HomeMy WebLinkAboutContract 39514ciry sECR�ARY CONTRACT Np. 3R51� SPECIFICATION AND FORMS OF CONTRACT AND BONDS For Cleaning of Digester No 13 at VCWWTP Project No. WTR-2009-300030 JULY 15, 2009 FORTWORTH WATER Prepared By 'ITY OF FORT WORTH, WATER DEPARTMENT Project No. WTR-2009-300030 Water Department 1000 Throckmorton Street Fort Worth TX 76102 7.1 11. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX M&C Review Page 1 of 2 No M No Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FORT COUNCIL ACTION: Approved on 9/29/2009 REFERENCE ** 60CLEANING OF DIGESTER DATE: 9/29/2009 NO.: C-23808 LOG NAME: NO. 13 AT WCWWTP CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize a Contract in the Amount of $85,500.00 with ACE Pipe Cleaning, Inc., for the Cleaning of Digester No. 13 at Village Creek Wastewater Treatment Plant RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract in the amount of $85,500.00 with ACE Pipe Cleaning, Inc., for the Cleaning of Digester No. 13 at Village Creek Wastewater Treatment Plant. DISCUSSION: The City of Fort Worth owns and operates Village Creek Wastewater Treatment Plant (VCWWTP), which is a 166 MGD activated sludge system, comprised of primary, secondary and tertiary treatment, chlorine disinfection and dechlorination. Liquid treatment processes include screening, primary settling, activated sludge, secondary clarification, filtration and chlorination. Digester No. 13 has been in operation since 1986 and was last cleaned in October 2003. In order to perform the inspection and evaluation of the digester it needs to be empty and clean. Plant personnel initiated the cleaning in August 2009. Due to the excessive amount of debris inside the digester and a lack of proper heavy duty equipment to pump and lift it out, plant maintenance personnel have been unable to successfully perform this task. This cleaning project includes the removal of all solids, rags, material and wash down water and to be disposed of properly prior to evaluation. This project was advertised for bid in the Fort Worth Star-Telea_ ram on July 16, 2009 and July 23, 2009. On August 6, 2009, the following bids were received. BIDDER ACE Pipe Cleaning, Inc. Veolia ES Industrial Services Sludge Technology, Inc. Synagro of Texas -CDR, Inc. Renda Environmental Environmental, Inc. BID $85,500.00 $89,763.00 $96,750.00 $108,000.00 $177,750.00 $290, 250.00 CONTRACT TIME 50 Calendar Days In addition to the contract cost, $6,000.00 is provided for project contingencies, $3,000.00 is required for staff support and inspection by the Water Department. An M/WBE Waiver was approved due to the presence of negligible subcontracting opportunities. This project is located in COUNCIL DISTRICT 5. file://H:\PROJECT FILE\VCWWTP\Digester Cleaning\M&C C-23808.htm 11/11/2009 M&C Review Page 2 of 2 i FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current operating budget, as appropriated, of the Water and Sewer Operating Fund. TO Fund/Account/Centers FROM Fund/Account/Centers PE45 539120 0705006 $85.500.00 Submitted for City Manager's Office by: Fernando Costa (6122) Oriainatinq Department Head: S. Frank Crumb (8207) Additional Information Contact: Seiavash Mir (8404) ATTACHMENTS VCWWTP Digester13Location M_ ap,.pdf '" file://HAPROJECT FILE\VCWWTP\Digester Cleaning\M&C C-23808.htm 11/11/2009 a CITY OF FORT WORTH • CLEANING OF DIGESTER NO. 13 VILLAGE CREEK WASTEWATER TREATMENT PLANT WATER DEPARTMENT PROJECT NO. WTR-2009-300030 ADDENDUM 1 no July 30, 2009 BID DATE: Thursday, August 6, 2009 Bids should be received by 1:30 PM Bids will be opened at 2:00 PM The following additions, deletions, modifications, or clarifications shall be made to the appropriate section of the plans and specifications and shall become part of the Contract Documents. Bidders will acknowledge receipt of this Addendum in the space provided on the Bid Form (Part B — Proposal). an SPECIFCATIONS Item Al-1 Modification: NOTICE TO BIDDERS. Revise the first paragraph to read as follows: - "Sealed proposals for the Cleaning of Digester No. 13 at the Village Creek Wastewater Treatment Plant, addressed to: CITY OF FORT WORTH PURCHASING DIVISION P.O. BOX 17027 FORT WORTH TX 76102 located in the lower level of the Municipal Building, 1000 Throckmorton Street, Fort Worth, Texas 76102, will be received at the Purchasing Office until 1:30 P.M., on Thursday August 6, 2009, and will be then publicly opened and read aloud at: 2:00 P.M. in the City Council Chambers." Item Al-2 Modification: PART B — PROPOSAL (Pages B-1 through B-3). Remove Section PART B — PROPOSAL and replace with attachment (revised proposal) NOTE: New proposal changes contract time from 21 calendar days to 50 calendar days Item Al-3 Deletion: SPECIAL CONDITIONS D-4 PROJECT SIGNS. This paragraph is deleted. Item AI-4: Modification: 01010 SUMMARY OF WORK. The following changes are made to this Section: 1. In Section 1.0 SCOPE OF WORK, Subsection WORK REQUIRED: Item 1 is deleted. 2. Section 1.03 DESCRIPTION OF WORK. Add the following paragraph: w "Dewatering material and method is at choice of the contractor. The material that will be transported to disposal drying bed area, east of the plant may contain up to 50% water or liquids provided that transportation method does not spill any liquid out side limit of plant. Should any spilling occur, contractor will be fully responsible for any liquid or water spill on the road while hauling the material to disposal area." 3. Section 1.06 PAYMENT METHODOLOGY. Add the following at the end of SECTION 01010: "1.06 PAYMENT METHODOLOGY. A. Total of Contract. Total cost of contract will be based on the measurement and calculated volume of material in Digester # 13 at the start of the contract (Notice to Proceed) B. Partial Payments. Partial payments will be based on estimated amount transported." PART B - PROPOSAL TO: Dale A. Fisseler, P.E City Manager Fort worth, Texas Fort Worth, Texas PROPOSAL FOR: furnishing of all materials and equipment and labor and all necessary appurtenances and incidental work to provide a complete and operable project designated as: City of Fort Worth Water Department Cleaning of Digester Number 13 at VCWWTP Project Number WTR-2009-300030 Pursuant to the foregoing Notice to Bidders, the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents and the General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions hereby proposes to do all the work, furnish all the labor, equipment and material, except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the plans and contract Documents and subject to the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: ITEM APPROX DESCRIPTION OF ITEMS WITH NO. OUANTITY BID PRICES WRITTEN IN WORDS 1. 4,500" CY Removal of all accumulated Material from digester for a total amount of: Dollars and Total Bid Amount PRICE PER TOTAL CUBIC YARD AMOUNT BID Cents $ 19.00 Dollars & Cents $ 19.00 $ 85,500 $ 85,500 B-1 (addendum 1) M Within ten days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% of the total amount bid is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time set forth, as liquidated damages for ethically and additional work caused thereby. If the total bid is less than $25,000, the bid bond is waived. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978 and all addendum thereto, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the Specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, and employment agency' in either furnishing of referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No 7278 as amended by City Ordinance No 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 50 calendar CiayS after beginning construction as set forth in the written work order to be furnished by the Owner. State of Residency: (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Missouri Non resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of Missouri , our principal place of business, are not required to underbid resident bidders. B-2 (addendum 1) a B. The principal place of business of our company or our parent company or majority holder is in the State of Texas. I (We), acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 2 (Initial W MO Seal If Bidder is Corporation Date:�U Mb Signature of Principal V. P. Title or Position ACE Pipe Cleaning Contractor 1509 Sylvania Ct Street Fort Worth TX 76111 City, State Zip 817-3321115 Telephone Number B-3 (addendum 1) SPECIFICATION AND FORMS OF CONTRACT AND BONDS For Cleaning of Digester No 13 at VCWWTP --. Project No. WTR-2009-300030 JULY 159 2009 FORTWORTH WATER Prepared By CITY OF FORT WORTH, WATER DEPARTMENT Project No. WTR-2009-300030 OF OW � Rr` DAVID R. TOWNSEND +�oga.e.m.bi0. b6.�p6.°a h� 58737 Water Department 1000 Throckmorton Street Fort Worth TX 76102 SPECIFICATION AND FORMS OF CONTRACT AND BONDS For Cleaning of Digester No 13 at VCWWTP Project No. WTR-2009-300030 JULY 15, 2009 FORTWORTH WATER Prepared By CITY OF FORT WORTH, WATER DEPARTMENT Project No. WTR-2009-300030 Water Department 1000 Throckmorton Street Fort Worth TX 76102 .. Cleaning of Digester No 13 at VCWWTP Table of Content Notice to Bidders A Special Instruction to Bidders. A Proposal B Minority & Business Enterprise Specification B General Condition C Supplementary Condition CS Special Condition D Technical Specification E Insurance & Bonds F Contract G I" WO Im 6. U-j sw NOTICE TO BIDDERS Sealed proposals for the Cleaning of Digester No. 13 at The Village Creek WWTP, will be received at the office of the Purchasing Manager until 1:30 P.M., Thursday, August 6, 2009, and then publicly opened and read aloud at 2:00 P.M. Plans and specifications may be obtained at Water Department, 1000 Throckmorton Street, 2°d FL Citv Hall, Fort Worth, Texas, 76102, phone 817-392-8220, No cost to the contractor. General Contract Documents and General Specifications for Water Departmenrt projects, dated January 1, 1978, with the latest revisions, also compromise a part of the Contract Documents for this project and may be obtained by paying a non-refundable fee of $50.00 for each set, at the office of Water Department, 2nd FL, 1000 Throckmorton Street, Fort Worth, Texas. All bidders submitting bids are required to be pre -qualified in accordance with the requirements of the special instructions to bidders. A pre -bid conference will be held at 10:00 AM on July 28, 2009 at Village Creek Wastewater Treatment Plant Conference Room, 4500 Wilma Lane. Arlington Texas 76012. The Engineer will transmit to all prospective bidders of record such Addenda as he considers necessary in response to questions arising at the pre -bid conference. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be rejected as being non -responsive. Information regarding the status of addenda may be obtained by contacting the Water Department at 817-392-8404. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. No bid may be withdrawn until the expiration of ninety (90) days from the date the bids are received. For additional information regarding the project, contact Mr. Seiavash, Mir, at 817-392-8404. Advertising Dates: July 16, 2009 July 23, 2009 FORT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is $26,000 or more, the M/WBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's M/WBE goal on this project is _0 1/6 of the total bid (Base bid applies to Parks and Community Services). COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated MfWBE goal, or 2. Good Faith Effort documentation, or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Depa1ment. within the following times allocated, in order for the entire bid to be considered responsive to the speci€icMions. Tho- OI'fercr shall deliver the WKSE documentation �r per: on ro the appropnnte employee of the .ma Paging daps rtrn cam ar-d-obtair, a datertime receipt. Such receipt shall be _v-.-Jeice that the COy reoeived the documentation in t7e tiers allocated. A Faxed copy will not be accepled. 1. Subcontractor Utilization Form, if goal is met or exceeded: 2. Good Faith Effort and Subcontractor Utilization Form, if participation is less than stated goal: 3. Good Faith Effort and Subcontractor Utilization Form, if no M/WBE participation: 4. Prime Contractor Waiver Form, if you will perform all subcontracting/supplier work: 5. Joint Venture Form, if utilize a joint venture to met or exceed goal. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MNVBE ORDINANCE, WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at (817) 392-6104. Rev. 1111105 SPECIAL INSTRUCTIONS TO BIDDERS (February 15, Z006) 1. PREOUALIFICATION REOUIREMENTS. All contractors submitting bids, are required to be pre -qualified by the Fort Worth Water Department prior to submitting bids. This pre -qualification process will establish a bid limit based on technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable equipment schedule, names and addresses of each individual or business entity owning 10% or more of the bidding entity, and any other documents the Department may deem necessary, to the Director of the Water Department or his designated representative, at least seven O calendar days prior to the date of the opening of bids. a) COVER LETTER. The cover letter provided by the prospective bidder with the pre -qualification information must include the following information: • Contact person (for additional information) if other than individual who signed the cover letter • If the bidder intends to submit a bid within thirty (30) days from the date that the pre -qualification request is submitted to the City, a statement as to the project to be bid and the date that the bids are scheduled to be opened. b) FINANCIAL STATEMENT. The financial statement required shall have been by an independent certified public accountant or independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. c) EXPERIENCE RECORD. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in the work of both the same nature and technical level as that of the project for which bids are to be received. Experience must be on projects that were completed no more than 5 years prior to the date on which bids will be received. A minimum of three references must be included. References must include a contact person name, telephone number, project name and total cost, and type of work done (Utility contractor shall list pipe size and pipe linear footage). d) EQUIPMENT SCHEDULE. The prospective bidder shall list the equipment that the Contractor has available for the project and list the equipment that Contractor will rent as may be required to complete the project on which the Contractor submits a bid. A-2 The Water Department will review each pre -qualification submittal. From the financial statement, the maximum bid limit will be based on amount of liquid assets times 10. The expiration date for pre -qualification will be established as 15 months after the date of the financial statement. The experience record will be reviewed and verified at the same time. The following conditions will apply: a) The Director of the Water Department shall be the sole judge as to the acceptability for financial and experience qualification to bid on any Fort Worth Water Department project. b) Bids received in excess of the bid limit shall be considered non -responsive and will be rejected as such. c) The City, in its sole discretion, may reject a bid for failure to demonstrate experience and/or expertise. d) Any proposals submitted by a non pre -qualified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. e) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a wavier of any necessary pre -qualification. For additional information contact John Kasavich, Fort Worth Water Department at (817) 392- 8480 (FAX 817-392-8195). Pre -qualification submittal should be sent to: John Kasavich Fort Worth Water Department 1000 Throckmorton Fort Worth, TX 76102-6212 2. BID SECURITY. A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in the amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bid bond, the surety must be licensed to do business in the State of Texas. In addition, the surety must (1) hold a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of authority from the Untied States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 3. CONFLICT OF INTEREST DISCLOSURE REQUIREMENT. Pursuant to Chapter 176 of the Local Government Code, any person or agent of a person who contracts or seeks to contract for the sale or purchase of property, goods, or services with a local governmental entity (i.e. The City of Fort Worth) must disclose in the Questionnaire Form CIQ ("Questionnaire") the person's affiliation or business relationship that might cause a conflict of interest with the local governmental entity. By law, the Questionnaire must be filed with the Fort Worth City Secretary no later than seven days after the date the person begins contract discussions or negotiations with the City, or submits an application or response to a request for proposals or bids, correspondence, or another writing related to a potential agreement with the City. Updated Questionnaires must be filed in conformance with Chapter 176. A copy of the Questionnaire Form CIQ can be found in the contract documents. The form is also available at httn://www.ethics.state.tx.us/forms/CIO.i)df. If you have any questions about compliance, please consult your own legal counsel. Compliance is the individual responsibility of each person or agent of a person who is subject to the filing requirement. An offense under Chapter 176 is a Class C misdemeanor. 4. BONDS. A performance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent of the contract price will be required. Reference C3-3.7. 5. WAGE RATES. Not less that the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents. must be paid on this project. 6. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 7. BIDDER LICENSE: Prior to the award of contract to an out-of-state bidder, the bidder shall be licensed to do business in the State of Texas. For licensing procedures, contact the Texas Secretary of State Offices (Telephone Number 1-512-463-5555 or 1-900-263-0060) 8. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statues, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower that the lowest bid submitted by a Texas resident bidder by the same amount that a Texas resident would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has a place of business in the State of Texas. This provision does not apply if this contract involves federal funds. V. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. _ 8. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be paid within forty-five (45) days after the completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against the City arising out of the Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of the contract. 10. DISABILITY: In accordance with provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on; the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of the Contractor or any of its subcontractors. Contract warrants it will fully comply with ADA's provision and any other applicable Federal, State, and local laws concerning disability and will defend, indemnify and hold harmless against any claims or allegations asserted by third parties or subcontractors against the City arising out of the Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning disability discrimination in the performance of this contract. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In a accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the A-6 GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non -responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a minority business enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less that three (3) years. 