HomeMy WebLinkAboutContract 39555.. No CITY SECRETARY D.O.E. FILE SPECIFICATIONS CONTRACTOR'S BONDING CO. CONSTRUCTION'S COPY AND CLIENT DEPARTMENT CONTRACT DOCUMENTS CITY Sl PPETAlly FOR CONTRACT NO. M-1-1-1 DRAINAGE BASIN PART 2 SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS IN THE CITY OF FORT WORTH, TEXAS SEWER PROJECT NO. P258-702170036183 CITY PROJECT NO. 00361 DOE NO. 4296 Mike Moncrief Mayor Dale A. Fisseler, P.E. City Manager S. Frank Crumb, P.E. Roberto C. Sauceda, P.E. Director City Project Manager Water Department PREPARED BY DUNAWA 1501 Merrimac Circle, Suite 100 Fort Worth, Texas 76107 Phone 817.335.1121 Fax 817.335.7437 Texas Registered Engineering Firm F-1114 2009 DA No. 2000181 OFFICIAL RECORD aw OI`I`'-G fsLC E:TARY FT. WORTH, TX 40 William A. Verkest Director Transportation and Public Works Department sloe It BRIAN S. DARBY ........................ 82623 �6D.� ''9ccG1STEP�•'��m F M&C Review Page 1 of 2 CITY COUNCIL AGENDA Official site of the City of Fort Worth, Texas FoRTWoRm -V- COUNCIL ACTION: Approved on 11/3/2009 - Ord. No. 18897-11-2009 DATE: 11/3/2009 REFERENCE NO.: C-23894 LOG NAME: 60SSM111P2- CONATSER CODE: C TYPE: NOW PUBLIC CONSENT HEARING: NO SUBJECT: Authorize a Contract in the Amount of $662,444.00 with Conatser Construction TX, LP, for Sanitary Sewer Rehabilitation Contract M-1-1-1, Part 2, from Shamrock Avenue to Northeast Seventh Street and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $723,444.00 from the Water and Sewer Operating Fund to the Sewer Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of $723,444.00 from available funds; and 3. Authorize the City Manager to execute a contract with Conatser Construction TX, LP, in the amount of $662,444.00 for Sanitary Sewer Rehabilitation Contract M-1-1-1, Part 2. DISCUSSION: On July 27, 2001, (M&C C-18456) Council authorized the City Manager to execute an Engineering Agreement with Dunaway Associates, L.P., for Sanitary Sewer Main 1-1-1 Condition Assessment and Drainage Area Evaluation Study. This project, Part 2, consists of the rehabilitation of a sanitary sewer main from Shamrock Avenue to Northeast Seventh Street. The project was advertised for bid on July 30, 2009, and August 6, 2009, in the Fort Worth Star - Telegram. On August 20, 2009, the following bids were received: Bidder Conatser Construction TX, LP Hall -Albert Construction, LLC William J. Schultz, Inc., d/b/a Circle "C" Construction Company Amount Time of Completion $662,444.00 120 Calendar Days $879,662.00 $1,085,110.00 M/WBE - Conatser Construction TX, LP, is in compliance with the City's M/WBE Ordinance by committing to 25 percent M/WBE participation. The City's goal on this project is 24 percent. In addition to the contract cost, $36,000.00 is required for construction staking, project management, material testing and inspection and $25,000.00 is provided for project contingencies. http://apps.cfwnet.org/council_packet/mc review.asp?ID=12369&councildate=ll/3/2009 11/5/2009 M&C Review Page 2 of 2 The project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers 2) P258 531350 702170036152 $10.000.00 2) P258 511010 702170036180 $6,000.00 2) P258 541200 702170036183 $687.444.00 2) P258 531200 702170036184 $4,000.00 2) P258 531350 702170036184 $2.000.00 2) P258 511010 702170036185 $2,000.00 2) P258 531350 702170036185 $12,000.00 1 &2) $723.444.00 P258 476045 7021700361ZZ Submitted for Citv Manaaer's Office bv: Oriainatina Department Head: Additional Information Contact: ATTACHMENTS 60SSM111 P2-CONATSER AO.doc 60SSM111 P2-CONATSER MAP REVISED.pdf FROM Fund/Account/Centers 1) PE45 538040 0709020 $723.444.00 2) P258 541200 702170036183 $662.444.00 Fernando Costa (6122) S. Frank Crumb (8207) Roberto C. Sauceda (2387) http://apps.cfwnet.org/councii_packet/mc review. asp?ID= 123 69&councildate= 11/3/2009 11/5/2009 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR M-1-1-1 DRAINAGE BASIN PART 2 SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS IN THE CITY OF FORT WORTH, TEXAS SEWER PROJECT NO. P258-702170036183 CITY PROJECT NO. 00361 DOE NO. 4296 Mike Moncrief Dale A. Fisseler, P.E. Mayor City Manager S. Frank Crumb, P.E. Roberto C. Sauceda, P,E. William A. Verkest Director City Project Manager Director Water Department Transportation and Public Works Department PREPARED BY DUNAWA Y R 1501 Merrimac Circle, Suite 100 w Fort Worth, Texas 76107 �® Phone 817.335.1121 Fax 817.335.7437 Texas Registered Engineering Firm F-1114 m���P�E ° e •°'° �' i 2009 ° oe.e.•oeeooe o e.E�MAN S. DUA•R••BYO• p..............r.........e DA No. 2000181 8 2 6 2 3 O�F Q/STVW •"��o 1, IYAL LNG®� —7 Z1 � DOCUMENTS TABLE OF CONTENTS SHORT FORM NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS (WATER - SEWER) TABLE OF CONTENTS DOCUMENTS TABLE OF CONTENTS ftd SHORT FORM NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS (WATER - SEWER) MWBE DOCUMENTS MWBE SPECIAL INSTRUCTIONS MWBE SUBCONTRACTORS/SUPPLIERS UTILIZATION FORM MWBE PRIME CONTRACTOR WAIVER MWBE GOOD FAITH EFFORT MWBE JOINT VENTURE BID PACKAGE BID PROPOSAL & SIGNATURE SHEETS VENDOR COMPLIANCE TO STATE LAW ADDENDA INDEX AND RECEIPT PRE -QUALIFIED SUB -CONTRACTOR LIST GENERAL AND SPECIAL CONDITIONS PART C GENERAL CONDITIONS (WATER - SEWER) SUPPLEMENTARY CONDITIONS TO PART C (WATER - SEWER) PART D - SPECIAL CONDITIONS (WATER - SEWER) PART DA - ADDITIONAL SPECIAL CONDITION (WATER - SEWER) PART E SPECIFICATIONS WAGE RATES COMPLIANCE WITH AND ENFORCEMENT OF PREVAILING WAGE RATES STANDARD DETAILS (WATER - SEWER) CONTRACTS, BONDS AND INSURANCE CERTIFICATE OF INSURANCE CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW CONFLICT OF INTEREST QUESTIONNAIRE PERFORMANCE BOND PAYMENT BOND MAINTENANCE BOND CITY OF FORT WORTH CONTRACT ow am TABLE OF CONTENTS PERMITS TRWD BNSF FWWR TxDOT EASEMENTS EASEMENT SHORT FORM NOTICE TO BIDDERS Sealed proposals for the following: FOR: M-1-1-1 DRAINAGE BASIN PART 2 -- SANITARY SEWER REHABILITATION AND IMPROVEMENTS SEWER PROJECT NO. P258-702170036183 CITY PROJECT NO. 00361 DOE NO. 4296 Addressed to: CITY OF FORT WORTH PURCHASING DIVISION .. 1000 THROCKMORTON ST FORT WORTH TX 76102-6311 no will be received at the Purchasing Office until 1:30 p.m., August 20, 2009 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. One set of plans and documents for this project maybe purchased for a non-refundable cost of Thirty Dollars ($30.00) per set in the 1501 Merrimac Circle, Suite 100, Fort Worth, Texas 76107. These documents contain additional information for prospective bidders. Plans and Specifications will be available for pick-up on Mondav, Auqust 3, 2009. The major work will consist of the following (All Approximate): 894 LF 10-inch Sewer line 830 LF 8-inch Sewer line 330 LF 6-inch Sewer line 9 EA Manholes All bidders submitting bids are required to be pre -qualified in accordance with the requirements of the Special Instructions to Bidders. For additional information, please contact Robert Sauceda, Project Manager, City of Fort Worth — Water Department at Telephone Number: 817-392-2387 or by email: Robert. Sauceda(a- fQrt�9 hoov.orq and/or Brian Darby, P.E., Project Manager, Dunaway Associates, L.P. at 817-3�35-112�j or by email: bsd cDdunaway-assoc.com Advertising Dates: July 30. 2009 August 6. 2009 t, COMPREHENSIVE NOTICE TO BIDDERS I Sealed proposals for the following: FOR: M-1-1-1 DRAINAGE BASIN PART 2 SANITARY SEWER REHABILITATION AND IMPROVEMENTS SEWER PROJECT NO. P258-702170036183 CITY PROJECT NO. 00361 DOE NO. 4296 Addressed to: CITY OF FORT WORTH PURCHASING DIVISION 1000 THROCKMORTON ST FORT WORTH TX 76102-6311 will be received at the Purchasing Office until 1:30 p.m. Auqust 20, 2009 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. One set of plans and documents for this project may be purchased for a non-refundable cost of Thirty Dollars ($30.00) per set in 1501 Merrimac Circle, Suite 100, Fort Worth, Texas 76107. These documents contain additional information for prospective bidders. Plans and Specifications will be available for pick-up on Monday. Auqust 3, 2009. The major work will consist of the following (All Approximate): 894 LF 10-inch Sewer line 830 LF 8-inch Sewer line ' 330 LF 6-inch Sewer line 9 EA Manholes Included in the above will be all other miscellaneous items of construction as outlined in the Plans, General Contract Documents and Specifications. NOTICES All bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil Statutes of the State of Texas with respect to the payment of prevailing wage rates and City of Fort Worth Ordinance no. 7400 (Fort Worth City Code Sections 13-A-221 through 13-A-29) prohibiting discrimination in the employment practices. Bid security may be required in accordance with Special Instructions to Bidders. The City of Fort Worth reserves the right to reject any and/or all bids and waive any and/or all formalities. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the Contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Addenda Index and Receipt form(s). Bids that do not - COMPREHENSIVE NOTICE TO BIDDERS acknowledge receipt of all addenda may be rejected as being non -responsive. Information regarding the status of addenda may be obtained by contacting the City Project Manager. Bidders, using the printed copy, shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposail section(s) and submit the complete specification book or face rejection of the bid as non -responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time deadline stated below or the bidder may request a copy of said forms from the City of Fort Worth Project Manager named in this solicitation. In accordance with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City of Fort Worth contracts. A copy of the Ordinance can be obtained from the office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM (with "Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received no later than 5:00 p.m., five (5) City of Fort Worth business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the Water Department to whom delivery was made. Such receipt shall be evidence that the City of Fort Worth received the Documentation. Failure to comply shall render the bid non -responsive. SUBMISSION OF BID AND AWARD OF CONTRACT The proposal within this document is designed as a package. In order to be considered an acceptable bid, the Contractor is required to submit a bid for the complete proposal. A bid proposal submittal that is received with the proposal incomplete will be rejected as being non -responsive. The Contractor, who submits the bid with the lowest price, will be the apparent successful bidder for the project. Bidders are hereby informed that the Director of the Water Department reserves the right to evaluate and recommend to the City of Fort Worth City Council the bid that is considered to be in the best interest of the City of Fort Worth. For additional information, please contact Mr. Brian Darby, P.E. with Dunaway Associates, L.P. at (817) 335- 1121, or Mr. Robert Sauceda, Project Manager, City of Fort Worth at (817) 392-2387. DALE A. FISSELER, P.E. CITY MANAGER Advertising Dates: July 30. 2009 August 6. 2009 MARTY HENDRIX CITY SECRETARY S. FRANK CRUMB, P.E. DIRECTOR WATER DEPARTMENT r By: 4 o b Tony Sholola, 'P.. Engineering Manager SPECIAL INSTRUCTIONS TO BIDDERS 1) PREOUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding,a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. .r c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. r d) Bids received in excess of the bid limit shall be considered non -responsive and will be rejected as such. No e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) MI are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded To be an _ acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law, or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 3. BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent of the contract price will be required, Reference C 3-3.7. 09/10/04 501 to 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of Right to Audit, under paragraph L of Section Cl: Supplementary Conditions To Part C — General Conditions, pertain to this inspection. (C) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. (d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601 g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is $25,000.00 or less, the contract amount shall be paid within forty- five (45) calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions 09/ 10/04 Fa or privileges of their employment, discriminate against persons because of their age except on the bases of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will •� defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM (`with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non -responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work _ performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation of facts (other than a negligent _. misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. 12. FINAL PAYMENT, ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment (less retainage) from the city for each pay period. 09/10/04 b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. y C. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due .� and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i) final quantities, or (ii) liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. 09/ 10/04 4 MWBE DOCUMENTS MWBE SPECIAL INSTRUCTIONS MWBE SUBCONTRACTORS/SUPPLIERS UTILIZATION FORM MWBE PRIME CONTRACTOR WAIVER MWBE GOOD FAITH EFFORT MWBE JOINT VENTURE wo FORT WORTH City of Fort Worth I" in 00 r Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY 1f the-toti dfoHar value=o[ the coil c -.is'x25,000 or more, th M/WBE goal'is applicable: If the total dollar value of the contract is;less than $25,000,. the-- BE goat is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MMBE PROJECT GOALS The City's M/WBE goal on this project is 24 % of the total bid (Base bid applies to Parks and Community Services). COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or 2. Good Faith Effort documentation, or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable. documents must be received by the Managing Uepar_trnent, within the following times allocated, in order for the entire bid to be considered responsive to the specifications, �i 3 � i��#eli��� tit iG1i4N$ in-pe (;h o .i e--Eipprrap at e ' tria€r i r#�ti ri `_ t` - `r fill be=_gviderit ;that-�tr� S r i f:tRE 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid �► to met or exceed goal. opening date, exclusive of the bid opening date. FAILUf E TO-comph1f WITH"THE CITY` QA�IVBE.ORDINANDEi V1fILL RESulT IN THE BID BEING CONSIDERED _ `. NON RESPONSIVE TO.SRECIFICA'EIONS Any questions, please contact the M/WBE Office at (817) 392-6104. Rev. 11/11/05 ATTACHMENT IA _ Page 1 of 4 FORT WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form P ME COMPANY NAME: Check applicable block to describe prime r 1 �/ Or)Y) s4 Y"t t- c4 I O n �/\ LP I M/W/DBE I NON-M/W/DBE PROJECT NAME: M-1-1-1 Drainage Basin Part 2, SanitarySewer Rehabilitation and Improvements BID DATE SEWER PROJECT NO. P258-702170036183 CITY PROJECT NO.00361 DOE No. 4296 Q g / a v/ CZ0017 City's M/WBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER 24 % � , gq C';fJ P1-QjeC,1A10. 00344 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. The undersigned Offeror agrees-. to enter into a formal agreement with the MNVBE firm(s) listed in this utilization. schedule, conditioned -upon execution of a contract ith the City of Fort Worth. The intentional and/or knowing misrepresentation of facts1is_grounds:for- . consideration of -disqualification and will result. in the bid being; considered non -responsive to tied spe -co ific ns M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 'i tt tier;- a payment by -:a subcontractor to we its supplier is considered 2"d tier ALL MIWBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have .. been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division- Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). .. If hauling services are utilized, the prime_ will be' given credit as� long as the M/WBE listed owns and operates at least one fully Licensed and''perational truckao: be used on the con tFacf: The MNVBE may lease trucks from another M/WBE firm, including NtIWBE owner -operators, and receive full MNVBE credit. The M/WBE may lease trucks from non MLItItSfBEs including owner -operators; but will only receive credit for the fees and commissions earnefty:the MNt1BE as outlitied_in the1ease agreement:. Rev. 5/30/03 ATTACHMENT IA Page 2 of 4 FORT+ W�ORT`H w s Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority, Women and non-M/WBEs. Please list MANBE firms first, use additional sheets if necessary. no Certification N (check one) n SUBCONTkACTOR/SUPPLIER T N T Detail Detail Company Name Address i e M W C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B R O B E E C T E A %W ROBERT GRANADOS TRUCKING HOW 0 l 4608 Sandage S u i P1 US, Fort Worth, Texas 76115' (817) 875-2400 Uncr m e, Red; M i k �45,g 00 as COWTOWN REDI-MIX PO Box 162327 Fort Worth, Texas 76161 f' v (817) 759-1919 f (817) 759-1716 F y TMbI�� tc, Roadrunner Traffic Supply, Inc. Car- -Vo' $ I `1 3200 Marquita Drive /� Fort Worth, Texas 76116 I r� eS phone:817-244-4524 l fax: 817-244-4819 4� TruBlue Services, LLC 8716 S. Water Tower Rd. S-e e 1ii� C>] 0 `-( Fort Worth, Texas 76179 I i so ` 100.0 phone: 817-917-3238 ✓ t BORING HAROS BROTHERS 5112 Mosson Road ,. Fort Worth, Texas 76119 (817) 572-6332 N Or 6 Rev. 5/30/03 r ATTACHMENT 1A FORT WORTH Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority, Women and non-M/WBEs. No Please list MIIIVBE firms first, use additional sheets if necessary. Certification N (check one) SUBCONTRACTOR/SUPPLIER T n N T Detail Detail Company Name i Address e M W C X M Subcontracting Work Supplies Purchased Dollar Amount T p Telephone/Fax r B B R O B nn E E C T E A -I`V SY '5Wc4 i vr1 S Magnum Manhole Company CA— L;, vie 314 S. Kirby Street Garland, Texas I nr v(214) 687-2293 fax(972) 231-3934 Pro+e CA; %ice COA+� t -c� 4o f * 1" ck r4v I \0- S am SUN COAST RESOURCES INC. Teri Bateman PO Box 972321 Dallas, Texas 75397 v(800)677-3835 x655 No NATIONAL WATERWORKS PO Box 840700 ' Dallas, Texas 75284 (800)252-1557 JLB Contracting, LLC PO Box 24131 I Fort Worth, Texas 76124 (817)261-2991 .. i No FA- T; pe,Ppe F'� yq 60 i- Ytn) J ps �t 'S`j,4 3� Rev. 5/30103 ATTACHMENT 1A — FORT WORTH Page 4 of 4 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ 9, / 0�� 06 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ a5'7l J' 3 dZ) The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a! Request for Approval of ChangelAddition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. a MW — By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. Au nOnature v " Tit e MLw-ia+&-e Y- On,-) qrm,14-1 ck�x' oo Company Name -F (). Rj2?�. I P��qg Address ,statemp `7(Q I 101 Printed Signatuue 0 ontact Name iNe (it different DoQ---a JC Teleptione and/or Fax C- C pa-) F »ail Addss I nc) Deft r Rev. 5/30/03 s FORT WORTH ATTACHMENT I Page 1 of 1 City of Fort Worth Prime Contractor Waiver Form PRIME COMPANY NAME: Check applicable block to describe t prime PROJECT NAME: kM/DBE I I NON-M/W/DBE _ M-1-1-1 Drainage Basin Part 2, SanitarySewer Rehabilitation and Improvements BID DATE SEWER PROJECT NO. P258-7121700361113 CITY PROJECT NO. 00361 DOE No. 4296 City's M/WBE Project Goal: I PROJECT NUMBER 24 % If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Faift7lre to complete this form in`its entirgty antl be:received`by tF a ll��raq�np Department on or bhfare>5:00 �rm� five (51 C�tv �ne Fp days after bid op���r�, exclusive ofthe-;bid opening date, wilLresult`in the bid being oonsi iered.:non-responsi'Vi to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, NO this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business- I NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WBE(s) on this contract, the payment therefore and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of aw the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws conceming false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. �+ Authorized Signature Printed Signature Title Contact Name (if different) Company Name Phone Number Fax Number Address Email Address b City/State/Zip Date Rev. 5/30/03 r FORT WORTH City of Fort Worth Good Faith Effort Form PRIME eeMPAWt NAME FrVjeCt Name; M-1-1-1 Drainage Basin Part 2, SanitarySewer Rehabilitation and Improvements SEWER PROJECT NO. P258-702170036183 ns CITY PROJECT NO. 00361 DOE No. 4296 City's M/WBE Project Goal: I PROJECT NUMBER 24°io 14 Roo eof AJP. 003 (0 l ATTACHMENT 1C Page 1 of 3 Check applicable block to describe prime MNV/DBE ✓NON-MM/DBE BID DATE IDd,C� J�b. Ll�q (o If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or if your I DBE participation is less than the City's project goal, you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (51 City business days afterbidopening, exclusive of bid .. opening date, will result in the bid being considered non -responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity) for the completion of this project, regardless of whether it is to be provided by a MIWBE or non-MIWBE. JDO NOT LIST NAMES OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the 2O° tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities I ruc i rArz d 4n t A.I D �� a V, 9LLLS ayv M 4-P i M I V( ww r, °�-sca i ]:T�4�r -i r l 5k l i Q C —} _ 1 P10 - Y1+Y1FU XP1 M" 1 V .=Yl- { O ;� �0, fssf 0 9�i A�Pg �i �� l �1P_ c Coo 'I �- .. 00 no Rev. 05/30/03 .. ATTACHMENT 1C Page 2 of 3 .. 2.) Obtain a current (not more than three (3) months old from the bid open date) list of MIWBE subcontractors and/or suppliers from the City's MIWBE Office. t/Yes Date of Listing 7l D ,�, I Og No 3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? ✓Yes (If yes, attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed_) No •� 4.) Did you solicit bids from MIWBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? YeS (If yes, attach list to include name of M/WBE firm, person contacted, phone number and date and time of contact) No NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide MIWBE name, date, time, fax number and documentation faxed. .. I NOTE: If the list of MIWBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the . bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (1.0)_otmore, the bidder must contact at least two- thirds (2/3) of the list within such area :of,oppvFtunity, but -not less:: than.: ten: -_to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of pllAns and specifications in order to assist the M/WBEs? Yes No -- 6.) Submit documentation if MIWBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MIWBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in -camera access to and inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone Contact Person Sc a of Work Reason for Rejection fif4.r_1tU_4 s Rev. 05/30/03 .. .. so s no ATTACHMENT I Page 3 of 3 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the MM/BE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City' /WBE Offi .. Title f larl: +�" �) C& Company Name P0 - ism 1'5 LP4 S Address MW 4--L, , �—rA -�b I lei City/State/zip so �- Printed Sig ature M .r) Contact Name and Title (if different) 44-7 53 171 3 r9,2)534-� 1T hone Number Fax Number I P) ail Addr ss �I Inc) Date/ l ,� Rev. 05/30/03 M Joint Venture Page 1 of 3 FORT WORTH CITY OF FORT WORTH Joint Venture Eligibility Form All questions must be answered; use "NA" l f applicable. Name of City project: M-1-I-1 Drainaf?e Basin Part 2. Sanitary Sewer Rehabilitation and Improvements A joint venture form must be completed on each project RFPBid/Purchasing Number: 1. Joint venture information: Joint Venture Name: Joint Venture Address: ,r (If applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each fine comprising the joint venture M/WBE firm Non-MlWBE ` name: ( firm name: Business Address: Business Address: I City, State, Zip: City, State, Zip: am I Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the M/WBE: I Describe the scope of work of the non-M/WBE: UK so no Rev. 5/30/03 ,. Joint Venture Page 2 of 3 3. What is the percentage of M/WBE participation on this joint venture that you wish to be counted toward +` meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) I •+ Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day -today —' management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: rr a. Estimating ----------------------------------------------- b. Marketing and Sales I ---------------------------------- ------------ """ c. Hiring and Firing of management personnel ----------------------------------------------- d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the M/WBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City s M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's M/WBE Ordinance. no .. Rev. 5/30/03 Joint Venture Page 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this .. provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts. ---------------------------------------- ----------------------------------------- Name of M/WBE firm Name of non-M/WBE firm Printed Name of Owner Signature of Owner Printed Name of Owner Signature of Owner Title Date Printed Name of Owner Signature of Owner Printed Name of Owner Signature of Owner Title Date Notarization State of County of On this day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that tl properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Namc Notary Public sign we Commission Expires (seat) Rev. 5/30/03 BID PACKAGE BID PROPOSAL & SIGNATURE SHEETS VENDOR COMPLIANCE TO STATE LAW ADDENDA INDEX AND RECEIPT PRE -QUALIFIED SUB -CONTRACTOR LIST PROPOSAL TO: MR. DALE A. FISSLER, P.E. - Fort Worth, Texas City Manager Fort Worth, Texas FOR: M-1-1-1 DRAINAGE BASIN PART 2 SANITARY SEWER REHABILITATION AND IMPROVEMENTS SEWER PROJECT NO. P258-702170036183 CITY PROJECT NO. 00361 DOE NO. 4296 Pursuant to the foregoing "Notice to Bidders," the undersigned has examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director, Water Department of the City of Fort Worth. If required by this project, Contractor must be pre -qualified in accordance with the projects sponsoring Departments of the City of Fort Worth requirements. Upon acceptance of this Proposal by the City Council and required by this project, the bidder is bound to execute a contract and furnish Performance, Maintenance Bond for the water replacement contract only, and Payment Bond approved by the City of Fort Worth for performing and completing said work within the time stated for the following sums, to wit: - Total quantities given in the bid proposal may not reflect actual quantities, by represent the best accuracy based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. r am 0r r r M-1-1-1 DRAINAGE BASIN — PART 2 SANITARY SEWER REHABILITATION AND IMPROVEMENTS Sewer Project No. P258-702170036183, City Project No. 00361, DOE No. 4296 PAY CPMS APPROX. DESCRIPTION OF ITEMS UNIT TOTAL ITEM No. QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE 1 BID-00331 330 LF pipe-Sewer-6 Inch-SDR35 (All Depths) * For t v Dollars and N O Cents per LF $ yO- OU $ 13, 20o• oo 2 BID-00350 200 LF pipe-Sewer-8 Inch-SDR26 (All Depths) dt /� /GO r >t v - t; ✓G Dollars and NO Cents LF $ yS OO $ 9000.UO g BID-00618 450 LF Pipe-Pressure-8 Inch (C-900 PVC) (Sanitary Sewer) i i Pt Dollars , and NO Cents per LF $ 5"0. DO $ 2,7,500.QD 4, BID-01165 185 LF Pipe-Sewer-8 Inch -In Casing Pipe -Other Than Open Cut - Install (8" 150 psi DIP with Protecto 401 including 16" casing pipe with stainless steel casing spacers) / �YPP Dollars and vt? Cents LF $ 360.00 $ S5,S00.00 5. BID-00246 260 LF Pipe-Sewer-10 Inch-SDR35 (All Depths) dt S : x ty Dollars and NO Cents LF $ 60. 00 $ 600.00 6. BID-00955 640 LF Pipe-101nch HDPE by Pipe Enlargement Techniques - Install Sep Q rli —% Dollars and NO ' Cents LF $ 70.00 $ go. 60 7. BID-00352 50 LF Sewer Service - 4 Inch Sewer Plumbing - 4 Inch - SCH 40 - Install An r y/ Dollars and ND Cents LF $ yD 00 $ ?,o00.00 g BID-00354 110 LF Sewer ServiceA Inch dt � Th; rt y — T,'VC Dollars and NO Cents LF $ 3S 0 o $ 3 BS6. 00 9. BID-00358 185 LF Sewer Service4 Inch SDR 26 rL. r J y - e,)7 Dollars and A)Q Cents per LF $ -3 8 .0 0 $ 2,030.00 10. BID-00358 80 LF Sewer Service4 Inch-SDR26 (By Short Bore) _ .; ( t- 1, Dollars and NO Cents per LF $ 60. 00 $ 41 e60. 00 11. BID-00443 690 LF Pavement-2 Inch Min HMAC on 2/27 Concrete Base (STR- 028) - Install �ort y- a°. jrfi t Dollars and Ale) Cents per LF $ !kov. 00 $ 12. BID-00458 385 LF Pavement -Concrete on 2127 Concrete Base (STR-031) Dollars and NO Cents LF $ SO.O 0 $ �9, -so. a a " Contractor must complete the following "City Approved Product" form on Page - Proposal - 5 4.1a - Proposal Chart-MM 072909.doc Proposal - 1 PAY ITEM 13. 14 15 20. 21. 22. 23. No no 24. 25. SANITARY SEWER REHABILITATION AND IMPROVEMENTS M-1-1-1 DRAINAGE BASIN - PART 2 Sewer Project No. P258-702170036183, City Project No. 00361, DOE No. 4296 CPMS APPROX. DESCRIPTION OF ITEMS UNIT TOTAL No. QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE BID-00092 45 Cy RipRap -- Install (18"-24" well graded) 5" x , ,,o Dollars and Cents per CY $ (as 0 v $ 2� iZS 00 BID-00134 320 SY Grass-Hydromulch Seeding Dollars and Nn Cents per SY $ ( 0 0 $ -2 -0,00 BID-00198 9 EA Collar -Manhole — 32 Inch — Frame & Cover 0 *1 e tJa"A Ck n d Dollars and /r/n Cents EA $ J/ 000.00 $ 9,aoo- no BID-00201 2,060 LF Inspection -Post Construction Cleaning & TV -%t) Dollars and A,)0 Cents per LF $ z, v o C $ BID-00202 12,940 LF Inspection-Preconstruction Cleaning & TV n Dollars and e� ply f V—r, ve Cents LF $ Z 8S $ 36,e SOD BID-00205 1 EA Manhole -• Abandon /PVC AWirc( Dollars and .tJ0 Cents per EA $ SOO.Do $ %700,0a BID-00205 4 EA Manhole — Abandon (structure) / C. 17A t A Dollars and .v03 Cents EA $ POO.00 $ 3, Zac. 00 BID-00206 28 EA Manhole — Remove %%te?e lt�p1ASQk(7/ Dollars and .V n Cents per EA $ 3,000,00 $ 8y, 600.0 O BID-00207 1 EA Manhole-Drop-Std 4 Ft Diam-(to 6 Ft depth) -7 woe fii --C!, mac, Dollars and it/D Cents per EA $ 4 I'Op, p0 $ 'Poo .00 BID-00208 4 VF Manhole-Drop-Std 4 Ft Diam-Added Depth (over 6 Ft Depth) Install / -7Z0 /1 6C Wr-eo/ T-� PeY Dollars and it/n Cents VF $ Z90, 00 $ , boo. oa BID-00211 20 VF Manhole, --Paint & Coating -interior Protective Coating -- Install ( %A1',A GIItQrP�7 Pt/—I�'VP Dollars and //rn Cents per VF $ /25; p 6 $ 3206. 0 Q BID-00213 8 EA Manhole-Std 4.Ft Diam-(to 6 Ft Depth) 771_e,11 y/—r/,"V (,�,A ,d Dollars and tie Cents per EA $ 2WOO.Qp $ Z0j000.Op BID-00214 18 VF Manhole-Std 4 Ft//Diam-Added Depth (over 6 Ft Depth) 0/1e 11 u/► Yta(� Dollars and VA Cents per VF $ �..0. Do $ �? 700• 00 4.1a - Proposal Chart-MM 072909.doc Proposal - 2 SANITARY SEWER REHABILITATION AND IMPROVEMENTS M-1-1-1 DRAINAGE BASIN — PART 2 Sewer Project No. P258-702170036183, City Project No. 00361, DOE No. 4296 PAY CPMS APPROX. DESCRIPTION OF ITEMS UNIT TOTAL ITEM No. ( QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE 26 BID-00217 9 EA Manhole -Vacuum Test Dollars and n Cents per EA $ SD , 00 $ TS� .. 27 BID-00335 20 FA Sewer Service-4 Inch Service Tap 1-hrte, kUABred Dollars and n Cents per EA $ '�V�. �D $ &, O CD 28. BID-00356 20 EA Sewer Service-0 Inch-2 Way Clean Out -rwo hundred Dollars .. and />O Cents per EA OCQ� . ([ CaD / r $ $ P9. BID-00362 3 EA 1 Sewer-Service-6 Inch-2 Way Clean Out (MAIN LINE CLEAN OUT) Thret. hundred _P41 fy J Dollars and �n Cents FA $�50� $'050 .. 30. BID-00372 1,610 LF Trench Safety System 5 Foot Depth Two Dollars and A Cents LF $ a �-� v�ot� 31. BID-00423 335 LF Curb ii< Gutter - Install Dollars and n Cents LF � ✓ OI 0 �/ OD �� /� .O . $ $ 32. BID-01189 1 LS Signal - Traffic Control - Design & Provide - Install Dour -� hou. sand Dollars and Il0 Cents LS $Lt 33. BID-00528 190 SF Walk - Install _ Pi `/ & Dollars and AC) Cents SF 0� $ $ 34. BID-00544 4 CY Fill Material-Flowable Fill (to abandon 6" existing sanitary sewer) 1 One. hun a fl d '}'tA and hQ Dollars Cents CY /' O 1 L . $ $ 35. BID-00544 8 CY Fill Material-Flowable Fill (to abandon 8" existing sanitary sewer) 06f, rid -Fen Dollars vo ✓ v �`' and Cents CY $ $ 36. BID-00544 45 CY Fill Material-Flowable Fill (to abandon 15" existing sanitary Dz, ktkAkred +eA Dollars �7J _ /L�O � ` � `7 and j1\0 Cents CY $ $ 37 BID-00544 45 CY Fill Material-Flowable Fill (to abandon 18" existing sanitary sewer) On, km l(ed -den Dollars q5D and A0 Cents CY 4.1a - Proposal Chart-MM 072909.doc Proposal - 3 SANITARY SEWER REHABILITATION AND IMPROVEMENTS M-1-1-1 DRAINAGE BASIN - PART 2 Sewer Project No. P258-702170036183, City Project No. 00361, DOE No. 4296 PAY CPMS APPROX. DESCRIPTION OF ITEMS UNIT TOTAL ITEM No. QUANTITY WITH BID PRICES WRITTEN IN WORDS VALUE VALUE 38. BID-00544 620 CY Fill Material-Flowable Fill (to abandon 24" existing sanitary sewer) I ont✓ �W d T6n Dollars and 1W Cents CY I [✓ $ �� oC��.i $ 1 ■.r 39. BID-00544 1,190 CY Fill Material-Flowable Fill (to abandon 39" existing sanitary sewer) I �, G A L , j� u b-e� 4� Dollars t1 11 n� o1(�7W � and r-10 Cents CY $ $ 40. BID-00841 200 LF Concrete -Encasement r 1 �P U Dollars .r 1+e and no Cents LF J 5 OD $ i 41. BID-01139 5 EA Structure - Remove �? Dollars Cents EA ''11 �� oOv'l /�`� n,�l �VI0a)' and S $ TOTAL $ ��/ 1�L�Z)D 0 or fto 0.# .. 4.1a - Proposal Chart-MM 072909.doc Proposal - 4 is so CITY APPROVED PRODUCT FOR * " CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED Standard Spec No. Size E 1-31 4" through 36" E1-25 4" through 15" E1-27 4" through 15" E1-28 18" through 27" E100-2 18" through 48" Consult with "City of Fort Worth, Texas Standard Product List" to obtain the Generic/Trade Name and the Manufacturer for the pipes listed above. Failure to provide the information required above may result in rejection of bid as non- responsive. Only Products listed above will be allowed for use in this proiect. Any substitutions shall result in reiection of bid as non -responsive 4.1a - Proposal Chart-MM 072909.doc Proposal - 5 PROPOSAL -a .. Within ten (10) days of notification by City, the undersigned will execute the formal contract and deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents, and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 120 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. The work order will be issued no later than 90 days after the award of contract. A. The principal place of business of our company is in the State of Non-resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident bidders in the State of our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledged of the following addenda: Addendum No. 1 (initials) Addendum No. 2 (initials) Addendum No. 3 (initials) (SEAL) if Bidder is Corporation Date: mg a �� o 01 Respectfully submitted, 1 n — U By: ��e----> am - C Title: _ f ��;de �1 Address: PC). Q Fort 010 iC'\ Telephone: — 4. 4.1a - Proposal Chart-MM 072909.doc Proposal - 6 PROPOSAL STATEMENT OF MATERIALS AND OTHER CHARGES MATERIALS INCORPORATED INTO THE PROJECT $ -31 Z LI to ALL OTHER CHARGES $ 1pv doo *TOTAL $ l o1 '94�/'z/.00 I/ *this total must agree with the total figure shown in Proposal, TOTAL AMOUNT BID in the bound contract. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. NOTE: ONLY THE COPY OF THIS FORM ON THE BOUND CONTRACTS IS TO BE FILLED OUT. 4.1a - Proposal Chart-MM 072909.doc Proposal - 7 VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the State of - Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required too underbid a nonresident bidder in order .. to obtain a comparable contract in the State in which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or nonresident bidders in order for your bid to meet specifications. The failure of out-of-state or nonresident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident vendors in (give State), our principal place of business, are required to be percent lower than resident bidders by State law. A copy of the Statute is attached. Nonresident vendors in (give State), our principal place of business, are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas ompany (Oease print) Address City/State/Zip Signature: Title: a (Please print) THIS FORM MUST BE RETURNED WITH YOUR QUOTATION .. ADDENDA INDEX AND RECEIPT N//q- Addenda Date Receipt Number PRE -QUALIFIED SUB -CONTRACTOR LIST SUB -CONTRACTOR Indicate Unit(s)/Section(s) Detail Subcontracting Company Name Working Work Address Telephone/Fax r W f r GENERAL AND SPECIAL PART C GENERAL CONDITIONS (WATER - SEWER) SUPPLEMENTARY CONDITIONS TO PART C (WATER - SEWER) PART D - SPECIAL CONDITIONS (WATER - SEWER) PART DA - ADDITIONAL SPECIAL CONDITION (WATER - SEWER) PART E SPECIFICATIONS WAGE RATES COMPLIANCE WITH AND ENFORCEMENT OF PREVAILING WAGE RATES STANDARD DETAILS (WATER - SEWER) UW r No .o .. PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1(1) C1-1.2 Contract Documents C1-1(1) C1-1.3 Notice to Bidders C1-1(2) C1-1.4 Proposal C1-1(2) C1-1.5 Bidder C1-1(2) C1-1.6 General Conditions C1-1(2) C1-1.7 Special Conditions C1-1(2) C1-1.8 Specifications C1-1(2) C1-1.9 Bond C1-1(3) C1-1.10 Contract C1-1(3) C1-1.11 Plans C1-1(3) C1-1.12 City C1-1(3) C1-1.13 City Council C1-1(3) C1-1.14 Mayor C1-1(3) C1-1.15 City Manager C1-1(4) C1-1.16 City Attorney C1-1(4) C1-1.17 Director of Public Works C1-1(4) C1-1.18 Director, City Water Department C1-1(4) C1-1.19 Engineer C1-1(4) C1-1.20 Contractor C1-1(4) C1-1.21 Sureties C1-1(4) C1-1.22 The Work or Project C1-1(4) C1-1.23 Working Day C1-1(5) C1-1.24 Calendar Day C1-1(5) C1-1.25 Legal Holiday C1-1(5) C1-1.26 Abbreviations C1-1(5) C1-1.27 Change Order C1-1(6) C1-1.28 Paved Streets and Alleys C1-1(6) C1-1.29 Unpaved Streets and Alleys C1-1(7) C1-1.30 City Streets C1-1(7) C1-1.31 Roadway C1-1(7) C1-1.32 Gravel Street C1-1(7) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2(1) C2-2.2 Interpretation of Quantities C2-2(2) C2-2.3 Examination of Contract Documents and Site C2-2(2) C2-2.4 Submitting of Proposal C2-2(3) C2-2.5 Rejection of Proposals C2-2(3) C2-2.6 Bid Security C2-2(3) C2-2.7 Delivery of Proposal C2-2(4) C2-2.8 Withdrawing Proposals C2-2(4) C2-2.9 Telegraphic Modification of Proposals C2-2(4) C2-2.10 Public Opening of Proposals C2-2(4) C2-2.11 Irregular Proposals C2-2(5) C1-1 (1) i C2-2.12 Disqualification of Bidders C2-2(5) C3-3 AWARD OF EXECUTION OF DOCUMENTS C3-3.1 Consideration of Proposals C3-3(1) C3-3.2 Minority Business Enterprise/ Women -Owned Business Enterprise Compliance C3-3(1) C3-3.3 Equal Employment Provisions C3-3(1) C3-3.4 Withdrawal of Proposals C3-3(2) C3-3.5 Award of Contract C3-3(2) C3-3.6 Return of Proposal Securities C3-3(2) C3-3.7 Bonds C3-3(2) C3-3.8 Execution of Contract C3-3(4) C3-3.9 Failure to Execute Contract C3-3(4) C3-3.10 Beginning Work C3-3(4) C3-3.11 Insurance C3-3(4) C3-3.12 Contractor's Obligations C3-3(7) C3-3.13 Weekly Payroll C3-3(7) C3-3.14 Contractor's Contract Administration C3-3(7) C3-3.15 Venue C3-3(8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4(1) C4-4.2 Special Provisions C4-4(1) C4-4.3 Increased or Decreased Quantities C4-4(1) C4-4.4 Alteration of Contract Documents C4-4(2) C4-4.5 Extra Work C4-4(2) C4-4.6 Schedule of Operations C4-4(4) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4(4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5(1) C5-5.2 Conformity with Plans C5-5(1) C5-5.3 Coordination of Contract Documents C5-5(2) C5-5.4 Cooperation of Contractor C5-5(2) C5-5.5 Emergency and/or Rectification Work C5-5(3) C5-5.6 Field Office C5-5(3) C5-5.7 Construction Stakes C5-5(3) C5-5.8 Authority and Duties of Inspectors C5-5(4) C5-5.9 Inspection C5-5(5) C5-5.10 Removal of Defective and Unauthorized Work C5-5(5) C5-5.11 Substitute Materials or Equipment C5-5(6) C5-5.12 Samples and Tests of Materials C5-5(6) C5-5.13 Storage of Materials C5-5(7) C5-5.14 Existing Structures and Utilities C5-5(7) C5-5.15 Interruption of Service C5-5(8) C5-5.16 Mutual Responsibility of Contractors C5-5(9) C5-5.17 Cleanup C5-5(9) C5-5.18 Final Inspection C5-5(9) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY 1W W No mom amm I" ow VW SM im C1-1 (1) od -00 C6-6.1 Laws to be Observed C6-6(1) C6-6.2 Permits and Licenses C6-6(1) C6-6.3 Patented Devices, Materials and Processes C6-6(1) C6-6.4 Sanitary Provisions C6-6(2) C6-6.5 Public Safety and Convenience C6-6(2) C6-6.6 Privileges of Contractor in Streets, Alleys, and Rights -of -Way C6-6(3) C6-6.7 Railway Crossings C6-6(4) C6-6.8 Barricades, Warnings and Watchmen C6-6(4) C6-6.9 Use of Explosives, Drop Weight, etc. C6-6(6) C6-6.10 Work Within Easements C6-6(6) C6-6.11 Independent Contractor C6-6(8) C6-6.12 Contractor's Responsibility for Damage Claims C6-6(9) C6-6.13 Contractor's Claim for Damages C6-6(9) C6-6.14 Adjustment or Relocation of Public Utilities, etc. C6-6(10) C6-6.15 Temporary Sewer Drain Connections C6-6(10) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6(10) C6-6.17 Use of a Section or Portion of the Work C6-6(11) C6-6.18 Contractor's Responsibility for Work C6-6(11) C6-6.19 No Waiver of Legal Rights C6-6(11) ■• C6-6.20 Personal Liability of Public Officials C6-6(12) C6-6.21 State Sales Tax C6-6(12) C7-7 PROSECUTION AND PROGRESS .s C7-7.1 Subletting C7-7(1) C7-7.2 Assignment of Contract C7-7(1) C7-7.3 Prosecution of the Work C7-7(1) .,. C7-7.4 Limitations of Operations C7-7(2) C7-7.5 Character of Workmen and Equipment C7-7(2) C7-7.6 Work Schedule C7-7(3) C7-7.7 Time of Commencement and Completion C7-7(4) C7-7.8 Extension of Time of Completion C7-7(4) C7-7.9 Delays C7-7(5) C7-7.10 Time of Completion C7-7(5) C7-7.11 Suspension by Court Order C7-7(6) C7-7.12 Temporary Suspension C7-7(6) C7-7.13 Termination of Contract Due to National Emergency C7-7(7) C7-7.14 Suspension or Abandonment of the Work and Annulment of Contract C7-7(8) C7-7.15 Fulfillment of Contract C7-7(10) C7-7.16 Termination for Convenience of the Owner C7-7(10) C7-7.17 Safety Methods and Practices C7-7(13) C8-8 MEASUREMENT AND PAYMENT ... C8-8.1 Measurement of Quantities C8-8(1) C8-8.2 Unit Prices C8-8(1) C8-8.3 Lump Sum C8-8(1) C8-8.4 Scope of Payment C8-8(1) C8-8.5 Partial Estimates and Retainage C8-8(2) C1-1 (1) aw C8-8.6 Withholding Payment C8-8(3) C8-8.7 Final Acceptance C8-8(3) C8-8.8 Final Payment C8-8(3) *�+ C8-8.9 Adequacy of Design C8-8(4) C8-8.10 General Guaranty C8-8(5) C8-8.11 Subsidiary Work C8-8(5) C8-8.12 Miscellaneous Placement of Material C8-8(5) C8-8.13 Record Documents C8-8(5) ,.r to PART C - GENERAL CONDITIONS C1-1 DEFINTIONS SECTION C1-1 DEFINITIONS MW C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are MW used, the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of the contract. These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (sample) White PART B - PROPOSAL (sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow IMF C1-1 (1) r (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El -White E2-Goldenrod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White r b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and ow include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS s PART F - BONDS w MW C1-1 (1) IM PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished directly to interested parties pertaining to the work contemplated under the Contract Documents constitutes the Notice to Bidders. C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents, constitutes a bidder. C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions, the latter shall take precedence and shall govern. C1-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATIONS: The Specifications are that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to 6" AM Aw .w MW on Am PM M ,w off CM (2) '0" 4M w standard specifications, regulations, requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as thought they were embodied therein. C1-1.9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3.7) c. Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part a and C2-2.6) C1-1.10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail .. the location, dimension and position of the various elements of the project, including such profiles, typical cross -sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents, but they are a part of the Contract Documents just as though they were bound therein. 'C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City Manager, each of which is required by charter to perform specific duties. Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested ow in the City Manager. The terms City and Owner are synonymous. C1-1.13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. wo C1-1 (3) r 4W C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized representative, assistant, or agents. Cl- 1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. C1-1.20 CONTRACTOR: The person, persons, partnership, company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub -contractor is a person, firm corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. no bw "M ME W No IMF .w •w CIA (4) WE "N C1-1.23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m., with exceptions as permitted in paragraph C7-7.6. C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. C1-1.25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: 1. New Year's Day January 1 2. M.L. King, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September .� 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine. _ When one of the above named holidays or a special holiday declared by the City Council, falls on Saturday, the holiday shall be observed on the preceding Friday, or if it falls on Sunday, it shall be observed on the following Monday by those employees working on working day operations. Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1.26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: AASHTO - American Association of State Highway Transportation .. Officials ASCE - American Society of Civil Engineers LAW - In Accordance with ,r AWWA - American Water Works Association ASA - American Standards Association HI - Hydraulic Institute No MW Asph. - Asphalt Ave. - Avenue Blvd. - Boulevard CI - Cast Iron CL - Center Line GI - Galvanized Iron Lin. - Linear or Lineal lb. - Pound MH - Manhole +� Max. - Maximum MGD -Million Gallons per Day CFS - Cubic Foot per Second Min. - Minimum Mono. - Monolithic $ - Percentum R - Radius _ low I.D. - Inside Diameter O.D. - Outside Diameter Elev. - Elevation F - Fahrenheit C - Centigrade In. - Inch # Ft. - Foot St. - Street CY - Cubic Yard *� Yd. - Yard SY - Square Yard L.F. - Linear Foot JEW D.I. - Ductile Iron C1-1.27 CHANGE ORDER: A "Change Order" is a written ift supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more _ than 25k of the amount of the particular item or items in the original proposal. All- "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall "' be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: kmff C1-1 (6) �" vW W 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment, not including an oiled surface, with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys." C1-1.30 CITY STREETS: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: The roadway is defined as the area between parallel lines two (21) feet back of the curb lines or four (41) feet back of the average edge of pavement where no curb exists. .f C1-1.32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than —the natural material found on the .. street surface before any improvement was made. C1-1 (7) SECTION C-GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with proposal forms which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10%) percent of the estimated project cost will be required. For an experience record 1 given project, it must seeking qualification in magnitude as that of th received. Such experience not more than five ( 5 ) ye< to be received. The Din sole judge as to thi c be considered to be acceptable for a reflect the experience of the firm work of both the same nature and project for which bids are to be must have been on projects completed rs prior to the date on which bids are ctor of the Water Department shall be acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. �.r ow VW o V* MW OR aw off M wo C2-2 (1) # W C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to `! be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract ,,, Documents. Prior to the filing of proposal, bidders are required to read .. and become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be '+ necessary, to gain a complete knowledge of the conditions which will be encountered during the construction of the project. They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon �+ the Owner. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal in prima -facie evidence that the bidder has made the investigations, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. WM C2-2 (2) i .w The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the Owner nor the Engineer guarantees that the data shown is representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSAL: The bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the bidder shall state the prices, written in ink in both words and numerals, for which he proposes to do the work contemplated or furnish the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. . If a proposal is submitted by an individual, his or her name must be signed by his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given, and the proposal must be signed by a member of the firm association, or partnership, or by a person duly authorized. If a proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalanced values of any items. Proposals tendered or delivered after the official time designated for receipt of proposals shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the "Proposal." The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the hm bw 4+ ..r s 4W rr MR .t r.n yff C2-2 (3) WN three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2.7 DELIVERY OF PROPOSALS: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL" and the name of description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration of a .. proposal must be made in writing, addressed to the City manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non - consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received *- within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. s C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non -consideration Request" has been received will be publicly opened and read aloud by the City ,P� Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the owner until ow C2-2 (4) r7m rn the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as being "Irregular" if they show any omissions, alterations of form, additions, or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However, the Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their proposals not considered for any of, but no not limited to, the following reasons: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquiries as the Owner may see fit to make. g. Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. sw h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: # 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration, which have been successfully completed by the Bidder. w C2-2 (5) No ib no .r w so 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2 (6) 40 PART C—GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS wr C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of brining items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit Aw prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. 'T Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re -advertise for new proposals, or to proceed with the work in any manner as may be considered for the best interest of the Owner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, 11M upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) an/or a Woman -Owned Business Enterprise (WBE) on the contract and the ow payment therefore. Contractor further agrees, upon request by Owner, to allow an audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for bidding on future contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with current City Ordinance prohibiting discrimination in employment practices. The Contractor shall post the required .r C3-3 (1) notice to that effect on the project site, and at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty- five (45) days after the date on which the proposals were opened. C3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withhold final action on the proposals for a reasonable time, not to exceed forty-five (45) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. no The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids, the Owner may, at its discretion, return the proposal security which _ accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders, will be retained by the owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3.7 BONDS: With the execution and delivery of the Contract !Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good and sufficient performance bond in an amount not less than 100 percent of the .. amount of the contract, as evidenced by the proposal and tabulation or otherwise, guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work r C3-3 (2) w 4W bw b. or the use of inferior materials. This performance bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in M' the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the op project by the City. C. MAINTENANCE BOND: A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. d. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and }` faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344 Acts 56th Legislature, """ Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all payments as above stipulated are made. e. OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the 40 Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury List for that company. Each bond shall be properly executed by both the Contractor and the Surety Company. r L7 .. Should any surety on the contract be determined unsatisfactory w at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the required bond or bonds or to sign the required .. contract within ten (10) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occurring to the Owner by reason of said awardee's failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3.10 BEGINNING WORK: The Contractor shall not commence work +� until authorized in writing to do so by the Owner. Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually .. termed the "Work Order" or "Proceed Order", it is agreed that the surety Company will, within ten 910) days after the commencement date set forth in such written authorization, �. commence the physical execution of the contract. C3-3.11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been - approved by the Owner. The prime Contractor shall be C3-3 (4) 17-M MR responsible for delivering to the Owner the sub -contractor's certificate of insurance for approval. The prime contractor shall indicate of the certificate of insurance included in the documents for execution whether or not his insurance covers sub- contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub -contractors. a. COMPENSATION INSURANCE: The Contractor shall +� maintain, during the life of this contract, Workers' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub -contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers' compensation Statute, the Contractor shall provide adequate employer's general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract Contractor's Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $500,000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above -mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability (covers General Contractor's Liability for acts of sub -contractors). 40 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation (if excavations are to be performed adjacent to same). 4. Damage to underground utilities for $500,000. 5. Builder's risk (where above -ground structures are involved). 6. Contractual Liability (covers all indemnification requirements of Contract). C3-3 (5) ~ A Los d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY ,m DAMAGE: The Contractor shall procure and maintain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less .e than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on account of one accident, and automobile property am damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub- contractors, respectively, against damage claims which may arise from operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall .. furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner. (Sample attached.) All insurance requirements made upon the Contractor shall apply to the sub -contractor, should the Prime Contractor's insurance not cover the "` sub -contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's .w insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within .. the city limits of the City of Fort Worth, Tarrant County, Texas. Each such agent shall be a duly qualified agent, one upon whom service of process may be had, and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or W C3-3 (6) W MW any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, I` insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex (the Fort Worth -Dallas area.) The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. WE C3-3:12 CONTRACTOR'S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials, labor and services when due. to C3-3.13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven (7) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept w posted in a conspicuous place at the site of the project at all times during the course of the Contract. Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. Aw C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person, persons, partnership, company, firm association, corporation or other who is approved to do business MP with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort IMF Worth -Dallas metropolitan area. The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be WE empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other matter associated such as maintaining adequate and Am appropriate insurance or security coverage for the project. C3-3 (7) Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor's principal base of operations be other w than in the Fort Worth -Dallas metropolitan area, notification of the Contractor's assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, appropriately signed and sealed, as applicable, by the Contractor's responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents. The intent of these requirements is that all matters associated with the Contractor's administration, whether oriented in furthering the �++ work, or other, are governed directly by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to .. the satisfaction of the Engineer, the Engineer, at his sole discretion, may demand that such local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. Nocredit of working time will be for periods in which work stoppages are in effect fort his reason. C3-3.15 VENUE: Venue of any action herein shall be exclusively in Tarrant County, Texas. wr s No .W C3-3 (8) ,. PART C-GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish, all in full compliance with the requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra of special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "special Provisions: covering all such work will be prepared by the Owner previous to the time of receiving bids or proposal for such work and furnished to the bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C 4-4.3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and if found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon work above or below the 25 percent of stated in the proposal; such revised that portion of the the original quantity consideration to be h" IM wo 4M 4W MW tw UK im 40 AP C4-4 (1) V' r:J r determined by special agreement or as hereinafter provided for "Extra Work." No allowance will be made for any changes in i anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories, shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the am Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be .. considered as waiving or invalidating any condition or provision of the Contract Documents. ,r C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the .w Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however, that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. ++ b. An agreed lump sum. �, C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates, (3) materials entering permanently into the project, and (4) actual cost of insurance, bonds, and social security as determined by the owner, plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The MW C4-4 (2) No Am d. fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in (1), (2), (3), and (4) above. The Contractor shall keep accurate cost records on the form and in the method suggested by the Owner and shall give the Owner access to all accounts, bills, 4§p vouchers, and records relating to the Extra Work. No "Change Order" shall become effective until it has been MM approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner. In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the engineer for written orders authorizing such Extra Work, prior to beginning such work. Should a difference arise as to what does or does not constitute ME Extra Work or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and # shall keep an accurate account of the actual reasonable cost thereof as provided under method (Item C). Claims for extra work will not be paid unless the Contractor shall file his claim +►- with the Owner within five (5) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified 'payrolls i.+ covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for "extra work" whether or not initiated by a "change order" shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or extra work. 1W C4-4 (3) NM C4-4.6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner's approval thereof, a "Schedule of Operations," showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8 h " X 11" sheets and at least five black of blue line prints shall be furnished to the Owner. C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within Ten (10) days prior to submission of first monthly progress payment, the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the .. Contractor proposes to carry on the work, the date of which he will start the several major activities (including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: so a. Milestone dates and final project completion dates shall be developed to conform to time constraints, sequencing requirements and completion time. No M C4-4 (4) W M 40 b. The construction process shall be divided into activities with time durations of approximately fourteen (14) days and construction values not to i"' exceed $50,000. Fabrication, delivery and submittal activities are exceptions to this guideline. Wo C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the �. duration of each activity. d. One critical path shall be shown on the construction RM schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. �" The construction schedule shall, as a minimum, be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into *� activities in enough detail to achieve activities of approximately fourteen(14) days' duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. Mpp For each of the trades or subcontracts, the construction schedule shall indicate the following procurements, construction and pre -acceptance activities and events in their logical ,..r sequence for equipment and materials. 1. Preparation and transmittal of submittals. 2. Submittal review periods. 3. Shop fabrication and delivery. ho 4. Erection or installation. M jW C4-4 (5) 0 +s 5. Transmittal of manufacturer's operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner's operator instruction (if applicable). B. Final inspection. 9. Operational testing. 10. Final inspection. If, in the opinion of the Owner, work accomplished falls behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition-, the Owner may require the Contractor to submit a revised schedule .. demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time. If the Owner finds the proposed plan not acceptable, he may require the Contractor to increase the work force, the construction plant and equipment, the number of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. MW r. C4-4 (6) PART C-GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished, work performed, rate of progress of the work, overall sequence of the construction, interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the- work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequences of procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the Contract Documents. He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. C5-5.2 CONFORMITY WITH PLAN: shall conform with lines, dimensions shown on the otherwise described in the from the approved Contract during construction will Engineer and authorized by t . The finished project in all cases grades, cross -sections, finish, and plans or any other requirements Contract Documents. Any deviation Documents required by the Engineer n all cases be determined by the ze Owner by Change Order. C5-5 (1) do 40 TO A& 1& .. imm M mo L" An M IF W 0 r low C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract me Documents are made up of several sections, which, taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the we sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern over general conditions and ■" standard specifications, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. In -the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In 'the event of a conflict in the drawings, specifications, or other portions of the Contract Documents, which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C-5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contractor shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the engineer, his inspector, and other Contractors in every possible way. The Contractor shall at all times have competent personnel .. available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the contractor's agent on the work. Such assistant project superintendent shall be a resident of CS-5 (2) a,+ Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to adequately provide for the safety or convenience of the travelling public or the owners of 3W property across which the project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. CS-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the ,� Contractor through his designated representative, shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition. Such a response shall occur day or night, whether the project is scheduled on a calendar -day or on a working -day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies, omissions, or corrections necessary to conform with the requirements of the projectr specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant �. condition and request the contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 .r hours, the City may take such remedial action with City forces or by contract. The City shall then deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due the Contractor on the project. C5-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer, if specifically called for. The field office shall be not less than 10 by 14 feet in floor area, substantially constructed, well heated, air conditioned, lighted, and weather-proof, so that documents will not be damaged by the elements. C5-5.7 CONSTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines, grades, and C5-5 (3) N s measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents, and lines, grades and measurements will be established by means of stakes or other customary method of marking a may be found consistent with good practice. XM These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings, as may be established for the Contractor's use or AM guidance, shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost of replacing such stakes or marks plus 25t will be charged against the �• Contractor, and the full amount will be deducted from payment due the Contractor. .� C5-5.8 AUTHORITY AND DUTIES OF CITY INSPECTORS: City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer _ the progress of the work and the manner in which it is being performed, any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents, and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the +� manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at issue can be referred to, and be decided by, the .. Engineer. The City Inspector will not, however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion or ,,. section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents. He will in no case act as superintendent or foreman or perform any other duties for _ the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties. The so .o C5-5 (4) s Am rr Contractor shall regard and obey the directions and instruction of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents, provided, however, should the Contractor object to any orders or instructions of the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5.9 INSPECTION: The Contractor shall furnish the AM Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents. If the Engineer so 10 requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, a` the uncovering or removing and_ the replacing of all adjacent defective or damaged parts shall be at the Contractor's expense. No work shall be done or materials used without suitable supervision or inspection. C5-5.10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials, or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor. Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such works. qF C5-5 (5) W s C5-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the Specifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if contractor wishes to .F furnish or use a proposed substitute, he shall, prior to the pre -construction conference, make written application to Engineer for approval of such substitute certifying in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that specified; jpw and identifying all variations of the proposed substitute from that specified and indicating available maintenance service. No substitute shall be ordered or installed without the written approval of .Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor's expense. Contractor shall indemnify and hold .�. harmless Owner and engineer and anyone directly or indirectly employed by either of them from and against the claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. C5-5.12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion am of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless otherwise specifically provided. The s failure of the Owner to make any tests of materials shall in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise specified, will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not, without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. WN In case of concrete, the aggregates, design minimum, and the C5-5 (6) APE mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contractor shall be responsible for replacing any concrete which does not meet the requirements of the contract Documents. Tests shall be made at least 9 days prior to the placing of concrete, using samples from the same aggregate, cement, and mortar which are to be used it later in the concrete. Should the source of supply change, new tests shall be made prior to the use of the new materials. C5-5.13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, water mains, conduits, sewer lines and service lines for all +� utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the Plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the Contract MW Documents, in which case the provision in these Contract Documents for Extra Work shall apply. wo It shall be the Contractor's responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all existing utilities, +r structures and service lines. Verification of existing utilities, structures and service lines shall include W C5-5 (7) notification of all utility companies at least forty-eight (48) hours in advance of construction including exploratory excavation if necessary. All verification of existing utilities and their adjustment shall be considered as subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosecution of work where the interruption of service is necessary, the Contractor, at least 24 hours in advance, shall be required to: 1. Notify the Water Department's Distribution Division of location, time, and schedule of service interruption. 2. Notify each customer personally through responsible personnel of time and schedule of the .f interruption of their service, or 3. In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer's entrance doorknob. The tag shall be durable in composition, and in large bold type shall say: "NOTICE" Due to Utility Improvement in your neighborhood, -- your (water) (sewer) service will be interrupted on between the hours of and This inconvenience will be as short as possible. Thank you, MW aM s Contractor Address Phone b. Emergency: In the event that an unforeseen service interruption occurs, notice shall be as above, but immediate. C5-5 (8) M aw C5-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through acts or neglect on the part of the contractor, any other Contractor or any sub -contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub -contractor by agreement or arbitration. If such other Contractor or sub -contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor, who shall indemnify and •+ save harmless the Owner against any such claim. C5-5.17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the satisfaction of the Engineer. If, within twenty-four (24) hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the Engineer, the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the contractor in the written notice, and the costs of such direct action, plus 25% of such costs, shall be deducted from monies due or to become due to the Contractor. pr Upon the completion of the project as a whole as covered by these Contract Documents, and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. He shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean, polished and new appearing condition. No extra compensation will be made to the Contractor for any clean-up required on the project. C5-5.18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final clean-up performed, the Engineer will notify the proper officials of the Owner and request that the final inspection be made. Such inspection will be made within 10 days after such notification. After such C5-5 (9) Md CJ OW final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing .. of the acceptance of the same after the proper resolution has been passed by the City Council. No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the work. i i WO so 4W i CS-5 (10) MW NhP OPP PART C-GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY a. SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY W C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City in ordinances and regulations which in any way affect the conduct of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers, agents, and employees against any and all claims or liability arising from or based on the violation of any such 4 law, ordinance, regulation, or order, whether it be by himself or his employees. C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses, pay all charges, costs and fees, and give all notices necessary and incident to the due and lawful prosecution of the work. C6-6.3 PATENTED DEVICES, MATERIALS AND PROCESSES: If the Contractor is required or desires to use any design, device, •+ material, or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract prices shall include all royalties or costs arising from patents, trademarks, and copyrights in any way involved in ,4 the work. The Contractor and his sureties shall indemnify, and save harmless, the Owner from any and all claims for infringement by reason of the use of any such patented design, device, material or process, or any trademark or copyright in connection with the work agreed to be performed under these Contract Documents, and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of such infringement at any time during the prosecution of the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and all suits brought for the infringement of any patent claimed to be infringed upon by the design, type of construction or material C6-6 (1) �r 4" no as or equipment specified in the Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. C6-6.4 SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put into immediate force and effect by the Contractor. The necessary sanitary conveniences for use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the Contractor and their use shall be strictly enforced by the Contractor. All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. All sanitary laws and regulations of the State of Texas and the City shall be strictly complied with. n. C6-6.5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted, as to cause no greater we obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all times all phases of his work in such ow a manner as not to impair the safety or convenience of the public, including, but not limited to, safe and convenient ingress and egress to property contiguous to the work area. The Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation operations, at all driveway crossings. Such provisions may include bridging, placement of crushed stone or gravel or such other means of providing proper ingress and egress for the property served by the driveway as the Engineer may approve as appropriate. Other means may include the diversion of driveway traffic, with specific approval by the Engineer. If diversion of traffic is approved by the Engineer, the Contractor shall make arrangements .� satisfactory to the Engineer for the diversion of traffic and shall, at his own expense, provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. MW C6-6 (2) an amp The materials excavated and the construction materials, such as pipe, used in the construction of the work shall be placed so as ' not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes, water valves, gas valves, or manholes in the vicinity. The Owner reserves the AM right to remedy any neglect on the part of the Contractor in reference to public convenience and safety which may come to its attention, after twenty-four (24) hours notice in writing to the AW Contractor, save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the cost of such work done or materials furnished by the Owner O. or by the City shall be deducted from monies due or to become due to the Contractor. IM The Contractor, after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer, and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible, and when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus. The Contractor shall promptly notify the Fire Department Headquarters when all such obstructed streets, alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary bridges or make other arrangements for crossing over ditches or streams, his responsibility for accidents in connection with such J• crossings shall include the roadway approaches as well as the structures of such crossings. .r The Contractor shall at all times conduct his operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in settlement of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT- OF -WAY: For the performance of the contract, the Contractor will be permitted to use and occupy such portions of the public streets and alleys, or other public places or other rights -of- way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in C6-6 (3) A' r writing by the Engineer. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. Excavated and waste materials shall be piled or stacked in such a way that does not interfere with the use of spaces that may be designated to be left free and unobstructed, or inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the contract, enter upon the work and premises used by the assistance for the completion of adjoining work. Any additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any railway, the City will secure the necessary •. easement for the work. Where the railway tracks are to be crossed, the Contractor shall observe all the regulations and instructions of the railway company regarding the methods of performing the work and take all precautions for safety of property and the public. Negotiations with the railway companies for permits shall be done by and through the City. r The Contractor shall give the City notice not less than five days prior to the time of his intention to begin work on that portion of the project which is related to the railway properties. The Contractor will not be given extra or ~ additional compensation for such railway crossings unless specifically set forth in the Contract Documents. MM C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is carried on in or adjacent to any street, alley, or public place, the Contractor shall, at his own expense, furnish, erect, and MW maintain such barricades, fences, lights and danger signals, and shall provide such watchmen, and shall take all such other precautionary measures for the protection of persons or property No and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor shall furnish and maintain at am least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep pedestrians away, and vehicles from being driven on or _ into, any work under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. no C6-6 (4) s im M All installations and procedures shall be consistent: with the provisions set forth in the "1980 Texas Manual on Uniform '* Traffic Control Devices for Streets and Highways", issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d, Vernon's Civil Statutes, pertinent sections being Section Nos. 27, :29, 30 and 31. in The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign, which has been erected by the City. If it is determined that aL sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division (phone number 870-8075), to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual, and such temporary sign must be installed prior to the removal of the permanent " sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the •+ permanent sign and shall leave his temporary sign in :place until such reinstallation is completed. The Contractor will be held responsible for all damage to the work or the public due to failure of barricades, signs, fences, lights, or watchmen to protect them. Whenever evidence is found of such damage to the work, the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor's own expense. The Contractor's responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. JW No compensation, except as specifically provided in these Contract Documents, will be paid to the Contractor for the work and materials involved in the constructing, providing, and maintaining of barricades, signs, fences, and lights or for salaries of watchmen, for the subsequent removal and disposal of such barricades, signs, or for any other incidentals necessary •.+ for the proper protection, safety, and convenience of the public C6-6 (5) WE qE no during the contract period, as this work is considered to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal. C6-6.9 USE OF EXPLOSIVES, DROP WEIGHT, ETC.: Should the Contractor elect to use explosives, drop weight, etc., in the prosecution of the work, the utmost care shall be exercised at all times not to endanger life or property. The Contractor shall notify the proper representative of any public service corporation, any company, individual, or utility, and the Owner, not less than twenty-four (24) hours in advance of the use of any activity which might damage or endanger property along or adjacent to the work. Where the use of explosives is to be permitted on the project as .. specified in the Special Contract Documents, or the use ,of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four (24) hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives. All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor's, insurers to the Engineer within ten (10) days after receipt of written notice of the claim to the Contractor from either the City or the claimant. The city shall proceed to give notice to the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. whenever explosives are stored or kept, they shall be stored in a safe and secure manner and all storage places shall be plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times. All vehicles in which explosives are being transported shall be' plainly marked as .. mentioned above and shall, insofar as possible, not use heavy traffic routes. No C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges as the City may deem necessary for the prosecution of the work. Any additional rights -of -way or work area considered necessary by the Contractor shall be provided by him at his own expense. Such C6-6 (6) AME JM additional rights -of -way or work area shall be acquired for the benefit of the City. The City shall be notified in writing of the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor, and a copy furnished to the Engineer. Unless specifically provided otherwise, the Contractor shall clear all rights -of -way or easements of obstructions, which must be removed to make possible proper prosecution of the work as a part of the project construction operations. The Contractor shall be responsible for the preservation of and shall use every precaution to prevent damage to all trees, shrubbery, plants, lawns, fences, culverts, curbing and all other types of structures or improvements, and to all water, sewer and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences, and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or private lands or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company, individual, or other, either as owners or occupants whose land or interest in land .� might be affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material or equipment. When and where any direct or indirect damage or injury is done to public or private property on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non -execution thereof on the part of the Contractor, he shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as may be directed by the owner, or he shall make good' such damages or injury in a manner acceptable to the owner of the property and +�+ the Engineer. M C6-6 (7) C-J no All fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross braced posts on either side of permanent easement before the fence is cut. Should additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits, before the fence is cut. Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the site is vacated overnight, and/or at all times to prevent livestock — from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to.the various items bid in the project proposal. Therefore, no r separate payment shall be allowed for any service associated with this work. In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the Owner may, upon 48-hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results, proceed to repair, rebuilt or otherwise restore such property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. C6-6.11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that contractor shall perform all work and services hereunder as an independent contractor, and not as an officer, agent, servant or employee of the Owner. Contractor shall have exclusive control of and the exclusive right to control the details of all the work and services performed hereunder, and all persons performing same, and shall be solely .+ responsible for the acts and omissions of its officers, agents, servants, employees, contractors, subcontractors, licensees invitees. The doctrine of respondent superior shall not apply as between Owner and Contractor, its officers, agents, employees, contractors and subcontractors, and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. M C6-6 (8) sh sW C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own .. expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out .� of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of owner, its officers, servants, or employees. Contractor likewise covenants and _ agrees to indemnify and hold harmless the Owner from and against any and all injuries to owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of owner, its officers, servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, No final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) .� provides Owner with a letter from. Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. C6-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of the Owner, he shall within three days after the actual sustaining of such alleged damage, make a written statement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged C6-6 (9) W 41 damage and, upon request, shall give the Engineer access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be filed as herein required, the Contractor's claim for compensation shall be waived, and he shall not be entitled to payment on account of i such damages. C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC: In case it is necessary to change, move, or alter in any manner the property of a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been issued by the Engineer. The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making such changes or repairs to their property that may be necessary by the performance of this contract. C6-.b.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed, the Contractor shall, at his own expense and cost, provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage, which will be received from these drains and sewers, and for this purpose he shall provide and maintain, at his own cost and expense, adequate pumping facilities and temporary outlets or diversions. The Contractor, at his own cost and expense, shall construct such troughs, pipes, or other structures necessary, and be prepared at all times to dispose of drainage and sewage received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract, except when specified or ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disposed of in a satisfactory manner so that no nuisance is created and so that the work under construction will be adequately protected. C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water Department for so doing. C6-6 (10) M City water furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main. All piping required beyond the point of delivery shall be installed by the Contractor at his own expense. The Contractor's responsibility in the use of all existing fire hydrants and/or valves is detailed in Section E2-1.2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges, if any, for water will be at the regular established rates. When meters are not used, the charges, if any, will be as prescribed by the City Ordinance, or where no ordinance applies, payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6.17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer, and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. All necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall be preformed by the Contractor at his own expense. C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents, the work shall be under the charge and care of the Contractor, and he shall take every necessary precaution to prevent injury or damage to the work or any part thereof by action of the elements or from any cause whatsoever, whether arising from the execution of non -execution of the work. The Contractor shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the causes herein. C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City shall not operate as a waiver of any provision of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. C6-6 (11) am am moo M L7 on M The Owner reserves the right to correct any error that may be am discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. C6-6.20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no _ liability upon the authorized representatives of the Owner, either personally or otherwise as they are agents and representatives of the City. .. C6-6.21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (H) of the Texas Limited Sales, Excise, and Use Tax Act, the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to _his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued by the r Contractor in lieu of the tax shall be subject to and shall comply with the provisions of State Comptroller's Ruling .011, and any other applicable State Comptroller rulings pertaining to the Texas Limited Sales, Excise, and Use Tax Act. On a contract awarded by a developer for the construction of a no publicly -owned improvement in a street right-of-way or other easement which has been dedicated to the public and the City of Fort Worth, an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (H) of the Texas .. limited Sales, Excise, and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. wo r r r Limited Sale, Excise and Use Tax permits and information can be obtained from: Comptroller of Public Accounts Sale Tax Division Capitol Station Austin, TX C6-6 (12) w PART C-GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS SECTION C7-7 PROSECUTION AND PROGRESS C7-7.1 SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workmen under his immediate superintendence, work of a value of not less than fifty (50%) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents. All transactions of the Engineer will be with the Contractor. Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements regarding character and competency. The Owner will not recognize any subcontractor on the work. The Contractor shall at all times, when the work is in operation, be represented either in person or by a superintendent, or other designated representative. C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part boo thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right, title, or interest therein or any part thereof, to No any person or persons, partnership, company, firm or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state, attempt to dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sureties shall successfully complete said contract, and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. C7-7.3 PROSECUTION OF THE WORK: Prior to beginning any construction operation, the Contractor shall submit to the on Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a C7-7 (1) ow wo wo brief outlining in detail and step by step the manner of prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials, and labor as is necessary to insure its completion within the time limit. r The sequence requested of all construction operations shall be .at -all times as specified in the Special Contract Documents. :.Any deviation from such sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with --any deviation until he has received written approval from the Engineer. Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of this Agreement, and a progress schedule shall not constitute a change in the contract time. w. C7-7.4 LIMITATIONS OF OPERATIONS: The working operations shall at all times be conducted by the Contractor to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than is necessary for the proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. MW C7-7.5 CHARACTER OR WORKMEN AND EQUIPMENT: Local labor shall be used by the Contractor when it is available. The Contractor may bring in from outside the City of Fort Worth his key men and his .. superintendent. All other workmen, including equipment operators, may be imported only after the local supply is exhausted. The Contractor shall employ only such superintendents, foremen, and workmen who are careful, competent, and fully qualified to perform the duties or tasks assigned to them, and the Engineer may demand and secure the =I C7-7 (2) Now summary dismissal of any person or persons employed by the Contractor in or about or on the work who, in the opinion of the Owner, shall misconduct himself or be found to be incompetent, disrespectful, intemperate, dishonest, or otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill, ability, and experience to properly perform the work assigned to them and operate any MW equipment necessary to properly carry out the performance of the assigned duties. r The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of r. progress. All equipment, tools, and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory, safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work, workmen or adjacent property will result from its use. C7-7.6 WORK SCHEDULE: Elapsed working days shall be computed starting with the first day of work completed as defined in C1- 1.23 "WORKING DAY" or the date stipulated in the "WORK ORDER" for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays, providing that the following requirements are met: a. A request to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later than the Thursday preceding. b . Any work to be done on the project on such a specific Saturday, Sunday or Legal Holiday must be, in the "k opinion of the Engineer, essential to the timely completion of the project. MP The Engineer's decision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or No C7-7 (3) M MM no Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. Calendar Days shall be defined in C1-1.24 and the Contractor may work as he so desires. C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time specified v in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. The Contractor shall maintain a rate of progress such as will insurethatthe whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within thetime established in such documents and such extension of •• time as may be properly authorized by the Owner. C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval. In adjusting the contract time for completion of work, consideration will be given to unforeseeable causes beyond the control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, acts of the Owner, fire, flood, tornadoes, epidemics, quarantine restrictions, strikes, freight embargoes, or delays of sub- contractors due to such causes. When the date of completion is based on a calendar day bid, a request for extension of time because of inclement weather will not be considered. A request for extension of time due to inability to obtain supplies and materials will be considered ,. only when a review of the Contractor's purchase order dates and other pertinent data as requested by the Engineer indicates that the contractor has made a bona fide attempt to secure delivery on schedule. This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. C7-7 (4) aw If satisfactory execution and completion of the contract should require work and materials in greater amounts or quantities than those set forth in the approved Contract Documents, then the contract time may be increased by Change Order. C7-7.9 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. When such extra compensation is claimed, a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct, shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. C7-7.10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the Proposal section of the contract documents. The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon. The amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, or the increased time granted by the Owner, or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given in the following MW EW MW mo WF ow C7-7 (5) No U__1 schedule, unless otherwise specified in other parts of the Contract Documents, will be deducted from monies due the Contractor, not as a penalty, but as liquidated damages suffered by the Owner. AMOUNT OF CONTRACT LIQUIDATED DAMAGES Less than $5,000 $35.00 .. $5,001 to 15,000 45.00 5,001 to 25,000 63.00 25,001 to 50,000 105.00 50,001 to 100,000 154.00 100,001 to 500,000 210.00 5.00,001 to 1,000,000 315.00 1,000,001 to 2,000,000 420.00 2,000,001 and over - 630.00 The parties hereto understand and agree that any harm to the City caused by the Contractor's delay in completing the work hereunder in the time specified by the Contract Documents would be impossible or very difficult to accurately estimate, and that the "Amount of Liquidated Damages Per Day", as set out above, is a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7.11 SUSPENSION BY COURT ORDER: The Contractor shall suspend operations on such part or parts of the work ordered by any .. Court, and will not be entitled to additional compensation by virtue of such Court Order. Neither will he be liable to the City in the event the work is suspended by a Court Order. ow Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. .. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract, for any reason, the owner will make no extra payment for stand-by time of construction equipment and/or construction crews. Wd C7-7 (6) .r r rr If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner ` that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. am Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of, the Contractor as set forth in Paragraph MW C7-7.8 EXTENSION OF THE TIME OF COMPLETION, and should it be determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not No available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. No reimbursement shall be allowed if the equipment is moved to another construction project for the City of Fort Worth. The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations .m promptly when notified by the Engineer to so resume operations. C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency so declared by the President of the United States, or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months, the Contractor shall, within seven days, notify the City in writing giving a detailed statement of the efforts which have been made and listing all necessary items of labor, materials, and equipment not obtainable. If, after investigation, the Owner finds that such conditions exist and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contractor, then if the Owner cannot after reasonable effort assist the 'Contractor in procuring and making available the necessary labor, materials and equipment within thirty days, the Contractor may request the C7-7 (7) W to no Owner to terminate the contract and the Owner may comply with the request, and the termination shall be conditioned and based + upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include, + but not be limited to, the payment for all work executed but no anticipated profits on work which has not been performed. C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF r CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared cancelled by the City Council for any good and sufficient cause. The following, by way of example, but not of limitation, may be considered grounds for suspension or cancellation: Now a. Failure of the Contractor to commence work operations within the time specified in the Work Order issued by + the Owner. b. Substantial evidence that progress of the work + operations by Contractor is insufficient to complete the work within the specified time. ,w c. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. .. g. Failure of the Contractor to promptly make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. + .. C7-7 (8) go h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud MP on the City in the construction of work under contract. W i. A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or .. for any other purpose. j. If the Contractor shall, for any cause whatsoever, ME fail to carry on the working operation in an acceptable manner. .. k. If the Contractor commences legal action against the Owner. A copy of the suspension order or action of the City Council shall be served on the Contractor's Sureties. When work is suspended for any cause or causes, or when the contract is cancelled, the Contractor shall discontinue the work or such NOW part thereof as the Owner shall designate, whereupon the Sureties may, at their option, assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and may perform the same or may, with the written consent of the Owner, sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon consent of the Owner, sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authorized agents. r The Sureties, in such event shall assume the Contractor's place in all respects, and shall be paid by the Owner for all work performed by them in accordance with the terms of the Contract '~ Documents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses, subject to all of the terms of the Contract Documents. In case the Sureties do not, within the specified time, exercise their right and option to assume the contract responsibilities, or that portion thereof which the Owner has ordered the Pw C7-7 (9) P" Contractor to discontinue, then the Owner shall have the power to complete, by contract or otherwise, as it may determine, the work herein described or such part thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and use any materials, plants, tools, equipment, supplies, and property of any kind — provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, and all expenses incidental thereto. The expense so charged shall be deducted by the Owner from such monies as may be due or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any part thereof. The Owner shall not be required to obtain the lowest bid for the work completing the contract, but the expense to be deducted shall be the actual cost of the owner of such work. In case such expenses shall exceed the amount which would have been payable under the contract if the same had been completed by the Contractor, then the Contractor and his Sureties shall pay the amount of such excess to the City on notice from the Owner of the excess due. When any particular part of the work r is being carried on by the Owner by contract or otherwise under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of the Contract Documents and in a manner that does not hinder or interfere with performance of the work by the Owner. C7-7.15 FULFILLMENT OF CONTRACT: The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have been finished and completed, the final inspection made by the Engineer, and the final acceptance and final payment made by the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: so A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance .w with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. Any such termination shall be affected by ow C7-7 (10) W .r mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a notice of termination, and except as otherwise directed by the Engineer, the Contractor shall: 1. Stop work under the contract on the date and to the extent specified in the notice of termination; 2. Place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the work under the contract as is not terminated; 3. Terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the not5ice of termination; 4. Transfer title to the Owner and deliver in the manner, at the times, and to the extent, if any, directed by the Engineer: a. the fabricated or unfabricated parts, work in process, completed work, supplies and other material produced as a part of, or acquired in connection with the performance of, the work terminated by the notice of termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the contract had been completed, would have been required to be furnished to the Owner. 5. Complete performance of such part of the work as shall not have been terminated by the notice of termination; and on on* aw W r .w MW RM W C7-7 (11) WE L7 w w 6. Take such action as may be necessary, or as the Engineer may direct, for the protection and preservation of the property related to its contract which is in the possession of the contractor and in which the Owner has or may acquire the rest. C. TERMINATION CLAIM: Within 60 days after notice of termination, the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the Engineer. Unless one or more extensions in writing are granted by the Owner upon request of the Contractor, made in writing within such 60-day period or authorized extension thereof, any and all such claims shall be conclusively deemed waived. D. AMOUNTS: Subject to the provisions of Item C7-7.16 •• (C), the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the contractor by reason of the total or partial termination of work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract price as reduced by the amount of + payments otherwise made and as further reduced by the contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due for lost or anticipated profits. Nothing in C7-7.16(E) hereafter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the amount U0 or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. + E. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to agree as provided in C7- 7.16 (D) upon the whole amount to be paid to the �. Contractor by reason of the termination of work pursuant to this section the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. W C7-7 (12) 1W PM F. DEDUCTIONS: In arriving at the amount due the contractor under this section, there shall be deducted " (a) all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; (b) any claim which the Owner may have against the Contractor in connection with this contract; and (c) the agreed price for, or the proceeds of sale of, any materials, �• supplies or other things kept by the Contractor or sold, pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. ,,. G. ADJUSTMENT: If the termination hereunder be partial, prior to the settlement of the terminated portion of ... this contract, the Contractor may file with the Engineer a request in writing for an equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by the notice of termination), such equitable adjustment as may be agreed upon shall be made in such price or prices; nothing contained herein, however, shall limit the right of the Owner and the contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. NNW H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter the rights which the Owner may have for termination of this contract under C7-7.14 hereof entitled "Suspension or Abandonment of the Work and Amendment of Contract" or any other right which Owner may have for default or breach of contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be MW responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their "" enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and regulations to protect person and property from injury, including death, or damage in connection with the work. C7-7 (13) M Rd wo s PART C-GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT SECTION C8-8.1 .MEASUREMENT OF QUANTITIES: The determination of quantities of work performed by the Contractor and authorized by the Contract Documents acceptably completed under the terms of ' the Contract Documents shall be made by the Engineer, based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers, and weights of the materials and items installed. C8-8.2 UNIT PRICES: When in the Proposal a "Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the .. Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finished overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, delays, profits, injuries, damages claims, taxes, and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation. C8-8.3 LUMP SUM: When in the Proposal a "Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to furnish all labor, tools, materials, machinery, equipment, appurtenances, and all subsidiary work necessary for the construction and completion of all the work to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. .. C8-8.4 SCOPE OF PAYMENT: The Contractor shall receive and accept the compensation, as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any No C8-8 (1) No unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in M' paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of *- such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an VW acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or aw equipment, nor in any way prejudice or affect the obligations -of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfection, or damage shall have been discovered on or before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. .+ C8 - 8 . 5 PARTIAL ESTIMATES AND RETAINAGE : Between the lgt and 5th day of each month the Contractor shall submit to the Engineer a mow statement showing an estimate of the value of the work done during the previous month, or estimate period, under the Contract Documents. Not later than the loth day of the month, w the Engineer shall verify such estimate, and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ($100.00) in amount, 90% of such estimated sum will be paid to the mow Contractor if the total contract amount is less than $400,000, or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400,000 or greater, within twenty- five (25) days after the regular estimate period. The City will have the option of preparing estimates on forms furnished by the City. The partial estimate may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work as a permanent part thereof, but which at the time M C8-8 (2) of the estimate have not been installed. Such payment will be allowed on a basis of 850-. of the net invoice value thereof. The Contractor shall furnish the Engineer such information as he may request to aid him as a guide in the verification or the preparation of partial estimates. It is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and payment will be subject to correction in the estimate rendered .. following the discovery of an error in any previous estimate, and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its r quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any monthly estimate if the contractor fails to perform the work •. strictly in accordance with the specifications or provisions of this contract. ,,. C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. C8-8.7 FINAL ACCEPTANCE: Whenever the improvements provided for _ by the Contract Documents have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, the Contractor shall notify the Engineer in writing that the improvements are ready for the final inspection. The Engineer shall notify the appropriate officials of the Owner, who will within a reasonable time make such final inspection, and if the work is satisfactory, in an `• acceptable condition, and has been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer will initiate the processing of the final estimate and recommend final acceptance of the project and final payment therefor as outlined in C8-8.8 below. .,r C8-8.8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. so C8-8 (3) aw All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. MW The amount of the final estimate, less previous payments and any sums that have been deducted or retained under the provisions of the Contract Documents, will be paid to the Contractor within 60 days after final acceptance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to to the Owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as furnished by the City, certifying that all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as me aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or ar any act or neglect of said City relating to or connected with the Contract. The making of the final payment by the Owner shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. .. C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engineers and designers to prepare the Contract Documents and all modifications of the approved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its own design features, sufficiency of the Contract Documents, the safety of the structure, and the practicability of the operations of the completed project, provided the Contractor has complied with the WPM requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereto approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has mow complied with the said requirements of the Contract Documents, approved modifications thereof, and all approved additions and alterations thereto. SM C8-8 (4) M MP so C8-8.10 GENERAL GUARANTY: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the r Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to other .. work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general. -guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. C8-8.11 SUBSIDIARY WORK: Any and all work specifically governed 'W by documentary requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid .o has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface mo restoration, rock excavation and cleanup are general items of work which fall in the category of subsidiary work. r C8-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one -tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. C8-8.13 RECORD DOCUMENTS: Contractor shall keep on record a copy of all specifications, plans, addenda, modifications, shop .. drawings and samples at the site, in good order and annotated to show all changes made during the construction process. These shall be delivered to Engineer upon completion of the work. .. 71 Wo SECTION Cl: SUPPLEMENTARY CONDITIONS TO PART C - GENERAL CONDITIONS A. General These Supplementary Conditions amend or supplement the General Conditions of the ,., Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. B. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in its entirety and replaced with the following: •• Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the loth day and 25th day respectively. Estimates will be paid •. within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent .r part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. The Contractor will furnish the Engineer such information as may be .o reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by .. Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. C. Part C - General Conditions: Paragraph C3-3.11 of the General Conditions is deleted and replaced with D-3 of Part D - Special Conditions. D. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" Revised Pg. 1 10/24/02 .. E. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8), is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such in'urv. damage or death is caused, in whole or in Part, by the neelfeence or alleged negligence of Owner, its ofcers. servants, or employees. Contractor likewise covenants —' and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of # this Contract, whether or not any such injury or damage is caused in whole or in part by the neelieence or alleged neelieence of Owner, its ofcers. servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a ..� release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. �• The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. F. INCREASED OR DECREASED OUANTITIES: Part C - General Conditions, Section C44 SCOPE OF WORK, Page C 4-4 (1), revise paragraph C4-4.3 INCREASED OR DECREASED QUANTITIES to read as follows: .�. The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in lost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted herein as applying to the overall quantities of sanitary sewer pipe in each pipe size but not to the various depth categories. ,. G. C3-3.11 INSURANCE: Page C3-3 (7): Add subparagraph "h. ADDITIONAL Revised Pg. 2 10/24/02 .r no wo INSURANCE REOUIREMENTS" No a. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. ow b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the "' contracted project. c. Any failure on part of the City to request required insurance documentation shall not No constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non -renewal, and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. f. Deductible limits, or self-f inded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. g. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk ..� retention groups. The City must approve in writing any alternative coverage. h. Workers' compensation insurance policy(s) covering employees employed on the ,. project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. '• i. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self -funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give y- rise to a liability claim or lawsuit or which could result in a property loss. 1. Contractor's liability shall not be limited to the specified amounts of insurance •� required herein. Revised 10/24/02 Pg. 3 r in. Upon the request of City, Contractor shall provide complete copies of all insurance .ft policies required by these contract documents. H. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4, Scope of Payment at page C8-8(1) is �. deleted in its entirety and replaced with the following: The Contractor shall receive and accept the compensation as herein provided, in full no payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any MW unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of " patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract w and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two (2) year guaranty period after the final w acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. I. C8-8.10 GENERAL GUARANTY: Delete C8-8.10, General Guaranty at page C8-8(4) is deleted in its entirety and replaced with the following: MW Neither the final certificate of payment nor any provision in the Contract Documents, nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of final 'r acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed .. defects with reasonable promptness. Revised 10/24/02 w Pg. 4 0 Any reference to any shorter period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specifications, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of acceptance of the project. In the Special Instructions to Bidders, TPW contracts place the following in lieu of the existing paragraph 2. J. Part C - General Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL, Page C2-2 (4) exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the following: C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his aw representative at the official location and stated time set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, P.O. Box 17027, Fort Worth, Texas 76102. ow C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non -consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City .. Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal .. opening time, no further consideration will be given to the proposal K. C3-3.7 BONDS (CITY LET PROJECTS): Reference Part C, General Conditions, dated November 1, 1987; (City let projects) make the following revisions: 1. Page C3-3(3); the paragraph after paragraph C3-3.7d Other Bonds should be revised to we read: Revised 10/24/02 rr Pg. 5 .s In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the .. Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the M' adequacy of the proof required herein. 2. Pg. C3-3(5) Paragraph C3-3.11 INSURANCE delete subparagraph "a. COMPENSATION INSURANCE". 3. Pg. C3-3(6), Paragraph C3-3.11 INSURANCE delete subparagraph "g. LOCAL + AGENT FOR INSURANCE AND BONDING". .. L. RIGHT TO AUDIT: Part C - General Conditions, Section C8-8 MEASUREMENT AND PAYMENT, Page C8-8 (5), add the following: .. C8-8.14 RIGHT TO AUDIT: (a) Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any s directly pertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided .o adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. .. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: W. 1. 50 copies and under - 10 cents per page Revised Pg. 6 10/24/02 i no 2, More than 50 copies - 85 cents for the first page plus fifteen cents for each page thereafter up M. SITE PREPARATION: The Contractor shall clear rights -of -way or easements of obstruction which must be removed to make possible proper prosecution of the work as a part of this project construction operations. The contractor's attention is directed to paragraph C6-6.10 work within easements, page C6-6(4), part C - General Conditions of the Water Department General Contract Document and General Specifications. Clearing and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the pipe. .r N. Reference Part C - General Conditions, Section C6-6.8 BARRICADES. WARNINGS AND WATCHMEN: 1. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word flagmen. i 2. In the first paragraph, lines five (5) and six (6), change the phrase take all such other precautionary measures to take all reasonable necessary measures. O. MINORITY/WOMEN BUSINESS ENTERPRISE COMPLIANCE: Reference Part C (General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE" shall be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than thee (3) years. .. Revised s 10/24/02 Pg. 7 i P. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of .. the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. .. (b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of Section C-1, L. Right to „w Audit (Rev. 9/30/02) pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. (d) With each partial payment estimate or payroll period, whichever is less, an affidavit IM stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. U r M .r .W Revised 10/24/02 Pg. 8 PART D - SPECIAL CONDITIONS .o a a a fm a m .r a no D-1 GENERAL.....................................................................................................................3 D-2 COORDINATION MEETING....................................................................................... 5 D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW................5 D- 4 COORDINATION WITH FORT WORTH WATER DEPARTMENT ................................ 7 D- 5 CROSSING OF EXISTING UTILITIES.......................................................................... 7 D- 6 EXISTING UTILITIES AND IMPROVEMENTS .............. :............................................... 8 D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES........................................................... 8 D_ ;TRAFFIC .WRE), L.................................................................................................... 9 D- 9 DETOURS ...... :......................................................................................... I ................. 10 D- 10 EXAMINATION OF SITE.............................................................................................10 D- 11 ZONING COMPLIANCE..............................................................................................10 D- 12 WATER FOR CONSTRUCTION................................................................ ....10 D- 13 WASTE MATERIAL.....................................................................................................10 D-14 PROJECT CLEANUP AND FINAL ACCEPTANCE......................................................10 D-15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK................................11 D- 16 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES ...........................11 D-17 BID QUANTITIES........................................................................................................11 D- 18 ......................... CUTTING OF CONCRETE.............................................................. ...11 D- 19 PROJECT DESIGNATION SIGN.................................................................................12 D- 20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT.....................................12 D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL.......................................................12 D- 22 CRUSHED LIMESTONE BACKFILL............................................................................12 D- 23 2:27 CONCRETE.........................................................................................................13 D- 24 TRENCH EXCAVATION. BACKFILL. AND COMPACTION.........................................13 D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS ...........14 D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS)................15 D- 27 SANITARY SEWER MANHOLES................................................................................16 D- 28 SANITARY SEWER SERVICES..................................................................................19 D- 29 REMOVAL. SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES ............... 20 D- 30 DETECTABLE WARNING TAPES.............................................................................. 23 D- 31 PIPE CLEANING......................................................................................................... 23 D- 32 DISPOSAL OF SPOIUFILL MATERIAL....................................................................... 23 D- 33 MECHANICS AND MATERIALMEN'S LIEN................................................................ 23 D- 34 SUBSTITUTIONS..._....................................................................................................24 D- 35 PRE -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER ............ 24 D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES ......................................... 27 D- 37 BYPASS PUMPING..................................................................................................... 28 D- 38 POST -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER.......... 29 D- 39 SAMPLES AND QUALITY CONTROL TESTING........................................................ 30 D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE) ............................................................... 31 D- 41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES ........................ 32 D- 42 PROTECTION OF TREES, PLANTS AND SOIL ......................................................... 32 D- 43 SITE RESTORATION.................................................................................................. 33 D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST .............................................. 33 D- 45 TOPSOIL, SODDING. SEEDING & HYDROMULCHING............................................. 33 D- 46 CONFINED SPACE ENTRY PROGRAM..................................................................... 38 D- 47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION ........................... 39 D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS) ...................... 39 D- 49 CONCRETE ENCASEMENT OF SEWER PIPE..........................................................40 D- 50 CLAY DAM.............................................................................. ........ 40 03/12109 SC-1 PART D - SPECIAL CONDITIONS D- 51 EXPLORATORY EXCAVATION (D-HOLE)................................................................. 40 D- 52 INSTALLATION OF WATER FACILITIES................................................................... 40 52.1 Polvvinvl Chloride (PVC) Water Pipe........................................................................... 40 52.2 Blockinq.................................................................................... .........41 52.3 Tvpe of Casinq Pipe.................................................................................................... 41 52.4 Tie-ins....................................................................................... ......... ......................... 41 52.5 Connection of Existing Mains.......................................................................................41 52.6 Valve Cut-Ins.............................................................................................................. 42 52.7 Water Services............................................................................................................ 42 52.8 2-Inch Temporary Service Line....................................................................................44 52.9 Purqinq and Sterilization of Water Lines ............... .............45 52.10 Work Near Pressure Plane Boundaries .....................................................................45 52.11 Water Sample Station..................................................................................................45 52.12 Ductile Iron and Grav Iron Fittings............................................................................... 46 D- 53 SPRINKLING FOR DUST CONTROL ................... ....46 D- 54 DEWATERING.......................................................... .... ............................................. 47 D- 55 TRENCH EXCAVATION ON DEEP TRENCHES........................................................ 47 .., D- 56 TREE PRUNING..........................................................................................................47 D- 57 TREE REMOVAL.............................................................................................. .......48 D- 58 TEST HOLES.............................................................................................................. 48 D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION.......................................................................................... .......... 48 D- 60 TRAFFIC BUTTONS ` D- 61 SANITARY SEWER SERVICE CLEANOUTS.............................................................49 D- 62 TEMPORARY PAVEMENT REPAIR ............................. D- 63 CONSTRUCTION STAKES......................................................................................... 50 D- 64 EASEMENTS AND PERMITS..................................................................................... 50 D- 65 PRE -CONSTRUCTION NEIGHBORHOOD MEETING ................................................ 51 D- 66 WAGE RATES............................................................................................................ 51 D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE ..................................... 52 D- 68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN1 ACRE) ..................... ......................................................................................53 D- 69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS................................................................................... 55 D- 70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD ............................................ 55 M D- 71 EARLY WARNING SYSTEM FOR CONSTRUCTION .................... D- 72 AIR POLLUTION WATCH DAYS ................................... ........................ 56 D- 73 FEE FOR STREET USE PERMITS AND RE -INSPECTIONS ..................................... 57 03112109 SC-2 PART D - SPECIAL CONDITIONS This Part D — Special Conditions is complimentary to Part C — General Conditions and Part C1 — Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C — General Conditions and part C1 — Supplementary Conditions to Part C of the Contract are to be read together. Any conflict between Part C — General Conditions and Part C1 — Supplementary Conditions of the Contract and this Part D, Part D shall control. FOR: M-1-1-1 DRAINAGE BASIN PART 2 SANITARY SEWER REHABILITATION AND IMPROVEMENTS SEWER PROJECT NO. P258-702170036183 CITY PROJECT NO. 00361 DOE NO. 4296 D-1 GENERAL so The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions shall be applicable to this project under the provisions stated .. above. The. Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2) years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the * General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. Thespecifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre - qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. ow This contract and project, where applicable, may also be governed by the two following published specifications, except as modified by these Special Provisions: .. 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 03112109 SC-3 w PART D - SPECIAL CONDITIONS 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRALTEXAS Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, W Texas 76102. The specifications applicable to each pay item are indicated by the call -out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the r contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non -responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to — Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to �.. the time set for the opening of proposals. After all proposals not requested for non - consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. _ C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. 03/12/09 SC-4 PART D - SPECIAL CONDITIONS D-2 COORDINATION MEETING For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The contractor shall be present at all meetings. D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions: 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the .. duration of the project. 2. Duration of the project - includes the time from the beginning of the work on the project �. until the contractor's/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees_ This includes, without .� limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory •r requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person governmental entity will have on file certificates persons providing services on the project; and , f beginning work on the project, so the of coverage showing coverage for all 03 12109 ua SC-5 PART D - SPECIAL CONDITIONS 2. No later than seven days after receipt by the contractor, a new certificate of coverage 414 showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on —` the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person .. providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and IM b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially MW affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by an paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. ON 03112109 SC-6 PART D - SPECIAL CONDITIONS 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage i for the duration of the project, that the coverage wAI be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the -� contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes_ "REQUIRED WORKER'S COMPENSATION COVERAGE t i The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes �- persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512) 463-3642 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". D- 4 COORDINATION WITH FORT WORTH WATER DEPARTMENT -� During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. D- 5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or -� proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be constructed of ductile iron pipe. The Engineer shall determine the required length of replacement. .. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or 03112109 SC-7 PART D - SPECIAL CONDITIONS neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. D- 6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions (as approved or authorized by the applicable utility company) for the support, protection and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. It is understood that the Contractor is not responsible for the permanent relocation of existing utilities in direct conflict with the proposed construction_ The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line. He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. In case it is necessary to change or move the property of any owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Any damaqe to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractors expense, to the satisfaction of the City. 03/12/09 SC-8 ra .o an i .. am ■. PART D - SPECIAL CONDITIONS so In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor MW to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. D- 8 TRAFFIC CONTROL • The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. Onless otherwise it dbded as part of the; Construction documents; the Contractor shall Ot t �' traffic control plan (du(y:sealed, signed andda ed by a Reg stered`Pf6fessior!ai Engineer';(P: ttae^--state of Texas)to the City Traffic Eng'meer [Tel (817)392 87.7 ;at or betort pretbnstruction conference The P.E. preparing; the traffic control ;plan may utilize standardw reroute configurations posted as "Typicals'. on tF a City's Buzzsaw website Although work w Begin until the trafficcoplan has been reviewed and'approved, the Contractor's time will } .. in-.-., accordance with timeframe mutually .estabtipt ed in then ,Noticeto - Proceed' issue .. Eon'tractor_ . _ The Contractor will not remove any regulatory sign, instructional sign, street name sign or other .. sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 817-392-7738) to remove the sign. In ., the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above -referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. Work shall not be performed on certain locations/streets during "peak traffic periods" as -+ determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." 7-7:010111,P'ilk.-At-Or traffic control shall cover._idesign and / or i l ti ri; and=t - .r .. 03/1 ZW SC-9 M PART D - SPECIAL CONDITIONS D- 9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. W D- 10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions, which may affect construction of this project_ Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing `- improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions, which may give, rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. D-11 ZONING COMPLIANCE .- During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. D- 12 WATER FOR CONSTRUCTION The Contractor at his own expense will furnish water for construction. D- 13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D-14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean-up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property .. If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed) of the appropriate bid item(s) will 00 be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed. im No more than seven days shall elapse after completion of construction before the roadway, right- of-way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make 03112109 SC-10 PART D - SPECIAL CONDITIONS a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth shall give final acceptance of the completed project work. D-16 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup. The Contractor shall not commence with water and/or sanitary sewer installation until such time that the survey cut -sheets have been received from the City inspector. D-16 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage -type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (ONCOR) who will erect temporary mechanical barriers, de - energize the lines, or raise or lower the lines. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to ONCOR, and shall record action taken in each case. 4. The Contractor is required to make arrangements with the ONCOR company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D-17 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. '* Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. D- 18 CUTTING OF CONCRETE 03/12/09 .•. SC-11 PART D - SPECIAL CONDITIONS When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be .. subsidiary to the unit cost of the respective item. D- 19 PROJECT DESIGNATION SIGN Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts. The Engineer shall approve the exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs ... shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance with Figure 30, except that they shall be V-0" by 2'-0" in size. The information box shall have the following information: For Questions on this Project Call: (817) 392-8306 M-F 7:30 am to 4:30 p.m. or (817) 392-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional - compensation will be allowed. D- 20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification .., for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances .. required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one -tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents =- regardless of the actual amount used for the project. D- 22 CRUSHED LIMESTONE BACKFILL .. Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications 03/12/09 SC-12 .W PART D - SPECIAL CONDITIONS for Street and Storm Drain Construction Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, and General Contract Documents. D- 23 2:27 CONCRETE Transportation and Public Works Department typical sections for Pavement and Trench Repair for — Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call -out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete. D- 24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein. 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights -of -way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type "C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. if excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type "C" back -fill material is not suitable, at the direction of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure A. Sand material specified in Figure A shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: 03112M SC-13 r PART D - SPECIAL CONDITIONS ow Less than 10% passing the #200 sieve P.I. = 10 or less Additionally, the crushed limestone embedment gradation specified in Section E1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be replaced with the following: Sieve Size % Retained 11 0-10 1 /2" 40-75 3/8" 55-90 #4 90-100 #8 95-100 .All other provisions of this section shall remain the same. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Backfill material to be compacted as described above must be within +-4% of its optimum moisture content. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfill material to meet 'the standards will be at the expense of the Contractor and will be billed at the commercial rates as " determined by the City. These soil density tests shall be performed at two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the City. 4. MEASUREMENT AND PAYMENT: All material, with the exception of Type "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. Type "B" backfill shall be paid for at a pre -bid unit price of $15.00 per cubic yard. D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 2000-1 through 2000-3. The results of the street cores that were conducted on the project streets, to determine HMAC depths on existing streets, are provided in these specifications and contract documents. go 03112109 SC-14 PART D - SPECIAL CONDITIONS All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2) feet or less in width. Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. The pavement shall be replaced within a maximum of five (5) working days, providing job placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Construction Services section will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Construction Services section. D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub -Part P - Excavations, are hereby made a part of this specification and shall be the minimum governing requirements for trench safety. C. DEFINITIONS: .. 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a series of horizontal level or steps, usually with vertical or near -vertical surfaces between levels. 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined away from the excavation. 03/12" 0 SC-15 PART D - SPECIAL CONDITIONS 4. SHIELD SYSTEM - Shields used in trenches are generally referred to as "trench boxes" or "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent structures .. or can be designed to be portable and move along as the work progresses. Shields can be either pre -manufactured or job -built in accordance with OSHA standards. 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or am timber system that supports the sides of a trench and which is designed to prevent cave- ins. Shoring systems are generally comprised of cross -braces, vertical rails, (uprights), horizontal rails (wales) and/or sheeting. "" D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of embedment or bottom of excavation. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5) feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, — materials, equipment and incidentals necessary for the installation and removal of trench safety systems. no D- 27 SANITARY SEWER MANHOLES A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., .. and E2-14 Vault and Manhole Construction of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. For new sewer line installations, the Contractor shall temporarily plug all lines at every open _ manhole under construction in order to keep debris out of the dry sewer lines. The plugs shall not be removed until the applicable manhole complete with cone section has been constructed and the lid installed to keep out debris as a result of additional construction. 1 CONCRETE COLLARS Concrete collars will be required on all manholes specified as per gOFV1t Star id, 4 06TSKSi4N ©09. ; ELE rz 3. LIFT HOLES: All lift holes shall be plugged with a pre -cast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (112) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. ,. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. M 03112109 SCA 6 T PART D - SPECIAL CONDITIONS 5. MANHOLE .COVERS All lids shah have pick s in lieu of pick holes.. anhole frames and covers shall be PAMREX, or approved equal, with 30-inch clear opening:;' Coversishall ,r set flush with the rim, of the frame and shall have no larger than 1/8-inch gap between the frame and cover. Bearing surfaces shall be machine f%nished, Locking manhole lidganc frames will be restrted-:to locations v�Tithin, the 100-year;flo¢dplamtd areas speeifjcal4y designated on:the pes 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecoi," or equal to, a minimum or 14 mils dry film thickness. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole _ sections constructed for the City of Fort Worth Water Department, excluding only the joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. .. This sealant shall be pre -formed and trowelable Bitumastic as manufactured by Kent -Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross -sectional area or flat -tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre -formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. B. EXECUTION: 1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above -specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. The manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in accordance with the recommendations_ The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint sealer. r o1Vr2" SC-17 7 7 E qm PART D - SPECIAL CONDITIONS 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre -cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre -cast flattop section. Pre -cast concrete rings, or a pre -cast concrete flattop section will be the only adjustments allowed. In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone section below this level are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface. If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre- formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface. The top of the casting shall be 1/8 inch below the finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46- 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. 4. The exterior surface of all pre -cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. 03/12/09 SC-18 MM no r ftw ftw PART D - SPECIAL CONDITIONS MM The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing and exterior surface coating. No Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to, joint sealing, lift hole sealing, and exterior surface coating. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D- 28 SANITARY SEWER SERVICES Any reconnection, relocation, re-routes, replacement, or new sanitary sewer service shall be required as shown on the plans, and/or as described in these Special Contact Documents in "" addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case -by -case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. D. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to ' the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary 'r Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. E. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a minimum of two (2) percent slope or as approved by the Engineer. For situations involving sewer service re-routing, whether on public or private property, the City shall provide line and grade for the sewer service lines as shown on the project plans. Prior to installing the applicable sewer main or lateral and the necessary ~ service lines, the Contractor shall verify (by de -holing at the building clean -out) the elevations (shown on the plans) at the building clean -out and compare the data with the elevation at the proposed connection point on the sewer main, in order to ensure that the two (2) percent 03112109 SC-19 r PART D - SPECIAL CONDITIONS minimum slope (or as specified by the Engineer) requirement is satisfied. Elevations shall also .. be verified at all bend locations on the service re-route. Aft applicable sewer mains, laterals and affected service lines that are installed without pre -construction de -holing at the affected residences (to verify design elevations) shall be removed and replaced as necessary at the Contractor's expense in the event grade conflicts are brought to light after de -holing is conducted. All elevation information obtained by the Contractor shall 'be submitted to the Inspector. The Engineer shall be immediately notified in the event that the two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans, the Contractor shall obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is " satisfied. Prior to backfilling, the Contractor shall double check the grade of the installed service line and submit signed documentation verifying that the line has been installed as designed to the Engineer. The Contractor, at its sole expense, shall be required to uncover any �- sewer service for which no grade verification has been submitted. All re-routes that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense. The Contractor shall ensure that the service line is backfilled and compacted in .. accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. The Contractor shall .. remove the existing clean -out and plug the abandoned sewer service line. The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property. Furthermore, the contractor shall utilize the services of -' a licensed plumber for all service line work on private property. Permit(s) must be obtained from the City- of Fort Worth Development Department for all service line work on private property and all work related to the service line must be approved by a City of Fort Worth Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. Payment for work and materials such as backfill, removal of existing clean -outs, plugging the ._ abandoned sewer service line, double checking the grade of the installed service line, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear _ foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. D- 29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as _ shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. 03112109 SC-20 PART D - SPECIAL CONDITIONS B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall be removed and returned to the Water Department NEW warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials_ The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. aw C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. w Surface restoration shall be compatible with existing surrounding surface and grade. If the valve is in a concrete vault, the vault shall be demolished in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top no slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated no material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item - Abandon Existing Sewer Manhole. H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel diameter section, and base section shall be removed. The excavation shall then be backfilled orz SC-21 MW DART D - SPECIAL CONDITIONS and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the Engineer. Surface restoration shall be compatible with surrounding surface. 1. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. C. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as -- follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). 