HomeMy WebLinkAboutContract 57253-CO2DocuSign Envelope ID: E09871 BC-1 77JC8F-A26B-56434104C908
FORT Wc)P,-r m City of Fort Worth
Change Order Request
Project Name: South Westside V Elevated Storage Tank and Transmission Main Project
Project No.(s):l 103428 1 DOE No. I N/A
Project Description: Construction for South Westside V Elevated Storage Tank
CSC No. 57253-0O2
City Sec No.: 57253
City Proj. No.: 103428
Contractor: Landmark Structures[, L.P. Change Order# 2 1 Date
219/2023
City Project Mgr.J Russell R$dder City Inspector. Ronnie Cardenas
Phone Number. 817-392-4970 Phone Number: (682) 309-3761
Dept. Water Sewer Totals
Contract Time
(Calender days)
Original Contract Amount $7,360,000.00 "$7;360;000-00
420
Extras to Date $86 492.00 $86;492;00
05
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $7,446 492.00 f $7,446;492600
.425:
Amount of Proposed Change Order $4;387i00 $4387001
Revised Contract Amount VA50;"879 00, ;y s $7,450;879 00':! :
425
Original Funds Available for Change Orders $220,800.00 $220;8,0.0:00
Remaining Funds Available for tl s CO $134 308:00 $134 308`.00
Additional Funding (if necessary)
CHANGE ORDER'S to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
1.23%
MAXALLO NABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
! $9;200.;00,000;,,
IIUSTIEICATION:(REASONS)!FOR;CHANGE'ORDER
Change Order No. 2 will provide for the installation of a Prominent Chlorine Residual Analyzer (Water
Department Standard) iri lieu of the ATI analyzer that was included in the original bid.
It is understood and agreed that tie acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for Ail costs arising out of, or incidental to, the above Change Order. _
Tonuactd ;a uompany,N,�nI I f Contractor Name ( i Contractor Siqna re Date
andmar Structures I, L P. Chris Lannon 1K
77! er Date
A--� / , C-: - 'Z, - L I - 2- LA
Director (Water Dept) B Datef Construction Su ervisor (Water Dept" Date
C,', a,� H der- T. S Feb 22, 2024 ey
S n>r iQr Assistant City Attome`',Date Assistant City Manager Date
- Feb 22, 2024 -�— Feb 22, 2024
i
Council Action (If Required)
M&C Number N/A I M&C Date Approved NIA 1
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
DocuSign Envelope ID: E09871 BC-1 778-4C8F-A26B-56434104C908
FORT WORTH City of Fort Worth
Change Order Additions
Project Name j South Westside V Elevated Storage Tank and Transmission Main Project City Sec No.: 1 57253
Project No.(s): 10.3428 1 DOE No.I N/A City Proj. No.: 1 103428
Project I Construction for South Westside V Elevated Storage Tank
Description
Contractor Landmark Structures I, L.P. j Change Order: Date: j 2/9/2023
City Project Mgr. I Russell Redder City Inspector I Ronnie Cardenas
ADDITIONS
HER ER UESCRIN I IUN DEPT ' Q) Unit Unit Cost Total
36 Prominent Chlorine Analyzer Water .00 LS $6,950.00 $6,950.00
37 Credit for ATI Chlorine Analyzer Water 1.00 LS-$2,563.00-$2,563.00
61
Water $4,387.00
Sewer
Page 1 of 1 lAdditions Sub Total $4,387.00
DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C908
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name I South Westside V Elevated Storage Tank and Transmission Main Project City Sec No.: I 57253
Project No.(s): I 103428 I DOE No. I N/A City Proj. No.: I 103428
Project Description I Construction for South Westside V Elevated Storage Tank
Contractor I Landmark Structures I, L.P. I Change Order: F2 Date I 2/9/2023
City Project Mgr. I Russell Redder City Inspector: I Ronnie Cardenas
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost (Total
(Water
Sewer
Page 1 of 1 IDeletions Sub Total
DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C9O8
MWBE Sub
CO #
MIWBE Breakdown for this Change Order
I Type of Service
Previous Change Orders
DATE
Total
Total
AMOUNT
Amount for this CO I
$0.00 1
$0.00 1
Page 1 of 1
DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C908
Landmark Structures
November 30, 2023
1665 Harmon Road
Fort Worth, Texas 76177
817.439.8888 Phone
Halff Engineering
817,439.9001 Fax
4000 Fossil Creek Blvd.
w mv.teamlandmark.com
Fort Worth, TX 76137
Attn: Ron King, P.E.
Re: City of Fort Worth
South Westside V EST
Prominent Chlorine Analyzer
Dear Mr. King,
At the request of the city, Landmark proposes to provide a Prominent Chlorine Analyzer per the
attached data sheets for the lump sum price of $4,387.00,
Please feel free to contact me should you have any questions or require further information in
this matter.
Best Regards,
LANDMARK STRUCTURES I, L.P.
Eugene Chastain
Project Manager
DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C908
2/9/24
South Westside V Elevated Storage Tank
CSC:57253
CPN: 103428
Change Order 2 Notes
The I&E staff at FWWD requested a change of the chlorine residual analyzer to be
provided for this tank to match those found in other ESTs in the distribution system. The
contractor bid an ATI analyzer and proposes to change it to the requested Prominent analyzer,
according to the terms of the attached proposal.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Russell Redder, P.E.
Name of Employee
Project Manager
Title
4gU44QQ
aq FORT�aa
ATTEST: pro °o9�°co
PV0 1
% .�z�Clnes a�'a� nEXA5o4p
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY