HomeMy WebLinkAboutContract 57253-CO2DocuSign Envelope ID: E09871 BC-1 77JC8F-A26B-56434104C908 FORT Wc)P,-r m City of Fort Worth Change Order Request Project Name: South Westside V Elevated Storage Tank and Transmission Main Project Project No.(s):l 103428 1 DOE No. I N/A Project Description: Construction for South Westside V Elevated Storage Tank CSC No. 57253-0O2 City Sec No.: 57253 City Proj. No.: 103428 Contractor: Landmark Structures[, L.P. Change Order# 2 1 Date 219/2023 City Project Mgr.J Russell R$dder City Inspector. Ronnie Cardenas Phone Number. 817-392-4970 Phone Number: (682) 309-3761 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $7,360,000.00 "$7;360;000-00 420 Extras to Date $86 492.00 $86;492;00 05 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $7,446 492.00 f $7,446;492600 .425: Amount of Proposed Change Order $4;387i00 $4387001 Revised Contract Amount VA50;"879 00, ;y s $7,450;879 00':! : 425 Original Funds Available for Change Orders $220,800.00 $220;8,0.0:00 Remaining Funds Available for tl s CO $134 308:00 $134 308`.00 Additional Funding (if necessary) CHANGE ORDER'S to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1.23% MAXALLO NABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) ! $9;200.;00,000;,, IIUSTIEICATION:(REASONS)!FOR;CHANGE'ORDER Change Order No. 2 will provide for the installation of a Prominent Chlorine Residual Analyzer (Water Department Standard) iri lieu of the ATI analyzer that was included in the original bid. It is understood and agreed that tie acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for Ail costs arising out of, or incidental to, the above Change Order. _ Tonuactd ;a uompany,N,�nI I f Contractor Name ( i Contractor Siqna re Date andmar Structures I, L P. Chris Lannon 1K 77! er Date A--� / , C-: - 'Z, - L I - 2- LA Director (Water Dept) B Datef Construction Su ervisor (Water Dept" Date C,', a,� H der- T. S Feb 22, 2024 ey S n>r iQr Assistant City Attome`',Date Assistant City Manager Date - Feb 22, 2024 -�— Feb 22, 2024 i Council Action (If Required) M&C Number N/A I M&C Date Approved NIA 1 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX DocuSign Envelope ID: E09871 BC-1 778-4C8F-A26B-56434104C908 FORT WORTH City of Fort Worth Change Order Additions Project Name j South Westside V Elevated Storage Tank and Transmission Main Project City Sec No.: 1 57253 Project No.(s): 10.3428 1 DOE No.I N/A City Proj. No.: 1 103428 Project I Construction for South Westside V Elevated Storage Tank Description Contractor Landmark Structures I, L.P. j Change Order: Date: j 2/9/2023 City Project Mgr. I Russell Redder City Inspector I Ronnie Cardenas ADDITIONS HER ER UESCRIN I IUN DEPT ' Q) Unit Unit Cost Total 36 Prominent Chlorine Analyzer Water .00 LS $6,950.00 $6,950.00 37 Credit for ATI Chlorine Analyzer Water 1.00 LS-$2,563.00-$2,563.00 61 Water $4,387.00 Sewer Page 1 of 1 lAdditions Sub Total $4,387.00 DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C908 FORT WORTH City of Fort Worth Change Order Deletions Project Name I South Westside V Elevated Storage Tank and Transmission Main Project City Sec No.: I 57253 Project No.(s): I 103428 I DOE No. I N/A City Proj. No.: I 103428 Project Description I Construction for South Westside V Elevated Storage Tank Contractor I Landmark Structures I, L.P. I Change Order: F2 Date I 2/9/2023 City Project Mgr. I Russell Redder City Inspector: I Ronnie Cardenas DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost (Total (Water Sewer Page 1 of 1 IDeletions Sub Total DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C9O8 MWBE Sub CO # MIWBE Breakdown for this Change Order I Type of Service Previous Change Orders DATE Total Total AMOUNT Amount for this CO I $0.00 1 $0.00 1 Page 1 of 1 DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C908 Landmark Structures November 30, 2023 1665 Harmon Road Fort Worth, Texas 76177 817.439.8888 Phone Halff Engineering 817,439.9001 Fax 4000 Fossil Creek Blvd. w mv.teamlandmark.com Fort Worth, TX 76137 Attn: Ron King, P.E. Re: City of Fort Worth South Westside V EST Prominent Chlorine Analyzer Dear Mr. King, At the request of the city, Landmark proposes to provide a Prominent Chlorine Analyzer per the attached data sheets for the lump sum price of $4,387.00, Please feel free to contact me should you have any questions or require further information in this matter. Best Regards, LANDMARK STRUCTURES I, L.P. Eugene Chastain Project Manager DocuSign Envelope ID: E09871BC-1778-4C8F-A26B-56434104C908 2/9/24 South Westside V Elevated Storage Tank CSC:57253 CPN: 103428 Change Order 2 Notes The I&E staff at FWWD requested a change of the chlorine residual analyzer to be provided for this tank to match those found in other ESTs in the distribution system. The contractor bid an ATI analyzer and proposes to change it to the requested Prominent analyzer, according to the terms of the attached proposal. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Russell Redder, P.E. Name of Employee Project Manager Title 4gU44QQ aq FORT�aa ATTEST: pro °o9�°co PV0 1 % .�z�Clnes a�'a� nEXA5o4p Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX