Loading...
HomeMy WebLinkAboutContract 56208-A4AMENDMENT No . 4 CSC No. 56208-A4 TO CITY SECRETARY CONTRACT No. 56208 WHEREAS, the City of Fort Worth (CITY) and MAS Consultants, LLC, (ENGINEER) made and entered into City Secretary Contract No. 56208, (the CONTRACT) which was authorized by M&C 21-0586 on the 17' day of August, 2021 in the amount of $269,495; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $38,375.00 which was administratively authorized February 08, 2022, Amendment Number 2 in the amount of $75,469.00 which was authorized by M&C 22-0597 on August 9, 2022 and Amendment No.3 in the amount of $67,443.00.00 administratively authorized on May 23, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2020, WSM-D, CPN 103419; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $2,389.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $453,171.00. 0 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD City of Fort Worth, Texas W&SS Repl. Contract 2020, WSM-D Prof Services Agreement Amendment Template CITY SECRETARY CPN 103419 Revision Date: 12/08/2023 FT. WORTH, TX Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Feb 22, 2024 ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: 444�a�a�� of FORr�°a d�° nn %�.i°d �a pro o:d a�4� TEXA`�o4� �ROR644 Christopher Harder (Feb 21, 2024 09:37 CST) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER MAS Consultants, LLC DN: CII US, EB .. c h.zl@,,,-dvll.,,,, 0="MAS Angel Sanchez ConsulU-LLC, CN=AngelSan— D.,,zaz4az,s 5091-00 Angel Sanchez, P.E. President DATE: 2/19/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Clayt4n Torrance, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: 4)� Douglas Black (Feb 22, 202416:36 CST) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: 24-0072 (FUNDING) M&C Date: 01/23/2024 Form 1295 No.: N/A W&SS Repl. Contract 2020, WSM—D OFFICIAL RECORD CPN 103419 CITY SECRETARY FT. WORTH, TX VAG. "- CONSULTING ENGINEERS January 23, 2024 Clayton M. Torrance, P.E. Professional Engineer City of Fort Worth - Water Department 311 West 10th Street Fort Worth, Texas 76102 Reference: Water and Sanitary Sewer Replacements, Contract 2020 WSM-D, City Project Number 103419 — Contract Amendment No. 4 for Miscellaneous Drainage Improvements Dear Clayton: MAS Consulting Engineers is pleased to offer additional professional engineering services for this project. These additional services were requested by the City of Fort Worth Transportation and Public Works Department for drainage improvements within the current project limits. The proposed drainage improvements include the replacement of various drainage inlets and sidewalks affected by proposed improvements. MAS Consulting Engineers proposes to increase the contract amount by $2,389.00 for these additional services which will include updating plans and specifications for said improvements. All additional services will be performed in accordance with the original contract dated 8/23/2021. Summary of Contract Fee Original Contract Amount $ 269,495.00 Contract Amendment No. 1 $ 38,375.00 Proposed Amendment No. 2 $ 75,469.00 Proposed Amendment No. 3 $ 67,443.00 Proposed Amendment No. 4 $ 2.389.00 Revised Contract Amount $ 453,171.00 If you have any questions or we may be of further service, please call me at 817-938-8832. Respectfully Submitted, MAS Consulting Engineers Angel Sanchez, IYP- Principal MAS Consulting Engineers TBPELS Firm Reg. No. 17018 101 Summit Avenue, Suite 1030, Fort Worth Texas 76102 • Office: 817-708-2422 • www.mas-ce.com Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Water Department Design Services for Water and Sewer Replacement Contract 2020 WSM-D - TPW Additional Services City Project No. 103419 Lal or (hours) Task No. Task Description Principal Project CADD RPLS Survey Tech Project Project Survey Administ . Total Labor ._ Manager Engineer Crew Rath $220 $150 $12S $11� $94 $is' so $11J 1.0 1.1 PP oiect Manay ent Nlanaginq the Team 6 1 J 1 1 1 1 Internal Team Meetings 1.2 in and ReportingQ 1 21 Pre -Design Coordination Meeting 1.2.2 Design Submittal Review Meetings (2 Meetings) f f 1.2.3 Prepare Monthly Prop ss Reports 1 24 Prepare Baseline Schedule and Updates 1.2.5 Coordination With Other Agencies _ 2.0 Conceptual Design 0 0 6 6 0 d d 6 2.1 Data Collection (assumes 1950 LF) 2.2 Conce luaI Desi n Packa a assumes 1950 LF _ 221 Re isRs an routing options ota roperhes 222 Sewer Service Routing Figures (4 Figures) 2.3 Estimate 3.0 rellminar�(Des�prt 0 0 0 6 0 3.1 Preliminary Desgn Drawings 3.1.1 Estimate 312 sae Visits 3 1 3 Sewer Service Routing Figures 40 Inet Dar�pn 4.2 Final Dreif(90 %) Construction Plans 421 Site Visits 1 i 422 Sewer Service Routing Figures 4.3 Final (100%) Construction Plan 2 Q 4 431 Specifications and EOPCC Old f f 5.0 Id Phase Se A- 0 6 6 0 5.1 id Support 5.1.1 Upload and Sell Contract Documents and Maintain Plan Holders List 51 2 Issue Addenda (assumes 3) 5.1.3 Attend Pre -bid Conference _ 5.1.5 Attend Bid Openuz 51 6 Tabulate Bids and Recommend Award 5.1.7 Issue Conformed Contract Documents 6.0 Construction Phase Services 6.1 Construction Support 61 1 Attend Pneconsbuction Conference 6.1.2 Attend Public Meeting 61 3 Prole" Site Visas (assumes 6 mo of constr & 1 visit per wk) with Report 61 4 Request for Information Review 02S 0 S f 6.2 Record Dnewings 0.26 0.26 1 70 OW/Easement Services 7.1 Rght-of-Way Research 7.2 Right-of-Way/Easement Preparation and Submittal [12 easements at $1500 qer esmt,d necessary 7.3 Temporary Right of EntrySubmittal (assumes �1) 8� `{ 8.1 Dtlesgn Survey 9.9.2 `` d�-213dinelKiit by City) Totals City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8,09.2012 Reporting From. Subconsultant Ell zense Subconsultant MBE Total Expense Cost Task Sub Total % Complete Remaining Reproduction Budget $60 b $265.00 $ MWBE Non-MWBE - $6 $0 $6 $266 $265.00 $0 $ $ $ $0 $ $ - $0 $0 $0 $0 $0 $0 $ - $ - $ - $0 $ $0 $266 $ $ $ $0 $ $265 $0 $ _ - $ - $ - $0 $0 $0 $Q $ - $ - $ - $0 $0 $0 �M"� 6 E0.00 $ $6 s $ $ $�6J $U $6 0.00 $o $0 $ $ $ $6 $0 0 $0 $ _ T-- T-- gG $0 $0 $ - $ - $$u $o $0 $ - $ - $ - $0 $0 $0 -000 6 $0.00 $ - 1 {6. 0 $o $Q $ - $ - $ - $0 $Q $0 $6 $ $ $ $6 $6 $0 $0 $ - $ - $ - $0 $0 $0 $0 $ - $ - $ - $0 $0 $0 6 $1,725.00 $ - ' $�6 $1! $1,724 ■ $1.725.00 $6 $ $ $ $6 $6 $0 $269 $ - $ - $ - $0 $269 $265 $Q $ $1.146 $ - $ - $ - - $ - $ - $0 $6 $Q $1.146 $0 $1.140 $320 6 • $6 • INNE $0.00 $ $0 $ - - $ - $ - $6d $0 0 $0 $ - $ - $ - $0 $0 $0 $0 $ - $ - $ - $0 $0 $0 $0 $ $ $ $0 $0 $0 $0 $ _ - $ - $ - $0 $0 $0 $Q $ $6 $ - $ - $ - $ $o $6 $Q $6 $0 -11111110 0 6 $398.4 $ - $'6 $399 398.75 $6 $ - $ - $ - $6 $6 $0 $Q $ - $ - $ - $o $o. $0 $6 $ $ $ $o $6 $0 $0 $ _ $ - $ - $0 $0 _ $0 $219 $ - $ - $ - $0 $219 $215 $184 $ - $ $ - $6 $184 $184 6 $0.00 $ - 5� NONS�6 $'6 $rQ ' NONN0.00 $0 $ - $ - $ - $0 $0 $0 NOT MENNErd "NE $0 $ $ - f, $0.06 $ INONE" ==O"6� $6 $ $ $ S$2,389 J�� Water and Sewer Design Breakdown Footage % Footage Design Fee Water Sanitary Sewer Total Cost % Complete Remaining Budget Water! 1950 749° $ 1,770 F00taye % LF Sewer! 68 f 26°°J $ 619 165 74 $ 1,770 68 26� $ 619 $ 2.389 0� $ 2,389 Total) 263II 100°°I $ 2,389 0° $ 0° $ $ 0° $ - TOTAL 1950 74°° $ 1,770 682 26 ° $ 619 $ 2,389 0° $ 2,389 $0 $0 $0 $0 • $0 $0 au $0 /I $2,389.0 IN 2,38. roject Summary Total Hours 20 Total Labor $2,389 Total Expense $0 MBE Subconsultant $0 Non -MBE Subconsuteri $0 5% Sub Markup $0 MBE Participation 0.00% otal Project Cost $2,389.00 am City of Fort Worth, Texas Mayor and Council Communication DATE: 01/23/24 M&C FILE NUMBER: M&C 24-0072 LOG NAME: 60WSSC20WSMDA4MASEFUNDING SUBJECT (CD 7 and CD 9) Adopt an Appropriation Ordinance in the Amount of $2,389.00 for Water and Sanitary Sewer Replacement Contract 2020 WSM- D and Amend the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Storm Water Capital Projects Fund by increasing estimated receipts and appropriations in the Water and Sanitary Sewer Contract, 2020 WSM-D Project (City Project No. 103419) in the amount of $2,389.00 and decreasing estimated receipts and appropriations in the Drainage Improvement programmable project (City Project No. P00043) by the same amount and amend the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On August 17th, 2021, Mayor and Council Communication (M&C) 21-0586, the City Council authorized an engineering agreement in the amount of $269,495.00 with MAS Consultants, LLC (City Secretary Contract No. 56208). The agreement was subsequently revised by Amendment Number 1 in the amount of $38,375.00 (funding authorization on February 08, 2022, Mayor and Council Communication (M&C) 22-0102) that provided for additional design services for the replacement of deteriorated water and sanitary sewer mains in the immediate vicinity of the project, Amendment No. 2 in the amount of $75,469.00 authorized on August 9, 2022, Mayor and Council Communications (M&C) 22-0597, that provided for additional design services for additional water and sanitary replacement on W. 5th Street (University Drive to Carroll Street) on the projects and Amendment No. 3, in the amount of $67,443.00 (funding authorization on May 23, 2023, Mayor and Council Communication (M&C) 23-0403) that provided for additional design and survey for the replacement of deteriorated water and sanitary sewer main on 6th Street and the re-route of a sewer main currently located on private property in the rear of lots into public right-of-way on Lenox Drive, Potomac Avenue and Hamilton Avenue. The additional appropriation in this M&C will provide funding costs with proposed Amendment No. 4 to the engineering agreement in the amount of $2,389.00 to provide additional design for the replacement of four severely deteriorated storm drain inlets within the project limits as shown on the attached location map. The Transportation and Public Works Department is responsible for the cost of this amendment. Funding is available in the Drainage Improvement project within the Stormwater Capital Projects Fund for the purpose of funding the W/SS REPL Contract 2020 WSM-D within the Stormwater Capital Project Fund. Funding from the Stormwater Capital Projects Fund was included in the FY2024-2028 Capital Improvement Program for project P00043 - Drainage Improvement Projects. An appropriation ordinance is needed to move appropriations from the programmable project to the jointly funded static project. The action in this M&C will amend TPW's contribution to the Fiscal Years 2024-2028 Capital Improvement Program as approved in connection with Ordinance 26453-09-2023, Section 7. Capital Improvements, page 30, as follows: 60WSSC20WSMDA4MASEFUNDING Capital Project Fund Name Name 52002 - Stormwater P00043 - Capital Drainage Projects Improvement Fund FY2024 Authority CIP Appropriations $2,790,935.00 This M&C Budget Revised 1justment FY2024 Budget $(2,389.00) $2,788,546.00 Appropriations for Water and Sanitary Sewer Replacement, Contract 2020 WSM-D, are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital Projects $711,082.00 $0.00 $711,082.00 - Fund 56002 Stormwater Capital Projects - Fund 52002 $0.00 $2,389.00 $2,389.00 Project Total $0.00 $2,389.00 $713,471.00 `Numbers rounded for presentation purposes. The project is located in COUNCIL DISTRICTS 7 and 9. A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the Drainage Improvements Programmable Project within the Stormwater Capital Projects Fund and upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the W/SS Repl Contract 2020 WSM-D project to support the above recommendation and execution of the amendment. Prior to any expenditure being incurred, the Water Department and the Transportation and Public Works Department have the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: Chris Harder 5020 Additional Information Contact: Brenda Oropeza 8271 60 W SSC20WSMDA4MASEFUNDING 52002 0200431 P00043 2024 ($2,389.00) 52002 0200431 4952001 103419 2024 $2,389.00 52002 0200431 103419 2024 $2,389.00 1 52002 0200431 4952001 103419 002880 9999 ($2,389.00) 1