CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality
("CITY"), and Shield Engineering Group, PLLC authorized to do business in Texas,
("ENGINEER"), for a PROJECT generally described as: Sanitary Sewer Rehabilitation,
Contract 130 — Project No. 105177.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to $229,540.00 as set
forth in Attachment B. Payment shall be considered full compensation for all labor
(including all benefits, overhead and markups), materials, supplies, and equipment
necessary to complete the Services.
Engineer shall provide monthly invoices to City. The Engineer shall provide the City
sufficient documentation, including but not limited to meeting the requirements set forth in
Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by Engineer of said payment shall release City from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
City in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
original effective date.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 1 of 15 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Article IV
Obligations of the Engineer
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 2 of 15
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on -site observation(s) of a
deviation from the contract documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 3 of 15
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 4 of 15
Business Equity Participation
City has goals for the full and equitable participation of minority business
and/or women business enterprises in City contracts greater than
$100,000. In accordance with the City's Business Equity Ordinance No.
25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in
Chapter 20, Article X of the City's Code of Ordinances, as amended, and any
relevant policy or guidance documents), the City has goals for the full and
equitable participation of minority business and/or women business
enterprises in City contracts greater than $100,000. Engineer acknowledges
the MBE and WBE goals established for this contract and its execution of this
Agreement is Engineer's written commitment to meet the prescribed MBE and
WBE participation goals. Any misrepresentation of facts (other than a
negligent misrepresentation) and/or the commission of fraud by the Engineer
may result in the termination of this Agreement and debarment from
participating in City contracts for a period of time of not less than three (3)
years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 5 of 15
effect as of the time copying is performed.
K. INSURANCE
Engineer shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and City has approved
such insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondent superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 6 of 15
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 7 of 15
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 8 of 15
Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 9 of 15
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 10 of 15
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless
CITY and all of its officers, agents and employees from and against all
claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
or any amendments or exhibits hereto.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 11 of 15
The failure of CITY or ENGINEER to insist upon the performance of any
term or provision of this Agreement or to exercise any right granted herein
shall not constitute a waiver of CITY's or ENGINEER's respective right to
insist upon appropriate performance or to assert any such right on any
future occasion.
L. Immigration Nationality Act
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER unless a sole proprietor, acknowledges that in accordance with
Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or
more full time -employees and the contract value is $100,000 or more, the
City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company"
shall have the meanings ascribed to those terms in Section 808.001 of the
Texas Government Code. By signing this contract, ENGINEER certifies
that ENGINEER'S signature provides written verification to the City
that if Chapter 2271, Texas Government Code applies, ENGINEER: (1)
does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
N. Prohibition on Boycotting Energy Companies
ENGINEER acknowledges that in accordance with Chapter 2274 of the
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 12 of 15
Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13,
§ 2), the CITY is prohibited from entering into a contract for goods or
services that has a value of $100,000 or more, which will be paid wholly or
partly from public funds of the City, with a company (with 10 or more full-
time employees) unless the contract contains a written verification from the
company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms
"boycott energy company" and "company" have the meaning ascribed to
those terms by Chapter 2274 of the Texas Government Code (as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274
of the Government Code is applicable to this Agreement, by signing
this Agreement, ENGINEER certifies that ENGINEER's signature
provides written verification to the CITY that ENGINEER: (1) does not
boycott energy companies; and (2) will not boycott energy companies
during the term of this Agreement.
O. Prohibition on Discrimination Against Firearm and Ammunition
Industries
ENGINEER acknowledges that except as otherwise provided by Chapter
2274 of the Texas Government Code (as added by Acts 2021, 87th Leg.,
R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the City, with a company (with 10 or
more full-time employees) unless the contract contains a written verification
from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate during the term of the contract
against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the
meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent
that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, ENGINEER certifies that
ENGINEER's signature provides written verification to the CITY that
ENGINEER: (1) does not have a practice, policy, guidance, or directive
that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument.
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 13 of 15
The following attachments and schedules are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B - Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Attachment F — Insurance Requirements
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 14 of 15
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
7�.c,—
Fernando Costa
Assistant City Manager
Date: Feb 21, 2024A. �o444pnn�
v �OR1oo
,09�d
v !`° -1 d
Pvo lox
ATTEST: °oar' *o
a
� .� Q�ti TEXA90a
bnaaaoo
Jannette S. Goodall
City Secretary
APPROVAL RECOMMENDED:
By: Christopher Ad er(Feb 8, 202415:37 CST)
Chris Harder, P. E.
Director, Water Department
APPROVED AS O FORM AND LEGALITY
By: Douglas Black (Feb 21, 202414:26 CST)
Douglas W Black
Sr. Assistant City Attorney
Contract Compliance Manager:
BY:
ENGINEER
Shield Engineering Group, PLLC
/ Jean'— Marie Alexander, P. E.
Chief Operating Officer
Date: 2/5/2024
Form 1295 No. 2023-1088356. .
M&C No.: 23-1078
M&C Date: 12/12/2023
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
wrence Hamilt , P.E.
Project Manager
City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130
Standard Agreement for Engineering Related Design Services City Project No. 105177
Revised Date: November 23, 2021
Page 15 of 15
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
ATTACHMENT A
Scope for Engineering Desiqn Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
Street Council Limits Lateral/Main Water Water Sanitary Sewer Comments
District Number Repl Size Sewer Size
(LF) Repl
(LF)
Humbolst CD-8 Bransford L-304 1251 6
St Street to the
Railroad
Alley between
E Terrel
Ave/Humbolst
st and
Bransford
St/Troost St
Pulaki St CD-8 Bransford St 545 6
to Fabons St;
Troost St to 267 6
Freeman St
Verbena St CD-8 FabonsStto 800 6
Freeman St
Alleys
between L-1512
Troost
St/Freeman St
and Pulaski
St/Verbena St; L-1484
Verbena
St/White St
Freeman St CD-8 Pulaski St to 559 6
White St
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 19
1420 6
242 6
1484 6
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
WORK TO BE PERFORMED
Task 1. Design Management
Task 2 GORGOptual De&igl4
Ttilc 2, Pr9limiRary no&4Y,
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey and Subsurface Utility Engineering Services
Task 9. Plan Submittal Checklists
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
■ communicate effectively,
■ coordinate internally and externally as needed, and
■ proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct review meetings with the CITY at the end of each design phase
• Prepare invoices and submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the Water
Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 2 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 3 MWBE reports will be prepared
• 3 meetings with city staff
• 1 monthly water department progress reports will be prepared
• 1 monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
G. Plan Submittal Checklists (See Task 9)
ThThe-vvrrc ciz `tv .`� 09sign shall ho oNbmitted to CITY per the approved Drnion# Cashed ilo
The purpose of the noRsopt"-a design is fer the EN(_`INEER t9
f Study the preieo#
fTldeRtify and ddey p el#erRati�i�that eRhaRGe the system,
f Present (three gh the defined deliverables) these alternatives to the CITY
f I7eremmend the olternov thL� OUnnessfi illy addresses the design problem and
—Obtcin the CITY's endersemen# of this ronnept
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 3 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
ENGINEERwill develop the GGn Gent,,al design of the infrastr, Intl ire as follows
2.1. Data GG"eEtOOR
CITY, ENGINEER will researnh proposed
immentc in GE)NURGtiGn with aRy a+hor planned future imnrn�iemen+s +ha+
may influen Ge the nroient
• Th�GINEER Will also identify and seek to obtain data for evicting GGnditiGns
t c� msy imnaGt the nreie G+ inGl, ,ding b it no+ limited utilities,
te•, agen Gies (TXDQT
and railroads), Gity nnastor Plans, and property ewfwship Qc cvailable from +he
Tax Assessor's office
• The data GGllertion efforts will alse ORGl,,de GondUGting menial GGGrdina+ion
sewer re rG, sting plcno.
• The ENGINEER shall visit the nroieG+ site and obtain the meter numbers and sizes
OR all evicti+Rg, +
meters to he renla d % Gn the nrGient avid shall irdentify evicting
sample
re
Re
2.2. (;eoterhniGal IRIyestigatiens
� N INNER shall c d"'se the !`ITV of test borings and eth--\, oNbsb:rFa%
�#+ans that may he needed for the nrejent. If the CITY determines that
s,,Gh berings Or investigatiGns are needed then the ENGINEER I��" . shall \
the CITY and CITY %Gterhniral Gonsaltant to draw ,,n snesifiGatiGns for s,,Gh
2.3. Firs Line Racoons
?.'I. Tha-SeesOptucl
GA -VP -I` S-heet
• Ie-onhibits and Fi#ton summary- of alternative design GGnGen+s GGnsidered
re GGmmended design GGn Gent
•dosed phcoing of aRy water --a wni:cry Ce�ewerv"cork thcA io inGl„clad in this
nrGleGt dGG, invented in bath the nreieGt sGhed, ale aR� na..rrativ
• 1)GG, manta+iGn Gf kepi design denisiGns
t E3timates of nrehable GGns+r, IGtiGn GGst.
ASSUMPTIONS
• = Geet niGal b,--�,9e-e;�expeGted or this pr9jeGt
t Gonies of the non Gent, sal design na Gkage (30 design) will he delivered
e letter sued and GGnvh_ he,,nd with a nl n
�srt shall c��r ����iGeyer.
Drawings will ha oize fold outs bE)6IRd OR the FePEA
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 4 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
�11�11 �tlrtT�LSTT.'E7�1:\7•:RlP.1:t�7i\�T.IZtAfR7:Ts�li1■T7R:��LT.'►T.ET.�7T7:R�LSTT:
prc)jeGt f or in _/
• ENGINEER /Review
• ENGINEER / ■
w-r44on appraval by the GITY of the GGRGOPW\31
A. Gi G--Pt5.\'l n
TASK a. PRELIMINARY DESIGN (GA PERCENT).
Preli plans and sp �qc s�izII he si ihmi+tend to CITY per the approved Dreier+
Cnhwdaiee
("_` ICCP will develop the preliminary design of the infrastrU Gt ire as follows
Cp 3 e�velepment of Preliminary Resign DraWings anrd enifinanrde
v. ti any.) shall �n l i�c the
following:
• Ce"er Sheet
• AA Pre'eGt GeRtrel Sheet, shOWinn all CORtrel point)e useduseder set while gathering
data. Generally nn a male of nn+ lu,00 thsn 1:400. The fnlleWiRg infnrma}inn Shall
he inrdinaterd fer eanh Centrel Peint• Identified (existing City Mena amen+ #8901 PK
,
Moil 5/8" Iron Red); X, 1/ and- 7 &-errlina}e3 in an ideRtiTied Geerrdina+e System
and a�Tebearinnbase. ZGOOrdinate��m only; ,decnrin}i"e Iona+inn
(i.e. set in the pen+e.erdine of the inlet in the South ni irh line of North Side Drove at the
East ee Fld e�uluo ct the Cei theast norner of Nerth Side Drove an,-d North �Qoin
Ctrs
• Overall preien+ easement Iavel i+ sheet(s) with property eWner inform a}inn
• Overall nreien+ water and/or Ltl �tnrV-s ewer layet sheets.
The water Irayea�t shee
t
shall identify the proposed wator main improvement/ existing wator maino in tha
Vininity and all wator appartenannes along with pressure plane boundaries, water
}inns valves anrd fir rants The sewer Iayel it sheet shall
ta�}kn, pump ctc,�����e--h}(�,�,-r��Tc�ev�er�nc
identify the prepeserd sewer main imprevement/existing sewor n-\.aino and--aI4
se or sppartenannes in the „inini+„
• Overall water and lor --anitary-sewor cbcn'denment shoe+
• roordonates on cll P.C.'a, P.T.'s, P.I.'o, mcnhal�.es, va;voo, mainline fit- tags, etc.,
IR the SarFne GOorvramut systom ao the Control Rents
•--Benoh msrlco p9F 1,000 ft of planipFefile sheet—twe nr n^nrn
• Rearipns given on cll proposed Gen+erlinec0 er baselines
Ueatlon eq iatiens relating i itilitiec +o naVinge whon apprapriate.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 5 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
Plcn cnd profile Shoots WhiGh spew the folio n,ing• proposed Water and/G�- xnitcry
sewer plan/profile and reGGMmeRded pope Sze, f�ydrants, water �e linos
and motor boxes gate valves' isolation "ah,00 msnheles evicting moto
i er
nmbers and Siz6a thpt &\ o tebe replaGed evicting sample IGGatIGRG evicting firs
Addition Msmac) al„nn With nr„norty ,,Wnorahip ohcll bs nrevi,de d nn the plan
The ENGINEER choll mck
easement When the evicting alignment of a water nn� L�Initw `cx mein air
r� lateral iS Ghanged nr"iSienS will he monde in the final p\!cns c.nd/er cperifiGatienc
by the ENGINEER �,�tiry treIGGate all Ser"ire lines which are rr�nnerterd to the evicting
main land-GGe`Jt acid 09n,ine Iines to the relenateid main
The fells n,inghall be any }nlirohle of all Inrotinnc where it is nereccory to relerote er
repute t�h�co)(i3ting privato cc\nitix), "e,e,er semine Iine due to the ahanrdnnment nr
real, Rmept o�eex�t'r} pi bliG sanitary sewer lateral or main: Th&-CITY shall
farnioh th,aF=ISj INEER h s osmple format of hew the SeWeF SeFViGeGGIme
repot Jte/relonatinn chef ld he idecigneid ap.sl �bmitted for GopStF Untinn flUripg
design s m,e"f if a rednon he inserted through the Gleanni it to the bottom of the
seFV Ge Iinee the ENGINEER Will obtain the flew Iine eleyatien and design the
?eernP,TGeIiRe� riop to ald"epticinggthe PFejeot fer bird If the Se WiGe flE)W fine
i nformatinn Gannet he obtained di firing design survey, the Cnl(_INEER Jha ll delay
the design-vrt I�I se verrerviGe imfl Until lafter o Quality Level A S else irfaGe Utility
Engin Rg�CUG ins tien ha,^ been performed). TheLevel A SUE will he
performed; 0 \ by the ENGINEER if inGl uded in the fee proposal; or (2) by the CITY
prier to bidding if the CITY determinog thct it IG noeded for saticfa Gtnr" Gempletinn
of the design; or (3) by the GentraGtnr after the project hao been hid! by means of a
hid item to that effeot. In A options the CAI/_INEER ohsll propose
hle'I R:ono in the preiert and roller# flew line elevation anrd ether oppliGahle
iR formation of the sewer c ervreline. The ENGINEER a c o t io informationto
p rn"ide the design for the xxiit-- r•
p) se�e,er cep rie line to he rerouted OF relonated
•--Prevido mcp oh` W'Rg Inrotinn Of new manhole Genctrl iGtien at the eRd of evicting
sewer segments 90 degree bends OF tee nn ns Site survey OF cpenifiG
design plcna for manhole Gonstrl iGtiGn is nGt inGli idedd cc part of for the SG pp The
Gen+ra Gt deGldmontt Doll &p&Gify the it is the GeRtra Gtnr'c recponoibility4e
Gnordinate Utility Inr•atinne ieto. manhole Genstn Gtinn
• The ENGINEER willppreare standard and Special detail sheets for water Iine
{wx` �llotinn and sewer reYYhahilitatieR er replaGen,ont th1 are not already inGl ided in
the rl_Sestien of the C Q CPc Ti tiBf$�Theae-may inr id Genrne Etign details
between aa.rriow part3 of the prnient0 i itnneling details, g g borinand iaGLindetails,
waterline details
trenGhless
0 ue to the GORStFUGtien of the 0
details and special sen,ioe lateral reonnnegtiens
3.2. (_'eeterhniGal Investigation
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 6 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
`a ? I GR84I igtabilifii R-111 e14
Drier to the 60 percent review meeting with the CITY thg GNG! CCU half
sgherli ile anld attend a preiegt site Visit With the CITY Preiegt Manager avid
GORStFIAg+ie�TSOnnel to
walk the}}r8}e6tThe ENGINEER shsll 3Nrnmsriz--4- e
CITY's remments from the field visit anrd submit this information to the CITY in
W tt Rg.
3A "Wity Clearange
The ENGINEER Will rensi il+ with the CITY's Transpertatien anrd Di iblir• Werks
Department Water Depar+men+ and ether CITY idepar+monta, pabl1e UtilitieS,
apprevimate leGatlen of abeve anrd i mrdergroi R d utilities, and ether facilities
(cUrren+ anrd fi t iro) ths\ hsv-o sn impCGt or 'n'nrflraIe,nrGeenrthe preiec+ ENGINEER
will TCITY fr .-ilities to a„eird or minimi'e conflicts With evio+inn utilities, avid
where IlneWR anld possible censirder pe+ontial future utilities in !designs
DVVF= files fer eaoh /
appreved r plaR set te the desigRated prejeGt folder OR BIM360
PFejeGt. The —MAIF foles should be Greated dilreGtly fFeFn the GAD files as eppesed
posteed _
sealed the sealed GentraGt dGGUrnents.
Develop / /
Divisionby the TraffiG / r Works ■ _ .
be sealed by a prefesswenal engineer registered 'R
State ef Texas.
pL.,blin meeting(s) will he cenidi fisted er attended during the prc�iminary
design ph--\o&-.
bg4R,g, --,� sn sverane bore depth of faet each will he provided.
r�sss�.r.�esrr.�■s>,rn:�rs�rstr■nnu:�■rer_t:■rs�. _ _
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 7 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
3vto of oizo plc /i Will be delivered fnr the GGR641!Gtabili4�i
4C .`Fits-Gf size r Qns will be delivered for the DrelimiRary rlocinn
0
t sets of sneGifiGations will he delivered for the Preliminary Design /60
desigR).
• DWF files Greated from design GAD drawings will he uploaded to the designated
rr,je^Gt f or in I?IA436-0-.
• The C r 's FE)Rt eRd and teGhrRiGal GpeGifiGatiORS will be used. ThGINEEP
shall supplement the terhniGal snegifiy+ations if needed
• ai&-- of size drawings will he delivered for Utility Gleearancee..
