Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 39656 (2)
CITY SECRETA13Y CONTRACT NO. .39Lq5--.(P- SPECIFICATIONS AND CONTRACT DOCUMENTS FOR VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 MIKE MONCRIEF MAYOR BILL VERKEST, P.E. DIRECTOR, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT CITY PROJECT NO. 00213 WATER PROJECT NO. P275-705140021388 CITY OF FORT WORTH, TEXAS OCTOBER 2009 S. FRANK CRUMB, P.E. DIRECTOR WATER DEPARTMENT OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX DALE CITY MANAGER ANDREW T. CRONBERG, P.E. ASSISTANT DIRECTOR, ENGINEERING AND FISCAL SERVICES DEPARTMENT IL EhVIRONMEN7AL.EHGIHEEftS•6651GHEA&-SC�ISILT� TBPE REGISTRATION NO. 13 Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/8/2009 DATE: Tuesday, December 08, 2009 REFERENCE NO.: C-23963 LOG NAME: 60RECLAIMED CONSTRUCTION MAIN PART 3 SUBJECT: Authorize a Contract with Conatser Construction TX, Inc., in the Amount of $3,287,350.00, for the Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 from FM-157 to DFW International Airport RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract in the amount of $3,287,350.00 with Conatser Construction TX, Inc., for the Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3. DISCUSSION: On November 9, 2004, the City Council approved Resolution No. 3137 requesting financial assistance from the Texas Water Development Board (TWDB) for a Regional Facility Planning Grant to develop the Fort Worth Water Reuse Priority and Implementation Plan. On August 26, 2008, (M&C C-22998) the City Council authorized an engineering agreement with Alan Plummer Associates, Inc., (APAI) to design the Eastside Reclaimed Water System and to assist with development of wholesale contracts for service to the Cities of Arlington, Euless and the DFW International Airport. Part 3 of the Village Creek Reclaimed Water Eastern Delivery System Distribution Main project will install approximately 10,400 linear feet of 24-inch reclaimed water transmission main and 7,900 linear feet of 20- inch reclaim transmission main from Euless Main Street crossing of THE Railroad to DFW Airport. A wholesale reclaimed water customer meter station for the DFW Airport will be installed on the north side of the SH-181 (Airport Freeway) west of Amon Carter Boulevard. The project will be funded with the American Recovery and Reinvestment Act (ARRA) 2009 SFR Reclaim Water funding. The project was advertised for bids on September 24, 2009 and October 1, 2009, in the Fort Worth Star - Telegram. On October 29, 2009, the following bids were received: 1Bidders JConatser Construction TX, Inc. Merryman Excavation lArk Contracting Services, LLC North Texas Contracting, Inc. 1S.J. Louis Construction of Texas, Ltd. lGin-Spen, Inc. 11-ewis Contractors, Inc. IIBid Amount 11Time? of Comaletioni 11$3,287,350.0011270 Calendar Days j 11$3,420,610.001 11$3,407,150.001 11$3,568,470.00� II$3,925,838.001 11$5,224,290.001 11$5,254,650.001 In addition to the contract cost, $15,000.00 is required for construction staking, $45,000.00 is required for material testing, $45,700.00 is required for inspection, $15,000.00 is required for staff time and $98,620.00 http://apps.cfwnet.org/ecouncil/printmc.asp?id=12824&print=true&DocType=Print 12/18/2009 Page 2 of 2 is provided for project contingencies Since this construction project is being funded with loan proceeds received from the Texas Water Development Board (TWDB) originating from American Recovery and Reinvestment Act of 2009 (DWSRF/ARRA) Fund the Water Department is required to have copies of the executed construction contracts returned to the TWDB on or before January 8, 2010; and construction must begin no later than February 17, 2010. If either of these deadlines are not met the City of Fort Worth will be ineligible to receive the $16,265,000.00 loan and all related construction contract will be null and void. Conatser Construction TX, Inc., is in compliance with the City's M/WBE ordinance by committing to 16 percent M/WBE participation. The City's M/WBE goal for this project is 15 percent. This project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that pending the receipt of loan proceeds from Texas Water Development Board, and adoption of the attached appropriation ordinance; funds will be available in the current capital budget, as appropriated in the Drinking Water SRF/ARRA 2009 Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for Citv Manaaer's Office bv: Oriainatina Department Head: Additional Information Contact: FROM Fund/Account/Centers P256 531350 705290021352 P256 531200 705290021384 P256 511010 705290021385 P256 511010 705290021380 P256 541200 705290021388 Fernando Costa (6122) S. Frank Crumb (8207) David Townsend (8430) $15,000.00 $45.000.00 $45.700.00 $15.000.00 $3.385.970.00 ATTACHMENTS 1. 60Reclaim Water Main Part 3 MWBE Compliance Form.Ddf (CFW Internal) 2. 60Reclaimed Construction Main Part 3 BFT.Ddf (CFW Internal) 3. 60RECLAIMED CONSTRUCTION MAIN PART 3.Ddf (CFW Internal) 4. M&C lanquage chanae.msq (CFW Internal) 5. Village Creek Reclaimed Water Easten Delivery Svstem Distribution Main Part 3 MaD.Odf (Public) http://apps.cfwnet.org/ecouncil/printmc.asp?id=12824&print=true&DocType=Print 12/18/2009 v- -r w V- -Ir- IV L-A w -11- I- rr 0318-042-01 ADDENDUM NO. 1 TO CONTRACT DOCUMENTS AND SPECIFICATIONS FOR CITY OF FORT WORTH, TEXAS w. VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 TO: PROSPECTIVE BIDDERS AND PLAN HOLDERS The Plans, Specifications, and Contract Documents shall be modified as required by the �* following items: Item 1-1 Specifications, SHORT FORM NOTICE TO BIDDERS Add the following paragraph after the first paragraph of Submission of Bid and Award of Contract. A The following documents must be completed and made a condition of this bid: • Proposal (Part B) • Bid Bond • TWDB Prime Contractor Affirmative Steps Certification and Goals (WRD-217) •• • DBE Subcontractor Performance (Form — 6100-3) Failure to complete any of the aforementioned items will result in the Bid being rejected. The three lowest bidders are required to complete any and all additional forms attached in Part CS Texas Water Development Board Supplemental Contract Conditions as well as all City of Fort Worth Minority and Women Business Enterprises Specifications within 5 business days after bid opening. The Bidder shall certify within the DBE forms attached within Part CS that a "good faith effort" be made to achieve the goals requested by the Texas Water Development Board and the City of Fort Worth. Proposal securities of the lowest three bidders will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. Item 1-3 Specifications, COMPREHENSIVE NOTICE TO BIDDERS MW Add the following paragraph after the first paragraph of Submission of Bid and Award of Contract. o• The following documents must be completed and made a condition of this bid: • Proposal (Part B) • Bid Bond .. • TWDB Prime Contractor Affirmative Steps Certification and Goals (WRD-217) • DBE Subcontractor Performance (Form -- 6100-3) F:VrojectsN031 6\042-01 �SpecsTart 3WddendumIAddendum 1.doc ADDENDUM 1 — PAGE 1 No low Item 1-3 (continued) 0318-042-01 Failure to complete any of the aforementioned items will result in the Bid being rejected. The three lowest bidders are required to complete any and all additional forms attached in Part CS Texas Water Development Board Supplemental Contract Conditions as well as all City of Fort Worth Minority and Women Business Enterprises Specifications within 5 business days after bid opening. The Bidder shall certify within the DBE forms attached within Part CS that a .. "good faith effort" be made to achieve the goals requested by the Texas Water Development Board and the City of Fort Worth. Proposal securities of the lowest three bidders will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. aw Item 1-4 Specifications, PART B - PROPOSAL: .. Delete this section in its entirety and replace with the attached PROPOSAL (ATTACHMENT 1-AD1). 0 .o Item 1-5 Specifications, Minority and Women Business Enterprises Specifications M Add the following section after the PROPOSAL (ATTACHMENT 2-AD1) "Minority and Women Business Enterprises Specifications no Special Instructions to Bidders Subcontractors/Suppliers Utilization Form Good Faith Effort Form Prime Contractor Waiver Form we Joint Venture Eligibility Form" .r Item 1-6 Specifications, Part CS - Texas Water Development Board Supplemental Contract Conditions MW Add the following to the end of the section: Davis -Bacon Wage Rate TX 44 (ATTACHMENT 3-AD1) an Item 1-7 Specifications, PART E —TECHNICAL SPECIFICATIONS: Section 01002 Measurement and Payment Revise Bid items to reflect the PROPOSAL attached in this document. am F:Vrojects103181042-011Specs\Part McidendumMcidendum_1.doc ADDENDUM 1 — PAGE 2 .n aw 0318-042-01 sw Item 1-7 (continued) Section 15022 PIPING SYSTEM, DUCTILE IRON PIPE Delete Part 2, Section 2.1, Paragraph A, Item 1 in its entirety and replace with the .. following. "1. As a minimum, the following pressure classes shall apply: Diameter Pipe (inch) Min. Pressure Class (PSI) 3" through 12" 350 psi 16" — 20" 250 psi *� 24" 200 psi 30" — 64" 150 psi" Item 1-8 Specifications, APPENDIX E, 404 Permit, Enclosure 4: Add Sheet Number 27 and Number 28 of 32 (ATTACHMENT 4-AD1). Item 1-10 Plans, Sheet G-004 — GENERAL NOTES: ,w Note 11 Delete note in its entirety and replace with the following. 'Concrete thrust blocking shall not be allowed. All fittings shall be restrained using mechanical joint restraints and joints shall be restrained for a sufficient length to resist the design thrust as specified by the manufacturer and in -- accordance with AWWA. The restraint design shall be submitted to the OWNER for approval prior to construction." Note 15 Delete note in its entirety. UN .. f:tprojects1031M042-01XSpecsTart3%ddendum1vWdendum 1.d6c ADDENDUM 1 — PAGE 3 1 00 "0 r—i Item 1-10 (continued) Note 44 Delete note in its entirety and replace with the following. 0318-042-01 "44. PIPE MATERIAL USED FOR THIS PROJECT FOR PIPELINE SHALL BE AS SHOWN PER THE FOLLOWING: PIPE PIPE MATERIAL WORKING PRESSURE PERCENT SIZE PRESSURE RATING ALLOWABLE (I. D.) DEFLECTION* ..i 6" PVC — AWWA C900 DR 14 150 PSI 200 PSI 50% HDPE — AWWA C906 150 PSI 50% & ASTM D 3350 DR 9 20" DIP — AWWA C161 150 PSI 200 PSI 75% PVC — AWWA C905 DR 18 150 PSI 150 PSI 50% RCCP — AWWA C303 150 PSI 150 PSI 1 75% 24" DIP — AWWA C151 150 PSI 200 PSI 1 75% STEEL PIPE — AWWA 150 PSI 150 PSI 75% C200 « PVC — AWWA C905 DR 18 150 PSI 150 PSI 50% f RCCP — AWWA C303 150 PSI 150 PSI 75% `PERCENT ALLOWABLE DEFLECTION IS A PERCENTAGE OF THE MANUFACTURER'S MAXIMUM ALLOWABLE DEFLECTION" Note 45 Add the following note. "45. CONTRACTOR SHALL PROVIDE TEMPORARY LIVE STOCK FENCING WHILE CROSSING PRIVATE PROPERTY. THE COST FOR TEMPORARY FENCING SHALL BE SUBSIDIARY TO THE OTHER ITEMS BID. Item 1-11 .. Plans, Sheet C- 300 through Sheet C-320 .o Note 1 Delete note in its entirety and replace with the following. "1. CONTRACTOR SHALL PULL PIPE AS REQUIRED. PIPE JOINTS AND FITTINGS SHALL NOT BE DEFLECTED MORE THAN THE PERCENTAGE OF MANUFACTURE'S ALLOWABLE DEFLECTION PER JOINT, SEE ••• NOTE 44 SHEET G-004." .. .. F:1projects103181042-011SpecslPart3Wddendum1%Addendum 1.doc ADDENDUM 1 —PAGE4 ON 0318-042-01 go Item 1-12 Plans, Sheet C-316 Delete this sheet in its entirety and replace with the attached Sheet C-316 .. (ATTACHMENT 5-AD1). Item 1-13 Plans, Sheet C-317 Delete this sheet in its entirety and replace with the attached Sheet C-317 (ATTACHMENT 6-AD1). All items in conflict with this addendum are hereby deleted. THIS ADDENDUM IS MADE PART OF THE SPECIFICATIONS AND CONTRACT DOCUMENTS, AND SHALL BE ACKNOWLEDGED ON THE PROPOSAL AND ON THE BID ENVELOPE. 4 .� ALAN PLUMMER ASSOCIATES, INC. r GGw Daniel A e te, P.E. .r October 15, 009 Im rr %W F:Vrojects10318M2-011SpecsTad3%Addendum1kAddendum 1.doc ADDENDUM 1 — PAGE 5 n. MP PROPOSAL on TO: MR. DALE A. FISSLER, P.E. Foil Worth, Texas City Manager .� Fort Worth, Texas FOR: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM a" DISTRIBUTION MAIN PART 3 WATER PROJECT NO. P275-705140021388 ow City Project No.: 00213 Pursuant to the foregoing "Notice to Bidders," the undersigned has examined the plans, specifications, and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all .labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. If required by this project, Contractor must be pre -qualified in accordance with the projects sponsoring Departments of the City of Fort Worth requirements. Upon -� acceptance of this Proposal by the City Council and required by this project, the bidder is bound to execute a contract and fiirnish Performance, Maintenance Bond for the water replacement contract only, and Payment Bond approved by the City of Fort Worth for performing and completing said work within «� the time stated for the following sums, to wit Total quantities given in the bid proposal may not reflect actual quantities, by represent the best �• accuracy based on a reasonable effort of investigation; however, they are given for the pui pose of bidding on and awarding the contract. aw ATTACHMENT 1- AD1 .. aw r �_j MW WM MW ,. .. MW Item Approx. Description of Items with No. Quantity Bid Prices Written In Words PART 3 301 1 LS Implementation of the Storm Water Pollution Prevention Plan including all material and labor, for a total lump sum amount of Dollars and Cents. S 302A 10100 LF 24-inch diameter C-151 Ductile Iron Pipe furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backfill, for the sum of Dollars and Cents per Linear Foot. • S 302B 10100 LF 24-inch diameter C-200 Steel Pipe with Cathodic Protection System furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backfill, for the sum of. Dollars and Cents per Linear Foot. $ 302C 10100 LF 24-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backfill. for the sum of Dollars and Cents per Linear Foot. S 302D 10100 LF 244nch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backfill, for the sum of. Dollarsand Cents per Linear Foot. S Unit Extended Price Amount Bid S S S ATTACHMENT 1-AD1 ". Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 303A 5900 LF 20-inch diameter C-151 Ductile Iron Pipe furnished and installed complete in place as shown on the Plans and described in .. the Specifications including trenching, embedment and backfill, for the sum of _ Dollars and Cents per Linear "' Foot. $ S 303E 5900 LF 20-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System furnished and installed complete in place as shown on the Plans .. and described in the Specifications w including trenching, embedment and backfill, for the sum of MW Dollars and Cents per Linear Foot. $ $ 303C 5900 LF 20-inch diameter C-905 Class 200 DR-18 "m Polyvinyl Chloride Pipe furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, +o embedment, and backfill. for the sum of - Dollars and Cents per Linear .. Foot. $ S 304A 150 LF 6-inch diameter C-900 Class 200 DR 14 Polyvinyl Chloride Pipe furnished and `m installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment and backfill, for the sum of _ .. Dollars and Cents per Linear Foot $ $ 304B 150 LF 6-inch diameter C-906 Class 200 DR 9 DIPS High Density Polyethylene (HDPE) Pipe (including trenching, embedment, concrete encased thrust restraint, & backfill) furnished and installed complete and in place, for the sum of Dollars and Cents per Linear Foot. $ $ ON R ATTACHMENT 1-AD1 No K�l Item Approx. Description of Items with No. Quantity Bid Prices Written In Words PART 3 305 2000 LF 30-inch diameter Casing Pipe by Horizontal Directional Drill furnished and installed complete in place as shown on �. the Plans and described in the Specifications including trenching, embedment, and backfill, for the sum of. ow Dollars and Cents per Linear Foot. $. 306 260 LF 36-inch diameter Casing Pipe by Other than Open Cut, furnished and installed complete in place as shown on the Plans and described in the Specifications w including trenching, embedment, and backfill, for the sum of Dollars and Cents per Linear .� Foot. $ 307A 260 LF 244nch diameter C-151 Ductile Iron Pipe inside 36-inch diameter steel casing furnished and installed, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. 307E 260 LF 24-inch diameter C 200 Steel Pipe with Cathodic Protection System inside 36- inch diameter steel casing furnished and installed, complete in place as shown on +� the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear ` Foot. $ 307C 260 LF 24-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe inside 36-inch diameter steel casing furnished and installed, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. $ Unit Price 4 Extended Amount Bid $ $ 6 ATTACHMENT 1-AD1 4" No 8.0 .. Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 307D 260 LF 24-inch diameter C-905 DR-18 Polyvinyl Chloride Pipe inside 36-inch diameter steel casing furnished and installed, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. $ $ 308A 2000 LF 20-inch diameter C-151 Ductile Iron Pipe inside 304nch steel casing furnished and installed complete in place as shown on the Plans and described in the Specifications, for the sum of t Dollars and Cents per Linear Foot. $ $ 308E 2000 LF 20-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System inside 304nch steel casing furnished and installed complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. S S 308C 2000 LF 20-inch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe inside 364nch steel casing furnished and installed complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Lineal Foot. $ $ 309 16000 LF Design and implement Trench Safety System complete in place, for the sum of Dollars and Cents per Linear Foot. $ ATTACHMENT 1-AD1 Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 310 4 EA 24-inch Resilient Seated Gate Valve and Vault complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Each. $ $ 311 7 EA 20-inch Resilient Seated Gate Valve and Vault complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Each. $ S .+ 312 10 EA 2-inch Automatic Combination Air and Vacuum Release Valve and Vault complete in place as shown on the Plans .. and Specifications, for the sum of Dollars and Cents per Each. $ $ 313 3 EA For furnishing and installing blowoff assemblies including valves, pipe, fittings, concrete, excavation, and backfill, complete in place as shown on the Plans and Specifications, for the sum of Dollars and Cents per Each. $ $ 314 1 EA 10-inch Meter Station (D/FW) for D/F'W Airport, furnish and install as shown on the Plans and described in the .. Specifications complete in place, for the sum of Dollars and Cents per Each. $ $ 315A 9 TON 24-inch diameter Ductile Iron Pipe fittings and specials furnished and installed .. complete in place including restraint joint design, for the sum of Dollars and Cents per Ton. S $ Y ATTACHMENT 1-AD1 w Item Approx. Description of Items with Unit Extended s No. Quantity Bid Prices Written in Words Price Amount Bid PART 3 315B 1 LS 24-inch diameter Steel Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Lump .. Sum. $ $ 315C 1 LS 24-inch diameter Concrete Pressure Pipe fittings and specials furnished and w installed complete in place including restraint joint design, for the sum of Dollars and Cents per Lump w f Sum. + $ $ 316A 7 TON 20-inch diameter Ductile Iron Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of .. Dollars and Cents per Ton. $ $ 316E 1 LS 20-inch diameter Concrete Pressure Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Lump Sum. 3 $ 317 7,000 SY Furnish and install Temporary Pavement .. Repair as directed by OWNER, complete and in place, for the sum of Dollars and Cents per -- Square Yard. $ $ 318 20 SY For Gravel Drive Repair per Figure #238 complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Square Yard. $ 5 ATTACHMENT 1-AD1 Item Approx. Description of Items with No. Quantity Bid Prices Written In Words PART 3 319 7,000 SY For Permanent Hot Mix Asphaltic Concrete (HMAC), complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Square Yard. $ 320 9,000 LF For Pavement Wedge Milling, 2-inch to 0-inch depth, 5-foot wide, complete in place as shown on the Plans and described in the Specifications, for the sum of « Dollars and Cents per Linear Foot. $ 321 20 EA For Butt Joint Milling, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Each. $ 322 150 SY For Concrete Pavement Repair per Figure STR-031 complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Square Yard. $ 323 1 LS For Design and implementation of a Traffic Control Plan complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Lump Sum. 324 250 CY Furnish Additional Rock for Foundation not shown in Plans or Specifications and as directed by the OWNER, for the sum of Dollars and Cents per Cubic Yard. S Unit Extended Price Amount Bid • S U ATTACHMENT 1-AD1 no i. Item Approx. Description of Items with No. Quantity Bid Prices Written In Words PART 3 325 200 CY Furnish Flowable Fill encasement shown in Plans or described in Specifications and as directed by the OWNER, for the sum of Dollars and Cents per Cubic Yard. S 326 7,000 LF Hydromulch Seeding furnished and installed as described in the Specifications, for the sum of Dollars and Cents per Linear Foot. S TOTAL AMOUNT BID $ Unit Extended Price Amount Bid r r r TYPE Tee Tee Reducer 90° Bend 45° Bend 22.5° Bend 11.25° Ben Blind Flan ` Tee 90' Bend 45° Bend 22.5° Bend _ 11.25° Ben Blind Flang I am LIST OF Select Fitting Type FITTINGS For Project: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY DISTRIBUTION MAIN PART 3 ADD OR SUBTRACT FOR THE FOLLOWING Select Fitting Type INCLUDING INSTALLATION. SIZE _TY WEIGHT TOTAL'4VT COST 24"x20" 24°x6„ 24"x20" 2411' I I 24" 124" d 12411 i ge 12411 20"x6" 1 1 20" 20" 20" 1 I d 20" e 1 20" ) ! I I i 1 r Contractor shall fill in blanks for "Weight", "Total Wt" and "Cost" as a part of the bid. Contractor is responsible for correct quanity total of all fittings and specials. ATTACHMENT 1-ADI r UW Within ten (10) days after notification by the City of Foil Worth, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. If as a requirement of this project, the undersigned bidder certified that they have been furnished at least No one set of the General Contract Documents and General or Special Specifications for Projects, and that they have read and thoroughly understand all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. aw The undersigned assured that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee no applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction with ten (10) calendar days after issue of the work order and to complete the contract within 270 days after beginning construction as set forth in the written work order to be furnished by the Owner. (Circle and complete A or B below, as applicable) A. The principal place of business of our company is in the State of a. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. b. Nonresident bidders in the. State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Respectfidly submitted, By: Title: Company: Address: ATTACHMENT 1- AD1 — F-oT,,W,o�tTx City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is $26,000 or more, the MIWBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the Citys current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MANBE goal on this project is is % of the total bid (Base bid applies to Parks and Community Services). COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the Citys M/WBE Ordinance by either of the following: i. Meet or exceed the above stated Mf BE goal, or 2. Good Faith Effort documentation, or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated in order for the entire bid to be considered responsive to the specifications The Offeror shalt delbver the MWBE documentatbon in. person to tfie appropriate employee of the managing department and obtain a datelGrrie receipt.. Such recelpt s., p.. — be eviderice that the City received the documentation in the time allocated. A faxed copy,will not be accepted, 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: — 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5.00 p.m., five (5) City business days after the bid perform all subcontraclinglsupplier work: ( opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. am I FAILURE TO COMPLY WITH THE CITY'S MIWBE ORDINANCE, WiLL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE TO SPECIFICATIONS Any questions, please contact the MIWBE Office at (817) 392-6104. Rev. 1111105 ATTACHMENT 2 - AD1 ATTACHMENT IA Page 1 of 4 FORT�WIORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime � PROJECT NAME: Village Creek Reclaimed water Eastern Delivery MWIDBE I 1 I NON-MMNDBE BID DATE System Distribution Plain - Part 3 City's MNVBE Project Goat: I Prime's M/wBE Project Utilization: PROJECT NUMBER 15 % ern P275-705140021388 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. IThe undersigned Offeror agrees to enter into a formal agreement with the MNVBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional .. and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specifications as MNVBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business In the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1" tier, a payment by a subcontractor to its supplier is considered 2nd tier ALL MNVBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (MAWE), If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE .owner -operators, and receive full M/WBE credit. The .. MNVBE may lease trucks from non-M/WBEs, including owner -operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. ATTACHMENT 2 - AD1 Rev. 5/30103 .w { ATTACHMENT IA FORTIVORT111 Page z of a Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority, Women and non-MMBEs. Please list M/ BE firms first, use additional sheets if necessary. Certification N {check one) SUBCONTRACTOR/SUPPLIER T Detail Detail Company Name t N T Address e M w C X M Subcontracting Work Supplies Purchased Dollar Amount Telephono/Fax r B 8 R O B E E C T E A IMP MP on lu—j w. w I f ATTACHMENT 2 - AD1 Rev. 5/30103 w i ATTACHMENT IA FORrIVORTH Page 3of4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e:. Minority, Women and non-MANBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N (check one) R SUBCONTRACTORISUPPLIER T N T Detail petal) Company Name i C X M Subcontracting Work Supplies Purchased Dollar Amount Address e M w T D W Telophone/Fax r B B R A B E E C T E A A 4 �r s s M ATTACHMENT 2 - AD1 Rev, 5130f03 i 1 FORTIVORTH am Total Dollar Amount of M/WBE Subcontractors/Suppliers $ Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ ATTACHMENT IA Page 4 of 4 ,,. The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor aw shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. w By affixing a signature to this form, the Offeror further agrees to*pro%ide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M1W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. Auftrized Signature Printed Signature s Title Contact Namarfille (It different) Company Name Telephone and/or Fax s Address E-mail Address cltylstatemp Date s ATTACHMENT 2 - AD1 Rev. 5/30103 .e ATTACHMENT 1C Page 1 of 3 FORT WORTH City of Fort Worth Good Faith Effort Form w PRIME COMPANY NAME: Check applicable block to describe prime PROJECTNAME: Village Creek xeclaimea stater Eastern velivery f � MMIDBE � , NON-MMIDBE System Distribution Alain - Part 3 B1D DATE1A City's MNVBE Project Goal: PROJECT NUMBER 15 % P275-705140021388 If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or If your DBE participation is less than the City's project goal, you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 9 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fratjd, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. ... Failure to complete this form, In its entiretywith supporting documentation, and received by the Managing Department on or before 6:00 p.m. five (6)'City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunityl for the completion of this project, regardless of whether It Is to be provided by a M/WBE or non-M1WBE. (DO NOT LIST NAMES OF FIRMSI On Combined Projects, list each subcontracting and or supplier opportunity through the 2no tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities am T-40PI ATTACHMENT 2 - AD'I Rev.06130J03 aw no "W .. .. aw ATTACHMENT 1C Page 2 of 3 2.) Obtain a current (not more than three (3) months old from the bid open date) list of M/WBE subcontractors and/or suppliers from the City's M/WBE Office. Yes No Date of Listing ! ! 3.) Did you solicit bids from MlWBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? Yes (if yes, attach M/WBE mail fisting to include name of flrm and address and a dated copy of letter mailed.) No 4.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes (if yes, attach list to include name of MIWBE firm, person contacted, phone number and date and time of contact.) No .� NOTE: A facsimile may be used to comply with either 3 or 4, but may not be useq for both. If a facsimile Is used, attach the fax confirmation, which is to provide MlWBE name, date, time, fax number and documentation faxed. NOTE: If the list of MIWBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the bidder must contact the entire list to be In compliance with questions 3 and 4. If the list of MlWBEs for a particular subcontracting/suppller opportunity Is ten (10) or more, the bidder must contact at least two- thirds (2/3) of the list within such area of opportunity, but not less than ten to be In compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/1NBEs or information regarding the location of 's plans and specifications in order to assist the M/WBEs? Yes. No 6.) Submit documentation if MlWBE quotes were rejected. The documentation submitted should be In the forms of an affidavit, include a detailed explanation of why the M/WBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in -camera access to and Inspection of any relevant documentation by City personnel. (Please use additional sheets, If necessary, and attac►.) .. Company Name Telephone Contact Person Scope of Work Reason for Rejection No s ATTACHMENT 2 - AD1 Rev. 05130/03 ATTACHMENT1C Page 3 of 3 ADDITIONAL INFORMATION; Please provide additional Information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. -W w *+ The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false 'm statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an Irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. MW The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's M/WBE Office. w Authorized Signature Printed Signature T10e Contact Name and Title (if different) Company Name Phone Number Fax Number Address Email Address Citylstate/Zip Date ATTACHMENT 2 - AD1 Rev. 05130/03 w .. r MW w FORT WORTH City of Fort Worth Prime Contractor Waiver Form PRIME COMPANY NAME: PROJECTNAME: Village Creek ReClaimea water Eastern Delivery System Distribution Main - Part 3 City's M/W8E Project Goal: PROJECT NUMBER P275-705140021388 15 ATTACHMENT I Page 1 of 1 Check applicable block to describe prime M/W/DBE I I NON-M/W1DBE IBID DATE If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Manaainp Department on or before 5:00 a.m., five 151 Citv business days after bid ovenlnq, exclusive of the bid opening date, will result In the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? YES if yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? _ YES .. If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MIWBE(s) on this contract, the payment therefore and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MMBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. w I Authorized Soature Printed 5ignalure w Title Contact Name (if different) Company Name Phone Number Fax Number Address Email Address rr Citylstatetap Date Rev, $130103 r. ATTACHMENT 2 - AD1 r "" Joint Venture Page 1 of 3 F'C3R�.T.,�WORTH MW s CITY OF FORT WORTH Joint Venture EhLyibility Form Ali questions unrst be answered; use "NA - if applicable. Village Creek Reclaimed Water Eastern Delivery System w Name of City project: niehrihut- i^ wain R re. 'i Aprutt venture torm must bt completed on sa�h project UPBid/Purehasing Number: P275-705140021388 w 1. Joint venture information: 1 Joint Venture Name. Joint Venture Address: (,]f applicable) ITelephone: Facsimile: E-mail address: Cellular t,. identifythe firms that comprise the joint vent ure: t r Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the ioint venture ANIMBE firm I Non-MAI'BE ,., name: firm name: Business Address: Business Address: City, State, Zip: City, State, Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying agency: _ 2. Scope of work performed by the Joint Venture: Describe the scope of work of the il-IAVBE: Describe the scope of work of the non-NIMBE: 1 { kw i ATTACHMENT 2 - AD1 Rev. W0103 "o �+ Joint Venture Page 2 of 3 3. What is the percentage of IVIJWBE participation on this joint venture that you wish to be counted toward "' meeting the project goal? .. 4. Attach a copy of (lie joint venture agreement. 5. List components of ownership of joint venture: (Do trot complete!fulls hiforutatioa is described in joint venhere agreement) wo Profit and loss sharing: Um Capital contributions, including ow equipment: Other applicable ownership interests: � M "' 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision ninking of the joint venture: .. Financial decisions I (to include Account Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales ------------------------------------------ c. Hiring and Firing of management personnel ' -•----------------------------------- d. Purchasing of major equipment 9M and/or supplies Supervision of field operations 1 The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the M/WBE percentage applied toward the goal for the project listed on this form. NOTE: .. From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amountslpercentages change from the originally approved 'information, then the participants must inform the City's M1WBE Office immediately for approval- Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's MUSE Ordinance. r 1 aw ATTACHMENT 2 - AD1 Rev. w3o/w I s .. .w Joint Venture Page 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information .. necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if die joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint .er venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts.________ !� Name of hll/ li@ firm Name of non-MAVBE firm Printed Name of Owner Printed Name of Owner Signature of 0nmer Signature of Owner w � f Printed Name of Owner Printed Name of Owner URI Signature of Owner Signature of Owner Title Title Date �w ... Date Notarization State of County of On this day of , 20 , before me appeared � AriS� to ire personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act acid deed. Notary Public PrintlYmoc Notary Public Signature Commission Expires Cseao .. ATTACHMENT 2 - AD1 Rev. WOW s .. GENERAL DECISION: TX20080044 10/09/2009 TX44 ,�. Date: October 9, 2009 General Decision Number: TX20080044 10/09/2009 Superseded General Decision Number: TX20070046 State: Texas r.. Construction Type: Heavy Counties: Johnson, Parker and Tarrant Counties in Texas. '" Heavy Construction Projects (Including Water and Sewer Lines) Modification Number Publication Date 0 02/08/2008 �. 1 05/09/2008 2 07/25/2008 3 07/24/2009 ,.r 4 10/09/2009 PLUM0146-002 05/01/2009 Rates Fringes PLUMBER/PIPEFITTER................$ 25.56 6.86 ow ---_ _ -- - _-------- ---------------------------_-------- SUTX1990-04106/01/1990 « Rates Fringes CARPENTER... ........... i ........ $ 10.40 $3.64 Concrete Finisher ................$ 9.81 ELECTRICIAN.............. .......$ 13..26 Forts Setter ........ .............. $ 7.86 w Laborers: Common ......................$ 7.25 Utility .....................$ 8.09 PAINTER ..........................$ 10.89 .� Pipelayer ........................$ 8.43 Power equipment operators: Backhoe............... ...$ 11.89 3.30 Bulldozer .......... .......... $ 10.76 .. Crane........ ............$ 13,16 3.30 Front End Loader ............ $ 10:54 Mechanic:. ..................$ 10.93 Scraper ... .................$ 10.00 .MM Reinforcing Steel Setter.........$ 10.64 TRUCK DRIVER ........... _......... $ 7.34 WELDERS - Receive rate prescribed for craft performing .. operation.to which welding is incidental. Unlisted classifications needed for work not included within aw the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ----------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing:. rr ATTACHMENT q MW TM-1 WAGE DETER14INATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can ,., be: * an existing published wage determination * a survey underlying a wage determination aw * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling "' On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted .. because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 .. 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: wr Wage and Hour Administrator M U.S, Department of Labor 200 Constitution Avenue, N.W. No" Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage .. payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. ..r 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: .r Administrative Review Board U.S. Department of Labor 200 Constitution. Avenue, N.W. Washington, DC 20210 MW 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION 4 .. ATTACHMENT 3-AD1 Im .. • 13MPs, such as erosion control blankets, may need to be installed at the time of seeding to provide stability until the vegetation is fully established. it may also be necessary to divert water from the channel until vegetation is established or to line the channel with sod. • Vegetated ditches. must not be subject to sedlmentatlon from disturbed areas. r • Sediment traps may be needed at channel inlets to prevent entry of muddy runoff and channel sedimentation. �•• Availability of water during dry periods to maintain vegetation Sufiicient available land area Maintenance: During establishment, vegetation lined drainage ditches should be inspected, repaired, and vegetation reestablished If necessary. After the vegetation has become established, the ditch 'r should be checked periodically to determine if the chaQnei Is withstanding flow velocities without damage. Check the ditch for debris, scour, or erosion -and Immediately make ropairs if needed. Check the channel outlet and all road crossings for bank stability and evidence of piping or scour •, • holes and make repairs Immediately. Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the vegetation In a healthy condition at all times, singe It Is the primary erosion protection for the channel. Vegetaflon lined drainage ditches should be seasonally maintained by mowing or irrigating, depending on the vegetation selected. The long- term management of ditches as stable, vqgetated, 'natural' drainage systems with native vegetation buffers is highly recommended due to the Inherent stabllfty offered by grasses, shrubs, trees, and other vegetation. Research in the Austin area indicates that vegetated controls are effective at removing pollutants even when dormant. Therefore; Irrigation Is not required to maintain growth during dry periods, but may be necessary oply to prevent -the vegetation from dying. Sand Filter Svstems The objective of sand filters Is to remove sediment and the pollutants from the first flush of pavement and impervious area runoff. The filtration of nutrients, organics, and colP%rm bacteria Is enhanced by a mat of bacterial slime that develops during normal operations. One of the main advantages of sand filters Is their adaptability; they can be used on areas with thin soils, high evaporation rates, low -soil infiltration rates, in limited -space areas, and where groundwater is to be protected. r Since their original inception In Austin, Texas, hundreds of Intermittent sand filters have been Implemented to treat stormwater runoff. There have been numerous afterations orvariatlons In the original design as engineers In other judsdictlons have improved and adapted the technology to meet their specific requirements. Major types include the Austin Sand'Fiiter, the District of Columbia Underground Sand -Filter, the Alexandria Dry Vault Sand Filter, the Delaware Sand Filter, and peat - sand filters which are adapted to provide a sorption layer and vegetative cover to various sand filter r r designs. ' 1 t' ..0 RaviscaApril z, 2007 Page 21 of 32 r ATTACHMENT 4 - AD1 r i Design Considerations: •. • Appropriate for space -limited areas • Applicable In arld climates where wet basins and constructed wetlands are not appropriate • High TSS removal efficiency Cost Considerations: Filtration Systems may require less land than some other BMPs, reducing the land acquisition cost; however the structure itself is one of the more expensive BMPs, in addition, maintenance cost can be substantial, Erosion Control Compost Description: Erosion control compost (ECC) can be used as an aid to control erosion on critical sites during the establishment period ofprotective vegetation. The most common uses are on steep slopes, swales, diversion dikes, and on tidal or streartt banks. Materials: New types of erosion control compost are continuously being developed. The Texas Department of Transportation (TxDOT) has established minimum performance standards which must be met for any products seeking to be approved for use within any of TxDOT's construction or maintenance activilles. Material used within any TxDOT construction or maintenance activities must meet material specifications In accordance with current TxDOT specifications. TOOT maintains a website at hftp://mAv.dot.state.tx.us/des/landscape/composVspedificafons,htrn that provides Information on compost specification data. This website also contains Information on areas where the Texas Commission on Environmental Quality (TCEQ) restricts the use of certain compost products. ECC' used for projects not related to TxDOT should also be of quality materials by meeting performance standards.and compost specification data. To ensure the quality of compost used as an ECC, products should meet all applicable state and federal regulations, including but not limited to the United States" Environmental Protectfcn Agency (USEPA) Code of Federal Regulations (CFR), Title 40, Part 503 Standards for Class A biosollds and Texas Natural Resource Conservation Commission (now. named TCEQ) Health and Safety Regulations as � defined in the Texas Administration Code (TAC), Chapter 332, and all other relevant requirements for compost products outlined in TAC, Chapter 332. Testing requirements required by the TCEQ are defined in TAG Chapter 332, Including Sections §332.71 Sampling and Analysis Requirements for Final Products i and §332.72 Final Product Grades. Compost specification data approved by TxDOT are #or appropriate to use ensuring the use of quality compost materials or for guidance, i Testing standards are dependent upon the intended use for the compost and ensures product safety, and product performance regarding the prpduct's specific use. The appropriate compost sampling and testing protocols included in the United States Composting Council (USCC) Test Methods for the Examination of Composting and Compost' (TMECC) should be conducted on .w 1 compost products used for ECC to ensure that the products used will not impact public health, safety, and the environment and to promote production and marketing of quality composts that meet i i Revised April 2, 2W7 Page 28 of 32 t { ATTACHMENT 4 - AD1 a 3 n 8 0 565 o 0 n 560 a u t �0 555 a y 1 0 1 z a" 550 �n o�a' a b� n E ns 545 �5 W s a m 540 �o ' e x 'o W4 " 535 ry i CI 0 0$ 530 s W LL a a REA141,70ER OF CITY OF F0.47 :YJR1H i Wt. 20J7. PAGE 567 100$ PAGE. 24J 1 O.R.i.1ST. PC STA 152+66.78 1 BEGIN CURVE 1 O N=6990078.16 Q E=2412317.46 +1 I 01 25' T.C.E. - 1 25' PROPOSED T� PERMANENT RECLAIMED £X 24` WATER PIPELINE roRr noR H AND SALT WATER PIPEUNE �1 WN f'J66 / - EASEMENT NO. 3-6 - - _ z� g - 7=7,_�Y__'_•n- �' � )j5731'S6'E Q1�+ - - - �_==__ M S.011 /C.4E5 MATC afES4PCAX£ EXPLORAROtJ, E.t.C. 25 PROPO, S ~ ��N� S D£SCRi3ED AS AINt S1TC Al T.C.C.�. 1.GEASEMENT NO. 3-7 'a D207J04J64 JsB,� D.R.rc.T. \7.50' �`7� O_® t / .1j PROPOSED 20- RECLAIMED WATER LINE 7.500' STA. 156+95.00 INSTALU (1) 2• COMBINATION AIR & VACUUM RELEASE VALVE N /1 40 20 0 40 80 120 HORIZONTAL SCALE : 1" = 40' 4 0 4 6 12 VERTICAL SCALE 1' = 4' c TES:CONTRACTOR SHALL PULL PIPE AS REQUIRED. PIPE JOINTS AND FITTINGS SHALT. NOT BE DEFLECTED MORE THAN THE PERCENTAGE OF MANUFACTURER'S ALLOWABLE DEFLECTION PER JOINT, SEE NOTE 45, SHEET G-004. 2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION, SEE GENERAL NOTE 25, 16 7 AC Es SHEET G-004. 107 J, PL-OX 11J 6D LF PERM. l / l CAR. A, SL 12981 ATUOS rRGY..,817-215-1368 (YtLLl4 DAY) ASPHALT PAVEMENT 1 t / Artr 1- eoo-8ns-o440 REPAIR I 7 0 if i - X--7- -- FUTURE FAA BLVD. -FUTURE PAVEMENT _ __ _-__ �'\ 4' __ t J CP-7S ! SA,47.Y.TT SHALE CATHERNO.-1-a66-535-E836 25.00' TCE 20, CAS£A!£NT TER COUVUMCA1101.S.-1-800-344-8377 / - TEXAS YADS7R£AI C1fESAPEAKE EhTRGY.-405-610-2649 (KE11r imms-SON) / / ~ GAS SCRE4CES C1TY OF Ft. AO.RTH VfATER DEPT.-617-392-6296 (FIELD OPS) 01Y OF EUESS PUBUC WOMCS-617-685-1650 GTY CF ARLN:GTO4 HATER UT4HiES-817-459-6600 (VAL J-J.4-8VtT,EI.T.) _ / . --.` ;7;.3f+ CURVE DATA I= L=369.41' STA 156+20.00 -` R=1481.00' - INSTALL: (1) 20• RESILIENT / f/ A=14'17'29' SEATED GATE VALVE �i 1 690.00 LF. BY OPEN CUT TYP. BACKFILL AND EMBEDMENT I � I Y T \ ` 1 PT STA. 156+36.19 END CURVE N=6990235.75 E=2412650,51 f 1_ £X GROUND UN£ AT CENTER OF PIPE ---- - 150.00 LF. BY OPEN CUT TYP. IKFILL AND EMBEDMENT 60.00 LF. BY OPEN CUT TYP. BACWILL PER PERM. ASPHALT PVMT. TRENCH REPAIR DT'L. 1. SHT. C-902 ------------ _,_.-,-..--.-----.------_ ---- \ c- - -__-- 20.0 -__ - --- -� Y� --�-- FLOWABLE FILL\��/ 7 - n 00 20.0' 2�+ tin FLO'tVABLE FILL - ~ 4. - - TOP OF PROPOSED 20' X 4 RECLAIMED WATER LINE 1 i- 149 +00 PROP 0 RECLAIMED F(-- 1dED '.0 RECLAIMED O / 19-. _-� vi �-•" I2.1 WATER INE 0-0,237. •Tr<i ATER LINE Z L ti W 2 j � (E ts7 ZZa i o aYi `s 1` a, Al 4' 'm � � _ < 51 .1S 1�7 th 4(3 �? III YT'K1 1� W U r17 m 1i a- �(Pj W N CI iv2 w W 1' ta1/ 4- W 1- IJJ !- W W W -7Q VI J Z 1+0 -+ f' 1\- 4\•' V N > f- N Z TtI T- 1•" 150+00 151+00 152+00 153+00 154+00 155+00 1 +0 157+00 158 00 CITY OF Fr NARTH PARKS A40 CODUUtdTF SERIXES OEP.-617-392-7275 04JAS/FORT A04tH WEIMTMAL A'RPORF-272-973-5114 (EWE H. 70Ph;P.E) CQUESS-1-800-344-8377 E7tERGr YMCS1FR.-I-600-375-5702 OAS GULF COAST, LLC.-1-BE6-497-2284 KOCH PFEIF:r.-817-688-0089 (JrPF GOLW,) LENTL 3.-1-800-441-0223 (U.RAfGOPAL) U14ELLM EXPLORER P.PELME-918-574-7393 (808 HALER) VETRO ACCESS NETAWK. IN;C_.1-800-494-4844 TAARA4T COW41Y-817-229-3217 (DOUG KESSEY) TRNOY RNER AUTHORtlY a1?-467-4343 TRtOrY Af&R EXPRESS.-214-749-2636 O.VCOR SERVICE CENTER..at?-443-3429 (TERFTr IASATFw1 O.4COR ROlT_.8t7-215-6262 (CURT SHAW) rX00t-817-370-6500 rX EXCAVATM SLEETY SYSIEu...l-8O0-DO-ICSS ATTACHMENT 5-AD1 M 565 560 555 WATER MAP 2132-424 I 8 ADMIDUU Nat OS 550 (40. �ATq REVISION BY FORTWORTH CITY OF FORT WORTH, TEXAS WATER DEPARTMENT WATER VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM D►STRIBUTION MAIN PART 3 CIVIL PLAN AND PROFILE STA. 149+00 TO STA. 158+00 ALAN PLUMMER ASSOCIATES, INC. f320 S. UNNVEMM ORIM 8UfT6 300 FORT WORTU. Tr3L4S 26107-5?04 TOPE FIRM REOISTRATtOY NO. 13 I DESICNEO: RECOMUE11DED: SUBIAITTED: DESIGN ENGINEER DESIGN; DWA SCALE 4rY PROECT RG SHEET DRAfl.4: BS/SME As st077L CO213 DATE T- _ C 1rAiFR Ro. CHECKED: CRM I Oct 152009 P275-7r7514002f398 0 s 570 R 0 1 565 �S a u 560 d ,o n� a� 555 o� n a 550 4� �Q 545 �g �a u% wLL 540 a > n m o i 535 I i ( I 1 5.071 ACRES CHES4PEAK£ EXPLORA710,`{ L.L.0 I RE11,4UYDER OF C17Y OF F0.4T JIoR771 OESCR8£O AS ORLL S1T£ AI i VOL. 2037, PAGE 567 7.C.C.L.ho. W07JO9369 'JOL. 2008, PAGE. 24J O.R. TC. T. Cr 25' PROPOSED PROPOSED 20' PERMANENT RECLAIMED WATER PIPEUNE AND - RECLAIMED WATER LINE 25' PROPOSED i SALT WATER PIPELINE1 EASEMENT NO, 3-8 O PERMANENT RECLAIMED WATER PIPELINE _ QI AND SALT WATER PIPELINE +1 g g g EASEMENT NO. 3-7 $ 7.50' — 8 g g t + + « + + + f$ e I 0 l r - - - - - -- - - - - ----------------.....--- -- ----I------ AL inl--- - - - - ---------- -------- ----------- ---- ---- --- ----------- - - - - - - - - - - - - - -- - - L&i� - - - _ JI - EA7s7aVc 5' [x7-76 X URUTY EAS£11ENT STA 163+32.00 INSTALL: (1) 2' COMBINATION AIR cQ - 25' T.C.E. do VACUUM RELEASE VALVE 16.47 ACRES LOT 3, DLOCK Ili CALL A. SID. 12981 RR LC.T (n IG 47 ACRES LOT 3, BLOCK 113 CAB. A, - SLD. 129E I P.k 7, C. I. TOP OF PROPOSED 20'- RECLAIMED WATER LINE I . 800.00 LF. BY OPEN CUT TYP. BACKFILL AND EMBEDMENT - O C£T17ER OF PIPE CROP aU 1J9% 1 WATER UNE h CJ F- a 4- 59+QO . 11. . 161.+( to LAj A 'zJ t� 1Q 1' m to v- 4 PROP 40 20 0 40 80 120 HORIZONTAL. SCALE ; i' 40' 4 0 4 8 Q VERTICAL SCALE : i' = 4' NOTES: 1. CONTRACTOR SHALL PULL PIPE AS REQUIRED. PIPE JOINTS AND FITTINGS SHALL NOT BE DEFLECTED MORE THAN THE PERCENTAGE OF MANUFACTURER'S ALLOWABLE DEFLECTION PER JOINT, SEE NOTE 45, SHEET G-004. 2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. SEE GENERAL NOTE -25, SHEET 0-004. ATUOS ENERV-.817-215-43ea (NYLIAU a#Y) Athi...1-800-695-0i40 UWIETT SKLE GAThMW-.I-866-535-6a36 CwwTErt tovuUNCAna S._1-fiao-344-e3n OiESWEAKE ENERGY...405-810-2649 (KENT WLG1 iSON) CITY OF FT. NO.R1H WATER OEPT-.817-392-8296 ((1ELO OPS) CITY OF EULESS PUBLIC W'ORRS._817-665-1550 CITY OF ARU4GTO4 WATER UM3tiES-.817-459-6600 (VAL JEAI/-(3ART,EI.i.) CITY OF FE NO.iTN PARKSMOCOU'JUNRY SWXES DEP.-817-392-7275 O LtAS/FORT NORTH INTERILAIMAL A:RPORt.-972-973-6114 (EDGE N. TOYAR,P.E.) 04TESS...1-800-344-8317 ENERGY TRARVTP..1-670-375-5702 EMS GULF COAST, LLC...1-866-497-2284 KOCH P,PELINE,817-688-0069 (JEFF COLW.4) MSL 3.-i-eW-441-0223 (01WOOPfL) U.ACELLA11 DIPLORER PPEIP1E-918-574-7393 (808 1ILLFR) LIETRO ACCESS NEt1{ORA, 4NC;..1-e0O-494-4844 TAMWiT COUNTY.,.$17--229-3217 (DOUG KESSEY) TR401Y RNER A1Jt110001Y_.8t7-467-4343 HLNITY MNTR E7.PRESS...214-749-2636 O:COR SET'.CE CE70EFLA17-443-3429 (TERRY tASATER) ONCOR RON._617-215-6262 (C17.RF SHIRP) ��,SEUF Ekttl TWOT-817-370-6500 i4y: TX E(CAVAMI SAR7Y MTEV_.1-800-0'0-TESS /, t: f^4 ATTACHMENT 6-AD1 6/0 570 1 565 560 WATER MAP 2132-124 I ® 13jd6� AQ umv Rat as 555 I I ( NO. PATE1 REVISIOfl DY FORTWORTH CITY OF FORT WORTH, TEXAS WATER DEPARTMENT WATER VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRrBUTION MATH PART 3 PLAN AND PROFILE STA. 158+00 TO STA. 166+00 t� AtAN PLUMMER ASSOCIATES, INC. I� a» 'a ta2o S. uNTVEToo ease s. YE Too PORE MV R GISTR TION ? . 64 13 TOPE fTRY 1EECISTTL#TTOK N0. IO DESIGNEOc RECOAVENDED: SUB.V.ITTED: DESIGN ENGMEER OESTCtT: OWA SCALE on E PRacT no. SHEET OS SME AS a72u C- 31 7 ORADRAWN:I DATE ATE WAIFR NO CHECKED: CRM Oct 15, 200 p275-705140021W rmw MW 0318-042-01 ADDENDUM NO. 2 TO CONTRACT DOCUMENTS AND SPECIFICATIONS FOR CITY OF FORT WORTH, TEXAS VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 TO: PROSPECTIVE BIDDERS AND PLAN HOLDERS The Plans, Specifications, and Contract Documents shall be modified as required by the following items: UW Item 2-1 .. Addendum No. 1, PART B - PROPOSAL: Delete this section (ATTACHMENT 1-AD1) in its entirety and replace with the attached Proposal (ATTACHMENT 1-AD2). r Item 2.2 Addendum No. 1, Item 1-12 a Delete this Item in its entirety and attachment (ATTACHMENT 5-AD1) and revert back to original plan sheet C-316. r Item 2-3 r Addendum No. 1, Item 1-13 Delete this Item in its entirety and attachment (ATTACHMENT 6-AD1) and revert back to original plan sheet C-317. Item 2-4 .. Specifications, PART E — TECHNICAL SPECIFICATIONS: Section 01002 Measurement and Payment Add the following bid item description. "4.42 — ITEM NO. 327 - 8-INCH DIAMETER RESILENT SEATED GATE "' VALVE AND BOX The unit price bid per each 8-inch Resilient Seated Gate Valve and Box shall .w be full compensation for furnishing and installing valves and boxes shown in the Plans and included in the Contract, and shall include all excavation, dewatering, furnishing and installing all necessary crushed rock or concrete .. bases, valve boxes, fittings, gate valve, miscellaneous materials, all necessary anchors, supports, all backfill, and all other incidentals required to provide the valve in place and in operation." .v F:Vrolects\03181042.011SpecslPart 3Wddendum MddendurrL.210-26.08.doc ADDENDUM 2 — PAGE 1 V" Wo 0318-042-01 Item 2-5 Plans, Sheet G-011 Add the following note at station 68+85. "STATION 68+85.00 .. INSTALL: (1) 24"x8" TEE (1) 8" GATE VALVE N: 6986025.82 .. E: 2407030.23" Delete note at station 146+25.00 in its entirety Add the following note at station 145+78.00 "2" COMBINATION AIR & VACUUM RELEASE VALVE STATION = 145+78.00 N = 6989713.68 E=2411733.290 4 Add the following at station 151+50. "STATION 151 +50.00 INSTALL: .. (1) 20"x8" TEE (1) 8" GATE VALVE N: 6990015.47 E: 2412218.93" Add the following at station 157+00. "STATION 157+00.00 INSTALL: (1) 20"x8" TEE (1) 8" GATE VALVE N: 6990297.06 E: 2412632.85" Add the following note at station 157+20,00 7" COMBINATION AIR, & VACUUM RELEASE VALVE STATION = 156+95.00 N=6989735.38 .. E=2411774.93" Wo F:1proJec1s1031M2-011Specs\Part Mddendum 2Wddendum 2 10-26-09.doa ADDENDUM 2 -- PAGE 2 .W MW Item 2-5 (continued) r Add the following note at station 168+00.00 "2" COMBINATION AIR & VACUUM RELEASE VALVE STATION = 168+00.00 r N=6991256.31 E=2412504.85" Add the following note at station 177+73.64 "2" COMBINATION AIR & VACUUM RELEASE VALVE STATION = 177+73.64 N = 6991342.55 E=2413441.76" Item 2-6 Plans, Sheet C-306 4 Add the following at station 68+85. -� "STA. 68+85 INSTALL: (1)24"x8"TEE r (1) 8" GATE VALVE (1) 8" BLIND FLANGE (FACING SOUTH)' Item 2-7 Plans, Sheet C-315 Delete note at station 146+25.00 in its entirety from the plan view. And replace note with the following at station 145+78.00. "STATION = 145+78.00 INSTALL: (1) 2" COMBINATION AIR & VACUUM RELEASE VALVE" Item 2-8 Plans, Sheet C-316 Add the following at station 151+50. "STA. 151 +50 INSTALL: (1)20"x8"TEE (1) 8" GATE VALVE (1) 8" BLIND FLANGE (FACING NORTHWEST)" r FAprojects103181042-MSpecWart 344ddendum 2Wddendum_210-26-09.doc r 0318-042-01 r ADDENDUM 2 — PAGE 3 no — 'r 0318-042-01 Item 2-8 (Continued) Add the following at station 157+00. "STA.157+00 INSTALL: (1)20'x8"TEE (1) 8" GATE VALVE (1) 8" BLIND FLANGE (FACING WEST)" Relocate 2" combination air and vacuum release valve at station 156+95.00 to STA. 157+20. All items in conflict with this addendum are hereby deleted. THIS ADDENDUM IS MADE PART OF THE SPECIFICATIONS AND CONTRACT DOCUMENTS, AND SHALL BE ACKNOWLEDGED ON THE PROPOSAL AND ON THE BID ENVELOPE. ALAN PLUMMER ASSOCIATES, INC. �,�.�tititillt�tttt �A�ti,o..... zlt Daniel p gate, P.E. r *; ,., ....•,•••:-•* October 26 2009 �*•A•••** rDA-NN1EL W A P P I Ff;ATF;"" F:Vroje4ots103181042-011Specs\Part 344ddendum 244ddendum 210-26-09.doc ADDENDUM 2 - PAGE 4 sm PROPOSAL TO: MR. DALE A. FISSLER, P.E. Fort Worth, Texas City Manager .. Fort Worth, Texas FOR: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM • DISTRIBUTION MAIN PART 3 WATER PROJECT NO. P275-705140021388 no City Project No.: 00213 Pursuant to the foregoing "Notice to Bidders," the undersigned has examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. If required by this project, Contractor must be pre -qualified in accordance with the projects sponsoring Departments of the City of Fort Worth requirements. Upon •• acceptance of this Proposal by the City Council and required by this project, the bidder is bound to execute a contract and furnish Performance, Maintenance Bond for the water replacement contract only, and Payment Bond approved by the City of Fort Worth for performing and completing said work within the time stated for the following sums, to wit: Total quantities given in the bid proposal may not reflect actual quantities, by represent the best .o accuracy based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. .. .. wo ow .. ATTACHMENT 1 AD2 rAW Item Approx. Description of Items with Unit No. w Quantity Bid Prices Written In Words Price PART 3 301 1 LS Implementation of the Storm Water Pollution Prevention Plan including all material and labor, for a total lump sum amount of Dollars and Cents. S $ 302A 10100 LF 24-inch diameter C-151 Ductile Iron Pipe furnished and installed complete in place as shown on the Plans and described in .v the Specifications including trenching, embedment, and backfill, for the sum of _ Dollars and Cents per Linear Foot. S 302E 10100 LF 24-inch diameter C 200 Steel Pipe with ., Cathodic Protection System furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, �+ embedment, and backfill, for the sum of _ Dollars and Cents per Linear Foot. $ $ _ 302C 10100 LF 24-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and .e backfill, for the sum of Dollars and Cents per Linear Foot. $ $ 302D 10100 LF 24=inch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backfill, for the sum of. Dollars and Cents per Linear Foot. $ $ Extended Amount Bid ATTACHMENT 1-AD2 -1 WE am Y -. .. Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 303A 5900 LF 20-inch diameter C-151 Ductile Iron Pipe furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment and backfill, for the sum of _ Dollars and Cents per Linear Foot. $ $ 303E 5900 LF 20-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System furnished and installed complete in place as shown on the Plans and described in the Specifications including *trenching, embedment and t backfill, for the sum of Dollars and Cents per Linear Foot. $ $ 303C 5900 LF 204nch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe furnished and installed complete in place as shown on the Plans and described In the Specifications including trenching, embedment, and backfill, for the sum of. Dollars and Cents per linear Foot. $ S 304A 150 LF 64nch diameter C-900 Class 200 DR 14 Polyvinyl Chloride Pipe furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment and backfill, for the sum of - Dollars and Cents per Linear Foot. $ $ 304E 150 LF 6-inch diameter C-906 Class 200 DR 9 DIPS High Density Polyethylene (HDPE) Pipe (including trenching, .embedment, concrete encased thrust restraint, & backfill) furnished and installed complete and in place, for the sum of Dollars and Cents per Linear Foot. $ $ W& ATTACHMENT 1-AD2 Item Approx. Description of Items with No. Quantity Bid Prices Written In Words PART 3 305 2000 LF 30-inch diameter Casing Pipe by Horizontal Directional Drill furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backGll, for the sum of. Dollars and Cents per Linear Foot. $ 306 260 LF 36-inch diameter Casing Pipe by Other than Open Cut, furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backfll. for the sum of Dollars and Cents per Linear Foot. $ 307A 260 LF 24-inch diameter C-151 Ductile Iron Pipe inside 36-inch diameter steel casing • furnished and installed, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. $ 307B 260 LF 24-inch diameter C-200 Steel Pipe with s Cathodic Protection System inside 36- inch diameter steel casing furnished and installed, complete in place as shown on .s the Plans and described in the Specifications, for the sum of 1 Dollars and Cents per Linear Foot. $ 307C 260 LF 24-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe inside 36-inch .. diameter steel casing furnished and ' installed, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. Unit Extended Price Amount Bid S $ ATTACHMENT 1-AD2 Item Approx. Description of Items with No. Quantity Bid Prices Written In Words .w PART 3 aw 307D IF 308A ur .w A 308B vow 308C 309 260 LF 24-inch diameter C-905 DR-18 Polyvinyl Chloride Pipe inside 36-inch diameter steel casing furnished and installed, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. $ 2000 LF 20-inch diameter C-151 Ductile Iron Pipe inside 30-inch steel casing furnished and installed complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. $ 2000 LF 20-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System inside 30-inch steel casing furnished and installed complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. $ 2000 LF 20-inch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe inside 30-inch steel casing furnished and installed complete in place as shown on the Plans and described in the 'Specifications, for the sum of Dollars and Cents per Linear Foot. $ 16000 LF Design and implement Trench Safety System complete in place, for the sum of Dollars and Cents per Linear Foot. $ Unit Extended Price Amount Bid R S ATTACHMENT 1-AD2 -, w up No VW Ow • .. E� w w .. .. Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 310 4 EA 24-inch Resilient Seated Gate Valve and Vault complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Each. S 311 6 EA 20-inch Resilient Seated Gate Valve and Vault complete in place as shown on the Plans and described in the Specifications, foe the sum of Dollars and Cents per Each. S g 312 3 EA 8-inch Resilient Seated Gate Valve and Vault complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Each. $ S 313 14 EA 2-inch Automatic Combination Air and Vacuum Release Valve and Vault complete in place as shown on the Plans and Specifications, for the sum of Dollars and Cents per Each. $ $ 314 3 EA For furnishing and installing blowoff assemblies including valves, pipe, fittings, concrete, excavation, and backfill, complete in place as shown on the Plans and Specifications, for the sum of Dollars and Cents per Each. $ $ 315 1 EA 10-inch Meter Station (D/FW) for D/FW Airport, furnish and install as shown on the Plans and described in the Specifications complete. in place, for the sum of Dollars and Cents per Each. $ S 316A 9 TON 24-inch diameter Ductile Iron Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Ton. $ ATTACHMENT 1-AD2 Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 up 316E 1 LS 24-inch diameter Steel Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Lump. Sum. $ $ 316C 1 LS 24-inch diameter Concrete Pressure Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Lump Sum. $ $ 317A 7 TON 20-inch diameter Ductile Iron Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Ton. S $ w 3178 1 LS 20-inch diameter Concrete Pressure Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Lump Sum. $ $ 318 7,000 SY Furnish and install Temporary Pavement Repair as directed by OWNER, complete ,.. and in place, for the sum of Dollars and Cents per Square Yard. $ $ .w 319 20 SY For Gravel Drive Repair per Figure #238 complete in place as shown on the Plans and described in the Specifications, for �. the sum of Dollars and Cants per .. Square Yard, $ $ a w MINNOW ATTACHMENT 1-AD2 ,r up a VW Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 320 7,000 SY For Permanent Hot Mix Asphaltic Concrete (HMAC), complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Square Yard. $ 321 9,000 LF For Pavement Wedge Milling, 2-inch to 0-inch depth, 5-foot wide, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Linear Foot. B $ 322 20 EA For Butt Joint. Milling, complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Each. $ g 323 150 SY For Concrete Pavement Repair per Figure STR-031 complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Square Yard. S S 324 1 LS For Design and implementation of a Traffic Control Plan complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars and Cents per Lump Sum. $ $ 325 250 CY Furnish Additional Rock for Foundation not shown in Plans or Specifications and as directed by the OWNER, for the sum of Dollars and Cents per Cubic Yard. $ $ ATTACHMENT 1-AD2 N Item Approx. Description of Items with No. Quantity Bid Prices Written In Words PART 3 326 200 CY Furnish Flowable Fill encasement shown in Plans or described in Specifications and as directed by the OWNER, for the sum of Dollars and Cents per Cubic Yard. $ 327 7,000 LF Hydromulch Seeding furnished and installed as described in the Specifications, for the sum of Dollars and Cents per Linear Foot. $ TOTAL AMOUNT BID $ Unit Extended Price Amount Bid F Notes: (1) Refer to Part E (Specifications), Section 01002 (Measurement and Payment). (2) Contractor shall select. only one option on items in letter series (i.e. A,13, C-or D) ATTACHMENT 1-AD2 w LIST OF Select Fitting Type FITTINGS �+ For Project: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY DISTRIBUTION MAIN PART 3 •e ADD OR SUBTRACT FOR THE FOLLOWING Select Fitting Type INCLUDING INSTALLATION. TYPE SIZE OTY WEIGHT TOTAL WT COST Tee 2411x20" Tee 24" x 8" .. Tee 2411x6" Reducer 2411x20" 90° Bend 124" ! -! 4V Bend 24" j 22.5° Bend 124" ! ! 11.25 ° Bend j 24" I j Blind Flange 'I 24" I I Tee 20"x8" I Tee 1201IX611 90° Bend ! 20" ! I 45° Bend ^ 120" ! I 22.5° Bend 120" 11.25° Bend 120" ( ! Blind Flange 120" r I Blind Flange + 8" ow mm I I 1 ! Contractor shall fill in blanks for "Weight", "Total WV and "Cost" as a part of the bid. Contractor is responsible for correct quanity total of all fittings and specials. ATTACHMENT 1- AD2 a. aa' Within ten (10) days after notification by the City of Fort )ATorth, the undersigned will execute the Wo formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and ow bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. If as a requirement of this project, the undersigned bidder certified that they have been furnished at least one set of the General Contract Documents and General or Special Specifications for Projecis, and that they have read and thoroughly understand all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. w The undersigned assured that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction; with ten (10) calendar days after issue of the work order and to complete the contract within 270 days after beginning construction as set forth in the written work order to be furnished by the Owner. (Circle and complete A or B below, as applicable) ,. A. The principal place of business of our company is in the State of a. Nonresident bidders in the State of , our principal place of +• business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. b. Nonresident bidders in the State of , our principal place of ., business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is MW in the State of Texas. ., Respectfully submitted, Title: ,,W Company: Address: VW .a am ATTACHMENT 1 AD2 0318-042-01 CITY OF FORT WORTH, TEXAS CONTRACT DOCUMENTS AND SPECIFICATIONS FOR VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN- PART 3 TABLE OF CONTENTS TABLE OF CONTENTS PART A NOTICE TO BIDDERS Notice to Bidders Special Instructions to Bidders PART B PROPOSAL Proposal PART C -GENERAL CONDITIONS Table of Contents Section C1 Definitions Section C2 Interpretation and Preparation of Proposal Section C3 Award and Execution of Documents Section C4 Scope of Work Section C5 Control of Work and Materials Section C6 Legal Relations and Public Responsibility Section C7 Prosecution and Progress Section C8 Measurement and Payment PART CS SUPPLEMENTARY CONDITIONS (TO PART C) Supplementary Conditions TEXAS WATER DEVELOPMENT BOARD SUPPLEMENTAL CONTRACT CONDITIONS PART D SPECIAL CONDITIONS Special Conditions 2008 Prevailing Wage rates Project Sign PART DA ADDITIONAL SPECIAL CONDITIONS (TO PART D) mo .. i September 2009 TABLE OF CONTENTS F:\projects\0318\042-W\Specs\Part 3\Table of Contents.doc 0318-042-01 '+ CITY OF FORT WORTH, TEXAS -- CONTRACT DOCUMENTS AND SPECIFICATIONS FOR VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM .� DISTRIBUTION MAIN- PART 3 TABLE OF CONTENTS (CONTINUED) PART E TECHNICAL SPECIFICATIONS DIVISION 1 —GENERAL REQUIREMENTS 01001 General Construction Requirements 01002 Measurement and Payment DIVISION 2 — SITE WORK 02001 Materials 02202 Excavation and Backfill Large Diameter Pipe 02230 Site Clearing 02231 Tree Protection and Trimming 02240 Dewatering 02260 Excavation Support and Protection 02326 Pipe.Jacking, Boring and Tunneling. 02910 Hydromulch Seeding DIVISION 3 — CONCRETE 03100 Concrete Formwork 03200 Concrete Reinforcement 03310 Miscellaneous Cast -In -Place Concrete _ 03600 Grout, Non -Shrink DIVISION 4 — MASONRY (NOT USED) DIVISION 5 - METALS (NOT USED) DIVISION 6 - WOOD AND PLASTICS (NOT USED) - DIVISION 7 - THERMAL AND MOISTURE PROTECTION (NOT USED) DIVISION 8 - DOORS AND WINDOWS (NOT USED) DIVISION 9 - FINISHES 09910 Painting and Protective Coatings DIVISION 10 - SPECIALTIES (NOT USED) ii September 2009 u TABLE OF CONTENTS F:\projectsMl M042-011Specs\Part ITable of Contents.doc 0318-042-01 a n. -. .. so CITY OF FORT WORTH, TEXAS CONTRACT DOCUMENTS AND SPECIFICATIONS FOR VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN- PART 3 TABLE OF CONTENTS (CONTINUED) DIVISION 11 — EQUIPMENT (NOT USED) DIVISION 12 - FURNISHINGS (NOT USED) DIVISION 13 - INSTRUMENTATION AND SPECIAL CONSTRUCTION 13110 Cathodic Protection DIVISION 14 - CONVEYING SYSTEMS (NOT USED) DIVISION 15 - MECHANICAL 15015 Piping Systems -Basic Materials and Methods 15020 Restrained Joints 15021 Piping Systems, Steel 15022 Piping Systems, Ductile Iron Pipe 15030 Piping Systems, PVC and CPVC Pressure Pipe 15035 Piping Systems, High Density Polyethylene (HDPE) Pressure Pipe 15040 Reinforced Concrete Cylinder Pipe (Bar -Wrapped) 15070 Field Testing of Piping Systems 15100 Valves: Basic Requirements and Miscellaneous 15101 Gate Valves 15105 Combination Air and Vacuum Release and Air Release Valve 15143 Control Valve, Hydraulically -Actuated DIVISION 16 (NOT USED) PART F BONDS AND INSURANCE Performance Bond Payment Bond Maintenance Bond Insurance Form Workers Compensation Affidavit PART G CONTRACT iii TABLE OF CONTENTS FAprojects\0318\042-01\Specs\Part 3\Table of Contents.doc September 2009 Im 0318-042-01 CITY OF FORT WORTH, TEXAS _ CONTRACT DOCUMENTS AND SPECIFICATIONS FOR VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM s DISTRIBUTION MAIN- PART 3 TABLE OF CONTENTS (CONTINUED) APPENDIX A Storm Water Pollution Prevention Plan APPENDIX B Easements APPENDIX C Geotechnical Bore Logs APPENDIX D Subsurface Utility Engineering Reports APPENDIX E Texas Department of Transportation Permit APPENDIX F THE Permit _ APPENDIX G Additional Permits iv September 2009 .t TABLE OF CONTENTS F:lprojects103181042-011Specs\Part 31Table of Contents.doc ./ SHORT FORM NOTICE TO BIDDERS so "" Sealed proposals for the following: FOR: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 City Project No. 00213 Water Project No. P275-705140021388 Addressed to: CITY OF FORT WORTH PURCHASING DIVISION 1000 THROCKMORTON ST FORT WORTH TX 76102-6311 .r will be received at the Purchasing Office until 1:30 p.m., Thursdav, October 29, 2009 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. One set of plans and documents for this project maybe purchased for a non-refundable cost of Sixty Dollars ($125.00) per set at the offices of Alan Plummer Associates, Inc. 1320 S. University Drive, Suite 300, Fort Worth, TX 76107. These documents contain additional information for prospective bidders. Plans and Specifications will be available for pick-up on Friday, September 25, 2009. The major work will consist of the following (All Approximate): Distribution Main Part 3: 10,350 linear feet of 24-inch pipe 7,900 linear feet of 20-inch pipe Included in the above will be all other miscellaneous items of construction as outlined in the Plans, General Contract •• Documents and Specifications. A non -mandatory pre -bid meeting will be held at the Village Creek Wastewater Treatment Plant at 2:30 pm, on Tuesday, October 13, 2009. NOTICES s Pre -qualification according to the Fort Worth Water Department Special Instructions to Bidders is required. All bidders must be pre -qualified with the City of Fort Worth Water Department a minimum of seven (7) days prior to the bid opening. .. Bid security may be required in accordance with Special Instructions to Bidders. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, aw if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the Contract. .. The City of Fort Worth reserves the right to reject any and/or all bids and waive any and/or all formalities. American Recovery and Re -investment Act (ARRA) Funding —This contract is to be funded through a (grant/loan) obtained from the TWDB as part of the American Recovery and Re -investment Act. There are a number of special .o provisions for this funding that the bidder should understand. .W SHORT FORM NOTICE TO BIDDERS Projects must be under construction prior to February 17, 2010. This project will not be funded if this schedule is not achieved. DOL Wage Rates will apply to this funding package. a) Section 1606 of ARRA requires that all laborers and mechanics employed by contractors and subcontractors on project funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 U.S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the Davis -Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis -Bacon contract clauses set forth in that section. Federal agencies providing grants, cooperative agreements, and loans under the Recovery Act shall ensure that the standard Davis -Bacon contract clauses found in 29 CFR 5.5 (a) are T incorporated in any resultant covered contracts that are in excess of $2,000 for construction, alteration or repair (including painting and decorating). b) For additional guidance on the wage rate requirements of section 1606, contact your awarding agency. Recipients of grants, cooperative agreements and loans should direct their initial inquiries concerning the application of Davis -Bacon requirements to a particular federally assisted project to the Federal agency funding the project. The Secretary of Labor retains final coverage authority under Reorganization Plan No. 14. y The project will include special reporting provisions to a national database regarding the progress of construction. The Federal Funding Accountability and Transparency Act of 2006, the Government Funding Transparency Act of 2008 ("2008 Act), and Section 1512(c) of ARRA require periodic reporting of project information. Applicants much report on the financial status and performance of their projects on a weekly and quarterly basis. The Reporting Requirements include reporting on the performance of all fast -tier contracts and grants awarded for the project, with special consideration given to estimating the number jobs created and the number of jobs retained by the activity. Applicants must require contractors to obtain a Dun and Bradstreet _ Data Universal Numbering System Number and maintain current registration in the Central Contractor Registration. Applicants must agree to furnish all information and reports required by federal and state law, and must agree to require all contractors to furnish information needed for reporting purposes.. The project includes certain Buy -American provisions included in the American Recovery and Reinvestment Act. a) Definitions. Manufactured goods, public building and public work, and steel, as used in this notice, are defined in the 2 CFW 176.140. b) Waiver from Buy -American provision. 1n accordance with ARRA Section 1605(c), the EPA has provided notice that it has granting a nationwide waiver of the requirements of section 1605(a) of Public Law 111-5, Buy American requirements, based on the public interest authority of section 1605(bx1), allowing the use of non -domestic iron, steel, and manufactured goods when they occur in de minimis incidental components of SHORT FORM NOTICE TO BIDDERS eligible projects for which a Clean or Drinking Water State Revolving Fund (SRF) has concluded or will we conclude an assistance agreement using ARRA funds where such components cumulatively comprise no more than a total of 5 percent of the total cost of the materials used in and incorporated into a project. .� c) Requests for determinations of inapplicability. A prospective applicant requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) should submit the request to the award official in time to allow a determination before submission of applications of proposals. The prospective applicant shall include the information and applicable supporting data required by paragraphs at 2 CFR 176.140(c) and (d) in the request. If an applicant has not requested a determination regarding the inapplicability of 1605 of the Recovery Act before submitting its application of proposal, or has not received a response to a previous request, the applicant shall include the information and supporting data in the application or proposal. d) Evaluation of project proposals. If the Federal Government determines that an exception based on unreasonable cost of domestic iron, steel, and/or manufactured goods applies, the Federal Government will .. evaluate a project requesting exception to the requirements of section 1605 of the Recovery Act by adding to the estimated total cost of the project 25 percent of the project cost, if foreign iron, steel, or manufactured goods are used in the project based on unreasonable cost of comparable manufactured domestic iron, steel, and/or manufactured goods. .. e) Alternate project proposals 1) When a project proposal includes foreign iron, steel, and/or manufactured goods not listed by the Federal Government at 2 CFR 176.140(b)(2), the applicant also may submit an alternate proposal "' based on use of equivalent domestic iron, steel; and/or manufactured goods. 2) If an alternate proposal is submitted, the applicant shall submit a separate cost comparison table prepared in accordance with 2 CFR 176.140(c) and (d) for the proposal that is based on the use of any rM foreign iron, steel, and/or manufactured goods for which the Federal Government has not yet determined an exception applies. 3) If the Federal Government determines that a particular exception requested in accordance with 2 CRF 176.140(b) does not apply, the Federal Government will evaluate only those proposals based on use of the equivalent domestic iron, steel, and/or manufactured good, and the applicant shall be required to furnish such domestic items. This contract is contingent upon release of funds from the Texas Water Development Board. Any contract awarded under this Notice to Bidder is expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Notice to Bidder or any resulting contract. The contrast is subject to regulations contained in 31 TAC, Chapter 363, if effect on the date this contract is executed. Equal Opportunity in Employment — All qualified Applicants will receive consideration for employment without regard to race, color, age, handicap or national origin. Bidders will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order No. 11375, and as supplemented in Department of Labor regulations 41 .. CFR Part 60. .. SHORT FORM NOTICE TO BIDDERS Disadvantaged Business Enterprise (DBE) — This contract is subject to EPA established DBE "fair share" goals. TWDB document "TWDB Disadvantaged Business Enterprise Program Guidance" is included in the bidding documents. This contract is subject to EPA established Disadvantaged Business Enterprise (DBE) CONSTRUCTION 34.8% 6.7% SUPPLIES 9.7% 5.2% EQUIPMENT 7.2% 4.1% SERVICES 16.1% 21.3% - SUBMISSION OF BID AND AWARD OF CONTRACT The proposal within this document is designed as a package. In order to be considered an acceptable bid, the Contractor is required to submit a bid for the complete proposal. A bid proposal submittal that is received with the proposal incomplete will be rejected as being non -responsive. The Contractor, who submits the bid with the lowest price, will be the apparent successful bidder for the project. Bidders are hereby informed that the Director of the Water Department reserves the right to evaluate and recommend to the City of Fort Worth City Council the bid that is considered to be in the best interest of the City of Fort Worth. For additional information, please contact Daniel W. Applegate P.E., Project Manager, Alan Plummer Associates, Inc. at 817-870-2544 or by email: dpplegate@apaienv.com or David Townsend, P.E., Project Manager, City of Fort Worth — Water Department at Telephone Number: 817-392-8296 or by email: david.townsend@fortworthgov.org. COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: FOR: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 City Project No. 00213 Water Project No. P275-70514002388 Addressed to: CITY OF FORT WORTH PURCHASING DIVISION .� 1000 THROCKMORTON ST FORT WORTH TX 76102-6311 will be received at the Purchasing Office until 1:30 p.m., Thursday. October 29.2009 and then publicly opened and �., read aloud at 2:00 p.m. in the Council Chambers. One set of plans and documents for this project maybe purchased for a non-refundable cost of One Hundred Twenty Five Dollars ($125.00) per set at the offices of Alan Plummer Associates, Inc. 1320 S. University Drive, Suite 300, Fort Worth, TX 76107. These documents contain additional information for prospective bidders. Plans and Specifications will be available for pick-up on Friday, September 25, 2009. The major work will consist of the following (All Approximate): Distribution Main Part 3: 10,350 linear feet of 24-inch pipe 7,900 linear feet of 20-inch pipe Included in the above will be all other miscellaneous items of construction as outlined in the Plans, General Contract Documents and Specifications. All bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City of Fort Worth Ordinance no. 7400 (Fort Worth City Code Sections 13-A-221 through 13-A-29) prohibiting discrimination in the employment practices. A non -mandatory pre -bid meeting will be held at the Village Creek Wastewater Treatment Plant at 2:30 pm, on Tuesday, October 13, 2009. NOTICES Pre -qualification according to the Fort Worth Water Department Special Instructions to Bidders is required. All bidders .. must be pre -qualified with the City of Fort Worth Water Department a minimum of seven (7) days prior to the bid opening. `" Bid security may be required in accordance with Special Instructions to Bidders. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the Contract. The City of Fort Worth reserves the right to reject any and/or all bids and waive any and/or all formalities. .. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Addenda Index and Receipt form(s). Bids that do not acknowledge receipt of all w ow COMPREHENSIVE NOTICE TO BIDDERS addenda may be rejected as being non -responsive. Information regarding the status of addenda may be obtained by contacting Daniel W. Applegate P.E., Project Manager, Alan Plummer Associates, Inc. at 817-870-2544 or by email: dapplegate@apaienv.com. Bidders, using the printed copy, shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposal section(s) and submit the complete specification book or face rejection of the bid as non -responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time deadline stated below or the bidder may request a copy of said forms from the City of Fort Worth Project Manager named in this solicitation. w In accordance with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City of Fort Worth contracts. A copy of the Ordinance can be obtained from the office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM (with "Documentation') and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received no later than 5:00 p.m., five (5) City of Fort Worth business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the Water Department to whom delivery was made. Such receipt shall be evidence that the City of Fort Worth received the Documentation. Failure to comply shall render the bid non- responsive. American Recovery and Re -investment Act (ARRA) Funding — This contract is to be funded through a (grant/loan) obtained from the TWDB as part of the American Recovery and Re -investment Act. There are a number of special provisions for this funding that the bidder should understand. Projects must be under construction prior to February 17, 2010. This project will not be funded if this schedule is not achieved. W DOL Wage Rates will apply to this funding package. a) Section 1606 of ARRA requires that all laborers and mechanics employed by contractors and subcontractors on project funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projects of a character similar _ in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States.Code. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 U.S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the Davis -Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis -Bacon contract clauses set forth in that section. Federal agencies providing grants, cooperative agreements, and loans under the Recovery Act shall ensure that the standard Davis -Bacon contract clauses found in 29 CFR 5.5 (a) are incorporated in any resultant covered contracts that are in excess of $2,000 for construction, alteration or repair (including painting and decorating). b) For additional guidance on the wage rate requirements of section 1606, contact your awarding agency. Recipients of grants, cooperative agreements and loans should direct their initial inquiries concerning the application of Davis -Bacon requirements to a particular federally assisted project to the Federal agency funding the project. The Secretary of Labor retains final coverage authority under Reorganization Plan No. 14. The project will include special reporting provisions to a national database regarding the progress of construction. COMPREHENSIVE NOTICE TO BIDDERS The Federal Funding Accountability and Transparency Act of 2006, the Government Funding Transparency Act of 2008 ("2008 Act"), and Section 1512(c) of ARRA require periodic reporting of project information. Applicants much report on the financial status and performance of their projects on a weekly and quarterly basis. The Reporting Requirements include reporting on the performance of all first -tier contracts and grants awarded for the project, with special consideration given to estimating the number jobs created and the number of jobs retained by the activity. Applicants must require contractors to obtain a Dun and Bradstreet Data Universal Numbering System Number and maintain current registration in the Central Contractor Registration. Applicants must agree to furnish all information and reports required by federal and state law, and must agree to require all contractors to furnish information needed for reporting purposes. The project includes certain Buy -American provisions included in the American Recovery and Reinvestment Act. a) Definitions. Manufactured goods, public building and public work, and steel, as used in this notice, are defined in the 2 CFW 176.140. b) Waiver from Buy -American provision. In accordance with ARRA Section 1605(c), the EPA has provided notice that it has granting a nationwide waiver of the requirements of section 1605(a) of Public Law 111-5, Buy American requirements, based on the public interest authority of section 1605(bxl), allowing the use of non -domestic iron, steel, and manufactured goods when they occur in de minimis incidental components of eligible projects for which a Clean or Drinking Water State Revolving Fund (SRF) has concluded or will conclude an assistance agreement using ARRA funds where such components cumulatively comprise no more than a total of 5 percent of the total cost of the materials used in and incorporated into a project. .< c) Requests for determinations of inapplicability. A prospective applicant requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) should submit the request to the award official in time to allow a determination before • submission of applications of proposals. The prospective applicant shall include the information and applicable supporting data required by paragraphs at 2 CFR 176.140(c) and (d) in the request. If an applicant has not requested a determination regarding the inapplicability of 1605 of the Recovery Act before submitting its application of proposal, or has not received a response to a previous request, the applicant shall include the information and supporting data in the application or proposal. I" d) Evaluation of project proposals. If the Federal Government determines that an exception based on unreasonable cost of domestic iron, steel, and/or manufactured goods applies, the Federal Government will evaluate a project requesting exception to the requirements of section 1605 of the Recovery Act by adding to the estimated total cost of the project 25 percent of the project cost, if foreign iron, steel, or manufactured goods are used in the project based on unreasonable cost of comparable manufactured domestic iron, steel, and/or manufactured goods. e) Alternate project proposals M` 1) When a project proposal includes foreign iron, steel, and/or manufactured goods not listed by the Federal Government at 2 CFR 176.140(b)(2), the applicant also may submit an alternate proposal based .M on use of equivalent domestic iron, steel, and/or manufactured goods. .. 0 COMPREHENSIVE NOTICE TO BIDDERS 2) If an alternate proposal is submitted, the applicant shall submit a separate cost comparison table prepared in accordance with 2 CFR 176.140(c) and (d) for the proposal that is based on the use of any foreign iron, steel, and/or manufactured goods for which the Federal Government has not yet determined an exception applies. 3) If the Federal Government determines that a particular exception requested in accordance with 2 CRF 176.140(b) does not apply, the Federal Government will evaluate only those proposals based on use of the equivalent domestic iron, steel, and/or manufactured good, and the applicant shall be required to furnish such domestic items. This contract is contingent upon release of funds from the Texas Water Development Board. Any contract awarded under this Notice to Bidder is expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Notice to Bidder or any resulting contract. The contrast is subject to regulations contained in 31 TAC, Chapter 363, if effect on the date this contract is executed. Equal Opportunity in Employment— All qualified Applicants will receive consideration for employment without regard to race, color, age, handicap or national origin. Bidders will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order No. 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. Disadvantaged Business Enterprise (DBE) — This contract is subject to EPA established DBE "fair share" goals. TWDB document "TWDB Disadvantaged Business Enterprise Program Guidance" is included in the bidding documents. This contract is subject to EPA established Disadvantaged Business Enterprise (DBE) CONSTRUCTION 34.8% 6.7% SUPPLIES 9.7% 5.2% EQUIPMENT 7.2% 4.1% SERVICES 16.1% 21.3% SUBMISSION OF BID AND AWARD OF CONTRACT The proposal within this document is designed as a package. In order to be considered an acceptable bid, the Contractor is required to submit a bid for the complete proposal. A bid proposal submittal that is received with the proposal incomplete will be rejected as being non -responsive. The Contractor, who submits the bid with the lowest price, will be the apparent successful bidder for the project. Bidders are hereby informed that the Director of the Water Department reserves the right to evaluate and recommend to the City of Fort Worth City Council the bid that is considered to be in the best interest of the City of Fort Worth. For additional information, please contact Daniel W. Applegate P.E., Project Manager, Alan Plummer Associates, Inc. at 817-870-2544 or by email: dpplegate@apaienv.com or David Townsend, P.E., Project Manager, City of Fort Worth — Water Department at Telephone Number: 817-392-8296 or by email: david.townsend@fortworthgov.org. DALE A. FISSELER, P.E. CITY MANAGER Advertising Dates: September 24, 2009 October 1, 2009 MARTY-I-ENDRIX CITY SECRETARY SPECIAL INSTRUCTIONS TO BIDDERS 1) PREOUALIFICATION REOUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification .�r process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. VW a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. �* b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. .. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non -responsive and will be rejected as such. .. e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) �+ are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded To be an .o acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have wo obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required M„ under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 3. BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred (1001%) percent of the contract price will be required, Reference C 3-3.7. 09/10/04 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the Citv :The (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. (d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of .� business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is $25,000.00 or less, the contract amount shall be paid within forty- five (45) calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions 09/ 10/04 2 or privileges of their employment, discriminate against persons because of their age except on the bases of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City IM0 harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the �-+ availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will .. defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against. City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM (`with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non -responsive. .. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances �+ relating to false statements. Further, any such misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. 12. FINAL PAYMENT, ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment (less retainage) from the city for each pay period. 09/ 10/04 3 b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. C. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. £ In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i) final quantities, or (ii) liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. 09/10/04 4 um .. mm .. vim mm PART B Proposal *-4 mw mw PROPOSAL TO: MR. DALE A. FISSLER, P.E. 1.0 City Manager Fort Worth, Texas Fort Worth, Texas FOR: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 WATER PROJECT NO. P275-705140021388 City Project No.: 00213 Pursuant to the foregoing "Notice to Bidders," the undersigned has examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. If required by this project, Contractor must be pre -qualified in accordance with the projects sponsoring Departments of the City of Fort Worth requirements. Upon acceptance of this Proposal by the City Council and required by this project, the bidder is bound to execute a contract and furnish Performance, Maintenance Bond for the water replacement contract only, and Payment Bond approved by the City of Fort Worth for performing and completing said work within .� the time stated for the following sums, to wit: . Total quantities given in the bid proposal may not reflect actual quantities, by represent the best accuracy based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. I ATTACHMENT,1 AD2 Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 301 1 LS implementation of the Storm Water Pollution Prevention Plan Including all material and labor, for a total lump sum amount of Pe,3 --1:13pLca,-d Dollars and N U Cents. $ 1 g.6100•1) D $y<10 D. 302A 10100 LF 24-Inch diameter C-151 Ductile Iron Pipe ' furnished and installed complete In place as shown on the Plans and described in the Specifications Including trenching, embedment, and backiiii,,for the sum of. Dollars and Cents per Linear Foot. $ $ "tiv 302E 10100 LF 24-inch diameter C-200 Steel Pipe with Cathodic Protection System furnished and Installed complete In place as shown on the Plans and described in the Specifications including trenching, embedment, and backfiiil. for the sum of. Dollarsand Cents per Linear t Foot. $ $ 302C 10100 LF 24-Inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic w Protection System furnished and Installed complete in place as shown on the Plans and described In the Specifications including trenching, embedment, and backfiii, for the sum of ,(e ✓r-,-ry A4 A-t--- Dollars and .-GO Cents per Linear Foot. �� — $ $Pr 302D 10100 LF 24-inch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe furnished and Installed complete in place as shown on the Plans and described in the Specifications including trenching, Ow embedment, and backfili, for the sum of. Dollars and Cents per Linear Foot. w $ w ATTACHMENT 1-AD2 w Item No. PART 3 303A a 303E 03C 04A 304B E Approx. Description of Items with Unit Quantity Bid Prices Written In Words Price 5900 LF 20-inch diameter C-151 Ductile Iron Pipe furnished and Installed complete In place as shown on the Plans and described in the Specifications including trenching, embedment and backfill, for the sum of _ Dollars and Cents per Linear Foot. $ 5900 LF 20-Inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System furnished and Installed complete in place as shown on the Plans and described In the Specifications including trenching, embedment and backfiil, for the sum of Dollars and Cents per Linear Foot. $ 5900 LF 20-Inch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe furnished and Installed complete in place as shown on the Plans and described In the Specifications Including trenching, embedment, and backfill for the sum of. S✓xtY 4 ✓.t.6 Dollars and do Cents per Linear C� Foot. $ �•' 150 LF 6-Inch diameter C-900 Class 200 DR 14 Polyvinyl Chloride Pipe furnished and Installed complete In place as shown on the Plans and described In the Specifications including trenching, embedment a�dbac_I�fN1, for the sum of 9 7- Dollars and A4 Cents per Linear °— Foot. $ 10 150 LF 6-inch diameter C-906 Class 200 DR 9 DIPS High Density Polyethylene (HDPE) Pipe (including trenching, embedment, concrete encased thrust restraint, & backfill) furnished and installed complete and in place, for the sum of Dollars and Cents per Linear Foot. $ Extended Amount Bid $ 4/0 a10 $ 4,061,0 o� $ 4000 $ 0/-0 .. .. No Y Iwo ATTACHMENT 1-AD2 No .. No .. a" Item Approx. No. Quantity PART 3 305 2000 LF 306 260 LF 307A 260 LF 307B 260 LF 307C 260 LF Description of Items with Unit Bid Prices Written In Words Price 30-Inch diameter Casing Pipe by Horizontal Directional Drill furnished and installed complete in place as shown on the Plans and described in the Specifications including trenching, embedment, and backfill for the sum of. 7h,cee u isi 4,I Dollars and pLp Cents per Linear Foot. $ 3 �• 0 0 36-Inch diameter Casing Pipe by Other than Open Cut, furnished and installed complete In place as shown on the Plans and described In the Specifications including trenching, embedment, and backfill, for the sum of 'fh rac , 4u*Aad v,s-t.4 Dollars and ti O Cents per Linear Foot. $(p0 • DID 24-inch diameter C-151 Ductile Iron Pipe Inside 36-inch diameter steel casing furnished and Installed, complete in place as shown on the Plans and described In the Specifications, for the sum of Dollars and Cents per linear Foot. $ 24-Inch diameter C-200 Steel Pipe with Cathodic Protection System Inside 36- inch diameter steel casing furnished and Installed, complete In place as shown on the Plans and described In the Specifications, for the sum of Dollars and Cents per Linear Foot. $ 24-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe Inside 36-Inch diameter steel casing furnished and installed, complete in place as shown on the Plans and described In the S ecificatio s, for the sum of Extended Amount Bid $ -7 DDD• o0 $ 9 3 10co• oa 3 .4/1),6 ld $ /lio 6/,0 Dollars and 1J0 Cents per Linear v D Foot. $ 0.60 $ a- 3`,' ATTACHMENT 1-AD2 • r r Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 307D 260 LF 24-Inch diameter C-905 DR-18 Polyvinyl Chloride Pipe inside .36-Inch diameter ' steel casing furnished and installed, complete in place as shown on the Plans .. and described In the Specifications, for the sum of Dollars and Cents per Linear Foot. $ 308A 2000 LF 20-Inch diameter C-151 Ductile Iron Pipe ■' Inside 30-inch steel casing furnished and installed complete in place as shown on the Plans and described In the Specifications, for the sum of Q Q Q- Tel 14U.fJdf43 Dollars and 14D Cents per Linear Foot. 1 �•$�02 D1DO�. OD r 308B 2000 LF 20-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe with Cathodic Protection System Inside 30-Inch steel casing furnished and Installed complete in place as shown on the Plans and described In the Specifications, for the sum of Irr` Dollars and Cents per Linear Foot. $ 308C 2000 LF 20-Inch diameter C-905 Class 200 DR-18 Polyvinyl Chloride Pipe Inside 30-Inch steel casing furnished and installed ..+ complete In place as shown on the Plans and described In the Specifications, for the sum of w Dollars and Cents per Linear Foot. $ 309 16000 LF Design and Implement Trench Safety System complete In place, for the sum of FOhTtFN p Dollars and Ad? Cents per Linear °,' Foot. $ $ ATTACHMENT 1-AD2 r w Item Approx. No. Quantity PART 3 310 4 EA 311 6 EA 312 3 EA 313. 14 EA 314 3 EA 315 1 EA 316A 9 TON N" Description of Items with Bid Prices Written In Words Unit Extended Price Amount Bid 24-Inch Resilient Seated Gate Valve and Vault complete in place as shown on the Plans and described in the Specifications, for the sum of -riA e n jJ Two —fil-v)U 'Cu nd Dollars and �_ Cents per Each. $ •�D $ Oj 20-inch Resilient Seated Gate Valve and Vault complete in place as shown on the Plans and described in the Spedl ficatlons, for the sum of - SP & er iJ -MOUSa r ti, Dollars and tJ D _ Cents per Each. $I-IOZ_DD $_ Lv� •[)DUD v 8-Inch Resilient Seated Gate Valve and Vault complete In place as shown on the Plans and described In the Specifications, for the sum of 0 M a `' xj -11�a rid Dollars and rJfl Cents per Each. $ ��UDD•uD $_LY�aoa 2-inch Automatic Combination Air and Vacuum Release Valve and Vault complete in place as shown on the Plans and Specificgations, for the sum of `Thn yi� X � Dollars and n1� Cents Der Each. $ t�.00 �0 $ $J{ ©DO• O For furnishing and installing blowoff assemblies Including valves, pipe, fittings, concrete, excavation, and backfill, complete in place as shown on the Plans and Specifications, for the sum of r;U'1ve 1jU,'3a-1&d. v o D Dollars and Nj) Cents per Each. $ DD• $iSOD. 10-Inch Meter Station (DJFW) for DJFW Airport, furnish and Install as shown on the Plans and described in the Specifications complete. in place, for the sum of'D „o _ 9 U1-4 d 1Url rkn" c4 Y1 CA, OD pi) Dollars and NI Cents per Each. $F�PDDD- $ F �D 17- 24-inch diameter Ductile iron Pipe fittings and specials furnished and installed complete in place including restraint joint design, for the sum of Dollars and Cents per Ton. $ $ 4-0410 ATTACHMENT 1-AD2 Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 316E 1 LS 24-Inch diameter Steel Pipe fittings and specials furnished and Installed complete In place Including restraint joint design, for the sum of Dollars and Cents per Lump, /0 610 Sum. $ S 3160 1 LS 24-Inch dipmeter Concrete Pressure Pipe fittings and specials furnished and Installed complete in place Including restraint joint design, for the sum of Dollars and A a Cents per Lump o` f0 �� G p d 00 Sum. $ r $ J 317A 7 TON 20-Inch diameter Ductile Iron Pipe fittings and specials furnished and Installed complete in place Including restraint joint design, for the sum of o� ,SIX Tif<�5�1 F Gle fh�ekD Dollars Cents Ton. — $ and ,u per $—J�W 317E 1 LS 20-inch diameter Concrete Pressure Pipe fittings and specials furnished and Installed complete in place including restraint joint design, for the sum of Dollars and Cents per Lump Sum. 3 $ 318 7,000 SY Furnish and install Temporary Pavement Repair as directed by OWNER, complete and in place for the sum of Dollars and -.&)fl Cents per Square Yard. // $ log $ • Acm-oO 319 20 SY For Gravel Drive Repair per Figure #238 complete in place as shown on the Plans and described in the Specifications, for the sum of Tej Dollars and U Cents per / O'D D D Square Yard. $ $ .?OD• ATTACHMENT 1-AD2 w Item No. PART 3 320 321 MW 322 323 324 325 Approx. Description of Items with Unit Extended Quantity Bid Prices Written In Words Price Amount Bid 7,000 SY For Permanent Hot Mix Asphaltic Concrete (HMAC), complete in place as shown on the Plans and described in the Specifications for the sum of Dollars and tJ 0 Cents per Square Yard. p $ r,?n ID$ M,DGU•O 9,000 LF For Pavement Wedge Milling, 2-inch to 0-inch depth, 5-foot wide, complete in place as shown on the Plans and described In the Specifications, for the sum of `"Th•rvP . Dollars and rJO Cents per Linear Foot. p D OD $ ��. $ Xz 20 EA For Butt Joint Milling, complete in place as shown on the Plans and described in the Specification's! for the sum of Dollars and N D Cents per Each. $ $—Ce CUD 150 SY For Concrete Pavement Repair per Figure STR-031 complete in place as shown on the Plans and described in the Specifications, for the sum of Dollars O Cents anQ per Square Yard. d D p D $�• $�p�'-lSD• 1 LS For Design and Implementation of a Traffic Control Plan complete in place as shown on the Plans and described in the Spec ications, f r the sum of y-!Za nc3 Dollars anJ17 Cents per Lump $ Sum. $ 250 CY Furnish Additional Rock for Foundation not shown in Plans or Specifications and as directed the OWNER, for the sum of —'T P �1 Dollars and P i t Cents per Cubs pp O O 1 a • Yard. $ $�`JOa' ATTACHMENT 1-AD2 t Item Approx. Description of Items with Unit Extended No. Quantity Bid Prices Written In Words Price Amount Bid PART 3 326 200 CY Furnish Flowable Fill encasement shown In Plans or described in Specifications and as directed by the OWNER, for the sum of S ; 2C4 �1 F I—v -2 ,_ Dollars and 10 Cents per Cubic Yard. D $ 0 O tlz. 327 7,000 LF Hydromulch Seeding furnished and installed as described in the Specification the sum of WD goliars and n1 D Cents per Linear D D Foot. $ . $ H01MW.1�i[6I111211 I17 o� r $ 3 21? 3Sv Notes: (1) Refer to Part E (Specifications), Section 01002 (Measurement and Payment). (2) Contractor shall select only one option on items in letter series (i.e. A, B, C or D) a ATTACHMENT 1-AD2 aw aw No mw aw TYPE Tee Tee Tee ` Reducer 90° Bend 45* Bend 22.5° Bend 11.25 ° Bend Blind Flange Tee Tee 900 Bend 450 Bend 22.5° Bend 11.25° Bend Blind Flange Blind Flange LIST OF Select Fitting Type FITTINGS For Project: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY DISTRIBUTION MAIN PART 3 ADD OR SUBTRACT FOR THE FOLLOWING Select Fitting Type INCLUDING INSTALLATION. COST q 000 2soo 1200V v_ I ..?00 d I 3 006 3o6a �- I 1 �000� 2 5-0 0 z a'o o zsoo °= ,rod 0 ,?00 = SIZE 24"x20" 24'+ x $" 124"x6" 124"x20" 124" 124" I 24" 12414 124" 20"x8" 20"x6" 12011 20" 20" 20" 2011 8" WEIGHT / 000 42r Czs .ro0 7J-0 7.rd 7Sn 7Js-0 `ZS �Zr �zr Z- 0 16? o T)TAL WT /o0 0 car svoo I s vo I yso I C60 d I 2?r0 I 9'00 0 I z so ds 0 a G7,to /z so �;p,ry zs® 1.7ra ZOO to 0 1 .Contractor shall fill in blanks for "Weight", "Total Wt" and "Cost" as a part of the bid. Contractor is responsible for correct quanity total of all fittings and specials. Im ATTACHMENT 1- AD2 . f' low Within ten (10) days after notification by the City of Foil Worth, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and .. bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. If as a requirement of this project, the undersigned bidder certified that they have been furnished at least one set of the General Contract Documents and General or Special Specifications for Projecis, and that they have read and thoroughly understand all the requirements and conditions of those General .,. Documents and the specific Contract Documents and appurtenant plans. The undersigned assured that its employees and applicants for employment and those of any labor organization, subcontractors, *or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction with ten (10) calendar days after issue of the work order and to complete the contract within 270 days after beginning construction as set forth in the written work order to be furnished by the Owner. Um (Circle and complete A or B below, as applicable) A. The principal place of business of our company is in the State of a. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. b. Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Respectfully submitted, By: yr I B '-C r Title: &VA'V,-Q ' Yvit Company: & 0 ► t�n`TSCtLP Address:v. w< log ATTACHMENT 1 AD2 1JLA p-er .. FORT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is $25,000 or more, the MNYBE goal Is applicable. If the total dollar value of the contract is less than $25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (MAINBE) in the procurement of all goods and services to the City on a�contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's M/WBE goal on this project is 15 % of the total bid (Base bid applies to Parks and Community Services). COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or r 2. Good Faith Effort documentation, or; 3. Waiver documentation, or: 4. Joint Venture. ow SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MWBE documentatiog In person to the appropriate employee of the managing department and obtain a dale/time receipt. Such receipt shall be evidence that the City received the_documentation in the lime_allocated. A faxed copy will not be accepted: 1. Subcontractor Utilization Form, if goal is met or exceeded: 2. Good Faith Effort and Subcontractor Utilization Form, if participation is less than stated goat: 3. Good Faith Effort and Subcontractor Utilization Form, if no M/WBE participation: 4. Prime Contractor Waiver Form, if you will perform all subcontracting/supplier work: 5. Joint Venture Form, if utilize a joint venture to met or exceed goal. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening dale. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MIWBE ORDINANCE, WILL RESULT IN THE BiD BEING CONSIDERED I NONRESPONSIVE To SPECIFICATIONS Any questions, please contact the M/WBE Office at (817) 392-6104. ATTACHMENT 2 - AD1 « i NEW ATTACHMENT IA Page t of 4 FORT WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form .,. PRIME COMP+�ANY NAME: Check applicableblockto describe prlme PROOJECf AME: r 0D�CUcite L_-P I M!W/DBE I I NON •MM/DBE Village Creek Reclaimed Water Eastern Delivery ..� 810 LQATE System Distribution plain - Part 3 10 ,/n/y�� City's M/WBE Project Goal: Prime's M/w8E Project Utilization: RdJE uM ER 15 % 4 % P275-705140021388 r - Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional .� and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specifications M/WBEs listed toward meeting the project goal must be located In the nine (9) county marketplace or currently doing business In the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e.; a direct payment from the prime contractor to a subcontractor is considered Is' tier, a payment by a subcontractor to .� its supplier is considered 2ne tier _ ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner -operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner -operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the tease agreement. u4; �o r FRo ATTACHMENT 2 - AD1 Rev. 5130/03 ATTACHMENT IA u.. FOILrWOitrit IV- • Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority. Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N 0 SUBCONTRACTOR/SUPPLIER (check one) T N T n De Detail Company Name I C X ing Work M Subcontracting Supplies Purchased Dollar Amount Address Telephone/Fax e M W T D r 8 8 R O 8 ... E E C T E A R )BERT GRANADOS TRUCKING u I 1 5�12 Kingslink Circle 6FfA ✓ Su � �uS Worth, Texas 76135 (8 7) 237-3520 aw c1)nC�Yt✓4e-- o� - d1' Nl b< 5 B,yGiD COWTOWN REDI-MIX PO Box162327 t Fort Worth, Texas 76161 1 ••• v (817) 759-1919 f (817) 759-1716 11 �I 50 Roadrunner Traffic Supply, Inc. CO►14YV Ta asDriveC Fort Worth, Fort Worth, Texas 76116 ' / ✓ � 11 J / aw phone:817-244-0305 fax: 817-2444819 t�yd ry M ui�h TruBtueServices, LLC Tower Rd. C- 8716 S. Water Fort Worth, Texas 76179 ` phone: 817-917-3238 I ✓. ` 39coo� r SUN COAST RESOURCES INC. Teri Bateman PO Box 972321 ✓ — Dallas, Texas 75397 v (800)677-3835 x655 RD SUPPLY WATERWORKS, L(d. ' 1 19c, -i- 'O Box 840700 ✓ , j_ '/ n "'' Dallas, Texas 75284 '817) 595-0580 ATTACHMENT 2 - AD1 Rev. 5130103 ATTACHMENT 1A FUR r WoR m Page 3 of A Primes are required to identify ALL subcontractors/suppliers, regardless of status; I.e., Minority, Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. _ Certification N SUBCONTRACTORISUPPLIER T (check one) n Company Name I N T Detail Detail Address e M w c X M Subcontracting Work Supplies Purchased Dollar Amount hone/Fax T 0 K Tele ..r p r E E R B C T E A JLB Contracting, LLC PO Box 24131 f Fort Worth, Texas 76124 (817) 261-2991 ATTACHMENT 2 - AD1 Rev. 5130/03 ATTACHMENT 1A f{7Rr_ WoRTFI Page 4 014 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ 0 5N, goo. ° Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ 9 '7 51 9 00. 00 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ I 4 33, r700- Da 1 The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Add/flon. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. hot d Signal C 1 Title &2:%PV- aYY--Afa(A1DrN-NX, LAD Company Name �P. v IgJAug Address -1 11 City/State/ilp s i e r'C'J 1 Printed Slgna�re %YnQCe (If different) '817-15544-L155 to Telephone and/or Fax all Addres Mow 109 Dale ATTACHMENT 2 - A01 Rev. 5/30/03 um .r r es r. .. no W h �l "0 wo .J u r V PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1 (1) C1-1.1 Definition of Terms C1-1 (1) C 1-1.2 Contract Documents Cl-1 (2) C 1-1.3 Notice to Bidders Cl-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C 1-1.6 General Conditions Cl-1 (2) C 1-1.7 Special Conditions Cl-1 (2) C 1-1.8 Specifications Cl-1 (2) C1-1.9 Bonds C1-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans CI-1 (3) C1-1.12 City CI-1 (3) C1-1.13 City Council CI-1 (3) C1-1.14 Mayor CI-1 (3) C1-1.15 City Manager C1-1 (3) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (3) C1-1.18 Director, City Water Department CI-1 (3) C1-1.19 Engineer C1-1 (3) C1-1.20 Contractor C1-1 (3) C1-1.21 Sureties C1-1 (4) C1-1.22 The Work or Project C1-1 (4) C1-1.23 Working Day CI-1 (4) C1-1.24 Calendar Days C1-1 (4) C1-1.25 Legal Holidays C1-1 (4) C 1-1.26 Abbreviations Cl-1 (4) C1-1.27 Change Order C1-1 (5) C1-1.28 Paved Streets and Alleys CI-1 (5) C1-1.29 Unpaved Streets or Alleys C1-1 (6) C1-1.30 City Street C1-1 (6) C1-1.31 Roadway C1-1 (6) C1-1.32 Gravel Street C1-1 (6) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site of Project C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (2) (1) C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3) C2-2.7 Delivery of Proposal C2-2 (3) C2-2.8 Withdrawing Proposals C2-2 (3) C2-2.9 Telegraphic Modifications of Proposals C2-2 (3) C2-2.10 Public Opening of Proposal C2-2 (4) C2-2.11 Irregular Proposals C2-2 (4) C2-2.12 Disqualification of Bidders C2-2 (4) C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 Consideration of Proposals C3-3 (1) C3-3.2 Minority Business Enterprise/Women Business C3-3 (1) Enterprise Compliance C3-3.3 Equal Employment Provisions C3-3 (1) C3-3.4 Withdrawal of Proposals C3-3 (1) C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3.7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (3) C3-3.9 Failure to Execute Contract C3-3 (3) C-3-3.10 Beginning Work C3-3 (4) C3-3.11 Insurance C3-3 (4) C3-3.12 Contractor's Obligations C3-3 (6) C3-3.13 Weekly Payrolls C3-3 (6) C3-3.14 Contractor's Contract Administration C3-3 (6) C3-3.15 Venue C3-3 (7) C44 SCOPE OF WORK C44.1 Intent of Contract Documents C4-4 (1) C44.2 Special Provisions C44 (1) C44.3 Increased or Decreased Quantities C44 (1) C44.4 Alteration of Contract Documents C44 (2) C4-4.5 Extra Work C44 (2) C44.6 Schedule of Operation C44 (3) C44.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5.3 Coordination of Contract Documents C5-5 (1) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (2) C5-5.6 Field Office I C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) (2) .w so M .. M C5-5.8 Authority and Duties of City Inspector C5-5 (3) C5-5.9 Inspection C5-5 (4) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (4) C5-5.11 Substitute Materials or Equipment C5-5 (4) C5-5.12 Samples and Tests of Materials C5-5 (5) C5-5.13 Storage of Materials C5-5 (5) C5-5.14 Existing Structures and Utilities C5-5 (5) C5-5.15 Interruption of Service C5-5 (6) C5-5.16 Mutual Responsibility of Contractors C5-5 (7) C5-5.17 Clean -Up C5-5 (7) C5-5.18 Final Inspection C5-5 (8) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6.2 Permits and Licenses C6-6 (1) C6-6.3 Patented Devices, Materials, and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (1) C6-6.5 Public Safety and Convenience C6-6 (2) C6-6.6 Privileges f Contractor in Streets, Alleys, C6-6 (3) and Right -of -Way C6-6.7 Railway Crossings C6-6 (3) C6-6.8 Barricades, Warnings and Flagmen C6-6 (3) C6-6.9 Use of Explosives, Drop Weight, Etc. C6-6 (4) C6-6.10 Work Within Easements C6-6 (5) C6.6.11, Independent Contractor C6-6 (6) C6-6.12 Contractor's Responsibility for Damage Claims C6-6 (6) C6-6.13 Contractor's Claim for Damages C6-6 (8) ' C6-6.14 Adjustment or Relocation of Public Utilities, Etc. C6-6 (8) C6-6.15 Temporary Sewer and Drain Connections C6-6 (8) C6-6.16 Arrangement and Charges for Water Furnished by the City C6-6 (9) C6-6.17 Use of a Section or Portion of the Work C6-6 (9) C6-6.18 Contractor's Responsibility for the Work C6-6 (9) C6-6.19 No Waiver of Legal Rights C6-6 (9) C6-6.20 Personal Liability of Public Officials C6-6 (10) C6-6.21 State Sales Tax C6-6 (10) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of The Work C7-7 (1) C7-7.4 Limitation of Operations C7-7 (2) C7-7.5 Character of Workmen and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3) C7-7.7 Time of Commencement and Completion C7-7 (3) C7-7.8 Extension of Time Completion C7-7 (3) (3) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (4) C7-7.11 Suspension by Court Order C7-7 (5) C7-7.12 Temporary Suspension C7-7 (5) C7-7.13 Termination of Contract due to National Emergency C7-7 (6) C7-7.14 Suspension or Abandonment of the Work C7-7 (6) and Annulment of the Contract: C7-7.15 Fulfillment of Contract C7-7 (8) C7-7.16 Termination for Convenience of the Owner C7-7 (8) C7-7.17 Safety Methods and Practices C7-7 (11) C8-8 MEASUREMENT AND PAYMENT aim C8-8.1 Measurement Of Quantities C8-8 (1) C8-8.2 Unit Prices C8-8 (1) C8-8.3 Lump Sum C8-8 (1) C8-8.4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) C8-8.6 Withholding Payment C8-8 (3) C8-8.7 Final Acceptance C8-8 (3) C8-8.8 Final Payment C8-8 (3) C8-8.9 Adequacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4) C8-8.11 Subsidiary Work C8-8 (4) C8-8.12 Miscellaneous Placement of Material C8-8 (4) C8-8.13 Record Documents C8-8 (4) M UM (4) ow M 771 SECTION C 1-1 DEFINITIONS PART C - GENERAL CONDITIONS Cl-1 DEFINITIONS us C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are used, the intent and meaning shall be understood and interpreted as follows: MW C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are in all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of the contract. These are contained on the General Contract Documents and the Special Contract Documents. "' a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and Include the following Items no PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White _ PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White E2-Golden Rod .. E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White •� PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract .� Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) same as above PART B -PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F --BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) 140 C1-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents, constitutes a bidder. C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Whenever there may be a conflict between the General Conditions and the Special Conditions, the latter shall take precedence.. C1-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which set forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed an useful project. Whenever reference is made to standard specifications, regulations, requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. ion C1-1.9 BONDS: The bond or bonds are the written guarantee or security furnished by the Contractor for prompt and faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7) bw b. Payment Bond (see paragraph C3-3.7) C. Maintenance Bond (see paragraph C3-3.7) _ d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1 (2) no C 1-1.10 CONTRACT: The Contract is a formal signed agreement between the owner and the Contractor covering the mutual understanding of the two contracting parties about .. the project to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the .. Owner's representative showing in detail the location, dimension and position of the various elements of the project, including such profiles, typical cross -sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as -� the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from the other parts of the Contract Documents, but they are part of the Contract Documents just as though they were bound therein. C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and :chartered under the Texas State Statutes, acting by and through its governing body or its City Manager, each of which is required by charter to perform specific duties. Responsibility for final enforcement of the Contracts involving the City of Fort Worth is .. by Charter vested in the City Manager. The terms City and Owner are synonymous. _ C 1-1.13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. .. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. -• C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. -� C1-1.17 DIRECTOR OF PUBLIC WORKS: The officially appointed official of the City of Fort Worth, Texas, referred to in the charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR. CITY WATER DEPARTMENT: The officially appointed Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized representative, assistant, or agents. _ C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. r C1-1.20 CONTRACTOR: The person, person's, partnership, company, firm, association, or corporation, entering into a contract with the Owner for the execution of work, acting C1-1 (3) directly or through a duly authorized representative. A sub -contractor is a person, firm, corporation, supplying labor and materials or only labor, for the work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds as are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. C1-1.23 WORKING DAY: A -working day is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m., with exceptions as permitted in paragraph C7-7.6 C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. C1-1.25: LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: 1. New Year's day 2. M.L. King, Jr. Birthday 3. Memorial Day 4. Independence Day 5. Labor Day 6. Thanksgiving Day 7. Thanksgiving Friday 8. Christmas Day 9. Such other days in lieu of holidays as the City Council may determine January 1 Third Monday in January Last Monday in May July 4 First Monday in September Fourth Thursday in November Forth Friday in November December 25 When one of the above named holidays or a special holiday is declared by the City Council, falls on a Saturday, the holiday shall be observed on the preceding Friday, or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations. Employees working calendar day operations will consider the calendar as the holiday. C1-1.26 ABBREVIATIONS: Whenever the abbreviations defined herein appear in the Contract Documents, the intent and meaning shall be as follows: d" bw i C1-1 (4) AASHTO - American Association of State Highway Transportation Officials ASCE - American Society of Civil Engineers .. IAW - In Accordance With ASTM - American Society of Testing Materials .. AWWA - American Water Works Association ASA - American Standards Association HI - Hydraulic Institute Asph. - Asphalt Ave. - Avenue Blvd. - Boulevard Cl - Cast Iron CL - Center Line .. GI - Galvanized Iron Lin. - Linear or Lineal lb. - Pound _ ME - Manhole Max. - Maximum MGD - Million Gallons per Day CFS - Cubic Foot per Second Min. - Minimum Mono. - Monolithic % - Percentum R - Radius I.D. - Inside Diameter O.D. - Outside Diameter Elev. - Elevation F - Fahrenheit C - Centigrade In. - Inch Ft. - Foot St. - Street CY - Cubic Yard Yd. - Yard SY - Square yard L.F. - Linear Foot D.I. - Ductile Iron C1-1.27 CHANGE ORDER: A "Change Order" is a written supplemental agreement ., between the Owner and the Contractor covering some added or deducted item or feature which may be- found necessary and which was not specifically -included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the .. proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. so All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: l . Any type of asphaltic concrete with or without separate base material. _ 2. Any type of asphalt surface treatment, not including an oiled surface, with or without separate base material. 3. Brick, with or without separate base material. .. 4. Concrete, with or without separate base material. 5. Any combination of the above. w C1-1 (5) C1-1.29- UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined for "Paved Streets and Alleys." C1-1.30 CITY STREET: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: The roadway is defined as the area between parallel lines two (2') back of the curb lines or four (`4) feet back of the average edge of pavement where no curb exists. . r. C1-1.32 GRAVEL STREET: A gravel street is an unimproved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6) .. MW SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL go SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with Proposal form, which .. will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the -- amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," all of -which must be properly executed and filed with the Director of the City Water Department one week vrior to the hour for ovenins of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and no more than one (1) year old. .. In the case that bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as , that of the project -for which - bids are to be received, and such experience must have been completed not more than five (5) years prior to the date on .. which Bids are to be received. The Director of the Water Department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. w The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the MW project on which he submits a bid. C2-2.2 INTERPRETATION OF OUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as avvroximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2(1) r- a C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: ' Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the Owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to filing of proposal, to read and become familiar with the _ Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during construction of the project. They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima -facie evidence that the bidder has made the investigation, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, on the plans -are for general information only and may not be correct. Neither the Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the _ form shall be correctly filled in and the Bidder shall state the prices, written in ink in both words and numerals, for which he proposes to do work contemplated or furnish the materials required. All such prices shall be written legibly. In case of discrepancy between price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member of the firm, association, or partnership, or by person duly authorized. If a proposal is submitted by a company or corporation, the company or corporation name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power C2-2(2) wo .. of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate bids, erasures, or irregularities of any kind, or contain unbalanced value of any items. Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and the amount indicated in the "Notice to Bidders" -� and the "Proposal." The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his .. representative in the official place of business as set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper _ place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marker with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager, City.Hall, Fort Worth; Texas...-- C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration must be made in writing, addressed to the City Manager, and filed with •• him prior to the time set for opening of proposals. After all proposals not requested for non -consideration are opened and publicly read aloud, the proposals for which non - consideration requests have been properly filed may, at the option of the Owner, be .. returned unopened. C2-2.9 TELEGRAHIC MODIFICATIONS OF PROPOSALS: Any Bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening _ time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2(3) No C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly '! filed and for which no "Non -consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as "Irregular" if they show any omissions, alterations of form, additions, or conditions not called for, _ unauthorized alternate bids, or irregularities of any kind. However, the Owner reserves the right to waive any all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which can not be waived. C2-2.12 DISOUALIFICATION OF BIDDERS: Bidders may be disqualified and their proposals not considered for any of, but not limited to, the following reasons: a) Reasons for believing that collusion exists among bidders. b) Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. c) The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d) The bidder being in arrears on any existing contract or having defaulted on a previous contract. e) The bidder having performed a prior contract in an unsatisfactory manner. f) Lack of competency as revealed by financial statement, experience _ - - - - — -statement,- equipment schedule, and such ,inquiries- as the Owner, -may --see - fit to make. g) Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h) The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions 2. A current experience record showing especially the projects of a nature similar to the one under consideration, which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of the bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(4) .. PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS j SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and .. read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of the unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may • enter into the cost of the completed project will be considered as the amount of the bid. Until the ward of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re -advertise for new proposals, or to proceed with the work in any manner as may be considered for the best interest of the Owner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS _ ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman -owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by the Owner, to allow and audit and/or -an -examination of any- books, -records; or files in the possession of the Contractor that will substantiate the actual work performed by an MWE or WBF. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinances prohibiting discrimination in employment practices. The Contractor shall post the required notice to that effect on the project site, and at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the _ Owner, it cannot be withdrawn by the Bidder within forty-five (45) days after the date on which the proposals were opened. C3-3 (1) C 3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withhold final action on the proposals for a reasonable time, not to exceed forty-five (45) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. The award of the contract, if award is made, will be to the lowest and best responsive bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals ... have been determined for comparison of bids, the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest -- bidders, will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good and sufficient performance bond in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the full -and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work or use of inferior materials. This performance bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND: A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. C. PAYMENT BOND: A good and sufficient payment bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article im C3-3 (2) sm wr ow 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344, Acts 56t' Legislature, Regular Session, 1959, effective April 27, ow 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all .. payments as above stipulated are made. d. OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the Owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately .. provide a new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due .. or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner, the Contract and such bonds as may be required in the Contract Documents. No Contract shall be binding upon the Owner until it has been attested by the City Secretary, approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to �. execute the required bond or bonds or to sign the required contract within ten (10) days after the contract is awarded shall be considered by the owner as an abandonment of his _ proposal, and the owner may annual the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occurring to the owner by reason of said awardee's failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which the Owner will C3-3 (3) so suffer by reason of such failure on the part of the Awardee and shall thereupon immediately by forfeited to the Owner. The filing of a proposal will be considered as acceptance of this provision by the Bidder. C-3-3.10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner. Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed "Work Order" or "Proceed Order", it is agreed that the Surety Company will, within ten (10) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3.11INSURANCE: The Contractor shall not commence work under this contract until he has obtained all insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub -contractor's certificate of insurance for approval. The prime Contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub -contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub -contractors. a. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Worker's Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub -contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under - --the Worker's Compensation Statute, the Contractor shall provide -adequate employer's general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor Shall procure and shall maintain during the life of this contract; Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in the amount not less than $500,000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as a separate policies or by additional endorsement to one of the above -mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability (covers General Contractor's Liability for acts of sub -contractors). C3-3 (4) on no am so 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation fif excavation are performed adiacent to same). 4. Damage to underground utilities for $500,000. Wo 5. Builder's risk (where above-izround structures are involved). 6. Contractual Liability (covers all indemnification requirements of Contract). d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY am DAMAGE: The Contractor shall procure and maintain during the life of this Contract, Comprehensive Automobile Liability Insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on account of one accident, and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance _ required under the above paragraphs shall provide adequate protection for the Contractor and his sub -contractors, respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of -the. following -special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the owner with satisfactory proof of coverage by insurance required iri these Contract Documents in the amounts and by carriers satisfactory to .. the Owner. (Sample attached.) All insurance requirements made upon the Contractor shall apply to the sub -contractors, should the Prime Contractor's insurance not cover the sub -contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's insurance and C3-3 (5) No performance, payment, maintenance and all such other bonds are written, shall be represented by an agent or agents having an office located within the city limits of the City of Fort Worth. Tarrant County, Texas. Each such agent shall be a duly qualified, one upon whom authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, and claims that the City of Fort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, insurance, and/or bonding company.- If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth - Dallas area. The name of the agent, or agents shall be set forth on all such bonds and certificates of insurance. C3-3.12 CONTRACTOR'S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials, labor and services when due. C3-3.13 WEEKLY PAYROLLS: A certified copy of each payroll covering payment of wages to all persons engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven (7) days after the close .of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract. Copies of the wage rates will be furnished the Contractor, by the Owner, however, posting and protection of the wage rates shall be the responsibility of the Contractor. - C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person, persons, partnership, company, firm, association, corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth -Dallas metropolitan area. The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or other wise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditure, all claims against work or any other mater associated such as �* maintaining adequate and appropriate insurance or security coverage for the project. Such local authority for the administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. 'f Should the Contractor's principal base of operations be other than in the Fort Worth - Dallas metropolitan area, notification of the Contractor's assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, all M C3-3 (6) hm appropriately signed and sealed, as applicable, by the Contractor's responsible offices with the understanding that this written assignment of authority to the local representative shall become part of the project Contract as though bound directly into the project documents. The intent of these requirements is that all matters associated with the Contractor's administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to the satisfaction of the Engineer, the Engineer, at his sole discretion, may demand that such w local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of working time will be allowed for periods in which work stoppages are in effect for this reason. N M 1-1 a a/ w r-* a C3-3.15 VENUE: Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. 1 C3-3 (7) PART C - GENERAL CONDITIONS C44 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C44.1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor .. undertakes to construct or furnish, all in full compliance with the requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may .. be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed _ work which is not covered by these Contract Documents, the "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for any such work and famished. to the Bidder in the form of Addenda. _ All such "Special Provisions" shall be considered to be part of the Contract Documents just as though they were originally written therein. C44.3 INCREASED OR DECREASED OUANTITIES: The Owner reserves the right - to- alter the -quantities of the work - to be - performed or to -extend- or shorten the improvements at any time when and as found to be necessary, and the Contractor shall .. perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than twenty-five (25) percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work." No allowance will be made for any changes in anticipated profits not shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. .. Variations in quantities of sanitary sewer pipes in depth categories, shall be interpreted herein as applying to overall quantities of sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4 (1) .. C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change order, the " owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations _ of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided however, that before any extra work is begun a "Change order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates, (3) materials entering permanently into the project, and (4) actual cost of insurance, bonds, and social security as determined by the Owner, plus a fixed fee to be agreed upon but not to - exceed 10 percent of the actual cost of such extra work. The fined fee is not to include any additional profit to the Contractor for rental of equipment owner by him and used for extra work. The fee shall be full and _ complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in (1), (2), (3), and (4) above. The Contractor shall keep accurate cost records on the form and in the method suggested by the Owner and shall give the Owner access to all accounts, bills, vouchers, and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting Parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner. In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work, prior to beginning such work. C4-4 (2) Mod Should a difference arise as to what does or dose not constitute Extra Work, or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall .. proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof as provided under method (Item Q. Claims for extra work will not be paid unless the Contractor shall file his claim with the .. Owner within five (5) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon said Extra Work. .r The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for .o permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for "Extra Work" whether or not initiated by a "Change Order" shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, .. extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or extra work. C44.6 SCHEDULE OF OPERATION: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner's approval thereof, a "Schedule of Operations," showing by a straight line method the date of commencing and finishing each of the major elements of the Contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There shall be presented also a composite graph showing the anticipated progress of _construction -with the time being plotted horizontally -and percentage --of completion - plotted vertically. The progress charts shall be prepared on 8-1/2" x I I" sheets and at .. least five black or blue line prints shall be furnished to the Owner. C44.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: .. Within ten (10) days prior to submission of the first monthly progress payment, the Contractor shall prepare and submit to the owner for approval six copies of the schedule in which the Contractor proposes to carry on activities (including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments _ in contract time approved by the Engineer. Three copies of the updated schedule shall, be delivered at such intervals as directed by the Engineer. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. C4-4 (3) •r Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: - a. Milestone dates and final project completion dates shall be developed to conform to the time constraints, sequencing requirements and completion time. b. The construction progress shall be divided into activities with time durations of approximately fourteen days (14) days and construction values not to exceed $50,000. Fabrication, delivery and submittal activities are exceptions to this guideline. C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. Thirty days shall be used for submittal -review unless otherwise specified. The construction schedule shall as a minimum, be divided into general categories as — indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts, the construction schedule shall indicate the following procurements, construction and preacceptance activities and events in their logical sequence for equipment and materials. 1. Preparation and transmittal of submittals 2. Submittal review periods. C4-4 (4) GM 3. Shop fabrication and delivery. 4. Erection or installation. 5. Transmittal of manufacturer's operation and maintenance instructions. 6. Installed equipment and materials testing. •• 7. Owner's operator instruction (if applicable). 8. Final inspection. 9. Operational testing. If, in the opinion of the Owner, work accomplished falls behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time. If the owner finds the proposed plan not _ acceptable, he may require the Contractor to increase the work force, the construction plant and equipment, the number of work shifts or overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with diligence as will insure its completion within the time specified. C4-4 (5) PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. The Engineer shall decide all questions which arise as to the quality and acceptability of the materials furnished, work performed, rate of progress of the work, overall sequence of the construction, interpretation of the Contract Documents, acceptable fulfillment of the Contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequence or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the contract documents. The Engineer shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In -the -event, of any dispute between -the Engineer and Contractor over, the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the owner and Contractor, a written decision on the matter in controversy. .. C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines, grades, cross -sections, finish, and dimensions shown on the plans or any other requirements other wise described in the Contract Documents. Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections, which, taken together, are intended to _ describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern over general conditions and standard specification, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the C5-5 (1) Contract Documents, and the owner shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In the event of a T conflict in drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of Contract Documents and shall have available on the site of the project at all times, one set of such Contract Documents. The Contractor shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer, his inspector, and other Contractors in every possible way. — The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor's agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas, and shall be subject to call, as is the project superintendent, at any time of the day or night on -any day of the week on which the Engineer determines that circumstances require the `~ presence on the project site of a representative of the Contractor to adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of the property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative, shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition. Such a response shall occur day or night, whether the project is scheduled on a calendar -day or a working -day basis. M Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the M1 C5-5 (2) discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not shoe just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds ..� due the Contractor on the project. C5-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer, if specifically called for. The field office shall be not less than 10 x 14 feet in floor area, substantially constructed, well heated, air conditioned, lighted, and weather proof, so that documents will not be damaged by the elements. C5-5.7 CONTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines, grades, and measurements necessary to the proper prosecution and control of the work contracted under these Contract Documents, and lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings as may be established for Contractor's use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to _ remove them. Whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost of replacing such stakes or marks plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. .. C5-5.8 AUTHORITY AND DUTIES OF CITY INSPECTOR: City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing •• of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being .. furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents, and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the .. work, the City Inspector will have the authority to reject materials or equipment, and/or to suspend work until the question at issue can be referred to and decided by the Engineer. _ The City Inspector will not, however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion or section of the work, nor to issue any instructions contrary tot he requirement s of the C5-5 (3) Contract Documents. The City Inspector will in no case act as superintendent or foreman or perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties. The Contractor shall regard and obey the directions and _ instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents of the Contract Documents, provided, however, should the Contractor object to any orders or instructions or the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in Controversy. C5-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents. If the Engineer so requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should Work so exposed or examined prove to be unacceptable, the uncovering or removing and replacing of all adjacent defective or damaged parts shall be at the Contractor's expense. No work shall be done or materials used without suitable supervision or inspection. C5-5.10 REMOVAL OF EDEFCTIVE AND UNAUTHORIZED WORK: All work, materials, or equipment which has been rejected shall be remedied or removed and replaced in -an -acceptable manner by the Contractor -at this -expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specially provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due tot he Contractor. Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such work. C5-5.11 SUBSTITUTE MATERIALS OR EOUIPMENT: If the Specifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the preconstruction conference, make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the function called for by the general design, be similar and of equal substance to that specified and be suited to the same use and C5-5 (4) wr capable of performing the same function as that specified ; and identifying all variations of the proposed substitute from that specified and indicating available maintenance service. No substitute shall be ordered or installed without written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor's expense. Contractor shall indemnify and hold harmless Owner and Engineer and anyone .directly or indirectly employees by either of .. them from and against the claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. "r C5-5.12 SAMPLES AND TESTS OF MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless other wise specifically provided. The failure of the Owner to make any tests of materials shall in no way relieve the contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise specified, will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not, without specific written permission of the Engineer, use materials represented by the _ samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. r. In case of concrete, the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contractor shall be responsible for replacing any concrete which does not " meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete, using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of new materials. C5-5.13 STORAGE OF MATERIALS: All materials which are to be used in the a+ construction contract shall be stored so as to insure the preservation of quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the ground, and shall be placed under cover we when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the plans relative to the existing utilities are based on the best information _ available. Omission from, the inclusion of utility locations on the Plans is not to be considered as nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, water mains, conduits, sewer lines and service lines for C5-5 (5) TO all utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision of which is not made in these Contract Documents, in which case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractor's responsibility to verify locations of the adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate ,F clearances. The Contractor shall take all necessary precautions in order to protect all existing utilities, structures, and service lines. Verification of existing utilities, structures, and service lines shall include notification of all utility companies at least forty-eight (48) �. hours in advance of construction including exploratory excavation if necessary. All verification of utilities and their adjustment shall be considered subsidiary work. MW C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosecution of work where the ' interruption of service is necessary, the Contractor, at least 24 hours in advance, shall be required to: 1. Notify the Water Department's Distribution Division as to location, time, and schedule of service interruption. 2. Notify each customer personally through responsible personnel as to the time and schedule of the interruption of their service, or 3. In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer's door PM knob. The tag shall be durable in composition, and in large bold letters shall say: on go W C5-5 (6) we .n "NOTICE" Due to Utility Improvement in your neighborhood, your (water) (sewer) service will be interrupted on between the hours of and This inconvenience will be as short as possible. Thank You, Contractor Address Phone wo b. Emergency: In the event that an unforeseen service interruption occurs, notice shall be as above, but immediate. C5-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through act or neglect on the part of the Contractor, or any other Contractor or any sub -contractor shall suffer loss or damage of the work, the Contractor agrees to settle with such other Contractor or sub -contractor by agreement or arbitration. If such other Contractor or sub- contractor shall assert any claim against the owner on account of damage alleged to have been sustained, the owner will notify the Contractor, who shall indemnify and save harmless the owner against any such claim. C5-5.17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on i` the job site during the, prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the satisfaction of the Engineer. Twenty-four (24) hours after written notice is given the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the Engineer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. ON Upon the completion of the project as a whole as covered by these Contract Documents, and before final acceptance and final payment will be made, the Contractor shall clean me and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. He shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean, polished and new appearing condition. No extra compensation will be made to the Contractor for any clean-up required on the project. C5-5 (7) w C5-5.18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final clean-up performed, the Engineer will notify the proper officials of the Owner and request that a Final Inspection be made. Such inspection will be made within 10 days after such notification. After such final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resolution has been passed by the City Council. No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the work. z VU 4M 4M C5-5 (8) .s up No PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY No C6-6.1 LAWS TO BE OBSERVED:The Contractor shall at all times observe and comply with all Federal and State Laws and City ordinances and regulations which in any .,. way affect the conduct of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea or misunderstanding '+ or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers, agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order, whether it be by himself or his employees. C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all permits and ~' licenses, pay all charges, costs and fees, and give all notices necessary and incident to the due and lawful prosecution of the work. C6-6.3 PATENTED DEVICES. MATERIALS. AND PROCESSES: If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract price shall include all royalties or cost arising from patents, trademarks, and copyrights in any way involved in the work. The Contractor and his sureties shall indemnify and save harmless the Owner from any and all -- claims for infringement by reason of the use of any such trade -mark or copyright in .,, connection with the work agreed to be performed under these Contract Documents, and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of such infringement at any time during the prosecution of the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and all suits brought for the infringement of any patent claimed to be infringed upon the design, type of construction or material or equipment specified in the �+ Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. C6-6.4 SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put _ into immediate force and effect by the Contractor. The necessary sanitary conveniences for use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the Contractor and their use shall be strictly enforced by w C6-6(1) we No the Contractor. All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. All sanitary laws and regulations of the State of Texas and the City shall be strictly complied with. C6-6.5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be placed and used, and the work shall at all times be so _ conducted, as to cause no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all times all phases of his work in such a manner as not to impair the safety or *. convenience of the public, including, but not limited to, safe and convenient ingress and egress to the property contiguous tot he work area. The Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation operations, at all driveway crossings. Such provisions may include bridging, placement or crushed stone or gravel or such other means of providing proper ingress and egress for the property served by the driveway as the Engineer may approve as appropriate. Such other means may include the diversion of driveway tragic, with specific approval by the Engineer, If diversion of traffic is approved by the Engineer at any location, the Contractor may make arrangements �• satisfactory to the Engineer for the diversion of traffic, and shall, at his expense, provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. The materials excavated and the construction materials such as pipe used in construction of the work shall be placed so as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes, water valves, gas valves, or manholes in the vicinity. The Owner -reserves the right to remedy any neglect on -the part -of -the Contractor as regards to public convenience and safety which may come to its attention, after twenty-four hours notice in writing to the Contractor, save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the .. cost of such work or materials furnished by the Owner or by the City shall be deducted from the monies due or to become due to the Contractor. The Contractor, after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer, and. Police Department, when any street or alley is ... requested to be closed or obstructed or any fire hydrant is to be made inaccessible, and when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus. The Contractor shall promptly notify the Fire Department Headquarters when all such obstructed streets, alleys, or hydrants are placed back in service. Where the Contractor is required to construct temporary bridges or make other arrangements for crossing over ditches or streams, his responsibility for accidents in connection with such crossings shall include the roadway approaches as well as the structures of such crossings. C6-6(2) to no The Contractor shall at all times conduct his operation and use of construction machinery so as not to damage or destroy trees and scrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in ,. settlement of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. �r C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS. ALLEYS. AND RIGHT-OF-WAY: For the performance of the contract, the Contractor will be permitted to use and occupy such portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the Engineer. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. Excavated and waste materials shall be piled or staked in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed '~ and so as not to inconvenience occupants of adjacent property. If the street is occupied by railroad tracks, the work shall be carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the contract, enter upon the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work. Any additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any- railroad, -the, City will secure the necessary easement for the work. Where -the- - railroad tracks are to be crossed, the Contractor shall observe all the regulations and .� instructions of the railroad company as to the methods of performing the work and take all precautions for the safety of property and the public. Negotiations with the railway companies for the permits shall be done by and through the City. The Contractor shall give the City Notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties. The Contractor will not be given extra compensation for such railway crossings unless '„ specifically set forth in the Contract Documents. C6-6.8 BARRICADES. WARNINGS AND WATCHMEN: Where the work is '" carried on in or adjacent to any street, alley, or public place, the Contractor shall at his own expense furnish, erect, and maintain such barricades, fences, lights, and danger signals, shall provide such watchman, and shall take all such other precautionary measures for the protection of persons or property and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor shall furnish and maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep pedestrians away from, and vehicles from being driven on or into, any work under C6-6(3) No construction or being maintained. The Contractor shall furnish watchmen and keep them "" at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. 61 All installations and procedures shall be consistent with provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d Veron's Civil Statues, pertinent section being Section Nos. 27, 29,30and 31. 4 The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be WE removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division (phone number 871-8075), to remove the sign. In case of regulatory signs, the Contractor must replace the permanent am sign with a temporary sign meeting the requirements of the above referred manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, iud the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be re- installed, the Contractor shall again contact the Signs and Markings Division to re -install 'IF the permanent sign and shall leave his temporary sign in place until such re -installation is completed. %W The Contractor will be held responsible foe all damage to the work or the public due to failure of barricades, signs, fences, lights, or watchmen to protect them. Whenever evidence is -found of such damage to the work -the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor's own expense. The Contractor's responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. No compensation, except as specifically provided in these Contract Documents, will be paid to the Contractor for the Work and materials involved in the constructing, providing, and maintaining of barricades, signs, fences, and lights or salaries of watchmen, for the subsequent removal and disposal of such barricades, signs, or for any other incidentals necessary for the proper protection, safety, and convenience of the public during the contract period, as this work is considered to be subsidiary to the several items for which *- unit or lump sum prices are requested in the Proposal. C6-6.9 USE OF EXPLOSIVES. DROP WEIGHT. ETC.: Should the Contractor elect to use explosives, drop weight, etc., in the prosecution of the work, the utmost care shall be exercised at all times so as not to endanger life or property. The Contractor shall notify the proper representative of any public service corporation, any company, individual, or utility, and the Owner, not less than twenty-four hours in advance of the use of any C6-6(4) �r activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Conditions Documents, or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives. d C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges, as the �+ City may deem necessary for the prosecution of the work. Any additional rights -of -way or work area considered necessary by the Contractor shall be provided by him at his expense. Such additional rights -of -way or work area shall be acquired for the benefit of the City. The City shall be notified in writing as to the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the Engineer. Unless specifically provided otherwise, the Contractor shall clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations. The Contractor shall be responsible for the preservation of and shall use every precaution to prevent damage to, all tress, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to alf-other public or -private property adjacent to the work. The Contractor shall notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the work. Such • notice shall be made at _least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. aw When and where any direct or indirect or injury is done to public or private property on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of non -execution thereof on the part of the Contractor, he shall restore or so have restored as his cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise .. C6-6(5) replacing and restoring as may be directed by the Owner, or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer. All fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross brace posts on either side of the permanent easement before the fence is cut. Should additional fence cuts be necessary, the Contractor shall provide cross -braced posts at the point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits, before the fence is cut. Temporary fencing shall be erected in place of the fencing removed whenever the work is .,. not in progress and when the site is vacated overnight, and/or at all times to prevent livestock from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to the various items bid in the project proposal. Therefore, no separate payment shall be allowed for any service associated with this work In case of failure on the part of the Contractor to restore such property or to make good such damage or injury, the Owner may, upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results, `* proceed to repair, rebuild, or otherwise restore such property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due to or to become due to the Contractor under this contract. C6.6.11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that the -Contractor shall perform all- work and services hereunder as .an . 4 independent contractor, and not as an officer, agent, servant, or employee of the Owner. Contractor shall have exclusive control of and exclusive right to control the details of all work and services performed hereunder, and all persons performing the same, and shall be solely responsible for the acts and omissions of its officers, agents, servants, employees, contractor, subcontractors, licensees and invitees. The doctrine of respondeat ftp superior shall not apply as between Owner and Contractor, its officers, agents, employees, contractors and subcontractors, and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. bw C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner, its officers, agents, servants, and employees from and against any and all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons, of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by the Contractor, its officers, agents, employees, contractors, subcontractors, licensees or invitees, whether or not caused, in whole or in apart, by alleged negligence on the part of officers, agents, employees, contractors, subcontractors, licensees or invitees of the 4M C6-6(6) WA a* Owner; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, its officers, agents, servants, and employees for property damage .. or loss, and/or personal injuries, including death, to any and all person of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by the Contractor, its ., officers, agents, employees, contractors, subcontractors, licensees or invitees, whether or not caused, in whole or in apart, by alleged negligence of officers, agents, employees, contractors, subcontractors, licensees or invitees of the Owner. Contractor likewise ..1 covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries, loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in whole or in apart, any and all alleged acts of omission of officers, agents, employees, contractors, subcontractors, licensees, or invitees of the Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended to the Director of the Water Department for a period of 30 days after the date of such final inspection, unless the ~ Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. If the claims concerned remains unsettled as of the expiration of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in the amount equal to the total dollar amount then due less the dollar value of any written claims- pending against the Contractor arising out of performance of such work, and such semi-final payment may then be recommended by the Director. The Director shall not recommend final payment to a Contractor against whom such a as claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory tot he Director that: 1. The claim has been settled and a release has been obtained from the claimant involved, or s 2. Good faith efforts have been made to settle such outstanding claims, and such good faith efforts have failed. If condition (1) above is met at any time within the six month period, the Director shall s recommend that the final payment to the Contractor be made. If condition (2) above is met at any time within the six month period, the Director may recommend that final payment to the Contractor be made. At the expiration of the six month period, the C6-6(7) Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. C6-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation foe any alleged damage by reason of the acts or omissions of the Owner, he shall within three days after the actual sustaining of such alleged damage, make a written statement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25 h day of the month succeeding that in which ant such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and the amount of such alleged damage and, upon request, shall give the Engineer access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be filed as hereinabove required, the Contractor's claim for compensation shall be waived, and he shall not be entitled to payment on account of such damages. C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC.: In case it is necessary to change, move, or alter in any manner the property of a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been issued by the Engineer. The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making such changes or repairs to the property that -may be necessary by the performance of this Contract " C6-6.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing MW sewer lines have to be taken up or removed, the Contractor shall, at his own expense and cost, provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage which ,W will be received from these drains and sewers, and for this purpose he shall provide and maintain, at his own cost and expense, adequate pumping facilities and temporary outlets or divisions. Er The Contractor, at his own cost and expense, shall construct such troughs, pipes, or other structures necessary, and be prepared at all times to dispose of drainage and sewage +� received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract, except when specified or ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disposed of in a satisfactory manner so that no nuisance is created and so that the work under construction will be adequately protected. wo C6-6(8) AW C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water Department for so doing. ,r City water fiunished to the Contractor shall be delivered to the Contractor from a connection on an existing City main. All piping required beyond the point of delivery shall be installed by the Contractor at his own expense. ,s The Contractor's responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-1.2 USE OF FIRE HYDRANTS AND VALVES in these General w Contract Documents. When meters are -used to measure the water, the charges, if any, for water will be made at the regular established rates. When meters are not used, the charges, if any, will be as prescribed by the City ordinance, or where no ordinances applies, payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. r C 6-6.17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, . in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written notice of the Engineer, and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. All necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or deficient operations on the part of the Contractor, shall be performed by the Contractor at his expense. C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents, the work shall be under the charge and care of the Contractor, and he shall take every necessary precaution to prevent injury or damage to the work or any part thereof by action of the elements or .r from any cause whatsoever, whether arising from the execution or nonexecution of the work. The Contractor shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the hereinabove causes. C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City shall not operate as a waiver of any provision of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. ow The Owner reserves the right to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. ow C6-6(9) am 4W C6-6.20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no liability upon the authorized representative of the Owner, either personally or other wise as they are agents and representatives of the City. C6-6.21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, and organization which qualifies for exemption pursuant the provisions of Article 20.04 (H) of the Texas Limited Sales, Excise, and Use Tax Act, the Contractor may purchase, low rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable State Comptroller's rulings pertaining to the Texas Limited Sales, Excise, and Use Tax Act. On a contract awarded by a developer for the construction of a publicly -owner improvement in a street right-of-way or other easement which has been dedicated to the public and the City of Fort Worth, an organization which qualifies for exemption pursuant the provisions of Article 20.04 (I) of the Texas Limited Sales, Excise, and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. Texas Limited Sales, Excise, and Use Tax Act permits and information can be obtained PW from: -Comptroller of Public Accounts - Sales Tax Division Capitol Station Austin, TX F. ftw im VW ow .. MW C6-6(10) 4W ow PART C - GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS 00 SECTION C7-7 PROSECUTION AND PROGRESS: .. C7-7.1 SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workmen under his immediate superintendance, work of a value of not less than fifty (50%) percent of the value embraced on the contract. If the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed .. under these Contract Documents. All transactions of the Engineer will be with the Contractor. Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject tot he same requirements as to character �+ and competency. ' The Owner will not recognize any subcontractor on the work. The Contractor shall at all times, when the work is in operation, be represented either in person or by a superintendent or other designated representatives. C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer, sublet, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. aw If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right, title, or interest therein or any part thereof, to any person or persons, partnership, company, firm, or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency -laws of any states, attempt to dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sureties shall successfully complete said contract, and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it .r would be impracticable and extremely difficult to fix the actual damages. C7-7.3 PROSECUTION OF THE WORK: Prior to beginning any construction 1+ operations, the Contractor shall submit to the Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a brief outlining in detail and step by step the manner of prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous s manner and with sufficient equipment, materials, and labor as is necessary to insure its completion within the time limit. C7-7(1) s bw The sequence requested of all construction operations shall be at all times as specified in the Special Contract Documents. Any Deviation from such sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with any deviation until he = has received written approval from the Engineer. Such specification or approval by the Engineer shall not relieve the Contractor from full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 EXTENSION OF aw TIME OF COMPLETION of this Agreement, and a progress schedule shall not constitute a change in the contract time. _ C7-7.4 LIMITATION OF OPERATIONS: The working operations shall at all times be conducted by the Contractor so as to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than is necessary for proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. C7-7.5 CHARACTER OF WORKMEN AND EOUIPMENT: Local labor shall be used by the Contractor when it is available. The Contractor may bring from outside the City of Fort Worth his key men and his superintendent. All other workmen, including equipment operators, may be imported only after the local supply is exhausted. The Contractor shall employ only such superintendents, foremen, and workmen who are careful, competent, and fully qualified to perform the duties and tasks assigned to them, and -the Engineer may demand and secure the, summary dismissal of -any person or persons employed by the Contractor in or about or on the work who, in the opinion of the Owner, shall misconduct himself or to be found to be incompetent, disrespectful, intemperate, EW dishonest, or otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglect or refuses to comply with or carry out the direction of the owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill, ability, and experience to properly perform the WW work assigned to them and operate any equipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for the prosecution of the work in an acceptable manner and at a satisfactory rate of progress. All equipment, tools, and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory, safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work. Workmen or adjacent property will result from its use. aw C7-7(2) o. dw No C7-7.6 WORK SCHEDULE: Elapsed working days shall be computed starting •o with the first day of the work completed as defined in C 1-1.23 "WORKING DAYS" or the date stipulated in the "WORK ORDER" for beginning work, whichever comes first. go Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays, providing that the following requirements are met: ,0 a. A request to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later that the preceding Thursday. w b. Any work to be done on the project on such a specific Saturday, Sunday or Legal Holiday must be, in the opinion of the Engineer, essential to the timely completion of the project. The Engineer's decision shall be final in response to such a request for approval to work am on a specific Saturday, Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. Calendar Days shall be defined in C 1-1.24 and the Contractor may work as he so desires. .� C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. so The Contractor shall maintain a rate of progress such as will insure that the whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time .r as may be properly authorized. C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request for an • extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval. In adjusting the contract time for completion of work, consideration will be given to unforeseen causes beyond the control of and without the fault or negligence of the Contractor, fire, flood, tornadoes, epidemics, quarantine restrictions, strikes, embargoes, or delays of sub -contractors due to such causes. s am C7-7(3) on When the date of completion is based on a calendar day bid, a request for extension of 400 time because of inclement weather will not be considered. A request for extension of time due to inability to obtain supplies and materials will be considered only when a review of the Contractor's purchase order dates and other pertinent data as requested by the Wn Engineer indicates that the Contractor has made a bonafide attempt to secure delivery on schedule. This shall include efforts to obtain the supplies and materials from alternate amp sources in case the first source cannot make delivery. If satisfactory execution and completion of the contract should require work and materials in greater amounts or quantities than those set forth in the approved Contract Documents, then the contract time mat be increased by Change Order. so C7-7.9 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to Wo be furnished by the City. When such extra compensation is claimed, a written statement thereof shall be presented by the Contractor to the Engineer and if by the Engineer found correct, shall be approved and referred by the Engineer to the City Council for final Wa approval or disapproval; and the action thereon by the City Council shall be final and binding. If delay is caused by specific orders given by the Engineer to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for shall, however, be subject to the approval of the City Council: and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. C7-7.14 TIME OF COMPLETION: The time of completion is an essential element of the Contract. Each bidder shall indicate in the appropriate place on the last page of the proposal, the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the proposal section of the Contract Documents. The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon. The amount of time so stated ... by the successful bidder or the City will become the time of completion specified in the Contract Documents. .w For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, or increased time granted by the Owner, or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given in the following schedule, unless otherwise specified in other parts of the Contract Documents, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the Owner. aw C7-7(4) M .w AMOUNT OF CONTRACT AMOUNT OF LIQUIDATED .� DAMAGES PER DAY Less than $ 5,000 inclusive $ 35.00 $ 5,001 to $ 15,000 inclusive $ 45.00 $ 15,001 to $ 25,000 inclusive $ 63.00 ,r $ 25,001 to $ 50,000 inclusive $ 105.00 $ 50,001 to $ 100,000 inclusive $ 154.00 $ 100,001 to $ 500,000 inclusive $ 210.00 $ 500,001 to $ 1,000,000 inclusive $ 315.00 $ 1,000,001 to $ 2,000,000 inclusive $ 420.00 $ 2,000,000 and over . $ 630.00 .e The parties hereto understand and agree that any harm to the City caused by the Contractor's delay in completing the work hereunder in the time specified by the Contract Documents would be incapable or very difficult to calculate due to lack of accurate information, and that the "Amount of Liquidated Damages Per Day", as set out above, is .r a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7.11 SUSPENSION BY COURT ORDER: The Contractor shall suspend aw operations on such part or parts of the work ordered by any court, and will not be entitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the vent the work is suspended by a Court Order. Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unsuitable conditions which •• in the opinion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of the work covered by this contract, for any reason, the Owner will make no extra payment for stand-by time of construction equipment and/or construction crews. If it should become necessary to suspend work for an indefinite period, the Contractor ow shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage �` about the work, and erect temporary structures where necessary. .. Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in Paragraph C7-7.8 EXTENSION OF THETIME OF COMPLETION, and should it be No C7-7(5) up determined by mutual consent of the Contractor and the Engineer that a solution to allow `' construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. No reimbursement shall be allowed if the equipment is moved to another construction project for the City of Fort Worth. ko The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: •- Whenever, because of National Emergency, so declared by the president of the United States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months, the Contractor shall within seven days notify the City in writing, giving a detailed statement of the efforts which have been made and listing all necessary items of labor, materials, and equipment not obtainable. If, after " investigations, the owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contractor, than if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials, and equipment within thirty days, the Contractor my request the owner to terminate the contract and the owner may comply with -the request, and the termination shall be conditioned and based upon,a - final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include. But not be limited to the payment for all work executed but not anticipated profits on work which has not been performed. EW C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF THE CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared canceled by the City Council for any good and sufficient cause. The following, by way of example, but not of limitation, may be considered grounds for suspension or cancellation: *� a. Failure of the Contractor to commence work operations within the time specified in the Work Order issued by the Owner. b. Substantial evidence that progress of the work operations by the Contractor is insufficient to complete the work within the specified time. C7-7(6) .0 so C. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. „o e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. .r f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. .. g. Failure of the Contractor promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has .W been directed in writing by the Engineer or the Owner. h. Substantial evidence of collusion for the purpose of illegally procuring a No contract or perpetrating fraud on the City in the construction of work under contract. ow i. A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of ow any creditor or for any other purpose. j. If the Contractor shall for any cause whatsoever not carry on the working operation in an acceptable manner. k. If the Contractor commences legal action against the Owner. A Copy of the suspension order or action of the City Council shall be served on the Contractor's Sureties. When work is suspended for any cause or causes, or when the ..� contract is canceled, the Contractor shall discontinue the work or such part thereof as the owner shall designate, whereupon the Sureties may, at their option, assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and +� may perform the same or may, with written consent of the owner, sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authorized agents. The Sureties, in such event shall assume the Contractor's place in all respects, and shall be paid by the Owner for all work performed by them in accordance with the terms of the .r Contract Documents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses, subject to all of the terms of the Contract Documents. w C7-7(7) MW In case the Sureties do not, within the hereinabove specified time, exercise their right and option to assume the contract responsibilities, or that portion thereof which the Owner has ordered the Contractor to discontinue, then the Owner shall have the power to complete, by contract or otherwise, as it may determine, the work herein described or Now such work thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and use any materials, plants, tools, equipment, supplies, and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, and all expenses incidental thereto. The expense so charged shall be deducted by the owner from such monies as may be due or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any part thereof. The Owner shall not be required to obtain the lowest bid for the work completing the contract, but the expense to be deducted shall be the actual cost of the owner of such work In case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed by the Contract, then the Contractor and his Sureties shall pay the amount of such excess to the City on notice from the Owner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise under the provisions of this section, the Contractor shall continue '* the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with the performance of the work by the Owner. C7-7.15 FULFILLMENT OF CONTRACT: The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by-law, when all the work and -all sections or parts of the project covered by the Contract Documents have been finished and completed, the final inspection made by the Engineer, and the final acceptance and no final payment made by the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. A. NOTICE OF TERMINATION: Any Termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any M C7-7(8) WN .. claim, demand or suit shall be required of the Owner regarding such discretionary action ■w B. CONTRACTOR ACTION: After receipt of a notice of termination, and except as otherwise directed by the Engineer, the Contractor shall: 1W 1. Stop work under the contract on the date and to the extent specified in the notice of termination; .M 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for .o completion of such portion of the work under the contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by notice of termination; .. 4. transfer title to the Owner and deliver in the manner, at the times, and to the extent, if any, directed by the Engineer: VW a. the fabricated or unfabricated parts, work in progress, completed work, supplies and other .� material produced as a part of, or acquired in connection with the performance of, the work .� terminated by the notice of the termination; and b. The completed, or partially completed plans, wo drawings, information and other property which, if the contract had been completed, would have been required to be furnished to the Owner. 5. complete performance of such work as shall not have been terminated by the notice of termination; and 6. Take such action as may be necessary, or as the Engineer may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. .r At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the Engineer a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of C7-7(9) .. EW which has been directed or authorized by Engineer, Not later than 15 days thereafter, the owner shall accept title to such items provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. woo C. TERMINATION CLAIM: Within 60 days after the notice of termination, the Contractor shall submit his termination claim to the , Engineer in the form and with the certification prescribed by the Engineer. Unless one or more extensions in writing are granted by the Owner upon request of the Contractor, made in writing within such 60-day period or authorized extension thereof, any and all such claims shall be conclusively deemed waived. D. AMOUNTS: Subject to the provisions of Item C7-7.1(C), the Contractor and the Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of the work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract price reduced by the amount of payments otherwise made and as further reduced by the contract price work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due for lost or anticipated profits> Nothing in C7-7.16(E) hereafter, prescribing the amount to be paid to the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to agree as provided in C7-7.16(D) upon the whole amount to be paid to the Contractor by reason of the termination of the work VW pursuant to this section, the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. F. DEDUCTIONS: In arriving at the amount due the Contractor under this section there shall be deducted; 1. all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; amp M C7-7(10) "0 VW 2. any claim which the Owner may have against the Contractor in connection with this contract; and 3. the agreed price for, or the proceeds of the sale of, any materials, supplies or other things kept by the Contractor or y sold, pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. G. ADJUSTMENT: If the termination hereunder be partial, prior to the settlement of the terminated portion of this contract, the Contractor may file with the Engineer a request in writing for an equitable adjustment of .. the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by notice of termination), such equitable adjustment as may be agreed upon shall be •�r made in such price or prices; noting contained herein, however, shall limit the right of the owner and the Contractor to agree upon the amount or amounts to be paid tot he Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. MW H. NO LIMITATION OF RIGHTS: Noting contained in this section shall limit or alter the rights which the Owner may have for termination of this contract under C7-7.14 hereof entitled "SUSPENSION OR .. ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT" or any other right which the Owner may have for default or No breach of contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be wo responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage .� in connection with the work. ow aw s VW C7-7(11) so "W rr PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT C8-8.1 MEASUREMENT OF OUANTTTIES: The determination of quantities of work performed by the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer, based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers, and weights of the materials and item installed. .. C8-8.2 UNIT PRICES: When in the Proposal a "Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finishing costs, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other clauses, delays, -� profits, injuries, damages claims, taxes, and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation. C8-8.3 LUMP SUM: When in the Proposal a "Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to furnish all labor, tools, materials, machinery, equipment, appurtenances, and all subsidiary work necessary for the construction and completion of all the work to provide a complete and functional item .. as detailed in the Special Contract Documents and/or Plans. C8-8.4 SCOPE OF PAYMENT: The Contractor shall receive and accept the w compensation as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the `* action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, C8-8(1) .r and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the one year guaranty period after the final acceptance. JON The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the lst and the 5`h day of each month, the Contractor shall submit to the Engineer a statement showing an estimate of the value of the work done during the previous month, or estimate period �* under the Contract Documents. Not later than the 10`h day of the month, the Engineer shall verify such estimate, and if it is found to be acceptable and the value of the work performed since the last partial payment was made exceeds one hundred dollars ($100.00) inn amount, 90% of such estimated sum will be paid to the Contractor if the total contract amount is less than $400,000.00, or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400,000.00 or greater, within twenty-five (25) days after the regular estimate period. The City will have the option of preparing estimates on forms furnished by the City. The partial estimates may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work as a permanent part thereof, but which at the time of the estimate have not been installed (such payment will be allowed on a basis of 85% of the net invoice value thereof). The Contractor shall furnish the Engineer such information as he may request to aid him as a guide in the verification or the preparation of partial estimates. It is understood that partial estimates from month to month will be approximate only, all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate, and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quantity of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City, reserves the right to withhold the payment of any monthly estimate if the Contractor fails to perform the work strictly in accordance with the specifications or provisions of this Contract. Mo W C8-8(2) MW .w C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. C8-8.7 FINAL ACCEPTANCE: Whenever the improvements provided for by the Contract Documents shall have been completed and all requirements of the Contract Documents shall have been fulfilled on the part of the Contractor, the Contractor shall notify the Engineer in writing that the improvements are ready for final inspection. The ,. Engineer shall notify the appropriate officials of the Owner, will within a reasonable time make such final inspection, and if the work is satisfactory, in an acceptable condition, and has been completed in accordance with the terms of the Contract Documents and all No approved modifications thereof, the Engineer will initiate the processing of the final estimate and recommend final acceptance of the project and final payment thereof as outlines in paragraph C8-8.8 below. w C8-8.8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. JY The amount of the final estimate, less previous payments and any sums that have, been up deducted or retained under the provisions of the Contract Documents, will be paid to the Contractor within 60 days after the final acceptance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the owner satisfactory MW evidence of compliance as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit as furnished by the City, certifying that; aw A. all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in fiill, aw B. that the wage scale established by the City Council in the City of Fort Worth has been paid, and C. that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of said City relating to or connected with the Contract. MW C8-8(3) so MW The making of the final payment by the Owner shall not relieve the Contractor of any "" guarantees or other requirements of the Contract Documents which specifically continue thereafter. rw C8-8.9 ADEOUACY OF DESIGN: It is understood that the Owner believes it has employed competent engineers and designers to prepare the Contract Documents and all modifications of the approved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its own design features, sufficiency of the Contract Documents, the safety of the structure, and the practicability of the operations of w. the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereof approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has complied with the Contract Documents, approved modifications thereof, and all alterations thereof. C8-8.10 GENERAL GUARANTY: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of the work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to the other work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. do C8-8.11 SUBSIDIARY WORK: Any and all work specifically governed by documentary requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific "w item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each MW bid item. Surface restoration, rock excavation and cleanup are general items of work which fall in the category of subsidiary work. MW C8-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by top the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one - tenth unit. Payment for miscellaneous placement of material shall be in accordance with .W the General Contract Documents regardless of the actual amount used for the Project. C8-8.13 RECORD DOCUMENTS: The Contractor shall keep on record a copy of all specifications, plans, addenda, modifications, shop drawings and samples at the C8-8(4) ,/ no site, in good order and annotated to show all changes made during the construction process. These shall be delivered to the Engineer upon completion of the work. 04 No ti 1/ Mt CJ No so ON "0 so fs MW CO'O(S) •/ Texas Water Development Board Supplemental Contract Conditions w. w VON wo Texas Water Development Board SUPPLEMENTAL CONTRACT CONDITIONS For Projects Funded through the Clean Water State Revolving Loan Program (ARRA) and Drinking Water State Revolving Loan Program (ARRA) s 'o SUPPLEMENTAL CONTRACT CONDITIONS on CWSRF and DWSRF ARRA Table of Contents Construction Contract Supplemental Conditions Conditions: 1. Supersession 2. Privity of Contract 3. Definitions Ong 4. Laws to be Observed 5. Review by Owner. and TWDB 6. Award of Contract to Nonresident Bidder .. 7. Bid Guarantee 8. Performance and Pavment Bonds 9. Progress Payments and Pavment Schedule .. 10. Workman's Comp_ ensation Insurance Coverage 11. Changes 12. Eaual Employment Opp_ ortunity and Affirmative Action (41 CFR 604.4, 1.7, 1.8, 4.2, and •• 4.3) 13. Debarment and Suspension (40 CFR 32, Appendix B) 14. Disadvantaged Business Enterprise (DBE) Reauirements 15. Archeological Discoveries and Cultural Resources 16. Endangered Species 17. Hazardous Materials 18. Proiect Sign 19. Operation and Maintenance Manuals and Training 20. As -built Dimensions and Drawings �. 21. American Recovery and Reinvestment Act (ARRA) Forms to be completed for submittal to TWDB if selected as the low bidder: ARRA Davis -Bacon Certification • ARRA Buy -American Certification • ARRA Reporting Certification ow • DBE Forms ■ DBE Affirmative Steps Certification and Goals (WRD-217) ■ Prime Contractor Affirmative Steps Solicitation Report (WRD-216) ■ Loan/Grant Participation Summary (WRD-373) ■ 6100-2, 6100-3, 6100-4 (As Applicable) • Contractor's act of Assurance (ED-103) Contractor's Resolution on Authorized Representative (ED-104) • Bidder's Certifications regarding Equal Employment Opportunity and Non -Segregated Facilities (WRD-255) Vendor Compliance with Non -Resident Bidder Requirements (WRD-259) • Debarment and Suspension (SRF-404) • Breakdown Lump Sum Bid (ED-102), If Applicable .. we Construction Contract Supplemental Conditions Conditions: .. 1. SUPERSESSION The Owner and the contractor agree that the TWDB Supplemental Conditions apply to that work eligible for Texas Water Development Board assistance to be performed under this contract and .a these clauses supersede any conflicting provisions of this contract. In particular ARRA conditions supersede 2. PRIVITY OF CONTRACT Funding for this project is expected to be provided in part by the Texas Water Development Board. Neither the State of Texas, nor any of its departments, agencies or employees is, or will -� be, a party to this contract or any lower tier contract. This contract is subject to applicable provisions 31 TAC Chapter 375 and 371 as applicable and as in effect on the date of the assistance award for this project. MW Contingent Award of Contract This contract is contingent upon release of funds from the Water Development Board. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by a loan or grant from the Texas Water Development Board, and a grant from the United States Environmental Protection Agency (U.S. EPA:) Neither the State of Texas, or U.S. EPA nor any of its departments, agencies, or employees are or will be a party to this Invitation for Bids or any resulting contract. 3. DEFINITIONS (a) The term Owner means the local entity contracting for the construction services. (b) The term "TWDB" means the Executive Administrator of the Texas Water Development Board, or other person who may be at the time acting in the capacity or authorized to perform the functions of such Administrator, or the authorized representative thereof. 4. LAWS TO BE OBSERVED In the execution of the Contract, the Contractor must comply with all applicable Local, State and Federal laws, including but not limited to laws concerned with labor, safety, minimum wages, and the environment. The Contractor shall make himself familiar with and at all times shall observe and comply with all Federal, State, and Local laws, ordinances and regulations which in any manner affect the conduct of the work, and shall indemnify and save harmless the Owner, Texas Water Development Board, and their representatives against any claim arising from violation of any such law, ordinance or regulation by himself or by his subcontractor or his employees. 5. REVIEW BY OWNER, and TWDB (a) The Owner, authorized representatives and agents of the Owner, and TWDB shall, at all times have access to and be permitted to observe and review all work, materials, equipment, — payrolls, personnel records, employment conditions, material invoices, and other relevant data and records pertaining to this Contract, provided, however that all instructions and approval 10 ■r .. with respect to the work will be given to the Contractor only by the Owner through authorized representatives or agents. BW (b) Any such inspection or review by the TWDB shall not subject the State of Texas to any action for damages. 6. AWARD OF CONTRACT TO NONRESIDENT BIDDER A governmental entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lowest bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. A non-resident bidder is a contractor whose corporate offices or .. principal place of business is outside of the state of Texas. (Source: Texas Government Code Chapter 2252 Subchapter A Nonresident Bidders, Q 2252.002.) The bidder will complete form WRD-259 which must be submitted with the bid. .• 7. BID GUARANTEE Each bidder shall furnish a bid guarantee equivalent to five percent of the bid price. (Water Code .. 