & Sewer Bond 2015A Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water & Sewer Bond 2015A Fund for the SS Main M-245B & M-279 REPL project to support the above recommendations and execution of the amendment. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. Submitted for Citv Manaaer's Office by Oriainatina Business Unit Head Dana Burghdoff 8018 Chris Harder 5020 Additional Information Contact: Liam Conlon 6824 60MARINECSSPIAI-KHA Fid Table 1 & 2 56007 0700430 4905430 103497 2024 $516,382.00 1 & 2 56007 0600430 4905430 UNSPEC 2024 ($683,930.00) 1 & 2 56007 0600430 103497 2024 $167,548.00 1 & 2 56007 0700430 103497 2024 $516,382.00 1 & 2 56007 0600430 UNSPEC 2024 ($683,930.00) 1 & 2 56007 0700430 4905430 103497 001730 9999 ($516,382.00) 1 & 2 56007 0600430 4905430 UNSPEC UNSPEC 9999 $683,930.00 1 1