• N INFER shall n9#PFseeed with Fins.I Design antivities without ,eyrittan lappr9vat
by the CITY of the Preliminary design plano.
DELIVERABLES
A Prellminar\y Design drawings and snenifinatiens
B. Utility Gl ranee dFawings
G. Traffin Gantral DlaR
D. rm Water Polli�tionPTeVeRtioPlaR
E. Eotimabas
F. ►Wta lime listing names and ay-dFesses of residents and bl isinesses affected hey
the nroient
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upen 1W;rgval of the PFV ftinary plans, ENGINEER will prepare construction plans as
follows:
•F=E)Hw-ejeoto that di3tNrb sn srea-gfeathsn go,,e (I) acFthe GeRtra^ter will be
resnensihle fer nrenarinn and submitting the Storm Water Pel' itien Prevention PIGn
Gonotruotion Plan aGGGFdiRg te the GUrFeRt CITY :cW44 Gr#er4a nnanual for- Site
Ileye pment and GonstrUG40n Whioh will be innornorater•1 into the SVVPPP by the
rye n tevrrtra &) F.
4.1. Data Collection
• The ENGINEER will also identify and seek to obtain data for existing conditions that
may impact the project including but not limited to; utilities, agencies (TxDOT and
railroads), City Master Plans, and property ownership as available from the Tax
Assessor's office.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 8 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all
existing meters to be replaced on the project and shall identify existing sample stations
and fire line locations.4.2 Draft Final plans (90%) and specifications shall be
submitted to CITY per the approved Project Schedule. The packages shall include:
• Cover Sheet
A Project Control Sheet, showing all Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400. The following information shall be
indicated for each Control Point: Identified (existing City Monument #8901, PK Nail,
5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in
the centerline of the inlet in the South curb line of North Side Drive at the East end of
radius at the Southeast corner of North Side Drive and North Main Street).
Overall project water and/or sanitary sewer layout sheets. The water layout sheet
shall identify the proposed water main improvement/ existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify
the proposed sewer main improvement/existing sewer mains and all sewer
appurtenances in the vicinity.
• Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in
the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet — two or more.
• Bearings qiven on all proposed centerlines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines and
meter boxes, gate valves, isolation valves, manholes, existing meter numbers and
sizes that are to be replaced, existing sample locations, existing fire line locations,
existing utilities and utility easements, and all pertinent information needed to
construct the project. Legal description (Lot Nos., Block Nos., and Addition Names)
along with property ownership shall be provided on the plan view.
The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced, including
replacement of existing service lines within City right-of-way or utility easement. When
the existing alignment of a water and sanitary sewer main or lateral is changed,
provisions will be made in the final plans and/or specifications by the ENGINEER to
relocate all service lines which are connected to the existing main and connect said
service lines to the relocated main.
The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
realignment of the existing public sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction. During design
survey, if a rod can be inserted through the cleanout to the bottom of the service line,
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 9 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
the ENGINEER will obtain the flow line elevation and design the service line prior to
advertising the project for bid. If the service flow line information cannot be obtained
during design survey, the ENGINEER shall delay the design of the sewer service line
until after a Quality Level A Subsurface Utility Engineering (SUE investigation has
been performed). The Level A SUE will be performed; (1) by the ENGINEER if
included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines
that it is needed for satisfactory completion of the design; or (3) by the Contractor after
the project has been bid, by means of a bid item to that effect. In all options, the
ENGINEER shall propose appropriate de -hole locations in the project and collect flow
line elevation and other applicable information of the sewer service line. The
ENGINEER shall use this information to provide the design for the sanitary sewer
service line to be rerouted or relocated.
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific design
plans for manhole construction is not included as part of the scope. The contract
documents shall specify that it is the Contractor's responsibility to coordinate utility
location, etc. manhole construction.
4.3 Traffic Control Plan
• Develop a traffic control plan utilizing standard traffic reroute configurations posted
as "Typicals" on the CITY's BIM360 website. The typicals need not be sealed
individually, if included in the sealed contract documents.
• Develop supplemental traffic control drawings as needed for review and approval by
TxDOT and the Traffic Division of the Transportation and Public Works Department.
These drawings shall be sealed by a professional engineer registered in the State of
Texas.
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%) to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
• 2_ sets of 11x17 size drawings and 0_ sets of22x34 size
drawings and _1 specifications will be delivered for the 90% Design package.
• A PDF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in BIM360.
• 2 sets of _11x17 size drawings and _2 specifications will be
delivered for the 100% Design package.
• A PDF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in BIM360.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 10 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
• [Engineer to provide estimated final sheet list (cover/index, general notes, control point
location, easement layout, SUE plan sheets, no. of plan/profiles, special detail sheets,
etc.)]
DELIVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
D. Original cover mylar for the signatures of authorized CITY officials.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto BIM360 for
access to potential bidders.
• Contract documents shall be uploaded in a .xIs file.
• Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to BIM360 in .pdf format. The .pdf will consist of
one file of the entire plan set. The dWf Will GGRSiGt of individual files „no fe
eaoh plan 3h9et, and will be RumbeFe d and Rarned1 in c mcnnor oimilcr taut
of th P!e.n oo+�.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
BIM360 from documents sold and from Contractor's uploaded Plan Holder
Registrations in BIM360.
The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's BIM360folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 11 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
addenda. The ENGINEER shall upload all approved addenda onto BIM360 and
mail addenda to all plan holders.
• Attend the pre bid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be uploaded into the project's Bid Results folder on BIM360BIM360.
• Incorporate all addenda into the contract documents and issue conformed sets.
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher. There shall be one (1) PDF file for the Water plan set.
Each PDF file shall be created from the original CAD drawing files and shall
contain all associated sheets of the particular plan set. Sinqular PDF files for
each sheet of a plan set will not be accepted. PDF files shall conform to
naming conventions as follows:
TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number of
sheets in this file.
Example: X-12755_org18.pdf
PDF files shall be uploaded to the project's Final Drawing folder in BIM360.
2) In addition to the PDF files, the ENGINEER shall submit each plan sheet as an
individual DWG file with all reference files integrated into the sheet. If the plans were
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 12 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
prepared in DGN format, they shall be converted to DWG prior to uploading. The
naming convention to be used for the DWG files shall be as follows:
I. TPW files shall use the W number as for PDF, but shall include the sheet
number in the name — "W-1956—SHT01.dwg", "W-1956—SHT02.dwg", etc.
II. Water and Sewer file names shall use the X number as for PDF and
DWF files, but shall include the sheet number in the name — "X-
12155—SHT01.dwg", "X-12755—SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number (817) 392-8426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• _3_ sets of construction documents will be sold to and made available on
BIM360 for plan holders and/or given to plan viewing rooms.
• 5_ sets of _11 "x17" size and _5 sets of _22"x34" size
drawings plans and _2_ specifications (conformed, if applicable) will be
delivered to the CITY.
• PDF and DWG files will be uploaded to BIM360.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruction conference.
• After the pre -construction conference, the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 13 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
The ENGINEER shall attend the "Final' project walk through and assist with preparation of
final punch list
6.2 Record Drawings
• The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
o As -Built Survey
o Red -Line Markups from Contractor
o Red -Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, on mylar for record storage. The ENGINEER may
keep copies of the information provided by the CITY for their files, but all original
red -lined drawings shall be returned to the CITY with the mylars.
2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Singular PDF and DWF files for each sheet of a
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 14 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. TPW file name example — "W-1956_rec47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_rec" designating the file is of
a record drawing plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_rec3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_rec"
designating the file is of a record drawing plan set, "36" shall be the total
number of sheets in this file.
Example: X-12755_rec18.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawings folder
in BIM360.
ASSUMPTIONS
• 3 RFI's are assumed.
• -1 Change Orders are assumed
• One copy of full size (22"x34") mylars will be delivered to the CITY.
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings on Mylar
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1. Right -of -Way Research
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 15 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
• The ENGINEER shall determine rights -of -way, easements needs for construction of the
project. Required temporary and permanent easements will be identified based on available
information and recommendations will be made for approval by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM
for real property acquisition
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's BIM360 site.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry
documents for landowners to CITY PM for real property acquisition. It is assumed that letters
will only be required for land owners adjacent to temporary construction easements or who
are directly affected by the project and no easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's BIM360 site.
ASSUMPTIONS
• _36 Easements or right-of-way documents will be necessary.
• 47 Temporary right -of -entry documents will be necessary.
• Right -of -Way research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal District (TAD) information available at the
start of the project and available on -ground property information (i.e. iron rods, fences,
stakes, etc.). It does not include effort for chain of title research, parent track research,
additional research for easements not included in the TAD, right-of-way takings, easement
vacations and abandonments, right-of-way vacations, and street closures.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 16 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
• ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic data, elevations of all
sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities,
structures, trees (measure caliper, identify overall canopy, and have qualified arborist
identify species of trees), and other features relevant to the final plan sheets. Existing
drainage at intersections will be verified by field surveys. Spot elevations will be shown on
intersection layouts with cross slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the following:
A Project Control Sheet, showing ALL Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400:
- The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base.
Z coordinate on CITY Datum only.
C. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North
Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main
Street).
- Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control.
- No less than two horizontal bench marks, per line or location.
- Bearings given on all proposed centerlines, or baselines.
- Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of
Entry for landowners to CITY PM.
The documentation shall be provided in conformance with the checklists and templates
available on the CITY's BIM360 site.
ASSUMPTIONS
• Topographic survey at intersection will include no more than 100 ft. in each direction.
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 17 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
B. Drawing of the project layout with dimensions and coordinate list.
TASK 9. PLAN SUBMITTAL CHECKLISTS
Engineer shall complete and submit Plan Submittal Checklists in accordance with the
following table:
PLAN SUBMITTAL CHECKLIST REQUIREMEN—S
Traffic
Traffic
Traffic
Street
Water
Control
Control
Control
Traffic Storm
"A"
Storm
Lights
/Sewer
Traffic
30%
60%
90%
Attachment Signal Water
Water
(Submit
(Submit
Engineering
Type (Submit All o
30%
a
60 /o
All @
All @
(Submit All
@ 30%)
30%
60%)
@ 60/oo)
Required for all work
in City
ROW
Street X X
X
X
V
X
X
X
X
Storm Water X
X
X
X
X
Water / Sewer
X
X
X
X
*If included in street project
ASSUMPTIONS
DELIVERABLES
A. Standard City of Fort Worth Traffic Control Details
B. Specific phased traffic control plan for one (1) area — Freeman Steet and Rosedale
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 18 of 19
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION, CONTRACT 130
CITY PROJECT NO.: 105177
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right -of -
entries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and
re -bidding of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase
• Design phase public meetings
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to submitting for permits (ie.TxDOT, railroad, etc...)
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to easements,
right-of-way, and/or temporary right -of -entries.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Construction Shop drawing review, samples and other submittals submitted by the
contractor.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 19 of 19
ATTACHMENT B
COMPENSATION
Design Services for
Sanitary Sewer Rehabilitation, Contract 130
City Project No. 105177
Lump Sum Project
Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $229,540.00 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies, and
equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item 111. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Water Department monthly progress reports and schedules in the format required
by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 3
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Shield Engineering Project Management,
Group, PLLC Engineering Design
Proposed MWBE Sub -Consultants
Visintainer Engineering PM Assistance & QAQC
Non-MWBE Consultants
Project Number & Name
Sanitary Sewer Rehabilitation,
Contract 130
City MWBE Goal = 9%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 3
TOTAL
Total Fee
$229,540.00
Fee Amount %
$206,540.00 90%
$23,000.00 10%
$229,540.00 100%
MWBE Fee MWBE %
$23,000.00 10%
Consultant Committed Goal = 10%
LM
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 3
LMI
Professional Services Invoice Project Manager: I Lawrence Hamilton
Project: Sanitary Sewer Rehabilitation, Contract 130
City Project #: 105177 1
City Sec Number:
Company Name: IShield Engineering Group, PLLC
Supplier's PM:
Supplier Invoice #:
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Jean Marie Alexander
2023101.01-1
1
Supplier Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: accountin shield -en ineerin .com
Office Address: 1600 W 7th Street, Ste 400, Fort Worth, TX 76102
Telephone: 817-810-0696
Fax:
Remit AddreSS: ACH/PO BOX 470636, Fort Worth, TX 76147
Agreement
LTD
Agreement Amendment
Amount to
Completed
Sheet FID and Work Type Description
Amount Amount
Date
Amount
Work Type 1 Water Design
$108,276.00
$108,276.00
Work Type 2 Sewer Design
$121,264.00
$121,264.00
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Totals This Invoice
$229,540.00
$229,540.00
Overall Percentage Spent:
Percent ($) Invoiced Current Remaining
Spent Previously Invoice Balance
$108,276.00
$121,264.00
$229,540.00
Professional Services Invoice Project Manager: Lawrence Hamilton
Project: Sanitary Sewer Rehabilitation, Contract 130
City Pro)ect #: 105177
Work Type Desc: lWater Supplier Instructions:
FID:
City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Company Name: Shield Engineering Group, PLLC
Supplier's PM: Jean Marie Alexander
Supplier Invoice #: 2023101.01-1
Payment Request #: 1
Service Date:From
Service Date:To
Invoice Date:
Pay Items
30 - Desiqn
Description
Totals This Unit
email: accounting@shield-engineering.com
Office Address: 1600 W 7th Street, Ste 400, Fort Worth, TX 76102
Telephone: 817-810-06 g6
Fax:
Remit ACH/PO BOX 470636, Fort Worth, TX 76147
Agreement LTD
Agreement Amendment Amendment Amount to Completed
Amount Number Amount Date Amount
$108,276.00 $108,276.00
$108,276.00
$108,276.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
Current
Invoice
Remaining
Balance
$108,276.00
$108,276.00
Professional Services Invoice Project Manager: Lawrence Hamilton
Project: Sanitary Sewer Rehabilitation, Contract 130
City Project #: 105177
Work Type Desc: I Sanita ry Sewer Supplier Instructions:
FID:
City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Company Name: Shield Engineering Group, PLLC
Supplier's PM: Jean Marie Alexander
Supplier Invoice #: 2023101.01-1
Payment Request #: 1
Service Date:From
Service Date:To
Invoice Date:
Pay Items
30 - Design
Description
Totals This Unit:
email: accounting@shield-engineering.com
Office Address: 1600 W 7th Street, Ste 400, Fort Worth, TX 76102
Telephone: 817-610-0696
Fax:
Remit ACH/PO BOX 470636, Fort Worth, TX 76147
Agreement LTD
Agreement Amendment Amendment Amount to Completed
Amount Number Amount Date Amount
$121,264.00 $121,264.00
$121,264.00
$121,264.00
Overall Percentage Spent:
Percent ($) Invoiced
Spent Previously
Current Remaining
Invoice Balance
$121,264.00
$121,264.00
T-1 Qu
BID PROPOSAL
Page 1 of2
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
Unit 1: Water Improvements
Protect Item Information Bidder's Proposal
Builist
Description
Specification Section No.
Unit of
Bid Quantity
Unit Price
Bid Value
Item No.
Measure
1
3311'0261
8" PVC Water Pipe
3311 12
LF
3491
$110.00
$384.010.001
2
13311'0161
6" PVC Water Pipe
3311 12
LF
105
$165.00
$17.325.001
3
13312.3003
8" Gate Valve
33 12 20
EA
12
$2.950.00
$35.400.00 1
4
13312.3002
6" Gate Valve
33 12 20
EA
9
$2.310.00
$20.790.00 1
5
13305.0003
8" Waterline Lowering
33 05 12
EA
1
$13.400.00
$13.400.001
6
13312.0117
Connection to Existing 4"-12" Water Main
33 12 25
EA
11
$4.225.00
$46.475.001
7
13312.2001
1"Water Service, Meter Reconnection
331210
EA
112
$590.00
$66.080.001
8
13312.2003
1"Water Service
331210
EA
112
$2.650.00
$296.800.001
9
13312.2004
1" Private Water Service
33 12 10
LF
55
$53.75
$2.956.251
10
10241.12184"-12"
Water Abandonment Plug
024114
EA
14
$1.200.00
$16.800.001
11
13311.0001
Ductile Iron Water Fittings w/ Restraint
3311 11
TON
3
$11.650.00
$30.290.001
12
13312.0001
Fire Hydrant
331240
EA
9
$6.200.00
$55.800.001
13
10241.1001
Water Line Grouting
0241 14
CY
25
$525.00
$13.020.001
14
10241.1011
Remove 4" Water Line
0241 14
LF
174
$15.00
$2.610.00 1
15
10241.1301
Remove & Salvage 4" Water Valve
0241 14
EA
1
$400.00
$400.00 1
16
10241.1302
Remove & Salvage 6" Water Valve
0241 14
EA
8
$400.00
$3.200.00 1
17
10241.1303
Remove & Salvage 8" Water Valve
0241 14
EA
1
$400.00
$400.00 1
18
10241.1510
Salvage Fire Hydrant
0241 14
EA
8
$1.000.00
$8.000.001
19
13201.0112
5' W ide Asphalt Pvmt Repair, Residential w/ 2:27 Conc Base
3201 17
LF
5284
$140.00
$739.760.00 1
20
13201.0201
Asphalt Pvmt Repair Beyond Defined Width, Residential
3201 17
BY
587
$70.00
$41.090.001
21
13201.0614
Conc Pvmt Repair, Residential
3201 29
BY
387
$220.00
$85.140.001
22
13213.0301
4" Conc Sidewalk
32 13 20
SF
75
$15.00
$1.125.001
23
13213.0401
6" Concrete Driveway
32 13 20
SF
385
$18.00
$6.930.00 1
24
13216.0101
6" Conc Curb and Gutter
32 16 13
LF
605
$75.00
$45.375.001
25
13304.0101
Temyorary Water Services
33 04 30
LS
1
$50.000.00
$50.000.001
26
3305.0103
Exploratory Excavation of Existing Utilities
33 05 30
EA
2
$2.325.00
$4.650.00 1
27
13305.0109
Trench Sat t�
33 05 10
LF
3473
$2.50
$8.682.501
28
133055.Q011171
Valve Box Adjustment
33 05 14
EA
21
$725.00
$15.225.001
29
1
onrete ar for Valve
330517
11.550.001
$$2.000.00
30
�g5.02�3
Ymported Emlbedment/Backfill, CLSM
3305 10
CY
10
$200.00
1
31
13471.0001
Traffic Control
3471 13
MO
3
$5.670.00
$17.010.001
32
Mobilization
01 7000
LS
1
$104,000.00
$104.000.001
33
�0170.0100
0171.0101
Construction Staking
01 71 23
LS
1
$10,000.00
$10.000.001
34
0171.0102
As -Built Survey
01 7123
LS
1
$10.000.00
$10.000.001
35
19999.0005
SWPPPs 1 acre
LS
1
$8.000.00
$8.000.001
36
19999.0001
Miscellaneous Utility Adjustment (Irrigation)
LS
1
$5.000.00
$5.000.001
37
I9999.0002
Water Construction Allowance
LS
1
$145.000.00
$145.000.001
WATER IMPROVEMENTS SUBTOTAL
$2,324,293.75 1
20%CONTINGENCY
$464,858.751
WATERIMPROVEMENTSTOTAL
$2,789,152.501
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Foam R-s 20120120 20231227 C.- 130 90% OPCC
T-1 Qu
BID PROPOSAL
P" 2of2
Unit 2: Sanitary Sewer Improvements
Project Item Information Bidder's Proposal
Btdlist
Description
Specification Section No.
