Loading...
HomeMy WebLinkAboutContract 60591-A1AMENDMENT No.1 CSC NO. 60591-A1 TO CITY SECRETARY CONTRACT No. 60591 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 60591, (the CONTRACT) which was authorized by M&C 23-0908 on the 31st day of October, 2023 in the amount of $974,121.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement on Camp Bowie Boulevard, CPN 105062; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $ 69,185.00 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,043,306.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas W & SS Repl. on Camp Bowie Blvd. Prof Services Agreement Amendment Template CPN 105062 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Feb 22, 2024 p oFFong°�n 0000000e ��a a'o °p°o ooio ATTEST: ago /� � 66 00 d danIl>ezp54 p �� bO000a Jannette Goodall City Secretary APPROVAL RECOMMENDED: chri Ito her ma;4ef- Christopher Harder (Feb 21, 2024 11:14 CST) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Kimley-Horn and Associates, Inc. dl�-Zfqa"' r-'e. John Atkins, P.E. Vice President DATE: 02/20/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Preeti KC, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: 4&-oc— Douglas Black (Feb 22, 202416:19 CST) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: 24-0134 (FUNDING) M&C Date: February 13, 2024 Form 1295 No.: 2024-1113831 OFFICIAL RECORD CITY SECRETARY W & SS Repl. on Camp Bowie Blvd. CPN 105062 FT. WORTH, TX Kimley»>Horn January 17, 2024 Ms. Preeti KC, P.E. Project Manager City of Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Re: WATER AND SANITARY SEWER REPLACEMENTS ON CAMP BOWIE BOULEVARD Amendment No. 1 KHA No. 061018457 City Project No. 105062 / City Secretary No. 60591 Dear Preeti: The City of Fort Worth (CITY) has requested that Kimley-Horn perform additional services under Amendment Number 1 for the WATER AND SANITARY SEWER REPLACEMENTS ON CAMP BOWIE BOULEVARD project. After Kimley-Horn completed design of the expedited 36" water main along Camp Bowie from Montgomery Street to Clifton Street, the project was advertised for bidding and is proceeding into construction. The original contract did not include these services, as it was assumed the construction would be included in an existing construction contract through the CITY. These improvements are further described as follows: TASK 4.0 — FINAL DESIGN: ($8,490) ENGINEER will complete Final Design in accordance with the Original Contract for the following: • The CITY requested alternative design items and coordination to allow the construction contract to be incorporated into an existing construction contract with Jackson Construction. • Modifications and preparation of plans and specifications for bidding. TASK 5.0 — BID PHASE SERVICES — EXPEDITED 36" MAIN: ($21,330) ENGINEER will complete Bid Phase Services in accordance with the original contract and as follows: The original contract did not include Bid Phase Services for the expedited 36" water main and is being added through this amendment. In addition to the CITY's standard Bid Phase Contract language, the ENGINEER will complete the following additional tasks not included in the Original Contract: • Review of plans, contract documents, and specifications provided by Dunaway for consistency with the 36" water main project. • Coordination with Dunaway to issue addenda and answer construction questions from Contractors. • The CITY requested an additional pre -bid meeting for the 36" water main. TASK 6.0 — CONSTRUCTION PHASE SERVICES — EXPEDITED 36" MAIN: ($39,365) ENGINEER will complete Construction Phase Services in accordance with the scope of services attached and as follows: Kimley>>> Horn Page 2 • The original contract did not include Construction Phase Services and is being added through this amendment. • Since the construction must be completed by June 2024, four (4) months of Construction Phase Services are assumed. In addition to the attached Construction Phase Services language, the ENGINEER will complete the following additional tasks not included in the Original Contract: • Maintain