610 L. ABANDONMENT OF EXISTING SEWER LINES: Where plans call for abandonment of existing sewer mains after the construction of a new sewer main, the Contractor shall be responsible for TV inspection of 100% of the existing sewer main to be abandoned to make a `� final determination that all existing service connections have been relocated to the new main. Once this determination has been made, the existing main will be abandoned as indicated above in Item I. ow w 03112109 SC-22 PART D - SPECIAL CONDITIONS D- 30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2Y2 pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as follows: Type of Ufility Color Code Legends Water Safety Blue Caution! Buried Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable ^* tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). D- 31 PIPE CLEANING Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all "' exposed pipe ends during any period of work stoppage. r so so D- 32 DISPOSAL OF SPOILIFILL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, Contractor shall remove the spoil/fill material at his expense and dispose of such materials in accordance with the Ordinances of the City and this section. D- 33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon receipt of payment. oWbw SC-23 PART D - SPECIAL CONDITIONS D- 34 SUBSTITUTIONS .. The specifications for materials set out the minimum standard of quality, which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has ow been specified. Where the term "or equal', or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the Contractor procures the proposed substitute_ Where the term "or equal', or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub -section as related to "substitutions" shall be applicable to all sections of these specifications. D- 35 PRE -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured -in -place pipe, fold and form pipe, slip -line, etc_), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment _ necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high -velocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high -velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high -velocity gun for washing and scouring manhole walls and floor. The gun shall be capable of producing flows from a fine spray to •• a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in _ diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage ` present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high - velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it M 03112109 SC-24 no PART D - SPECIAL CONDITIONS .. will be assumed that a major blockage exists, and the cleaning effort shall be abandoned. When additional quantities of water from fire hydrants are necessary to avoid delay in normal working procedures, the water shall be conserved and not used unnecessarily. No �. fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for _ the water meter and related charges for the setup, including the water usage bill. All expenses shall be considered incidental to cleaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS .. OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. r- B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. am When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection videotapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy O3 I ZV9 10 SC-25 PART D - SPECIAL CONDITIONS ■m of the distance meter shall be checked by use of a walking meter, roll -a -tape, or other Im suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shalll be incidental to Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a .� copy of such records will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard -size photographs of the .w television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. No 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording .. playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. The Engineer will return tapes to the Contractor upon completion of review. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the �* Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re -televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected. The Engineer will return tapes to the Contractor upon completion of review. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre -Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall W provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of the 03/R 12fo9 SC-26 .. PART D - SPECIAL CONDITIONS tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspection. ow The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES D. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with all connections in place. Lift holes shall be plugged, and all drop -connections and gas sealing connections shall be installed prior to testing. no 03112209 The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the drop -connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury (10"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table below in accordance with ASTM C1244-93: SC-27 PART D - SPECIAL CONDITIONS ` Table I .. MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" Hg (10"Hg - 9"H9) (SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole 0 to 16' 40 sec. 52 sec. _ 18' 45 sec. 59 sec. 20' 50 sec. 65 sec. 22' 55 sec. 72 sec. 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. 28' 69 sec. 91 sec. 30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' 1. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one -inch of mercury (1" Hg) after the required test time. Any manhole, which fails to pass the initial test, must be repaired by either pressure grouting through the `" manhole wall or digging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. "' Following completion of a successful test, the manhole shall be restored to its normal condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, and all incidentals, including all bypass pumping, required to complete the test as specified herein. D- 37 BYPASS PUMPING The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to T discharge sewage into the trenches. Payment shall be incidental to rehabilitation or replacement of the sewer line. ba bo 03112/09 SC-28 PART D - SPECIAL CONDITIONS D- 38 POST -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television inspection performed by an independent sub -Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. C. EXECUTION: M0 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. No more than 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll -a -tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the ow passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost or retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television .. inspection. Sanitary sewer mains must be laced with enough water to fill all low pints. The television inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced to SC-29 PART D - SPECIAL, CONDITIONS r stationing as shown on the plans. A copy of these television logs will be supplied to the ,. City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard -size photographs of the .m television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor ■- upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Enqineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re - televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. D. PAYMENT OF POST -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post -construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a quality No that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Im Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be .o included in the appropriate bid item - Post -Construction Television Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D- 39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or _ Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and _ will bear any expense related thereto. B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine T days prior to the placing of concrete using the same aggregate, cement, and mortar which are 03/1 tio9 SC-30 .. PART D - SPECIAL CONDITIONS .o to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in -place material on this project will be performed by the city at its own no expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the no requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE) "' A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures wo unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, .o temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled -hay retards, dikes, slope drains and other devices. imp B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible -earth material exposed by preparing right- of-way, clearing and grubbing, the surface area of erodible -earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution -control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution -control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control -■ features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution -control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil -erosion -control measures shall be performed as directed by the Engineer. 2. Waste or disposal areas and construction roads shall be located and constructed in a no manner that will minimize the amount of sediment entering streams. a31121oq SC-31 PART D - SPECIAL CONDITIONS am 3. Frequent fordings of live streams will not be permitted; therefore, temporary bridges or aw other structures shall be used wherever an appreciable number of stream crossings are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. 4. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 5. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work_ 6. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will .w be given for this work. D- 41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES an The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities 10 to minimize obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D- 42 PROTECTION OF TREES, PLANTS AND SOIL aw All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or ,,,,, better than prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be _ restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated _ as soon as possible with a tree wound dressing. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property - including street Rights -of -Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 817-392-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can W be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. 03112109 SC-32 1___J PART D - SPECIAL CONDITIONS .. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred will be considered a subsidiary cost of the project. D- 43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one -tenth (0.1) of a foot. D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid to be considered responsive. Products and processes listed in the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements. D- 45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING This item shall be performed in accordance with the City of Fort Worth Parks and Community -o Services Department Specifications for Topsoil, Sodding and Seeding. 1. TOPSOIL no DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the lines and me grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to No supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving MW operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. MW 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. .. Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties _ for sodding are Prairie and 609. MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum ON121W so SC-33 PART D - SPECIAL CONDITIONS .= thickness of native soil attached to the roots. St_ Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the source shall be watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross -sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the requirements hereinafter described. Sodding shall be either "spot" or "block"; either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per square inch compression. Hand tamping may be required on terraces. b. Block Sodding. At locations on the Drawings or where directed, sod blocks shall be carefully placed on the prepared areas. The sod shall be so placed that the entire designated area shall be covered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall, upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the block sod firmly in place. When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. sm i. .. .. .. .. r. am ow 03112109 SC-34 PART D - SPECIAL CONDITIONS The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. -� MATERIALS: a. General. All seed used must carry a Texas Testing Seed label showing purity and no germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each No variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. am The specified seed shall equal or exceed the following percentages of Purity and germination: .. Common Name Purity Germination Common Bermuda Grass 95% 90% Annual Rye Grass 95% 95% Tall Fescue 95% 90% Western Wheatgrass 95% 90% Buffalo Grass Varieties Top Gun 95% 90% Cody 95% 90% .. Table 120.2.(2)a. URBAN AREA WARM -SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clav or Tiaht Soils Mixture for -■ Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 •• to Buffalograss 60 Bermudagrass 20 Buffalograss 40 M May 1 Total: 100 Total: 100 Total: 100 Table, 120.2.(2)b TEMPORARY COOL -SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 50 May 1 Annual Rye 50 Total: 100 so 031121M SC-35 RM 01- PART D - SPECIAL CONDITIONS CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross -sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. or b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section D- 45, Construction Methods, is not applicable since no seed bed preparation is required. DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. The seed, or seed mixture, specified shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand rather than by mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one -eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the "Cultipacker" type. All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. After the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one -quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) inches in depth. Am ON I= ow No a am Im 03112109 SC-36 IN .0 PART D - SPECIAL CONDITIONS The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the .. item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the asphalt shall be at a rate of three -tenths (0.3) gallons per square yard. It shall be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. RE -SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re -seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to .w insure that slit -seeding equipment will be able to cut through the turf and achieve adequate soil penetration. .6 " Slit -seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. we 4. HYDROMULCH SEEDING: If hydro mulch seeding is provided, seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. 5. CONSTRUCTION WITHIN PARK AREAS "` TURF RESTORATION OF PARK AREAS: FERTILIZER DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing .. the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20- 0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. •.. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of "Seeding". 03n2M SC-37 so PART D - SPECIAL CONDITIONS ,w 0 MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for "Seeding" will be measured by the linear foot, complete in place. Acceptable material for "Sodding" will be measured by the linear foot, complete in place. Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeding. fJ .. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted `m below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. .. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D- 46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA, as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. .. .. 03/12/09 SC-38 PART D - SPECIAL CONDITIONS D- 47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION 7. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. 8. The inspector along with appropriate City staff and the City's consultant shall make an No inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 9. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. ow 10. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies, which are discovered at the time of final inspection. 11. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C - GENERAL CONDITIONS. D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS) 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. aw 2. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. so 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at .. least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. No 4. Nothing shall be stored over the tree root system within the drip line area of any tree. 5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. 8. Contractor shall employ a qualified landscaper for all the work required for tree care to .o ensure utilization of the best agricultural practices and procedures. a3/1DW Ed SC-39 PART D - SPECIAL CONDITIONS .. 9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter .- shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D- 49 CONCRETE ENCASEMENT OF SEWER PIPE Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter •� indicated. The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. D- 50 CLAY DAM Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations indicated on the Drawings No or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing .m and finishing shall be subsidiary to the price bid for pipe installation. D- 51 EXPLORATORY EXCAVATION (D-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the " existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of so findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design am modifications. The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). _ Payment shall not be made for verification of existing utilities per item D-6. Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. D- 52 INSTALLATION OF WATER FACILITIES 62.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). In 03112109 SC-40 PART D - SPECIAL CONDITIONS 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. 52.3 Type of Casing Pipe 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: For the inside and outside of casing pipe, coal -tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. _ Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non - concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: no Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. It 52.4 Tie -Ins The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. me 52.5 Connection of Existing Mains The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of 0Y1z" SC-41 PART D - SPECIAL CONDITIONS .. shutting down an existing main, the Contractor shall notify the City Project Manager, .. Construction Services, Phone 817-392-8306, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. am 52.6 Valve Cut -Ins It may be necessary to cut -in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closing valves in other lines and putting consumers out of service for that period of time necessary to cut in the new valve; the work must be expedited to the utmost and all such cut -ins must be •• coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated appurtenants required, shall be included in the price of the appropriate bid items. .. 5-2.7 Water Services The relocation, replacement, or reconnection of water services will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured service branches. All materials used shall be as specified in the Material Standards (E1-17 & E1-18) contained in the General Contract Documents. All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1- inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. All services which are to be replaced or relocated shall be installed with the service main tap and service line being in line with the service meter unless otherwise directed by the Engineer. A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. All water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the 03112109 SC-42 No PART D - SPECIAL CONDITIONS .. water service in the proposed location and receipt of a meter from the project inspector the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. The contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5) feet from Main to five (5) feet behind the Meter. 2. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap through the meter. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, r labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2 a3llZo9 SC-43 Ef PART D - SPECIAL CONDITIONS a. inch water meters or smaller. The reinforced plastic water meter boxes shall comply with section E1-18A — Reinforced Plastic Water Meter Boxes. Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five (5) feet behind thec meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box. 1. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). 2. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple service lines with taps servicing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. Payment shall be made at the unit bid price in the appropriate bid item(s). 52.8 2-Inch Temporary Service Line A. The 2-inch temporary service main and 3/4-inch service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime (HTH) prior to installation. The out -of -service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department Meter Shop for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re -install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Engineer. The temporary service layout shall have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. w am W am M 03112109 SC44 so PART D - SPECIAL CONDITIONS an When the temporary service is required for more than one location the 2-inch temporary service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next w successive project location. Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. B. In order to accurately measure the amount of water used during construction, the Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new mains that cannot be metered from a hydrant will be estimated as accurately as possible. At the pre -construction conference the contractor will •• advise the inspector of the number of meters that will be needed along with the locations where they will be used. The inspector will deliver the hydrant meters to the locations. After installation, the contractor will take full responsibility for the meters until such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter Shop will evaluate the condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repairs. The issued meter is for this specific project and location only. Any water that the contractor may need for personal use will require a separate hydrant meter obtained by the Contractor, at its cost, from the Water Department. 52.9 Purging and Sterilization of Water Lines Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The City will provide all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. •+ Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de -chlorinated" prior to disposal. The line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of purity. Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the pipe. 52.10 Work Near Pressure Plane Boundaries Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes 52.11 Water Sample Station GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. o3rtua9 SC-45 PP PART D - SPECIAL CONDITIONS am .. The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. am PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. ow Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service .. line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work -and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid .. for Water Sample Stations. 52.12 Ductile Iron and Gray Iron Fittings Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: E2-7.11 DUCTILE -IRON AND GRAY -IRON FITTINGS: All ductile -iron and gray -iron fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene .. wrapping, horizontal concrete blocking, vertical tie -down concrete blocking, and concrete cradle necessary for construction as designed. All ductile -iron and gray -iron fittings, valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E1-13 and Construction Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie -down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, horizontal concrete blocking, vertical tie -down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. D- 53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall _ apply. However, no direct payment will be made for this item and it shall be considered to this contract. 03/12/09 SC-46 PART D - SPECIAL CONDITIONS D- 54 DEWATERING The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. .,. Ground water shall not be discharged into sanitary sewers. Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. D- 55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D- 56 TREE PRUNING A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPMENT 1. Vibratory Knife 2. Vermeer V-1550RC Root Pruner C. NATURAL RESOURCES PROTECTION FENCE 3. Steel "T" = Bar stakes, 6 feet long. 4. Smooth Horse -Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. no D. ROOT PRUNING 7. Survey and stake location of root pruning trenches as shown on drawings. 8. Using the approved specified equipment, make a cut a minimum of 36 inches deep in order to minimize damage to the undisturbed root zone. -' 9. Backfill and compact the trench immediately after trenching. 10. Place a 3-foot wide by flinch deep cover of mulch over the trench as required by the Engineer. 0311bns so SC-47 PART D - SPECIAL CONDITIONS 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no im roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, equipment and protection. r. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. D- 57 TREE REMOVAL Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and no additional payment will be allowed. D- 58 TEST HOLES _ The matter of subsurface exploration to ascertain the Mature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. �. Whether prospective bidders perform this subsurface exploration jointly or independently, and whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. �. If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. The cost of all rock removal end other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: 03/12/09 SC-48 .o PART D - SPECIAL CONDITIONS no The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, City Project No (CPN)., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the `pre -construction notification' flyer is attached. .. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City no Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, the contractor shall prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. The notice shall be prepared as follows: The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The flyer shall be prepared on the contractor's letterhead and shall include the following information: Name of the project, City Project Number, the date of the interruption of service, the period the interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed. The contractor shall not be permitted to proceed with interruption of water service until the flyer has been delivered to all affected residents and businesses. ,. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector.. All work involved with the notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. D- 60 TRAFFIC BUTTONS _'s The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD) of the Transportation/Public Works Department to install the markings, no the contractor shall contact SSMD at (817) 392-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. D- 61 SANITARY SEWER SERVICE CLEANOUTS Whenever a sanitary sewer service line is installed or replaced, the Contractor shall install a two- .o way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways, streets, sidewalks, etc. whenever possible. When it is not possible, the cleanout stack and cap shall be cast iron. no go a lz" SC-49 no PART D - SPECIAL CONDITIONS F Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price bid for Sanitary Sewer Service Cleanouts. D- 62 TEMPORARY PAVEMENT REPAIR The Contractor shall provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing asphalt shall be saw cut to provide a uniform edge and the entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing pavement and the temporary repair. Cost of saw cutting shall be subsidiary to the temporary pavement repair pay item. The contractor shall be responsible for maintaining the temporary pavement until the paving contractor has mobilized. The paving contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D- 63 CONSTRUCTION STAKES The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D- 64 EASEMENTS AND PERMITS The performance of this contract requires certain temporary construction, right -of -entry agreements, and/or permits to perform work on private property. The City has attempted to obtain the temporary construction and/or right -of -entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes_ For locations where the City was unable to obtain the easement or right -of -entry, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, are available to the Contractor for review by contacting the consultant who distributes the plans for the project. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General .. .. .. am so .o an am t w 03112109 SG-50 7 PART D - SPECIAL CONDITIONS Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for thoroughly reviewing, .0 understanding and complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. For railroad permits, any and all railroad insurance costs and any other incidental costs necessary to meet the conditions associated with permit(s) compliance, including payment for flagmen, shall be included in the lump sum pay bid item for "Associated Costs for Construction within Railroad ! Agency Right-of-way". No additional compensation shall be allowed on this pay item. D- 65 PRE -CONSTRUCTION NEIGHBORHOOD MEETING After the pre -construction conference has been held but before construction is allowed to begin on this project a public meeting will be held at a location to be determined by the Engineer. The contractor, inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related questions. Every effort will be made to schedule the neighborhood meeting within the two weeks following the pre -construction conference but in no case will construction be allowed to begin until this meeting is held. D- 66 WAGE RATES Compliance with and Enforcement of Prevailing Wage Laws Duty to pay Prevailinq Waqe Rates. The contractor shall comply with all requirements of Chapter 2258, Texas Government Code (Chapter 2258), including the payment of not less than the rates determined by the City Council of _ the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents. Penalty for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. •• Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of its initial determination. Upon the City's .. 030uos SC-51 PART D - SPECIAL CONDITIONS determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to paragraph (c) above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. Records to be Maintained. The contractor and each subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall pertain to this inspection. Pav Estimates. With each partial payment estimate or payroll period, whichever is less, the contractor shall submit an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. Postmq of Waqe Rates. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) through (g) above. (Wage rates are attached at the end of this section.) (Attached) D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos National Emissions Standards for Hazardous Air Pollutants (NESHAP) found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of asbestos cement pipe (ACP) in compliance with NESHAP. Nothing in this specification shall be construed to void any provision of a contract or other law, ordinance, regulation or policy whose requirements are more stringent. 03112M SC-52 PART D - SPECIAL CONDITIONS B. ACP is defined under NESHAP as a Category II, non -friable material in its intact state but which may become friable upon removal, demolition and/or disposal. Consequently, if the removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas Department of Health. The notification must be filed at least ten days prior to removal of the material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. The Environmental Protection Agency (EPA) defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable. The Excavator is responsible to employ those means, methods, techniques and sequences to ensure this result. E_ Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of Fort Worth assumes no responsibility for compliance programs, which are the responsibility of the Excavator. (Copy of forms attached) F. The removal and disposal of ACP shall be subsidiary to the cost of installing the new pipe unless otherwise stated or indicated on the project plans or contract documents. D-68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN 1 ACRE) PERMIT: As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small Construction Activity) or five or more acres of total land (Large Construction Activity). The contractor is defined as an "operator" by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http://www.tnrcc.state.tx.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www,dfwstormwater.com/runoff.html. Not all of the structural controls discussed in the BMP Manual will necessarily apply to this project_ Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in minimum sediment retention of not less than 70%. NOTICE OF INTENT (NOI): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre -construction meeting a TCEQ Notice of Intent (NOI) form prepared by the engineer. It serves as a notification to the TCEQ of construction activity as well as a commitment that the contractor understands the requirements of the permit for r 03112Jo9 SC-53 PART D - SPECIAL CONDITIONS storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted to the TCEQ at least 48 hours prior to the contractor moving on site and shall include the required $100 application fee. The NOI shall be mailed to: Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 A copy of the NOI shall be sent to: City of Fort Worth Department of Environmental Management 5000 MLK Freeway Fort Worth, TX 76119 NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity, the contractor shall sign, prior to final payment, a TCEQ Notice. of Termination (NOT) form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. The NOT should be mailed to: Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction site. Copies of the project SWPPP's are available for viewing at the office of the Consultant disbursing the plans for the project. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. LARGE CONSTRUCTION ACTIVITY - DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES: A Notice of Intent (NOI) form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination (NOT) form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee, or, when another permitted operator assumes control over all areas of the site that have not been finally stabilized. MW9 SC-54 ow PART D - SPECIAL CONDITIONS SMALL CONSTRUCTION ACTIVITY - DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOI form is not required. However, a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching, soil retention blankets, or other �. structural or non-structural storm water pollution controls. The method of control shall result in a minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT -FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown on the proposal as full compensation for all items contained in the project SWPPP. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. The Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project. In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this activity through the appropriate City representative. The Contractor shall not operate water line valves of existing water system. Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre -qualified contractor who is the apparent low bidder(s) for a project to submit such additional information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. r 03/12/09 SC-55 MW PART Q - SPECIAL CONDITIONS D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. No 2. The Project Manager and the Directors of Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the ` City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to •-- interested individuals will distributed by the Water Department's Public Information Officer. 4. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Water Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. D-72 AIR POLLUTION WATCH DAYS The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00'a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p-m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 �- a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA 03112109 SC-56 an ow PART Q - SPECIAL CONDITIONS as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or no alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. 1� D-73 FEE FOR STREET USE PERMITS AND RE -INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re -inspections for parkway construction, such as driveways, sidewalks, etc., will be required. The fees are as follows: 1. The street permit fee is $50.00 per permit with payment due at the time of permit application. 2, A re -inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re -inspection. Payment by the contractor for all street use permits and re -inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. 03/12/09 END OF PART D - SPECIAL CONDITIONS SC-57 PART D - SPECIAL CONDITIONS (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: .. THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON WATER AND I OR SEWER LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 03112109 SC-58 Mo PART D - SPECIAL CONDITIONS FORTWORTH Data: DOE NO. XXXX Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION ►f DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON am BETWEEN THE HOURS OF AND No IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR .. MR. 'AT (CITY INSPECTOR) (TELEPHONE NUMBER) r THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, bw 0311ZV9 SC-59 ,CONTRACTOR 1 0 f_ PART D - SPECIAL CONDITIONS TEXAS DEPARTMENT OF HEALTH DEMOLITION t RENOVATION ?k NOTIFICATION FORM NOTE: CIRCLE iTEMS THAT ARE AMENDED T n H N4TIFICA'170NJf � i) Abatement Contractor TOH Ucernse Humber_ Address: City: State: 2rp: Office Phone Number. ( } Job Site Phone Number: Sits Supervisor, TDH Liceme Number •• Site Supervisor. TDH License Number..... Trained Orr -Site NESHAP individual: _...._. _.. Certi�cation Date:. Demolition Contractor: Office Phone, Numbers} Address: State: Zip., 2) Project Consuttent or Operator. TDH License Number. Maft,q Address: - City. State: ZIP: Office Phone Number: j 1 3) FadlityOwner. Attention: Mading Address; aw City: State: Zip: Owner Phone NunhberLj "Note: The Invoice for the notification fee will be sent to the owner of the building anal the billing addren for the invoice will be obtained from the Information that Is provided In this section. 4) Description or Facility Name: Physical Address: County: City: zip: Facility Phone Numberf } Facility Contact Person: Description of A saIRODm �Jumber. Prior Use: 1=utufa Use: .. Age of Buildirg)Facitity: Sias: Number of Floors, School (K -12): D YES ❑ NO S) Type of Work: O Demolition ❑ Renovation (Abatament) ❑ Annual Consolidated Work will be during: (3 Ray ❑ Eve ❑ Night Phased Fn jeO .. Description of work scdxWe: a) is this a Public Building? Q YES rJ NO Federal Facility? D YES =_, NO Industrial Site? o YES 0 NO NESHAPrOniy Facility? ❑ YES D NO Is BuitdINIFacility Occupied? ❑ YES 0 NO � 7) Notification Type CHECK ONLY ONE V. 7 Original (1D Working Days) D Cancellation 0 Amendment D EmergencylOrdered f o. if this is an amendment, which amendment number Is this? (Enclose copy of original andfor last amendment) I` If an emergency, who did you talk wIM at TDH? F.mergencylf: , a. Date and Hour of Emergency (HHIM1u DDNY)- Irt Description of the sudden, unexpected !:vent and expirttation Of haw the event caused unsafe conditions or would cause 1?` equipment damage (computers, machinery etc in © B) Description of procedures to be followed In the event that unexpected asbestos is found or previously non -friable Y asbestos material becomes crumbled, pulvarized, or reduced to powder. = 9) Was art Asbestos survey performed? r3 YES C NO Date: 1 I TDH Inspector License No; Q Analytical Method: 0 PL.M ❑ TEM n Assumed TDH Laboratory License No: N (For TAHPA (public building) projects: an assumption must be made by a TDH Licensed Inspector) z 14) Description of planned demolition or renovation work, type of material, and method(s) to be used, sr. 11) Description of work prrOkm and engineering corttrota to be used to prevent emissions of asbestos at the demoAtion/renovaftoa: _ uo omw s, - W 03(12/09 SC-60 to MW PART D - SPECIAL CONDITIONS 12) ALL applicable items in the following table must be completed; IF NO ASBESTOS PRESENY CHECK HERE 0 r Approxlmste amount of Check unit of measurement Asbestos-Containling Building Material Asbestos 'TYPE, Pipes Surface Area Lit Ln SO SO Cu Cu Ft M Ft M Ft M RACNI to be removed RACM NOT removed Interior Cateow/ I non-friabto removed Exterior Category I non -friable, removed rr _ Catecory I non -friable NOT removed Interior Category ll non friable removed ... Exterior Category 11 non -friable removed Cateoory II noel-frlahle NOT removed RACM O f-Facility Component 13) Wasta Trartsporter Ntwio: TDIi Liwn.se Number Address: City: State: Zip: Contact Person: Phone Number. f 14) wasM Dispotl Ste Name: Address: CCty Staff: Zip: Telephone: { I TNRCC Permit Number_ r 15) For structurally unsound fed itles, attach a copy of demolition order and identilly Govemmental Official below: Name. Regisltatlori No: Title: Dale of order (MWDDJYY) ! I Date order to begin (MM117DJYY) r ..r 16) Scheduled Dates of Asbestos Abatement (MI4AtDD/YY) Start: I I Complete; I 1 17) Scheduled Dates DemoliiionlRenovation (MNWD/YY) Start: I I Complete: ! I Note: If the start date on this notification ton not bo mak Via TDH Regional or Local Program afiice Aurae be contacted by phone prior to the start data. Failure to do so is a vlotatlon to accor$dnco to TAHPA, 3*dlon 295.51. 1 hareby cerfity chat all information I have provided is Correct, complete, and tn,e to the best of my knowledge. 1 acknowledge that I am responsible for all aspects of the notification form, including, but not limiting, content and submission dates. The maximum penalty is S10,001) per day per violation. _ f ) (Signature of Building Ownerl Operamr (Printed Name) (Dime) (Tek"Me) or Delegated Consultant/Contractor) ` Fax lumber) MAIL TO: ASBESTOS NOTIFICATION! SECTION TO= SUBSTANCES CONTROL DIVISION TEXAS DEPARTMENT OF HEALTH *Faxon are not accilpts& PO BOX 143538 "Faxes are not aceaptimil AUSnN, TX 18114-3530 PH:512-834-6500, 1-800-572-5549 Form APEI#5, dated 07/`29/02 Rfepiaces TDH form dated 07/13/01_ For assistance in compfeling loran, caN 1-800-572-5548 03/12/09 SC-61 r-1 PART D - SPECIAL CONDITIONS ow Classifications Houdy Rates IDS Classifications I Hrlyr Rts Air Tool Operator $ Scraper Operator $11.42 (Asphalt Raker $13.99 IServicer $12.32 Asphalt Shove)er $8.8.0 I Slip Form Machine Operator $12.33 Asphalt Distributor Operator. $13.99 Spreader Box Operator $10.92 Asphalt Paving Machine Operator $12-79 Tractor operator. Crawler Type $i2.fi6 Batching Plan eiigher $14.15Tractor operator, Pneumatic $1291 (Broom orSweeper Operator V.88 ITravelinqr &fixer Operator $12.03 l Bulldozer Operator $1322 Truck Driver- Single Axle (Light) $10 91 ( Carpenter (Rough) $12-00 Truck Driver- Single Axle (Heavy) $11.4 7 Concrete Finisher- Paving $1285 Truck Driver- Tandem Axle Semi -Trailer $11.75 �ConcreteFinisher-Structures $1327 Truck Driver LowboylFloat $14.93 I Concrete Paving Curbing Mach. Oper_ $12-DO Truck Driver- Transit Mix $12_08 Wagon Drill, Boring, blachane. Post Hole (Driller Concrete Paving Finishing Mach. Oper. $13.83 334.00 Concrete Paving Joint Sealer Oper. $12.50 lWelder $13.57 Concrete Paving Sax Oper. $13.50 (Work Zone Barricade Serricer $10.09 Concrete Paving Spreader Oper. $14_50 (Concrete Rubber $10 B1 (Crane, Clamshell, Sackhoe, Derrick, Dragline,. Shovel $14.12 Electrician $1$_12 jFlagger $8A3 FForm Builder- Structures $11_53 (Form Setter- Paring & Curbs $11.83 Foundation Drill Operator, Crawler Mounted $13.87 Foundation Drill Operator, Truck Mounted $18-31) Front End Loader $12_B2 I Laborer- Common $9.18 Utility $10_65 ELaborer- Mechanic $18.97 Milling Machine Operator, Fine Grade $11.83 I Mixer Operator $11-58 Motor Grader Operator (Fine Grade) $1520 I Motor Grader Operator, Rough Oiler $14_50 (Painter. Structures $13.17 Pavement Marking Machine Open $10.04 Pipe Layer $11-1 4 Roger. Steel Wheel Plant &Tic Pavements $11 28 Roger, Steel Wheel Other Flatwheel or Tamping $10.92 Roger, Pneumatic, Self -Propelled Scraper $11.07 P.einforcing Steel Setter (Paving) $14.86 (Reinforcing Steel Setter Structure) $1829 Source m AGC of Texas (Hwy, Hvy, Willies Industrial Branch) wvwv.accessgpagovfdavisbaconf IM r r. r. r 03112109 SC-62 so PART DA - ADDITIONAL SPECIAL CONDITIONS mw w41 mw No mo no sm mw so low DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS ............ OMITTED DA-2 PIPELINE REHABILITATION CURED -IN -PLACE PIPE ................................. OMITTED DA-3 PIPE ENLARGEMENT SYSTEM...................................................................................4 DA-4 FOLD AND FORM PIPE.................................................................................. OMITTED DA-5 SLIPLINING..................................................................................................... OMITTED DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT ..................................... .................12 DA-7 TYPE OF CASING PIPE.............................................................................................15 DA-8 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR.............................................16 DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION ..................18 DA-10 MANHOLE REHABILITATION........................................................................OMITTED DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION ................... OMITTED DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM .... OMITTED DA-13 INTERIOR MANHOLE COATING - QUADEX SYSTEM.. ....... ........................ OMITTED DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM ...................................- 21 DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM....................................24 DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER........ ........................................................................................................................ OMITTED DA-17 INTERIOR MANHOLE COATINGSTRONG-SEAL-SYSTEM.........................OMITTED DA-18 ......................... RIGID FIBERGLASS MANHOLE LINERS ...................................................... OMITTED DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION ................................... OMITTED DA-20 PRESSURE GROUTING.............................................................................................27 DA-21 VACUUM TESTING OF REHABILITATED MANHOLES ............................................ 30 DA-22 FIBERGLASS MANHOLES............................................................................ OMITTED DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES .................... 33 DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER ............................................ 33 DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS....................................................34 DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE ............................................ 34 DA-27 GRADED CRUSHED STONES................................................................................... 35 DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE...............................................OMITTED DA-29 BUTT JOINTS - MILLED................................................................................. OMITTED DA-30 2" H.M.A-C. SURFACE COURSE (TYPE "D" MIXI.................................................... 35 DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER................................OMITTED DA-32 NEW 7" CONCRETE VALLEY GUTTER........................................................ OMITTED DA-33 NEW 4" STANDARD WHEELCHAIR RAMP .................................................. OMITTED DA-34 8" PAVEMENT PULVERIZATION...................................................................OMITTED DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) .............. OMITTED DA-36 RAISED PAVEMENT MARKERS.................................................................... OMITTED DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING .... OMITTED DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL............ ........................................................................................................................ OMITTED DA-39 ROCK RIPRAP - GROUT - FILTER FABRIC .............................................................. .............................. 36 DA-40 CONCRETE RIPRAP ............................. .... OMITTED DA-41 CONCRETE CYLINDER PIPE AND FITTINGS...............................................OMITTED DA-42 CONCRETE PIPE FITTINGS AND SPECIALS., ............................................. OMITTED DA-43 UNCLASSIFIED STREET EXCAVATION....................................................... OMITTED DA-44 6" PERFORATED PIPE SUBDRAIN...............................................................OMITTED DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS ........................................ OMITTED DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION.. ................. ................ OMITTED DA-47 PAVEMENT REPAIR IN PARKING AREA ...................................................... OMITTED DA-48 EASEMENTS AND PERMITS.....................................................................................40 10123108 ASC-1 PART DA - ADDITIONAL SPECIAL CONDITIONS ... DA-49 HIGHWAY REQUIREMENTS......................................................................................40 DA-50 CONCRETE ENCASEMENT.......................................................................................40 DA-51 CONNECTION TO EXISTING STRUCTURES ............................................................40 DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION .....................OMITTED DA-53 OPEN FIRE LINE INSTALLATIONS..............................................................OMITTED DA-64 WATER SAMPLE STATION........................................................................... OMITTED DA-55 CURB ON CONCRETE PAVEMENT............................................................... OMITTED DA-56 SHOP DRAWINGS...............................................................................................,.....41 DA-57 COST BREAKDOWN..................................................................................................41 DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY ...................... OMITTED DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP ........................................................ OMITTED DA-60 ASPHALT DRIVEWAY REPAIR.................................................................................42 DA-61 TOP SOIL....................................................................................................................42 DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT..... OMITTED DA-63 BID QUANTITIES........................................................................................................42 DA-64 WORK IN HIGHWAY RIGHT OF WAY........................................................................43 DA-65 CRUSHED LIMESTONE (FLEX -BASE), ......................................................... OMITTED DA-66 OPTION TO RENEW.......................................................................................OMITTED DA-67 NON-EXCLUSIVE CONTRACT....................................................................... OMITTED DA-68 CONCRETE VALLEY GUTTER ............................. .... ..................................... OMITTED DA-69 TRAFFIC BUTTONS....................................................................................... OMITTED DA-70 PAVEMENT STRIPING...................................................... ......... OMITTED DA-71 H.M.A.C. TESTING PROCEDURES ................................ ..................... OMITTED DA-72 SPECIFICATION REFERENCES................................................................................43 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK -FLOW PREVENTERICONTROL VALVE AND BOX........................................................................................... OMITTED DA-74 RESILIENT -SEATED GATE VALVES............................................................. OMITTED DA-75 EMERGENCY SITUATION, JOB MOVE -IN .................................................... OMITTED DA-76 1 %" & 2" COPPER SERVICES...................................................................... OMITTED DA-77 SCOPE OF WORK (UTIL. CUT)...................................................................... OMITTED DA-78 CONTRACTOR'S RESPONSIBILTY (UTIL. CUTI.......................................... OMITTED DA-79 ......................................... CONTRACT TIME (UTIL. CUTI ............................ .. OMITTED DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) ..................... OMITTED DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) ....................................... OMITTED DA-82 LIQUIDATED DAMAGES (UTIL. CUT)........................................................... OMITTED DA-83 PAVING REPAIR EDGES (UTIL. CUTI........................................................... OMITTED DA-84 TRENCH BACKFILL (UTIL. CUTI.................................................................... OMITTED DA-85 CLEAN-UP (UTIL. CUT).................................................................................. OMITTED DA-86 PROPERTY ACCESS (UTIL. CUTI................................................................. OMITTED DA-87 SUBMISSION OF BIDS (UTIL. CUTI.............................................................. OMITTED DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) ...................................OMITTED DA-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT III (UTIL. CUT).................. OMITTED DA-90 2" TO 9" H.M.A.C. PAVEMENT (UTIL. CUTI.................................................. OMITTED DA-91 ADJUST WATER VALVE BOXES, MANHOLES, AND VAULTS_(UTIL. CUT)OMITTED DA-92 MAINTENANCE BOND (UTIL. CUT................................................................ OMITTED DA-93 BRICK PAVEMENT (UTIL. CUT) ............................................7....................... OMITTED DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT).................................................OMITTED DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT) .......................................... OMITTED DA-96 REPAIR OF STORM DRAINI STRUCTURES (UTIL. CUT).-.. ......................... OMITTED DA-97 "QUICK -SET" CONCRETE (UTIL. CUTI........................................................ OMITTED wo .. i .w wo aw i aw i aw No 10123108 ASC-2 No No PART DA - ADDITIONAL SPECIAL CONDITIONS me mw no .. .. .. wo ow DA-98 UTILITY ADJUSTMENT (UTIL. CUT).............................................................. OMITTED DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUTI ........ OMITTED DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUTZ ....................... OMITTED DA-101 CONCRETE CURB AND GUTTER (UTIL. CUTI......................................... OMITTED DA-102 PAYMENT (UTIL. CUT)............................................................................... OMITTED DA-103 DEHOLES (MISC. EXT.)............................................................................. OMITTED DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.)...........................................OMITTED DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) ............................... OMITTED DA-106 BID QUANTITIES (MISC. EXT.1..................................................................OMITTED DA-107 LIFE OF CONTRACT (MISC. EXT.)............................................................ OMITTED DA-108 FLOWABLE FILL (MISC. EXT.1................................................................. OMITTED DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.1.............................................. OMITTED DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL.1................OMITTED DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.1.................................OMITTED DA-112 MOVE IN CHARGES (MISC. REPL.).......................................................... OMITTED DA-113 PROJECT SIGNS (MISC. REPL.)............................................................... OMITTED DA-114 LIQUIDATED DAMAGES (MISC. REPL.) ................................................... OMITTED DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.)................................ OMITTED DA-116 FIELD OFFICE........................................................ . ................................... OMITTED DA-117 TRAFFIC CONTROL PLAN........................................................................ OMITTED DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS. OMITTED DA-119 CATHODIC PROTECTION SYSTEM............................................................. OMITTED 10123108 ASC-3 w PART DA - ADDITIONAL SPECIAL CONDITIONS .. DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS..............OMITTED •• DA-2 PIPELINE REHABILITATION CURED -IN -PLACE PIPE................................OMITTED fte DA-3 PIPE ENLARGEMENT SYSTEM A. GENERAL: 1. Description: This specification includes requirements to rehabilitate existing sanitary sewers by the pipe enlargement system, herein called Pipe Bursting or Pipe Crushing (Pipe Bursting/Crushing). This system includes splitting or bursting the existing pipe to install a new polyethylene pipe and reconnect existing sewer service connections. 2. Methods: This section specifies the approved system method or process to include all labor, materials, tools, equipment and incidentals necessary to provide for the complete rehabilitation of deteriorated gravity sewer lines by the Pipe .. Bursting/Crushing systems. Approved methods include: the PIM Corporation (PIM System), Piscata Way, New Jersey; McLat Construction (McConnell System for Pipe Crushing), Houston, Texas; and Trenchless Replacement Systems, (TRS System), Calgary, Canada. Refer to Part D - SPECIAL CONDITIONS D-34 SIBSTITUTIONS for information regarding pre -approval procedures for alternative processes. r. 3. Definition: The Pipe Bursting/Crushing system is defined as the reconstruction of gravity sewer pipe by installing an approved pipe material, by means of one of the pre -approved methods set forth in Section A.2 of this specification_ The process "' involves the use of a static, hydraulic or pneumatic hammer "moling" device, suitably sized to break out the old pipe or using modified boring "knife" with a flared plug that implodes and crushes the existing sewer pipe. Forward progress ftw of the "mole" or the "knife" may be aided by the use of hydraulic equipment or other apparatus, as specified in the approved methods. The replacement pipe is either pulled or pushed into the bore. The method allows for replacement of pipe .. sizes from 8" through 21" and/or upsizing in varying increments up to 21". This specification is based on the precedent that the Pipe Bursting/Crushing system used has been pre -approved by the Fort Worth Water Department. 4. Quality Assurance: The Contractor shall be certified by the particular Pipe Bursting/Crushing system aw manufacturer that such firm is a licensed installer of their system. No other Pipe Bursting/Crushing system other than those listed in Section A.2. of these specifications is acceptable. ow a. Personnel directly involved with installing the new pipe shall receive training in the proper methods for joint fusing, handling, and installing the .• polyethylene pipe. Training shall be performed by a qualified representative as determined by the pipe manufacturer. rr 1w /os ASC-4 No No PART DA - ADDITIONAL SPECIAL CONDITIONS b. Personnel directly involved with installing the new pipe shall receive training 'W in the proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a qualified representative as determined by the pipe manufacturer. r 5. Submittals: Submit for review and acceptance, the following Contractors Work Plan and Drawings to the City: MW a. Shop drawings, catalog data, and manufacturer's technical data showing complete information on material composition, physical properties, and dimensions of new pipe and fittings. include manufacturer's recommendation for handling, storage, and repair of pipe and fittings if damaged. b. Location and number of insertion or access pits shall be planned by Contractor and submitted in writing prior to excavation for approval by the City. C. Method of construction and restoration of existing sewer service connections. This shall include: 1) Detail drawings and written description of the entire construction procedure to install pipe, bypass sewage flow and reconnection of sewer service connections. 2) Working drawings for information only showing sewage flow bypass, .o and maintenance of traffic. Contractor shall provide for continuous sewerage flow. Dewatering shall be the Contractor's responsibility. Im 3) Certification of workmen training for installing pipe. no 4) Television inspection reports and video tapes made after new pipe installation. 6. Delivery, Storage, and Handling: a. Transport, handle, and store pipe and fittings as recommended by manufacturer. b. If new pipe and fittings become damaged before or during installation, it shall be repaired as recommended by the manufacturer or replaced as required by the Project Manager at the Contractor's expense, before proceeding further. C. Deliver, store and handle other materials as required to prevent damage. B. MATERIALS: 1. Polyethylene Piping Material: The pipe and fitting material shall be high density, 'r extra molecular weight (EHMW) polyethylene pipe material conforming to ASTM 10/23/08 ASC-5 PART DA - ADDITIONAL SPECIAL CONDITIONS ft" D1248, Type 111, Class C, Category 5, Grade P34, and have a PPI (Plastic Pipe Institute) recommended designation of PE3408 and cell classification 345434C per ASTM D3350. The molecular weight category shall be extra high (250,000 to 1,500,000) as per the Gel Permeation Chromatography determination procedure with a typical value of 330,000. a. The interior of the pipe shall be a light reflective color to facilitate closed circuit television inspection. MW b. The pipe material shall be listed by the Plastic Pipe Institute (PPI) in PPI TR-4. The pipe material shall have as hydrostatic design basis of 1600 psi fto at 73 F and 800 psi at 140 F. C. The manufacturer's certification shall state that the pipe was manufactured .o from one specific resin and shall state the resin used and its source. All pipe shall be made of virgin material. No rework, except that obtained from the manufacturer's own production of the same formulation, shall be used. .. d. Pipe supplied under this specification shall have a nominal Ductile Iron Pipe Size inside diameter. The Standard Dimension Ratio (SDR) and minimum pressure rating of the pipe shall be SDR 17 - 100 psi. Pipe with a lower .. SDR ratio and higher pressure rating may be used in lieu of the minimum specified. 2. Tests: The Contractor shall be required to send submittals to the City of Fort Worth on the production material. a. The pipe manufacturer shall provide certification that samples of the production product meets these specifications. The certification will state that production product has been tested in accordance with ASTM D2837, ., and validated in accordance with the latest revision of PPI TR-3. b. The pipe manufacturer shall provide certification that stress regression testing has been performed on the specific product. Certification shall include a stress life curve per ASTM D2837 and testing shall have been performed in accordance with ASTM D2837. C. Rejection: Polyethylene plastic pipe and fittings may be rejected for failure to meet any of the requirements of this specification. MW C. SEWER SERVICE CONNECTIONS: 1. Sewer Service Connections: Sewer service connections shall be connected to the �- new pipe by mechanical or fusion methods. Once the saddle is secured, a hole shall be drilled in the pipe the full inside diameter of saddle outlet. 2. Pipe Saddles: Mechanical saddles shall be made of polyethylene pipe compound that meets the requirements of ASTM D1248, Class C, have stainless steel straps and fasteners, neoprene gasket and backup plate. Mechanical saddles shall be .. Strap -on -Saddle Type as manufactured by Driscopipe or Tapping Saddle 10/23/08 ASC-6 .. PART DA - ADDITIONAL SPECIAL CONDITIONS manufactured by DuPont, or approved equal. Fusion saddles shall be go electrofusion bunch saddles as manufactured by Central Plastics Company, or approved equal. UW 3. Connection to Existing Service: Connections to the existing sewer service connections pipe shall be made using flexible couplings. All flexible couplings shall conform to ASTM C425 and shall be as manufactured by Fernco Joint Sealer Co., -� DFW Plastics, Inc. or approved equal. Backfill at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench intersection and shall be in accordance with these UW specifications. The Contractor shall, upon request, permit the Engineer to take elevations on both the existing and new portions of the service connection pole to determine final grade and invert elevations. Elevation changes greater than 0.10 feet from the house lateral piping and shall be reconnected as directed by the Engineer, 4. Service Interruptions: Service interruptions to homes shall not exceed 18 hours. D. PREPARATION: 1. Bypassing Sewage: a. The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or .. adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. UW b. The Contractor shall be responsible for continuity of sanitary sewer service to each facility connected to the section of sewer during the execution of wo the work. If sewage backup occurs and enters buildings, the Contractor shall be MW responsible for clean-up, repair, property damage costs and claims. 2. Line Obstructions: If pre -installation (TV) inspection reveals an obstruction in the .. existing sewer (heavy solids, dropped joints, protruding service taps or collapsed pipe) which will prevent completion of the pipe bursting/crushing process, and cannot be removed by conventional sewer cleaning equipment, then an obstruction removal shall be made by the Contractor, with the approval of the Engineer. 3. Sags in Sewer Line: ALL SAGS AND GRADE PROBLEMS IN EXISTING SEWER LINES SHALL BE CORRECTED AS PART OF THIS CONTRACT. If the pre - construction television inspection reveals a sag in the sewer line, the Contractor shall be responsible for bringing the proposed sewer pipe to an acceptable grade without a sag. A sag is defined as any sewer line segment more than 3 feet in length which ponds water in the absence of sewage flow. The contractor shall take 10123108 ASC-7 li PART DA - ADDITIONAL SPECIAL CONDITIONS the necessary measures to eliminate the sag by the method of: pipe replacement, r digging a sag elimination pit and bringing the bottom of the pipe trench to a uniform grade in line with the existing pipe invert or by other measures that shall be acceptable to the Engineer and the City. .. a. Identification of Sags: Sags shall be identified by television inspection in the absence of sewage flow. If available, the Contractor shall be furnished television tapes from the City identifying the sag location. Flow shall be blocked at an upstream manhole and diverted to another sewer line or downstream manhole below the segment of pipe to be inspected. TV inspection shall be performed in accordance with television inspection of sanitary sewer lines. Video tapes shall be submitted to the City for review. b. Correction of Sags: Sags shall be corrected by open cut and by adding additional bedding material to bring the sag back to grade where access is available. For pipe enlargement methods, all sags identified on the pre - construction video tapes shall be corrected prior to commencing with pipe enlargement. In instances where sags are located under existing structures, the existing sewer line may be relocated using open cut or boring methods. The City shall specifically review potential relocation's and evaluate the constructability, economics and engineering feasibility prior to construction .. work. c_ Measurement and Payment: Measurement and payment to correct sags shall be per linear foot of pipe construction to correct the sag. For pipe bursting methods, open -cut or bore construction, the applicable bid prices in the proposal section shall apply. 4. Television Inspection: Inspection of the pipelines shall be performed by experienced personnel trained in locating breaks, obstacles and service connections by closed circuit color television. Television inspection shall be in .w accordance with the specifications contained herewith for "Pre- and Post - Construction Television Inspection of Sanitary Sewer Lines", Part D - Special Conditions D-35 and D-38, respectively. aw E. PIPE ENLARGEMENT SYSTEM AND PIPE INSTALLATION: 1. Site Organization: a. Insertion or access pits shall be located such that their total number shall be minimized and the length of replacement pipe installed in a single pull shall be maximized. b. Existing manholes shall be utilized wherever practical. Manhole inverts and No bottoms may be removed to permit access for installation equipment. 1023108 ASC-8 ,. PART DA - ADDITIONAL SPECIAL CONDITIONS fto C. Equipment used to perform the work shall be located away from buildings so as not to create a noise impact. Provide silencers or other devises to reduce machine noise as needed to meet requirements. d. The actual pipe enlargement procedure shall commence prior to 11:00 AM in order to afford the contractor ample time to complete all related work within the allotted workday, which is defined as the hours between 7:00 AM and 6:00 PM, so as not to impose on the peace and comfort of persons in the immediate vicinity. No actual pipebursting work shall be started after 11:00 AM; all actual pipebursting activity shall cease at 6:00 PM. Other activities other than the actual pipebursting may continue after 6:00 PM. Z Finished Pipe: The installed replacement pipe shall be continuous over the entire .,. length of each pipe segment from manhole to manhole and shall be free from visual defects such as foreign inclusions, concentrated ridges, discoloration, pitting, varying wall thickness, pipe separation, other deformities. Replacement pipe with gashes, nicks, abrasions, or any such physical damage which may have occurred during storage and/or handling, which are larger/deeper than 10% of the wall thickness shall not be used and shall be removed from the construction site. The replacement pipe passing through or terminating in a manhole shall be carefully cut out in a shape and manner approved by the Engineer. The invert and benches shall be streamlined and improved for smooth flow. The installed pipe shall meet the leakage requirements of the pressure test specified later. 3. Pipe Jointing: a. Sections of polyethylene replacement pipe shall be assembled and joined on the job site above the ground. Jointing shall be accomplished by the heating and butt -fusion system in strict conformance with the manufacturer's printed instructions. b. The butt -fusion system for pipe jointing shall be carried out in the field by _ operators with prior experience in fusing polyethylene pipe with similar equipment using proper jigs and tools per standard procedures outlined by the pipe manufacturer. These joints shall have a smooth, uniform, double rolled back bead made while applying the proper melt, pressure, and alignment. It shall be the sole responsibility of the Contractor to provide an acceptable butt -fusion joint. All joints shall be made available for inspection by the Engineer before insertion. The replacement pipe shall be joined on the site in appropriate working lengths near the insertion pit. The maximum length of continuous replacement pipe which shall be assembled above ground and pulled on the job site at any one time shall be 600 linear feet. C. For situations where the replacement pipe is not pulled all the way to the manhole or if it is impossible to pull the missle all the way through, the following shall apply: At the direction of the Engineer, a 12"-184 full circle steel clamp shall be utilized to connect segments of the HDPE pipe. 4. New Pipe Installation: 1023108 ASC-9 PART DA - ADDITIONAL SPECIAL CONDITIONS " a. Thread winch cable or chain and associated lines through sewer section to UK be rehabilitated. Keep lines away from pedestrian and vehicular traffic. b. Existing manholes may be used for launch and receiving access. Remove i manhole invert and bottom as required. Pull winch chain through sewer section and attach to cutter and machine head. Lower into launching manhole, apply winch tension pulling the cutter and head into the sewer until the rear of the machine is flush with the manhole wall. Attach steel starter pipe and advance assembly until the rear of the steel starter pipe is flush with the manhole wall. Lower hydraulic jack into the manhole and align. Insert new pipe by simultaneous operation of the jack and winching the cutter and head forward. 5. Anchoring New Pipe and Sealing Manholes: .. a. After the new pipe has been installed in the entire length of the sewer section, anchor the pipe at manholes. The new pipe shall protrude in the a„ manholes for enough distance to allow sealing and trimming. b. Sealing the new pipe at manholes shall not begin for a minimum of ten (10) .� hours after installation. Provide a flexible gasket connector in the manhole wall at the end of the new pipe, centered in the existing manhole wall. Grout flexible connector in the manhole, filling all voids the full thickness of the manhole wall. C. Restore manhole bottom and invert. am 6. Field Testing: a. Low Pressure Air Test of Replacement Pipe: After a manhole -to -manhole .w section of sanitary sewer main has been pipe burst/crushed and prior to any service lines being connected to the replacement pipe, the pipe shall be plugged at each manhole with pneumatic plugs. The design of the plugs shall be such that they will hold against the test pressure without requiring external blocking or bracing. One of the plugs shall have three air hose connections; one for the inflation of the plug, one for reading the air pressure in the sealed line, and one for introducing air into the sealed line. Low pressure air shall then be introduced into the sealed line until the internal air pressure reaches 4.0 psig greater than the average back pressure resulting from any ground water that may be over the pipe. At least two minutes shall elapse to allow the pressure to stabilize. The time required for the internal pressure to decrease from 3.5 to 2.5 psig greater than the average back pressure resulting from any ground water that may -- be over the pipe, shall not be less than the time shown for a given pipe diameter in the following table: Carrier Pipe Minimum Elapsed Diameter (inches) Time (minutes) 8 4 10 5 ASC-10 PART DA - ADDITIONAL SPECIAL CONDITIONS I 12 6 15 1 7 b. Post -Construction Television Inswo pection of New Pipe: Refer to Special Condition for Post -Construction Television Inspection of Sanitary Sewer. F. MEASUREMENT AND PAYMENT: 1. Pipe Installation: Pipe installation will be measured for payment by the linear foot of pipe actually installed in the various diameters of sewers measured along the .. centerline of the sewer from centerline to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. 2. Service Reconnections: Installation of sewer service connections will be measured for payment by each actually reconnected to the installed pipe. Payment will be made for the quantities measured at the unit price per each listed. Payment shall include required excavation and backfill, saddles, flexible connections, and all other incidentals necessary to successfully reconnect sewer service lines to the rehabilitated sewer. Payment shall not include pavement replacement, which if .. required, shall be paid separately. 3. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item for Pre -Construction Television Inspection of Sanitary Sewer Lines. 4. By-pass Pumping: The Contractor shall provide diversion for the flow of sewage around the section or sections of pipe designated for rehabilitation. The pumps and by-pass lines shall be of adequate capacity and size to handle all flows. All costs for by-pass pumping required during installation of the pipe shall be subsidiary to pipe enlargement. 5. Subsidiary Work: Any damage to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or replacement of fences, sprinkler system piping and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. 6. Testing: All cost for testing the replacement pipe by a pressure method will be incidental to pipe installation. DA-4 FOLD AND FORM PIPE..........................................................................OMITTED DA-5 SLIPLINING.........................................................................................OMITTED 10/23/08 ASC-11 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT A. GENERAL: .. 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the ow casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Specifications. "' 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad -- company, as applicable. B. MATERIALS: a. 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the following: a. Field Strength: 35,000 psi minimum. b. Wall thickness: 0.375 in. minimum (0.5 for railroad crossings). C. Diameter: As shown on the drawings (minimum size requirements). aw d. Joints: Continuous circumferential weld in accordance with AWS D1A. 2. Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. 3. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or ow as designated on the plans. 4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive .w strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. C. EXECUTION 1. Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be �. performed in such a manner so as to not interfere with the operation of the railroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to .. safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2. Pits and Trenches: 10123108 ASC-12 PART DA - ADDITIONAL SPECIAL CONDITIONS a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. r b. The location of the pit shall meet the approval of the Engineer. C. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. 3. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and workmen. The holes are to be bored mechanically. The boring shall be done using a pilot hole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other -� methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or .. other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. Jetting or sluicing will not be permitted. b. In unconsolidated soil formations, a gel -forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. C. Allowable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. 4. Installation of Carrier Pipe in Casing: .. a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. 10123108 ASC-13 PART DA - ADDITIONAL SPECIAL CONDITIONS `' C. The Contractor shall prevent over -belling the pipe while installing it through NW the casing, A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. .. d. At all bored, jacked, or tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will not be required unless specified on the plans and "w specified by the Engineer. e. Closure of the casing after the pipe has been installed shall be plugged at the ends of the casing as shown on the drawings or as required by the Engineer, 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indicated on drawings and as required and directed by the Engineer Wr sewer shall be constructed of bore and jacked ductile iron pipe. b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. C. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. 4 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be r„ used, with the approval of the Engineer or railroad/highway officials. a. When tunneling is permitted, the lining of the tunnel shall be of sufficient strength of support the overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the Engineer shall not relieve the Contractor of the ow responsibility for the adequacy of the liner method. b. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mud jacked. C. Access holes for placing concrete shall be space at maximum intervals of ,. 10 feet. D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be .. measured by the linear foot of pipe, complete in place. Such measurement will be made 10123108 ASC-14 .. PART DA - ADDITIONAL SPECIAL CONDITIONS 10 between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials low required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. Payment shall not include pavement replacement, which if required, shall be paid separately. DA-7 TYPE OF CASING PIPE 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1- 15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: Im A. For the inside and outside of casing pipe, coal -tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. a" B. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. r Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company, Advanced Products and Systems, Inc., or an approved equal shall be used on all non - No concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. ,r 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. A. For the inside and outside of casing pipe, coal -tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. B. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing we Company, Advanced Products and Systems, Inc., or an approved equal shall be used on all non - concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. 3. PAYMENT: 10123108 ASC-15 PART DA - ADDITIONAL SPECIAL CONDITIONS an Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. DA-8 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR A. GENERAL: The work covered by this item consists of furnishing all labor, material, equipment, supervision, etc. necessary to construct a point repair on the portion of a service line located within a utility easement, street right-of-way or on private property. Point repairs on private property shall only be addressed after the Contractor has received written permission from the property owner to do the work. A blank Right -of -Entry Agreement form to be completed by the Contractor and the individual property owners is included at the end of this section. The Contractor shall keep a record copy of all Right - of -Entry forms obtained and have it on hand at all times during construction. r� r10/23V/08 The street addresses and approximate location of service line repairs are shown in Table _ and the Field Survey Forms in Attachment . It shall be the Contractors responsibility to accurately field locate the exact point of repair. MATERIALS: The pipe replacement material shall be gasketed joint, gravity PVC sewer pipe (ASTM D- 3034, SDR 26) and have a minimum cell classification of 12454 A or B as defined in ASTM D-1784. Installation shall be in strict compliance with the manufacturer, recommendations and the Uni-Bell Plastic Pipe -Association. The method of jointing the ends of the replaced pipe with the existing pipe shall be water tight. EXECUTION: After the location of the point repair is determined, the Contractor shall excavate and remove the damaged pipe and replace with new pipe. The minimum length of pipe replaced shall be three (3) feet. All work shall be performed by a licensed plumber. Determine whether additional lengths of line beyond "minimum length" criteria need replacement. Report need for additional replacement to City and obtain approval before proceeding. 2. The Contractor shall excavate, shape the bottom of the trench and place the required pipe bedding so that the grade of the replaced pipe matches the existing service line grade. 3. Numerous service line point repairs along with lateral line point repairs and obstruction removals are located in areas which in many instances will require the removal of existing landscaping, structures, sidewalks, driveways, etc. Items removed or disturbed shall replaced or restored to original conditions or better. 4. Removal of Debris: Excess excavated material and debris are to be removed from the work site daily. Cost of hauling excess excavation and debris is to be included in the price bid for "Service Line Point Repair". ASC-16 .. ., w .. .. .. .. on .. PART DA - ADDITIONAL SPECIAL CONDITIONS 5. Roof and Yard Drains: At the locations indicated in Table of the Attachments_ The Contractor shall disconnect roof and yard drains from the sanitary sewer service line. For yard drains, the Contractor shall excavate and remove the drain from the yard and plug the line at the property line. For roof drains, the Contractor shall remove the downspout from the drain line and plug the line to prevent inflow. In addition, the Contractor shall install an elbow fitting at the bottom of the downspout to direct runoff, away from the building, and a concrete splash pad to -� prevent erosion. 6. Disconnected Service Lines: At the locations indicated in Table of .. Attachments to the Special Contract Documents, the Contractor shall remove the service line no longer in use by excavating at the property line and plugging the service line. 7. Abandonment of Point Repair: If a pipe is exposed and found in good condition, not requiring a point repair, notify City Engineer who will record abandonment of point repair. Backfill the excavation, replace pavement or sidewalk and repair and seed or sod unpaved areas. 8. Cleanout Repair: The Contractor shall make appropriate repairs to cleanouts as indicated in Table _ and as shown on the PLANS. All cleanout repair worts shall be performed by a licensed plumber. a. General This special condition describes the repair of sanitary sewer cleanouts located on private property as designated on the 1/1 Elimination Repair plans. Repair of the cleanouts shall consist of replacing defective cleanout caps or installing new caps where none exist, such that inflow is eliminated. There will be no repairs made to the existing cleanouts that require excavation, other than what is required to expose the top of the cleanout so that the new caps can be installed. b. Materials Replacement cleanout caps shall be Dal -Caps as manufactured by Dallas Specialty & Mfg. Company, or equal. The rubber caps are held down by MW stainless steel clamps. C. Excavation 1) The Contractor shall submit shop drawings on all materials and equipment to be installed. 2) The Contractor is responsible for obtaining right of entry from the property owners prior to performing any work. Property owners should be notified 48 hours in advance of any work on their property. 10123108 ASC-17 PART DA - ADDITIONAL SPECIAL CONDITIONS ON 3) The Contractor shall restore any disturbed surface to its original or No better condition at no separate pay. D. MEASUREMENT AND PAYMENT: .. Payment for service line point repair shall be on a unit price basis for each repair performed on all sizes of service lines for the respective depths. The minimum length of service line point repair shall be three (3) feet. No separate pay if the work is done within the limits of a service line reconnect as defined in Special Condition, D-28, "Sanitary Sewer Services 2. Measurements for extra length repair is on a linear foot basis for repairs in excess of the minimum 3 foot replacement length. 3. All pipe fittings, adapters, concrete collars, bedding, and removal and replacements of grass sodding required shall be considered incidental to service line point repair. 49V 3. If no pay item is included for any work required to properly complete a service line point repair as specified, the cost to perform said work, including any required .w removal and replacement of materials, shall be considered incidental to the service line point repair. 5. Depth of Bury is to be measured from Natural Ground Level to the Flow Line of the so Sanitary Sewer Service Line at the Point of Replacement. The minimum trench width shall be 3'-0". .. 6. All excavation, backfill, removal and replacement of grass sodding and landscaping, plugs, fittings, and splash pads shall be considered incidental to removal of yard drains, disconnecting roof drains and plugging disconnected .. service lines. 7. No separate payment will be made for the Contractor to obtain written permission .m to enter private property. 8. Payment will be made for Abandonment of Point Repairs at the Contract Unit Price for Excavation and Backfill Abandoned Point Repairs. 9. Payment shall be made at the Contract Unit Price for each sanitary sewer cleanout successfully repaired. Payment shall be full compensation for all materials, "'' equipment, and labor required to perform the work. DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION A. GENERAL: 1. Scope: This section governs all work, materials and testing required for the application of interior protective coating. Structures designated to received interior coating are listed on the construction drawings. The structures are to be coated, including interior wall, top and bench surfaces. Protective coating for corrosion 10123108 ASC-18 09 PART DA - ADDITIONAL SPECIAL CONDITIONS protection shall meet the requirements of this Specification (and items DA-14 and DA-15) and the Manufacturers recommendations and specifications. 2. Description: The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of protective coating of structures in accordance with manufacturer's recommendations. 3. Manufacturer's Recommendations: Materials and procedures utilized for the lining process shall be in strict accordance with manufacturer's recommendations. low 4. Corrosion Protection: Corrosion protection may be required on all structures where high turbulence or high H2S content is expected. B. MATERIALS: .. 1. Scope: This section governs the materials required for completion of protective coating of designated structures. 2. Protective Coating: The protective coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. or a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. 3. Specialty Cement (If required for leveling or filling): The specialty cement -based coating material shall be either Quadex QM-1s as manufactured by Quadex, Inc, or Reliner MSP as manufactured by Standard Cement Materials. ,,. 4. Material Identification: The protective coating material sprayed onto the surface of the structure shall be a urethane or epoxy resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the minimum physical properties as follows: Property Standard Long Term Value MW Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM D-790 550,000 psi .. 5. Mixing and Handling: Mixing and Handling of specialty cement material and protective coating material, which may be toxic under certain conditions shall be in •. accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control ,., at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray coating operations and coating installations. 10/2sro8 ASC-19 r PART DA - ADDITIONAL SPECIAL CONDITIONS C. EXECUTION: 1. General: Protective coating shall not be installed until the structure is complete and in place. am 2. Preliminary Repairs: a. All foreign materials shall be removed from the interior of the structure ! using high pressure water spray (3500 psi to 4000 psi at spray tip). b. All unsealed lifting holes, unsealed step holes, and voids larger than approximately one-half (1/2) inch in thickness shall be filled with patching compound as recommended by the material supplier for this application. C. After all repairs have been completed, remove all loose material. 3. Protective Coating: AW a. The protective coating shall be applied to the structure from the bottom of the frame to the bench, down to the top of the trough. The top of the ,. structure shall also be coated. b. The protective coating shall be installed in accordance with the '+ manufacturer's recommendations and the following procedure. 1) The surface shall be thoroughly cleaned of all foreign materials and matter. 2) Place covers over the invert to prevent extraneous material from entering the sewers. .. 3) If required for filling or leveling, apply specialty cement product to provide a smooth surface for the coasting material. 4) Spray the urethane or epoxy onto the structure wall and bench/trough to a minimum uniform thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. After the walls are coated, the wooden bench covers shall be removed. u 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. 6) No applications shall be made to frozen surfaces or if freezing is expected 'to occur inside the structure within 24 hours after application. 4. Testing of Rehabilitated Manholes: Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are 10123108 ASC-20 O. ar PART DA - ADDITIONAL SPECIAL CONDITIONS complete in accordance with the Section D-36 - VACUUM TESTING OF .. SANITARY SEWER MANHOLES. D. MEASUREMENT AND PAYMENT: Payment shall be based on the Contract Unit Price Bid per vertical foot, measured from the bottom of the flame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the work. Pressure grouting, if necessary to stop active infiltration prior to application of the protective coating, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower portion of a particular structure, if required by the Engineer, .. shall be paid for separately, as specified in Section DA-10, MANHOLE REHABILITATION. DA-10 MANHOLE REHABILITATION.................................................................OMITTED DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION .....................OMITTED DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM........ OMITTED DA-13 INTERIOR MANHOLE COATING - QUADEX SYSTEM.................................OMITTED DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM Y/ A. GENERAL •. 1. Scope This section governs all work, materials and testing required for the application of low interior manhole coating. Manholes designated for interior coating are listed on the Manhole Rehabilitation Schedule. Interior manhole coating shall meet the requirements of this Section or of Section DA-12, DA-13, DA-15, DA-16 or DA-17. .. 2. Description * The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. 3. Manufacturer's Recommendations Materials, mixture ratios, and procedures utilized for the coating process shall be in accordance with manufacturer's recommendations. 4. Manholes Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (1/2) inch specialty cement -based coating material or (Quadex QM-1s or Reliner MSP) sprayed or trowelled on coating over the original interior surface. 10123108 ASC-21 PART DA - ADDITIONAL SPECIAL CONDITIONS ma B. MATERIALS 1. Scope C. f 0/23108 2. 3. 4. 5. This section governs the materials required for completion of interior coating of manholes. Interior Coating The interior coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. Specialty Cement The specialty cement -based coating material shall be either Quadex QM-1s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. Material Identification The interior manhole coating material sprayed onto the surface of the manhole shall be a urethane resin system formulated for the -application to a sanitary sewer environment. The spray system shall exhibit the physical properties as follows: Propertv Standard Lonq Term Value Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM. D-790 550,000 psi Mixing and Handling Mixing and handling of specialty cement material and interior coating material, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray coating operations and coating installations. EXECUTION 1. General ASC-22 ru .. A. W at .. aW No .. I" PART DA - ADDITIONAL SPECIAL CONDITIONS Manhole coating shall not be installed until sealing of manhole frame and grade " adjustments, or partial manhole replacement when required for the manhole per the Manhole Rehabilitation Schedule, is complete. 2. Temperature Normal interior coating operation shall be performed at temperatures of 40OF or .. greater. No application shall be made when freezing is expected within 24 hours. 3. Interior Manhole Coating a. The interior coating shall be applied to the manhole from the bottom of the frame to the bench, down to the top of the trough. b. The interior coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. .. 1) The surface shall be thoroughly cleaned of all foreign materials and matter. Cleaning shall be accomplished by using high pressure water spray (minimum 3500 psi at spray tip), cleaning with muriatic acid, `"' degreaser, or other solvents as needed in order to remove any film or residue on the surface. no 2) Place covers over the invert to prevent extraneous material from entering the sewers. ., 3) Apply a minimum of one-half (1/2) inch specialty cement product (Quadex QM-1s or Reliner MSP) smooth surface for the urethane coating material. w 4) Spray the urethane onto the manhole wall and bench/trough with a minimum thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. 5) Coat trough area with specialty cement product (Quadex QM-1s or Reliner MSP). 1. Testing of Rehabilitated Manholes -� a. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 21. f D. MEASUREMENT AND PAYMENT Payment shall be based on the Contract Unit Price per vertical foot, measured from the .. bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the work. Grouting, if necessary, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower 10/23/08 ASC-23 PART DA - ADDITIONAL SPECIAL CONDITIONS as portion of a particular manhole, if required by Manhole Rehabilitation Work Schedule or required to be done by the Engineer, shall be paid for separately at the Contract Unit Price. DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM A. GENERAL 1. Scope This section govems all work, materials and testing required for the application of interior manhole coating. Manholes designated for interior coating are listed of the Manhole Rehabilitation Schedule, listed in Section i. Interior manhole coating shall meet the requirements of this Section, or of Section DA-12, DA-13, DA-14, DA-16 or DA-17. 2. Description The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. 3. Manufacturer's Recommendations Materials, mixture ratios, and procedures utilized for the coating process shall be in accordance with manufacturer's recommendations. 4. Manholes Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (1/2) specialty cement -based coating material (Quadex QM-1s or Reliner MSP) sprayed or trowelled on coating over the original interior surface. B. MATERIALS 10/23/08 F L 1. Scope This section governs the materials required for completion of interior coating of manholes. 2. Interior Coating Raven Ultra High -Build epoxy Coating, a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. 3. Specialty Cement ASC-24 aw W 1_� a. am aw WN us PART DA - ADDITIONAL SPECIAL CONDITIONS The specialty cement -based coating material shall be either Quadex QM-1 s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification Contractors will completely identify the types of grout, mortar, sealant, and/or root -• control chemicals proposed and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical properties, ease of application, and expected performance. These grouting materials shall be compatible with Raven 405 interior coating. The contractor shall be responsible for getting approval from Raven Lining systems and/or the grout manufacturers for the use of these grouting materials. 5. Mixing and Handling Mixing and handling of interior coating, which may be toxic under certain conditions low shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Coating shall be performed only by certified applicators approved by the manufacturers. C. EXECUTION .. 1. General .. I a,23/08 Manhole coating shall not be performed until sealing of manhole from frame and grade adjustments, partial manhole replacement, manhole grouting or sewer replacementirepairs are complete. 2. Temperatures Normal interior coating operation shall be performed at temperatures of 40°F or greater. No application shall be made when freezing is expected within 24 hours. 3. Interior Manhole Coating a. Manholes scheduled for interior coating are shown on the Manhole Rehabilitation Schedule. The interior coating shall be applied to the manhole from the bottom of the manhole frame to the bench/trough, including the benchttrough. b. The interior coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1) The surface preparation shall comply with the requirements of Section DA-11, SURFACE PREPARATION FOR MANHOLE RESTORATION. ASC-25 PART DA - ADDITIONAL SPECIAL CONDITIONS am .. 2) Apply a minimum of one-half (1/2) inch specialty cement -based product (Quadex QM-1s or Refiner MSP) smooth surface for the urethane coating material. sm 3) The surface prior to application may be damp but shall not have noticeable free water droplets seeping or running water. Material ow shall be spray applied per manufacturer's recommendations with a minimum thickness of 125 mils (0.125 inch). 4) After the walls are coated, the wooden bench covers shall be removed and the bench sprayed to the same average and minimum thickness as required for the walls. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. 6) No applications shall be made to frozen surfaces or if freezing is expected to occur in side the manhole within 24 hours after application. f. Testing of Rehabilitated Manholes a. After the epoxy liner has set (hard to touch), all visible pinholes shall be repaired. Repairs shall be made by lightly abrading the surface and brushing the lining material over the area. All blisters and evidence of uneven cover shall be repaired according to the manufacturer's recommendations. Spot check of coating thickness may be made by Owner's Representative, and the contractor shall repair these areas as required, at no additional cost to the Owner. *• b. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 21 —VACUUM TESTING OF REHABILITATED MANHOLES. D. MEASUREMENT AND PAYMENT No Payment shall be based on the Contract Unit Price per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment all testing necessary to complete the work. Payment for grouting of pipe seals, bench and trough and manhole walls shall be based on the Contract Unit Price for each manhole actually grouted. DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER..................................................................................................OMITTED am DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM..........................OMITTED DA-18 RIGID FIBERGLASS MANHOLE LINERS ..................................................OMITTED 10/23/08 ASC-26 a. a PART DA - ADDITIONAL SPECIAL CONDITIONS DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION..................................OMITTED DA-20 PRESSURE GROUTING A. GENERAL 1. Scope. This Section governs all work, materials and testing required for the MW pressure grouting of manhole defects. Manholes or sections of manholes with active leaks shall be repaired as indicated in the Manhole Rehabilitation Schedule. ••` 2. Description. The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of pressure grouting of manhole defects in accordance with the Contract Documents. 