HomeMy WebLinkAboutContract 60988CSC No. 60988
DEVELOPER FUNDING AGREEMENT
FOR
465 S MAIN ST
ILLUMINATION IMPROVEMENTS
THIS AGREEMENT is by and between 465 South Main, LLC hereinafter referred to as "Developer",
and the City of Fort Worth, hereinafter referred to as "City".
WHEREAS, Developer, is the owner of land at 465 S Main St. within the City of Fort Worth, Tarrant County
Texas, more fully depicted on Exhibit A attached hereto and incorporated herein (the "Property"); and
WHEREAS, Developer is making improvements to the Property pursuant to that certain permit issued by
City (Permit No. PK22-05185 & P1322-06713); and
WHEREAS, in order to serve the Property and fulfill illumination requirements by City regulations,
Developer is required to construct 2 street lights and related appurtenances ("Illumination Improvements") as
depicted on Exhibit B attached hereto and incorporated herein; and
WHEREAS, Developer has requested that City perform the installation of the Illumination Improvements
and agrees to pay for the cost thereof, and
WHEREAS, City has agreed to install the Illumination Improvements; and
WHEREAS, Developer will make a contribution to the City in the amount of $37,073.55
(the "Contribution"), which is the estimated cost for construction, inspection, fees, permits and staff
costs ("Construction Costs") of the Illumination Improvements; and
WHEREAS, after installation of the Illumination Improvements, the City will perform a final accounting
review and if any additional amount is owed for the Construction Costs, City will invoice Developer and
Developer shall remit same to the City or if any credit or refund is owed to Developer, City shall remit same to
Developer.
NOW THEREFORE, in consideration of the above recitals and the promises and covenants herein, City
and Developer do hereby agree as follows:
Developer will provide to City the Contribution amount of $37,073.55 for construction of the Illumination
Improvements concurrent with Developer's execution and return of this Agreement.
2.
Developer's Contribution to the City is an estimate of Developer's obligation for its costs related to the
Illumination Improvements. If any cost overages are due the City for the construction, Developer shall remit same
to City within 30 days of receipt of a request for same; likewise, if any credit or refund is due Developer at the
completion and final accounting of the Illumination Improvements construction, same shall be refunded by City to
Developer. If the actual Construction Costs are more than the estimated payments made by the Developer, the
Developer shall pay the difference to the City before the improvements will be accepted by the City. If the actual
Construction Costs are less than the estimated payments made by the Developer, the City will refund the difference
unless, in either case, the difference between the actual costs and the estimated payments is fifty dollars ($50.00)
or less. In that case, the City will not issue a refund and the Developer will not be responsible for paying the
difference.
OFFICIAL RECORD
Dev Funding Agreement: CITY SECRETARY Page 1 of 6
Illumination Improvements FT. WORTH, TX
3.
City will use its best reasonable efforts to perform this Agreement without undue delay.
4.
This Agreement shall be binding upon and inure to the benefit of the City and Developer and their respective
successors and assigns. This Agreement, together with any exhibits attached hereto, constitutes the entire agreement
between the parties hereto, and may not be amended except by a writing signed by all parties and dated subsequent
to the date hereof.
If Developer or any subsequent owner transfers the Property or any portion thereof prior to the performance
of all obligations of the Developer or City hereunder, Developer or such transferring owner shall obtain an agreement
from the transferee assuming the obligations of the transferring owner under this Agreement performable from and
after the date of transfer. From and after the date of such transfer, the transferee shall be solely obligated under this
Agreement, and the transferring owner shall have no further obligations under this Agreement, with respect to the
Property or portion thereof transferred.
5.
Notices required pursuant to the provisions of this Agreement shall be conclusively determined to have
been delivered when (1) hand -delivered to the other Party, its agents, employees, servants or representatives,
(2) delivered by electronic means with confirmation of the transmission, or (3) received by the other Party by
United States Mail, registered, return, receipt requested, addressed as follows:
City of Fort Worth
Attn: Jesica McEachern, Assistant City
Manager 200 Texas Street
Fort Worth, TX 76102-6 31 1
Email: Jesica.McEachern(a�fortworthtexas.Qov
With Copy to the City Attorney.
451 South Main, LLC
Attn: Rian Maguire
451 South Main, Suite 200
Fort Worth, TX 76104
Email: Rianachcdev,com
Executed by each party's duly designated and authorized representative; effective as of the date subscribed by the
City's designated Assistant City Manager.