Unit of
Bid Quantity
Unit Price
Bid Value
Item No.
Measure
35
3331.4215
15" Sewer Pipe
33 11 10, 33 31 12, 33 31 20
LF
1500
$400.00
$600.000.00 1
18
3331.4115
VC SKI 2 Sewer P(r
33 11 10, 33 31 12, 33 31 20
LF
859
$214.00
$183.826.001
36
3331.0102
6" Sewer Pipe, Point Repair
33 31 22, 33 31 23
LF
20
$275.00
$5.500.00 1
25
3331.1102
6" to 8" Pipe Enlargement
3331 23
LF
496
$115.00
$57.040.001
29
0241.2106
15" Sewer Aban onment Plug
0241 14
EA
4
$1.000.00
$4.000.00 1
30
0241.2103
8" Sewer Abandonment Plug
0241 14
EA
3
$800.00
$2.400.00 1
5
0241.2102
6" Sewer Abandonment Plug
0241 14
EA
1
$1.105.00
$1.105.00 1
27
3331.3311
4" Sewer Service, Reconnection
3331 50
EA
2
$1.875.00
$3.750.00 1
26
3331.3101
4" Sewer Service
3331 50
EA
1
$2.700.00
$2.700.00 1
28
3331.3105
4" Private Sewer Service
3331 50
LF
67
$82.00
$5.494.00 1
34
3331.3102
4" 2-Way Cleanout
3331 50
EA
6
$437.00
$2.622.00 1
19
3339.0001
Epoxy Manhole Liner (Warren Environmental or Chesterton)
33 39 60
VF
110
$515.00
$56.650.001
20
3339.1001
4' Manhole
33 39 10, 33 39 20
EA
8
$9.300.00
$74.400.00 1
31
3339.1002
4' Drop Manhole
33 39 10, 33 39 20
EA
2
$13.400.00
$26.800.001
32
3339.1003
4' Extra Depth Manhole
33 39 10, 33 39 20
VF
29
$345.00
$10.005.001
14
3305.0107
Manhole Adjustment, Minor
33 05 14
EA
2
$535.00
$1.070.00 1
22
3305.0106
Manhole A justment, Major w/ Cone, Ring, Frame, & Cover
33 05 14
EA
2
$5.050.00
$10.100.00 1
6
0241.2201
Remove 4' Sewer Manhole
0241 14
EA
6
$1.520.00
$9.120.00 1
33
0241.5001
Abandon Manhole
0241 14
EA
2
$1.815.00
$3.630.001
16
3305.0112
Concrete Collar for Manhole
33 05 17
EA
12
$1.020.00
$12.240.001
4
/0241.2001
Sanitary Line Grouting
0241 14
CY
242
$525.00
$127.050.001
_,0241.1300
Remove Conc Curb&Gutter
1 0241 15
LF
1 1
$9.50
$0.001
_7
23
'3201.0112
5' W ide Asphalt Pvmt Repair, Residential w/ 2:27 Conc Base
1 3201 17
LF
1 1
$140.00
$0.001
8
3201.0201
Asphalt Pvmt Repair Beyond Defined Width, Residential
1 3201 17
SY
1 1
$70.00
$0.001
24
3201.0614
Conc Pvmt Repair, Residential
1 3201 29
SY
1 1
$220.00
$0.001
9
3216.0101
6" Cone Curb and Gutter
32 16 13
LF
1 1
$75.00
$0.001
10
3301.0001
Pre -CCTV Inspection
3301 31
LF
496
$9.00
$4.464.001
11
3301.0002
Post -CCTV Inspection
3301 31
LF
2855
$8.00
$22.840.001
12
3301.0002
Final- Manhole CCTV Inspection
3301 31
EA
15
$625.00
$9.375.00 1
13
3301.0101
Manhole Vacuum Testing
3301 30
EA
15
$400.00
$6.000.00 1
15
3305.0109
Trench Safety
33 05 10
LF
2399
$2.50
$5.997.50 1
38
3305.0113
Trench Water Stops
330515
EA
1
$1,183.00
$1.183.001
17
3305.0203
Imported Embedment/Backfill, CLSM
33 05 10
CY
215
$200.00
$43.000.001
21
3471.0001
Traffic Control
3471 13
MID
3
$5.670.00
$17.010.001
3
0170.0100
Mobilization
01 7000
LS
1
$66.600.00
$66.600.001
1
0171.0101
Cc�strrFtion Staking
01 71 23
LS
1
$10.000.00
$10.000.001
2
0171.0102
As- uirrt Survey
01 7123
LS
1
$10.000.00
$10.000.001
38
9999.0003
Connect 15" Main to Exist Manhole
EA
3
$850.00
$2.550.00 1
39
9999.0004
Sanitary Sewer Construction Allowance
LS
1
$93.000.00
$93.000.00 1
SEWER IMPROVEMENTS SUBTOTAL
$1,491,521.501
20%CONTINGENCY
$298,304.301
SEWER IMPROVEMENTS
TOTAL
$1,789,825.801
Base Bid
Subtotal Unit 1 - Water Improvements $2.324.293.751
Subtotal Unit 2 -Sewer Improvements $1.491.521.501
Total $3,815,815.251
Total (with 20 % contingency) $4,578,978.30 1
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
F. R--120120120 20231227 C.-13090 % OPCC
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Water Department Survey Services for
Sewer Main M-22, L-304 and Water Relocations
City Project No. 105177
Task No. Task Description Principal
Project
Manager
Project
Engineer
EIT
Labof(hours)
CADD
RPLS
SIT
Survey
Tech
Survey
Crew
Ad, "I"'
relive
I Subconsullant
Total Labor Cos[ I Subconsullant
MWBE I Non-MWBE
Pense
Reproduction
Total Expense
Cost
Task Sub Total
%Complete Remaining
Budget
Rate $300 $280 $200 $150 $130 $245 $145 $115 $185 $95
11.0 Project Management 0 7 0 8 0 0 0 0 0 0
1.1 Maregimp the Team
11.2 QA OC 2
1.2 Commum t-antl Reporting
2.1 Pre -Design Coordination Meeting (assumes 1 meetinq) 1 1
1 2.2 Design Submittal Review Meetims (assumes 2 meetings) 1 1
127-8 Coordination With Other Agencies(TxDOT) 3 6
3.0 (Preliminary Design (90 Percent) 0 10 SO 188 24 0 0 0 0 0
3.1 Data Collection 10
I 32 PP eliminar�Design Draw nos 8 S�ecifi ations (4813 LF`` 4 28 20 24
preliminaryUesign Drawings & Spec1 -"ns -1°rovided by City InHouse Design(2380
32 LF $S) 4 16
I 33 Constmctabikty Review
I 3.4 Public Meeting 2 2 2
I 3 5 U6bN Clea an a (Assumes 1 site visd)
I 3.8 Tragic Control Plan 2 12 40
37 Estimate 2 4 10
$ 3,160
1 $ 1,400 $
$ -
$ 1,400
$ 4,560
$ 960I
$ 6301
$ 630
$ 2,340
$ 400
$ 200
$ 200
$ 600
$ 560I
$ 400
$ 430I
$ 430
$ 200
$ 200
$ 1,740
$ 600
$ 44,120
$ 12,200 $ $
$ 12,200
$ 56,320
$ 1,500
$ 35,840
$ 4,800
$
$ 1,660
$
$ 10,360
$ 3,660
$ 1,500 1
$ 27,840 I $ 8.000
$ 3,200 $ 1.600
$ I
$ 1,260 I $ 400
$ I
$ 8,960 I $ 1,400
$ 2,860 $ 800
$
$ 8,000
$ 1,600
$
$ 400
$
$ 1,400
$ 800
4.0 Final Design 0 3 10 48 0 0 0 0 0 0
4.1 SWPPP (') (Assumed a SWPPP book will be provided by the contractor)
I 41 Prepare ISWM Construction Plan (Not included in this contract)
I 4.2 Final Draft (90%) Construction Plans and Specifications
I 4 3 Final (100%) Plans and Specifications 2 6 40
4A Construction Estimates (90%and 100%) 1 4 8
5.0 Bid Phase 0 3 5 5 0 0 0 0 0 0
51 Bid Support
5.1.1 Upload and Sell Contract Documents and Maintain Plan Holders List
51.2 Issue Addend, 1-sumes l) 2 2
5.1.3 Attend Pre -lad Conference 1 1
5.1.4 Attend Bid Opening
5.1.5 Tabulate Bids and Recommend Award 2 2
5.1 6 Issue Conformed Contract Documents 2
$ 10,040
$ 2,800
$
$
$ 2,800
$ 12,840
$
$
$
$ 10,1601
$ 2,680
$ 3,690
I
$ I
$ 1,1601
$ 1,030
$ -
$ 700
$ 800
$
I
I
I $ 2,400
$ 400
$
$
$
$
$
$ 7,760
$ 2,280
$ 2,400
$ 400
$ 2,590
$ 600
$
$ Soo
$ 1,100
$
I
200
$ 400
I
I
$500
$
$ 200
$ 960I$
$ 6301
$ 400
$
$ -
$ 700
$ 300
$
$ 500
�I I
I
6.0 Construction Phase Services 0
6.1 Construction Support
61.1 Altentl Pra,onstruction Conference
8.1.2 Attend Public Meeting
fi 1.3 Project Ste VSlls (assumes 3 mo of constr)
f Information Review (assumes 3)
6.2 R.rmyDmwmgs
6
8
5
0
0
0
0
0
0
$ 4,230
E 1,200
E
$
$ 1,200
$ 5,430
1
2
2
2
2
2
3
2
2
3
$
$ 9601
$ 400
$ 400
$ 400