3. Manufacturer's Recommendations. Materials, additives, mixture ratios, and procedures utilized for the grouting process shall be in accordance with ..e manufacturer's recommendations. 4. Manholes. Manholes to be grouted are of brick, concrete, or fiberglass construction, A. MATERIALS 1. Grouting Materials: a. Urethane Gel Grout: Urethane gel grout, such as Scotch -Seal 5610 gel or equal shall be a hydrophilic polymer. The chemical shall be mixed within the .r range of from 8 to 10 parts of water and shall contain a reinforcing agent supplied by the same manufacturer. The material shall gel and cure to a tough flexible elastomeric condition. When wet, the gel shall exhibit strength .,,. properties of at least 25 psi tensile at 150 percent elongation. The material shall not change in linear dimension more than eight percent when subjected to wet and dry cycles. b. The chemical grout shall be applied so as to have the grout material flow freely into the defects. To avoid any wastage of the material flowing through the defects, a gel control agent may be added. The following properties shall be exhibited by the grout: 1) Documented service of satisfactory performance in similar usage. 2) Controllable reaction times and shrinkage through the use of I. chemicals supplied by the same manufacturer. The minimum gel set time shall be established so that adequate grout travel is achieved. 3) Resistance to chemicals; resistant to most organic solvents, mild acids and alkali. 4) Compressive recovery return to original shape after repeated deformation. .� 5) The chemical shall be essentially non -toxic in a cured form. 10123108 ASC-27 PART DA - ADDITIONAL SPECIAL CONDITIONS 6) Sealing material shall not be rigid or brittle when subjected to dry atmosphere. The material shall be able to withstand freeze/thaw and moving load conditions. 7) Sealing material shall be noncorrosive. a. A reinforcing agent such as Scotch -Seal Brand 5612 reinforcing agent or '" equivalent shall be utilized in accordance with manufacturer's recommendations. Any 5612 reinforcing agent which contains lumps must be discarded. Care must be taken to be sure that the pH of the water in the 'M tank is from 5 to 9. As a precaution against the possibility of the pH being outside this range, take a small amount of water from the tank to which Gel Reinforcing Agent 5612 is to be added. Add a few drops of 5612 to this test .• sample. Scotch -Seal Brand Gel Reinforcing Agent 5612 should disperse readily. If precipitation occurs, drain the tank and retest. Repeat as necessary until dispersion occurs. If dispersion does not occur, do not use the water source. b. A filler material such as Celite 292 (diatomaceous earth) from Johns Mansville or equivalent shall be utilized. The addition of the filler material shall not exceed the quantity specified by the manufacturer, and continuous agitation of the water side of the mixture is required. The filler material may also be utilized as a reinforcing agent in accordance with the urethane gel grout manufacturer's recommendations. 1. Additives: Grout additions may be utilized for catalyzing the gel reaction, inhibiting .. the gel reaction, buffering the solution, lowering the freezing temperature of the solution, acting as a filler, providing strength or for inhibition of root growth. 2. Root Control: A root inhibiting chemical such as dichlobenil shall be added to the chemical grout mixture at a safe level of concentration and shall have the ability to remain active within the grout for a minimum of 12 months. 3. Material Identification: Contractor shall completely identify the types of grout, mortar, sealant, and/or root control chemicals used and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical `� properties, ease of application, and expected performance, to the satisfaction of the Engineer. Ir 4. Mixing and Handling: Mixing and handling of chemical grout and forming constituents, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that chemicals or gels produced by the chemicals are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the grout material and additives shall perform the grouting operations. 10123108 ASC-28 Im an no PART DA - ADDITIONAL SPECIAL CONDITIONS C. EXECUTION 1. General. Manhole grouting shall not be performed until sealing of manhole frame and grade adjustments, partial manhole replacement, or manhole repairs are WIN complete. 2. Preliminary Repairs: a. Seal all unsealed lifting holes, unsealed step holes, voids larger than approximately one-half (1/2) inch in thickness. All cracked or deteriorated material shall be removed from the area to be patched and replaced with Octocrete, as manufactured by IPS Systems, Inc. or equal, in accordance with manufacturer's specifications. WM b. Cut and trim all roots within the manhole. 3. Temperature_ Normal grouting operations including application of interior coatinWM g shall be performed in accordance with manufacturer's recommendations. 4. Grouting Material Usage. Grouting of the manhole may include corbel, wall, pipe seals, manhole joints, wall to flattop joint, and/or bench/trough. Areas of the manhole designated to be grouted will be directed by the Engineer. If entire manhole is scheduled for grouting, grouting shall include the entire manhole * including corbel, wall, pipe seals and bench/trough. Pipe seal grouting shall include all pipe seals in the specified manhole and grouting of the specified manhole including the bench/trough to the maximum height of 18 inches from the crown. r 5. Drilling and Injection: .. a. Injection holes shall be drilled through the manhole wall at locations indicated in the appropriate detail(s). b. Grout shall be injected throuMW gh the holes under pressure with a suitable probe. Injection pressure shall not cause damage to the manhole structure or surrounding surface features. Grout shall be injected through the lowest holes first. The procedure shall be repeated until the manhole is externally am sealed with grout. C. Grouting from the ground surface shall not be allowed. d. Grout travel shall be verified by observation of grout to defects or adjacent injection holes. Provide additional injection holes, if necessary, to ensure grout travel. e. Injection holes shall be cleaned with a drill and patched with a waterproof quick setting mortar for brick and concrete manholes. 6. Testing of Rehabilitated Manholes. Testing of rehabilitated manholes for water tightness shall be performed by the Contractor in the presence of the Engineer in 10123106 ASC-29 PART DA - ADDITIONAL SPECIAL CONDITIONS no accordance with the requirement of Section DA-21, VACUUM TESTING OF REHABILITATED MANHOLES of these specifications. D. MEASUREMENT AND PAYMENT If the entire manhole is grouted, the Contract Unit Price shall be per vertical foot grouted as indicated on the Manhole Rehabilitation Schedule included in these specifications or as required by the Engineer. Payment for grouting pipe seals, bench and trough, and 18 inches above crown of pipe, and grouting flattop to wall joint, shall be based on the Contract Unit Price per each manhole rehabilitated as indicated on the Manhole Rehabilitation Schedule. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment, preliminary repairs and testing necessary to complete the work including grouting with urethane grout. DA-21 VACUUM TESTING OF REHABILITATED MANHOLES A. GENERAL Scope. This section describes manhole testing to effectively confirm the watertight integrity of existing manholes following structural ,infiltration and inflow related repairs and that the appearance of the work is acceptable. Description: Infiltration may be observed in manhole defects at manhole walls, pipe seals or benchttrough areas. Infiltration related repairs are intended to eliminate leakage of groundwater into manholes. Inflow may be observed in manhole defects at manhole frames, covers, frame seals, grade adjustments, grade adjustment seals, corbels, or walls. Inflow related repairs are intended to eliminate sources of surface water entry that become active during rainfall events. Structural repairs may be required when making Ill related manhole repairs. Structural repairs may include defects in any manhole components but not displaying 1/1. Testing, Observations and Guarantee Periods: The testing required shall be performed by the Contractor at locations designated by the Engineer and documented to the satisfaction of the Engineer. Any new or rehabilitated manholes that are observed to be leaking by the Engineer during periods of high groundwater or during inflow conditions shall be subject to additional repairs. The Contractor shall be responsible for all additional repairs required on these unsatisfactory manholes during the guarantee period. All manhole rehabilitation work shall be warranted to be free of defects and of good workmanship for a minimum of three (3) years from the date of final acceptance of the project. Any manhole repairs completed by the Contractor which fail during the warranty period shall be repaired to the satisfaction of the City at no additional cost to the City. fts a■ up a0 of as -W a. .. ". r, aw am 10/23/08 ASC-30 to M MW PART DA - ADDITIONAL SPECIAL CONDITIONS an B. MATERIALS - Not specified. C. EXECUTION Infiltration Testing; All interior coated manholes and all partial replacement manholes shall be observed (tested) by the no Contractor in the presence of the Engineer for sources of infiltration. Observations will be made during high groundwater conditions, wherever possible. - Manholes shall be tested after installation with all connections (existing and/or proposed) in place. Drop -connections and gas sealing connections shall be installed prior to testing. The lines entering the manhole shall be temporarily plugged with the plugs braced to prevent them from being drawn .. into the manhole. The plugs shall be installed in the lines beyond drop -connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole (so that the manhole frame seal is tested) and inflated in accordance with the manufacturer's recommendations. A vacuum of 10 inches of mercury shall be drawn, and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. If the drop in the level is less than 1-inch of mercury (final vacuum greater than 9-inches of mercury), the manhole will have passed the vacuum test. After a successful test, the temporary plugs will be removed. The required test time is determined from Table I. Table 1 no MINIMUM TIME REQUIRED FOR A VACUUM DROP OF 1" H9 (10"H9 - 9" H9) fSEC) �. DEPTH OF M.H. 48-Inch Dia. 604nch Dia. 72-Inch Dia. (FT.) Manhole Manhole Manhole 8 20 sec. 26 sec. 33 sec. 10 25 sec. 33 sec. 41 sec. 12 30 sec. 39 sec. 49 sec. 14 35 sec. 45 sec. 57 sec. 16 40 sec. 52 sec. 67 sec. 18 45 sec. 59 sec. 73 sec. ** T=5 sec. T=6.5 sec. T=8 sec. "For all Manholes over 18 feet in depth, add 'T' seconds as shown for each respective diameter for each two feet of additional depth of manhole to the time shown for that 18 foot depth. [Example: A 30 (thirty) foot deep, 48 (forty-eight) inch Manhole Total Test Time would be 75.0 seconds. 45.0+6(5.0)=75.0 seconds] (Values listed above are extrapolated from ASTM C924-85). Manhole vacuum levels observed to drop greater than 1-inch of mercury (Final vacuum less than 9- inches of mercury) will have failed the test and will require additional rehabilitation. The Contractor shall make the necessary repairs to the already completed rehabilitation work at no additional compensation. If the failure of the vacuum test is determined to be due to preexisting conditions not on the manhole rehabilitation schedule for that manhole, this additional work may be authorized by the Owner's Representative. After completion of the additional rehabilitation the manhole shall then be re -tested as described above until a successful test is made. Only one payment for manhole vacuum testing will be made on each manhole. Vacuum testing is required on all manholes having interior rehabilitation. 10123108 ASC-31 aw, PART DA - ADDITIONAL SPECIAL CONDITIONS ::J Inflow Testing: i All partially rehabilitated manholes shall be dyed water tested unless the manhole has successfully passed the vacuum test. Manholes shall be dyed water tested in the presence of the Engineer. The dye test shall consist of applying a concentrated dye solution around the manhole frame. Dyed water shall be applied for at least ten minutes. Manholes observed to be actively leaking greater than one drip per five seconds will have failed the test and will not be acceptable. Manholes failing the test will require additional rehabilitation by the Contractor at no additional compensation. Other Testing: One (1) rehabilitated manhole will be randomly selected for further testing. A laboratory selected by the City will take core samples of wall sections of manholes with wall coatings. Testing of the core samples will be done to evaluate material thickness, compressive strength, flexural strength and �.. slant shear bond strength. The following are the minimum required strengths for cementitious and non-cementitious wall coatings: Compressive Strength. Compressive strength shall conform to ASTM C 495 and C 109 and shall meet or exceed a minimum 28-day break of 4,000 psi. 4. Flexural Strength. Flexural strength shall conform to ASTM C 348 and shall meet or exceed a minimum 28-day break of 1,200 psi. .. Slant Shear Bond Strength. Slant shear bond strength shall conform to ASTM 882 modified and shall meet or exceed a minimum 28-day break of 2,400 psi. a. If the manhole tested fails to pass any of these requirements, another manhole shall be selected and tested. If the second manhole fails, the City may, at its option, stop work until the Contractor can provide assurance that testing requirements can be met. Guarantee: Contractor shall warrant that the workmanship and materials are free from defects and that the manholes are sealed from inflow and infiltration for a period of three (3) years from the date of final acceptance of the project. No D. MEASUREMENT AND PAYMENT Payment for manhole vacuum testing shall be made at the Contract Unit Price bid for each Manhole Vacuum Test actually performed and passed and the appearance of the completed manhole is visually acceptable. Payment shall be full compensation for all labor and materials necessary to complete each test. No payment will be made for additional vacuum tests or any dyed water .. testing. I. 10123108 ASC-32 W. No Im PART DA - ADDITIONAL SPECIAL CONDITIONS Payment for manhole core testing, including all labor and materials necessary to complete each test, shall be made at the Contract Unit Price bid for each Manhole Core Test actually performed and passed. DA-22 FIBERGLASS MANHOLES....................................................................OMITTED DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES A The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the resurfacing process commences for a .a particular street. The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activity. In any event a street shall be completely marked a minimum of two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the contractors responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day) the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Comnanv Telephone Number Fort Worth Water Dept. 817-392-8296 ATMOS Gas 1-866-332-8667 TXU Electric 1-800-242-9113 SWBT 1-800-395-0440 Charter Communications 817-246-5538 Fort Worth Transportation and Public Works 817-392-6594 For other facilities 1-800-DIG-TESS Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five (5) working days after .. completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, bw 10123108 ASC-33 PART DA - ADDITIONAL SPECIAL CONDITIONS as laydown curb and gutter, or in like kind, as governed by the standard City Specifications, item No. 104 "Removing Old Concrete", Item No. 502 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-S4. Pay limits for laydown curb and gutter are shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall saw cut the curb and gutter and pavement prior to removal. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul -off of the removed material to a suitable dump site. The street void shall be filled with H.M.A.C. 'Type D" mix as per specification No. 300 "Asphalts, Oils and Emulsions", Item No. 304 "Prime Coat" and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities and top soil as per specification item No. 116 "Top Soil", if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water meters, sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. If the contractor fails to complete the work within fourteen (14) calendar days, a $100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS This item shall include the removal and replacement of existing concrete driveways, due to deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul -off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications. The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the work. DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable sub -base. The total depth of excavation could range from a couple of inches to include the surface -base -same sub -base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site, the same day as excavated, to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with "Type D" surface mix. This item will always be used even if no base improvements are required. The proposed H.M.A.C. repair shall match the existing im M W LJ a. W .r 10123108 ASC-34 .r PART DA - ADDITIONAL SPECIAL CONDITIONS -A pavement section or the depth of the failed material, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and Emulsions", 304 "Prime Coat", and 312 "Hot -Mix Asphaltic Concrete" shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-27 GRADED CRUSHED STONES This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208 "Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE...........................................OMITTED _. DA-29 BUTT JOINTS - MILLED........................................................................OMITTED DA-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) All applicable provisions, of Standard Specifications, Item Nos. 312 "Hot -Mix Asphaltic Concrete", 300 "Asphalts, Oils and Emulsions", 304 "Prime Coat", and 313 "Central Plant Recycling -Asphalt Concrete" shall apply to the construction methods for this portion of the project. Standard Specification 312.5 (1) shall be revised as follows: The prime coat, tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising, the temperature being taken in the shade and away from artificial heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in the opinion of the Engineer. s The contractor shall furnish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C. overlay. The City will provide laboratory control as necessary. The unit price bid per square yard of H.M.A.C. complete and in place, shall be full compensation no for all labor, materials, equipment, tools, and incidentals necessary to complete the work. DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER................................OMITTED a' DA-32 NEW 7" CONCRETE VALLEY GUTTER ....................................................OMITTED 10123108 ASC-35 PART DA - ADDITIONAL SPECIAL CONDITIONS a. 4 DA-33 NEW 4" STANDARD WHEELCHAIR RAMP...............................................OMITTED DA-34 8" PAVEMENT PULVERIZATION.............................................................OMITTED DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) ...............OMITTED DA-36 RAISED PAVEMENT MARKERS..............................................................OMITTED DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING ........ OMITTED DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL.OMITTED DA-39 ROCK RIPRAP - GROUT - FILTER FABRIC L 1 oi2sio8 GENERAL: 1. General Conditions, Supplemental Conditions, applicable requirements of Division 1 - General Requirements and the North Central Texas Council of Governments (NCTCOG) Standard Specifications, are hereby made a part of this section. 2. This item shall govern for the installation of rock riprap of the various sizes shown on the plans. DESIGN CRITERIA: 1. The toe of the riprap revetment shall be entrenched in stable channel bottoms. If the channel bottom is not stable, the design shall incorporate other requirements needed to stabilize the revetment toe. 2. The channel side slope shall be as shown on the drawings. 3. Engineering filter fabric material shall be placed underneath the riprap. 4. Riprap shall extend up the bank to an elevation where vegetation will provide adequate protection. See cross sections. PRODUCT: 1. RIPRAP MATERIAL: Stone for riprap shall be durable and of a suitable quality to insure permanence in the structure, It shall be free from cracks, seams and other defects that would tend to increase deterioration. Rock shall be reasonably well graded between the following prescribed limits: Sieve Size (Souare Mesh) 24" 24 inch Riprap 18 inch 12 inch 6 inch ASC-36 Percent Passinq 100 80-90 45-55 0-20 so Am on to No am +. PART DA - ADDITIONAL SPECIAL CONDITIONS r .. um No I" Sieve Size (Square Mesh) Percent Passinq 18" 18 inch 100 Riprap 12 inch 60-85 6 inch 15-45 3 inch 0-15 2. RIPRAP WEIGHT: Weight of rock shall be one hundred fifty five pounds per solid cubic foot (min.) calculated from the bulk specific gravity (saturated surface dry). 3. FILTER FABRIC BLANKET: Approved Manufacturer: • Supac - Heavy Grade 8NP (UV) • Trevira 011/280 • Amoco 4553 • or Equal Heavy Grade 4. RIPRAP GROUTING a. FINE AGGREGATE: Fine aggregate for grouting mix shall consist of natural sand, manufactured sand, or a combination of natural and manufactured sands. The grading and uniformity of the fine aggregate shall conform to the following requirements as delivered to the mixers: Sieve Designation, U.S. Standard Square Mesh 3/8 in. (9.5 mm) No. 4 (4.75 mm) No. 8 (2.36 mm) No. 16 (1.18 mm) No. 30 (600 um) No. 50 (300 um) No. 100 (150 um) D. EXECUTION: 10/23/08 M � 1. CONSTRUCTION: Permissible Limits Percent by Weight, Passinq 100 95 -100 80 - 95 55 - 75 30 - 60 12-30 2-10 a. The channel side slope and the toe excavation shall be prepared to the required lines and grades. b. Filter fabric and riprap shall be placed in succession to the required thicknesses and elevations, Riprap shall be hand placed around structures to prevent damage to the structures. 2. INSTALLATION OF THE FILTER FABRIC (GEOTEXTILE): The geotextile shall be placed in the manner and at the locations shown on the drawings. At the time of installation, the geotextile shall be rejected if it has defects, rips, holes, flaws, deterioration or damage incurred during manufacture, transportation or storage. The ASC-37 PART DA - ADDITIONAL SPECIAL CONDITIONS Im surface to receive the geotextile shall be prepared to a relatively smooth condition free = of obstructions, depressions, debris, and soft or low density pockets of material. Erosion features such as rills, gullies, etc. must be graded out of the surface before geotextile placement. The geotextile shall be placed with the long dimension perpendicular to the centerline of the channel and laid smooth and free of tension, stress, folds, wrinkles, or creases. The strips shall be placed to provide a minimum width of 24-inches of overlap for each joint. Temporary pinning of the textile to help hold it in place until the rock riprap is placed. The temporary pins shall be removed as .. the riprap is placed to relieve high tensile stress which may occur during placement of material on the geotextile. The specified placement procedure requires that the length of the geotextile be greater than the actual slope length. The Contractor shall adjust " the actual length of the geotextile used based on initial installation experience. The geotextile shall be protected at all times during construction from contamination by surface runoff and any geotextile so contaminated shall be removed and replaced with uncontaminated geotextile. Any geotextile damaged during its installation or during placement of riprap shall be replaced by the Contractor at no cost to the Owner. The work shall be scheduled so that the covering of the geotextile with a layer of the �. specified material is accomplished within seven (7) calendar days after placement of the geotextile. Failure to comply shall require replacement of geotextile. The geotextile shall be protected from damage prior to and during the placement of rock riprap. Before placement of gabion units, the Contractor shall demonstrate that the placement technique will prevent damage to the geotextile. In no case shall any type of equipment be allowed on the unprotected geotextile. 3. RIPRAP PLACEMENT: Stone for riprap shall be placed on the filter fabric blanket in such a manner as to produce a reasonably well graded mass of rock with the minimum practicable percentage of voids and shall be constructed within the specified tolerance to the lines and grades shown on the drawings. Then intent of these specifications is to require placement of riprap to the thickness shown and to allow isolated stones to extend as much as six inches above grade. Riprap shall be placed to its full course -- thickness at one operation and in such a manner as to avoid displacing the fabric. The larger stones shall be well distributed and the entire mass of stones in their final position shall conform to the gradation specified hereinbefore. The finished riprap shall be free from objectionable pockets of small stones and clusters of larger stones. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source, by 'M controlled dumping of successive loads during final placing, or by other methods of placement which will produce the specified results. Rearranging of individual stones, by mechanical equipment or by hand will be required to the extent necessary to obtain a reasonably well graded distribution of stone specified above. The Contractor shall maintain the riprap protection until accepted. Any material displaced by any cause shall be replaced at his erosion to the lines and grades shown on the Drawings. 4. GROUT PLACEMENT: Grout shall be composed of cement, water and air -entraining admixture and sand mixed in the proportions of 1 part of Portland cement to 3 parts of sand, sufficient water to produce a workable mixture, and that amount of admixture which will entrain sufficient air to produce durable grout, as determined by the ENGINEER. Sand for grouting shall conform to the requirements of paragraph: FINE AGGREGATE. The grout shall be mixed in a concrete mixer in the manner specified for concrete except that the time of mixing shall be increased to that necessary to produce a 101223108 ASC-38 an PART DA - ADDITIONAL SPECIAL CONDITIONS _ mixture having a consistency such as to permit gravity flow into the interstices of the riprap with the help of limited spading and brooming. The grout shall be used in the work within a period of one (1) hour after mixing. Retempering of ground will not be permitted. Riprap shall not be grouted when the ambient temperature is below 35 degree F. or above 95 degrees F. unless approved by the ENGINEER in writing; nor when the grout, without special protection, is likely to be subjected to freezing temperatures before final set has occurred. Prior to grouting, all surfaces of riprap shall be wetted. The riprap shall be grouted in successive longitudinal strips, approximately 10 feet in width, commencing at the lowest strip and working up the slope. Grout shall be brought to the place of final deposit by approved means, and in no case will grout be permitted to flow on the riprapped surface a distance in excess of 10 feet. Immediately after dumping the batch of grout, it shall be distributed over the surface of the strip by the use of brooms and the grout worked into place between stones with suitable spades, trowels, or vibrating equipment. As a final operation, the grout shall be removed from the top surfaces of the upper stones and from pockets and depressions in the surface of the stone protection. After completion of any strip as specified, no workman or any load shall be permitted on the grouted surface for a period of at least 24 hours. The grouted surface shall be protected from rain, flowing water, and mechanical injury. The surface of all grouted riprap shall be cured by keeping the surface continuously wet for a period of not less than 7 days. E. MEASUREMENT AND PAYMENT 1. FILTER FABRIC: Filter fabric will be measured by the square yard for material used including that required at toes and thickened edges of riprap. Payment for filter fabric will be made at the contract unit price per square yard which includes all plant, labor, material, and all installation costs in -place, complete. 2. STONE RIPRAP: Stone (rock) riprap will be measured by the cubic yard using actual plan dimensions. Payment for riprap will be made at the contract unit price per cubic yard which includes all plant, labor, material, and installation costs in -place, complete. 3. GROUT: Grout for rock riprap will be measured by the square yard using actual plan dimensions. Payment for grout will be made at the contract unit price per square yard which includes all plant, labor, material, and installation costs in -place, complete. DA-40 CONCRETE RIPRAP..................................................... OMITTED ........................ DA-41 CONCRETE CYLINDER PIPE AND FITTINGS............................................OMITTED DA-42 CONCRETE PIPE FITTINGS AND SPECIALS............................................OMITTED -- DA-43 UNCLASSIFIED STREET EXCAVATION ...................................................OMITTED DA-44 6" PERFORATED PIPE SUBDRAIN.........................................................OMITTED DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS......................................OMITTED DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION...................................OMITTED 10/23/06 ASC-39 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-47 PAVEMENT REPAIR IN PARKING AREA ..................................................OMITTED W DA-48 EASEMENTS AND PERMITS Easements and permits, both temporary and permanent, have been secured for this project at this time and made a part thereto. Any easements and/or permits, both temporary and permanent, that have not been obtained by the time of publication shall be secured before construction starts. No work is to be done in areas requiring easements and/or permits until the " necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, along with any special conditions that may have been imposed on these easements and permits. Where the pipeline crosses privately owned property, the easements and construction areas are shown on the plans. The easements shall be cleaned up after use and restored to their original •- conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment .5 will be allowed for this item. DA-49 HIGHWAY REQUIREMENTS The Texas Department of Transportation requirements pertaining to the construction of this project are enclosed herein and made part of these specifications. up DA-50 CONCRETE ENCASEMENT Concrete encasement shall be Class E (1500 psi) concrete and for sewer line encasements shall conform to Fig. 113; for water line encasements it shall conform to Fig. 20 of the General Contract Documents. Requirements for such encasement are specified in Sections E1-20 and E2-20 of the General Contract Documents. .. Payment for work such as forming, placing, and finishing including all labor, tools, equipment and material necessary to complete the work shall be included in the linear foot price bid for Concrete ,n Encasement_ DA-51 CONNECTION TO EXISTING STRUCTURES All connections between proposed and existing facilities, shall consist of a watertight seal. Concrete used in the connection shall be Class A (3000 psi) concrete and meet the requirements of Section E1-20 and E2-20 of the General Contract Documents. Prior to concrete placement, a gasket, RAM-Nek or approved equal shall be installed around penetrating pipe. Payment for such work as connecting to existing facilities including all labor, tools, equipment, .. and material necessary to complete the work shall be included in the linear foot price of the appropriate pipe BID ITEM. DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION .......................OMITTED DA-53 OPEN FIRE LINE INSTALLATIONS..........................................................OMITTED 10123108 ASC-40 .. on PART DA - ADDITIONAL SPECIAL CONDITIONS DA-54 WATER SAMPLE STATION....................................................................OMITTED DA-55 CURB ON CONCRETE PAVEMENT.........................................................OMITTED DA-56 SHOP DRAWINGS 1. Submit seven (7) copies -of shop drawings, layouts, manufacturer's data and material schedules as may be required by the Engineer for his review. Submittals may be checked by and stamped with the approval of the Contractor and identified as the Engineer may require. Such .. review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. Indicated actions by the Engineer, which may result from his review, shall not constitute ,., concurrence with any deviation from the plans and specifications unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing submittals are not change orders. The purpose of submittals by the Contractor is to demonstrate that the Contractor understands the design concept, and that he demonstrates his understanding by indicating which equipment and materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use. If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed, the design drawings and specifications shall govern. The Contractor shall be responsible for dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of constriction, coordination of his work with that of other trades and satisfactory performance his work. The Contractor shall check and verify all measurements and review submittals prior to being submitted, and sign or initial a statement included with the submittal, which signifies compliance with plans and specifications and dimensions suitable for the application. Any deviation from the specified criteria shall be expressly stated in writing in the submittal. Three (3) copies of the approved submittals shall be retained by the Contractor until completion of the project and presented to the City in bound form. 2. Shop drawings shall be submitted for the following items prior to installation: List the required submittals here Additional shop drawing requirements are described in some of the material specifications. 3. Address for Submittals - The submittals shall be addressed to the Project Manager: .• (Project Manager) City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 DA-57 COST BREAKDOWN .. In order to establish a basis upon which partial payments to the Contractor may be authorized, immediately after execution of the contract the Contractor shall fumish a detailed cost breakdown of his contract price arranged and itemized to meet the approval of the Engineer. 10/23/08 ASC-41 PART DA - ADDITIONAL SPECIAL CONDITIONS to DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY.......................OMITTED .. DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP ....................................................OMITTED DA-60 ASPHALT DRIVEWAY REPAIR At locations where H.M.A.C. driveways are encountered, such driveways shall be completely .p replaced for the full extent of utility cut with H.M.A.C. equal to or better than the existing driveway. DA-61 TOP SOIL as Where directed by the Engineer, top soil shall be applied in accordance with the City of Fort Worth Transportation and Public Works Department's Standard Specifications for Street and Storm Drain Construction, Item 116, except as follows: All labor, equipment, tools and incidentals *� shall be included in the square yard bid price for the top soil. DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT ....... OMITTED ,. DA-63 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. In particular, the Contractor shall be aware that it is the City's intention that the quantities in Unit I be used on an"emergency" basis only. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding and awarding the contract. A contract in the amount of $200,000 (see Options to Renew) shall be awarded with final payment based on actual measured quantities and the unit price bid in this proposal. Moreover, there is to be not limit on the variation between the estimated quantities shown and actual quantities performed. It is understood and agreed that the scope of work contemplated in this contract is that which is designated by the City bit will in not case exceed $200,000 (see Options to Renew) including all change orders. .. am 10123108 ASC-42 on on PART DA - ADDITIONAL SPECIAL CONDITIONS DA-64 WORK IN HIGHWAY RIGHT OF WAY When the Engineer directs the Contractor to perform work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (Tex -Dot), the Contractor shall obtain approval from the Texas Department of Transportation prior to commencing any work therein. All work performed in the Tex -Dot right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation and Item E2-29.1 °Construction Within -� Highway Right -of -Way" of the General Contract Documents and Specifications, effective July 1, 1978, as amended. M DA-65 CRUSHED LIMESTONE (FLEX -BASE) .....................................................OMITTED no am DA-66 OPTION TO RENEW..............................................................................OMITTED DA-67 NON-EXCLUSIVE CONTRACT................................................................OMITTED DA-68 CONCRETE VALLEY GUTTER................................................................OMITTED DA-69 TRAFFIC BUTTONS..............................................................................OMITTED N " DA-70 PAVEMENT STRIPING...........................................................................OMITTED M DA-71 H.M.A.C. TESTING PROCEDURES...........................................................OMITTED DA-72 SPECIFICATION REFERENCES When reference is made in these specifications to a particular ASTM, AWWA, ANSI or other specification, it shall be understood that the latest revision of such specification, prior to the date of these general specifications or revisions thereof, shall apply. DA-73 RELOCATION OF SPRINKLER SYSTEM BACK -FLOW PREVENTERICONTROL VALVE AND BOX..................................................................................OMITTED "' DA-74 RESILIENT -SEATED GATE VALVES........................................................OMITTED DA-75 EMERGENCY SITUATION, JOB MOVE-IN.................................................OMITTED DA-76 1 %" & 2" COPPER SERVICES...............................................................OMITTED •• DA-77 SCOPE OF WORK (UTIL. CUT)...............................................................OMITTED DA-78 CONTRACTOR'S RESPONSIBILTY (UTIL. CUT) .......................................OMITTED DA-79 CONTRACT TIME (UTIL. CUT)................................................................OMITTED DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) .....................OMITTED DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) .....................................OMITTED DA-82 LIQUIDATED DAMAGES (UTIL. CUT) ............................. ....................OMITTED 1012.3108 ASC-43 om t- PART DA - ADDITIONAL SPECIAL CONDITIONS on DA-83 PAVING REPAIR EDGES (UTIL. CUT) .....................................................OMITTED DA-84 TRENCH BACKFILL (UTIL. CUT)............................................................OMITTED ., DA-85 CLEAN-UP (UTIL. CUT).........................................................................OMITTED DA-86 PROPERTY ACCESS UTIL. CUT) )............................................................OMITTED DA-87 SUBMISSION OF BIDS (UTIL. CUT)..........................................................OMITTED an DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) ...................................OMITTED DA-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT III (UTIL. CUT) ...................OMITTED w. DA-90 2" TO 9" H.M.A.C. PAVEMENT (UTIL. CUT) ..............................................OMITTED An DA-91 ADJUST WATER VALVE BOXES, MANHOLES, AND VAULTS (UTIL. CUT).... OMITTED m DA-92 MAINTENANCE BOND (UTIL. CUT).........................................................OMITTED DA-93 BRICK PAVEMENT (UTIL. CUT)..............................................................OMITTED an DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) .............................................OMITTED DA-95 CEMENT STABILIZED SUBGRADE UTIL. CUT OMITTED ON DA-96 REPAIR OF STORM DRAINI STRUCTURES (UTIL. CUT) .............................OMITTED .. DA-97 "QUICK -SET" CONCRETE (UTIL. CUT) ............................................ ..OMITTED DA-98 UTILITY ADJUSTMENT (UTIL. CUT) ........................................... ....OMITTED DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) ..........................................................................................................................OMITTED DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUT) .....................OMITTED DA-101 CONCRETE CURB AND GUTTER (UTIL. CUT) .....................................OMITTED DA-102 PAYMENT (UTIL. CUT).....................................................................OMITTED r. DA-103 DEHOLES (MISC. EXT.)....................................................................OMITTED DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.) .......................................OMITTED w DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) .............................OMITTED 10123108 ASC-44 ow PART DA - ADDITIONAL SPECIAL CONDITIONS DA-106 BID QUANTITIES (MISC. EXT.)...........................................................OMITTED DA-107 LIFE OF CONTRACT (MISC. EXT.) ......................................................OMITTED DA-108 FLOWABLE FILL (MISC. EXT.)..........................................................OMITTED DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.) ..........................................OMITTED DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL.).................OMITTED DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.) ..............................OMITTED DA-112 MOVE IN CHARGES (MISC. REPL.).........................................................OMITTED DA-113 PROJECT SIGNS (MISC. REPL.)........................................................OMITTED DA-114 LIQUIDATED DAMAGES (MISC. REPL.) ..............................................OMITTED DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) ..............................OMITTED DA-116 FIELD OFFICE.................................................................................OMITTED DA-117 TRAFFIC CONTROL PLAN................................................................OMITTED DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS... OMITTED DA --119 CATHODIC PROTECTION SYSTEM ....................................................OMITTED 10/23/08 ASC-45 rl SECTION E SPECIFICATIONS JANUARY 1, 1978 WATER DEPARTMENT All materials, construction methods and procedures used in this project shall conform to Sections El, E2, and E2A of the Fort Worth Water Department General Contract Documents and General Specifications, together with any additional material specification(s), construction(s) or later revision(s). (See revisions listed on this sheet). Sections El, E2 and E2A of the Fort Worth Water Department General Contract Documents and General Specifications are hereby made a part of this contract document by reference for all purposes, the same as if copies verbatim herein, and such Sections are filed and kept in the office of the City Secretary of the City of Fort Worth as an official record of the City of Fort Worth. INDEX El MATERIAL SPECIFICATIONS E2 CONSTRUCTION SPECIFICATIONS E2A GENERAL DESIGN DETAILS Revisions as of April 20, 1981, follow: E1-2.4 Backfill: (Correct minimum compaction requirement to 95% Procter density and correct P.I. values as follows:) C. Additional backfill requirements when approved for use in streets: 1. Type B Backfill - _ (c) Maximum plastic index (PI) shall be 8 2. Type C Backfill (a) Material meeting requirements and having a PI of 8 or less shall be considered as suitable for compaction by wetting (b) Material, meeting requirement and having a PI of 9 or more shall be considered for use only with mechanical compaction E2-2.1 ITrench Backfill: (Correct minimum compaction requirement wherever it appears in this section to 95% Procter density except for paragraph a.l. where the "95% modified Procter density" shall remain unchanged). s Classifications Air Tool Operator Asphalt Raker _ Asphalt Shoveler (Asphalt Distributor Operator (Asphalt Paving Machine Operator ,., Batching Plant Weigher Broom or Sweeper Operator Bulldozer operator Carpenter (Rough) Concrete Finisher- Paving (Concrete Finisher -Structures Concrete Paving Curbing Mach. Oper. (Concrete Paving Finishing Mach. Oper. (Concrete Paving Joint Sealer Oper. (Concrete Paving Saw Oper. (Concrete Paving Spreader Oper. _ Concrete Rubber Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel Electrician Flagger Form Builder- Structures Form Setter- Paving & Curbs ' Foundation Drill Operator, Crawler Mounted Foundation Drill Operator, Truck Mounted Front End Loader Laborer- Common Laborer- Utility Mechanic Milling Machine Operator, Fine Grade (Mixer Operator Motor Grader Operator (Fine Grade) Motor Grader Operator, Rough Oiler (Painter, Structures r (Pavement Marking Machine Oper. ipe Layer oller, Steel Wheel Plant- Mix Pavements Roller, Steel Wheel Other Flatwheel or Tamping Roller, Pneumatic, Self -Propelled Scraper Reinforcing Steel Setter (Paving) Reinforcing Steel Setter (Structure) Hrly Rts $10.06- $13.99 $8.80 $13.99 $12.78 $14.15 $9.88 $13.22 $12.80 $12.85 $13.27 $12.00 $13.63 $12.50 $13.56 $14.50 $10.61 $14.12 $18.12 $8.43 $11.63 $11.83 $13.67 $16.30 $12.62 $9.18 $10.65 $16.97 $11.83 $11.58 $15.20 $14.50 $13.17 $10.04 $11.04 $11.28 $10.92 $11.07 $14.86 $16.29 Scraper Operator Servicer Slip Form Machine Operator Spreader Box Operator Tractor operator, Crawler Type Tractor operator, Pneumatic Traveling Mixer Operator Truck Driver- Single Axle (Light) Truck Driver- Single Axle (Heavy) Truck Driver- Tandem Axle Semi -Trailer Truck Driver- Lowboy/Float Truck Driver- Transit Mix Wagon Drill, Boring Machine, Post Hole Driller Welder Work Zone Barricade Servicer Hrly Rts $11.42 $12.32 $12.33 $10.92 $12.60 $12.91 $12.03 $10.91 $11.47 $11.75 $14.93 $12.08 $14.00 $13.57 $10.09 MI CI so Compliance with and Enforcement of Prevailing Wage Laws (a) Dutv to pay Prevailing Wage Rates. The contractor shall comply with all requirements of Chapter 2258, Texas Government Code (Chapter 2258), F including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents. (b) Penalty for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. (c) Complaints of Violations and Citv Determination of Good Cause. On receipt of _ information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an initial determination, before the 3Is' day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from 'a successive progress payments pending a final determination of the violation. (d) Arbitration Required if Violation Not Resolved. An issue relating to an alleged WX violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to paragraph (c) above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. s (e) Records to be Maintained. The contractor and each subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall pertain to this inspection. (f) Pay Estimates. With each partial payment estimate or payroll period, whichever is less, the contractor shall submit an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. (g) Posting of Wage Rates. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. (h) Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) through (g) above. a E---j no no uw uw no uw wo REFER TO ;AN-009 MANHOLE FRAME, COVE GRADE RINGS AND CONCRETE COLLAR PER SAN-009 WITH "SEWER" CAST IN LID. A x TRENCH WIDTH X, CONC. CRADLE 2 COATS OF APPLY INTERIOR TO EXTEND TO BITUMASTIC CORRO'31 ON PIPE BELL PROTECTION AS COATING y REQUIR E.D. 0-RING GASKETS ASTM C-76, CLASS 111 0 JOINTS RCP PRECAST MANHOLE JOINTS RECOATED SECTIONS OR EQUAL. X. AFTER SECTIONS (REF. E2-14) *VARIES WITH PUT TOGETHER PIPE DIA. SECTON A —A A :411 A GROUT �4. 2� Oln 2� • OD USE 4000 PSI CONCRETE 10 4' DIA. FOR SEWER PIPE UP TO 21" DIA. 5' DIA. FOR SEWER PIPE E1-14 MATERIAL 24" TO 36" DIA. E2-14 CONSTRUCTION FoRT%Rm CITY OF FORT WORTH, TEXAS STANDARD 4'DIAMETER MANHOLE SECTON B-B DATE: FEB. 2009 SAN-003 MANHOLE FRAME, COVER, GRADE RINGS AND CONCRETE COLLAR PER SAN-009 WITH "SEWER" CAST IN LID. USE SDR-26 PIPE TO FIRST JOINT �30" CLEAR BEHIND LIMIT OF OPENING EXCAVATION APPLY INTERIOR CONCRETE CORROSION COLLAR PROTECTION AS / REQUIRED. _ / APPLY 2 COATS SDR-26 TES �OF BITUMASTIC / COATING 1''2" III V =I -� INSTALL NUTS AWAY I I I— / FROM M.H. WALL ON CONCRETE - SEE —III m w M.J. FITTING j STANDARD 4' DIA. •• II I I1 I COR-TEN BOLTS / SAN-003AIL a. O / LIMITS OF I (III) td o J 4'-0" / mw EXCAVATION / _ w < IF REQUIRED, PROVIDE -I I m / ^ STUB EXTENSION AT END OF P.E. IN M.H. WALL / SLOPE 1'/1' TYP. j All I - j vVERTICAL TO 4 POINT OF PIPE mw �,il � +.fit •�Y.. ';... r.i �:�t•. •� •'�' .: i��' �� � GROUTED INVERT USE 4000 PSI tj CONCRETE E1-14 MATERIAL E2-14 CONSTRUCTION i CITY OF FORT WORTH, TEXAS STANDARD W DIAMETER DROP ACCESS MANHOLE O 4' DIA. FOR SEWER PIPE UP TO 21" DIA. 5' DIA. FOR SEWER PIPE 24" TO 36" DIA. DATE: FEB. 2009 SAN-005 NOTES: A. STANDARD PIPE FITTINGS SHALL BE USED TO FORM INVERTS OF JUNCTION MANHOLES WHEN POSSIBLE, WITH INSTALLATION AS FOLLOWS: 1. PIPE FITTING. 2. POUR MANHOLE FLOOR TO SPRING LINE OF FITTING. 3. BREAK OUT TOP OF FITTING TO SPRING LINE. 4. POUR REMAINDER OF MANHOLE INVERT TO PROVIDE VERTICAL INVERT WALL UP TO 3/4 POINT OF THE LARGER PIPE INVOLVED, AS DETAILED. 5. STEEL TROWEL FINISH INVERT OF MANHOLE. B. WHEN SPECIAL SITUATIONS PROHIBIT USE OF STANDARD PIPE FITTINGS AS ABOVE OUTLINED, THE INVERT SHALL BE FORMED OF CONCRETE AND STEEL TROWEL FINISHED TO PROVIDE SIMILAR FUNCTIONAL CHARACTERISTICS TO THOSE AFFORDED BY THE ABOVE INSTALLATION. INVERTS THUS FORMED SHALL BE CONSTRUCTED TO THE ENGINEER'S SATISFACTION. &0 "d'`, i• • lLry'':='�rr`Yljf�•`tf::> k r r.' 3.St:.•1t1�a�.►t t•+, •: s "' � ��3�1::c}" �r '{4 T+ t ' �i , i•� • .7•i ,ti'�•�,! �•Ii. t�r,� j r '•.r�. L x.:. . '• ,• � ' • Wit; ?ir„►'t�rr"'� 1�' ' w".:• vtt j ;:• . C.���:' •.yr• '�•.. •i. �••., + �,•y�-•. •. k.: �,i•� -ij � r.c •i. f.; ♦gyp~. •�:• CONCRETE SLAB _ �.,:.t r'� i :..• ,r i• �� �s}�„�'.; Y �' {-. .,.� a • �.•+ _ ;;: S .Y� : _ t1 •j••':r C+;�,r �''"'?�4. �� :'J:..•r^:,.:�..t•: t •S .r ;,`, .:.. .. •y: l0 -•. it ��•' .• r •�. I: •r. • v••i :Li rr: i.•.•r,r Y:••!•:_ r. .1 �' r • !� t• 'a4 i �sr � i J �:.:}' E1-14 MATERIAL SECTION A -A O WHEN PIPE SIZES DIFFER, E2-14 CONSTRUCTION MATCH THE PIPE CROWNS. &vp CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 JUNCTION MANHOLE BOTTOM SAN-006 Ml No W VARIABLE DIAMETER BORE TO BE LARGE ENOUGH w TO PERMIT DESIGN TYPE PIPE TO BE PULLED OR m w JACKED THROUGH. S J W m Q Q Q I TYPICAL BORED SECTION LONGITUDINAL VIEW PRESSURE GROUT AS NEEDED I—i I I —I I I -III -III -III-► I I-III=1 I III -III -I I-III-III=1 I I-III-11 B I _ I I I lI I I 1 1I_ ", f I I,, I I-II_�-I I I I I 1 6 � � I I I-. =I I I=A 1 I ]7Ajj W 0 w m w a a W ~ W W w ~ W mQ >� Q Q Q I—III—III—III—IIIIII --—;III,; I I IIII� �) Ill-� -III-� (�=III=III=III=III-III- TYPICAL BORE WITH PIPE INSTALLED LONGITUDINAL VIEW CASING SPACERS (REFER TO STD. PRODUCT LIST) PERIMETER OF THE BORE DIP CARRIER PIPE ow TYPICAL END VIEW NOTE: 1. COMPRESSION TYPE JOINTS TO BE USED IF POSSIBLE. 