CITY OF FORT WORTH, TEXAS:
By: Cw
Jesica McEachern
Assistant City Manager
Date:
APPROVAL RECOMMENDED:
A.
By: Lauren Prieur (Feb 17, 2024 17:15 CST)
Lauren Prieur, Director Transportation
and Public Works
Dev Funding Agreement:
Illumination Improvements
451 SOUTH) N, rC:
jB : / /s%
Rian Maguire
Principal z
Date: //
Page 2 of 6
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
APPROVED AS TO FORM AND LEGALITY:
fj�
By: Douglas Black (Feb 21, 202414:18 CST)
Douglas W. Black
Senior Assistant City Attorney
CONTRACT AUTHORIZATION
M&C: N/A
Date Approved:
pg4U�p4��
ATTEST: �� Fo
FORT�yOaad
%a VeY ?tjg o8�=0
By:000-00
Jannette S. Goodall a°4z, 454pp
City Secretary
CONTRACT COMPLIANCE MANAGER:
By signing, I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
Clint Hoover, P.E.
Engineering Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Dev Funding Agreement: Page 3 of 6
Illumination Improvements
Exhibit A
Dev Funding Agreement: Page 4 of 6
Illumination Improvements
Citv of Fort Worth Lighting Permit Cover Sheet
Date: 3/15/2023
Developer: 451 South Main, LLC fX New Submittal
451 South Main, Suite 200 [ Resubmittal
Fort Worth, Texas 76104 [ Change In Submitttal
Project Name: 465 South Main - Chambers B
Location: 465 South Main, Fort Worth, Texas 76104
Designer: Jordan & Skala Engineers Submitted By: Abby Boyd
Parkway Permit #: PK22-04349 Building Permit #: PB22-10245
Associated CFA: CPN: N/A City PM: N/A
Permit Includes: [ Title Sheet Ix Lighting Plan [ Detail Sheets
F- Parkway Permit L Building Permit L Additional Sheets (list below)
Description: The installation of two new pedestrian lights and the required number of ground boxes.
Comments:
Submittal is: IX Reviewed DC Approved I= Resubmittal Required
F Meeting/Discussion Required
F- Other:
Review &Decision By: KB L
Date: 3/16/120237
Quantities
I Pole Quantity 2 I
Pole Type Washln r 10'
Luminalre Type WFCL2 PC030K"-ITFC3
BK NF PR7 AO RFD325896
I Luminalm Quantlry 2 I
I Ground Box QuantlN I 1 I
I Summary of Total Conduit and Cables
Run
Size Length Overhead/Bore/Trench a6—COPPER
R-1 2' 29 Trench()%�T(' 3
R-3 2" 22 Trench (T) 3
I CABLETOTALAn 101
TOTAL CONDUIT QUANTITIES (Fr) TRENCH FOR 2-CONDUIT=303
OFFICE/RETAIL
...... . �- •vusaac'v+uaaar�...� - �....�.... ..----..�._..----.--..-------------
R-2 R-3
LEGEND
p Existing Light
❑ Existing Ground Box
New Light
New Ground Box
— Conduit
NOTES:
�ranrnta lwm.upn rprp,aa.m,naappmtlro n{M1t
utt heml—m 14' Iron IazeplcuN tp
lacealpieruxellu lR' Irpm backal plertp ROW.
[FW IlEntlntgNhm b be Imhlletl Ma tlryol port WMM1
pnllllaE llgM1tlngconbaclo Ull r.
rill g11ARAM23 paatoaMatrtet II{M1t mubvNon
�pmng rpnawn
MpintM1ml ba.m.dplawwam at.tw eppmolsr.
[mpt ngM1t Ipppe.tlpm.M1.n x Imrallpa r Mplmum r,an
-AII ll{M1tlra„latem m,terlab mart 4apprpued by
1AM1tlng Department II— II{M1tln{App,aeA Pmtlu. urtl.
-All Wan{/ublea mus[be rapper.
�-
urban bobcat
ARCHITECTS
W
CHCaDEVELOPMENT
EW
PEbIIT Dbi2R2
t Ott REPSDNY pD1�15.tT
I ] Ott RM90N g33 I
IGIECRED RY: NRC
IDRAMN OY: .a
Ilt�ll�ll IDocDAe Dgnam
hr'
�Dxlo;
APPROVED
By DaNSKo ar 11:5a am, Mar fa, 202JJ y�,•g„z _-�
WEST TUCKER STREE SITE PLAN
C SI•TEPm N (50' RIGHT—OF—WAY)
Parkway Permit* PK22-04349 „r D sskdD DomeDrt E1.0
Building Permit #: PB22-10245
Exhibit B
Dev Funding Agreement: Page 5 of 6
Illumination Improvements
��.N �ELECTRICAL, �.LC.
821 E. Dion Avernle
Fort V4 ortlt, Texas 76140
M15W.1w,uielectrical.coni
IF 817-,>61-7403
9
Thursday, September 28, 2023
To: Clint Hoover
City of Fort Worth
Bean Electrical, LLC. is proud to offer an estimate for the project:
Chambers Building B
Scope: Per Bid Items below.
1. Furnish/install 2" Sch 80 by trench
2. Furnish/install ground box
3. Furnish/install TY 7 foundations w/ 10' Washington standards
4. Furnish/install No. 8 XHHW and electrical connections
5. Furnish/install traffic control and street use permit
Base Bid:
Note: Bid based on plans provided
$37,073.55
Clarifications and Exclusions:
1. Proposal is for all bid items on proposal above
2. Excludes anything not listed in scope and the following below
3. Surveying & Staking
4. Damage to Paving or Asphalt
5. Performance/Payment/Maintenance Bonds
6. Utility Company Charges
7. Damage to unseen/unmarked utilities
8. Allowances/City Fees
9. Taxes (if any)
10. Due to the market changes in materials, price good for 30 days.
11. Bid based on normal working hours (7:00 to 3:30-Mon. thru Fri). No overtime or acceleration included
12. Bean Electrical, LLC. reserves the right to negotiate a mutually acceptable contract.
If rock is present additional fees involved for equipment
Sincerely,
Jason Hess
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1 800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints
' BE""L
ELECTRICAL,, LLC,
l E. Fltioll) Aveiiiw- V 17-J01-7400 BL
Fort Wooli, Tc•xa, 76140 F 817-561-7.403
�ti�{�3-.1�c�-rlicicc•t nc•al.c•� rn�
Item
Estimate
Unit
Code
quantity
1
101
LF
2
1
EA
3
2
EA
4
303
LF
5
2
EA
6
4
EA
7
1
MO
8
1
EA
Description
Unit Price
Total
Amount
CHAMBERS BUILDING B
FURNISH/INSTALL 2" SCH 80 BY TRENCH
$49.00
$4,949.00
FURNISH/INSTALL GROUND BOX
$2,290.00
$2,290.00
INSTALL TY 7 FOUNDATION
$2,640.00
$5,280.00
FURNISH/INSTALL NO.8 XHHW
$4.85
$1,469.55
FURNISH/INSTALL 10' WASHINGTON STANDARDS
$8,830.00
$17,660.00
ELECTRICAL CONNECTION
$365.00
$1,460.00
TRAFFIC CONTROL
$3,465.00
$3,465.00
STREET USE PERMITS
$500.00
$500.00
TOTAL
$37,073.55
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1 800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints
465S. Main St Illumination Improvements
of
w 6 Ran. a
ram
Legend
Project Location
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
DOCUMENT TITLE: 465 South Main Lighting Funding Agreement
M&C: PARKWAY PK22- BUILDING PB22- DOC#:
PERMIT: 05185 PERMIT: 06713
Date: 10/25/23
To:
Name
Department
Initials
1.
Clint Hoover
TPW - Signature
60
2,
Anna Benavides
TPW — Initial
A'
3,
Rajnish Gupta
TPW - Signature
74z-
4,
Martin Phillips
TPW — InitialP
5.
Lauren Prieur
TPW - Signature
6.
Doug Black
Legal — Signature
dwb
7.
Jesica McEachern
CMO - Signature
im
1-
8.
Ronald Gonzales
CSO - Signature
Kc
9.
Jannette Goodall
CSO - Signature
7
10.
Allison Tidwell
CSO - Initial
.IL
AT
11.
Tabitha Giddings
TPW
Date Out
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES []No SAME DAY: []YES []No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsaFortWorthTexas.2ov at ext. 7233 for pick up when completed.
Thank you!