1
$
$ 400
$
$ 1,360
$ 1,2601
$ 1,0501
$ 400
$ 400
$ 1,660
$ 1,450
$ 960
$ -
$ -
$ -
$ 960
$ -
I
I�
7.0 ROW/Easement Services (Provided in TPW Scope)
] 1 R ht-of-Wa Research
]2 ht-ot-W (7sement p (j 9/nnlaljq, spumes 36)
1 73 mry igof EMntubmilfaP(Assumes 4� 1
0
0
0
0
0
88
45
351
41
0
$ 76,035
b 4,800
E
$ 800
$ 5,600
$ 81,635
$ 18,330
60,7151
$ 2,5901
18
70
45
351
27
14
$ 15,930
57,5151$
$ 2,590
$ 2.400
2,400
$800
$ 2,400
3,200
$
I' IjI
18.0 SUNEy
81 Design Survey
8.1 Tie antl Dip AdtlOonal SSMH (Assumes 8)
0
0
0
0
0
0
23
1 81
1.
0
$ 42,765
b
$
$
$
$ 42,7651
$ 40,2451
$ 2,520 1
19
4
1 71
4
8
1 $ 40,245
$ 2,520
$
$
ra dyDmachad Semces
9.0 i "rare
1 Totals
$ 20,000
E
$ 20,000 1
$ 227,240 1 $ - $ -
0
29
14
2.
24
88
68
1 432
203
0
1$ 202,940
1 $ 23,0011
1 E
$ 1,300
$ 24,300
( Footage
% Footage Design Fee I
vva,n� a��u
Water
nay,. mnanuuw„
Sandmy Sewer
Total Cost % Complete
rrelasu
Remammq Butlgetl
oumrn uy
Total Hours
1.173
Water) 339'Jj
47°°f $ 108,2761
Fo. %
LF
%J
Total Labor $
202.940
Sewer) 380(!f
Total) 719'
53%J $ 121,264
100°°I $ 229.540
9,J
1 Contract 1 ',�'39'Sf 47 $108,276 I
TOTAL 339' I 47 1 $106,276
380T
380
53 .1 $
53 �I $
121,264 $ 229.540
121.264 $ 229.540
0.< $ 229,540
0°°I $ 229,540
Total Expense $
ME�FF(F �H uI R( $
E
24.300
23,000
Non-fk11jF Sll �[�apCupl $
iiiMBEJSBE
2.300
PSadiyMg1
10.0%
Total Projedf Co:( $
229,540
City of Fort Worth Texas
Attachment B - Level of Effort Supplement
PMO Official Release Data 8 09 2012
1 Of
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Sanitary Sewer Rehabilitation, Contract 130
City Project No. 105177
None
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page 1 of 1
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
A. ENGINEER Project Schedule Development
ENGINEER shall prepare a project schedule for the services to be provided in fulfilling
the requirements of the Agreement and encompassing the Scope of Work defined in
Attachment A to the Agreement.
ENGINEER shall prepare and maintain project schedule throughout the life of the project
as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule.
ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for
planned sequencing of the work activity and timing of the work.
B. Schedule "Tier" Selection
City has identified three "Tier" levels for project schedules as defined in City's
Specification 00 31 15, to align with the size and complexity of the project as a basis for
schedule development. City's Project Manager will determine the "Tier" level for the
ENGINEER's project schedule as part of the negotiation of the Agreement.
C. Project Baseline Schedule
ENGINEER will produce an initial project schedule and submit as a "baseline" for review
and acceptance by City's Project Manager as defined in City's Specification 00 31 15
which will be referred to as the Project Baseline Schedule. Updates to the baseline
schedule follow the requirements of City's Specification 00 31 15.
D. Project Progress Schedule
ENGINEER will provide to the City, monthly updates to their project schedule indicating
progress of the Work in compliance with the requirements of City's Specification 00 31
15 and said schedule will be referred to as the Project Progress Schedule.
E. Master Project Schedule
City will develop and maintain a master project schedule for the overall project.
ENGINEER's project baseline and progress schedule submittals will be an integral part
of the development and updating process of City's Master Project Schedule.
City of Fort Worth, Texas
Attachment D
Revision Date: 07.20.2018
Page 1 of 1
SANITARY SEWER
REHABILITATION, CONTRACT 130
CPN No: 105177
ID
Task
Task Name
Duration
Start
Finish
Predecessors
Resource Names 2023
2024
0
Mode
H1
H2 H1
1
701
Project Planning
15 days
Mon 4/3/23
IFri 4/21/23
I"I
2
)r
Program/Project Planning
15 days
Wed 6/28/23
Tue 7/18/23
3
Project Start
5 days
Wed 6/28/23
Tue 7/4/23
4
Planning
60 days
Wed 7/5/23
Tue 9/26/23
3
5
)r
Project Agreement
38 days
Mon 10/16/23
Wed 12/6/23
6
04
Project/Contract Agreement
1 day
Mon 10/16/23
Mon 10/16/23
4FS+5 days
7
Wa
Program/Project Contract Agreement
51 days
Tue 10/17/23
Tue 12/26/23
8
04
Select Consultant/Negotiate Fee & Scope
8 days
Tue 10/17/23
Thu 10/26/23
6
9
M&C Process - Design
32 days
Fri 10/27/23
Mon 12/11/23
8
`
10 k�"�'
�+
Award Agreement - Design
1 day
Tue 12/12/23
Tue 12/12/23
9
11
Agreement Execution
10 days
Wed 12/13/23
Tue 12/26/23
10
12
Jr
Design
88 days
Tue 9/26/23
Thu 1/25/24
13
90% Final Design
88 days
Tue 9/26/23
Thu 1/25/24
,
14
11%
Issue Design Notice to Proceed
1 day
Tue 9/26/23
Tue 9/26/23
h
15
11%
Design Survey
3 days
Wed 9/27/23
Fri 9/29/23
14
1
16
04
Design Kick-off Meeting
1 day
Tue 9/26/23
Tue 9/26/23
I
17
Prepare Final Design Drawings & Document:
29 days
Mon 10/2/23
Thu 11/9/23
15
18
11%
Submit Final Plans & Specs
1 day
Fri 11/10/23
Fri 11/10/23
17
19
7r
Public Meeting
1 day
Tue 11/14/23
Tue 11/14/23
18
20
Review 90% Plans and Specs (CFW)
21 days
Mon 11/13/23
Mon 12/11/23
18I
21
ra
Incorporate Final Comments and Submit
3 days
Tue 12/12/23
Thu 12/14/23
20
Revised Drawings S. Documents
22
04
Peer Review Meeting/Design Review
15 days
Fri 12/15/23
Thu 1/4/24
21
Meeting (Technical)
23
)r
Approve Final Plans and Specifications and
5 days
Mon 1/8/24
Fri 1/12/24
22
Route for Signatures
24
11%
Final Design Complete
1 day
Mon 1/15/24
Mon 1/15/24
23
25
7r
Establish MBE Goal for Construction Contra13
days
Tue 1/16/24
Thu 1/18/24
24
26
Prepare Bid Package
5 days
Fri 1/19/24
Thu 1/25/24
25
27
Permits
42 days
Fri 11/10/23
Mon 1/8/24
1
28
Identify Required Permits
5 days
Fri 11/10/23
Thu 11/16/23
17
29
Prepare Permits
0 days
Thu 11/16/23
Thu 11/16/23
28
1- /16
30
4
RR Permitting - Submit, Review, Approve
0 days
Thu 11/16/23
Thu 11/16/23
28
j 1' 1/16
31
SWPPP- Submit,Review,Approve
0days
Thu 11/16/23
Thu 11/16/23
28
j 1'I/i6
32
Floodplain Services - Submit, Review, Approve
0 days
Thu 11/16/23
Thu 11/16/23
28
j 1' 1/16
33
TxDOT Permitting -Submit, Review, Approve
30 days
Fri 11/17/23
Thu 12/28/23
28
34
Gas Main Crossing Permits - Submit, Review,
0 days
Thu 11/16/23
Thu 11/16/23
28
j 1' 1/ 6
Approve
35
11
TRW D & City of FW Parks Conversion -
0 days
Thu 11/16/23
Thu 11/16/23
28
j 1' 1/ 6
Submit, Review, Approve
36
1r.
USACE Permit Section (408) and (NWP12) -
0 days
Thu 11/16/23
Thu 11/16/23
28
1' I/ 6
Submit, Review, Approve
37
Review and Approve Permits
6 days
Fri 12/29/23
Fri 1/5/24
33
Task Summary
,
, Inactive Milestone
Duration -only
Start -only C External Milestone
Project: Attachment D
Schedule
Date' Fri 12/15/23
Split . . . . . . . . . . . . . . . . I . . Project
Summary
Ii
Inactive Summary 0
0 Manual Summary Rollup
Finish -only 7 Deadline ♦
Milestone ♦ Inactive Task
Manual Task
Manual Summary ----------
External Tasks Progress
Page 1
2025
H2
Manual Progress
H1
Shield Engineering Group, PLLC
SANITARY SEWER REHABILITATION, CONTRACT 130
CPN No: 105177
ID
Task
Task Name
Duration
Start
Finish
Predecessors
Resource Names 2023
Mode
H1
38
Permits
1 day
Mon 1/8/24
IMon 1/8/24
137
39
Environmental
0 days
Thu 8/10/23
Thu 8/10/23
40
Identify Environmental Issues
0 days
Thu 11/9/23
Thu 11/9/23
17
41
Archaeological Investigation
0 days
Mon 1/15/24
Mon 1/15/24
24
42
ra
Review Investigation Findings
0 days
Mon 1/15/24
Mon 1/15/24
24
43
04
Archaeological Retrenching (if necessary)
0 days
Mon 1/15/24
Mon 1/15/24
24
44
Wa
Investigation Report Finalization
0 days
Mon 1/15/24
Mon 1/15/24
24
45
04
Environmental
0 days
Mon 1/15/24
Mon 1/15/24
24
46
11%
Utilities
20 days
Thu 11/9/23
Thu 12/7/23
47
11%
Utilities
0 days
Thu 11/9/23
Thu 11/9/23
17
48
11%
Utility Relocation
20 days
Thu 11/9/23
Thu 12/7/23
49
11%
Utilities Start
0 days
Thu 11/9/23
Thu 11/9/23
17
50
Review Plans and Specs - Utilities
20 days
Fri 11/10/23
Thu 12/7/23
49
51
Utility Relocation
0 days
Thu 12/7/23
Thu 12/7/23
50
52
Utilities Complete
0 days
Thu 12/7/23
Thu 12/7/23
51
53
04
Construction
947 days
Mon 5/10/21
Tue 12/24/24
54
11%
Construction
1 day
Mon 5/10/21
Mon 5/10/21
55
Project Management
90 days
Mon 5/10/21
Fri 9/10/21
56
Construction Project Management
90 days
Mon 5/10/21
Fri 9/10/21
57
Construction Advertisement
165 days
Thu 11/23/23
Wed 7/10/24
58
Advertisement
72 days
Thu 11/23/23
Fri 3/1/24
59
2r'
Advertisement Period
26 days
Thu 11/23/23
Thu 12/28/23
60 EEC]i
i
Bid Advertisement
1 day
Fri 1/26/24
Fri 1/26/24
26
61
Ill
Advertisement Period
25 days
Mon 1/29/24
Fri 3/1/24
60
62 EEC]III
Hold Pre -Bid Meeting
1 day
Wed 2/14/24
Wed 2/14/24
60FS+12 days
63
Issue Addenda (as needed)
17 days
Thu 2/1/24
Fri 2/23/24
60FS+3 days
64
Bid Opening
1 day
Thu 2/29/24
Thu 2/29/24
61FS-2 days
65
Review Bids - Bid Tabulations and
1 day
Fri 3/1/24
Fri 3/1/24
64
Select Contractor
66
MWBE Documentation
6 days
Mon 3/11/24
Mon 3/18/24
67
Submit MWBE Compliance Documents
1 day
Mon 3/11/24
Mon 3/11/24
65FS+5 days
68
Review and Approve MWBE Compliance
5 days
Tue 3/12/24
Mon 3/18/24
67
Documents
69
,
M and C Process
20 days
Tue 12/12/23
Mon 1/8/24
70
Start M&C Process - Construction
1 day
Tue 3/26/24
Tue 3/26/24
68FS+5 days
71 8
M&C Process
60 days
Wed 3/27/24
Tue 6/18/24
70
72 I�"�'
Award Contract - Construction
1 day
Wed 6/19/24
Wed 6/19/24
71
73
Contract Execution
15 days
Thu 6/20/24
Wed 7/10/24
74
Execute Contract Documents (Contractor
5 days
Thu 6/20/24
Wed 6/26/24
72
75
!
Execute Contract Documents (CFW)
10 days
Thu 6/27/24
Wed 7/10/24
74
76
Pre -Construction Activities
22 days
Thu 7/18/24
Fri 8/16/24
Project: Attachment D Schedule Task Summary . . Inactive Milestone Duration -only Start -only
DateFri 12/15/23 Split . . . . . . . . . . . . . . . . I . . Project Summary Inactive Summary 0 0 Manual Summary Rollup Finish -only
Milestone ♦ Inactive Task Manual Task Manual Summary 7-m"momf External Tasks
Page 2
H2
♦ 8/10
2024
H1
I
j 11 r9
/15
♦� /15
/15
/15
/15
11
11, r9
rl
L r9
49'12/7
j'12/7
Ill
C External Mtlestone
7 Deadline
Progress
2025
H2 I H1
♦ Manual Progress
♦
Shield Engineering Group, PLLC
ID
Name
SANITARY SEWER REHABILITATION, CONTRACT 130
CPN No: 105177
adecessors (Resource Names 2023
H1
77
4
Distribute Executed Contract Documents to 5 days
Thu 7/18/24
Wed 7/24/24
75FS+5 days
Construction
78
Hold Pre -Construction Meeting with
1 day
Tue 7/30/24
Tue 7/30/24
77FS+3 days
Contractor
79
Issue Notice to Proceed for Construction
1 day
Wed 7/31/24
Wed 7/31/24
78
80
of
Hold Public Meeting - Pre -Construction
5 days
Tue 8/6/24
Mon 8/12/24
79FS+3 days
81
111%
Submittals and Approvals
10 days
Fri 8/2/24
Thu 8/15/24
79FS+1 day
82
Pre -Construction
1 day
Fri 8/16/24
Fri 8/16/24
81
83
Construction Contract
70 days
Mon 8/19/24
Fri 11/22/24
84
Notice to Proceed for Construction
1 day
Mon 8/19/24
Mon 8/19/24
82
85
Construction Phase Start
1 day
Tue 8/20/24
Tue 8/20/24
84
86
Construction
68 days
Wed 8/21/24
Fri 11/22/24
85
87
Ill
Construction Contract
68 days
Wed 8/21/24
Fri 11/22/24
85
88
Ill
Materials/Testing
69 days
Wed 8/21/24
Mon 11/25/24
89
Ill
Material and Soil Testing
68 days
Wed 8/21/24
Fri 11/22/24
85
90
Ill
Material/Soil Testing
1 day
Mon 11/25/24
Mon 11/25/24
89
91
Ir+
Inspection
90 days
Wed 8/21/24
Tue 12/24/24
92
4
Inspections
68 days
Wed 8/21/24
Fri 11/22/24
85
93
Ill
Final Inspection
10 days
Mon 11/25/24
Fri 12/6/24
92
94
4
Construction Phase Complete
1 day
Mon 12/9/24
Mon 12/9/24
93
95
4
Inspection
90 days
Wed 8/21/24
Tue 12/24/24
85
96
Ill
Closeout
51 days
Wed 12/25/24
Wed 3/5/25
97
Ill
Closeout
1 day
Wed 12/25/24
Wed 12/25/24
95
98
W.
Closeout Report and Review
21 days
Wed 12/25/24
Wed 1/22/25
99
Ill
Submittals (Project Closeout Documentatio15 days
Wed 12/25/24
Tue 12/31/24
95
100
W.