12. ADDENDA: Bidders wanting further information, interpretation or clarification of the contract documents must make their request in writing to the Fort Worth Water Department Engineering Services, at least 96 hours prior to bid opening. Answers to all such requests will be bound and made a part of the Contract Documents. No other explanation or interpretation will be considered official or binding. Should a bidder find discrepancies in, or omissions from, the Contract Documents, or should the bidder be in doubt as to their meaning, the bidder should at once notify the Fort Worth Water Department Engineering Services, in order that a written addendum may be sent to all bidders. Any addenda issued will be mailed or be delivered to each prospective bidder. The bid proposal as submitted by the bidder must be so constructed as to include any addenda issued by the Fort Worth Water Department, prior to 24 hours of the opening of bids with appropriate recognition of addenda so noted in the bid proposal. a - PART B - PROPOSAL TO: Dale A. Fisseler, P.E City Manager Fort worth, Texas Fort Worth, Texas PROPOSAL FOR: furnishing of all materials and equipment and labor and all necessary appurtenances and incidental work to provide a complete and operable project designated as: City of Fort Worth Water Department Cleaning of Digester Number 13 at VCWWTP Project Number WTR-2009-300030 Pursuant to the foregoing Notice to Bidders, the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents and the General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions hereby proposes to do all the work, furnish all the labor, equipment and material, except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the plans and contract Documents and subject to the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: TOTAL ITEM APPROX DESCRIPTION OF ITEMS WITH AMOUNT NO. OUANTITY BID PRICES WRITTEN IN WORDS BID 1. 1 LS Removal of all accumulated Material from digester and clean per Specification, for a total amount of. and Dollars Cents/L.S. B-1 Within ten days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% of the total amount bid is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time set forth, as liquidated damages for ethically and additional work caused thereby. If the total bid is less than $25,000, the bid bond is waived. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978 and all addendum thereto, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the Specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, and employment agency in either furnishing of referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No 7278 as amended by City Ordinance No 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 21 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. State of Residency: (Complete A or B below, as applicable:) t A. The principal place of business of our company is in the State of Non resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place .t of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority holder is in the State of Texas. B-2 I (We), acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: __. Addendum No. I (Initials) Addendum No. 2 (Initials) Signature of Principal Title or Position Contractor Street City, State Zip Seal If Bidder is Corporation Date: Telephone Number B-3 rr s dot qW FM EM an EP PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1 (1) C1-1.1 Definition of Terms C1-1 (1) C 1-1.2 Contract Documents Cl-1 (2) C1-1.3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C 1-1.6 General Conditions Cl-1 (2) C 1-1.7 Special Conditions Cl-1 (2) C 1-1.8 Specifications Cl-1 (2) C1-1.9 Bonds C1-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans Cl-1 (3) C1-1.12 City C1-1 (3) C1-1.13 City Council C1-1 (3) C1-1.14 Mayor C1-1 (3) CI-1.15 City Manager C1-1 (3) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (3) C1-1.18 Director, City Water Department C1-1 (3) C1-1.19 Engineer C1-1 (3) C1-1.20 Contractor C1-1 (3) C1-1.21 Sureties C1-1 (4) C1-1.22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 (4) C1-1.24 Calendar Days Cl-1 (4) C 1-1.25 Legal Holidays Cl-1 (4) C 1-1.26 Abbreviations Cl-1 (4) C1-1.27 Change Order C1-1 (5) C 1-1.28 Paved Streets and Alleys Cl-1 (5) C 1-1.29 Unpaved Streets or Alleys Cl-1 (6) C1-1.30 City Street C1-1 (6) C1-1.31 Roadway C1-1 (6) C1-1.32 Gravel Street C1-1 (6) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site of Project C2-2 (2) C2-2.4 Submitting. of Proposal C2-2 (2) (1) Tw C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3) ,wr C2-2.7 Delivery of Proposal C2-2 (3) C2-2.8 Withdrawing Proposals C2-2 (3) C2-2.9 Telegraphic Modifications of Proposals C2-2 (3) �* C2-2.10 Public Opening of Proposal C2-2 (4) C2-2.11 Irregular Proposals C2-2 (4) C2-2.12 Disqualification of Bidders C2-2 (4) C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 Consideration of Proposals C3-3 (1) C3-3.2 Minority Business Enterprise/Women Business C3-3 (1) Enterprise Compliance C3-3.3 Equal Employment Provisions C3-3 (1) C3-3.4 Withdrawal of Proposals C3-3 (1) C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3.7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (3) C3-3.9 Failure to Execute Contract C3-3 (3) C-3-3.10 Beginning Work C3-3 (4) rr• C3-3.11 Insurance C3-3 (4) C3-3.12 Contractor's Obligations C3-3 (6) C3-3.13 Weekly Payrolls C3-3 (6) C3-3.14 Contractor's Contract Administration C3-3 (6) C3-3.15 Venue C3-3 (7) C44 SCOPE OF WORK C4-4.1 Intent of Contract Documents C44 (1) C4-4.2 Special Provisions C44 (1) C4-4.3 Increased or Decreased Quantities C44 (1) C4-4.4 Alteration of Contract Documents C44 (2) C4-4.5 Extra Work C44 (2) C4-4.6 Schedule of Operation C44 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C44 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5.3 Coordination of Contract Documents C5-5 (1) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (2) *k C5-5.6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) r. (2) RM _ C5-5.8 Authority and Duties of City Inspector C5-5 (3) C5-5.9 Inspection C5-5 (4) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (4) C5-5.11 Substitute Materials or Equipment C5-5 (4) C5-5.12 Samples and Tests of Materials C5-5 (5) C5-5.13 Storage of Materials C5-5 (5) C5-5.14 Existing Structures and Utilities C5-5 (5) C5-5.15 Interruption of Service C5-5 (6) C5-5.16 Mutual Responsibility of Contractors C5-5 (7) C5-5.17 Clean -Up C5-5 (7) C5-5.18 Final Inspection C5-5 (8) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6.2 Permits and Licenses C6-6 (1) C6-6.3 Patented Devices, Materials, and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (1) C6-6.5 Public Safety and Convenience C6-6 (2) C6-6.6 Privileges f Contractor in Streets, Alleys, C6-6 (3) and Right -of -Way C6-6.7 Railway Crossings C6-6 (3) C6-6.8 Barricades, Warnings and Flagmen C6-6 (3) C6-6.9 Use of Explosives, Drop Weight, Etc. C6-6 (4) C6-6.10 Work Within Easements C6-6 (5) C6.6.11 Independent Contractor C6-6 (6) C6-6.12 Contractor's Responsibility for Damage Claims C6-6 (6) C6-6.13 Contractor's Claim for Damages C6-6 (8) C6-6.14 Adjustment or Relocation of Public Utilities, Etc. C6-6 (8) C6-6.15 Temporary Sewer and Drain Connections C6-6 (8) C6-6.16 Arrangement and Charges for Water Furnished by the City C6-6 (9) C6-6.17 Use of a Section or Portion of the Work C6-6 (9) C6-6.18 Contractor's Responsibility for the Work C6-6 (9) C6-6.19 No Waiver of Legal Rights C6-6 (9) C6-6.20 Personal Liability of Public Officials C6-6 (10) C6-6.21 State Sales Tax C6-6 (10) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of The Work C7-7 (1) C7-7.4 Limitation of Operations C7-7 (2) C7-7.5 Character of Workmen and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3) C7-7.7 Time of Commencement and Completion C7-7 (3) C7-7.8 Extension of Time Completion C7-7 (3) (3) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (4) C7-7.11 Suspension by Court Order C7-7 (5) C7-7.12 Temporary Suspension C7-7 (5) C7-7.13 Termination of Contract due to National Emergency C7-7 (6) C7-7.14 Suspension or Abandonment of the Work C7-7 (6) and Annulment of the Contract: C7-7.15 Fulfillment of Contract C7-7 (8) C7-7.16 Termination for Convenience of the Owner C7-7 (8) C7-7.17 Safety Methods and Practices C7-7 (11) C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement Of Quantities C8-8 (1) C8-8.2 Unit Prices C8-8 (1) C8-8.3 Lump Sum C8-8 (1) C8-8.4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) ow C8-8.6 Withholding Payment C8-8 (3) C8-8.7 Final Acceptance C8-8 (3) C8-8.8 Final Payment C8-8 (3) FM C8-8.9 Adequacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4) C8-8.11 Subsidiary Work C8-8 (4) VW C8-8.12 Miscellaneous Placement of Material C8-8 (4) C8-8.13 Record Documents C8-8 (4) s� 4WO off bmt MW w. F-.m (4) PART C - GENERAL CONDITIONS Cl-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are used, the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are in all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of the contract. These are contained on the General Contract " Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and Include the following Items PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White ,,. PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El -White E2-Golden Rod E2A- White + PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) rq C1-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. am C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially 'r received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association, wo corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents, NOW constitutes a bidder. C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Whenever there may be a conflict between the General Conditions and the Special Conditions, the latter shall take precedence.. .a CI-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not fts specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of UM the project. C1-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract MW Documents which set forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed an useful project. Whenever reference is made to standard specifications, regulations, #' requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. 4 C1-1.9 BONDS: The bond or bonds are the written guarantee or security furnished by the Contractor for prompt and faithful performance of the contract and include the ,s following: a. Performance Bond (see paragraph C3-3.7) ,.. b. Payment Bond (see paragraph C3-3.7) C. Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and we C2-2.6) 1W C1-1 (2) 1W C1-1.10 CONTRACT: The Contract is a formal signed agreement between the owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location, dimension and position of the various elements of the project, including such profiles, typical cross -sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from the other parts of the Contract Documents, but they are part of the Contract Documents just as though they were bound therein. C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and „ chartered under the Texas State Statutes, acting by and through its governing body or its City Manager, each of which is required by charter to perform specific duties. Responsibility for final enforcement of the Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1.13 CITY COUNCIL: The duly elected and qualified governing body of the City of ... Fort Worth, Texas. C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem — of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of 1W the City of Fort Worth, Texas, or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort i' Worth, Texas, or his duly authorized representative. C1-1.17 DIRECTOR OF PUBLIC WORKS: The officially appointed official of the City of Fort Worth, Texas, referred to in the charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR, CITY WATER DEPARTMENT: The officially appointed Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized representative, assistant, or agents. C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. C1-1.20 CONTRACTOR: The person, person's, partnership, company, firm, association, or corporation, entering into a contract with the Owner for the execution of work, acting C1-1 (3) directly or through a duly authorized representative. A sub -contractor is a person, firm, �- corporation, supplying labor and materials or only labor, for the work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds as are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C 1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the fixrnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. C1-1.23 WORKING DAY: A working day is defined as a calendar day, not including Wr Saturdays, Sundays, and legal holidays, in which weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m., with exceptions We as permitted in paragraph C7-7.6 C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. C1-1.25: LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: 1. New Year's day January 1 2. M.L. King, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Forth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as 09 the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council, falls on a Saturday, the holiday shall be observed on the preceding Friday, or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations. Employees working calendar day operations will �. consider the calendar as the holiday. C1-1.26 ABBREVIATIONS: Whenever the abbreviations defined herein appear in the Contract Documents, the intent and meaning shall be as follows: C1-1 (4) Imm ..r AASHTO - American Association of State MGD - Million Gallons Highway Transportation Officials per Day ASCE - American Society of Civil CFS - Cubic Foot per Engineers Second IAW - In Accordance With Min. - Minimum ASTM - American Society of Testing Mono. - Monolithic Materials % - Percentum AWWA - American Water Works R - Radius Association I.D. - Inside Diameter ASA - American Standards Association O.D. - Outside Diameter HI - Hydraulic Institute Elev. - Elevation Asph. - Asphalt F - Fahrenheit Ave. - Avenue C - Centigrade ,: Blvd. - Boulevard In. - Inch CI - Cast Iron Ft. - Foot CL - Center Line St. - Street .. GI - Galvanized Iron CY - Cubic Yard Lin. - Linear or Lineal Yd. - Yard lb. - Pound SY - Square yard MH - Manhole L.F. - Linear Foot Max. - Maximum D.I. - Ductile Iron C 1-1.27 CHANGE ORDER: A "Change Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature " which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment, not including an oiled surface, with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. Wr C1-1 (5) W W( C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or *w other surface is any area except those defined for "Paved Streets and Alleys." C1-1.30 CITY STREET: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: The roadway is defined as the area between parallel lines two (2') back of the curb lines or four (`4) feet back of the average edge of pavement where no curb exists. C1-1.32 GRAVEL STREET: A gravel street is an unimproved street to which has been added one or more applications of gravel or similar material other than the natural WE material found on the street surface before any improvement was made. an MW 40 W RW 1W C1-1 (6) SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL i C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with Proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by _ an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and no more than one (1) year old. In the case that bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been completed not more than five (5) years prior to the date on which Bids are to be received. The Director of the Water Department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. IM C2-2(1) 4W .W C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the Owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though 'such addenda were actually written into the original Contract Documents. Bidders are required, prior to filing of proposal, to read and become familiar with the lop Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during construction of the project. They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders �. shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima -facie evidence that the bidder has made the investigation, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, on the plans are for general information only and may not be correct. Neither the Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. at C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the Wt form shall be correctly filled in and the Bidder shall state the prices, written in ink in both words and numerals, for which he proposes to do work contemplated or furnish the materials required. All such prices shall be written legibly. In case of discrepancy 4K between price written in words and the price written in numerals, the price most advantageous to the City shall govern. trr If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member of the firm, association, or partnership, or by person duly authorized. If a proposal is submitted by a company or corporation, the company or corporation name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power *� C2-2(2) sr we of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. kw ` C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate bids, erasures, or irregularities of any kind, or contain unbalanced value of any Im items. Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. MW C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and the amount indicated in the "Notice to Bidders" and the "Proposal." The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his j" representative in the official place of business as set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder ev must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marker with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City qW Manager, City Hall, Fort Worth, Texas. aw C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration must be made in writing, addressed to the City Manager, and filed with him prior to the time set for opening of proposals. After all proposals not requested for non -consideration are opened and publicly read aloud, the proposals for which non - consideration requests have been properly filed MM, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAHIC MODIFICATIONS OF PROPOSALS: Any Bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2(3) 1-J C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly - filed and for which no "Non -consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. r, C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as "Irregular" if they show any omissions, alterations of form, additions, or conditions not called for, MP unauthorized alternate bids, or irregularities of any kind. However, the Owner reserves the right to waive any all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which can not be waived. C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their „4 proposals not considered for any of, but not limited to, the following reasons: a) Reasons for believing that collusion exists among bidders. b) Reasonable grounds for believing that any bidder is interested in more than .�• one proposal for work contemplated. c) The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d) The bidder being in arrears on any existing contract or having defaulted on a previous contract. e) The bidder having performed a prior contract in an unsatisfactory manner. f) Lack of competency as revealed by financial statement, experience statement, equipment schedule, and such inquiries as the Owner may see fit to make. g) Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. 'r h) The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions 2. A current experience record showing especially the projects of a nature similar to the one under consideration, which have been successfully completed by the Bidder. .� 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of the bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. 1W %W C2-2(4) ime PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of the unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the ward of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re -advertise for new proposals, or to proceed with the work in any manner as may be considered for the best interest of the Owner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman -owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by the Owner, to allow and audit and/or an examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinances prohibiting discrimination in employment practices. The Contractor shall post the required notice to that effect on the project site, and at his �. request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner, it cannot be withdrawn by the Bidder within forty-five (45) days after the date on which the proposals were opened. am C3-3 (1) V. C 3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withhold final mo action on the proposals for a reasonable time, not to exceed forty-five (45) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. an The award of the contract, if award is made, will be to the lowest and best responsive bidder. be The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids, the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders, will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. .. C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good and sufficient performance bond in aw the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work or use of inferior materials. This performance bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND: A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. Wr C. PAYMENT BOND: A good and sufficient payment bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the ow prompt, full and faithful payment of all claimants as defined in Article C3-3 (2) WK ry 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344, Acts 56`h Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the Owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that ,— company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner, the Contract and such bonds as may be required in the Contract Documents. No Contract shall be binding upon the Owner until it has been attested by the City Secretary, approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to ,. execute the required bond or bonds or to sign the required contract within ten (10) days after the contract is awarded shall be considered by the owner as an abandonment of his proposal, and the owner may annual the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occurring to the owner by reason of said awardee's failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which the Owner will C3-3 (3) �� EPW suffer by reason of such failure on the part of the Awardee and shall thereupon VM immediately by forfeited to the Owner. The filing of a proposal will be considered as acceptance of this provision by the Bidder. C-3-3.10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner. Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed "Work Order" or "Proceed Order", it is agreed that the Surety Company ,- will, within ten (10) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3.11INSURANCE: The Contractor shall not commence work under this contract until he has obtained all insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub -contractor's certificate of insurance for approval. The prime Contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub -contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub -contractors. a. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Worker's Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub -contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Worker's Compensation Statute, the Contractor shall provide adequate employer's general liability insurance for the protection of such of his employees not so protected. �a b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor Shall procure and shall maintain during the life of this contract, Comprehensive General Liability Insurance (Public Liability and Property. Damage Insurance) in the amount not less than $500,000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as a separate policies or by additional endorsement to one of the above -mentioned policies, and in the amount as set forth for public +-r liability and property damage, the following insurance: 1. Contingent Liability (covers General Contractor's Liability for acts Wr of sub -contractors). MW C3-3 (4) OPW 2. Blasting, prior to any blasting being done. ow 3. Collapse of buildings or structures adjacent to excavation Cif excavation are performed adiacent to same). 4. Damage to underground utilities for $500,000. 5. Builder's risk (where above -ground structures are involved). 6. Contractual Liability (covers all indemnification requirements of Contract). d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain during the life of this Contract, Comprehensive Automobile Liability Insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on account of one accident, and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub -contractors, respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed �. by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. LJ f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the owner with satisfactory proof of coverage by insurance required in these Contract Documents in the amounts and by carriers satisfactory to the Owner. (Sample attached.) All insurance requirements made upon the q" Contractor shall apply to the sub -contractors, should the Prime Contractor's insurance not cover the sub -contractor's work operations, g. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's insurance and C3-3 (5) .. W performance, payment, maintenance and all such other bonds are written, shall be represented by an agent or agents having an office located within the city limits of the City of Fort Worth. Tarrant County, Texas. Each such agent shall be a duly qualified, one upon whom authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, and claims that the City of Fort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth - Dallas area. The name of the agent, or agents shall be set forth on all such bonds and certificates of insurance. C3-3.12 CONTRACTOR'S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials, labor and services when due. C3-3.13 WEEKLY PAYROLLS: A certified copy of each payroll covering payment • of wages to all persons engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven (7) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the *� Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract. Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person, persons, partnership, company, firm, association, corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth -Dallas metropolitan area. The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters made responsible to act for the Contractor in all matters AW pertaining to the work governed by the Contract whether it be administrative or other wise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditure, all claims against work or any other mater associated such as ,r maintaining adequate and appropriate insurance or security coverage for the project. Such local authority for the administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. WN Should the Contractor's principal base of operations be other than in the Fort Worth - Dallas metropolitan area, notification of the Contractor's assignment of local authority M' shall be made in writing to the Engineer in advance of any work on the project, all I* C3-3 (6) w.► V" appropriately signed and sealed, as applicable, by the Contractor's responsible offices with the understanding that this written assignment of authority to the local representative shall become part of the project Contract as though bound directly into the project 4' documents. The intent of these requirements is that all matters associated with the Contractor's administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to the satisfaction of the Engineer, the Engineer, at his sole discretion, may demand that such local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of working time will be allowed for periods in which work stoppages are in effect for this reason. C3-3.15 VENUE: Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. CM (7) PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C44 SCOPE OF WORK VW C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish, all in full compliance with the requirements and intent Ito of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, the "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving *� bids or proposals for any such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be part of the Contract Documents just as though they were originally written therein. C4-4.3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the «� improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than twenty-five (25) percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be fuurnished by the 25 percent or more, then either parry to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work." No allowance will be made for any changes in anticipated profits not shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories, shall be interpreted *� herein as applying to overall quantities of sanitary sewer pipe in each pipe size, but not to the various depth categories. s.- to C4-4 (1) 4W C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change order, the owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided however, that before any extra work is begun a "Change order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: -} a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates, (3) materials entering permanently into the project, and (4) actual cost of insurance, bonds, and social security as determined by the Owner, plus a fixed fee to be agreed upon but not to exceed 10 percent of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owner by him and used for extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in (1), (2), (3), and (4) above. The Contractor shall keep accurate cost records on the form and in the method suggested by the Owner and shall give the Owner access to all accounts, bills, vouchers, and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting Parties. ..r No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner. In case any orders or instructions, either oral or written, appear to the Contractor .�► to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work, prior to beginning such work. C4-4 (2) %W MW Should a difference arise as to what does or dose not constitute Extra Work, or as to the }- payment thereof, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof as provided under method (Item Q. Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five (5) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from �• the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. W, The compensation agreed upon for "Extra Work" whether or not initiated by a "Change Order" shall be a full, complete and final payment for all costs Contractor incurs as a VA result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged 0 work as a result of the change or extra work. C4-4.6 SCHEDULE OF OPERATION: Before commencing any work under this im contract, the Contractor shall submit to the Owner and receive the Owner's approval thereof, a "Schedule of Operations," showing by a straight line method the date of commencing and finishing each of the major elements of the Contract. There shall be also MW shown the estimated monthly cost of work for which estimates are to be expected. There shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and percentage of completion' plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10) days prior to submission of the first monthly progress payment, the Contractor shall prepare and submit to the owner for approval six copies of the schedule in which the Contractor proposes to carry on activities (including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. _ The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Engineer. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. bw C4-4 (3) us Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to the time constraints, sequencing requirements and completion time. b. The construction progress shall be divided into activities with time durations of approximately fourteen days (14) days and construction values not to exceed $50,000. Fabrication, delivery and submittal activities are exceptions to this guideline. C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. "" f. Thirty days shall be used for submittal review unless otherwise specified. The construction schedule shall as a minimum, be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts, the construction schedule shall indicate the following procurements, construction and preacceptance activities and events in their logical sequence for equipment and materials. .M 1. Preparation and transmittal of submittals log 2. Submittal review periods. MW C4-4 (4) .. ++r 3. Shop fabrication and delivery. �• 4. Erection or installation. 5. Transmittal of manufacturer's operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner's operator instruction (if applicable). 8. Final inspection. 9. Operational testing. WF If, in the opinion of the Owner, work accomplished falls behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time. If the owner finds the proposed plan not acceptable, he may require the Contractor to increase the work force, the construction plant and equipment, the number of work shifts or overtime operations without additional ..Y cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with diligence as will insure its completion within the time specified. lim ift W %W C4-4 (5) v W Xerox WorkCentre 5225 Banner Sheet Unknown @Poft 9 Date & Time: 07/02/2009 09:20 AM User Name: Unknown gPort 9 File Name: Start Page .w w 4M .i MW PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS ow C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. The Engineer shall decide all questions which arise as to the quality and acceptability of the materials furnished, work performed, rate of progress of the work, overall sequence of the construction, interpretation of the Contract Documents, acceptable fulfillment of the Contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequence or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the contract documents. The Engineer shall determine the amount and quality of the work completed and -• materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the owner and Contractor, a written decision on the matter in controversy. C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines, grades, cross -sections, finish, and dimensions shown on the plans or any other requirements other wise described in the Contract Documents. Any deviation from the approved Contract Documents required by the Engineer during construction will 4p� in all cases be determined by the Engineer and authorized by the Owner by Change Order. C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections, which, taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern over general conditions and standard specification, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the to C5-5 (1) VW ,F �* Contract Documents, and the owner shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In the event of a conflict in drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of Contract Documents and shall have available on the site of the project at all times, one set of such Contract Documents. .r The Contractor shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer, his inspector, and other r,. Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such superintendent and -� his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor's agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas, and shall be subject to call, as is the project superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of the property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative, shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition. Such a response shall occur day or night, whether the project is scheduled on a calendar -day or a working -day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the -� project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the or C5-5 (2) %W discrepant condition and request the Contractor to take remedial action to correct the r- condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not shoe just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct' an amount equal to the entire costs for such remedial action, plus 25%, from any funds due the Contractor on the project. C5-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer, if specifically called for. The field office shall be not less than 10 x 14 feet in floor area, substantially constructed, well heated, air conditioned, lighted, and weather proof, so that documents will not be damaged by the elements. C5-5.7 CONTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines, grades, and measurements necessary to the proper prosecution and control of the work contracted under these Contract Documents, and lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings as may be established for Contractor's use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost of replacing such stakes or marks plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. C5-5.8 AUTHORITY AND DUTIES OF CITY INSPECTOR: City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents, and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will have the authority to reject materials or equipment, and/or to suspend work until the question at issue can be referred to and decided by the Engineer. The City Inspector will not, however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion or JW section of the work, nor to issue any instructions contrary tot he requirement s of the %a C5-5 (3) yr Contract Documents. The City Inspector will in no case act as superintendent or foreman or perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties. The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents of the Contract Documents, provided, however, should the Contractor object to any orders or instructions or the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in Controversy. C5-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents. If the Engineer so requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such .. portion of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract Documents. .� Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should Work so exposed or examined prove to be unacceptable, the uncovering or removing and replacing of all adjacent defective or damaged parts shall be at the Contractor's expense. No work shall be done or materials used without suitable supervision or inspection. C5-5.10 REMOVAL OF EDEFCTIVE AND UNAUTHORIZED WORK: All work, materials, or equipment which has been rejected shall be remedied or removed and am replaced in an acceptable manner by the Contractor at this expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specially provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due tot he Contractor. Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such work. C5-5.11 SUBSTITUTE MATERIALS OR EOUIPMENT: If the Specifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is .r equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the preconstruction conference, make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the function called for by the general design, be similar and of equal substance to that specified and be suited to the same use and C5-5 (4) MW +W capable of performing the same function as that specified ; and identifying all variations of the proposed substitute from that specified and indicating available maintenance service. No substitute shall be ordered or installed without written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor's expense. Contractor shall indemnify and hold harmless Owner and Engineer and anyone directly or indirectly employees by either of them from and against the claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. C5-5.12 SAMPLES AND TESTS OF MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless other wise specifically provided. The failure of the Owner to ... make any tests of materials shall in no way relieve. the contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise specified, will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not, �^ without specific written permission of the Engineer, use materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. In case of concrete, the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contractor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete, using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of new materials. C5-5.13 STORAGE OF MATERIALS: All materials which are to be used in the construction contract shall be stored so as to insure the preservation of quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5.14 EXISTING STRUCTURES AND UTILITIES:, The location and dimensions 1 w shown on the plans relative to the existing utilities are based on the best information available. Omission from, the inclusion of utility locations on the Plans is not to be considered as nonexistence of, or a definite location of, existing underground utilities. " The location of many gas mains, water mains, conduits, sewer lines and service lines for C5-5 (5) VAN all utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered ` sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision of which is not made in these Contract Documents, in which case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractor's responsibility to verify locations of the adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all existing utilities, structures, and service lines. Verification of existing utilities, structures, and service lines shall include notification of all utility companies at least forty-eight (48) hours in advance of construction including exploratory excavation if necessary. All Iverification of utilities and their adjustment shall be considered subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosecution of work where the interruption of service is necessary, the Contractor, at least 24 hours in advance, shall be required to: 1. Notify the Water Department's Distribution Division as to location, time, and schedule of service interruption. AL 2. Notify each customer personally through responsible personnel as to the time and schedule of the interruption of their service, or 3. In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer's door knob. The tag shall be durable in composition, and in large bold letters shall say: 40 C5-5 (6) AMOUNT OF CONTRACT AMOUNT OF LIQUIDATED DAMAGES PER DAY Less than $ 5,000 inclusive $ 35.00 $ 5,001 to $ 15,000 inclusive $ 45.00 $ 15,001 to $ 25,000 inclusive $ 63.00 $ 25,001 to $ 50,000 inclusive $ 105.00 $ 50,001 to $ 100,000 inclusive $ 154.00 $ 100,001 to $ 500,000 inclusive $ 210.00 $ 500,001 to $ 1,000,000 inclusive $ 315.00 $ 1,000,001 to $ 2,000,000 inclusive $ 420.00 $ 2,000,000 and over $ 630.00 The parties hereto understand and agree that any harm to the City caused by the Contractor's delay in completing the work hereunder in the time specified by the Contract Documents would be incapable or very difficult to calculate due to lack of accurate information, and that the "Amount of Liquidated Damages Per Day", as set out above, is a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7.11 SUSPENSION BY COURT ORDER: The Contractor shall suspend operations on such part or parts of the work ordered by any court, and will not be entitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the vent the work is suspended by a Court Order. Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unsuitable conditions which in the opinion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of the work covered by this contract, for any reason, the Owner will make no extra payment for stand-by time of construction equipment and/or construction crews. If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in Paragraph C7-7.8 EXTENSION OF THETIME OF COMPLETION, and should it be C7-7(5) %V determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. No reimbursement shall be allowed if the equipment is moved to another construction project for the City of Fort Worth. The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. me C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency, so declared by the president of the United States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months, the Contractor shall within seven days notify the City in writing, giving a detailed statement of the efforts which have been made -- and listing all necessary items of labor, materials, and equipment not obtainable. If, after investigations, the owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contractor, than if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials, and equipment within thirty days, the Contractor my request the owner to terminate the contract and the owner may comply with the request, and the termination shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include. But not be limited to the payment for all work executed but not anticipated profits on work which has not been performed. im C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF THE CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared canceled by the City Council for any good and sufficient cause. The following, by way of example, but not of limitation, may be considered grounds for suspension or cancellation: a. Failure of the Contractor to commence work operations within the time specified in the Work Order issued by the Owner. b. Substantial evidence that progress of the work operations by the Contractor is insufficient to complete the work within the specified time. C7-7(6) C. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. """ e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. 14 f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. g. Failure of the Contractor promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction of work under at contract. i. A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or for any other purpose. j. If the Contractor shall for any cause whatsoever not carry on the working operation in an acceptable manner. k. If the Contractor commences legal action against the Owner. A Copy of the suspension order or action of the City Council shall be served on the Contractor's Sureties. When work is suspended for any cause or causes, or when the contract is canceled, the Contractor shall discontinue the work or such part thereof as the owner shall designate, whereupon the Sureties may, at their option, assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and may perform the same or may, with written consent of the owner, sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authorized agents. The _ Sureties, in such event shall assume the Contractor's place in all respects, and shall be paid by the Owner for all work performed by them in accordance with the terms of the Contract Documents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses, subject to all of the terms of the Contract Documents. 1W C7-7(7) In case the Sureties do not, within the hereinabove specified time, exercise their right and option to assume the contract responsibilities, or that portion thereof which the Owner has ordered the Contractor to discontinue, then the Owner shall have the power to complete, by contract or otherwise, as it may determine, the work herein described or such work thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and use any materials, plants, tools, equipment, supplies, and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, and all expenses incidental thereto. The expense so charged shall be deducted by the owner from such monies as may be due or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any part thereof. The Owner shall not be required to obtain the lowest bid for the work completing the contract, but the expense to be deducted shall be the actual cost of the owner of such work In case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed by the Contract, then the Contractor and his Sureties shall pay the amount of such excess to the City on notice from the Owner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with the performance of the work by the Owner. C7-7.15 FULFILLMENT OF CONTRACT: The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have been finished and completed, the final inspection made by the Engineer, and the final acceptance and final payment made by the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. A. NOTICE OF TERMINATION: Any Termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice .w shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any C7-7(8) w claim, demand or suit shall be required of the Owner regarding such 4L discretionary action B. CONTRACTOR ACTION: After receipt of a notice of termination, 4W and except as otherwise directed by the Engineer, the Contractor shall: 1. Stop work under the contract on the date and to the extent Or specified in the notice of termination; 2. place no further orders or subcontracts for materials, MF services or facilities except as may be necessary for completion of such portion of the work under the contract jw as is not terminated; 3. terminate all orders and subcontracts to the extent that they ftL relate to the performance of the work terminated by notice of termination; 4. transfer title to the Owner and deliver in the manner, at the times, and to the extent, if any, directed by the Engineer: a. the fabricated or unfabricated parts, work in progress, completed work, supplies and other material produced as a part of, or acquired in �* connection with the performance of, the work terminated by the notice of the termination; and b. The completed, or partially completed plans, drawings, information and other property which, if the contract had been completed, would have been required to be furnished to the Owner. 5. complete performance of such work as shall not have been AM terminated by the notice of termination; and UML 6. Take such action as may be necessary, or as the Engineer may direct, for the protection and preservation of the property related to its contract which is in the possession of too the Contractor and in which the owner has or may acquire the rest. �� At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the Engineer a list, certified as to quantity and quality, of any or all items of termination ow inventory not previously disposed of, exclusive of items the disposition of C7-7(9) �- which has been directed or authorized by Engineer, Not later than 15 days thereafter, the owner shall accept title to such items provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. C. TERMINATION CLAIM: Within 60 days after the notice of termination, the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the Engineer. Unless one or more extensions in writing are granted by the Owner upon _ request of the Contractor, made in writing within such 60-day period or authorized extension thereof, any and all such claims shall be conclusively deemed waived. D. AMOUNTS: Subject to the provisions of Item C7-7.1(C), the Contractor and the Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of the work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract price reduced by the amount of payments otherwise made and as further reduced by the contract price work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No .. amount shall be due for lost or anticipated profits> Nothing in C7-7.16(E) hereafter, prescribing the amount to be paid to the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. Im E. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to agree as provided in C7-7.16(D) upon the whole amount to be paid to the Contractor by reason of the termination of the work Ism pursuant to this section, the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by T reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. F. DEDUCTIONS: In arriving at the amount due the Contractor under this section there shall be deducted; aw 1. all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; C7-7(10) u 2. any claim which the Owner may have against the Contractor in connection with this contract; and 3. the agreed price for, or the proceeds of the sale of, any materials, supplies or other things kept by the Contractor or sold, pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. " G. ADJUSTMENT: If the termination hereunder be partial, prior to the settlement of the terminated portion of this contract, the Contractor may file with the Engineer a request in writing for an equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by notice of termination), such equitable adjustment as may be agreed upon shall be made in such price or prices; noting contained herein, however, shall limit the right of the owner and the Contractor to agree upon the amount or amounts to be paid tot he Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Noting contained in this section shall limit or alter the rights which the Owner may have for termination of this contract under C7-7.14 hereof entitled "SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF } CONTRACT" or any other right which the Owner may have for default or breach of contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. Id rr a6 C7-7(11) iW PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT C8-8.1 MEASUREMENT OF QUANTITIES: The determination of quantities of work performed by the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer, based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will _ be the actual length, area, solid contents, numbers, and weights of the materials and item installed. C8-8.2 UNIT PRICES: When in the Proposal a "Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finishing costs, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other clauses, delays, profits, injuries, damages claims, taxcs, and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation. C8-8.3 LUMP SUM: When in the Proposal a "Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to furnish all labor, tools, "' materials, machinery, equipment, appurtenances, and all subsidiary work necessary for the construction and completion of all the work to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. low C8-8.4 SCOPE OF PAYMENT: The Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, C8-8(l) M, and for completing the work in an acceptable manner according to the terms of the W Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the one year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the 1 " and the 5f day of each month, the Contractor shall submit to the Engineer a statement showing an estimate of the value of the work done during the previous month, or estimate period under the Contract Documents. Not later than the I e day of the month, the Engineer shall verify such estimate, and if it is found to be acceptable and the value of the work performed since the last partial payment was made exceeds one hundred dollars ($100.00) inn amount, 90% of such estimated sum will be paid to the Contractor if the total contract amount is less than $400,000.00, or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400,000.00 or greater, within twenty-five (25) .. days after the regular estimate period. The City will have the option of preparing estimates on forms furnished by the City. The partial estimates may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work as a permanent part thereof, but which at the time of the estimate have not been installed (such payment will be allowed on a basis of 85% of the net invoice value thereof). The Contractor shall furnish the Engineer such information as he may request to aid him as a guide in the verification or the preparation of partial estimates. It is understood that partial estimates from month to month will be approximate only, all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate, and such estimate om shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quantity of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. Wo The City reserves the right to withhold the payment of any monthly estimate if the Contractor fails to perform the work strictly in accordance with the specifications or .. provisions of this Contract. C8-8(2) dEp ,.. C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. C8-8.7 FINAL ACCEPTANCE: Whenever the improvements provided for by the Contract Documents shall have been completed and all requirements of the Contract .. Documents shall have been fulfilled on the part of the Contractor, the Contractor shall notify the Engineer in writing that the improvements are ready for final inspection. The Engineer shall notify the appropriate officials of the Owner, will within a reasonable time make such final inspection, and if the work is satisfactory, in an acceptable condition, and has been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer will initiate the processing of the final .. estimate and recommend final acceptance of the project and final payment thereof as outlines in paragraph C8-8.8 below. C8-8.8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. i The amount of the final estimate, less previous payments and any sums that have been deducted or retained under the provisions of the Contract Documents, will be paid to the Contractor within 60 days after the final acceptance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the owner satisfactory evidence of compliance as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit as furnished by the City, certifying that; A. all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, B. that the wage scale established by the City Council in the City of Fort Worth has been paid, and C. that there are no claims pending for personal injury and/or property damages. i The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or — neglect of said City relating to or connected with the Contract. C8-8(3) be The making of the final payment by the Owner shall not relieve the Contractor of any so guarantees or other requirements of the Contract Documents which specifically continue thereafter. C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent engineers and designers to prepare the Contract Documents and all modifications of the approved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its own design features, sufficiency of the Contract Documents, the safety of the structure, and the practicability of the operations of _ the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereof approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has complied with the Contract Documents, approved modifications thereof, and all alterations thereof. No C8-8.10 GENERAL GUARANTY: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of the work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to the other work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. C8-8.11 SUBSIDIARY WORK: Any and all work specifically governed by documentary requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each _ bid item. Surface restoration, rock excavation and cleanup are general items of work which fall in the category of subsidiary work. C8-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by .. the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one - tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the Project. C8-8.13 RECORD DOCUMENTS: The Contractor shall keep on record a copy hmp of all specifications, plans, addenda, modifications, shop drawings and samples at the C8-8(4) "M .. site, in good order and annotated to show all changes made during the construction process. These shall be delivered to the Engineer upon completion of the work. MW MP ,. WO MW MW M W C8-8(5) Mr SUPPLEMENTARY CONDITIONS FORT WORTH, WATER DEPARTMENT WATER AND WASTEWATER TREATMENT PLANT PROJECTS October 1, 2008 1. CONTRACT DOCUMENTS: In Section C1-1.2 CONTRACT DOCUMENTS, delete Paragraph C1-1.2b SPECIAL CONTRACT DOCUMENTS and add the following: "b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) SPECIAL INSTRUCTION TO BIDDERS PART B - PROPOSAL (Bid) M/WBE BID SPECIFICATIONS PART C - GENERAL CONDITIONS PART CS- SUPPLEMENTARY CONDITIONS PART D - SPECIAL CONDITIONS PART E - TECHNICAL SPECIFICATIONS PERMITS/EASEMENTS (Some Permits are Multicolored) PART F - BONDS AND INSURANCE PART G - CONTRACT PART H - PLANS/FIGURES (may be bound separately) White White White Golden Rod Canary Yellow Green Green White White White White White" 2. DIRECTOR OF TRANSPORATION AND PUBLIC WORKS: Delete entire Paragraph C1-1.17, and replace with the following: C1-1.17 DIRECTOR OF TRANSPORATION AND PUBLIC WORKS: The officially appointed Director of the Transportation and Public Works Department of the City of Fort Worth, or his duly authorized representative, assistant, or agents. 3. ENGINEER: Delete entire Paragraph C1-1.19, and replace with the following: The Director of Fort Worth Transportation and Public Works Department, the Director of the Fort Worth Water Department, or their duly authorized assistants, - agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. 4. PROPOSAL FORM: In Section C2-2.1, Paragraph 1, revise lav4 sentence to read as follows: "The Bidder shall furnish a Financial Statement, Equipment Schedule, and Experience Record, all of which must be properly executed and filed with the Director of the Water Department one week prior to the hour for opening of bids. Information shall be on forms provided by the Bidder and acceptable to the City. CS-1 5. EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: In Section C2-2.3, Paragraph 2, add the following to the last sentence: "except for changes in the site conditions caused by factors outside of the control of the Contractor which occur after the Contractor's inspection and prior to installation." 6. INTERPRETATION AND PREPARATION OF PROPOSAL: Part C - General Conditions, Section C2-2, exchange Paragraphs C2-2.7, C2-2.8, and C2-2.9 with the following: C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security and other required material, to the Purchasing Manager or his representative at the official location and stated time set forth in the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL" and the name or description of the project designated in the "Notice To Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102." C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for the opening of proposals. A request for non consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non -consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. 7. MINORITY BUSINESS ENTERPRISE/WOMEN BUSINESS ENTERPRISE COMPLIANCE: Delete entire Paragraph C3-3.2, and replace with the following: C3-3.2 MINORITY AND WOMEN BUSINESS ENTERPRISES: In a accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the CS-2 GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non -responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a minority business enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less that three (3) years. 8. C3-3.5 AWARD OF CONTRACT is modified to read as follows: "The Owner reserves the right to withhold final action on the proposals for a reasonable time, not to exceed the period stated for the duration of the Bid Security stated in the Notice to Bidders or 90 days, whichever is shorter." ' 9. C3-3.7 BONDS. For the Paragraph after Paragraph C3-3.7d OTHER BONDS, which begins with "No sureties", change the entire paragraph to read as follows: "In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. Each bond shall be properly executed by both the Contractor and the Bonding Company." CS-3 10. INSURANCE. Delete entire Paragraph C3-3.11 INSURANCE, and replace with the following:: C3-3.11INSURANCE: The Contractor shall not commence work under this contract until he has obtained all insurance required under the Contract Documents, and such insurance has been approved by the Owner and certificates of Insurance shall be delivered to the Owner (City of Fort Worth, Contract Administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, Texas 76102) prior to commencement of work on the contract project. The prime Contractor shall be responsible for delivering to the Owner the sub- contractor's certificate of insurance for approval. The prime Contractor shall indicate on the certificate of insurance included in the documents for execution whether or not _ his insurance covers sub -contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub -contractors. The General Contractor may require all subcontractors to be insured and submit documentation ensuring that the requirements of C3-3.11 are met for all subcontractors. Failure of the Owner to request required documentation, shall not constitute a waiver of the insurance requirements specified herein. The Contractor's liability shall not be limited to the specified amounts of insurance required herein. a. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Worker's Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub -contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Worker's Compensation Statute, the Contractor shall provide adequate employer's general liability insurance for the protection of such of his employees not so protected. Worker's compensation insurance covering employees in the project site shall be indorsed with a waiver of subrogation providing rights of recovery in favor of the OWNER. b. COMMERICAL GENERAL LIABILITY INSURANCE: The Contractor Shall procure and shall maintain during the life of this contract, General Liability Insurance (Public Liability and Property Damage Insurance) in the amount not less than $500,000 covering each occurrence/aggregate on account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence/aggregate on account of property damage with $2,000,000 umbrella policy coverage. Certificates of insurance shall state that Insurance is on an "occurrence" basis. Certificate shall also contain a statement that no exclusions by endorsement have been made to the Commercial General Liability Policy. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as a separate policies or by additional endorsement to one of the above -mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: CS-4 1. Contingent Liability (covers General Contractor's Liability for acts of sub -contractors). 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation Lif excavation are performed adjacent to same). 4. Damage to underground utilities for $500,000. 5. Builder's risk (where above -ground structures are involved). 6. Contractual Liability (covers all indemnification requirements of Contract). The City, its offices, employees and servants shall be endorsed as additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's worker's compensation insurance policy. Contractor's insurance policies shall be indorsed to provide that such insurance is primary protection and any self -funded or commercial coverage maintained by the OWNER shall not be called upon to contribute to loss recovery. 7. When required by the Contract Documents, Environmental Impairment Liability Coverage must be provided in the limits of $1,000,000 per occurrence and $2,000,000 annual aggregate. The Environmental Impairment Liability (EIL) must contain coverage for sudden and accidental contamination or pollution, liability for gradual emissions, and clean-up costs. The EIL coverage shall include two year completed operations coverage on a per Project 4 basis. A separate insurance policy may be needed to fulfill this requirement. EIL for damages incurred in the course of transporting sludge shall be covered under the contractor's insurance policy(s). d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain during the life of this Contract, Comprehensive Automobile Liability Insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 aggregate on account of one accident, and automobile property damage insurance in an amount not less than $100,000 aggregate. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub -contractors, respectively, against damage CS-5 claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the owner with satisfactory proof of coverage by insurance required in these Contract Documents in the amounts and by carriers satisfactory to the Owner. (Sample attached.) Other than Worker's Compensation Insurance, in lieu of specified insurance, the City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. All insurance requirements made upon the Contractor shall apply to the sub -contractors, should the Prime Contractor's insurance not cover the sub -contractor's work operations. g. DEDUCTIBLE LIMITS. The deductible limits or self -funded retention limits, on each policy must not exceed $10,000 per occurrence unless otherwise approved by the City. h. INSURANCE COMPANY: The insurance company with whom the Contractor's insurance is written shall be authorized to do business in the State of Texas and shall have a current A.M. Best Rating of "A:VII" or equivalent measure of financial strength and solvency. i. NOTIFICATION. During the lifetime of this contract, the Contractor shall notify the ENGINEER in writing, of any known loss occurrence that could give rise to a liability claim or lawsuit or which could result in a property loss. j. CANCELLATION. Insurance shall be endorsed to provide the City with a minimum of thirty days notice of cancellation, non -renewal and/or material change in insurance policy terms or coverage. A minimuml0 day notice shall be acceptable in the event of non-payment of insurance premium to insurance company. CITY RESPONSIBILITIES. The City shall not be responsible for direct payment of insurance premium costs for Contractor's Insurance. 11 C3-3.13 WAGE RATES: Delete Paragraph C3-3-13 WEEKLY PAYROLLS in its entirety and replace with C3-3-13 WAGE RATES as shown below: "The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. CS-6 The Contractor, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) that name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; (ii) the actual per diem wages paid to each worker. These records shall be open, all reasonable hours, for inspection by the City. The provisions of Section C8-8- 14, RIGHT TO AUDIT, pertain to this inspection. The Contractor shall include in its subcontract's and/or shall otherwise require all of its subcontractors to comply with paragraphs above. With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The Contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times." 12. INCREASED OR DECREASED QUANTITIES: Revise Paragraph C4-4.3 to read as follows: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices established in the contract documents. No allowance will be made for any changes in lost or anticipated profits not shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted herein as applying to overall quantities of sanitary sewer pipe in each pipe size, but not to the various depth categories. A 13. LIMITATION OF INCIDENTAL CHARGES (Reference C4-4.5c): The Contractor agrees that should any change in the work of extra work be ordered, the following applicable percentage shall be added to Material and Labor Costs to cover overhead and profit: 1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed 15%. 2. Allowance to the Contractor for overhead and profit for extra work performed by a subcontractor and supervised by the Contractor shall not exceed 10%. Contractor shall be reimbursed for direct field overhead when the change requires an extension of the Contract period. Contractor shall not be reimbursed for indirect overhead or indirect costs related to changes to this contract. CS-7 14. TESTING COSTS: Paragraph 5-5.12, revise the first sentence to read as follows: "Where, as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid for by the Contractor unless otherwise specifically provided for in the Technical Specifications." 15. LAWS TO BE OBSERVED: Paragraph C6-6.1, delete "or which may be enacted later". After the word "exist," add "at the time of the Contract or may be hereafter exist during the performance of the Contract." 16. BUILDING PERMITS: Paragraph C6-6.2 Insert the following at the end of the paragraph; "Contractors are responsible for obtaining all construction permits from the governing agencies. Contractor shall schedule all code inspections with the Code Inspection Department in accordance with the permit requirements and submit copy of updated schedule to the Engineer weekly. Building, plumbing, electrical and mechanical building permits are issued without charge. Water and sewer access fees will be paid by the Water Department. Any other permit fees are the responsibility of the Contractor." 17. BARRICADES, WARNINGS AND FLAGMEN: In Paragraph C6-6.8, replace the word "watchmen" wherever in appears with the word "flagmen". In the first paragraph, lines five (5) and six (6), replace "take all such other precautionary measures" with "take all reasonable necessary measures". 18. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Delete entire Paragraph C6-6.12, and replace with the following: "C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to indemnify the City' Engineer and Architect, and their personnel at the project site for the Contractor's sole negligence. In addition, the Contractor covenants and agrees to indemnify, hold harmless and defend at its own expense, the Owner, its officers, agents, servants, and employees, from and against all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise of, the work and services to be performed hereunder by the Contractor, its officers, agents, employees subcontractors, licensees or invitees, whether or not anv such iniurv, damage or death is caused, in whole or in part, by the negligence or alleged negligence of the Owner, its officers, agents, servants, or emplovees. Contractor likewise covenants and agrees to indemnify and hold harmless Owner from and against any and all injuries to the Owner's officers, agents, servants, and employees, loss or destruction of property of the Owner arising form the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damage is caused, in whole or in part, by the negligence or alleged negligence of the Owner, its officers, agents, servants, or emplovees CS-8 In the event the Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until the Contractor either (a) submits to the Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides the Owner with a letter from the Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract." 19. STATE SALES TAX: A. Delete Paragraph C6-6.21 STATE SALES TAX in its entirety. B. This contract is issued by an organization, which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise, and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction are subject to State Sales Tax under House Bill 11, enacted August 15, 1991. All such taxes shall be included in the various amounts on the Proposal Form. The successful Bidder shall be required to submit a breakdown between costs of labor, consumable material and other construction costs and costs of material incorporated into the project construction prior to execution of this contract. B. At the time of execution of the Contract Documents by the Contractor, the Contractor shall complete the "Statement of Materials and Other Charges" which identifies the project costs anticipated in the Project into "Materials Incorporated into the Project" and "All Other Charges". The Contract shall be a "Separated Contract". C. The City of Fort Worth will issue appropriate Certificates of Resale to the Contractor. D. All Change Orders to the Contract will separate charges for materials and labor and will contain the following statement: "For purposes of complying with Texas Tax Code, the Contractor agrees that the charges for material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor." 20 AIR POLLUTION WATCH DAYS: Add the following to Section C7-7: r. C7-7.18 AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME CS-9 .. PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION.. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. 21. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4 SCOPE OF PAYMENT in its entirety and replace with the following: "The Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two (2) year guaranty period after the final acceptance. The Owner shall be the sole CS-10 judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein." 22. PARTIAL PAYMENTS: Change Paragraph C8-8.5 to read as follows: "Partial pay estimates shall be submitted by the Contractor 5th day and the 20th day of the month that work has been is in progress. The estimate shall be processed by the City on the 1 Oth day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net invoice value thereof. The Contractor will furnish the engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000.00 at the execution, retainage shall be ten percent (10%). For contracts of $400,000.00 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with subcontract agreement, within five (5) business days after receipt by the Contractor of the payment by the City. Contractor's failure to make the required payment to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial `m pay estimates and payment of the same will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate. Payment of any partial pay estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this Contract." 23. GENERAL GUARANTY. Delete Paragraph C8-8.10 GENERAL GUARANTY in its entirety and replace with the following: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of the work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or CS-11 damages in the work and pay for any damage to the other work resulting therefrom which shall appear within a period of two (2) years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. Any reference to any shorter period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specification, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of acceptance of the project. 24. RIGHT TO AUDIT: Add the following to Section C8-8: C8-8.14 RIGHT TO AUDIT: "(a) The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give Contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this article together with subsection (c) hereof. The City shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse contractor for the cost of the copies as follows: 1. 50 Copies and Under - 10 cents per page. 2. More than 50 copies - 85 cents for the first page plus fifteen cents for each page thereafter." (5/25/93) CS-12 25. SCHEDULE OF COSTS: Add the following to Section C8-8: C8-8.15 SCHEDULE OF COSTS: Following the completion of all work on the Project and prior to submittal of a request for final payment, the Contractor shall provide a Schedule of Costs to City for approval which lists all equipment systems, structures, building electrical and HVAC systems, overhead and project related costs. The items will be grouped into categories using the Owner's list of category codes which will be provided by the Owner at the Preconstruction Conference. The Schedule of Costs will be used by the City as input to the Capital Assets System, and will not be considered in preparation of modifications to the Contract. Costs associated with the preparation and processing of this schedule of costs shall be subsidiary to the price bid. The Contractor will also provide a projected payment schedule tied to the project schedule and the schedule of values which projects the monthly payments through the end of the Project. The Payment schedule must be submitted along with the first request for payment. This information is necessary to arrange financing of the Project by the City. END OF SECTION CS-13 *■ D-1 GENERAL: Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications. effective July 1, 1978, are made part of the Contract Documents for this Project. The Plans, Special conditions and Provisions Documents, and the rules, regulations, requirements, instructions, drawings and details referred to by manufacturer's name, number or identification included therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the Contractor. The Specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Special Contract Documents 3. General Contract Documents and General Specifications The following Special Conditions shall be applicable to this project and shall govern any conflicts with the General Contract documents under the provisions stated above. D-2 PROJECT DESIGNATION: Construction under these Special Documents shall be performed under the Fort Worth Water Department Project Designations: Water Project Number , VW Sewer Project Number , and/or Other D-4 PROJECT SIGNS: Project Signs are required at all locations which will be under construction for more than thirty (30) calendar days as indicated in Part B Proposal. Project Signs shall be in �w accordance with Figure 30 (dated 8-28-89) of the General Contract Documents. The signs may be mounted on skids or on posts. The exact locations and methods of mounting shall be approved by the engineer. Any and all costs for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D-5 CITY FURNISHED MATERIALS: For water projects, the City will furnish "pipe cleaning pigs," chlorine gas or chlorinated lime (HTH) and all water for initial cleaning and sterilization of water lines. All other materials for construction of the project, including water for compaction, shall be furnished by the Contractor. MW SUPPLEMENTARY CONDITIONS FORT WORTH, WATER DEPARTMENT WATER AND WASTEWATER TREATMENT PLANT PROJECTS October 1, 2008 VW 1. CONTRACT DOCUMENTS: In Section C 1-1.2 CONTRACT DOCUMENTS, delete Paragraph C1-1.2b SPECIAL CONTRACT DOCUMENTS and add the following: "b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents _ and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) White SPECIAL INSTRUCTION TO BIDDERS White PART B - PROPOSAL (Bid) White ' M/WBE BID SPECIFICATIONS Golden Rod PART C - GENERAL CONDITIONS Canary Yellow PART CS- SUPPLEMENTARY CONDITIONS Green PART D - SPECIAL CONDITIONS Green j PART E - TECHNICAL SPECIFICATIONS White PERMITS/EASEMENTS (Some Permits are Multicolored) White PART F - BONDS AND INSURANCE White PART G - CONTRACT White PART H - PLANS/FIGURES (may be bound separately) White" 2. DIRECTOR OF TRANSPORATION AND PUBLIC WORKS: Delete entire Paragraph C1-1.17, and replace with the following: F C1-1.17 DIRECTOR OF TRANSPORATION AND PUBLIC WORKS: The officially appointed Director of the Transportation and Public Works Department of VW the City of Fort Worth, or his duly authorized representative, assistant, or agents. k. 3. ENGINEER: Delete entire Paragraph C1-1.19, and replace with the following: .. The Director of Fort Worth Transportation and Public Works Department, the Director of the Fort Worth Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the - - particular duties entrusted to them. .. 4. PROPOSAL FORM: In Section C2-2.1, Paragraph 1, revise last sentence to read as to follows: "The Bidder shall furnish a Financial Statement, Equipment Schedule, and Experience Record, all of which must be properly executed and filed with the Director of the Water Department one week prior to the hour for opening of bids. Information shall be on forms provided by the Bidder and acceptable to the City. f ft- CS-1 5. EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: In " Section C2-2.3, Paragraph 2, add the following to the last sentence: "except for changes in the site conditions caused by factors outside of the control of the Contractor which occur after the Contractor's inspection and prior to installation." 6. INTERPRETATION AND PREPARATION OF PROPOSAL: Part C - General * Conditions, Section C2-2, exchange Paragraphs C2-2.7, C2-2.8, and C2-2.9 with the following: C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security and other required material, to the Purchasing Manager or his representative at the official location and stated time set forth in the proposal at the proper time to the proper place. The mere fact that a ` proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL" and the name or description of the project designated in the "Notice To Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102." Wff C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for the opening of proposals. A request for non consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non -consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may • modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to „w the proposal. FT 7. MINORITY BUSINESS ENTERPRISE/WOMEN BUSINESS ENTERPRISE .. COMPLIANCE: Delete entire Paragraph C3-3.2, and replace with the following: C3-3.2 MINORITY AND WOMEN BUSINESS ENTERPRISES: In a accord with .. City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the _ participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the %W CS-2 GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non -responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a minority business enterprise ■• (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less that three (3) years. a* 8. C3-3.5 AWARD OF CONTRACT is modified to read as follows: .M "The Owner reserves the right to withhold final action on the proposals for a reasonable time, not to exceed the period stated for the duration of the Bid Security stated in the Notice to Bidders or 90 days, whichever is shorter." 9. C3-3.7 BONDS. For the Paragraph after Paragraph C3-3.7d OTHER BONDS, which begins with "No sureties", change the entire paragraph to read as follows: "In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on .,, obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. Each bond shall be properly executed by both the Contractor and the Bonding Company." CS-3 ws 10. INSURANCE. Delete entire Paragraph C3-3.11 INSURANCE, and replace with the following:: tow C3-3.11INSURANCE: The Contractor shall not commence work under this contract until he has obtained all insurance required under the Contract Documents, and such insurance has been approved by the Owner and certificates of Insurance shall be delivered to the Owner (City of Fort Worth, Contract Administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, Texas 76102) prior to commencement of work on the contract project. .. The prime Contractor shall be responsible for delivering to the Owner the sub- contractor's certificate of insurance for approval. The prime Contractor shall indicate on the certificate of insurance included in the documents for execution whether or not New his insurance covers sub -contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub -contractors. The General Contractor may require all subcontractors to be insured and submit documentation ensuring that the requirements of C3-3.11 are met for all subcontractors. Failure of the Owner to request required documentation, shall not constitute a waiver of the insurance requirements specified herein. The Contractor's liability shall not be limited to the specified amounts of insurance required herein. a. COMPENSATION INSURANCE: The Contractor shall maintain, '* during the life of this contract, Worker's Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub -contractors. In case any class of employees engaged in .. hazardous work on the project under this contract is not protected under the Worker's Compensation Statute, the Contractor shall provide adequate �. employer's general liability insurance for the protection of such of his employees not so protected. Worker's compensation insurance covering employees in the project site shall be indorsed with a waiver of subrogation providing rights of recovery in favor of the OWNER. b. COMMERICAL GENERAL LIABILITY INSURANCE: The Contractor Shall procure and shall maintain during the life of this contract, General Liability Insurance (Public Liability and Property Damage Insurance) in the amount not less than $500,000 covering each occurrence/aggregate on .. account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence/aggregate on account of property damage with $2,000,000 umbrella policy coverage. Certificates of insurance shall state that Insurance is on an "occurrence" basis. Certificate shall also contain a statement that no exclusions by endorsement have been made to the Commercial General -Liability Policy. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as a separate policies or by additional endorsement to one of the above -mentioned policies, and in the amount as set forth for public liahilitar and t%rnr%ancxr rlamarta flka fnllnxxnncr incnranrP- 1. Contingent Liability (covers General Contractor's Liability for acts of sub -contractors). "V 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation fif MW excavation are performed adjacent to same). go 4. Damage to underground utilities for $500,000. 5. Builder's risk (where above -wound structures are involved). 6. Contractual Liability (covers all indemnification requirements of Contract). The City, its offices, employees and servants shall be endorsed as additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's worker's compensation insurance policy. Contractor's insurance policies shall be indorsed to provide that such insurance .. is primary protection and any self -funded or commercial coverage maintained by the OWNER shall not be called upon to contribute to loss recovery. 7. When required by the Contract Documents, Environmental "W Impairment Liability Coverage must be provided in the limits of $1,000,000 per occurrence and $2,000,000 annual aggregate. The Environmental Impairment Liability (EEL) must contain coverage for sudden and accidental contamination or pollution, liability for gradual emissions, and clean-up costs. The EIL coverage shall include two year completed operations coverage on a per Project .. basis. A separate insurance policy may be needed to fulfill this requirement. EIL for damages incurred in the course of transporting sludge shall be covered under the contractor's �+ insurance policy(s). d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain during the life of this Contract, Comprehensive Automobile Liability Insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 aggregate on account of one accident, and automobile property damage insurance in an amount not less than $100,000 aggregate. .. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub -contractors, respectively, against damage CS-5 .. %W claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the owner with satisfactory proof of coverage by insurance required in .. these Contract Documents in the amounts and by carriers satisfactory to the Owner. (Sample attached.) Other than Worker's Compensation Insurance, in lieu of specified insurance, the City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. All insurance requirements made upon the Contractor shall Vs apply to the sub -contractors, should the Prime Contractor's insurance not cover the sub -contractor's work operations. g. DEDUCTIBLE LIMITS. The deductible limits or self -funded retention limits, on each policy must not exceed $10,000 per occurrence unless otherwise approved by the City. h. INSURANCE COMPANY: The insurance company with whom the Contractor's insurance is written shall be authorized to do business in the State of Texas and shall have a current A.M. Best Rating of "A:VH" or equivalent measure of financial strength and solvency. i. NOTIFICATION. During the lifetime of this contract, the Contractor shall notify the ENGINEER in writing, of any known loss occurrence that could �. give rise to a liability claim or lawsuit or which could result in a property loss. j. CANCELLATION: Insurance shall be endorsed to provide the City with a minimum of thirty days notice of cancellation, non -renewal and/or material change in insurance policy terms or coverage. A minimum10 day -W notice shall be acceptable in the event of non-payment of insurance premium to insurance company. CITY RESPONSIBILITIES. The City shall not be responsible for direct payment of insurance premium costs for Contractor's Insurance. 11 C3-3.13 WAGE RATES: Delete Paragraph C3-3-13 WEEKLY PAYROLLS in its entirety and replace with C3-3-13 WAGE RATES as shown below: "The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. I. CS-6 .. V" The Contractor, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) that name and occupation of each worker .k employed by the contractor in the construction of the work provided for in this `bra contract; (ii) the actual per diem wages paid to each worker. These records shall be t- open, all reasonable hours, for inspection by the City. The provisions of Section C8-8- 14, RIGHT TO AUDIT, pertain to this inspection. The Contractor shall include in its subcontract's and/or shall otherwise require all of its subcontractors to comply with paragraphs above. _ . With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The Contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times." .. 12. INCREASED OR DECREASED QUANTITIES: Revise Paragraph C4-4.3 to read as follows: up The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the "W unit prices established in the contract documents. No allowance will be made for any changes in lost or anticipated profits not shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted herein as applying to overall quantities of sanitary sewer pipe in each pipe size, but not to the various depth categories. low 13. LIMITATION OF INCIDENTAL CHARGES (Reference C4-4.5c): The Contractor agrees that should any change in the work of extra work be ordered, the following applicable percentage shall be added to Material and Labor Costs to cover overhead and profit: or 1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed 15%. i„� 2. Allowance to the Contractor for overhead and profit for extra work performed by a subcontractor and supervised by the Contractor shall not exceed 10%. 1W Contractor shall be reimbursed for direct field overhead when the change requires an extension of the Contract period. Contractor shall not be reimbursed for indirect overhead or indirect costs related to changes to this contract. 1W CS-7 UW Vs me 14. TESTING COSTS: Paragraph 5-5.12, revise the first sentence to read as follows: "Where, as called for in the Contract Documents, tests of materials or equipment are 1, necessary, such tests will be made at the expense of and paid for by the Contractor unless otherwise specifically provided for in the Technical Specifications." 15. LAWS TO BE OBSERVED: Paragraph C6-6.1, delete "or which may be enacted later". After the word "exist," add "at the time of the Contract or may be hereafter exist during the performance of the Contract." 16. BUILDING PERMITS: Paragraph C6-6.2 Insert the following at the end of the paragraph; "Contractors are responsible for obtaining all construction permits from the governing agencies. Contractor shall schedule all code inspections with the Code Inspection .t Department in accordance with the permit requirements and submit copy of updated schedule to the Engineer weekly. Building, plumbing, electrical and mechanical building permits are issued without charge. Water and sewer access fees will be paid .. by the Water Department. Any other permit fees are the responsibility of the Contractor." 17. BARRICADES, WARNINGS AND FLAGMEN: In Paragraph C6-6.8, replace the word "watchmen" wherever in appears with the word "flagmen". In the first paragraph, lines five (5) and six (6), replace "take all such other precautionary measures" with "take all reasonable necessary measures". 18. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Delete entire fto Paragraph C6-6.12, and replace with the following: "C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: aw Contractor covenants and agrees to indemnify the City' Engineer and Architect, and their personnel at the project site for the Contractor's sole negligence. In addition, the Contractor covenants and agrees to indemnify, hold harmless and defend at its own expense, the Owner, its officers, agents, servants, and employees, from and against all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise of, the work and services to be performed hereunder by the Contractor, its officers, agents, employees subcontractors, licensees or invitees, 4 whether or not anv such iniurv, damage or death is caused, in whole or in part, by the negligence or alleged negligence of the Owner, its officers, agents, servants, or emplovees. Contractor likewise covenants and agrees to indemnify and hold harmless Owner from and against any and all injuries to the Owner's officers, agents, servants, MW and employees, loss or destruction of property of the Owner arising form the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damage is caused, in whole or in part, by the negligence or alleged .. negligence of the Owner, its officers, agents, servants, or emplovees In the event the Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until the Contractor either (a) submits to the Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides the Owner with a letter from the Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract." 19. STATE SALES TAX: A. Delete Paragraph C6-6.21 STATE SALES TAX in its entirety. B. This contract is issued by an organization, which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise, and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction are subject to State Sales Tax under House Bill 11, enacted August 15, 1991. All such taxes shall be included in the various amounts on the Proposal Form. The successful Bidder shall be required to submit a breakdown between costs of labor, consumable material and other construction costs and costs of material incorporated into the project construction prior to execution of this contract. B. At the time of execution of the Contract Documents by the Contractor, the Contractor shall complete the "Statement of Materials and Other Charges" which identifies the project costs anticipated in the Project into "Materials Incorporated into the Project" and "All Other Charges". The Contract shall be a "Separated Contract". C. The City of Fort Worth will issue appropriate Certificates of Resale to the Contractor. so D. All Change Orders to the Contract will separate charges for materials and labor ar and will contain the following statement: µ "For purposes of complying with Texas Tax Code, the Contractor agrees that the charges for material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor." 20 AIR POLLUTION WATCH DAYS: Add the following to Section C7-7: i• C7-7.18 AIR POLLUTION WATCH DAYS: The Contractor shall be required to h observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME Im MW hu CS-9 VW "W PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION.. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. 21. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4 SCOPE OF PAYMENT in its entirety and replace with the following: "The Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. .. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the '* obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two (2) year guaranty period after the final acceptance. The Owner shall be the sole CS-10 P 4.r judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein." 22. PARTIAL PAYMENTS: Change Paragraph C8-8.5 to read as follows: "Partial pay estimates shall be submitted by the Contractor 5th day and the 20th day of the month that work has been is in progress. The estimate shall be processed by the City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the .� net invoice value thereof. The Contractor will furnish the engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000.00 at the execution, retainage shall be ten percent (10%). For contracts of $400,000.00 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with subcontract agreement, within five (5) business days after receipt by the Contractor of the payment by the City. Contractor's failure to make the required payment to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of the same will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate. Payment of any partial pay estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this Contract." 23. GENERAL GUARANTY. Delete Paragraph C8-8.10 GENERAL GUARANTY in its entirety and replace with the following: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of the work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or CS-11 7W damages in the work and pay for any damage to the other work resulting therefrom which shall appear within a period of two (2) years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. Any reference to any shorter period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specification, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of acceptance of the project. 24. RIGHT TO AUDIT: Add the following to Section C8-8: C8-8.14 RIGHT TO AUDIT: "(a) The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give Contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision ' to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to exajTine and photocopy any directly pertinent books, documents, papers, and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this article together with subsection (c) hereof. The City shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse contractor for the cost of the copies as follows: 1. 50 Copies and Under - 10 cents per page. L7 2. More than 50 copies - 85 cents for the first page plus fifteen cents for each page thereafter." (5/25/93) 4- i CS-12 TOW Mul 25. SCHEDULE OF COSTS: Add the following to Section C8-8: C8-8.15 SCHEDULE OF COSTS: Following the completion of all work on the Project and prior to submittal of a request for final payment, the Contractor shall _ provide a Schedule of Costs to City for approval which lists all equipment systems, structures, building electrical and HVAC systems, overhead and project related costs. The items will be grouped into categories using the Owner's list of category codes which will be provided by the Owner at the Preconstruction Conference. The Schedule of Costs will be used by the City as input to the Capital Assets System, and will not be considered in preparation of modifications to the Contract. Costs associated with the preparation and processing of this schedule of costs shall be subsidiary to the price bid. The Contractor will also provide a projected payment schedule tied to the project schedule and the schedule of values which projects the monthly payments through the end of the Project. The Payment schedule must be submitted along with the first request for payment. This information is necessary to arrange financing of the Project by the City. END OF SECTION CS-13 HEAVY & HIGHWAY CONSTRUCTION PREVAILING WAGE RATES 2008 J Air Tool Operator $10.06 Asphalt Distributor Operator $13.99 J Asphalt Paving Machine Operator $12,78 J J Asphalt Raker $11.01 J Asphalt Shoveler $ 8.80 J J Batching Plant Weigher $14.15 J Broom or Sweeper Operator $ 9.88 J .. J Bulldozer Operator $13.22 J Carpenter $12.80 - J Concrete Finisher, Paving $12.85 J J Concrete Finisher, Structures $13.27 J Concrete Paving Curbing Machine Operator $12.00 Concrete Paving Finishing Machine Operator $13.63 Concrete Paving Joint Sealer Operator $12,50 J - Concrete paving Saw Operator $13.56 Concrete Paving Spreader Operator $14.50 J Concrete Rubber $10.61 J J Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel Operator $14.12 J Electrician $18.12 Fla ger J $ 8.43 J Form Builder/Setter, Structures $11,63 J Form Setter, Paving & Curb $11.83 J Foundation Drill Operator, Crawler Mounted $13.67 J Foundation Drill Operator, Truck Mounted $16.30 J Front End Loader Operator $12.62 Laborer, Common $ 9.18 J J Laborer, Utility J $10.65 J J Mechanic $16.97 Milling Machine Operator, Fine Grade $11.83 J Mixer Operator $1 1.58 Motor Grader Operator, Fine Grade $15.20 J Motor Grader Operator, Rough $14.50 Oiler $ I4.98 Painter, Structures $13.17 Pavement Marking Machine Operator $10.04 Pipelayer $1I.04 J Reinforcing Steel Setter, Paving $14.86 J Reinforcing Steel Setter, Structure J $ I6.29 J Roller Operator, Pneumatic, Self -Propelled J $11.07 J Roller Operator, Steel Wheel, Flat Wheel/Tamping J $10.92 Roller Operator, Steel Wheel, Plant Mix Pavement J $11.28 Scraper Operator ( $11.42 Servicer J $12.32 J Slip Form Machine Operator $12.33 J Spreader Box Operator $10.92 { J Tractor Operator, Crawler Type $12.60 J Tractor Operator, Pneumatic $12.91 J Traveling Mixer Operator $12.03 J Truck Driver, Lowboy -Float $14.93 J Truck Driver, Single Axle, Heavy $11.47 J Truck Driver, Single Axle, Light $10.91 J Truck Driver, Tandem Axle, emi-Trailer J $11.75 J J Truck Driver, Transit -Mix $12.08 J Wagon Drill, Boring Machine, Post Hole Driller Operator I $14.00 Welder J $13.57 .. Work Zone Barricade Servicer I $10.09 2008 PREVAILING WAGE RATES CONSTRUCTION INDUSTRY AC Mechanic Helper $12.00 Plumber Helper $14.90 Acoustical Ceiling Mechanic $15.24 Reinforcing Steel Setter $10.00 Bricklayer/Stone Mason $19.12 Roofer $14.00 Bricklayer/Stone Mason Helper $10.10 Roofer Helper $10.00 y Carpenter $16.23 Sheet Metal Worker $16.96 Carpenter Helper $11.91 Sheet Metal Worker Helper $12.31 Concrete Finisher $13.49 Sprinkler System Installer $18.00 Concrete Form Builder $13.12 Sprinkler System Installer Helper $9.00 Drywall Mechanic $14.62 Steel Worker Structural $17.43 Drywall Helper $10.91 Concrete Pump $20.50 Crane, Ctamsheel, Backhoe, Derrick, VI-ine Drywall Taper $13.00 Shovel $17.76 ' Drywall Taper Helper $9.00 Forklift $12.63 Electrician (Journeyman) .. $20.20 Front End Loader $10.50 I Electrician Helper $14.43 Truck Driver $14.91 Electronic Technician $19.86 Welder $16.06 Electronic Technician Helper $12.00 Welder Helper $9.75 Floor Layer (Resilient) $20.00 Floor Layer Helper $13.00 Glazier $18.00 s Glazier Helper $13.00 Insulator $14.78 - I Insulator Helper $11.25 Laborer Common $10.27 _ I Laborer Skilled $13.18 Lather $16.10 Painter $14.83 Painter Helper $8.00 Pipefitter $18.85 Pipefitter Helper $12.83 Plasterer $17.25 Plasterer Helper $12.25 01010 SUMMARY OF WORK 01010 SUMMARY OF WORK 1.0 SCOPE OF WORK This information relates to work required to clean and remove accumulated grit and "rags" from digester 13 at the City of Fort Worth Village Creek Wastewater Treatment Plant. Special Conditions 1. Safety: Care should be taken to monitor the air in the work area for methane and hydrogen sulfide gas. The Contractor will submit a written safety plan which will include the use of a triple gas (H2S, LEL and 02 deficiency) detection device. The digester will be open to atmosphere, but may contain a gas mixture including ammonia, hydrogen sulfide and/or methane. 2. At any time that high flow or other operational conditions require, the contractor may be required to immediately remove personnel and equipment from the work area. 3. Contractor will be responsible for lock-out/tag-out of equipment; plant staff will assist in designating which equipment will need to be locked-out/tagged-out. 4. Contractor will attend a plant evacuation/orientation class for employees assigned to the Village Creek job. 5. Location: City of Fort Worth Village Creek Wastewater Treatment Plant; 4500 Wilma Lane; Arlington, Texas 76012. 6. The City is tax exempt from Sales and from Use Tax. 7. The City will provide service water and sufficient length of fire hose; contractor will be responsible for providing nozzles required for cleaning the digester. 8. Digester 13 was put in operation in 1986 and was last cleaned in October, 2003. 9. Digester 13 is 90 feet in diameter with a 27 foot side water depth and an additional 6.8 feet of cone bottom with a 2' deep sump in the center. Attention is directed to discharge piping which runs along the floor inside the digester. 10. At this time, the digester contains approximately 7 feet of material consisting of liquid, "rags" and grit. The total volume is estimated to be approximately 4,000 cubic yards; the volume of grit is estimated to be approximately one thousand cubic yards. Liquid material (excluding slurries grit and/or "rags") that can be pumped can be returned to the plant. For the purpose of bidding, no differentiation is made concerning composition of digester material. Work Required 1. The contractor will submit a bid based on 4,000 cubic yards of material. 2. Solid material which is removed from the digester will be transported to the Village Creek Drying beds, located approximately 1 % miles east of the plant. Warranty 1. The contractor warrants that work will be completed in a workmanlike manner and that the job site will be returned to the original appearance and state of neatness. 2. Work will be considered acceptable after a final visual inspection. 1.01 WORK INCLUDED A. Construct work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the project completely operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete project. 1.02 JOB CONDITIONS A. The General Conditions, the Supplementary Conditions, and Division One specifications apply to each specification sections. B. Comply with all applicable state and local codes and regulations pertaining to the nature and character of the work being performed. 1.03 DESCRIPTION OF WORK This Project consists of Removal of all accumulated material from the digester number 13. Contractor shall provide labor equipment and transportation to remove and transport all the material to designated area. Contractor is responsible of transporting the material with safely manor to the deposal facility area. 1.04 OCCUPANCY A. As soon as all the material removed and broom clean the digester, the Owner shall have the right to accept it form the contractor. B. Owner may accept the facility for continued use after cleaned up and testing at the option of the Owner. If acceptance is delayed at the option of the Owner, shut down facilities per approved Operation and Maintenance procedures. C. The execution of bonds is understood to indicate the consent of the surety. D. Conduct operations to insure the least inconvenience to the Owner and general public. 4160 1.05 CONTRACTOR'S USE OF PROJECT SITE A. Limit the use of project site for work and storage to the areas at a site approved by the Owner. B. Coordinate the use of the premises with the Engineer. C. Assume full responsibility for the protection and safekeeping of products stored at the site. D. Store products such that owner has access to all treatment units for maintenance and operations. E. Obtain and pay for the use of any additional storage or work areas needed for construction. r,V � F. Any damage to existing facilities, including contamination, caused by the / Contractor's personnel, visitors, materials, or equipment, shall be repaired or corrected at the Contractor's expense. G. No alcoholic beverages or illegal substances shall be permitted on the site at any time. END OF SECTION MW 4W s w r s CONTRACTOR COMPLIANCE WITH WORKER' S COMPENSATION LAW pursuant to Article 8308-3.23 of Veron's Annotated Civil Statues, Contractor Certifies that it provides worker's compensation insurance coverage for all of its employees t Va Val WTP employed on City of Fort Worth project C4n;nc) a' Number__WTi Z — Pam'9 -- 3Qo0.� O CONTRAC TOR By. Title Date STATE OF TEXAS § COUNTY OF TARRANT § /I- to-oq BEFORE ME, the undersigned authority, on this day personally appeared O j known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of A �X L�� for the purpose and consideration therein expressed and in the capacity therein stated. ._ q rlclEi�i tJ1�TDER MY HAND AND SEAL OF OFFICE this i,,of Iv 0ULtVI boy- y 2,00(-1 we 0 is Notary public in and for the State of Texas CARMEN K. CARLENTINE Notary Public, State of Texas My Commission Expires August 24, 2011 Page 1 Of 1 a PERFORMANCE BOND Bond No. 105352109 THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MENBYTHESEPRESENTS:Thatwe(1) Ace Pipe Cleaning, Inc. 1509 Sylvania Ct. a (2) Corporation Of Fnrt Wnrth,,TX 76111 , .� hereinafter called Principal, and (3) Travelers Casualty and surety Company of America a corporation organized end existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the Iaws of the State of Texas, hereinafter called Owner, in the penal sum of. -EIgtvty Five Thousand Five Hundred and 00/100 _ 0:s5,goo.00 ) Dollars in lawful money of the United States, to be paid i-i Fort Worth, _ Tart County, Texas,.for.the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. TIDE CONDITION OF THIS OBLIGATION is such that Whereas, the I'rineipal entered into a certain contract with the City. of Fort Worth, the Owner, dated. the _ day of -.5q+ern,be, A.D. 19_,,' a copy of which is hereto attached and made apart hereof; for the construction of-, Cleaning of Digester #13 designated as Project No.(s) , a copy of which contract is hereby attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred to as the "work". M NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the Work in accordance with the plans, specif cations, and contract documents during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and he shall satisfy all claims and demands incurred', under the contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason. of failure to do so, and shall reimburse anA repay the owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. F-1 PROVIDED FURTHER, that if any legal action be fled upon this bond, venue shall lie in Tarrant County, State of Texas. AND PRQVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no charge, extension of time, alteration or addition to the terms of the contract .or to the work to be performed thereunder, or the specifications accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN "WITNESS WHEREOF, this instrument is executed in six counterarts each one of which shall be deemed an original, this the 30Kday of StPttnt b& A.D., ATTEST: (Principle) Secretary (SEAL) f� P Witness as to Principal 1 ti kid, a� Address ?��( ATTEST: Ace Pipe Cleaning, Inc. PRINCIPAL (4) (Address) Travelers Casualty and Surety Company of America (� Surety By: ,,a (Attorney 1n-fact) (5) Brenda D. Hockberger (Surety) Secretary (Address) (S E A I.) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor � �.(2) A Corporation, a Partnership or an Witness to Surety Individual as the case maybe � Y Gina M. Damato (3) Correct name of Surety 215 Shuman Blvd., Napery i I I.e, IL 60563 (4) If Contractor is partnership, all Partners (Address) should execute Bond (S) A True copy of Power of Attorney shall be attached to Bond by Attorney -in -fact F-2 +K y WA •0 WARNING: THIS PQWFR OF AT?ORNI=Y IS INVALID WITHOUT THE RED BORDER i POWER OF ATTORNEY TRAVELERSJ� Farmington Casualty Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 221398 Certificate No. 0 0 312 4 9 4 0 KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Ew Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint =a Carol F. Tasciotti, Evonne Brown, Adele M. Korczak, Grace Villarreal, Gail Schroeder, Cindy Genslinger, Gina M. Damato, Thomas A. Pictor, Erik Janssens, Jane Bronson, Michael Damewood, Rosemary Muliere, Kathleen M. Anderson, Vaenessa Sims, Luisa Catalano, Marva Miller, Thomas N. Tague, Brenda D. Hockberger, Meredith Day, Carlina A. Jewell, Tara S. Petersen, Todd D. Baraniak, Dale F. Poquette, Oscar F. Rincon, Heather Meyer. Moises Alcantar, James P. Fagan, Amar Patel, Heather J. Meneghetti, John C. Redding, Stephanie Miller, *0 Phil Horvath, Grace Lawrence, David Letcher, Andrew Stontz, Jennifer Seppi, Ann Mulder, and Gabriel Jacquez St to of ILLINOIS C my of COOK .r On this —36 day of.��n� Z 00 q before me personally appeared Brenda D. Hockberver , known to me to be the Attorney -in -Fact of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, the corporation that executed the within instrument and acknowledged to me that such corporation executed the same. ML W IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first written above. OFFICIAL SEAL _ OSGAR F. RINCON L,N NOTARY PUBLIC - STATE OF ILLINOIS 7u// MY COMMISSION EXPIRES AUG. 30 2012 I(N aTY�Ublic) ur. s?SEALas c d........:• J v. •.. a r e .......... ....... r� State of Connecticut City of Hartford ss. r W M& By: /Georg Thompson, nior ice President 14th July 2009 On this the day of , before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. In Witness Whereof, I hereunto set my hand and official seal. G•u VW 4A My Commission expires the 30th day of June, 2011. �$L�G Marie C. Tetreault, Notary public 4y* Ed 58440-4-09 Printed in U.S.A. WARNING,: THI$ POWEfi OF ATTORNEY IS INVALID WITHOUT THE RED BORDER WARDING: THIS POWER OF ATTORNEY IS INVALID WITF10UT THE RED BORDF;R ion This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelit)- and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: t>! RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and sea] with the M Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may WE delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking 4W shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds ~ and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. t• I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insuranc( Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Gugwty Company do hereby certify that the above and foregoin( is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force ark effect and has not been revoked. r IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seats of said Companies this 11 day of 'TU JV 20 0 �. Kori M. Johans�u/Assistant Secretary ME G I.6 U.� IRE �N IN,p t INSUq JP TY AIyG 1� "^,Y tY'Y� 3 % t+ NtED T ��ioRv�A+jfi W'cOaPON4lf �i '� ate`? 1 9.8 2� 0 � 1977 �• "' i E i: � T w NARiPORD, . �NNrfFOR0.� . CONK. n 5� caw+• f� N 1896 t �' tm To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number, the above -named individuals and the details of the bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY I5 INVALID WITHOLff THE PED BORDER AW TRAVELERS IMPORTANT NOTICE TO OBTAIN INFORMATION OR MAKE A COMPLAINT: You may contact Travelers Casualty & Surety Company of America, Travelers Casualty & Surety Company, Travelers Indemnity Company, Standard Fire Insurance Company and/or Farmington Casualty Company for information or to make a complaint at: Travelers Bond Attn: Claims 1500 Market Street West Tower, Suite 2900 Philadelphia, PA 19102 (267) 675-3130 (267) 675-3102 Fax You may contact the Texas Department of Insurance to obtain the information on companies, coverages, rights or complaints at: Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 (800) 252-3439 ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not become a part or a condition of the attached document and is given to comply with Section 2253-021, Government Code, and Section 53.202, Property Code, effective September 1, 2001. nA .. Bond No. 105352109 MAINTENANCE BOND ITIE STATE OF TEXAS § COUNTY OF TAR1tANT § KNOWALLMENBYTFIESEPRESENTS: That we(1) Ace Pipe Cleaning, Inc. as Principal, acting herein by and througli (2) its duly authorized and (3) Travelers Casualty and Surety Com any of America a corporation organized and existing under the laws of the State of Connecticut as surety, do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at Fort Worth, in. Tarrant County, Texas, the sum of: �• Eighty F14e Thousand Five Hundred acid 00/100' Dollars ($ 85,500.00 �, laWful money of the United Stares, for the payment of which sum well and truly be made unto ,_said City of Fart .Worth and its successors, said Contractor and surety do hereby bind -- tber�Reeives, their heirs, executors, administrators, and assigns and successors, jointly and severally. This obligation is conditioned, however, that, WIIEREA.S, the Principal has entered into a certain contract with the City of Fort Worth, the Owner, dated 1 for the performance of the following described public work non the co "on of the following described public improvements:. Cleaning of Digester #13 all of -the same, being referred to herein and in said contract as the Work and being designated as Project No.(s) . . ; and said contract, including all of the- specifications, conditions and written instruments referred to therein as contract documents being hereby incorporated herein by reference for all purposes and made a part hereof the same as if set out verbatim herein; and, WfIEREAS, in said Contract, Contractor binds xtsclfto use such materials and to so construct the work that it will remains in good repair and condition for and during the period. one year - after the date of the final acceptance of the work by the City, and, WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said tens. of ; and, VaWREAS, sad Contractor binds itself to repair or reconstruct the work in whole or in part at any tithe within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it is necessary; and, WIM AS, said Contractor binds itself, upon receiving notice of the need thereof to repair or reconstruct said work as herein provided. NOW THEREFORE, if said Contractor shall keep its said agreement to maintain, repair or reconstruct said work in accordance with all the terms and conditions of said F-5 contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall remain in full force and effect, and said City shall have and recover fxom the said Contractor and its surety damages in the premises as prescribed by said contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive bleaches until the full amount hereof is exhausted. WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas; and, ri IN WITNESS WHEREOF, this instrument is executed in s i X counterparts, - each one of which shall be deemed an original, dated :.*te-m �l t,. - L, Ace Pipe Cleanln Inc. _- ATTEST: PRINC AL (4) BY 40o G ifi�r ; (Principle) Secretary 150Y 27 ;K E A L) s (Address) 6AVIM X `*as to P " cip Address Travelers Casualty and Surety Company of America ATTEST: By. t'�. �c Y At ; '1 Brenda D. Hockberger . (Attorney-tn-fact) (�} 215 Shuman Blvd., Naperville, IL 60563 (Surety) Secretary (SEAL) �,� Wit as to Surety Gina M. Damato 215 Shuman -Blvd., Naperville, IL 60563 (Address) (Address) NOTE_ Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as the case may be (3) Correct name of Surety (4) If Contractor is Partnership, all Partners should execute Boad (5) A True copy of Power of Attorney shall be attached to Bond by Attorney -in -fact F-b No s WARNING: THIS POWEFI OF ATTORNEY IS INVALTD WITHOUT 131E RED BORDER POWER OF ATTORNEY TRAVELERSJ� Farmington Casualty Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 221398 Certificate No. 0 0 312 4 9 5 2 KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and r Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint M Carol F. Tasciotti, Evonne Brown, Adele M. Korczak, Grace Villarreal, Gail Schroeder, Cindy Genslinger, Gina M. Damato, Thomas A. Pictor, Erik Janssens, Jane Bronson, Michael Damewood, Rosemary Muliere, Kathleen M. Anderson, Vaenessa Sims, Luisa Catalano, Marva Miller, Thomas N. Tague, Brenda D. Hockberger, Meredith Day, Carlina A. Jewell, Tara S. Petersen, Todd D. Baraniak, Dale F. Poquette, Oscar F. Rincon, Heather Meyer, Moises Alcantar, James P. Fagan, Amar Patel, Heather J. Meneghetti, John C. Redding, Stephanie Miller, Phil Horvath, Grace Lawrence, David Letcher, Andrew Stontz, Jennifer Seppi, Ann Mulder, and Gabriel Jacquez State of ILLINOIS County of COOK ,.)n is day of r— —�Q before me personallyappeared BrentD. Hockberver , known to me to be the Attorney -in -Fact of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, the corporation that executed the within instrument and acknowledged to me that such ,,� orporation executed the same. TN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first written above. OF ILIA '6EAL OSCAR F. ON NOTARY PUBLIC -STATEATE OF ILLINOIS �7 MY COMMISSION EXPIRES AUG. 30 2012 (Otar�PLib1iC) � 'y1982A6 O ;Q;j7)7 WANGE` ��\ Sf$ �AA1Lt,Iw 9'\\"`"."/s/aye8 �'rl���++✓✓' 41 iy *515Ye SZJLi8A9M�..6 7z State of Connecticut By: City of Hartford ss. Georg Thompson, nior ice President � 14th July 2009 On this the day of before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. � p.YIET In Witness Whereof, I hereunto set my hand and official seal.W My Commission expires the 30th day of June, 2011. #� '0UB61�+ it `Marie C. Tetreault, Notary Public ft 58440-4-09 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER ARNING: THIS POWER OF ATTORNEY IS INVALfD WITHOUT THE RED BORDER � � A r! This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: t� RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undettaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking MW shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is r, FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. tr I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Gugwty Company do hereby certify that the above and foregoilk I is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and Axed the Seals of said Companies this day of T wi H Kori M. Johans Assistant Secretary y G�SVA< F{RE 4 �P,M IMf '� �NSV Tr ANO _n�RY V, S � C� ll ••wvNa z �ItORv�RATF.s P� PORAT ':�i 0 9�', � ti Z 1 9 8 2 p � `1977 � � � ^ u, i .•�^ Z � 0� _fin - i IIARIFORD, �WlRfrdH0. � [0 4+ c 1951 � •• S E � � : � • ca+e. n � N teas -. To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attomey-In-Fact number, the above -named individuals and the details of the bond to which the power is attached. im rA 'EARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT TKI RED 8?01'IDER AM TRAVELERS IMPORTANT NOTICE TO OBTAIN INFORMATION OR MAKE A COMPLAINT: You may contact Travelers Casualty & Surety Company of America, Travelers Casualty & Surety Company, Travelers Indemnity Company, Standard Fire Insurance Company and/or Farmington Casualty Company for information or to make a complaint at: Travelers Bond Attn: Claims 1500 Market Street West Tower, Suite 2900 Philadelphia, PA 19102 (267) 675-3130 (267) 675-3102 Fax You may contact the Texas Department of Insurance to obtain the information on companies, coverages, rights or complaints at: Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 (800) 252-3439 ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not become a part or a condition of the attached document and is given to comply with Section 2253-021, Government Code, and Section 53.202, Property Code, effective September 1, 2001. Bond No. 105352109 PAYMENT BOND THE STATE OF TEXAS § KNOW ALL BY THESES PRESENTS: COUNTY OF TARRANT § That we,(1) Ace Pipe Cleaning, Inc. a (2) Corporation of Tarrant County, Texas hereinafter called Principal and (3) Travelers Casualty and Surety Company of America , a corporation organized and existing under the laws of the State CT and fully authorized to transact business in the State of _ Texas, as Surety, are held and firmly bound unto -the City of Fort Worth, a municipal corporation organizcd Zqd• existing under the laws of the State of Texas, hereinafter called Owner,• and unto all perms, firms,, imd corporations who may furnish materials for, or perform labor .upon, the building or i�►�overisl�ereerreferred tointhe penal sumof Eighty Five Thousand Five Hundred and 00/100 t in lawful money of the United ••_ Dollars- �_oo.00 ) . States to be prWd in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firnaly by these presents. TIDE CONDITION OF MIS OBLIGATION is such that whereas, the Principal entered into a 41 certain contract with. the City of Fort Worth, the Owner, dated the ` al K day of LIN ►- 2a•�, a -copy of which is hereto attached. and made a part hereof, for the consideration of: Cleaning of Digester 013 designated as Project Number , a'copy of which contract is hereto attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred to as the `work". NOW TIiEREFORE, the condition of this obligation is such that, if the Principal shall promptly make payment to all claimants as defined- in Chapter 2253, Texas Government Code, _ supplying labor -and materials in the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it shall remain in full force and effect. THIS BOND IS MADE AND -ENTERED into solely for the protection of all claimants supplying labor and material in the prosecution of the work provided for in said Contract, as claimants are defined in said'Chapter 2253, and all such claimants shall, have a direct right of action under the bond as provided in Chapter 2253, Texas Government Code. PROVIDE FURTHR, that if Any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas, State of Texas, and that the said Surety, for value received, hereby stipulates and agrees that no change extension of time, alteration or addition to the terms of the contract or to the work be performed thereunder or the specification accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or the specifications. PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder whose claim shall be unsatisfied. IN WITNESS WHEREOF, this trument is executed in six counterparts, each one of which . shaU be deemed an original, this _CLday of r 20AJ. ATTEST: (Principal) Secretary (SEAS,) (witness as to Principal) 0291 (Address) 1 ATTEST: (Surety) . Secretary (SEAT.) R w11Ile5S RS t0 Surety GI na M. Damato 215 Shuman Blvd., Naperville, IL 60563 Address Ace Pipe Cleaning, Inc. Principal BY: 'L (Printed Name/Title) 12�20F Sy),(,wj;f' e_17. Address City/State/Zip Travelers Casualty and Surety Company of America (Sty) �i Attorney -in -Fact (5) Brenda D. Hockber 215 Shuman Blvd. Address Naperville, IL 60563 City/State/Zip Now, Date of bond must not bo bofore the date of award of contract (1) Corte t name of Contractor (2) A corporation partnership, or individual us the case tttay be (3) Carrot name of 5urrty (a) .If Contractor is a pattnarabip, the Cattract must be executed by the mnnaog or general partner of tic partner ship ■ no r 0-1 WARNING: THIS BOWER OF ATTORNEY IS INVALID WITHOUT THE REC 156Hi0Ek POWER OF ATTORNEY TRAVELERSJ� Farmington Casualty Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 221398 Certificate No. 0 0 312 4 9 4 6 KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint w Carol F. Tasciotti, Evonne Brown, Adele M. Korczak, Grace Villarreal, Gail Schroeder, Cindy Genslinger, Gina M. Damato, Thomas A. Pictor, Erik Janssens, Jane Bronson, Michael Damewood, Rosemary Muliere, Kathleen M. Anderson, Vaenessa Sims, Luisa Catalano, Marva Miller, Thomas N. Tague, Brenda D. Hockberger, Meredith Day, Carlina A. Jewell, Tara S. Petersen, Todd D. Baraniak, Dale F. Poquette, Oscar F. 1 I Rincon, Heather Meyer, Moises Alcantar, James P. Fagan, Amar Patel, Heather J. Meneghetti, John C. Redding, Stephanie Miller, 4I Phil Horvath, Grace Lawrence, David Letcher, Andrew Stontz, Jennifer Seppi, Ann Mulder, and Gabriel Jacquez State of ILLINOIS County f COOK as On this CL�__ day of e - p C before me personally appeared Brenda D. Hockbert7er . known to me to be the Attorney -in -Fact of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, the corporation that executed the within instrument and acknowledged to me that such corporation executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year in this certificate first written above. OFFICIAL'u"EA'L OSCAR F. RINCON [NOTARY PUBLIC - STATE OF ILLI]2012 L'"'/ Y COMMISSION EXPIRES AUG. 30 (Notary ublic) 4s\t��y •`s'/a tiH State of Connecticut By: City of Hartford ss. Georg Thompson, .ior ice President Mw� 14th July 2009 On this the day of before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety �. Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. In Witness Whereof, I hereunto set my hand and official seal.iQ�i` V My Commission expires the 30th day of June, 2011. '°lfBU� �¢ `Marie C. Tetreault, Notary Public 58440-4-09 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER f WARNIN13: THIS POWER 0ir7ATTOfiNlrY L5 INVALID WITHOUT THE RED 80ROER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attomeys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officer; pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. r I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty "ce Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers CasdVty and Surety Company, Travelers Casualty and Surety Company of America, and United SEafts Fidelity and Guamty Company do hereby certify that the above and f going is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. we IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the Seals of said Companies this ��� day of .J a l y 201Q$_. Kori M. Johans,6/Assistant Secretary GP6U,� FIRE 6 PM CMS ��SU ,Ty q,y eVP ooG %y'ME�SaD �� � 1951 ti oT �`SEAL,io/ �`,SSRL:�! CONN. .........d 61 To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number, the above -named individuals and the details of the bond to which the power is attached. WE AF q40 ho WASHING: THIS POWER OF ATTORNEY I5 INVALID WITHOUT THE HED BORDER AW TRAVELERS IMPORTANT NOTICE TO OBTAIN INFORMATION OR MAKE A COMPLAINT: You may contact Travelers Casualty & Surety Company of America, Travelers Casualty & Surety Company, Travelers Indemnity Company, Standard Fire Insurance Company and/or Farmington Casualty Company for information or to make a complaint at: Travelers Bond Attn: Claims 1500 Market Street West Tower, Suite 2900 Philadelphia, PA 19102 (267) 675-3130 (267) 675-3102 Fax You may contact the Texas Department of Insurance to obtain the information on companies, coverages, rights or complaints at: Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 (800) 252-3439 ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not become a part or a condition of the attached document and is given to comply with Section 2253-021, Government Code, and Section 53.202, Property Code, effective September 1, 2001. "W .. no PART G - CONTRACT THE STATE OF TEXAS COUNTY OF TARRANT THIS CONTRACT, made and entered into Jay � .�-ep ^ J 2. ®Bq by and between the City of Fort Worth, a home -rule municipal corporation located in Tarrant County. Texas, acting through its City Manager thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER" and da of the City of 4*wxou C-�7 and State of _/gip . , "CONTRACTOR" , County of 7:i kSva) Party of the Second Part. Hereinafter termed WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second Part (Contractor) hereby agrees with the said Party of the First Part (Owner) to commence and complete certain improvements described as follows: deAnirnO, of Di e.srte.� No. 13 of Vi��d�e Creed �Va�wae r Try`,w P l a n rt ,Pro�e-J WT2- 20'09 - �0003a and all extra work connected therewith, under the terms as stated in the Contract Documents, and at his (their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, bonds, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or other written explanatory matter thereof, and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's Written Proposal and other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contract Documents and General Specifications, all of which are made a part hereof and collectively evidence and constitute the entire contract. OFFICIAL RECORD CITY SECRETARY G-1 ! FT. WORTH, TX 4S The Contractor hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete same within the time stated in the Proposal. The Owner agrees to pay the Contractor in current funds for the performance of the contract in accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents and all approved modifications therefor, and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in quadruplicate the year and the day first above written. ATTEST: City of Fort Worth, Texas (Owner) .. Parry of the First Part •• By: Fernando Costa, Assistant City Manager Marty Hen ix, City Secret(ry Contract Authorization (SEAL) 2,°l 109 Date WITNESSES: 4�& -1445. pliot- B Y Approved for the Fort Worth Ci ater Department: a S. Frank Crumb, PE, Water Director - Approved as to Form and Legality: Assistant City OFFICIAL RECORD CITY SECRETARY G-2 FT. WORTH, TX A .. — B C D Z Z O U s F ME /BG2B /862 {' 8 Gc•4) NorE: 8"L56 NoT SXOWN �ME T FO2 CLAKIT(. 5EF ONQ M 181G 6'rCS-/5 4 C-AS`0I8CHAi0G6' ASSY, (3"GC-4.)—' 6"CS-/5 BfLSG--4_:) SEE DET. •THIS NG 3 lV4 Y VA VE B "GC -¢ S5E PLAN ANO IVDTF l PPJ0 ' J SUPPOf2TS oN - - COVE,? TYP G ZONE IREVI 0/0E67B,4 COYEP.w1__INSU4A710N SEE SPECS. f 13 48�T ACCESS Nfi u �� -RE67RA/NT' TYP. FOR ALL SEE_ ONG:. M1611 \ A/le/NG AT WALG r ii—a-i ` . ! / OFFSET f'/PE CLAlkI0 TY/? EL,.499. 97 e� MAX. S. 5EE loer, lawn, M2 ACCESS BR/O�,ff --\\ T� \ �I SEE O/VG. 9/B/6 IICI Z EG. 466 /7 el-,480' I7 4B 5, B3 _ EL, '3- B"LSG-4) I 5EE DETAIL A, IV/6/T OUTG/NE OF EAST (B"G9 SEE ONO, M/B/O V,1E /6647 1. . ' (6pCS-/5 - 3GOG.OMR EL, 478. /T (. EL. 4TB. E 7 SEE ONG. M/6/5 J EL, 47fi.75 - TYR Fd E' GU/DE - - - e- TYPE F (2 EO-24 �' �ENETRAT/ON _ _ 3 TQ C47CJ{ ... 3OA'40CE6 6 SE OW(i /TGhF/, SEEOING.WAS/6' 017'C DRAINAGE CONC.' ORA/NAGS E•H SEE DWG• G•9 M/8 /6 ¢` EL. 47750 OJTCy�SEE - I '70`0 O/A. 00f'0/4r ACCESS _ ONG• GY/ , .SEE DWG. M/8/6 EG. 4G/. 07 CONG, SUPPORT EL, 454.0 5EE.ST,PUC;'iVRAL. 454,83 \7- 1' 7.5�4. 452.83 J0' 0 �,5ACKFJLL -SEE P/PE.AS SPEC/F/EO� TYP SPECS. 2 gEG//✓B TO ST F.P. DIGESTER ' C ILLUSTRATIVE SECTION SCALE: 3/16"=1`-0 165,4116629 1 BROWN Axe CALDWELL AJoint Venture (��II FREESE eHo NICHOLS,!a FORTWORTH,TEXAS H REVISIONS DESCRIPTION BY IDAIti AFF - 3 L/FTDVG HANDLE "/-1 E 6,F NJATCH AVl BOLTS, NUTS AA1,0 GABKE7- . 2 %2 0 0A S d/SCHA,PGE P//'E (5CH BO BLK STL) "" �f GAS AlELL (g 4 " TL) 2 %z"rH,�EaaEa urELao��r Sf SQUARE.'%4"TH/Cfl ' ! E//101'Y'COA7E0 STEEL 2 PLATE To BE SUTT- WEL0El7 ALL AROUND GAS WELL ANOWEGOEd /O1 O IWIA/. l5eLOAt/ G/QU/a z evfl- TO UNOEpS/dE OF COI�EP� USING A A✓ELO. A16409- SHALL 6,F (BiiCG_4 L GAS T/GHT. (e 65 L60-4 VAAV,69 GU/0E - %4'/ /1 ANELO Lo :. T 90 ° Af'AR7- /oL/."0 SPACING C/C, OR/ENT' 4u @/BO°APART, GAS DISCHARGE ASSEMBLY 2"0-24) A a� ..,,N DETAIL i t�aj�OF=f,}Nf MI9I7 — �•C£OF T� , ROF . SECTION No SCALE }:4 MIE315.. _ .. ..r._......_.._. ,� 1 f g' eOBF➢T Al11F11 tFNCE 10•aw ;pC SCALE: I/2 =1-0 3, / _ 3itv� /9560.....�a ..�......29,Jyr..-..,rj. •'., .ww / 4 F'�G/STEPE'•�•2• 'fP':*tyrJTtt`i",r. h T VT PROJECTNUMBER DIGESTER TANK IS: SECTION SHEET I ®- F _.___....I__..... G_. _ ... .....___� C H • OPTyG. SEE•. OlNG. M/B/6 (5EE' $1'EC$ FO,f f^f/NGEp FGAA/GE') .O/GESTE,� P/FE GAL LERY - - TYPE 'F'PENETRAT/ON . ^ONC. SUPPORT SEE ST,V 0 /L/G. /2: - /"4f OR/F/CE La /" SPAC/NP� C/C., OR/ENTEd e /B0°,410,4RT f , /'RESSU,t'E V/NG - GA9/ ET - CS-/5) RETAINER ,�/ivc Tole oP Co1TEAe-- _:_ � i