2. IF COMPRESSION TYPE JOINT IS NOT AVAILABLE, M.J. TYPE SHALL "' BE USED AND JOINTS BOLTED BEFORE PULLING PIPE INTO PLACE. E1-15 MATERIAL r E2-15 CONSTRUCTION PRESSURE GROUT AROUND CASING AND CARRIER PIPE. GROUT SHALL BE PROPORTIONED AS 1 CU. FT. OF CEMENT, 3.5 CU. FT. OF CLEAN FINE SAND WITH SUFFICIENT WATER ADDED TO PROVIDE A FREE FLOWING THICK SLURRY. CASING PIPE SEWER LINES SHALL BE SECURED BY CASING SPACERS AS MANUFACTURED BY CASCADE WATERWORKS MANUFACTURING CO., ADVANCE PRODUCTS do SYSTEMS, OR APPROVED EQUAL. CITY OF FORT WORTH, TEXAS BORED CROSSING DETAIL DATE: FEB. 2009 SAN-008 .. �� r r r r r vim r COLLAR CONFIGURATION -.rt FOR PAVED AREA MANHOLE FRAME AND -•- 32" COVI EQU, STD. 8-#4 RE COLLAR CONFIGURATION FOR UNPAVED AREA 4 -8 2"x8"x30"I.D. CONCRETE PRECAST 320 MIN. 3'4" CHAMFER (TYP.) GRADE RINGS PER AS TM C478. <7 , - z GROUND - �30" CLEAR��. • 4 OPENING CONCRETE COLLAR RAM-NEK HEIGHT VARIES wo r A SEC110 J A -A REBAR SHALL BE PLACED 3" MIN. FROM O3 HINGES ARE REQUIRED ON TOP AND BOTTOM OF CONCRETE COLLAR. ALL 32" COVERS (REFER TO STD. PRODUCTS LIST). 02 WHERE MANHOLES ARE IN THE STREET, INSTALL ® HINGED LIDS INSTALLED IN E1-14, E1-20, E1-21 MATERIAL 2 MORE GRADE RINGS BETWEEN CASTING AND STREETS SHALL OPEN AGAINST THE FLOW OF E2-14, E2-20, E2-21 CONSTRUCTION TOP OF PAVEMENT. TRAFFIC. CITY OF FORT WORTH, TEXAS RT DATE: JUNE 2009 , MANHOLE FRAME, COVER, GRADE RINGS AND CONCRETE COLLAR SAN-009 w I I I I I I I I I I I PROPERTY LINE "CITY OF FORT WORTH STANDARD CLEANOUT w/ 6. 4" CONCRETE CASTIRON CAP #3 BARS COLLAR 12' COLD JOINT REQUIRED STANDARD PARKWAY Y,"/FT. 4" ( I I I I I`I I I III III —III— •. III_II1=IIIz 2',.�?t•• y !�` EXIST. OR PROP. 4' SIDEWALK IFOR NEW I �:'%►';;;G �:� ; 12" DEVELOPMENT'`` =?,i�f DOUBLE BAND STAINLESS — °� �' STEEL COUPLING CAP RISER 2' BELOW GRADE. "i'I:`" ' ';" BACKFILL CLEANOUT STACK WITH CONC ER TE COLLAR (CAST IRON) %ask �c Kwr NATIVE TOPSOIL COMPACTED TO (PLAN VIEW) �N,;a, ;,fr;.?y'; 95% STANDARD PROCTOR DENSITY 4" STACK (IRON OR PVC) CONCRETE —�+tiy�;{'+''rl�,.`TWO WAY SWEEP TEE ANCHOR CLEANOUT TEE ( EXISTING OR PROPOSED 4 {J SFWER SERHCE '—� 1 1 SOR-35 OR SDR-26 SERVICE, i , },i, • SLOPE —VARIES. 2% MIN. I' FERNCO FLEXIBLE `' COUPLING REQUIRED MIN. IF EXISTING SERVICE 1' MIN. I 6" IS PRESENT, OTHERWISE PLUG. I MIN. SEWER MAIN PAID FOR AS CLEANOUT ` 'i PRODUCT INFORMATION •• From Stanley Roberts & Assoc., Information Subject To Change. DESCRIPTION WEIGHT PART NO, Cast Iron Lateral Cleanout 18 Ibs ATL-424 W/ SS Bolts and Coupling ,t* SSBOLTS 1.5" 6 Lair—�tiJ �U 0 RING I � 7 &VP CAST IRON CLEANOU — PROPERTY LINE SIDEWALK STREET CURB QLANOUT NOTF—S 1, THE SWEEP TEE AND PIPE FITTINGS INSTALLED SHALL BE SDR-35 OR SDR-26 PVC MATERIAL. 2. CONNECTIONS TO THE EXISTING SERVICE SHALL BE MADE USING RUBBER SLEEVE COUPLINGS WITH STAINLESS STEEL DOUBLE BAND REPAIR SLEEVES. THE SLEEVES SHALL BE TIGHTENED TO THE TORQUE RECOMMENDED BY THE MANUFACTURER. 3. SLOPE OF THE SANITARY SEWER SERVICE SHALL BE A MINIMUM OF 2 PERCENT, 4. PIPE AND FITTINGS SHALL BE SDR-35 OR SDR-26 PVC WHEN NOT IN HIGH TRAFFIC AREAS. 5. CONCRETE USED AROUND CLEANOUT ASSEMBLY SHALL BE 5 SACK, 3,000 PSI MIX. DRIVEWAY —PROPERTY UNE 101 SIDEWALK r I CAST IRON J CURB i / CLEANOUT DRIVEWAY APPROACH STREET FAST IRON CLEANOUT BOOT CITY OF FORT WORTH, TEXAS TWO WAY SERVICE CLEANOUT DATE: FEB. 2009 SAN-011 s s mw mw or .r r ow r wo .. .. aw .w mw r TUNNEL LINER (AS INDICATED IN SPECIAL F [t F Q Q- o a w w o m Z m Q J Q w j Zn z z I ANNULAR SPACE GROUTED CUT AWAY LONGITUDINAL SECTION 1 NOTE: FURNISH & INSTALL GROUT IN KA►►U OF 1 CUBIC FOOT OF CEMENT AND 3.5 CUBIC FEET OF CLEAN FINE SAND WITH SUFFICIENT WATER ADDED TO PROVIDE A FREE FLOWING THICK SLURRY. E1-15 MATERIAL E2-15 CONSTRUCTION �r�VoR� NNEL LINER FILL BETWEEN LINER AND SEWER PIPE WITH GROUT ;EWER PIPE k INSTALL SKIDS AS NECESSARY. SKIDS SHALL MEET THE APPROVAL OF THE ENGINEER_ END VIEW CITY OF FORT WORTH, TEXAS TYPICAL TUNNEL SECTION DATE: FEB. 2009 SAN-018 u 2' — \13 200'MIN. SPACING PER COMPACTED BENTONITE CITY OF FORT WORTH CLAY OR 2:27 CONCRE E — TREE ORDINANCE. PIPE vEXISTING GROUND �I,�IIIIIII � I� 5 0 � 4' OR TO BOTTOM OF PAVEMENT BASE OR TOP SOIL MINIMUM TRENCH WIDTH — PIPE = PIPE DIA. + l' DIA. TRENCH WIDTH TYPICAL SECTION CITY OF FORT WORTH, TEXAS CLAY DAM UNDISTURBED SOIL DATE: FEB. 2009 SAN-019 EXISTING SURFACE BACKFILL AS APPROPRIATE 1I- ITt; .. >', ": cv f;•-, '.:; �;.:.v�•..,� ` I� III ..••• (II 44 —I I I ,t: { � : ;,,�.L•:.+• _ :l s.: �:�:,\ III_ —III •-'..�": t,:,.:,,r`; = :.• .:Yr..."..,: n+,,,•.►..`=1I I- � —lid � .� :C.•i �.r,qti •i � ..' O 6" MIN. DIMENSION. 6" MAX. FOR PAY PURPOSES WHEN BID PER CUBIC YARD. O 6" MIN. DIMENSION. MAX. FOR PAY PURPOSES SHALL BE 6" ON MAINS 24" AND SMALLER, 9" ON MAINS 30" AND LARGER WHEN BID PER CUBIC YARD. O3 4" MIN. DIMENSION. 4" MAX. FOR PAY PURPOSES WHEN BID PER CUBIC YARD. 4 CLASS 'E' (1500 PSI) CONCRETE. O � E1-7 MATERIAL E2-7 CONSTRUCTION OR�+�O + CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 1 Ai CONCRETE ENCASEMENT SAN-020 la I la I I 0A I N-I 11 I I I =1II-III-i W -III-III= -III j TYPE "C" BACKFILL SEE SPEC. E1-2.4 G.C.D. MINIMUM 6" INITIAL'; BACKFILL COVER .. T:::: =" `'"'•' . SAND MATERIAL EMBEDMENT III-` `-•"_ & INITIAL BACKFILL SEE SPEC. E 1-2.3 G.C.D. MINIMUM 6" ':" "" EMBEDMENT _ II�IIIII�IIIII�IIIII�IIIII�IIIII�IIII WATER: SIZES UP TO AND INCLUDING 12" =ElIMlIE, 1ElIEIII= 111_III-II uj III-111�I -III= Q12 _ i II.. TYPE "C" BACKFILL MINIMUM 12" INITIAL—�� I —I SEE SPEC. E1-2.4 ,+ BACKFILL COVER _IIII v 11= G.C.D. !_ FILTER FABRIC - I I III 111 SUPAC-HEAVY GRADE 8NP =1 (UV) OR APPROVED EQUAL. w -lll II-i CRUSHED STONE MINIMUM 6" 1-1 I ' 11- SEE SPEC. E1-2.3 EMBEDMENT -III-—f 1 i—t i = II-1 G.C.D. lEl I Fil I F1 I El 111111111 � I NOTE: SPECIFICATION WATER: SIZES 16" AND LARGER REFERENCES ARE FOR .�. WATER AND SANITARY SANITARY SEWER: ALL SIZES SEWER ONLY. SAND GRADATION • LESS THAN 10% PASSING MATERIAL SPECIFICATIONS ■. #200 SIEVE THE EMBEDMENT AND BACKFILL DETAILS PROVIDED ON THIS SHEET SHALL REPLACE APPROPRIATE PROVISIONS OF E1-2.4(b) • P.I. = 10 OR LESS AND E1-2.3 OF THE GENERAL CONTRACT DOCUMENTS AND SPECIFICATIONS FOR WATER DEPARTMENT PROJECTS (G.C.D.) � I ALL OTHER PROVISIONS OF THESE ITEMS SHALL APPLY, I CRUSHED STONE GRADATION SIEVE SIZE RETAINED 1" 0-10 ' 72" 40-75 %" 55-90 .. #4 90-100 #8 95-100 WAw CITY OF FORT WORTH, TEXAS DATE: JUNE 2009 WATER AND SANITARY SEWER EMBEDMENT AND BACKFILL DETAILS WTR-029 l 1 t t. i t i 1 l; i 1 t 1 1 1[ 2'-7- 8'-0" 2*-10" FoRT WO 2'-7- 0 PROJECT NAME _ - - 5" PROGRAM NAME / PROJECT # / AMOUNT 2 This project is managed by the Department 1 Questions on this project, call (817) 392-8306 w J After hours water and sewer emergencies, call (817) 392-4477 5f-f -- , -- YR (TYP.) 3" 1 - 7'-6- I '- MITE L- PMS 288 (BLUE) FONTS: FORT WORTH LOGO - CHELTENHAM BOLD ALL OTHER TEXT - ARIAL LOGO COLORS: FORT WORTH - PMS 288 (BLUE) LONGHORN LOGO - PMS 725 (BROWN) FoRTWORTH CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 PROJECT SIGN - 4'x8' E2-1 CONSTRUCTION (FOR C.I.P PROJECTS) WTR-034 I I 1 1 1 I i I I I ) t - I : I - I- 1 - I l I l 1 ) I I 4'-0' 7" 2'-10' 7' 2.251 - - -- - -- w-- . FoOTWORT' M I 3" R (TYP.) 2.25�� _ � PROJECT NAME _L2° PROGRAM NAME/PROJECT #/AMOUNT This project is managed by Z Dept. N i Questions on this project, call: (817) 392-8306 J After hours water and sewer emergencies, call: (817) 392-4477 2.5� ' �- w- l3' 1� 3'-6" 4 3" 1 � �1- WHITE PMS 288 (BLUE) FONTS: FORT WORTH LOGO - CHELTENHAM BOLD ALL OTHER TEXT - ARIAL LOGO COLORS: FORT WORTH - PMS 288 (BLUE) LONGHORN LOGO - PMS 725 (BROWN) CITY OF FORT WORTH, TEXAS E2-1 CONSTRUCTION &VM PROJECT SIGN - 4'x4' DATE: FEB. 2009 WTR-035 EXISTING _ TRENCH REPAIR LIMITS CURB & EXISTING HMAC NEW HMAC GUTTER PAVEMENT 1-i (SEE NOTE 1) :;II .II •':+,�� !� •/ . ,. f. 'A. .a....ir• � .,y�l� �lk} .. �, d 15 i. in ';wt r .t. . e• .a :.�. �.�y, � • �..� t" �...4?i,..; c . y Lam. • b. -11",� (��_lil—III III _ !I— I —;;.^'. •.'. ttE... �i3:f t+:... ac �F�. if' ' ` I I . I I I I—� I I-1 I � � , 4n�, , ��.�. II I I:.: I�I I (.::: 'i—, ill�lll� � i-, '— 2w= y'rf. �a '7.:'ti �. •i^ y. 1 n' EXISTING SUBGRADE jv (IF ANY) PIPE I DITCH WALL r.i:i :, di �•.,i.#J�I I I� —III • w� 44• r ti:•4?!S.^4c...... 4"J' ii,'. '.•rA'.a' I 'Yby t2.;:=I I- -1 11.--, Em i 1-_TIll ::::L::: 4)��•i �i.��':,�' �t'tl: •01nL � :N •,, art.• !\O i � I-1 li-•I �_I I i-1 i•I-1 I I- _-.i�::� ia: .::'. , .,:6:•'a';";�-•:T•::'.�- I I III I II: •,.I .:(I!;;:III Ii�; II ; ;I,I::' 11I�� 1i:7:;.�?Il:il=il{�,,III;...I.II�I,: PRIME COAT BACKFILL MATERIAL PER DETAIL WTR-034 (SEE NOTE 3) NOTES: 1. ALL EXISTING ASPHALT COURSE SHALL BE REPLACED TO THE ORIGINAL DEPTH. PLACE A MINIMUM OF 2" HMAC SURFACE COURSE (TYPE "D" MIX) TO MATCH EXISTING GRADE AS SHOWN. 2. PLACE A MIN. OF S" 2:27 CONCRETE AS SHOWN. 3. FLOWABLE FILL MAY BE REQUIRED TO' BACKFILL ALL TRENCHES IN DOWNTOWN STREETS AND IS OPTIONAL IN OTHER AREAS. IF FLOWABLE FILL IS REQUIRED, A SEPERATE PAY ITEM WILL BE PROVIDED FOR SUCH. 4. ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH THE CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION. ORTWO T CITY OF FORT WORTH, TEXAS DATE:10-2007 PERMANENT ASPHALT PAVEMENT TRENCH REPAIR STR-028 I} 1 l' 1 � t � 1 t � 1 I �� 1 1 1 �! ► 1 1 l [ � 1 1 f 4 5' MIN. CLASS 'A' REINFORCED CONCRETE PAVEMENT EXISTING REPLACEMENT TO THE SEE DETAIL EXISTING CURB & 6" MIN. NEAREST JOINT OR CURB. STR-035 CONCRETE GUTTER PAVEMENT III •�: :7 ..1.: i ., eft „ r• .)� .,1,• ..f �:11•. :i•;, 7:. ,r.•.~a. �'Pj#'"-''�,•• �j•�.. ,• a. �,�`. 1��• �+<. •�SMs�.,,.��:, , :r'••.. !s,+.! a.',4�.-'..r. .��..�p• ',::":�_i �.!} i �,I ��- 's,$, Z' ^!'+: :'• i ..', ;c��fi;; .: ,Q; • . «• ,• r Rom• �r.:-+• �) 1 J 'a, x's.. •Y++ .4.,.:f;sx i S a ....?M 4 !!4:',} r :4�'�i ' "a i'{j.•s x,. ^ .:+P:. ,x.. o .,.• �•• j::, � i' 'TV� .:<: •.,. •s,•p,.. x .`gy �_..,� y,..'p�t:St?r .f_<.•I. ;t�., •3. �y. >r .n ! :.ii�..•..Y;•..:'� y�: v�VV''ia j�}�,.1.,:'��:�°:�'i "•d: .•v .� Ny,•µ,,, i•- 1 a,v�i.•`qa.�}}', •�+,,sk'' ri.•' _—�— _� +5r.r\es:••E'' >' ,.,.. •Y�,nNC�'' '•ti..:.`�.I— _I I ;4,. O •Y •, a»o _ �i•.rRT , x a '5�4 t� •s ..I _.,1— "'�_ i—i = 71 f—.I•f I I� I - I qi-._: �, . ..bi�l..�_;t?�., ...` =1 Ia f I .' ;.1 I I I I_ i 1- I j , i. +=f'i� (_nr:�r a;ai'.'Il ..�il......1 L. •I.L...• II ... �l�_..._I f.....111: I� i' ` II, �,I I�� { L -�i�rit r,�,v_ — —j - 111 �i i I-12"M+.K � I "12�i — I EXISTING a;;�u� •`a"��_ U EXISTING CONCRETE JOINT SUBGRADE (IF ANY) , l BACKFILL MATERIAL PIPE '�.� PER DETAIL WTR-034 (SEE NOTE 1) DITCH WALL 't <►'�, "aK�+'w,III::"�: i � i .•.'e:?fie' _ i f �+,Y . ...•r ... FL11.. FLOOWABLE FILL MAY BE REQUIRED TO BACKFILL ALL TRENCHES IN DOWNTOWN STREETS AND IS OPTIONAL IN OTHER AREAS. IF FLOWABLE FILL IS REQUIRED, A SEPERATE PAY ITEM WILL BE PROVIDED FOR SUCH. 2. REINFORCED CONCRETE PAVEMENT SHALL BE REPLACED TO ORIGINAL DEPTH, OR TO A MINIMUM OF 6", WHICHEVER IS GREATER. 3. PLACE 6" OF 2:27 CONCRETE AS SHOWN. 1" OF REINFORCED CONCRETE MAY BE SUBSTITUTED FOR EVERY 2" OF 2:27 CONCRETE. 4.REINFORCEMENT OF CONCRETE MUST MEET CITY STANDARD OR MATCH EXISTING, WHICHEVER IS GREATER, 5. ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH THE CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION. ORT WO T CITY OF FORT WORTH, TEXAS DATE: 10 2007 REINFORCED CONCRETE PAVEMENT TRENCH REPAIR STR-031 CONTRACTS, BONDS AND INSURANCE CERTIFICATE OF INSURANCE CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW CONFLICT OF INTEREST QUESTIONNAIRE PERFORMANCE BOND PAYMENT BOND MAINTENANCE BOND CITY OF FORT WORTH CONTRACT W CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTH Date: NAME OF PROJECT: M-1-I-1 DRAINAGE BASIN - PART 2, SANITARY SEWER REHABILITATION AND IMPROVEMENTS - PROJECT NUMBER: SAN. SEWER PROJ. NO. P258-702170036183, CITY PROD. NO.00361, DOE NO. 4296 IS TO CERTIFY THAT: is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for the type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liability Worker's Compensation Comprehensive General Liability Insurance (Public Liability) Blasting Collapse of Building or structures adjacent to excavations i Damage to Underground Utilities Builder's Risk Comprehensive Automobile Liability Contractual Liability w� Other w No Bodily Injury: Ea. Occurrence: $ Property Damage: Ea. Occurrence: $ Ea. Occurrence: $ Ea. Occurrence: $ Ea. Occurrence: $ Bodily Injury: Ea. Person: $ Ea. Occurrence: $ Property Damage Ea. Occurrence: $ Bodily Injury: Ea. Occurrence: $ Property Damage: Ea. Occurrence: $ Locations covered: Description of operations covered - The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. Aeencv Insurance Co. Fort Worth Aeent By Address Title M CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Sewer Project No. P258-702170036183 , City Project No. 00361, and DOE No. 4296. CONTRACTOR A. _ . t _ � game: Mark Pappas, Vice -President of — Conatser Management Group, Inc, G.P. Title: Date: 5eWC&bc( orn ,aLYA STATE OF TEXAS § COUNTY OF TARRANT § Before me, the undersigned authority, on this day personally appeared VO-A d,g-S , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of f ,,m,CnAa4 .e- ;,_ T)(, Lfor the purposes and consideration therein expressed and in the capacity therein stated. 4�- Given Under My Hand and Seal of Office this day of , 20 r N Public in and for the State of "`�:. JAMIE L BROWN y Texas * t i NOTARY PUBLIC State of Texas Comm. Exp. 06-27-2012 r r r no Bond No: 022028916 me 44 no .09 THE STATE OF TEXAS COUNTY OF TARRANT That we, (1) PERFORMANCE BOND § KNOW ALL BY THESE PRESENTS: Conatser Construction TX, LP as Principal herein, and (2) Liber Mutual Insurance Comoanv I a corporation organized under the laws of the State of (3) MA and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the sum of Six Hundred Sixty -gyp Thousand, Four Hundred Forty -Four and No/ 100 - - - Dollars ($662,444.00 ) for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Principal has entered into a certain written contract with the Obligee dated the day of NOV 0 3 2009 20 , a copy of which is attached hereto and made a part hereof for all purposes, for the construction of M-1-I-1 Drainage Basin Part 2 Sanitary Sewer System Rehabilitation and Improvements in the City of Fort Worth, Texas NOW, THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, theri this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this day of NOV 0 32009 20� uonatser rucu ln, PRINCIP ATTEST: By• ame: Mark Pappas (Principal) Secretary Vice President of Conatser Title: Management Group, Inc. , GP (S E A L) Address: P n—P,,, ty,R Fnrt Wnrt-h, TX 76119 Wit ss as t6 Principal Liberty Mutual Insurance Canpany SURETY ATTEST: By. Nam Glenna S. Davis Secretary Attorney in Fact (S E A L) Address: 175 Berkelev Street Boston, MA 0211T Witness as Surety Telephone Number: 972.663.2902 Carolyn Mapl s 0 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney -in -Fact. The date of bond shall not be prior to date of Contract. Bond No: 022028916 M PAYMENT BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL BY THESE PRESENTS: That we, (1), Conatser Construction . LP as Principal herein, and (2) Liberty MutuAl Insurance Company a corporation organized and existing under the laws of the State of (3) MA , as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of Six Hundred Sixtv-Two 'Thousand, Four Hundred Forty=Four and N0/ 100 - - — - - Dollars ($ 662,444.00 ) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, the Principal has entered into a certain written contract with the Obligee dated the day of NOV 0 3 2009 , 20_, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length, for the following project: M-1-T-1 Drnipaga-$aain Part 2 Sanitary Sewer Svstem Rehabilitation and Imnrovements in tha Clay of Fnrt Wnrt-h. Taxac NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253, Texas Government Code, as amended) supplying labor or materials in the prosecution of the work under the contract, then this obligation shall be void; otherwise, to remain in full force _. and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this day of NOV 0 3 2009 20_ ATTEST: (Principal) Secretary .. (S E A L) r j Witass as to Principal ATTEST: Secretary (S E A L) no Conatser Construction , PRINC L 'Name: Mark Pappas Vice President of Conatser Title: Management Group. Inc.. GP Address: P. 0. Box 15448 Fort Worth. i'X 76119 Liberty Mutual Insurance Company SURETY By:� Name: Glenna S. Davis Attorney in Fact Address: 175 Berkelev Street Boston, MA 02117 Witness as teurety ` Telephone Number: 972.233.9588 Carolyn Maples NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety . Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attomey-in-Fact. The date of bond shall not be prior to date of Contract. Bond No: 022028916 MAINTENANCE BOND .. THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL BY THESE PRESENTS: That Conatser Construction TX. LP ("Contractor"), as principal, and, I,ih,,t,,r„al TnsUr3nr,- Ccmpany a corporation organized under the laws of the State of MA , ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of Six Hundred Sixty -Two Thousand, Four Hundred Fortv-Four & No/100 - - Dollars ($_ tinn ), lawful money of the United States, for payment of which sum well and .. truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors, jointly and severally. This obligation is conditioned, however, that: WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort .. Worth, dated the of NOV 0 3206 20_, a copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: M-1-I-1 Drainage Basin Part 2, Sanitary Sewer System Rehabilitation and Improvements in the City of Fort Worth. Texas the same being referred to herein and in said contract as the Work and being designated as project Seer Project N0. P258-702170036183 number(s) City Project No. 00361,DOE 4296 and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and being made a part hereof; and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of Two (2) years; and WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in ' part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said Work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executedyipi nt f8) counterparts, each of which shall be deemed an original, this — day of A.D. 20 ATTEST: Conatser Construction TX, TLa (S E A Q Contractor 2 By: �r/ 11 Secretary Name: Mark Pannas Vice President of Conatser Title: Management Groun. Inc,. C:a ATTEST: Liberty Mutual Insurance ComDanv (S E A Q Surety By: Q Secretary Name: Glenna S. Davis Title: Attornev--in--Fact 175 RPrkPiPy StraPt Boston. MA 02117 Address Tel No: 972.233.9588 .. IL THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 2589779 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the 'Company"), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint GREG A. WILKERSON, GLENNA S. DAVIS, CATHY VINSON, CAROLYN MAPLES, JOHN R. WILSON, ALL OF THE CITY OFFORT WORTH, STATE OF TEXAS .................................... ................. .......... .............. .................................................. ....................................... . .......................................................................... .................................................. each individually if there be more`than one named, its true and lawful attorney -in -fact to make. execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding TWENTY FIVE MILLION AND 00/100** **************"** DOLLARS ($ 25,000,000.00***** ) each, and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed pursuant to and by authority of the following By-law and Authorization: ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys -in -fact: Pursuant to Article X111, Section 5 of the By -Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby authorized to appoint such attorneys -in -fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 12th day of June 2009 k�LIBERTY MUTUAL INSURANCE COMPANY Garnet W. Elliott, Assistant Secretary COMMONWEALTH OF PENNSYLVANIA ss * „ COUNTY OF MONTGOMERY On this 12th day of June , 2009 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation. IN TESTIMONY W first above writtenZ4_4 OF CERTIFICATENL,Wb�O 4y subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year COMMONWEALTH OF PENNSYI VAN{A NOhar!mi Sad Term Paswa, N4tay Pu61 PlrTmth Tv p, Martyort,my Ca,v,ty My comm isaan EX%f March 2@, 2013 Member, PQn yieeme MsodMm of Hdaries By Ter6sa Pastella, Notary Public I, the undersigned, Assistan Se retary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attomeys-in-fact as provided in Article XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this day of niq0,��099 y 4�4 7, 0 David M. Carey, Assert Secretary No so W IONU ert� AU'ttual Important Notice TO OBTAIN INFORMATION ABOUT THIS BOND OR TO MAKE A COMPLAINT: You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Your notice of claim against the attached bond may be given to the Surety Company that issued the bond by sending it to the following address: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the claim office by telephone at: 610-832-8240 Premium or Claim Disputes If you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. This notice is for information purposes only and does not become a part of or a condition of the attached document. It is given to comply with Section 2253.048, Government Code, and Section 53.202, Property Code, Effective September 1, 2001 i THE STATE OF TEXAS CITY OF FORT WORTH. TEXAS CONTRACT KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT N O V 0 3 2003 This Contract made and entered into this the day of A.D., 2009, by and between the CITY OF FORT WORTH, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, by and through its duly authorized Assistant City Manager, ("Owner"), and (Contracting Company Name here), ("Contractor") Owner and CONATSER CONSTRUCTION TX LP. Owner and Contractor may be referred to herein individally as a "Party" or collectively as the "Parties. WTTNESSETH: That said parties have agreed as follows: 10 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: M-1-I-1 Drainage Basin Part 2 Sanitary Sewer System Rehabilitation and Improvements That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Water Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 93 The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Department of Water (Engineering) of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 120 Calender days. OFFICIAL RECORD CITY SECRETARY L FT. YOFTti� , TX If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of $315.00 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 0 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not anv such iniurp. damage or death is caused, in whole or in Part, by the negligence or alleged ne lei ence off' Owner. its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damage is caused in whole or in Part by the negligence or alleged negligence of Owner, its officers. servants or emPlovees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner _ satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, upon the execution of this Contractor, and before beginning work, to make, execute and deliver to City of Fort Worth the following bonds in the name of the City of Fort Worth in a sum equal to the amount of the Contract. The form of the bond shall be as herein provided and the surety must first be acceptable to the requirements of the Chapter 2253 of the Texas Government • Code, as Amended. OFFICIAL RECORD' CITY SECRETARY FT. WORTH, TX A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the Owner. B. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the + amount of the Contract, solely for the protection of the claimants supplying labor and material in the prosecution of the work. C If the Contract amount is in excess of $100,000, a Performance Bond shall be executed, ` in the amount of the Contract conditioned on the faithful performance of the work in accordance with the Plans, Specifications, and Contract Documents. Said bond shall solely be for the protection of the Owner. s D. A Two-year Maintenance Bond in the name of the Owner is required for all projects to insure the prompt, full and faithful performance of the general guarantee contained in the Contract Documents. 8. The Owner agrees and binds itself to pay, and the Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates n/a, + shall be Six Hundred Sixty Two Thousand Four Hundred Forty Four Dollars and No cents, ($662,444.00). 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Owner. Any request for any sublease or assignment shall be made in writing and submitted to the Director of the Engineering Department. No 10. + The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 8 counterparts with its corporate seal attached. - OFFICIAL RECORD' no CITY SECRETARY FT. WORTH, TX no NOY 0 32009 Done in Fort Worth, Texas, this the day of RECO D BY: DIRECTOR, DEPARTMENT OF WATER - am - CONTRACTOR - - TITLE p� ex rar Ljd--�- rz ADDRESS 76111 . A.D., 2009. CITY OF FORT WORTH FERNANDO COSTA, ASST CITY MANAGER ATTEST: CITY SECRETARY (SEAQ C-'Xmq.q Contract uthori aatiox _"I- Date APPROVED AS TO FORM AND LEGALITY: ASST. I'I Y ORNEY OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX PERMITS TRWD BNSF FWWR TxDOT PERMITS Bidders are advised that the City of Fort Worth has not acquired all the necessary permits for the construction of the project as shown in the Plans. Bidders are hereby notified that the City anticipates obtaining the necessary permits by the start of construction. In the event the necessary permits are not obtained, the City reserves the right to terminate the award of the contract at any time before the contractor begins any construction work on the project(s). In addition, Bidders shall hold their unit prices until the City has completed the acquisition of all permits. The contractor shall be prepared to commence construction without all executed permits and shall submit a schedule to the City of how construction will proceed in the other areas of the project do not require permits. .. TARRANT REGIONAL WATER DISTRICT 800 East North Side Drive Fort Worth, Texas76102-1097 BOARD OF DIRECTORS George W. Shannon, President Victor W. Henderson, Vice President Charles B. Campbell Jr., Secretary Hat S. Sparks III Brian C. Newby James M. Oliver General Manager October 6, 2003 Mr. Kervin M. Campbell Dunaway Associates, Inc. 1501 Merrimac Circle Fort Worth, Texas 76107 Re: Sanitary Sewer Main 383-A Replacement Dear Mr. Campbell, P.O. Box 4508 Fort Worth, Texas 76164-0508 Telephone 817-335-2491 FAX 817-740-1429 Thank you for submitting plans for the proposed pipe -bursting and replacement of sanitary sewer main #383-A within the Fort Worth floodway near Samuels Avenue. We have reviewed the plans and have the following comments: • The contractor must compact all voids surrounding the proposed manhole replacements to 95% proctor density. • No construction materials may remain overnight within the floodway. Furthermore, all material must be removed upon completion of the project, • All surfaces on District property must be returned to original grades and turf re-established upon completion of the project. • The District does reserve the right to require a full stand of grass be evident in affected areas prior to the expiration of the contractor's warranty period. Please submit the final legal description in order for our attorney to draft the document. I am also enclosing a copy of the Corps of Engineers' approval letter for the project. Provided the aforementioned comments are strictly adhered to, we hereby approve the project for construction. Please provide this office at least 48 hours notice in advance of construction on District property. Sincerely, Qa Rick Carroll Senior Land Agent Xc: Darrell Beason Dean Kuhn U:12003fldy.doc � � '.»,`✓.iz?,Dw _c_JFK - ...... .....r.w .r. DEPARTMENT OF THE ARMY FORT WORTH DISTRICT, CORPS OF ENGINEERS P.O. BOX 1 FORT WORTH, TEXASS 76 76102-0300 REPLYTO ATTENSeptember 25 2003 ATTENTION OF- P J - Operations Division Mr. Wesley Cleveland western Division Manager Tarrant Regional Water District 1022 North Calhoun Fort Worth, Texas 76106-0508 Dear Mr. Cleveland: I am replying to a request from Mr. Rick Carroll of your office for our review of the proposed construction of the M-383-A sewer line segment located approximately 0.25 mile west of Samuels Avenue in Fort Worth. This proposed work will impact the Fort Worth Floodway. The proposed work is acceptable and is hereby authorized. This project has been assigned Project Number 200300532. Please include this number in all future correspondence concerning this project. Failure to reference the project number may result in a delay. My staff reviewed the plans for the proposed work in accordance with the provisions of 33 CFR, Section 208.10, pertaining to work in Federally constructed local flood protection projects and Pamphlet No. 1150-2-1, Criteria for Additional Construction Within the Limits of Existing Floodways. We have determined that this proposed work will not adversely affect the operation and maintenance of the Fort Worth Floodway and will comply with the provisions of 33 CFR and the guidelines in Pamphlet No. 1150-2-1. My staff also reviewed the project in accordance with Section 404 of the Clean Water"Act and Section 10 of the Rivers and Harbors Act of 1899. Under Section 404, the U.S. Army Corps of Engineers (USAGE) regulates the discharge of dredged and fill material into waters.of the United States, including wetlands. The USACE responsibility under Section 10 is to regulate any work in, or affecting, navigable waters of the United States. Based on the description of the proposed work, other information available to us, and current regulations and policy, we have determined that this project will not involve any of these activities. Therefore, it will not require Department of the Army authorization under these laws. However, it is incumbent upon the owner to remain informed of any changes in USAGE Regulatory Program regulations and policy as they relate to this project. -2- This authorization should not be considered as an approval of the design features of any activity authorized or an implication that such construction is considered adequate for the purpose intended. It does not authorize any damage to private property, invasions of private rights, or any infringement of Federal, state, or local laws or regulations. Thank you for your interest in our nation's water resources. If you have any questions about the provisions in Section 208.10 or the guidelines in Pamphlet No. 1150-2-1, please contact Mr. Steve Dempsey at the address above or by telephone at (817) 886-1607. If you have any questions concerning our regulatory program, please contact Mr. Ken Laterza at the address above or by telephone at (817) 886-1735. Sincerely, ehn R. Minahan Colonel, Corps of Engineers District Engineer w TARRANT REGIONAL WATER DISTRICT 800 East North Side Drive Fort Worth, Texas 76102-1097 BOARD OF DIRECTORS i Georgc W. Shannon, President P.O. Box 4508 Victor W. Henderson, Vice President Fort Worth, Texas 76164-0508 Charles B. Campbell Jr., Secretary Telephone 817-335-2491 Hal S. Sparks III \ \J FAX 817-740-1429 r Brian C. Newby James M. Oliver General Manager December 22, 2003 Mr. Brian Darby ` Dunaway Associates, Inc. 1501 Merrimac Circle, Suite 100 Fort Worth, Texas 76107-6572 Re: M-178 and M-42 Sanitary Sewer Line Abandonment Dear Mr. Darby, • Thank you for submitting the revised plans for the M-178 and M-42 sanitary sewer pipeline and manhole abandonment on the Fort Worth Floodway. Attached is a copy of the approval letter from the Corps of Engineers. We have no additional comments and also approve the plans. ir Please be reminded that the contractor must notify me at least 48 hours prior to construction on District property. If you have any questions regarding this matter, please call me at (817)626-0277 at your convenience. Sincerely, Rick Carroll Senior Land Agent Xc: Darrell Beason Dean Kuhn U:Ifldlet.DOT OFF REPLY TO A11! NTIQN OF oil t40 1429; 12/08/03 1:05PM;JfiJ& #441;Page 1/2 At: 114 DEPARTMENT OF THE ARMY FORT WORTH DISTRICT, CORPS OF ENGINEERS P.O. BOX 17300 FORT WORTH, TEXAS 76102-0300 operations Division December 3, 2003 Mr. Wesley Cleveland Western Division Manager Tarrant Regional Water District 1022 North Calhoun Fort Worth, rexas 76106-0508 Dear Hr. Cleveeland: i am replying to a request from Mr. Rick Carroll of your office for our review.of a proposed sewer line abandonment schedule for sewer lines M-178 and M-42 in the city of Fort Worth, Texas. The proposed work is acceptable and is hereby authorized provided the following comments are incorporated into the final plan: a. Remove the manholes and fill the resulting holes. Compact all Pill and backfill in 6-inch lifts to at least 95 percent of madified density as 'specified in ASTM D-1557. All backfill shall consist of impervious materials. b. Reestablish. Vegetation to its original condition or better. o. Remove all excess material from the limits of the floodway_ My staff reviewed the plans for the proposed work in accordance with the provisions of 33 CFR, Section 208.10, pertaining to work in Federally constructed local flood protection projects and Pamphlet No. 1150-2-1, Criteria for Construction Within the Limits of Existing Federal Flood Protection Projects. We have determined that this proposed work will not adversely affect the operation and maintenance of the Fort Worth Floodway and will comply with the provisions of 33 CFR and the guidelines in Pamphlet No. 1150-2-1. My staff also reviewed the project in accordance with Section 404 of the Caean Water Act and Section 10 of the Rivers and Harbors Act of 1899. Under Section 404, the U.S. Army Corps of Engineers (USACE) regulates the discharge of dredged and fill material into waters of the United states, including wetlands. The USACE responsibility under section 10 is to regulate any work in, or affecting, navigable waters of the United States. Based ;ent'by4 TARRANT REGIONAL WATER DIST. 817 740 1429; 12/08/03 1:05PM;]eJEa1 ►{441;Page 212 i r�I -2- on,the description of the proposed work, other information available to us, and current regulations and policy, we have determined t at this project will not involve any of these activities. Therefore, it will not require Department of the Army authori ation under these laws. However, it is incumbent upon the own r to remain informed of any changes in USACE Regulatory P.ogram regulations and policy as they relate to this project. This authorization should not be considered as an approval of the design futures of any activity authorized or an implication that such ccgs:rucztion is considered adequate for the purpose intended. It does not authorize any damage to private property, invasions of private: rights, or any infringement of Federal, state, or local laws or regulations. Thank yo for your interest in our nation's water resources. If you have ny questions about the provisions in section 208.10 or the guide Ines in Pamphlet No. 1150-2--1, please contact Mr. Steve Derpsey at the address above or by telephone at (817) 886-1607. 11 you have any questions concerning our regulatory program, please contact Mr. David Madden at the address above or by telephone at (817) 886-1741. sincerely, John R. Min an Colonel, C ps of Engineers District Engineer BOARD OF DIRECTORS George W. Shannon, President Victor W. Henderson, Vice President Charles B. Campbell Jr., Secretary Hal S. Sparks III Brian C. Newby May 24, 2004 Mr. Brian Darby Dunaway Associates, Inc. 1501 Merrimac Circle Fort Worth, Texas 76107 TARRANT REGIONAL WATER DISTRICT 800 East North Side Drive Fort Worth, Texas 76102-1097 Y- James M. Oliver General Manager Re: M141 Sanitary Sewer Improvements Project Dear Mr. Darby, P.O. Box 4508 Fort Worth, Texas 76164-0508 Telephone 817-335-2491 FAX 817-740-1429 Thank you for submitting the plans for the proposed M1-11 sanitary sewer pipeline improvements located within the Fort Worth Floodway. We have reviewed the plans and have the following comments: • The contractor must compact all voids surrounding both the proposed and abandoned manholes to 95% proctor density. • All new manholes must be mounted flush with the surrounding surface so that a mower may pass over them. Fill material may be placed around the manhole and transitioned to the surrounding surface if necessary. • All construction materials must be removed upon completion of the project. • All surfaces on District property must be returned to original grades and turf re- established upon completion of the project. • The contractor must produce a stand of grass in the affected area within 14 days of the completion of the project. • The contractor shall follow a Storm Water Pollution Prevention Plan during and after the construction phase of the project. I am enclosing a copy of the . USACOE approval letter for the project. Provided the aforementioned comments are strictly adhered to, we hereby approve the project for construction. Please have the contractor contact Dean Kuhn at (817)229-2565 concerning any no pre-construction meetings and within 48 hours prior to construction. U:lftdwylet.DOT If you have any further questions regarding this matter, please do not hesitate to call me at (817)626-0277. Sincerely, Rick Carroll Senior Land Agent Xc: Darrell Beason Dean Kuhn .. iY L .. DEPARTMENT OF THE ARMY FORT WORTH DISTRICT, CORPS OF ENGINEERS P..BOX 1 76 FORT WORTH, TEXAS 761U2-030U REPLY TO May 13, 2004 ATTE►iT1ON Of Operations Division Mr. Wesley Cleveland Western Division Manager Tarrant Regional Water District .1022 North Calhoun Fort Worth,.Texas 76106-0508 Dear Mr. Cleveland: I am replying to a request from Mr. -Mick Carroll of your office for .our review of the proposed sanitary sewer abandonment schedule for the M-1-I-i drainage basin in the city of Fort Worth, Tarrant County, Texas. This proposed work will impact a portion of the Fort Worth Floodway. This project has "been assigned Project Number 20.0300740. Please include this number in all future correspondence concerning this project. Failure to reference the project number may result in a delay. The proposed work is acceptable and is hereby authorized. My staff .raviewed the plans for the proposed work in accordance with the provirsiOns of 33 CFR, Section 208.10, pertaining to work in Federally constructed local flood protection projects and Pamphlet No. 11$0-2-1, Criteria for Construction Within the Limits of Existing Federal Flood Protection Projects. We have determined that this proposed work will not adversely affect the operation and maintenance of the Fort Worth Floodway and will comply with the provisions of 33 CFR and the guidalines in Pamphlet No. 1150-2-1. My staff also reviewed the project in accordance with Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. Under Section 464, the U.S. Army Corps of Engineers (USAC9) regulates the discharge of dredged and fill material into waters of -the United States, including wetlands. The USAGE responsibility under Section 10 is to regulate any wozk in, or affecting, navigable waters of the United States. Based on the description of the proposed work, other information available to us, and current regulations and policy, we have determined that this project will not involve any of these activities.. Therefore, it will not require Department of the Army authorization under these laws. However, it is incumbent upon the owner to remain informed of any changes In USAGE Regulatory program regulations and policy as they :re:late to this project. -2- This authorization should not be considered as an approval of the design features of any activity authorized or an .implication that such construction is considered adequate for the purpose intonded. It does not authorize any damage to private property, invasions of private rights, or any infringement of Federal, state., or local laws or regulations. Thank you .for your interest in our nation's water resources. If you have any questions about the provisions in Section 208,10 or the guidelines in Ipamphlet No. 1150-2-1, please contact Mr. Steve Dempsey at the :address above or by telephone at .(817) 886-1607. If you have ,any questions concerning our regulatory program.,, please contact Xr. Jim Kelly at the address above or by telephone at (817) 886-1739. -sincerely, inR. I�iinahan s of Engineers District Engineer .. EASEMENTS EASEMENT me mw EASEMENTS Bidders are advised that the City of Fork Worth has not acquired all the necessary temporary construction easements for the construction of the project as shown in the Plans. Bidders are hereby notified that the City anticipates obtaining the necessary temporary construction easements by the start of construction. In the event the necessary temporary construction easements are not obtained, the City reserves the right to terminate the award of the contract at any time before the contractor begins any construction work on the project(s). In addition, Bidders shall hold their unit prices until the City has completed the acquisition of all temporary construction easements. The contractor shall be prepared to commence construction without all executed temporary construction easements and shall submit a schedule to the City of how construction will proceed in the other areas of the project do not require temporary construction easements. s i tr wm ARY SENVER MAIN (M-1-I-1) PARCEL No.2 siz H 01ISTON STREET t Itwl I�AUrCli SURVEY 5 0 No 115 T I OF IEXAS } } OUNT' F I T T } I V EM SANIT ARY SEWER EASEMENT THAT' fi uli dondo, hereinafter referred to as "Grantors", for and in consideration of One b ar 10 and other valuable consideration paid by the City of Fort Worth, a municipal cO Ora " ant County, Texas, receipt of which is hereby acknowledged, do giant, bargai conyMy to said City, its successors .and assigns, the use and passage in, over, across, belo nn the towing parcel or tract of land situated in Tarrant County, card Texas, in aca ce wrt a pi ei o attached: I rACHED EXHIBIT It is further- agreed and o t tb i of Fort Worth will be permitted the use of the above described strip of t or t p os f the construction and maintenance of a sanitary sewer main An ingress and s " ern t shall be granted in order that access may be gained to the above described Penman n ani Sewer ent. TO HAVE AND TO HOLD the above des ' ed r ises, together with all and singular, the rights appurtenances thereto in anywise do u to the said City of Fort Worth-, its successors and assigns, forever And w ere in ur ves, our heirs, successors and assigns, to warrant and forever defend, 011.7 ll an sin lar a 'd premises unto the said City of Fort Worth, its successors and assigns, agar st ry son whomsoever lawfully claiming or to claim the same or any part thereof It is intended by these presents to convey a . glut Of- ay to the said City of Fort Worth to maintain, construct and repair the above descri ed' v ents, with the usual rights of -ingress and egress in the necessary use of such right -of- ayi in said promises IN WITNESS OF, Grantors have cause tliy i h mt to be executed on the day of �✓ �� %{Frax Racaclayd6. RHUW Tb : ROBERT HUMPHREYS, LAND AGENT CITY OF FORT WORTH REAL PROPERTY MANAGEMENT 921 TAYLOR FORT WORTH TEXAS 76102 Page 03NP00W&k d h 'kON� flfG . 4PW AVMMW-" aam 1 I'AliY SEWER MAIN (M41-1-1) F II . �N. 011SION SIREEI' H BATUG$ SURVEY � .�No_ 115 ACKNOVPLEDGEMENP PARCEL No . 2 1SEE E 5 the undersigned authority, on this day personajj� a' l 6®e�?� v known to me, or pro a to be a person whose name is subscribed to the foregoing instrument, and ackoowl ge to a h --,Ws executed the same for the purposes and consideration therein expressed. GIVEN UNDER AND SEAT. Of OFFICE, this ZEtco day of / VELgs vN otary c, to of xas y"t 'map°,� My Commission expires on the O 200'7 f ,x Page 2 of 4 IM .Mr 4J' TPARY SEWER MAIN (M-1-I-1) I E II 9 10USTON STRFEI AUG1� SURVEY B w 1 No.115 EXHI BI7 "A„ PARCEL No. 2 1 E?ein a mint S Sewer Easement situated in the John Baugh Survey, Abstract No j 115, C of ort V F t County, Texas, and being out of e 2 09 acre tract of ]and (by deed) be as c deeded to Ana Yulisa A readoodo as recorded in Volume 15740, Page 53 a ecords of Tarrant County, Texas, said Permanent Sanitary Sewer Easement be' mo ga�iarly described by metes and bounds as follows: in h iro rod found for the southeast corner of a .0 03 acre tract of land (by deod) de�cr' ed ats act eeded to Ana Yulisa Arrendondo as recorded Lou Volume 15740, Pago 53 o sat e,a of Tarrant County, 'I exas, said 5/8 inch iron rod being a comer in the westsai 09 acre tract of land; THENCE South 44 degrees 30 minutes 00 seconds West (Re; fe cc with the south line of said 0.03 acre tract of land and with the westerly line of sai 2 e act f land, passing at a distance of 16.24 feet a 1/2 inch iron rod found for the south t co f aid 0 03 acre tract of land and for the most southerly northeast corner of Lot " ', of e ifford-Ml & .Co Plant No 41 Site, an addition to the city of Fort Worth, if Co t ex as recorded in Volume 388-133, Page 100 of the Plat Records of Tarrant C xas n all, a distance of 5994 feet the POINT OF BEGINNING, said point bein o he theasterly line of said Lot "A"; THENCE South 58 degrees 03 utes t6 s nds E t a distance of 43 64 feet to a point for corner in the east line of said 2. acryl4yct f land and in the westerly right -of --way line of the St. Louis, San F cis & ex Railroad, said point being in a non- tangent curve to the right havi g a ius of 1387 14 fect, a central angle of 04 degrees 40 minutes 16 seco s cbo beating of South 09 degrees 22 minutes 21 seconds West, a distance 1624 which a 5/8 inch iron rod found for the most aorth comer of said 2 tract o land bears a chord bearing of North 05 degrees 51 minutes 03 seconds E t f et; THENCE with said non -tangent curve to the 'ghi; wi t esterly right-of-way line of said St Louis San Francisco & Iexas Raiff with i easterly line of said 2 09 acre tract of land, an arc length of 16 24 feet to po' mer•, THENCE North 58 degrees 03 minutes 16 seconds " es , dis f 53 22 feet to a point for cornet in the westerly line of said 2.09 acr ac and d in the southeast line of said Loot "A", from which a 5/8 inch iron rod fo d fo in the westerly litre of said 2.09 acre tract of land bears South 44 de ees 0 no 00 seconds West , a distance of 3 7 65 feet: THENCE North 44 degrees 30 minutes 00 seconds East, wit we ' 'ne f'said 2.09 acre tract of land and with the southeast line of said Lot c¢ f 1537 feet to the POINT OF BEGINNING and containing 727 squ t or 17 - ores of land, more or Tess Date: October 7, 2003 Curtis Smith Registered Professional I and Surveyor No. 5494 Page 3 of 4 9xi4M--* ti:+W WYII A;IR *-3 PL n AOVl4 � Mik . M i t f V TY F F VVO R RTY A s 927 TA nTYJG� FT WO T Submitter FO 71 WARNING - THIS IS PA Filed For Registration: 07120/2004 03:11 PIA Instrument #: D204225080 �* WD S PGS e0f; By: { Ifll{{! lfl! IIlI{!IL{!lIIII {{III �I!{ !{{U I{!I{llllllll{ {III � D204225080 ANY PROVISION WHICH RESTRICTS THE SALE, RE OF THE DESCRIBED REAL PROPERTY BECAUSE C RACE IS INVALID AND UNENFORCEABLE UNDER F . PROPERTY - 001 ZCFV% ;NDERSON INTY CLERK 'COURTHOUSE ffHERI=ORD 76196-0401 �ZSRR 0 y �fE OFFICIAL RECORD. S I'ARY SEWER MAIN (M-1-I-1) PARCEL No.1 E II 1 HOUS I ON S I BEET L T `° ", BLOCK ONE I I O HILL & CO. PLANT No. 41 SITE 1 S E F IEXAS ) j ) C O I' } E NI SANITARY SEWER EASEMENT I I c THAT —ETC, hereinafter referred to as "Grantors", or d i o eration of One Dollar ($1.00) alld other valuable consideration paid by the City o o a municipal corporation of Tarrant County, Texas, receipt of which is hereby acknow dg , 91 , bargain, and convey unto said City, its successors and assigns, the use and pa ge in, cross, below and along the following parcel or tract of land situated in-Iu y, T xa , in rdance with'the plat hereto attached: 1 �4�] AT"I ACHED EXIIIB11 j i It is further agreed and and tqA Ci f Fort Worth will be permitted the use of the above described strip of Ian f p of construction and maintenance of a sanitary sewer main An ingress and a ss a nt s 1 be granted in order that access may be gained to the above described Penman d er Easement { TO HAVE AND TO HOLD the a described re es, together with all and singular, the ' rights appurtenances thereto in anywise belo . g unt the said City of Fort Worth, its i Am successoIs and assigns, forever And we here in u el , our heirs, successors and assigns, { to warrant and forever defend, all and ' gula the aid emises unto the said City of Fort Worth, its successors and assigns, again y homsoever lawfully Claiming or to I claim the same or any part thereof. It is intended by these presents to convey a righ of- t the said City of Fort Worth to I !j maintain, construct and repair the above described in ov , with the usual rights of ingress ; and egress in the necessary use of such right-of-w j al g said premises.. IN. —WITNESS MWEREOF, Grantors have caul t to be executed on the f .rn day of r= . 20 I 1 f ... I I CIIY QOF FORT WORTH LAND AGENTL'! 37SD p OT REAL PROPERTY MANAGEMENT AGENT- E 927 TAYLOR FORT WORTH TEXAS 76102 i Page 1 of'4 - ! GOR20"OOM & ASSOCIATES. *#C. - 0707 !RE Q� SiA1 ROAD SORE 60 FORT 91ORTK r1r 76112 PK 617-496-1424 rw 6 -496�, 766 - -- - _� „ - - -- - - - -- t IrFD-MLL. RY SEWER MAIN (M-1-I-1) OU&fON STREEI ",BLOCK ONE & CO. PLANT'No.41 SITE ACKNOWLEDGEMENT I S7 F* PARCEL No..1 CO[JN0 T BEFO , t , '�d t 41 the undersigned authority, on this day personally a e ell known to me, or prow to e e e person whose name is subscribed to the foregoing instrumclt, and acknowled t np t she executed the same for the purposes and consideration therein expressed. GIVEN UNDER Y SEAL OF OFFICE, this -J ,the day of N P lic, State of Texas `wisn�;nwa My Commission expires on the 20 AZO Y SEWER MAIN (M-1-I-1) PARCEL No 1 USION STREET BLOCK ONE -HILL & CO. PLANI No. 41 SITE EXHIBIT "A" �Ino /V IIein�g-a't , eat a"' Sewer Easement out of Lot "A", Block One of Gifford -Hill & Co. Plant N . 41 ' additi n to the City of Fort Worth, Tarrant County, Texas, as recorded in Volum 3 133 age * the Plat Records of Tarrant County, Texas, said Lot "A" being deeded t Gi rd- o., c as recorded in Volume 3600, Page 242 of the Deed Records of Tarrant as, d Permanent Sanitary Sewer Easement being more particularly descn�ed b etc d nds as follows: COMMENCI t 519 inc iron rod found for the southeast comer of a 0 03 acre tract of land (by deed) d be as •a t III eded to Ana Yulisa Arrendondo as recorded in Volume 15740, page 53 of ai Dee o o Tarrant County, Texas, said 518 inch iron rod being a corner in the wester line of a e tract of land (by deed) described as Tract II deeded to ' Arta Yulisa Atrendon r o'rd in Volume 15740, Page 53 of said Deed Records of Tarrant County, Texas; THEM ou ees 30 minutes 00 seconds West (Reference Bearing), with the south line of sai 0 ct f land and with the westerly line of said 2 09 acre tract of land, passing at a distant of 16, eat/2 ' ch iron rod found for the southwest comer of said 0 03 acre tract of land d or c in st h 1y northeast corner of said Lot "A", in ail, a ! distance of 59 94 feet to the T G ING, said point being in the southeast line of { said Lot "A"; THENCE South 44 degrees 30 n s 00 secon st, with the southeast line of said Lot f "A" and with the wester line of sai 09 acr tract of land, a distanceof 15.37 feet ' to a point for comer, from which /8 ' on d found for comer in the southeast lint of'said Lot "A" bears So 44 gre 30 inutes 00 seconds West, a distance of 37.65 feet; E THENCE North 58 degrees 03 minutes 1 econ ri distance of 116.46 feet to a point i for corner; THENCE North 11 degrees 28 minutes 55 seconl s)ostance of 68.29 feet to a point for ! comes in the south line of an existing .0' S et Easement as recorded in 1 Volume 388-133, Page 100 of the Plat Re f Taman County, Texas: { IHENCE North 69 degrees 10 minutes 48 secoads as wi uth line of said 15.0' ' ` Sanitary Sewer Easement, a distance of 15 20 eet to po' f cornet, r THENCE South l l degrees 28 minutes 55 seconds East, a di anc f 3 feet to a point for ' comer, t THENCE South 58 degrees 03 minutes 16 seconds East, a 'st f 11 . 4 feet to the ! t POINT OF BEGINNING and containing 2,718 sq .62 cres of land, more or less 1 / Date: October 7, 2003N. - I I Curtis Smith •GL' •. •5 7 Registered Professional Land Surveyor r O 54s4 ...,Q, No 5494 Page 3 of'4 - - - CORRONDMA R MSOLWR S. 61C. _ $707 # 4TWTO STIUR flOAD SMIC 50 FMMoRnt Tx 14112 ML 617-"5_1424 FH( 9 _41� - 768' .� • EXHIBIT L PAR CEL No. 1 o �Wg I SO SN ' I JAE �AB LINE LENpTrH ING ���• o°oo'�y I I L-2 i SI B 9 10'48* l ox ///// I I o I C Sf0 kE BURDING •t43.. N 1 '� TRACT n aos ACRES (a+ oFm) I t'•3 a: 3f.,�_.iq O� ATU TU" ARAETrD01400 ram, J Y�•�,.. w vOwlre 15740- PALL 13 "A T C 7 f � tp •;.:; Tx j�`ruT f M: •�2'/,.'ink.. __ — -..—.. .. _ — °j?c P NANENT SM➢i/i�Y SEWER CASEMENT-D - a1s�pf cz Ac P.O.C. FNo 5/6vt f �O PASSFIG O 16.24 J FNO 1/2'IRON ROD Bp�g:a7c sk...,lw'tz61,Q /gyp LOT "A" BLOCK ONE J GIFFORD—HILL & CO_ PLANT No. 41 SITE � VOLUME 388-133. PAGE 100 ti rr I P.R..TC.T_ .