HomeMy WebLinkAboutContract 60983CSC No. 60983 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Shield Engineering Group, PLLC authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Sanitary Sewer Rehabilitation, Contract 130 — Project No. 105177. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $229,540.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 1 of 15 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 3 of 15 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 4 of 15 Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), the City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. Engineer acknowledges the MBE and WBE goals established for this contract and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 5 of 15 effect as of the time copying is performed. K. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 6 of 15 P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 7 of 15 F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 8 of 15 Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 9 of 15 D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 10 of 15 property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 11 of 15 The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 12 of 15 Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 13 of 15 The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 14 of 15 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH 7�.c,— Fernando Costa Assistant City Manager Date: Feb 21, 2024A. �o444pnn� v �OR1oo ,09�d v !`° -1 d Pvo lox ATTEST: °oar' *o a � .� Q�ti TEXA90a bnaaaoo Jannette S. Goodall City Secretary APPROVAL RECOMMENDED: By: Christopher Ad er(Feb 8, 202415:37 CST) Chris Harder, P. E. Director, Water Department APPROVED AS O FORM AND LEGALITY By: Douglas Black (Feb 21, 202414:26 CST) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: BY: ENGINEER Shield Engineering Group, PLLC / Jean'— Marie Alexander, P. E. Chief Operating Officer Date: 2/5/2024 Form 1295 No. 2023-1088356. . M&C No.: 23-1078 M&C Date: 12/12/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. wrence Hamilt , P.E. Project Manager City of Fort Worth, Texas Sanitary Sewer Rehabilitation, Contract 130 Standard Agreement for Engineering Related Design Services City Project No. 105177 Revised Date: November 23, 2021 Page 15 of 15 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 ATTACHMENT A Scope for Engineering Desiqn Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Street Council Limits Lateral/Main Water Water Sanitary Sewer Comments District Number Repl Size Sewer Size (LF) Repl (LF) Humbolst CD-8 Bransford L-304 1251 6 St Street to the Railroad Alley between E Terrel Ave/Humbolst st and Bransford St/Troost St Pulaki St CD-8 Bransford St 545 6 to Fabons St; Troost St to 267 6 Freeman St Verbena St CD-8 FabonsStto 800 6 Freeman St Alleys between L-1512 Troost St/Freeman St and Pulaski St/Verbena St; L-1484 Verbena St/White St Freeman St CD-8 Pulaski St to 559 6 White St City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 19 1420 6 242 6 1484 6 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 WORK TO BE PERFORMED Task 1. Design Management Task 2 GORGOptual De&igl4 Ttilc 2, Pr9limiRary no&4Y, Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Plan Submittal Checklists TASK 1. DESIGN MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, ■ communicate effectively, ■ coordinate internally and externally as needed, and ■ proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 2 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • 3 MWBE reports will be prepared • 3 meetings with city staff • 1 monthly water department progress reports will be prepared • 1 monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 9) ThThe-vvrrc ciz `tv .`� 09sign shall ho oNbmitted to CITY per the approved Drnion# Cashed ilo The purpose of the noRsopt"-a design is fer the EN(_`INEER t9 f Study the preieo# fTldeRtify and ddey p el#erRati�i�that eRhaRGe the system, f Present (three gh the defined deliverables) these alternatives to the CITY f I7eremmend the olternov thL� OUnnessfi illy addresses the design problem and —Obtcin the CITY's endersemen# of this ronnept City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 3 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 ENGINEERwill develop the GGn Gent,,al design of the infrastr, Intl ire as follows 2.1. Data GG"eEtOOR CITY, ENGINEER will researnh proposed immentc in GE)NURGtiGn with aRy a+hor planned future imnrn�iemen+s +ha+ may influen Ge the nroient • Th�GINEER Will also identify and seek to obtain data for evicting GGnditiGns t c� msy imnaGt the nreie G+ inGl, ,ding b it no+ limited utilities, te•, agen Gies (TXDQT and railroads), Gity nnastor Plans, and property ewfwship Qc cvailable from +he Tax Assessor's office • The data GGllertion efforts will alse ORGl,,de GondUGting menial GGGrdina+ion sewer re rG, sting plcno. • The ENGINEER shall visit the nroieG+ site and obtain the meter numbers and sizes OR all evicti+Rg, + meters to he renla d % Gn the nrGient avid shall irdentify evicting sample re Re 2.2. (;eoterhniGal IRIyestigatiens � N INNER shall c d"'se the !`ITV of test borings and eth--\, oNbsb:rFa% �#+ans that may he needed for the nrejent. If the CITY determines that s,,Gh berings Or investigatiGns are needed then the ENGINEER I��" . shall \ the CITY and CITY %Gterhniral Gonsaltant to draw ,,n snesifiGatiGns for s,,Gh 2.3. Firs Line Racoons ?.'I. Tha-SeesOptucl GA -VP -I` S-heet • Ie-onhibits and Fi#ton summary- of alternative design GGnGen+s GGnsidered re GGmmended design GGn Gent •dosed phcoing of aRy water --a wni:cry Ce�ewerv"cork thcA io inGl„clad in this nrGleGt dGG, invented in bath the nreieGt sGhed, ale aR� na..rrativ • 1)GG, manta+iGn Gf kepi design denisiGns t E3timates of nrehable GGns+r, IGtiGn GGst. ASSUMPTIONS • = Geet niGal b,--�,9e-e;�expeGted or this pr9jeGt t Gonies of the non Gent, sal design na Gkage (30 design) will he delivered e letter sued and GGnvh_ he,,nd with a nl n �srt shall c��r ����iGeyer. Drawings will ha oize fold outs bE)6IRd OR the FePEA City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 4 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 �11�11 �tlrtT�LSTT.'E7�1:\7•:RlP.1:t�7i\�T.IZtAfR7:Ts�li1■T7R:��LT.'►T.ET.�7T7:R�LSTT: prc)jeGt f or in _/ • ENGINEER /Review • ENGINEER / ■ w-r44on appraval by the GITY of the GGRGOPW\31 A. Gi G--Pt5.