Contract Reconciliation
10 days
Wed 1/1/25
Tue 1/14/25
99
101
1+
Project Acceptance (Acceptance Letter)
1 day
Wed 1/15/25
Wed 1/15/25
100
102
4
Notice of Completion/Green Sheet
5 days
Thu 1/16/25
Wed 1/22/25
101
103
11
Close -Out Report and Review
15 days
Wed 12/25/24
Tue 1/14/25
95
104
Ill
As -Built Survey
16 days
Wed 1/15/25
Wed 2/5/25
105
Ill
As -Built Survey
15 days
Wed 1/15/25
Tue 2/4/25
103
106
1
As -Built Survey
1 day
Wed 2/5/25
Wed 2/5/25
105
107
Ill
Mapping
20 days
Thu 2/6/25
Wed 3/5/25
108
Ill
Mapping
20 days
Thu 2/6/25
Wed 3/5/25
106
109
4
As -Built Plans
30 days
Thu 2/6/25
Wed 2/19/25
110
Ill
As -Built Plans
10 days
Thu 2/6/25
Wed 2/19/25
106
111
W+
As -Built Plans
10 days
Thu 2/6/25
Wed 2/19/25
106
112
Ill
Acceptance
10 days
Thu 3/27/25
Wed 4/9/25
113
Ill
Financial Reconciliation
5 days
Thu 3/27/25
Wed 4/2/25
108FS+15 days
114
Ill
Capitalization
5 days
Thu 4/3/25
Wed 4/9/25
113
Project: Attachment D Schedule Task - summary . . Inactive Mtlestone Duration -only Start -only
Date Fri 12/15/23 Split ,,,,,,,,,,,,,,,,I„ Project Summary Inactive Summary 0 0 Manual Summary RollupFinish-only
Milestone ♦ Inactive Task Manual Task Manual Summary External Tasks
Page 3
2024 2025
H2 H1 H2 H1
I
I
I
t �t
I
1�
I
C External Mtlestone ♦ Manual Progress
7 Deadline +
Progress
Shield Engineering Group, PLLC
ATTACHMENT E
N F 9 ' - � �� 1 �� p,,.,�t-,1 T
y„ ,w t Lu
....
i
t
-a
Z
J n LLB i.' `F► J
. I 1rt
LEUDAST
w ,.
Lu _
U) F 'k L
_ y
. r �
' • " LLB 11+ V'
K" E TERRELL�AV
i JERRELLAVE
r
M-22 -
FT7E
.HUMBOLT-ST r HUMBOLT ST HUMBOLTST
;� EXISTING SANITARY I
N
SEWER MAIN TO
. BE ABANDONED
z L—
� m - o
r -
PULASKI ST PULASKI ST
a� —
P,ULASKIST .�
T a i -- --- — -- M-22 — — G\.
SIC s
VERBENA ST i ' 'VERBENA ST 02
F— s
N
LL
211
Z
O i I► Q
LL
w
z
LL — -- 00
ST--
ROSEDALEST
R DSEDAL' EST
OLEANDERST
40
FORTWORTH
Ir
A'f
IA
-UUMBO T.STr
Rya �1 I re
BENA��"'
'A
L
ATTACHMENT "F"
CERTIFICATE OF INSURANCE
Design Services for
Sanitary Sewer Rehabilitation, Contract 130
City Project No. 105177
City of Fort Worth, Texas
Attachment F
PMO Release Date: 05.19.2010
Page I of I
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 12/12/23 M&C FILE NUMBER: M&C 23-1078
LOG NAME: 60SSRC130-SHIELD
SUBJECT
(CD 8) Authorize Execution of an Engineering Agreement with Shield Engineering Group, PLLC, in the Amount of $229,540.00, for the Sanitary
Sewer Rehabilitation, Contract 130 Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2024-
2028 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Shield Engineering Group, PLLC, in the amount of $229,540.00, for Sanitary Sewer
Rehabilitation, Contract 130 project; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund
in the amount of $426,240.00, transferred from available funds within the Water and Sewer Fund, for the Sanitary Sewer Rehabilitation,
Contract 130 (City Project No. 105177) to effect a portion of Water's contribution to Fiscal Years 2024-2028 Capital Improvement Program.
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize execution of an engineering agreement with Shield Engineering Group, PLLC, in
the amount of $229,540.00, for Sanitary Sewer Rehabilitation, Contract 130 project for the preparation of plans and specifications for sanitary
sewer replacement or installation and cast iron water main replacements as indicated on the following streets, and easements:
Scope of
Street
From
To
Work
E. Rosedale
Water/
Freeman Street
E. Pulaski Street
Street South
Sewer
Right -of -Way
Installation
White Street
Troost Street
Freeman
Sewer
Street
Installation
Between
Freeman
Sewer
[Easement
erbena Street and
Troost Street
Street
Replacement
White Street
Freeman
Water/
Verbena Street
Fabons Street
Street
Sewer
Installation
E. Rosedale
Sewer
Fabons Street
Verbena Street
Street South
Installation
Right -of -Way
Easement between E.
Freeman
Sewer
Pulaski Street and
Troost Street
Street
Replacement
Verbena Street
JE. Pulaski Street
Bransford Street
Fabons Street
Water
E. Pulaski Street
Troost Street
Freeman
Water
Street
Easement between E.
Sewer
Humbolt Street and E.
Troost Street
East 105 feet
Installation
Pulaski Street
JE. Humbolt Street
Bransford Street
Troost Street
Water
between E.
Sewer
[Easement
errell Avenue and
Troost Street
West 700 feet
Replacement
umbolt Street
Troost Street / E.
North 1,050
Sewer
Troost Street
Rosedale Street
feet
Installation
Intersection
This project also provides for the abandonment and relocation of Sanitary Sewer Main M-22 which currently traverses across several parcels of
private properties into public street right-of-way as shown on the attached location map.
In addition to the contract amount, $196,700.00 (Water: $69,000.00; Sewer: $127,700.00) is required for project management, real property
acquisition, utility coordination, and material testing. This project will have no impact on the Water Department's operating budget when completed.
The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as
projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in
support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows:
60SSRC130-SHIELD
Capital
Project FY2024 CIP
Revised
Budget Change
Fund
Name Appropriations Authority
(Increase/Decrease) FY2024
Name
Budget
W&S
105177
Capital
SS
Projects -
Rehab $0.00 This M&C
$426,240.00 $426,240.00
Fund
Contract
56002
130
Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Sanitary
Sewer Rehabilitation, Contract 130 within the Water & Sewer Capital Projects Fund.
Appropriations for Sanitary Sewer Rehabilitation, Contract 130, are as depicted below:
Fund Existing Additional Project
Appropriations Appropriations Total*
W&S Capital
Projects - Fund $0.00 $426,240.00 $426,240.00
56002
(Project Total 1 $0.00 $426,240.00 $426,240.00
*Numbers rounded for presentation purposes.
Business Equity: Shield Engineering Group, PLLC, is in compliance with the City's Business Equity Ordinance by committing to 10 percent
MWBE participation on this project. The City's MWBE goal on this project is nine percent.
The project is located in COUNCIL DISTRICTS 8.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water and Sewer Fund, and upon approval of the above recommendations
and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the SS Rehab Contract 130
project to support the above recommendations and execution of the engineering agreement. Prior to any expenditure being incurred, the Water
Department has the responsibility of verifying the availability of funds.
Submitted for Citv Manaaer's Office by
Oriainatina Business Unit Head
Dana Burghdoff 8018
Chris Harder 5020
Additional Information Contact: Lawrence Hamilton 2626
60SSRC130-SHIELD FID Table
1 2 56002 0600430 105177 2024 $177,276.00
56002 0700430 4956001 105177 2024 $248,964.00
56002 0700430 105177 2024 $248,964.00
1 2 56002 0600430 4956001 105177 001730 9999 ($177,276.00)
56001 0709020 5956001 $248,964.00
56002 0700430 4956001 105177 001730 9999 ($248,964.00)
2
56002
0600430
5110101
105177
001730
9999
$18,900.00
Water Staff Cost
2
56002
0600430
5550102
105177
001730
9999
$4,000.00
Public Outreach
1
56002
0600430
5330500
105177
001730
9999
$108,276.00
Contract
2
56002
0600430
5310350
105177
001770
9999
$2,000.00
Utility Coordination
2
56002
0600430
5330500
105177
001784
9999
$31,500.00
Soil Lab Consultant
2
56002
0600430
5310350
105177
001784
9999
$12,600.00
Soil Lab TPW Staff
2
56002
0700430
4956001
105177
001730
9999
($248,964.00)
2
56002
0700430
5110101
105177
001730
9999
$25,200.00
Water Staff Cost
1
56002
0700430
5330500
105177
001730
9999
$121,264.00
Contract
2
56002
0700430
5710010
105177
001740
9999
$70,000.00
Easement Acquisition
2
56002
0700430
5110101
105177
001740
9999
$20,000.00
Easement Acquisition
2
56002
0700430
5330500
105177
001740
9999
$5,000.00
Easement Acquisition
2
56002
0700430
5740010
105177
001780
9999
$5,000.00
Easement Acquisition
56002
0700430
5310350
105177
001770
9999
$2,500.00
Utility Coordination
H-1
56002 I
I 2060000 I
105177
RETAIN I
I I
I
I Ret inage Combo Code