Loading...
HomeMy WebLinkAboutContract 58276-A1AMENDMENT No . 1 CSC No. 58276-A1 TO CITY SECRETARY CONTRACT No. 58276 WHEREAS, the City of Fort Worth (CITY) and BGE, Inc, (ENGINEER) made and entered into City Secretary Contract No. 58276, (the CONTRACT) which was authorized by M&C 22-0594 on the 911 day of August, 2022 in the amount of $361,230.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Richardson Slough Lift Station Modifications and 20-inch Sanitary Sewer Main, CPN 103514; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $116, 345. 00 . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $477,575.00. 0 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Richardson Slough LS & 20 in SS Main Prof Services Agreement Amendment Template CPN 103514 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth '5 1.Cj_ _ Fernando Costa Assistant City Manager DATE: Feb 22, 2024 �n pOFnn FORt�pdd o � ATTEST: °°°*.od Od�� nEXA5o4p Jannette Goodall City Secretary APPROVAL RECOMMENDED: Chr&s 01?l7er !Harder Christopher Harder (Feb 21, 2024 09:39 CST) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER BGE, Inc. JtAo Y r Carl J. Krogness, P.E. Vice -President DATE: 02/20/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Scoff Taylor PE Scott Taylor, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: 4giaor— Douglas Black (Feb 22, 2024 16:15 CST) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: M&C Date 24-0101 01/30/2024 Form 1295: 2023-1103897 Richardson Slough LS & 20 in SS Main OFFICIAL RECORD CPN 103514 CITY SECRETARY FT. WORTH, TX October 19, 2023 Scott Taylor, PE Senior Project Manager Water Department City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 RE: Amendment No. 1— Design Services — Water Department Design Services for Richardson Slough 20-inch Force Main City Project No. 103514 Dear Mr. Taylor: BGE, Inc. appreciates the opportunity to provide additional services for the Richardson Slough project. The additional scope of work is summarized below. Old Granbury Road — 24 Inch Water Main (1,615 LF) A 24-inch waterline is proposed to connect planned improvements along Old Granbury Road to future Bryant Irvin Road. The proposed alignment begins within Old Granbury Road east of the Fort Worth and Western Railroad intersection. The 24-inch water main is proposed to run southwest, paralleling the existing force main before turning northwest, crossing perpendicular to the FWWR for approximately 360 LF. The proposed line then runs west for approximately 850 LF connecting to the proposed 24-inch water main along the Bryant Irvin Road extension. Please see the attached Vicinity Map for project location details. The line is proposed to be installed via open cut except for the railroad crossing, approximately 360 LF. Additional engineering services include topographic survey, Level A SUE, and geotechnical services. A topographic survey will be performed for the additional 1,615 LF of water main, and geotechnical borings will be obtained approximately every 500 LF along the length of the alignment. Permanent and Temporary Construction Easements will be required to install and maintain the proposed line. The railroad will require permits (licensing agreement and temporary right -of -entry) to cross. The proposed scope includes developing construction plans consistent with Tasks 1-4 of Attachment A of the Agreement, including geotechnical investigations. The proposed scope includes additional Bid Serving. Leading. Solving.— BGE, Inc. • 777 Main Street, Suite 1900 • Fort Worth, Texas 76102 • 817-887-6130 • www.bgeinc.com Scott Taylor, PE October 19, 2023 Page 2 Phase Services (Task 5) and Construction Phase Services (Task 6) required for the construction of the 24-inch water line. Additional Right-of-way and Easement Services (Task 7) include one right -of -entry, one permanent easement, and one temporary construction easement. Additional Survey and Subsurface Utility Engineering (SUE) Services (Task 8) include approximately 1,615 LF of topographic survey and Level B and Level A SUE for three proposed waterline crossings of an existing high-pressure gas transmission main. Permitting Services (Task 9) are required for the crossing. The scope and fee include time for the additional permits needed for the waterline crossing and the permitting fees for the 24-inch water main crossing and the 20-inch force main crossing. The opinion of