HomeMy WebLinkAboutContract 56750-A1AMENDMENT No . 1 CSC No. 56750-A1
TO CITY SECRETARY CONTRACT No. 56750
WHEREAS, the City of Fort Worth (CITY) and ALAN PLUMMER and ASSOCIATES,
INC. d1bla Alan Plummer Associates, Inc., (ENGINEER) made and entered into City
Secretary Contract No. 56750, (the CONTRACT) which was authorized by
M&C 21-0670 on the 14th day of September, 2021 in the amount of $
300,000.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
City of Fort Worth, Citywide Drainage Improvements Design, CPN
100092; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work, a revised fee and updated
hourly rate schedule.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated February 5, 2024, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $99,000.00. (See Attached Funding Breakdown Sheet, Page -3-)
2.
Article II, Paragraph A of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall be an amount of $399,000.00.
Article II and Attachment B of the CONTRACT are amended to include
the current hourly rate schedule specified in the proposal attached
hereto (Exhibit 1) and incorporated herein.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect. OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Citywide Drainage Improvements Design
Prof Services Agreement Amendment Template CPN 100092
Revision Date: February 2, 2024
Page 1 of 2
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
0�4�
Jesica McEachern
Assistant City Manager
DATE: Feb 20, 2024
ENGINEER
ALAN PLUMMER ASSOCIATES, INC.
5�uuuu� � 7 1���
Shawn C Dankenbring (Feb 13, 202411:05 M )
Shawn Dankenbring, P.E.
Stormwater Team Leader
DATE: Feb 13,2024
APPROVAL RECOMMENDED:
A&``
�
LaurenPrieur
Director, Transportation and Public Works
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
GPO�fYPY S{'YIlf"G�
Geoffrev Smith (Feb 13.202408:29 CST)
Geoffrey Smith, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
D��
Mack (Feb 14, 2024 21:15 CST)
Douglas W. Black
Sr. Assistant City Attorney
llpgn
0'! FOR. 4&
O
ATTEST:
OOo ^=0
PPPrt o 8*pa
OdIln nEX45aad
Jannette Goodall
City Secretary
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Citywide Drainage Improvements Design
Prof Services Agreement Amendment Template CPN 100092
Revision Date: February 2, 2024
Page 2 of 2
FUNDING BREAKDOWN SHEET
City Secretary No.56750
Amendment No. 1
Department Fund -Account -Center
TPW 52002-0200431-5330500-100092-002830
Amount
$ 99,000.00
Total: $ 99,000.00
City of Fort Worth Amendment 1
Professional Services Agreement Amendment Template to City Secretary Contract No. 56750
CFW Official Release 9/19/2017 CPN 100092
Page 4 of 4 Citywide Drainage Improvements Design
PLUMMER
7�QF
February 5, 2024
Geoffrey Smith, PE, CFM
Capital Delivery Division
City of Fort Worth
Fort Worth, TX
Re: Additional Service Request (ASR) No. 1
Citywide Drainage Improvements Design, CPN 100092, City Contract # 56750, M&C 21-0670
Plummer Job No. 0318-078-01
Sent Via: E-mail to: Geoffrey.smith@fortworthtexas.gov
Dear Mr. Smith:
This letter is to request funding for additional services for the above referenced site. These
additional services are required due to the need for additional miscellaneous storm drain design
services. The previous design contract was for $300,000 for on -call storm drain design services
including several Task Orders that are currently ongoing. This amendment is for a $99,000
increase to the original contract amount. All additional services proposed are to be performed in
accordance with the original contract dated September 14, 2021.
Original Contract Amount $300,000.00
ASR No. 1 $ 99,000.00
Revised Contract Amount $399,000.00
A budget increase of $99,000 is the estimated cost of Plummer's current understanding of the
additional services identified above. Upon signing of this ASR by the client, this ASR to be
governed by the existing proposal for this project signed by the client and engineer on the 14th
day of September2021.
We would also like to change our rates to 2024 rates, see attachment 1.
If you have any questions regarding the above scope or compensation, please feel free to let us know. If
this proposal is acceptable to you, please respond accordingly with an amendment. We look forward to
working with you on this project.
Sincerely,
Alan Plummer Associates, Inc.
TBPE Firm No. 13
G
Shawn C. Dankenbring, PE, D.WRE
Stormwater Team Lead
1320 S. University Dr, Suite 300 Page 1 of 2
Fort Worth, TX 76107
Plummer.com
PLUMMER
7W
Attachment 1
HOURLY FEE SCHEDULE — 2024
Staff Description
2024 Rate
Staff Admin
$100.00
Senior Admin
$115.00
Staff CAD
$120.00
Senior CAD
$145.00
CAD Manager
$165.00
Staff Geospatial
$105.00
Senior Geospatial
$130.00
Geospatial Manager
$160.00
1 ntern
$80.00
Staff Engineer/Scientist
$140.00
Project Engineer/Scientist
$180.00
Project Manager
$250.00
Subject Matter Expert/Senior Project Manager
$305.00
Principal
$340.00
Billing rates may be adjusted by up to 4 percent annually (at the beginning of
each calendar year) during the term of this agreement.
1320 S. University Dr, Suite 300 Page 2 of 2
Fort Worth, TX 76107
Plummer.com
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Amendment 1 — Alan Plummer Associates, Inc.
M&C: 21-0670 CPN: 100092
CSO:
56750
DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Geoffrey Smith, P.E.
TPW
Feb 13, 2024
2
Shawn Dankenbring
Consultant
Feb 13, 2024
<sdankenbring(aplummer. com>
3.
Patricia Wadsack
TPW A/D
Feb 13, 2024
4.
Lauren Prieur
TPW/Dir
Feb 13, 2024
5.
Doug Black
Legal
,�
Feb 14, 2024
6.
Jesica McEachern
CMO
a`
Feb 20, 2024
7.
Ronald Gonzales
CSO
KC
Feb 20, 2024
8.
Jannette Goodall
CSO
190L
Feb 20, 2024
9.
Allison Tidwell
CSO
Feb 20, 2024
10.
tpw_sw_contracts
TPW
11.
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(a,fortworthtexas.cov Call 817-229-3283 with questions. Thank you!