17.183). If a bid bond is provided, the contractor shall utilize a surety company which is authorized to do business in Texas in accordance with Art. 7.19-1. Bond of Surety Company; Chapter 7 of the Insurance Code. am 8. PERFORMANCE AND PAYMENT BONDS Each contractor awarded a construction contract furnish performance and payment bonds: an (a) the performance bond shall include without limitation guarantees that work done under the contract will be completed and performed according to approved plans and specifications and in accordance with sound construction principles and practices; and ft" (b) the performance and payment bonds shall be in a penal sum of not less than 100 percent of the contract price and remain in effect for one year beyond the date of approval by the engineer of the political subdivision. (c) The contractor shall utilize a surety company which is authorized to do business in Texas in Ep accordance with Art. 7.19-1. Bond of Surety Company; Chapter 7 of the Insurance Code. 9. PROGRESS PAYMENTS AND PAYMENT SCHEDULE sr (a) The Contractor shall submit for approval immediately after execution of the Agreement, a carefully prepared Progress Schedule, showing the proposed dates of starting and completing each of the various sections of the work, the anticipated monthly payments to become due the `� Contractor, and the accumulated percent of progress each month. (b) The following paragraph applies only to contracts awarded on a lump sum contract price: COST BREAKDOWN -The Contractor shall submit to the Owner a detailed breakdown of his estimated cost of all work to be accomplished under the contract, so arranged and itemized ` as to meet the approval of the Owner or funding agencies. This breakdown shall be submitted promptly after execution of the agreement and before any payment is made to the Contractor for the work performed under the Contract. After approval.by the Owner the unit prices wo w established in the breakdown shall be used in estimating the amount of partial payments to be made to the Contractor. (c) Progress Payments Contractor must submit with each pay request the "Statement of Compliance .. Certification by Contractor for ARRA Davis -Bacon Requirements" (1) The Contractor shall prepare his requisition for progress payment as of the last day of the -' payment month and submit it, with the required number of copies, to the Engineer for his review. Except as provided in Paragraph (3) of this subsection, the amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) five percent (5%) minimum of the total amount, as a retainage and (2) the amount of all previous payments. The total value of work completed to date shall be based on the actual or estimated quantities of work completed and on the unit prices contained in the agreement (or cost breakdown approved pursuant to section 6.b relating to lump sum bids) and adjusted by approved change orders. The value of materials properly stored on the site shall be based upon the estimated quantities of such materials and the invoice prices. Copies of all invoices shall be available for inspection by the Engineer. (2) The Contractor shall be responsible for the care and protection of all materials and work upon which payments have been made until final acceptance of such work and materials by the Owner. Such payments shall not constitute a waiver of the right of the Owner to require the fulfillment of all terms of the Contract and the delivery of all improvements embraced in this Contract complete and satisfactory to the Owner in all details. fto (3) This clause applies to contracts when the Owner is a Municipal Utility District, or Water Control and Improvement District. The retainage shall be ten percent minimum of the _ amount otherwise due until at least fifty percent of the work has been completed. After the project is fifty percent completed, the District may reduce the retainage from ten percent to no less than five percent. (4) The five percent (5%) minimum retainage of the progress payments due to the Contractor may not be reduced until the building of the project is substantially complete and a reduction in the retainage has been authorized by the TWDB. (5) The following clause applies only to contracts where the total price at the time of execution is $400,000 or greater and the retainage is greater than 5% and the Owner is not legally exempted from the condition (i.e certain types of water districts). The Owner shall deposit the retainage in an interest -bearing account, and the interest earned on such retainage funds shall be paid to the Contractor after completion of the contract and final acceptance of the project by the Owner. (d) Withholding Payments. The Owner may withhold from any payment otherwise due the Contractor so much as may be necessary to protect the Owner and if so elects may also - withhold any amounts due from the Contractor to any subcontractors or material dealers, for work performed or material furnished by them. The foregoing provisions shall be construed 12 ow solely for the benefit of the Owner and will not require the Owner to determine or adjust any claims or disputes between the Contractor and his subcontractors or Material dealers, or to withhold any moneys for their protection unless the Owner elects to do so. The failure or .o refusal of the Owner to withhold any moneys from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract. (e) Payments Subject to Submission of Certificates. Each payment to the Contractor by the Owner shall be made subject to submission by the Contractor of all written certifications required of him and his subcontractors by Section 3 hereof (relating to labor standards) and other general and special conditions elsewhere in this contract. (f) Final Payment. (1) Upon satisfactory completion of the work performed under this contract, as a condition before final payment under this contract or as a termination settlement under this contract the contractor shall execute and deliver to the Owner a release of all claims against the Owner arising under, or by virtue of, this contract, except claims which are specifically exempted by the contractor to be set forth therein. Unless otherwise provided in this contract, by State law or otherwise expressly agreed to by the parties to this contract, final payment under this contract or settlement upon termination of this contract shall not constitute a waiver of the Owner's claims against the contractor or his sureties under this contract or applicable performance and payment bonds. .. (2) After final inspection and acceptance by the Owner of all work under the Contract, the Contractor shall prepare his requisition for final payment which shall be based upon the .. carefully measured or computed quantity of each item of work at the applicable unit prices stipulated in the Agreement or cost breakdown (if lump sum), as adjusted by approved bw change orders. The total amount of the final payment due the Contractor under this contract shall be the amount computed as described above less all previous payments. .. (3) The retainage and its interest earnings, if any, shall not be paid to the Contractor until the TWDB has authorized a reduction in, or release of, retainage on the contract work. (4) Withholding of any amount due the Owner, under general and/or special conditions regarding "Liquidated Damages," shall be deducted from the final payment due the Contractor. 10. WORKMAN'S COMPENSATION INSURANCE COVERAGE (a) The contractor shall certify in writing that the contractor provides workers' compensation G. insurance coverage for each employee of the contractor employed on the public project. (b) Each subcontractor on the public project shall provide such a certificate relating to coverage of .. the subcontractor's employees to the general contractor, who shall provide the subcontractor's certificate to the governmental entity. (c) A contractor who has a contract that requires workers' compensation insurance coverage may provide the coverage through a group plan or other method satisfactory to the governing body of the governmental entity. 13 .� MW (d) The employment of a maintenance employee by an employer who is not engaging in building or construction as the employer's primary business does not constitute engaging in building or construction. (e) In this section: (1) "Building or construction" includes: (A) erecting or preparing to erect a structure, including a building, bridge, roadway, public utility facility, or related appurtenance; MW (B) remodeling, extending, repairing, or demolishing a structure; or (C) otherwise improving real property or an appurtenance to real property through similar M, activities. (2) "Governmental entity" means this state or a political subdivision of this state. The term WM includes a municipality. 11. CHANGES VW (a) The Owner may at any time, without notice to any surety, by written order, make any change in the work within the general scope of the contract, including but not limited to changes: r (1) In the specifications (including drawings and designs); (2) In the time, method or manner of performance of the work; (3) In the Owner -furnished facilities, equipment, materials, services or site, or (4) Directing acceleration in the performance of the work. r (5) The original contract price may not be increased under this section by more than 25 percent. The original contract price may not be decreased under this section by more than 25 percent without the consent of the contractor. (Local Government Code 271.060) (b) A change order shall also be any other written order (including direction, instruction, interpretation or determination) from the Owner which causes any change, provided the contractor gives the Owner written notice stating the date, circumstances and source of the order and that the contractor regards the order as a change order. (c) Except as provided in this clause, no order, statement or conduct of the Owner shall be treated as a change under this clause. or entitle the contractor to an equitable adjustment. (d) If any change under this clause causes an increase or decrease in the contractor's cost or the MW time required to perform any part of the work under this contract, whether or not changed by any order, the Owner shall make an equitable adjustment and modify the contract in writing. Except for claims based on defective specifications, no claim for any change under paragraph (a)(2) above shall be allowed for any costs incurred more than 20 days before the contractor gives written notice as required in paragraph (a)(2). In the case of defective specifications for which the Owner is responsible, the equitable adjustment shall include any increased cost the contractor reasonably incurred in attempting to comply with those defective specifications. -. 14 �J (e) If the contractor intends to assert a claim for an equitable adjustment under this clause, the contractor must, within 30 days after receipt of a written change order under paragraph (a)(1) or the furnishing of a written notice under paragraph (a)(2), submit a written statement to the Owner setting forth the general nature and monetary extent of such claim The Owner may extend the 30-day period. The contractor may include the statement of claim in the notice under paragraph (2) of this changes clause. .. (f) No claim by the contractor for an equitable adjustment shall be allowed if made after final payment under this contract. (g) Changes that involve an increase in price will be supported by documentation of the costs components in a format acceptable to the Owner. 12. EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION - This provision only applies to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects which receive funds made directly available by Federal funding and the contract agreement is for more than $10,000. ■r Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, age,- handicap or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. The Bidder's Certifications regarding Equal Employment Opportunity and Non -Segregated Facilities (WRD-255) must be submitted with the bid. During the performance of this contract, the Contractor agrees as follows: am (a) The Contractor will not discriminate against any employee or applicant for. employment because of race, color, religion, sex, age, handicap, or national origin. The Contractor will •• take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, age, handicap, or national origin. Such action shall include, but not be limited to the following: low Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (b) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, age, handicap, or national •• origin. (c) The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 15 ..� (d) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, the Age Discrimination in Employment Act of 1967,29 U.S.C.A. 621 (1985), Executive Order 12250 of November 2, 1980, the Rehabilitation Act of 1973, 29 U.S.C.A. 701 et seq. (1985), and of the rules, regulations, and relevant orders of the Secretary of Labor. (e) The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (f) In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be -• canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, .. and such, other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. (g) The Contractor will include the portion of the sentence immediately preceding paragraph (a) and the provisions of paragraphs (a) through (g) in every subcontract or .. purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will .. take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: PROVIDED, HOWEVER, That in the event a Contractor becomes •• involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the Contractor may request the United States to enter into such litigation to protect the interest of the United States. (h) The Contractor will comply with Executive Order 11246 based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the .. Standard Federal Equal Employment Opportunity Construction Contract Specifications, as set forth in 41 CFR Part 60-4 and its efforts to meet the goals established for the geographical area where the Contract is to be performed. The hours of minority and female .. employment and training must be substantially uniform throughout the length of the Contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the Contract, the Executive Order, and the regulations in 41 CFR Part 60-4. The goals are expressed as .. percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any office of federal contract compliance programs office or from federal procurement contracting officers 16 fto .. (512) 229-5835. The Contractor is expected to make substantially uniform progress toward its goal in each craft during the period specified. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the notice which contains the applicable goals set for minority and female participation and which is set forth in the solicitations from which this contract resulted. 13. DEBARMENT AND SUSPENSION - This provision applies only to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects which receive funds made directly available by Federal funding. This contract is subject to the Title 40 Code of Federal Regulations Part 32 concerning Debarment and Suspension. The contractor will comply with the assurances provided with the bid that led to this contract. This contract is subject to the provisions the federal Debarment and Suspension requirements of 40 CFR Part 32, including but not limited to Appendix B as follows: Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -- Lower Tier Covered Transactions Instructions for Certification 13.1. By signing and submitting this proposal, the prospective lower tier participant is providing the certification set out below. 13.2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the .. prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. 13.3. The prospective lower tier participant shall provide immediate written notice to the "0 person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous when submitted or had become erroneous by reason of changed circumstances. 13.4. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. `w 13.5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 17 aw .. 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with -which this transaction originated. 13.6. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions. 13.7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from covered transactions, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the List of Parties Excluded from Federal Procurement and Nonprocurement Programs. .� 13.8. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is .� normally possessed by a prudent person in the ordinary course of business dealings. 13.9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered ' transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. .W Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -- Lower Tier Covered Transactions (1) The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. (2) Where the prospective lower tier participant is unable to certify to any of the statements .. in this certification, such prospective participant shall attach an explanation to this proposal. Ow 14. DISADVANTAGED BUSINESSES ENTERPRISES - This provision applies to all ARRA Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects. This contract is subject to the EPA established Minority Business Enterprise (MBE) / Women's Business Enterprise (WBE) "fair share" goals: 18 .. CATEGORY MBE WBE CONSTRUCTION 34.8% 6.7% SUPPLIES 9.7% 5.2% EQUIPMENT 7.2% 4.1% SERVICES 16.1% 21.3% The prime contractor must submit the PRIME CONTRACTOR AFFIRMATIVE STEPS CERTIFICATION and GOALS (WRD-217) with the bid, to demonstrate the Prime Contractor's understanding and commitment to taking affirmative steps. The contractor must provide the Owner with the information required in the Texas Water Development Board Loan/Grant Participation Summary, TWDB document WRD-373 and provide sufficient documentation (TWDB WRD-216) that a "good faith effort" was made in offering fair opportunity for participation by qualified DBE firms. These forms are included in the TWDB Disadvantaged Business Enterprise Program Guidance included herein. This information must be submitted prior to the contract award so the information can be approved and presented to the TWDB for funding of this contract (a) The Contractor shall, if awarding sub -agreements, to the extent appropriate for the goals listed in the instructions to bidders make a good faith effort to use minority and women business when possible as sources of supplies, construction, equipment and services by taking the following steps: (1) Including qualified small, minority, and women's businesses on solicitation lists; (2) Assuring that small, minority, and women's businesses are solicited whenever they are potential sources; (3) Dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation of small, minority, and women's businesses; (4) Establishing delivery schedules, where the requirements of the work permit, which will encourage participation by. small, minority, and women's businesses; and (5) Using the services and assistance of the Small Business Administration and the Office of Minority Business Enterprise of the U.S. Department of Commerce, as appropriate. (b) The Contractor shall submit to the Owner information on utilization of minority and women business enterprises within 30 days of entering into an agreement with a minority or women business enterprise. The information shall include reporting called for in TWDB Disadvantaged Business Enterprise Program Guidance. (c) The Contractor shall maintain a documentation file on all efforts to obtain Minority and Women -Owned Business Participation. r No W am No %a .. L__1 19 ," w 15. ARCHEOLOGICAL DISCOVERIES AND CULTURAL RESOURCES No activity which may affect properties listed or properties eligible for listing in the National Register of Historic Places, or eligible for designation as a State Archeological Landmark is authorized until the Owner has complied with the provisions of the National Historic Preservation Act and the Antiquities Code of Texas. The Owner has previously coordinated with the appropriate agencies and impacts to known cultural or archeological deposits have been avoided or mitigated. However, the Contractor may encounter unanticipated cultural or archeological deposits during construction. If archeological sites or historic structures which may qualify for designation as a State am Archeological Landmark according to the criteria in 13 TAC 41.6 - 41.10, or that may be eligible for listing on the National Register of Historic Places in accordance with 36 CFR Part 800, are discovered after construction operations are begun, the Contractor shall immediately cease wo operations in that particular area and notify the Owner, the TWDB, and the Texas Antiquities Committee, P.O. Box 12276, Capitol Station, Austin, Texas 78711-2276. The Contractor shall take reasonable steps to protect and preserve the discoveries until they have been inspected by the .. Owner's representative and the TWDB. The Owner will promptly coordinate with the State Historic Preservation Officer and any other appropriate agencies to obtain any necessary approvals _ or permits to enable the work to continue. The Contractor shall not resume work in the area of the discovery until authorized to do so by the Owner. 16. ENDANGERED SPECIES No activity is authorized that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), and/or the State of Texas Parks and Wildlife Code on Endangered Species, or to destroy or adversely modify the habitat of such species. MW If a threatened or endangered species is encountered during construction, the Contractor shall immediately cease work in the area of the encounter and notify the Owner, who will immediately implement actions in accordance with the ESA and applicable. State statutes. These actions shall MW include reporting the encounter to the TWDB, the U. S. Fish and Wildlife Service, and the Texas Parks and Wildlife Department, obtaining any necessary approvals or permits to enable the work to continue, or implement other mitigation actions. The Contractor shall not resume construction .0 in the area of the encounter until authorized to do so by the Owner. 17. HAZARDOUS MATERIALS Materials utilized in the project shall be free of any hazardous materials, except as may be specifically provided for in the specifications. If the Contractor encounters existing material on sites owned or controlled by the Owner or in material sources that are suspected by visual observation or smell to contain hazardous materials, the Contractor shall immediately notify the Engineer and the Owner. The Owner will be responsible for the testing for and removal or disposition of hazardous materials on sites owned or controlled by the Owner. The Owner may suspend the work, wholly or in part during the testing, removal or disposition of hazardous materials on sites owned or controlled by the Owner. 20 .. ow18. PROJECT SIGN A project IDENTIFICATION SIGN will be provided to the contractor. The contractor shall erect •• the sign in a prominent location at the construction project site or along a major thoroughfare within the community as directed by the Owner. 19.OPERATION AND MAINTENANCE MANUALS AND TRAINING (a) The Contractor shall obtain installation, operation, and maintenance manuals from manufacturers and suppliers for equipment furnished under the contract. The Contractor shall submit three copies of each complete manual to the Engineer within 90 days after approval of shop drawings, product data, and samples, and not later than the date of shipment of each item of equipment to the project site or storage location. (b) The Owner shall require the Engineer to promptly review each manual submitted, noting necessary corrections and revisions. If the Engineer rejects the manual, the Contractor shall correct and resubmit the manual until it is acceptable to Engineer as being in conformance with design concept of project and for compliance with information given in the Contract Documents. Owner may assess Contractor a charge for reviews of same items in excess of three (3) times. Such procedure shall not be considered cause for delay. Acceptance of manuals by Engineer does not relieve Contractor of any requirements of terms of Contract. r (c) The Contractor shall provide the services of trained, qualified technicians to check final equipment installation, to assist as required in placing same in operation, and to instruct operating personnel in the proper manner of performing routine operation and maintenance of the equipment. (d) Operations and maintenance manuals specified hereinafter are in addition to any operation, maintenance, or installation instructions required by the Contractor to install, test, and start-up the equipment. (e) Each manual to.be bound in a folder and labeled to identify the contents and project to which it applies. The manual shall contain the following applicable items: (1) A listing of the manufacturer's identification, including order number, model, serial number, and location of parts and service centers. (2) A list of recommended stock of parts, including part number and quantity. am (3) Complete replacement parts list. (4) Performance data and rating tables. .. (5) Specific instructions for installation, operation, adjustment, and maintenance. (6) Exploded view drawings for major equipment items. (7) Lubrication requirements. bw 21 MW MW MW (s) Complete equipment wiring diagrams and control schematics with terminal identification. 20. AS -BUILT DIMENSIONS AND DRAWINGS (a) Contractor shall make appropriate daily measurements of facilities constructed and keep accurate records of location (horizontal and vertical) of all facilities. (b) Upon completion of each facility, the Contractor shall furnish Owner with one set of direct prints, marked with red pencil, to show as -built dimensions and locations of all work constructed. As a minimum, the final drawings shall include the following: (1) Horizontal and vertical locations of work. (2) Changes in equipment and dimensions due to substitutions. (3) "Nameplate" data on all installed equipment. no (4) Deletions, additions, and changes to scope of work. (5) Any other changes made. 21. AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) Issues related to the ARRA are covered in the separate document attached following the Construction Contract Supplemental Conditions ow M Created 6/8/09 ARRA SUPPLEMENTAL CONTRACT CONDITIONS STATE REVOLVING FUND .� FOR ARRA'S BUY AMERICAN, DAVIS-BACON, & REPORTING REQUIREMENTS Texas Water Development Board — June 2009 I. Introduction This compliance checklist contains explanations, required contract conditions, required bid solicitation language and a sample certification form for Clean Water State Revolving Fund (CWSRF) and Drinking Water State Revolving Fund (DWSRF) projects that are funded in whole or in part with funds from the American Recovery and Reinvestment Act ("ARRA", or "Recovery _ Act") of 2009. This checklist addresses three of the most important ARRA requirements — the Buy American, Davis -Bacon, and Reporting requirements. TWDB/EPA MAKE NO CLAIMS REGARDING THE LEGALITY OF THIS DOCUMENT WITH RESPECT TO STATE OR LOCAL LAW. IT IS IMPERATIVE THAT ANY PARTY INSERTING THIS DOCUMENT INTO A CONTRACT VERIFY THAT IT IS LEGAL AND ENFORCEBLE ACCORDING TO STATE AND LOCAL LAWS, REGULATIONS AND ORDINANCES: II. Proiects funded in whole or in Dart with ARRA funds must comply with: • Wage Rate Requirements (Davis -Bacon Act) under Section 1606 of ARRA; • Buy American Requirements (for iron, steel and manufactured goods) under Section 1605 of ARRA; and • Reporting and Registration Requirements under Subtitle A, "Transparency and Oversight Requirements", of ARRA, and other federal and state laws. III. U.S.'EPA Office of Inspector General Section 1514 and 1515 of ARRA gives the federal Environmental Protection Agency (EPA) Office of Inspector General (OIG) responsibility for review of ARRA funded projects and provides authority to examine all records of the borrower including contracts or subcontracts and anyone else involved in the project. Project bid solicitations, RFPs, and project contracts must include a requirement that all contractors and sub -contractors "shall promptly refer to an appropriate inspector general any credible evidence that a principal, employee, agent, contractor, sub -grantee, subcontractor, or other person has submitted a false claim under the False Claims Act or has committed a criminal or civil violation of laws pertaining to fraud, conflict of interest, bribery, gratuity, or similar misconduct involving those funds. Contractors and sub -contractors shall furnish to the EPA Office of Inspector General any information or records requested by that office." OIG's hotline for reporting fraud, waste and abuse is 1-888-546-8740. IV. Pursuant to ARRA, Applicants must comply with the following three covenants: 23 New 1. PrevailinQ Wazes - Section 1606 ofARRA: Notwithstanding any other provision of law and in a manner consistent with other provisions in ARRA, all laborers and mechanics employed by contractors and sub -contractors on projects funded directly by or assisted in whole or in part by and through the federal government pursuant to ARRA shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code. With respect to the labor standards specified in this section, the Secretary of Labor shall have the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (64 Stat. 1267; 5 U.S.C.App.) and section 3145 of title 40, United States Code. The purpose of this requirement is to apply Davis -Bacon Act wage rules to all assistance agreements made in whole or in part with funds appropriated under ARRA. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis -Bacon contract clauses set forth in that section. Required Davis -Bacon (Federal Prevailing Wages) Actions for Applicants: • Applicant wage decisions must be included in the bidding and contract documents. Applicants should obtain federal Wage Determinations online: httn://www.wdol.eov/ • All construction, alteration, repair (including painting and decorating) contracts and subcontracts in excess of $2,000 funded with ARRA funds must include the standard _ Davis -Bacon contract clauses found in 29 CFR 5.5(a) (APPENDIX 1) • Post the required Poster (WH 1321) and applicable wage rates at the construction site: htti)://www.dol.gov/esa/whd/T)rograms/dbra/whl321.htm • Use either the DOL Payroll Form WH 347 and weekly Statement of Compliance or a payroll form with all of the same data elements as the DOL Payroll Form WH347 and a separate Statement of Compliance. Payroll Form WH347: .. htti)://www.dol.izov/esa/whd/t)rograms/dbra/wh347.htm • Applicants should use the attached bid solicitation (APPENDIX 2) and contract term (APPENDIX 1) documents *R Additional Davis -Bacon Resources: • The U. S. Department of Labor implementing regulations at 29 CFR Part 1, 29 CFR Part 3 .. and 29 CFR Part 5 are available at: www.dol.gov/esa/whd/reg-librarv.htm41 • Federal Register Notice Vol. 73, No 245, Friday_ December 19, 2008 Page 77511-77512 amending 29 CFR Part 3 and Part 5 • U. S. Department of Labor — Wage & Hour Division Home Page: httn://www. dol. gov/esa/whd/Drogams/dbra/index.htm • Davis -Bacon Act: httt)://www.dol.Lov/esa/whd/vrograms/dbra/whatdbra.htm • FAQs: httn://www.dol.gov/esa/whd/Drograms/dbra/facs.htm Mod 24 M .. .. WHEN AVAILABLE FROM EPA, ADDITIONAL INFORMATION WILL BE PROVIDED ON DAVIS-BACON REPORTING AND MONITORING. 2. Buv American: American Iron. Steel. and Manufactured Goods - Section 1605 of ARRA: no None of the appropriated funds may be used for the construction, alteration, maintenance or repair of a public building or public work unless all of the iron, steel, and manufactured goods used in the project is produced in the United States unless (i) a waiver is provided to the recipient by the United States EPA or (ii) compliance would be inconsistent with United States obligations under international agreements. In order to receive a waiver, the applicant must send a written request to EPA. A contractor may only avoid the Buy American provision if the contractor receives a written .. waiver from the United States EPA in advance. A decision will be made based on the following criteria: • the requirement is inconsistent with the public interest for purposes of the project for which a waiver has been requested; • iron, steel, and necessary manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or • inclusion of iron, steel, and manufactured goods produced in the United States will increase the overall cost of the project by more than 25 percent. aw Under ARRA, a "manufactured good" means a good brought to the construction site for incorporation into the building or work that has been--(i) Processed into a specific form and no shape; or (ii) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials. _ Under ARRA, "public building and public work" means a public building of and a public work of, a governmental entity. These buildings and works may include, without limitation, bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping aw stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works. Under ARRA, "steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements. The Clean Water State Revolving Fund and Drinking Water State Revolving Fund must follow the EPA Guidance on Buy American included in the EPA Memorandum ARRA 09-1 dated April 28, 2009 (httD://www.et)a.gov/water/enarecoverv/docs/04-29-2009 BA_waiver nrocess_final.ndf). The EPA memorandum includes definitions, required contract conditions, a sample contractor certification and a waiver process for Buy American for the State Revolving Funds. Additional ..• information can be found in the Office of Management and Budget regulations (2 CFR Part 176, Subpart B, available at httD://edocket.access.2Do.izov/2009/E9-9073.btin). PLEASE NOTE that TWDB will not award a contract for any project that requests a waiver from EPA until the EPA decision on the waiver request is made. Applicants must include Buy American provisions in bid documents (APPENDIX 5) and in no contracts: • Buy American contract clause requirements (APPENDIX 3) 25 • Buy American bidder and sample contractor certification (APPENDIX 4) 3. Section 1512 — Reporting and Registration Reauirements: In order to meet its reporting requirements under ARRA, the Federal Funding Accountability and Transparency Act of 2006, the Government Funding Transparency Act of 2008 ("2008 Act"), and state law, TWDB is required to collect specific project and applicant information from award recipients, who in turn must collect information from contractors and subcontractors. Funding recipients will be required to provide weekly and quarterly reports of data elements specified by TWDB. It is the award recipient's responsibility to ensure that it collects all the information TWDB requests to satisfy federal and state reporting requirements. Texas award recipients should remember to include terms in all project bid solicitations, RFPs and project contracts that mandate contractor and subcontractor compliance with ARRA, federal, and state reporting requirements. Applicants must include Reporting Requirement provisions in bid solicitations (APPENDIX 7) and in contracts (APPENDIX 6). Pursuant to Federal Funding Accountability and Transparency Act (FFATA) and ARRA, the Applicant must: • Obtain a Data Universal Numbering System (DUNS) number that represents a universal identifier for all federal funding assistance. DUNS numbers can be obtained from Dun and Bradstreet at httD://fedgov.dnb.com/webform/, and • Register with the Central Contractor Registration (CCR) and maintain current registration at all times during which the project is active or under consideration for ARRA funds. .. Register at httD://www.ccr.2ov/. V. Additional Covenants: All ARRA State Revolving Fund Applicants agree to make any additional covenants required in .. order to comply with all federal law requirements, including, but not limited to, the requirements set forth under ARRA, federal and state law. .. FAILURE TO COMPLY WITH ALL OF THE REQUIREMENTS AND TO MAKE ALL THE COVENANTS AS LISTED IN THIS GUIDANCE, WILL RESULT IN FORFEITURE OF ALL FEDERAL ARRA FUNDING. rn ow ow 26 Im APPENDIX 1 Mandatory Davis -Bacon Contract Conditions Texas Water Development Board - ARRA Funded Project .. PLEASE NOTE: This lanauaee must be included in all Davis -Bacon covered construction contracts and subcontracts. (29 CFR Part 5.5). (a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, .. including painting and decorating, of a public building or public work, or building or work financed in whole or in part from federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in Sec. 5.1, the following clauses (or any modifications thereof to meet the particular needs of the agency, Provided, That such modifications are first approved by the Department of Labor): (1) Minimum wages (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis -Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions MW of paragraph (a)(1)(iv) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in Sec. 5.5(a)(4). Laborers or mechanics �- performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, that the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph (a)(1)(ii) of this section) and the Davis -Bacon poster (WH-1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. (ii) (A) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The 27 contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: No (1) The work to be performed by the classification requested is not performed by a classification in the wage determination; and (2) The classification is utilized in the area by the construction industry; and (3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (B) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and .. wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, .. Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (C) In the event the contractor, the laborers or mechanics to be employed in the •• classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of .. all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will �- notify the contracting officer within the 30-day period that additional time is necessary. (D) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs (a)(1)(ii) (B) or (C) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. fto (iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (iv) If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, .. that the applicable standards of the Davis -Bacon Act must have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of _ obligations under the plan or program. (2) Withholding The OWNER shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the contractor under this 28 contract or any. other Federal contract with the same prime contractor, or any other federally - assisted contract subject to Davis -Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), all or part of the wages required by the contract, the (Agency) may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. (3) Payrolls and basic records (i)Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work (or under the United States Housing Act of 1-937, or under the Housing Act of 1949, in the construction or development of the project). Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs .. anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis- Bacon Act), daily and weekly number of hours worked, _ deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section _ 1(b)(2)(B) of the Davis -Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the OWNER if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the OWNER.. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee's social security number). The required weekly payroll �- information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current .� 29 r r address of each covered worker, and shall provide them upon request to the applicant, sponsor, or owner, as the case may be, for transmission to the applicant, sponsor, or owner, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an .investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the sponsoring government agency (or the applicant, sponsor, or owner). (B) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: r (1) That the payroll for the payroll period contains the information required to be provided under Sec. 5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate — information is being maintained under Sec. 5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete; (2) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than .. permissible deductions as set forth in Regulations, 29 CFR part 3; (3) That each laborer or mechanic has been paid not less than the applicable wage r rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. �— (C) The weekly submission of a properly executed certification set forth on the reverse side r of Optional Form WH-347 shall satisfy the requirement for submission of the i "Statement of Compliance" required by paragraph (a)(3)(ii)(B) of this section. 1 (D) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code. M (iii) The contractor or subcontractor shall make the records required under paragraph (a)(3)(i) of this section available for inspection, copying, or transcription by authorized representatives of the OWNER or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the ,.. Federal agency may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon .. request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 30 . r a (4) Apprentices and trainees (i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State _ Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing .. construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with ,. the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different .� practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (ii) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and -■ individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage -� determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for •+ 31 fts am less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage .m determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work .. actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (iii) Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30. (5) Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract. (6) Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR 5.5(a)(1) through (10) and such other clauses as the may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5. (7) Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. (8) Compliance with Davis -Bacon and Related Act requirements. All rulings and interpretations of the Davis -Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract. (9) Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 .r CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S.. Department of Labor, or the employees or their representatives. (10) Certification of eligibility (i) By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government- contracts by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). _ (ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). 32 M (iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. (b) Contract Work Hours and Safety Standards Act. The Agency Head shall cause or require the contracting officer to insert the following clauses set forth in paragraphs (b)(1), (2), (3), and (4) of this section in full in any contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by Sec. 5.5(a) or 4.6 of part 4 of this title. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. (1) Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. (2) Violation; liability for unpaid wages; liquidated damages. In the event of any violation no of the clause set forth in paragraph (b)(1) of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (b)(1) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by .. the clause set forth in paragraph (b)(1) of this section. (3) Withholding for unpaid wages and liquidated damages. The OWNER shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally -assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section. _ (4) Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (b)(1) through (4) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (b)(1) through (4) of this section. (c) In addition to the clauses contained in paragraph (b), in any contract subject only to the Contract Work Hours and Safety Standards Act and not to any of the other statutes cited in Sec. 5.1, the Agency Head shall cause or require the contracting officer to insert a clause requiring that the contractor or subcontractor shall maintain payrolls and basic payroll records during the course of the work and shall preserve them for a period of three years from the completion of the contract 33 W M for all laborers and mechanics, including guards and watchmen, working on the contract. Such records shall contain the name and address of each such employee, social security number, correct classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid. Further, the Agency Head shall cause or require the contracting officer to insert in any such contract a clause providing that the records to be maintained under this paragraph shall be made available by the contractor or subcontractor for inspection, copying, or transcription by authorized representatives of the OWNER and the Department of Labor, and the contractor or subcontractor will permit such representatives to interview employees during working hours on the job. I have read the above and I hereby certify that I will comply with the "Mandatory Davis -Bacon Contract Conditions". N of Contractor ,nature and Title and Date The following form must be completed by'the contractor and submitted with each payment request to the owner for ARRA financing: r 34 aw CJ STATEMENT OF COMPLIANCE CERTIFICATION BY CONTRACTOR for ARRA .. Davis -Bacon Requirements up In accordance with Title 29 CFR 5.5 each monthly engineering estimate must be accompanied by the following certificate executed by each prime contractor employing mechanics and laborers at the work site in which the federal government is to participate: Date 0" Estimate Number: for the period to .o Name of Project: Location: Contract Number: Date Contract Awarded: TWDB ARRA Project No.: .. I hereby certify that all of the contract requirements in Appendix 1 "Mandatory Davis -Bacon Contract Conditions" have been complied with by: •• as principal contractor and by each subcontractor (Name of Contractor) employing mechanics or laborers at the site of the work, or there is a substantial dispute with respect to the required provisions. w Name and Contractor/Subcontractor No M Signature and Title Notes: 1. This certification may be placed on the estimate or on a separate sheet attached to the estimate. 2. The Texas Water Development Board shall, prior to approving a voucher, satisfy itself that copies of these certificates are on file with the Owner. 35 w .. 04 w APPENDIX 2 MMMM Mandatory Davis -Bacon Bid Solicitation and RFP Language Texas Water Development Board — ARRA-Funded Project This lanuuage must be included in all ARRA project bid solicitations and RFPs: (a) Section 1606 of ARRA requires that all laborers and mechanics employed by contractor; and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rate! not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31. of title 40, United States Code. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 U.S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the Davis -Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis -Bacon contract clauses set forth in that section. Federal 1 1 agencies providing grants, cooperative agreements, and loans under the Recovery Act shall ensure that the standard Davis -Bacon contract clauses found in 29 CFR 5.5(a) are incorporated in any resultant covered contracts that are in excess of $2,000 for tru ti alt f lud' t' d d tin cons con, era ion or repair (inc ing pain mg an ecora g). (b) For additional guidance on the wage rate requirements of section 1606, contact your awarding agency. Recipients of grants, cooperative agreements and loans should direct their initial inquiries concerning the application of Davis -Bacon requirements to a particular federally assisted project to the Federal agency funding the project. The Secretary of Labor retains final coverage authority under Reorganization Plan Number 14. W APPENDIX 3 Buy American Contract Language (from EPA Memorandum dated April 28, 2009 ARRA 09-01) Texas Water Development Board - ARRA Funded Project The Contractor acknowledges to and for the benefit of the City of ("Purchaser") and the Texas Water Development Board (the "Board") that it understands the project, goods and services under .. this Agreement (collectively, the "Project") are being funded, in whole or in part, with monies made available by the federal American Recovery and Reinvestment Act of 2009 ("ARRA') and ARRA contains provisions commonly known as `Buy American" which require that all of the iron, steel, and manufactured goods used in the Project be produced in the United States ("Buy American Requirements") including all iron, steel, and manufactured goods provided by the Contractor pursuant to this Agreement. The Contractor hereby represents and warrants to and for the benefit of the Purchaser and the Board that (a) the Contractor has reviewed and understands the Buy American Requirements, and (b) all of the iron, steel, and manufactured goods used in the Project will be and/or have been produced in the United States in a manner that complies with the Buy American Requirements, unless a waiver of the requirements is approved by the federal Environmental Protection Agency. The Contractor agrees to provide to the Purchaser and the Board any further verified information, certification or assurance of compliance with this • paragraph, or information necessary to support a waiver of the Buy American Requirements, as may be requested from time to time by the Purchaser or the Board. Notwithstanding any other provision of this Agreement, any failure of the Contractor to comply with this paragraph shall *' permit the Purchaser or the Board to recover as damages against the Contractor any loss,, expense or cost (including without limitation reasonable attorneys' fees) incurred by the Purchaser or the Board resulting from any such failure (including without limitation any impairment or loss of funding, whether in whole or in part, from the Board or any damages owed to the Board by the Purchaser). While the Contractor has no direct contractual privity with the Board, the Purchaser and the Contractor agree that the Board, as a lender to the Purchaser for the funding of the Project, is a third party beneficiary of the provisions contained in this paragraph and neither this paragraph (nor any other provision of this Agreement necessary to give this paragraph effect) may be amended or waived without the prior written consent of the Board. Ow 37 4W OW APPENDIX 4 Buy American Contractor Certification (From the EPA Memorandum dated April 28, 2009, ARRA 09-01) ' Texas Water Development Board- ARRA Funded Project 1. Identification of American -made Iron, Steel, and Manufactured Goods: Consistent with the terms of am the Purchaser's bid solicitation and the provisions of ARRA Section 1605, the Bidder certifies that this bid reflects the Bidder's best, good faith effort to identify domestic sources of iron, steel, and manufactured goods for every component contained in the bid solicitation where such American -made components are 40 available on the schedule and consistent with the deadlines prescribed in or required by the bid solicitation. 2. Verification of U. S. Production: the bidder certifies that all components contained in the bid me solicitation that are American -made have been so identified, and if this bid is accepted, the Bidder agrees that it will provide reasonable, sufficient, and timely verification to the Purchaser of the U.S. production of each component so identified. 3. Documentation Regarding Non -American —made Iron, Steel, or Manufactured Goods: The bidder certifies that for any component or components that are not American -made and are so identified in this bid, the Bidder has included in or attached to this bid one or both of the following as applicable: a. Identification of an citation to a categorical waiver published by the U.S. Environmental Protection Agency in the Federal Register that is applicable to such components or components, and an analysis that supports its applicability to the component or components; b. Verifiable documentation sufficient to the Purchaser, as required in the bid solicitation or otherwise, that the Bidder has sought to secure American -made components but has determined that such components are not available on the schedule and consistent with the deadlines prescribed .,,. in the bid solicitation, with assurance adequate for the Bidder under the applicable conditions stated in the bid solicitation or otherwise. 4. Information and Detailed Justification Regarding Non -American -Made Iron, Steel, or Manufactured Goods: The Bidder certifies that for any such component or components that are not so available, the Bidder has also provided in or attached to this bid information, including but not limited to aw the verifiable documentation and a full description of the bidder's efforts to secure any such American - made component or components, that the Bidder believes are sufficient to provide and as far as possible constitute the detailed justification required for a waiver under section 1605 with respect to such component or components. The Bidder further agrees that, if this bid is accepted, it will assist the Purchaser 00 in amending, supplementing, or further supporting such information as required by the Purchaser to request and, as applicable, implement the terms of waiver with respect to any such component or components. I have read the above and I hereby certify that I will comply with the above Buy -American provisions. 77, C/0 /f N1 Name of Contractor w Q Signature and Title and Date 38 .. 4W APPENDIX 5 Mandatory "Buy American" �. Bid Solicitation and RFP Language Texas Water Development Board — ARRA-Funded Project w This lanauaae must be included in all ARRA vroiect bid solicitations and RFPs: Im (a) Definitions. Manufactured good, public building and public work, and steel, as used in this notice, are defined in the 2 CFR 176.140. (b) Requests for determinations of inapplicability. A prospective applicant requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) should submit the request to the award official in time to allow a determination before submission of applications or proposals. The prospective applicant shall include the information and applicable supporting data required by paragraphs at 2 CFR 176.140(c) and (d) in the request. If an applicant has not requested a determination regarding the inapplicability_ of 1605 of the Recovery Act before submitting its- application or proposal, or has not received a response to a previous request, the applicant shall include the information and supporting data in the .. application or proposal. ■. .. (c) Evaluation of project proposals. If the Federal Government determines that an exception based on unreasonable cost of domestic iron, steel, and/or manufactured goods applies, the Federal Government will evaluate a project requesting exception to the requirements of section 1605 of the Recovery Act by adding to the estimated total cost of the project 25 percent of the project cost, if foreign iron, steel, or manufactured goods are used in the project based on unreasonable cost of comparable manufactured domestic iron, steel, and/or manufactured goods. d) Alternate project proposals. (1) When a project proposal includes foreign iron, steel, and/or manufactured goods not listed by the Federal Government at 2 CFR 176.140(b)(2), the applicant also may submit an alternate proposal based on use of equivalent domestic iron, steel, and/or manufactured goods. (2) If an alternate proposal is submitted, the applicant shall submit a separate cost comparison table prepared in accordance with 2 CFR 176.140(c) and (d) for the proposal that is based on the use of any foreign iron, steel, and/ or manufactured goods for which the Federal Government has not yet determined an exception applies. (3) If the Federal Government determines that a particular exception requested in accordance with 2 CFR 176.140(b) does not apply, the Federal Government will evaluate only those proposals based on use of the equivalent domestic iron, steel, and/or manufactured goods, and the applicant shall be required to furnish such domestic items." 39 40 APPENDIX 6 so Reporting Requirements Contract Language Texas Water Development Board - ARRA Funded Project (a) The Contractor acknowledges to and for the benefit of the City of ("Purchaser") and the Texas Water Development Board (the "Board") that it understands the project, goods and services under this Agreement (collectively, the "Project") are being funded,.in whole or in part, with monies made available by the federal American Recovery and Reinvestment Act of 2009 ("ARRA") and ARRA contains reporting provisions ("Reporting Requirements") under Section 1512(c) which require award recipients to report on the financial status and performance of their projects on a weekly and quarterly basis. The Reporting Requirements include .« reporting on the performance of all first -tier contracts and grants awarded for the project, with special consideration given to estimating the number of jobs created and the number of jobs retained by the activity. 4 (b) Contractors must maintain current registrations in the Central Contractor Registration (www.ccr.gov) at all times during which they have active federal .� awards funded with ARRA funds. A Dun and Bradstreet Data Universal Numbering System (DUNS) Number (www.dnb.com) is one of the requirements for registration in the Central Contractor Registration. (c) The Contractor will furnish all information and reports required by federal and state law a„ I have read the above and I hereby certify that I will comply with the "Reporting Requirements Contract Language". Name of Contractor Signa �Tideate 40 APPENDIX 7 Mandatory Reporting Requirements Bid Solicitation and RFP Language Texas Water Development Board — ARRA-Funded Project .ge must be included in all ARRA Droiect bid solicitations and RFPs: The Federal Funding Accountability and Transparency Act of 2006, the Government Funding Transparency Act of 2008 ("2008 Act"), and Section 1512(c) of ARRA require periodic reporting of project information. Applicants must report on the financial status and performance of their projects on a weekly and quarterly basis. The Reporting Requirements include reporting on the performance of all first -tier contracts and grants awarded for the project, with special consideration given to estimating the number of jobs created and the number of jobs retained by the activity. Applicants must require contractors to obtain a Dun and Bradstreet Data Universal Numbering System Number and maintain current registration in the Central Contractor Registration. Applicants must agree to furnish all information and reports required by federal and state law, and must agree to require all contractors to furnish information needed for reporting purposes. 41 w w ,. WW Texas Water Development Board No Clean Water and Drinking Water State Revolving Funds Disadvantaged Business Enterprise Program (DBE) Guidance to Loan Recipients No The Texas Water Development Board's (TWDB) Clean Water and Drinking Water State Revolving Fund programs receive federal funds from the U.S. Environmental Protection Agency Imp (EPA). These fiords are used to provide low interest rate loans to finance wastewater and drinking water capital projects. As a condition of federal grant awards, EPA regulations require that loan recipients (municipalities, towns, public water authorities, etc.) and sub -recipients -+ (prime contractors and sub -contractors) make a "good faith effort" to award a fair share of work to DBE's who are small business enterprises (SBE's), minority business enterprises (MBE's), and women -owned business enterprises (WBE's) whenever procuring construction, supplies, services, and equipment. The DBE Program is an outreach, education, and goal oriented program designed to increase the participation of DBE's in procurements funded by EPA assistance agreements. In addition, EPA regulations require evidence of the demonstration of the "Six Affirmative Step Six Affirmative Steps +. 1. Include qualified DBEs on solicitation lists; 2. Solicit potential DBEs whenever they are potential sources; 3. Reduce contract size or quantities when economically feasible, to permit maximum participation of DBEs; 4. Establish delivery schedules to encourage participation by DBEs; 5. Use the services and assistance of the EPA, Small Business Administration, U.S. Department of Transportation, or by state, local, Tribal, or private entities whose certification criteria match EPA's; 6. Require Prime Contractors to follow steps 1- 5 when awarding subcontracts or sub - agreements. EPA's DBE program rule applies to contract procurement actions funded in part by EPA ,W assistance agreements awarded after May 27, 2008. There are three (3) new forms that must be completed and submitted with bid proposals: New Forms Instructions 6100-2 - DBE Subcontractor Participation Form - Loan recipient must ensure that Prime Contractor receives this form to give to all DBE Subcontractors to report any concerns regarding an EPA - funded project (i.e. reason for termination by Prime Contractor, late payment, etc.). This form should be filled out only when necessary, and forwarded directly to: "' Debora N. Bradford Small and Disadvantaged Business Coordinator Procurement Section (6MD-CP) EPA, Region 6 1445 Ross Avenue ,„, Dallas, Texas 75202-2733 43 4M 6100-3 — DBE Subcontractor Performance Form — Prime Contractor and each subcontractor +. must complete and submit this form (and other required TWDB WRD Forms) with your bid or proposal package. This form should reflect the work or services being provided to Prime Contractor as well as the cost. Also indicate whether the Subcontractor is currently certified as an MBE or WBE under EPA's DBE Program. 6100-4 — DBE Subcontractor Utilization Form — Loan recipient must complete and have Prime .. Contractor list each DBE Subcontractor on this form (and other required TWDB WRD Forms) and submit with your bid or proposal package. List all Subcontractors being used on project, type of work, estimated cost, and if they are currently certified as an MBE or WBE under EPA's 9M DBE Program. Updated WRD Forms All WRD Forms (215, 216, 217, and 373) have been updated as of 02/09. Please do not use an earlier version of these forms; they will not be accepted. Also, form WRD-218 for Self - Certification of SBE's, MBE's, and WBE's is no longer applicable. Do not use this form. Disadvantage Business Enterprises (MBEs and WBEs) must be certified by state, local, Tribal, or private entities whose certification criteria match EPA's. WK In section D (Program Type) of the WRD Forms, two new boxes have been added: Drinking Water SRF/ARRA Funds and Clean Water SRF/ARRA Funds. These boxes are associated with the American Recovery and Reinvestment Act Funds, otherwise known as "Stimulus Funding" for Drinking Water State Revolving Fund — Water Projects, and Clean Water State MP Revolving Fund — Wastewater Projects. Insert and "X" in the box(es) that apply to your project. All of the aforementioned forms (6100-2, 6100-3, 6100-4, and WRDs 215, 216, 217, and 373) are .. available on TWDB's website for your convenience. Please download and save these forms onto your computer. TWDB encourages tuned forms to be submitted, instead of handwritten forms. hfD://www.twdb.state.tx.us/publications/forms manuals/SMWBE.xIs If you have any questions or need assistance, please contact Otis Williams at (512) 463-1878; or by email at: otis.williams@twdb.state.tx.us 44 MW .. .r Texas Water Development Board Disadvantaged Business Enterprise (DBE) Program Tips for Achieving a Good Faith Effort in Procurement wo wo No .e. To assist entities identify, include, and utilize qualified Disadvantaged Business Enterprises (DBEs), applicants and prime contractors are encouraged to refer to the following list of resources made available on a local, statewide, and national level. Resources for identifying DBEs: ♦ Texas Procurement and Support Services (TPASS) Centralized Master Bidders List (CMBL) & Historically Underutilized Business (HUB) Search -The CMBL & HUB Search is a statewide database managed by the TPASS. This database contains contact information on all vendors registered to do business with the State, including TPASS-certified HUB vendors. The CMBL R HUB search is an online system available to the public free of charge. hftr)://www.ci)a.state.b(.us/cmbl/cmbihub.htmi ♦ Texas Department of Transportation - Disadvantaged Business Enterprise Directory hftD://www.dotstate.tx.us/business/tucoinfo.htm ♦ The City of Houston - Minority, Women -Owned, and Disadvantaged Business Directory http://houston.mwdbe.com/FrontEndNendorSearchPublic.aso?TN=Houston Diversitv ♦ The City of Austin - Minority Vendor List htto://www.ci.austin.tx.us/purchase/pu vendor intro.htm ♦ Small Business Administration's -Dynamic Small Business Search - SBA-DSBA is an Intemet-based system that allows applicants and prime contractors to search for small, minority and women -owned businesses in their area. htto://dsbs.sba.aov/dsbs/dsp dsbs.cfm ♦ Other Minority & Women Business Organizations that you can contact directly to obtain a list of qualified vendors for your procurement opportunity: American Indian Chamber of Commerce of Texas Website: www_aicct.com Contact: Diana Woodward Email: dwoodward ..aicct.com Phone: 817-429-2323 Fax: 817-451-3575 Southwest Minority Supplier Development Council Website: www.smsdc.ora Contact: Name: Jennifer Mort Texas Association of Historically Underutilized Businesses Website: www.texashubs.ora Contact: Roy Mata Email: rmata@tgsaustin.com, info@texashubs.org Phone: 512-220-4293 Fax: 512-288-9121 Women's Business Council — Southwest Website: www.wbcsouthwest.ora Contact: Emilia Menthe, Candy Briggs 45 wl Email: jennifer@smsdc_org Phone: 512-386-8766 Dallas/Fort Worth Minority Business Development Council Website: www.dfwmbdc.com Contact: Andrew Nash Email: business@dfwmbc.com Phone: 214-630-0747 Fax: 214-637-2241 Options for announcing your solicitation: Email: ementhe@wbcsouthwest.org, ewilliams@wbcsouthwest.org Phone: 817-299-0566 Women Contractors Association Website: http://www.womencontractors. orq/ Contact: Cherri Morris Email: director@womencontractors.org Phone: 713-807-9977 Fax: 713-807-9917 ♦ Direct Communication - Contacting potential bidders by direct communication can include but are not limited to correspondence by letter, facsimile, telephone, or email. Applicants and prime contractors are required to provide copies of outreach letters, mailing lists, telephone, fax, and email tracking logs. ♦ Small Business Administration's (SBA) Sub -Net- Sub -Net is an Internet -based system that allows applicants and prime contractors to post their procurement opportunities online. Access to the database is free to government agencies and contractors, and is an excellent resource for soliciting DBE's for your project. The Sub -Net database can be accessed at: htto://web.sba.aov/subnet ♦ Newspaper Advertisements -The posting of applicable project procurement opportunities should be done in accordance with the notice requirements of state law on competitive bidding, where applicable. There are specific laws governing each type of entity. For example, two important provisions of state law governing municipalities require: 1. The notice should be published once a week for two consecutive weeks in a newspaper published in the municipality. If no newspaper is published in the municipality, the notice must be posted at the city hall for 14 days before the date set to publicly open the bids and read them aloud; 2. The date of the first publication should be BEFORE the 14"' day of the date set to publicly open the bids. *** Please consult your legal counsel for specific laws governing your entity. *** IPertinent language that.needs to appear within the text of the solicitation includes: A. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). B. Any contractor contracts awarded under this Invitation for Bid (IFB) or Request for Qualifications (RFQ) are expected to be funded in part by a loan from the TWDB. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this IFB, RFQ, or any resulting contract. %W No aw L J 46 s .. C. This contract is subject to the Environmental Protection Agency's (EPA) "fair share policy", which includes EPA -approved "fair share goals" for Minority Business Enterprise (MBE) and Women UW Business Enterprise (WBE) firms in the Construction, Supplies, Equipment, and Services procurement categories. EPA's policy requires that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to Smail Minority and Women -Owned Business Enterprises. Although EPA's policy does not mandate that the fair share w goals be achieved, it does require applicants and prime contractors to demonstrate us of the six affirmative steps. The current fair share goals for the State of Texas are as follows: 1NW CATEGORY MBE WBE CONSTRUCTION 34.8% 6.7% MW SUPPLIES 9.7% 5.2% EQUIPMENT 7.2% 4.1 % WP SERVICES 16.1 % 21.3% w D. Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. Small, minority, and women -owned business enterprises are encouraged to respond. VIM 47 I" ftV .+ w w .r w "M "W Texas Water Development Board (TWDB) Disadvantaged Business Enterprise (DBE) Review Useful Information for Completing & Submitting DBE Forms Item 1 is required to be submitted once with the LOAN APPLICATION and must be approved by the DBE Coordinator PRIOR to obtaining a TWDB funding commitment. Item Form Responsible Party Purpose of Form Establishes the Applicant/Entity's understanding of federal guidelines and certifies their willingness to comply with EPA's "Good Faith Effort" policy in all project WRID 215 Applicant/Entity Only procuremnts paid for with federal loan proceeds. Describes ethe maximum potential Minority Business Enterprise/Women-Owned Business Enterprise (MBE/WBE) procurement opportunities using the pre- established goals. Items 2, 3, & 4 are required to be submitted once with the LOAN APPLICATION for those Applicants who procure Bond Counsel, Financial Advisor, and Engineer professional services and intend to fund those services with federal loan proceeds. Item Form Responsible Party 2 WRD Applicant/Entity Only 3 WRID Prime Contractor(s) Only 217 4 3R3 Applicant/Entity Purpose of Form Identifies who was solicited and how the solicitation was conducted. Must include the appropriate backup documentation such as newspaper advertisements, mailouts/letters, web postings, phone/fax logs etc. Establishes the Pime Contractor's understanding of federal guidelines and certifies their willingness to comply with EPA's "Good Faith Effort" policy in all project procurements paid for with federal loan proceeds. Describes the maximum potential MBE/WBE subcontracting opportunities using the pre -established goals. Describes all contracts actually awarded by the Applicant/Entity and/or Prime Contractor. Should include adequate backup documentation to confirm Small Minority and Women -Owned Business Enterprises (SMWBE) status, where applicable. Items 5 6, 7, 8, 9 & 10 are required to be submitted for contracts which could be awarded during the planning, design & construction phases of the project. This applies to all contracts awarded by the applicant/entity, as well as subcontracts awarded by prime contractors. Item Form Responsible Party 5 WRD Applicant/Entity & 216 Prime Contractor 6 WRD Prime Contractor(s) 217 Only Purpose of Form Identifies who was solicited and how the solicitation was conducted. Must include the appropriate backup documentation such as newspaper advertisements, mail o u ts/letters, web postings, phone/fax logs etc. Establishes the Prime Contractor's understanding of federal guidelines and certifies their willingness to comply with EPA's "Good Faith Effort" policy in all project procurements paid for with federal loan proceeds. Describes the maximum potential MBEMIBE subcontracting opportunities using the pre- established goals. 48 fA 7 8 SRF 373 DBE 6100-2 DBE 6100-3 10 DBE 6100-4 Applicant/Entity & Describes all contracts actually awarded by the Applicant/Entity Prime Contractor and/or Prime Contractor. Should include adequate backup documentation to confirm SMWBE status, where applicable. Applicant/Entity & Loan recipient must ensure that Prime Contractor receives this Prime Contractor form to give to all DBE Subcontractors to report any concerns regarding an EPA -funded project (i.e., reason for termination by Prime Contractor, late payment, etc.). This form should be filled out only when necessary, and forwarded directly to: Debora N. Bradford, Small and Disadvantaged Business Coordinator- Procurement Section (6MD-CP) -EPA, Region 6; 1445 Ross Avenue Dallas, Texas 75202- 2733 Complete and submit this form with your bid or proposal Prime Contractor(s) g package. This form should reflect the work or services being Subcontractor(s) provided as well as the cost. Also indicate whether the Subcontractor is currently certified as an MBE or WBE under EPA's DBE Program. Loan recipient must complete and have Prime Contractor list Applicant/Entity & each DBE Subcontractor on this form and submit with your bid or Prime Contractor proposal package. List all Subcontractors being used on the project, type of work, estimated cost. Indicate if the Subcontractor is currently certified as an MBE or WBE under EPA's DBE Program. „ _..TVVDB Contact Information: Contact: Otis Williams Email: Otis.Williams(a)twdb.state.tx.us Phone: 512.463.1878 Fax: 512.475-3009 y.. qM I� ow LO 49 so TEXAS WATER DEVELOPMENT BOARD (TWDB) APPLICANT/ENTITY AFFIRMATIVE STEPS CERTIFICATION and GOALS .• I i WRD-215 1. PROJECT INFORMATION A TWDB B. Applicant/Entity C. Loan/Grant D. Program Type .r. Project No. Name Amount (inaert"X" forall teal apply) Drinking Water SRF (DWSRF) I , Clean Water SRF (CWSRF) s i + Colonia Wastewater (CWTAP) + Drinking Water SRF/American Reinvestment and RecoveryAct (ARRA) Funds t t ' Clean Water SRF/ARRAfunds ... II. GOOD FAITH EFFORT(App!icadletoail PHaneContracts Awaatdbythe appucawE„tay) I understand that it is my responsibility to comply with all state and federal regulations and guidance in the utilization of Small, Minority, Women -Owned and Small Businesses in Rural Areas, in procurement I certify that I will make a "good "+ faith effor 1.1Inciuding qualified SBE, MBE, WBE and SBRAs on procurement solicitation lists; 2. Soliciting potential SBE, MBE, WBE and SBRAs; w 3.iReducing contract size/quantities, when economically feasible, to permit maximum participation by SBE, MBE, WBE and �SBRAs; 4.lEstablishing delivery schedules to encourage participation by SBE, MBE, WBE and SBRAs; 400 5. Using the services and assistance of the Small Business Administration, Minority Business Development Agency, U.S. Department of Commerce, Texas Marketplace; 6. Requiring all PRIME contractors to follow steps 1-5 of the "good faith effort' in employing SBE, MBE, WBE and SBRA 1100 Subcontractors; Signature-ApplicantlEntity Representative Title Certification Date "all i II III. PROJECT PARTICIPATION ESTIMATES (Demonstrates maximum potential for MBENVBE participation, based on total loan/gr Total Procurement Potential MBEParticipation Potential WBE Participation "' Cost Category Total Goal Extension Goal Extension Construction $ - 34.8% $ - ' 6.7% $ Supplies $ - 9.7% $ - 5.2% $10110 - Equipment $ - 7.2% $ - ° 4.1% $ - i Services $ -; 16.1% $ - ` 21.3% $ - *Other Issuance Costs s (rot subject to Minority Wornen- $ -', WA WA Owned Business Erderonss ools) _ - Total Procurement $ t $ - $ (must equal IoaNgrant arrowd) r 1 I I I i 1 IV. TWDB APPROVAL SIGNATURES PICA Engineer Approval Date DBE Coordinator 1 Approval Date 'Other ISSUANCE costs can include: origination fees; bond insurance; land/easementhight-of-way; attorney general fee; paying agent fee or other non -bid project costs. 50 TEXAS WATER DEVELOPMENT BOARD (TWDB) AFFIRMATIVE STEPS SOLICITATION REPORT I WRD-216 I I. PROJECT INFORMATION I A. TWDB B. Applicant/Entity C. Contract Project No. Name Amount 62400 City of Fort Worth $ 3,287,350.00 Village Creek Reclaimed Water Eastern Project Description: I Delivery System Distribution Main Part 3 Prime Contractor: lConatser Construction TX, LP Solicitation By: I Applicant/Entity V I Prime Contractor Prime Contractor TWDB Construction Contract Number. II. SOLICITATION LIST D. Program Type (insert')(' for all that apply) iI Drinking Water State Revolving Fund (DWSRF) IClean Water State Revolving Fund (CWSRF) �Colonial Wastewater(CWTAP) i DWSRF/American Reinvestment & X& Recovery Act (ARRA) Funds nCWSRF/ARRA Funds Column ' List on this form, or provide a separate list of each business entity solicited for procurement: I Full name, street address, city/state/zip, for each Small, Minority, Woman, Rural Area or Other N Column 2 Enter one of the following procurement or contract categories, S CONSTRUCTION, SUPPLIES; EQUIPMENT; SERVICES T Column 3 Enter the type of business: R Small Business Enterprise (SBE), Minority Business Enterprise (MBE), Women -Owned Business U Enterprise (WBE), Small Rural Business Area (SRBA), or OTHER .NOTE, "OTHER" - Company or firm is C Non-SBE, MBE, WBE or SBRA) T Column 4 Evidence of Good Faith Effort solicitations will include a combination of the following outreach methods. I Adequate backup documentation must be attached to this form for each method used. O 1, Newspaper Advertisements 5. Internet & Web Postings N X 2. Direct Contact by Phone, Fax, Mailouts 8. Trade Association Publications S 3. Meetings or Conferences 7. Other Government Publications 4. Minority Media Column 3 Column 4 Name & Address of Procurement or Type of Solicitation Business Entities Solicited for Procurement Contract Category I Business Methods See Attached 9 pages SI@gature - Aut r►:t Representative Title ( Date /A Vice President I December 9, 2009 III. TWDIfAPPROVAL SIGNATURES PFCA Engineer I Approval Date I DBE Coordinator I Approval Date PRIME CONTRACTOR: CONATSER CONSTRUCTION TX, LP PROJECT DESCRIPTION: VILLAGE CREEK RECLAIM WATER (PART 3) COLUMNI COLUMN COLUMN COLUMN NAMFIADDRESS OF ENTITIES CONTRACT CATEGORY TYPE OF BUSINESS SOLICITATION METHODS AEI SERVICES Provides TV Inpsection and Pipe Direct by Phone, Fax, Mailouts 1107 Arwine court, Suite ##100 SIC: 162306 Cleaning Euless, Texas 76040 M/WBE CONTRACTOR 817-268-1381 B20 Environmental, Inc. SERVICES Provldes TV Inpsection and Pipe Direct by Phone, Fax, Mailouts 3103 Clear Lake Court SIC: 162306 Cleaning Arlington, TX 76017 M/WBE CONTRACTOR 817467-7006 DFW Inf structure, Inc. SERVICES Provides TV Inpsection and Pipe Direct by Phone, Fax, Mallouts 4913 Briar Patch Lane SIC: 162306 Cleaning Burleson, TX 76028 M/WBE CONTRACTOR 817-739-9070 Magnum Manhole SERVICES Provides TV Inpsection and Pipe Direct by Phone, Fax, Mailouts 3828 Cavalier Dr. SIC: 162306 Cleaning Garland, TX 75042 M/WBE CONTRACTOR 214-687-2293 NTP Plumbing SERVICES Provides TV Inpsection and Pipe Direct by Phone, Fax, Mailouts 1025 E. Powell Ave. SIC: 162306 Cleaning Fort Worth, TX 76104 M/WBE CONTRACTOR 817483-6200 ri Ram Too] & Supply Company, Inc SUPPLIER Supplies Rebar Direct by Phone, Fax, Mailouts 2323 Crown Road SIC: 179102 M/WBE CONTRACTOR Dallas, Texas 75229 817-759-1993 3/fag Communications, LLC SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mallouts 709 Northill Dr SIC: 321201 M/WBE CONTRACTOR Richardson, TX 75080 a 214-934-5692 All -Tex Pipe & Supply, Inc. SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts 5205 Elliott Reeder Road SIC: 321201 M/WBE CONTRACTOR Haltom City, TX 76117-5915 817-831-3821 LKT & Associates SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mallouts P O Box 668 SIC: 321201 M/WBE CONTRACTOR Melissa, TX 75454-0668 214-544-0440 Romar Supply, Inc. SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mallouts 2468 Fabens Road SIC: 321201 M/WBE CONTRACTOR Dallas, TX 75229 214-357-2020 Thompson Bearings & Power Tmms SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts s, P O BOX 222261 SIC: 321201 M/WBE CONTRACTOR Dallas, TX 75062 972-812-0878 THT Electric Company SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mallouts dba THT SIC: 321201 M/WBE CONTRACTOR 2999 N. Stemmons Freeway 972-979-3204 Winston Water Cooler, Ltd. SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts 5014 Mark IV Parkway SIC: 321201 M/WBE CONTRACTOR Fort Worth, TX 76106 817-624-9090 FORM WRD-216 Page 1 0 Form WRD-216 Additional Information Page 1 of 9 mmo No October 8, 2009 �v Conatser Construction TX. LP P. O. Box 15448 Fort Worth, Texas 76119 (817) 534-1743 FAX: (817) 5344556 Attention: Certified and Approved MBE and WBE Enterprise Companies SIC 00321201 We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN, PART 3 Water Project No. P275-705140021388 DOE#: N/A City Project #: 00213 PROJECT BID DATE: October 29.2009 Specifications and Contract Documents for this project [s] may be obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX., L. P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file with us prior to bid submittal and must be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 ( Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. All bids must be quoted "One Work Day Prior to Bid Opening", no later than 5:00 PM; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. If you have any questions or comments regarding the above, please call (817) 534-1743 or fax (817) 534-4556. Mark Pappas Vice -President A. Form WRD-216 Additional Information Page 2 of 9 Conatser Construction TX. LP P. O. Box 15448 Fort Worth, Texas 76119 (817) 534-1743 FAX: (817) 534-4556 no October 8, 2009 Attention: Certified and Approved MBE and WBE Enterprise Companies SIC 001179102 We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN, PART 3 Water Project No. P275-705140021388 DOE#: N/A City Project #: 00213 PROJECT BID DATE: October 29.2009 Specifications and Contract Documents for this project [s] maybe obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX., L. P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file with us prior to bid submittal and must be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 ( Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. All bids must be quoted "One Work Day Prior to Bid Opening", no later than 5:00 PM; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. if you have any questions or comments regarding the above, please call (817) 534-1743 or fax (817) 534-4556. Mark Pappas Vice -President r Form WRD-216 Additional Information Page 3 of 9 r. .. aw .d Conatser Construction TX. LP P. O. Boa 15448 Fort Worth, Texas 76119 (817) 534-1743 FAX: (817) 5344556 October 8, 2009 Attention: Certified and Approved MBE and WBE Enterprise Companies SIC 00162306 We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN, PART 3 Water Project No. P275-705140021388 DOEM N/A City Project #: 00213 PROJECT BID DATE: October 29.2009 Specifications and Contract Documents for this project [s] may be obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX., L. P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file with us prior to bid submittal and must be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment ofprevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 ( Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. All bids must be quoted "One Work Day Prior to Bid Opening", no later than 5:00 PM; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. If you have any questions or comments regarding the above, please call (817) 534-1743 or fax (817) 534-4556. Mark Pappas Vice -President Form NVM-216 Additional Information Page 4 of 9 I I t DBE DBE ID# FIRM ADDRESS 00162M AEI 1101 Arw ne Court, Suile #100 00162306 1320 Environmental, Inc. 3103 Clear Lake Court ot00162306 DFW hrtrastrvcture, Inc. 4913 Briar Patch Lane O 00162306 Magnum Manhole & Underground Co. 3828 Cavalier Drive �00162306 NTP Plumbing & Utilities Contractor P O BOX 2110 179102 Ram Tool & Supply Company, Inc. 1432 Mac Arthur Dr. 01� >00179102 Rebar Service & Supply Company, Inc. 1390 Gilman Road a n0321201 3)TAG Communications, U C 709 North Hill Drive O �290321201 All -Tex Pipe & Supply, Inc. 5205 Elliott Reeder Road 0321201 Ceeo Sales Corporation 708 N. Main Street 900321201 LKT & Associates P O BOX 668 r• 000321201 Romar Supply, Inc. 2468 Fabens Road '•d ID cFQ Thompson Bearings & Power Transmission LLC P 0 BOX 222261 cM321201 THT Electric Company, Inc. DBA THT 2999 N. Stemmons Frwy W321201 Tower Well Resources, LLC P O BOX 1641 00321201 Winston Water Cooler, LTD. 5014 Mark IV Parkway 08-Oct-09 CITY STAY! 2V PHONIZ FAX LZ IZR October 8, 2009 Balm TX 76040 (817) 268-1381 (817) 268-1921 Y Arlington TX 76017 (817) 467-7006 (817) 465-6149 Y Burleson TX 76028 18887399070 (917) 332-7244 Y Garland TX 75042 (214) 687-2293 (972) 276-5318 Y Fort Worth TX 76104 (817) 483-6200 (817) 483-6203 Y Carrollton TX 75007 (817) 759-1993 (817) 759-2799 Y Kamedale TX 76060 (817) 4834603 (817) 483-8418 Y Richardson TX 75080 12149345692 19722342512 Y Haltom City TX 76117 (817) 831-3821 (817) 831-2173 Y Fort Worth TX 76154-0 (817) 429-1866 (817) 332-5103 Y Melissa TX 75454 (214) 544-0440 (214) 544-3684 Y Dallas TX 75229 (214) 357-2020 (214) 357-1398 Y Dallas TX 75062 (972) 812-0878 (972) 812-0877 Y Lewisville TX 75077 (972) 979-3204 (469) 322-2668 Y Colleyville TX 76034 (817) 849-1577 (817) 485-1677 Y Fort Worth TX 76106 (817) 624-9090 (817) 624-1747 Y .. Im r-1 "M no ..0 r .w r Send Log Status AtType PrName Date Compie Fax Sei Thompson Bearings & Power Tr... Thu 10/8/2009 5:00 PM Comple Fax Sei Magnum Manhole & Undergrou... Thu 10/8/2009 4,46 PM Compie Fax Sei All -Tex Pipe & Supply, Inc. Thu 10/8/2009 4:35 PM Comple Fax Sei Ram Tool & Supply Company, Inc Thu 10/8/2009 4:50 PM Comple Fax Sei Winston Water Cooler, LTD. Thu 10/8/2009 5:04 PM Comple Fax Sei Conatser Construction, Inc. to Thu 10/8/2009 4.41 PM Failed Fax Set Tower Well Resources, LLC Thu 10/8/2009 5:14 PM Comple Fax Set Rebar Service & Supply Company Thu 10/8/2009 4:52 PM Comple Fax Set NTP Plumbing & Utilities Contr Thu 10/8/2009 4:48 PM Comple Fax Set B2O Environmental, Inc. Thu 10/8/2009 5:07 PM Comple Fax Set DFW Intrastructure, Inc. Thu 10/8/2009 4:43 PM Comple Fax Set Ceco Sales Corporation Thu 10/8/2009 4:38 PM Comple Fax Set AEI Thu 10/8/2009 4:32 PM Failed Fax Set THT Electric Company, Inc. D Thu 10/8/2009 5:12 PM Comple Fax Set LKT & Associates Thu 10/812009 4:44 PM Comple Fax Set Romar Supply, Inc. Thu 10/8/2009 4:54 PM Failed Fax Set 3/TAG Communications, LLC Thu 10/8/2009 5:11 PM Page 1 Pa... Company Su... 2 2 2 2 2 2 2 2 2 2 2 2 23o n/ 2 Lam- c'Sf�G c */fit 2 2 2 C t'7 i N.t t D S .,o-c -e -0-/ Form VWRD-216 Additional Information Page 6 of 9 so r so Ow Phone Number/Callerld 9728120877 9722765318 8178312173 8177592799 8176241747 8175344556 8174851677 8174838418 8174836203 8174656149 8173327244 8173325103 8172681921 4693222668 21454436M 2143571398 19722342512 Send Log Page 2 Form WRD-216 Additional Information Page 7 of 9 .o From: Bertha Gianulis To: Inc. to Conatser Construction Conatser Construction, TX-, LP No Tel: 817-534-1743 Fax: 817-534-4556 so To: Inc. to Conatser Construction an Company: Fax Number: 8175344556 Subject : Pages including cover page: 2 Date: 10/8/2009 Time: 4:41:54 PM Page 1 of 2 in FAX COVER From: Bertha Gianulis Company: Conatser Construction Fax Number : (817) 534-4556 Time: 4:31:34 PM Date: 10/8/2009 MESSAGE We are soliciting bids from Certified and Approved MBE and WBE enterprise companies for projects within the City of Fort Worth, Texas. The following letter outlines the details. 1 Thank You for your interest. T T Form WRD-216 Additional Information Page 8 of 9 From: Bertha Gianulis To: Inc. to Conatser Construction Date: 10/8/2009 Time: 4:41:54 PM Page 2 of 2 r--i so CONATSER CONSTRUCTION TX.. L.P. P. O. Box 15448 Fort Worth, Texas 76119 (817)534-1743 (817)534-4556 October 8, 2009 Attention: Certified and Approved MBE and WBE Enterprise Companies We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN, PART 3 w Water Project No. P275-705140021388 DOE#: N/A City Project #: 00213 •+ PROJECT BID DATE: October 29.2009 Specifications and Contract Documents for this project [s] may be obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX., L.P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file with us urior to bid submittal and must R be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. All bids must be quoted "One Work Day Prior to Bid Onenine", no later than 5:00 P.M.; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. If you have -- any questions or comments regarding the above, please call me at (817) 534-1743. Our Fax Number is (817) 534-4556. 71 Mark Pappas Vice -President .. Form WRD-216 Additional Information Page 9 of 9 TEXAS WATER DEVELOPMENT BOARD (TWDB) PRIME CONTRACTOR AFFIRMATIVE STEPS CERTIFICATION and GOALS WRD-217 I. PROJECT INFORMATION A. TWDB B. Applicant/Entity (t. Loan/Grant Project No. Amount 62400 City of Fort Worth $ 22,260,000.00 D. Contract Number E. Prime Contractor F. Contract Amount P275-705140023188 Conatser $ 3,287,350.00 Construction TX, LP G. Program Type (insert ")" for all that apply) =Drinking Water SRF (DWSRF) =Clean Water SRF (CWSRF) =Colonic Wastewater (CWTAP) �XDWSRF/American Reinvestment & Recovery Act (ARRA) Funds CWSRF/ARRA Funds II. GOOD FAITH EFFORT (Apph�able to all Sub -Agreements Awarded by the Prime Contractot / understatia that it a My MpoofIbZ6 to comply with au state and jeLrat ngutatwni and gutaance tri t tit ats=atwn of SnI4 winonty, WN-oumedandSmaiTcUsinmses in RrrolArrat, in procur mmt. I cert>� that Iuiffsail a ''yoodfitith rjfart'to afford opportunities EXCEPTION for SsaQBn,taets Pattnpnu (SBcE,I Woortty Mumas tEntapwa (AME)woman-ortmed®unne s Estrrprise OVOE)and stnah: 4Zarrt As the Prime Contractor, Businus�Arear (MA) hv: 1. Including qualified SBE, MBE, WBE and SBRA's on procurement solicitation lists; I certify that I have reviewed the 2. Solicitingpotential SBE, MBE, WBE and SBRA's; contract requirements and found no available 3. Reducing contract size/quantities, when economically feasible, to permit maximum participation subcontracting opportunities. by SBE, MBE, WBE and SBRA's; I also certify that I will fulfill 100 4. Establishing delivery schedules to encourage participation by SBE, MBE, WBE and SBRA's; percent of the contract requirements with my own 5. Using the services and assistance of the Small Business Administration, Minority Business employees & resources. Development Agency, U.S. Department of Commerce, Texas Marketplace; E3 .. 6. Submitting documentation to the Texas Water Development Board to verify good faith effort, steps 1-5. hark 9 eooficaWe) Signature - Author' d)/presentative Title Certification Date + Vice President � f December 9, 2009 Ill. OJECT PARTICIPATION ESTIMATES Demonstrates mardmum potential for MBEMBE participation, based on total contract amount) Total Procurement Potential MBE Participation Potential WBE Participation Cost Category Total Goal Extension Goal Extension Construction $ 1,803,650 34.8% 6.7% Supplies $ 1,169,300 9.7% 5.2% $ 203,900 Equipment $ - 7.2% $ - 4.1% $ - Services $ 314,400 16.1% $ 293,900 21.3% $ 12,000 'Other Issuance Costs cc not subject to Minonty women -puma{ $ - NIA NIA Business Entemd" goals'. Total Procuremen (must —al contract amountts $ 3,287,35011 $ 293,900 $ 215,900 IV. TWDB APPROVAL SIGNATURES PFCA Engineer Approval Date DBE Coordinator Approval Date IN Other ISSUANCE costs can Include: r,riaination fees: bond insurance; land/easement/riaht-of-way: aWmev general fee: paving agent fee or other non - bid project costs. W 0 49 no �� TEXAS WATER DEVELOPMENT BOARD LOAN/GRANT PARTICIPATION SUMMARY I W►RD-373 I I. PROJECT INFORMATION A. TWDB Project B. Applicant/Entity Name C. Contractor D. Program Type (i wo-x-fa eri ow owy) Number Loan Amount �I 62400 City of Fort Worth 3,287,350.00& Drinking Water State Revolving Fund (DWSRF) (Village Creek Reclaimed Water Eastern Delivery ❑Clean Water State Revolving Project Description: System Distribution Main Part 3 Fund (CWSRF) Prime Contractor: ,Conatser Construction TX, LP =Colonia Wastewater (CWTAP) Solicitation By: Applicant/Entity I X Prime ContractorV DWSRF/American Reinvestment g, Recovery Act (ARRA) Funds TWDB Construction Contract Number: > 1 CWSRF/ARRA Funds II. LIST OF ACTUAL CONTRACTS / PROCUREMENTS r Column 1 Enter the full name, street address, city/state/zip for each firm awarded a contract for the project s Column 2 Enter the procurement category: CONSTRUCTION; SUPPLIES; EQUIPMENT; SERVICES T Enter the type of business: Small Business Enterprise (SBE); Minority Business Enterprise (MBE); R u Column 3 Women -Owned Business Enterprise (WBE); Small Rural Business Area (SRBA); or OTHER C Non-SBE, MBE, WBE or SBRA) T Column 4 Enter the exact amount of the awarded contract 0 N Column 5 Enter the exact date the contract was or will be executed s Column 6 Enter the certification type (i.e, state; federal; NCTRCA; City of Houston; sen-Certification etc.) Column 1 " � -- — Column , Column 3 �_�����Column 4 Column 5 _ Colu mn6 Name & Address of Contracted Procurement Type of Actual Contract Contract Type of Small Minority FirmNendor Category Business Awarded ($) Execution Date Women -Owned Business Enterprise Certification Robert Granados Trucking .5412 Kingslink Circle Services MBE $ 293,900.00 12/08/09 NCTRCA Fort Worth, Texas 76135 Cowtown Redi-Mix iP.O. Box 163267 Supplies MBE/WBE $ 158,400.00 12/08/09 NCTRCA r Fort Worth, Texas 76161 Roadrunner Traffic Supply 3200 Marquita Drive Supplies MBE/WBE $ 6,500.00 12/08/09 NCTRCA Fort Worth, Texas 76116 TrueBlue Services 18716 S. Water Tower Road Services WBE $ 12,000,00 12/08/09 NCTRCA Fort Worth, Texas 76179 1 hereby certib that afh of the , firma fated above acre contracted w work on the sped wd prWxt. I afro certify that I wilf immediately notify the T&w 'Water Vevelopmew Boardifany ofthe &tedsmag minority, women -ouwdorraraffirms are terminatedfrom the project. Signature - Authorized Representative I Title Date Continued on Next Page III. TWDB APPROVAL SIGNATURES PFCA Engineer Approval Date DBE Coordinator Approval Date I .8 TEXAS WATER DEVELOPMENT BOARD LOAN/GRANT PARTICIPATION SUMMARY I WRD-373 I 1. PROJECT INFORMATION A. TWDS Project B. Applicant/Entity Name Number 62400 City of Fort Worth C. Contractor �I D. Program Type lip x f an uwmay) Loan Amount $ 3,287,350.00 Village Creek Reclaimed Water Eastern Delivery Project Description: System Distribution Main Part 3 Prime Contractor: Conatser Construction) TX, LP Solicitation By: i Applicant/Entity 1 X Prime Contractor TWDB Construction Contract Number: 11. LIST OF ACTUAL CONTRACTS I PROCUREMENTS ❑Drinking Water State Revolving Fund (DWSRF) Clean Water State Revolving Fund (CWSRF) Colonia Wastewater (CWTAP) X DWSRF/American Reinvestment & Recovery Act (ARRA) Funds ,CWSRF/ARRA Funds i I Column 1 Enter the full name, street address, city/state/zip for each firm awarded a contract for the project S Column 2 Enter the procurement category: CONSTRUCTION; SUPPLIES; EQUIPMENT; SERVICES T R Enter the type of business: Small Business Enterprise (SSE); Minority Business Enterprise (MBE); U Column 3 Women -Owned Business Enterprise (WBE); Small Rural Business Area (SRBA); or OTHER o Non-SBE MBE, WBE orSBRA; T i Column 4 Enter the exact amount of the awarded contract 0 N Column 5 Enter the exact date the contract was or will be executed s Column 6 Enter the certification type (i.e. state; federal; NCTRCA; Cty of Houston; Self-Cenificatbon etc.) Column 1 column 2 Column S Column 4 Column 5 C _ ^ olumn 6 Name 8 Address of Contracted Procurement Type of Actual Contract Contract Type of Small Minority Firm/Vendor Category Business Awarded ($) Execution Date Women -Owned Business Enterprise Certification Suncoast Resources, Inc. 6922 Cavalcade Supplies WBE $ 39,000.00 12/08/09 NCTRCA Houston, Texas 77028 HD Supply P.O. Box 840700 Supplies Non-MBE/WBE $ 965,400.00 12/08/09 WA Dallas, Texas 75284 JLB Contracting, LLC P.O. Box 24131 Supplies Non-MBEiWBE $ 8,500.00 12/08/09 WA Fort Worth, Texas 76124 Conatser Construction TX, LP P.O. Box 15448 Suppl aSServic Non-MBE/WBE $ 1,803,650.00 12/08/09 I WA Fort Worth, Texas 76119 1 hm6y certify that all of the fumy bated a6ave were contracted to work on the speafretl prgra 1 also certify that 1 will imaw4ately notify the Tarim Water Development Board!f any of the rutefAinK minority, :vomenouu or ruraffirms are termmatedfrom the project. SI re - Authors d R46presentative Title Date Vice President December 9, 2009 III. TWDB APPROVAL S ATURES PFCA Engineer Approval Date DBE Coordinator Approval Date I 1 r fm .. MW .. Now MW "W TEXAS WATER DEVELOPMENT BOARD Disadvantaged Business Enterprise Program DBE Subcontractor Participation Form - 6100-2 Subcontractor Signature Title/Date Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. EPA FORM 6100-2 (DBE Subcontractor Participation Form) ,y 02/09 54 aP�QOEVE�oA�ff�� TEXAS WATER DEVELOPMENT BOARD Disadvantaged Business Enterprise Program�- DBE Subcontractor Performance Form - 6100-3 NAME OF SUBCONTRACTOR Robert Granados Trucking PROJECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 ADDRESS 5412 Kingslink Circle, Fort Worth, Texas 76135 BID/PROPOSAL NO. TELEPHONE NO. EMAIL ADDRESS PRIME CONTRACTOR NAME Conatser Construction TX, LP CONTRACT ITEM NO. ITEM OF WORK OR DESCRIPTION OF SERVICES BID TO PRIME PRICE OF WORK SUBMITTED TO PRIME CONTRACTOR Trucking - Haul Off Materials $ 293,900.00 Yes No . . �Curr fly fi s or WBE tEPA's DBE Program? / December 9, 2009 Signa re of Prime Contractor Date Manz Vice President Print ame - - Title December 9, 2009 Signature of Subcontractor Date Robert Granados _ ,t Print Name Title ! i Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. 1 EPA FORM 6100-3 (DBE fi � . Performance Form) 02/09 TEXAS WATER DEVELOPNu0,.ii t BOARD o Disadvantaged Business Enterprise Program h R DBE Subcontractor Performance�r Form - 6100-3 K NAME OF SUBCONTRACTOR Cowtown Redi-Mix PROJECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 ADDRESS P.O. Box 163267, Fort Worth, Texas 76161 BID/PROPOSAL NO. TELEPHONE NO. EMAIL ADDRESS PRIME CONTRACTOR NAME Conatser Construction TX, LP CONTRACT ITEM NO. ITEM OF WORK OR DESCRIPTION OF SERVICES BID TO PRIME PRICE OF WORK SUBMITTED TO PRIME CONTRACTOR Concrete Redi-Mix Products $ 158,400.00 i I — •--• — — Yes —.._ No Currently c tie r WBE ua s DBE Program? December 9.2009 � Signatur of Prime C Date Ma P as I A Vice President Print Name Y Title December 9, 2009 Signature of Subcontractor Date Vice President Print Name Title Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. EPA FORM 6100-3 (DBE S. , . Performance Form) 32/09 _ _ W ��49$VELOpA'� TEXAS WATER DEVELOPMENT BOARD XDisadvantaged Business Enterprise Program o DBE Subcontractor Performance ,rt . ,. Form - 6100-3 NAME OF SUBCONTRACTOR Roadrunner Traffic Supply PROJECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 ADDRESS 3200 Marquita Drive, Fort Worth, Texas 76116 BID/PROPOSAL NO. TELEPHONE NO. EMAIL ADDRESS PRIME CONTRACTOR NAME Conatser Construction TX, LP CONTRACT ITEM NO. ITEM OF WORK OR DESCRIPTION OF SERVICES BID TO PRIME PRICE OF WORK SUBMITTED TO PRIME CONTRACTOR Traffic Control Devices $ 6,500.00 i' Yes No Currently cert' a or WBE and A's DBE Program? December 9, 2009 _ L Signatur of Prime Contractor Date Mark Pappas _ _ _ Vice President �AAP,,r,int Name Title December 9.2009 m Signature of Subcontractor Date J_ Marilyn Edlund President Print Name Title -Si ...i . is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. EPA FORM 6100-3 (DBE Subcontractor Performance Form) 02/09 - TEXAS WATER DEVELOPMENT BOARD 3��4�G��toAs2� Disadvantaged Business Enterprise Program o DBE Subcontractor Performance o Form - 6100-3 x NAME OF SUBCONTRACTOR PROJECT NAME: Village Creek Reclaimed Water TrueBlue Services Eastern Delivery System Distribution Main Part 3 ADDRESS 8716 S. Water Tower Road, Fort Worth, Texas 76179 BID/PROPOSAL NO. TELEPHONE NO. EMAIL ADDRESS PRIME CONTRACTOR NAME Conatser Construction TX, LP CONTRACT ITEM OF WORK OR DESCRIPTION OF SERVICES PRICE OF WORK ITEM NO. BID TO PRIME SUBMITTED TO PRIME CONTRACTOR Erosion Control Services i $ 12,000.00 I Currently c ifi I a M r WBE u PA's DBE Program? igna ur f Prime Contractor r QDas rint ame Signature of Subcontractor Bobby Olivas Print Name Yes _ - No December 9, 2009 Date Vice President Title DeceMoer 9, 2009 Date Vice President Title Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. EPA FORM 6100-3 (DBE Subcontractor Performance Form) 02/09 TEXAS WATER DEVELOPMENT BOARD ��4pFVELOp�c� Disadvantaged Business Enterprise Program ° DBE Subcontractor Performance ��-gVELn ° * ' Form - 6100-3 NAME OF SUBCONTRACTOR PROJECT NAME: Village Creek Reclaimed Water Suncoast Resources, Inc. Eastern Delivery System Distribution Main Part 3 ADDRESS 6922 Cavalcade, Houston, Texas 77028 BID/PROPOSAL NO. TELEPHONE NO. EMAIL ADDRESS PRIME CONTRACTOR NAME Conatser Construction TX, LP CONTRACT ITEM OF WORK OR DESCRIPTION OF SERVICES PRICE OF WORK ITEM NO. BID TO PRIME SUBMITTED TO PRIME CONTRACTOR Fuel - Diesel & Gasoline Yes No ICurre �yce ;*e ;794E or WB ander EPA's DBE Program? _ December 9, 2009 Sigma re of Prime Contractor Date ark Pappas _ _ Vice President Print Name Title December 9, 2009 Signature of Subcontractor Date Terri Bateman Vice President _ Print Name Title Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. EPA FORM 6100-3 (DBE Subcontractor Performance Form) 02/09 39,000.00 M M no ��BVELOp� p-VELOp I o� TEXAS WATER DEVELOPMENT BOARD o *� •<* k Disadvantaged Business Enterprise Program` •- DBE Subcontractor Utilization Form - 6100-4 BID/PROPOSAL NO. PROJECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 NAME OF PRIME BIDDER/PROPOSER E-MAIL ADDRESS Conatser Construction TX LP ADDRESS P.O. Box 15448, Fort Worth, Texas 76119 TELEPHONE NO. (817) 534-1743 FAX NO. (917) 534-4556 The following subcontractors will be used on this project: COMPANY NAME, TYPE OF WORK TO BE ESTIMATED CURRENTLY ADDRESS, PHONE NUMBER, PERFORMED DOLLAR CERTIFIED AND E-MAIL AMOUNT AS AN MBE ADDRESS OR WBE? ,Robert Uranados Trucking Trucking - Haul Off Material $ 293,900.00 MBE `5412 Kingslink Circle Fort Worth, Texas 76135 (817) 875-2400 I certify under penalty of perjury that the forgoing statements are true and correct. In the event of a replacement of ubcontra;tor ill adhere to the replacement requirements set -forth in 40 CFR Part 33 Section 33. ©. December 9, 2009 ignature of rime Contractor - Date Mark Pappas Vice President —. Print Name �- -- -- I Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. EPA FORM 61004 (DBE ; . ...... , ,.r Utilization Form) 32/09 �pCsV EGpA pCsV ELOP 3 � TEXAS WATER DEVELOPMENT BOARDS o Disadvantaged Business Enterprise Program`.- _ DBE Subcontractor Utilization Form - 6100-4 BID/PROPOSAL NO. PROJECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 NAME OF PRIME BIDDER/PROPOSER E-MAIL ADDRESS Conatser Construction TX LP ADDRESS P.O. Box 15448, Fort Worth, Texas 76119 TELEPHONE NO. (817) 534-1743 FAX NO. (817) 5344556 The following subcontractors will be used on this project: COMPANY NAME, TYPE OF WORK TO HE ESTIMATED CURRENTLY ADDRESS, PHONE NUMBER, PERFORMED DOLLAR CERTIFIED AND E-MAIL AMOUNT AS AN MBE ADDRESS OR WBE? Cowtown Redi-Mix Redi-Mix Concrete Products $ 158,400.00 MBE/WBE Fort Worth, Texas 76161 (817)759-1919 I certify under penalty of perjury _ are true and correct. In the event of jury that the forgoing statements a replacement of a subcontractoy,4 will adhere to the replacement requirements set -forth in 40 CFR Part 33 Section 33.302 _ _De_ cenlbvr 9, 2009 ignature of 0rime Contractor Date 'Mark Pappas _ Vice President Print Name Title "J ... ... ,. is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide � :services pursuant to an EPA award of financial assistance. ;EPA FORM 6100-1(DBE Subcontractor Utilization Form) 102/09 No M .o no r TEXAS WATER DEVELOPMENT BOARD �, o *`< Disadvantaged Business Enterprise Program �.• rt/ DBE Subcontractor Utilization Form - 6100-4 BID/PROPOSAL NO. PROJECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 NAME OF PRIME BIDDER/PROPOSER E-MAIL ADDRESS Conatser Construction TX LP ADDRESS P.O. Box 15448, Fort Worth, Texas 76119 TELEPHONE NO. (817) 534-1743 FAX NO. (817) 5344556 The following subcontractors will be used on this project: COMPANY NAME, TYPE OF WORK TO BE ESTIMATED CURRENTLY ADDRESS, PHONE NUMBER, PERFORMED DOLLAR CERTIFIED AND E-MAIL AMOUNT AS AN MBE ADDRESS OR WBE? Roadrunner Trathc Supply Traffic Control Supplies $ 6,5UU.UU MBE/WBE 3200 Marquita Drive Fort Worth, Texas 76116 (817)244-0305 I certify under penalty of perjury that the forgoing statements are true and correct. In the event of a replacement of a subcontractor, I will adhere to the replacement requirements set -forth in 40 CFR Part 33 Section 33.302 _ December 9, 2009 Signature of a Contractor Date Mark Pappas Vice President _ Print Name Title Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. EPA FORM 6100-4 (DBE Subcontractor Utilization Form) 02/09 3�`�pgV ELpp��2a e3����vC V ELOp��2� �v o TEXAS WATER DEVELOPMENT BOARD�� o *' ��• 'h Disadvantaged Business Enterprise Program �` *.• `= "DI Form - 6100-4 BID/PROPOSAL NO. PROTECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 NAME OF PRIME BIDDER/PROPOSER E-MAIL ADDRESS Conatser Construction TX LP ADDRESS P.O. Box 15448, Fort Worth, Texas 76119 TELEPHONE NO. (817) 534-1743 FAX NO. (817) 534-4556 The following subcontractors will be used on this project: COMPANY NAME, TYPE OF WORK TO BE ESTIMATED CURRENTLY ADDRESS, PHONE NUMBER, PERFORMED DOLLAR CERTIFIED AND E-MAIL AMOUNT AS AN MBE ADDRESS OR WBE? T,,,Pul„- 42— . e. F—;,,,, !'.,.,*—1 T 17 tltltl tltl wT2F 8716 S. Water Tower Road Fort Worth, Texas 76179 (817)917-3238 I certify under penalty of perjury that the forgoing statements are true and correct. In the event of a replacement of a subcontractor, I will adhere to the replacement requirements set -forth in 40 CFR Part 33 Section 33.302 December 9. 2009 � Signature o rime Contractor Date Mark Patinas _ _ Vice President Print Name Title Subcontractor is defined as a company, firm, joint venture, or individual who enters into an agreement with a contractor to provide services pursuant to an EPA award of financial assistance. L02109EAFORM 6100-4 (DBE Subcontractor Utilization Form) w Q�gV ELpA ..,_ stv FLpp ,. TEXAS WATER DEVELOPMENT BOARD o �* •: ;% Disadvantaged Business Enterprise Program�w DBE Subcontractor Utilization Form - 6100-4 W M go BID/PROPOSAL NO. PROJECT NAME: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3 NAME OF PRIME BIDDERIPROPOSER E-MAIL ADDRESS Conatser Construction TX LP ADDRESS P.O. Box 15448, Fort Worth, Texas 76119 TELEPHONE NO. (817) 534-1743 FAX NO. (817) 5344556 The following subcontractors will be used on this project: COMPANY NAME, TYPE OF WORK TO BE ESTIMATED CURRENTLY ADDRESS, PHONE NUMBER, PERFORMED DOLLAR CERTIFIED AND E-MAIL AMOUNT AS AN MBE ADDRESS OR WBE? Suncoast Resources, Inc. Fuel - Diesel & Gasoline $ 39,000.00 WBE 6922 Cavalcade (800)677-3835 I certify under penalty of perjury that the forgoing statements are true and correct. In the event of a replacement of a sul. .... .. , I will adhere to the replacement requirements set -forth in 40 CFR Part 33 Section 33.302 _ December 9, 2009 ignature qoYrime C • Date Mark Pappas _ Vice President _ Print Name Title Subcontractor is defined as a co joint venture, or individual who enters into an company, firm, j agreement with a . ..... ,. � .. ).provide services pursuant to an EPA award of financial assiatance. J.� EPA FORM 61004 (DBE Subcontractor Utilization Form) 02/09 W CONTRACTOR'S ACT OF ASSURANCE (ED-103) STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, Jamie L. Brown, a Notary Public duly commissioned and qualified in and for the County of TARRANT in the State of Texas came and appeared Conatser Construction TX. LP , as represented by Mark PaniDas , the corporation's Vice President , who declares he/she is authorized to represent Conatser Construction TX, LP pursuant to provisions of a resolution adopted by said corporation on the 9th day of December . 2009 (a duly certified copy of such resolution is attached to and is hereby made a part of this document). Mark Pannas , as the representative of Conatser Construction TX, LP , declares that Conatser Construction TX, LP assures the Texas Water Development `\iI 11aIe Creel- QCClaaimerl Board that it will construct Wm-0- yEA�%,-r del project at (�--Or�Wo Texas, in accordance with sound construction practice, all laws of the State of Texas, and the rules of the Texas Water Development Board. GIVEN UNDER MY HAND and seal of office this 9th day of December, 2009 A.D. JAMIE L BROWN *tf,? NOTARY PUBLIC Comm. tExp. 06 27-2012 ate of Texas My Commission expires w Jamie L Brown Printed Name CONTRACTOR'S RESOLUTION (ED-104) ON AUTHORIZED REPRESENTATIVE Conatser Construction TX. LP Name or Names I hereby certify that it was RESOLVED by a quorum of the directors of the Conatser Construction TX, LP . meeting name of corporation on the 9th day of December , 2009, that Mark Pappas, be, and hereby is, authorized to act on behalf of Conatser Construction TX, LP , as its name of corporation representative, in all business transactions conducted in the State of Texas, and; That all above resolution was unanimously ratified by the Board of Directors at said meeting and that the resolution has not been rescinded or amended and is now in full forces and effect; and; In authentication of the adoption of this resolution, I subscribe my name and affix the seal of the corporation this 0 day of December. 2009. (seal) or Secretary WRD-255 09/12/01 BIDDER'S EEO/NSF CERTIFICATIONS (WRD-255) Project Name Village ( reek Reel aim M Water RactPrn_ 17P� C� ctem Dist Main Part 3 Project Number __62400 Contract For The following certifications must be completed by the bidder for each contract. A. EQUAL EMPLOYMENT OPPROTUNITY: ( ) I have developed and have on file at my each establishment affirmative action programs pursuant to 41 CFR Part 60-2. s ( ) I have participated in previous contract(s) or subcontract(s) subject to the equal opportunity clause under Executive Orders 11246 and 11375. I have filed all reports due under the requirements contained in 41 CFR 60-1.7. ( X ) I have not participated in previous contracts(s) subject to the equal opportunity clause under Executive Orders 11246 and 11375. M ) I will obtain a similar certification from any proposed subcontractor(s), when appropriate. B. NONSEGREGATED FACILITIES ( ) I certify that I do not and will not maintain any facilities provided for my employees in a segregated manner, or permit my employees to perform their services at any location under my control where segregated facilities are maintained; and that I will obtain a similar certification prior to the award of any federally assisted subcontract exceeding $10,000 which is not exempt from the equal opportunity clause as required by 41 CFR 60-1.8. I understand that a false statement on this certification may be grounds for rejection of this bid proposal or termination of the contract award. Mark Pannas. Vi esident Type a e & Title A 'dde�r's Authorized Representative (signature of Bidder's Authorized Re resentative ,,rr P /-WI/0 f Date Conatser Construction TX, LP P.O. Box 15448. Fort Worth. Texas 76119 Name & Address of Bidder WRD-259 3/20/02 VENDOR COMPLIANCE WITH RECIPROCITY ON NON-RESIDENT BIDDERS Govemment Code 2252.002 provides that, in order to be awarded a contract as low bidder, a non-resident bidder must bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the state in which the non- resident's principal place of business is located. A non-resident bidder is a contractor whose corporate offices or principal place of business is outside of the state of Texas. This requirement does not apply to a contract involving Federal funds. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non- resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the blank in Section B. A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident vendors in (give state), our principal place of business, are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas: X BIDDER: Company ��. Bey I p �1�� � 176 111 ,, City State Zip f �I1 By: (please print) n Signature ►I •c� Ya.u,o�Nr Title: (please print) THIS FORM MUST BE RETURNED WITH THE BID 60 SRF-404 (5/13/91) SRF Number CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS The prospective participant certifies to the best of its knowledge and belief that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (b) Have not within a three year period preceding this proposal been convicted of or had a civil judgement rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and (d) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State, or local) terminated for cause or default. I understand that a false statement on this certification may be grounds for rejection of this proposal or termination of the award. In addition, under 18 USC Sec. 1001, a false statement may result in a fine of up to $10,000 or imprisonment for up to 5 years, or both. .. ---Mark Pavnas. Vic esident d Name & Title of Authorized Representative ' Signature of Authorized Representative Date I am unable to certify to the above statements. My explanation is attached 12/17/2009 10:19 091029 VILLAGE CREEK REC WTR PT3 4 *** Mark Pappas BID TOTALS Biditem Description Ouantity Units Unit Price Bid Total 10 IMPLEMENT OF SWPPP 1.000 LS 18,500.00 18,500.00 'w 40 24" DIA C303 BAR WRAP CCP W/CATH PROT SYS 10,100.000 LF 79.00 797,900.00 80 20" DIA C905 CL 200 DR 18 POLY CHL PIPE 5,900.000 LF 65.00 383,500.00 90 6" DIA C900 CL 200 DR 14 POLY CHLORIDE PIPE 150.000 LF 40.00 6,000.00 T 110 30" DIA CAS PIPE HOR DIR DRILL 2,000.000 LF 350.00 700,000.00 120 36" DIA CAS OTOC 260.000 LF 360.00 93,600.00 150 24" DIA C303 BAR WRAP CCP IN 36" DIA STL CASING 260.000 LF 90.00 23,400.00 170 20" DIA C151 DI PIPE IN 30" STL CS 2,000.000 LF 110.00 220,000.00 200 DESIGN & IMPLEMENT TRENCH SAFETY SYS 16,000.000 LF 14.00 224,000.00 210 24" RESIL SEATED GTE VLVE & VAULT 4.000 EA 22,000.00 88,000.00 220 20" RESIL SEATED GTE VLVE & VAULT 6.000 EA 17,000.00 102,000.00 230 8" RESIL SEATED GTE VLVE & VAULT 3.000 EA 1,000.00 3,000.00 240 2" AUTO COMB AIR & VACUUM REL VLVE & VAULT 14.000 EA 6,000.00 84,000.00 250 BLOWOFF ASSEM W/VLVE,PIPE,FITT,CONC,EXCAV,B-FI 3.000 EA 5,500.00 16,500.00 260 10" MTR STA(D/FW) FOR D/FW AIRPORT 1.000 EA 130,000.00 130,000.00 290 24" DIA CONC PRESS PIPE FITT & SPECIALS 1.000 LS 60,000.00 60,000.00 w 300 20" DIA DI PIPE FITT & SPECIALS 7.000 TN 6,500.00 45,500.00 320 TEMP PAVEMENT REP 7,000.000 SY 6.00 42,000.00 330 GRAVEL DR REPAIR P/FIG # 238 20.000 SY 10.00 200.00 340 PERM HOT MIX ASPHALTIC CON HMAC 7,000.000 SY 20.00 140,000.00 350 PAVE WEDGE MILLING 2"-0" DEPTH,5' WIDE 9,000.000 LF 3.00 27,000.00 360 BUTT JOINT MILLING 20.000 EA 300.00 6,000.00 370 CONC PAVE REP P/FIG STR-031 150.000 SY 45.00 6,750.00 380 DES & IMP TRAFFIC CONT PLAN 1.000 LS 40,000.00 40,000.00 .n 390 ADDL ROCK FOR FOUNDATION 250.000 CY 10.00 2,500.00 400 FLOW FILL ENCASEMENT 200.000 CY 65.00 13,000.00 410 HYDROMULCH SEEDING 7,000.000 LF 2.00 14,000.00 Bid Total $3,287,350.00 no TWDB FORM ED-102 11 J Part CS Supplementary Conditions To Part C - General Conditions am SUPPLEMENTARY CONDITIONS FORT WORTH WATER DEPARTMENT WATER AND WASTEWATER PROJECTS October 1, 2008 1. CONTRACT DOCUMENTS: In Section C1-1.2 CONTRACT DOCUMENTS, .. delete Paragraph C1-1.2b SPECIAL CONTRACT DOCUMENTS and add the following: "b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are No prepared for each specific project as a supplement to the General Contract Documents and include the following items: .. PART A - NOTICE TO BIDDERS (Advertisement) White SPECIAL INSTRUCTION TO BIDDERS White PART B - PROPOSAL (Bid) White .• PART C - GENERAL CONDITIONS Canary Yellow - PART CS- SUPPLEMENTARY CONDITIONS Green TEXAS WATER DEVELOPMENT BOARD SUPPLEMENTAL CONDITIONS Pink PART D - SPECIAL CONDITIONS Green PART DA - ADDITIONAL SPECIAL CONDITIONS Green • PART E - TECHNICAL SPECIFICATIONS White PERMITS/EASEMENTS (Some Permits are Multicolored)' White PART F - BONDS AND INSURANCE White no PART G - CONTRACT White PART H - PLANS/FIGURES (may be bound separately) White" No 2. DIRECTOR OF TRANSPORATION AND PUBLIC WORKS: Delete entire Paragraph C 1-1.17, and replace with the following: "C1-1.17 DIRECTOR OF TRANSPORATION AND PUBLIC WORKS: The officially appointed Director of the Transportation and Public Works Department of .. the City of Fort Worth, or his duly authorized representative, assistant, or agents." 3. ENGINEER: Delete entire Paragraph C1-1.19, and replace with the following: "The Director of Fort Worth Transportation and Public Works Department, the Director of the Fort Worth Water Department, or their duly authorized assistants, .. agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them." -■ 4. PROPOSAL FORM: In Section C2-2.1, Paragraph 1, delete last sentence and replace with the following: MW "The Bidder shall furnish a Financial Statement, Equipment Schedule, and Experience Record, all of which must be properly executed and filed with the .. CS-1 .. Director of the Water Department one week prior to the hour for opening of bids. Information shall be on forms provided by the Bidder and acceptable to the City." 5. EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: In Section C2-2.3, Paragraph 2, add the following to the last sentence: "except for changes in the site conditions caused by factors outside of the control of the Contractor which occur after the Contractor's inspection and prior to installation." 6. INTERPRETATION AND PREPARATION OF PROPOSAL: Part C - General Conditions, Section C2-2, exchange Paragraphs C2-2.7, C2-2.8, and C2-2.9 with the following. "C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security and other required material, to the Purchasing Manager or his representative at the official location and sxated time set forth in the proposal at the proper time to the proper place. The metre fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL" and the name or description of the project designated in the "Notice To Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with -the Purchasing Manager cannot be withdrawn prior to the time set for iff a opening of proposals. A request for non consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set fcr the opening of proposals. After all proposals not requested for non -consideration am opened -and publicly read aloud, the proposals for which non -consideration reque.-ts have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening -proposals, provided such telegraphic communication is' received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration wi 11 be given to the proposal." 7. MINORITY BUSINESS ENTERPRISE/WOMEN BUSINESS ENTERPRISE COMPLIANCE: Delete entire Paragraph C3-3.2, and replace with the following: "C3-3.2 MINORITY AND WOMEN BUSINESS ENTERPRISES: In a accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Offic,- of the City W W W No U W .. .W .. .. W .. CS-2 Secretary. The bidder shall submit the MBE/WBE SUBCONTRACTOR/SUPPLIER .� UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the +� managing department no later than 5:00 p.m, five (5) City business days after the bid opening date. The bidder shall obtaina, receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non -responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a minority business enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work .. performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible .. and barred from participating in City work for a period of time of not less that three (3) years." No 8. C3-3.5 AWARD OF CONTRACT: Delete first paragraph and replace with the following: "The Owner reserves the right to withhold final action on the proposals for a reasonable time, not to exceed the period stated for the duration of the Bid Security stated in the Notice to Bidders or 90 days, whichever is shorter." 9. C3-3.7 BONDS. For the Paragraph after Paragraph C3-3.7d OTHER BONDS, which begins with "No sureties", -change the entire paragraph to read as follows: "In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law, or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted _ as a reinsurer in the state of Texas and is the holder of a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon. request. The City, in its sole discretion, will determine the adequacy of the proof required herein. Each bond shall be properly executed by both the Contractor and the Bonding Company." wo CS-3 10. INSURANCE. Delete entire Section C3-3.11 INSURANCE, and replace with the _ following: "C3-3.11INSURANCE: The Contractor shall not commence work under this _ contract until he has obtained all insurance required under the Contract Documents, and such insurance has been approved by the Owner and certificates of Insurance shall be delivered to the Owner (City of Fort Worth, Contract Admini 3trator in the .. respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, Texas 76102) prior to commencement of work on the contract project. The prime Contractor shall be responsible for delivering to the O er the sub- ., contractor's certificate of insurance for approval. The prime Contractorhall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub -contractors. It is the intention of the Owner that the •• insurance coverage required herein shall include the coverage of all sub -contractors. The General Contractor may require all subcontractors to be insured and submit documentation ensuring that the requirements of C3-3.11 are met for all subcontractors. Failure of the Owner to request required documentat on shall not constitute a waiver of the insurance requirements specified herein. The Contractor's liability shall not be limited to the specified amounts of insurance required herein. a. COMPENSATION INSURANCE: The Contractor shad maintain, during the life of this contract, Worker's Compensation Insurance on all of . his employees to be engaged in work on the project under this contract, and for all sub -contractors. In case any class of employee engaged in hazardous work on the project under this contract is not protected under the Worker's Compensation Statute, the Contractor shall provide adequate employer's general liability insurance for the protection o such of his employees not so protected. Worker's compensation insurance covering .. employees in the project site shall be indorsed with waiver of subrogation providing rights of recovery in favor of the OWNER. b. COMMERICAL GENERAL LIABILITY INSURANCE: The Contractor Shall procure and shall maintain during the life of this contract, General .. Liability Insurance (Public Liability and Property Damage insurance) in the amount not less than $500,000 covering each occurrence�aggregate on account of bodily injury, including death, and in an amount not less than .. $500,000 covering each occurrence/aggregate on account of property damage with $2,000,000 umbrella policy coverage. Certificates of insurance shall state that Insurance is on an "occurrence" basis. Certificate shall also contain a statement that no exclusions by endo ement have been made to the Commercial General Liability Policy. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as a separate policies or by additional endorsement to one of the above - mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: W .. CAL&1! .. a• 1. Contingent Liability (covers General Contractor's Liability for acts of sub -contractors). 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation (if MW excavations are performed adiacent to same). 4. Damage to underground utilities for $500,000. 5. Builder's risk (where above -Around structures are involved). 6. Contractual Liability (covers all indemnification requirements of Contract). The City, its offices, employees and servants shall be endorsed as additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's worker's compensation insurance policy. Contractor's ., insurance policies shall be indorsed to provide that such insurance is primary protection and any self -funded or commercial coverage maintained by the OWNER shall not be called upon to contribute to loss recovery. 7. When required by the Contract Documents, Environmental Impairment Liability Coverage must be provided in the limits of $1,000,000 per occurrence and $2,000,000 annual aggregate. The Environmental Impairment Liability (EIL) must contain coverage for sudden and accidental contamination or pollution, liability for gradual emissions, and clean-up costs. The EIL coverage shall include two year completed operations coverage on a per Project basis. A separate insurance policy may be needed to fulfill this requirement. EIL for damages incurred in the course of _ transporting sludge shall be covered under the contractor's insurance policy(s). _ d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain during the life of this Contract, Comprehensive Automobile Liability Insurance in an No amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 aggregate on account of one accident, and MW automobile property damage insurance in an amount not less than $100,000 aggregate. .. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub -contractors, respectively, against damage CS-5 claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazares which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the owner with satisfactory proof of coverage by insurance required in these Contract Documents in the amounts and by carriers satisfactory to .. the Owner. (Sample attached.) Other than Worker's Compensation Insurance, in lieu of specified insurance, the City may consider alternative coverage or risk treatment measures through insurance Fools or risk .. retention groups. The City must approve in writing any alternative coverage. All insurance requirements made upon the Contractor shall apply to the sub -contractors, should the Prime Contractor's :nsurance not cover the sub -contractor's work operations. g. DEDUCTIBLE LIMITS. The deductible limits or self -funded retention ` limits, on each policy must not exceed $10,000 per occurrence unless otherwise approved by the City. h. INSURANCE COMPANY: The insurance company witk whom the Contractor's insurance is written shall be authorized to do business in the State of Texas and shall have a current A.M. Best Rating cof "A:VII" or equivalent measure of financial strength and solvency. i. NOTIFICATION. During the lifetime of this contract, the CLactor shall notify the ENGINEER in writing, of any known loss occurrence that could give rise to a liability claim or lawsuit or which could result in a property loss. j. CANCELLATION: Insurance shall be endorsed to provide de City with a minimum of thirty days notice of cancellation, non -renewal and/or material change in insurance policy terms or coverage. A miiumuml0 day notice shall be acceptable in the event of non-payment of insurance .. premium to insurance company. CITY RESPONSIBILITIES. The City shall not be responsible for direct payment of insurance premium costs for Contractor's Insurance." 11 C3-3.13 WAGE RATES: Delete Section C3-3-13 WEEKLY PAYROLLS in its .. entirety and replace with C3-3-13 WAGE RATES as shown below: No "The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates detemined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance ,w with Chapter 2258, Texas Government Code. Such prevailing wage rater are included in these contract documents. CS-6 W .. The Contractor, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) that name and occupation of each worker employed by the contractor in the construction of the work provided for in this .. contract; (ii) the actual per diem wages paid to each worker. These records shall be open, all reasonable hours, for inspection by the City. The provisions of Section C8-8- 14, RIGHT TO AUDIT, pertain to this inspection. The Contractor shall include in its subcontract's and/or shall otherwise require all of its subcontractors to comply with paragraphs above. With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas .. Government Code. _ The Contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times." .. 12. C4-4.3 INCREASED OR DECREASED OUANTITIES: Delete Section C4-4.3 and replace with the following: .. "The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the Imp unit prices established in the contract documents. No allowance will be made for any changes in lost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents." 13. C4-4.5 EXTRA WORK: Delete Section C4-4.5, paragraph (c) and replace with the following: "The Contractor agrees that should any change in the work of extra work be ordered, the following applicable percentage shall be added to Material and Labor Costs to cover overhead and profit: _ 1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed 15%. 2. Allowance to the Contractor for overhead and profit for extra work performed by a subcontractor and supervised by the Contractor shall not exceed 10%. .. Contractor shall be reimbursed for direct field overhead when the change requires an extension of the Contract period. Contractor shall not be reimbursed for indirect overhead or indirect costs related to changes to this contract." 14. C44.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Delete Section C4-4.7 in its entirety- CS-7 .. 15. C5-5.12 TESTING COSTS: Paragraph C5-5.12, revise the first sentence to read as follows: `w "Where, as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid for by the Contractor unless otherwise specifically provided for in the Technical Specifications and shall be subsidiary to various items bid." 16. C6-6.1 LAWS TO BE OBSERVED: Paragraph C6-6.1, delete "or which may be enacted later by bodies having jurisdiction or authority for such enactment" and replace .. with the following: "at the time of the Contract or may be hereafter exist during the performance of the .. Contract." 17. C6-6.2 PERMITS AND LICENSES: Paragraph C6-6.2 Insert the following at the end of the paragraph; "Contractors are responsible for obtaining all construction permits from the governing .. agencies. Contractor shall schedule all code- inspections with the Code Inspection Department in accordance with the permit requirements and submit copy of updated schedule to the Engineer weekly. Building, plumbing, electrical and mechanical .. building permits are issued without charge. Water and sewer access fees will be paid by the Water Department. Any other permit fees are the responsibility of the Contractor." 18. C6-6.8 BARRICADES.. WARNINGS AND FLAGMEN: In Paragraph C6-6.8, replace the word "watchmen" wherever it appears with the word "flagmen". In the first paragraph, lines five (5) and six (6), replace "take all such other precautionary measures" with "take all reasonable necessary measures": 19. C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Delete entire Paragraph C6-6.12, and replace with the following: .. "C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to indemnify the City' Engineer and Architect, and their personnel at the project site for the Contractor's sole negligence. In addition, the Contractor covenants and agrees to indemnify, hold harmless and defend at its own expense, the Owner, its officers, agents, servants, and employees, from and against all claims or suits for property loss, property damage, personal injury, including death, arising out of; or alleged to arise of, the work and services to be performed hereunder by the Contractor, its officers, agents, employees subcontractors, licensees or invitees, .. whether or not anv such iniurv. damage or death is caused. in whole or in part. by the negligence or alleged negligence of the Owner, its officers, agents servants, or Le lovees. Contractor likewise covenants and agrees to indemnify and hold harmless .. Owner from and against any and all injuries to the Owner's officers, agents, servants, and employees, loss or destruction of property of the Owner arising form the CS-8 performance of any of the terms and conditions of this Contract, whether or not anv .o such iniury or damage is caused. in whole or in part. by the negligence or alleged negligence of the Owner, its officers, agents, servants, or emnlovees ow In the event the Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until the Contractor either (a) submits to the Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides the Owner with a letter from the Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. r The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is r outstanding as a result of work performed under a City Contract." 20. C6-6.21 STATE SALES TAX: Delete Paragraph C6-6.21 STATE SALES TAX in its entirety and replace with the following: _ "A. This contract is issued by an organization, which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise, and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction are subject to State Sales Tax under House Bill 11, enacted August 15, 1991. All such taxes shall be included in the various amounts on the Proposal Form. The successful Bidder shall be required to submit a breakdown between costs of labor, consumable material and other construction costs and costs of material incorporated into the project construction prior to execution of this contract. .. B. At the time of execution of the Contract Documents by the Contractor, the Contractor shall complete the "Statement of Materials and Other Charges" which identifies the project costs anticipated in the Project into "Materials Incorporated into the Project" and "All Other Charges". The Contract shall be a "Separated Contract". No C. The City of Fort Worth will issue appropriate Certificates of Resale to the Contractor. D. All Change Orders to the Contract will separate charges for materials and labor and will contain the following statement: "For purposes of complying with Texas Tax Code, the Contractor agrees that the charges for material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor." 21. C7-7.18 AIR POLLUTION WATCH DAYS: Add the following Section C7-7.18: "C7-7.18 AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on CS-9 days designated 'as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with .. 6:00 a.m. - 10:00 a.m. being critical BECAUSE -EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION.. vo The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the .. afternoon prior to the WATCH day. On designated Air Pollution Watzh Days, the Contractor shall bear the responsibility of being aware that such da}s have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 .. a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto he allowable weather days of a given month." 22. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4 SCOPE OF PAYMENT in its entirety and replace with. the following: "The Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials; and incidentals for p,,-rforining all work contemplated and embraced under these Contract Documents, fo all loss and damage arising out of the nature of the work or from the action of the lements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the .. terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the .. work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage sh<dl have been .. CS-10 M discovered on or before the final inspection and acceptance of the work or during the .. two (2) year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein." 23. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Delete Section C8-8.5 and replace with the following: "Partial pay estimates shall be submitted by the Contractor 5th day and the 20th day of the month that work has been is in progress. The estimate shall be processed by the •• City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered .. to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net invoice value thereof. The Contractor will fiarnish the engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000.00 at the execution, retainage shall be ten percent _ (10%). For contracts of $400,000.00 or more at the time of execution, retainage shall be five percent (5%). .o Contractor shall pay subcontractors in accord with subcontract agreement, within five (5) business days after receipt by the Contractor of the payment by the City. Contractor's failure to make the required payment to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. .. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of the same will be subject to correction in the estimate rendered following'the discovery of an error in any previous estimate. Payment of any .o partial pay estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the '" Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this Contract." 24. C8-8.10 GENERAL GUARANTY: Delete Paragraph C8-8.10 GENERAL GUARANTY in its entirety and replace with the following: "Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an CS-11 acceptance of the work not done in accordance with the Contract tsponsibility cuments or relieve the Contractor of liability in respect to any express warranties or _ for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to the other work resulting therefrom whichshall appear within a period of two (2) years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outlined The Owner .. will give notice of observed defects with reasonable promptness. Any reference to any shorter period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specification, it being the City's intent that the Contractor guarantee its work for a period of two (2) ye;ors following the date of acceptance of the project." 25. C8-8.14 RIGHT TO AUDIT: Add the following Section C8-8.14: M "C8-8.14 RIGHT TO AUDIT: (a) The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and re,-,ords of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during normal working hours to all necessajy Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give Contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereundEr a provision to the effect that the subcontractor agrees that the City shall, until the 'expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papery and records _ of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this article together with subsection (c) hereof. The City shall give subcontractor reasonable advance notice of intended audil�. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse contractor for the cost of the copies as follows: .. 1. 50 Copics and Under - 10 cents per page. 2. More than 50 copies - 85 cents for the first page plus fifteen cents :For each page thereafter." (5/25/93). CS-12 .. 26. C8-8.15 SCHEDULE OF COSTS: Add the following Section C8-8.15: "C8-8.15 SCHEDULE OF COSTS: Following the completion of all work on the .. Project and prior to submittal of a request for final payment, the Contractor shall provide a Schedule of Costs to City for approval which lists all equipment systems, structures, building electrical and HVAC systems, overhead and project related costs. MW The items will be grouped into categories using the Owner's list of category codes which will be provided by the Owner at the Preconstruction Conference. The Schedule of Costs will be used by the City as input to the Capital Assets System, and will not be considered in preparation of modifications to the Contract. Costs associated with the preparation and processing of this schedule of costs shall be subsidiary to the price bid. The Contractor will also provide a projected payment schedule tied to the project "" schedule and the schedule of values which projects the monthly payments through the end of the Project. The Payment schedule must be submitted along with the first go request for payment. This information is necessary to arrange financing of the Project by the City." .. MW MW aw MW No END OF SECTION CS-13 Part D Special Conditions no we 4" s 4" so 00 'o. PART D - SPECIAL CONDITIONS D-1 GENERAL.....................................................................................................................3 D-2 COORDINATION MEETING.........................................................................................5 D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW................5 D- 4 COORDINATION WITH FORT WORTH WATER DEPARTMENT................................7 D- 5 CROSSING OF EXISTING UTILITIES..........................................................................7 D- 6 EXISTING UTILITIES AND IMPROVEMENTS..............................................................8 D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES...........................................................8 D- 8 TRAFFIC CONTROL.....................................................................................................9 D- 9 DETOURS...................................................................................................................10 D- 10 EXAMINATION OF SITE.............................................................................................10 D- 11 ZONING COMPLIANCE..............................................................................................10 D- 12 WATER FOR CONSTRUCTION..................................................................................10 D- 13 WASTE MATERIAL.....................................................................................................10 D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE......................................................10 D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK.................................11 D- 16 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES ............................11 D- 17 BID QUANTITIES........................................................................................................11 D- 18 CUTTING OF CONCRETE..........................................................................................12 D- 19 PROJECT DESIGNATION SIGN.................................................................................12 D- 20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT......................................12 D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL........................................................12 D- 22 CRUSHED LIMESTONE BACKFILL.................................... ........................................ 13 D- 23 2:27 CONCRETE.........................................................................................................13 D-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION.........................................13 D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS ............ 14 D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) ................15 D- 27 SANITARY SEWER MANHOLES....................................................................OMITTED D- 28 SANITARY SEWER SERVICES......................................................................OMITTED D- 29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES.... OMITTED D- 30 DETECTABLE WARNING TAPES .................................. :............................................ 16 D- 31 PIPE CLEANING.........................................................................................................16 D- 32 DISPOSAL OF SPOIUFILL MATERIAL.......................................................................17 D- 33 MECHANICS AND MATERIALMEN'S LIEN.................................................................17 D- 34 SUBSTITUTIONS........................................................................................ ........17 D- 35 PRE -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER OMITTED D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES..............................OMITTED D- 37 BYPASS PUMPING.........................................................................................OMITTED D- 38 POST -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWEROMITTED D- 39 SAMPLES AND QUALITY CONTROL TESTING.........................................................17 D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE)................................................................18 D- 41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES ........................19 D- 42 PROTECTION OF TREES, PLANTS AND SOIL.........................................................19 D- 43 SITE RESTORATION..................................................................................................20 D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST..............................................20 D- 45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING.............................................20 D- 46 CONFINED SPACE ENTRY PROGRAM.....................................................................25 D- 47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION ............................27 D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS)......................27 D- 49 CONCRETE ENCASEMENT OF SEWER PIPE..........................................................28 03 12109 SC-1 PART D - SPECIAL CONDITIONS D- 50 CLAY DAM ................................................................................................................... 28 D- 51 EXPLORATORY EXCAVATION (D-HOLE) ................................................................. 28 D- 52 INSTALLATION OF WATER FACILITIES .................................................................... 28 52.1 Polyvinyl Chloride (PVC) Water Pipe ........................................................................... 28 52.2 Blocking .................... : .................................................................................................. 29 52.3 Type of Casing Pipe ..................................................................................................... 29 52.4 Tie-ins .................................................... :"*** ..... * ... *""**"'* .... ..... , ....... OMITTED 52.5 Connection of Existing Mains ........................................................................... OMITTED 52.6 Valve Cut -Ins ................................................................................................... OMITTED 52.7 Water Services ................................................................................................ OMITTED 52.8 2-inch Temporary Service Line ........................................................................ OMITTED 52.9 Purging and Sterilization of Water Lines .......................................................... OMITTED 52.10 Work Near Pressure Plane Boundaries ........................................................... OMITTED 52.11 Water Sample Station .................................................................................................. 29 52.12 Ductile Iron and Gray Iron Fittings .......................................................... ; ......... OMITTED D- 53 SPRINKLING FOR DUST CONTROL .......................................................................... 30 D- 54 DEWATERING ............................................................................................................ 30 D- 55 TRENCH EXCAVATION ON DEEP TRENCHES .........................................................30 D- 56 TREE PRUNING .......................................................................................................... 30 D- 57 TREE REMOVAL ......................................................................................................... 31 D- 58 TEST HOLES .............................................................................................................. 31 D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION ........................................................................................................ 32 D- 60 TRAFFIC BUTTONS .................................................................................................... 33 D- 61 SANITARY SEWER SERVICE CLEANOUTS ..................................................OMITTED D- 62 TEMPORARY PAVEMENT REPAIR ............................................................................ 33 D- 63 CONSTRUCTION STAKES ......................................................................................... 33 D- 64 EASEMENTS AND PERMITS ...................................................................................... 33 D- 65 PRE -CONSTRUCTION NEIGHBORHOOD MEETING ....................................OMITTED D- 66 WAGE RATES ............................................................................................................. 34 D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE .....................................36 D- 68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN1 ACRE) .................................................... ...................................................... 36 D- 69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS ..................................................................................... 38 D- 70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD ............................................39 D- 71 EARLY WARNING SYSTEM FOR CONSTRUCTION .................................................39 D- 72 AIR POLLUTION WATCH DAYS ................................................................................ 40 13- 73 FEE FOR STREET USE PERMITS AND RE -INSPECTIONS .....................................40 aw 03112109 SC-2 PART D - SPECIAL CONDITIONS This Part D — Special Conditions is complimentary to Part C — General Conditions and Part C1 — Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C — General Conditions and part C1 — Supplementary Conditions to Part C of the Contract are to be read together. Any conflict between Part C — General Conditions and Part C1 — Supplementary Conditions of the Contract and this Part D, Part D shall control. w FOR: Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 1 & 4 FORT WORTH, TEXAS CITY PROJECT NO. 37547 WATER DEPARTMENT PROJECTS NO. P 275-705140021383 D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: w 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions shall be applicable to this project under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2) years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre - so qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such -work. This contract and project, where applicable, may also be governed by the two following published specifications, except as modified by these Special Provisions: 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 03/12/09 .ft SC-3 PART D - SPECIAL CONDITIONS 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRALTEXAS Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call -out for the pay item by the designer. If not shown, then applicable published specifications in either of these - documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non -responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: w A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole -` responsibility to deliver the proposal at the proper time to the proper place. The mere fact that! a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word `M "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. - B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non - consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of -` the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. w 03/12/09 SC-4 PART D - SPECIAL CONDITIONS D-2 COORDINATION MEETING For coordination purposes, weekly meetings at the job site may be required to maintain the project dW on the desired schedule. The contractor shall be present at all meetings. .V D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions: 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TVVCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. 2. Duration of the project - includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which fumishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and w 03112109 so SC-5 r. PART D - SPECIAL CONDITIONS 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certifi d mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. i I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; -3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and F b.) A new certificate of coverage showing extension of coverage, pr�or to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one •— year thereafter. 6. Notify the governmental entity in writing by certified mail or person I delivery, within ten .. (10) days after the person knew or should have known, of any c ange that materially affects the provision of coverage of any person providing services on t e project; and — 03112109 SC-6 s PART D - SPECIAL CONDITIONS am 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom ow they are providing services. 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor no who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed owith the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self-insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other -- civil actions. 9. The contractor's failure to comply with any of these provisions is a breach of contract by the �. contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Workers Compensation Act or other Texas Workers Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this +., construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Workers Compensation Commission at (512) 463-3642 to receive information no on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employers failure to provide coverage". owD- 4 COORDINATION WITH FORT WORTH WATER DEPARTMENT During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to ow determine the best times for deactivating and activating those lines. D- 5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be 03112Jo9 SC-7 No PART D - SPECIAL CONDITIONS constructed of ductile iron pipe. The Engineer shall determine the required length of replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Glass 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. D- 6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the ` Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, �- service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions (as approved or authorized by the applicable utility company) for the support, protection and/or temporary relocation of all utility poles, gas lines, telephone cables, utility -. services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. It is understood that the Contractor is not responsible for the permanent relocation of existing utilities in direct conflict with the proposed construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line. He shall -µ cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. In case it is necessary to change or move the property of any owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of . making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the o•�vners of the utilities involved and from evidences found on the ground. D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES „- It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new 03112109 SC-8 PART D — SPECIAL CONDITIONS wo line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Anv damage to the ow existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. .. In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. D- 8 TRAFFIC CONTROL The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set r=forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. MR ." 40 The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 817-392-7738) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary 00 sign meeting the requirements of the above -referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the .. temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such �- reinstallation is completed. Work shall not be performed on certain locations/streets during "peak traffic periods" as .n determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." ba up 03(92/09 SC-9 M PART D - SPECIAL CONDITIONS D- 9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project -w area. D-10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions, which may affect construction of this project. Particular attention should be given to methods of providing ingress - and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions, which may -- give, rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. D-11 ZONING COMPLIANCE During the construction of this project, the Contractor shall comply With present zoning requirements of the City of Fort Worth in the use of vacant property for storagle purposes. D-12 WATER FOR CONSTRUCTION The Contractor at his own expense will furnish water for construction. D-13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the Y Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D-14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be .done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, cle -up shall be done on a daily basis. Clean up work shall include, but not be limited to: Sweeping the street clean of dirt or debris Storing excess material in appropriate and organized manner Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly c-pndition, on the next estimate payment (and all subsequent payments until completed) of the appropriate bid item(s) will be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right- 03/12/09 SC-10 PART D - SPECIAL CONDITIONS MW of -way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its .,, representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth shall give final acceptance of the .4 completed project work. D-15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup. The Contractor shall not commence with water and/or sanitary sewer installation until such time that the survey cut -sheets have been received from the City inspector. on D-16 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." No 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage -type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. 3. When necessary to work within six feet of high voltage electric lines, notification shall be given ' the power company (ONCOR) who will erect temporary mechanical barriers, de' - energize the lines, or raise or lower the lines. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to ONCOR, and shall record action taken in each case. 4. The Contractor is required to make arrangements with the ONCOR company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D-17 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the ow actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C44.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. 03112109 SC-11 PART D - SPECIAL CONDITIONS D-18 CUTTING OF CONCRETE When existing concrete is cut, such cuts shall be made with a concrete saw All sawing shall be am subsidiary to the unit cost of the respective item. D-19 PROJECT DESIGNATION SIGN Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts. The Engineer shall approve the exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being mm" conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance �. with Figure 30, except that they shall be V-0° by 2'-0" in size. The information box shall have the following information: For Questions on this Project Call: (817) 392-8306 M-F 7:30 am to 4:30 p.m. or (817) 392-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D- 20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification .� for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one -tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. 03112109 SC-12 PART D - SPECIAL CONDITIONS w D- 22 CRUSHED LIMESTONE BACKFILL Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, and General Contract Documents. D- 23 2:27 CONCRETE Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call -out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete. D- 24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION .e Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract " Documents and Specifications except as specified herein. 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the "' stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial 4W measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights -of -way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special ,. Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be *W backfilled above the top of the embedment material with Type "C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than Im 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type "C" back -fill material is not suitable, at the direction of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure A. Sand material specified in Figure A shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: 03112109 SC-13 PART D - SPECIAL CONDITIONS Less than 10% passing the #200 sieve P.I. = 10 or less Additionally, the crushed limestone embedment gradation specified in Section E1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be replaced with the following: Sieve Size % Retained .. 1 " 0-10 1 /2" 40-75 3/8" 55-90 #4 90-100 #8 95-100 All other provisions of this section shall remain the same. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie under existing or future pavement shall be backfilled Der Figure A with 95% Standard Proctor Density by mechanical devices specifically designed r compaction or a combination of methods subject to approval by the Engineer. Backfill mated I to be compacted as described above must be within +-4% of its optimum moisture content. The City, at its own expense, will perform trench compaction tests per A.S. .M. standards on all trench backfill. Any retesting required as a result of failure to compact the ba kfill material to meet the standards will beat the expense of the Contractor and will be billed at the commercial rates as determined by the City. These soil density tests shall be performed at two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level o trench backfill to be tested. No extra compensation will be allowed for exposing the backfill I�yerI to be tested or providing trench safety system for tests conducted by the City. 4. MEASUREMENT AND PAYMENT: All material, with the exception of hype "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. Type "B" backfill shall be paid for at a pre -bid unit price of $15.00, per cubic yard. D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS .. The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 2000-1 through 2000-3. The results of the street cores that were conducted on the project streets, to determine HMAC depths on existing streets, are provided in these specifications and contract documents. 03112109 SC-14 %W PART D - SPECIAL CONDITIONS .m All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be aw backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2) feet or less in width. Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. ur The pavement shall be replaced within a maximum of five (5) working days, providing job placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Construction Services section will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Construction Services section. D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub -Part P - Excavations, are hereby made a part of this specification and shall be the minimum governing requirements for trench •� safety. C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a series of horizontal level or steps, usually with vertical or near -vertical surfaces between levels. r 03112109 SCA 5 i PART D - SPECIAL CONDITIONS 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined - away from the excavation. 4. SHIELD SYSTEM - Shields used in trenches are generally referred to as "trench boxes" or "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be ermanent structures or can be designed to be portable and move along as the work progresses. Shields can be either pre -manufactured or job -built in accordance with OSHA standar is. 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or 00 timber system that supports the sides of a trench and which is designed to prevent cave- ins. Shoring systems are generally comprised of cross -braces, vertical rails, (uprights), horizontal rails (wales) and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of embedment or bottom of excavation. The quantity of trench safety .w systems shall be based on the linear foot amount of trench depth greater than five (5) feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench — safety systems. D- 30 DETECTABLE WARNING TAPES .w Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil en ased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical r agents and solvents m found in the soil. The minimum overall thickness of the tape shall be 5.5 il , and the width shall not be less than two inches with a minimum unit weight of 2Y pounds/1 inchJ100'. The tape shall be color coded and imprinted with the message as follows: Tvne of Utilitv Color Code Legends Water Safety Blue Caution! Buried Water Line Below Reclaimed Safety Purple Caution! Buried Reclaimed Water Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close ,f to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding,) blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). .. D- 31 PIPE CLEANING 03112109 SC-16 1� JJ PART D - SPECIAL CONDITIONS Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D- 32 DISPOSAL OF SPOIL/FILL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, Contractor shall remove the spoil/fill material at his expense and dispose of such materials in accordance with the Ordinances of the City and this section. D- 33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon receipt of payment. D- 34 SUBSTITUTIONS The specifications for materials set out the minimum standard of quality, which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has been specified. Where the term "or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the Contractor procures the proposed substitute. Where the term "or equal", or "or approved equal° is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended .s purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub -section as related to •• "substitutions" shall be applicable to all sections of these specifications. D- 39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be .� used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. 03112109 SC-17 PART D - SPECIAL CONDITIONS r B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in -place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project .. specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the -a requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. r D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE) A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the go CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled -hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible -earth material exposed by preparing right- of-way, clearing and grubbing, the surface area of erodible -earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution -control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution -control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution -control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil -erosion -control measures shall be performed as directed by the Engineer. _ 03112109 SCA 8 "W PART D - SPECIAL CONDITIONS 1. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. w 2. Frequent fordings of live streams will not be permitted; therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossings are MW necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. 3. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 4. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. 5. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials. He shall MW conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. pq C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. D- 41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D- 42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated as soon as possible with a tree wound dressing. "` By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights -of -Ways and designated alleys. This permit can be obtained by calling the No Forestry Office at 817-392-5738. All tree work shall be in compliance with pruning standards for Class 11 Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the .. 03/12109 SC-19 PART D - SPECIAL CONDITIONS Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by a` the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. ww To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Rod Oak trees shall be immediately sealed using a commercial pruning paint. .. No separate payment will be made for any of the work involved for this item and all costs incurred will be considered a subsidiary cost of the project. .. D- 43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one -tenth (0.1) of a foot. D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid to be considered responsive. Products and processes listed in No the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements. D- 45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING This item shall be performed in accordance with the City of Fort Worth Parks and Community "! Services Department Specifications for Topsoil, Sodding and Seeding. 1. TOPSOIL DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the lines and -- grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street I excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Ber�}�uda, Buffalo or St. " Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie and 609. ow 03112109 SC-20 -. PART D - SPECIAL CONDITIONS MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness "~ of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug — until planted. When so directed by the Engineer, the sod existing at the source shall be watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross -sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the requirements hereinafter described. Sodding shall be either "spot" or "block'; either Bermuda, Buffalo or St. Augustine grass. 0-0 a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the ow dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the VW finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per Im square inch compression. Hand tamping may be required on terraces. b. Block Sodding. up At locations on the Drawings or where directed, sod blocks shall be carefully placed on the prepared areas. The sod shall be so placed that the entire designated area shall be covered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall, upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the block sod firmly in place. •- When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread 03112109 SC-21 MW PART D - SPECIAL CONDITIONS uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. MATERIALS: a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. The specified seed shall equal or exceed the following percentages of Purity and germination: Common Name Purit Germination Common Bermuda Grass 95% 90% Annual Rye Grass 95% 95% _ Tall Fescue 95% 90°/4 Western Wheatgrass 95% 90% Buffalo Grass Varieties Top Gun 95% 90% " Cody 95% 90% Table 120.2.(2)a. raw URBAN AREA WARM -SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clav or Tight Soils Mixture for Sandv Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 e. Table, 120.2.(2)b TEMPORARY COOL -SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 03112109 SC-22 .. PART D - SPECIAL CONDITIONS to Western Wheatgrass 50 May 1 Annual Rye 50 Total: 100 CONSTRUCTION METHODS: After the designated areas have been completed to the lines, .. grades, and cross -sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section ••. previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly 1W distributed over the areas shown on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the .. specified uniform rate of application for both is obtained. "Finishing" as specified in Section D- 45, Construction Methods, is not applicable since no seed bed preparation is required. DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall wo be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-45, Construction "" Methods. The seed, or seed mixture, specified shall then be planted at the rate required and the No application shall be made uniformly. If the sowing of seed is by hand rather than by mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one -eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the go "Cultipacker" type. All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. a. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. .. After the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application N. shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is 03112109 SC-23 PART D - SPECIAL CONDITIONS obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one -quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and tie asphalt is applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) inches in depth. The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be .. of the type and grade as shown on the Drawings and shall conform to thel requirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the asphalt shall be at a rate of three -tenths (0.3) gallons per square yard. It shall be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. _ RE -SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re -seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit -seeding equipment will be able to cut through the turf and achieve adequate soil penetration. ' * Slit -seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. 4. HYDROMULCH SEEDING: If hydro mulch seeding is provided, seed mix shall have 95% purity of Dermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER ow DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20- -� 0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry 03112109 SC-24 -0 PART D - SPECIAL CONDITIONS .o and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. .. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) w pounds per acre for all types of "Seeding". MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. w Acceptable material for "Seeding" will be measured by the linear foot, complete in place. Acceptable material for "Sodding" will be measured by the linear foot, complete in place. .. Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeding. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract d, unless and otherwise noted in the plans and bid documents to be paid for at the unit price -bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price MW per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be.the total compensation for furnishing and placing all sod; for -all rolling --and tamping; for all watering; for disposal of all surplus materials; and for all materials, labor, •. equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D- 46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, No are defined by OSHA, as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. 03112100 SC-25 00 CONDITIONS .. .w N. .. .. .. im oyIyos SC-26 .. v PART D - SPECIAL CONDITIONS MW D- 47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION 6. Prior to the final inspection being conducted for the project, the contractor shall contact the No city inspector in writing when the entire project or a designated portion of the project is substantially complete. %W 7. The inspector along with appropriate City staff and the City's consultant shall make an inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 8. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. 9. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies, which are discovered at the time of final inspection. 10. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C - GENERAL CONDITIONS. D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS) 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 2. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs �. pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. no 5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. .. 8. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. .. 03112109 W SC-27 PART D - SPECIAL CONDITIONS 9. Short tunneling shall consist of power augering or hand excavation. 'the tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D- 49 CONCRETE ENCASEMENT OF SEWER PIPE Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. D- 50 CLAY DAM Clay dam construction shall be performed in accordance with the Wa tewater Clay Dam ,.. Construction, figure in the Drawings in these Specifications, at locations indicate on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price bid for pipe installation. D- 51 EXPLORATORY EXCAVATION (D-HOLE) .. The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall .w conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a propos d facility alignment. The exploratory excavation shall be conducted prior to construction of the a tire project only at a, locations denoted on the plans or as directed by the engineer. Contractor sh II submit a report of findings (including surveyed elevations of existing conflicting utilities) to the Cit prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a ow safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). No Payment shall not be made for verification of existing utilities per item D-6. Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, .. shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. D- 52 INSTALLATION OF WATER FACILITIES 52.1 Polyvinyl Chloride (PVC) Water Pipe .. POLYVINYL Chloride Plastic Water Pipe and fittings on this Project sh II be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfrll, bedding, blocking, detectable tapes and all other associated appurtenant aw required, shall be included in the linear foot price bid of the appropriate B D ITEM(S). .. 03112109 SC-28 aw PART D - SPECIAL CONDITIONS 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. 52.3 Type of Casing Pipe 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: For the inside and outside of casing pipe, coal -tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non - concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. 2. SEWER: Boring used on this project shall be .in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. No 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. 52.11 Water Sample Station GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. w The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. .. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. 03112109 SC-29 .. PART D - SPECIAL CONDITIONS w Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. D- 53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be: considered to this contract. D- 54 DEWATERING The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. Dewatering shall be considered as- incidental -to -a construction and all costs incurred will - be - considered to be included in the project price. D- 55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D- 56 TREE PRUNING A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPMENT 1. Vibratory Knife 2. Vermeer V-1550RC Root Pruner C. NATURAL RESOURCES PROTECTION FENCE 3. Steel "T" = Bar stakes, 6 feet long. .. a .. 1W %W .. .. .. 03112109 SC-30 uv Im PART ❑ - SPECIAL CONDITIONS 4. Smooth Horse -Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. .. 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. D. ROOT PRUNING 7. Survey and stake location of root pruning trenches as shown on drawings. 8. Using the approved specified equipment, make a cut a minimum of 36 inches deep in order to minimize damage to the undisturbed root zone. 9. Backfill and compact the trench immediately after trenching. 10. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to .,, construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. D- 57 TREE REMOVAL Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and •� no additional payment will be allowed. D- 58 TEST HOLES The matter of subsurface exploration to ascertain the nature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. Whether prospective bidders perform this subsurface exploration jointly or independently, and whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. 03112109 SC-3 9 you PART D - SPECIAL CONDITIONS .. If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all .. responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. The cost of all rock removal and other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. am .. D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION w OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each rw residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, City Project No (CPN)., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the 'pre -construction notification' flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City .. Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, the contractor shall prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. The notice shall be prepared as follows: The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The .o flyer shall be prepared on the contractor's letterhead and shall include the following information: Name of the project, City Project Number, the date of the interruption of service, the period the interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service `° interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed. The contractor shall not be permitted to proceed with interruption of water service until the flyer has been delivered to all affected residents and businesses. wr 03112109 SC-32 qW PART D - SPECIAL CONDITIONS Electronic versions of the sample flyers can be obtained from the Project Construction Inspector.. All work involved with the notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. D- 60 TRAFFIC BUTTONS The removal and replacement of traffic buttons is the responsibility of the contractor and shall be •• considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD) of the Transportation/Public Works Department to install the markings, the contractor shall contact SSMD at (817) 392-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. D- 62 TEMPORARY PAVEMENT REPAIR The Contractor shall provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing asphalt shall be saw cut to provide a uniform edge and the entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing aw pavement and the temporary repair. Cost of saw cutting shall be subsidiary to the temporary pavement repair pay item. The contractor shall be responsible for maintaining the temporary pavement until the paving contractor has mobilized. The paving contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D- 63 CONSTRUCTION STAKES The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D- 64 EASEMENTS AND PERMITS 03/12/09 SC-33 PART D - SPECIAL CONDITIONS The performance of this contract requires certain temporary construction, right -of -entry agreements, and/or permits to perform work on private property. The City has attempted to obtain the temporary construction and/or right -of -entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right -of -entry, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, are available to the Contractor for review by contacting the consultant who distributes the plans for the project. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for thoroughly reviewing, understanding and complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. For railroad permits, any and all railroad insurance costs and any other incidental costs necessary to meet the conditions associated with permit(s) compliance, including payment for flagmen, shall be included in the lump sum pay bid item for "Associated Costs for Construction within Railroad / Agency Right-of-way". No additional compensation shall be allowed on this- pay item. D- 66 WAGE RATES Compliance with and Enforcement of Prevailing Wage Laws r .. .. .. .. Dutv to Dav Prevailina Waae Rates. The contractor shall comply with all requirements of Chapter 2258, Texas Government Code (Chapter 2258), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such j prevailing wage rates are included in these contract documents. Penaltv for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or partof the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. Complaints of Violations and Citv Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an initial rw 0312/09 SC-34 PART D - SPECIAL CONDITIONS .w determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the ow contractor or subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts .. being subtracted from successive progress payments pending a final determination of the violation. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do not resolve the issue by agreement. before the 15th day after the date the City makes its initial determination pursuant to paragraph (c) above. •• if the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. _ Records to be Maintained. ' The contractor and each subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the "" actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall pertain to this inspection. .. Pav Estimates. With each partial payment estimate or payroll period, whichever is less, the contractor shall submit .w an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. ... Postina of Waae Rates. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. ow .. Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) through (g) above. (Wage rates are attached at the end of this section.) (Attached) 03112109 SC-35 I� PART D - SPECIAL CONDITIONS D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. it is the intent of the city of Tort vvortn to comply witn the requirements of the Asbestos .. National Emissions Standards for Hazardous Air Pollutants (NESHAP) found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of asbestos cement pipe (ACP) in compliance with .. NESHAP. Nothing in this specification shall be construed to void any provision of a contract or other law, ordinance, regulation or policy whose requirements are more stringent. B. ACP is defined under NESHAP as a Category II, non -friable material in its intact state but `" which may become friable upon removal, demolition and/or disposal. Consequently, if the removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas so Department of Health. The notification must be filed at least ten days prior to removal of the material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. The Environmental Protection Agency .. (EPA) defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. MW C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable. The Excavator is .. responsible to employ those means, methods, techniques and sequences to ensure this result. E. Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of Fort Worth assumes no responsibility for compliance programs, which are the responsibility .. of the Excavator. (Copy of forms attached) F. The removal and disposal of ACP shall be subsidiary to the cost of installing the new pipe unless otherwise stated or indicated on the project plans or contract documents. D-68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN 1 ACRE) wr PERMIT: As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small Construction .. Activity) or five or more acres of total land (Large Construction Activity). The contractor is defined as an "operator" by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http://www.tnrcc.state.b(.us/permitting/water perm/wwperm/construct.htmi. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management 03/1VO9 SC-36 PART D - SPECIAL CONDITIONS Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.html. Not all of the structural controls discussed in the BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in minimum sediment retention of not less than 70%. NOTICE OF INTENT (NOI): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre -construction meeting a TCEQ Notice of Intent (NOI) form prepared by the engineer. It serves as a notification to the TCEQ of construction activity as well as a commitment that the contractor understands the requirements of the permit for storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted to the TCEQ at least 48 hours prior to the contractor moving on site and shall include the required $100 application fee. The NOI shall be mailed to: Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 y A copy of the NOI shall be sent to: City of Fort Worth Department of Environmental Management 5000 MLK Freeway Fort Worth, TX 76119 "' NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity, the contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT) form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the .. permit. The NOT should be mailed to: .. Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an .. erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction site. Copies of the ° project SWPPP's are available for viewing at the office of the Consultant disbursing the plans for the project. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. No LARGE CONSTRUCTION ACTIVITY — DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES: A Notice of Intent (NOI) form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the ow 03112109 SC-37 PART D - SPECIAL CONDITIONS Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the "' conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the am construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination (NOT) form shall be submitted within 30 days after final stabilization has been achieved on all •0 portions of the site that is the responsibility of the permittee, or, when another permitted operator assumes control over all areas of the site that have not been finally stabilized. SMALL CONSTRUCTION ACTIVITY - DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOI form is not required. However, a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion, sedimentation and water "' pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching, soil retention blankets, or other structural or non-structural storm water pollution controls_ The method of control shall result in a .. minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown on the proposal as full compensation for all items contained in the project SWPPP. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS ■• It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. The Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project. In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this activity )ugh the appropriate City representative. The Contractor shall not operate water line valves of sting water system. Failure to comply will render the Contractor in violation of Texas Penal Je Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full ent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a ult of these actions. 2109 SC-38 r r PART D - SPECIAL CONDITIONS D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre -qualified contractor who is the apparent low bidder(s) for a project to submit such additional information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION —• Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. 2. The Project Manager and the Directors of Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the .. City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to ,., interested individuals will distributed by the Water Department's Public Information Officer. ow 4. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Water Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. w 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. 03112109 .. SC-39 PART D - SPECIAL CONDITIONS D-72 AIR POLLUTION WATCH DAYS The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 ,. a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION.. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. D-73 FEE FOR STREET USE PERMITS AND RE -INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re -inspections for parkway construction, such as driveways, sidewalks, etc., will be required. The fees are as follows: 1. The street permit fee is $50.00 per permit -with payment due at the time of permit application. 2. A re -inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re -inspection. Payment by the contractor for all street use permits and re -inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. ow END OF PART D - SPECIAL CONDITIONS Im ww rw Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: No No PART D - SPECIAL CONDITIONS (To be printed on Contractor's Letterhead) THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON WATER AND I OR SEWER LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS .� NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, -• PLEASE CALL: + Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> w AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL .. 03112109 w SC-41 PART D - SPECIAL CONDITIONS FORT WORTH Daft DOE HO. 10= Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR 03112109 SC-42 .. PART D - SPECIAL CONDITIONS 'F TEXAS DEPARTMENT OF HEALTH DEMOLITION / RENOVATION ° NOTIFICATION FORM _ r NOTE ORCLE ITEMS THAT ARE AM ENDED T D H O NOTIFICATION# _ 1) Abatement Contractor. TDH License Number I Address; City: State: Zip: �. Offics Phone Number: ( 1 Jots Site Phone Number:_ e Site Supervisor, MH Ucense Number V Site Supervisor. TDH Lfcen3e Number. ti Trained On -Site NESHAP Individual: Certification pate: .r e O Demolition Cwtrectar: Office Phene Number{ 1 n Address: City: Slate; Zip: er I:< y 2) Project C4nsullant or Operator TDH Lir anso Number: = Mailing Address: El Cit}r State: T-rp: Office Phone Number f 1 A 3) Facility Owner. ,. H Altenikn:.: .: . - P Maine Address: Ctty: State: Zip. Owner Phone Numberi l "Note: Tho Invaico for the notification foe will be sent to the owner of the building and the billing address for the invoice will be .. obtained *am the Information that is pravidod in this section. N 4) Description or Fac* Name: Physical Address: County_ City. Zip: $ Facility Phone Number(1 FscFdy Contact Person: •••• H Desctiption of A►eaftorn Number; A Prior Use: - Fuk" Use: P\ Age of BuifdingrFadlity: Size: Numbero(Fiorue: School (K-12): ❑ YES q NO .. O 6) Typo of Worse t7 Demolition t] Renovation {Abatement} a Annual Consolidated T Wnrlcwill pp during: ❑ Day 0 Everting 0 Night O -Phased F'rgeot _ Description of Work schedule Is this a Public Building?. 0 YE5 d NO Federal Fatillty✓t OYES ONO Indtrsirial ate? OYES ONO o NESHAP-OltiyFaclRW d YES ..;0 NO IsBulkdkg1 adl7tyOccupied? o YES Cl NO L 7) Noftalion Type CHECK ONLY ONE t7 Oirlglnal {10 9Yoritin9 Days) D t ancrrtlaHon C] Artretldment 0 EmargenoyfOrdened o If this is an amendment, which amendment number to Wh __(Enclose dopy of arlgInal andlar last amendment) If an emergency, who did you talk with at TDH? EmergenoA Date and Hour of Emergency (HF AAWDMYY)- " Des; pdon of the sudden, unexpected event and explanation of haw ilia event caused Unsafe conditions or Would cause a equipment damage (computers. machinery, etc n O B) Description of procedures to be #allowed In the event that unexpected asbestos fslios nd or previously non -friable Y -asbestos material becomes crumbled. pulverized, or reduced to powder - E - :S _ - 9) W88 8n Asbestos survey performed? a YES ONO 1139w ! ! TDH inspector- Uoense No: G Analytical Meihod; O PLM ❑ TFM ❑ Assumed TDH LaboratoryLicense No: N (For TAHPA (public busding) projects: an assumption must be made by a TDH Licensed Inspector) .. - 10) Description of planned demoti76on or renovation work, type of material, and method(s) to be usedr 11) Description of work pradioaa and engkwering Controls to be used to prevent emissions of asbestos at the damolidaWrenovatkon: oy1M SC-43 PART D - SPECIAL CONDITIONS .M 12) ALL applicable Items in sne rollowing table must be completed; IF NO ASBESTOS PRESENT CHECK HERE n Approximate amount of Aebadoo-Containing Building Material Asbestos Type Pipes Surface Area RACM to be removed RACM NOT removed Interior Cateoary I non -friable removed Extarior Ca%gory I non -friable removed Category I non -friable NOT removed Interior Cat"ory 0 non -finable removed EMeftr Category 11 non -friable removed Category it non-Mable NOT removed PACM Off-Fac,Tiiy Component Check unit of measurement 13) Waste Transporter Name: TDH l.ioense Nu►nber. Address: City: Stale: Zip: C w t ct Person: Phone Number. ( 1 14) Waste Disposal Site Name: :;Addretts City: State. Zp: =Tdepftane:;�1 TTIRCC Permit Number, 15) For structurally unsound faclNtles, attach a copy of darnaftri order and identify Governmental Official below: Nam Reglstreiian No: Title Delp- of order (1 M(PDUYY) t I Date cider to begin(14ODDIYY) i I 16) Scheduled Dates of Asbestos Abatement WDOPM Starr 1 I Complete: t 1 17) Schedutsd Detas DemolillonlRenovation (MMODIYY) Start 1 .-. --- 1— . Compiete: f I "!foie: If the start date an this natlltr4on can not be mat, tho TOM Regional or Locat Program office ARM be contacted by phone prior to the start data. Failure to do so Is a vlolation in accordance to TAHPA. Section 29&61. 1 hereby ce�jF that all information I have provided is correct. complete. and true to the best of my knawiedgm 1 acknowledge Oat I alai responsible for all aspects or the notification form, includ"aig, but not limiting, content and submission dates. The nrwmwn pen►agYis$10,000 per day per vkAsUon. f 74 iSignel ft of BUIdlitlg Owner/ Operator (Printed Mama) (Date) (Telephone) ax Domed ConsWtantlContractor) k IKAIL TO: ASBESTOS NOTI>`lCA710N SECTION f TOXIC SUBSTANCES CONTROL DIVISION TEXAS DEPARTMENT OF HEALTH `Ahxas are not acceptaaf* P10 BOX 14353870- "Faxes em not accaptq& _. AUSTIN. TX 787143538 PH:512�3�t-a6W,1-840-572-5548 FortttAl?Bf dakdQ7/Z Rt TDhI form dBtadOT/f3D7. For assistance in camPlalmg form, coif l-8IX7-572-5548 .. go M r• 03112M SC-44 L--j PART D — SPECIAL CONDITIONS SC-45 PART D - SPECIAL CONDITIONS Asphalt Raker Asphalt Shoveler Asphalt Distributor Operat9� Asphalt Pavingklachne (5�perator hatching Plant Weigher Broom or tiSiveeper Operator Bulldozer Operator CarpenterJRaugh). Concrete tinfer- aving Concrete Finisher-Stnctures Concrete Paving Curling Mach. Oper- Concrete Pa\vw Finishing Mach- Over. Concrete Paving Joint Sealer Oper. Concrete Paving Saw O Concrete Paving er Oper. Loncrele Rubber Crane, Clamshe8, Baekhoe, Derrick, Dragliine. Shovel Eleclriaan Form Builder- Struchues Form Setter- Paving 3 Curbs Foundation Drill Operator. Crawler Mounted Foundation Drill Operator, Truck Mounted Front End Loader Laborer- Common Laborer- Unity Mehrarrc Milling Machine Operator. Fine Grade Mixer raior Motor Grader Operator (Fine Grade) Motor Grader Operator. Rough Oiler Painter, Structures Pavement Marking Machine Oper- Pipe Layer Roler, Steel Wheel Plant- Mix Pavements Refer,Steel Wheel Other Flatwheel or ► Refer, Pneumatic, Self-Prope9ed Scraper ReW"ng SUw4 Setter (Paving) Remliorcing Steel Seller (!§trvcture) Source is AGC of Texas (Hwy. Huy. Utilities industrial Branch) www.aecess.gpogovidavis6acan! Houd Ra $1�-06 $13.90 S8.80 $13.99 $12-78 $14-15 $9-88 $1322 $12.60 $12-65 $13-27 $12-DO $13-03 $12-50 $13.50 $14-50 $10.61 $14.12 $18-12 S8.43 $11-63 $11_83 $13.67 $16.30 $12.62 $9-18 $10-65 $16.97 $11.83 $11.58 $1520 $14.50 $13-17 $10.D4 $11-04 $1120 $10-92 $11.07 $14-86 $1629 Scraper 6perator Servicer Slip Form Machine Operator Spreader Box Operator Tractor operator, Crawler Type Tractor operator. Pneumatic TraveliN Mixer Operator Truck Drives Single Axle (Ught) Truck Driver- nee Azle f Heav� - Truck Driver- andem Axle Semurailer Truck Driver- LowboylFloat Truck Drives Transit K6 Wagon Drill, Boring Machine. Post Hale Duller Welder Work Zone Barricade Servicer 511.42 $12.32 $12.33 $10.92 $12.60 $12.91 41203 $10.91 $11.47 $11.75 $14.93 $12.08 314.00 $13.57 $10.09 am raw No raw Imo■ No 03112109 SCA6 Part DA additional Special Conditions am PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS ........................... OMITTED DA-2 PIPELINE REHABILITATION CURED -IN -PLACE PIPE..................................................OMITTED DA-3 PIPE ENLARGEMENT SYSTEM..................................................................................... OMITTED DA-4 FOLD AND FORM PIPE..................................................................................................- OMITTED DA-5 SLIPLINING......................................................................................................................OMITTED DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT......................................................................... 4 DA-7 TYPE OF CASING PIPE......................................................................... .......OMITTED .................. DA-8 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR ................................................. OMITTED DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION .....................OMITTED DA-10 MANHOLE REHABILITATION............................................................................... ......... . OMITTED DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION ...................................OMITTED DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM ....................OMITTED DA-13 INTERIOR MANHOLE COATING - QUADEX SYSTEM ..................................................OMITTED DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM .......................................... OMITTED DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM ........................................ OMITTED DA-16 INTERIOR MANHOLE COATING- PERMACAST SYSTEM WITH EPDXY LINER....... OMITTED DA-17 INTERIOR MANHOLE COATING-STRONG-SEALSYSTEM.........................................OMITTED DA-18 .............................. RIGID FIBERGLASS MANHOLE LINERS ....................................... .. OMITTED DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION ...................................................OMITTED DA-20 PRESSURE GROUTING.................................................................................................OMITTED DA-21 VACUUM TESTING OF REHABILITATED MANHOLES .................................................OMITTED DA-22 FIBERGLASS MANHOLES ..................................................... .........OMITTED DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES ........................ OMITTED DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER ................................................ OMITTED DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS........................................................OMITTED DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE............................................................... 7 DA-27 GRADED CRUSHED STONES...................................................................................................... 7 DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE...............................................................OMITTED DA-29 BUTT JOINTS -MILLED ................................................ :............................................................... 8 DA-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX).......................................................... ........................ OMITTED DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER ................................................. OMITTED DA-32 NEW T' CONCRETE VALLEY GUTTER.........................................................................OMITTED DA-33 NEW 4" STANDARD WHEELCHAIR RAMP................................................................... OMITTED DA-34 8" PAVEMENT PULVERIZATION....................................................................................OMITTED DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) .............................OMITTED DA-36 RAISED PAVEMENT MARKERS..................................................................................... OMITTED DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING .....................OMITTED DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL............ OMITTED DA-39 ROCK RIPRAP - GROUT - FILTER FABRIC ..................................... OMITTED DA-40 CONCRETE RIPRAP......................................................... ..............OMITTED ................................ DA-41 CONCRETE CYLINDER PIPE AND FITTINGS...............................................................OMITTED DA-42 CONCRETE PIPE FITTINGS AND SPECIALS .................... ........OMITTED DAA3 UNCLASSIFIED STREET EXCAVATION...................................................................................... 8 DA-44 6" PERFORATED PIPE SUBDRAIN................................................................................OMITTED DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS......................................................... OMITTED DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION ................................... ..........OMITTED DA-47 PAVEMENT REPAIR IN PARKING AREA.......................................................................OMITTED DA-48 .......................... EASEMENTS AND PERMITS......................................................... ..................... 9 DA-49 HIGHWAY REQUIREMENTS..........................................................................................OMITTED DA-50 CONCRETE ENCASEMENT......................................................................................................... 9 DA-51 CONNECTION TO EXISTING STRUCTURES.............................................................................. 9 DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION......................................OMITTED DA-53 OPEN FIRE LINE INSTALLATIONS................................................................................OMITTED DA-54 WATER SAMPLE STATION............................................................................................ OMITTED DA-55 CURB ON CONCRETE PAVEMENT...............................................................................OMITTED DA-56 SHOP DRAWINGS.. .... ................................................................................................................. 9 10123108 ASC-1 PART DA - ADDITIONAL SPECIAL CONDITIONS C= DA-57 COST BREAKDOWN.__.. .......................................................................................................... ................................................................................................... 10 DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY .................................................. 10 DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP........................................................................OMITTED DA-60 ASPHALT DRIVEWAY REPAIR................................................................................................... 11 DA-61 . TOP SOIL. . .................. ............................................................................................................... 11 DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT ..................... OMITTED DA-63 BID QUANTITIES......................................................................................................................... 11 DA-64 WORK IN HIGHWAY RIGHT OF WAY............................................................................ OMITTED DA-65 CRUSHED LIMESTONE (FLEX-BASE)...........................................................................OMITTED DA-66 OPTION TO RENEW.........................................................................................a......................... 11 DA-67 NON-EXCLUSIVE CONTRACT................................................................................................... 11 DA-68 CONCRETE VALLEY GUTTER.......................................................................................OMITTED DA-69 TRAFFIC BUTTONS........................................................................................................OMITTED DA-70 PAVEMENT STRIPING....................................................................................................OMITTED DA-71 H.M.A.C. TESTING PROCEDURES............................................................................................ 12 DA-72 SPECIFICATION REFERENCES................................................................................................ 12 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK -FLOW PREVENTER/CONTROL VALVE AND BOX.................................................................................................................................. OMITTED DA-74 RESILIENT -SEATED GATE VALVES.......................................................................................... 12 DA-75 EMERGENCY SITUATION, JOB MOVE-IN................................................................................. 13 DA-76 1 Y:z & 2' COPPER SERVICES .............:..... .. .................................................................. OMITTED DA-77 SCOPE OF WORK (UTIL. CUT)...................................................................................... OMITTED DA-78 CONTRACTOR'S RESPONSIBILTY (UTIL. CUT)........................................................... .................................. OMITTED DA-79 CONTRACT TIME (UTIL. CUT) .................................................... ....... .OMITTED ....... .................... DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL CUT) ........................ . ............ OMITTED DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) ....................................................... OMITTED DA-82 LIQUIDATED DAMAGES (UTIL. CUT)...........................................................................OMITTED DA-83 PAVING REPAIR EDGES (UTIL. CUT) .............................................. ....... ...................... OMITTED DA-84 TRENCH BACKFILL (UTIL. CUT).................................................................................... OMITTED DA-85 CLEAN-UP (UTIL. CUT)....................................................................... .....OMITTED ...............:....... DA-86 PROPERTY ACCESS (UTIL. CUT)............................................................................OMITTED DA-87 SUBMISSION OF BIDS (UTIL. CUT) .............................................. .....OMITTED ............................ DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT)...................:................................OMITTED DA-89 CONCRETE BASE REPAIR FOR UNIT 11 & UNIT III (UTIL. CUT)..................................OMITTED DA-90 2' TO 9' H.M.A.C. PAVEMENT (UTIL. CUT)...................................................................OMITTED DA-91 ADJUST WATER VALVE BOXES, MANHOLES, AND VAULTS (UTIL. CUT) ................ OMITTED DA-92 MAINTENANCE BOND (UTIL. CUT)............................................................................... OMITTED DA-93 BRICK PAVEMENT (UTIL. CUT).....................................................................................OMITTED DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) ........................................ ...OMITTED ....................... DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT)...........................................................OMITTED DA-96 REPAIR OF STORM DRAIN\ STRUCTURES (UTIL. CUT) ............................................ OMITTED DA-97 ...................... "QUICK -SET' CONCRETE (UTIL. CUT) ........................................ ........... OMITTED DA-98 UTILITY ADJUSTMENT (UTIL. CUT) ................................ ... OMITTED DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) ........ OMITTED DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUT) ......................................OMITTED DA-101 CONCRETE CURB AND GUTTER (UTIL CUT) ........................................................ ........................... OMITTED DA-102 PAYMENT (UTIL. CUT)........................................................... ......OMITTED .............................. DA-103 DEHOLES (MISC. EXT.)..............................................................................................OMITTED DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.)...................................................................... 13 DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.).......................................................... 13 DA-106 BID QUANTITIES (MISC. EXT.).............................................................................................. 13 DA-107 LIFE OF CONTRACT (MISC. EXT.)............................................................................ OMITTED DA-108 FLOWABLE FILL (MISC. EXT.).............................................. ......... 13 DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.).............................................................. OMITTED DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL)................................ OMITTED DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.)................................................ OMITTED 10123108 ASC-2 m am .m m m um um um um PART DA - ADDITIONAL SPECIAL CONDITIONS DA-112 MOVE IN CHARGES (MISC. REPL.).......................................................................... OMITTED DA-113 PROJECT SIGNS (MISC. REPL.)............................................................................... OMITTED DA-114 LIQUIDATED DAMAGES (MISC. REPL.)................................................... ........ OMITTED DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.)................................................ OMITTED DA-116 FIELD OFFICE............................................................................................................OMITTED DA-117 TRAFFIC CONTROL PLAN..................................................................................................... 14 DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS ........................... 14 DA-119 CATHODIC PROTECTION SYSTEM..........................................................................OMITTED iorlyos ASC-3 mw PART DA - ADDITIONAL SPECIAL CONDITIONS DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT aw A. GENERAL: 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade'as shown on the Plans and as established in the Specifications. 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad .. company, as applicable. B. MATERIALS: no 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the following: No a. Field Strength: 35,000 psi minimum. M b. Wall thickness: 0.312 in. minimum (0.5 for railroad crossings). C. Diameter: As shown on the drawings (minimum size requirements). d, Joints: Continuous circumferential weld in accordance with AWS D1.1. 2, Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. 3. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or no as designated on the plans. 4, Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. C. EXECUTION 1, Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the railroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2. Pits and Trenches: 1023108 ASC-4 PART DA - ADDITIONAL SPECIAL CONDITIONS a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from .. caving in. b. The location of the pit shall meet the approval of the Engineer. C. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. 3. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and workmen. The holes are to be bored mechanically. The boring shall be done using a pilot hole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. Jetting or sluicing will not be .. permitted. b. In unconsolidated soil formations, a gel -forming colloidal drilling fluid _ consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. C. Allowable variation from the line and grade shall be as specified under paragraph AZ All voids between bore and outside of casing shall be .. pressure grouted. 4. Installation of Carrier Pipe in Casing: a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. 1.0 10/23/08 ASC-5 PART DA - ADDITIONAL SPECIAL CONDITIONS C. The Contractor shall prevent over -belling the pipe while installing it through the casing. A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d. At all bored, jacked, or tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will not be required unless specified on the plans and specified by the Engineer. e. Closure of the casing after the pipe has been installed shall be plugged at .. the ends of the casing as shown on the drawings or as required by the Engineer. 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indicated on drawings and as required and directed by the Engineer .. sewer shall be constructed of bore and jacked ductile iron pipe, b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. C. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed .. by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. r 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be used, with the approval of the Engineer or railroad/highway officials. a. When tunneling is permitted, the lining of the tunnel shall be of sufficient .. strength of support the overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. b. The space between the tunnel liner and the limits of excavation shall be MW pressure grouted or mud jacked. C. Access holes for placing concrete shall be space at maximum intervals of 10 feet. D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be UW measured by the linear foot of pipe, complete in place. Such measurement will be made 10123/08 ASC-6 .r r PART DA - ADDITIONAL SPECIAL CONDITIONS between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. Payment shall not include pavement replacement, which if required, shall be paid separately. r.. DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar r. means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable sub -base. The total depth of excavation could range from a couple of inches to include the surface -base -some sub -base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site, the same day as excavated, to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with 'Type D" surface mix. This item will always be used even if no •• base improvements are required. The proposed H.M.A.C. repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C, pavement thickness will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and Emulsions", 'r 304 "Prime Coat", and 312 "Hot -Mix Asphaltic Concrete" shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-27 GRADED CRUSHED STONES This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208 "Flexible Base". .. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. .. 1023108 ASC-7 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-29 BUTT JOINTS - MILLED A. Description: This item requires the contractor to mill "butt joints" into the existing surface, in association with the wedge milling operation to the depth and at locations as described below. The butt joint will provide a full width transition section, whereby the new overlay shall maintain constant depth at the point the new overlay is terminated and the new surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of Pay Item No. 9 - Wedge Milling. The configuration of the butt joints is described in more detail below. General details of butt joint locations - along with wedge milling in general - are shown in plan form at the back of this document. B. Construction Details Prior to the milling of the butt joints, the Contractor shall consult with the Construction Engineer for proper location of these joints and verify that the selected limits of the projects' street are correct. The general locations for butt joints are at all beginning and ending points of streets listed in the project and as more graphically detailed at the back of this specification book. The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the continuity of the asphalt surface. Each butt joint shall be 20 feet long and milled out across the full width of the street section to a tapered depth of 2". This milled area shall be tapered within the 20 feet to a depth from 0" to 2" at a line adjacent to the beginning and ending points or intermediate transverse items. This butt joint - when overlayed - will consist of a asphalt section that will transition the new overlay to match the existing pavement elevation. The contractor shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. C. Measurement and Payment Butt joints as prescribed above, will be measured by the unit of each butt joint milled. The disposal of excess material involved will not be measured for payment. Each butt joint -milled, measured as above, complete -in place -in accordance with these specifications, will be paid for at the unit price shown in the proposal for "Butt Joints". The unit price bid per each shall be full compensation for all milling, including material haul -off, tools, labor, equipment and incidentals necessary to complete the required work. DA43 UNCLASSIFIED STREET EXCAVATION This item will be used if additional excavation is needed that is not covered by 08" PAVEMENT PULVERIZATION". Additional Excavation is the removal of the excessive crown and base to bring the new base to proper grade and City standard specifications for street reconstruction. All 1h10123108 ASC-8 M MW NNW ri .m no we ..r aw .. PART DA - ADDITIONAL SPECIAL CONDITIONS applicable provisions of Item No. 106 "Unclassified Street Excavation" shall apply, work shall be paid per cubic yard. No DA-48 EASEMENTS AND PERMITS Easements and permits, both temporary and permanent, have been secured for this project at w this time and made a part thereto. Any easements and/or permits, both temporary and permanent, that have not been obtained by the time of publication shall be secured before construction starts. No work is to be done in areas requiring easements and/or permits until the .. necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, along with any special conditions that may have been imposed on these easements and permits. w Where the pipeline crosses privately owned property, the easements and construction areas are shown on the plans. The easements shall be cleaned up after use and restored to their original conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. DA-50 CONCRETE ENCASEMENT 'o Concrete encasement shalt be Class E (1500 psi) concrete and for sewer line encasements shall conform to Fig. 113; for water line encasements it shall conform to Fig. 20 of the General Contract Documents. Requirements for such encasement are specified in Sections E1-20 and .. E2-20 of the General Contract Documents. Payment for work such as forming, placing, and finishing including all labor, tools, equipment and Wd material necessary to complete the work shall be included in the linear foot price bid for Concrete Encasement. DA-51 CONNECTION TO EXISTING STRUCTURES _ All connections between proposed and existing facilities, shall consist of a watertight seal. Concrete used in the connection shall be Class A (3000 psi) concrete and meet the requirements of Section E1-20 and E2-20 of the General Contract Documents. Prior to concrete placement, a gasket, RAM-Nek or approved equal shall be installed around penetrating pipe. w Payment for such work as connecting to existing facilities including all labor, tools, equipment, and material necessary to complete the work shall be included in the linear foot price of the w appropriate pipe BID ITEM. DA-56 SHOP DRAWINGS 1. Submit seven (7) copies of shop drawings, layouts, manufacturer's data and material schedules as may be required by the Engineer for his review. Submittals may be checked by and stamped with the approval of the Contractor and identified as the Engineer may require. Such review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. 1023/08 ASC-9 PART DA - ADDITIONAL SPECIAL CONDITIONS Indicated actions by the Engineer, which may result from his review, shall not constitute concurrence with any deviation from the plans and specifications unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing .. submittals are not change orders. The purpose of submittals by the Contractor is to demonstrate that the Contractor understands the design concept, and that he demonstrates his understanding by indicating which equipment and materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use. If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed, the design drawings and specifications shall govern. The Contractor shall be responsible for dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of constriction, coordination of his work with that of other trades and satisfactory performance his work. The Contractor shall check and verify all measurements and review submittals prior to being submitted, and sign or initial a statement included with the submittal, which signifies compliance with plans and specifications and dimensions suitable for the application. Any deviation from the specified criteria shall be expressly stated in writing in the submittal. Three (3) copies of the approved submittals shall be retained by the Contractor until completion of the project and presented to the City in bound form. 2. Shop drawings shall be submitted for the following items prior to installation: Pipe and fittings (coating and lining, and other requirements as indicated in the individual specifications), valves, combination air vacuum release valves, blowoff assemblies, meters, strainer, concrete vaults, flow control valves and orifice plate, pipe connection details, pipe bedding material reports, concrete and HMAC reports, casing pipe, casing spacers, grout mix report, cathodic protection, trench safety plan and traffic control plan shop drawings. Additional shop drawing requirements are described in some of the material specifications. 3. Address for Submittals - The submittals shall be addressed to the Project Manager: David Townsend, P.E. City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 DA-57 COST BREAKDOWN W In order to establish a basis upon which partial payments to the Contractor may be authorized, .. immediately after execution of the contract the Contractor shall furnish a detailed cost breakdown of his contract price arranged and itemized to meet the approval of the Engineer. DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY All work involving paving and/or drainage shall conform to the two following published specifications, except as modified herein: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION — CITY OF FORT WORTH IC123108 ASC-10 W PART DA - ADDITIONAL SPECIAL CONDITIONS STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRAL TEXAS DA-60 ASPHALT DRIVEWAY REPAIR At locations where H.M.A.C. driveways are encountered, such driveways shall be completely no replaced for the full extent of utility cut with H.M.A.C. equal to or better than the existing driveway. DA-61 TOP SOIL .. Where directed by the Engineer, top soil shall be applied in accordance with the City of Fort Worth Transportation and Public Works Department's Standard Specifications for Street and No Storm Drain Construction, Item 116, except as follows: All labor, equipment, tools and incidentals shall be included in the square yard bid price for the top soil. DA-63 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C443 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. •* In particular, the Contractor shall be aware that it is the City's intention that the quantities in Unit 1 be used on an `emergency' basis only. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding and awarding the contract. A contract in the amount of $200,000 (see Options to Renew) shall be awarded with final payment based on actual measured ., quantities and the unit price bid in this proposal. Moreover, there is to be not limit on the variation between the estimated quantities shown and actual quantities performed. It is understood and agreed that the scope of work contemplated in this contract is that which is designated by the City bit will in not case exceed $200,000 (see Options to Renew) including all change orders. Im DA-66 OPTION TO RENEW The City has the right to renew this contract for three (3) one year terms/expenditures of $200,000 under the same terms, conditions, and unit prices. The City shall give at least sixty (60) days notice prior to the expiration of one year from the date of execution of this contract or of an option period or a like notice at such time as there is less than $20,000 left unexpended. DA-67 NON-EXCLUSIVE CONTRACT This contract is non-exclusive. During the term of this contract or any renewal hereof, the City reserves the right to advertise and award another contract for like or similar work. If a second 10123108 ASC-11 PART DA - ADDITIONAL SPECIAL CONDITIONS contract is awarded, the City further reserves the right to issue work orders under either contract as it deems in its best interest, without recourse. DA-70 PAVEMENT STRIPING Pavement striping, whenever and wherever encountered, shall be replaced to match the existing striping or as directed by the Engineer. Materials used shall be of 420 Type intersection grade tape (in 18-inch width) such as Stamark as manufactured by 3M company or approved equal. The unit price bid for this item shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-71 H.M.A.C. TESTING PROCEDURES The contractor is required to submit a Mix Design for both Type "B" and "D" asphalt that will be used for each project. This should be submitted at the Pre -Construction Conference. This design shall not be more than two (2) years old. Upon submittal of the design mix a Marshal (Proctor) will be calculated, if one has not been previously calculated, for the use during density testing. For type "B" asphalt a maximum of 20% rap may be used. No Rap may be used in type "D" Upon approval of an asphalt mix design and the calculation of the Marshal (proctor) the contractor is approved for placement of the asphalt. The contractor shalt contact the City Laboratory, through the inspector, at least 24 hours in advance of the asphalt placement to schedule a technician to assist in the monitoring of the number of passes by a roller to establish a rolling pattern that will provide the required densities. The required Density for Type "B" and for Type "D" asphalt will be 91% of the calculated Marshal (proctor). A Troxler Thin Layer Gauge will be used for all asphalt testing. After a rolling pattern is established, densities should be taken at locations not more than 300 feet apart. The above requirement applies to both Type "B" and "D" asphalt. Densities on type "B" must be done before Type "D" asphalt is applied. Cores to determine thickness of Type "B" asphalt must be taken before Type "D" asphalt is applied. Upon completion of the application of Type "D" asphalt additional cores must be taken to determine the applied thickness. DA-72 SPECIFICATION REFERENCES When reference is made in these specifications to a particular ASTM, AWWA, ANSI or other specification, it shall be understood that the latest revision of such specification, prior to the date of these general specifications or revisions thereof, shall apply. DA-74 RESILIENT -SEATED GATE VALVES Any resilient -seated gate valves supplied for this contract shall conform to Material Standard E1-26, STANDARD SPECIFICATIONS FOR RESILIENT -SEATED GATE VALVES, with the exception of size requirements in sections E-26.1. All resilient -seated gate valves shall be mechanical joints and be approved on the City of Fort Worth Standard Product List. 10123108 ASC-12 go PART DA - ADDITIONAL SPECIAL CONDITIONS DA-75 EMERGENCY SITUATION, JOB MOVE -IN The Owner or Engineer shall determine when an emergency situation shall exist. When water v- emergency work is required, the Contractor shall mobilize to the said location within twenty-four (24) hours after given notification from the Inspector and/or Project Manager. The Contractor shall make all necessary arrangements for bypass pumping, setting up barricades, notifying no citizens, etc., while waiting for other utilities to be located as directed by the Engineer. The Contractor shall work continuously until the emergency worts order has been completed at a time agreed to by the Project Manager, Inspector, and Contractor. After the emergency work order has been completed, there will be no additional "Job Move -In' charges paid to remobilize back to the previous project location site. .. DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.) The Contractor shall have no more than three (3) locations under construction at any one time, unless approval by the Engineer has been granted in writing. DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) Care shall be taken to keep all water extensions clean and free from foreign objects. Chlorinated lime shall be placed in the first joint of pipe of the extension and upon completion of the pipe laying, water shall be introduced slowly for sterilization, after which the extension shall be thoroughly flushed with clean water. Risers shall be installed, as directed by the Engineer, for flushing and for providing sample points for bacteria tests. The water main extensions of the project shall be tested under normal line pressure and any leaks observed shall be immediately repaired. .. DA-106 BID QUANTITIES (MISC. EXT.) Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. DA-108 FLOWABLE FILL (MISC. EXT.) 1. Description: The flowable fill material shall be delivered to the site, free flowing and self -leveling and shall have a consistency enabling it to fill all voids without tamping, vibrating or compacting. The flowable fill material shall have an in place density of not less than 95 and not more than 115 lbs./cu. ft., with a maximum twenty-eight (28) day compression strength of not less than 60 and not more than 85 PSI allowing the material to be removed with hand tools such as picks and shovels. The height of free fall of the flowable fill shall not exceed four (4) feet. 10123108 ASC-13 PART DA - ADDITIONAL SPECIAL CONDITIONS 2. Material Specifications: -� Foowable fill shall consist of: a. An appropriate amount of Portland Cement meeting ASTM C-150 (with other additives as necessary). b. Aggregates meeting ASTM C-33 No c. Sand or fine aggregates as per City of Ft. Worth Standard Specifications for Street and Storm Drain Construction Item 406 d. Flyash, Class C or F, meeting ASTM C-618 e. Admixtures 1. Mineral admixtures will be pozzolanic 2. Chemical admixtures shall be in liquid or powder form used in standard ready -mix concrete products unless specifically designed for flowable fill. Permissible types of admixtures are: a. High air generators, as manufactured by Grace Construction Products or approved equal, which are specifically designed for flowable fill to lower unit weights, reduce shrinkage and subsidence, and control compressive strength. b. Air entraining admixtures conforming to ASTM C-260. ... c. High range water reducers conforming to ASTM C-494 Type F or G. d. Accelerating admixtures conforming to ASTM C-494, Type C. 1. Non -chloride, non -corrosive accelerators used where metals are present in concrete or embedded members. 2. Calcium chloride DA-117 TRAFFIC CONTROL PLAN Traffic control shall be in accordance with item D-8 of the Special Conditions with the exception of the Contractor providing the traffic control plan. A traffic control plan hwbeen prepared and is included in the project plans. All other requirements of D-8 shall apply. DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS The contractor shall coordinate his work with the work of other contractors on remaining units of this project. The contract documents indicate the starting and stopping points for each of the -- units of the project. The plans indicate "connecting to an existing pipeline" constructed by others and ending the line with the installation of a plug. If the start of the project cannot be connected to the previous unit, the contractor will begin his line with a plugged section of pipe. If the pipeline .. is constructed for the connecting unit the contractor shall connect his line with the adjoining unit in lieu of installation of a plug. Contractor will be paid for "connection" to existing line or installation of blind flanges based on the unit price bid for the water or sewer main. 10/23/08 ASC-14 PART E chnical Specifications 0318-042-01 SECTION 01001 GENERAL CONSTRUCTION REQUIREMENTS 1.0 SCOPE -, The work involved under this Contract consists of the furnishing of all materials, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction and completion of the project, including but not limited to the following major items: Distribution Main Part 3 shall consist of the following: The reclaimed water pipeline consist of approximately 10,350 linear feet of 24-inch pipe and 7,900 linear feet of 20-inch pipe parallel and adjacent to Euless South Main, Pipeline Road, American Blvd, and FAA Blvd; with approximately 2,000 linear feet of horizontal directional drilling in two 30-inch steel casing crossings of State Highway 360 and State Highway 183; ending on D/FW International Airport property. 2.0 MATERIAL FURNISHED BY OWNER All materials for this contract shall be provided by the CONTRACTOR in accordance with the applicable specifications unless specifically noted otherwise in the Plans or Specifications. 3.0 CONNECTION TO THE EXISTING RECLAIMED WATER LINE CONTRACTOR will make a connection to the existing 24-inch reclaimed water line at the edge of the Trinity Rail Express right of way at the intersection of the Trinity Rail Express and Euless South Main as show on the Plans. The CONTRACTOR shall provide and install necessary fittings to make the connection to the reclaimed water line as shown in the plans. The CONTRACTOR shall request permission in writing from the OWNER to work at the connection at least fourteen (14) days prior to the requested date. The request must include the CONTRACTOR'S plan and procedure to connect to the existing facilities, the proposed date; the proposed time for initiating the connection, the proposed time the connection will be completed, and any other information which may be needed by the ENGINEER to evaluate the request. The CONTRACTOR shall not initiate work at the connection site until approval is granted. The CONTRACTOR shall take measures to insure that no concrete, debris or materials enter the reclaimed water line. 01001-1 February 18, 2009 GENERAL CONSTRUCTION REQUIREMENTS F:\projects103181042-011specsxPart 3\01001.doc w 318-3205 4.0 SANITATION FACILITIES The CONTRACTOR shall provide portable toilet and drinking water facilities in sufficient number for the CONTRACTOR'S use throughout the course of the Project and in accordance with OSHA requirements. CONTRACTOR'S personnel will not be permitted to use toilet or drinking water facilities in the existing buildings. 5.0 POWER FOR CONSTRUCTION The CONTRACTOR shall at his own expense pay for all electrical power for project construction. 6.0 FIREARMS Neither the CONTRACTOR nor any of his employees shall be allowed to carry firearms on the Project, either on their persons or within their automobiles. 7.0 REFERENCE STANDARDS Reference to the standards of any technical society, organization, or association or to the codes of local and state authorities shall mean the latest standard codes, specifications, or tentative specifications adopted and published at the date of taking bids, unless specifically stated otherwise. 8.0 OFFSITE STORAGE Offsite storage of materials or equipment shall be the sole responsibility of the CONTRACTOR. In the event that the CONTRACTOR does not -have adequate facilities to receive and .protect equipment or materials when delivery is made, then the CONTRACTOR shall be solely responsible for the storage of such items. Equipment or materials shall be stored by the CONTRACTOR according to each manufacturer's recommendations. The CONTRACTOR may, at his option, make such arrangements with each vendor to delay - shipment of certain items by storing them at the factory. Additional costs incurred thereby shall be bome by the CONTRACTOR. Such changes in shipping schedules shall not in any way affect the designated completion date of this Contract. 9.0 HANDLING MATERIALS NOT APPROVED The CONTRACTOR shall remove from the site any materials found to be damaged and any materials not meeting the Specifications. Any payment for materials found to be damaged shall be deleted from the next monthly partial payment request. Inspection before installation shall not relieve the CONTRACTOR from any responsibility to fumish materials which meet the specified requirements. 01001-2 January 26, 2009 GENERAL CONSTRUCTION REQUIREMENTS F.VrojectsN0318\042-01 \Specs\Part 3\01001.doc 318-3205 10.0 CONTRACT DOCUMENTS AT THE SITE The CONTRACTOR shall maintain at the Project site one copy of the Contract Documents including Plans, Specifications, Addenda, Change Orders, approved Shop Drawings, and any other modifications approved by the ENGINEER. The CONTRACTOR shall maintain a working copy of the Stormwater Pollution Prevention Plan showing current control devices. The CONTRACTOR shall also keep copies of all project correspondence and payment requests at the site. These documents shall be kept in good order in file cabinets and shall be marked to accurately record all changes made during construction and to accurately record the location and size of existing buried pipe and valves encountered during construction of the Project. With each monthly pay request, the CONTRACTOR shall make available updated record drawings for OWNER's review. Upon completion of the Project, these drawings shall be made available to the ENGINEER for the OWNER. 11.0 DUST CONTROL The CONTRACTOR shall be responsible for eliminating and/or alleviating dust resulting from his construction operations. This is particularly applicable to dust which results from vehicular traffic traveling along or through areas where construction has resulted in dirt or dust being left on streets. The CONTRACTOR shall sprinkle water or use other dust control methods which will reduce dust to a minimum. The OWNER may request additional dust control sprinkling at anytime as deemed necessary. Dust control will be considered subsidiary to construction and no separate measurement and payment will be made. No oils, petroleum based solutions, or other substances which endanger the environment may be utilized for dust control. 12.0 CITY AND COUNTY ORDINANCES .� The CONTRACTOR shall abide by all City and County ordinances and standards when working within their jurisdiction, pertaining to any and all of the CONTRACTOR'S construction and work activities. The CONTRACTOR is responsible for obtaining copies of and becoming familiarwith all applicable ordinances and standards. Such ordinances shall include, but are not limited to, those addressing barricades, warning and detour signs; disposal of excess earth and materials; allowable hours and days for performing work; noise; air pollution; erosion and sedimentation control; and any other applicable ordinances and standards. The CONTRACTOR shall contact the jurisdiction in which the work is being conducted to obtain all necessary ordinances and standards. No separate measurement and payment will be made for abiding by all City and County ordinances and standards, but will be considered as subsidiary to construction. 13.0 OPEN TRENCHES Except at excavations created as the result of pits for bores, tunnels, jacking or similar operations (i.e., construction other than open trench), or as set forth in these Contract Documents, the CONTRACTOR shall backfill all trenches at the completion of each days work to the OWNER'S satisfaction and in addition to other required barricades and warning devices. The backfill shall extend from the end of the pipe to the top of the trench. 01001-3 January 26, 2009 GENERAL CONSTRUCTION REQUIREMENTS F:\projects\0318\042-01\Specs\Part 3\01001.doc f' 318-3205 At excavations created as the result of pits for bores, tunnels, jacking or similar operations, the CONTRACTOR shall, in addition to other required barricades and warning devices, furnish and install adequate barricades to prevent and stop vehicles from driving into pits and prevent pedestrians and livestock from falling into pits. 14.0 PIPE CLOSURE AND BUOYANCY OF STRUCTURES At the end of each working day, the CONTRACTOR shall plug the ends of all exposed pipeline with inflatable plugs placed inside the ends of the pipe or with OWNER approved plug, to prevent any material or objects from entering the pipeline. The CONTRACTOR shall anchor all pipelines and structures to prevent their flotation should rain occur prior to the completion of backfilling to proposed final grade. 15.0 LIGHTING A. Provide lighting for construction operations and security. B. Permanent lighting may be used when available. C. Maintain lighting and make routine repairs. 16.0 HEATING AND VENTILATION A. Provide as required to maintain specified conditions for construction operations. B. Protect materials and finishes from damage due to temperature or humidity. C: Provide ventilation of enclosed areas to cure materials, disperse humidity and prevent accumulations of dust, fumes, vapors, or gases. 17.0 FIRST AID FACILITIES CONTRACTOR shall provide full compliment of first aid supplies in weatherproof container at locations convenient to work sites. 18.0 FIRE PROTECTION A. Provide portable fire extinguishers, rated 2A minimum, in CONTRACTORS' field office, and storage sheds. B. Provide means of notifying personnel in case of emergency. C. Ensure internal combustion engine powered equipment is located at safe distance from combustible materials. D. Prohibit smoking in locations and operations of potential fire hazard and clearly post "No Smoking" or "Open Flame" signs. 01001-4 January 26, 2009 GENERAL CONSTRUCTION REQUIREMENTS F:\projects\0318\042-01\Specs\Part 3\01001.doc R` 318-3205 E. Flammable/Combustible Liquids: 1. Store flammable/combustible liquids in conformance with requirements of federal and local codes and regulations. 2. Provide approved metal safety containers for storage of flammable/combustible liquids in excess of one gallon. 3. Prohibit storage of flammable/combustible liquids near exits, stairways or common passageways. 19.0 FIELD OFFICES AND SHEDS The CONTRACTOR may provide a field office and sheds forthe CONTRACTOR's use. The CONTRACTOR shall be responsible for utilities. The CONTRACTOR has sole responsibility for acquiring a site for the location of offices and sheds. 20.0 SPECIAL ACCESS REQUIREMENTS AND CONSTRUCTION LIMITATION ON ROADWAYS This item pertains to work adjacent to and within all roadways on this Project. The CONTRACTOR will be required to provide one lane of traffic at all times on all roadways in the Project area, unless otherwise indicated on the drawings. The CONTRACTOR shall notify all emergency units operating in the area of the proposed work and closing schedule. The CONTRACTOR shall immediately inform all said units of any change in the closing schedule. The CONTRACTOR shall provide a minimum of one point of ingress and egress to all apartments, businesses, schools and homes on both sides of all roadways. Prior to installing asphalt pavement, the CONTRACTOR shall place an all-weather surface for temporary access. The all-weather surface shall meet the requirements of the Texas Department of Transportation Standard Specifications (TXDOT), Item 248, Type A. The CONTRACTOR shall take all necessary precautions to protect pedestrians in the work area. When working within or adjacent to the following rights -of -way, the CONTRACTOR shall cover all open trenches at the end of each work day using a method designed by the CONTRACTOR's Texas Registered Professional Engineer which will be capable of supporting AASHTO H-20 highway loads and/or provide barricades as set forth in the contract documents: All City roadways All County Roadways All State Roadways All other open trenches within roadways not noted hereinabove shall be properly barricaded and protected as set forth in the Contract Documents. At intersections and driveways, the CONTRACTOR shall install gravel material, as set forth in TXDOT Item 247, Type A, Grade 1. 01001-5 January 26, 2009 GENERAL CONSTRUCTION REQUIREMENTS F:\projects103181042-011Specs\Part 3\01001.doc 318-3205 21.0 POTABLE WATER LINE PROTECTION AND TCEQ REQUIREMENTS The CONTRACTOR shall abide by all TCEQ standards for installing reclaimed water pipelines. Reclaimed water lines and potable water lines shall be installed no closer than nine (9) feet from each other. Where the nine feet separation distance cannot be achieved, the CONTRACTOR shall place all underground potable water, reclaimed water and wastewater lines in accordance with the TCEQ's Rules and Regulations for Public Water Systems effective October 1, 1992 and Design Criteria for Sewage Systems and the requirements of Texas Natural Resource Conservation Commission Chapter 290 relating to Water Hygiene. 22.0 STORMWATER DISCHARGE PERMIT In accordance with the requirements set forth by the Environmental Protection Agency (EPA) in the Federal Register, Volume 63, No. 128, July 6, 1998, pages 36490 through 36519, titled "Final NPDES General Permit for Stormwater Discharge from Construction Sites," it will be the sole responsibility of the CONTRACTOR to comply with the referenced General Stormwater Permit conditions for the life of the project. A Storm Water Pollution Prevention Plan is provided in Appendix A. These requirements include, but are not limited to, the provision for filing a Notice of Intent (NOI) and maintaining the pollution prevention plans required in the General Stormwater Permit. All costs associated with complying with all provisions of the General Stormwater Permit shall be borne by the CONTRACTOR. Unless notified otherwise, the CONTRACTOR shall be authorized to discharge stormwater associated with the CONTRACTOR's Project work activities. Additional information may be obtained by contacting EPA's NPDES stormwater hotline at 703/821-4823 or the appropriate EPA Regional Office. This requirement is set forth to ensure that no damage or degradation to neighboring properties, public or private thoroughfares and waterways occurs as a result of erosion caused by construction activities. Any property disturbed by construction activities shall be returned to either specified condition or preconstruction conditions as set forth in the Contract Documents. The CONTRACTOR shall provide an overall erosion and sedimentation control system which will protect all disturbed areas and soil stockpile/spoil areas. An appropriate erosion and sedimentation system must be used and maintained in effective operating condition during construction, and all exposed soil and other fills must be permanently stabilized at the earliest practicable date. The CONTRACTOR shall have the sole responsibility for the means, methods, techniques, sequences and procedures for the furnishing, installing and maintaining erosion and " sedimentation control structures and procedures. The overall system shall be modified by the CONTRACTOR from time to time as may be required to effectively control erosion and sediment during construction and as directed by the OWNER during construction. 01001-6 January 26, 2009 GENERAL CONSTRUCTION REQUIREMENTS F:VrojedsN0318W42-01\.Specs\Part 3\01001.doc "0 318-3205 23.0 EXPLOSIVES Use of explosives will not be allowed on this Project. 24.0 PROJECT PHOTOGRAPHS A. The CONTRACTOR shall take photographs of the project site and all residences prior to construction, a minimum of 30 monthly during the construction of the Project and after completion of the Project including all residences. Photographs may be taken with a quality 35mm or better quality camera equipped to photograph either interior or exterior exposures, with lenses ranging from wide angle to 135mm. Photographs shall be taken at locations as designated by the OWNER and/or ENGINEER. All prints and negatives required by the OWNER shall become the property of the OWNER. B. Two (2) glossy color prints (minimum 4" x 6") and the negatives shall be provided for each photograph taken. Each print shall be marked to indicate project name, date and time, location, direction of exposure, and a description of what is being photographed. Prints shall be clear and sharp with proper exposure. If photographs of adequate quality are not produced from exposure, additional photographs shall be taken immediately. C. The CONTRACTOR shall provide photographs of the entire site prior to construction. Starting one (1) month after the date of the preconstruction photographs, and continuing as long as the work is in progress, monthly photographs shall be taken to accurately record the work that has progressed during that period. D. The CONTRACTOR shall record the condition of the project by video taping the entire site prior to construction. The video shall be clear and sharp and accurately record the preconstruction condition of the permanent easement, temporary easement and all structures within and adjacent to the easements. The OWNER shall be furnished a DVD copy of the video taken prior to the CONTRACTOR moving equipment and materials onto the {project site. 25.0 UNCLASSIFIED EXCAVATION All excavation will be unclassified. It shall be the responsibility of the CONTRACTOR to make such subsurface investigations as he deems necessary to determine nature of material to be excavated. END OF SECTION 01001-7 January 26, 2009 GENERAL CONSTRUCTION REQUIREMENTS F:\orojectsX0318\042-01\Specs\Part 3\01001.doc 0318-042-01 SECTION 01002 MEASUREMENT AND PAYMENT 1.00 GENERAL The 'Bid Price" for each and every item, as set forth in the proposal, shall include the furnishing of all labor, tools, materials, machinery, appliances, and equipment appurtenant to and necessary for the construction and completion in a first class, workmanlike manner of all work as herein specified in strict accordance with these Specifications and accompanying plans. The "Bid Price" shall also include any and all kinds, amount or class of excavation, backfilling, pumping, or drainage, sheeting, shoring and bracing, disposal of any and all surplus materials, protection of all overhead, surface or underground structures; removal and replacement of any poles, conduits, pipelines, appurtenances and connections, cleaning up, overhead expense, bonds, public liability and compensation and property damage insurance, patent fees, and royalties, risk due to the elements, mobilization and demobilization, and profits, unless otherwise specified. The bid price shall also include all other incidentals not specifically mentioned above that may be required to fully construct each and every item complete in place in accordance with the true intent and meaning of the specifications and accompanying plans. The CONTRACTOR shall take all measures necessary to protect existing structures, lawns, trees, shrubbery, etc., on the areas adjacent to the work, that are not necessary to remove or cut as a part of the construction, and if damaged, shall replace them in as good condition or better than previously existed at his own cost and expense without additional compensation from the OWNER. The CONTRACTOR shall protect and save all trees located on leased lots or between the property lines and the street right-of-way, and all trees noted in the plans and as instructed by the OWNER without additional compensation by the OWNER. Listed below are descriptions of items as listed in the Proposal and the manner in which payment shall be awarded for each. If there is not a specific measurement and/or payment section, paragraph or item associated with each Technical Specification contained in this Contract Document, then the following descriptions shall be used to describe measurement and payment. 2.00 BID ITEMS 2.01 ITEM NO. 301 - STORM WATER POLLUTION PREVENTION PLAN The unit price bid per lump sum for the Storm Water Pollution Prevention Plan shall include furnishing and installing the materials required for erosion prevention structures, at various locations on the plans. All structures shall be inspected and built per the specifications. After the project is complete and mature vegetation is present in disturbed 01002-1 January 29, 2009 MEASUREMENT AND PAYMENT FAprojects\0318\042-01\Specs\Part 3\01002.doc 0318-042-01 areas the structures, which prevented storm water pollution shall be removed offsite for proper disposal at contractor's expense. 2.02 ITEM NO. 302A - 24-INCH DIAMETER C-151 DUCTILE IRON PIPE The unit price bid per linear foot of 24-inch diameter C-151 Ductile Iron Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing pipe, pipe detection tape (buried above the entire length of pipe), poly bagging, transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 24-inch ductile iron pipe shall be considered subsidiary to this bid item. Pipe poly bagging shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement 4 will be made for payment (unless a separate pay item is provided in the Proposal). CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER. OWNER shall provide tracker balls. 2.03 ITEM NO. 302B - 24-INCH DIAMETER C-200 STEEL PIPE The unit price bid per linear foot of 24-inch diameter C-200 Steel Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing steel pipe, pipe detection tape (buried above the entire length of pipe), cathodic protection, transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 24-inch steel pipe shall be considered subsidiary to this bid item. ti Pipe shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal)_ As subsidiary to 'the unit price bid per linear foot of 24-inch Steel Pipe, the CONTRACTOR shall have a Cathodic Protection System designed by a Certified 01002-2 January 29, 2009 MEASUREMENT AND PAYMENT F:\projects\0318\042-01\Specs\Part 3\01002.doc 0318-042-01 Corrosion Control Specialist that is nationally certified and has at least five (5) years experience with similar cathodic protection system design. All items described by this design shall be furnished and installed at no additional cost to the OWNER. The cathodic protection system design shall include at a minimum the following: 1) sacrificial anode beds, 2) test stations, 3) bonding at all pipe joints, and 4) insulation kits for valves. Contractor shall install any additional items directed by corrosion control specialist at no additional cost to the OWNER. CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER. OWNER shall provide tracker balls. T 2.04 ITEM NO. 302C - 24-INCH DIAMETER C-303 BAR WRAPPED CONCRETE CYLINDER PIPE The unit price bid per linear foot of 24-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing pipe, pipe detection tape (buried above the entire length of pipe), bagging, cathodic protection, transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 24-inch C-303 bar wrapped concrete cylinder pipe shall be considered subsidiary to this bid item. Pipe shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal). As subsidiary to the unit price bid per linear foot of 24-inch C-303 Bar Wrapped Concrete Cylinder Pipe, the CONTRACTOR shall have a Cathodic Protection System designed by a Certified Corrosion Control Specialist that is nationally certified and has at least five (5) years experience with similar cathodic protection system design. All items described by this design shall be furnished and installed at no additional cost to the OWNER. The cathodic protection system design shall include at a minimum the following: 1) sacrificial anode beds, 2) test stations, 3) bonding at all pipe joints, and 4) insulation kits for valves. Contractor shall install any additional items directed by corrosion control specialist at no additional cost to the OWNER. As subsidiary to the unit price bid per linear foot of 24-inch C-303 Bar Wrapped Concrete Cylinder Pipe, the CONTRACTOR shall bag the reclaimed water pipeline 100- feet centered at all pipeline crossings furnished and installed at no additional cost to the OWNER. 01002-3 January 29, 2009 MEASUREMENT AND PAYMENT F:\projects\0318\042-01\Specs\Part 3\01002.doc •.. 0318-042-01 CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER. OWNER shall provide tracker balls. 2.05 ITEM NO. 302D - 24-INCH DIAMETER C-905 CLASS 200 DR 18 POLYVINYL CHLORIDE PIPE The unit price bid per linear foot of 24-inch diameter C-905 DR 18 Polyvinyl Chloride Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing pipe, pipe detection tape (buried above the entire length of pipe), transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 24-inch high polyvinyl chloride pipe shall be considered subsidiary to this bid item. Pipe shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with -} no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal). CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER. OWNER shall provide tracker balls. 2.06 ITEM NO. 303A - 20-INCH DIAMETER C-151 DUCTILE IRON PIPE The unit price bid per linear foot of 20-inch diameter C-151 Ductile Iron Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing pipe, pipe detection tape (buried above the entire length of pipe), poly bagging, transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 20-inch ductile iron pipe shall be considered subsidiary to this bid item. Pipe poly bagging shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal). CONTRACTOR shall install tracker balls in pipe trench at locations designated by 01002-4 January 29, 2009 MEASUREMENT AND PAYMENT F:\projects\0318\042-01\Specs\Part 3\01002.doc 0318-042-01 OWNER. OWNER shall provide tracker balls. 2.07 ITEM NO. 303B - 20-INCH DIAMETER C-303 BAR WRAPPED CONCRETE CYLINDER PIPE The unit price bid per linear foot of 20-inch diameter C-303 Bar Wrapped Concrete Cylinder Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing pipe, pipe detection tape (buried above the entire length of pipe), bagging, cathodic protection, transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 24-inch C-303 bar wrapped concrete cylinder pipe shall be considered subsidiary to this bid item. Pipe shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal). As subsidiary to the unit price bid per linear foot of 20-inch C-303 Bar Wrapped Concrete Cylinder Pipe, the CONTRACTOR shall have a Cathodic Protection System designed by a Certified Corrosion Control Specialist that is nationally certified and has at ` least five (5) years experience with similar cathodic protection system design. All items described by this design shall be furnished and installed at no additional cost to the OWNER. The cathodic protection system design shall include at a minimum the - following: 1) sacrificial anode beds, 2) test stations, 3) bonding at all pipe joints, and 4) insulation kits for valves. Contractor shall install any additional items directed by corrosion control specialist at no additional cost to the OWNER. As subsidiary to the unit price bid per linear foot of 20-inch C-303 Bar Wrapped Concrete Cylinder Pipe, the CONTRACTOR shall bag the reclaimed water pipeline 100- feet centered at all pipeline crossings furnished and installed at no additional cost to the OWNER. CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER. OWNER shall provide tracker balls. 2.08 ITEM NO. 303C - 20-INCH DIAMETER C-905 CLASS 200 DR 18 POLYVINYL CHLORIDE PIPE The unit price bid per linear foot of 20-inch diameter C-905 DR 18 Polyvinyl Chloride Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing pipe, pipe detection 01002-5 January 29, 2009 MEASUREMENT AND PAYMENT F:lprojects10318\042-01\,Specs\Part 3101002.doc 0318-042-01 tape (buried above the entire length of pipe), transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 20-inch high polyvinyl chloride pipe shall be considered subsidiary to this bid item. Pipe shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal). CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER. OWNER shall provide tracker balls. 2.09 ITEM NO. 304A - 6-INCH DIAMETER C-900 CLASS 200 DR 14 POLYVINYL CHLORIDE PIPE The unit price bid per linear foot of 6-inch diameter C-900 DR 14 Polyvinyl Chloride Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing pipe, pipe detection tape (buried above the entire length of pipe), transition pieces, closure pieces, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 6-inch polyvinyl chloride pipe shall be considered subsidiary to this bid item. Pipe shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal). CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER. OWNER shall provide tracker balls. 2.10 ITEM NO. 304B - 6-INCH DIAMETER C-906 CLASS 200 DR 9 DIPS HIGH DENSITY POLYETHYLENE PIPE The unit price bid per linear foot of 6-inch diameter C-906 Class 200 DR 9 DIPS High ti Density Polyethylene Pipe for the reclaimed water pipeline shall include locating and protecting all existing utilities, trenching, dewatering, hydrostatic testing; for furnishing and 01002-6 January 29, 2009 MEASUREMENT AND PAYMENT FApnojects\0318\042-01\Specs\Part 3\01002.doc 0318-042-01 installing pipe, pipe detection tape (buried above the entire length of pipe), transition pieces, closure pieces, concrete incased thrust restraint, flowable fill within asphalt pavement repair, insulating gaskets, clay dams, fencing, backfill and embedment material; and for cleanup, proper disposal, replacing utilities, seeding, and any other materials and work necessary for acceptable installation complete in place. All work and materials included in the installation of 6-inch high density polyethylene pipe shall be considered subsidiary to this bid item. Pipe shall be colored purple per TCEQ Chapter 210 requirements for reclaimed water pipe. Measurement for the pipe at the various sizes shall be the actual horizontal length along the centerline of pipe, from center to center of connecting pipes or to ends of pipes, with no deduct of length made for valves, fittings, and adapters. No separate measurement will be made for payment (unless a separate pay item is provided in the Proposal). CONTRACTOR shall install tracker balls in pipe trench at locations designated by OWNER" OWNER shall provide tracker balls. 2.11 ITEM NO. 305 - 36-INCH STEEL PIPE BY HORIZONTAL DIRECTIONAL DRILL The unit price bid per linear foot for Steel Casing Pipe by Horizontal Directional Drill construction shall include furnishing and installing the steel pipe by horizontal directional drilling operations, all excavation required for the entry and exit pits, equipment, fencing when required, drilling mud, and grout material as required. Horizontal directional drill operations shall be measured horizontally along the centerline of the pipe from end to end. 2.12 ITEM NO. 306 - 30-INCH STEEL CASING PIPE BY OTHER THAN OPEN CUT (OTOC) The unit price bid per linear foot for 36-inch Steel Casing Pipe by Other than Open Cut construction shall include furnishing and installing the carrier pipe by boring, jacking, or tunneling operations, all excavation required for the bore pits, fencing when required, and backfilling with flowable fill or other select backfill material as required. Other than open trench operations shall be measured along the centerline of the carrier pipe from end to end. 2.13 ITEM NO. 307A — 24-INCH C-151 DUCTILE IRON PIPE INSTALLATION WITHIN 36- INCH STEEL CASING The unit price bid per linear foot for 24-inch C-151 Ductile Iron carrier pipe installation within 36-inch Steel casing shall include furnishing and installing the carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. 2.14 ITEM NO. 307E — 24-INCH C-200 STEEL PIPE INSTALLATION WITHIN 36-INCH STEEL CASING The unit price bid per linear foot for 24-inch Steel carrier pipe installation within 36-inch 01002-7 January 29, 2009 MEASUREMENT AND PAYMENT F: "ects\0318\042-01 \Specs\Part 3\01002"doc 0318-042-01 Steel casing shall include furnishing and installing the carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. 2.15 ITEM NO. 307C — 24-INCH C-303 BAR WRAPPED CONCRETE CYLINDER PIPE INSTALLATION WITHIN 36-INCH STEEL CASING The unit price bid per linear foot for 24-inch C-303 Bar Wrapped Concrete Cylinder carrier pipe installation within 36-inch Steel casing shall include furnishing and installing the - carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. - 2.16 ITEM NO. 307D — 24-INCH C-905 CLASS 200 DR 18 POLYVINYL CHLORIDE PIPE INSTALLATION WITHIN 36-INCH STEEL CASING The unit price bid per linear foot for 24-inch C-905 DR 18 Polyvinyl Chloride carrier pipe installation within 36-inch Steel casing shall include furnishing and installing the carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. 2.17 ITEM NO. 308A - 20-INCH C-151 DUCTILE IRON PIPE INSTALLATION WITHIN 30- INCH STEEL CASING The unit price bid per linear foot for 20-inch Ductile Iron carrier pipe installation within 30- inch Steel casing shall include furnishing and installing the carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. 2.18 ITEM NO. 308E - 20-INCH C-200 STEEL PIPE INSTALLATION WITHIN 30-INCH STEEL CASING The unit price bid per linear foot for 20-inch Steel carrier pipe installation within 30-inch Steel casing shall include furnishing and installing the carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. 2.19 ITEM NO. 308C - 20-INCH C-303 BAR WRAPPED CONCRETE CYLINDER PIPE INSTALLATION WITHIN 30-INCH STEEL CASING The unit price bid per linear foot for 20-inch C-303 Bar Wrapped Cylinder carrier pipe installation within 30-inch Steel casing shall include furnishing and installing the carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. 2.20 ITEM NO. 308D — 20-INCH C-905 CLASS 200 DR 18 POLYVINYL CHLORIDE PIPE 01002-8 January 29, 2009 MEASUREMENT AND PAYMENT F:\projects\0318\042-01 \Specs\Part 3\01002.doc 0318-042-01 INSTALLATION WITHIN 36-INCH STEEL CASING The unit price bid per linear foot for 20-inch C-905 Class 200 DR 18 Polyvinyl Chloride carrier pipe installation within 36-inch Steel casing shall include furnishing and installing the carrier pipe within a directionally drilled steel casing, all equipment required, casing spacers, grout, and all other incidentals required to provide the carrier pipe complete in place and in operation. 2.21 ITEM NO. 309 - TRENCH SAFETY SYSTEM EXCEEDING 5-FOOT IN DEPTH The unit price bid per linear foot shall be full compensation for designing, furnishing, and installing a Trench Safety System and shall include all geotechnical work, all shoring (including any special shoring), sheeting, bracing and any other equipment, labor, designed by a Professional Engineer, and inspected by competent personnel on a daily basis, and all material necessary to provide a trench safety system in accordance with the Specifications. Measurement for the trench safety system along the pipeline shall be measured along the centerline of the pipeline. 2.22 ITEM NO. 310 - 24-INCH DIAMETER RESI LENT SEATED GATE VALVE AND VAULT The unit price bid per each 24-inch Resilient Seated Gate Valve and Vault shall be full compensation for furnishing and installing valves and vaults shown in the Plans and included in the Contract, and shall include all excavation, dewatering, furnishing and installing all necessary air vents, vaults, crushed rock or concrete bases, manhole vaults, manhole ring and cover, corporation stop and/or tapping valve on main pipeline, valve boxes, fittings, gate valve, miscellaneous materials, all necessary anchors, supports, all backfill, and all other incidentals required to provide the valve in place and in operation. 2.23 ITEM NO. 311- 20-INCH DIAMETER RESI LENT SEATED GATE VALVE AND VAULT The unit price bid per each 20-inch Resilient Seated Gate Valve and Vault shall be full compensation for furnishing and installing valves and vaults shown in the Plans and included in the Contract, and shall include all excavation, dewatering, furnishing and installing all necessary air vents, vaults, crushed rock or concrete bases, manhole vaults, manhole ring and cover, corporation stop and/or tapping valve on main pipeline, valve boxes, fittings, gate valve, miscellaneous materials, all necessary anchors, supports, all backfill, and all other incidentals required to provide the valve in place and in operation. 2.24 ITEM NO. 312 — 2-INCH AUTOMATIC COMBINATION AIR AND VACUUM RELEASE VALVE AND VAULT The unit price bid per each 2-Inch Automatic Combination Air and Vacuum Release Valve shall be full compensation for furnishing and installing air release valves and vaults shown in the Plans and included in the Contract, and shall include all excavation, dewatering, furnishing, and installing all necessary air vents, vaults, crushed rock or concrete bases, manhole vaults, manhole ring and cover, corporation stop and/or 01002-9 January29, 2009 MEASUREMENT AND PAYMENT FAprojeds10318\042-011SpecsNPad 3\01002.doc 0318-042-01 tapping valve on main pipeline, valve boxes, fittings, air release valve, miscellaneous valves, miscellaneous materials, all necessary anchors, supports, all backfill, and all other incidentals required to provide the valve in place and in operation. 2.25 ITEM NO. 313 - BLOWOFF ASSEMBLIES The unit price bid per each Blowoff Assembly shall be full compensation for furnishing and installing blowoff assemblies shown in the Plans and described in the Specifications; and shall include all necessary valves, valve vaults, fittings and piping; all miscellaneous materials and equipment for excavation, dewatering, cutting, backfill and all other incidentals required to provide blowoff assembly installation complete in place and in operation. All work and materials included in the installation of blowoff assemblies shall be considered subsidiary to this bid item. 2.26 ITEM NO. 314 — 10-INCH METER STATION (D/FW INTERNATIONAL AIRPORT) The unit price bid per each Meter Station shall be full compensation for furnishing, installing 8-inch meter stations at the various locations shown in the Plans and included in the Contract, and shall include excavation, backfill, hydrostatic testing, furnishing and installing all necessary valves, piping, fittings, meter, meter reader, vault, hatch, sump, strainer, supports, sample ports, taps, orifice plate, coupling, and all other incidentals required for an operational meter station. Payment shall be made on each meter station installed. 2.27 ITEM NO. 315A - 24-INCH DIAMETER DUCTILE IRON FITTINGS AND SPECIALS The unit price bid per ton of 24-inch diameter Ductile Iron Fittings and Specials for the reclaimed water pipeline, at all depths, shall be full compensation for location and protection of all utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing fittings, pipe detection tape, transition pieces, closure pieces, concrete encasement, insulating gaskets, poly bags, backfill and embedment material, and for cleanup, proper disposal, replacing utilities, seeding, and other work necessary for acceptable installation completely in -place. 2.28 ITEM NO. 315E - 24-INCH DIAMETER STEEL FITTINGS AND SPECIALS The unit price bid per lump sum of 24-inch diameter Steel Fittings and Specials for the .� reclaimed water pipeline, at all depths, shall be full compensation for location and protection of all utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing fittings, pipe detection tape, transition pieces, closure pieces, concrete L encasement, insulating gaskets, poly bags, backfill and embedment material, and for cleanup, proper disposal, replacing utilities, seeding, and other work necessary for acceptable installation completely in place. 2.29 ITEM NO. 315C - 24-INCH CONCRETE PRESSURE PIPE FITTINGS AND SPECIALS The unit price bid per lump sum of 24-inch diameter Concrete Fittings and Specials for the reclaimed water pipeline, at all depths, shall be full compensation for location and 01002-10 January 29, 2009 MEASUREMENT AND PAYMENT P\projects103181042-01lspecs\Part 3\01002.doc 0318-042-01 protection of all utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing fittings, pipe detection tape, transition pieces, closure pieces, concrete encasement, insulating gaskets, poly bags, backfill and embedment material, and for cleanup, proper disposal, replacing utilities, seeding, and other work necessary for acceptable installation completely in place. 2.30 ITEM NO. 316A - 20-INCH DIAMETER DUCTILE IRON FITTINGS AND SPECIALS The unit price bid per ton of 20-inch diameter Ductile Iron Fittings and Specials for the reclaimed water pipeline, at all depths, shall be full compensation for location and protection of all utilities, trenching, dewatering, hydrostatic testing; for furnishing and - installing fittings, pipe detection tape, transition pieces, closure pieces, concrete encasement, insulating gaskets, poly bags, backfill and embedment material, and for cleanup, proper disposal, replacing utilities, seeding, and other work necessary for acceptable installation completely in place. 2.31 ITEM NO. 316B - 20-INCH CONCRETE PRESSURE PIPE FITTINGS AND SPECIALS The unit price bid per lump sum of 20-inch diameter Concrete Fittings and Specials for the reclaimed water pipeline, at all depths, shall be full compensation for location and protection of all utilities, trenching, dewatering, hydrostatic testing; for furnishing and installing fittings, pipe detection tape, transition pieces, closure pieces, concrete encasement, insulating gaskets, poly bags, backfill and embedment material, and for cleanup, proper disposal, replacing utilities, seeding, and other work necessary for acceptable installation completely in place. 2.32 ITEM NO. 317 - TEMPORARY PAVEMENT REPAIR The unit price bid per square yard of Temporary Pavement Repair shall include furnishing, installation, the backfill, 6-inches of compacted flex base, 2-inches of hot mix asphalt, and all other incidentals required to provide temporary road repair as shown on the plans. Measurement and payment shall be actual horizontal area over the center line of pipe, where trenching is used to install piping main across a paved street. 2.33 ITEM NO. 318 — GRAVEL PAVEMENT REPAIR The unit price per square yard of pavement repair shall be full compensation for replacing gravel pavement following backfill and compaction of trench as shown on drawings and other work necessary for acceptable installation completely in place. Measurement and payment shall be actual horizontal area over the center line of pipe, where trenching is used to install piping main across a paved street. 2.34 ITEM NO. 319 -PERMANENT HOT MIX ASPHALTIC CONCRETE (HMAC) The unit price bid per square yard of Permanent Hot Mix Asphaltic Concrete (HMAC) 01002-11 January 29, 2009 MEASUREMENT AND PAYMENT F:\proje s\0318\042-01\5pe<s\Part 3\01002.doc 0318-042-01 shall include furnishing, installation, the base material required, and all other incidentals required to provide permanent road repair as shown on the plans and described in the specifications. The CONTRACTOR is to remove all existing HMAC pavement base material for trenching operations. The areas shall be saw cut, or other similar means, out of the — existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of excavation process, all base material shall be removed, if required, to a depth sufficient to obtain stable sub -base and/or trench depth. The remaining material shall be leveled and uniformly made ready to accept fill material. All excavated material shall be hailed off site, the same day as excavated, to a suitable dumpsite. After satisfactory completion of removal as outlined above and installation of pipeline, the CONTRACTOR shall place the pavement patch, with Type "Dn surface mix (PG 64- 22). This item will always be used even if no base improvements are required. The proposed HMAC repair shall match the existing pavement section, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing HAMC pavement thickness will not exceed 8 inches. Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. All applications of TxDOT's "Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges" Item Nos. 300 "Asphalts, Oils, and ` Emulsions", 310 "Prime Coat" (referenced Measurement and payment shall be actual horizontal area over the center line of pipe, where trenching is used to install piping main across a paved street. 2.35 ITEM NO. 320 — PAVEMENT WEDGE MILLING 2-INCH to 0-INCH DEPTH, 5.0 FT WIDE 1. Description This item shall consist of milling the existing pavement from the lip of the gutter at a 2-inch depth and transitioning to match the existing pavement (0-inch cut) at a minimum 5-foot width. The existing pavement to be milled will either be asphalt, concrete, or brick pavement. The milled surface shall provide a uniform surface free from gouges, ridges, oil film, and other imperfections of workmanship and shall have a uniform textured _. appearance. In all situations where the existing HMAC surface contacts the curb face, the wedge milling shall include the removal of the existing asphalt covering the gutter up to and along the face of curb If the existing base is brick and cannot be wedge milled, then existing brick base of 5- foot in width, shall be replaced with Type "D" surface mix (PG64-22) prior to placing HMAC surface. 01002-12 January 29, 2009 MEASUREMENT AND PAYMENT FAprojects103181042-01\.Specs\Part 3\01002.doc r 0318-042-01 For those streets designated as Mill Overlay the wedge milling shall begin within fourteen (14) calendar days from the completion of the curb and gutted. If the contractor fails to complete the work within fourteen (14) calendar days, $100 dollar Liquidated damage will be assessed per block per day. The wedge milling operations for this project will be performed in a continuous manner along both sides of the street. CONTRACTOR is required to begin the overlay, within seven (7) calendar days from the date of the wedge milling completion of any one street. Should the CONTRACTOR fail to meet this condition, the wedge milling operations of new streets will be shut down, and liquidated damage of $500.00 per day per street will be assessed until all wedge milled streets are overlayed. The overlay, once begun on a street shall continue uninterrupted until complete. The contractor shall haul -off the removed material to a suitable dumpsite. 2. Equipment The equipment for removing the pavement surface shall be a power operated milling machine or other equal or better mechanical means capable of removing, in either one pass or two passes, the necessary pavement thickness in a five-foot minimum width. The equipment shall be self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. The machine shall be equipped with an integral loading and reclaiming means to immediately remove material being cut from the surface of the roadway and discharge the cuttings into a truck, all in operation. Adequate back-up equipment (mechanical street sweepers, loaders, water trucks, etc.) and personnel will also be provided to keep flying dust to a minimum and to ensure that all cuttings are removed from street surface daily. Stockpiling of planed material will not be permitted on the project site unless designated by the ENGINEER. The machine shall be equipped with means to control dust created by cutting action and shall have a manual system providing for uniformly varying the depth of cut while the machine is in motion thereby making it possible to cut and flush to all inlets, manholes, or other obstructions within the paving area. The speed of the machine shall be variable in order to leave the desired pattern specified under Surface Texture. The unit price bid per linear foot shall be compensation for all labor, material, equipment, tools, and incidentals necessary to complete the work. 2.36 ITEM NO. 321 — BUTT JOINT MILLING This item requires CONTRACTOR to mill "but joints" into the existing surface, in association with the wedge milling operation to the depth and at locations as described below. The butt joint will provide a full width transition section, where by the new overlay shall maintain constant depth at the point the new overlay is terminated and the new surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of wedge milling. 01002-13 January 29, 2009 MEASUREMENT AND PAYMENT F:Vrojects\0318\042-01 \Specs\Part 3\01002.doc 0318-042-01 The general locations for butt joints are at all beginning and ending points of street repairs shown in the Plans and at all the beginning and ending points of 2-inch overlay. The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the continuity of the asphalt surface. Each butt joint shall be 20-feet long and milled out across the full width of the street section to a tapered 2-inch depth. This milled area shall be tapered within the 20-feet from a 0-inch to 2-inch depth at a line adjacent to the beginning and ending points or intermediate transverse items. This butt joint — when overlayed — will consist of an asphalt section that will transition the new overlay to match the existing pavement elevation. The CONTRACTOR shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. The unit price bid per each shall be full compensation for all milling, including material haul -off, tools, labor, equipment and incidentals necessary to complete the required work. 2.37 ITEM NO. 322 — CONCRETE PAVEMENT REPAIR The unit price bid per square yard of Concrete Pavement Repair shall include furnishing and installing Class "A" reinforced concrete pavement, 2:27 concrete, and all other incidentals required to provide concrete pavement road repair as shown on the plans. Measurement and payment shall be actual horizontal area over the center line of pipe, where trenching is used to install piping main across a concrete paved street. 2.38 ITEM NO. 323 — TRAFFIC CONTROL PLAN The unit price bid per lump sum to design and implement a traffic control plan. All traffic control devices and layouts shall be in accordance with Texas Department of Transportation "Manual of Uniform Traffic Control Devices" and all Federal and State Standards and Regulations. The construction of temporary driveway, street crossing, and curb cuts shall be considered subsidiary to this bid item. Contractor shall maintain a minimum of one lane of traffic at all times on City streets. Temporary paving for rerouting traffic shall be paid under the temporary paving bid item. The traffic control plan shall be designed to allow for unimpeded traffic from all private residences accessed from within project limits. Any areas within TXDOT Right -of -Way will require a traffic control plan submitted to TXDOT for approval. No work in TXDOT Right -of -Way will be allowed until the traffic control plan has been approved by TXDOT. Measurement and payment for this item shall be made on a lump sum basis and shall include all labor and materials to assure proper traffic and pedestrian safety and flow during construction. 2.39 ITEM NO. 324 —ADDITIONAL ROCK FOR FOUNDATION 01002-14 January 29, 2009 MEASUREMENT AND PAYMENT FAprojects\0318\042-01lspecs\Part 3\01002.doc 0318-042-01 Vb The unit price bid per cubic yard of Additional Rock for Foundation shall include furnishing, installation, and all other incidentals required where the OWNER directs. This bid item is for additional rock for foundation not shown on the plans or required in the specifications. 2.40 ITEM NO. 325 — FLOWABLE FILL ENCASEMENT The unit price bid per linear foot of Flowable Fill Encasement shall include furnishing, installing, and all other incidentals required, including anti -flotation measures, for concrete encasement to be in place and in operation. Carrier pipe shall be bid under respective bid item. 2.41 ITEM NO. 326 - HYDROMULCH SEEDING The unit price bid per linear foot of Hydromulch Seeding shall include furnishing, installing, and all other incidentals required for hydromulch seeding to be in place and in operation. Watering operation and schedule is required and included in bid price until mature stand of grass is present. END OF SECTION 01002-15 January 29, 2009 MEASUREMENT AND PAYMENT R\projects\0318\042-01\specs\Part 3\01002.doc 0318-042-01 il- SECTION 02001 MATERIALS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section provides the requirements for materials used for preparation of roadway fill, subgrade and base; structural subgrade and backfill; utility subgrade, bedding, embedment, and backfill; embankment and levee subgrade and fill; and other related work. 1.3 SUBMITTALS A. Submittals for Review. 1. Samples: As required by Engineer, provide one -gallon sample in a sealed container. 2. Contractor Design Mix Determination: Submit proposed design mix design for Controlled Low Strength Material and preliminary results demonstrating the mix design achieves required compressive strength. B. Submittals for Information. 1. Source of Materials: Submit name and location of source of materials. 2. Off -Site Borrow Source: Prior to furnishing off -site borrow (soils), provide notarized certification from the landowner stating to the best of landowner's knowledge and belief, the borrow source has never been contaminated by hazardous and/or toxic waste materials. 3. Certified Analysis: Submit test results by independent laboratory of material compliance with specifications. Results shall not be more than 30 days old. 1.4 REFERENCES A. Definitions. 1. Well -Graded: A mixture of particle sizes that has no specific concentrations or lack thereof of one or more sizes producing a material type which, when compacted, produces a strong and relatively incompressible soil mass free from detrimental voids. B. Reference Standards: Following are standards that may be referenced in this Section. 1. American Concrete Institute, ACI 229. - Controlled Low Strength Materials. 2. ASTM International (ASTM): a. C33 - Standard Specification for Concrete Aggregate. b. C40 - Standard Test Method for Organic Impurities in Fine Aggregates for Concrete. c. C88 - Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate. d. C94 - Standard Specification for Ready -Mixed Concrete. 02001-1 August 2009 MATERIALS 0318-042-01 e. C117 — Standard Test Method for Material Finer than 75 Micrometer (No. 200) -- Sieve in Mineral Aggregates by Washing. f. C127 — Standard Test Method for Density, Relative Density (Specific Gravity), and Adsorption of Coarse Aggregates. g. C131 — Standard Test Method for Resistance to Degradation of Small -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. h. C136 — Standard Test Method for Sieve Analysis of Fine and coarse Aggregates. i. C142 — Standard Test Method for Clay Lumps and Friable Particles in Aggregates. j. C150 — Standard Specification for Portland Cement. k. C535 — Standard Test Method for Resistant to Degradation of Large -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. I. C618 — Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Concrete. m. D75 — Standard Practice for Sampling Aggregates. n. D448 - Standard Classification for Sizes of Aggregate for Road and Bridge Construction. o. D1140 — Standard Test Method for Amount of Materials in Soils Finer than the No. 200 (75 micrometer) Sieve. p. D2487 — Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System). q. D2940 — Standard Specification for Graded Aggregate Material for Bases or Subbases for highways or Airports. r. D2974 — Standard Test Method for Moisture, Ash, and Organic Matter of Peat and other Organic Soils. s. D4221 — Standard Test Method for Dispersive Characteristics of Clay Soil by Double hydrometer. t. D4318 — Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. - u. D4832 — Standard Test Method for Preparation and Testing of Controlled Low Strength Material (CLSM) Test Cylinders. v. D5084 — Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials using a Flexible Wall Permeameter. w. E-11 — Standard Specification for Wire -Cloth and Sieves for Testing Purposes. 3. Public Works Construction Standards, North Texas Council of Governments F (NCTCOG). 4. Texas Department of Transportation, Standard Specifications for Construction of Highways, Streets, and Bridges (TxDOT). a. TxDOT Item 247 "Flexible Base" 5. Texas Department of Transportation, Manual of Testing Procedures (TEX): a. TEX-110-E "Particle Size Analysis of Soils" b. TEX-116-E "Ball Mill Method for Determining the Disintegration of Flexible Base Material" c. TEX-117-E "Triaxial Compression for Disturbed Soils and Base Materials" d. TEX-411-A "Soundness of Aggregate Using the Los Angeles Machine" e. TEX-460-A "Determining Crushed Face Particle Count" 1.5 DELIVERY, STORAGE AND HANDLING A. Storage and Protection. 02001-2 August 2009 MATERIALS 0318-042-01 1. Stockpile excavated materials and imported materials in designated areas or in areas approved by ENGINEER. Clearly identify stockpiles. 2. Lightly compact top and slope stockpiles to prevent excessive erosion and ponding - of water. 3. Store and handle materials in a manner to prevent contamination. B. Erosion and Sedimentation Control: Provide silt fences and surface drainage control at material stockpile areas in accordance with the Storm Water Pollution Prevention Plan (SWPPP). PART 2 - PRODUCTS 2.1 GENERAL A. Various site preparation, earthwork, trenching, and roadway subgrade and base Sections reference the materials listed in the following paragraphs. Not all materials listed in this Section are used on this Project. B. Sampling of materials shall be in accordance with ASTM D75. 2.2 GRANULAR MATERIAL A. Granular material shall be free flowing, such as sand or hydraulically graded crushed stone fines, or mixed sand and gravel. The material shall be free from lumps, stones ^ over 2-inches in diameter, clay and organic matter. The imported material shall be classified as GW, GP, GM, GC, SW, or SP according to Unified Soil Classification System, ASTM D2487. 2.3 COARSE AGGREGATE A. Coarse aggregate shall consist of gravel, crushed gravel, and crushed stone. It shall •- consist of sound and durable particles, free from frozen materials or injurious amounts of salts, alkali, organic matter of other material either free or as adherent coating, and reasonably well graded between the prescribed limits listed in Table 1 when tested in accordance with ASTM C136. B. Abrasion: It shall have a wear of not more than 40 percent when tested in accordance with ASTM C131 or ASTM C535. C. Soundness: When material is subjected to five (5) cycles of the sodium sulfate soundness test in accordance with ASTM C88, the weighted percentage of loss shall not exceed 12 percent. D. Amount of material finer than 75-micrometer (No. 200) sieve: Coarse aggregate for embedment shall contain not more than one percent by weight organic matter (other than native bitumen), clays, loam or pebbles coated therewith, and shall contain not more than five percent by weight on any one or combination of slate, schist or soft particles of sandstone. E. Each class of aggregate gradation shall comply with the applicable gradation limits listed in Table No. 1, when tested in accordance with ASTM C136. Table No. 1 Coarse Aggregate Gradation Aggregate Size Aggregate Size I Aggregate Size Aggregate Size Aggregate Size Sieve Size I No. 467 I No. 4 No. 57 No. 67 No. 8 I (1-1/2 to No. 4) (1-1/2 to 3/4 in.) 1 in. to No. 4) (3/4 in. to No. 4 3/8 in. to No. 8 02001-3 August 2009 MATERIALS 0318-042-01 Amounts Finer than Each Laboratory Sieve Mass Percent 2 in. 100 100 ---- ---- ----- 1-1 /2 in. 95 to 100 90 to 100 100 --- ----- 1 in. ---- 20 to 55 95 to 100 100 ----- 3/4 in. 35 to 70 0 to 5 ---- 90 to 100 ---- 1/2 in. ---- ----- 25 to 60 ---- 100 3/8 in. 10 to 30 0 to 5 ----- 20 to 55 85 to 100 No. 4 0 to 5 ----- 0 to 10 0 to 10 10 to 30 No. 8 ---- ---- 0 to 5 0 to 5 0 to 10 No. 16 ---- --- ---- ---- 0 to 5 Aggregate Size Number and gradation is in accordance with ASTM C33 and ASTM D448. 2.4 FINE AGGREGATE A. Fine aggregate shall consist of natural sand, manufactured sand, or a combination thereof, complying with the requirements for abrasion, soundness, and impurities as specified for coarse aggregate- B. The fine aggregate gradation shall comply with the applicable gradation limits, when tested in accordance with ASTM C136. Fine aggregate shall not have more than 45% passing any sieve and retained on the next consecutive sieve shown in Table No. 2 S and, its fineness modulus shall not be less than 2.3 or more than 3.1. Table No. 2 Fine Aggregate Gradation Sieve Percent Passing 3/8 in. 100 No. 4 95 to 100 No. 8 80 to 100 No. 16 50 to 85 No. 30 25 to 60 No. 50 5 to 30 No. 100 0 to 10 Gradation in accordance with ASTM C33 Fine Arc gregate. C. Plasticity index shall be less than 6 for material passing No. 30 sieve. 2.5 NATURAL GRAVEL A. Natural gravel shall consist of uncrushed stones, washed and screened, complying with the requirements for abrasion, soundness, and impurities as specified for coarse v aggregate. B. The aggregate gradation shall comply with the gradation limits listed in Table No. 3, when tested in accordance with ASTM C136. Table No. 3 Natural Gravel Gradation Passing or Retained Percent by Weight on Sieve Coarse Aggregate .. Passing on 1-1/2 inch 100 Retained on 314 inch 100 02001-4 August 2009 MATERIALS 0318-042-01 Fine Aggregate Passing on 3/4 inch 100 Retained on No. 4 100 2.6 CRUSHED STONE FOR FOUNDATION A. Crushed stone for foundations shall comply with the requirements for abrasion, soundness, and impurities as specified for coarse aggregate. B. Unless otherwise shown on the drawings, the aggregate gradation shall comply with the gradation limits listed in Table No. 1; Aggregate Size No. 57 or No. 67, when tested in accordance with ASTM C136. 2.7 SAND A. Sand shall consist of well -graded, clean, hard, durable, uncoated grains, free from lumps and organic material having a Soil Classification SW. Sand particles will pass a No. 4 sieve and be retained on a No. 200 sieve with the subdivisions as listed in Table No.4. If gradation subdivision not indicted, provide sand complying with the above gradation limits. �— Table No. 4 Sand Gradation Subdivisions Passing or Retained percent by Weight �- on Sieve Coarse Sand Passing No. 4 100 Retained on No. 10 100 Medium Sand Passing on No. 10 100 Retained on No. 40 100 Fine Sand Passing on No. 40 100 Retained on No. 200 100 Gradation requirements obtained from ASTM D2487. 2.8 PEA GRAVEL A. Pea Gravel: Conforming to ASTM C33, Aggregate Size No. 8, and coarse aggregate graded with 100 percent passing a 3/8-inch sieve and 90 percent retained on a No. 4 sieve. 2.9 CONCRETE ENCASEMENT A. Provide Ready mixed concrete prepared in accordance with ASTM C94. Select and proportion ingredients to obtain a minimum compressive strength of 3,000 psi at 28 days. B. Materials: 1. Cement: ASTM C150, Type I or Type II. - 2. Aggregate: ASTM C33, Size 67 or similar. 3. Fly Ash (if used): ASTM C618, Class C. 4. Water: Clean, potable, free of odor, organics, and deleterious materials. 02001-5 August 2009 MATERIALS 0318-042-01 C. Slump: Not less than 1-inch, cushion portion of embedment; 1 to 3 inches for the sides and top of encasement. 2.10 CONTROLLED LOW STRENGTH MATERIAL (FLOWABLE FILL) A. Ready mixed flowable fill is a blend of cement, fly ash, fine aggregate, and water. It is designed as a low strength, flowable material requiring no subsequent vibration or tamping to achieve 100% consolidation. B. Unless indicted otherwise, select and proportion ingredients to obtain compressive strength between 50 and 150 psi at 28 days in accordance with ASTM D4832 C. Materials: 1. Cement: ASTM C150, Type I, II, or Ill. 2. Aggregate: ASTM C33, Size 8 or fine aggregate. 3. Fly Ash (if used): ASTM C618, Class C. 4. Water: Clean, potable, free of odor, organics, and deleterious materials. D. The flowable fill mixture shall be mixed either in a pug mill, concrete mixer, or transit mixer and shall a minimum slump of 5-inches. 2.11 FLEXIBLE BASE A. Material Type: Unless otherwise specified, provide either crushed stone or crushed gravel as described below: 1. Crushed Stone produced and graded from oversize quarried aggregate that originates from a single, naturally occurring source. Do not use gravel or multiple sources. 2. Crushed Gravel with a minimum of 60% of the particles retained on a No. 4 sieve with two or more crushed faces as determined by TEX-460-A, Part I. Blending of two or more sources is allowed. B. Material Grade: Unless other specified on the Drawings, aggregate used as flexible base material, shall comply with the requirements listed in Table 5, Grade 2. Do not use additives such as, but not limited to lime, cement, or fly ash to modify aggregate to meet requirements of Table 5, unless shown on the Drawings. Table No. 5 Flexible Base Material Property Test Grade 1 Grade 2 Grade 3 Method Master Gradation Sieve Size (% Retained) 2-1/2 inch -- 0 0 1-3/4 inch Tex-110- 0 0 -10 0 - 10 7/8-inch E 10 — 35 --- --- 3/8-inch 30 — 50 -- No. 4 45 — 65 45 — 75 45 - 75 No. 40 70 - 85 60 - 85 50 -85 Liquid Limit % Max. 35 40 40 ASTM Plasticity Index % D4318 10 12 12 Max. Wet Ball Mill' Tex-116- 40 45 --- 02001-6 August 2009 MATERIALS 0318-042-01 Property Test Grade 1 Grade 2 Grade 3 Method Maximum E Wet Ball Mill, % Max. --- increase passing No. 20 20 40 Classification2 1.0 1.1 to 2.3 --- Minimum Compressive Strength 2, psi at: Tes-117- Lateral Pressure 0 E 45 35 psi Lateral Pressure 175 175 15 psi Foreign Material, % 1 1 Max. 1. When soundness value required by Drawings, test material in accordance with Tex-411-A. .•• 2. Meet both the classification and the minimum compressive strength, unless otherwise shown on the Drawings. 3. For work under TxDOT jurisdiction the flexible base material shall comply with the requirements of TxDOT Item 247, "Flexible Base", Type A, Grade 2, or Type C, Grade 2, unless otherwise indicted on the Drawings. 2.12 SELECT FILL A. Select fill shall consist of non -expansive material, such as gravel, fine stone cuttings, sand, sandy loam, or loam free from excessive clay, roots, grass, trash, or other organic materials. Stone cuttings shall have no dimension greater than 2-inches. Use approved material excavated from site or imported material. B. Select fill shall have a liquid limit of 35 or less; plasticity index between 4 and 20; and gradation approximately the limits indicated in Table No. 6. Table No. 6 Select Fill Retained on Sieve Percent by Weight No. 4_ 25 to 50 No. 40 50 to 85 No. 200 Not less than 35% fines passing Maximum aggregate size: 1-3/4 inches. 2.13 IMPERVIOUS CLAY FILL A. Impervious clay fill shall be placed as indicated on the Drawings. The material shall not be used as backfill against walls of structures except in the upper two feet. B. The material shall consist of soil materials classified as CH or CL in accordance with ASTM D2487; have a minimum liquid limit of 40; have a minimum plasticity index of 20; have a minimum of 50 percent by weight passing a No. 200 sieve; and shall be free of organics or other deleterious materials. 02001-7 August 2009 MATERIALS 0318-042-01 C. The material shall have a percent dispersion of less than 20 when tested in accordance with ASTM D4221. The material, when compacted to the recommended moisture and density, shall have permeability less than 1 x E-06 cm/s (1 ft/yr), as determined by remolded specimens of the actual materials proposed, in accordance with ASTM D5084. 2.14 SITE FILL A. Satisfactory Soils: ASTM D 2487 Soil Classification Groups GW, GP, GM, SW, SP, and SM, or a combination of these groups; free of rock or gravel larger than 3-inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter. B. Material shall have a liquid limit of 40 or less; plasticity index between 4 and 20; and gradation approximately the limits indicated in Table No. 7. Table No. 7 Site Fill Retained on Sieve Percent by Weight No. 4 Less than 35 No. 200 Less than 65 2.15 TOP SOIL A. Material shall be natural friable loam; free of subsoil, roots, grasses, and excessive amount of weeds, stone, and foreign matter. B. Material shall have a acidity range (pH) between 5.5 to 7.5; an organic matter content between 4 to 25 percent in accordance with ASTM D2974; and a gradation complying with Table No. 8. Table No. 8 Top Soil Retained on Sieve Percent by Weight No. 4 Less than 35 No. 200 Less than 65 2.16 UNCLASSIFIED EXCAVATION A. All material excavated from site not meeting the requirements for materials specified v above. 2.17 MATERIAL QUALITY CONTROL A. Sampling of material stockpiles and material sources shall be in accordance with ASTM D75. B. Perform gradation analysis in accordance with ASTM C136 for: 1. Coarse and fine aggregate, natural gravel, crushed stone for foundation, sand, select fill, impervious clay fill, earth fill, and topsoil. C. Perform abrasion testing in accordance with ASTM C131 or ASTM C535. 1. Coarse and fine aggregate and when requested by ENGINEER for natural gravel and crushed stone for foundation. D. Soundness testing in accordance with ASTM C88. 02001-8 August 2009 MATERIALS 0318-042-01 1. Coarse and fine aggregate and when requested by ENGINEER for natural gravel and crushed stone for foundation. E. Deleterious materials determination in accordance with ASTM C40, C117, and C142. 1. Coarse and fine aggregate and when requested by ENGINEER for natural gravel and crushed stone for foundation .,F. Determine liquid limit and plasticity index in accordance with ASTM D4318. 1. Sand for particles passing No. 8 sieve, select fill, impervious clay fill, and earth fill. G. Determine pH of topsoil in accordance with ASTM D2974. H. Determine permeability (hydraulic gradient) in accordance with ASTM D5084 and percent dispersion in accordance with ASTM D4221 of impervious clay fill materials. I. Provide tests results showing flowable fill mix design achieves desired compressive strength. 2.18 CONTAMINATION TESTING AND CERTIFICATION A. The CONTRACTOR shall arrange and pay for the services of an EPA approved laboratory to perform a toxic contaminant scan of composite borrow material samples furnished to the site which shall be representative of each separate borrow source in accordance with the U.S. Environmental Protection Agency protocol for the list of contaminants described in 40 CFR, Part 261, Appendix VIII and by EPA Methods SW- 846. All costs for contamination testing and certification shall be considered subsidiary to construction, and no separate payment will be made. B. The CONTRACTOR, prior to proceeding to furnish soil borrow to the site, shall submit copies of the results of the laboratory scan to the ENGINEER. The test results shall indicate whether the presence of contaminants is above EPA acceptable levels. Any potential off -site borrow on .which scan test results indicate the presence of contaminants above background levels will be rejected as an off -site soil borrow source. C. The laboratory performing the scan test for contaminants for the CONTRACTOR shall provide a written certification along with the test, which states that the laboratory is EPA approved and that the tests were performed according to EPA guidelines. D. The CONTRACTOR shall obtain a written, notarized certification from the landowner, supplier or manufacturer of each proposed offsite borrow source stating that to the best of the landowner's, supplier's, or manufacturer's knowledge and belief, there has never been contamination of the borrow source site with hazardous or toxic materials. The CONTRACTOR prior to proceeding to furnish soil materials to the site shall submit these certifications to the ENGINEER. The lack of such certification on a potential offsite soil borrow sources will be cause for rejection of that source. E. Soil materials derived from the excavation of underground petroleum storage tanks shall not be used as fill on this project PART 3 - EXECUTION (NOT USED) END OF SECTION 02001-9 August 2009 MATERIALS 0318-042-01 SECTION 02202 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES PART 1 - GENERAL ►- 1.01 SUMMARY A. Furnish labor, materials, equipment and incidentals necessary to excavate and backfill as required for the construction of the large diameter (greater than 18-inch) water pipeline facilities to the line, grade and extent indicated. 1.02 REFERENCES The applicable provisions of the following standards shall apply as if written here in their entirety: A. American Society for Testing and Materials (ASTM) standards: ASTM C 33 Specifications for Concrete Aggregates ASTM C 131 Test Method for Resistance to Degradation of Small -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. ASTM C 535 Test Method for Resistance to Degradation of Large -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. ASTM D 698 Test Methods for Moisture -Density Relations of Soils and Soil Aggregate Mixtures, Using 5.5-lb Rammer and 12 Inch Drop ASTM D 1556 Test Method for Density and Unit Weight of Soil In Place by the Sand Cone Method ASTM D 2487 Classifications of Soils for Engineering Purposes ASTM D 2922 Test Method for Density of Soil and Soil -Aggregate In Place by Nuclear Methods ASTM D 3017 Test Method for Water Content of Soil and Rock In Place by Nuclear Methods ASTM D 4253 Test Method for Maximum Index Density of Soils and Unit Weight of Soils Using Vibratory Tests ASTM D 4254 Test Methods for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density ASTM D 4914 Test Method for Density of Soil and Rock In Place by the Sand Replacement Method in a Test Pit ASTM G 57 Method for Field Measurement of Soil Resistivity Using the Wenner Four -Electrode Method B. American Water Works Association publications: AWWA C151 Ductile Iron Pipe AWWA C200 Steel Water Pipe 6" and Larger AWWA C301 Prestressed Concrete Pressure Pipe - Steel Cylinder Type for Water and Other Liquids AWWA C303 Reinforced Concrete Pressure Pipe - Steel Cylinder Type, Pretensioned, for Water and Other Liquids C. Texas Highway Department Standard Specifications for Road and Bridge Construction, latest edition. 1.03 SYSTEM DESCRIPTION [Not Used] 02202-1 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:%projects%0318 042-011Specs%Part 31Tech%Division 02%02202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE.doc 0318-042-01 1.04 SUBMITTALS Submittals shall be in accordance with City of Fort Worth standards, and shall include: A. Certified test reports for granular embedment, coarse gravel, flexible base backfill, - flexible base pavement, HMAC, and crushed concrete. Certified Test Reports shall be from an independent laboratory. Test reports shall include sieve analysis, Atterburg limits, and results of an Abrasion test. r B. Certified test reports for compaction tests. C. A five gallon bucket of granular embedment material. 1.05 QUALITY ASSURANCE [Not Used] 1.06 DELIVERY, STORAGE AND HANDLING [Not Used] 1.07 PROJECT CONDITIONS A. Classification of Excavation Excavation shall be "unclassified" and involves the removing of the necessary materials to provide the trench to the required width and depth. The Contractor, prior to submitting a proposal, must satisfy himself as to the actual sub -surface conditions. No extra or separate payments shall be made for rock, dewatering, or any other condition. B. City, County, and Private Road Crossings Where the work is in the right-of-way of City, County and/or privately owned roads, the Owner will secure the necessary permits and easements for the work. Work to be performed within the limits of the public right-of-way shall be in full accordance with the requirements of the easements and permits and as requested by the City, County, and/or private owner. Provide temporary access and detours for roads and driveways cut-off during pipe laying operations. C. Protection of Existing Structures and Utilities Prior to the manufacture of pipe and start of construction, the Contractor shall communicate with the local representative of all utility companies including, but not _- limited to oil, gas, electric and telephone companies, water and sanitary sewer utilities, and any other public or private utility companies in the location of the proposed construction in order to obtain the assistance of the utility owner in locating utility lines and in the avoidance of conflicts with utility lines. The Contractor shall uncover and determine the elevation and location of conflicts well ahead of the manufacture of the pipe. The Engineer has shown the approximate location of existing utilities as determined from field surveys and record data from utility companies. The fact that some utilities are not shown or are shown incorrectly in no way relieves the Contractor of his responsibility to locate all existing utilities. The Contractor shall advise the Engineer of any existing utilities that are not shown on the Plans, or are shown incorrectly, that affect the pipe layout. Contractor shall also propose a resolution to the utility conflict for the Engineer's review. The Engineer will determine whether the utility will be relocated or the proposed pipeline location revised. If the pipeline location is revised, an adjustment to the Contract price will be made by adjusting the quantities for the various unit price pay items. If the proposed 02202-2 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:VrojectsA0316 042-01%Specs%Part 31Tech\Division 02\02202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE -doe 0318-042-01 pipe grade is adjusted by two (2) vertical feet or less, no contract price adjustment will be made. if the proposed pipe grade is adjusted by more than two (2) vertical feet, a contract price adjustment will be agreed to as described in Article 6 of the General Conditions. Utilities that affect the pipe layout will be interpreted by the Engineer as follows: .. 1. Utilities that conflict with the grade of the proposed pipe will be interpreted as affecting the pipe layout. 2. Utilities that conflict with the operations and maintenance of the proposed pipe will be interpreted as affecting the pipe layout. Where excavation endangers adjacent structures and utilities, the Contractor shall, at his own expense, carefully support and protect such structures and/or utilities so that there shall be no damage. Costs of temporarily or permanently relocating the conflicting utilities shall be borne by the Contractor without extra compensation from the Owner. If in the opinion of the Engineer, concrete backfill is necessary for the support of utility lines crossing trenches, the Engineer may direct 2,000 psi concrete backfill to be used. Payment shall be made to the Contractor at the unit price bid for the installation of such quantity of the concrete backfill as directed by the Engineer. 1.08 WARRANTY [Not Used] 1.09 MAINTENANCE AGREEMENT A. Following the certification of completion by the Engineer, maintain paved surfaces, unpaved trench surfaces, fences, curbs, sidewalks, and gutters, for a period of 12 months thereafter. Material and labor required for the maintenance shall be supplied by the Contractor, and the work shall be done in a manner satisfactory to the Engineer. PART 2 - PRODUCTS 2.01 MATERIALS A. Concrete Embedment, Cap, Blocking, and Encasement Where concrete embedment, cap, blocking, or encasement is indicated or requested by the Engineer, it shall be 2,000 psi concrete. B. Flowable Fill Flowable fill shall be as specified by the City Specifications. C. Granular Embedment Granular embedment material shall be gravel, sandy gravel, or blended sand and crushed rock, free from large stones, clay, and organic material. Embedment material shall be a soil classification of GW, GP, SW, or SP as determined by ASTM D 2487. The embedment material shall be such that when wet, the fine material shall not form mud or muck. The embedment material shall be composed of tough durable particles, reasonably free from thin, flat and elongated pieces, of suitable quality to insure permanence in the trench and have a percentage of wear of not more than 40 percent when tested in accordance with ASTM C 131 or ASTM C 535. The P.I. of the fines .. 02202-3 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES lowF.,Vrojects10318W42-011Specs%Part 3%TechQvision 0202202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE.doc 0318-042-01 shall not exceed three (3). Light weight aggregate is not acceptable for granular embedment. Material used for granular embedment shall have a resistivity of not less than 5,000 ohms/cm as measured by ASTM G 57. This shall be cohesionless material meeting the following gradation requirements: Sieve Size Sq. Openings 1/2" 3/8" No. 4 No. 8 No. 16 D. Coarse Gravel Amount Passing Percent by Weight 100 85 —100 10-30 0-10 0-5 Where coarse gravel is required for water drainage, restoration of trench foundation, or other uses, it shall be crushed stone or gravel and in compliance with ASTM C 33 for Coarse Concrete Aggregate. Gradation shall be ASTM C 33 No. 57, No. 67, or as follows: Amount Passing Percent by Sieve Size Sq. Openings Weight 1 r' 95 —100 3/4" 55 — 85 1 /2" 25 — 50 No.4 0-5 E. Select Material Selected or processed excavated trench material free from rock fragments and clods larger than 2-inch greatest dimension. The select material shall be free of organic materials and shall be classified as SP or SP-SM with a plasticity index of 4 or less and a maximum of 12 percent passing the No. 200 sieve. Select materials shall be free of sharp or angular materials that could damage the pipe coating. F. Ordinary Material Trench excavated material free from rock fragments, clods, and organic material larger than 6-inch greatest dimension. G. Topsoil Topsoil is soil material relatively free of stones or other objectionable debris, which have sufficient humus content to readily support vegetative growth. The suitability of soil for topsoil shall be subject to approval by the Owner's Representative. H. Flexible Base Pavement Complying with Item 247 of the Texas Highway Department Standard Specifications for Road and Bridge Construction, latest edition, Type A, Grade 1 or 2. 02202-4 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F.,Vrojects=181042-01%.SpecsVPart 3%Tech%Division 02/02202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE.doc 0318-042-01 Flexible Base Backfill Complying with Item 247 of the Texas Highway Department Standard Specifications for Road and Bridge Construction, latest edition, Type A, Grade 1. J. Hot Mix Asphalt Concrete (Hmac) Hot Mix Asphalt Concrete shall comply with Item 340, Type D of the Texas Highway Department Standard Specifications for Road and Bridge Construction, latest edition. w PART 3 - EXECUTION 3.01 TRENCH EXCAVATION A. General 1. Excavate trenches to the alignment, width, and depth as indicated or as required for the proper installation of the pipe. Brace the trench and/or dewater the trench if necessary so that the workmen may work safely and efficiently. 2. Comply with all applicable laws, ordinances, rules, regulations and orders of any _ public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. Comply with the requirements for Trench Safety. 3. Dewater excavations so that the work is performed in the "dry". Bailing, pumping, and dewatering shall be at the Contractor's expense. Use coarse gravel (at no extra cost to the Owner) instead of embedment material under the pipe to provide for the free drainage and flow of water in the pipe trench, where it is necessary, in order to keep the water level below the pipe barrel and bell holes for joints. The water removed from trenches shall be conducted to natural drainage ways, drains, or storm sewers in such a manner as to prevent damage to adjacent property or to the public. Pumps of ample capacity and in duplicate must be provided to ensure that once an excavation is made dry, the water is kept down until that part of the work under construction is completed. 4. It is intended that the line be laid to the depth of cover shown on the Plans. The minimum depth of cover shall be maintained at all locations unless shown otherwise. The approximate ground profile and the top of pipe profile show the relationship intended by the Engineer. The precise and detailed pipe layout is to be prepared by the Contractor and submitted to the Engineer for review. The responsibility for the workability of the detailed layout remains the responsibility of the Contractor. High points shall be located at air valves and air valves shall be located in pipe sections having a horizontal grade. 5. Where unforeseen existing utilities or other conditions warrant a revision of the pipe grade or alignment, the Contractor shall submit a revised pipe layout to the Engineer for review. No intermediate high or low points will be allowed in the pipe grade without the approval of the Engineer. B. Pipe Trench 1. The "pipe zone" shall be defined as the zone from the bottom of the pipe trench to 12 inches above the top of the pipe. 2. The trench walls in the pipe zone shall be vertical. Trench widths shall be as shown on the Plans. 3. Trench walls above the pipe zone may be laid back or benched where room permits as necessary to meet the requirements of OSHA. 02202-5 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:%projects10318M2-011Specs%Part31TechOvision 02W2202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE.doc 0318-042-01 4. For steel pipe, where the character of the trench walls is loose, unstable, saturated soft clays, quicksand or otherwise unable to provide adequate side support to maintain the required pipe deflection, the Contractor shall modify the backfill to keep the pipe within the limits of the specified pipe deflection as per AWWA or as approved by Engineer. a. Contractor shall widen the trench excavation as necessary. b. Pipe shall be laid and trench backfilled with coarse gravel to the top of the pipe. Coarse gravel shall be compacted to 95 percent maximum density (ASTM D 4253). C. Contractor shall protect exterior pipe coating, and shall repair any damage caused by backfilling. d. Concrete encasement, soil cement or some other method approved by the Engineer may be used in lieu of this procedure. e. No additional compensation will be made for additional trench excavation, coarse gravel, concrete encasement, flowable fill, etc., for stabilizing the trench walls. C. Pipe Foundation 1. Excavate the trench to an even grade so that the full length of the pipe barrel is supported and joints make up properly. Excavate the trench to the line and -� grade indicated and as directed by the Engineer. Grades shall be uniform between high points and low points to eliminate intermediate "highs and lows". 2. The trench shall be "rough cut" a minimum of 6 inches below the bottom of the pipe. The "rough cut" dimension shall be increased as necessary to provide a minimum clearance of 2 inches from the bottom of the trench to the bottom of the bells, flanges, valves, fittings, etc. _ 3. The entire foundation area in the bottom of all excavations shall be firm, stable material. Loose material shall be removed, leaving a clean, flat trench bottom, and material shall not be disturbed below required sub -grade except as hereinafter described. If the subgrade is soft, spongy, disintegrated, or where the character of the foundation materials is such that a proper foundation cannot be obtained at the elevation specified, then when directed by the Engineer the Contractor shalt deepen the excavation to a depth where a satisfactory foundation can be obtained. The sub -grade shall then be brought back to the required grade with course gravel, thoroughly compacted to 95 percent maximum density as measured by ASTM D 4253. Payment for additional coarse gravel shall be made at the unit price bid in the Proposal. D. Correcting Faulty Grade If the trench is excavated to a faulty grade (at a lower elevation than indicated), correct the faulty grade as specified below: 1. In uniform, stable dry soils, correct the faulty grade with granular embedment material thoroughly compacted to 95 percent maximum density measured in accordance with ASTM D 4253. 2. In soft spongy disintegrated soils or where necessary to allow proper drainage, correct the faulty grade with course gravel compacted to 95 percent maximum ' density measured in accordance with ASTM D 4253. E. Pipe Clearance In Rock Remove ledge rock, rock fragments, or unyielding shale or marl to provide a clearance of at least 6 inches below the parts of the pipe, valves or fittings. Provide adequate 02202-6 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:"ects10318%042-011Specs%Part 31Tech Division 02%02202 EXCAVATION AND BACKFiLL LARGE DIAMETER PIPE.doc 0318-042-01 clearance for properly jointing pipe laid in rock trenches at bell holes. Refill the excavation to grade with granular embedment material. F. Blasting Procedure Blasting shall not be allowed. .. G. Bell Holes Required 1. Bell holes of ample dimension shall be dug in trenches at each joint of pipe to permit the jointing to be made properly, visually inspected, and so that the pipe will rest on the full length of the barrel. 2. Pipe with field -applied exterior coatings shall have the joints excavated to sufficient depth to allow proper cleaning, application, testing and inspection of the field -applied coating system. H. Care of Surface Material for Reuse Surface materials such as topsoil in its natural state, suitable for reuse in restoring the excavated surface, shall be kept separate from the general excavation material. The top 12 inches of the trench backfill shall be considered topsoil. Save the topsoil to be used as backfill of the top 12 inches of the trench after pipe laying. ` I. Manner of Piling Excavated Material Place excavated material so that work is not endangered or interferes with public traffic. Do not place excavated material over buried pipelines or existing utilities unless adequate provisions are made to protect those pipelines and/or utilities. Roads and driveways must be kept open in every case. Keep drainage channels clear of obstructions or make other satisfactory provisions for drainage. J. Trenching By Machine Or By Hand The use of trench digging machinery is approved except in places where operations of ' same will cause damage to existing structures above or below ground, in which case employ hand methods. K. Open Trench 1. The Owner's Representative shall have the right to limit the amount of trench that may be opened or partially opened at any time in advance of the completed line; and also the amount of trench left not backfilled. 2. Not over 500 feet of trench in open country or pasture land shall be opened at any one time, and not more than 150 feet of trench in populated areas shall be left open unless otherwise permitted in writing by the Owner. x 3. Backfill and/or protect trenches as necessary to prevent injury to livestock, adjacent property, and the public. 4. Trenches left open at night shall be fenced with adequate construction fencing. The Owner may require that no trenches be left open at night in streets or populated areas. L. Structural Excavation Excavation shall extend a sufficient distance from walls and footings to allow for form installation and inspection, except where concrete for walls and footings is authorized or required to be deposited directly against excavated surfaces. Where excavation, through the fault of the Contractor, is made below the elevation specified or directed by the Engineer, restore the excavation to the proper elevation with stabilized backfill _ (lean concrete or flowable fill) or other approved material at the Contractor's expense. 02202-7 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:4xviects10318%042-011Specs\Part WecMDivision 02\02202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE.doc 0318-042-01 3.02 BACKFILLING OF TRENCHES OUTSIDE ROADWAYS A. General This section of the specification is intended to cover the requirements for trench backfill where trench is in open fields, unimproved alleys, fields, and other similar open areas, except public and private roadways. B. Time of Backfilling Backfill operations shall immediately follow pipe jointing, joint coating application, and curing. C. Braced and Sheeted Trenches Remove sheeting and shoring as backfilling operations progress. Incorporate methods so that a good bond is obtained between the backfill material and the undisturbed trench walls. D. Protection of Pipe During Backfilling Operations Take the necessary precautions to protect the pipe during backfilling operations. Take care to prevent damage to the pipe or to the pipe coating, and repair any damaged pipe before being "covered up". Backfill the trench to prevent the deformation or otherwise deflection of the cylindrical shape of the pipe by more than the allowable pipe deflection as specified elsewhere. Use methods such as stulling or ellipsing as necessary. E. Site and Preparation In addition to clearing and grubbing of brush and trees along the right-of-way for this project, alteration to the topography shall be done if indicated on the Plans, at the locations and to the extent shown. F. Backfill Procedure in Pipe Zone for AWWA C301 Pipe 1. Place the first lift of granular embedment material (bedding layer) to a depth slightly above the bottom of pipe grade and do not compact. Lay pipe on this material to the indicated grade. Provide bell holes to permit the pipe to rest on the full length of the barrel and to permit joint make-up. 2. Place subsequent lifts of granular embedment material uniformly on both sides of the pipe to an elevation of 0.30 times the outside diameter of the pipe in maximum 12-inch thick loose lifts. Compact using vibration or mechanical tamping to a minimum of 95 percent maximum density in accordance with ASTM D 4253. Test embedment compaction per ASTM D 1556 and ASTM D 2922. Contractor shall take precautions to ensure no voids occur under the haunches of the pipe and to prevent disturbance of the pipe alignment. 3. After placement and compaction of the granular embedment material, deposit select backfill in the trench simultaneously and evenly on both sides of the pipe for the full width of the trench to the top of the pipe zone. Consolidate this material by mechanical compaction within two percent of optimum moisture content in lifts not exceeding 18-inch loose depth. Compaction of this material shall be at a minimum of 95 percent of Standard Proctor Density (ASTM D 698). G. Backfill Procedure in Pipe Zone for AWWA C200 Pipe 1. Depth of Cover 4 to 15 Feet a. Place the first lift of granular embedment material (bedding layer) to a depth slightly above the bottom of pipe grade and do not compact. Lay 02202-8 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:lprojects%03IW42-07\Specs%Part Wech%Division 02YM02 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE.doc 0318-042-01 pipe on this material to the indicated grade. Provide bell holes to permit the pipe to rest on the full length of the barrel and to permit joint make-up. b. Place the subsequent lifts of granular embedment uniformly on both sides of the pipe to the top of the pipe zone in maximum 12-inch thick loose lifts. Compact using vibration or mechanical tamping to a minimum of 95 percent maximum density in accordance with ASTM D 4253. Test embedment compaction per ASTM D 1556 and ASTM D 2922. Contractor shall take precautions to ensure no voids occur under the haunches of the pipe and to prevent disturbance of the pipe alignment. 2. Depth of Cover Over 15 Feet Pipe installed with a depth of cover greater than 15 feet shall be installed with flowable backfill material from the bottom of the trench to the top of the pipe zone as indicated on the standard detail sheet. H. Backfill Procedure Above Pipe Zone Mechanical compaction shall be utilized. Place ordinary material above the pipe zone in lifts not exceeding 18" loose depth and compact to 95 percent Standard Proctor density tested per ASTM D 698. The Contractor shall be responsible for any damage that may occur to the pipe using this method of compaction. Note: Special backfill materials and procedures may be required for roadway, railroad, stream crossings, and other special conditions. These will be indicated on the Plans where required. Surface Material Replacement 1. The top 12 inches of the trench backfill shall be composed of the original surface material or topsoil excavated from the trench. Place the topsoil over the consolidated trench backfill material and neatly round over the trench to a sufficient height to allow settlement to grade after consolidation. Grade the surface to allow drainage in the same manner as existed prior to construction. 2. Top soil shall not contain rocks or clods larger than those adjacent to the trench in the undisturbed condition. J. Backfill Around Structures 1. After completion of foundations, walls, etc., remove forms and clean excavation of debris or other objectionable matter prior to placing backfill. 2. In areas where structures such as slabs or pipes are to be constructed on backfill, backfill shall be lean concrete or granular backfill as indicated. Thoroughly compact the backfill. Granular backfill shall be compacted to a minimum of 95 percent maximum density in accordance with ASTM D 4253. 3. Mechanically tamp earth backfill around and over structures, using select material, and placed in layers not to exceed 8-inch loose thickness (higher lifts may be allowed with the approval of the Engineer in accordance with the Manufacturer's recommendations for large mechanical tampers). 4. Bring material to within 2 percent of optimum moisture content and compact each layer to a uniform density of not less than 95 percent Standard Proctor density as determined by ASTM D 698. Laboratory control shall be used to secure compliance with this requirement. 02202-9 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES s F:lprojects103181042-011SpecslPart WechOMsion 02102202 EXCAVATION AND BACI0=ILL LARGE DIAMETER PIPE.doc 0318-042-01 K. Inspection and Test Pits 1. Excavate test pits after the backfill has been placed and compacted in the pipe zone for the purpose of taking field density tests and inspecting the haunch areas under the pipe for voids. 2. Excavate the test pits to a depth and area of sufficient size to allow the inspector to visually inspect the haunch area of the pipe for voids or loose material next to the pipe and to make a field density test. Provide a safety trench shield to protect the inspector while in the pit. 3. After inspection, backfill and compact the test pit area in accordance with the applicable specification herein. 4. Dig one (1) test pit for inspection of each day's.work, if deemed necessary, as determined by the Owner's Representative. Repair and replace areas that are found not to be in compliance with the specification requirements, until satisfactory results are consistently and uniformly attained. 5. Special care should be taken by the Contractor to ensure that backfill material flows under the pipe haunches. The Contractor's method and procedures used to accomplish this will be observed to confirm that adequate results are being achieved. This may require the removal of pipe joints to observe the results and make density tests. Pipe laying shall not begin until satisfactory results are achieved by the Contractor's proposed method. 3.03 BACKFILL PROCEDURE FOR PUBLIC AND PRIVATE ROADS A. Compact granular backfill material within and above the pipe zone (when required per the Plans) for City and County roads, paved or improved private roads, driveways, sidewalks, parking lots and any proposed roads as indicated to a minimum of 95 percent maximum density as measured by ASTM D 4253. Test compacted material per ASTM D 1556 and ASTM D 2922. 3.04 MAINTENANCE OF SURFACES - A. Rock and Organic Material Exclusion Rock and organic material removed from the trench excavated material shall be removed from the right-of-way at the Contractor's expense. B. Deficiency of Backfill Any deficiency in the quantity of material for backfilling the trenches, or for filling depressions caused by settlement, shall be supplied by the Contractor at his expense. Make-up material shall be approved by the Owner's Representative. y C. Restoration of Surfaces Replace surface material and restore paving, curbing, sidewalks, gutters, shrubbery, fences, grass or turf, and other surfaces disturbed to a condition equal to that before the work began. Provide seeding as requested by the Owner or his Representative. 02202-10 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:%Projeds103181042-011SpecslPart WechQvision 02/02202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPEdoc 0318-042-01 D. Seeding and Sodding Provide seeding and sodding in all temporary and permanent easements and all rights -of -way as indicated in the Plans and disturbed areas. Seeding and/or sodding outside of these areas is to be planted when requested in writing by the Owner. 3.05 CLEAN AND ADJUST A. Remove surplus pipeline materials, tools, rubbish, and temporary structures, and leave the construction site clean, to the satisfaction of the Engineer. Grade the surface, and re-establish drainage. Removal of rock and other excess excavated material and general leveling and grading of the right-of-way surface to a presentable appearance shall proceed so as to not be further than 2,500 feet behind the backfilling operations. The Contractor shall be responsible for location of sites for disposal of excess material and the Owner shall make no additional payment for expenses incurred in such disposal. END OF SECTION 02202-11 June 2009 EXCAVATION AND BACKFILL FOR LARGE DIAMETER PIPELINES F:%projedsW3181042-01%SpecslPart 31TechQvision 02/02202 EXCAVATION AND BACKFILL LARGE DIAMETER PIPE.doc MW 0318-042-01 me PART 1 - GENERAL SECTION 02230 SITE CLEARING 1.1 RELATED DOCUMENTS .. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section specifies site clearing activities including trees and vegetation removal and root grubbing, tree protection, topsoil stripping and stockpiling, capping and removing utilities, temporary erosion and sedimentation control measures, and removing minor above- and below -grade site improvements. B. This section does not include detailed tree protection and trimming, tree and root pruning, or tree relocation; grading, excavating, backfilling for earthwork and trenching; building and selective demolition; or landscaping. C. Related Sections include the following: 1.3 DEFINITIONS A. Interfering or Objectionable Material: Trash, rubbish, and junk; vegetation and other organic matter, whether alive, dead, or decaying. B. Clearing: Removal of interfering or objectionable material lying on or protruding above ground surface. C. Grubbing: Removal of vegetation and other organic matter, including stumps, buried "" logs, and roots greater than two-inch caliber to a depth as specified in the following paragraphs. VM D. Scalping: Removal of sod without removing more than upper 3-inches of topsoil. E. Stripping: Removal of topsoil remaining after applicable scalping is completed. F. Topsoil: Natural or cultivated surface -soil layer containing organic matter and sand, silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects more than 2 inches in diameter; and free of subsoil and weeds, roots, toxic materials, or other non -soil materials. G. Tree Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction, and defined by the drip line of individual trees or the perimeter drip line of groups of trees, unless otherwise indicated. H. Project Limits: Areas, as shown or specified, within which work is to be performed. 02230-1 August 2009 SITE CLEARING 0318-042-01 " 1.4 MATERIAL OWNERSHIP A. Except for stripped topsoil or other materials indicated to remain OWNER'S property, cleared materials shall become Contractor's property and shall be removed from Project site. 1.5 SUBMITTALS A. Photographs or videotape, sufficiently detailed, of existing conditions of trees and plantings, adjoining construction, and site improvements that might be misconstrued as damage caused by site clearing. — 1.6 PROJECT CONDITIONS A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site -clearing operations. 1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from OWNER and authorities having jurisdiction. 2. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction. B. Salvable Improvements: As applicable, carefully remove items indicated to be salvaged and store on OWNER'S premises where indicated. C. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing. D. Do not commence site clearing operations until temporary erosion and sedimentation control measures are in place. PART 2 - PRODUCTS 2.1 SOIL MATERIALS A. Satisfactory Soil Materials: Requirements for satisfactory soil materials are specified in Division 2 Section 02001 "Materials." 1. Obtain approved borrow soil materials off -site when satisfactory soil materials are not available on -site. PART 3 - EXECUTION 3.1 PREPARATION A. Protect and maintain benchmarks and survey control points from disturbance during construction. B. Locate and clearly flag trees and vegetation to remain or to be relocated. C. Protect existing site improvements to remain from damage during construction. Restore damaged improvements to their original condition, as acceptable to Owner. 3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL A. Storm Water Pollution Prevention Plan (SWP3): 02230-2 SITE CLEARING August2009 0318-042-01 1. The CONTRACTOR shall comply with all requirements of the Permit, including the filling of the Notice of Intent (NOI) and Notice of Termination (NOT), record maintenance, and posting of the Permit. B. Temporary Erosion and Sedimentation Control: 1. Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of. soil -bearing water runoff to adjacent properties and walkways, according to a sediment and erosion control plan, specific to the site, which complies with the requirements of TCEQ, or EPA 832/R-92-005, or requirements of authorities having jurisdiction, whichever is more stringent. 2. The CONTRACTOR shall have the sole responsibility for the means, methods, techniques, sequences, and procedures for furnishing, installing and maintaining the erosion and sedimentation control system. 3. Inspect, repair, and maintain erosion and sedimentation control measures during construction until permanent vegetation has been established. 4. Remove erosion and sedimentation controls and restore and stabilize areas ., disturbed during removal. 3.3 TREE PROTECTION M A. Requirements for tree protection and related work are shall comply with the requirements of Division 2 Section 02231 "Tree Protection and Trimming." �. 3.4 UTILITIES A. Locate, identify, disconnect, and seal or cap off utilities indicated to be removed. Arrange with utility companies to shut off indicated utilities. B. Existing Utilities: If applicable, do not interrupt utilities serving facilities occupied by OWNER or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: r 1. Notify ENGINNER not less than two days in advance of proposed utility interruptions. 2. Do not proceed with utility interruptions without ENGINEER'S written permission. C. Excavate for and remove underground utilities as indicated to be removed. 3.5 LIMITS OF CLEARING r A. As follows, but not to extend beyond Project limits shown on the Drawings. 1. Excavation, Excluding Trenches: 5 feet beyond top of cut slopes. 2. Trench Excavation: 4 feet from trench centerline, regardless of trench width. 3. Fill: a. Clearing and Grubbing: 5 feet beyond toe of permanent fill. .. b. Stripping: 2 feet beyond toe of permanent fill. 4. Roadways: Clearing and grubbing 20 feet from roadway centerline. 5. Overhead Utilities: Clearing and grubbing entire width of easements and rights -of - way. 6. Other Areas: As shown on drawings. B. Remove rubbish, trash and junk from entire area within Project limits. 3.6 BLASTING A. Explosives: Do not use explosives. 02230-3 August 2009 SITE CLEARING 0318-042-01 3.7 BURNING A. Unless otherwise indicated, burning will only be allowed when the CONTRACTOR provides the OWNER with copies of written authorization from all appropriate and responsible regulatory agencies indicating that burning is acceptable. Said regulatory agencies may include, but not be limited to, State, City, County or local officials, fire marshals/chiefs, etc. 3.8 CLEARING AND GRUBBING A. Remove obstructions, trees, shrubs, grass, and other vegetation to permit installation of new construction. 1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated. 2. Cut minor roots and branches of trees indicated to remain in a clean and careful manner where such roots and branches obstruct installation of new construction. 3. Grind stumps and remove roots, obstructions, and debris extending to a depth of 18 inches below exposed subgrade. 4. Use only hand methods for grubbing within tree protection zone. 5. Chip removed tree branches and dispose of off -site. B. As required, fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated. 1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches, and compact each layer to a density equal to adjacent original ground. 3.9 TOPSOIL STRIPPING A. Remove sod and grass before stripping topsoil. B. Strip topsoil to whatever depths are encountered in a manner to prevent intermingling with underlying subsoil or other waste materials. 1. Remove subsoil and non -soil materials from topsoil, including trash, debris, weeds, roots, and other waste materials. C. Stockpile topsoil materials away from edge of excavations without intermixing with subsoil. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust. 1. Limit height of topsoil stockpiles to approximately 6 feet. 2. Do not stockpile topsoil within tree protection zones. 3. Dispose of excess topsoil as specified for waste material disposal. 3.10 SITE DEMOLITION A. Remove existing above -grade and below -grade improvements as indicated and as necessary to facilitate new construction. B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated. 1. Neatly saw -cut length of existing pavement to remain at the line of demolition before removing existing pavement. Saw -cut faces vertically. 2. Epoxy coat cut ends of steel reinforcement in concrete to remain to prevent corrosion. 02230-4 August 2009 SITE CLEARING aw 0318-042-01 "' 3.11 DISPOSAL A. Disposal: .. 1. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off OWNER'S property. 2. Dispose of stockpiled waste materials within 30-days. .. 3. When requested by OWNER, provide copies of the landfill receipts for waste material disposal. "" END OF SECTION .. .,, .. MW wo • 02230-5 SITE CLEARING August 2009 env 0318-042-01 V. SECTION 02231 TREE PROTECTION AND TRIMMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the protection and trimming of existing trees that interfere with, or are affected by, execution of the Work, whether temporary or permanent construction. B. Related Sections include the following: 1. Division 2 Section 02230 "Site Clearing" for removal limits of trees, shrubs, and other plantings affected by new construction. .s 1.3 DEFINITIONS A. Tree Protection Zone: Area surrounding individual trees or groups of trees to remain during construction, and defined by a 5-foot buffer outside the drip line of individual 6�4 trees or the perimeter drip line of groups of trees, unless otherwise indicated. 1.4 SUBMITTALS '" A. Product Data: For each type of product indicated. B. Tree Pruning Schedule: Written schedule from arborist detailing scope and extent of r, pruning of trees to remain that interfere with or are affected by construction. C. Qualification Data: For tree service firm and arborist. D. Certification: From arborist, certifying that trees indicated to remain have been protected during construction according to recognized standards and that trees were promptly and properly treated and repaired when damaged. E. Maintenance Recommendations: From arborist, for care and protection of trees affected by construction during and after completing the Work. 1.5 QUALITY ASSURANCE A. Tree Service Firm Qualifications: An experienced tree service firm that has successfully completed tree protection and trimming work similar to that required for this Project. The tree service firm will assign an experienced, qualified arborist to Project site during execution of tree protection and trimming. B. Arborist Qualifications: An arborist certified by ISA or licensed in the jurisdiction where Project is located. C. Tree Pruning Standard: Comply with ANSI A300 (Part 1), "Tree, Shrub, and Other Woody Plant Maintenance --Standard Practices (Pruning)." 02231-1 August 2009 TREE PROTECTION AND TRIMMING 0318-042-01 PART 2-PRODUCTS 2.1 MATERIALS A. Drainage Fill: Selected crushed stone, or crushed or uncrushed gravel, washed, ' ASTM D 448, Size 24, with 90 to 100 percent passing a 2-1/2-inch sieve and not more than 10 percent passing a 3/4-inch sieve. B. Topsoil: Natural or cultivated surface -soil layer containing organic matter and sand, silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects more than 1 inch in diameter; and free of weeds, roots, and toxic and other y nonsoil materials. 1. Obtain topsoil only from well -drained sites where topsoil is 4 inches deep or more; do not obtain poorly drained areas including, but not limited to, bogs, marshes, or wetlands. C. Filter Fabric: Manufacturer's standard, nonwoven, pervious, geotextile fabric of polypropylene, nylon, or polyester fibers. D. Construction Safety and Barrier Fence: High density polyethylene material, 4-foot height, nominal mesh opening 3-1/2 inches by 1-1/2 inches, with 6-foot heavy duty T- _ post, ground stables and other accessories for a complete fence system. E. Organic Mulch: Furnish either shredded hardwood or ground or shredded bark, free of deleterious materials; minimum composition should be 80% decomposed materials.. -- PART 3 - EXECUTION 3.1 PREPARATION A. Temporary Fencing: Install temporary fencing around tree protection zones to protect — remaining trees and vegetation from construction damage. Maintain temporary fence and remove when construction is complete. B. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations. C. Mulch areas inside tree protection zones and other areas indicated. — 1. Apply 3-inch average thickness of organic mulch. Do not place mulch within 6 inches of tree trunks. D. Do not store construction materials, debris, or excavated material inside tree protection zones. Do not permit vehicles or foot traffic within tree protection zones; prevent soil compaction over root systems. E. Maintain tree protection zones free of weeds and trash. F. Do not allow fires within tree protection zones. 3.2 EXCAVATION A. Install shoring or other protective support systems to minimize sloping or benching of excavations. .n B. Do not excavate within tree protection zones, unless otherwise indicated. 02231-2 August 2009 TREE PROTECTION AND TRIMMING 0318-042-01 ' C. Where excavation for new construction is required within tree protection zones, hand clear and excavate to minimize damage to root systems. Use narrow -tine spading forks and comb soil to expose roots. 1. Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist condition. Temporarily support and protect roots from damage •- until they are permanently relocated and covered with soil. D. Where utility trenches are required within tree protection zones, tunnel under or around roots by drilling, auger boring, pipe jacking, or digging by hand. 1. Root Pruning: Do not cut main lateral roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots with sharp pruning instruments; do not break or chop. 3.3 REGRADING A. Grade Lowering: Where new finish grade is indicated below existing grade around trees, slope grade beyond tree protection zones. Maintain existing grades within tree protection zones. 1. Root Pruning: Prune tree roots exposed during grade lowering. Do not cut main - lateral roots or taproots; cut only smaller roots. Cut roots with sharp pruning instruments; do not break or chop. B. Minor Fill: Where existing grade is 6 inches or less below elevation of finish grade, fill ' with topsoil. Place topsoil in a single uncompacted layer and hand grade to required finish elevations. C. Moderate Fill: Where existing grade is more than 6 inches but less than 12 inches below elevation of finish grade, place drainage fill, filter fabric, and topsoil on existing grade as follows- 1 . Carefully place drainage fill against tree trunk approximately 2 inches above elevation of finish grade and extend not less than 18 inches from tree trunk on all sides. For balance of area within drip -line perimeter, place drainage fill up to 6 inches below elevation of grade. 2. Place filter fabric with edges overlapping 6 inches minimum. 3. Place fill layer of topsoil to finish grade. Do not compact drainage fill or topsoil. Hand grade to required finish elevations. 3.4 TREE PRUNING A. Prune trees to remain that are affected by temporary and permanent construction. B. Prune trees to remain to compensate for root loss caused by damaging or cutting root system. Provide subsequent maintenance during Contract period as recommended by arborist. C. Pruning Standards: Prune trees according to ANSI A300 (Part 1) as follows: 1. Type of Pruning: As indicated on the Drawings or directed by the arborist prune trees either by cleaning, thinning, raising, or reduction or a combination. D. Cut branches with sharp pruning instruments; do not break or chop. E. Chip removed tree branches and do -not dispose within the tree protection zone. 02231-3 August 2009 TREE PROTECTION AND TRIMMING 0318-042-01 T 3.5 TREE REPAIR AND REPLACEMENT A. Promptly repair trees damaged by construction operations within 24 hours. Treat damaged trunks, limbs, and roots according to arborist's written instructions. B. Remove and replace trees indicated to remain that die or are damaged during construction operations that arborist determines are incapable of restoring to normal growth pattern. _ 1. Provide new trees of 6-inch caliper size or greater and of a species selected by ENGINEER when damaged trees more than 6 inches in caliper size, measured 12 inches above grade, are required to be replaced. Plant and maintain new trees as _ specified in applicable Division 2 Sections. 3.6 DISPOSAL OF WASTE MATERIALS A. Burning: Comply with the requirements of Division 2 Section 02230 "Site Clearing." B. Disposal: Remove excess excavated material and displaced trees from Owner's property, or as directed by OWNER or ENGINEER. - END OF SECTION 02231-4 August 2009 TREE PROTECTION AND TRIMMING aw 0318-042-01 W. PART 1 - GENERAL SECTION 02240 DEWATERING ,,. 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes construction dewatering. B. Related Sections: 1. Division 2 Section 02260 "Excavation Support and Protection" for shoring, bracing, and sheet piling of excavations. 2. Division 2 Section 02320 "Excavation and Backfilling for Large Diameter.Pipe" for excavation, trenching and backfilling for large utilities. aw 1.3 PERFORMANCE REQUIREMENTS A. Dewatering Performance: Design, furnish, install, test, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control hydrostatic .. pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades. 1. Delegated Design: Design dewatering system, including comprehensive engineering analysis by a qualified professional engineer in the state where the Project is to be constructed, using performance requirements and design criteria indicated. 2. Continuously monitor and maintain dewatering operations to ensure erosion control, stability of excavations and constructed slopes, that excavation does not flood, and that damage to subgrades and permanent structures is prevented. 3. Prevent surface water from entering excavations by grading, dikes, or other means. 4. Accomplish dewatering without damaging existing buildings, structures, and site improvements adjacent to excavation. 5. Remove dewatering system when no longer required for construction. _ 1.4 SUBMITTALS A. Action Submittal. Provide shop drawings for dewatering system. Show arrangement, locations, and details of wells and well points; locations of risers, headers, filters, .� pumps, power units, and discharge lines; and means of discharge, control of sediment, and disposal of water. B. Delegated -Design Submittal: For dewatering system indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation. C. Informational submittals `1. Qualification Data: For qualified Installer, land surveyor and professional engineer as applicable. 2. Field quality -control reports. 02240-1 August 2009 DEWATERING 0318-042-01 3. Other Informational Submittals: a. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by _ dewatering operations, if applicable. 1.5 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer that has specialized.in design of dewatering systems and dewatering work. B. Regulatory Requirements: Comply with governing notification regulations before beginning dewatering. Comply with hauling and disposal regulations of authorities having jurisdiction. 1.6 PROJECT CONDITIONS A. Interruption of Existing Utilities: As applicable, do not interrupt any utility serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility according to requirements indicated: 1. Notify Engineer no fewer than two (2) days in advance of proposed interruption of utility. 2. Do not proceed with interruption of utility without ENGINEER's written permission. B. Project -Site Information: A geotechnical report has been prepared for this Project and 4 is available for information only. The opinions expressed in this report are those of geotechnical engineer and represent interpretations of subsoil conditions, tests, and results of analyses conducted by geotechnical engineer. Owner will not be -• responsible for interpretations or conclusions drawn from this data. 1. Make additional test borings and conduct other exploratory operations necessary for dewatering. 2. The geotechnical report is referenced elsewhere in the Project Manual. C. Survey Work: If applicable, engage a qualified land surveyor or professional engineer to survey adjacent existing buildings, structures, and site improvements, establishing - exact elevations at fixed points to act as benchmarks. Clearly identify benchmarks and record existing elevations. 1. During dewatering, regularly resurvey benchmarks, maintaining an accurate log of _ surveyed elevations for comparison with original elevations. Promptly notify Architect if changes in elevations occur or if cracks, sags, or other damage. is evident in adjacent construction. , PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by dewatering operations. 1. Prevent surface water and subsurface or ground water from entering excavations, from ponding on prepared subgrades, and from flooding site and surrounding area. 02240-2 August 2009 DEWATERING 0318-042-01 2. Protect subgrades and foundation soils from softening and damage by rain or water accumulation. B. Install dewatering system to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities. 1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction. .. C. Provide temporary grading to facilitate dewatering and control of surface water. D. Monitor dewatering systems continuously. E. Promptly repair damages to adjacent facilities caused by dewatering. F. Protect and maintain temporary erosion and sedimentation controls, which are specified in Division 2 Section 02230 "Site Clearing" during dewatering operations. 3.2 INSTALLATION A. Install dewatering system utilizing wells, well points, or similar methods complete with aw pump equipment, standby power and pumps, filter material gradation, valves, appurtenances, water disposal, and surface -water controls. 1. Space well points or wells at intervals required to provide sufficient dewatering. •• 2. Use filters or other means to prevent pumping of fine sands or silts from the subsurface. B. Before excavating below ground -water level, place system into operation to lower water to specified levels. Operate system continuously until drains, sewers, and structures have been constructed and fill materials have been placed or until dewatering is no longer required. C. Provide an adequate system to lower and control ground water to permit excavation, construction of structures, and placement of fill materials on dry subgrades. Install sufficient dewatering equipment to drain water -bearing strata above and below bottom of foundations, drains, sewers, and other excavations. 1. Do not permit open -sump pumping that leads to loss of fines, soil piping, subgrade softening, and slope instability. D. Reduce hydrostatic head in water -bearing strata below subgrade elevations of foundations, drains, sewers, and other excavations. 1. Unless otherwise specified in the Geotechnical Report, maintain piezometric water level a minimum of 24 inches below surface of excavation. E. Dispose of water removed by dewatering in a manner that avoids endangering public health, property, and portions of work under construction or completed. Dispose of water and sediment in a manner that avoids inconvenience to others. Provide sumps, sedimentation tanks, and other flow -control devices as required by authorities having jurisdiction. i F. Provide standby equipment on site, installed and available for immediate operation, to maintain dewatering on continuous basis if any part of system becomes inadequate or .,, fails. If dewatering requirements are not satisfied due to inadequacy or failure of dewatering system, restore damaged structures and foundation soils at no additional expense to Owner. 02240-3 August 2009 DEWATENNG 0318-042-01 1. Remove dewatering system from Project site on completion of dewatering. Plug or fill well holes with sand or cut off and cap wells a minimum of 36 inches below overlying construction. G. Damages: Promptly repair damages to adjacent facilities caused by dewatering operations. 3.3 FIELD QUALITY CONTROL A. Observation Wells: When shown on Drawings, provide, take measurements, and maintain at least the minimum number of observation wells or piezometers indicated; additional observation wells may be required by authorities having jurisdiction. 1. Observe and record daily elevation of ground water and piezometric water levels in observation wells. _ 2. Repair or replace, within 24 hours, observation wells that become inactive, damaged, or destroyed. In areas where observation wells are not functioning properly, suspend construction activities until reliable observations can be made. Add or remove water from observation -well risers to demonstrate that observation wells are functioning properly. 3. Fill observation wells, remove piezometers, and fill holes when dewatering is completed. y B. Provide continual observation to ensure that subsurface soils are not being removed by the dewatering operation. END OF SECTION 02240-4 August2009 DEWATERING 40 0318-042-01 so SECTION 02260 EXCAVATION SUPPORT AND PROTECTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes temporary excavation support and protection systems. B. Related Sections: 1. Division 2 Section 02240 "Dewatering" for dewatering system for excavations. 1.3 PERFORMANCE REQUIREMENTS A. Design, furnish, install, monitor, and maintain excavation support and protection system capable of supporting excavation sidewalls and of resisting soil and hydrostatic .. pressure and superimposed and construction loads. 1. Delegated Design: Design excavation support and protection system, including comprehensive engineering analysis by a qualified professional engineer, licensed to practice in the state where the Project will be constructed, using performance requirements and design criteria indicated. B. As a minimum, the Excavation Support and Protection Plan shall address the following items: 1. Provide details of shoring, bracing, sheet piling, soldier piles and lagging, tie backs, and other support systems and provisions for worker protection from hazards of caving ground. 2. Methods and sequencing of installing excavation support. 3. Proposed locations for excavated materials. 4. Minimum lateral distance from the crest of slopes for vehicles, equipment, and stockpiled materials. 5. Prevent surface water from entering excavations by grading, dikes, or other means. 6. Install excavation support and protection systems without damaging existing buildings, structures, and site improvements adjacent to excavation. .. 7. Monitor vibrations, settlements, and movements. 1.4 SUBMITTALS A. Delegated -Design Submittal: For excavation support and protection system indicated to comply with performance requirements and design.criteria, including analysis data signed and sealed by the qualified professional engineer, licensed to practice in the state where the Project is constructed, responsible for their preparation. 1.5 PROJECT CONDITIONS A. Project -Site Information: A geotechnical report has been prepared for this Project and is available for information only. The opinions expressed in this report are those of geotechnical engineer and represent interpretations of subsoil conditions, tests, and 02260-1 August 2009 EXCAVATION SUPPORT AND PROTECTION 0318-042-01 results of analyses conducted by geotechnical engineer. OWNER and ENGINEER will not be responsible for interpretations or conclusions drawn from the data. 1. Make additional test borings and conduct other exploratory operations necessary for excavation support and protection. 2. The geotechnical report is referenced elsewhere in the Project Manual. B. Survey Work: Engage a qualified land surveyor or professional engineer to survey adjacent existing buildings, structures, and site improvements; establish exact elevations at fixed points to act as benchmarks. Clearly identify benchmarks and record existing elevations. 1. During installation of excavation support and protection systems, regularly resurvey - benchmarks, maintaining an accurate log of surveyed elevations and positions for comparison with original elevations and positions. Promptly notify ENGINEER if changes in elevations or positions occur or if cracks, sags, or other damage is evident in adjacent construction. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards that could develop during excavation support and protection system operations. 1. Shore, support, and protect utilities encountered. B. Install excavation support and protection systems to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities. 1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities _ without permission from OWNER and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction. C. Locate excavation support and protection systems clear of permanent construction so that forming and finishing of concrete surfaces are not impeded. D. Monitor excavation support and protection systems daily during excavation progress and for as long as excavation remains open. Promptly correct bulges, breakage, or other evidence of movement to ensure that excavation support and protection systems remain stable. E. Promptly repair damages to adjacent facilities caused by installing excavation support and protection systems. 3.2 TRENCHES A. For excavations exceeding 5 feet in depth, provide adequate safety system meeting requirements of applicable state and local construction safety orders, and Federal requirements. 02260-2 August 2009 EXCAVATION SUPPORT AND PROTECTION 0318-042-01 3.3 REMOVAL AND REPAIRS A. Remove excavation support and protection systems when construction has progressed sufficiently to support excavation and bear soil and hydrostatic pressures. Remove in stages to avoid disturbing underlying soils or damaging structures, pavements, facilities, and utilities. 1. Fill voids immediately with approved backfill compacted to density specified in Division 2 Section 02300 "Earthwork." 2. Repair or replace, as approved by ENGINEER, adjacent work damaged or displaced by removing excavation support and protection systems. B. If the support or stability of existing structures or site improvements is dependent, leave excavation support and protection systems permanently in place. Remove excavation support and protection systems to a minimum depth of 48 inches below overlaying construction and abandon remainder. END OF SECTION ,.. em 02260-3 August 2009 EXCAVATION SUPPORT AND PROTECTION UW 0318-042-01 SECTION 02326 PIPE JACKING, BORING, OR TUNNELING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section provides for pipe installation by jacking, boring, directional boring or drilling, or by tunneling. B. Related Sections: 1. Division 2 Section 02230 "Site Clearing" for site preparation, temporary erosion control measures, tee protection and other related work. 2. Division 2 Section 02240 "Dewatering" for dewatering requirements. 1.3 REFERENCES AND DEFINITIONS A. References: 1. ASTM International (ASTM): a. A 36 Specification for Carbon Structural Steel b. A 139 Specification for Electric -Fusion (Arc) -Welded Steel Pipe (NPS 4 and Over) c. A 307 Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength d. A 449 Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use e. A 760 Specification for Corrugate Steel Pipe, Metallic -Coated for Sewers and Drains f. C 76 Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe g. C 150 Specification for Portland Cement h. C 869 Specification for Foaming Agents Used in Making Performed Foam for Cellular Concrete 2. American Water Works Association (AWWA): a. C900 Standard for Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In. through 12 In. for Water Distribution B. Definitions: 1. Auger Boring: A technique for forming a bore from a drive pit to a reception pit, by means of a rotating cutting head. Spoil is removed back to the drive pit by helically wound auger flights rotating in a steel casing pipe. 2. Bentonite: Colloidal clay sold under various trade names that form slick slurry or gel when water is added. Also know as driller mud. 3. Carrier Pipe: The tube that carries the product being transported and which may go through casings at highways and railroad crossing. It may be made of steel, concrete, clay, plastic, ductile iron, or other materials. 4. Casing: A pipe used to line bore holes through which a pipe(s) called carrier pipes or ducts are installed. 02326-1 August 2009 PIPE JACKING, BORING, OR TUNNELING 40 0318-042-01 5. Directional Drilling: A steerable system for the installation of pipes, conduits and - cables in a shallow arc using a surface launched drilling rig. 6. Dry Bore: Any drilling or rod pushing system not employing drilling fluid in the process. _. 7. Pipe Jacking: A system of directly installing pipes behind a shield machine by hydraulic jacking from a drive shaft such that the pipes form a continuous string in the ground. 8. Trenchless Technology: Techniques for utility line installation, replacement, rehabilitation, renovation, repair, inspection, location and leak detection, with minimum excavation from the ground surface. 9. Tunneling: A construction method of excavating an opening beneath the ground without continuous disturbance of the ground surface and of large enough diameter to allow individuals access and erection of a ground support system at the location of material excavation. - 1.4 PERFORMANCE REQUIREMENTS A. General Performance: 1. Carrier Pipe: Lateral or vertical variation in pipe's final position from the established Drawing line and grade shall not exceed 1-inch per 10-feet, provided such variation shall be regular, only in one direction, and the final grade of the flow line shall be in the direction indicated on the Drawings. 2. Structural Performance: Specified casing pipe thickness based upon the superimposed loads and not upon loads, which may be placed on the pipe �- resulting from jacking operations. Provide increase strength required to withstand jacking loads. 1.5 SUBMITTALS A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and - manufacture instructions for casing pipe, carrier pipe, spacers, liner plates, and associated components as applicable. B. Shop Drawings: For bulkheads, access manholes, overall assembly, and related work - as applicable. Include plans, elevations, sections, details, and attachments to other work. C. Design Mixes: Concrete, grout, and flowable fill as applicable. D. Qualification Data: For qualified Installer. E. Welding certificates. F. Material Certificates: For each type of carrier pipe, casing pipe and grout material, from manufacturer. G. Minutes of preinstallation conference. 1.6 QUALITY ASSURANCE A. Installer Qualifications: An employer of workers trained and approved by manufacturer. B. Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1 M, "Structural Welding Code - Steel. 02326-2 August 2009 PIPE JACKING, BORING, OR TUNNELING 0318-042-01 C. Preinstallation Conference: Conduct conference at Project site. 1.7 PROJECT CONDITIONS A. Construction Method: Unless otherwise specifically designated, CONTRACTOR may select jacking, boring, tunneling, or trenchless construction method to be employed. Gravity sewer lines shall be maintained at a uniform grade throughout trenchless construction. B. Permit: 1. The OWNER shall be responsible to provide the documentation to the appropriate jurisdiction and obtain the required permits for designated jacking, boring, and tunneling operations shown on the Drawings. 2. For those areas where CONTRACTOR proposed to use jacking, boring, tunneling, or trenchless excavation operations in lieu of open cut, it shall be the responsibility of the CONTRACTOR to prepare documentation, obtain approval and required permits. C. Operation Restrictions: Conduct operations so as not to interfere with, interrupt, or endanger surface and activity thereon. 1. Minimize subsidence of surface, structures, and utilities above and in vicinity of operations. 2. Support ground continuously to prevent loss of ground and keep perimeters stable. 3. Be responsible for settlement resulting from operations. 4. Repair and restore damaged property to its condition before being disturbed at no cost to the OWNER. 5. Provide 48-hour notice prior to commencement of any jacking, boring, tunneling, or trenchless operations. D. Compliance: Comply with applicable ordinances, codes, statutes, rules, and _ regulations of the jurisdictional agency, the affected Railroad, TxDOT, and municipal, state and federal governmental agencies. E. Additional Criteria for Work Railroad Property: 1. Do not schedule work until submittals and insurance approval received from Railroad and ENGINEER and permit, if applicable, has been obtained. 2. Provide any additional insurance required by the Railroad or other jurisdiction agency. 3. Comply with AREMA and other Railroad requirements prior to commencing Work. 4. Obtain required Railroad safety training for operators performing Work within Railroad right-of-way, the required flagman, and work authorization from the Railroad. All costs associated with these activities shall be the CONTRACTOR'S responsibility. 5. Place safety, precautionary, and protective devices and services required before Work proceeds. F. Safety Requirements: 1. Provide flagman, barricades, lights, warning signs, ventilation, air quality monitoring, and other safety devices and equipment required to ensure the safety of personnel entering area, especially tunneling operations, safeguard traffic and pedisterians. 2. Establish procedure to logging personnel working within the bore or tunnel shaft, if applicable. 02326-3 August 2009 PIPE JACKING, BORING, OR TUNNELING 0318-042-01 3. Compliance with requirements of Division 2 Section "Excavation Support and - Protection." 4. Compliance with OSHA 29CFR 1926, and applicable criteria of ANSI A10.16-1995 (R2001) "Safety Requirements for Tunnels, Shafts, and Caissons." PART 2 - PRODUCTS 2.1 MATERIALS A. General: 1. Material of construction of casing pipe shall be as designated on the Drawings or as required by the jurisdictional agency for type of service. 2. Material of construction for the carrier pipe shall be as designated on the Drawings. 3. Carrier pipe shall be placed inside a casing pipe where foundation conditions T (presence of boulders, rubble, or rock) make the direct trenchless installation of the carrier pipe impractical. A casing pipe may also be used if the carrier pipe or conduit is not by itself suitable for trenchless installation. B. Casing Pipe: 1. Steel Pipe: a. Smooth walled steel pipe conforming to ASTM A 139, Grade B; 35,000 psi minimum yield strength. b. Minimum inside diameter shall be at least 2-pipe sizes larger than maximum outside diameter of carrier pipe, including bells or joints. c. Minimum wall thickness shall be 3/8-inch for 24-inch diameter and smaller; 1/2- inch 48-inch diameter and smaller, but larger than 24-inch; and 5/8-inch for 66- inch and smaller, but larger than 48-inch. d. Joints: Interlocking type, or butt -welded, lap welded, or welded using butt straps in the field. Each end of the casing for butt -welding shall be prepared by providing a 1/4-inch by 45-degree chamfer on the outside edges. _ e. Coating: None. C. Carrier Pipe: 1. Material of construction shall be as shown on the drawings and shall have restrained joints. 2. Carrier pipe shall be the same nominal diameter as the system pipe on either side of the carrier pipe. D. Casing Spacers: 1. Factory manufactured casing spacers shall be installed on all carrier pipes passing through a casing pipe. Wooden skids will not be allowed as an alternative. 2. Bolt -on style with a shell made of at least two halves, having band material manufactured of minimum 14 gauge hot rolled pickled steel or T-304 stainless steel, and 10 gauge risers. 3. Steel Band and risers shall have a copolymer -based thermoplastic coating finish, 10-15 mil thickness. 4. Spacer 8-inch wide carrier pipe size 24-inch and smaller, 12-inch wide 26-inch and larger. 5. Hardware; T-304 for stainless bands, or electro-plated for steel bands. 6. Liner, EDPM, 0.090-inch thicken, hardness Durometer "A" 85-90, Dielectric strength 60,000 VPM, and water adsorption of 1% maximum. 7. Runners, 1-inch or 2-inch wide, glass filled polymer plastic. 02326-4 August 2009 PIPE JACKING, BORING, OR TUNNELING rW 0318-042-01 8. Available Manufacturers: a. Advance Products & Systems, Inc. b. Cascade Waterworks Mfg. c. Pipeline Seal & Insulator Inc. E. Casing End Seals: 1. Manufactured of 1/8-inch thick neoprene rubber, attached using 1/2-inch wide T304 stainless steel bandings 100% non-magnetic worm gear mechanism. 2. Configuration may be pull -on end molded, wrap around with self -curing mastic sealing strips, or zipper configuration. 3. Available Manufacturers: a. Advance Products & Systems, Inc. b. Cascade Waterworks Mfg. c. Pipeline Seal & Insulator Inc. F. Grout: 1. Consist of one part Portland cement, ASTM C150, Type I or 11, three parts sand, and minimum amount of water to obtain desired consistency. 2. Sand shall consist of clean, hard, durable, uncoated grains, free from lumps and organic material_ All particles shall pass a No. 8 sieve and the material shall have a plasticity index of 12 or less. 3. Compressive strength of 100 psi at 28-days. G. Flowable Fill: 1. Ready mixed flowable fill is a blend of cement, fly ash, fine aggregate, and water. It is designed as a low strength, flowable material requiring no subsequent vibration or tamping to achieve 100% consolidation. 2. Unless indicted otherwise, select and proportion ingredients to obtain compressive strength between 50 and 150 psi at 28 days in accordance with ASTM D4832. 3. Materials: a. Cement: ASTM C150, Type I, 11, or Ill. b. Aggregate: ASTM C33, Size 8 or fine aggregate. c. Fly Ash (if used): ASTM C618, Class C. .. d. Water: Clean, potable, free of odor, organics, and deleterious materials. 4. The flowable fill mixture shall be mixed either in a pug mill, concrete mixer, or transit mixer and shall a minimum slump of five (5) inches. H. Cellular Concrete Backfill: 1. Concrete: ASTM C150, Type II. 2. Foaming agents conform to ASTM C 869. 3. Water: Clean, free of organic and other impurities. 4. Minimum 7 and 28 day compressive strength of 300 and 500 psi. I. Annular Sand Backfill: Sand for the annular space shall be clean and 100% shall pass a Standard no. 30 sieve. no J. Miscellaneous Items: 1. Surface Settlement Markers: a. Within bituminous pavement areas: "p.k." nails. b. Within nonpaved areas: Wooden nails_ c. Within concrete surfaces: Paint. 2. Grout Connections: Provide two inch grout connection regularly spaced at 5-foot centers, alternating at 30 degrees from plumb each side of the vertical centerline. 02326-5 August 2009 PIPE JACKING, BORING, OR TUNNELING 0318-042-01 3. Bulkheads and Access Manholes: Requirements shall be as shown on the Drawings. PART 3 - EXECUTION 3.1 GENERAL A. Unless soil borings in the immediate vicinity of the work area are available, CONTRACTOR shall investigate the existing soils and subsurface conditions so the appropriate equipment is provided to counter conditions, which can cause delay such as groundwater, running sand, boulders, or other subsurface conditions. 3.2 CONSTRUCTION BY JACKING A. Construct suitable pits or trenches at the jacking and receiving end to a depth no greater than required for placing of the guide and jacking timbers and a horizontal distance no nearer the roadbed than minimum distance shown on the Drawings. Excavation work shall comply with the requirements of Division 2 Section 02300 w "Earthwork." B. All open pits and trenches shall braced and shored or their walls sloped preventing caving or sliding of the walls into the open pit or trench complying with requirements of Division 2 Section 02260 "Excavation Support and Protection." C. Place pipe on guides for supporting pipe to be jacked and to direct it for proper - alignment and grade. Embankment material shall be excavated just ahead of the pipe, removed through the pipe, and the pipe forced through the opening provided. D. Excavation for the underside of the pipe, for at least one-third (1/3) of the pipe circumference, shall conform to the contour and grade of the pipe. Excavation for the top half of the pipe shall conform closely to the outside diameter and a clearance greater than 2-inches shall not be permitted. Preferably pipe shall be jacked from the low or downstream end. E. All voids between the pipe and the earth shall be filled with grout. Provide grout holes in the pipe. The grouting shall follow immediately upon completion of the jacking ` operation. Prepare bottom of pits as pipeline foundations in accordance with Division 2 Section 02320 "Excavation, Trenching, and Backfilling for Utilities." Backfill pits and trenches as soon as practical following completion of jacking operations and - installation of carrier pipe(s). F. Any pipe that cannot be repaired to its original condition or is damaged during jacking operations shall be removed and replaced at CONTRACTOR'S expense. 3.3 CONSTRUCTION BY BORING A. Construct suitable pits or trenches at the boring and receiving end to a depth no greater than required for placing of the guide and jacking timbers and a horizontal distance no nearer the roadbed than minimum distance shown on the Drawings. Excavation work shall comply with the requirements of Division 2 Section 02300 "Earthwork." B. All open pits and trenches shall braced and shored or their walls sloped preventing _ caving or sliding of the walls into the open pit or trench complying with requirements of Division 2 Section 02260 "Excavation Support and Protection." 02326-6 August 2009 PIPE JACKING, BORING, OR TUNNELING 4V 0318-042-01 C. The hole shall be bored mechanically with a suitable boring assemble designed to produce a smooth, straight shaft and so operated that the completed shaft shall be at the established line and grade. The boring shall be accomplished using either a pilot - hole method or a dry hole method. 1. Pilot Hole Method: Bore approximately a 2-inch pilot hole the entire length of the crossing and confirm line and grade. The pilot hole shall serve as the centerline for �. the lager diameter hole to be bored. 2. Dry Hole Method: Advance casing pipe as augers through the casing pipe remove the soil. Bentonite may be used as a lubricant. D. All voids between the pipe and the earth shall be filled with grout. Provide grout holes in the pipe. The grouting shall follow immediately upon completion of the jacking operation. Prepare bottom of pits and pipeline foundations in accordance with Division 2 Section 02320 "Excavation, Trenching, and Backfilling for Utilities." Backfill pits and trenches as soon as practical following completion of jacking operations and installation of carrier pipe(s). E. Any pipe that cannot be repaired to its original condition or is damaged during boring operations shall be removed and replaced at CONTRACTOR'S expense. 3.4 CARRIER PIPE INSTALLATION A. Installation: 1. Install carrier pipe to establish lines and grades. 2. Carrier pipe joints within the casing pipe shall be of the restrained type in accordance with applicable pipe specifications. If applicable, exterior and interior joints of the carrier pipe shall be mortar coated and lined in the field as installation - progresses. 3. For cast iron or ductile iron, encase pipe in polyethylene in accordance with applicable pipe section. _. 4. Install casing spacers by placing at each end of the casino pipe and at 6 to 8 feet intervals, and in accordance with manufacturer instructions. There shall be at least two spacers installed on each pipe section. 5. Seal ends of casing and carrier pipe using neoprene casing end seals and stainless steel bands. If overlap seal is employed, bond together the overlapping surfaces with permanent sealing adhesive. B. Testing: Hydrostatic testing of the carrier pipe shall be completed prior to the filling of the annular space between the casing and carrier pipe. Testing shall be accomplished in accordance with the applicable pipe section. C. Backfilling Annular Space between Carrier Pipe and Casing Pipe: Backfill annular space using annular sand, cellular concrete or flowable fill. D. Supports: Carrier pipe shall be supported to the quarter point by a concrete cradle across the boring or jacking pit to the first joint in the ditch section at each end. E. Additional Pipes or Conduits: Where more than one pipe or conduit, such as irrigation .. or communication/electrical cables or conduits, in addition to the primary carrier pipe, is shown inside the casing, they shall be bundled and attached to special multiple pipe cluster type spacers as a unit in the quadrant shown on the Drawings. • • 02326-7 August 2009 PIPE JACKING, BORING, OR TUNNELING 0318-042-01 3.5 CONSTRUTION BY GUIDED BORING OR DIRECTIONAL DRILLING - A. Guided boring or directional drilling shall be accomplished according to the standards in "Trenchless Technology Guidelines" published by International Society of Trenchless Technology. 3.6 CONSTRUCTION BY TUNNELING A. The tunnel shall be excavated in such a manner and to dimensions necessary to permit placement of supports for excavation. Adequate provisions shall be made for the safety, health, and protection of workers. All equipment operated in tunnel shall be powered by air or electricity. No equipment shall be permitted in tunnel powered by petroleum -based fuel. B. Tunnel dimensions shown on Drawings are minimum dimensions. Any excess excavation and subsequent backfill, concrete or grout fill shall be at the expense of the CONTRACTOR. C. Provide lighting and ventilation, quick removal of gasses and dust form operations, and means for removal of spoils from the excavations. D. Provide suitable steel or timber sheeting, shoring and bracing in accordance with Division 2 Section 02260 "Excavation Support and Protection." When installation is �- complete and with approval of ENGINEER, supports may be left in place, provided they clear the encasement or carrier pipe. No separate payment shall be made for supports'left in place. E. If the tunnel is to be lined with concrete as a monolithic structure, then the overbreak, if any or voids shall be poured with 4,000 psi concrete. F. Install carrier pipe in tunnel to established line and grade. As specified, fill the void space between the carrier pipe and tunnel walls or inside face of tunnel lining with annular sand, cellular concrete or flowable fill. 3.7 CATHODIC PROTECTION A. Unless otherwise specified, provide cathodic protection consisting of a 17-pound high potential magnesium anode at each end where steel casing pipe is installed. Provide Cathodic -testing station as shown on the Drawings. 3.8 FIELD QUALITY CONTROL A. Grade and Alignment. Provide field survey data confirming grade and alignment conforms to values shown on the Drawings and within limits of specified in this Section. B. Provide test data for materials used in installing casing and carrier pipe, such as grout, concrete, flowable fill, cellular concrete fill, and sand used to fill annular space between carrier pipe and casing. C. Provide settlement measurements. During construction, make observations of settlement markers at regular intervals of roadway and railroad tracks. Record and provide information. END OF SECTION 02326-8 August 2009 PIPE JACKING, BORING, OR TUNNELING .. 0318-042-01 .. SECTION 02910 HYDROMULCH SEEDING am PART 1 - GENERAL 1.1 RELATED DOCUMENTS .w A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Hydromulch seeding; includes mixing grass seed, fertilizer, mulch, with water. 2. Pesticide application. 3. Erosion control materials. 4. Maintenance of seeded areas for designated time period. B. Related Sections: 1. Division 2 Section 02230 "Site Clearing" for topsoil stripping and stockpiling. 1.3 DEFINITIONS AND REFERENCES A. Definitions: 1. Duff Layer: The surface layer of native topsoil that is composed of mostly decayed leaves, twigs, and detritus. 2. Finish Grade: Elevation of finished surface of planting soil. 3. Manufactured Topsoil: Soil produced off -site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil ' or planting soil. 4. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, - rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant. 5. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people. These include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses. .. 6. Planting Soil: Standardized topsoil; existing, native surface topsoil; existing, in - place surface soil; imported topsoil; or manufactured topsoil that is modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant . growth. 7. Subgrade: Surface or elevation of subsoil remaining after excavation is complete or top surface of a fill or backfill before planting soil is placed. 8. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the w' lack of organic matter and soil organisms. 9. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbed areas, the surface soil is typically topsoil, but in disturbed areas such as urban environments, the surface soil can be subsoil. 10. Turf: Short grass with earth bound to it by matted roots. 02910-1 August 2009 HYDROMULCH SEEDING WV 0318-042-01 11. Weeds: Includes Dandelion, Jimsonweed, Quackgrass, Horsetail, Morning Glory, Rush Grass, Mustard, Lambsquarter, Chickweed, Cress, Crabgrass, Canadian Thistle, Nutgrass, Poison Oak, Blackberry, Tansy Ragwort, Johnson Grass, Poison Ivy, Nut Sedge, Nimble Will, Bindweed, Bent Grass, Wild Garlic, Perennial Sorrel, and Brome Grass. B. References: 1. ASTM International (ASTM): a. C 602 — Specification for Agricultural Liming Materials b. D 977 — Specification for Emulsified Asphalt C. D 5268 — Specification for topsoil Used for Landscaping Purposes 1.4 SUBMITTALS A. Product Data: For each type of product indicated. 1. Pesticides and Herbicides: Include product label and manufacturer's application instructions specific to this Project. 2. Certification of Grass Seed: From seed vendor for each grass -seed monostand or mixture stating the botanical and common name, percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging. 3. Fertilizer: Provide product manufacturer's name, warranty of producer, weight and analysis, and form of constituents. 4. Product Certificates: For soil amendments and fertilizers, from manufacturer. 5. Pesticides: Type, analysis, application information, and safety information. B. Qualification Data: For qualified landscape Installer. C. Material Test Reports: For existing native surface topsoil, existing in -place surface soil, and imported or manufactured topsoil. 1.5 QUALITY ASSURANCE A. Installer Qualifications: A qualified landscape Installer whose work has resulted in successful turf establishment. 1. Professional Membership: Installer shall be a member in good standing of either the Professional Landcare Network or the American Nursery and Landscape Association. 2. Experience: Three years' experience in turf installation in addition to requirements in Division 1 Section "Quality Requirements." 3. Installer's Field Supervision: Require Installer to maintain an experienced full- time supervisor on Project site when work is in progress. B. Pesticide Applicator: State licensed, commercial. 1.6 PROJECT CONDITIONS A. Planting Restrictions: Plant during one of the following periods. Coordinate planting periods with initial maintenance periods to provide required maintenance from date of planting completion. 1. Seeding for erosion control: Refer to Table 1. 02910-2 August 2009 HYDROMULCH SEEDING 0318-042-01 2. Seeding for landscaping: Refer to Table 2. B. CONTRACTOR shall provide both the temporary and permanent planting mixtures at no additional cost to the OWNER. This includes returning to the Project following Substantial Completion in the spring to apply the permanent planting mixture. .1 C. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply products during favorable weather conditions according to manufacturer's written instructions. 1.7 DELIVERY, STORAGE, AND HANDLING A. Seed and Other Packaged Materials: 1. Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of conformance with state and federal laws, as applicable. 2. Deliver fertilizer in waterproof bags. 3. Store packaged materials in dry locations. B. Bulk Materials: 1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants. 2. Provide erosion -control measures to prevent erosion or displacement of bulk materials, discharge of soil -bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways. 3. Accompany each delivery of bulk fertilizers and soil amendments with appropriate certificates. "` 1.8 MAINTENANCE SERVICE .. A. Initial Turf Maintenance Service: Provide full maintenance by skilled employees of landscape Installer. Maintain as required in Part 3. Begin maintenance immediately after each area is planted and continue until acceptable turf is established but for not less than the following periods: 1. Seeded Turf. a. 90 days from date of planting completion during spring and summer. b. 60 days from date of planting completion during fall and winter. PART 2-PRODUCTS 2.1 SEED A. Grass Seed: 1. Fresh, clean, dry, new -crop seed complying with requirements of Texas Seed Law. The seed packaged shall contain a Texas Testing Seed Label showing purity and germination, name, type of seed, and complies with Texas Seed law. 2. Treated with fungicide. 3. New crop seed harvested with 1 year prior to planting, free of other weed seed to the limits allowable under the Texas Seed Law. 4. Seed shall have a germination and purity that will produce a live seed content of not less than 85 percent pure seed, and not more than 0.2 percent weed seed. 02910-3 August 2009 HYDROMULCH SEEDING 0318-042-01 5. Seed, which has become wet, moldy or otherwise damaged in transit or storage, " will not be acceptable. B. Seeding for Landscaping: Where specified on Drawings, provide a seed mixture at the rate depending on the planting as listed in Table 1. Table 1 - Seedinq for Landscaping Seed Mixture Planting Dates Seed Mix y No. 1 April 15 — August 31 100% Common Bermuda (Hulled) 50% Italian Rye No. 2 September 1 — April 14 25% Unhulled Common Bermuda 25% Kentucky 31 Tall Fescue Rate shall be as specified in Part 3 depending on application method. 2.2 FERTILIZER A. Commercial Fertilizer: Commercial -grade, pelletized, uniform in composition, free flowing, and suitable for application with standard equipment. Fertilizer shall be of neutral character, consisting of fast- and slow -release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition: 1. Composition: a. Initial Application: Analysis ratio of 20-20-20; traces of sulfur, iron and zinc; at a rate specified in Part 3 per 1000 Sq. Ft. b. Second Application: Analysis ratio of 12-4-8 at a rate specified in Part 3 per 1000 Sq. Ft. c. Figures in analysis ratio represent percentage of nitrogen, phosphorus, and -. potash nutrients respectively as determined by methods of the Association of Official Agricultural Chemists. d. Fifty percent of the nitrogen required shall be in the form of nitrate nitrogen, with the remaining may be in the form of urea nitrogen. 2. Composition. Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a qualified soil -testing laboratory. B. The fertilizer shall comply with the applicable State fertilizer laws and shall be delivered in bags or other convenient containers, each fully labeled and bearing the name, trademark, and warranty of the producer. C. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be pelletized or granulated fertilizer, with the total amount of nutrients furnished and applied per 1000 square feet shall equal or exceed that specified for each nutrient. D. Fertilizer which has become caked or exposed to excess humidity or moisture will not s_ be acceptable. 2.3 WATER A. Water shall be fresh and free from injurious amounts of oil, acid, alkali, salts, or other materials harmful to the growth of the grass. Plant and/or service water may also be used as directed by the OWNER. 2.4 MULCHES 02910-4 August 2009 HYDROMULCH SEEDING 0318-042-01 KI A. General: Consisting of straw, wood -fiber, mulch nettings, wood chips, compost, or other approved suitable material, free from of Johnson grass and other noxious weed seeds. B. Straw Mulch: Provide air-dry, clean, mildew- and seed -free, salt hay or threshed straw of wheat, rye, oats, barley, Bermuda grass hay or other hay harvested before seed production. The straw mulch shall be kept dry and shall not be rotted or molded. A minimum of 50 percent by weight of the herbage comprising hay shall be in 10-inch length or longer. C. Fiber Mulch: Biodegradable, dyed -wood, cellulose -fiber mulch; nontoxic and free of plant -growth or germination inhibitors; with a maximum moisture content of 15 percent and a pH range of 4.5 to 6.5. D. Fiber mulch in paragraph above and nonasphaltic tackifier in first paragraph below are primarily used to protect hydroseeded areas from wind and water erosion during establishment. E. Nonasphaltic Tackifier: Colloidal tackifier recommended by fiber -mulch manufacturer for slurry application; nontoxic and free of plant -growth or germination inhibitors. F. Asphalt emulsion in paragraph below may be used as a tackifier in a hydroseeding slurry or to temporarily bond straw mulch in place. G. Asphalt Emulsion: ASTM D 977, Grade SS-1; nontoxic and free of plant -growth or germination inhibitors. 2.5 PESTICIDES A. General: Pesticide, registered and approved by EPA, acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted pesticides unless authorized in writing by authorities having jurisdiction. B. Pre -Emergent Herbicide (Selective and Non -Selective): Effective for controlling the germination or growth of weeds within planted areas at the soil level directly below the mulch layer. C. Post -Emergent Herbicide (Selective and Non -Selective): Effective for controlling weed growth that has already germinated. 2.6 EROSION -CONTROL MATERIALS A. Erosion -Control Blankets: Biodegradable wood excelsior, straw, or coconut -fiber mat enclosed in a photodegradable plastic mesh. Include manufacturer's recommended steel wire staples, 6 inches long. B. Erosion -Control Fiber Mesh: Biodegradable burlap or spun-coir mesh, a minimum of 0.92 Ib/sq. yd., with 50 to 65 percent open area. Include manufacturer's recommended steel wire staples, 6 inches long. 02910-5 August 2009 HYDROMULCH SEEDING 0318-042-01 C. Erosion -Control Mats: Cellular, non -biodegradable slope -stabilization mats designed - to isolate and contain small areas of soil over steeply sloped surface, of 3-inch nominal mat thickness. Include manufacturers recommended anchorage system for slope conditions. �- 2.7 HYDROMULCH A. Hydromulch Material: 1. Product and Manufacturer: Areas requiring grass establishment shall be Second Nature Hydroseeding Mulch as manufactured by Central Fiber Corporation, or approved equivalent. 2. Mulch shall be manufactured of natural fiber stock free of plastics and foreign materials. 3. Mulch shall have a green non -toxic dye, disperse rapidly in water to form homogeneous slurry and shall remain in suspension. It shall have a water holding capacity of not less than 1300 grams water per 100 gram fiber, 2.8 PLANTING SOIL AND AMENDMENTS A. Topsoil: Unless otherwise designated on the Drawings, comply with the topsoil requirements of Section 02001 "Materials." PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas to be planted for compliance with requirements and other conditions affecting performance. 1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within a planting area. 2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions. 3. Suspend soil spreading, grading, and tilling operations during periods of _ excessive soil moisture until the moisture content reaches acceptable levels to attain the required results. 4. Uniformly moisten excessively dry soil that is not workable and which is too dusty. " B. if contamination by foreign or deleterious material or liquid is present in soil within a planting area, remove the soil and contamination as directed by ENGINEER and replace with new planting soil. C. Examine areas and conditions, with Installer present, for compliance with requirements w of site conditions and any other conditions affecting performance of the Work. D. Examine seed and fertilizer before installation. Reject any seed or fertilizer that is wet, moisture damaged, or mold damaged. 02910-6 August 2009 HYDROMULCH SEEDING 0318-042-01 E. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings from damage caused by planting operations. 1. Protect adjacent and adjoining areas from Hydromulch seeding and hydromulching overspray. 2. Protect grade stakes set by others until directed to remove them. B. Install erosion -control measures to prevent erosion or displacement of soils and discharge of soil -bearing water runoff or airborne dust to adjacent properties and walkways. 3.3 TURF AREA PREPARATION A. Limit subgrade preparation to areas to be planted. B. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 4 inches. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property. C. Spread planting soil or topsoil to a depth of 4 to 6 inches, but not less than required to meet finish grades after light rolling and natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet. 1. Spread approximately 112 the thickness of planting soil over loosened subgrade. Mix thoroughly into top 2 inches of subgrade. Spread remainder of planting soil. D. Unchanged Subgrades: If Hydromulch is to be placed in areas unaltered or undisturbed by excavating, grading, or surface -soil stripping operations, prepare surface soil as follows: 1. Remove existing grass, vegetation, and turf. Do not mix into surface soil. _. 2. Loosen surface soil to a depth of at least 6-inches. Apply soil amendments and fertilizers according to planting soil mix proportions and mix thoroughly into top 4- inches of soil. Till soil to a homogeneous mixture of fine texture. 3. Remove stones larger than 1-inch in any dimension and sticks, roots, trash, and other extraneous matter. 4. Legally dispose of waste material, including grass, vegetation, and turf, off OWNER'S property. E. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2-inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can be planted in the immediate future. .• F. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil. Ir: G. Smooth areas that have become gullied; and loosen or refill areas that have become compacted since completion of grading to a depth of 6 inches. 02910-7 August 2009 HYDROMULCH SEEDING 0318-042-01 H. Before planting, obtain ENGINEER'S acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading. 3.4 FERTILIZING A. Initial Fertilizer Application: Minimum rate of 15 lb per 1000 Sq. Ft. with Hydromulch mixture. B. Second Fertilizer Application: 1. Minimum rate 8 per 1000 Sq. Ft. 2. Period: Applied to the establishment areas between 45 and 60 days after date of seeding. 3.5 HYDROMULCH APPLICATION A. Hydromulch Seeding: Mix specified seed, fertilizer, and fiber mulch in water, using equipment specifically designed for hydroseed application. Continue mixing until uniformly blended into homogeneous slurry suitable for hydraulic application. 1. Mix slurry with non -asphaltic or asphalt -emulsion tackifier for slopes 3:1 or steeper. 2. Apply slurry uniformly to all areas to be seeded in a one-step process. Apply slurry at a rate so that mulch component is deposited at not less than rate listed below, and seed component is deposited at not less than the specified seed - sowing rate. a. Grades 2:1 or less: 2.5 Ibs per 1000 Sq. Ft. b. Grades greater than 2:1: 3.0 Ibs per 1000 Sq. Ft. 3. Mulch: As recommended by manufacturer. B. Apply slurry uniformly to all areas to be seeded in a two-step process. Apply first slurry coat at a rate so that mulch component is deposited at not less than 1000-lb/acre dry weight, and seed component is deposited at not less than the specified seed -sowing rate. Apply slung cover coat of fiber mulch (hydromulching) at a rate to comply with the mulch component specified above. C. For areas to be established, apply water with a fine spray immediately (within 24 hours) after each area has been seeded and mulched. Saturate to 4 inches of soil. Water _ daily as often as necessary for 4 weeks to establish grass. 3.6 SEED PROTECTION A. Cover seeded slopes where grade is steeper than 3:1 with erosion fabric. Roll fabric onto slopes without stretching or pulling. Cover hydromulched areas as recommended to obtain establishment of grass. B. Lay fabric smoothly on surface, bury top end of each section in 6 inch deep excavated topsoil trench. Provide 12-inch overlap of adjacent rolls. Backfill trench and rake smooth, level with adjacent soil. C. Secure outside edges and overlaps at 36-inch intervals with stakes. D. Lightly dress slopes with topsoil to ensure close contact between fabric and soil. 02910-8 August 2009 HYDROMULCH SEEDING 0318-042-01 .. E. At sides of ditches, lay fabric laps in direction of water flow. Lap ends and edges minimum 6 inches. F. No heavy equipment shall be moved over planted area unless area is to be retitled and reseeded. 3.7 PREPARATION FOR EROSION -CONTROL MATERIALS A. Prepare area as specified in "Turf Area Preparation" Article. B. For erosion -control mats, install planting soil in two lifts, with second lift equal to thickness of erosion -control mats. Install erosion -control mat and fasten as recommended by material manufacturer. C. Fill cells of erosion -control mat with planting soil and compact before planting. D. For erosion -control blanket or mesh, install from top of slope, working downward, and as recommended by material manufacturer for site conditions. Fasten as recommended by material manufacturer. 3.8 Moisten prepared area before planting if surface is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil. 3.9 TURF RENOVATION A. Renovate existing turf. B. Renovate existing turf damaged by CONTRACTOR'S operations, such as storage of materials or equipment and movement of vehicles. 1. Reestablish turf where settlement or washouts occur or where minor regrading is required. 2. Install new planting soil as required. C. Remove sod and vegetation from diseased or unsatisfactory turf areas; do not bury in soil. D. Remove topsoil containing foreign materials such as oil drippings, fuel spills, stones, gravel, and other construction materials resulting from Contractor's operations, and replace with new planting soil. E. Mow, dethatch, core aerate, and rake existing turf. F. Remove weeds before seeding. Where weeds are extensive, apply selective herbicides as required. Do not use pre -emergence herbicides. G. Remove waste and foreign materials, including weeds, soil cores, grass, vegetation, and turf, and legally dispose of them off Owner's property. H. Till stripped, bare, and compacted areas thoroughly to a soil depth of 6-inches. 02910-9 August 2009 HYDROMULCH SEEDING 0318-042-01 I. Apply soil amendments and initial fertilizers required for establishing new turf and mix thoroughly into top 4-inches of existing soil. Install new planting soil to fill low spots and meet finish grades. J. Apply seed and protect with straw mulch or sod as required for new turf. K. Water newly planted areas and keep moist until new turf is established. 3.10 TURF MAINTENANCE REQUIREMENTS A. Maintain and establish grass by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth turf. Provide materials and installation the same as those used in the original installation. 1. Fill in as necessary soil subsidence that may occur because of settling or other processes. Replace materials and turf damaged or lost in areas of subsidence. 2. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch and anchor as required to prevent displacement. 3. Apply treatments as required to keep turf and soil free of pests and pathogens or disease. Use integrated pest management practices whenever possible to minimize the use of pesticides and reduce hazards. B. Watering: Install and maintain temporary piping, hoses, and turf -watering equipment to convey water from sources and to keep turf uniformly moist to a depth of 4 inches. 1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas. 2. Water seeded area daily, keeping area moist until seeds have spouted, then at a minimum rate of 1-inch every four days unless rainfall precipitation is adequate. 3. Provide temporary irrigation systems in areas where permanent systems are not installed. C. Mow turf as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 1/3 of grass height. Remove no more than 1/3 of grass -leaf growth in initial or subsequent mowing. Do not delay mowing until grass blades bend over and become' matted. Do not mow when grass is wet. Schedule initial and subsequent mowing to maintain a grass height or 1 to 2 inches. D. Turf Post Fertilization: Apply second application of fertilizer after initial mowing and when grass is dry. 1. Use fertilizer of the analysis and at the rate specified in "Fertilizers" Article to turf area after the first mowing. 2. Prior to the. second fertilizer application, CONTRACTOR shall reseed areas which show bare spots of 2 square feet or larger. 3.11 SATISFACTORY TURF A. Turf installations shall meet the following criteria as determined by ENGINEER: 02910-10 August 2009 HYDROMULCH SEEDING 0318-042-01 NWJ 1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 95 percent or 150 plants per square foot. B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until turf is satisfactory. C. Protect seeded areas with warning signs during maintenance period, if necessary. 3.12 PESTICIDE APPLICATION A. Apply pesticides and other chemical products and biological control agents in accordance with requirements of authorities having jurisdiction and manufacturer's written recommendations. Coordinate applications with OWNER'S operations and others in proximity to the Work. Notify OWNER before each application is performed. V 1 B. Post -Emergent Herbicides (Selective and Non -Selective): Apply only as necessary to treat already -germinated weeds and in accordance with manufacturer's written recommendations. 3.13 CLEANUP AND PROTECTION A. Promptly remove soil and debris created by turf work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas. B. Erect temporary fencing or barricades and warning signs as required protecting newly planted areas from traffic. Maintain fencing and barricades throughout initial maintenance period and remove after plantings are established. C. Remove non -degradable erosion -control measures after grass establishment period. END OF SECTION 02910-11 August 2009 HYDROMULCH SEEDING 0318-042-01 IL SECTION 03100 CONCRETE FORMWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section consists of furnishing and installing formwork for cast -in -place concrete, including all shoring, anchorage, and related accessories. Openings in the formwork shall be provided for other work, as well as all formwork stripping activities. B. The CONTRACTOR shall be responsible for the design, layout, and construction of the formwork for the Project. C. Related Sections: 1. Division 3 Section "Concrete Reinforcement" for furnishing and installing steel reinforcement. 1.3 REFERENCES A. Definitions 1. Abrupt Surface Irregularities: offsets and fins at formed joints. 2. Gradual Surface Irregularities: warping and planar variations, measured with a 60- inch long straight edge for plane surfaces and a template for curved surfaces. B. References: 1. American Concrete Institute(ACI): a. 117 — Specifications for Tolerances for Concrete Construction and Materials b. 318/3183R — Building Code Requirements for Structural Concrete and Commentary c. 347R — Guide to Formwork for Concrete 1.4 DESIGN REQUIREMENTS A. Design formwork in accordance with ACI 347R and ACI 318/318R to provide concrete finishes specified on the Drawings and in Division 3 Section 03310 "Miscellaneous Cast -In -Place Concrete." B. Limits of tolerances and surface irregularities for the completed concrete work shall be in accordance with ACI 117 and as shown on the Drawings and specified herein. C. When high range water reducer (super plasticizer) is used in the concrete mix, forms shall be designed for full hydrostatic pressure per ACI 347. D. Make joints watertight. E. Limit panel deflection to 1/360"' of each component span to achieve tolerances specified. F. Earth cuts for forms: 1. For grade beams cast monolithically with slabs, earth cuts may be used for forming unexposed side of the grade beam when approved by the ENGINEER. 03100-1 September 2009 CONCRETE FORMWORK 0318-042-01 2. Earth cuts may be used for sides of footings if sides of excavation are in stable - condition to prevent caving or sloughing. 3. Inside face of perimeter grade beams not monolithic with slab on grade cast against earth: increase plan beam width by 1-inch. 4. Both faces of grade beams not monolithic with slab on grade cast against earth: increase plan beam width by 3-inches. G. Slip Forming: Not permitted. 1.5 SUBMITTALS A. Informational Submittal. 1. Qualification Data: For qualification of designer of formwork. 1.6 QUALITY ASSURANCE A. Formwork Designer: Formwork, falsework, and shoring designer shall be an engineer licensed in the state where the Project is being constructed. _ PART 2 - PRODUCTS 2.1 FORM -FACING MATERIALS A. Smooth -Formed Finished Concrete: Form -facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints. 1. Exterior -grade plywood panels, hard plastic finished plywood, overlaid waterproof particle board, or steel in "new and undamaged" condition, of sufficient strength and surface smoothness to produced specified finish. 2. High density overlay plywood for concrete surfaces to be painted. B. Rough -Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit. C. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass -fiber -reinforced _ plastic, paper, or fiber tubes that will produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface Mass. Provide units with sufficient wall thickness to resist plastic concrete loads without detrimental deformation. D. Pan -Type Forms: Glass -fiber -reinforced plastic or formed steel, stiffened to resist plastic concrete loads without detrimental deformation. E. Void Forms: Biodegradable paper surface, treated for moisture resistance, structurally sufficient to support weight of plastic concrete and other superimposed loads. F. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum. G. Rustication Strips: Wood, metal, PVC, or rubber strips, kerfed for ease of form removal. H. Form -Release Agent: Commercially formulated form -release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. 1. Ready -to -use water based material formulated to reduce or eliminate surface imperfections, containing no mineral oil or organic solvents. 03100-2 September 2009 CONCRETE FORMWORK 4i 0318-042-01 bm 2. Environmentally safe, complying with regulations, and can be used in potable water facilities. 3. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following: a. Master Builders, Inc.; Rheofinish. b. Cresset Chemical Company; Crete -Lease 20-VOC. c. US Mix Products Company; US SPEC Slickote. I. Form Ties: Factory -fabricated, removable or snap -off metal or glass -fiber -reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal. 1. Furnish units that will leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface. 2. Furnish ties that, when removed, will leave holes no larger than 7/8-inch in diameter in concrete surface. 3. Wire ties will not be permitted. 4. Furnish ties with integral water -barrier plates to walls indicated to receive dampproofing or waterproofing. 5. Flat bar ties for panel forms; furnish plastic or rubber inserts with minimum 1-inch depth and sufficient dimensions to permit patching of tie hole. 6. Water stop ties for water -holding structures, basements, pipe galleries, and accessible spaces below finish grade, furnish one of the following: a. Integral steel water stop 0.103 inch thick and 0.625 in diameter tightly and continuously welded to tie. b. Neoprene water stop 3/16-inch thick and 15/16-inch diameter whose center hole is 1/2-diameter of tie, or molded plastic water stop of comparable size. c. Orient water stop perpendicular to tie and symmetrical about center of tie. d. Design ties to prevent rotation or disturbance of center portion of tie during removal of ends and to prevent water leaking along tie. J. Nails, Spikes, Lag Bolts, Through Bolts, and Anchorages: Sized as required, of sufficient strength and character to maintain formwork in place while placing concrete. PART 3 - EXECUTION 3.1 FORMWORK A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads. B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117. C. Form Tolerances: Limit concrete surface irregularities, designated by ACI 347R, as abrupt or gradual, for the following finishes as follows: 1. Provide formwork for the finishes as specified in the Finish Schedule of Division 3 Section 03300 "Cast -In -Place Concrete." If concrete finish is not specified provide Class A as the default class for surfaces permanently exposed to view (smooth form finish) and Class C as the default class for surfaces that will be permanently concealed (rough form finish). 2. Straight Vertical or Horizontal Wall Surface: Flat planes within tolerance specified. 03100-3 September 2009 CONCRETE FORMWORK 0318-042-01 a. Class A for surfaces prominently exposed to view, where appearance is important. 1) Gradual or abrupt irregularities of 1/8-inch. b. Class B for coarse -textured surfaces to receive plaster, stucco, or wainscoting. 1) Gradual or abrupt irregularities of 1/4-inch. c. Class C for permanently exposed surfaces without additional finish. 1) Gradual or abrupt irregularities of 1/2-inch. T d. Class D for surfaces, usually permanently concealed, where roughness is not objectionable. 1) Gradual or abrupt irregularities of 1-inch. 3. Thickness: Maximum'/. -inch minus or'/z-inch plus from dimension shown. D. Construct forms tight enough to prevent loss of concrete mortar. E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical. 1. Install keyways, reglets, recesses, and the like, for easy removal. 2. Do not use rust -stained steel form facing material. F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike -off templates or compacting -type screeds. G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations. H. Chamfer exterior comers and edges of permanently exposed concrete. 1. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items. J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete. K. Install void forms in accordance with manufacturer's instructions to provide tight joints, _. anchoring to prevent displacement or floatation during concrete placement. Protect forms from moisture or crushing prior to concrete placement. L. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment. M. Coat contact surfaces of forms with form -release agent, according to manufacturer's written instructions, before placing reinforcement. ` 3.2 EMBEDDED ITEMS A. Place and secure anchorage devices, wall sleeves, sluice and slide gate frames, and other embedded items required for adjoining work that is attached to or supported by cast -in -place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. 03100-4 September 2009 CONCRETE FORMWORK 0318-042-01 1. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC's "Code of Standard Practice for Steel Buildings and Bridges." 2. Install wall sleeves, sluice and slide gate frames, and other embedded items in accordance with manufacturer's instructions_ 3. Install reglets to receive waterproofing and to receive through -wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions. 4. Install dovetail anchor slots in concrete structures as indicated. 3.3 WATER STOPS A. Provide and install water stops as specified in Division 3 Section 03300 "Cast -In -Place Concrete." 3.4 REMOVING AND REUSING FORMS A. Non -supporting Formwork: Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50OF for 24 hours after placing concrete. If temperatures are below 50°F, increase time for removal by a minimum of 12 hours. Remove formwork only if concrete is hard enough to not be damaged by form -removal operations and curing and protection operations are maintained. B. Supporting Formwork: In accordance with ACI 347R, leave formwork for beam soffits, joists, slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 75 percent of its 28-day design compressive -� strength as determined by test cylinders. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores- C. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form -facing material will not be acceptable for exposed surfaces. For metal forms, straighten, remove dents and clean to return to original condition. Apply new form -release agent. D. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by ENGINEER. 3.5 SHORES AND RESHORES _ A. Comply with ACI 318/318R and ACI 301 for design, installation, and removal of shoring and reshoring. 1. Do not remove shoring or reshodng until measurement of slab tolerances is complete. B. Plan sequence of removal of shores and reshore to avoid damage to concrete. Locate and provide adequate reshoring to support construction without excessive stress or deflection. END OF SECTION 03100-5 September 2009 CONCRETE FORMWORK 0318-042-01 . - SECTION 03200 CONCRETE REINFORCEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section consists of furnishing and installing reinforcement steel bars, wire fabric, and accessories for cast - in place concrete. B. Related Sections: 1. Division 3 Section 03100 "Concrete Formwork" for furnishing and installing formwork. 2. Division 3 Section 03300 "Cast -In -Place Concrete" for concrete mixing, placement, finishing, and curing. 1.3 REFERENCES A. American Concrete Institute (ACI): 1. 301— Specifications for Structural Concrete 2. 318/318R — Building Code Requirements for Structural Concrete 3. SP-66 — Detailing Manual B. American Welding Society (AWS): D1.4 Structural Welding Code — Reinforcing Steel C. ASTM International (ASTM): 1. A82 — Standard Specification for Steel Wire, Plain, for Concrete Reinforcement 2. A184 — Standard Specification for fabricated Deformed Steel Bar Mats for Concrete Reinforcement 3. A185 - Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete 4. A496 — Standard Specification for Steel Wire, Deformed, for Concrete Reinforcement 5. A497 — Standard Specification for Steel Welded Wire Reinforcement, Deformed, for Concrete 6. A615 — Standard specification for Deformed and Plain Billet -Steel Bars for Concrete Reinforcement 7. A706 — Standard Specification for Low -Alloy Steel Deformed and Plain Bars for Concrete Reinforcement 8. A775 — Standard Specification for Epoxy -Coated Steel Reinforcing Bars D. Concrete Reinforcing Steel Institute (CRSI): 1. Recommended Practice for Placing Reinforcing Bars 2. Manual of Standard Practice 3. Recommended Practice for Placing Bar Supports, Specifications and Nomenclature 1.4 SUBMITTALS A. Shop Drawings, Steel Reinforcement: .. 1. Shop drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement. 2. Prepare in accordance with CRSI Manual of Standard Practice and ACI SP-66 Detailing Manual. 3. Welded, metallic sleeve splice, and mechanical threaded connection. 03200-1 September 2009 CONCRETE REINFORCEMENT 0318-042-01 B. Information Submittals: 1. Lab test reports for reinforcing steel. 2. Manufacturer's instructions for mechanical threaded connections. 3. Welding certificates. 4. Test results of field-testing. 1.5 QUALITY ASSURANCE A. Perform work in accordance with referenced standards. B. Welding Qualifications: Qualify procedures and personnel according to D1.4, "Structural Welding Code - _ Reinforcing Steel." 1.6 DELIVERY, STORAGE, AND HANDLING A. Unload, store, and handle bars in accordance with CRSI "Recommended Practice for Placing Reinforce Bars." B. Store steel above ground on platforms, skids, blocks, or other supports. Protect steel, as far as possible, from mechanical injury and surface deterioration and rusting caused by exposure to weather. C. Marking: Clearly marls all bars with waterproof tags showing the number of bars, size, length, and yield strength. Mario steel with same designations as the member in which it occurs. PART 2-PRODUCTS 2.1 STEEL REINFORCEMENT A. Reinforcing Bars: ASTM A 615, Grade 60, deformed. B. Low -Alloy -Steel Reinforcing Bars: ASTM A 706, Grade 60, deformed, for reinforcing to be welded. No. 3 bars may be Grade 40. C. Epoxy -Coated Reinforcing Bars: ASTM A 615, Grade 60, deformed bars, ASTM A 775, epoxy coated, with less than 2 percent damaged coating in each 12-inch bar length. D. Steel Bar Mats: ASTM A 184, fabricated from ASTM A 615, Grade 60, deformed bars, assembled with - clips. E. Plain -Steel Wire: ASTM A 82, as drawn. F. Deformed -Steel Wire: ASTM A 496. G. Plain -Steel Welded Wire Reinforcement: ASTM A 185, plain, fabricated from as -drawn steel wire into flat sheets. H. Deformed -Steel Welded Wire Reinforcement: ASTM A 497, flat sheet. 2.2 REINFORCEMENT ACCESSORIES A. Tie Wire: Black, soft -annealed 16-gauge wire, or nylon-, epoxy-, or plastic -coated wire. B. Joint Dowel Bars: ASTM A 615, Grade 60, plain -steel bars, cut bars true to length with ends square and free of burrs. C. Epoxy -Coated Joint Dowel Bars: ASTM A 615, Grade 60, plain -steel bars, ASTM A 775 epoxy coated. 03200-2 September 2009 CONCRETE REINFORCEMENT 0318-042-01 D. Epoxy Repair Coating: Liquid, two-part, epoxy repair coating; compatible with epoxy coating on reinforcement and complying with ASTM A 775. E. Bar Supports and Spacers: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports and spacers from steel wire, cementitious fiber -reinforced, plastic, or precast concrete according to CRSI "Manual of Standard Practice," of greater compressive strength than concrete and as follows: + 1. For concrete surfaces exposed to view after form removal; small rectangular concrete blocks made of same color and strength as concrete placed around them or all plastic bar supports and side form spacers. 2. For epoxy -coated reinforcement, use epoxy -coated or other dielectric -polymer -coated wire bar supports. 3. Plastic Bar Supports as manufactured by Aztec Concrete Accessories, Bloomington, CA., or equal. F. Metal Sleeve Splice: Furnish with cast filler metal, capable of developing in tension or compression 125 percent of minimum tensile strength of bar. 1. Manufacture and Product: Erica Products, Inc., Cleveland, OH; Cadweld T-Series. G. Mechanical Threaded Connections: Furnish metal coupling sleeve with internal threads engaging threaded ends of bars developing in tension or compression 125 percent of minimum tensile strength of bar. 1. Manufacturers and Products: a. Erico Products, Inc., Cleveland, OH; Lenton Reinforcing Steel Couplings. b. Richmond Screw Anchor Co., Fort Worth, TX; Richmond DB-SAE Dowel Bar Splicers. H. Epoxy Grout: Epoxy grout shall be high strength, rigid epoxy adhesive manufactured for anchoring dowels into hardened concrete. The epoxy grout shall be capable of developing the full strength of the reinforcing bar. PART 3 - EXECUTION 3.1 PREPARATION A. Notify ENGINEER at lest 48-hours in advance when reinforcing is ready for inspection and allow sufficient time for inspection prior to placing concrete. B. Coat wire projecting from precast concrete bar supports with dielectric material, epoxy, or plastic. 3.2 REINFORCING BAR INSTALLATION A. General: Comply with CRSI "Manual of Standard Practice" for placing reinforcement. 1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete. 2. Where concrete surfaces are exposed to weather or liquid in hydraulic structures, provide plastic accessories only. Use of galvanized or plastic -tipped metal is not permitted in these locations. B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete. C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars. • 1. Bundle or space bars, instead of field bending, where construction access through reinforcing is necessary. 03200-3 September 2009 CONCRETE REINFORCEMENT 0318-042-01 2. Surfaces in contact with liquid shall have a minimum 2-inch cover, if not specifically indicated on the Drawings. 3. Spacing and Positioning: conform to ACI 318/318R. 4. Weld reinforcing bars according to AWS D1.4, where indicated. D. Tying Reinforcing Bars: Set wire ties with ends directed into concrete, not toward exposed concrete surfaces. E. Install welded wire reinforcement in longest. practicable lengths on bar supports spaced to minimize sagging. Lap edges and ends of adjoining sheets at least one mesh spacing. Offset laps of adjoining sheet widths to prevent continuous laps in either direction. Lace overlaps with wire. .4 F. Epoxy -Coated Reinforcement: Repair cut and damaged epoxy coatings with epoxy repair coating according to ASTM D 3963. Use epoxy -coated steel wire ties to fasten epoxy -coated steel reinforcement. G. Reinforcement around Openings: On each side and above and below pipe, wall sleeve, manhole, hatch, sluice or slide gate frame, and other openings, place an equivalent area of steel bars to replace steel bars cut for opening. Extend reinforcing a standard lap beyond opening at each end. H. Splices: 1. In accordance with ACI 318/318R and where shown on the Drawings. Do not place at other locations without approval of ENGINEER. 2. Use lap splices, tying securely to prevent displacement during concrete placement. 3. Welded Splices: accomplish full penetration grove welds and develop a minimum 125 percent of yield strength of bar. 4. Stagger splices in adjacent bars. Mechanical Splices and Connections: 1. Use only where shown on the Drawings and in other areas as approved by ENGINEER. 2. Install threaded rods as recommended by manufacturer with threads totally engaged into coupling sleeve. 3. For metal sleeve splice follow manufacturer's instructions. 4. Maintain edge distance and minimum concrete cover. J. Welding Requirements: 1. Only ASTM A706 bars may be welded. 2. Do not perform welding until welder qualifications are approved. K. Straightening and Rebending: Field bending of reinforcing bars in field is not permitted. Unless permitted by ENGINEER, do not cut reinforcing bars in field. — 3.3 TOLERANCES A. Placement Tolerances: Place reinforcement within the following tolerances. 03200-4 September 2009 CONCRETE REINFORCEMENT 0318-042-01 Tolerance Placement (inches) Concrete cover to formed surface ± 1/4 .r Minimum spacing between bars ± 1/4 Top bars in slabs and beams to 8-inch depth ± 1/4 r, Top bars in slabs and beams between 8 and 24-inch depth ± 1/2 Top bars in slabs and beams greater than 24-inch depth ± 1 Crosswise members spaced evenly within ± 2 `00& Lengthwise of members ± 2 B. Concrete Cover. Except as otherwise specified or shown on the Drawings, provide clear cover measured from reinforcement to the face of the concrete listed below. Tolerance Concrete Surface (inches) Drilled Piers (to vertical steel) 3 Slabs and Joists { Top and bottom bars for dry conditions 3/4 Top and bottom bars for wet conditions, formed concrete surfaces exposed to earth, water or weather, and over or in contact with sewage or wastewater. No. 5 bars and smaller 1-1/2 No. 6 through No. 18 bars 2 Beams and Columns r For dry conditions: Stirrups, spirals, and ties 1-1/2 Principal reinforcement 2 Exposed to earth, water, sewage, or weather: Stirrups and ties 2 Principal reinforcement 2-1/2 Walls For dry conditions: 1-1/2 Formed concrete surfaces exposed to earth, water, sewage, weather, or in 2 contact with ground: r Base Slabs At formed surfaces: 2 At unformed surfaces and bottoms in contact earth: 3 Over top of piles: 2 3.4 FIELD QUALITY CONTROL A. Testing Agency: 1. Owner will engage a qualified testing agency to perform tests and inspections on steel welds in -• accordance with AWS D1.4. 2. Owner will engage a qualified testing agency to inspect each mechanical splice and verify each component is installed in accordance with manufacturer's instructions. END OF SECTION 03200-5 September 2009 CONCRETE REINFORCEMENT r-° 0318-042-01 a" SECTION 03310 MISCELLANEOUS CAST -IN -PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section specifies cast -in -place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes, for non -critical applications of concrete and for projects using small quantities of concrete. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. B. Design Mixtures: For each concrete mixture. 1.4 QUALITY ASSURANCE A. Manufacturer Qualifications: A firm experienced in manufacturing ready -mixed concrete products and that complies with ASTM C 94 requirements for production facilities and equipment. B. Comply with ACI 301, "Specification for Structural Concrete." C. Comply with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials." PART 2-PRODUCTS 2.1 FORMWORK A. Furnish formwork and formwork accessories according to ACI 301. 2.2 STEEL REINFORCEMENT A. Reinforcing Bars: ASTM A 615, Grade 60, deformed. B. Plain -Steel Wire: ASTM A 82, as drawn. C. Plain -Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as -drawn steel wire into flat sheets. D. Deformed -Steel Welded Wire Reinforcement: ASTM A 497, flat sheet. 2.3 CONCRETE MATERIALS A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source throughout Project: 1. Portland Cement: ASTM C 150, Type 11 or Type 1/11. Supplement with the following: a. Fly Ash: ASTM C 618, Class C. Fly ash may be used for replacement of up to 15 percent of cement content by weight except for paving concrete. B. Normal -Weight Aggregate: ASTM C 33, graded, 1 -inch nominal maximum aggregate size. 03310-1 September 2009 MISCELLANEOUS CAST -IN -PLACE CONCRETE 0318-042-01 C. Water: ASTM C 94; potable. 2.4 ADMIXTURES A. Air -Entraining Admixture: ASTM C 260. B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride. 1. Water -Reducing Admixture: ASTM C 494, Type A. 2. Water -Reducing and Retarding Admixture: ASTM C 494, Type D. 2.5 RELATED MATERIALS A. Vapor Retarder: Multi -ply reinforced polyethylene sheet, ASTM E 1745, Class C, or polyethylene sheet, ASTM D 4397, not less than 10 mils thick. B. Joint -Filler Strips: ASTM D 1751, asphalt -saturated cellulose fiber, or ASTM D 1752, cork or self - expanding cork. 2.6 CURING MATERIALS A. Evaporation Retarder: Waterbome, monomolecular film forming; manufactured for application to fresh concrete. B. Absorptive Cover. AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 ozJsq. yd. when dry. C. Moisture -Retaining Cover: ASTM C 171, polyethylene film or white burlap -polyethylene sheet. D. Water. Potable. E. Clear, Waterbome, Membrane -Forming Curing Compound: ASTM C 309, Type 1, Class B. 2.7 CONCRETE MIXTURES A. Comply with ACI 301 requirements for concrete mixtures. B. Class "A": Provide Class "A" concrete with the following mix design limitations where Class "A" concrete is specified to result in concrete placed in the field of minimum compressive strength of 4000 psi at 28 days based on test cylinders which are taken during concrete placement. Unit Minimum Compressive Strength (7 day) Minimum Compressive Strength (28 day) Coarse Aggregate Fine Aggregate Water/Cementious Ratio (max.) Air Entrainment Superplasticizer Type F or G only Slump with Superplasticizer Slump without Superplasticizer Slump without Superplasticizer (for Piers) Minimum Cementious Content Measurement 3000 psi 4000 psi ASTM C33, No. 57 or 67 ASTM C33 0.44 by weight 5-7 percent As recommended by manufacturer 7 inches to 9 inches 3 inches ± 1 inch 6 inches ± 1 inch 564 pounds per cubic yard 03310-2 MISCELLANEOUS CAST -IN -PLACE CONCRETE September 2009 0318-042-01 C. Class "B": Provide concrete with the following mix design limitations where Class "B" concrete is specified to result in concrete placed in the field of minimum compressive strength of 3000 psi at 28 days based on test cylinders which are taken during concrete placement. Unit Measurement Minimum Compressive Strength (7 day) 2250 psi Minimum Compressive Strength (28 day) 3000 psi Coarse Aggregate ASTM C33, No. 467 Fine Aggregate ASTM C33 Water/Cementious Ratio (max.) 0.50 by weight Air Entrainment 4-6 percent Slump with Superplasticizer 7 inches to 9 inches Slump without Superplasticizer 3 inches ± 1 inch Minimum Cementious Content 470 pounds per cubic yard D. Class "C": Provide concrete with the following mix design limitations where Class 'C' concrete is specified to result in concrete placed in the field of minimum compressive strength of 2000 psi at 28 days based on test cylinders which are taken during concrete placement. Unit Measurement Minimum Compressive Strength (7 day) 1500 psi Minimum Compressive Strength (28 day) 2000 psi aw Coarse Aggregate ASTM C33, No. 467 Fine Aggregate ASTM C33 Water/Cemenbous Ratio (maximum) 0.62 by weight Air Entrainment None .. Slump - Plus or minus 1 inch (50 mm) 4 inches Minimum Cement Content 376 pounds per cubic yard '" 2.8 CONCRETE MIXING A. Ready -Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94, and furnish batch ticket information. 1. When air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes. PART 3 - EXECUTION 3.1 FORMWORK A. Design, construct, erect, brace, and maintain formwork according to ACI 301. 3.2 VAPOR RETARDERS A. When shown on the Drawings; Install, protect, and repair vapor retarder according to ASTM E 1643; place sheets in position with longest dimension parallel with direction of pour. 1. Lap joints 6 inches and seal with manufacturer's recommended adhesive or joint tape. r 3.3 STEEL REINFORCEMENT A. Comply with CRSI's_"Manual of Standard Practice" for fabricating, placing, and supporting reinforcement. 1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete. .. 03310-3 September 2009 MISCELLANEOUS CAST -IN -PLACE CONCRETE ;. 0318-042-01 3.4 JOINTS A. General: Construct joints true to line with faces perpendicular to surface plane of concrete. B. Contraction Joints in Slabs -on -Grade: Form weakened -plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of concrete thickness. C. Isolation Joints: Install joint -filler strips at junctions with slabs -on -grade and vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated. 1. Extend joint fillers full width and depth of joint, terminating within %cinch of finished concrete surface, unless otherwise indicated. Seal joint with concrete sealer. 3.5 CONCRETE PLACEMENT A. Comply with ACI 301 for measuring, batching, mixing, transporting, and placing concrete. B. Do not add water to concrete during delivery, at Project site, or during placement. C. Consolidate concrete with mechanical vibrating equipment. 3.6 FINISHING FORMED SURFACES A. Rough -Formed Finish: As -cast concrete texture imparted by form -facing material with be holes and defective areas repaired and patched. Remove fins and other projections exceeding 1/4 inch. 1. Apply to concrete surfaces not exposed to view. B. Smooth -Formed Finish: As -cast concrete texture imparted by form -facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defective areas. Remove fins and other projections exceeding 1/8 inch. 1. Apply to concrete surfaces exposed to view, to receive a rubbed finish, or to be covered with a — coating or covering material applied directly to concrete. C. Rubbed Finish: Apply the following rubbed finish, defined in ACI 301, to smooth -formed finished as -cast concrete where indicated: 1. Smooth -rubbed finish. 2. Grout -cleaned finish. D. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces, unless otherwise indicated. 3.7 FINISHING UNFORMED SURFACES A. General: Comply with ACI 302.1 R for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces. B. Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or darbies to form a uniform and open -textured surface plane before excess moisture or bleedwater appears on surface. 1. Do not further disturb surfaces before starting finishing operations. C. Float Finish: Apply float finish to surfaces indicated, to surfaces to receive trowel finish, and to bottoms of y` channels, box culverts, channel linings, and related construction. D. Trowel Finish: Apply a hard trowel finish to surfaces indicated and to floor and slab surfaces exposed to view, or to receive a floor hardener, or to be covered with resilient flooring, carpet, ceramic or quart' file set over a cleavage membrane, paint, or another thin film -finish coating system. 03310-4 September 2009 MISCELLANEOUS CAST -IN -PLACE CONCRETE %A 0318-042-01 E. Nonslip Broom Finish: Apply a nonslip broom finish to surfaces indicated and to exterior concrete platforms, steps, and ramps. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber -bristle broom perpendicular to main traffic route. 3.8 CONCRETE PROTECTING AND CURING A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold -weather protection and with ACI 301 for hot -weather protection during curing. B. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturers written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing. C. Begin curing after finishing concrete but not before free water has disappeared from concrete surface. D. Curing Methods: Cure formed and unformed concrete for at least seven days by one or a combination of the following methods: 1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials: a. Water. b. Continuous water -fog spray. c. Absorptive cover, water saturated and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers. 2. Moisture -Retaining -Cover Curing: Cover concrete surfaces with moisture -retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape. 3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period. 4. Curing and Sealing Compound: Apply uniformly to floors and slabs indicated in a continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Repeat process 24 hours later and apply a second coat. Maintain continuity of coating and repair damage during curing period. 3.9 FIELD QUALITY CONTROL A. Testing Agency: Engage a qualified independent testing and inspecting agency to sample materials, perform tests, and submit test reports during concrete placement according to requirements specified in 4- this Article. B. Tests: Perform according to ACI 301. "' 3.10 REPAIRS A. Remove and replace concrete that does not comply with requirements in this Section. 00 END OF SECTION 03310-5 September 2009 MISCELLANEOUS CAST -IN -PLACE CONCRETE a- r. 0318-042-01 PART 1 - GENERAL SECTION 03600 GROUT, NON -SHRINK 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section. 1.2 SUMMARY A. Section provides requirements for furnishing and placing non-metallic, non -shrink .. cementitious and epoxy type grouts for leveling column base plates, steel beams bearing on concrete, machinery and equipment, anchoring handrail posts into sleeves embedded into concrete, concrete repairs, and related work. B. Section provides requirements for cement -fine aggregate topping for concrete basins. C. Related Sections: 1.3 REFERENCES A. Definition: 1. Non -Shrink Grout: High -strength mortar or grout, which does not shrink in the plastic state, is dimensionally stable in the hardened state, and bonds permanently to a clean metal base plate, anchorage, concrete substrate, and other work. .. B. References: 1. American Concrete institute (ACI): a. 503.2 - Specification for Bonding Plastic Concrete to Hardened Concrete with a Multi -Component Epoxy Adhesive. 2. ASTM Intemational (ASTM): a. C109 - Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm] Cube Specimens) b. C150 - Specification for Portland Cement c. C157 - Test Method for Length Change of Hardened Hydraulic -Cement Mortar and Concrete d. C579 - Test Methods for Compressive Strength of Chemical -Resistant Mortars, Grouts, Monolithic Surfacing and Polymer Concretes. e. C827 - Test Method for Change in Height at Early Ages of Cylindrical Specimens from Cementitious Mixtures f. C881 - Specification for Epoxy -Resin -Base Bonding Systems for Concrete g. C1090 - Test method for Measuring Changes in Height of Cylindrical •- Specimens from Hydraulic -Cement Grout h. C1107 - Specification for Packaged Dry, Hydraulic -Cement Grout (Nonshrink) 3. Corps of Engineers, (CE): a. CRD-C620 - Standard Method of Sampling Fresh Grout b. CRD-C621 - Specification for Non -Shrink Grout 1.4 SUBMIso TTALS A. Action Submittals: 1. Product Data: Provide manufacturer's product data and installation instructions. 03600-1 September 2009 GROUT, NON -SHRINK W 0318-042-01 2. Proposed method for keeping existing concrete surfaces wet prior to placing grout. 3. Forming method for fluid grout applications. 4. Curing method for grout. B. Informational Submittals: 1. Manufacturer's Instructions. 2. Manufacturer's Training Schedule. 3. Material Certification: provide certificates of compliance or laboratory test reports, which indicate the following: a. Materials used are free from metallic components or corrosion -producing elements. b. Materials meet specified shrinkage and compressive strength requirements. 4. Manufacture's Certificate of Installation. 5. Statement of Qualifications: Non -shrink grout manufacturer's representative. - 6. Test Reports: a. Report for 24-hour evaluation of non -shrink grout. b. Field test reports and laboratory test results for field -drawn samples. 1.5 QUALIFICATIONS A. Non -Shrink Grout Manufacturer's Representative: Authorized and trained - representative of grout manufacturer. Minimum one-year experience, which has resulted in successful installation of grouts similar to those proposed for Project. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in unopened containers bearing intact manufacturer's labels. Store materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp. B. Store aggregates where grading and other required characteristics can be maintained and contamination avoided. PART 2 - PRODUCTS 2.1 MANUFACTURERS: A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the manufacturers listed in the following paragrahs. 2.2 MATERIALS A. Cementitious Grout: Provide non -shrink, non-metallic, non -corrosive cement -based grout conforming to the following requirements: - 1. Prepackaged natural aggregate grout requiring only the addition of water. 2. Applicable Standards: ASTM C1107 and CE CRD-C621. 3. Grout: ASTM 1107, Grade A, B, or C, as appropriate for the conditions.. 4. Height Change at 28 days: ASTM C-1090, 0.1 % maximum. 5. Compressive Strength, ASTM C109 in accordance with the compressive strengths listed in the Non -Shrink Grout Schedule for the application: 6. Initial Setting Time, After Addition of Water. Approximately one hour at 70°F. 7. Grout shall not bleed at maximum allowed water. 03600-2 September 2009 GROUT, NON -SHRINK 0318-042-01 ' 8. Available Manufacturers: a. Chemrex, Inc., Shakopee, MN b. Dayton Superior Corp., Miamisburg, OH -* c. Euclid Chemical Company d. Five Star Products, Inc., Fairfield, CT e. L&M Construction Chemicals, Omaha, NE — f. Master Builders, Inc. g. Sika Corporation B. Epoxy Grout: Provide non -shrink, non-metallic, non -corrosive epoxy grout conforming �to the following requirements: 1. Applicable Standards: ASTM C881 and ACI 503.2. a. Type, Grade, and Class determine by application. .2. Grout shall be manufactured for use in load bearing applications, bonding fresh concrete to hardened concrete. 3. Shrinkage at 28 days: None (0.00 shrinkage) when tested in accordance with ... ASTM C827, modified procedure, with a minimum effective bearing area (EBA) of 95 percent coverage of the tested base plate. 4. Compressive Strength, Minimum: 10,000 psi at seven days, when tested in accordance with ASTM C579. 5. Initial Setting Time, After Addition of Water: Approximately one hour at 70°F. C. Epoxy Adhesive: ASTM C881, Type V, epoxy -based bonding agent. D. Portland Cement: ASTM C150. E. Pea Gravel: Conforming to ASTM C33, Aggregate Size No. 8, coarse aggregate graded with 100 percent passing a 3/8-inch sieve and 90 percent retained on a No. 4 sieve. F. Water: Clean, potable, free of impurities detrimental to grout. G. Water -based, high solids content, non -yellowing curing compound: ASTM C 309, Type 1, Class B, and ASTM C 1315, Type 1, Class A. 1. Moisture Loss: 0.40 kg/square meter 72 hours. 2. Capable of moisture retention at manufacturer's specified application rate. 3. Available Products: a. Chemrex, Inc., Shakopee, MN; Masterkure. b. Dayton Superior Corp., Miamisburg, OH; Safe Cure and Seal 30%. c. Euclid Chemical Co., Cleveland, OH; Super Diamond Clear VOX. d. L&M Construction Chemicals, Omaha, NE; L&M Cure R-2 e. WR Meadows, Inc., Hampshire, IL; VOCOMP-30. f. Vexcon Chemical, Inc., Philadelphia, PA; Starseal 1315. 2.3 MIXES A. Cementitious Grout Mixes: 1. Mix cementitious grout in a mechanical mixer for the specified required time in accordance with the grout manufactures instructions. 2. Use required quantity of water necessary to produce a grout mixture having the desired flow properties; fluid, flowable, or plastic. .. 3. Select the desired properties for the application as indicated in the Non -Shrink Grout Schedule. 4W 03600-3 September 2009 GROUT, NON -SHRINK 0318-042-01 4. For areas over 4-inches in depth and where coarse aggregate will not obstruct passage of grout, the grout may be extended by adding clean pea gravel, if allowed and as recommended by the grout manufacturer. Comply with the grout manufacturer's recommendations for the maximum amount of per gravel to be added. B. Epoxy Grout Mixers: Mix in accordance with ACI 503.2 and grout manufacturer's instructions. ~ C. Non -Structural Concrete Topping: 1. Design for 3,000 psi at 28 days using pea gravel, 5-inch maximum slump, 0.50 maximum water-cementitious material ratio, and minimum cementitious material content of 470 pounds per cubic yard. 2. For use in adjusting final bottom elevation in clarifiers, thickeners, and related treatment units after the equipment has been installed. " PART 3 - EXECUTION 3.1 PREPARATION A. Remove all defective concrete, laitance, dirt, oil, grease, and other foreign matter from concrete surfaces by bush -hammer, chipping or other means, until a sound, clean concrete surface is achieved. B. Lightly roughen the concrete, but not enough to interfere with the proper placement of grout. Cover concrete areas with protective waterproof covering until ready to receive grout. C. Remove foreign matter from steel surfaces to be in contact with grout. Clean contact steel surfaces as necessary by wire brushing and wiping dust clean. D. Align, level, and maintain final positioning of all components to be grouted. Coat shims with a thin film of grease or wax to facilitate removal. Provide relief holes to avoid a.. trapping air beneath machinery and equipment base plates and other large base plates. E. Saturate all concrete surfaces with clean water for the period of time specked by manufacturer. Remove excess water, leaving none standing. Immediately before starting grouting operations, inspect surfaces to be grouted, removing any foreign matter. 3.2 FORMWORK A. Construct leak proof forms around objects to be grouted, anchoring and shoring to ~ withstand grout pressures. Forms to be constructed high enough to provide a "head" of grout where required forcing grout into difficult locations. B. Provide enough clearance between formwork and area to be grouted permitting proper placement of grout. 3.3 MIXING A. Mixing of grout shall be in accordance with the manufacturer's instructions. Mix using proper mechanical mixers. 03600-4 September 2009 GROUT, NON -SHRINK 0318-042-01 B. Mix grout as close to the work area as possible, transport the mixture quickly and in a manner that does not permit segregation of materials. C. After the grout has been mixed, do not add more water for any reason. 3.4 PLACING aw A. Place grout in accordance with manufacturer's instructions and recommendations. Place grout quickly and continuously by the most practical means possible; pouring, pumping or under gravity pressure. Place grout on one side only until grout rises at least one inch above the plate on opposite side. B. Follow established concrete procedures and grout manufacturer's instructions for precautions for hot and cold weather concreting. C. Final installation shall be a thoroughly compacted and free from air pockets. To facilitate placement, a chain or metal strap may be pulled back and forth under the base plates, forcing grout to flow under the entire area. D. Do not vibrate the placed grout mixture or allow it to be placed if the area is being vibrated by nearby equipment. E. Allow adequate depth between bottom of base plate and top of concrete base to assure the void can be completely filled with grout. F. Neatly trowel edges of grout base, tapered at an angle of 60 degrees when measured from horizontal, or as indicated. Provide dry -pack cementitious grout where additional grout is required for shoulders. G. Do not remove leveling shims for at least 48 hours after grout has been placed. After shim removal, fill voids with grout, packing using a suitable tool. H. Fill the angular space between handrail posts and sleeves with grout; bevel grout at junction with post preventing water to flow away from post. 1. Do not use grout, which has begun to set, or if more than one hour has elapsed after initial mixing. J. Where necessary to achieve bonding, an epoxy adhesive may be applied to clean, dry substrate surfaces in accordance with applicable requirements of ACI 503.2. �+ 3.5 GROUT TOPPING FOR CONCRETE BASINS A. Ensure all adjustments have been made to equipment prior to placement of grout topping. B. Prior to placement, perform the following operations: 1. Remove all laitance, debris, and foreign material from the base slab. 2. Us a metal screed or the equipment to check surface elevation ensuring the minimum thickness of grout can be obtained. 3. If there is not sufficient room for grout placement, remove high spots or adjust equipment, or both, to provide required clearance. M 4. Thoroughly wet base slab 24-hours prior to start of concrete topping placement. Keep surface damp. 5. Brush in neat cement grout immediately before placement of grout topping. C. When recommended by equipment manufacturer, use the basin equipment to screed grout on the basin floor. A representative of the equipment manufacturer is to be 03600-5 September 2009 GROUT, NON -SHRINK 0318-042-01 present during the screeding operation, unless otherwise approved by ENGINEER. Screed in accordance with equipment manufacturer's instructions. 3.6 CURING A. Cure cementitious grout for three days after placing by keeping wet and cover with burlap, clothes, or coating with a concrete membrane forming curing compound. B. Epoxy grout shall be cured in accordance with grout manufacturer's instructions. 3.7 FIELD QUALITY CONTROL A. Evaluation and Acceptance of Cementitious Non -Shrink Grout. 1. Provide a flow cone and cube molds with retraining caps. Continue tests during operations as demonstrated by grout manufacturer's representative. 2. Perform flow cone and bleed tests, and make three 2-inch by 2-inch cubes for each 25 cubic feet of each type of non -shrink grout used. Use restraining caps for cube molds in accordance with CE CRD-C621. 3. Following properties shall be in compliance with CE CRD-C621: a. Consistency: Grout outside range requirements will be rejected. b. Segregation: Grout, when aggregates separate will be rejected. c. Strength Test Failures: Grout work failing strength tests will be removed and replaced. d. Perform bleeding test demonstrating grout will not bleed. e. Store cubes at 70°F. f. Independent Testing Laboratory shall prepare, store, cure, and test cubes in accordance with CRD-C621. 3.8 NON -SHRINK GROUT SCHEDULE A. Furnish non -shrink grout for applications for consistency and compressive strengths as listed in the following construction schedule. Non -Shrink Grout Schedule Application Consistency Flow Compressive Conditions Strength, psi Filling tie holes, concrete repairs Flowable 140 percent 7000 Column base plates Fluid 20 to 30 seconds 7500 Equipment bases, 25 hp or less Fluid 20 to 30 seconds 7500 Equipment bases, greater than 25 hp Fluid 20 to 30 seconds 9000 Base plates and/or soleplates with Fluid 20 to 30 9000 vibration, thermal movement, etc. seconds END OF SECTION 03600-6 GROUT, NON -SHRINK September 2009 •- "M 0318-042-01 SECTION 09910 PAINTING AND PROTECTIVE COATINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. .. 1.2 SUMMARY A. This Section includes the surface preparation and application of HIGH- PERFORMANCE COATING SYSTEMS for exterior and interior surfaces applied to the following substrates: 1. Exterior substrates: a. Steel. b. Aluminum (not anodized or otherwise coated). C. Ferrous Metals d. PVC and fiberglass materials. 2. Interior Surfaces: a. Steel. b. Aluminum (not anodized or otherwise coated). C. Ferrous Metals. d. PVC and fiberglass materials. B. Related Sections: 1. Division 15 Sections for manufacturer's factory -applied coatings for equipment. 1.3 REFERENCES AND DEFINITIONS A. References: Following is a list of standards, which might be referenced in this Section. 1. ASTM International (ASTM): a. D16 - Definitions of Terms Relating to Paint, Varnish, Lacquer, and Related Products. b. D2016 - Test Method for Moisture Content of Wood. C. D4263 — Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method d. F1869 — Test Method for Measuring Moisture Vapor Emission Rate of - Concrete Subfloor Using Anhydrous Calcium Chloride 2. The Society for Protective Coatings (SSPC): a. SSPC Painting Manual, "Good Painting Practice" b_ SSPC Painting Manual, "Systems and Specifications" C. SSPC-SP1 Solvent Cleaning d. SSPC-SP3 Power Tool Cleaning e. SSPC-SP5 White Metal Blasting f. SSPC-SP6 Commercial Blast Cleaning g. SSPC-SP7 Brush -Off Blast Cleaning .. h. SSPC-SP10 Near -White Blast Cleaning i. SSPC-SP12 Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating 09910-1 September 2009 PAINTING AND PROTECTIVE COATINGS UW 0318-042-01 j. SSPC-SP13 Surface Preparation of Concrete k. SSPC-SP14 Industrial Blast Cleaning 1. SSPC-VIS 1 89 Visual Standard for Abrasive Blast Cleaned Steel 3. Master Painters Institute (MPI): MPI Architectural Painting Specification Manual 4. NACE International (National Association of Corrosion Engineers International) a. RP0287-95 "Field Measurements of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using Replica Tape" _. b. RP0188-99 "Discontinuity (Holiday) Testing of Protective Coatings" C. TM-01-70 "Visual Comparator for Surfaces of New Steel Airblast Cleaned with Sand Abrasive" _ d. TM-01-70 "Visual Comparator for Surfaces of New Steel Airblast Cleaned with Slag Abrasive" e. RP0178-95 "Fabrication Details, Surface Finish Requirements, and Proper Design Considerations for Tanks and Vessels to be Lined for Immersion Service" f. RPO 892-92 "Linings Over Concrete for Immersion Service" g. RPO 591-96 " Coatings for Concrete Surfaces in Non -Immersion" h. 6G186 "Surface Preparation of Contaminated Steel Surfaces" i. 6G191, "Surface Preparation of Contaminated Concrete." j. RPO 178 "Weld preparation Visual Comparator." r- 5. National Science Foundations (NSF): NSF 61 Drinking Water System Components -Health Effects B. Definitions: 1. Barrier Coat: Recommended coating material applied to factory -applied or other coatings, which consist of unidentified materials or non-compliance materials, prior to the application of the specified coating system. 2. CSDS: Coating System Data Sheet. 3. Coverage: Total minimum dry film thickness in mils or square feet per gallon. 4. Exposed Surfaces: Used to define painting locations and requirements it shall include all visible interior or exterior surfaces, top of walls, ceilings, and inside surfaces to V-0" below grade or the weir level or to floor level, whichever applies. 5. MDFT: Minimum Dry Film Thickness, mils. 6. MDFTPC: Minimum Dry Film Thickness per Coat, mils. 7. Mils: Thousandth of an Inch. 8. PDS: Product Data Sheet. 9. SFPG: Square Feet Per Gallon. 10. SFPGPC: Square Feet Per Gallon Per Coat. 1.4 SUBMITTALS A. Action Submittals: 1. Product Data: _ a. For each product. Furnish a Product Data Sheet (PDS), the manufacturer's technical data sheets, and paint colors available, where available. The PDS form is appended to the end of this Section. b. For each coating system, furnish a Coating System Data Sheet (CSDS). The CSDS form is appended to the end of this Section. C. Technical and performance information that demonstrates compliance with this specification. d. Indiscriminate submittal of only manufacturer's literature is not acceptable. e. Detail chemical and gradation analysis for each abrasive material. 09910-2 September 2009 PAINTING AND PROTECTIVE COATINGS w 0318-042-01 2. Samples: a. Proposed Abrasive Materials: Minimum 5-pound sample for each type. b. Reference Panel: 1) Surface Preparation: a) Prior to start of surface preparation, furnish a 4-inch by 4-inch steel panel for grade of sandblast specified herein, prepared to .. specified requirements. b) Provide panel representation of the steel used; prevent deterioration of surface quality. c) Panel to be reference source for inspection upon approval by ENGINEER. 2) Paint Samples for Verification: For each type of paint system and in each color and gloss of topcoat indicated. a) Submit Samples on rigid backing, 8 inches square. b) Step coats on Samples to show each coat required for system. c) Label each coat of each Sample. d) Label each Sample for location and application area. 3) Product List: For each product indicated, include the following: a) Show where each coating is to be used on the Project, with cross reference to this Section paragraphs and Painting Schedule. b) Product date and information submitted shall demonstrate compliance with this Section. c) Provide the surface preparation required or recommended by coating manufacturer for each type of coating application if different from that specified in this Section. B. Information Submittals: 1. Manufacturer's verification that submitted coating materials is suitable for the intended use. 2. Manufacturer's Certification of Compliance. 3. Special shipping, storage and protection, and handling instructions. 4. Manufacturer's Certificate of Proper Installation. 5. Qualification Data: For manufacturer and manufacturer's representative, if applicable. 6. Material Safety Data Sheets (MSDS) for.review and posting at Site. 7. Volatile Organic Compounds (VOC's) certification that VOC's emitted by paints and coatings are in compliance with regulatory requirements. Provide certification that paints and coatings comply with National Architectural and Industrial Maintenance (AIM) rule. 8. Manufacturer's Instructions: a. Provide manufacturer's instructions for the application of the coating system for the purpose intended by these specifications. The instructions shall provide the limitations, precautions, and requirements that may adversely affect the coating system; that may cause unsatisfactorily results after the application; or that may prevent the coating system not to serve the purpose for which it was intended, which is to provided coverage and protection from corrosion, shall be clearly stated. b. The instructions shall include, but not limited to: ., 1) Surface preparation. 2) Methods of Application. 3) Number of coats. 09910-3 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 4) Thickness of each coat. LL 5) Total Thickness. 6) Drying time of each coat, including primer. 7) Drying time of final coat before placement in service. — 8) Time allowed between coats. 9) Primers required to be used. 10) Primers not permitted. 11) Use of a primer. 12) Compatible topcoats. 13) Thinner and use of thinner. 14) Weather limitations during and after application (temperature, humidity, wind velocity). 15) Protection from sun. 16) Physical properties of paint, including percent solids content by volume, ingredient analysis, and weight per unit surface per dry mil thickness. 17) Cathodic bonding limitations, if any. 18) Equipment settings (air cap, fluid tip, equipment pressure settings, etc.) C. Field Quality -Control Reports: Provide temperature and humidity readings, testing for coating dry mil thickness and bonding, surface preparation, and related requirements. D. Pre -Installation Conference: Provide minutes of the pre -installation conference. s 1.5 QUALITY ASSURANCE A. Coating Manufacturer Qualifications: 1. Nationally recognized manufacturers of paints and protective coatings who are regularly engaged in the production of such materials for essentially identical service conditions. 2. Minimum of 5 years verifiable experience in manufacture of specified product. 3. Certified to ISO 9001 by an accredited certification agency. B. Applicator Qualifications: Company specializing in industrial painting and finishing with -- five (5) years documented experience, approved by product manufacturer, and shall provide proof before commencement of work that a qualified crew of painters will maintain throughout the duration of the work. C. Source Limitations: Coating systems of each type specified in this section shawl be supplied by a single manufacturer. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and protect products in accordance with manufacturer's instructions. Deliver products to site in the original, sealed, labeled, and unopened containers; inspect to verify acceptance. Damaged containers will not be accepted. _ B. Store paint materials in original containers in a secure (lockable), dry, heated and well ventilated single designation area meeting the minimum requirements of the paint manufacturer and jurisdictional authorities and at minimum ambient temperatures continuously maintained at not less than 450F (7°C) and not more than 90OF (320C). 09910-4 September 2009 PAINTING AND PROTECTIVE COATINGS .J 0318-042-01 C. Where toxic and/or volatile/explosive/flammable materials are being used, provide adequate fireproof storage lockers and take all necessary precautions and post adequate warnings (e.g. no smoking) as required. D. Take precautionary and safety measures to prevent fire hazards and spontaneous combustion. Remove oily rags, waste, or other fire hazards from facilities each night. Place cloths and cotton waste, which might constitute a fire hazard, in metal containers or destroy at the end of each work day. 1.7 PROJECT CONDITIONS A. Environmental Requirements: Do not perform painting work: 1. When the ambient air temperature and surface temperature are below 500 F or above 950 F. 2. Exterior Painting: Unless environmental conditions are within the coating manufacturer's requirements or until adequate weather protection is provided. Where required, suitable weatherproof covering and sufficient heating facilities shall be in place to maintain minimum ambient air and surface temperatures for 24 hours before, during, and after application of finishes. -3. Interior Painting: Unless adequate continuous ventilation and sufficient heating facilities are in place to maintain minimum ambient air and surface temperatures for 24 hours before, during, and after application of finishes. Provide supplemental ventilating and heating equipment if ventilation and heating from an existing system is inadequate to meet minimum requirements. 4. When the relative humidity is above 85% or whenever surface temperature is less than 5° F above dewpoint of ambient air. This includes abrasive blast cleaning of the surfaces. 5. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows: a. Concrete and Masonry (clay and concrete brick/block): 12%. b. Wood:15%. C. Plaster and Gypsum Board: 12% 6. On concrete or masonry substrates until: a. Surfaces have been installed for at least 28-days. b. Surfaces have been tested for alkalinity as required. s 7. Unless a minimum lighting level of 323 Lux (30 foot candles) is provided on surfaces to be painted. Adequate lighting shall be furnished by CONTRACTOR. B. Primers Compatibility: 1. Primers, which are factory applied to equipment, shall be as specified for the coating system indicated in this Section for the service. 2. CONTRACTOR shall notify equipment manufacturers which primers will be required in order to be compatible with the field -applied finish coats. 3. 4. Equipment purchase that has the manufacturer's standard primer or a factory applied finish, which is other than as specified in this Section, shall be prepared for application of specified coating system in accordance with paragraph titled Shop Finishes. .. C. CONTRACTOR shall be fully responsible for personnel safety during painting operations. .r 09910-5 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 1. Display caution signs in necessary areas advising of spray painting and warning against open flames. 2. Provide barriers or shelters on windy days to protect equipment and facilities. 3. Temporary ladders and scaffolds shall conform to applicable safety requirements. D. All coatings in contact with potable water and water being treated for use as potable . water shall conform to ANSI/NSF Standard 61 and shall be certified by an organization accredited by ANSI. E. CONTRACTOR shall receive written confirmation of the specific surface preparation procedures and primers used for all fabricated steel items from the fabricator/supplier to ascertain appropriate and manufacturer compatible finish coat materials to be used before painting such work. 1.8 EXTRA MATERIALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Furnish an additional 5 percent, but not less than 1 gallon of each material and color applied. 2. The material shall be delivered in unopened labeled containers as delivered from the manufacturer. If the manufacturer does not delivered in gallon containers, and in the case of special colors, the new gallon containers, properly closed with typed labels indicating brand, type, color, location used, etc. 3. Where multiple component materials are used, provide an unopened kit of the necessary materials in the manufacturer's smallest standard packaging size. Provide three (3) copies of the manufacturer's instructions describing the materials and directions for their use. 4. Provide a typed inventory list of the extra materials furnished at time of delivery. - 1.9 SPECIAL WARRANTY A. Warranty inspection of the coating systems shall be conducted during the eleventh month following completion and acceptance of all coating system work. The personnel or their representatives present at the pre -installation conference are requested to attend. All defective coating systems shall be repaired in accordance with this Section and to the satisfaction of the ENGINEER and OWNER. PART 2-PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturers: Provide coating products from one of the manufacturers listed below: 1. Carboline Protective Coatings and Linings 2. AzkoNobel (ICI Paints) r 3. PPG Protective and Marine Coatings (PPG Amercoat) 4. Tnemec Company, Inc. 5. Sherwin-Williams Company " 09910-6 September 2009 PAINTING AND PROTECTIVE COATINGS r 0318-042-01 -� 2.2 COATING MATERIALS A. General: 1. Coating manufacturer's highest quality products suitable for intended service. 2. All materials shall be from a single manufacturer for the each coating system used. 3. Other materials such as linseed oil, shellac, thinners, solvents, etc. shall be the highest quality product of the coating manufacturer and shall be compatible with paint materials being used. •• B. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous coating. .! 1. CONTRACTOR shall have complete responsibility for ensuring that each coating applied is compatible with its substrate and/or its intended finish coat, and that the completed coating system is suitable for its intended service. C. Accessory Materials: Thinning of paint and all accessory type materials used shall be strictly in accordance with the manufacturer's recommendations covering material types, solvents, mix ratios, and methods. D. Volatile Organic Compounds (VOC's) emitted by paints and coatings shall be in accordance with federal, state, and local regulations, as well as in accordance with National Architectural and Industrial Maintenance (AIM) rule. Provide certification that paints and coatings comply. ., .. a* .. 2.3 GLOSS/SHEEN RATINGS A. Paint gloss shall be defined as the sheen rating of applied paint in accordance with the values listed in Table 2. Gloss level ratings of all painted surfaces shall be as defined herein and as noted on the Painting Schedule. TABLE 2 GLOSS LEVEL Gloss Description Level GL-1 Matte or Flat finish GL-2 Velvet finish GL-3 Eggshell finish GL-4 Satin finish GL-5 Semi -Gloss finish GL-6 Gloss finish GL-7 High -Gloss finish I Source: MPI Architectural Paintinq Specification Manual 2.4 MIXING Units C? 60 degrees 0to5 0 to 10 10to25 20 to 35 35 to 70 70 to 85 > 85 Units C� 80 de rees 10 maximum 10 to 35 10 to 35 35 minimum A. Multiple -Component Coatings: 1. Prepare using each component as packaged by coating manufacturer. Mix only components specified by coating manufacturer. 2. No partial batches will be permitted. 3. Do not use multiple -component coatings that have been mixed beyond their pot life. 09910-7 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 " 4. Furnish small quantity kits for touchup painting and for painting other small areas. 5. Do not intermix additional components for reasons of color or otherwise, even within the same generic type of coating. 6. Colorants: Formulate coatings with colorants free of lead, lead components, or other materials that might be affected by presence of hydrogen sulfide or other gas likely to be present at Site. 2.5 SHOP FINISHES 'Y A. Shop Coating Requirements: 1. When required by equipment Specifications, such equipment shall have the _ applicable surface preparation, be primed, and the finished coating applied in shop by the manufacturer in accordance with this Section for the service and conditions. Touchup will be accomplished in the field with identical material after _ installation. 2. Where manufacturer's standard coating is not suitable for intended service condition, ENGINEER may approve use of a barrier -coat to be used between manufacturer's standard coating and specified field finish. i a. Barrier -coat shall be surface tolerant epoxy as recommended by manufacturer of specified field finish coat. b. Coordinate details of equipment manufacturer's standard coating with field coating manufacturer. 3. If approval not obtained, remove the factory -applied finish and apply the specified coating system. F B. Pipe Coating Requirements: 1. Ductile Iron Pipe: Refer to Division 15 Section 15020 "Piping Systems, Ductile Iron" when ductile iron piping is used on Project. 2.6 COLOR SCHEDULE A. Color Selection: 1. Colors: Purple 2. Colors selected may or may not be the manufacturer's standard color. 3. Submit color charts to Engineer at least 60 days prior to coating application to allow time for color selection. 4. Different colors will be selected for concrete structures; building columns, framing, walls, window and door frames, and other areas; various items of equipment; piping and conduit; safety colors will be used for fire equipment locations, protective covers for rotating or moving equipment, walkways, and other related items; architectural treatment, both interior and exterior of buildings; and for all other items of Work. 5. Colors for equipment shall be selected by OWNER during submittal process. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of work. " 09910-8 September 2009 PAINTING AND PROTECTIVE COATINGS r71 0318-042-01 aw 1. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as listed in Part 1-Project Conditions. B. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers. C. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry. Beginning coating application constitutes CONTRACTOR'S acceptance of substrates and conditions. 3.2 PROTECTION OF ITEMS NOT TO BE PAINTED M A. Remove, mask, or otherwise protect plates, machined surfaces, hardware, lighting fixtures, couplings, shafts, bearing, stainless steel, aluminum, fiberglass, and similar surfaces already in place that are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface -applied protection before surface preparation and painting. 1. Mask openings in motors, vents, filters, etc. to prevent paint materials from entering. 2. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface -applied protection if any. 3. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates. 4. Provide drop cloths to prevent paint materials from falling on or marring adjacent surfaces. B. Protect working parts of mechanical and electrical equipment from damage during surface preparation and painting process. Protect surfaces adjacent to or downwind of Work from overspray. 3.3 SUBSTRATE SURFACE PREPARATION A. General Requirement: 1. Comply with manufacturer's written instructions, recommendations contained in this Section, and SSPC PA 3, Guide to Safety in Paint Applications. 2. Clean substrates of substances that could impair bond of paints, including dirt, oil, grease, and incompatible paints. 3. Remove unknown primers or coatings systems and incompatible primers of shop painted work and prime substrate with compatible primers as required to produce paint systems indicated. 4. When removal is not feasible and with approval of ENGINEER, CONTRACTOR L• may apply a barrier coat in accordance with coating manufacturer's instructions prior to application of the designated coating system. 5. When abrasive blasting, use a source of compressed air, which is free of detrimental water and oil and capable of delivering the required volume and pressure. 6. Subject to review by ENGINEER, any substrate in which SPPC-SP6 or SPPC- SP10 abrasive blasting cannot be accomplished shall be cleaned in accordance with SPPC-SP3 removing loose mill scale, rust, paint, and other foreign matter. B. Structural Steel and Metal Fabrications (SP-3): 1. Remove rust and loose mill scale, if work has not been shop primed with coating system compatible primer, and other foreign materials. Clean using methods indicated below, and as recommended by coating manufacturer. 09910-9 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 a. Minimum Surface Preparation: SSPC-SP1, Solvent Cleaning, followed by SSPC-SP 6 Commercial Blast Cleaning. b. High Performance Coatings: SP5, White Metal Blast Cleaning, or SP10, Near -White Metal Blast Cleaning, as recommended by coating manufacturer. 2. The SSPC specifications are summarized as follows: a. SP1, Solvent Cleaning: Removal of visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants by cleaning with = solvent. b. SP2, Hand Tool Cleaning: Removal of loose rust, loose mill scale, loose paint, and other loose detrimental foreign matter, using non -power hand tools. C. SP3, Power Tool Cleaning: Removal of loose rust, loose mill scale, loose paint, and other loose detrimental foreign matter, using power -assisted hand tools. d. SP5, White Metal Blast Cleaning: Removal of visible oil, grease, dust, dirt, rust, mill scale, coatings, oxides, corrosion products, and other foreign matter by blast cleaning. e. SP6, Commercial Blast Cleaning: Removal of visible oil, grease, dust, dirt, rust, mill scale, coatings, oxides, corrosion products, and other foreign matter, except for random staining limited to no more than 33 percent of each unit area of surface which may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coatings. f. SP7, Brush -Off Blast Cleaning: Removal of visible oil, grease, dust, dirt, loose rust, loose mill scale, and loose coatings. Tightly adherent mill scale, rust, and coating may remain on surface. g. SP10, Near -White Metal Blast Cleaning: Removal of visible oil, grease, dust, dirt, rust, mill scale, coatings, oxides, corrosion products, and other foreign matter, except for random staining limited to no more than 5 percent i of each unit area of surface which may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied. coatings. h. SP11, Power Tool Cleaning to Bare Metal: Removal of visible oil, grease, dust, dirt, rust, mill scale, coatings, oxides, corrosion products, and other foreign matter using power -assisted hand tools capable of producing suitable surface profile. Slight residues of rust and paint may be left in lower portion of pits if original surface is pitted. L SP-12, High Pressure Water Jetting: Describes the use of waterjetting to achieve a defined degree of cleaning of surfaces prior to the application of a protective coating or lining system. 3. The words "solvent cleaning", "hand tool cleaning", "wire brushing", and "blast cleaning", or similar words of equal intent in these Specifications or in the coating manufacturer's instructions, refer to the applicable SSPC Specification. 4. Where OSHA, EPA, or other regulations preclude standard abrasive blast cleaning, wet or vacu-blast methods may be required. Coating manufacturers' recommendations for wet blast additives and first coat application shall apply. 5. Ductile Iron Pipe Supplied with Asphaltic Varnish Finish: For exposed or submerged locations, remove asphaltic varnish finish prior to performing -- specified surface preparation. 6. Hand tool clean surfaces areas that cannot be cleaned by power tool cleaning. 09910-10 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 7. Round of chamfer sharp edges and grind smooth burrs, jagged edges, and surfaces defects. 8. Welds and Adjacent Areas: Prepare such that there is: a. No undercutting or reverse edges on weld bead. b. No weld spatter on or adjacent to weld or any area to be painted. C. No sharp peaks or ridges along weld bead. 9. Grind embedded pieces of electrode or wire brush with adjacent surface of weld bead. a. Preblast Cleaning Requirements: .. b. Remove oil, grease, welding fluxes, and other surface contaminants prior to blast cleaning. c. Cleaning Methods: Steam, open flame, hot water, or cold water with appropriate detergent additives followed by clean water rinsing. d. Clean small isolated as above or solvent clean with suitable solvent and clean cloth. 10. Blast Cleaning Requirements: a. Type of Equipment and Speed of Travel: Design to obtain specified degree of cleanliness. Minimum surface preparation is as specified herein. b. Select type and size of abrasive to produce surface profile that meets coating manufacturer's recommendations for particular primer used. C. Use only dry blast cleaning methods. d. Do not reuse abrasive, except for designed recyclable systems. e. Meet applicable rules and regulations for air pollution and environmental control regulations for blast cleaning, confined space entry (if required), and disposition of spent aggregate and debris. 11. Post Cleaning Requirements: a. Clean surfaces of dust and residual particles from cleaning operations by dry (no oil or water vapor) air blast cleaning or other method prior to painting. Vacuum clean enclosed areas and other others where dust ` settling is a problem and wipe with a tack cloth. b. Paint surfaces the same day they are blasted. Reblast surfaces that have started to rust before they are painted. C. Aluminum Substrates (SP-5): Remove surface contamination such as dirt, oil, grease, oxidation, and other foreign matter in accordance with coating manufacturer's recommendations. D. Plastic and FRP Substrates (SP-6): 1. Hand sand surfaces to be coated with medium grit sandpaper to provide tooth for coating system. 2. Large areas by be power sanded or brush-off blasted, provided sufficient controls are employed so surface is roughened without removing excess material. 3. Prepare surfaces in accordance with coating manufacturer's recommendations. 3.4 APPLICATION .. A. General Requirements: 1. Inspection: Schedule with ENGINEER in advance for cleaned surfaces and all coats to succeeding coat. 2. Apply paint only to a dry, clean, properly cured and adequately prepared surfaces in areas where dust is no longer generated by construction activities such that airborne particles will not affect the quality of finished surfaces. 09910-11 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 3. Apply products in accordance with manufacturer's instructions in regard to drying time between coats, technique of application, ventilation, paint thinning, and safety precautions. a. Use applicators and techniques suited for paint and substrate indicated. b. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only. C. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces. 4. Allow applied coat to dry for the time period specified by the coating manufacturer before next coat is applied. Do not apply finishes to surfaces that are not dry to touch. 5. Apply coatings to produce surface films without cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections. Produce = sharp glass lines and color breaks. 6. Where multiple coats are specified; apply each coat in a different color, which compliments the following coat and is different than the proceeding coat. Each coat must be free of shadows and uniform in appearance. 7. Double -lap all welds. Apply prime coat by brush to all weld areas; then apply prime coat to entire surface, including weld areas. 8. Coat units or surfaces to be bolted together or joined closely to structures or to one another prior to assembly or installation. 9. Repair any damage or overspray to paint on existing structures caused by construction work. Match existing colors with touch-up paint. B. Substrates Subject to Immersion: 1. Coating shall be applied to internal vessel and pipe surfaces, nozzle bores, -- flange gasket seating surfaces, carbon steel intemals, and stainless steel internals, unless otherwise specified. 2. Obtain full cure for completed system. Do not immerse coating until completion of curing cycle. a. Apply coating to surfaces, which will be under water constantly or periodically, to appoint one foot above maximum water level. Mask the line _ of demarcation between the coating systems to a straight level line. C. Wood Surfaces: 1. Where clear finishes are required, tint fillers to match wood. Work fillers into the =- grain before set. Wipe excess from surface. 2. Prime back surfaces of interior and exterior woodwork with primer paint. 3. Prime back surfaces of interior woodwork scheduled to receive stain or varnish finish with gloss varnish reduced 25 percent with mineral spirits. D. Porous Surface, Such As Concrete and Masonry: 1. Filler/Surfacer: Use coating manufacturer's recommended product to fill air holes, bug holes, and other surface voids or defects. 2. Prime Coat: May be thinned to provide maximum penetration and adhesion. Type and amount of thinning shall be determined by coating manufacturer and dependent of surface density and type of coating. 3. Surface specified to receive water base coating should be damp, but free of running water, just prior to application. E. Factory Applied Coatings: 09910-12 September 2009 PAINTING AND PROTECTIVE COATINGS .. 0318-042-01 1. Shop Priming: Primer applied shall be compatible with the field applied coating system. If prier type is not known or is not compatible with final coating system, remove and the correct primer applied. 2. Unknown or Non -Compatible Coating System: a. Remove system and apply specified coating system at Project site. b. When not feasible and with approval of ENGINEER, a barrier coat may be applied as recommended by the coating manufacturer and the specified coating system applied. C. MDFT shall be increased by an amount equal to the barrier coat plus the unknown or non -compatible coating. F. Paint all items throughout the project except for surfaces listed below, unless otherwise designated on the Drawings or in the specifications: 1. Concrete walkways, pavement, sidewalks, and stair treads. 2. Interior fiberglass items. Exterior fiberglass shall be painted. 3. Metal surfaces of anodized aluminum, brass, bronze, chrome, copper, or stainless steel. 4. Nameplates or serial numbers 5. Grease fittings. 6. Valve operator stems. 7. Glass. G. Film Thickness and Coverage: 1. Number of Coats: a. Minimum required without regard to coating thickness. b. Additional coats may be required to achieve minimum paint thickness. 2. Application Thickness: a. Do not exceed coating manufacturer's recommendations. b. Measure using wet film thickness gauge to ensure proper coating thickness during application. 3. Film Thickness Measurements and Electrical Inspection of Coated Surfaces: a. Perform with properly calibrated instruments. b. Where inspection shows that the specified thickness is not developed, apply additional coats in accordance with manufacturer's instructions and cure schedule requirements to produce the required dry film thickness. 4. Attention shall be paid to edges, angles, flanges, and other similar areas, where insufficient film thickness are likely to be present. Assure complete hiding of underlying coats have been achieved. 3.5 MECHANICAL AND ELECTRICAL EQUIPMENT A. Applications: 1. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components and paint separately. 2. Prime and paint insulated and exposed pipes, conduit, boxes, insulated and exposed ducts, hangers, brackets, collars and supports. For insulated pipe, provide shop and field primer coats on pipe and surface preparation and final coat on insulation jacket. 3. Replace identification markings on mechanical or electrical equipment when painted accidentally. 4. Paint interior surfaces of air ducts, and convector and baseboard heating cabinets that are visible through grilles and louvers with one coat of flat black 09910-13 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 paint, to limit of sight line. Paint dampers exposed behind louvers, grilles, and convector and baseboard cabinets to match face panels. 5. Paint exposed conduit and electrical equipment occurring in finished areas. 6. Paint both sides and edges of plywood backboards for electrical and telephone �- equipment before installing equipment. B. Color code equipment, piping, conduit, and exposed ductwork in accordance with requirements indicated. Color band and identify with flow arrows and names. C. Coating systems applied at the factory shall be protected against damaged during transit, delivery, storage, and erection. 1. Repair damaged areas on factory applied coatings on equipment in accordance with the equipment manufacturer's instructions and with manufacturer's correct color. 2. Carefully blend repaired areas into original finish. D. The following items will receive factory applied coatings and usually will not be field painted: _ 1. Electrical panels, motor control centers, transformers, and related items. 2. Light fixtures. 3. Pressure gauges. 4. Instrumentation. 5. Similar items with standard factory finishes, subject to ENGINEER's review. 3.6 FIELD QUALITY CONTROL A. CONTRACTOR shall be responsible for the following testing during coating operations: y 1. Prior to start and during the coating application each day, temperature and humidity readings will be obtained. If the values obtained are not within the recommended temperature and humidity range described herein or as required by the coating manufacture, the coating application will not be allowed. ` 2. Periodically check the wet film thickness during coating applications. 3. Prepared records of the above tests and readings. B. Testing Agency: CONTRACTOR shall engage a qualified testing agency to perform tests and inspections. 1. MDFT Measurement: a. Obtain after application of each coat of paint and final coat for every 25 square feet of surface and at locations designated by the ENGINEER. b. A minimum of three readings of the area around the location will be obtained. C. If the average of these readings indicates the MDFT for the final coat is below the specified minimum, CONTRACTOR shall apply another coat in accordance with the manufacturer's instructions. 2. The interiors of liquid containing structures and tanks will be tested for holidays after final coat application. Areas found to be defective shall have an additional coat applied. 3. Visually inspect concrete, nonferrous metal, plastic, and wood surfaces to ensure proper and complete coverage has been obtained. 4. Provide particular attention to edges, angles, flanges, and similar areas where insufficient film thickness is likely to occur. C. Damaged Coatings, Pinholes, and Holidays: 09910-14 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 1. Feather edges and repair in accordance with recommendations of coatings manufacturer. 2. Hand or power sand visible areas of chipped, peeled, or abraded paint, and • feather edges. Apply prime and intermediate and final coatings in accordance with this Section. 3. Repair fusion bonded coatings as recommended by the manufacturer. .. 4. Apply finish coat, including touch-up and damaged repair coatings, in a manner that will present uniform texture and color -matched appearance. D. The coating system will be considered defective if it does not pass tests and inspections. When this occurs the ENGINEER will specify corrective measures. The coating system will be retested, with the additional expense occurred charged to the CONTRACTOR. E. Unsatisfactory Appearance: 1. Top coat surface found to have improper finish color or insufficient film thickness. 2. Evidence of runs, bridges, shiners, laps, or other imperfections shall be cause for rejection. 3. Repair defects in accordance with coating manufacturer's recommendations. 4. Leave staging up until the coating has been inspected and approval received. F. Testing of Paint Materials: OWNER reserves the right to invoke the following procedure at any time and as often as OWNER deems necessary during the period when paints are being applied- 1. Owner will engage the services of a qualified testing agency to sample paint materials being used. Samples of material delivered to Project site will be taken, identified, sealed, and certified in presence of Contractor. 2. Testing agency will perform tests for compliance of paint materials with product requirements. 3. OWNER may direct CONTRACTOR to stop applying paints if test results show materials being used do not comply with product requirements. CONTRACTOR shall remove non -complying paint materials from Project site, pay for testing, and repaint surfaces painted with rejected materials. CONTRACTOR will be required .� to remove rejected materials from previously painted surfaces if, on repainting with complying materials, the two paints are incompatible. a. Testing Report: Prepare a Report for each coating applied on the Project. 3.7 MANUFACTURER'S SERVICES A. In accordance with the requirements of Manufacturer's Services, coating representative shall be present at Project site as follows: 1. On first day of application of any coating system. 2. Minimum of two additional Site inspection visits as required to resolve filed problems attributable to, or associated with, coating manufacturer's product. 3. As required to verify full cure of coating prior to coated surfaces being placed into immersion service. 3.8 CLEANING AND PROTECTION A. During progress of Work maintain premises free of unnecessary accumulation of tools, . equipment, surplus materials, and debris. Collect cotton waste, cloths, and material which may constitute a fire hazard, place in closed metal containers and remove daily from site. 09910-15 September 2009 PAINTING AND PROTECTIVE COATINGS r 0318-042-01 B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by ENGINEER, and leave in an undamaged condition. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. - D. Upon completion of the work remove all staging and scaffolding. Dispose of all sand, containers, and rubbish in a suitable manner. Remove overspray, paint spots, oil or stains on adjacent surfaces. Leave the entire Project clean and acceptable. 3.9 PROTECTIVE COATING SYSTEMS A. General Information: 1. Coverage: The minimum coverage for the various components is specified as Minimum Dry Film Thickness (MDFT), unless otherwise indicated as Square Foot per Gallon (SFPG). 2. If a manufacturer is not listed, they do not offer a compatible coating system. B. Steel, Galvanized Steel, Aluminum, and Copper (CS-7): Submerged or - intermittently submerged; includes piping, valves, equipment, and related items. Also can be used on items to be buried underground, such as tanks and piping. 1. Surface Preparation: As described herein and in accordance with manufacturer's instructions, depending on the metal substrate. 2. Coating System: Selection shall be as shown in Painting Schedule or on the Drawings. Steel, Galvanized Steel, Aluminum, and Copper Submerged or Intermittently Submerged and Items Buried Underground Manufacturer Coat 1 I Coat 2 I Coat 3 Product I Coverage Product Coverage Product Coverage Generic Description Polyamidoamine Epoxy - AzkoNobel (ICI Paints- Bar-Rust4.0-6.0 236 Bar -Rust 236 4.0-6.0 Devoe) MDFT MDFT Carboline Carboguard 4.0-6.0 Carbolguard 4.0-6.0 890 MDFT 890 MDFT 4.0 -6.0 4.0 -6.0 PPG (Amercoat) Amercoat 385 MDFT Amercoat 385 MDFT - Sherwin-Williams Macropoxy 5.0-10.0 Macropoxy 5.0-10.0 646 Fast Cure MDFT 646 Fast Cure MDFT N69 Hi -Build 4.0-6.0 N69 Hi -Build 4.0-6.0 Tnemec Epoxoline II MDFT Epoxoline II MDFT Products and application procedures differ form one manufacturer to another, therefore apply coatings in accordance with manufacturer's instructions. C. Ferrous Metals, Alternate to Coating System CS-7 (CS-8): Submerged or intermittently submerged; includes piping, valves, equipment, and related items. Also can be used on items to be buried underground, such as tanks and piping. 09910-16 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 �. 1. Coating system may also be for as an alternate to Coating systemCS-7 when specified in the Painting Schedule. 2. Surface Preparation: a. SSPC-SP10, Near -White Blast, and in accordance with manufacturer's instructions, depending on the metal substrate. b. Remove applied primer, if unknown or provide verification an epoxy primer was used and the "recoat" time window has not expired. Normally this period from epoxy primer application to final coat application is 6 to 12 months. 3. Coating System: Selection shall be as shown in Painting Schedule or on the Drawings. Steel, Buried Alternate to Coating System CS-7 Manufacturer Coat 1 I Coat 2 I Coat 3 Product I Coverage Product I Coverage Product Coverage Generic Coal Tar Epoxy Over Polyamidoamine Epoxy Primer Description 2 Coat Application'' Single Coat A )plication Devran 223 2.0-4.0 8.0 16.0 AzkoNobel (ICI Paints) Recoatable MDFT Devtar 5A MDFTPC Devtar 247 MDFT Epoxy Carboline Carboline 888 2.0-4.0 Carbomastic 8.0 Carbomastic 16.0 MDFT 300M MDFTPC 300M MDFT 2.0 -4.0 Amercoat 8.0 Amercoat 16.0 PPG (Amercoat) Amercoat 370 MDFT 78HB Coal Tar MDFTPC 78HB Coal Tar MDFT Epoxy Epoxy Sherwin-Williams Recoatable 2.0 -4.0 Targuard Coal 8.0 Hi -Mil Sher- 16.0 Epoxy MDFT Tar Epoxy MDFTPC Tar Epoxy MDFT Tnemec N69 Hi -Build 2.0-4.0 46-H-413 8.0 46-H-413 16.0 Epoxoline II MDFT Tneme-Tar MDFTPC Tneme-Tar MDFT Products and application procedures differ form one manufacturer to another, therefore apply coatings in accordance with manufacturers instructions. (1) Apply second coat cross -wise to first coat. D. Steel, Galvanized Steel, Aluminum, and Copper (CS-7): Submerged or intermittently submerged; includes piping, valves, equipment, and related items. Also can be used on items to be buried underground, such as tanks and piping. 1. Surface Preparation: As described herein and in accordance with manufacturer's instructions, depending on the metal substrate. .. 2. Coating System: Selection shall be as shown in Painting Schedule or on the Drawings. .. mo 09910-17 September 2009 PAINTING AND PROTECTIVE COATINGS UN 0318-042-01 Steel, Galvanized Steel, Aluminum, and Copper " Submerged or Intermittently Submerged and Items Buried Underground Manufacturer Coat 1 I Coat 2 I Coat 3 Product I Coverage Product Coverage Product Coverage Generic Description Polyamidoamine Epoxy AzkoNobel (ICI Paints- Bar -Rust 236 4.0-6.0 Bar -Rust 236 4.0-6.0 Devoe) MDFT MDFT Carboline Carboguard 4.0-6.0 Carbolguard 4.0-6.0 890 MDFT 890 MDFT PPG (Amercoat) Amercoat 385 4.0 -6.0 Amercoat 385 4.0 -6.0 MDFT MDFT Sherwin-Williams Macropoxy 5.0-10.0 Macropoxy 5.0-10.0 646 Fast Cure MDFT 646 Fast Cure MDFT Tnemec N69 Hi -Build 4.0-6.0 N69 Hi -Build 4.0-6.0 Epoxoline II MDFT Epoxoline 11 MDFT Products and application procedures differ form one manufacturer to another, therefore apply coatings in accordance with manufacturer's instructions. E. Ferrous Metals Encased in Concrete, Plaster, Insulation, Fireproofing and Similar Materials (CS-9): 1. Surface Preparation: SSPC SP6, Commercial Blast Cleaning. 2. Coating shall be UL classified in accordance with UL 263 (ASTM E119) and meets material adhesion test ASTM E 736 for use under various fire -resistive products. Meets AISC requirements for Class B surface with a mean slip coefficient no less than 0.50 and tension creep not in excess of .005 inches (SSPCSP5/NACE 1 and SSPC-SP3). 3. Coating System: Selection shall be as shown in Painting Schedule or on the - Drawings. Ferrous Metals Encased in Concrete, Plaster, Insulation, Fireproofin and Similar Materials Manufacturer Coat 1 I Coat 2 Coat 3 Product I Coverage Product I Coverage Product I Coveraqe Generic Description Aromatic Polyurethane, Mio-Zinc Filled Primer Sherwin-Williams Corothane 1 2.0-4.0 Macropoxy 5.0-10.0 Mio-Zinc 2K MDFT 646 Fast Cure MDFT Tnemec Series 394 2.5-3.5 N69 Hi -Build 4.0-6.0 - PerimePrime MDFT Epoxoline 11 MDFT Products and application procedures differ form one manufacturer to another, therefore apply coatings in accordance with manufacturer's instructions. F. Metal Surfaces Exposed to Temperatures 2500 F to 4500 F (CS-10): 1. Surface Preparation: As described herein and in accordance with the -- manufacturer's instructions. a. SPC10, Near White Blast. 2. Coating System: Selection shall be as shown in Painting Schedule or on the Drawings, 09910-18 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 Metal Surfaces Exposed to Temperatures 250" F to 450" F Manufacturer Coat 1 I Coat 2 I Coat 3 Product I Coverage Product Coverage Product Coverage Generic Silicone Acrylic High Heat Description AzkoNobel (ICI Paints- HT-10 2 coats Devoe) (710-S- 1.0-1.5 9100) MDFTPC Thermaline 2 coats Carboline 490OR 1.0-1.5 Aluminum MDFTPC Amercoat 2 coats PPG (Amercoat) 892HS 1.0-1.5 Silicone MDFTPC Aluminum Kern Hi -Temp 2 coats Sherwin-Williams Heat -Flex II 1.0-1.5 450 MDFTPC Products and application procedures differ form one manufacturer to another, therefore apply coatings in accordance with manufacturer's instructions. G. Ferrous Surfaces in Contact with Potable Water and Water Being Treated for use WM as Potable Water (CS-11): 1. NSF Certified: Coatings shall conform to ANSI/NSF Standard 61 and certified by an organization accredited by ANSI. 2. Surface Preparation: As described herein and in accordance with the manufacturer's instructions. a. Interior Ferrous Metals; Submerged or Intermittently Submerged: SSPC SPC10, Near White Blast. b. Interior Ferrous Metals, Dry: SSPC SPC6, Commercial Blast. 3. Coating System: Selection shall be as shown in Painting Schedule or on the Drawings. aw w 09910-19 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 Ferrous Surfaces in Contact with Potable Water and Water Being Treated for use as Potable Water Manufacturer Coat 1 I Coat 2 I Coat 3 Product I Coverage Product I Coverage Product I Coverage Generic Organic, Zinc Rich Urethane/Modified Polyamine Epoxy, min. 80% Volume Solids Description AzkoNobel (ICI 4 0-6 0 4 0-6 0 Paints Devoe Bar -Rust 233H Bar -Rust 233H MDFT MDR Carboline Carboguard 61 5.0 MDFT Carboguard 61 5.0 MDFT PPG (Amercoat) Amerlock 2 5.0-6.0 Amedock 2 5.0-6.0 MDFT MDFT Sherwin-Williams Corothane 1 2.5-3.5 Tank Clad HS 3.0-6.0 Galvapac MDFT MDFT Tnemec Series 91 H2O 2.5 to 3.5 Series 141 10.0 Hydro -Zinc MDT Epoxoline MDFT Generic SPECIAL SYSTEM (Long term service of 25 to 30 years) Description Enviroline 230 AzkoNobel (ICI Potable Water 20 to 50 Paints-Enviroline) Lining (100% MDFT Soilds Hybrid Epoxy) Carboline Carboline(') Polyclad 708 25 to 30 (100% Solids MDFT Polyurthane) Sherwin-Williams Envirolastic 40 to 60 AR520 PW MDFT Series 406 25 to 30 Tnemec Elasto-Shield MDFT (100% Solids Polyurethane) Products and application procedures differ form one manufacturer to another, therefore apply coatings in accordance with manufacturer's instructions. (1) Carboline Alternate: Polibrid 705 applied at a coverage of 25 to 30 MDFT. H. Plastic (CS-17); Exposed, uninsulated, includes PVC and CPVC piping (exposed uninsulated), fabrications, vinyl siding and related items. 1. Surface Preparation: As described herein and in accordance with manufacturer's instructions. 2. Coating System: Selection shall be as shown in Painting Schedule or on the Drawings. 09910-20 PAINTING AND PROTECTIVE COATINGS September 2009 0318-042-01 Plastic Interior and Exterior, Exposed, Uninsulated Coat 1 Coat t'l Coat 3 Manufacturer Product I Coverage I Product I Coverage Product Coverage I Generic Aliphatic Polyurethane (exterior only) over Polyamidoamine Epoxy Description .. AzkoNobel (ICI Paints- gar -Rust 236 4.0-8.0 Devthane 359H 3.0-6.0 Devoe) MDFT MDFT Carbothane Carboline Carboguard89 4.0 MDFT 134HG Series 2 0-2.5 0 Polyurethane(l) MDFT 4.0-6.0 Amercoat 450 2.0-2.5 PPG Amercoat Amercoat 385 MDFT Series MDFT Macropoxy 4.0-10.0 Hi -Solids 3.0-4.0 Sherwin-Williams 646 Fast Cure MDFT Polyurethane MDFT Epoxy 4.0 MDFT Series 740/750 Tnemec N69 Hi -Build Endura 3.0-4.0 Epoxoline 11 - Shield MDFT Products and application procedures differ form one manuracturer to another, t ierefore apply coatings in accordance with manufacturer's instructions. (1) Apply polyurethane second coat to exterior plastic components. 3.10 FIELD QUALITY CONTROL A. CONTRACTOR shall be responsible for the following testing during coating operations: 1. Prior to start and during the coating application each day, temperature and humidity readings will be obtained. If the values obtained are not within the recommended temperature and humidity range described herein or as required wo by the coating manufacture, the coating application will not be allowed. 2. Periodically check the wet film thickness during coating applications. 3. Prepared records of the above tests and readings. B. Testing Agency: OWNER will engage a qualified testing agency to perform tests and inspections. 1. Minimum Dry Film Thickness (MDF) readings will be obtained after each coat of paint has been applied, and after final coat has been applied. A test will be made for every 25 square feet of surface and at locations designated by the ENGINEER. A minimum of three readings of the area around the location will be obtained. If the average of these readings indicates the MDF for the final coat is below the specified minimum, CONTRACTOR shall apply another coat in accordance with the manufacturer's instructions. 2. The interiors of liquid containing structures and tanks will be tested for holidays after final coat application. Areas found to be defected shall have an additional coat applied. C. The coating system will be considered defective if it does not pass tests and inspections. When this occurs the ENGINEER will specify corrective measures. The coating system will be retested, with the additional expense occurred charged to the -� CONTRACTOR. 09910-21 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 D. Testing of Paint Materials: Owner reserves the right to invoke the following procedure at any time and as often as Owner deems necessary during the period when paints are being applied: 1. Owner will engage the services of a qualified testing agency to sample paint materials being used. Samples of material delivered to Project site will be taken, identified, sealed, and certified in presence of Contractor. 2. Testing agency will perform tests for compliance of paint materials with product requirements. 3. Owner may direct Contractor to stop applying paints if test results show materials being used do not comply with product requirements. Contractor shall remove _ non -complying paint materials from Project site, pay for testing, and repaint surfaces painted with rejected materials. Contractor will be required to remove rejected materials from previously painted surfaces if, on repainting with complying materials, the two paints are incompatible. E. Prepare test and inspection reports. 3.11 CLEANING AND PROTECTION A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site. _. B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by ENGINEER, and leave in an undamaged condition. D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. E. During progress of Work maintain premises free of unnecessary accumulation of tools, equipment, surplus materials, and debris. F. Collect cotton waste, cloths, and material which may constitute a fire hazard, place in closed metal containers and remove daily from site. G. Upon completion of the work remove all staging and scaffolding. Dispose of all sand, containers, ad rubbish in a suitable manner. Remove overspray, paint spots, oil or stains on adjacent surfaces. Leave the entire Project clean and acceptable. 3.12 PRODUCT DATA SHEET, COATING SYSTEM DATA SHEET, AND PAINTING SCHEDULE A. Product Data Sheet and Coating System Data Sheet: Information shall be provided by coating system manufacturer for each system in accordance with the PDS and CSDS after the "END OF SECTION". B. Painting Schedule: Protective coatings shall be applied to the various substrates in accordance with the Painting Schedule after the "END OF SECTION". END OF SECTION _ 09910-22 September 2009 PAINTING AND PROTECTIVE COATINGS E:j 0318-042-01 w No .40 PRODUCT DATA SHEET Complete and attach manufacturer's Technical Data Sheet to this Product Data Sheet (PDS) for each product submitted. Provide manufacturer's recommendations for the following parameters at temperature (° F)/relative humidity. TEMPERATURE/RH I 50/50 70/30 90/25 Induction Time Pot Life Shelf Life Drying Time Curing Time Min. Recoat Time Max. Recoat Time Provide manufacturer's recommendations for the following: • Mixing Ratio: • Maximum Permissible Thinning: • Ambient Temperature Limitations: • Surface Temperature Limitations: • Surface Profile Requirements: 09910-23 September 2009 PAINTING AND PROTECTIVE COATINGS 0318-042-01 COATING SYSTEM DATA SHEET Complete this Coating System Data Sheet (CSDS) for each coating system; include all -- components of the system (surface preparation, primer, intermediate coats, and finish coat). Include all components of a given coating system on a single PSD. PAINT SYSTEM NUMBER: Paint System Title: Coating System Supplier: Representative: Surface Preparation: Paint Material Product Name/Number (Generic) (Proprietary) Minimum Coats Coverage 09910-24 September 2009 PAINTING AND, PROTECTIVE COATINGS 0318-042-01 SECTION 13110 CATHODIC PROTECTION PART 1 - GENERAL 1.1 SCOPE A. Contractor shall retain the services of a certified corrosion control specialist to conduct soil tests and design a cathodic protection system for all buried piping in the yard. B. Contractor shall furnish all materials and labor for installation of the cathodic protection system as recommended by the corrosion specialist. C. Test the cathodic protection system to verify it is functioning as specified herein: 1. After completion of system installation and pipe backfill. 2. One year after final acceptance of the work. D. Install additional anodes, wiring and other components recommended by the corrosion control specialist should either of the tests required by Paragraph 1.1 C indicate the system does not meet the performance standards specified herein. 1.2 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. Section 15021 — Piping System, Steel Pipe 1.3 SUMMARY A. Section includes passive cathodic protection systems that use magnesium anodes to protect ductile iron and steel piping. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: For cathodic protection. Include plans, evaluations, reports, sections, details, and attachments to other work. 1. Detail locations of cathodic protection equipment, devices, and outlets, with characteristics and cross-references to products. 2. Include calculations and details of anode designs. 3. Include labeling and identifying scheme for wires, cables, and test boxes. C. Operation and Maintenance Data: Provide in accordance with Division 1 Section 01350 "Operation and Maintenance Data." D. Information Submittals: 1. Manufacturer's Certification of Compliance. 2. Copies of the corrosion control specialist's certification that is responsible for the design. 13110-1 June 2009 CATHODIC PROTECTION 0318-042-01 L 3. Complete plans from corrosion specialist indicating location and details of -- corrosion control facilities. 4. Calculations and assumptions used in design of corrosion control system. 5. Special shipping, storage and protection, and handling instructions. -- 6. Manufacturer's instructions for installation. 7. Manufacturer's Certificate of Proper Installation 8. Field quality -control reports. 9. Report from corrosion control specialist indicating location and results of all field testing. 10. Warranty: Sample of special warranty. _ 11. Operation and Maintenance Data 1.5 REFERENCE STANDARDS A. NACE RPO-169: Design Criteria for Underground and Submerged Ferrous Steel. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver, handle and store equipment components in accordance with shop drawings, manufacturer's written instructions. 1.7 QUALITY ASSURANCE A. Corrosion control specialist shall be a NACE-certified corrosion specialist and a licensed professional engineer in the state of Texas. B. Corrosion control specialist firm shall have been in the business at least five (5) years - and demonstrate previous pipeline corrosion system design experience. C. Corrosion control specialist shall be approved by the OWNER prior to bidding. 1.8 WARRANTY A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace permanent reference electrodes that fails in materials or workmanship within specified warranty period. 1. Warranty Period: 15 years from date of Substantial Completion. 2. Cost for the removal, shipment, repair and installation by CONTRACTOR shall be included in warranty, as well as correction of defective work. 1.9 SYSTEM DESCRIPTION A. The cathodic protection system shall be comprised of wires, anodes, test stations, and other appurtenances necessary to make a complete system and to meet the performance standards specified herein. B. The test stations and other cathodic protection measures indicated on OWNER approved Shop Drawings shall be considered as minimum requirements. The Contractor shall install any other facilities recommended by the corrosion control specialist at no additional cost to the Owner. 13110-2 June 2009 CATHODIC PROTECTION 0318-042-01 C. The system shall be designed to meet the following performance guidelines. 1. Minimum design life — 15 years 2. Reference Potential — (-850) my do or more negative referenced to copper/copper sulfate anode. PART 2-PRODUCTS 2.1 MAGNESIUM ANODES, TYPE II A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Corrpro Companies, Inc. 2. Cott Manufacturing Company. 3. CPMasters, Inc. 4. ELTECH Systems Corporation USA; Anode Technologies Group. 5. Farwest Corrosion Control Company. 6. Loresco International. 7. MATCOR. B. Comply with ASTM B 843. C. Chemical composition as percent of weight shall be as follows: 1. Aluminum: 0.010 maximum. 2. Manganese: 0.50 to 1.3. 3. Zinc: 0.05 maximum. 4. Silicon: 0.50 maximum. 5. Copper. 0.02 maximum. 6. Nickel: 0.001 maximum. 7. Iron: 0.03 maximum. 8. Other Impurities: 0.05 each; 0.3 maximum total. 9. Magnesium: Remainder. D. Anode Core: Galvanized steel with anode wire silver -soldered to the core. Connection shall be recessed and epoxy insulated for 600-V rating. Connection shall be covered with heat -shrinkable tubing, and insulation shall be extended over connection. E. Anode Wires: Factory -installed cables, with copper conductors, suitable for direct burial; not less than No. 10 AWG with Type THWN insulation according to ASTM D 1248 and NEMA WC 70/ICEA S-95-658; long enough to extend to accompanying junction box without splicing. F. Anode Backfill: Backfill materials packaged in water -permeable fabric sack or cardboard container. Anodes shall be factory installed in packaged backfill using methods that result in dense packing of fill with factory -installed anode spacers to ensure centering of anode in packaged anode backfill. Backfill material shall have the following chemical composition by weight: 1. Hydrated Gypsum: 75 percent. 2. Bentonite Clay: 20 percent. 3. Anhydrous Sodium Sulfate: 5 percent. .W 13110-3 June 2009 CATHODIC PROTECTION M 0318-042-01 2.2 PERMANENT REFERENCE ELECTRODES A. Copper/copper sulfate (Cu/CuSO4), suitable for direct burial. Electrode shall be guaranteed by supplier for 15 years' service in the installed environment. 2.3 WIRE AND CABLE A. Anode Header Cable: Single -conductor, Type HMWPE, insulated cable specifically designed for direct -buried do service in cathodic protection installations. 1. Conductor: Stranded, annealed, uncoated copper, not less than No. 8 AWG, complying with ASTM B 3 and ASTM B 8. 2. Insulation: High -molecular -weight polyethylene, complying with NEMA WC 70/ICEA S-95-658. 3. Minimum Average Thickness of Insulation: 110 mils for Nos. 8 through 2 AWG, -` and 125 mils for Nos. 1 through 410 AWG; rated at 600 V. 4. Connectors: Copper compression type or exothermic welds. B. Conductors and Cables: 1. Bonding Conductors for Joint and Continuity Bonds: Not less than No. 8 AWG, stranded, Type THWN copper conductors. 2. Flexible Pipe Coupling Bonds: Flexible copper straps with electrical resistance equal to No. 1/0 AWG stranded copper wire and with five holes for five exothermic welds to pipe. 3. Test Wires: No. 12 AWG, Type THWN copper conductors. 4. Resistance Wires: No. 16 or No. 22 AWG nickel -chromium wire. 5. Cables for Installation in Conduit: Type THWN copper conductors. 2.4 TEST STATIONS A. Manufacturers: Subject to compliance with requirements, available manufacturers - offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Corrpro Companies, Inc. 2. Cott Manufacturing Company. 3. CPMasters, Inc. B. Plastic Test Stations: Flush -mounted type, manufactured of high -impact -resistant PVC or polycarbonate with watertight conduit connections and cover and removable terminal board having at least five terminals. C. Test Station Mounting Enclosures: 1. Non -Traffic -Area Boxes: Comply with requirements in Division 16 Section "Raceways" 2. Traffic -Area Boxes: Comply with requirements in Division 2 Section "Underground Ducts and Utility. Structures." Boxes shall have cast-iron covers with a welded bead legend "CP TEST." 13110-4 June 2009 CATHODIC PROTECTION _, 0318-042-01 2.5 SEALING, POTTING, AND DIELECTRIC COMPOUNDS A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Chase Corporation - Chase Specialty Coatings; Royston Business Group. 2. Chase Corporation - Chase Specialty Coatings; Tapecoat Business Group. 3. Farwest Corrosion Control Company. 4. 3M; Electrical Products Division. B. Sealing and Dielectric Insulating Compound: Comply with NACE RP0188. Black, rubber based, soft, permanently pliable, tacky, moldable, and unbacked; 0.125 inch minimum thickness or greater depending on conditions. C. D. 2.6 Potting Compound: Comply with NACE RP0188. Cast -epoxy, two -package type; fabricated for this purpose and covered with heat -shrinkable tape. Pressure -Sensitive, Vinyl -Plastic Electrical Tape: Comply with UL 510. EXOTHERMIC WELDING MATERIALS A. Exothermic Weld Kits: Specifically designed by manufacturer for welding materials and shapes required. B. Exothermic Weld Caps: Dome of high -density polyethylene, 10-mil minimum thickness, filled with mastic and containing a tunnel portion to separate lead wire from • exothermic weld. 2.7 COATING REPAIR MATERIALS A. Touchup Coating Materials: Comply with requirements in Division 9 Section 09900 "Painting" for coating systems for touchup of factory -applied coatings. B. Adhesive -Applied Coating Materials: Coating materials shall be compatible with factory -applied coating system. 1. Nominal thickness of coating materials shall be not less than 16 mils, plus or minus 5 percent. 2. Coating materials shall be one of the following supplied by factory -applied coating system manufacturer: a. Polyvinyl -chloride, pressure -sensitive, adhesive tape. b. High -density polyethylene/bituminous rubber compound tape. C. Butyl rubber tape. d. Coal -tar epoxy. PART 3 - EXECUTION 3.1 TESTING A. Prior to installation of the pipeline, test the soil for resistivity as recommended by the corrosion control specialist. ow 13110-5 June 2009 CATHODIC PROTECTION 0318-042-01 B. Test soil to depth of proposed pipe - 3.2 DESIGN A. Design system to meet the performance criteria described in plans from corrosion control specialist. Design shall include recommendations for location and size of all cathodic protection facilities. 3.3 GENERAL INSTALLATION REQUIREMENTS A. Comply with ANSI/IEEE C2 and NFPA 70. B. Make connections to ferrous pipe using exothermic welding. C. Coat welds with the coating repair material and apply an exothermic weld cap. 3.4 MAGNESIUM ANODE INSTALLATION A. Install magnesium anodes at locations that clear obstructions. Install at least 36 inches and no more than 10 feet from pipe to be protected. Install in augered holes with top of anode a minimum of 36 inches below finished grade. In soils that will collapse into augered holes, use casing of galvanized sheet steel. B. Install anodes in a dry condition after plastic or waterproof protective covering has been completely removed from water -permeable permanent container that houses anode metal. Do not use anode -connecting wire for lowering anode into hole. Backfill annular space around anode with fine earth in 6-inch layers; compact each layer using hand tools. Do not strike anode or connecting wire during backfilling and compacting. After backfilling and compacting to within 6 inches of finished grade, pour approximately 5 gal. of water into each filled hole. After water has been absorbed by earth, complete backfilling to finished level. C. If rock strata are encountered before achieving specified augured hole depth, install _ anodes horizontally at depth at least as deep as bottom of pipe to be protected. D. Install anodes spaced as indicated, connected through a test station to the pipeline, allowing slack in connecting wire to compensate for movement during backfill operation. E. Do not use resistance wires to reduce current output of individual or group anodes. 3.5 INSTALLATION OF REFERENCE ELECTRODES A. Install directly beneath the buried metallic component being protected. 3.6 CABLE AND WIRE INSTALLATION A. Install conductors, except anode wires, in PVC conduit with waterproof PVC junction boxes. Comply with requirements in Division 16 Section 16110 "Raceways" for conduit and its installation. 13110-6 June 2009 CATHODIC PROTECTION 0318-042-01 B. Anode Wire Installation: Cover trench bottom for the anode wire with 3-inch layer of sand or stone -free earth. Center wire on backfill layer and do not stretch or kink the conductor. Place backfill over wire in layers not exceeding 6 inches deep, and compact each layer. Use clean fill, free from roots, vegetable matter, and refuse. Place cable underground -line warning tape within 18 inches of finished grade, above cable and conduit. C. Bonding Conductors: Install conductors on metallic pipe, to and across buried flexible couplings, mechanical joints, and flanged joints except at places where insulating joints are specified. Welded and threaded joints are considered electrically continuous and do not require bonding. 1. Install at least two bonds between parts requiring bonding. 2. Bonding conductors must contain sufficient slack for anticipated movement between structures. Bonding conductors across pipe joints shall have not less than a 4-inch slack for pipe expansion, contraction, and soil stress. 3. Connect bonding conductors to pipe, coupling follower rings and coupling middle ring or sleeve. Connect bonding conductors with exothermic welds. D. For wire splicing, use compression connectors or exothermic welds. 3.7 TEST STATIONS A. Install test stations as follows: 1. At 1000-foot intervals. 2. At insulating joints. 3. At both ends of casings when casing material is included in the cathodic - protection system. 4. Where pipe crosses other metal pipes. 5. Where pipe connects to existing piping system. 6. Where pipe connects to dissimilar metal pipe. 7. And/or as recommended by corrosion specialist. B. Install test stations on backfill complying with requirements for trench bottom fill for anode wires unless otherwise indicated. C. Terminate test conductors on terminal boards and install a spare set of test leads at each testing location. 3.8 PIPE JOINTS A. Insulating Flange Sets: Cover flanges with sealing and dielectric compound. B. Insulating Unions: Install electrical isolation at each building entrance and at other locations indicated. Cover unions with sealing and dielectric compound. 3.9 INSULATING PIPE SLEEVES A. Install insulating sleeves between metallic piping and metal buildings, hangers, supports, and other metal structures. Completely surround the metallic pipe for the full length of the steel contact and effectively prevent contact between the cathodically protected metallic pipe and other metallic structures. Support insulating sleeve to 13110-7 June 2009 CATHODIC PROTECTION 0318-042-01 prevent damage to coating and to accommodate relative movement, vibrations, and temperature differentials. 3.10 COATINGS A. Field Joints: Apply adhesive -applied coating system in a thickness to achieve corrosion protection equal to adjacent factory -applied coating. 3.11 FIELD QUALITY CONTROL A. Comply with NACE RP0169 and NACE RP0285. B. Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory -authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. C. Tests and Inspections: 1. Static Pull Test: Choose, at random, one completed anode of each type for this destructive test. Demonstrate that anode wire connections have enough strength to withstand a minimum tensile load of 300 lb. If test fails, replace all anodes and repeat test at another randomly selected anode. 