probable construction cost (OPCC) for the proposed improvements is $1,520,630.00 (see attached OPCQ. The attached level of effort is the basis for an additional scope and fee request for the services described above. This proposed amendment increases the total contract amount summarized below: Original contract amount $361,230 Amendment No. 1 $116345 Revised Contract Amount $477,575 Please contact me at your earliest convenience to discuss our proposed amendment. Sincerely, JA�P' �4� Carl J. Krogness, PE Vice President BGE, Inc. TBPE Registration No. F-1046 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for RICHARDSON SLOUGH LIFT STATION MODIFICATION AND 20-INCH FORCE MAIN AMENDMENT 1 City Project No. 103514 Labor hours) Expense Task No. Task Description Principal Project Project EIT CADD Admin Total Labor Subconsultant Total Expense Task Sub Total Manayr Engineer Cost permit Fee Reproduction Cost Kate $300 $25J $186 $120 $140 $90 MWBE Non-MWBE 1.0 Project Management 0 5 5 6 0 0 $2,870 $0 $0 $0 $0 $0 $2,870 1.1 Managing the Team 1.2 Communications and Reporting 1.2.1 Pre -Design Coordination Meeting 1 1 2 $670 $0 $670 1.2.2 Design Submittal Review Meetings 4 4 4 $2,200 $0 $2,200 2.0 Conceptual Design (30-Percent) 0 9 12 26 16 6 $9,020 $0 $d $0 $0 $'6 $9,020 2.1 Data Collection (Conduct Site visits, review record drawings) 2 4 6 4 $2,500 $0 $2,500 2.2 Conceptual Alignment Plan and Profile 4 9 20 12 $6,526 3.0 Preliminary Design (60 Percent) 0 15 33 74 110 4 33,850 $5,175 $0 $0 $0 $5,1715 $39,025 3.1 Preliminary Design Package $0 $0 Project Specific Construction Notes (1 sheet) 1 4 $920 $0 $920 Overall project easement layout (1 sheet) 2 2 6 $1,440 $0 $1,440 Overall project waterline layout sheets (1 sheet) 1 6 $1,200 $0 $1,200 Plan/Profile Sheets (5 sheets) 0 6 12 36 60 $16,380 $0 $16,380 Details Sheets (1 sheet) 1 6 2 $1,180 $0 $1,180 SWPPP (3 sheets) 1 4 11 24 $5,770 $0 $5,770 3.2 Geotechnical Investigations $0 $5,175 $5,179 $5,175 3.3 Constructability Review $0 $0 $0 3.4 Utility Clearance 2 8 $1,620 $0 $1,620 Specifications 4 6 10 4 $3,640 $0 $3,640 Opinion of probable construction cost 2 4 4 $1,700 $0 $1,700 4.0 Final Design 2 6 14 44 49 0 $16,200 $0 $0 $0 $0 $0 $16,200 Final Draft (90%) Construction Plans and Specifications 0 4 8 2 6 30 $9,766 $6 $9,760 Final (100%) Plans and Specifications 2 2 6 18 19 $6,440 $0 $6,440 5.0 Bid Phase 0 1 3 12 2 0 $2,510 $0 $0 $0 $0 $0 $2,510 5.1 Bid Support Issue Addenda 1 2 $490 $0 $490 Tabulate Bids and Recommend Award 1 2 $420 $0 $420 5.2 Final Design Drawings & Specifications 2 8 2 $1,600 $0 $1,600 6.0 Construction Phase Services 0 7 22 28 8 2 $10,370 $0 $0 $0 $0 $0 $10,370 6.1 Construction Support Construction Observation & Progress Reports (2 visits) 2 4 8 $2,180 $0 $2,180 Shop Drawing Review (assume 2) 1 4 2 2 $1,490 $0 $1,490 Response to RFI (assume 2) 1 4 2 2 $1,490 $0 $1,490 Change Order Review (assume 0) $0 $0 $0 Review Lab Reports from Trench Work - Provide Summary 4 $720 $0 $720 Final Walk Through / Prepare punch list 2 2 4 2 $1,520 $0 $1,520 6.2 Record Drawings/As Built 1 4 11 4 $2,976 $6 $2,970 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 7.0 ROW/Easement Services 7.1 Right -of -Way Research (2 ROE @ $150IROE) 7.2 Right-of-Way/Easement Preparation and Submittal (2 easements) Right-of-Way/Easement Preparation and Submittal (2 temp const easements) 8.0 Survey 8.1 Design Survey (1750 LF) 8.3 Subsurface Utility Engineering Quality Level "A" (Utility Crossings) (3 locates @ $2,750/locate up to 15' including Level B to horizontally locate) 9.0 Permitting 9.2 Gas Line/Utility Permission/Permits 9.3 Railroad City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 0 0 0 0 0 0 0 0 0 0 0 4 9 12 8 2 4 6 4 1 4 6 4 Totals 2 44 9y 198 189 Water Line Footage 1,500 100% Sewer Line Footage 0 0 % 1,500 100% (A) Total Fee $116,345 (B) Survey Fee -$18,750 (C) Total Fee (-1survey Fee $97,595 1 Water Fee Sewer Fee 1 $97,595.00 I $0.00 0 $6,300 $0 $0 $0 $300 $3,000 $3,000 0 $10,500 $8,250 $0 $0 $10,500 $8,250 0 $5,000 $0 $0 $4,500 $2,500 $2,500 $4,500 6 $96,620 $13,425 $Q $4,50Q $0 $0 $6,300 $0 $300 $0 $3,000 $0 $3,000 $0 $8,250 $18,750 $0 $10,500 $0 $8,250 $8,250 $0 $4,500 $9,500 $0 $2,500 $4,500 $7,000 $0 $17,925 $114,545.00 Project Summary Total Hours 536 Total Labor $96,620 Total Expense $17,925 MBE/SBE Subconsultan , $13,425 Non-MBE/SBE Subconsultan{ $0 10% Markup $1,800 MBE/SBE Participation 11.5% Total Project Cost $116,345.00 City of Fort Worth, Texas Mayor and Council Communication DATE: 01/30/24 M&C FILE NUMBER: M&C 24-0101 LOG NAME: 60RSLSANDSSFMA1-BGE SUBJECT (CD 6) Authorize Execution of Amendment No. 1 to an Engineering Agreement with BGE, Inc., in the Amount of $116,345.00, for Richardson Slough Lift Station Modifications and 20-inch Sanitary Sewer Main Project, Adopt Resolution Expressing Official Intent to Reimburse Expenditures and Proceeds of Future Debt, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 1 to City Secretary Contract No. 58276 in the amount of $116,345.00, an engineering agreement with BGE, Inc. for Richardson Slough Lift Station Modifications and 20-inch Sanitary Sewer Main project for a revised contract amount of $477,575.00; 2. Adopt the attached resolution expressing Official Intent to Reimburse expenditures with proceeds of future debt for Richardson Slough Lift Station Modifications and 20-inch Sanitary Sewer Main Project; and 3. Adopt the attached appropriation ordinance adjusting appropriations in the Water & Sewer Commercial Paper Fund by increasing appropriations in the Richardson Slough Lift Station Modifications and 20-inch Sanitary Sewer Main project (City Project No. 103514) in the amount of $191,345.00, and decreasing appropriations in the W&S Commercial Paper project (City Project No. UCMLPR) by the same amount, to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On August 9, 2022, Mayor and Council Communication (M&C 22-0594) authorized an engineering agreement with BGE, Inc., (City Secretary Contract No. 58276), in the amount of $361,230.00 for the Richardson Slough Lift Station Modifications and 20-inch Sanitary Sewer Main project. Amendment No. 1 will provide the necessary design services for the installation of a 24-inch water main to connect proposed improvements along Old Granbury Road to future Bryant Irvin Road as shown on the attached location map. In addition to the contract cost, $75,000.00 is required for project management, real property and material testing. This project will have no impact on the Water Department operating budget when complete. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. Under federal law, debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds, but preserves the ability to reimburse itself from tax-exempt bond proceeds. The actions in the M&C will amend the City of Fort Worth's Fiscal Year 2024-2028 Capital Improvement Program as follows: 60RSLSANDSSFMA1 — BGE Capital BudgetRevised Project Fund FY2024 CIP Change Authority Name Name Appropriations (Increase/ Budget B Budget Decrease) 103514 56022 — - R- W&S Slough Commercial 20in SS $0.00 This M&C $191,345.00 $191,345.00 Paper Fund Force Main Funding for the R Slough 20in SS Force Main project is depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Commercial Paper Fund 56022 $0.00 $191,345.00 $191,345.00 Sewer Impact Fee $556,310.00 $0.00 $556,310.00 — Fund 57003 (Project Total $556,310.001 $191,345.00 $747,655.00 *Numbers rounded for presentation purposes. Funding is available in the Water Department's Commercial Paper project within the W&S Commercial Paper Fund for the purpose of funding the R Slough 20in SS Force Main Project. Business Equity: BGE, Inc. is in compliance with the City's Business Equity Ordinance by committing to 12 percent MWBE participation on this project. The City's MWBE goal on this project is eight percent. The project is located in COUNCIL DISTRICT 6. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial Paper Fund for the R Slough 20in SS Force Main project to support the above recommendations and execution of the contract. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: Chris Harder 5020 Additional Information Contact: Scott Taylor 7240 60RSLSANDSSFM-BGE FID Table 2 56022 0600430 103514 2024 $191,345.00 2 56022 0600430 UCMLPR 2024 ($191,345.00) 1) 56022 0600430 5330500 103514 001430 9999 $116,345.00 Consultant Fee 2&3) 56022 0600430 5110101 103514 001440 9999 $5,000.00 Land 2&3) 56022 0600430 5330500 103514 001440 9999 $2,500.00 Land 2&3) 56022 0600430 5710010 103514 001440 9999 $40,000.00 Land 2&3) 56022 0600430 5740010 103514 001480 9999 $2,500.00 Land 2&3) 56022 0600430 5310350 103514 001470 9999 $1,500.00 Utility 2&3) 56022 0600430 5540101 103514 001480 9999 $1,500.00 Public Outreach 2&3) 56022 0600430 5330500 103514 001484 9999 $12,000.00 Soil Lab Consultant