� /pa (BY GIFFORD-•HILL- & Co.. INC. VOLUME 3600. PAGE 242 FND 5/4-M T J m an EXHIBIT SHOWING A 1 15 0 PERMANENT SANITARY SEWER EASEMENT vj 8�0 PORTION A OF r. I LOT "A", BLOCK ONE GIFFORD—HILL &+ CO­AGOTPLANT No. 41 SITE ••••. s CITY OF FORT WORTH, TARRANT COUNTY, TEXAS RECORDED IN VOLUME 388-133 PAGE 100 OF THE PP}L�AT RECORDS OF ARRRANT COUNTY, TEXAS - WEE S COU SITI AREER M 2 718 4 ARE FEET OR 0$ OAJ.'RNo. ES 4296 SC J08 ,^f�0{. Tp—T. P Br. RCS FILE: 134 FSWTZM REGISTERED PROFE ATE OC7pBER 7. i PACE 4 OF q p4� E 1' r 31 �j(; �j�44 -^ RA(NgONA d ASSOCIATES INC. B737 . W STA� ROAD. ITE 224 • FART WORM.. TX. PH. A}? jR6—tits— FAX 81: '1788 I BY 927 TA R �W T Submitter. K:F WORTHIREAL PROPERTY - 001 ZCF1A NE HENDERSON A T NTV CLERK RR N O tM COURTHOUSE ATHERFORD F 76196-0401 1rC> No E OY WARNING - THUS IS P 1A RECORD. Filed For Registration: 011271200410:29 Am Document No.: D204027645 WD 5 PGS L I Ilfllll Ilfl fllll IIIII lllil IIIII IIIII 1111111111111111111 IN D204027645 ANY PROVISION WHICH RESTRICTS THE SALE, RENTA OF THE DESCRIBED REAL PROPERTY BECAUSE OF Cl RACE 1S INVALID AND UNENFORCEABLE UNDER FEbE db .4 no 1 S TARY SEWER MAIN (M-1-I-1) PARCEL No. 8 E II _ 7 AMUELS AVE. F. . LLIKEN SURVEY A, CT No.1045 I , SI E F IEXAS } i C +L. O I } �V E SANITARY SEWER EASEMENI THAT I, H u K fler referred to as "Grantor", Ayr and in consideration of One Dollar (31.. } o er le consideration paid by the City of Fort Worth, a mutncipal corporation T t ounty, Texas, receipt of which is hereby acknowledged, do grant, bargain, and c vey sar City, its successors and assigns, the use and passage in, over, across, below an a g t o11 wing parcel or tract of land situated in Tarrant County, Texas, in accordance with e p t et attad: S ATTACHED EXHMIT It is further agreed and unde to th Ci f Fort Worth will be permitted the use of the above described strip of Ian fo p f construction and maintenance of a sanitary sewer main. An ingress and e s t s be granted in order that access may be gained to the above described Permanern ry S Per Easement. TO HAVE AND 10 HOLDthe a e described emi together with all and singular, the tights appurtenances thereto in anywise be] o g unt the' said City of Fort Worth, its successors and assigns, forever And we her in elv ,out heirs, successors and assigns, to warrant and forever defend, sU and s' gulcr e rd remises unto the said City of Fort i I Worth, its successors and assigns, again ev Mson homsoevei lawfully claiming or to claim the same or any part thereof It is intended by these presents to convey a righ f-w to the said City of Fort Worth to maintain, construct and repair the above described ' p v en , with the usual rights of ingress t! and egress in the necessary use of such tight-of-wa , al g said premises. IN WITNESS WHEREOF, Grantors have caused t ' t to be executed on the 15th _ day of December , 2003 ESTATE OF S, DECEASED I , Helm itc a es; nt cutrix lnvm +eecoaD,Na ,csncr.,v ra r V ROBERT HUMPHREYS • LAND AGENT M & C: CITY OF FORT WORTH REAL PROPERTY MANAGEMENT 927 TAYLOR AGENT; D E ; FORT WORTH, TEXAS 76102 i I Page 1 of'4 000W"DOHA d ASSO(XAIM IKC. • 5707 9f%t0TW0,q2 STAR RW $Mt 50 FORS W IRTH_TX 76112 PN. e17-496-1424 FAX at7_s96- d F s r- 10 a'AI sat me as me • r i 201 l�FI ARY SEWER MAIN !,A ELS AVE. i LIKEN SURVEY 0..1045 _ 67? ACKNOWLEDGEMENT PARCEL No. 8 BEFOR Vxtkvs tL+MbcvlvQ he undersigned authority, on this day personally app ed, i t h e known to me, or prov to th person whose name is subscribed to the foregoing instrument, and acknowledged e t e/shecuted the same for the purposes and consideration therein expressed. GIVEN UNDER AND SEAL OF OFFICE, this %5* the day of KIMBERLY S. DYEss AzJ !yam Notary P1,11 State of Va MV.-satin Expires � y Public tate ofTftas ' n7 October 08, 2004 My Commission expires on the of - G�ObCr 20 o4 I i I� Page 2 of 4 �0�/rr0eraa i AMMM to — am lrWICIM WM Eaap_ vx% 1d_ PW Wn. to 14 111 rK 2'.-O.-ml. rice ei r. am M f S 1ARY SEWER MAIN (M-1-1-1) PARCEL No.. 8 EII � 17 AMUELS AVE. F. LIKEN SURVEY ' CT Na. 1045 i i � EX$IBIT "A" Being a t S er Easement situated in the F- G. Mulliken Survey, Abstract No. 1045, City of rt o an y, Texas, and being out of a tract of land deeded to Harry Kithrts as recorded Vo e 3 e 888 of tlie--Deed Records of Tarrant CountyTTexas, said -Permanent SanitarySew Eas en a ore particularty described by metes and bounds as follows; COMMENC G�ar a 3/ m n rod found for the most southerly southwest cornea of Lot 9-RD of the Northpark Bus , an a "tion to the City of Fort Worth, Tarrant County, Texas as recorded in Volume 388-129, g 6 0 PI t Records of Tarrant County, Texas, said 3/4 arch iron rod being the southeast comer of I. t oc 1 0A Fmhwirth Addition, an addition to'the City of Fort Worth, i Tarrant County, Tex r i t A, Slide 6755 of said Plat Records of Tarrant County, T'exas, from which a 1 in iro d and for the southeast comet of said Lot 9-RD bears North 78 degrees 21 minutes 30 s t, 'stance of 36718 feet, said 1/2 inch iron rod being the southwest corner of Lot 9-RC of o ar mess Center; THENCE South 59 degrees 10 minutes 44 seconds East, a distance of 4 . t a oint; THENCE South 13 degrees 14 minutes 47 seconds East, a distance of 170.37 f the P 21'rMENumber G, said point being in the north line of said Kithas tract of ]and, said pout t so m 3 54 acre tract of land (by deed) deeded to Tarrant County Water Control ov a One as recorded in Volume 2500, Page 157 of said Deed Records of 18r Co exa rom which a 5/8 inch iron rod found for reference in the north line of said Kithas tract o d i e south line of said 3 54 acre tract of land bears South 77 degrees 55 minutes 32 seconds We ad' ce of 190.0 I HENCE North 77 degrees 55 minutes 32 secon art, nth a north line of said Kithas tract of land and with the south line of said 3 54 el o Ian a distance of 15.00 feet to a point for I I .corn=;. IHLNCE South 13 degrees 14 minutes 47 s t, cane of 111.75 feet to a point for corner in the south line of said Kithas tract f land . being in the north line of a 226 acre tract of land (by deed) deeded to Tarr Wa Control and Improvement District Number One as recorded in Volume 25 , e 8 of said Deed Records of Tarrant County, Texas, from which a i/2 inch i d f nd or the northeast comer of said 226 acre tract of land bears North 76 degrees 5 utes 3 onds East, a distance of 237.83 feet, said 1/2 inch iron rod being in the sou a Ki tract of land; THENCE South 76 degrees 05 minutes 03 seconds West, i tBe . u line of said Kithas tract of I land and with the north line of said 2 26 acre trac of a e of 15.00 feet to a point for comer, IHENCE North 13 degrees 14 minutes 47 seconds West, a distan of f Ito the POINI OF j BEGINNING and containing 1,680 square feet or 0.03 acr d re. or less.. Note, Basis of bearing being referenced to the Northpwk Business ent P w' h controlling ' monuments shown hereon. I Data October27, 2003 Curtis Smith Registered Professional Land Surveyor •CUR •.. _ No 5494 .. ... asu 7 Page 3 of 4 CORRONOCNA s AS,?OCUrEs, WC. • a70T Tpy�pp 67 RNn RRt 3O FORS W.M. tx 761E . AL e17-19e-U44 rAx a1 -06 .09 sw w" .. I" *' f CNEJTABLE L ^' BEARING L 1 77'55'32' E L-< 5. ,76-05'03'W i I J� G Wow r 4' "Lll 9' " for eta lJ l l L ."Ocr , PARCEL No. 8 cFrtxsr �. star R766 raxar. FND 5/8' 0 25 50 100 SCALE FEET � 4 Nt o � $ �r 1 y m FNO 3/4.MN RM Q, y tin 1 �4ti� to ty y h GO � I FND 1/2-MM ROD s` 1. 'I VOLUK 24rtTACE 2 7 - FND //i N1CHOLAS HARRY KITHAS woN Rao VOLUME 5326, PAGE 325 D_R.T.0 T. i Ls v THL AgfiE VE Na P NESS CENTER W GN SF105K1 HEREON S EXHIBIT SHOWING ` A �• 15.0 PERMANENT SAMTARY SEWER EASEMENT '• ; BEING 51111ATED W THE ,,..�:: ' I�•{• F G. MULLIKEN SURVEY .={t ABSTRACT No. 1045 CITY OF FORT WORTH, TARRANT COUNTY. TEXAS _ PROJECT: SAKI SEWER M-1-t N 11 DOE No. 4296 BASEMEN A� YIO AR�0.: 180 5 F E7 OR 0 9 /\CRC. CT S SMI 3EBDR.i C3NEg T, S FDATE: 06 M-2. 2003 PACE 4 g4�y,��F SCKE: , kNO. 5494CORRONDONA R ASSOaATES.. 1... 87JT7.-_pO'-/. SFAEi ROAD `IRf 224 fORi WARt}1hT7f.�PN. 1=7fT96-1{24 FAX S1T 496-( 68 M C F WO H R Ty A MENT 927 TA R FT WO TX 'Wi Submitter: F WORTHIREAL PROPERTY - OD9 ZCn NE HENDERSON A O NTY CLERK R N O COURTHOUSE 1 7 THERFORD FO 76196-0401 E OY WARN11VG - THis 1S Pk�r-ldF,PfE OFFICIAL. RECORD. Filed For Registration: 02/05/2004 01:08 PM Document No.: D204039422 WD 5 PG5 (mom. By. 1IIl1111IN llill IN IN hill M1 IIII 111111111111111111 D204038422 ANY PROVISION WHICH RESTRICTS THE SALE, RENT OF THE DESCRIBED REAL PROPERTY BECAUSE OF COa RACE IS INVALID AND UNENFORCEABLE UNDER FEDERA s CO 1. -40 2. 3. 4. 5. • ARY SEWER MAIN (M-1-I-1) 1i SUBDTYISION • TARPARI-T" CO ? EL No y1121 Plf SWAM 44 Bye, Y LR ON T SANITARY SEWER EASEMENT That cline .treslv Earline Wall or Mrs. Lewis D. Wall, Jr.), hereinafter called' �� sum of $1.00 and other valuable consideraon paid, receipt of whi b ac wledged, by the City of Fort Worth, a municipal corporatio air un , Texas, hereinafter called Grantee, does hereby grant, sell and c v to C' ntee an easement and right of way upon and across the property of the r r situated ' arrant County, Texas, particularly described by metes and bo ds and pla n Exh' its "A" and "B" attached hereto and incorporated by reference (the "I sett ) . The right-of-way, rights and F purpose of placing, operating, replacing a sanitary sewer line_ The easement, rights and privileges herei Grantee shall operate a sanitary sewer line w described, for said period of time, Grantor h •eb�t legal representatives, to warrant and forever de Grantee, its successors, and assigns, against every claiming or to claim the same or any part thereof. i shall be used only for the maintaining, rebuilding and Grantor grants Grantee an exclusive easement for placing,, repairing, maintaining, rebuilding, and replacing a sanitary only for so long as Easement as above elf, his hefts, and nt and rights unto 04oever lawfully. In addition to the easement, rights, and privileges herein above shall have the right to use so much of the surface of the here' property of Cnantor as is shown on attached Exhibit "C" as easement in order to allow Grantor to re-constauct and install within way granted hereby the sanitary sewer contemplated by this grant (the PERMANENI SAINHARY SEWER EASEMENT 0 r, u 'onstruction Easement'): Upon the completion of such construction and in tallation, Grantee shall replace and restore all fences, or other structures which y have been relocated or removed during the construction period to as good as � r condition than they existed immediately prior to construction and i la on. The Temporary Construction Easement shall terminate upon the et fro pletion of the above described work, or A ril 30 2 VA Gr ►A �� ghts and privileges otherwise granted hereunder shall terminate or, such, as the purposes hereof cease to exist, are abandoned by Grantor iso s, serves, and shall continue to enjoy the use of all or any portion o 'VJL oily ran and all purposes which do not prevent the use by Grantee of e asei d g but not limited to, the right to build and use the herein giante ease a or ainage ditches and private streets, roads, driveways, alleys, walks, gar s, lanting or parking areas, and/or to dedicate all or any part of the pro p this easement to any city or other governmental or quasi -government agarlc or se public street, road or alley. Grantee is granted rcasl repair,, operate, maintain, 9 Grantee shall use its best efforts adjacent to the Easement as ha Grantor and verified with the Gra 10 it. f .. 12. 13. and egress onto the property to construct, replace tl tiitary sewer.. gage to any trees located on or or marked by the undersigned Grantee, without further damage to the pr pe�ha I clean up and haul away any brush, trees or other vegetation required t be tri med or removed in the course of installing the sanitary sewer line. Grantee shall use its best efforts to avoid an g e soil grade of the property, and upon completion of installation er ne to smooth and restore any changes in the soil grade necessitated bye ' st a n of that sewer line, -IN Grantee shall not store or park equipment or materi outside of the Easement and Temporary Construction E, This permanent sanitary sewer easement shall bind and inure i respective parties, their personal representative, successors, and PERMANENT SANIIARY SEWER EASEMENI preppy WITNESS WHEREOF, the instrument is executed this day of 2004. ,. Earline Prescott ACKNOWLEDGEMENT THE STATE OF T X. S COUNTY OF TARRAN § _ H BEFORE ME, %.,ne' %& he undersigned authority, on this day appeare , known to me, or proved to me to be th pe n whose a is subscribed to the foregoing instrument, and acknowledge to that b execu d the same for• the purposes and consideration therein expressed.. �/ GIVEN UNDER MY HAND AND AL F FICE, this ��/ the day of Notary F My Commission expires on the Al day of 20_Q�L. After recording return to: Robert HumpbMm, Land Agent City of Pon Worth 900 Monroe St, Suite 302 Fort Worth, TX 76102 PERMANENT SANITARY SEWER EASEMENI SA71}TTARY SEWER MAW (M-1-I-1) PARCEL No. 12 PHASE rr GREEIt STREET LOT li SALLIE -1ERR.ELL SIIBDIVISION g armanent S• Sewer Easement aftwed in the F 0. Mulhlcen Survey, Abstract No. 1045, City Fort o ant County, Texas, and being a poitton of tot 11 of the Sallie Terrell the City of Fort Worm, )'arrant County, Texas as recorded in Volume 1624, age 4 of e D rds of Tanaut County, Tn=,=d also being a portion of a tract of lead being ed Wall ]r as ieoorded in Vohznna 1872, Page 457 of the Deed Records of Turmt Co . Te ':,, a ' ent Sanitary SewerEssement being morepatticutsrly desasbcd by mdea and 110 W9: , Co C Gat 3/4 ' found for the moat Foutheriy southwest comer ofl.ot 9-RD of the Northp cn to the City of Fort Wortb, Tarrant County, Taus as recorded in Vohrme 3 -129, P e 1 lest Records of Taraat County, Texas, said 3/4 inch iron sod being the southeast eo AlR Fs ock 1 of the Fruhwirth Additions, an addition to the City of Fort Worth, Turaut Cauuty, Mags~z`eco ed Cabinet A. Slide 6155 of said Plat Records of Tarrant Ceuaty, Iexas, from wbic i _hod i and foI the southeast coma of said Lot 9-Rp bears Nolte 78 degrees 21 vpiaatcs 0 ds 1 di ante of 67.18 feet, said M2 inch iron rod being the southwest corner of Lot 9-RC f a ark or, THENCE South 59 deVeoa 10 mirmtes 44 seconds Favt, a disfauc -0 93 f, t poi CE South 13 dogrees 14 minutes 47 seconds a distance of 356.65 eat a >7 CB South 05 degiaes 02 minutes 42 seconds East, a distance of 246 69 foes to a Guth 20 degtem 24 minutes 5a seconds East, a distance of i 2.72 feat to the ]P I OF �G, said poled b ' the firth hue of said Lot 11, said poW r also being in the south lino of of land deed .�s A Stewart Jr. and Anita S. Clarrda as recorded is Vohrme 6373, Paso 662 of said Deed ds of Tarn County. Teems; rB.XKCE North 74 degrees 11 minut s Ens With north line of said Lot 11, with the north line of said Weil tr of lan and ' the th line of said Stewart tract of bud, a distance of 15, 05 feet to a po t fez fro ch a 3/8 inch, rod with cap etampad `TPC 1382" found for the no corner Qe ant deeded to-Farnu t Canty Wader Control and I1.,�u --I District rc: ia as Ieco ed in VoEm+e 2527. Page 560 of said Deed Records of Tarrant County, T 4 degrees 11 minutea 43 seconds East, a distance of 149..02 feet said S iron d w cap stamped gtPC: 13V- also being in the north line of said Lot 11; r THENCE South 20 degrees 24 minutes 58 seconds East a co 12 eat to a point dbneocnsr j do the south line of said Wall tract of land; said Dint north lime of T.,ot I of CraaMl's Addition, an addition, to the City of P W T , Torw'as recorded in Vohrme 654, Pago 515 of said Deed Records o arson vtrty, YBNNCE Sorith 74 degrees 11 minutes 43 seconds West; with the a line .sax tract of land end with the north line of Lot I 1 of said CrzoWs of 1051eet to a point for coiner; TMWC11 North 20 degrees 24 minutes M seconds West, a distance of 1 f to th OF BRG�G and containing 1,669 square The or 0 038 acres of a@ r 1 I " Note. Basis of bearing being referenced to the Northpsrk Business Ceuta- c morarmeats shown hereon Date: October• 27, 2003 �E OF I l3 1T Curtis S�miths,�4w'Qt i Re Lan m-ed Professional d Saveym A �'9,l`4. st j j _Gl*R"ONA a ASSOCtATM W. clo7 BPDri V SM ROAD -VXT M FORT Wo". rt 76112 •.PK 617-4"-1474 FAX 611-490-flft -- .x wo no c r dw no aw No me I y \ PARCEL No. 12 FRD.B7�7'kIdQT770F , DETAIL A i C/e4VdY 1stmr nu (NOT TO SCALE) .1 G jis t'j0 6? l� ,A \ no 3/4mw moo In oil lq* \i�w �ZNT EDGE OR iMILM wwKE wLuuE \ LOT it r p� Sao. VOl NE 723�, PAGE 68- ORT.C,T ZOT 10 . r 'J'4 qb0 LOT (0 d c' vs 01�r r N E07' 9 y t+ fy A� Zvi �e y p \ LOT 8 `o�s \ li \ %' LOT 8 w Duerr WING A - 1 15 O' PERMANENT SANITARY SEWER EASEMW Il B lT SUM AA PORDIOM OF LOT1 SALVE TERRELL SUBDIVISION • AN AMMON. TO THE V CfrY OF FORT WORTH TARRMFr COUNTY, TEXAS RECORDED W -VOLUME 1624 PAGE 274 r OF NNE PLAT RECORDS OF TARRANT COUNTY, TEXAS �t1 T ACOU� ON AREA: 1.869 SOUARE11 FEET OR--0.038 A REIPOE S 4298 J HO. 020S-t346 I ORAwN ei: ACS fYO(1 F1.'1{¢�SUTAWO OATS OCTOM 27, 2OW PAGE 4 OF 4 GORROM MA AeM17�'/GC WI' uu-•n uee.r.........-... ..« __- — -..• ,�o a mac, FWD lAr ROM RDO yy ' 0 ,30 60 120 ih SCALE IN FEET ! LINE TABLE 1 ! { UNE LENGTH BEARING -i _ 356.65' S 13'14'47'E L S 0602'42-E I L- 2.72' S 20'24'581E L= 15.05' N 74'11'43"E L 5,-`i,11.24' - S 20'24'58'E { Je'CQ• y6.08' S 7411'43WI L- 7,- 1 yY.2,4' N 20-24.58-W NREGSTEREO PROFESSIONAL IAHD SIMEYOR = INO. 5494 1 fir to rtts .w TOrra.l Cantyy Water C.an trui And Imptorem.nt Dtahid Number On. y 1 ` Com—t 0A.7CT. 1 f`r 1 5 . i� 1 } SCALE* V = 80' _ •--� ROP S �� f 10 A,Dii ARC S ER �! I ch.ii" A St...rt 4 A. Cards '~ 1005 sornuels Aruw rant W.CU% T.ms 75102 %=/341 O.R.TGT. Y.A Additb+ P Y N UCTION� M5NT 0 Tement C:.iwtr lsotr Co.hat .! LnpraWl.Mt 7r.teSct 1ie�b.r Oae 23t}/3!6.00. TCT. I r Torront Co.ty Matt C-'" . W I Ol.biot f imprv__t th,mb.r 0.. j=/541 0.1t MT i Ji • I i f Torrent county Ymt.r c_tm4 CU4ict I _ And lmprov _t iWnb.r One 1 Eu.m.nt 2322/341 0R.Tt;i t 1 l I I � t T _ t Tarr.nt cavaty we C.ntrd An0"YnprAv mk WbW �I Numbw a+ I , \ ® Eaffm"mt I 2l17/5�0 iti 2727/SS7 1 1 �® � ; SS Tl.ewls D. Jr. wall do Eorllne s� , r ��. g Dip 2700 Heartwood Dr F Wlorth, Twm 1610 .1 — / Coto a,:«a,Na°`in Sits GREER $T �� art �v!i ln�r sr c TerrWI, Shcla.Subdivision `- `� h Wnrra 1od twn Lot 11 �\ \\ ! tat n ♦ I 7mr l Casdy ty.ty cowal And Vnvoft nt \♦ Y.'.1 4—ky Ylbtw c o1 W\ \ Oktfkt .*4ffTtw On. \ And inprowmmt 0181ekt Hum On t5\ \ \ ♦ E.�.m.nt ]S17/'J60 ! ii17%9 C " \ \ Easnrwnt SI�/597 O,RT..0 F. ♦ QA.TC.T. \ \ 1 V TEMPORARY CO S EMENT HIEIT L- 21 EXHIBIT Dunaway miners Planners C Associates, Inc. L` d=pe; ects 17at !.t..4.Y CMi. Sll 100 adt Wi.1n T1[ 1..M O.. .�� tv .�1. �. � �.+ r.- ....�. � •. � �� � . no Y CI OF F A 900 m O FT WO Rx Suhmitter: 1 S - LAND AGNT SUl 302 TX �M, NE H RTTT T T RA U 0S'T W� 0 WARNING - THIS IS P Filed For Registration: 02/0112005 02:44 PM Instrument 4: D205031310 OPR 7 PGS By: --- — 11111111111 I111IN1111111111111111111111111INIII) D205031310 PROPERTY - 001 ZCM PTY CLERK tCOURTHOUSE THERFORD 76196.4401 r4d RECORD. ANY PROVISION WHICH RESTRICTS THE SALE, RENTAL t OF THE DESCRIBED REAL PROPERTY BECAUSE OF COLq RACE IS INVALID AND UNENFORCEABLE UNDER FEDERAL F pia a 1l A H Y SEWER MAIN (M 1 I-1) PARCEL No.11 b: II 4:BSS, 11?b:LS AVE. 'oh ULLYkaO NSURVEY tACT No..1045 �UWVT T OF TEXAS } UN TANAWT } NT SANTTARVftWER EASRMENT THAT 1 A� . pt wart Jr. and Anita Garcia hereinafter refereed to as "Grantors", for and in eons era ' n ofrprae Dollar ($ 100) and other valuable consideration paid by the City of Fort Worth, m ration of Tarrant County, Texas, receipt of which is hereby acknowledged, t, g and convey unto said City, its successors and assigns, the use and passage in, o r, c low,1d along the following parcel of tract of land situated in Tavant County, I x a d by %nth the plat hereto attached: STTACHED rxtuxiii .w It is ftuthei agreed and un'ityf_ Fort Worth will be permitted the use of the above described strip of ]an r th se the construction and maintenance of a sanitary sewer main. An ingress and a em shall be granted in order that access may be gained to the above described Permanen amt Sewer Eas ent TO HAVE AND TO HOLD'the above des ed pr es, together with all and singular, the rights appurtenances thereto in anywise on ` g unt the said City of Fort Worth, its successors and assigns, forever And we reby ind. Yes, our heirs, successors and assigns, to warrant and forever defend, all a, d -rig ar, e s 'd premises unto the said City of Fort Worth, its successors and assigns, again t ev ry pe oa whomsoever lawfully claiming or to claim the some or any part thereof It is intended by these presents to convey a h f--w y maintain, construct and repair the above describ i v and egress in the necessary use of such tight -of- , in ^IN�-� i�' )(TNESS WHEREGF. Grantors have caused is J7C ! T•� day of%t j , 20 r^ l k C.hAR,�es kyw*. RFe0)W1N6. Rja-&AU 70 Robert Humphreys, L.md Agent city Of port Worth Real Property Services Emincetiny Depattnunt Id S C: , L=e 900 Monroe Street Suite 302 Fort Worth Texts 76102-6302 Page 1 of 5 Goh, rw- i + Saujarr5. mp. . BV7 W"."aw .W% 511fE 'c Ktlf Wo Jµ ix HLIT f71. A"-IfF-'M* r}i 477- OE- the slid City of Fort Worth to s, with the usual rights of ingress �id premises. t to be executed on the y me .0 AW SEWER MAIN (M-1-I-1) BLS AVE. IKEN SURVEY Vo.1045 ACKNOWLEDGEMENT THE i PARCEL No.11 BE N9jjC the undersigned authotity, on this day personally app dknown to me, or proved t m o e t e p n whose name is subscribed lo, the foregoing insttummt, and acknowiedg to me �h e xecuted the same for the purposes and consideration therein expressed GIVEN ER H SEAL OF OFFICE, this-a=the day of JoM MA. .�j notary Public (} J ��' 0 '•, , v sute of Tex" N lie, State of Texas . _Camp[. iaDkes /f•t'120pb My Commission expires on the 20 Oio IHE SIAIE OF TEXAS COUNIY OF TA.RRANI BEFORE ME, th authority, on this day personally appeared, known to me, or proved to me to be the person whose mane is subs Ze oregoing instrument, and acknowledged to me that he/she executed thtr same r and eonsideratTon therein expressed GIVEN UNDER MY HAND AND SEAL OF OFFI is the day of ,20 Notary Public, State ofTexas�'X' My Commission expires on the day of 20 Page 2 of 5 GvFKJrXNA a'*-PXWm. 1K. . sxa VrW*nMn cr, x W_Q UQ[ so .MW KAkL Ix au 12 AL a17-40-r S+ .+x as? pm-1 ' rrARY SEWER MAIN (M-1-I-1) PARCEL No.11 EII 100 '41ULLS AVL. t .>s 1 N SVRVFY S C3 No.1045 Y EXHIBIT "A" Being P an t S ewer Basement situated in the F. G. Mullilcen Survey, Abstract No 1045, ' o oit W rrant County, Texas, and being out of a tract of' -land deeded to Charles A tcw 'ta S- Garcia as recorded in Volume 6373, Page 02 of the Deed Records o ty, Texas, said Permanent Sanitary Sewer Easement being more particularly d s and bounds as follows: COM2aENCIKG t a c iron r d found for the most southerly southwest corner of Lot 9- RD of the Northp k usi es C er, an addition to the City of Fort Worth, Tarrant County, Texas as recorded 'n um , Page 16 of the Plat Records of Tarrant Couaty,'Texas, said 3/4 inch iron r g e s east comer of Ldt AIR, Blockof the Fruhwiitli Addition, an addition to the City o T'anant County, Texas, as recorded in Cabinet A, Slide 6755 of said Plat Recor s t Co nty, Texas, from which a 1/2 inch iron nod found for the southeast corner of said t RD a orth 78 degrees 21 minutes 30 seconds East, a distance of'36718 feet, said lit in it be' g uthwest comer of Lot 9••RC of said Northpark Business Center, THENCE 059 a minutes 44 seconds East, a distance of 1.48.93 feet to a point, THENCE So 1 minutes 47 seconds East, a distance of 356.65 feet to a point; THENCE South 05 es minutes 42 seconds East, a distance of 147.66 feet to the POINT OF BEGINNING, d Dint being i north line of said Stewart tract of land, said point also being in the south a of a 1.6 cre tr ct of land (by deed) deeded to Tarrant County Water Control and Improvement Dis et N el a as recorded in Volume 2522, Page " 541 of said Deed Records of Tarrant Co , Te s; (HENCE North 74 degrees 07 minut 59 nds ast, with the north line of said Stewart tract of land and with the sout a of acre tract of land, a distance of 15 27 feet to a point for corner, from m /8 in iron rod with cap stamped "Metro Aerial Survey" found for the south t rfq o said 1.66 acre tract of land bears North 74 degrees 07 minutes 59 se d a stance of 176.13 feet, said 518 inch iron rod with cap stamped "Metro errS eing in the north tine of said Stewart tract of Land; THENCE South 05 degrees 02 minutes 42 seconds st, a di of 99 87 feet to a point for comer, IHRNCE South 20 degrees 24 minutes 58 seconds East, a s o 1 feet to a point for cornet in the south line of said Stewart tract of l d, d Din in the north line Of Lot 11 of the Sallie Terrell Subdivision, an ditron t {{ty of Fort Worth, •* Tarrant County, Texas as recorded in Volume 162 Pa of did Deed Records of Tarrant County, Texas, from which a 5/8 inch ' d ca stamped RPC 1382" found for the southeast comer of an easement d de ounty Water Control and Improvement District (dumber One as reco 'Vo a 28, Page 9 of said Deed Records of Tanant County, Texas bears N h 7 d I1 minutes 43 seconds East, a distance of 149:02 fed, said 518 inch ' r wi stamped "RPC 1382" being in the North line of said Lot 11; I'HENCR South 74 degrees 11 minutes 43 seconds West; with the south B e ewart tract of land and with the north line of said Lot 11, a distance of 1 0 t t nt for corner, Page 3 of 5 r *�eoi01N['7rK � MF rrW +wpR�ugn !pR AUYi sia�C yj M'F" IiiVeir, ;v �Eh12 go-,. e,7 �'.--,�» rwi �i�f+yo- ��/ M f� w so North 20 degrees 24 minutes 58 seconds West, a distance of 2 72 feet to a point for comer, North 05 degrees 02 minutes 42 seconds West, a distance of 99.03 feet to the POIIVP OF BEGINNING and oontairiitig 1,527 square feet'or 0.'035 acres of land ore or less. of beans being referenced to the Nortbparlr Business Center Plat with controlfing OCR 0° Date: October 27, 200� ( � Cbrtis Snuth Registered Professional L and -Surveyor Is No 5494.......... " SURd •" Page 4 of 5 j �.ice cUMp qr., t +5�.1ii41Yz, W. . SM7 P FW&M0D %(Fw W-�M a%M to M17 WATT 4 rx --F11? • 19L 6"-••F-14L4 FkK WJ*-Ffia .- No on r } EXHIBIT 55B -/ l0T J7J1 , PAID C.EL No. 1 ! \ awcr r �L fnuanFrx icnn�ox ` L'�INIT' X SLIM 676Q Lifjk E TABLE GTH I REARING 1 rt-1 '556 5" i S 13'14'47"E L 1%6' I S 06'02'42"E t" 1Frr'.27' N 7WO7'59"E --4 S 20'24'58'E 0 25 50 100 74'11'43'14 ;z , I / 20'24'58"W ° SCALE IN FEET m � O r•�iA FND 3/4%WN ROD t" cn W�SL" - �k" � c��n p✓ J..I q yH� t sy :0 04� y+� off. -� c� n� 99' �r `✓2 "J Mob '.N 05'02'42 ,... ✓.-..... �- -- V --- �� be g 05'02'42 E Q • W LD7 1D TAIL A \� �ENEN ARY EASEWE 1527 S0. FT. 0 .03 AC. ��^ FND 1/YRiDN ROD - y FND S/8'CAPPED o to IRON ROD STAMPED a 'RPO 13n A DEiAL A i IR FN 5/9 PED + (NOT TO SCALES 1� 1 rnnr IiEFRO AEROD RY�L.rcOiRir� /�-,t. ' 9 +PROVENENT DISTRICT NUNDEA ONE VOLUME 2528. PAGE 9 D R.T.ET tj o r rn 7 7O` SAM uELs AyEN L-6 i _L-4 EXHIBIT SHOWING of 150 PERMANENT SANITARY SEWER EASEMENT Z • �•• BEING SITUATED IN TW I F G. MULLIKEN SURVEY �••,� S ABSTRACT No. 1045 ty . • , CITY OF FORT WORTH TARRM1T COUNTY TbIAS PROJEC : `NARY S (i M-1 j� U2 DOrne 0. 4296 1346ESNTOWC RECISTFAED PIROFES51f �ASEM A UISITIO i2EA: 1 7 S UA FEAT OR 0.��3�,j5(/ ATESAws '� NOCTO0. � 22. 2003 PAGE' b OF 5 SCaIE: 1' 70' NO- 54�4 I GORRONOONA k ASSOMTES V4 ''. �,a7 �lAEWW00D S AIR ROW, SUITE n4 FORT WORM. V. PK 817/47.-1424 F.Y A f i PROPERTY - 001 ZCFV% - A� E HENDERSON AR C. TY CLERK T RA T U COURTHOUSE 10 E - THERFORD FO T , T 76196-0401 IN . aES COY WARNING - THIS IS PA T.E OFFIC! L RECORD. Filed For Registration: 03/09/2005 09:47 AM Instrument p: D205065511 OPR 6 PGS By: Illllfllllllllllfilllilllll IIIII1811illlllllllllllillllllll D205065511 ANY PROVISION WHICH RESTRICTS THE SALE, RENTAL OF THE DESCRIBED REAL PROPERTY BECAUSE OF COL RACE IS INVALID AND UNENFORCEABLE UNDER FEDERAL V ow -REGIONAL WATER DISTRICT, a body politic and corpornte under the laws a PTex whose mailing address is P. O.. Box 4508, Fort Worth, Texas 76164- 0508 (h ca - "G , for and in consideration of the sum of IEN AND N0/100 DOLLARS 0 0 e good and valuable consideration to Grantor in hand paid by the CITY OF W T TEXAS, a municipal corporation of Tarrant County, Texas, whose mailing address R . J Management, 1000 Throckmorton, Fort Worth, Iexas 76102 (herein called " ") e ceipt of which is hereby acknowledged, has BARGAINED, GRANTED, AND C V by these presents does BARGAIN, GRAM', AND CONVEY, unto th sat t ement and right-of-way (the "Easement") to survey, construct, reconstruct, main, inspect, alter, replace, repair, relocate within the Easement, and remove e t in ") sanitary sewer pipeline, and necessary appurtenant facilities, for the transporta ' e o et- and across the lands that are described by metes and b1 nod n Exhibits "A", "B" d a c, ed re and incorporated herein for all purposes (the 1 Permitted Use. The Lan hal reconstruction, operation, maintenance, insp do , the Easement, and removal of 'one ten inch (1 " the transportation of effluent. No building, struetui pipeline, and necessary appurtenant facilities, shall under the Land Easement and Right=of-Way are l Grantee only for the construction, replacement, repair, relocation within ecessmy appurtenant facilities, for �ve ent other than the sanitary sewer cghstructed, or maintained in, on, or 2. Pipeline to be. Buried.. Grantee shall by constructed hereunder a sufficient depth below the surfae or pipeline shall be not less than thirty-six (36) inches below ground; and when digging the ditch for said pipeline, Grantee subsoil, as nearly as possible, and when backfilling said ditch, t into the ditch first and the topsoil last. 3_ Reseivation of Minerals. There is reserved to the OvAd assigns, and not conveyed hereby, all of the oil, gas, and other minerals of'( lying upon the surface of, or at any depth under, the Land, including, I hydrocarbons, whether liquid, solid, or gaseous, and all other substances uranium, sulphur, gypsum, potash, _limestone, sand, and gravel, whether extraction, or production could consume or deplete the surface estate.. Im sewer pipeline to be !o that the top of said X X sting surface of the et ,e topsoil from the 042t%the subsoil back t `Zt. Performance of Work. All work done in connection with the Easement shall be e rm as expeditiously as possible so as not to interfere unreasonably with the use and ccu the Land by Grantor, its agents, representatives, employees, licensees, and invitees. ormin the work or causing the work to be performed, Grantee shall make adequate .. p vi ns or the safety and convenience of Grantor, its agents, representatives, employees, lice ' v ees, shall cause all work to be cleaned up promptly in order to minunize disrbgtio r "conv Grantee shall construct and operate the sanitary sewer pipeline at its sole co.-*-I'and., n tee shall perform all work necessary in connection with the constructoc or the uction, operation, maintenance, inspection, alterution, replacement,repair, ron ' �esement, and/or removal of such sanitary sewer pipeline in a good and worlan e e conformance with sound and accepted engineering practices. After any disturbance f t of the Land for any purpose authorized hereunder (whether in connection with ' i ' c n; any reconstruction or replacement, alteration or repair, any operation or mainte an ; an s vey r pection; any relocation within the Easement; removal; or otherwise), Grant s rest�--*s surface to the same condition as existed before any such disturbance. Further; r atry''•rfpro}�-ments are disturbed, damaged, or destroyed by the operations of Grantee hereunder, G to place and restore such improvements to a condition at least as good as existed beA any c di turbaRce, damage, or destruction. The sanitary sewer pipeline shall at all times be on sated, t p ted, and maintained in a safe condition and in full compliance with all appli le f, sta�, municipal, or other laws, statutes, regulations, ordinances, and orders.. 5. Temnoraiv Construction Easeme In a Grantor hereby grants to Grantee a temp orar nstr o Easement") over and across the lands that are ri "Temporary Construction Easement" on eac of bit Temporary Construction Easement are to b 1 construction of the sanitary sewer pipeline. UpTedZt pipeline, all rights granted within the T'empors operations, maintenance, and repairs shall be conf surface of the lands burdened by the Temporary Construct: hereunder, Grantee shall restore such surface to the sarr disturbance_ Further, if any improvements in the area c Easement are disturbed, damaged, or destroyed by the of agrees to replace and restore such improvements to a con any disturbance, damage, or destruction. 'on to the Easement granted herein, ement (thd "Temporary Construction metes and bounds under the heading ", 'W and "C". The lands within the -sed solely in connection with the ynp tion of the construction of said icti n Easement shall cease, and all After any disturbance of the en for any purpose authorized ndit' a existed before any such ,e by mporary Construction s G hereunder, Grantee ion t 1 t'>;osi as existed before 6_ Removal or Relocation of Piueline. It is specifrca d o Grantee that the Land is located, in whole or in part, within the Fort W F that the United States Army Corps of Engineers should require the re val r sanitary sewer pipeline in connection with the operation of the Fort Wo agrees to perform such required removal or relocation promptly and agrees to for all costs and expenses associated therewith Further, Grantee hereby releases, discharges, and agrees to indemnify and hold harmless Grantor, and Grantor's c -2- k e agreed a evt n (on of the V servants, employees, attorneys, successors, and assigns, from and against any and all costs, or expenses resulting from, arising out of or in connection with, or relating to any emoval or relocation of the sanitary sewer pipeline. 7 escrvations and Exceptions to Giant. The Easement is expressly made subject to an all xi ting restrictions, reservations, covenants, conditions, oil and gas leases, easements, an, oo , en c ces f whatsoevet kind or nature relating to the Land, whether or not they are sho d in -�. �County, Iexas; and to all zoning laws, regulations, and ordinances of municip . and g vernr ntal authorities relating to the Land, but only to the extent that they are still rce eff' n' for hereby reserves to itself, its successors and assigns, all rights in and to the L use and enjoy the surface and subsurface thereof for any and all purposes so as ch does not adversely interfere with the rights herein granted to Grantee.. In addition to jll'otll'& reesserved herein and not in limitation thereof; Grantor specifically reserves the righ p ac-ave.he Land- 9 . No 9w �adjml) ov�'r Grantee agrees that no buildings, structures, stations, regulators, or meters s a ilr n or above the surface of the Land without the prior written consent of Grantor. - 9. Automatic Re ert r. .Tfie .,as en and all rights and privileges granted herein, will automatically terminate t w ,, ent is no longer used for the purposes set out herein. In the event of such term o of u , Grantee agrees to execute a document in recordable form releasing all of Grantee's tigh h rider, butt wxh lwe to execute such a Release shall not effect Grantor's ownership of the Lan free and cl w of any aims, tights, or privileges of Grantee. 10. RELEASE Grantee, on b alf tsel relinquishes, and discharges Grantor, and to ' rc attorneys, successors, and assigns, from and ins causes of action, obligations, damages, injwles, to , without limitation, attorneys' fees, court cos or litigation related expenses) directly or, indirectly su tr with, or relating to the exercise of the rights herein gran et the activities contemplated herein. This release shall survi dccessors and assigns, hereby releases, directors, agents, servants, employees, 1 claims, demands, liabilities, suits, ti , costs, and expenses (including, to t fees, expert fees, and other, gZsing out of or, in connection Gr ��ee the performance of any of tn�tio of the Easement_ 11 Acceptance of Sanitary Sewer Pipeline EasemeF, this Sanitary Sewer Pipeline Easement and Right -of -Way, Grans! terms, conditions, benefits, and obligations contained herein. Easement in reliance upon Grantee's representation that Grantee conditions, benefits, and obligations contained herein 12. Binding Effect. The terms and provisions ofthis Sanitary SKW, and Right -of -Way shall inure to the benefit of and be binding upon Grantor respective successors and assigns and shall be covenants running with the land. -3- Way- By sing d accepted the pito grant the ;accee ; the terms, EJ ,as Entire Agreement. Ihis Sanitary Sewer Pipeline Easement and Right -of -Way of the agreements between the patties respecting the subject matter hereof, and no prior )ns or statements, verbal or written, have been made modifying, adding to, or changing _this instrument. - No amendments, modifications, or revisions of this Sanitary Sewer, of -Way shall be effective unless made in writing, dated subsequent to the patties hereto, or' their respective successors or assigns.. TP44AVR? . OLD the above-descnbed Easement, together with all and singular the tights app a reto in anywise belonging, unto the Grantee, the said City of Fort Worth, Tex 'Tess and assigns, for so long as the Easement is used for the purposes stated herein, and up ces t ch use, all tights, titles, and interests vesting in Grantee, the said City of Fort Wo as i su essors and assigns, by virtue hereof shall automatically cease and determine. Granto d . s h e bi elf; its successors and assigns, to WARRANT AND DEFEND all and si u he to the Grantee, the said City of Fort Worth, Texas, its successors and assigns, eveTrpetson whomsoever lawfully claiming or- to claim the same of any part thereof, by, ugly, or a Grantor; but not otherwise, subject, however, to the automatic tight of'revetter i'' o rr ,s and conditions stated herein. EXECUTED this After recording return to: Robert Humphreys, Land Agent City of Fort Worth 900 Monroe St, Suite 302 Fort Worth, TX 76102 M & C..L" /3-V 9-_ DATE 0171a-ai�' AGENT AMA, DOE* -W%_ WATER DISTRICT, nent Disttict CITY OF FORT APPROVED FORAA AND ASSISTANT~ CITY ATTORNEY ♦♦ M" M M A OF I EXAS )'OFTARRANI '�uue he fo . going instrument was acknowledged before me on this day ofMffc-fi, 2005, ve C isti Real Property Manager of Tarrant Regional Water District, a Water Control v istri on behalfofsaid District. INlltllpj��� ff _ Notary Public, State of Texas Printed Name: My Commission Expires: STATE OF TEXAS COUNTY OF TARRAN The foregoing inst Cct,, _ , 2005, by C Fart Worth, Texas, a municipal M1' aMMS1oN WIRES JUIY 26. 2007 After recording return to: U: Robert Humphm", Land Agent City of Fort Worth 900 Monroe St, Suite 302 Fort Worth, TX 76102 PATR%nMYMSanit"Sewtr Pipeline 10 Inch rev 034105 dm ,ed before me on this /3 day of f the City of of sa City. of Texas l Dares: PERMAN NT SANITARY SEWER EASEMENT •• i - ent Sanitary Sewer Easement -situated in the F. 0. Mulliken. Survey, Abstract No,, 1045, i C ty f F W County, Texas, and being out of a 1.66 acre tract of -land (by deed) deeded to T o ater Co of and improvement District Number One as recorded in Vbluma 2S22, page ' 54 a Rec of Tarrant County. Texas, said Permanaast Sanitary Sewer Easement being more particular. csd and bounds as fallows: CO aai a 3/ on rod found for the roost southerly southwest count of Lot 9 RD of the Nortbpark B dition to the City of Fort Worth, Tarrant County, Texas as recorded in "Volume 38 129 ag 60 c flat Records crlan=t County, Texas. said 3/4 inch iron rod being the southeast cc of of Block 1 of the Fruftwirth Addition, an addition to the City of•Fort Worth, Tarrant County ed in Cabinet A. Slide 6755 of said Plat Records of Tarrant County, I eras. foam vvhr 1 inch » ro rod found for the southeast corner of said Lot 9-RD bears North 78 degrees 2I minutes 3 se a a db f 367.18 fast, said 1/2 inch ima rod being the southwest corner oi' i of 9-RC of aid atess Center; TF1'ENCE South 59 defines 10 minutes 44 i seconds F.2A a cat 48�. ,�3 a point; TIiENCB South 13 degrees 14 minutes 47 seconds East, a distance of 35 �^ a MUNCE South 05 degrees 02 minutes 42 seconds East, a distance of 39.12 feet to the '�O EG 41NG. said point being in the north line of said 1.66 acre tract of land, said pbi alaaf b in a south line of a 2.26'acre tact o£ land deeded to Tarrant County Water- Control and r '"Number One as iecorded in Volume 2514, Page 386 of said Deed Records of Tarrant V!�; THENCE North 75 degrees 0 S East, with the north line of said 1.66 acre tract of land and with tho sou sa3 6 acre tract of land, a distance of 1322 feet to a point for comer,, fiord which in the nor or of said I.66 arrest tract of land and for the southeast comer of d 26 acre d bears North 75 degrees 07 minutes 59 seconds East, a distance o 0.99 feet; i THENCE South 05 degrees 02 minutes 42 s ands East, dig of 108.27 feet to it point for corner, said point being in the south lin of 1.6 acr act of land, said point also being in the north lipe of a tract of land doed to es tewirt Jr. and Anita S CW=ia as recorded in Volume 6373, Page 662 of sat ced R f Tarrant County. Twisa, Srom which a 519 inch iron rod with cap stamped e I S ay' found for the southeast comer of said 1.66 acre tractof land bears North 74 grorarqU sites 59 seconds Past, a distance of 176.13 feet, said 5/8 inch iron rod with pAing4ad 'Metro Aerial Survey- bating in the north line of said Stewart tract of land; ll� TSFIYCE South 74 degrees 07 minutes 59 seconds as the of said 1.66 acre tract of land and with the north line of said Stewart I ce of 1S 27 feet to a point for corner; TECENCE North 03 degrees 02 minutes 42 seconds West, a 109�feet to the POINT OF DEGiNMNG and containing 1.626 square feat or 0.037 es orlem i T7EWORARY CONSTRUCTION 1z" Being a 15.0' wide temporary construction easement parallel with and ' c ' o e line of said 150' wide permanent sanitary sewer sasoment, said 15.0' wide t on eni shall cxpira upon completion of the sanitary sower project. Note: Basis of bearing being referenced to the Northpark Business Center t lliug monuments shown hereon - Date: November 6, 2003 r.XHiB# ■T A . T •ems. Curtis Smith jCUFrnSRegistered Professional Land Surveyor .......5 TNo_ 5494 Page I of 2 =mtONOONA a A-0mTM fmc- t7w enecrwnoo sTACR RQAA anTr so sawn wewm Tv 7..., r EXHIBIT 7 !A i SOT A1A 7xrz&LOCT PAR C'EL No _ 1 a A`M.� r=AD In°p . 1CMI!!LT A. 94tAd I7QQ ,rl , un C; FM 31-6-sRom ROD 7� :5-N \�\r ch s , I w Y' - to '42 T 9 05D21 u Ta p� RiD 1/21ROR ROD aa� cf s..0, TIEMPo L J ' %+ •� 01 CONSTItucSpR EM�iiS (1.8= as FT. OR 37 p rs ZMA aire. 1 N �..-.._.'- �•.._... RJO S/E'cJwPCD 1R0t1 ROO _ , � STAIMPW-Nfl'RO AMAL 9URVCY ' MCC OF MSTINO EASEMENT - I TARRANT COUNTY WATER CONTROL ANO WPROV£MEM OLSTRlC7 NUMBER ONE 1 , WLUME 2! PAOOC B .t D R.T,C.T. t OICH HARRY Kr rHAS r VO 8. PAGE 323 D.R. T.. Q o f 1 I LINE TABLE I UNE LENGT�t BEARIN I L-1 39.12' S 0502'G42"E L-2 15.22- N- 75-07'59'E L-3 13.27' S 7- 07'59i3V j 50 100 svN v C E FEET I Noses B ss ", ara ro THE NORTII�,P-AA ESS CEH PLAT lYfiN I C0wM Nt1A1g6fC� WR k[RFOtI. EXHIBIT SHOVANG 4F v w i3.6' PERMANENT SANITARY SEINER EASEMENT ....... _•• L r F. G. IvtLL.fKENSURVEY ABSTRACT' No. 1 045 '��' - :8 .4 CITY OF FORT WORTH, TARRANT COUNTY. TEXAS E 1LZ AC r r, ONwAR ER gl-1.626 5�AR�' PIEEI' O A No- #296 Ct1 T1�✓ C,� No. 02 RAwN ev ink t teesmr.Owc " ' T NOYfM �. Roas D.e:c o 2 'AR � .. .REgSTERED /ROF�IONAL n rsiveano i FFMMANENT SANITARY SBWRR EASEMENT rB g� eat Sanitary Sewer Easement situated in the F. G. Mullikea Survey, Abstract No_ 1045, tty _5 F VW orth, 'Tarrant County, Texas, and being out of a 2.26 acre tract of l�►ad (by deed) deeded to a�' o cr oatroj and L-, �....ent District Number One.as recorded in Volumo 2514, Page 6 c the Re f'Tarrant County, Texas, said Permanent Sanitary Sower Easement being more scrib�' snares and bounds as follows. C1711d�iN a 3 from and found for the most southerly southwest tamer of Lot 9 ~RD he Northp B ' css� an ddition to .the City of Port Worth, Tarrant County, Texas as recorded in Vohmne 38 29' a a Plat Records of Tarrant County, Texas, said 3/4 inch iron rod being the southeast a rn of t A Block 1 of the Frvhwirth Addition. an addition to the City of Fort Worth, Taaant Co exas recorded in Cabinet A, Slide 6755 of said Plat Records of Tarrant County, Tetras, from ch n rod found for the southeast cm er of said Lot 9-RD bears North 78 degrees 21 3 sec s t, a distance of 367,18 fett, said 1/2 inch iron rod being the southwest corner of Lot 9-R of d usiaess Center; 7MINCE South S9 degrees 10 miszutes 44 seconds East, a ells e o 1 ' 3 a point; THENCE South 13 degrees 14 minutes 47 seconds East, a distance of 2 .60 of to a OF BEGINNING. said point being in the north line of said 226 sere tract of Iand, t al aiag in the south tine of a tract of land deeded to Harry Kithas as recorded in Volume 1532, go ' Deed Records of Tarrant County, Texas TRICE North 76 d S 0 sec Iand and with th so 1 of d corner, !Tara whi a rod of land bears North 6 d 05 zn V2 inch iraon rod also thg �outlt jL,urn,v-.a. South 13 degr m14 min 477 seconds TSEINCE Soutb 05 degrees 02 minutes 42 ac�dcfac said point being in the south li�s of SaU north lino of a 1.66 acre tract oX improvement District Number e Records of Tarrant County. Texas, m acre tract of land and for the northeas degrees 07 minutes 59 seconds East.'& di: East, with the north line of said 226 &ore tract of tract ,of land. a distance of 15.00 :feet to a point for• and for the northeast comer of said 2.26 acre tract utes 03 seconds East, a distance of 23713 foot, said line of said Kithas tract of land; a of 7530 feet to a port for corner; ,a tance of 37.60 ::feet to a point for corner, �crc of land, said point also being in the d ed'to Tarrant County Water Control and in Volume 2522, Page $41 of said Deed t for the southeast corner of said 226 of sal .66 sate tract of land bears North 75 !. 9 feet; ;j a.ir%.x. South 75 degrees 07 minutes 59 seconds We'r0wi th Lind and with the north line of said 1.66 a for corner; I ' xra.ir%,A North 05 degrees 02 minuses 42 seconds Wcst, 00 ,.a,c.i.k.&. North 13 degrees 14 minutes 47 seconds West; a ' BEGINNING and containing 1,696 square feet or 0.03 ac 7ZNTORARY CONSTRIICTION Bong a 15.0' wide t constructioa Casement parallel with and 15.0' wide permanent sanitary sower easement; said IS.0' wide tempo expire upon completion of the sanitary sewer project line of said 2.26 acre tract, of Manse of 15.22 feet to a point feet to a point for corner; � 5 eat to the POINT OF , )f or Ian. to t a lime of said shall Not= Basis of bearing being -26 —.1 to the Northpa& Business Cea monuments shown hereon. Date; Novena 6, 2003 �HIED" E3 Smith �� Registered Professional Land Surveyor No., 5494 Page 1 vf2 vaua+ooru do ASSOCIA? m. nvaercn J'�p °c nrr Ron wrtc so �va� ivoxrr. �t oe�n rn e»-+sa-�+s� ��x air-it3)1 no 77,-77 ZOr.AlJt I" itocr =,ADJmere ��77 �+L p �ON rya ++1M2' .1. sl:,ms tree .L-A..R CEL 1 � o . c9 ��� r x.r cr. � . � t F o. C. —0 3/41R0„ ROO x � i o, CO yb y b .r2 m S1'O � � t t rm TAAl7ANf COtJTtTY WATER ODMAOL ANO 9JPRovemew D(Srpp���ICpTp NVMSLR ONL t VOLUME D.R.T.CT.AGC 279 t Inc Rnp I UNE TAQLE UNE LENGTH • BEARING *O l L-1 15.00, N 76 03'03-E NCNOLAS MARRY KITHAS L-2 75.30, S 113.14'47-E VOLUME 5326. PAGE 325 +L 3 37.60' S 05'02'42`E D.R.T.C.T. hr-4 15.22' S 7.5-07'$9`W - —45 39.12' N 0S'02'42-W 74.05' I N 13'14.47'W fi s, 1 /-,45 50 100 - N U FEET L S PAP � � „,„E . - SA c0 9 OMQYi1 o r� EXHIBIT SHOWING 15.0' PERMANENT SANITARY SEWER EASWENT ••• . OEM aRVAM IN 9NL .... S . F. 0. MULLIKEN SURVEY ABSTRACT No. 1045 CNY OF FORT WORTH. TARRANT COUNTY, TEXAS �E MEN M-19PA s?!rA!.69 �{(AFtE FF.T C7R p.U,jgOICRE� 42'96�Il ooEl. qaaiiSs11�8pp CU S int- TE ,�OVE�lP��7 CF 2 I SN�CEs • ' r �I �£G W rR0/FS310 iM1 S[JRVKYOR _ 0 w a 34 A � � N 17. rIMMA,NENT SANrrARY SEWER EASEMENT g a eat Sanitary Sewer Easement .eitnsted 3n ithe F. d. Mulliken Survey, Abstract No. 1045, C' o W rth. T County, Texas, and being out of a 3.54 acro tract of land (by deed) deeded to T er C trod and Improvement District Number One as recorded in Volume 2500, Page 15 of the Roc Tarrant County, Texas, said Permanent Sanitary Sewer Easement being more gartr iy scrib y and bounds as follows: CO G a 3! a rod found for the most southerly soutdrweat cornet' of Lot 9-RD of the Northpar s 'tion to the City of Port Worth, Tarrant County, Texas, as recorded in Volume 388 ge Plat Records of Tarrant County, Texas said 3/4 inch iron rod being in t the worth !in o act act of land (by deed) deeded to Tames D. Barros and Cary Tim IAPoint as recorded in Vo 95 144 of said Deed Records of Tarrant Couaty. Texas, said 3/4 inch iron rod also being so con of I.ot AIR, $took I of the Fruhwirth Addition, an addition to the City of Fort Wa4th.- C , as recorded in Cabinet A, Slide 6755 of said Plat Records of Tarrm.-d County. Tax a I iron rod found for the southeast comer of said Lot 9-RD bears North 78 degr 2 3 East, a distance of 36718 feet, said In inch iron rod berg the southwest corner Lot R of 14ortbrpark Business Center; 'Ii�NCE South 59 degrees 10 minutes 44 seconds East, ce 148„93 fact to a point; THENCE South 13 degrees 14 minutes 47 seconds East, a distance of ..00 oft OYN'i' OF BEGINNI1�lG, said point being in the north line bf said 3.54 acre tract ofla th ' e of'said 8.0 acre tract of land; THENCE North 78 degrees 3 tes 16 s St. with the north line of said 3.54 acre tract of Innd and with the s tir Eno s ' 8"0 a tract of laud, a distance of 15..01 fad to a point for comes, from wisic 65 o race comer post f ypnd for the northeast corner of said 3.54 acre tract of N. 78 degrees 33 minutes 16 seconds East, a distance of 59.78 feet; '7CHLNCI South 13 degrees I4 minutes 4'7 secon cc of IM20 feet to a point for comer in the south lice of said 3.54 net+o of d oint being in the north line of a tract of land deeded to Harry Kithas as r xd V Dime 532., Page 388 of said Dead Records of Tarrant County, Texas; ' T$EPJCE South 77 degrees 55 minutes 32 roc a south line of said 3.54 acre tract of Iand and with the north line of said ici of i distance of 15.00 feet to a point for corner. from which a 5/8 inch iron rod f d f o in the south lire of said 3.54 acre tract of land and in the north line of sal of land bears, South '77 degrees 55. minutes 32 seconds Nest, a distance of 19 00 oat; TIMENCE North 13 degrees 14 minutes 47 seconds West, a a £ 1 0.36 feet to the POINT OF BEGINNING and containing I,504 square feet 0. es f land mare or Iess. TEMPORARY CONSTRUCTIO Being a 15.0' wide temporary construction casement parallel with ac to a east Iine of said 15.0' wide permanent sanitary sewer essam=4 said. I5.0' wide t or ns on easement Shall expire upon cam pled= of the sanitary sower project. Note: Basis of bearing being referenced to the Northpaik Rusin or k wr controlling monuments shown bmeon. Data: November 6. 2003 EXHIBIT C Curtis Smith Registered Professional Load Surveyor No.5494 Page I of 2 p+ Jgl>QpY . R!a rr+.rr ■14b+7*04e lfi�r-MAD dui. ne+ r"* *T -X ?15 ►It s It mm P. O. C. ltiO/i'LRON ROD / S+i t`��• p�-�i M W 10 coo b ./ Eoct Or zxssnNc rAsv rw UtRRANt COUNTY WATER CONTROL. ANO )UPROVEMENT OfS a NU>l9ER ONC WLLIMC 2340 PZC 202 O.R.T.�.r. 1 i 6.0 ACRES (BY DEED) m. + IAMES D. SARROS AND a i C.AARY TIM LAPOINT VOLUME 9545, PAGE 144 D..R..T..C.T, $ 1 INO 1/z'TROH Ron 1 � . 2•n�er°o�j FM' 1 ES A. BARROS VOWM 8268, PAGE 112 �? I, EN1AR STREET I VOLUME 8623, PAGE 47S O.R.T..C•T. + 1 ' 1 ; i i 1 'I 0 25 50 100 I SCA'-E. IN FEEL SAAfUELS A YEN NOORA4 PAAR1(B�"0WE= t NTM PtA'mWfTM Tli[ CONnww"O yONumv% E SHOW" HEREON. EXHIBIT SHOWING A 15,CY PERMANENT" SANITARY SEWER EASEMENT I BELHO SIILAT m N ,71-m F. G_ MUL-LIKEN SURVEY ABSTRACT No. 1045 CrtY OP FORT WORTH. TARRANT COUNTY, TEXAS 140. P 9 C (1��1(N��1YTiCNVWA EA�M-Mrr BY` 5RC5 5� Fl Oit Q. CADDOnf P- 1 LESULDWC N` EXHIBIT PARCEL No. 7 w I LINE TABLE LJNE` LENGTH i SEARING L-1 15.01` j N 78'33`15'E I L-2 I 15.00' I S 77-55'32•W ►s'i� 7 7788•321r Ia..ao• co 0 ,so so, olr �/. HARRY K"IiAS VOLUME 7532, PAGE 38D � D.R,T.C.T 0 / 1 � LPG 1.26 ACRES- t ErY DEC JAA4ES O. RARROS TI6/ LAPOINT 1� r no CI OF UO REA R 1000 TF C FT WOR Submitter: 4 k'1 1 M WARNING - THIS IS PROPERTY - 001 ZCFV1 IIITY CLERK (COURTHOUSE HERFORD f 76196-0401 ��E,�OY ' iE OFF10AL RECORD. Filed For Registration: 06121/2005 08:49 AM Instrument#: D205174295 OPR 12 PG5 4„0 f 1111111 Jill 1111111111 IN 111111111111111111111111 IN I 1111 D205174295 ANY PROVISION WHICH RESTRICTS THE SALE, RENTAL OF THE DESCRIBED REAL PROPERTY BECAUSE OF COL I RACE IS INVALID AND UNENFORCEABLE UNDER FEDERA