HomeMy WebLinkAboutContract 60985CSC No. 60985 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Walker Partners, LLC authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Water and Sanitary Sewer Replacement Contract 2023, WSM-B — Project No. 104914. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $345,496.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 1 of 15 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-13 Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 3 of 15 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 4 of 15 Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), the City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. Engineer acknowledges the MBE and WBE goals established for this contract and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-13 Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 5 of 15 effect as of the time copying is performed. K. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 6 of 15 P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 7 of 15 F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-13 Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 8 of 15 Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 9 of 15 D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 10 of 15 property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 11 of 15 The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-13 Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 12 of 15 Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 13 of 15 The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth, Texas Water and Sanitary Sewer Repl. Contract 2023, WSM-B Standard Agreement for Engineering Related Design Services City Project No. 104914 Revised Date: November 23, 2021 Page 14 of 15 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH Fernando Costa Assistant City Manager Date: Feb 21, 2024 ATTEST: Jannette S. Goodall City Secretary v o � pORT��dd o C o Pvo o=d 0o0 00 o a�'*� �b 000l000 nEXA`�ooAp APPROVAL RECOMMENDED: ByChristopher H der (Feb 19, 202407:57 CST) By Chris Harder, P. E. Director, Water Department APPROVED AS TO FORM AND LEGALITY fj� By:Douglas Black (Feb 21, 202414:55 CST) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: BY: ENGINEER Walker Partners, LLC George E. "Jed" Walker, E President/CEO Date: January 29, 2024 Form 1295 No. 2023-1081731 M&C No.: 23-1083 M&C Date: 12/12/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requi ements. i Gi�G'J�,� L rence Har4ilton, P.E. - Project Manager City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page 15 of 15 Water and Sanitary Sewer Repl. Contract 2023, WSM-B City Project No. 104914 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 ATTACHMENT A Scope for Enaineerina Desian Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-B CITY PROJECT NO. 104914 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE Water line replacements along 4 streets listed below. Walker Partners recommends open cut replacement, followed by asphalt pavement repair and pulverized mill and overlay. • Selkirk Drive — from South Drive to Weyburn Drive: 739.6 LF of 8" DI to 8" PVC • Heywood Avenue — from Norwich Drive to Selkirk Drive: 890.5 LF of 6" Cl to 8" PVC • Shellbrook Avenue — from Norwich Drive to Selkirk Drive: 654.7 LF of 6" Cl to 8" PVC • Norwich Drive — from South Drive to Shellbrook Avenue: 800.9 LF of 12" Cl to 8" PVC • Norwich Drive — from Shellbrook Avenue to Selkirk Drive: 874.6 LF of 8" DI to 8" PVC • Norwich Drive — from Shellbrook Avenue to Selkirk Drive: 63.6 LF of 6" DI to 8" PVC Sanitary sewer line replacements along 2 streets listed below. Walker Partners recommends open cut replacement, followed by asphalt pavement repair and pulverized mill and overlay. • Selkirk Drive — from South Drive to halfway between Weyburn and Shellbrook: 1,020.2 LF of 6" VC to 8" PVC • Norwich Drive — from South Drive to halfway between Weyburn and Shellbrook: 922.6 LF of 8" VC to 8" PVC • Selkirk Drive — from 4616 to 4624 Selkirk: 148.5 LF of 12" VC to 8" PVC • Selkirk Drive — from 4649 to 4705 Selkirk: 166.4 LF of 8" VC to 8" PVC Sanitary sewer line replacements along the back property lines between the streets listed below within the existing 10-foot utility easements. Walker Partners recommends pipe bursting replacement. • South Drive / Heywood Avenue to Norwich Drive: 561.2 LF of 6" VC to 8" PVC • South Drive / Heywood Avenue to Selkirk Drive: 396.8 LF of 6" VC to 8" PVC • Heywood Avenue / Weyburn Drive to Norwich Drive: 445.6 LF of 6" VC to 8" PVC • Heywood Avenue / Weyburn Drive to Selkirk Drive: 284.7 LF of 6" VC to 8" PVC • Weyburn Drive / Shellbrook Avenue to Norwich Drive: 447.7 LF of 6" VC to 8" PVC • Weyburn Drive / Shellbrook Avenue to Selkirk Drive: 311.2 LF of 6" VC to 8" PVC • Shellbrook Avenue / Norwich Drive to Selkirk Drive: 531.4 LF of 6" VC to 8" PVC • Norwich Drive / Weyburn Drive to Selkirk Drive: 937.9 LF of 6" VC to 8" PVC • Weyburn Drive / Inwood Road to Selkirk Drive: 1,349.8 LF of 6" VC to 8" PVC City of Fort Worth, Texas Attachment A Revised Date: 12/9/2022 Page 1 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 Selkirk / FWW Railroad from 4501 to 4645 Selkirk: 1,091.0 LF of 6" VC to 8" PVC Between 4617 and 4625 Selkirk: 125.5 LF of 6" VC to 8" PVC Between 4401 and 4409 Inwood over to 3908 and 3912 Weyburn: 455.4 LF of 6" VC to 8" PVC WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Plan Submittal Checklists TASK 1. DESIGN MANAGEMENT ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team a. Lead, manage and direct design team activities. b. Ensure quality control is practiced in performance of the work. c. Communicate internally among team members. d. Task and allocate team resources. 1.2. Communications and Reporting a. Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements. b. Conduct review meetings with the CITY at the end of each design phase. c. Prepare invoices and submit monthly in the format requested by the CITY. d. Prepare and submit monthly progress reports in the format provided by the Water Department. e. Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 2 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 f. Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. g. Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure and provide and obtain information needed to prepare the design. h. With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. i. Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS a. 15 M/WBE reports will be prepared b. 4 meetings with City staff c. 15 monthly Water Department progress reports will be prepared d. 15 monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 9) TASK 2. CONCEPTUAL DESIGN (30 PERCENT) The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to study the project, identify and develop alternatives that enhance the system, present (through the defined deliverables) these alternatives to the CITY, recommend the alternatives that successfully address the design problem, and obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 3 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 2.1. Data Collection a. In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. b. The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. c. The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. d. The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2. Geotechnical Investigations a. Since most of project will be shallow open trench excavation in street right-of-way or trenchless rehab where soils will not be disturbed, geotechnical exploration is not anticipated. 2.3. Fire Line Reconnection 2.4. The Conceptual Design Package shall include the following: a. Cover Sheet b. Graphic exhibits and written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept. c. Proposed phasing of any water and sanitary sewer work that is included in this project documented in both the project schedule and narrative form. d. Documentation of key design decisions (Project Decision Log). e. Estimates of probable construction cost. ASSUMPTIONS a. 0 Geotechnical borings are expected for this project. b. Two copies of the conceptual design package (30% Design) will be delivered. Report shall be letter sized and comb- bound with a clear plastic cover. Drawings will be 11 "x17" size foldouts bound in the report. c. DWF files created from design CAD drawings will be uploaded to the designated project folder in BIM360. d. ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 4 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 e. ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package TASK 3. PRELIMINARY DESIGN (60 PERCENT) Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: a. Cover Sheet b. Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). c. Overall voiect easement lavout sheet(s) with property owner information. d. Overall voiect water and/or sanitary sewer lavout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. e. Overall water and/or sanitary sewer abandonment sheet. f. Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. g. Benchmarks per 1,000 feet of plan/profile sheet — two or more. h. Bearings given on all proposed centerlines, or baselines. i. Station equations relating utilities to paving, when appropriate. j. Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 5 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de - hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. m. Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2. Geotechnical Investigation a. Since most of project will be shallow open trench excavation in street right-of-way or trenchless rehab where soils will not be disturbed, geotechnical exploration is not anticipated. The ENGINEER shall identify/collect nearby soils reports in the project's vicinity, evaluate available soil reports and provide recommendations regarding the rehabilitation design and identifying potential constraints for the City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 6 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. 3.3. Public Meeting a. After the preliminary plans have been reviewed and approved by the CITY, the ENGINEER shall prepare project exhibits, and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. The ENGINEER shall coordinate with CITY GIS staff to identify affected property owners/residents and develop a spreadsheet listing addresses of those to invite to the public meeting. 3.4. Utility Clearance a. The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. b. The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in BIM360 for forwarding to all utility companies which have facilities within the limits of the project. The DWF files should be created directly from the CAD files as opposed to PDF files. 3.5. Traffic Control Plan a. Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's BIM360 website. The typicals need not be sealed individually, if included in the sealed contract documents. b. Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. ASSUMPTIONS a. One (1) public meeting will be conducted or attended during the preliminary design phase. b. No borings will be provided and recommendations will be based on available nearby soils reports. c. Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional 5 project specific traffic control sheets will be developed. d. Two sets of Half size plans will be delivered for the Constructability Review. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 7 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 e. Two sets of Half size plans will be delivered for the Preliminary Design (60% Design). f. Two sets of specifications will be delivered for the Preliminary Design (60% Design). g. DWF files created from design CAD drawings will be uploaded to the designated project folder in BIM360. h. The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. i. Two sets of Half size drawings will be delivered for Utility Clearance. j. ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Clearance drawings C. Traffic Control Plan D. Estimates of probable construction cost E. Database listing names and addresses of residents and businesses affected by the project. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT) Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: a. For projects that disturb an area greater than one (1) acre, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM Construction Plan according to the current CITY iSWM Criteria Manual for Site Development and Construction which will be incorporated into the SWPPP by the contractor. b. Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. c. Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. d. The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 8 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 ASSUMPTIONS a. Two sets of Half size drawings and Two sets of Full size drawings and Four specifications will be delivered for the 90% Design package. b. A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. c. Two sets of Full size drawings and Two specifications will be delivered for the 100% Design package. d. A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. e. The final plans are estimated to include 10 water plan and profile sheets and 22 sanitary sewer plan and profile sheets. DELIVERABLES A. 90% construction plans and specifications, including the iSWM Construction Plan. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support a. The ENGINEER shall upload all plans and contract documents onto BIM360 for access to potential bidders. i. Contract documents shall be uploaded in a .xIs file. ii. Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. iii. Plan Sets are to be uploaded to BIM360 in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The Awf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 9 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 b. The ENGINEER shall sell contract documents and maintain a plan holders list on BIM360 from documents sold and from Contractor's uploaded Plan Holder Registrations in BIM360. c. The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's BIM360 folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto BIM360 and mail addenda to all plan holders. d. Attend the prebid conference in support of the CITY. e. Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. f. When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. g. Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on BIM360. h. Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings 1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Sinqular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 10 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in BIM360. 2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name — "W-1956—SHT01.dwg", "W- 1956—SHT02.dwg", etc. II. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155—SHT01.dwg", "X-12755—SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS a. The project will be bid only once and awarded to one contractor. b. Two sets of construction documents will be sold to and made available on BIM360 for plan holders and/or given to plan viewing rooms. c. Four sets of Half size and Four sets of Full size drawings plans and Five specifications (conformed, if applicable) will be delivered to the CITY. d. PDF, DWF and DWG files will be uploaded to BIM360. DELIVERABLES A. Addenda B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 11 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 TASK 6. CONSTRUCTION PHASE SERVICES ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support a. The ENGINEER shall attend the preconstruction conference. b. After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. c. The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. d. As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. e. The ENGINEER shall attend the "Final" project walk through and assist with preparation of final punch list. 6.2 Record Drawings a. The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As -Built Survey o Red -Line Markups from Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions b. The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. c. The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 12 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 d. The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the mylars. 2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Sinqular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_rec47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "47" shall be the total number of sheets in this file. Example: W-0053_rec3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "36" shall be the total number of sheets in this file. Example: X-12755_rec18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawings folder in BIM360. ASSUMPTIONS a. 10 RFI's are assumed. b. 2 Change Orders are assumed. c. One copy of Full size (22"x34") mylars will be delivered to the CITY. DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Final Punch List items F. Record Drawings on Mylar City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 13 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 TASK 7. ROW/EASEMENT SERVICES ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research a. The ENGINEER shall determine rights -of -way, easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. a. The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. b. The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition c. The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. 7.3. Temporary Right of Entry Preparation and Submittal a. Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry documents for landowners to CITY PM for real property acquisition. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. b. The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. ASSUMPTIONS a. 5 Easements or right-of-way documents will be necessary. b. 130 Temporary right -of -entry documents will be necessary. c. Right -of -Way research and mapping includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 14 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 A. Easement exhibits and meets and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES ENGINEER will provide survey support as follows. 8.1. Design Survey a. ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. b. The minimum survey information to be provided on the plans shall include the following: A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). c. Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. d. No less than two horizontal bench marks, per line or location. e. Bearings given on all proposed centerlines, or baselines. f. Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal a. Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of Entry for landowners to CITY PM. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 15 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 b. The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM360 site. ASSUMPTIONS a. Topographic survey at intersection will include no more than 100 ft. in each direction. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 9. PLAN SUBMITTAL CHECKLISTS Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: PLAN SUBMITTAL CHECKLIST REQUIREMENTS Traffic Traffic Traffic Street Water n rol Control Control Control Traffic "A" Storm Storm Lights /Sewer Traffic /° 6 g 30% Attachment Signal Water Water (Submit (Submit Engineering Type (Submit All 30% 60% All @ All @ (Submit All @ 30%) 30% 60%) @ 60%) Required for all work in City ROW Water / Sewer X X X *If included in street project ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scoae of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: a. Negotiation of easements or property acquisition including temporary right -of -entries. b. Services related to development of the CITY's project financing and/or budget. c. Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. d. Construction management and inspection services e. Periodic site visits during construction phase f. Design phase public meetings City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 16 of 24 ATTACHMENT DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM•B CITY PROJECT NO.: 104914 g. Performance of materials testing or specialty testing services. h. Services necessary due to the default of the Contractor. i. Services related to damages caused by fire, flood, earthquake or other acts of God. j. Services related to warranty claims, enforcement and inspection after final completion. k. Services related to submitting for permits (ie.TxDOT, railroad, etc...) Services related to Subsurface Utility Engineering Levels A, B, C or D m. Services related to Survey Construction Staking n. Services related to acquiring real property including but not limited to easements, right-of-way, and/or temporary right -of -entries. o. Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. p. Construction Shop drawing review, samples and other submittals submitted by the contractor. q. Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 17 of 24 ATTACHMENT "B" COMPENSATION Design Services for WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-B City Project No. 104914 Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $345,496.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item I II. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 18 of 24 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Walker Partners, LLC Design and Construction Services Proposed MWBE Sub -Consultants Gorrondona & Associates Design Survey Non-MWBE Consultants None. Project Number & Name 104914 - WSSR 2023 WSM-B City MWBE Goal = 8.0% City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 19 of 24 TOTAL Fee Amount % $246,847.00 71.4% $98,649.00 28.6% $345,496.00 100% Total Fee MWBE Fee I MWBE % $345,496.00 $98,649.00 1 28.6% Consultant Commtted Goal = 28.6 % ATTACHMENT B COMPENSATION ENGINEER INVOICE (Supplement to Attachment B) Design Services for WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-B City Project No. 104914 Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 20 of 24 Professional Services Invoice Project: lWater and Sanitary Sewer City Project #: 1104914 PO # City Sec Number: INiA Company Name: IWalker Partners, LLC Consultant's PM: Supplier Invoice M Payment Request M Service Date:From Service Date:To Invoice Date: Iroject Manager: Lawrence Hamilton Summa Contract 2023, WSM-B Supplier Instructions: Fill in green cells including Invoice Number, From and To Dates and the included worksheets. When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. email: Office Address: Telephone: Fax: Remit Address: Agreement LTD Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance Work Type 1 Water Desiqn $105,165.00 $105,165.00 $105,165.00 Work Type 2 Sanitary Sewer Desiqn $240,331.00 $240,331.00 $240,331.00 Work Type 3 Work Type 4 Work Type 5 Work Type 6 Totals This Invoice $345,496.00 $345,496.00 $345,496.00 Overall Percentage Complete: Professional Services Invoice Project Manager: John Logan Project: Water and Sanitary Sewer Replacement Contract 2023, WSM-B City Project #: 104914 Work Type Desc: supplier Instructions: FID: City Sec Number: NIA Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Walker Partners, LLC Supplier's PM: email: Supplier Invoice #: Office Address: Payment Request #: Telephone: Service Date:From Fax: Service Date:To Invoice Date: Remit Pay Items Description 30 - Desiqn Water Desiqn Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $105,165.00 $105,165.00 Percent ($) Invoiced Current Invoice Remaining Balance $105,165.00 Totals This Unit: $105,165.00 $105,165.00 $105,165.00 Overall Percentage Complete: Professional Services Invoice Project Manager: Lawrence Hamilton Project: Water and Sanitary Sewer Replacement Contract 2023, WSM-B City Project #: 104914 Work Type Desc: Supplier Instructions: FID: City Sec Number: N/A Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buusaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Walker Partners, LLc Supplier's PM: email: Supplier Invoice #: Office Address: Payment Request #: Telephone: Service Date:From Fax: Service Date:To Invoice Date: Remit Pay Items Description 30 - Design Sanitary Sewer Design Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $240,331.00 $240,331.00 Percent ($) Invoiced Current Remaining Spent Previously Invoice Balance $240,331.00 Totals This Unit: $240,331.00 $240,331.00 $240,331.00 Overall Percentage Complete: Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Water Department Design Services for Water and Sanitary Sewer Replacements Contract 2023 WSM-B City Project No. 104914 Task Description I Project Project son, gqaoeor )hour �unior Survey Survey Task No. Rate) Pr$325a1 I M$27 Er,�;95er $1 0 D $150er CE95D $165 I $1 0 Crew A$90n 11.0 Protect ManA ri 4 11 Maiaginp the Team 1.1.b QA/OC 4 1 2 Communwabons and RReporli g 1.2.a Pre -Design CgPrQ s lyj� %af (.....a. 1 meeting) 1 1.2.b vlan Design SubmlHal He ew Ivi 1 ��ppIS es 4 mee0��pp 1.2 d Prepare Monthly Progress Reports ass es 15 monlhsa� split with TPW ) 1.2.1 Prepare WMhly MBE/SBE Reports (ass mes 15 months) 1.2o-h Coordination With Other Acencies Includes Rail Peimdtine 2.0 ., ual De ' 30-Percent 4 2 1 Data 'ollec[lon 4,0' 4 LF Water, ,196 LF Sewer = 13,220 LF ToWl) 2.4 Conceptual Design Package (assumes 13.220 LF total) 24.e Esbmale 3.0 preliminary Design 60 Percent 4 31 Preliminary Uessm rammis 4 3.3 Public Meeting 34 "11y Cleaance 1 35 TratfI. Control Plan 6.0 7nal Design 4 4.2 Final Draft (90%) Construction Plans and Specifications 2 43 Final /I10% Plans and 1 44 r�cMcations Consfmdlon�stimates 190'h and 100%) 5.0 Mid Phase 0 5.1 Bid Support 5.l a Upload and Sell Contract Documents and Maintain Plan Holders List 511, Issue Addenda (assumes 3) 5A c Attend Pre -bid Conference 5.1 d 5.1 pp Attend Bid 019ni q Tabulate Bids and Recommend Award 5. Issue Conformed Contract Documents 16.0 ComdWaion Phase Services 1 6 1 Construction SuprPit 6.1 a Attend Preconslmdion Conference 6.1.b Attend Public Meeting 6.1 c Protect Site Visits (assumes 10 monthM 6.1.d Request for Information Review (assumes 3) 1 6.2 Record Dmwmqs 1 17.0 ROW/Easement Services 0 71 Research 72 73 Zht-of-Wa K(am_(-WajYl,Easement Pret�aatenand Submittal s me 5((�$2SO each) TemooreN Riots of Entry Submittal (assumes 130 $100 aacli) City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date8.09 2012 I Foola(� /o Foola{� De% Fee I Water) 4.D24.0 0 up $ 1b5,165 70 STotall 13.22021 100%I $ 345,496 1 I Design Cost Per Linear Foot Summa Cost �CosbLF Minus (Total Length Total Cosl of Reserve Reserves Easements 13,220 00 $345,496 $0 0 $1:000.0 $23 87 1 Subconsultant E:/(y�e s Labor Cost Subconsultant n s Total Expense Task Sub Total %Complete Remaining Reproduction Cost Budget a 578 28 145 0 26 1239,715 $ 98,649 $0 $2,200 $100,849 $310,5641 0%. $0 Water and Sewer Design Breakdown Project Summary Water J SanitaN Sewer Total Cost % Comolete Remaining Budoe Total Hours 1.682 Footage)J % $' LFJJ % Total Labor Total ExpenseWBE $239,711 1. $$98.649 TOTAL( 4.024.Odl W4401$ 105.165 9.1960J1 70%I$ 240.332 $ 345.496 0%I$ 345.496 Subconsuthm Non-MWBE Subconsullan $0 5% Sub Markup $4.932.45 MWBE Participation 28.6% 8%Goal I Total Protect Co. I $345,49 W.W OWalker Partners engineers I surveyors Engineer's Conceptual Opinion of Probable Cost City of Fort Worth Water and Sanitary Sewer Replacements Contract 2023, WSM-B City Project No.: 104914 5-01212.00 January 9, 2024 UNIT 1: WATER IMPROVEMENTS Item Bidlist Item Description Spec No. Quantity Unit Unit Price Total Amount 1 3311.0261 8" PVC Water Pipe 33 11 12 3,250 LF $130.00 $422,500.001 3 3311.0461 12" PVC Water Pipe 33 11 12 810 LF $250.00 $202,500.001 4 3312.3003 8" Gate Valve 33 1220 9 EA $3,500.00 $31,500.001 5 3312.3103 8" Cut -in Gate Valve 33 1220 2 EA $4,000.00 $8,000.001 6 3312.3005 12" Gate Valve 33 1220 2 EA $7,000.00 $14,000.001 16 0241.1300 Remove Conc Curb & Gutter 0241 15 20 LF $50.00 $1,000.001 17 3216.0101 6" Conc Curb and Gutter 32 16 13 20 LF $50.00 $1,000.001 18 3305.0109 Trench Safety 33 05 10 4,060 LF $2.00 $8,120.001 19 3312.0001 Fire Hydrant 33 1240 7 EA $12,000.00 $84,000.001 20 3312.2001 1" Water Service, Meter Reconnection 33 12 10 70 EA $500.00 $35,000.001 21 3312.2003 1" Water Service 33 12 10 70 EA $2,000.00 $140,000.001 27 3304.0101 Temporary Water Services 33 04 30 1 LS $7,000.00 $7,000.001 28 3312.0117 Connection to Existing 4"-12" Water Main 33 1225 6 EA $6,000.00 $36,000.001 29 3305.0111 Valve Box Adjustment w/ Conc Collar 33 05 14 0 EA $0.001 30 3201.0400 Temporary Asphalt Paving Repair 3201 18 4,060 LF $30.00 $121,800.001 31 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 3201 17 4,060 LF $90.00 $365,400.001 32 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 3201 17 20 SY $200.00 $4,000.001 33 3201.0614 Conc Pvmt Repair, Residential 3201 29 20 SY $50.00 $1,000.001 44 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 20 EA $1,500.00 $30,000.001 45 3292.0101 Utility Service Surface Restoration Sodding 3292 13 0 SY $0.001 46 3292.0100 Block Sod Placement 3292 13 0 SY $0.001 47 3217.5001 Curb Address Painting 32 17 25 8 EA $50.00 $400.00 1 48 3291.0100 Topsoil 3291 19 0 CY $0.001 49 3471.0001 Traffic Control 3471 13 5 Mo $5,000.00 $25,000.001 50 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY 32 11 29 0 TN $0.001 51 3305.0108 Utility Adjustment (irrigation adjustments) 33 05 14 10 EA $1,000.00 $10,000.001 52 0171.0102 As -Built Survey 01 71 23 1 LS $20,000.00 $20,000.001 53 3125.0101 SWPPP>_1acre 312500 0 LS $0.001 Subtotal Construction Cost - Unit 1 Water Improvements $ 1,568,220.00 Mobilization / Project Incidentals (8%) $ 125,457.60 Contingency (30%) $ 470,466.00 Total Construction Cost - Unit 1 Water Improvements $ 2,164,143.60 Page 1 of 3 OWalker Partners engineers I surveyors Engineer's Conceptual Opinion of Probable Cost City of Fort Worth Water and Sanitary Sewer Replacements Contract 2023, WSM-B City Project No.: 104914 5-01212.00 January 9, 2024 UNIT 2: SANITARY SEWER IMPROVEMENTS Item Bidlist Item Description Spec No. Quantity Unit Unit Price Total Amount 33 11 10, 4 3331.4115 8" PVC SDR-26 Sewer Pipe by Open Cut 3331 12, 2,280 LF $120.00 $273,600.00 3331 20 6 3331.1102 6" to 8" PVC by Pipe Enlargement 3331 23 7,000 LF $150.00 $1,050,000.001 9 0241.2201 Remove 4' Sewer Manhole 0241 14 54 EA $1,000.00 $54,000.001 11 3231.0412 6' Fences, Wood 3231 29 4,000 LF $30.00 $120,000.001 12 3231.0123 6' Chain Link, Aluminum 3231 13 0 LF $0.001 13 3301.0001 Pre -CCTV Inspection 3301 31 9,280 LF $4.00 $37,120.001 14 3301.0002 Post -CCTV Inspection 3301 31 9,280 LF $4.00 $37,120.001 15 3301.0101 Manhole Vacuum Testing 3301 30 0 EA $0.001 16 3331.3101 4" Sewer Service 3331 50 48 EA $2,500.00 $120,000.001 18 3331.1201 Service Reinstatement, Pipe Enlargement 3331 23 147 EA $2,000.00 $294,000.001 19 3331.2201 4" Service Reconnection, CIPP 3331 12 0 EA $0.001 20 3339.1102 5' Drop Manhole 3339 10, 54 EA $15,000.00 $810,000.00 33 39 20 32 3305.0112 Concrete Collar 33 05 17 5 EA $1,500.00 $7,500.001 33 3305.0109 Trench Safety 33 05 10 2,280 LF $2.00 $4,560.001 34 3305.0107 Manhole Adjustment, Minor w/ Conc Collar 33 05 14 20 EA $2,000.00 $40,000.001 35 3305.0106 Manhole Adjustment, Major 33 05 14 5 EA $4,000.00 $20,000.001 37 0241.1400 Remove Conc Valley Gutter 0241 15 0 SY $0.001 38 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 3201 17 2,630 LF $90.00 $236,700.001 39 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 