Report Log ■ ENGINEER will maintain a log of test results as they are received. • Coordination with Testing Lab and CITY ■ ENGINEER will coordinate with Testing Lab regarding any discrepancies as well as timing of proposed testing. ENGINEER will notify CITY of failed tests. • Review of Testing Reports ■ ENGINEER will review materials testing reports as they are received to determine conformance with the Construction Contract Documents, and whether further clarification is required from the Testing Lab. ■ Assumptions: Maintaining Report Log, Coordination with Testing Lab and City, and Review of Testing Reports is limited to eight (8) hours. • Limitation of Responsibilities ■ ENGINEER shall not be responsible for the acts or omissions of the CITY's testing lab. ENGINEER shall not have the authority or responsibility to direct the work of the CITY's testing lab. We recommend that the CITY increase the budget by $69,185 for these additional services. The following tables summarize our recommended budget revisions, water design fees, and revised contract amount: Description Water Total Task 4 — Final Design $8,490 $8,490 Task 5 — Bid Phase Services — Expedited 36" $21,330 $21,330 Water Main Task 6 — Construction Phase Services — Expedited $39,365 $39,365 36" Water Main Total $69,185 $69,185 Kimley»>Horn The following breakdown for water and sewer services is recommended: Water Fee Original Contract $648,216 Amendment No. 1 $69,185 Total I $717,401 Sewer Fee SurveFee y Total $172,310 $153,595 $974,121 $0 $0 $69,185 $172,310 I $153,595 $1,043,306 Page 3 The following table summarizes our recommended budget revisions and shows the revised contract amount: Task Original Amend Revised Number Contract No.1 Contract Task 1 $42,795 $0 $42,795 Task 2 $100,346 $0 $100,346 Task 3 $277,740 $0 $277,740 Task 4 $232,080 $8,490 $240,570 Task 5 $45,475 $21,330 $66,805 Task 6 $0 $39,365 $39,365 Task 7 $7,650 $0 $7,650 Task 8 $238,035 $0 $238,035 Task 9 $0 $0 $0 Task 10 $30,000 $0 $30,000 Total $974,121 $69,185 $1,043,306 Project Kimley»>Horn Page 4 We appreciate the opportunity to be of continued service to the CITY. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. John R. Atkins, P.E. Senior Vice President JRA/sdw Attachments: Level of Effort Summary Scope of Services for Additional Construction Phase Services KAFTW_Utilities\061018457 - Camp Bowie W-SS Replacements - Hulen to Montgomery\PPP\POST_NTP\Final Contract\Amend 01\2024-01-15_Amend1_Camp Bowie- kha-signed.doc EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement on Camp Bowie (Hulen St. to Montgomery St.) City Project No. 105062-Amerdment No. 1 Labor(hiurs) Expense Task No. Task Description Senior Project EIT Administrative Total Labor Subconsultant Total Expense Task Sub Total Budget Percentage Professional Manaqer/Engineer Cost Travel Reproduction Cost Remaining Complete Rate $370 $295 $245 $130 MWBE Non-MWBE 1.0 Project Management 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 2.0 Conceptual Design(30-Percent) 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 3.0 Preliminary Design (60 Percent) 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 4.0 Final Design 2 8 22 0 $8,490 $0 $0 $0 $0 $0 $8,490 Final Draft (90%) Construction Plans and Specifications - (Amend 1 Expedited 36" 4.1 Project l $0 $0 4.1.1 Cover/Index/ControlJ2l 4 $980 $980 4.1.2 Shutdown/Sequencing/bump Station 2 $590 $590 4.1.3 Overall Layouts $0 $0 Plan and Profile Sheets - Revisions for 4.1.4 coordination with Jackson 1 4 12 $4,490 $4,490 4.1.5 Detail Sheets $0 $0 4.1.6 Pavement Repair/Coordination $0 $0 4.1.7 Traffic Control Plans $0 $0 4.1.8 Erosion Control Plans $0 $0 4.1.9.a Specifications 2 pggdite�i $04.1.9.b $0 giects) Specifications 2 �itdding <1ru $0 $0 4.1.10 Final Quantities OPCC $0 $0 4.2 Cathodic Protection Study $0 $0 $0 4.3 Public Meetin,QPrep/Exhibits $0 $0 $0 4.4 Final (100 %� Plans and Specifications 1 2 6 $2,430 $2,430 4.5 Final uantdies/OPCC $0 $0 5.0 Bid Phase 6 34 36 2 $21,330 $0 $0 $0 $0 $0 $21,330 Bid Support -(Amend 1 Expedited 36" 5.1 ProJ'ect) 5.1.1 Upload Documents to BIM360 $0 $0 Coordination and Review of Dunaway's 5.1.1.a plans and specifications for inclusion 2 10 5 $4,915 Hold Contract Documents and Maintain 5.1.2 Plan Holders List 2 2 2 $1,340 $1,340 5.1.3 Issue Addenda/Answer Questions (3) 2 5 6 $3,689 $3,685 5.1.4 Prep/Attend Pre -Bid -Meeting (2) 1 6 5 $3,369 $0 $3,365 5.1.5 Tabulate Bids and Recommend Award 0 0 $0 $0 5.2 Mylar Drawings/Conformance Docs 0 5 12 $4,415 $0 $4,415 Prepare Additional Contract 5.2.1 Documents/Specifications 1 6 6 $3,610 6.0 Construction Phase Services 17 43 74 2 $39,365 $0 $0 $0 $0 $0 $39,365 6.1 Construction Support (Expedited 36" Project) 6.1.1 Prep/Attend Preconstruction Conference 2 2 $1,330 $1,330 6.1.2 Prep/Attend Public Meeting (2) 2 3 $1,325 $1,325 6.1.3 Site Visits (Monthly, up to 4) 2 8 8 $5,060 $5,060 6.1.4 Testing Coordination and Evaluation $2,000 $2,000 6.1.5 Clarifications/Interpretations/RFI(1) 1 2 2 $1,450 $1,450 6.1.6 Change Orders (1) 1 4 4 $2,530 $2,530 6.1.7 Shop Drawing Review and Log (30) 7 20 45 $19,515 $19,515 6.1.8 Substitutions $0 $0 6.1.9 Final Walk Through Visit/Punch List (2) 3 4 4 $3,270 $3,270 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 6.2 Record Drawings/As Built (5 sheets) 7.0 ROW/Easement Services 8.0 Survey/SUE 9.0 Permitting 9.1 TxDOT - US Route 377 10.0 Mclitional Services 10.1 Additional Services Description Conceptual Design 130%) Preliminary DesigRn 60%) Final Design (10 / ) Survey Subtotal Total City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 1 1 8 2 $2,885 0 0 0 0 $0 0 0 0 0 $0 0 0 0 0 $0 0 0 0 $0 0 0 0 0 $0 Totals 2S 85 132 4 $69,181 Water Line Footage 906.00 100 Sewer Line Footage 0.00 0 906.00 (A) Total Fee $69,185 (B) Survey Fee $0 JC) Total Fee Rsurvey Fee $69,185 ater Fee (100% of C) Sewer Fee (0 % of C) I $69,185.00 $0.00 li WP Water Sewer 31 $20,756.00 $0.00 32 $41,511.00 $0.00 33 $6,919.00 $0.00 51 $0.00 $0.00 I $69,186.00 $0.00� $69,186.00 $2,885 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $69,185.00 Project Summary Total Hours 246 Total Labor $69,185 Total Expense $0 MBE/SBE Subconsultan $0 Non-MBE/SBE Subconsultanl $0 10% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Cos 1 $69,185.00 ATTACHMENT A DESIGN SERVICES FOR WISS REPLACEMENT ON CAMP BOWIE CITY PROJECT NO.: 105062 ATTACHMENT A Scope for Enqineerinq Desiqn Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENTS ON CAMP BOWIE CITY PROJECT NO.: 105062 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the Camp Bowie Water Replacement — Expedited 36-Inch Water Main projects as follows. 6.1 Construction Support The ENGINEER shall attend the preconstruction conference for each construction contract. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend each virtual public meeting to help explain the proposed project to residents. The CITY will schedule the meeting and send invitations to affected customers. Visits to Site and Observation of Construction. ENGINEER will provide monthly on -site construction observation services during the construction phase. ENGINEER will make visits at intervals as directed by the CITY in order to observe the progress of the Work. Such visits and observations by Consultant are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on ENGINEER's exercise of professional judgment. Based on information obtained during such visits and such observations, Consultant will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and ENGINEER will keep Client informed of the general progress of the Work. The purpose of ENGINEER's site visits will be to enable ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to ENGINEER, and to provide Client a greater degree of confidence that the completed Work will conform in general to the Contract Documents. ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of any City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 3 ATTACHMENT A DESIGN SERVICES FOR W/SS REPLACEMENTS ON CAMP BOWIE CITY PROJECT NO.: 105062 Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. • Clarifications and Interpretations. ENGINEER will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents to Client as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by Client. • Change Orders. ENGINEER may recommend Change Orders to CITY, and will review and make recommendations related to Change Orders submitted or proposed by the Contractor. Shop Drawings and Samples. ENGINEER will review and approve or take other appropriate action in respect to Shop Drawings and Samples and other data which Contractor is required to submit, but only for conformance with the information given in the Contract Documents. Such review and approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs. Disagreements between Client and Contractor. ENGINEER will, if requested by CITY, render written decision on all claims of CITY and Contractor relating to the acceptability of Contractor's work or the interpretation of the requirements of the Contract Documents pertaining to the progress of Contractor's work. In rendering such decisions, ENGINEER shall be fair and not show partiality to CITY or Contractor and shall not be liable in connection with any decision rendered in good faith in such capacity. Final Notice of Acceptability of the Work. ENGINEER will attend a final site visit conducted by the CITY to determine if the completed Work of Contractor is generally in accordance with the Contract Documents and the final punch list so that ENGINEER may recommend, in writing, final payment to Contractor. Accompanying the recommendation for final payment, ENGINEER shall also provide a notice that the Work is generally in accordance with the Contract Documents to the best of ENGINEER's knowledge, information, and belief based on the extent of its services and based upon information provided to ENGINEER upon which it is entitled to rely. • Limitation of Responsibilities. ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work. ENGINEER shall not have the authority or responsibility to stop the work of any Contractor. 6.2 Record Drawings • The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 2 of 3 ATTACHMENT A DESIGN SERVICES FOR W/SS REPLACEMENTS ON CAMP BOWIE CITY PROJECT NO.: 105062 or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: • These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage for each construction contract. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the mylars. PDF files shall be uploaded to the project's Record Drawings folder in E-Builder. ASSUMPTIONS • ENGINEER will provide up to two (2) exhibits for two (2) virtual public meeting and prepare a listing of names and addresses of residents and businesses affected by the project. • One (1) RFI is assumed. • One (1) Change Order is assumed. • Thirty (30) Shop Drawings reviews are assumed. • Four (4) Site Observation Visits are assumed. • One (1) PDF copy of full size (22"x34") record drawing plans will be delivered to the CITY for the construction contract. DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Record Drawings on PDF City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 3 of 3 City of Fort Worth, Texas Mayor and Council Communication DATE: 02/13/24 M&C FILE NUMBER: M&C 24-0134 LOG NAME: 60WWSCAMPBOWIEP2-CIRCLEC AND KHAA1 SUBJECT (CD 7) Authorize Execution of a Contract With William J. Schultz, Inc. dba Circle C Construction Company, in the Amount of $1,280,205.00, for the Water and Sanitary Sewer Replacement on Camp Bowie Hul-Mont Project Part 2 and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with William J. Schultz, Inc. dba Circle C Construction Company, in the amount of $1,280,205.00, for the Water and Sanitary Sewer Replacement on Camp Bowie Hul-Mont project Part 2; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $1,583,426.00, from available funds, for the purpose of funding the Water and Sanitary Sewer Replacement on Camp Bowie Hui -Mont project (City Project No. 105062) Part 2 to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On October 31, 2023, Mayor and Council Communication (M&C) 23-0908, authorized an engineering agreement with Kimley-Horn and Associates, Inc. (City Secretary Contract No. 60591) in the amount of $974,121.00 for design of the Water and Sanitary Sewer Replacement on Camp Bowie Boulevard which includes the segment of the roadway from Hulen Street to University Drive. In order to expedite replacement of the existing 30-inch cast iron water main on the roadway segment from Montgomery Street to Clifton Street ahead of proposed roadway and streetscape improvements, the Water Department initiated Part 2 of the project. The appropriation amount requested also includes the amount of $69,185.00 for Amendment No. 1 to provide compensation for the preparation of plans and specifications and to perform construction support services for Part 2. Part 2 of the project was advertised for bids on November 30, 2023, and December 7, 2023, in the Fort Worth Star -Telegram. On January 11, 2024, the following bids were received: Bidder William J. Schultz, Inc. dba Circle C Construction Company Western Municipal Construction Jackson Construction, LTD Jenus Construction, Inc. Amount Time of Completion 120 $1,280,205.00 Calendar Days $1,467,229.97 $2,037,418.00 $4, 789, 954.00 In addition to the contract amount, $170,026.00 is required for project management, material testing and inspection, and $64,010.00 is provided for project contingencies. Approximately 906 linear feet of cast iron water pipe will be replaced as part of this project. This project will have no impact on the Water Department's operating budget when completed. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60WWSCAMPBOWIEP2-CIRCLEC AND KHA Capital Revised Project FY2024 CIP Budget Fund Name Appropriations Authority Adjustment FY2024 Name Budget 105062 W&S — W/SS Capital Repl. Projects Camp $0.00 This M&C $1,583,426.00 $1,583,426.00 — Fund Bowie 56002 Hul— Mont. Funding is currently available in the Unspecified -All Funds project within the Water & Sewer Capital Projects Fund for the purpose of funding the Water and Sanitary Sewer Replacement on Camp Bowie Hul-Mont project. Appropriations for the Water and Sanitary Sewer Replacement on Camp Bowie Hul-Mont project are as depicted below: Fund Existing Additional project Total* Appropriations Appropriations Water & Sewer Capital Projects $1,424,023.00 $1,583,426.00 $3,007,449.00 Fund 56002 (Project Total $1,424,023.00 $1,583,426.00 $35007,449.00 *Numbers rounded for presentation purposes. Business Equity: William J. Schultz, Inc. dba Circle C Construction Company, is in compliance with the City's Business Equity Ordinance by committing to 14 percent MWBE participation on this project. The City's MWBE goal on this project is 14 percent. The project is located in COUNCIL DISTRICT 7. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the Unspecified -All Fund project within the W&S Capital Projects Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the W/SS Repl Camp Bowie Hul-Mont. project to support the above recommendations and execution of the contract and amendment. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office bv: Fernando Costa 6122 Oriainatina Business Unit Head: Chris Harder 5020 Additional Information Contact: Preeti KC 5467 60WWSCAMPBOWIEP2-CIRCLEC AND KHAA1 FID Table 2 56002 0600430 4956001 105062 2024 $1,583,426.00 2 56002 0600430 UNSPEC 2024 ($1,583,426.00) 2 56002 0600430 105062 2024 $1,583,426.00 2 56002 0600430 4956001 UNSPEC UNSPEC 9999 $1,583,426.00 2 56002 0600430 4956001 105062 001780 9999 ($1,583,426.00) 2 56002 0600430 5110101 105062 001780 9999 $26,884.00 Staff Costs - Construction 2 56002 0600430 5110101 105062 001785 9999 $80,653.00 Staff Costs - Inspection 2 56002 0600430 5550102 105062 001780 9999 $2,000.00 Public Outreach 2 56002 0600430 5740010 105062 001780 9999 $64,010.00 Project contingencies 2 56002 0600430 5330500 105062 001780 9999 $69,185.00 To Pay Engineering Company 1 56002 0600430 5740010 105062 001780 9999 $1,280,205.00 To pay contractor 2 56002 0600430 5310350 105062 001784 9999 $40,326.00 Soil Lab - TPW Staff Costs 2 56002 0600430 5330500 105062 001784 9999 $20,163.00 Soil Lab - Consultant 56002 2060000 105062 RETAIN Combo Code $1,583,426.00