\'l n TASK a. PRELIMINARY DESIGN (GA PERCENT). Preli plans and sp �qc s�izII he si ihmi+tend to CITY per the approved Dreier+ Cnhwdaiee ("_` ICCP will develop the preliminary design of the infrastrU Gt ire as follows Cp 3 e�velepment of Preliminary Resign DraWings anrd enifinanrde v. ti any.) shall �n l i�c the following: • Ce"er Sheet • AA Pre'eGt GeRtrel Sheet, shOWinn all CORtrel point)e useduseder set while gathering data. Generally nn a male of nn+ lu,00 thsn 1:400. The fnlleWiRg infnrma}inn Shall he inrdinaterd fer eanh Centrel Peint• Identified (existing City Mena amen+ #8901 PK , Moil 5/8" Iron Red); X, 1/ and- 7 &-errlina}e3 in an ideRtiTied Geerrdina+e System and a�Tebearinnbase. ZGOOrdinate��m only; ,decnrin}i"e Iona+inn (i.e. set in the pen+e.erdine of the inlet in the South ni irh line of North Side Drove at the East ee Fld e�uluo ct the Cei theast norner of Nerth Side Drove an,-d North �Qoin Ctrs • Overall preien+ easement Iavel i+ sheet(s) with property eWner inform a}inn • Overall nreien+ water and/or Ltl �tnrV-s ewer layet sheets. The water Irayea�t shee t shall identify the proposed wator main improvement/ existing wator maino in tha Vininity and all wator appartenannes along with pressure plane boundaries, water }inns valves anrd fir rants The sewer Iayel it sheet shall ta�}kn, pump ctc,�����e--h}(�,�,-r��Tc�ev�er�nc identify the prepeserd sewer main imprevement/existing sewor n-\.aino and--aI4 se or sppartenannes in the „inini+„ • Overall water and lor --anitary-sewor cbcn'denment shoe+ • roordonates on cll P.C.'a, P.T.'s, P.I.'o, mcnhal�.es, va;voo, mainline fit- tags, etc., IR the SarFne GOorvramut systom ao the Control Rents •--Benoh msrlco p9F 1,000 ft of planipFefile sheet—twe nr n^nrn • Rearipns given on cll proposed Gen+erlinec0 er baselines Ueatlon eq iatiens relating i itilitiec +o naVinge whon apprapriate. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 5 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 Plcn cnd profile Shoots WhiGh spew the folio n,ing• proposed Water and/G�- xnitcry sewer plan/profile and reGGMmeRded pope Sze, f�ydrants, water �e linos and motor boxes gate valves' isolation "ah,00 msnheles evicting moto i er nmbers and Siz6a thpt &\ o tebe replaGed evicting sample IGGatIGRG evicting firs Addition Msmac) al„nn With nr„norty ,,Wnorahip ohcll bs nrevi,de d nn the plan The ENGINEER choll mck easement When the evicting alignment of a water nn� L�Initw `cx mein air r� lateral iS Ghanged nr"iSienS will he monde in the final p\!cns c.nd/er cperifiGatienc by the ENGINEER �,�tiry treIGGate all Ser"ire lines which are rr�nnerterd to the evicting main land-GGe`Jt acid 09n,ine Iines to the relenateid main The fells n,inghall be any }nlirohle of all Inrotinnc where it is nereccory to relerote er repute t�h�co)(i3ting privato cc\nitix), "e,e,er semine Iine due to the ahanrdnnment nr real, Rmept o�eex�t'r} pi bliG sanitary sewer lateral or main: Th&-CITY shall farnioh th,aF=ISj INEER h s osmple format of hew the SeWeF SeFViGeGGIme repot Jte/relonatinn chef ld he idecigneid ap.sl �bmitted for GopStF Untinn flUripg design s m,e"f if a rednon he inserted through the Gleanni it to the bottom of the seFV Ge Iinee the ENGINEER Will obtain the flew Iine eleyatien and design the ?eernP,TGeIiRe� riop to ald"epticinggthe PFejeot fer bird If the Se WiGe flE)W fine i nformatinn Gannet he obtained di firing design survey, the Cnl(_INEER Jha ll delay the design-vrt I�I se verrerviGe imfl Until lafter o Quality Level A S else irfaGe Utility Engin Rg�CUG ins tien ha,^ been performed). TheLevel A SUE will he performed; 0 \ by the ENGINEER if inGl uded in the fee proposal; or (2) by the CITY prier to bidding if the CITY determinog thct it IG noeded for saticfa Gtnr" Gempletinn of the design; or (3) by the GentraGtnr after the project hao been hid! by means of a hid item to that effeot. In A options the CAI/_INEER ohsll propose hle'I R:ono in the preiert and roller# flew line elevation anrd ether oppliGahle iR formation of the sewer c ervreline. The ENGINEER a c o t io informationto p rn"ide the design for the xxiit-- r• p) se�e,er cep rie line to he rerouted OF relonated •--Prevido mcp oh` W'Rg Inrotinn Of new manhole Genctrl iGtien at the eRd of evicting sewer segments 90 degree bends OF tee nn ns Site survey OF cpenifiG design plcna for manhole Gonstrl iGtiGn is nGt inGli idedd cc part of for the SG pp The Gen+ra Gt deGldmontt Doll &p&Gify the it is the GeRtra Gtnr'c recponoibility4e Gnordinate Utility Inr•atinne ieto. manhole Genstn Gtinn • The ENGINEER willppreare standard and Special detail sheets for water Iine {wx` �llotinn and sewer reYYhahilitatieR er replaGen,ont th1 are not already inGl ided in the rl_Sestien of the C Q CPc Ti tiBf$�Theae-may inr id Genrne Etign details between aa.rriow part3 of the prnient0 i itnneling details, g g borinand iaGLindetails, waterline details trenGhless 0 ue to the GORStFUGtien of the 0 details and special sen,ioe lateral reonnnegtiens 3.2. (_'eeterhniGal Investigation City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 6 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 `a ? I GR84I igtabilifii R-111 e14 Drier to the 60 percent review meeting with the CITY thg GNG! CCU half sgherli ile anld attend a preiegt site Visit With the CITY Preiegt Manager avid GORStFIAg+ie�TSOnnel to walk the}}r8}e6tThe ENGINEER shsll 3Nrnmsriz--4- e CITY's remments from the field visit anrd submit this information to the CITY in W tt Rg. 3A "Wity Clearange The ENGINEER Will rensi il+ with the CITY's Transpertatien anrd Di iblir• Werks Department Water Depar+men+ and ether CITY idepar+monta, pabl1e UtilitieS, apprevimate leGatlen of abeve anrd i mrdergroi R d utilities, and ether facilities (cUrren+ anrd fi t iro) ths\ hsv-o sn impCGt or 'n'nrflraIe,nrGeenrthe preiec+ ENGINEER will TCITY fr .-ilities to a„eird or minimi'e conflicts With evio+inn utilities, avid where IlneWR anld possible censirder pe+ontial future utilities in !designs DVVF= files fer eaoh / appreved r plaR set te the desigRated prejeGt folder OR BIM360 PFejeGt. The —MAIF foles should be Greated dilreGtly fFeFn the GAD files as eppesed posteed _ sealed the sealed GentraGt dGGUrnents. Develop / / Divisionby the TraffiG / r Works ■ _ . be sealed by a prefesswenal engineer registered 'R State ef Texas. pL.,blin meeting(s) will he cenidi fisted er attended during the prc�iminary design ph--\o&-. bg4R,g, --,� sn sverane bore depth of faet each will he provided. r�sss�.r.�esrr.�■s>,rn:�rs�rstr■nnu:�■rer_t:■rs�. _ _ City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 7 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 3vto of oizo plc /i Will be delivered fnr the GGR641!Gtabili4�i 4C .`Fits-Gf size r Qns will be delivered for the DrelimiRary rlocinn 0 t sets of sneGifiGations will he delivered for the Preliminary Design /60 desigR). • DWF files Greated from design GAD drawings will he uploaded to the designated rr,je^Gt f or in I?IA436-0-. • The C r 's FE)Rt eRd and teGhrRiGal GpeGifiGatiORS will be used. ThGINEEP shall supplement the terhniGal snegifiy+ations if needed • ai&-- of size drawings will he delivered for Utility Gleearancee.. • N INFER shall n9#PFseeed with Fins.I Design antivities without ,eyrittan lappr9vat by the CITY of the Preliminary design plano. DELIVERABLES A Prellminar\y Design drawings and snenifinatiens B. Utility Gl ranee dFawings G. Traffin Gantral DlaR D. rm Water Polli�tionPTeVeRtioPlaR E. Eotimabas F. ►Wta lime listing names and ay-dFesses of residents and bl isinesses affected hey the nroient TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upen 1W;rgval of the PFV ftinary plans, ENGINEER will prepare construction plans as follows: •F=E)Hw-ejeoto that di3tNrb sn srea-gfeathsn go,,e (I) acFthe GeRtra^ter will be resnensihle fer nrenarinn and submitting the Storm Water Pel' itien Prevention PIGn Gonotruotion Plan aGGGFdiRg te the GUrFeRt CITY :cW44 Gr#er4a nnanual for- Site Ileye pment and GonstrUG40n Whioh will be innornorater•1 into the SVVPPP by the rye n tevrrtra &) F. 4.1. Data Collection • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 8 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations.4.2 Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. The packages shall include: • Cover Sheet A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). Overall project water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Bench marks per 1,000 ft of plan/profile sheet — two or more. • Bearings qiven on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 9 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de -hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. • Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. 4.3 Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's BIM360 website. The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by TxDOT and the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS • 2_ sets of 11x17 size drawings and 0_ sets of22x34 size drawings and _1 specifications will be delivered for the 90% Design package. • A PDF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. • 2 sets of _11x17 size drawings and _2 specifications will be delivered for the 100% Design package. • A PDF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 10 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 • [Engineer to provide estimated final sheet list (cover/index, general notes, control point location, easement layout, SUE plan sheets, no. of plan/profiles, special detail sheets, etc.)] DELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto BIM360 for access to potential bidders. • Contract documents shall be uploaded in a .xIs file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to BIM360 in .pdf format. The .pdf will consist of one file of the entire plan set. The dWf Will GGRSiGt of individual files „no fe eaoh plan 3h9et, and will be RumbeFe d and Rarned1 in c mcnnor oimilcr taut of th P!e.n oo+�. • The ENGINEER shall sell contract documents and maintain a plan holders list on BIM360 from documents sold and from Contractor's uploaded Plan Holder Registrations in BIM360. The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's BIM360folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 11 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 addenda. The ENGINEER shall upload all approved addenda onto BIM360 and mail addenda to all plan holders. • Attend the pre bid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on BIM360BIM360. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings 1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher. There shall be one (1) PDF file for the Water plan set. Each PDF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Sinqular PDF files for each sheet of a plan set will not be accepted. PDF files shall conform to naming conventions as follows: TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf PDF files shall be uploaded to the project's Final Drawing folder in BIM360. 2) In addition to the PDF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 12 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF, but shall include the sheet number in the name — "W-1956—SHT01.dwg", "W-1956—SHT02.dwg", etc. II. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155—SHT01.dwg", "X-12755—SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • _3_ sets of construction documents will be sold to and made available on BIM360 for plan holders and/or given to plan viewing rooms. • 5_ sets of _11 "x17" size and _5 sets of _22"x34" size drawings plans and _2_ specifications (conformed, if applicable) will be delivered to the CITY. • PDF and DWG files will be uploaded to BIM360. DELIVERABLES A. Addenda B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 13 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. The ENGINEER shall attend the "Final' project walk through and assist with preparation of final punch list 6.2 Record Drawings • The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As -Built Survey o Red -Line Markups from Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the mylars. 2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 14 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_rec47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "47" shall be the total number of sheets in this file. Example: W-0053_rec3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "36" shall be the total number of sheets in this file. Example: X-12755_rec18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawings folder in BIM360. ASSUMPTIONS • 3 RFI's are assumed. • -1 Change Orders are assumed • One copy of full size (22"x34") mylars will be delivered to the CITY. DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Final Punch List items F. Record Drawings on Mylar TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 15 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 • The ENGINEER shall determine rights -of -way, easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. 7.3. Temporary Right of Entry Preparation and Submittal • Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry documents for landowners to CITY PM for real property acquisition. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. ASSUMPTIONS • _36 Easements or right-of-way documents will be necessary. • 47 Temporary right -of -entry documents will be necessary. • Right -of -Way research and mapping includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES A. Easement exhibits and meets and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 16 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: - The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. C. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). - Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. - No less than two horizontal bench marks, per line or location. - Bearings given on all proposed centerlines, or baselines. - Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal • Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of Entry for landowners to CITY PM. The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. ASSUMPTIONS • Topographic survey at intersection will include no more than 100 ft. in each direction. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 17 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 B. Drawing of the project layout with dimensions and coordinate list. TASK 9. PLAN SUBMITTAL CHECKLISTS Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: PLAN SUBMITTAL CHECKLIST REQUIREMEN—S Traffic Traffic Traffic Street Water Control Control Control Traffic Storm "A" Storm Lights /Sewer Traffic 30% 60% 90% Attachment Signal Water Water (Submit (Submit Engineering Type (Submit All o 30% a 60 /o All @ All @ (Submit All @ 30%) 30% 60%) @ 60/oo) Required for all work in City ROW Street X X X X V X X X X Storm Water X X X X X Water / Sewer X X X X *If included in street project ASSUMPTIONS DELIVERABLES A. Standard City of Fort Worth Traffic Control Details B. Specific phased traffic control plan for one (1) area — Freeman Steet and Rosedale ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existinq Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 18 of 19 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION, CONTRACT 130 CITY PROJECT NO.: 105177 CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary right -of - entries. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re -bidding of the contract for construction. • Construction management and inspection services • Periodic site visits during construction phase • Design phase public meetings • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to submitting for permits (ie.TxDOT, railroad, etc...) • Services related to Subsurface Utility Engineering Levels A, B, C or D • Services related to Survey Construction Staking • Services related to acquiring real property including but not limited to easements, right-of-way, and/or temporary right -of -entries. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Construction Shop drawing review, samples and other submittals submitted by the contractor. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 19 of 19 ATTACHMENT B COMPENSATION Design Services for Sanitary Sewer Rehabilitation, Contract 130 City Project No. 105177 Lump Sum Project Compensation A. The ENGINEER shall be compensated a total lump sum fee of $229,540.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item 111. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 3 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Prime Consultant Shield Engineering Project Management, Group, PLLC Engineering Design Proposed MWBE Sub -Consultants Visintainer Engineering PM Assistance & QAQC Non-MWBE Consultants Project Number & Name Sanitary Sewer Rehabilitation, Contract 130 City MWBE Goal = 9% City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 3 TOTAL Total Fee $229,540.00 Fee Amount % $206,540.00 90% $23,000.00 10% $229,540.00 100% MWBE Fee MWBE % $23,000.00 10% Consultant Committed Goal = 10% LM EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 3 of 3 LMI Professional Services Invoice Project Manager: I Lawrence Hamilton Project: Sanitary Sewer Rehabilitation, Contract 130 City Project #: 105177 1 City Sec Number: Company Name: IShield Engineering Group, PLLC Supplier's PM: Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Jean Marie Alexander 2023101.01-1 1 Supplier Instructions: Summary Fill in green cells including Invoice Number, From and To Dates and the included worksheets When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. email: accountin shield -en ineerin .com Office Address: 1600 W 7th Street, Ste 400, Fort Worth, TX 76102 Telephone: 817-810-0696 Fax: Remit AddreSS: ACH/PO BOX 470636, Fort Worth, TX 76147 Agreement LTD Agreement Amendment Amount to Completed Sheet FID and Work Type Description Amount Amount Date Amount Work Type 1 Water Design $108,276.00 $108,276.00 Work Type 2 Sewer Design $121,264.00 $121,264.00 Work Type 3 Work Type 4 Work Type 5 Work Type 6 Totals This Invoice $229,540.00 $229,540.00 Overall Percentage Spent: Percent ($) Invoiced Current Remaining Spent Previously Invoice Balance $108,276.00 $121,264.00 $229,540.00 Professional Services Invoice Project Manager: Lawrence Hamilton Project: Sanitary Sewer Rehabilitation, Contract 130 City Pro)ect #: 105177 Work Type Desc: lWater Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Shield Engineering Group, PLLC Supplier's PM: Jean Marie Alexander Supplier Invoice #: 2023101.01-1 Payment Request #: 1 Service Date:From Service Date:To Invoice Date: Pay Items 30 - Desiqn Description Totals This Unit email: accounting@shield-engineering.com Office Address: 1600 W 7th Street, Ste 400, Fort Worth, TX 76102 Telephone: 817-810-06 g6 Fax: Remit ACH/PO BOX 470636, Fort Worth, TX 76147 Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $108,276.00 $108,276.00 $108,276.00 $108,276.00 Overall Percentage Spent: Percent ($)Invoiced Spent Previously Current Invoice Remaining Balance $108,276.00 $108,276.00 Professional Services Invoice Project Manager: Lawrence Hamilton Project: Sanitary Sewer Rehabilitation, Contract 130 City Project #: 105177 Work Type Desc: I Sanita ry Sewer Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Shield Engineering Group, PLLC Supplier's PM: Jean Marie Alexander Supplier Invoice #: 2023101.01-1 Payment Request #: 1 Service Date:From Service Date:To Invoice Date: Pay Items 30 - Design Description Totals This Unit: email: accounting@shield-engineering.com Office Address: 1600 W 7th Street, Ste 400, Fort Worth, TX 76102 Telephone: 817-610-0696 Fax: Remit ACH/PO BOX 470636, Fort Worth, TX 76147 Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $121,264.00 $121,264.00 $121,264.00 $121,264.00 Overall Percentage Spent: Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance $121,264.00 $121,264.00 T-1 Qu BID PROPOSAL Page 1 of2 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Unit 1: Water Improvements Protect Item Information Bidder's Proposal Builist Description Specification Section No. Unit of Bid Quantity Unit Price Bid Value Item No. Measure 1 3311'0261 8" PVC Water Pipe 3311 12 LF 3491 $110.00 $384.010.001 2 13311'0161 6" PVC Water Pipe 3311 12 LF 105 $165.00 $17.325.001 3 13312.3003 8" Gate Valve 33 12 20 EA 12 $2.950.00 $35.400.00 1 4 13312.3002 6" Gate Valve 33 12 20 EA 9 $2.310.00 $20.790.00 1 5 13305.0003 8" Waterline Lowering 33 05 12 EA 1 $13.400.00 $13.400.001 6 13312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 11 $4.225.00 $46.475.001 7 13312.2001 1"Water Service, Meter Reconnection 331210 EA 112 $590.00 $66.080.001 8 13312.2003 1"Water Service 331210 EA 112 $2.650.00 $296.800.001 9 13312.2004 1" Private Water Service 33 12 10 LF 55 $53.75 $2.956.251 10 10241.12184"-12" Water Abandonment Plug 024114 EA 14 $1.200.00 $16.800.001 11 13311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 3 $11.650.00 $30.290.001 12 13312.0001 Fire Hydrant 331240 EA 9 $6.200.00 $55.800.001 13 10241.1001 Water Line Grouting 0241 14 CY 25 $525.00 $13.020.001 14 10241.1011 Remove 4" Water Line 0241 14 LF 174 $15.00 $2.610.00 1 15 10241.1301 Remove & Salvage 4" Water Valve 0241 14 EA 1 $400.00 $400.00 1 16 10241.1302 Remove & Salvage 6" Water Valve 0241 14 EA 8 $400.00 $3.200.00 1 17 10241.1303 Remove & Salvage 8" Water Valve 0241 14 EA 1 $400.00 $400.00 1 18 10241.1510 Salvage Fire Hydrant 0241 14 EA 8 $1.000.00 $8.000.001 19 13201.0112 5' W ide Asphalt Pvmt Repair, Residential w/ 2:27 Conc Base 3201 17 LF 5284 $140.00 $739.760.00 1 20 13201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 3201 17 BY 587 $70.00 $41.090.001 21 13201.0614 Conc Pvmt Repair, Residential 3201 29 BY 387 $220.00 $85.140.001 22 13213.0301 4" Conc Sidewalk 32 13 20 SF 75 $15.00 $1.125.001 23 13213.0401 6" Concrete Driveway 32 13 20 SF 385 $18.00 $6.930.00 1 24 13216.0101 6" Conc Curb and Gutter 32 16 13 LF 605 $75.00 $45.375.001 25 13304.0101 Temyorary Water Services 33 04 30 LS 1 $50.000.00 $50.000.001 26 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 2 $2.325.00 $4.650.00 1 27 13305.0109 Trench Sat t� 33 05 10 LF 3473 $2.50 $8.682.501 28 133055.Q011171 Valve Box Adjustment 33 05 14 EA 21 $725.00 $15.225.001 29 1 onrete ar for Valve 330517 11.550.001 $$2.000.00 30 �g5.02�3 Ymported Emlbedment/Backfill, CLSM 3305 10 CY 10 $200.00 1 31 13471.0001 Traffic Control 3471 13 MO 3 $5.670.00 $17.010.001 32 Mobilization 01 7000 LS 1 $104,000.00 $104.000.001 33 �0170.0100 0171.0101 Construction Staking 01 71 23 LS 1 $10,000.00 $10.000.001 34 0171.0102 As -Built Survey 01 7123 LS 1 $10.000.00 $10.000.001 35 19999.0005 SWPPPs 1 acre LS 1 $8.000.00 $8.000.001 36 19999.0001 Miscellaneous Utility Adjustment (Irrigation) LS 1 $5.000.00 $5.000.001 37 I9999.0002 Water Construction Allowance LS 1 $145.000.00 $145.000.001 WATER IMPROVEMENTS SUBTOTAL $2,324,293.75 1 20%CONTINGENCY $464,858.751 WATERIMPROVEMENTSTOTAL $2,789,152.501 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Foam R-s 20120120 20231227 C.- 130 90% OPCC T-1 Qu BID PROPOSAL P" 2of2 Unit 2: Sanitary Sewer Improvements Project Item Information Bidder's Proposal Btdlist Description Specification Section No. Unit of Bid Quantity Unit Price Bid Value Item No. Measure 35 3331.4215 15" Sewer Pipe 33 11 10, 33 31 12, 33 31 20 LF 1500 $400.00 $600.000.00 1 18 3331.4115 VC SKI 2 Sewer P(r 33 11 10, 33 31 12, 33 31 20 LF 859 $214.00 $183.826.001 36 3331.0102 6" Sewer Pipe, Point Repair 33 31 22, 33 31 23 LF 20 $275.00 $5.500.00 1 25 3331.1102 6" to 8" Pipe Enlargement 3331 23 LF 496 $115.00 $57.040.001 29 0241.2106 15" Sewer Aban onment Plug 0241 14 EA 4 $1.000.00 $4.000.00 1 30 0241.2103 8" Sewer Abandonment Plug 0241 14 EA 3 $800.00 $2.400.00 1 5 0241.2102 6" Sewer Abandonment Plug 0241 14 EA 1 $1.105.00 $1.105.00 1 27 3331.3311 4" Sewer Service, Reconnection 3331 50 EA 2 $1.875.00 $3.750.00 1 26 3331.3101 4" Sewer Service 3331 50 EA 1 $2.700.00 $2.700.00 1 28 3331.3105 4" Private Sewer Service 3331 50 LF 67 $82.00 $5.494.00 1 34 3331.3102 4" 2-Way Cleanout 3331 50 EA 6 $437.00 $2.622.00 1 19 3339.0001 Epoxy Manhole Liner (Warren Environmental or Chesterton) 33 39 60 VF 110 $515.00 $56.650.001 20 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 8 $9.300.00 $74.400.00 1 31 3339.1002 4' Drop Manhole 33 39 10, 33 39 20 EA 2 $13.400.00 $26.800.001 32 3339.1003 4' Extra Depth Manhole 33 39 10, 33 39 20 VF 29 $345.00 $10.005.001 14 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 2 $535.00 $1.070.00 1 22 3305.0106 Manhole A justment, Major w/ Cone, Ring, Frame, & Cover 33 05 14 EA 2 $5.050.00 $10.100.00 1 6 0241.2201 Remove 4' Sewer Manhole 0241 14 EA 6 $1.520.00 $9.120.00 1 33 0241.5001 Abandon Manhole 0241 14 EA 2 $1.815.00 $3.630.001 16 3305.0112 Concrete Collar for Manhole 33 05 17 EA 12 $1.020.00 $12.240.001 4 /0241.2001 Sanitary Line Grouting 0241 14 CY 242 $525.00 $127.050.001 _,0241.1300 Remove Conc Curb&Gutter 1 0241 15 LF 1 1 $9.50 $0.001 _7 23 '3201.0112 5' W ide Asphalt Pvmt Repair, Residential w/ 2:27 Conc Base 1 3201 17 LF 1 1 $140.00 $0.001 8 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 1 3201 17 SY 1 1 $70.00 $0.001 24 3201.0614 Conc Pvmt Repair, Residential 1 3201 29 SY 1 1 $220.00 $0.001 9 3216.0101 6" Cone Curb and Gutter 32 16 13 LF 1 1 $75.00 $0.001 10 3301.0001 Pre -CCTV Inspection 3301 31 LF 496 $9.00 $4.464.001 11 3301.0002 Post -CCTV Inspection 3301 31 LF 2855 $8.00 $22.840.001 12 3301.0002 Final- Manhole CCTV Inspection 3301 31 EA 15 $625.00 $9.375.00 1 13 3301.0101 Manhole Vacuum Testing 3301 30 EA 15 $400.00 $6.000.00 1 15 3305.0109 Trench Safety 33 05 10 LF 2399 $2.50 $5.997.50 1 38 3305.0113 Trench Water Stops 330515 EA 1 $1,183.00 $1.183.001 17 3305.0203 Imported Embedment/Backfill, CLSM 33 05 10 CY 215 $200.00 $43.000.001 21 3471.0001 Traffic Control 3471 13 MID 3 $5.670.00 $17.010.001 3 0170.0100 Mobilization 01 7000 LS 1 $66.600.00 $66.600.001 1 0171.0101 Cc�strrFtion Staking 01 71 23 LS 1 $10.000.00 $10.000.001 2 0171.0102 As- uirrt Survey 01 7123 LS 1 $10.000.00 $10.000.001 38 9999.0003 Connect 15" Main to Exist Manhole EA 3 $850.00 $2.550.00 1 39 9999.0004 Sanitary Sewer Construction Allowance LS 1 $93.000.00 $93.000.00 1 SEWER IMPROVEMENTS SUBTOTAL $1,491,521.501 20%CONTINGENCY $298,304.301 SEWER IMPROVEMENTS TOTAL $1,789,825.801 Base Bid Subtotal Unit 1 - Water Improvements $2.324.293.751 Subtotal Unit 2 -Sewer Improvements $1.491.521.501 Total $3,815,815.251 Total (with 20 % contingency) $4,578,978.30 1 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS F. R--120120120 20231227 C.-13090 % OPCC Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Water Department Survey Services for Sewer Main M-22, L-304 and Water Relocations City Project No. 105177 Task No. Task Description Principal Project Manager Project Engineer EIT Labof(hours) CADD RPLS SIT Survey Tech Survey Crew Ad, "I"' relive I Subconsullant Total Labor Cos[ I Subconsullant MWBE I Non-MWBE Pense Reproduction Total Expense Cost Task Sub Total %Complete Remaining Budget Rate $300 $280 $200 $150 $130 $245 $145 $115 $185 $95 11.0 Project Management 0 7 0 8 0 0 0 0 0 0 1.1 Maregimp the Team 11.2 QA OC 2 1.2 Commum t-antl Reporting 2.1 Pre -Design Coordination Meeting (assumes 1 meetinq) 1 1 1 2.2 Design Submittal Review Meetims (assumes 2 meetings) 1 1 127-8 Coordination With Other Agencies(TxDOT) 3 6 3.0 (Preliminary Design (90 Percent) 0 10 SO 188 24 0 0 0 0 0 3.1 Data Collection 10 I 32 PP eliminar�Design Draw nos 8 S�ecifi ations (4813 LF`` 4 28 20 24 preliminaryUesign Drawings & Spec1 -"ns -1°rovided by City InHouse Design(2380 32 LF $S) 4 16 I 33 Constmctabikty Review I 3.4 Public Meeting 2 2 2 I 3 5 U6bN Clea an a (Assumes 1 site visd) I 3.8 Tragic Control Plan 2 12 40 37 Estimate 2 4 10 $ 3,160 1 $ 1,400 $ $ - $ 1,400 $ 4,560 $ 960I $ 6301 $ 630 $ 2,340 $ 400 $ 200 $ 200 $ 600 $ 560I $ 400 $ 430I $ 430 $ 200 $ 200 $ 1,740 $ 600 $ 44,120 $ 12,200 $ $ $ 12,200 $ 56,320 $ 1,500 $ 35,840 $ 4,800 $ $ 1,660 $ $ 10,360 $ 3,660 $ 1,500 1 $ 27,840 I $ 8.000 $ 3,200 $ 1.600 $ I $ 1,260 I $ 400 $ I $ 8,960 I $ 1,400 $ 2,860 $ 800 $ $ 8,000 $ 1,600 $ $ 400 $ $ 1,400 $ 800 4.0 Final Design 0 3 10 48 0 0 0 0 0 0 4.1 SWPPP (') (Assumed a SWPPP book will be provided by the contractor) I 41 Prepare ISWM Construction Plan (Not included in this contract) I 4.2 Final Draft (90%) Construction Plans and Specifications I 4 3 Final (100%) Plans and Specifications 2 6 40 4A Construction Estimates (90%and 100%) 1 4 8 5.0 Bid Phase 0 3 5 5 0 0 0 0 0 0 51 Bid Support 5.1.1 Upload and Sell Contract Documents and Maintain Plan Holders List 51.2 Issue Addend, 1-sumes l) 2 2 5.1.3 Attend Pre -lad Conference 1 1 5.1.4 Attend Bid Opening 5.1.5 Tabulate Bids and Recommend Award 2 2 5.1 6 Issue Conformed Contract Documents 2 $ 10,040 $ 2,800 $ $ $ 2,800 $ 12,840 $ $ $ $ 10,1601 $ 2,680 $ 3,690 I $ I $ 1,1601 $ 1,030 $ - $ 700 $ 800 $ I I I $ 2,400 $ 400 $ $ $ $ $ $ 7,760 $ 2,280 $ 2,400 $ 400 $ 2,590 $ 600 $ $ Soo $ 1,100 $ I 200 $ 400 I I $500 $ $ 200 $ 960I$ $ 6301 $ 400 $ $ - $ 700 $ 300 $ $ 500 �I I I 6.0 Construction Phase Services 0 6.1 Construction Support 61.1 Altentl Pra,onstruction Conference 8.1.2 Attend Public Meeting fi 1.3 Project Ste VSlls (assumes 3 mo of constr) f Information Review (assumes 3) 6.2 R.rmyDmwmgs 6 8 5 0 0 0 0 0 0 $ 4,230 E 1,200 E $ $ 1,200 $ 5,430 1 2 2 2 2 2 3 2 2 3 $ $ 9601 $ 400 $ 400 $ 400 1 $ $ 400 $ $ 1,360 $ 1,2601 $ 1,0501 $ 400 $ 400 $ 1,660 $ 1,450 $ 960 $ - $ - $ - $ 960 $ - I I� 7.0 ROW/Easement Services (Provided in TPW Scope) ] 1 R ht-of-Wa Research ]2 ht-ot-W (7sement p (j 9/nnlaljq, spumes 36) 1 73 mry igof EMntubmilfaP(Assumes 4� 1 0 0 0 0 0 88 45 351 41 0 $ 76,035 b 4,800 E $ 800 $ 5,600 $ 81,635 $ 18,330 60,7151 $ 2,5901 18 70 45 351 27 14 $ 15,930 57,5151$ $ 2,590 $ 2.400 2,400 $800 $ 2,400 3,200 $ I' IjI 18.0 SUNEy 81 Design Survey 8.1 Tie antl Dip AdtlOonal SSMH (Assumes 8) 0 0 0 0 0 0 23 1 81 1. 0 $ 42,765 b $ $ $ $ 42,7651 $ 40,2451 $ 2,520 1 19 4 1 71 4 8 1 $ 40,245 $ 2,520 $ $ ra dyDmachad Semces 9.0 i "rare 1 Totals $ 20,000 E $ 20,000 1 $ 227,240 1 $ - $ - 0 29 14 2. 24 88 68 1 432 203 0 1$ 202,940 1 $ 23,0011 1 E $ 1,300 $ 24,300 ( Footage % Footage Design Fee I vva,n� a��u Water nay,. mnanuuw„ Sandmy Sewer Total Cost % Complete rrelasu Remammq Butlgetl oumrn uy Total Hours 1.173 Water) 339'Jj 47°°f $ 108,2761 Fo. % LF %J Total Labor $ 202.940 Sewer) 380(!f Total) 719' 53%J $ 121,264 100°°I $ 229.540 9,J 1 Contract 1 ',�'39'Sf 47 $108,276 I TOTAL 339' I 47 1 $106,276 380T 380 53 .1 $ 53 �I $ 121,264 $ 229.540 121.264 $ 229.540 0.< $ 229,540 0°°I $ 229,540 Total Expense $ ME�FF(F �H uI R( $ E 24.300 23,000 Non-fk11jF Sll �[�apCupl $ iiiMBEJSBE 2.300 PSadiyMg1 10.0% Total Projedf Co:( $ 229,540 City of Fort Worth Texas Attachment B - Level of Effort Supplement PMO Official Release Data 8 09 2012 1 Of ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for Sanitary Sewer Rehabilitation, Contract 130 City Project No. 105177 None City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page 1 of 1 FORT WORTH ATTACHMENT "D" PROJECT SCHEDULE A. ENGINEER Project Schedule Development ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the requirements of the Agreement and encompassing the Scope of Work defined in Attachment A to the Agreement. ENGINEER shall prepare and maintain project schedule throughout the life of the project as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned sequencing of the work activity and timing of the work. B. Schedule "Tier" Selection City has identified three "Tier" levels for project schedules as defined in City's Specification 00 31 15, to align with the size and complexity of the project as a basis for schedule development. City's Project Manager will determine the "Tier" level for the ENGINEER's project schedule as part of the negotiation of the Agreement. C. Project Baseline Schedule ENGINEER will produce an initial project schedule and submit as a "baseline" for review and acceptance by City's Project Manager as defined in City's Specification 00 31 15 which will be referred to as the Project Baseline Schedule. Updates to the baseline schedule follow the requirements of City's Specification 00 31 15. D. Project Progress Schedule ENGINEER will provide to the City, monthly updates to their project schedule indicating progress of the Work in compliance with the requirements of City's Specification 00 31 15 and said schedule will be referred to as the Project Progress Schedule. E. Master Project Schedule City will develop and maintain a master project schedule for the overall project. ENGINEER's project baseline and progress schedule submittals will be an integral part of the development and updating process of City's Master Project Schedule. City of Fort Worth, Texas Attachment D Revision Date: 07.20.2018 Page 1 of 1 SANITARY SEWER REHABILITATION, CONTRACT 130 CPN No: 105177 ID Task Task Name Duration Start Finish Predecessors Resource Names 2023 2024 0 Mode H1 H2 H1 1 701 Project Planning 15 days Mon 4/3/23 IFri 4/21/23 I"I 2 )r Program/Project Planning 15 days Wed 6/28/23 Tue 7/18/23 3 Project Start 5 days Wed 6/28/23 Tue 7/4/23 4 Planning 60 days Wed 7/5/23 Tue 9/26/23 3 5 )r Project Agreement 38 days Mon 10/16/23 Wed 12/6/23 6 04 Project/Contract Agreement 1 day Mon 10/16/23 Mon 10/16/23 4FS+5 days 7 Wa Program/Project Contract Agreement 51 days Tue 10/17/23 Tue 12/26/23 8 04 Select Consultant/Negotiate Fee & Scope 8 days Tue 10/17/23 Thu 10/26/23 6 9 M&C Process - Design 32 days Fri 10/27/23 Mon 12/11/23 8 ` 10 k�"�' �+ Award Agreement - Design 1 day Tue 12/12/23 Tue 12/12/23 9 11 Agreement Execution 10 days Wed 12/13/23 Tue 12/26/23 10 12 Jr Design 88 days Tue 9/26/23 Thu 1/25/24 13 90% Final Design 88 days Tue 9/26/23 Thu 1/25/24 , 14 11% Issue Design Notice to Proceed 1 day Tue 9/26/23 Tue 9/26/23 h 15 11% Design Survey 3 days Wed 9/27/23 Fri 9/29/23 14 1 16 04 Design Kick-off Meeting 1 day Tue 9/26/23 Tue 9/26/23 I 17 Prepare Final Design Drawings & Document: 29 days Mon 10/2/23 Thu 11/9/23 15 18 11% Submit Final Plans & Specs 1 day Fri 11/10/23 Fri 11/10/23 17 19 7r Public Meeting 1 day Tue 11/14/23 Tue 11/14/23 18 20 Review 90% Plans and Specs (CFW) 21 days Mon 11/13/23 Mon 12/11/23 18I 21 ra Incorporate Final Comments and Submit 3 days Tue 12/12/23 Thu 12/14/23 20 Revised Drawings S. Documents 22 04 Peer Review Meeting/Design Review 15 days Fri 12/15/23 Thu 1/4/24 21 Meeting (Technical) 23 )r Approve Final Plans and Specifications and 5 days Mon 1/8/24 Fri 1/12/24 22 Route for Signatures 24 11% Final Design Complete 1 day Mon 1/15/24 Mon 1/15/24 23 25 