3201 17 0 SY $0.001 40 3201.0400 Temporary Asphalt Paving Repair 3201 18 2,630 LF $30.00 $78,900.001 56 3292.0100 Block Sod Placement 3292 13 0 SY $0.001 57 3292.0101 Utility Service Surface Restoration Sodding 3292 13 0 SY $0.001 58 3291.0100 Topsoil 3291 19 0 CY $0.001 59 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 30 EA $1,500.00 $45,000.001 61 3471.0001 Traffic Control 3471 13 6 MO $5,000.00 $30,000.001 62 0171.0102 As -Built Survey 01 71 23 1 LS $20,000.00 $20,000.001 63 3305.0108 Utility Adjustment (irrigation adjustments) 33 05 14 20 EA $1,000.00 $20,000.001 Subtotal Construction Cost - Unit 2 Sanitary Sewer Improvements $ 3,183,500.00 Mobilization / Project Incidentals (8%) $ 254,680.00 Contingency (30%) $ 955,050.00 Total Construction Cost - Unit 2 Sanitary Sewer Improvements $ 4,393,230.00 Page 2 of 3 OWalker Partners engineers I surveyors Engineer's Conceptual Opinion of Probable Cost City of Fort Worth Water and Sanitary Sewer Replacements Contract 2023, WSM-B City Project No.: 104914 5-01212.00 January 9, 2024 UNIT 3: PAVING IMPROVEMENTS Item Bidlist Item Description Spec No. Quantity Unit Unit Price Total Amount 1 0241.0100 Remove Sidewalk 0241 13 0 SF $0.001 2 0241.0401 Remove Concrete Drive 0241 13 0 SF $0.001 3 0241.1300 Remove Conc Curb&Gutter 0241 15 0 LF $0.001 4 0241.1400 Remove Conc Valley Gutter 0241 15 0 SY $0.001 5 0241.1700 11" Pavement Pulverization 0241 15 0 SY $0.001 6 0241.1800 Remove Speed Cushion 0241 15 1 EA $0.001 7 3123.0101 Unclassified Excavation by Plan 31 23 16 0 CY $0.001 8 3125.0101 SWPPP>_1acre 312500 0 LS $0.001 9 3212.0303 3" Asphalt Pvmt Type D 32 12 16 0 SY $0.001 10 3212.0401 HMAC Transition 32 12 16 0 TN $0.001 11 0241.1506 2" Surface Milling 0241 15 18,980 SY $10.00 $189,800.001 12 3212.0302 2" Asphalt Pvmt Type D 32 1203 18,980 SY $40.00 $759,200.00 1 13 3216.0101 6" Conc Curb and Gutter 32 1613 0 LF $0.001 14 3216.0301 7" Conc Valley Gutter, Residential 32 16 13 0 SY $0.001 15 3217.5001 Curb Address Painting 32 1725 0 EA $0.001 16 3291.0100 Topsoil 3291 19 0 CY $0.001 17 3292.0100 Block Sod Placement 3292 13 0 SY $0.001 18 3305.0107 Manhole Adjustment, Minor w/ Conc Collar 33 05 14 0 EA $0.001 19 3305.0108 Utility Adjustment (irrigation adjustments) 3305 14 0 EA $0.001 20 3305.0111 Valve Box Adjustment w/ Conc Collar 33 05 14 0 EA $0.001 21 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY 32 11 29 0 TN $0.001 22 3471.0001 Traffic Control 3471 13 6 MO $5,000.00 $30,000.001 23 3349.5006 Remove and Replace Inlet Top 10' 33 49 20 0 EA $0.001 Subtotal Construction Cost - Unit 3 Paving Improvements $979,000.00 Mobilization / Project Incidentals (8%) $ 78,320.00 Contingency (30%) $ 293,700.00 Total Construction Cost - Unit 3 Paving Improvements $ 1,351,020.00 Total Construction Cost - Unit 1 Water Improvements $ 2,164,143.60 Total Construction Cost - Unit 2 Sanitary Sewer Improvements $ 4,393,230.00 Total Construction Cost - Unit 3 Paving Improvements $ 1,351,020.00 Total Construction Cost $ 7,908,393.60 Page 3 of 3 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-B City Project No. 104914 No changes to the City of Fort Worth's Standard Agreement revised on 12/9/2022. City of Fort Worth, Texas Attachment C Revised Date: 12/9/2022 Page 21 of 24 FORT WORTH ATTACHMENT "D" PROJECT SCHEDULE WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-B City Project No. 104914 A. ENGINEER Project Schedule Development ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the requirements of the Agreement and encompassing the Scope of Work defined in Attachment A to the Agreement. ENGINEER shall prepare and maintain project schedule throughout the life of the project as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned sequencing of the work activity and timing of the work. B. Schedule "Tier" Selection City has identified three "Tier" levels for project schedules as defined in City's Specification 00 31 15, to align with the size and complexity of the project as a basis for schedule development. City's Project Manager will determine the "Tier" level for the ENGINEER's project schedule as part of the negotiation of the Agreement. C. Project Baseline Schedule ENGINEER will produce an initial project schedule and submit as a "baseline" for review and acceptance by City's Project Manager as defined in City's Specification 00 31 15 which will be referred to as the Project Baseline Schedule. Updates to the baseline schedule follow the requirements of City's Specification 00 31 15. D. Project Progress Schedule ENGINEER will provide to the City, monthly updates to their project schedule indicating progress of the Work in compliance with the requirements of City's Specification 00 31 15 and said schedule will be referred to as the Project Progress Schedule. E. Master Project Schedule City will develop and maintain a master project schedule for the overall project. ENGINEER's project baseline and progress schedule submittals will be an integral part of the development and updating process of City's Master Project Schedule. City of Fort Worth, Texas Attachment D Revision Date: 07.20.2018 Page 22 of 24 CFW - Integrated Program Management ID ID Code 1 1 2 2 1000 3 3 1010 4 5 5 1110 6 6 1120 7 7 1130 8 8 1140 9 9 10 10 11 IS 12 12 3000 13 13 3005 14 14 3100 15 15 3110 16 16 3120 17 17 3130 18 18 3140 19 19 3150 20 20 3170 21 22 22 3200 23 23 3210 24 24 3215 25 25 3220 26 26 3230 27 27 3260 28 29 29 3300 30 30 3310 31 31 3320 32 32 3325 33 33 3330 34 34 3340 35 35 3350 36 36 3370 37 37 3380 38 39 39 4000 40 40 4020 41 41 4030 42 42 4040 43 43 4900 44 144 45 45 1600 46 46 1605 47 47 1607 48 48 1610 49 50 50 1640 51 151 1645 P552 521A 3 53 1900 54 54 1905 55 55 1910 56 56 1940 Water and Sanitary Sewer Replacements Contract 2023, WSM-B Report Print Date: Dec-22-2023 City Project No. 104914 Duration I Start (Finish Predecessors 2024 2025 2026 ] De_ Jan Feb I Mar I Apr May I Jun Jul Aua Seo Oct Nov Dec Jan Feb Mar Aor I Mav Jun Jul I Aua I Seo On Nov Dec Jan Feb Mar Aor Mav Jun I lul Aua Seo On I Nov \ Dx Program / Project Planning 1 day? Wed 8/2/23 Wed 8/2/ Project Start 1 day? Wed 8/2/23 Wed 8/2/23 Planning 1 day? Wed 8/2/23 Wed 8/2/23 Project Agreements �ys Thu 8/3/23 Mon 1/8/24 Select Consultant / Negotiate Fee / Scope 17 days Thu 8/3/23 Fri 8/25/23 M&C Process - Design 22 days Mon 8/28/23 Tue 9/26/23 Award Agreement / Design 0 days Tue 12/12/23 Tue 12/12/23 Agreement Execution 8 days Wed 12/13/23 Fri 12/22/23 Draft Subconsultants Agreements 14 days Wed 12/13/23 Mon 1/1/24 Signed Subconsultant Agreements 5 days Tue 1/2/24 Mon 1/8/24 30% Conceptual Design �! 12/22/23 Mon 6/3/24 Issue Design Notice to Proceed 0 days Fri 12/22/23 Fri 12/22/23 Design Kickoff Meeting 1 day Mon 12/25/23 Mon 12/25/23 Design Survey 40 days Tue 1/9/24 Mon 3/4/24 Prepare 30% Drawings and Documents 40 days Tue 3/5/24 Mon 4/29/24 Submit 30% Design Package 0 days Mon 4/29/24 Mon 4/29/24 Review 30% Conceptual Design (CFW) 14 days Tue 4/30/24 Fri 5/17/24 Incoporate Comments / Submit Revised 30% 10 days Mon 5/20/24 Fri 5/31/24 Peer / Design Review Meeting (Technical) 1 day Mon 6/3/24 Mon 6/3/24 Conceptual Design Complete 0 days Mon 6/3/24 Mon 6/3/24 60% Preliminary Design ' 104 days Tue 6/4/24 Fri 10/25/24 Prepare 60% Plans and Specifications 80 days Tue 6/4/24 Mon 9/23/24 Submit 60% Design Package 0 days Mon 9/23/24 Mon 9/23/24 Review 60% Preliminary Design( CFW) 14 days Tue 9/24/24 Fri 10/11/24 Hold Public Meeting - Design 5 days Mon 10/14/24 Fri 10/18/24 Incoporate Comments / Submit Revised 60% 10 days Mon 10/14/24 Fri 10/25/24 Preliminary Design Complete 0 days Fri 10/25/24 Fri 10/25/24 90% Final Design 1 120 days Mon 10/28/24 Fri 4/11/25 Prepare 90% Plans and Specifications 80 days Mon 10/28/24 Fri 2/14/25 Submit 90% Design Package 0 days Fri 2/14/25 Fri 2/14/25 Review 90% Final Design (CFW) 15 days Mon 2/17/25 Fri 3/7/25 Hold Project Meeting 5 days Mon 3/10/25 Fri 3/14/25 Incorporate Final Comments / Submit 100% Package 15 days Mon 3/10/25 Fri 3/28/25 Approve Final Plans/Specs and Route for Signatures 10 days Mon 3/31/25 Fri 4/11/25 100% Design Complete 0 days Fri 4/11/25 Fri 4/11/25 Establish M/WBE Goal 10 days Mon 3/10/25 Fri 3/21/25 Prepare Bid Package 10 days Mon 3/24/25 Fri 4/4/25 Right -of -Way land Acquisition 246 days Mon 9/23/24 Tue 9/2/25 Right of Way Start 0 days Mon 9/23/24 Mon 9/23/24 Prepare Easement Documents (Consultant Exhibits) 31 days Tue 9/24/24 Tue 11/5/24 Property Management Appraisal Process 95 days Wed 11/6/24 Tue 3/18/25 Easement Acquisition 120 days Wed 3/19/25 Tue 9/2/25 Real Property / Easement Acquisition Complete 0 days Tue 9/2/25 Tue 9/2/25 Permitting ` 224 days Tue 6/4/24 Fri 4/11/25 Identify Required Permits 40 days Tue 6/4/24 Mon 7/29/24 Prepare Permits 80 days Tue 7/30/24 Mon 11/18/24 RR Permitting -Submit, Review, Approve 120 days Mon 10/28/24 Fri 4/11/25 SWPPP -Submit, Review, Approve 64 days Tue 11/19/24 Fri 2/14/25 Environmental 2 days Tue 6/4/24 Wed 8/28/24 Identify Environmental Issues 40 days Tue 6/4/24 Mon 7/29/24 Archaeological Investigation 22 days Tue 7/30/24 Wed 8/28/24 Utility Relocations 20 days Fri 10/11/24 Fri 3/28/25 Utility Relocations Start 0 days Fri 10/11/24 Fri 10/11/24 Distribute 60% Plans to Franchise Utilities 40 days Mon 10/14/24 Fri 12/6/24 Franchise Utility Relocations 80 days Mon 12/9/24 Fri 3/28/25 Franchise Utility Relocations Complete 0 days Fri 3/28/25 Fri 3/28/25 2 2 5 6FS+55 days 7 7 9W�8 12 10 14 15 16 17 18 19 20 22 23 24 24 26 27 29 30 31 31 33 34 31 361p�23 39 40 41 42 20 45 27 46 20 SO 24 24 53 54 55 3/28 CFW - Integrated Program Management ID ID Code Task Name Duration I Start Finish 57 57 2000 Construction Project Management 1 day? Mon 4/7/25 Mon 4/7/25 58 58 Advertisement Period 23 days Fri 4/4/25 Wed 5/7/25 59 59 2030 Bid Advertisement 0 days Fri 4/4/25 Fri 4/4/25 60 60 2040 Advertisement Period 20 days Mon 4/7/25 Fri 5/2/25 61 61 2050 Hold Pre -Bid Meeting 1 day Mon 4/14/25 Mon 4/14/25 62 62 2060 Issue Addenda (as needed) 14 days Tue 4/15/25 Fri 5/2/25 63 63 2070 Bid Opening 0 days Fri 5/2/25 Fri 5/2/25 64 64 2080 Review Bids/Tabulation and Select Contractor 3 days Mon 5/5/25 Wed 5/7/25 65 M/WBE Documentation 8 days Mon 5/5/25 Wed 5/14/25 66 66 2100 Submit M/WBE Compliance Documents 3 days Mon 5/5/25 Wed 5/7/25 67 167 2110 Review and Approve M/WBE Compliance Docs 5 days Thu 5/8/25 Wed 5/14/25 68 68 M and C Process 20 days Wed 5/14/25 Wed 6/11/25 69 69 2120 Start M&C Process 0 days Wed 5/14/25 Wed 5/14/25 70 70 2130 M&C Process 20 days Thu 5/15/25 Wed 6/11/25 71 71 2140 Award Construction Contract 0 days Wed 6/11/25 Wed 6/11/25 72 72 Construction Contract Execution 16 days Thu 6/12/25 Thu 7/3/25 73 73 2150 Execute Contract Documents (Contractor) 11 days Thu 6/12/25 Thu 6/26/25 74 174 2160 Execute Contract Documents (CFW) 5 days Fri 6/27/25 Thu 7/3/25 75 Pre -Construction Activities 16 days Fri 7/4/25 Fri 7/25/25 76 76 2200 Distribute Executed Contract Documents 5 days Fri 7/4/25 Thu 7/10/25 77 77 2220 Hold Pre -Construction Meeting with Contractor 1 day Fri 7/11/25 Fri 7/11/25 78 78 2230 Issue Notice to Proceed for Construction 0 days Fri 7/11/25 Fri 7/11/25 79 79 2235 Hold Public Meeting - Pre -Construction 1 day Mon 7/21/25 Mon 7/21/25 80 80 2240 Submittals and Approvals 10 days Mon 7/14/25 Fri 7/25/25 81 81 82 Pre -Construction Complete 0 days Fri 7/25/25 Fri 7/25/25 82 Construction / Inspection T 408 days Wed 5/14/25 Fri 12/4/26 83 83 2245 Notice to Proceed - Construction 1 day Mon 7/28/25 Mon 7/28/25 84 84 2300 Construction 247 days Tue 7/29/25 Wed 7/8/26 85 85 2385 Inspections 241 days Wed 5/14/25 Wed 4/15/26 135 1135 Construction Substantially Complete 0 days Wed 7/8/26 Wed 7/8/26 136 1136 2390 Final Inspection 10 days Thu 7/9/26 Wed 7/22/26 137 1137 2395 Construction Phase Complete 0 days Wed 7/22/26 Wed 7/22/26 138 Closeout Report and Review 97 days Thu 7/23/26 Fri 12/4/26 N138 111 139 2120 Contract Reconciliation 15 days Thu 7/23/26 Wed 8/12/26 140 1140 2600 As -Built Survey 20 days Thu 7/23/26 Wed 8/19/26 141 1141 2700 Mapping 20 days Thu 8/20/26 Wed 9/16/26 142 1142 2800 As -Built Plans 20 days Thu 9/17/26 Wed 10/14/26 143 1143 2510 Submittals (Project Closeout Documents) 30 days Thu 10/15/26 Wed 10/28/26 144 1144 91 Closeout Report and Review 25 days Thu 10/29/26 Wed 12/2/26 145 1145 2505 Project Acceptance Letter 1 day Thu 12/3/26 Thu 12/3/26 146 1146 2550 Notice of Completion / Green Sheet 1 day Fri 12/4/26 Fri 12/4/26 147 1147 2910 Final Reconciliation 1 day Fri 12/4/26 Fri 12/4/26 148 1148 2920 Capitalization 0 days Fri 12/4/26 Fri 12/4/26 Water and Sanitary Sewer Replacements Contract 2023, WSM-B City Project No. 104914 Predecessors 20M 2025 De _ Jan Feb I Mar I Apr Ma Jun Jul Aua Seo Oct Nov Dec Jan Feb 59 37 59 6055+5 days 61 60,62 63* 63 660�67 69 70 71 73 74 76 77 77FS+5 days 78 80 81 83 84 135 136 137 137 140 141 142 143 144 145 145 147 Page 2 Report Print Date: Dec-22-2023 2026 ] Mar Aor I Mav Jun I Jul I Aua Seo OR Nov Der Jan Feb Mar Aor Mav Jun lul Aua Seo Or[ Nov \ Der L �5T, �4 �6/11 7/11 7/25 u � I II IIIIIIIIIIIIIIIIII IIIIIII III II IIIIIIII IIII II 17� 7 /22 112 r, ATTACHMENT E LAMBERT-AVE- " p iM Z k �j 'I{ r� A SOU TH`DR w T 1, , ik HEYV�/p:OD-AVE ti Y i WEYBURN DR-- 0A70 Z!z . SNEL�g OOK AVE �O p 4' V ♦r' � 6 r " r 5� QA IPA s, E r r FORTWO THo FORT WORTH ATTACHMENT "F" CERTIFICATE OF INSURANCE WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2023, WSM-B City Project No. 104914 City of Fort Worth, Texas Attachment F Revision Date: 07.20.2018 Page 24 of 24 City of Fort Worth, Texas Mayor and Council Communication DATE: 12/12/23 M&C FILE NUMBER: M&C 23-1083 LOG NAME: 60WSSC23WSMB-WALKERP SUBJECT (CD 3) Authorize Execution of an Engineering Agreement with Walker Partners, LLC in the Amount of $345,496.00 for the Water and Sanitary Sewer Replacement Contract 2023, WSM-B Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Walker Partners, LLC in the amount of $345,496.00, for Water and Sanitary Sewer Replacement Contract 2023, WSM-B project; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $591,308.00, transferred from available funds within the Water and Sewer Fund, for the Water and Sanitary Sewer Replacement Contract 2023, WSM-B project (City Project No. 104914) to effect a portion of Water's contribution to Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize execution of an engineering agreement with Walker Partners, LLC, in the amount of $345,496.00 for the preparation of plans for the Water and Sanitary Sewer Replacement Contract 2023, WSM-B project on the following streets and easements: Street From (Norwich Drive Selkirk Drive Easement between South Drive and Heywood Avenue Heywood Avenue Easement between Heywood Avenue and Weyburn Drive Easement between Weyburn Drive and Shellbrook Avenue Easement south of South Drive Shellbrook Avenue South Drive 190 feet north of the South Drive / Selkirk Drive Intersection Norwich Drive 1►G7T1C�791= Norwich Drive Norwich Drive 475 feet south of the South Drive / Inwood Road Intersection Norwich Drive To (Selkirk Drive 145 feet west of the Weyburn Drive / Selkirk Drive Intersection Selkirk Drive Selkirk Drive Selkirk Drive Selkirk Drive I East 450 feet i Selkirk Drive Easement north 580 feet north of the of Selkirk Drive Inwood / Selkirk Drive East 200 feet Intersection Scope of Work Water/Sewer Water/Sewer Sewer Water Sewer Sewer Sewer Water Sewer Easement between Inwood Road Selkirk Drive North 1,200 feet Sewer and Weyburn Drive Easement 400 feet south and between 250 feet east of the Weyburn Drive Weyburn Drive / South 980 feet Sewer and Norwich Norwich Drive Drive Intersection Easement 145 feet south and 70 ISoutheasterly between feet east of the 190 feet then Shellbrook Shellbrook Avenue / Southerly 290 Sewer Avenue and Norwich Drive feet Norwich Drive Intersection 180 feet west and Easement 180 feet south of Northeasterly south of Selkirk Selkirk Drive / 1,130 feet Sewer Drive Norwich Drive Intersection I I In addition to the contract amount, $245,812.00 (Water: $100,656.00; Sewer: $145,156.00) is required for project management, utility coordination, easement acquisition and material testing. This project will have no impact on the Water Department's operating budget when completed. The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60WSSC23WSMB-WALKERP Capital Budget Change Revised Fund Project FY2024 CIP Authority FY2024 Name Name Appropriations (Increase/Decrease) Budget W&S 104914 Capital W/SS Repl Projects Contract Con -Fund 56002 2023 WSM-B $0.00 This M&C $591,308.00 $591,308.00 Funding is currently available in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the W/SS Repl Contract 2023, WSM-B project within the Water & Sewer Capital Projects Fund. Appropriations for Water and Sanitary Sewer Replacement Contract 2023, WSM-B project, are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital Projects- Fund $0.00 $591,308.00 $591,308.00 56002 (Project Total i $0.00II $591,308.001$591,308.00 *Numbers rounded for presentation purposes. BUSINESS EQUITY OFFICE: Walker Partners, LLC, is in compliance with the City's Business Equity Ordinance by committing to 28 percent MWBE participation on this project. The City's MWBE goal on this project is 8 percent. The project is located in Council District 3. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water and Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the W/SS Repl Contract 2023 WSM-B project to support the above recommendations and execution of the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: Chris Harder 5020 Additional Information Contact: Lawrence Hamilton 2626 60WSSC23WSMB-WALKERP FiD Table 2 56002 0600430 104914 2024 $205,821.00 2 56002 0700430 4956001 104914 2024 $385,487.00 2 56002 0700430 104914 2024 $385,487.00 2 56002 0600430 4956001 104914 001730 9999 ($205,821.00) 1 2 56001 0709020 5956001 $385,487.00 2 56002 0700430 4956001 104914 001730 9999 ($385,487.00) 2 56002 0600430 5110101 104914 001730 9999 $26,250.00 Water Staff Cost 2 56002 0600430 5550102 104914 001730 9999 $4,000.00 Public Outreach 1 56002 0600430 5330500 104914 001730 9999 $105,165.00 Contract 2 56002 0600430 5310350 104914 001770 9999 $1,500.00 Utility Coordination 2 56002 0600430 5330500 104914 001784 9999 $52,500.00 Soil Lab Consultant 2 56002 0600430 5310350 104914 001784 9999 $16,406.00 Soil Lab TPW Staff 2 56002 0700430 4956001 104914 001730 9999 ($385,487.00) 2 56002 0700430 5110101 104914 001730 9999 $42,656.00 Water Staff Cost 1 56002 0700430 5330500 104914 001730 9999 $240,331.00 Contract 2 56002 0700430 5710010 104914 001740 9999 $60,000.00 Easement Acquisition 2 56002 0700430 5110101 104914 001740 9999 $20,000.00 Easement Acquisition 2 56002 0700430 5330500 104914 001740 9999 $10,000.00 Easement Acquisition 2 56002 0700430 5740010 104914 001780 9999 $10,000.00 Easement Acquisition 2 56002 0700430 5310350 104914 001770 9999 $2,500.00 Utility Coordination 56002 2060000 104914 RETAIN I RetainaRe Combo Code