NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Cohix Phase 1
City Project No.: 103287
Improvement Type(s): ❑ Paving ❑ Drainage
Original Contract Price:
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
x❑ Street Lights ❑ Traffic Signals
Feb 19, 2024
Contractor Date
President
Title
Independent Utility Construction INC
Company Name
$47,439.56
$164,288.36
$164,288.36
&�)-w �-
Feb 19, 2024
William Fauver (Feb 19.202407:33 CST)
Project Inspector
Date
Feb 21, 2024
Kha(,,�215,55 Cf
Project Manager
Date
41-
Feb 21, 2024
0— n(Feb 21, 202416:09 CST)
CFA Manager
Date
A.
Feb 21, 2024
Lauren Prieur (Feb 21, 202416:11 CST)
TPW Director
Date
Cp��
Feb 22, 2024
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: Cohix Phase 1
City Project No.: 103287
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 280 WD
Work Start Date: 6/13/2022
Completed number of Soil Lab Test: 750
Completed number of Water Test: 18
Days Charged: 369
Work Complete Date: 1/31/2024
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name COHIX PHASE 1
Contract Limits
Project Type STREET LIGHTING IMPROVEMENTS
City Project Numbers 103287
DOE Number 3287
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date 12/21/2021
For Period Ending 1/31/2024
WD
Contract Time 2WD
Days Charged to Date 369
Project Manager NA
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors E. DAVILA / W. FAUVER
Contract is 100.00 Complete
Thursday, February 15, 2024 Page 1 of 4
City Project Numbers 103287 DOE Number 3287
Contract Name COHIX PHASE 1 Estimate Number 1
Contract Limits Payment Number 1
Project Type STREET LIGHTING IMPROVEMENTS For Period Ending 1/31/2024
Project Funding
UNIT VI. STREET LIGHTING IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
2" CONDT PVC SCH 80 (T) (CO #1) (CO #3)
3087 LF
$13.68
$42,230.16
3087
$42,230.16
2
NO 10 INSULATED ELEC CONDR (CO #1)
1935 LF
$4.12
$7,972.20
1935
$7,972.20
3
FURNISH/INSTALL TYPE 33B ARM
27 EA
$150.00
$4,050.00
27
$4,050.00
4
FURNISH/INSTALL LED LIGHTING FIXTURE (70
27 EA
$250.00
$6,750.00
27
$6,750.00
WATT ATBO COBRA HEAD)
5
FURNISH/INSTALL RDWAY ILLUM TY 11 POLE
27 EA
$1,474.00
$39,798.00
27
$39,798.00
6
RDWY ILLUM FOUNDATION TY 1,2, AND 4
27 EA
$1,184.00
$31,968.00
27
$31,968.00
7
NO 2 INSULATED ELEC CONDR (CO #3)
1152 LF
$4.50
$5,184.00
1152
$5,184.00
8
FURNISH/INSTALL LED LIGHTING FIXTURE)
4 EA
$450.00
$1,800.00
4
$1,800.00
(CO #3)
9
FURNISH/INSTALL TYPE 33A ARM (CO #3)
4 EA
$250.00
$1,000.00
4
$1,000.00
10
RDWY ILLUM FOUNDATION TY 3, 5, 6 AND 8
4 EA
$1,384.00
$5,536.00
4
$5,536.00
(CO #3)
11
RDWY ILLUM TY 18 POLE (CO #3)
4 EA
$2,100.00
$8,400.00
4
$8,400.00
12
GROUND BOX TYPE B (CO #3)
3 EA
$800.00
$2,400.00
3
$2,400.00
13
FURNISH/INSTALL 240-480 VOLT METERED
I EA
$7,200.00
$7,200.00
1
$7,200.00
--------------------------------------
PEDESTAL (CO #3)
Sub-Total of Previous Unit
$164,288.36
$164,288.36
Thursday, February 15, 2024 Page 2 of 4
City Project Numbers 103287
Contract Name COHIX PHASE 1
Contract Limits
Project Type STREET LIGHTING IMPROVEMENTS
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number 3
Total Contract Price
DOE Number 3287
Estimate Number 1
Payment Number 1
For Period Ending 1/31/2024
$116,848.80
$160.20
$47,279.36
$164,288.36
Total Cost of Work Completed $164,288.36
Less % Retained $0.00
Net Earned $164,288.36
Earned This Period $164,288.36
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$164,288.36
Thursday, February 15, 2024 Page 3 of 4
City Project Numbers 103287
Contract Name COHIX PHASE 1
Contract Limits
Project Type STREET LIGHTING IMPROVEMENTS
Project Funding
Project Manager NA
Inspectors E. DAVILA / W. FAUVER
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
DOE Number 3287
Estimate Number 1
Payment Number 1
For Period Ending 1/31/2024
City Secretary Contract Number
Contract Date
12/21/2021
Contract Time
25 WD
Days Charged to Date
369 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $164,288.36
Less % Retained $0.00
Net Earned $164,288.36
Earned This Period $164,288.36
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$164,288.36
Thursday, February 15, 2024 Page 4 of 4
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT #
DOE #
FID #
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Cohix Ph 1
A - Water, Sewer, Drainage
B - Paving
C - Street Lights
21-0144
103287
30114-0200431-103287-EO7685
X-26892
Troy Gardner
Khal Jaafari
CITY PARTICIPATION: Yes
Phone No: 682-215-8720
Phone No: 817-392-7872
CHANGE
ORDER No:
Al, 131, C1
RECEIVED
By Khal Jaafari at 12:11 am, Aug 23, 2022
CONTRACT UNIT
WATER
I SEWER
I PAVING
I DRAINAGE
�evelo STREET LIGHTS
CONTRACT
er
DAYS
Developer Cost City Cost
Developer Cost I City Cost
(Developer Cost City Cost
(Developer Cost I City Cost
Cost City Cost
$1,076,386.89 $60,234.31
$1,165,072.00 I
I $1,393,061.40
I $1,216,275.00 I
$116,848.80
I 225 WD
$1,076,386.89 $60,234.31
$1,165,072.00 I $0.00
$1,393,061.40 $0.00
I $1,216,275.00 I $0.00
$116,848.80 $0.00
I 225 WD
$2,000.00
$1,490.00 I
$114,101.00
I I
$160.20
$1,078,386.89 $60,234.31
$1,166,562.00 I $0.00
$1,507,162.40 $0.00
I $1,216,275.00 I $0.00
$117,009.00 $0.00
I 225 WD
$1,138,621.20
$1,166,562.00
I $1,507,162.40
I $1,216,275.00
$117,009.00
Dev. Cost:
$5,085,395.29
City Cost:
$5,145,629.60
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the contract doe. um nts
CITY BID ITEM
PAY ITEM #
#
QUANTITY
UNIT
12
9999.0000
1
EA
You are directed to make the following changes in the contract docum nts
CITY BID ITEM
PAY ITEM #
#
QUANTITY
UNIT
5
3331.3101
1
EA
You are directed to make the following changes in the contract docur"gnts
CITY BID ITEM
PAY ITEM #
#
QUANTITY
UNIT
3
3211.0501
-0.40
SY
4
3211.0502
0.40
SY
5
32 11 .0400
0.14
TON
6
3213.0301
0.015
SF
You are directed to make the following changes in the contract documents
CITY BID ITEM
PAY ITEM #
#
QUANTITY
UNIT
2
3211.0502
-0.1
SY
3
3211.0400
0.358
TON
14
3292.0100
3695
SY
15
3291.0100
616
CY
You are directed to make the following changes in the contract docum nts
CITY BID ITEM
PAY ITEM #
#
QUANTITY
UNIT
1
2605.3015
1
9
LF
2
3441.1410
9
LF
RECEIVED
By Khal Jaafari
at 12:11 am, Aug 23, 2022
UNIT IA: WATER IMPROVEMENTS
ITEM DESCRIPTION
UNIT PRICE
TOTAL
1 1/2" Irrigation Service
$2,000.00
$2,000.00 I
TOTAL
$2,000.00 I
UNIT /I: SANITARY SEWER IMPROVEMENTS
ITEM DESCRIPTION
UNIT PRICE
TOTAL
4" Sewer Service
$1,490.00
$1,490.00 I
TOTAL
$1,490.00 I
UNIT IV., PAVING IMPROVEMENTS
ITEM DESCRIPTION
UNIT PRICE
TOTAL
6" Lime Treatment
$3.10
-$1.24
8" Lime Treatment
$3.65
$1.46 I
Hydrated Lime
$180.00
$25.20 I
4" Conc Sidewalk
$5.75
$0.09 I
TOTAL
$25.51
UNIT V. OFFSITE PAVING IMPROVEMENTS
ITEM DESCRIPTION
UNIT PRICE
TOTAL
8" Lime Treatment
$3.25
-$0.33 I
Hydrated Lime
$180.00
$64.44
Block Sod Placement
$16.38
$60,524.10 I
Topsoil
$86.83
$53,487.28 I
TOTAL
$114,075.50 I
UNIT VI., STREET LIGHTING IMPROVEMENTS
ITEM DESCRIPTION
UNIT PRICE
TOTAL
2" CONDT PVC SCH 80(T)
$13.68
$123.12
NO 10 Insulated Elec Condr
$4.12
$37.08 I
TOTAL
$160.20
REASONS FOR CHANGE ORDER
Added missing bid items, adjusted rounding error in paving quantities, shifted streetlight to avoid driveway.
Revised: 10-12-2011 Page 2
DocuSign Envelope ID: FF7E3867-E92B-491 E-9856-8D797C361 F42
RECOMMENDED:
By: Shield Engineering Group. PLLC
Name -
Title: UI4_0 Pj{9!5dpEw'r
RECEIVED
By Khal Jaafari at 12:12 am, Aug 23, 2022
APPROVED:
DocuSigned by:
By:
(
—F.,—.star tar SUSA Realstate Group, Inc.
Name: 4F0...
Tape: Vice Presi dent
APPROVED:
By: Bu sCq Construction, Inc
—
Name:
Tite:
Vice President
By:
Gitco Contracgng. Inc
Name:
V C �- ✓�`'��—
True:
1fi 9�S l
By:
Independent U01ity Construction, Inc
Name:
(Z� ilk t{�G
Title:
President
Revised: 10-12-2011 Page 3
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT #
DOE#
WATER PROJECT #
SEWER PROJECT #
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
ICREDITS TO DATE
(CONTRACT TO DATE
(AMOUNT OF PROP. CHANGE ORDER
IREVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Cohix Ph 1 CHANGE
B - Paving ORDER No:
21-0144 CITY PARTICIPATION:( No
103287
3B
30114-0200431-103287-EO7685
30114-0200431-103287-EO7685
X-26892
Bill Fauver Phone No: 817-897-3698
Khal Jaafari Phone No: 817-392-7872
RECEIVED
By Khal Jaafari at 2:06 pm, Nov 14, 2023
CONTRACT UNIT
WATER SEWER I PAVING DRAINAGE STREET LIGHTS
Developer Developer Developer Developer - -- Developer
Cost City Cost Cost City Cost Cost Cost City Cost Cost City Cost
t
$1,393,061.40 ;. S
$375128.24
$0.00 $0.00 $0.00 .$0.00 $1,768,189.64 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00 $0.00 $0.00 $0.0 ;1 768189.64 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $1,768,189.64 $0.00 $0.00
Dev. Cost: $1,768,189.64 City Cost: $0.00
$1,768,189.64
I
(CONTRACT
DAYS
225
225
225
You are directed to make the following changes in the contract documents
CITY BID ITEM
PAY ITEM #
# QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE
TOTAL
Unit IV: Paving
I 8
3213.0501 -2 EA Barrier Free Ramp, Type P-1 $2,095.29
-$4,190.58
14*
3213.0504 2 EA Barrier Free Ramp, Type M-2 $2,095.29
$4,190.58
TOTAL
$0.00
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
Sidewalk ramps adjusted due to constructability constraints in field. This change order pertains to Revision 2 of construction plans.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
Revised: 10-12-2011 Page 1
RECOMMENDED:
ConsulEr,...
U—
By: Shield
Name: RVof^ IiIII I PE
Title: Vice President
APPROVED:
Developer
By: d5
Name: SIFAHE"� gQIN
Title: J7aJELo�ME� DtREGa►Z
APPROVED:
Contractor�
By:
Name: Lela McQuien
Title: Vice President, Ooarations
Revised: 10-12-2011 Page 2
IPROJECT NAME:
CONTRACT:
ICFA #
CITY PROJECT #
IDOE #
WATER PROJECT #
SEWER PROJECT #
I FI LE #
INSPECTOR:
PROJECT MANAGER:
IORIGINAL CONTRACT
(EXTRAS TO DATE
(CREDITS TO DATE
(CONTRACT TO DATE
(AMOUNT OF PROP. CHANGE ORDER
IREVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Cohix Ph 1
C - Street Lights
21-0144
103287
30114-0200431-103287-EO7685
30114-0200431-103287-EO7685
X-26892
CITY PARTICIPATION: No
CHANGE
ORDER No:
3C
Bill Fauver Phone No: 817-897-3698 RECEIVED
Khal Jaafari Phone No: 817392-7B72
By Khal Jaafari at 12:32 pm, Oct 25, 2023
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREETLIGHTS I CONTRACT
Developer Developer Developer Developerj
DAYS
Developer Cost Cost Cost Cost Cost
$116,848.8225 I
$160.20
I
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $117,009�0225
$47,279.36
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 $16 288.3225
$0.00 $0.00 $0.00 $0.00 $164,288.36 I
Dev. Cost: $164,288.36 City Cost:
$164,288.36
You are directed to make the following changes in the contract docum mis
CITY BID ITEM
PAY ITEM #
#
QUANTITY
UNIT
Unit VI: Street Lights
1
2605.3015
1,152
LF
7*
3441.1405
1,152
LF
8*
3441.3051
4
EA
9*
3441.1632
4
EA
10*
3441.3302
4
EA
11*
3441.3342
4
EA
12*
3441.1501
3
EA
13*
3441.1772
1
EA
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
ITEM DESCRIPTION
2" CONDT PVC SCH 80(T)
NO 2 Insulated Elec Condr
FurnishAnstall LED Lighting Fixture (137 watt ATB2 Cobra Head)
Furnish/Install Type 33A Arm
Rdwy Ilium Foundation TY 3,5,6, and 8
Rdwv Illum TY 18 Pole
Ground Box Type B
Furnishlnstall 240-480 Volt Metered Pedestal
GRAND TOTAL
UNIT PRICE TOTAL
1 $13.68 $15,759.36 I
$4.50 $5,184.00
$450.00 $1.800.00 I
1 $250.00 $1,000.00
1 $1,384.00 $5,536.00
1 $2,100.00 I $8,400.00
1 $800.00 $2,400.00
1 $7,200.00 I $7,200.00
TOTALI I $47,279.36
1 $47,279.36
Added street lights on median along McPherson Boulevard. This Change Order pertains to Revision 2 of construction plans.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
Revised: 10-12-2011 Page 1
RECOMMENDED:
By:
Name: 1�VAKJ Ik Iw , PIE
Title: V Q
APPROVED:
(Developer)
By:
v!_
Name: F✓E� gRW
Title: D6�bL�AM�t+r 171iti6L7DR
APPROVED:
(Contractor%//y,
Name: Richard Wolfe
Title: President
r
RECEIVED
By Khal Jaafari at 12:32 pm, Oct 25, 2023
Revised: 10-12-2011 Page 2
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
February 8, 2024
Independent Utility.
5109 Sun Valley DR
Fort Worth TX 76119
RE: Acceptance Letter
Project Name: Cohix Phase 1
Project Type: Street Lights
City Project No.: 103287
To Whom It May Concern:
On February 8, 2024 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on February 8, 2024,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at Khal
Jaafari. 817-392-7872.
Sincerely,
K� ��) P�
alp
Khal Jaafari (Feal, 202415:55 CST)
Khal Jaafari, Project Manager
Cc: William Favour, Inspector
Donald Watson, Inspection Supervisor
Aaron Ybarra, Senior Inspector
Andrew Goodman, Program Manager
Shield Engeering, Consultant
Burnsco Construction INC., Contractor
Forestar, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared RICHARD
WOLFE, PRESIDENT Of INDEPENDENT UTILITY
CONSTRUCTION, INC., known to me to be a credible person, who being
by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Cohix Phase 1 - City Project No. 1032
BY
Riclfe, President
Subscribed and sworn before me on this date 19th of February, 2024.