7r Establish MBE Goal for Construction Contra13 days Tue 1/16/24 Thu 1/18/24 24 26 Prepare Bid Package 5 days Fri 1/19/24 Thu 1/25/24 25 27 Permits 42 days Fri 11/10/23 Mon 1/8/24 1 28 Identify Required Permits 5 days Fri 11/10/23 Thu 11/16/23 17 29 Prepare Permits 0 days Thu 11/16/23 Thu 11/16/23 28 1- /16 30 4 RR Permitting - Submit, Review, Approve 0 days Thu 11/16/23 Thu 11/16/23 28 j 1' 1/16 31 SWPPP- Submit,Review,Approve 0days Thu 11/16/23 Thu 11/16/23 28 j 1'I/i6 32 Floodplain Services - Submit, Review, Approve 0 days Thu 11/16/23 Thu 11/16/23 28 j 1' 1/16 33 TxDOT Permitting -Submit, Review, Approve 30 days Fri 11/17/23 Thu 12/28/23 28 34 Gas Main Crossing Permits - Submit, Review, 0 days Thu 11/16/23 Thu 11/16/23 28 j 1' 1/ 6 Approve 35 11 TRW D & City of FW Parks Conversion - 0 days Thu 11/16/23 Thu 11/16/23 28 j 1' 1/ 6 Submit, Review, Approve 36 1r. USACE Permit Section (408) and (NWP12) - 0 days Thu 11/16/23 Thu 11/16/23 28 1' I/ 6 Submit, Review, Approve 37 Review and Approve Permits 6 days Fri 12/29/23 Fri 1/5/24 33 Task Summary , , Inactive Milestone Duration -only Start -only C External Milestone Project: Attachment D Schedule Date' Fri 12/15/23 Split . . . . . . . . . . . . . . . . I . . Project Summary Ii Inactive Summary 0 0 Manual Summary Rollup Finish -only 7 Deadline ♦ Milestone ♦ Inactive Task Manual Task Manual Summary ---------- External Tasks Progress Page 1 2025 H2 Manual Progress H1 Shield Engineering Group, PLLC SANITARY SEWER REHABILITATION, CONTRACT 130 CPN No: 105177 ID Task Task Name Duration Start Finish Predecessors Resource Names 2023 Mode H1 38 Permits 1 day Mon 1/8/24 IMon 1/8/24 137 39 Environmental 0 days Thu 8/10/23 Thu 8/10/23 40 Identify Environmental Issues 0 days Thu 11/9/23 Thu 11/9/23 17 41 Archaeological Investigation 0 days Mon 1/15/24 Mon 1/15/24 24 42 ra Review Investigation Findings 0 days Mon 1/15/24 Mon 1/15/24 24 43 04 Archaeological Retrenching (if necessary) 0 days Mon 1/15/24 Mon 1/15/24 24 44 Wa Investigation Report Finalization 0 days Mon 1/15/24 Mon 1/15/24 24 45 04 Environmental 0 days Mon 1/15/24 Mon 1/15/24 24 46 11% Utilities 20 days Thu 11/9/23 Thu 12/7/23 47 11% Utilities 0 days Thu 11/9/23 Thu 11/9/23 17 48 11% Utility Relocation 20 days Thu 11/9/23 Thu 12/7/23 49 11% Utilities Start 0 days Thu 11/9/23 Thu 11/9/23 17 50 Review Plans and Specs - Utilities 20 days Fri 11/10/23 Thu 12/7/23 49 51 Utility Relocation 0 days Thu 12/7/23 Thu 12/7/23 50 52 Utilities Complete 0 days Thu 12/7/23 Thu 12/7/23 51 53 04 Construction 947 days Mon 5/10/21 Tue 12/24/24 54 11% Construction 1 day Mon 5/10/21 Mon 5/10/21 55 Project Management 90 days Mon 5/10/21 Fri 9/10/21 56 Construction Project Management 90 days Mon 5/10/21 Fri 9/10/21 57 Construction Advertisement 165 days Thu 11/23/23 Wed 7/10/24 58 Advertisement 72 days Thu 11/23/23 Fri 3/1/24 59 2r' Advertisement Period 26 days Thu 11/23/23 Thu 12/28/23 60 EEC]i i Bid Advertisement 1 day Fri 1/26/24 Fri 1/26/24 26 61 Ill Advertisement Period 25 days Mon 1/29/24 Fri 3/1/24 60 62 EEC]III Hold Pre -Bid Meeting 1 day Wed 2/14/24 Wed 2/14/24 60FS+12 days 63 Issue Addenda (as needed) 17 days Thu 2/1/24 Fri 2/23/24 60FS+3 days 64 Bid Opening 1 day Thu 2/29/24 Thu 2/29/24 61FS-2 days 65 Review Bids - Bid Tabulations and 1 day Fri 3/1/24 Fri 3/1/24 64 Select Contractor 66 MWBE Documentation 6 days Mon 3/11/24 Mon 3/18/24 67 Submit MWBE Compliance Documents 1 day Mon 3/11/24 Mon 3/11/24 65FS+5 days 68 Review and Approve MWBE Compliance 5 days Tue 3/12/24 Mon 3/18/24 67 Documents 69 , M and C Process 20 days Tue 12/12/23 Mon 1/8/24 70 Start M&C Process - Construction 1 day Tue 3/26/24 Tue 3/26/24 68FS+5 days 71 8 M&C Process 60 days Wed 3/27/24 Tue 6/18/24 70 72 I�"�' Award Contract - Construction 1 day Wed 6/19/24 Wed 6/19/24 71 73 Contract Execution 15 days Thu 6/20/24 Wed 7/10/24 74 Execute Contract Documents (Contractor 5 days Thu 6/20/24 Wed 6/26/24 72 75 ! Execute Contract Documents (CFW) 10 days Thu 6/27/24 Wed 7/10/24 74 76 Pre -Construction Activities 22 days Thu 7/18/24 Fri 8/16/24 Project: Attachment D Schedule Task Summary . . Inactive Milestone Duration -only Start -only DateFri 12/15/23 Split . . . . . . . . . . . . . . . . I . . Project Summary Inactive Summary 0 0 Manual Summary Rollup Finish -only Milestone ♦ Inactive Task Manual Task Manual Summary 7-m"momf External Tasks Page 2 H2 ♦ 8/10 2024 H1 I j 11 r9 /15 ♦� /15 /15 /15 /15 11 11, r9 rl L r9 49'12/7 j'12/7 Ill C External Mtlestone 7 Deadline Progress 2025 H2 I H1 ♦ Manual Progress ♦ Shield Engineering Group, PLLC ID Name SANITARY SEWER REHABILITATION, CONTRACT 130 CPN No: 105177 adecessors (Resource Names 2023 H1 77 4 Distribute Executed Contract Documents to 5 days Thu 7/18/24 Wed 7/24/24 75FS+5 days Construction 78 Hold Pre -Construction Meeting with 1 day Tue 7/30/24 Tue 7/30/24 77FS+3 days Contractor 79 Issue Notice to Proceed for Construction 1 day Wed 7/31/24 Wed 7/31/24 78 80 of Hold Public Meeting - Pre -Construction 5 days Tue 8/6/24 Mon 8/12/24 79FS+3 days 81 111% Submittals and Approvals 10 days Fri 8/2/24 Thu 8/15/24 79FS+1 day 82 Pre -Construction 1 day Fri 8/16/24 Fri 8/16/24 81 83 Construction Contract 70 days Mon 8/19/24 Fri 11/22/24 84 Notice to Proceed for Construction 1 day Mon 8/19/24 Mon 8/19/24 82 85 Construction Phase Start 1 day Tue 8/20/24 Tue 8/20/24 84 86 Construction 68 days Wed 8/21/24 Fri 11/22/24 85 87 Ill Construction Contract 68 days Wed 8/21/24 Fri 11/22/24 85 88 Ill Materials/Testing 69 days Wed 8/21/24 Mon 11/25/24 89 Ill Material and Soil Testing 68 days Wed 8/21/24 Fri 11/22/24 85 90 Ill Material/Soil Testing 1 day Mon 11/25/24 Mon 11/25/24 89 91 Ir+ Inspection 90 days Wed 8/21/24 Tue 12/24/24 92 4 Inspections 68 days Wed 8/21/24 Fri 11/22/24 85 93 Ill Final Inspection 10 days Mon 11/25/24 Fri 12/6/24 92 94 4 Construction Phase Complete 1 day Mon 12/9/24 Mon 12/9/24 93 95 4 Inspection 90 days Wed 8/21/24 Tue 12/24/24 85 96 Ill Closeout 51 days Wed 12/25/24 Wed 3/5/25 97 Ill Closeout 1 day Wed 12/25/24 Wed 12/25/24 95 98 W. Closeout Report and Review 21 days Wed 12/25/24 Wed 1/22/25 99 Ill Submittals (Project Closeout Documentatio15 days Wed 12/25/24 Tue 12/31/24 95 100 W. Contract Reconciliation 10 days Wed 1/1/25 Tue 1/14/25 99 101 1+ Project Acceptance (Acceptance Letter) 1 day Wed 1/15/25 Wed 1/15/25 100 102 4 Notice of Completion/Green Sheet 5 days Thu 1/16/25 Wed 1/22/25 101 103 11 Close -Out Report and Review 15 days Wed 12/25/24 Tue 1/14/25 95 104 Ill As -Built Survey 16 days Wed 1/15/25 Wed 2/5/25 105 Ill As -Built Survey 15 days Wed 1/15/25 Tue 2/4/25 103 106 1 As -Built Survey 1 day Wed 2/5/25 Wed 2/5/25 105 107 Ill Mapping 20 days Thu 2/6/25 Wed 3/5/25 108 Ill Mapping 20 days Thu 2/6/25 Wed 3/5/25 106 109 4 As -Built Plans 30 days Thu 2/6/25 Wed 2/19/25 110 Ill As -Built Plans 10 days Thu 2/6/25 Wed 2/19/25 106 111 W+ As -Built Plans 10 days Thu 2/6/25 Wed 2/19/25 106 112 Ill Acceptance 10 days Thu 3/27/25 Wed 4/9/25 113 Ill Financial Reconciliation 5 days Thu 3/27/25 Wed 4/2/25 108FS+15 days 114 Ill Capitalization 5 days Thu 4/3/25 Wed 4/9/25 113 Project: Attachment D Schedule Task - summary . . Inactive Mtlestone Duration -only Start -only Date Fri 12/15/23 Split ,,,,,,,,,,,,,,,,I„ Project Summary Inactive Summary 0 0 Manual Summary RollupFinish-only Milestone ♦ Inactive Task Manual Task Manual Summary External Tasks Page 3 2024 2025 H2 H1 H2 H1 I I I t �t I 1� I C External Mtlestone ♦ Manual Progress 7 Deadline + Progress Shield Engineering Group, PLLC ATTACHMENT E N F 9 ' - � �� 1 �� p,,.,�t-,1 T y„ ,w t Lu .... i t -a Z J n LLB i.' `F► J . I 1rt LEUDAST w ,. Lu _ U) F 'k L _ y . r � ' • " LLB 11+ V' K" E TERRELL�AV i JERRELLAVE r M-22 - FT7E .HUMBOLT-ST r HUMBOLT ST HUMBOLTST ;� EXISTING SANITARY I N SEWER MAIN TO . BE ABANDONED z L— � m - o r - PULASKI ST PULASKI ST a� — P,ULASKIST .� T a i -- --- — -- M-22 — — G\. SIC s VERBENA ST i ' 'VERBENA ST 02 F— s N LL 211 Z O i I► Q LL w z LL — -- 00 ST-- ROSEDALEST R DSEDAL' EST OLEANDERST 40 FORTWORTH Ir A'f IA -UUMBO T.STr Rya �1 I re BENA��"' 'A L ATTACHMENT "F" CERTIFICATE OF INSURANCE Design Services for Sanitary Sewer Rehabilitation, Contract 130 City Project No. 105177 City of Fort Worth, Texas Attachment F PMO Release Date: 05.19.2010 Page I of I City of Fort Worth, Texas Mayor and Council Communication DATE: 12/12/23 M&C FILE NUMBER: M&C 23-1078 LOG NAME: 60SSRC130-SHIELD SUBJECT (CD 8) Authorize Execution of an Engineering Agreement with Shield Engineering Group, PLLC, in the Amount of $229,540.00, for the Sanitary Sewer Rehabilitation, Contract 130 Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2024- 2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Shield Engineering Group, PLLC, in the amount of $229,540.00, for Sanitary Sewer Rehabilitation, Contract 130 project; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $426,240.00, transferred from available funds within the Water and Sewer Fund, for the Sanitary Sewer Rehabilitation, Contract 130 (City Project No. 105177) to effect a portion of Water's contribution to Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize execution of an engineering agreement with Shield Engineering Group, PLLC, in the amount of $229,540.00, for Sanitary Sewer Rehabilitation, Contract 130 project for the preparation of plans and specifications for sanitary sewer replacement or installation and cast iron water main replacements as indicated on the following streets, and easements: Scope of Street From To Work E. Rosedale Water/ Freeman Street E. Pulaski Street Street South Sewer Right -of -Way Installation White Street Troost Street Freeman Sewer Street Installation Between Freeman Sewer [Easement erbena Street and Troost Street Street Replacement White Street Freeman Water/ Verbena Street Fabons Street Street Sewer Installation E. Rosedale Sewer Fabons Street Verbena Street Street South Installation Right -of -Way Easement between E. Freeman Sewer Pulaski Street and Troost Street Street Replacement Verbena Street JE. Pulaski Street Bransford Street Fabons Street Water E. Pulaski Street Troost Street Freeman Water Street Easement between E. Sewer Humbolt Street and E. Troost Street East 105 feet Installation Pulaski Street JE. Humbolt Street Bransford Street Troost Street Water between E. Sewer [Easement errell Avenue and Troost Street West 700 feet Replacement umbolt Street Troost Street / E. North 1,050 Sewer Troost Street Rosedale Street feet Installation Intersection This project also provides for the abandonment and relocation of Sanitary Sewer Main M-22 which currently traverses across several parcels of private properties into public street right-of-way as shown on the attached location map. In addition to the contract amount, $196,700.00 (Water: $69,000.00; Sewer: $127,700.00) is required for project management, real property acquisition, utility coordination, and material testing. This project will have no impact on the Water Department's operating budget when completed. The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60SSRC130-SHIELD Capital Project FY2024 CIP Revised Budget Change Fund Name Appropriations Authority (Increase/Decrease) FY2024 Name Budget W&S 105177 Capital SS Projects - Rehab $0.00 This M&C $426,240.00 $426,240.00 Fund Contract 56002 130 Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Sanitary Sewer Rehabilitation, Contract 130 within the Water & Sewer Capital Projects Fund. Appropriations for Sanitary Sewer Rehabilitation, Contract 130, are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital Projects - Fund $0.00 $426,240.00 $426,240.00 56002 (Project Total 1 $0.00 $426,240.00 $426,240.00 *Numbers rounded for presentation purposes. Business Equity: Shield Engineering Group, PLLC, is in compliance with the City's Business Equity Ordinance by committing to 10 percent MWBE participation on this project. The City's MWBE goal on this project is nine percent. The project is located in COUNCIL DISTRICTS 8. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water and Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the SS Rehab Contract 130 project to support the above recommendations and execution of the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office by Oriainatina Business Unit Head Dana Burghdoff 8018 Chris Harder 5020 Additional Information Contact: Lawrence Hamilton 2626 60SSRC130-SHIELD FID Table 1 2 56002 0600430 105177 2024 $177,276.00 56002 0700430 4956001 105177 2024 $248,964.00 56002 0700430 105177 2024 $248,964.00 1 2 56002 0600430 4956001 105177 001730 9999 ($177,276.00) 56001 0709020 5956001 $248,964.00 56002 0700430 4956001 105177 001730 9999 ($248,964.00) 2 56002 0600430 5110101 105177 001730 9999 $18,900.00 Water Staff Cost 2 56002 0600430 5550102 105177 001730 9999 $4,000.00 Public Outreach 1 56002 0600430 5330500 105177 001730 9999 $108,276.00 Contract 2 56002 0600430 5310350 105177 001770 9999 $2,000.00 Utility Coordination 2 56002 0600430 5330500 105177 001784 9999 $31,500.00 Soil Lab Consultant 2 56002 0600430 5310350 105177 001784 9999 $12,600.00 Soil Lab TPW Staff 2 56002 0700430 4956001 105177 001730 9999 ($248,964.00) 2 56002 0700430 5110101 105177 001730 9999 $25,200.00 Water Staff Cost 1 56002 0700430 5330500 105177 001730 9999 $121,264.00 Contract 2 56002 0700430 5710010 105177 001740 9999 $70,000.00 Easement Acquisition 2 56002 0700430 5110101 105177 001740 9999 $20,000.00 Easement Acquisition 2 56002 0700430 5330500 105177 001740 9999 $5,000.00 Easement Acquisition 2 56002 0700430 5740010 105177 001780 9999 $5,000.00 Easement Acquisition 56002 0700430 5310350 105177 001770 9999 $2,500.00 Utility Coordination H-1 56002 I I 2060000 I 105177 RETAIN I I I I I Ret inage Combo Code