Notary Public
Tarrant County, State of _
Texas Y "I'' CHRISTINA GARCIA
Notary Public, State of Texas
:9r +!�F Comm. Expires 12-20-2024
Notary ID 130940785
CONSENT OF
OWNER
❑
SURETY COMPANY
ARCHITECT
❑
CONTRACTOR
❑
TO FINAL PAYMENT
o�R
❑
(SIMILAR TO AIA DOCUMENT G707)
PROJECT: City Project # 103287 for Street Lighting to serve Cohix Phase 1,
(name, address) Fort Worth, TX
TO (Owner)
F— City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
1
CONTRACTOR: Independent Utility Construction, Inc.
Bond No. 170884G
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
--.1 CONTRACT DATE:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and
address of Surety Company)
Westfield Insurance Company
955 Garden Park Drive, Suite 230 SURETY COMPANY,
Allen, TX 75013
on bond of (here insert name and address of Conti -actor)
Independent Utility Construction, Inc.
5109 Sun Valley Drive CONTRACTOR,
Fort Worth, TX 76119
hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the
Surety Company of any of its obligations to (here insert name and address of Owner)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102 OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
The Surety Company has hereunto set its hand this
Attest:
(Seal):
16th day of February , 2024
WESTFIELD INSURANCE COMPANY
Surety Company
By
Signature o uthorize'blepresentative/
Kyle W. Sweeney Attorney —in —Fact
Title
Note: This form is intended to be used as a companion document to the Contractor's Affidavit of Payment of Debts and Claims, Current Edition
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME
POWER # AND ISSUED PRIOR TO 08/23/23, FOR ANY PERSON OR PERSONS NAMED BELOW
General
POWER NO. 4220052 06
Power Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
CERTIFIED COPY Ohio Farmers Insurance Co.
Westfield Center. Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a 'Company" and collectively as "Companies.' duly
organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center. Medina County. Ohio, do by these
presents make, constitute and appoint
CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W. SWEENEY, ELIZABETH GRAY, DAVID SWEENEY, JOINTLY OR
SEVERALLY
of FORT WORTH and State of TX its true and lawful Attorneys) -in -Fact, with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship in any penal limit. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
'Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary.'
"Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting
held on February 8, 2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to be hereto
affixed this 23rd day of AUGUST A.D., 2023 .
Corporate "g "�" AWESTFIELD INSURANCE COMPANY
Seals P\A ..... ,lC �a��•nN •�/s'''c ��SURA WESTFIELD NATIONAL INSURANCE COMPANY
Affixed :p': ��ir F OHIO FARMERS INSURANCE COMPANY
r ' �: vii&RTER4- 3 3 : sro _�. �i i3C=4.1
ran
State of Ohio """' By:
County of Medina ss.: Gary W. _tumper, Nationahurety Leader and
Senior Executive
On this 23rd day of AUGUST A.D., 2023 , before me personally came Gary W. Stumper to me known, who, being by me duly sworn,
did depose and say, that he resides in Medina, OH; that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE
COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which
executed the above instrument: that he knows the seals of said Companies: that the seals affixed to said instrument are such corporate seals: that
they were so affixed by order of the Boards of Directors of said Companies: and that he signed his name thereto by like order.
Notarial
Seal
Affixed , P,: ••""'-••.
State of Ohio p tyo David A. Kotnik, Attorney at Law, Notary Public
County of Medina ss.: v���,- My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code)
Te0F°,
I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which is still in full force and effect: and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 16LAday of
LUYIA
SO
SEAL
,s•�\ti. �. rC� .t ��P . _ per%,, •..•':.G��SU��'�.,,'i
y ' fvMARTER �' `
=H SEAL : _ f®=
`cn, Secretary7r' rase : ��'} = vj: 'p' 3�•. ��4� :�$;
° 4 Frank A. Carrino, Secretary
BPOAC2 (combined) (03.22)