2. Insulation Testing: Before anode system is connected to pipe, test insulation at each insulating joint and fitting. Demonstrate that no metallic contact, or short circuit, exists between the two insulated sections of pipe. Replace defective joints or fittings. 3. Bonding Tests: Test for electrical continuity across all bonded joints. Repair or add additional bonds until electrical continuity is achieved. 4. Baseline Potentials: After backfilling of pipe and anodes is completed, but before anodes are connected to pipe, measure the static potential of pipe to soil. Record initial measurements. 5. Anode Output: Measure electrical current as anodes or groups of anodes are connected to pipe. Use a low -resistance ammeter. Record current, date, time, _ and location of each measurement. 6. Pipe -to -Reference Electrode Potential Measurements: On completion of installation of entire cathodic protection system, make electrode potential measurements according to NACE RP0169, using a copper/copper-sulfate reference electrode and a potentiometer -voltmeter, or a do voltmeter with an internal resistance (sensitivity) of not less than 100,000 ohms per volt and a full scale of 1 or 2 V. Make measurements at same locations as those used for baseline potentials. Record voltage, date, time, and location of each measurement, using one of the following two methods: a. 0.85 V Negative Voltage: With cathodic system in operation, measure a negative voltage of at least minus 0.85 V between pipe and a saturated copper/copper-sulfate reference electrode contacting the earth directly over pipe. b. 100-mV Polarization Voltage: Determine polarization voltage shift by interrupting protective current and measuring polarization decay. An immediate voltage shift will occur if protective current is interrupted. Use voltage reading, after immediate shift, as base reading from which to measure polarization decay. Measure at least a minimum polarization 13110-8 June 2009 CATHODIC PROTECTION 0318-042-01 voltage shift of 100 mV between pipe and a saturated copper/copper- sulfate reference electrode contacting the earth directly over pipe. D. Location of Measurements for Piping: For coated piping or conduit, measure from reference electrode in contact with the earth directly over pipe. Measure at intervals not exceeding 400 feet. Make additional measurements at each distribution service W. riser, with reference electrode placed directly over service line. 04 E. Inspect coatings; comply with NACE RP0188. Repair imperfections of factory -applied coatings as specified in "Coatings" Article. 1. Use electronic holiday detectors to detect coating imperfections. 2. All damage to the protective coating during transit and handling shall be repaired before installation. 3. Repair factory -applied coatings to have equal or better corrosion resistance than the factory -applied coating system. Field -repair material shall be of the type approved by, and shall be applied as recommended by, manufacturer of the coating material. 3.12 ADJUSTING A. During the first year after Substantial Completion, test, inspect, and adjust cathodic protection system every three months to ensure its continued compliance with specified requirements. 3.13 DEMONSTRATION A. Engage a factory -authorized service representative to train OWNER'S maintenance personnel to adjust, operate, and maintain cathodic protection system and prepare Operation and Maintenance data in accordance with Division 1 Section 01350 " Operation and Maintenance Data." END OF SECTION 13110 13110-9 June 2009 CATHODIC PROTECTION 0318-042-01 SECTION 15015 PIPING SYSTEMS -BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section specifies piping materials and installation methods common to the piping system Sections of Division 15 and includes joining materials, piping specialties, and basic piping installation instructions. This Section includes: 1. All exposed, submerged, and buried plant and station piping including _ modifications to existing. systems as well as new pipe systems, except systems specified in related work. 2. Potable water and raw water mains, sanitary sewers, storm drains and culverts serving plant or station and shown on Drawings. 3. Floor and sanitary drain systems within building limits are not included. 4. Domestic water distribution systems, sanitary sewage systems, and storm drainage systems are covered in other Sections. 5. CONTRACTOR shall mark actual flowline or top of pipe elevations and actual coordinates on record drawings when pipelines are being installed. _ B. Related Sections: 1. Division 2 Section "Excavation and Backfill for Large Diameter Pipe" for the excavation, trenching, and backfilling for buried piping systems. 2. Division 2 Section "Piped Utilities -Basic Materials and Methods" for materials and methods for off -site piped utilities specified in Division 2 piping systems. 1.3 REFERENCES AND DEFINITIONS A. References: 1. American National Standards Institute (ANSI): a. B9.1 Standard Safety Code for Mechanical Refrigeration b. B31.1.0 Standard Code for Pressure Piping, Power Piping 2. ASTM International (ASTM): a. A 53 — Specification for Pipe, Steel, Black and Hot -Dipped, Zinc -Coated, Welded and Seamless b. B 32 — Specification for Solder Metal c. B 813 — Specification for Liquid and Paste Fluxes for Soldering Copper and Copper Alloy Tube d. B 828 — Practice for Making Capillary Joints by Soldering of copper and Copper Alloy Tube and fittings e. C 1173 — Specification for Flexible Transition Couplings for underground Piping Systems f. D 1785 — Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120 g. D 2564 — Specification for Solvent Cements for Poly(\/inyl Chloride) (PVC) Plastic Piping systems 15015-1 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 h. D 2672 — Specification for Joints for IPS PVC Pipe Using Solvent Cement i. D 2846 — Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Hot- and Cold -Water distribution Systems j. D 2855 — Practice for Making Solvent -Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings k. D 3139 — Specifications for Joints for Pressure Pipes Using Flexible Elastomeric Seals I. D 3212 — Specification for Joints for Drain and Sewer Pipes using Flexible Elastomeric Seals m. E 814 Test Method for Fire Tests of Through -Penetration Fire Stops n. F 402 — Practice for Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining thermoplastic Pipe and Fittings o. F 656 — Specifications for Primers for Use in Solvent Cement Joints of Poly Vinyl Chloride) (PVC) Plastic Pipe and Fittings ` p. F 493 — Specification for Solvent Cements for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe and Fittings 3. American Society of Mechanical Engineers (ASME): a. A13.1 Scheme for Identification of Piping Systems b. B1.20.1 Pipe Threads, General Propose, Inch c. B16.21 Nonmetallic Flat Gaskets for Pipes Flanges d. B18.2.1 Square and Hex Bolts and Screws, Inch Series 4. American Welding Society (AWS): a. A5.8 Specification for Filler Metals for brazing and Braze Welding _ b. D1.1 Structural Welding Code Steel c. D10.12 Guide for Welding Mild Steel Pipe 5. American Waterworks Association (AWWA): _ a. C110 — Standard for Ductile -Iron and Gray -Iron Fittings, 3 In. Through 48 In. (76 mm Through 1,219 mm) for Water b. C219 — Standard for Bolted, Sleeve -Type Couplings for Plain -End Pipe 6. National Science Foundation (NSF): a. NSF/ANSI 61 — Drinking Water Components — Health Effects B. Definitions: 1. Ferrous Metal: Iron, steel, stainless steel, and alloys with iron as principal component. 2. -Nonmetallic: PVC, CPVC, PE, HDPE, and FRP. _ 3. Nonferrous Metals: Copper 4. Wetted or Submergence: a. Submerged, or less than one foot above the maximum liquid surface of water _ holding structures. b. Below top of channels, under cover of slabs of channels or tanks. c. In other damp or covered locations (e.g., vaults, wetwells, utility corridors, etc.) 5. Exposed or Atmospherically Exposed Piping: All piping exposed to the atmosphere (not buried, submerged, or embedded). This designation includes insulated piping inside chases, or piping hidden from view. 6. Texas Administrative Code (TAC): a. Chapter 317 —Design Criteria for Sewerage Systems b. Chapter 290 Subchapter D — Rules and Regulations for Public Water Systems c. Chapter 210 -Use of Reclaimed Water -- 15015-2 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS s 0318-042-01 1.4 SYSTEM DESIGN DESCRIPTION A. General: z 1. The Drawings and Specifications are not all inclusive of explicit piping details; provide piping in accordance with the laws and regulations and intended use, including: a. Power Plant Piping: ANSI/ASME B31.1 Code. b. Building .Service Piping: ANSI/ASME B31.9 Code, as applicable. c. Sanitary Building Drainage and Vent Systems: ICBO/APMO Uniform Plumbing Code. 2. Buried Piping: Provide to be suitable for design conditions as follows: a. H2O-S16 traffic load (AASHTO Standard Highway Specifications for Bridges) with 1.5 impact factor. b. Piping both with and without internal pressure. 3. Pressure Testing and Disinfection of Pipelines: Refer to Division 15 Section "Field Testing of Plant and Station Piping Systems" for testing of gravity and pressure piping systems; the disinfection of potable water systems; and to the individual piping system Sections for specific requirements. B. Design Requirements: 1. The configuration and layout of various piping systems are shown in the Drawings. The types of pipe and joints, and embedment (if buried) to be used for each system are shown on the drawings or included in the appropriate specification Sections. 2. In certain locations, pipe supports, anchors, and expansion joints have been indicated on the drawings, but no attempt has been made to indicate every pipe support, anchor, and expansion joint. 3. It shall be the CONTRACTOR'S responsibility to provide a complete system of pipe supports, to provide expansion joints, and to provide restraints and anchor all piping, in accordance with the requirements set forth herein. Additional pipe supports may be required adjacent to expansion joints, couplings, or valves. 4. Pipe and fittings shown on yard piping drawings are general in nature. CONTRACTOR shall determine exact lengths and fittings required and make field adjustments necessary to complete piping and avoid conflicts. 5. Changes to the plan and profile of piping shall be submitted to ENGINEER for approval. C. Restrained Pipe and Fitting Joints, Buried Piping: 1. Restrained joints shall be used for a sufficient distance from each bend, tee, elbow, plug, or other fitting to resist thrust that will develop at the design pressure. 2. CONTRACTOR shall provide restraint length calculations in accordance with AWWA M41 based on the laying conditions, soil conditions, depth of cover, and pressures to determine the number of restrained joints that will be required. 3. For the purposes of thrust restraint, design pressures shall be the working pressure shown, plus the additional surge allowance for potable water, service water, and pump discharge piping. The design pressure shall be 1.5 times the design test pressure indicated for all other piping. 1.5 SUBMITTALS A. Product Data: Submit product data on each product item to be installed. 15015-3 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 B. Shop Drawings: Provide shop drawings for piping systems, organized by plant areas or individual piping systems. Prepare drawings to scale (1/4-inch = 1 foot 0 inch minimum), with the following information: 1. Type of piping including materials, fittings, weights, linings, and coatings. A code or -- key to product data sheet may be used. 2. Location and type of joints, fittings, taps, supports, restraint systems, kickers, and blocking (as applicable). Identify by catalog number or shop drawing detail number. 3. Provide information on interior linings and exterior coatings. 4. Identify the exact number of restrained joints, as well as the length of restrained joint piping for pressure buried piping. C. Specials: Provide fabrication drawings for specials including fabricated fittings, wall pipes, and wall sleeves. Show dimensions and materials of construction. D. Before starting fabrication, CONTRACTOR shall provide ENGINEER with pipe design = calculations, the proposed engineered hanger and support systems, and specials, which shall incorporate the following information: 1. Laying plan identifying all restrained joints, details of standard pipe section, special -e fittings, pipe supports, and bends. 2. Piping components shall be numbered or otherwise sequence designated. 3. Outlets and bends shall be made up into special lengths so that, when installed, - they will be located as indicated. 4. Each pipe and fitting shall be marked indicating class of pipe and location number in pipe laying plan. Markings shall be coded to the Shop drawings. E. Quality Control Submittals: 1. Welding certificates. 2. Field Test Reports: For each pressure testing of piping systems and field-testing specified in other piping systems sections. 3. Affidavits: a. Manufacturer's Certificate of Compliance with reference standards. t b. Laboratory Testing Equipment: Certified calibrations, manufacturer's product data and test procedures. c. Certified welding inspection and test results. .- 1.6 QUALITY ASSURANCE A. Steel Support Welding: Qualify procedures and personnel according to - AWS D1.1/D1.1M, "Structural Welding Code." B. Steel Piping Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications." ` 1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping." 2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current. u 3. Welding procedures and testing shall comply with ANSI B31.1.0, "Standard Code for Pressure Piping, Power Piping," and the AWS Welding Handbook. 4. Soldering and Brazing Procedures shall conform to ANSI B9.1, "Standard Safety - Code for Mechanical Refrigeration." C. Comply with ASME A13.1 for lettering size, length of color field, colors, and viewing angles of identification devices. Y 15015-4 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 1.7 DELIVERY, STORAGE, AND HANDLING A. Acceptance at Site: 1. General: Comply with manufacturer's instructions for unloading, storage, and handling at Project site. 2. Delivery and Handling: a. Do not deliver piping materials to project site prior to ENGINEER'S review of required submittals. b. Unload and handle piping materials using proper material handling equipment. Use heavy canvas or nylon slings tolift pipe and fittings to protect coatings. c. Do not drop, roll, skid piping materials. d. Take such additional precautions as necessary to avoid damaging piping materials and coatings thereon. - B. Storage and Protection: 1. Store piping materials in a manner that will reduce risk of damage. 2. Block piping materials to prevent rolling. 3. Protect materials from weather and sun as recommended by the manufacturer. 4. Provide factory -applied plastic end -caps on each length of pipe and tube, except for concrete, corrugated metal, hub -and -spigot, and clay pipe. Maintain end -caps through shipping, storage and handling to prevent pipe -end damage and prevent entrance of dirt, debris, and moisture. 5. Protect stored pipes and tubes. Elevate above grade and enclose with durable, waterproof wrapping. When stored inside, do not exceed structural capacity of the floor. 6. Protect flanges, fittings, and specialties from moisture and dirt by inside storage and enclosure, or by packaging with durable, waterproof wrapping. Attach protectors over entire gasketed surface of flanges. 7. Flexible piping shall be stored in shaded area 24-hours prior to installation. 1.8 PROJECT CONDITIONS A. Field Measurements: Verify actual dimensions of openings, construction contiguous with work, and related items by field measurements before fabrication. B. Flange Coordination: Coordinate the dimensions, hole drillings and type of flange face (flat or raised) of the flanges furnished with companion flanges of valves, pumps and ;► equipment to be connected to or installed in the piping. C. NSF Certified: All surfaces and materials in contact with water or in contact with a chemical being added to water that is being treated for potable water use and conveyance, shall comply with the requirements of the Safe Drinking Water Act and shall conform to NSF-61. Product shall bear the mark or seal of an accredited testing laboratory. 1.9 COORDINATION A. Coordinate installation of required supporting devices and set sleeves in poured -in - place concrete and other structural components as they are constructed. B. Coordinate installation of identifying devices after completing covering and painting if devices are applied to surfaces. C. Coordinate size and tocatton. of concrete abases.: ,.: Formwork, reinforcement, and concrete requirements are specified in Division 3. .. 15015-5 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS W 0318-042-01 D. Coordinate installation of piping systems with other trades; such as electrical, — instrumentation, fire protection, and HVAC ducts. PART 2 - PRODUCTS 2.1 PIPING A. As specified in the various Division 15 Sections and as shown on the Drawings. B. Diameters Shown: 1. Standardized Products: Nominal Size. 2. Fabricated Steel Piping (Except Cement -Lined): Outside diameter, ASME B36.10M. 2.2 PIPE JOINING MATERIALS A. Pipe -Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents. 1. ASME B16.21, nonmetallic, flat, asbestos free, 1/8-inch maximum thickness, unless otherwise indicated. a. Full -Face Type: For flat -face, Class 125, cast-iron and cast -bronze flanges. _ b. Narrow -Face Type: For raised -face, Class 250, cast-iron and steel flanges. 2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full - face or ring type, unless otherwise indicated. B. Flange Bolts and Nuts: 1. ASME B18.2.1, carbon steel, unless otherwise indicated. 2. Exposed: ASTM A307, Grade B, hex head bolts; ASTM A563, Grade A or B, hex - head nut; and ASTM F436 hardened steel washers. Corten acceptable for mechanical joints. 3. Buried: ASTM A193 or ASTM A320, Type 304 stainless steel bolts; ASTM A194, _ Type 304, hex head nuts/ and washers of the same material as bolts. 4. Submerged: ASTM A193 or ASTM A320, Type 316 stainless steel bolts; ASTM A194, Type 316, hex head nuts/ and washers of the same material as bolts. C. Segmented Mechanical Couplings: Provide when designated on the Drawings or as an option to flanges for above ground piping, segmented mechanical couplings may be used. 1. Housing: Ductile iron conforming to ASTM A-536, grade 65-45-12, with orange enamel coating. 2. Coupling Gasket: Grade "E° EDPM. 3. Bolts and Nuts: Heat -treated plated carbon steel, trackhead meeting physical and chemical requirements of ASTM A-449 and physical requirements of ASTM A-183. 4. Victaulic Style 77 standard flexible couplings or equivalent. D. Plastic, Pipe -Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated. E. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813. F. Brazing Filler Metals: AWS A5.8, BCuP Series, copper -phosphorus alloys for general - duty brazing, unless otherwise indicated; and AWS A5.8, BAg1, silver alloy for refrigerant piping, unless otherwise indicated. 15015-6 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS w 0318-042-01 G. Welding Filler Metals: Comply with AWS D10.12/D10.12M for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded. H. Solvent Cements for Joining Plastic Piping: 1. CPVC Piping: ASTM F 493. 2. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656. I. Fiberglass Pipe Adhesive: As furnished or recommended by pipe manufacturer. 2.3 TRANSITION FITTINGS A. Transition Fittings, General: Same size as, and with pressure rating at least equal to and with ends compatible with, piping to be joined. B. Transition Couplings NPS 1-1/2 and Smaller: 1. Underground Piping: Manufactured piping coupling or specified piping system fitting. 2. Aboveground Piping: Specified piping system fitting. C. AMA Transition Couplings NPS 2 and Larger: 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Cascade Waterworks Mfg. Co. b. Dresser, Inc.; DMD Div. c. Ford Meter Box Company, Inc. (The); Pipe Products Div. d. JCM Industries. e. Smith -Blair, Inc. f. Viking Johnson. 2. Description: AMA C219, metal sleeve -type coupling for underground pressure piping. D. Plastic -to -Metal Transition Fittings: 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not • limited to, the following: a. Spears Manufacturing Co. 2. Description: CPVC and PVC one-piece fitting with manufacturer's Schedule 80 equivalent dimensions; one end with threaded brass insert, and one solvent - cement -joint or threaded end. E. Plastic -to -Metal Transition Unions: .r 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Colonial Engineering, Inc. b. NIBCO INC. c. Spears Manufacturing Co. 2. Description: CPVC and PVC four-part union. Include brass or stainless -steel threaded end, solvent -cement -joint or threaded plastic end, rubber O-ring, and union nut. F. Flexible Transition Couplings for Underground Nonpressure Drainage Piping: 15015-7 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 1. Available Manufacturers: Subject to compliance with requirements, manufacturers - offering products that may be incorporated into the Work include, but are not limited to, the following: a. Cascade Waterworks Mfg. Co. v b. Fernco, Inc. c. Mission Rubber Company. d. Plastic Oddities. 2. Description: ASTM C 1173 with elastomeric sleeve ends same size as piping to be joined, and corrosion -resistant metal band on each end. 2.4 INSULATING FLANGES, COUPLINGS AND UNIONS A. Dielectric Fittings, General: Assembly of copper alloy and ferrous materials or ferrous material body with separating nonconductive insulating material suitable for system _ fluid, pressure, and temperature. B. Dielectric Unions: 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Capitol Manufacturing Co. _ b. Central Plastics Company. c. Epco Sales, Inc. d. Hart Industries, International, Inc. e. Watts Water Technologies, Inc. f. Zurn Plumbing Products Group; Wilkins Div. 2. Description: Factory fabricated, union, NPS 2 and smaller. a. Pressure Rating: 150 psig minimum at 180 deg F unless otherwise specified. b. End Connections: Solder joint copper alloy and threaded ferrous; threaded ferrous. C. Dielectric Flanges: 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Capitol Manufacturing Co. b. Central Plastics Company. c. Epco Sales, Inc. d. Watts Water Technologies, Inc. 2. Description: Factory -fabricated, bolted, companion -flange assembly, NPS 2-1/2 to NPS 4 and larger. a. Pressure Rating: 150 psig minimum unless otherwise specified. b. End Connections: Solder joint copper alloy and threaded ferrous; threaded solder joint copper alloy and threaded ferrous. _ D. Dielectric -Flange Kits: 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not h limited to, the following: a. Advance Products & Systems, Inc. b. Calpico, Inc. c. Central Plastics Company. d. Pipeline Seal and Insulator, Inc. 15015-8 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS ow 0318-042-01 Is 2. Description: Non -conducting materials for field assembly of companion flanges, NPS 2-1/2 and larger. a. Pressure Rating: 150 psig minimum unless otherwise specified. -- b. Gasket: Neoprene or phenolic. c. Bolt Sleeves: Phenolic or polyethylene. d. Washers: Phenolic with steel backing washers. E. Dielectric Couplings: 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not .. limited to, the following: a_ Calpico, Inc. b. Lochinvar Corporation. 2. Description: Galvanized -steel coupling with inert and noncorrosive, thermoplastic lining, NIPS 3 and smaller. a. Pressure Rating: 300 psig at 225 deg F unless otherwise specified. b. End Connections: Threaded. F. Dielectric Nipples: 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Perfection Corporation. ,. b. Precision Plumbing Products, Inc. c. Victaulic Company. 2. Description: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining. a. Pressure Rating: 300 psig at 225 deg F unless otherwise specified. b. End Connections: Threaded or grooved. 2.5 CONNECTORS AND COUPLINGS A. General: Unless otherwise specified; .. 1. Type 304 stainless steel bolts, fasteners, tie rods and accessories are required for connectors intended for buried, wetted, or submerged service. 2. Carbon steel bolts, fasteners, tie rods and accessories are required in exposed atmospheric service. Coat items in accordance with Division 9 Section "Painting and Protective Coatings." B. Elastomer Bellows Connector: 1. Type: Fabricated spool, with single filled arch. 2. Materials: Nitrile tube and neoprene cover. 3. End Connections: Flange, 125-lb ANSI B16.1 standard, with elastomeric face and steel retaining rings. 4. Working Pressure: 190 psig minimum, size 12-inch and smaller. 5. Thrust Restraint: Manufacturer designed control rods, fasteners, and accessories to limit travel of elongation and compression. 6. Manufacturers and Products: a. Garlock; Style 204 b. Goodall rubber Co. c. General Rubber Corp. C. Flexible Type Couplings (Steel and Stainless Steel Pipe): 15015-9 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 1. Design: Provide thrust ties across flexible couplings. 2. Body and Middle ring: Carbon, Type 304, or Type 316. 3. Followers: Ductile iron, malleable iron, Type 304, or Type 316. 4. Bolts: Carbon steel, Type 304 or 316 stainless steel. - 5. Gaskets: EDPM 6. Materials of construction of coupling, closure plates, end rings, and fasteners to match piping materials on which coupling is employed, as well as whether it is .., exposed, wetted or submerged service. 7. Manufacturer and Product: a. Dresser; Style 128 b. Smith -Blair; Style 912 D. Split Sleeve Couplings (Steel and Stainless Steel Pipe): 1. Design: Double arch, with built-in thickened shoulders. Full joint restraint achieved for two times test pressure by weld -on end rings. Closure plates and sealing pad integral with coupling. 2. Gaskets: EDPM 0-ring style. _ 3. Joint Deflection: Up to 2 degree. 4. Carbon steel metal components to have factory -applied fusion bonded epoxy coating (7 MDFT). _ 5. Materials of construction of coupling, closure plates, end rings, and fasteners to match piping materials on which coupling is employed, as well as whether it is exposed, wetted or submerged service. 6. Manufacturer and Product: Victaulic, Inc.,; Depend-O-Lok Model FxF, Type 2 Coupling, or equal. E. Flanged Coupling Adapters (FCA) (Ductile Iron and Steel Pipe): _ 1. Design: Provide thrust across flexible coupling adapters. 2. Body: Carbon steel conforming to AWWA C207. 3. Flange: AWWA C207 or ANSI Standards. y 4. Bolts: Carbon steel, Type 304 or 316 stainless steel. 5. Gaskets: EDPM. 6. Carbon steel metal components to have factory -applied fusion bonded epoxy coating (7 MDFT). 7. Materials of construction of coupling, closure plates, end rings, and fasteners to match piping materials on which coupling is employed, as well as whether it is exposed, wetted or submerged service. 8. Manufacturer and Product: a. Dresser, Style 128 b. Smith -Blair; Style 912 F. Wedge Action Restraints (Ductile Iron and PVC Pipe): 1. Design: Wedges and wedge actuating components are incorporated into the design of the follower gland. 2. Material: Ductile iron, ASTM A536, Grade 65-45-12; wedges BHN 370 minimum. 3. Nuts: Designed with torque -limiting twist -off nuts, exposing a bolt head sized to permit adjustment and removal of joint restraint. 4. Chemical and nodularity test shall be performed as recommended by Ductile Iron Society on a per ladle basis. 5. Traceability: Provide material traceability records. 6. Coating: a. Wedge Assembly: Two coats of liquid Xylan fluoropolymer, heat cured. 15015-10 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS w 0318-042-01 *� b. Casting Body: Polyester based powder, electrostatically applied and heat cured, providing corrosion, impact and UV protection. 7. Approvals: �• a. Ductile Iron Pipe Restraints: 1) Underwriters Laboratories: Size 3-inch through 24-inch. 2) Factory Mutual: Size 3-inch through 12-inch. b. PVC Pipe Restraints: 1) Underwriters Laboratories: Size 4-inch through 12-inch. 2) Factory Mutual: Size 4-inch through 12-inch. 3) Size 4-inch through 24-inch comply with ASTM F1674. 8. Manufacturer and Product: a. Ductile Iron Pipe: EBAA Iron Megalug 1100 series. b. PVC Pipe: EBAA Iron Megalug 2000 PVC series. 2.6 PIPE SLEEVES A. Mechanical sleeve seals for pipe penetrations: 1. Pipe to wall/casing penetration closures shall be modular mechanical type, consisting of interlocking synthetic rubber links shaped to continuously fill the annular space between pipe or conduit and wall/casing opening. Once expanded, the mechanical seal shall provide a watertight seal. 2. Elastomeric element size and material shall be selected per manufacturer recommendations. Assemble with ASTM A276, Type 316 stainless steel bolts and nuts. 3. Pressure end plates shall be either Type 316 stainless steel or manufactured of glass reinforced plastic, with a minimum tensile strength of 27,000 psi. 4. Sized: According to manufacturer's recommendations for the size of pipe shown; to provide a watertight seal between pipe and wall sleeve opening. 5. Available Manufacturers: a. Advance Products & systems, Inc. (Innerlynx) b. Pipeline Seal & insulator, Inc. (Link -Seal) B. Galvanized -Steel Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint. C. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized, plain ends. D. Cast -Iron Sleeves: Cast or fabricated "wall pipe" equivalent to ductile -iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated. E. Molded PVC Sleeves: Permanent, with nailing flange for attaching to wooden forms. F. PVC Pipe Sleeves: ASTM D 1785, Schedule 40. G. Molded PE Sleeves: Reusable, PE, tapered -cup shaped and smooth outer surface with nailing flange for attaching to wooden forms. H. Insulated and Encased Pipe Sleeve: Conforming to Pipe Shields, Inc.; Models WFB<WFB-CS and —CW Series, as applicable. I. Seepage Ring: Provide a seepage ring in middle of wall sleeve as follows: 1. 3/16-inch minimum thickness, centered between sleeve ends for water stoppage .. on sleeves located in exterior or water bearing walls. 2. Outside Diameter: 3-inches grater that pipe sleeve outside diameter. .. 15015-11 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS %I 0318-042-01 3. Continuously fillet weld on each side all around. 2.7 EXPANSION JOINTS A. Elastomer Bellows: 1. Type: Reinforced, molded wide -arch. 2. End connections: Flanged, 125-lb ANSI B1.1 standard, with Type 304 stainless steel retaining rings. - 3. Washers: Over the retaining rings to provide a leak proof joint under test pressure. 4. Thrust Protection: Manufacturer designed and supplied control rods, fasteners, and accessories to protect bellows from overextension at test pressures. 5. Tube and Bellows Arch Lining: EDPM. 6. Rated Temperature: 250°F. 7. Rated Deflection and Pressure: a. Lateral Deflection: 3/4-inch minimum. b. Burst Pressure: four times rated pressure. c. Compression Deflection at Minimum Pressure: 1/2-inch at 250 psig. 8. Manufacturer and Product: a. Holz Rubber Company, Inc. b. Mercer Rubber Co.; Series 500 c. General Rubber Corp. d. Goodall Rubber Co. 2.8 LININGS AND COATINGS A. Interior Pipe Linings: Prepare, prime, and finish pipe interior in accordance the applicable piping system Division 15 Sections. B. Exterior coatings: Prepare, prime, and finish pipe interior in accordance the applicable piping system Division 15 Sections. 2.9 IDENTIFICATION A. Provide piping, valve, equipment, and ::`related product . iidentification devices in accordance with Division 10 Section'90952 ``Identificatiom Stericiling, and Tagging." 2.10 FIRESTOPPING A. Voids between sleeves or core -drilled openings and pipe or conduit passing through ` fire rated assemblies shall be fire stopped to comply with requirements of ASTM E 814. PART 3 - EXECUTION 3.1 GENERAL INSTALLATION REQUIREMENTS A. CONTRACTOR shall be responsible for, develop, and comply with the trench safety plan and a confined space entry plan in accordance with Division 2 Section "Excavation and Support Protection." B. CONTRACTOR shall provide a dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades complying with the requirements of Division 2 Section "Dewatering.° 15015-12 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS --I 0318-042-01 C. Excavation, trenching and backfilling of trenches for buried utilities shall comply with the requirements of Division 2 Section "Excavation and Backfill for Large Diameter Pipe." D. Install all piping systems in accordance with the Drawings, Specifications, reviewed shop drawings and manufacturer's installation instructions. Pipe and fitting materials shall comply with the individual Division 15 piping system sections. E. Examine all piping materials prior to installation and replace items that are damaged or otherwise defective. F. Thoroughly clean inside of all piping, valves, and accessories, and outside of all materials which will be exposed. Clean before installation and maintain in that condition until accepted by OWNER. G. Provide secure temporary caps or plugs over all pipe openings at the end of each day to prevent foreign material from entering the piping systems. Brace pipe to prevent it from floating. H. Do not modify structures, equipment, or piping for the purpose of installing piping unless specifically authorized by the ENGINEER. I. All piping systems shall be cleaned and tested prior to making connections at structures and to existing pipe systems. Small diameter pipes shall be flushed and large diameter pipes shall have mandrels pulled or other acceptable verification furnished that pipes are clean and no construction debris remains. Temporary blocking and forms used to grout inverts and blockouts shall be removed and manholes and pipes shall be tested before payment will be approved for the last 10 percent of the respective pipe pay estimate items. 3.2 PIPING FLEXIBILITY PROVISIONS A. General: Install flexible couplings to facilitate installation of piping, connections to equipment and pumping units, and to permit disassembly of valve, instrumentation components in accordance with approved Shop Drawings. ., B. Flexible Joints at Concrete Backfill or Encasement: Install within 18-inches from the termination of any concrete backfill or encasement. C. Flexible Joints at Concrete Structures: 1. Install 18-inches or less from the face of structure; joint may be flush with face. 2. Install a second flexible joint, whether shown or not: a. Pipe Diameter 18-Inches and Smaller: Within 18-inches of the first flexible joint. b. Pipe Diameter Larger Than 18-Inches: Within one pipe diameter of the first flexible joint. 3.3 DIELECTRIC FITTING APPLICATIONS A. Dry Piping Systems: Connect piping of dissimilar metals with the following: 1. NPS 2 and Smaller: Dielectric unions. - 2. NPS 2-1/2 to NPS 12: Dielectric flanges or dielectric flange kits. B. Wet Piping Systems: Connect piping of dissimilar metals with the following: 1. NPS 2 and Smaller: Dielectric couplings. 2. NPS 2-1/2 to NPS 4: Dielectric nipples. 3. NPS 2-1/2 to NPS 8: Dielectric nipples or dielectric flange kits. 15015-13 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 4. NIPS 10 and NIPS 12: Dielectric flange kits. 3.4 PIPING INSTALLATION A. Install piping according to the following requirements and Division 15 Sections specifying piping systems. B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on the Coordination Drawings. C. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless _ specifically indicated otherwise. D. Install piping to permit valve servicing. E. Install piping at indicated slopes. F. Install piping free of sags and bends. G. Install fittings for changes in direction and branch connections. H. Select system components with pressure rating equal to or greater than system operating pressure. I. Sleeves are not required for core -drilled holes. J. Permanent sleeves are not required for holes formed by removable PE sleeves. K. Penetrations: Install sleeves for pipes passing through concrete and masonry walls and concrete floor and roof slabs. 1. Cut sleeves to length for mounting flush with both surfaces. a. Exception: Extend sleeves installed in floors of equipment areas or other wet areas 2 inches above finished floor level. 2. Install sleeves in new walls and slabs as new walls and slabs are constructed. a. Steel Pipe Sleeves: For pipes smaller than NIPS 6. b. Steel Sheet Sleeves: For pipes NPS 6 and larger, penetrating gypsum -board partitions. 3. Watertight Penetrations; - a. Provide wall pipes with thrust collars. b. Provide taps for stud bolts in flanges set flush with wall face. 4. Non -Watertight Penetrations: _ a. Pipe sleeves with seep ring or modular mechanical seal. b. Sleeves are not required for core -drilled openings. 5. Existing Walls: Core -drilled openings and use modular mechanical seal. 6. Caulk all sleeves water and air tight. Seal annular space between pipe and sleeve with fire stopping compound. L. Verify final equipment locations for roughing -in. M. Refer to equipment specifications in other Sections for roughing -in requirements. N. Isolation Valves: Provide piping systems with line size shutoff valves located at risers, at main branch connections to mains for all equipment, and at other locations as indicated and required. 15015-14 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 0.0 O. Vent and Drain Valves: 1. Pipe 2-1/2 Inch Diameter and Larger: 3/4-inch vent, 1-inch drain, unless otherwise shown. �+ 2. Pipe 2-inch and Smaller: 1/2-inch vent.'/4-inch drain, unless other wise shown. 3. Install vent and drain valves at low points (drains) and high point (vents) of piping systems so that these systems can be entirely drained and vented. Provide line size ball valves for all vents and drains. P. Gravity drain systems beneath slabs shall be ductile iron, except for chemical drains, unless shown specifically on Plans. Encase all piping beneath slabs. Q. Install cleanouts on sludge piping so that all runs between bends may be accessed and at intervals not exceeding 250 feet on straight runs. .... R. All bolts and fasteners on buried or submerged fittings and valves shall be Type 304 stainless steel. S. Provide taps and connections for flushing, testing, and disinfecting pipeline systems. w T. Provide taps or weld-u-lets with stainless steel ball valves and piping at all high points in the piping systems for addition of air valves. 3.5 PIPING JOINT CONSTRUCTION A. General: 1. Join pipe and fittings according to the following requirements and Division 2 Sections specifying piping systems. 2. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe. 3. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly. B. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows: 1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified. 2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds. C. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article. D. Push -on Joints: 1. Comply with the recommendations of the pipe manufacturer relative to gasket installation and other jointing operations. 2. Prepare pipe ends by removing from bell and spigot ends all lumps, blisters, excess coal -tar coatings, oil and grease, then wire brush and wipe clean and dry before laying pipe. 3. Install ring gasket and, when seated, apply thin film of lubricant to inside surface of gasket. 4. Set spigot, applying lubricant as necessary, aligning with bell and contacting gasket. 5. Pipe 6 inches and smaller may be driven with a bar lever on end of pipe. 6. For larger pipe, use only approved ratchet -type jacking tool to pull pipe "home." E. Flanged Joints: 15015-15 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 1. Prior to installation of bolts, accurately center and align flanged joints to prevent t mechanical prestressing of flanges, pipe and equipment. Align bolt holes to straddle the vertical, horizontal or north -south center line. Do not exceed 3/64-inch per foot of inclination of the flange face from true alignment. - 2. Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. 3. Use bolts, nuts, and washers of the designated material for service conditions. Tighten bots progressively to prevent unbalance stress. Draw bolts tight to ensure proper seating of gaskets. Use suitable lubricants on bolt threads. F. Mechanical Joints: _ 1. Assemble in accordance with manufacturer's instructions. Remove all foreign matter from pipe ends, gaskets, and fittings before installation. 2. Wash ends of pipe, gaskets, and fittings with soapy water before assembly. - 3. If effective sealing is not obtained, disassemble joint and clean and reassemble. Over tightening bolts to compensate for poor installation practice will not be permitted. 4. Mechanical joints shall be suitably restrained to prevent movement. G. Mechanical Couplings, Rigid- 1. Install per manufacturer's instructions. Pipe ends shall be clean and smooth. - 2. Space between pipe ends shall be at least 1/4-inch, but not more than one inch. H. Flexible Couplings and Flanged Coupling Adapters: 1. Install per Drawings and in accordance with manufacturer's instructions at locations to facilitate removal of equipment, valves, and other elements. 2. All flexible couplings and flanged couplings shall be restrained. I. Grooved Joints: Assemble joints with grooved -end pipe coupling with coupling housing, gasket, lubricant, and bolts according to coupling and fitting manufacturer's written instructions. J. Soldered Joints: Apply ASTM B 813 water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy (0.20 percent maximum lead content) complying with ASTM B 32. K. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper -phosphorus brazing filler metal complying with - AWS A5.8. L. Pressure -Sealed Joints: Assemble joints for plain -end copper tube and mechanical pressure seal fitting with proprietary crimping tool to according to fitting manufacturer's written instructions. M. Plastic Piping Solvent -Cemented Joints: Clean and dry joining surfaces. Join pipe = and fittings according to the following: 1. Comply with ASTM F 402 for safe -handling practice of cleaners, primers, and solvent cements. 2. CPVC Piping: Join according to ASTM D 2846. - 3. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket fittings according to ASTM D 2672. Join other -than -schedule -number PVC pipe and socket fittings according to ASTM D 2855. 4. PVC Nonpressure Piping: Join according to ASTM D 2855. 15015-16 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 N. Plastic Pressure Piping Gasketed Joints: Join according to ASTM D 3139. O. Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212. P. Plastic Piping Heat -Fusion Joints: Clean and dry joining surfaces by wiping with clean cloth or paper towels. Join according to ASTM D 2657. 1. Plain -End PE Pipe and Fittings: Use butt fusion. ,. 2. Plain -End PE Pipe and Socket Fittings: Use socket fusion. Q. Bonded Joints: Prepare pipe ends and fittings, apply adhesive, and join according to pipe manufacturer's written instructions. 3.6 VALVES AND VALVE BOXES A. Prior to installing valves, remove foreign matter from within the valve. Inspect valves in the open and closed position to verify that all parts are in satisfactorily working condition. B. Install valves, setting valves plumb, with operators aligned as shown on the Drawings. For buried valves, center valve boxes on valves. Carefully tamp earth around each valve box for a minimum of four feet or to the trench face if less than four feet. 3.7 SECURING AND SUPPORTING A. Exposed Piping Systems: 1. Engineered Hanger and Support System as shown on the Drawings; and as specified herein to maintain the line and grade and prevent the transfer of stress to pumps, equipment and other related work. a. This includes the design of multiple piping supports and trapeze hangers and the selection of appropriate hangers and anchors to the structures, buildings, and facilities. This design shall be accomplished by a professional engineer license in the state where the Project is to be constructed. 2. Reaction Anchorage and Blocking: Install suitable reaction blocking, struts, anchors, clamps, joint harness, or other adequate means for preventing movement of pipe caused by unbalanced internal liquid pressure. Pressure can be expected R at tees, elbows, Y-branches, and other bends, which are installed in piping subjected to internal hydrostatic heads in excess of 15 feet in exposed piping.. B. Buried Piping Systems: 1. Reaction Anchorage and Blocking: Install suitable reaction blocking, struts, anchors, clamps, joint harness, or other adequate means for preventing movement of pipe caused by unbalanced internal liquid pressure. Pressure can be expected at unlugged tees, Y-branches and bends deflecting 11-1/4 degrees or more, which are installed in piping subjected to internal hydrostatic heads in excess of 30 feet in buried piping. •• 2. Restrained Joints: a. Unless otherwise indicated on the Drawings, the CONTRACTOR shall provided restrained pipe joints and fittings in accordance with Part 1 Project Requirements. b. All fittings shall be restrained using restrained joint pipe and fittings for a sufficient length to resist the internal hydrostatic pressures. .. c. Restrained push -on pipe and fittings shall be capable of being deflected after assembly. 15015-17 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 d. The design for restrained joints, including the length necessary to resist the design thrust and the approval of the fill material and compaction method, shall be performed and sealed by a professional engineer license in the state where the Project is to be constructed. - e. The above applies to unsaturated soil conditions. In locations where ground water is encountered, the soil density shall be reduced to its buoyant weight for all backfill below the water table and the coefficient of friction shall be reduced to 0.25. f. Bends and Appurtenances: 1) Provide restrained at all bends. 2) Horizontal changes in pipe direction may be accomplished without the use of direction -changing fittings. Controlled horizontal longitudinal bending using deflected joints may be used and shall not exceed 50 percent of the manufacturer's written recommendations. 3) Vertical changes in pipe direction may be accomplished without the use of directional -changing fittings which require vertical thrust blocking and/or joint restraint. Controlled vertical longitudinal bending shall be accomplished using deflected joints, resulting in a circular pipe arc where joints do not require restraint. Joint deflections shall not exceed 50 percent of the manufacturer's written recommendations. 4) Valves, hydrants, and fittings shall be supported by a concrete block or concrete cradle. The weight of these items shall not be supported by the pipe. 3. Concrete Thrust Blocking: a. When specified on the Drawings or with written approval from the ENGINEER, provide concrete thrust blocking between the fitting and solid, undisturbed ground. b. In the event that adequate support against undisturbed ground cannot be obtained, install metal harness anchorages consisting of steel rods or bolts across the joint and securely anchored to the pipe and fittings, or other adequate anchorage facilities. 3.8 CORROSION PROTECTION A. Provide corrosion protection for all steel clamps, rods, bolts, and other metal accessories used in reaction anchorages or joint harness where subject to submergence or contact with earth or other fill material and not encased in concrete. Apply not less than two coats of coal -tar mastic coating material to clean, dry metal surfaces. Allow first to dry prior to application of second coat. 3.9 PIPING CONNECTIONS A. Make connections according to the following, unless otherwise indicated: 1. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final "- connection to each piece of equipment. 2. Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final connection to each piece of equipment. 3. Install dielectric fittings at connections of dissimilar metal pipes. B. Connections with Existing Piping: 1. Field verify all dimensions, sizes, configuration and related items on all existing piping to which connections are to be made. 15015-18 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 2. Connections between new work and existing piping shall utilized suitable fittings for the conditions encountered. 3. Each connection with an existing pipe shall be made at a time under conditions which will least interfere with service to the OWNER or to customers, and as authorized by the OWNER. Provide notification 48 hours in advance prior to making connections. C. Pipe Connections: 1. Piping connections shall be of the type indicated on the Drawings or in the Piping Schedule. •+ 2. Field -welded joints will be permitted only when indicated on the Drawings and will require approval of the ENGINEER. 3. Field -welded joints will only be permitted at locations where the interior coatings can be repaired and inspected. 4. Additional flanged, compression sleeve or grooved end couplings may be added by the CONTRACTOR to facilitate fabrication, handling, transportation and field assembly at no additional cost. 3.10 EQUIPMENT INSTALLATION A. Install equipment level and plumb, unless otherwise indicated. B. Install equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference with other installations. Extend grease fittings to an accessible location. C. Install equipment to allow right of way to piping systems installed at required slope. 3.11 PAINTING A. Painting of piped utility systems, equipment, and components is specified in Division 9 „ Painting Sections. B. Damage and Touchup: Repair marred and damaged factory -painted finishes with materials and procedures to match original factory finish. 3.12 IDENTIFICATION A. Piping Systems: Install pipe markers on each system. Include arrows showing normal direction of flow. 1. Plastic markers, with application systems. Install on insulation segment if required for hot non -insulated piping. 2. Locate pipe markers on exposed piping according to the following: a. Near each valve and control device. b. Near each branch, excluding short takeoffs for equipment and terminal units. Mark each pipe at branch if flow pattern is not obvious. c. Near locations where pipes pass through walls or floors or enter inaccessible enclosures. d. At manholes and similar access points that permit view of concealed piping. e. Near major equipment items and other points of origination and termination. B. Buried Piping System Identification: 1. Buried water piping systems shall have marking tape installed approximately 12- inches above the pipe in accordance with Division 2 Section "Excavation, Trenching, and Backfilling for Utilities." V 15015-19 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS -/ 0318-042-01 2. Install detectable warning tape above non-metallic pipelines. C. Equipment: Install engraved plastic -laminate sign or equipment marker on or near each major item of equipment. 1. Lettering Size: Minimum 1/4 inch high for name of unit if viewing distance is less than 24 inches, 1/2 inch high for distances up to 72 inches, and proportionately larger lettering for greater distances. Provide secondary lettering two-thirds to three -fourths of size of principal lettering. - 2. Text of Signs: Provide name of identified unit. Include text to distinguish among multiple units, inform user of operational requirements, indicate safety and emergency precautions, and warn of hazards and improper operations. D. Adjusting: Relocate identifying devices that become visually blocked by work of this or other Divisions. 3.13 CONCRETE BASES A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's written instructions and according to seismic codes at Project. `- 1. Construct concrete bases of dimensions indicated, but not less than 4 inches larger in both directions than supported unit. 2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of base. 3. Install epoxy -coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor. 4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. 5. Install anchor bolts to elevations required for proper attachment to supported equipment. 6. Install anchor bolts according to anchor -bolt manufacturer's written instructions. 7. Use . 3000-psi, 28-day compressive -strength concrete and reinforcement _ as specified in Division 3 Section "03300 Cast -in -Place Concrete." 3.14 IDENTIFICATION A. Identify system components, wiring, cabling, and terminals_ Comply with requirements for identification specified in Division 10 Section 10952 "Identification, Stenciling, and Tagging" and Division 16 Section 16075 "Electrical Identification." 3.15 CONNECTIONS TO EQUIPMENT FURNISHED BY OTHERS A. Provide service connections to equipment furnished by others, utilizing equipment shop drawings furnished for indicating type, number and location of connecting points. As part of the work, field adjustments as to the type, number, and location may be required. This is considered part of the Work. 1. Roughing -In: Extend service connections to various items of equipment. Temporarily terminate at proper points as indicated on the shop drawings furnished or as directed. 2. Final Connections: Provide items, such as pipe, fittings, adapters, valves, insulation, and other materials, required to connect equipment from the rough -in locations. - 3. Valves: Provide cut-off valve for each service at rough -in locations, except drains. 15015-20 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 3.16 CLEANING OF PIPING SYSTEMS A. Clean piping systems thoroughly. Purge pipe of construction debris and contamination before placing the system in service. Provide temporarily connections required for cleaning, purging and circulation. B_ Install temporary strainers in front of pumps, tanks, solenoid valves, control valves, and other equipment where permanent strainers are not indicated. Keep these strainers in service until the equipment has been tested, then remove either entire strainer or straining element only. Fit strainers with line size blow off valve. C. Circulate a chemical cleaner in chilled, heating and condensing water systems; and steam and condensing piping systems to remove mill scale, grease, oil, and silt_ Circulate for 48-hours, flush system and replace with clean water. Dispose of chemical solution in accordance with local ordinances. The type and quantity of cleaning chemicals shall be as recommended by the supplier for the service. .. 3.17 FIELD QUALITY CONTROL A. Testing Agency: Engage a qualified testing agency to perform tests and inspections. B. Tests and Inspections: 1. Lined carbon steel pipe and fittings shall be inspected by the CONTRACTOR after installation to ensure linings are intact in accordance with the piping system section and shall certify to that effect. a. Pipe 24-Inches and Smaller: Engage an inspection organization to video inspect pipe and report findings. 2. Pressure test piping systems in accordance with Division 15 Section 15070 "Field Testing of Piping Systems." 3. Additional field-testing shall be as described in the individual piping systems sections of Division 15. "' C. The piping system component(s) will be considered defective if it does not pass tests and inspections. w D. Prepare test and inspection reports. wr .. ..a 3.18 SUPPLEMENTS A. Piping Schedule shall either be as shown on the Drawings or after the 'END OF SECTION." END OF SECTION .. 15015-21 September 2009 PIPING SYSTEMS -BASIC MATERIALS AND METHODS PIPING SCHEDULE Pipe Size Piping Pressure (psiq) Color Product Legend (Inches) Material Section Installation Maximum Test Code Operatinq 15015-22 PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 Remarks Month Year � ti 0318-042-01 PIPING SCHEDULE Pipe Size Piping Pressure (psiq�� Color Product Legend (Inches) Material Section Installation Maximum Test Code Remarks Operating GENERA -NOTES: Provide pipe labels for all exposed pipes. Pipe labels shall include flow arrows and comply with requirements of this Section All piping shall be color coded in accordance with Division 9 Section "Painting and Protective Coatings." Heat traced and insulated exposed piping in accordance with Division 15 Section "Heat Traced and Insulation." MATERIALS LEGEND: INSTALLATION: TESTING: CPM = Corrugated Metal Pipe BUR = Buried P = Pneumatic Test CSTL = Carbon Steel or Welded Pipe EXP = Exposed H = Hydrostatic Test CU = Copper Pipe SUB = Submerged WC = Water Column FRP = Fiberglass Pipe ABREVIATIONS: N/A = Not Applicable FRP-GRP = Glass -Fiber -Reinforced Fiberglass Pipe HTI = Heat Trace and Insulated HDPE = High Density Polyethylene Pipe Piping PVC = Polyvinyl Chloride PVC-DWV = Polyvinyl Chloride -Drain, Waste and Vent RCP = Reinforced Concrete Pipe SST = Stainless Steel Pipe 15015-23 Month Year PIPING SYSTEMS -BASIC MATERIALS AND METHODS 0318-042-01 PART 2 - RESTRAINED JOINTS FOR DUCTILE IRON PIPE All designated fittings shall be restrained using restrained joint pipe and fittings for a sufficient length to resist the design thrust. When joint restraint for an 8-inch through 42-inch push -on joint pipe installation is required and indicated in the project plans or specifications, restrained push -on joint pipe and fittings utilizing ductile iron components shall be provided. Restrained joint pipe shall be ductile iron manufactured in accordance with the requirements of ANSI/AWWA C151/A21.51. Push -on joints for such pipe shall be in accordance with ANSI/AWWA C111/A21.11. Pipe thickness shall be designed in accordance with ANSI/AWWA C150/A21.50, and shall be based on laying conditions and internal pressures as stated in the project plans and specifications. All restrained joints shall consist of shop -fabricated restrained joints and shall be U.S. Pipe TR FLEX, American LOK-Ring, or equivalent. Restrained joint fittings shall be ductile iron in accordance with applicable requirements of ANSI/AWWA C110/A21.10 with the exception of the manufacturer's proprietary design dimensions. Push -on joints for such fittings shall be in accordance with ANSI/AWWA C111/A21.11. Fittings shall be U.S. Pipe TR FLEX, American LOK-Ring fittings, or equivalent. Torque activated means of restraint will not be allowed. Cement mortar lining and seal coating for pipe and fittings, where applicable, shall be in accordance with ANSI/AWWA C104/A21.4. Bituminous outside coating shall be in accordance with ANSI/AWWA C151/A21.51 for pipe and ANSI/AWWA C110/A21.10 for fittings. For designing restrained joints, refer to the material specific pressure requirements described in the general notes of the Plans. Restrained push -on joint pipe and fittings shall be capable of being deflected after assembly. All restrained joint pipe and fittings shall be wrapped in polyethylene. END OF SECTION 15020-2 February 18, 2009 RESTRAINED JOINTS F:\projects\0318\042-01 \Specs\Part 3\Tech\Division 15\15020 Restrained Joints.doc 0318-042-01 SECTION 15021 PIPING SYSTEM, STEEL PIPE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and .. Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Fabricated, lined and coated steel pipe, sizes 6-inch through 144-inches. - = B. Related Sections: 1. Section 13110 — Cathodic Protection C. Related Work: 1. This Section contains material requirements for pipe, fittings, specials, and appurtenances for the steel piping systems, as well as Part 1- General. 1.3 SYSTEM DESCRIPTION (NOT USED) 1.4 SUBMITTALS A. Submittals shall be in accordance with City of Fort Worth standards and shall include: B. Shop Drawings: 1. Prior to the creation of fabrication and laying drawings, the CONTRACTOR shall submit drawings to the ENGINEER showing nominal diameter, northing, easting, and top -of -pipe elevation at each joint location where the proposed pipe connects to the existing pipe(s). 2. Prior to the fabrication of the pipe, submit fabrication and laying shop drawings to the ENGINEER. Drawings shall include a schematic location profile and a tabulated layout schedule, both of which shall be appropriately referenced to the stationing of the proposed pipeline as shown on the plan and profile sheets. Drawings shall be based on the plans and specifications and shall incorporate - changes necessary to avoid conflicts with existing utilities and structures. Drawings shall also include full details of reinforcement, and dimensions for pipe and fittings. Details for the design and fabrication of all fittings and specials and -' provisions for thrust restraint shall be included. Where welded joints are required, drawings shall include proposed welding requirements and provisions for thermal stress control. -t 3. Shop drawings and data shall be submitted in accordance with City of Fort Worth standards to provide information as to the general character, style and manufacturer of the pipe material, coatings, linings, restrains, pipe joints, fittings, gaskets, pipe layout and appurtenances, miscellaneous items to allow the OWNER to adequately identify the materials or equipment to be incorporated into the project. Data shall be provided for all materials of construction. 15021-1 June 2009 PIPING SYSTEM, STEEL PIPE F:VrojectsW318%042-011SpecsTart 3%Tech\Division 15%15021 Piping Systems, Steel.doc .s 0318-042-01 4. Shop drawings shall be complete to indicate where the material is to be incorporated into the project. The CONTRACTOR shall provide schedules of pipe and fittings and their use, pipe classes and other information which would allow this material to be identified at some future date. C. Quality Control Assurance Submittals 1. Prior to shipment of the pipe, the Pipe Manufacturer shall submit the following: a. A Certificate of Adequacy of Design stating that the pipe to be furnished complies with AWWA C200, AWWA C205, AWWA C210, AWWA C222, and these specifications. b. Copies of results of factory hydrostatic tests shall be provided to the ENGINEER. C. Mill certificates, including chemical and physical test results for each heat of steel. d. Polyurethane coating and heat shrink sleeve catalog sheets and technical information. e. A Certified Test Report from the polyurethane coating manufacturer - indicating that the coatings were applied in accordance with manufacturers requirements and in accordance with this specification. f. Certified test reports for welder certification for factory and field welds. g. Certified test reports for cement mortar tests. h. Submit certificates of compliance with referenced standards for all products specified in Part 2. Pipe systems submitted upon without the certificates of - compliance shall be returned without review. 1.5 REFERENCES A. American National Standards Institute (ANSI): 1. B16.21 - Nonmetallic Gaskets for Pipe Flanges B. American International (ASTM): 1. A234 - Specification for Pipe fittings of Wrought Iron Carbon Steel and Alloy Steel for Moderate and Elevated Temperature Service 2. A307 - Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength 3. A563 - Specification for Carbon and alloy Steel Nuts - 4. D1330 - Specification for Rubber Sheet Gaskets 5. F436 - Specification for Hardened Steel Washers C. American Waterworks Association (AWWA): 1. C200 - Standard for Steel Water Pipe-6 In. and Larger 2. C203 - Standard for Coal -Tar Protective Coatings and Linings for Steel Water Pipelines -Enamel and Tape -Hot -Applied 3. C205 - Standard for Cement -Mortar Protective Lining and Coating for Steel Water Pipe-4 In. and Larger -Shop Applied _ 4. C206 - Standard for Field Welding of Steel Water Pipe 5. C207 - Standard for Steel Pipe Flange for Waterworks Service. 4 In. Through 144 In. 6. C208 - Standard for Dimensions for Fabricated Steel Water Pipe Fittings - 7. C210 - Standard for Liquid -Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines 15021-2 June 2009 PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part Wech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 8. C213 — Standard for Fusion -Bonded Epoxy Coating for the Interior and Exterior of Steel Water Pipelines 9. C219 — Standard for Bolted, Sleeve -Type Couplings for Plain End Pipe 10. C221 — Standard for Fabricated Steel Mechanical Slip -Type Expansion Joints. 11. C606 — Grooved and Shoulder Joints D. National Science Foundation (NSF): 1. NSF/ANSI 61 — Drinking Water Components — Health Effects 1.6 QUALITY ASSURANCE A. Qualifications for Welding Work: 1. Qualify welding processes and welding operators in accordance with AWS "Structural Welding Code" D1.1, Section 5, Qualification. 2. Provide certification that all welders employed on or to be employed for the Work have satisfactorily passed AWS qualification tests within the previous 12 months. The CONTRACTOR shall ensure that all certifications are kept current. B. All surfaces and materials in contact with water, or in contact with a chemical being added to water that is being treated for potable use, shall conform to ANSI/NSF 61 and be certified by an organization accredited by ANSI, or shall meet the TCEQ requirements for contact with potable water. C. The lining shall be shop applied spun cement mortar lining. The manufacturer shall be certified under S.P.F.A. quality certification program for steel pipe and accessory manufacturing or be ISO certified. D. OWNER Testing and Inspection: 1. Pipe may be subject to inspection by an independent testing laboratory, which laboratory shall be selected and retained by the OWNER. Representatives of the laboratory or the ENGINEER shall have access to the work whenever it is in preparation or progress, and the Pipe Manufacturer shall provide proper facilities for access and for inspection. The Pipe Manufacturer shall notify the OWNER in writing, a minimum of two (2) weeks prior to the pipe fabrication so that the OWNER may advise the Manufacturer as to the OWNER's decision regarding tests to be performed by an independent testing laboratory. Material, fabricated parts, and pipe, which are discovered to be defective, or which do not conform to the requirements of this specification shall be subject to rejection at any time -- prior to OWNER's final acceptance of the product. Pipe manufacturer shall be responsible for repairs to the lining and coating systems required as a result of OWNER testing. 2. The inspection and testing by the independent testing laboratory anticipates that production of pipe shall be done over a normal period of time and without "slow downs" or other abnormal delays. In the event that an abnormal production time is required, and the OWNER is required to pay excessive costs for inspection, then the CONTRACTOR shall be required to reimburse the OWNER for such laboratory costs over and above those which would have been incurred under a t, normal schedule of production as determined by the ENGINEER. E. Factory Testing 15021-3 June 2009 PIPING SYSTEM, STEEL PIPE rs F:Vrojects103181042-01kSpecs\Part 31Tech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 The Manufacturer shall perform all tests as required by the applicable AWWA standards and as listed herein. a. Cement Mortar Lining 1) Shop -applied cement mortar linings shall be tested in accordance - with AWWA C205. b. Polyurethane Coating 1) General: The polyurethane coating shall be tested in accordance with AWWA C222. 2) Thickness: The thickness of the coating shall be tested in accordance with SSPC PA2. The coating system applied to the pipe shall be tested for holidays according to the procedures outlined in NACE RPO188 using a wet sponge holiday tester or a high voltage spark tester (operating at 100 volts per mil), for the dry film thickness specified of 35 mil. 3) Adhesion Testing: a) Polyurethane coatings or linings shall have an adhesion to steel of 1500 pounds per square inch, minimum. b) Polyurethane coating adhesion to steel substrates shall be tested using pneumatic pull off equipment, such as HATE Model 108 or Delfesko Positest, in accordance with ASTM D 4541 and AWWA C222, except as modified in this section. c) Adhesion testing records shall include pipe identification, surface tested (interior or exterior), surface temperature, -' coating thickness, tensile force applied, mode of failure, and percentage of substrate failure relative of dolly surface. d) Dollies or adhesion testing shall be glued to the coating surface and allowed to cure for a minimum of 12 hours. Because of high cohesive strength, polyurethane coatings shall be scored around the dolly prior to conducting the adhesion test. ., e) Failure shall be by adhesive and cohesive failure only. Adhesive failure is defined as separation of the coating from the steel substrate. Cohesive failure is defined as failure within the coating, resulting in coating remaining both on the steel - substrate and dolly. f) Partial substrate and glue failure will be retested if the substrate failure is less than 50 percent relative of the dolly surface area and the applied tension was less than the specified adhesion. Pipes that have partial adhesion will be rejected as a substrate adhesion failure. - g) Glue failures in excess of the minimum required tensile adhesion would be accepted as meeting the specified adhesion requirements. - h) Adhesion tests will be conducted on polyurethane pipe coating and lining independently (where applicable) and will be accepted or rejected independently of the other. i) Repair patches on the polyurethane coating shall be randomly selected for adhesion testing in a manner as described herein and at the discretion of the coating inspector conducting the _ adhesion tests. Adhesion of repairs shall be as specified for the type of repair. 15021-4 June 2009 PIPING SYSTEM, STEEL PIPE FAprojects\0318\042-01\Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 j) Independent adhesion testing by a third party will be paid by OWNER. If adhesion test fails Manufacturer will be responsible for cost of testing. C. Hydrostatic Pressure Testing 1) Each joint of pipe shall be hydrostatically tested prior to application of lining or coating. The internal test pressure shall be that which results in a fiber stress equal to 75% of the minimum yield strength of the steel used. Each joint of pipe tested shall be completely watertight under maximum test pressure. As a part of testing equipment, the Pipe Manufacturer shall maintain a recording pressure gauge, reference number of pipe tested, etc. The pipe shall be numbered in order that this information can be recorded. 2) Fittings shall be fabricated from hydrostatically tested pipe. Fittings shall be tested by hydrostatic test, air test, magnetic particle test, or dye penetrant test. Air test shall be made by applying air to the welds at 10 pounds per square inch pressure and checking for leaks around and through welds with a soap solution. d. Charpy V-Notch Test (For 0.5 inch and thicker steel wall). 1) Each heat of steel shall be tested to verify minimum impact values of 25 ft-lb at 30°F. e. Mill Certification 1) The OWNER will require the Manufacturer to furnish mill test -' certificates on reinforcing steel or wire, steel plate, and cement. The Manufacturer shall perform the tests described in AWWA C200, for all pipe, fittings, and specials. F. MANUFACTURER'S TECHNICIAN FOR PIPE INSTALLATION 1. During the construction period, the Pipe Manufacturer shall furnish the services ,.. of a factory trained, qualified, job experienced technician for a period of one (1) 8-hour working day excluding travel to advise and instruct as necessary in pipe laying and pipe jointing. The technician shall assist and advise the CONTRACTOR in his pipe laying operations and shall instruct construction personnel in proper joint assembly and joint inspection procedures. The technician is not required to be on -site full time; however, he shall be on -site as requested by the ENGINEER, OWNER, or CONTRACTOR. 2. The Pipe Manufacturer shall provide services of the Polyurethane Coating Manufacturer's representative and a representative from the Heat Shrink Joint Manufacturer for a period of not less than one (1) day excluding travel week at beginning of actual pipe laying operations to advise CONTRACTOR and OWNER regarding installation, including but not limited to, handling and storage, cleaning and inspecting, coating repairs, field applied coating, heat shrink installation procedures and general construction methods and how they may affect the pipe coating. The Manufacturer's Representative shall be required to return if, in the opinion of the ENGINEER, the polyurethane coating or the .. CONTRACTOR's construction methods do not comply with contract specifications. Cost for the Manufacturer's Representatives to return to the site shall be at no additional cost to the OWNER. 1.7 DELIVERY, STORAGE AND HANDLING A. Packing: .. 15021-5 June 2009 PIPING SYSTEM, STEEL PIPE F_\projects\0318\042-01\Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc r 0318-042-01 1. The pipe shall be prepared for shipment to afford maximum protection from normal hazard of transportation and allow pipe to reach project site in an undamaged condition. Pipe damaged in shipment shall not be delivered to the project site unless such damaged pipe is properly repaired. 2. Pipes shall be carefully supported during shipment and storage. Pipe, fittings, and specials shall be separated so that they do not bear against each other, and the whole load shall be securely fastened to prevent movement in transit. Ship pipe on padded bunks with tie -down straps approximately over stulling. Store pipe on padded skids, sand or dirt berms, tires, or other suitable means to protect the pipe from damage. Each end of each length of pipe, fitting, or special and the middle of each pipe joint shall be internally supported and braced with stulls to maintain a true circular shape. Internal stulls shall consist of timber or steel firmly wedged and secured so that stulls remain in place during storage, _ shipment, and installation. Pipe shall be rotated so that one stull remains vertical during storage, shipment and installation. Stulls shall not be removed until pipe is laid and set to grade and backfilled. 3. Deliver, handle, and store pipe in accordance with the Manufacturer's recommendations to protect coating systems. B. Marking for Identification 1. Each length of pipe and each fitting shall have plainly marked on one end, the class for which it is designated, the date of manufacture, and the identification number as shown on the Shop Drawings. Beveled pipe shall be marked with the amount of the bevel. Top centerline shall be marked on all specials. 2. Pipe shall be purple in color per TCEQ Chapter 210 Regulations for reclaimed water systems. C. Point of Delivery 1. It is desired that pipe be hauled direct from pipe plant to the project site and strung along pipeline route, thus avoiding rehandling of pipe and the possibility of damage thereto. Where fully loaded truck and trailer cannot operate along the pipeline route, pipe may be unloaded at access points along the route, and brought to the trench side by approved methods; however, the CONTRACTOR shall be responsible that pipe is undamaged at the time of laying. D. All pipe ends for piping located in the treatment process shall be covered with a weather resistant cap, plug or blind flange prior to shipment, which shall remain in place until installation of the pipe. E. All pipe and fittings shall be stored at least 4 inches off the ground and shall be kept free of debris and dirt until installation. 15021-6 .tune 2009 PIPING SYSTEM, STEEL PIPE F.\projects103181042-01%Specs\Part 3l7rech0vision 15\15021 Piping Systems, Steel.doc 0318-042-01 WIS .. .. r 1.8 PROJECT CONDITIONS A. Design Pressures: 1. Operating Pressure: Refer to Piping Schedule. 2. Surge Allowance: 40% of operating pressure. 3. Water Temperature: 90°F maximum. PART 2 - PRODUCTS 2.1 MATERIALS A. Exterior Polyurethane Coating 1. Polyurethane Coating shall meet the requirements of AWWA C222. Use a coating that conforms to an ASTM D 16 Type V system (2-package polyisocyanate, polyol-cured urethane coating). The components are mixed in 1:1 ratio at time of application. The components shall have balanced viscosities in their liquid state and shall not require agitation during use. The plant -applied coating shall be CORROPIPE Il OMNI as manufactured by Madison Chemical Industries Inc., or equal Futura Coatings. The cured coating shall have the following properties: a. Conversion to Solids by Volume: 97% plus or minus 3%. b. Temperature Resistance: Minus 40°F and plus 130°F. C. Minimum Adhesion: 1500 psi, when applied to steel pipe which has been blasted to comply with SSPC-SP10. d. Cure Time: For handling in 1 minute at 120°F, and full cure within 7 days at 70°F. e. Maximum Specific Gravities: Polyisocyanate resin, 1.20. Polyol resin, 1.15. f. Minimum Impact Resistance: 80 inch -pounds using 1-inch diameter steel ball. g. Minimum Tensile Strength: 2000 psi. h. Hardness: 55 plus or minus 5 Shore D at 70°F. i. Flexibility Resistance: ASTM D 522 using 1-inch mandrel. Allow coating to cure for 7 days. Perform testing on test coupons held for 15 minutes at temperature extremes specified above. j. Dry Film Thickness: 35 mils B. Exterior Polyurethane Coating for Specials, Fittings, Repair and Connections 1. The shop -applied and field -applied coating shall be CORROPIPE II OMNI, and GP II (E) Touch -Up, respectively, as manufactured by Madison Chemical Industries or approved equal. The shop -applied and field -applied coating shall have the properties specified in paragraph 2.01A. Mix and apply polyurethane coatings in accordance with the coating manufacturer's recommendations. C. Cement Mortar Linings 1. Cement mortar linings shall be shop -applied for pipe sizes 96-inch and smaller. Shop applied cement mortar linings shall conform to the requirements of AWWA C205 with the following modifications: Sand used for cement mortar shall be silica sand. Curing of the linings shall conform to the requirements of AWWA C205. 15021-7 PIPING SYSTEM, STEEL PIPE R\projects\031=42-01%Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc June 2009 0318-042-01 2. Welding shall only be performed after the lining is applied in instances when the - pipe is large enough to access joints for recoating. 3. Linings for air pipe, fittings, and couplings shall be suitable for temperatures of 240°F. D. Flange Nuts and Bolts 1. For exposed, non -corrosive environments, Referenced Standard: ASTM A307. -- 2. Grade: B. 3. Head: Hex. 4. Length: So that end extends beyond nut by at least one nominal bolt diameter. s 5. Bolts, nuts, and fasteners on couplings, flanges or joints that are buried or in vaults, or manholes shall be 304 stainless steel. Buried MJ fitting bolts may be Corten. Bolts, nuts, and fasteners on submerged couplings, flanges, or joints _ shall be 316 stainless steel. E. Steel 1. Steel shall meet the requirements of AWWA C200 and shall be of continuous casting. Steel shall be homogeneous and shall be suitable for field welding, fully kilned and fine austenitic grain size. F. Bend Fittings 1. All bend fittings shall be short radius with multiple miter joints (four (4) joints minimum on 901 bends) unless specifically called out in the Plans. Short radius shall be defined as the radius of the bend equals the diameter of the fitting. G. Threaded Outlets 1. Where outlets or taps are threaded, fumish and install brass bushings for the outlet size indicated. H. Outlets for Weld Leads 1. The CONTRACTOR may use outlets for access for weld leads. Outlet configuration shall be bolted with gaskets after use. Outlet configuration shall be approved by the ENGINEER. Tunnel Liner Rails and Roller Plates 1. Tunnel liner rails and roller plates shall be designed, fabricated and supplied by the tunnel liner manufacturer or pipe manufacturer. Refer to Division 2 for additional tunneling requirements. J. Coatings for Outside of Pipe and Fittings: 1. Buried steel piping shall -be polyurethane coated as specified herein. 2.2 MIXES A. Mortar for Interior Joints 1. Mortar shall be one part cement to two parts sand. Cement shall be ASTM C 150, Type I. Sand shall be of sharp silica base. Sand shall be plaster sand meeting ASTM C 35. Interior joint mortar shall be mixed with as little water as possible so that the mortar is very stiff, but workable. Water for cement mortar shall be treated and suitable for drinking water. 15021-8 June 2009 PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 0-0 No .-4 B. Mortar for Pipe Patching for Shop -Applied Cement Mortar Lining 1. Mortar for patching shall be as per interior joints. C. Bonding Agent 1. Bonding agent for cement mortar lining patching shall be Probond Epoxy Bonding Agent ET-150, parts A and B; Sikadur 32 Hi -Mod, or approved equal. 2.3 MANUFACTURED PRODUCTS A. Pipe Design - For Diameters 4 Inches Only: 1. General: As specified above for smaller pipe except as specified below. 2. Type Ends: a. Flanged unless otherwise specified. See flange specification below. b. Plain end where flexible couplings or flange coupling adaptors are shown on Drawings. B. Pipe Design - For Diameters 6 Inches and Larger: 1. Pipe Design: a. Steel pipe shall be designed, manufactured, and tested in conformance with AWWA C200, AWWA M11, and with the criteria specified herein. Sizes and pressure conditions (working pressure, surge pressure, and test pressure) shall be as shown on the drawings. The design pressure shall be the test pressure, and the transient plus working pressure shall include the surge pressure and working pressure. Fittings, specials, and connections shall be designed for the same pressure. Fittings, specials, and connections shall be designed for the same pressures as the adjacent pipe. Pipe design shall be based on trench conditions and the design pressure in accordance with AWWA M11; using the following parameters: 1) Unit Weight of Fill (W) = 130 pcf 2) Live Load = AASHTO HS 20 3) Live Load = Coopers E 80 at Railroads 4) Trench Depth = As Indicated 5) Deflection Lag Factor - (DI) = 1.1 6) Coefficient K = 0.10 7) Maximum Calculated Deflection - Dx = Dy = 2% 8) Soil Reaction Modulus - (E') _ a) 1,500 psi for Typical Trench Section with 4-15 feet of cover (Granular fill embedment) b) 3,500 psi for Typical Trench Section with over 15 feet of cover (Flowable fill embedment) b. The fittings and specials shall be designed in accordance with AWWA C208 and AWWA M11 except that crotch plates shall be used for outlet reinforcement for all Pressure Diameter Values, PDV, greater than 6,000. 15021-9 .June 2009 PIPING SYSTEM, STEEL PIPE FAprojects\0318\042-01\Specs\Part Wech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 C. Where the pipe requires additional external support to achieve the specified maximum deflection, the CONTRACTOR and pipe supplier will be required to furnish alternate methods for pipe embedment. No additional compensation will be made to the CONTRACTOR by the OWNER where ` this method is required. d. Trench depths indicated shall be verified after existing utilities are located. Vertical alignment changes required because of existing utility or other = conflicts shall be accommodated by an appropriate change in pipe design depth. In no case shall pipe be installed deeper than its design allows. 2. Provisions for Thrust: a. Thrust at bends, tees, or other fittings shall be resisted by restrained joints. Thrust at bends adjacent to casing shall be restrained by welding joints through the casing and a sufficient distance each side of the casing. No _ thrust restraint contribution shall be allowed for pipe in casing unless the annular space in the casing is filled with grout. b. Restrained joints shall be used a sufficient distance from each side of the bend, tee, plug, or other fitting to resist thrust which develops at the design pressure of the pipe. For the purposes of thrust restraint, design pressures shall be the larger of the test pressure or the surge plus the working pressures. If no surge pressure is shown, use 1.5 times the ` working pressure for design. Restrained joints shall consist of welded joints. C. Thrust restraint design shall be the complete responsibility of the pipe manufacturer. The length of pipe with restrained joints to resist thrust forces shall be determined by the Pipe Manufacturer in accordance with AWWA M11 and the following: _ 1) The Weight of Earth shall be calculated as the weight of the projected soil prism above the pipe. 2) Soil Density = 110 pcf (maximum value to be used). 3) Coefficient of Friction = 0.20 (maximum value to be used for polyurethane coated steel pipe). 4) The above applies to unsaturated soil conditions. In locations where ground water is encountered, the soil density shall be reduced to its y buoyant weight for all backfill below the water table, and the coefficient of friction shall be reduced to 0.15 for polyurethane coated steel pipe. - 5) For horizontal bends, the length of pipe to be restrained shall be calculated as follows: For A less than 600 L = P A sin (A /2) f (We + Wp + Ww) 15021-10 June 2009 PIPING SYSTEM, STEEL PIPE F:\projectsX0318\042-01\Specs\Part 3\TechMivision 15X15021 Piping Systems, Steel.doc 0318-042-01 For A greater than 600 L = PA(1-cos A) f (We + Wp + Ww) where: L = Length of pipe to be restrained P = 1.5 times working pressure A = Cross sectional area of pipe steel cylinder I.D. -- A = Deflection angle We = Weight of earth Wp = Weight of pipe Ww = Weight of water f = Coefficient of friction 3. Inside Diameter a. The inside diameter, including the cement mortar lining, shall be a minimum of the nominal diameter of the pipe specified, unless otherwise indicated on the Plans. 4. Wall Thickness: a. The minimum pipe wall steel thickness shall be pipe OD/230. Where indicated on the plans, pipe and fittings shall have thicker steel pipe wall. The minimum steel wall thickness shall also be such that the fiber stress shall not exceed 50% of the minimum yield strength of the steel, nor the following, at the specified working pressure. Pipe Type Maximum Stress at Working Pressure AWWA C200, Steel Pipe, 23,000 psi Polyurethane Coated b. Pipe which is placed in casing or tunnel shall have a minimum pipe wall steel thickness of OD/144. C. Pipe, fittings, and specials shall be designed such that the maximum stresses in the pipe due to thrust loading will not exceed 18,000 psi nor 50 percent of the steel yield strength at the thrust design pressure (the larger of the test pressure or working pressure plus surge pressure). 5. Seams a. Except for mill -type pipe, the piping shall be made from steel plates rolled into cylinders or sections thereof with the longitudinal and girth seams butt welded or shall be spirally formed and butt welded. There shall be not more than two (2) longitudinal seams. Girth seams shall be butt -welded and shall not be spaced closer than 6' except in specials and fittings. 6. Joint Length a. Maximum joint length shall not exceed 50'. Maximum joint length of steel pipe installed in casing shall not exceed 25'. C. Heat Shrink Sleeves for Polyurethane Coated Steel Pipe - - 1. Heat shrink sleeves shall meet AWWA C216, as manufactured by Canusa, Rachem, or approved equal. 15021-11 June 2009 PIPING SYSTEM, STEEL PIPE FAprojects\0318\042-01\Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 D. Joint Bonds, Insulated Connections, and Flange Gaskets 1. All rubber gasket joints shall be bonded for electrical continuity. If cathodic protection is required, refer to Division 13. E. Bend Fittings 1. All bend fittings shall be short radius unless specifically called out on the Plans. Short eadius shall be defined as the radius of the bend equals the diameter of the fitting. 2. On pipes 24-inch diameter and smaller, mitered joints are not required; smooth rolled fittings are allowed. F. Pipe Ends Pipe ends shall be lap welded slip joint; butt strap joint; flanged joint, or flexible coupled joint. Pipe ends shall be welded at all pipe joints unless otherwise specified on the plans. 1. Lap Welded Slip Joint: a. Lap welded slip joint shall be provided in all locations for pipe larger than 60" and where joints are welded for thrust restraint. Ends of pipe, fittings, and specials for field welded joints shall be prepared with one (1) end expanded in order to receive a plain end making a bell and plain end type of joint. Clearance between the surfaces of lap joints shall not exceed 1/8" at any point around the periphery. b. In addition to the provisions for a minimum lap of 1 1/2" as specified in AWWA C200, the depth of bell shall be such as to provide for a minimum distance of 1" between the weld and the nearest tangent of the bell radius when welds are to be located on the inside of the pipe. C. Lap welded slip joints shall be welded from the inside for pipe diameters 42" and larger. _ 2. For Fittings with Flanges a. Flanged joints shall be provided at connections to valves and where indicated. Ends to be fitted with slip on flanges shall have the longitudinal or spiral welds ground flush to accommodate the type of flanges provided. Pipe flanges and welding of flanges to steel pipe shall conform to the requirements of AWWA C207 and AWWA C206. Pipe flanges shall be of rated pressure equal to or greater than, the adjacent pipe class. Flanges shall match the fittings or appurtenances which are to be attached. 3. Flexible Couplings a. Flexible couplings shall be provided where shown in the Plans and as specified in Sections 15001 and 15080. Ends to be joined by flexible couplings shall be of the plain end type, prepared as stipulated in AWWA C200. In addition, the welds on ends to be joined by couplings shall be ground flush to permit sliding the coupling in at least one direction to clear the pipe joint. Harness bolts and lugs shall comply with AWWA M11. 4. Butt Strap Closure Joints a. Where necessary to make closure to pipe previously laid, closure joints shall be installed using butt strap joints in accordance with AWWA C206 and applicable provisions of this specification. 15021-12 .June 2009 PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 G. Factory -Applied Exterior Polyurethane Coatings: 1. Applicator Qualifications: a. Equipment will be certified by the coating manufacturer to meet the requirements for material mixing, temperature control, application rate, and ratio control for multi -part coatings. b. Equipment not meeting the written requirements of the coating manufacturer shall be rejected for coating application until repairs or replacement of the equipment is made to the satisfaction of the ENGINEER. C. Personnel responsible for the application of the coating system shall have certification of attendance at the coating manufacturer's training class within the last three years. The certified applicator shall be present during all coating application work and shall have responsibility for controlling all aspects of the coating application. 2. Surface Preparation: a. Visible oil, grease, dirt, and contamination shall be removed in accordance with SSPC-SP1, solvent cleaning. b. Surface imperfections such as metal slivers, burrs, weld splatter, gouges, or delaminations in the metal shall be removed by filing or grinding prior to abrasive surface preparation. C. In cold weather or when moisture collects on the pipe and the temperature of the pipe is less than 45°F, preheat pipe to a temperature between 45 and 90°F and 50F above dew point. d. Pipe shall be cleaned by abrasive blasting with a mixture of steel grit and shot to produce the surface preparation cleanliness as specified. Recycled abrasive shall be cleaned of debris and spent abrasive in an air wash separator. e. Grit and shot abrasive mixture and gradation shall be adequate to achieve a sharp angular surface profile of the minimum depth specified. f. Protect prepared pipe from humidity, moisture, and rain. Keep pipe clean, _ dry, and free of flash rust. All flash rust, imperfections, or contamination on cleaned pipe surface shall be removed by reblasting prior to primer application. g. Priming and coating of pipe shall be completed in a continuous operation the same day as surface preparation. h. Wire wheel or blast exterior surfaces in accordance with SSPC-SP10; to a near -white metal blast cleaning with a 3.0 mil angular profile in bare steel. •• 3. Equipment a. Two -component, 1:1 mix ratio, heated airless spray unit. 4. Temperature a. Minimum 5°F above dew point temperature. The temperature of the surface shall not be less than 60°F during application. 5. Humidity a. Heating of pipe surfaces may be required to meet requirements of 2.01A if relative humidity exceeds 80%. 6. Resin a. Do not thin or mix resins; use as received. Store resins at a temperature above 55°F at all times. 15021-13 June 2009 PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part Wech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 7. Application a. Applicator shall be approved by the coating manufacturer and conform to coating manufacturer's recommendations. Apply directly to pipe to achieve a total dry film thickness (DFT) of 35 mils. Multiple -pass, one coat application process is permitted provided maximum allowable recoat time specified by coating manufacturer is not exceeded. The main line pipe shall have a cutback at time of application so that there is approximately 3 inches of bare steel on either side of the future weld. The cutback area shall be abrasively blasted in the shop to facilitate easier field surface preparation. The exterior bare steel area of the pipe shall be adequately -- protected during pipe handling and shipment. 8. Recoating a. Recoat only when coating has cured less than maximum time specified by _. coating manufacturer. When coating has cured for more than recoat time, brush -blast or thoroughly sand the surface. Blow -off cleaning using clean, dry, high pressure compressed air. -. 9. Curing a. Do not handle pipe until coating has been allowed to cure, per manufacturer's recommendations. PART 3 - EXECUTION 3.1 INSTALLATION, CLEANING, AND TESTING A. Comply with the requirements of Division 15 Section 15001 "Plant Piping - General." B. Restrained Joints: Unless otherwise indicated on the drawings, the CONTRACTOR shall use mechanical restrained pipe joints and fittings (no thrust blocks). The length of pipe requiring thrust restraint shall be calculated as described in Chapter 13 of AWWA M-11. 1. All joints requiring thrust restraint shall be welded (buried) in accordance with AWWA C-206 or restrained with mechanical systems (exposed). 2. CONTRACTOR shall design restrained joints based on the specified pressures as shown in the Piping Schedule or Drawings and in accordance with AWWA M- 11. 3. The design for restrained joints, including the length necessary to resist the design thrust, for the embedded conditions, shall be performed and sealed by a Professional Engineer in the state where the Project is being constructed. 4. CONTRACTOR shall bear all costs for the design and will not receive reimbursement from the OWNER. C. Field Testing: Comply with the requirements of Division 15 Section 15001 "Plant Piping - General." Minimum test pressure shall be 75 psi, if not shown otherwise. D. General: 1. Install steel pipe, fittings, specials, and appurtenances as specified and required for the proper functioning of the completed pipe line. Install pipe, fittings, and specials in accordance with the Manufacturer's recommendations and AWWA M11. Pipe shall be laid to the lines and grade indicated. Just before each joint of polyurethane coated steel pipe is lowered into the ditch it is to be 15021-14 June 2009 PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part Wech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 inspected and tested for holidays. All damaged areas and holidays are to be repaired before the pipe is lowered into the trench. 2. The requirements of Division 2 Section "Trenching, Backfilling, and Compacting" govern for the excavation and backfilling of trenches for laying steel pipe, fittings, and specials. Maximum allowable pipe deflection is limited to 2% in any direction for polyurethane coated steel pipe. 3. Keep the pipe clean during the laying operation and free of sticks, dirt, animals, and trash, and at the close of each operating day, effectively seal the open end of the pipe against the entrance of water using a gasketed night cap. Do not lay - pipe in water. 4. Install bonds at all pipe joints, other than welded joints or insulated joints. _. E. Pipe Handling 1. Pipe shall be handled at all times with a minimum of two wide non-abrasive slings, belts or other equipment designed to prevent damage to the coating or lining. The equipment shall be kept in such repair that its continued use is not injurious to the coating. The spacing of pipe supports required to handle the pipe shall be adequate to prevent cracking or damage to the lining or coating. F. Line Up and Bends: 1. Line up pipe for joining so as to prevent damage thereto. Thoroughly clean the bell and spigot ends of each joint of pipe of foreign matter, rust and scale before placing spigot into bell. 2. Where abrupt changes in grade and direction occur, the CONTRACTOR shall employ special shop fabricated fittings for the purpose. Field cutting the ends of the steel pipe to accomplish angular changes in grade or direction of the line shall not be permitted. G. Pipe Laying - Welded Joints: 1. Weld joints in accordance with the AWWA C206 for Field Welding of Steel Water Pipe. CONTRACTOR shall provide adequate ventilation for welders and for OWNER'S Representative to observe welds. Unless otherwise specified, welds shall be full circle fillet welds. External welding shall be completed before application of field applied joint coating. 2. Adequate provisions for reducing temperature stresses shall be the responsibility of the CONTRACTOR. 3. After the pipe have been joined and properly aligned and prior to the start of the welding procedure, the spigot and bell shall be made essentially concentric by shimming or tacking to obtain clearance tolerance around the periphery of the joint. In no case shall the clearance tolerance be permitted to accumulate. 4. Before welding, thoroughly clean pipe ends. Weld pipe by machine or by the manual shielded electric arc process. Welding shall be performed so as not to damage lining or coating. Cover the polyurethane coating as necessary to protect from welding. 5. Furnish labor, equipment, tools and supplies, including shielded type welding rod. Protect welding rod from any deterioration prior to its use. If any portion of a box or carton is damaged, reject the entire box or carton. 6. In all hand welding, the metal shall be deposited in successive layers. For hand welds, not more than 1/8" of metal shall be deposited in each pass. Each pass except the final one, whether in butt or fillet welds, shall be thoroughly bobbed or peened to relieve shrinkage stresses and to remove dirt, slag, or flux before the 15021-15 June 2009 PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part 3\7rech0vision 15\15021 Piping Systems, Steel.doc 0318-042-01 succeeding bead is applied. Each pass shall be thoroughly fused into the plates Y at each side of the welding groove or fillet and shall not be permitted to pile up in the center of the weld. Undercutting along the side shall not be permitted. _ 7. Welds shall be free from pin holes, non metallic inclusions, air pockets, undercutting and/or any other defects. 8. If the ends of the pipe are laminated, split or damaged to the extent that satisfactory welding contact cannot be obtained, remove the pipe from the line. 9. Furnish each welder employed with a steel stencil for marking the welds, so that the work of each welder may be identified. Have each welder stencil the pipe adjacent to the weld with the stencil assigned to him. In the event any welder leaves the job, his stencil shall be voided and not duplicated if another welder is employed. 10. Use only competent, skilled and qualified workmen. Each welder employed by the CONTRACTOR shall be required to satisfactorily pass a welding test in accordance with AWWA C206 before being allowed to weld on the line. 11. After each welder has qualified in the preliminary tests referred to above, _ inspections shall be made of joints in the line. Any welder making defective welds shall not be allowed to continue to weld. 12. Dye penetrant tests in accordance with ASTM E165, or magnetic particle tests, shall be performed by the CONTRACTOR's independent testing laboratory on all - welded joints. Welds that prove to be defective will be replaced or repaired, whichever is deemed necessary by the ENGINEER, at CONTRACTOR's expense. 13. If the CONTRACTOR disagrees with the ENGINEER's interpretation of welding tests, test sections may be cut from the joint for physical testing. The CONTRACTOR shall bear the expense of repairing the joint, regardless of the results of physical testing. The procedure for repairing the joint shall be approved by the ENGINEER before proceeding. H. Inside Joint Grouting for Pipe With Plant -Applied Mortar Lining 1. Upon completion of backfilling of the pipe trench, fill the inside joint recess with a stiff cement mortar. Prior to placing of mortar, clean out dirt or trash which has collected in the joint, and moisten the concrete surfaces of the joint space by spraying or brushing with a wet brush. Where the mortar joint opening is one inch or wider, such as where trimmed spigots are required, apply a bonding agent to mortar and steel surface prior to placing joint mortar. Ram or pack the stiff mortar into the joint space and take extreme care to ensure that no voids remain in the joint space. After the joint has been filled, level the surfaces of the joint mortar with the interior surfaces of the pipe with a steel trowel so that the surface is smooth. Exterior Joint Protection for Polyurethane Coated Steel Pipe 1. General: a. All buried pipe joints shall be field coated after pipe assembly in accordance with AWWA C216, using Heat Shrink Sleeves. Width of heat . shrink sleeve shall be sufficient to overlap the polyurethane coating by a minimum of 3 inches. Overlapping of two or more heat shrink sleeves to achieve the necessary width will not be permitted. T 2. Heat Shrink Sleeves: a. Primer. Provide as recommended by the sleeve manufacturer. 15021-16 June Zoos PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 b. Filler Mastic: Mastic filler shall be provided for all bell and spigot and coupling type joints. Size and type shall be as recommended by the sleeve manufacturer for type of pipe and joint. C. Joint Coating: Cross -linked polyolefin wrap or sleeve with a mastic sealant, 85 mils total thickness, suitable for pipeline operating temperature, sleeve material recovery as recommended by the manufacturer. High recovery ' sleeves shall be provided for bell and spigot and coupling style joints with a minimum of 50% recovery. Sleeve length shall provide a minimum of 3-inch overlap onto intact pipe coating on each side of the joint. Width to take into consideration shrinkage of the sleeve due to installation and joint profile. d. Manufacturers: Canusa, Raychem, or approved equal. 3. Installation: a. Clean pipe surface and adjacent coating of all mud, oil, grease, rust, and other foreign contaminates with a wire brush in accordance with SSPC- SP2, Hand Tool Cleaning, or SSPC-SP3, Power Tool Cleaning. Remove oil or grease contamination by solvent wiping the pipe and adjacent coating in accordance with SSPC-SP1, Solvent cleaning. Clean the full circumference of the pipe and a minimum of 6 inches onto the existing coating. b. Remove all loose or damaged pipe coating at joint and either repair the coating as specified herein or increase the length of the joint coating, ' where reasonable and practical. C. Complete joint bonding of pipe joints before application of joint coating. d. Joint bonds shall be low profile bonds and all gaps and crevices around the bonds shall be filled with mastic sealant. e. Store sleeves in shipping box until use is required. Keep dry and sheltered from exposure to direct sunlight. Store off the ground or concrete floors .. and maintain at a temperature between 60°F and 100°F as recommended by the sleeve manufacturer. f. Metal surface shall be free of all dirt, dust, and flash rusting prior to sleeve application. g. Preheat pipe uniformly to 140°F to 160°F or as recommended by the sleeve manufacturer. Monitor pipe temperature using a surface temperature gauge, infrared thermometer, or color changing crayons. Protect preheated pipe from rain, snow, frost, or moisture with tenting or shields and do not permit the joint to cool. h. Prime joint with specified primer and fill all cracks, crevices, and gaps with mastic filler in accordance with the manufacturer's recommendations for the full circumference of the pipe. i. Apply heat shrink sleeve when it is at a minimum temperature or 60°F and - while maintaining the pipe temperature above the preheat temperature specified. Apply sleeve in accordance with the manufacturer's instructions and center the sleeve over the joint to provide a minimum of 3-inch overlay .. onto the existing pipe coating. j. Apply heat to the sleeve using either propane fire infrared heaters or wrap around heaters. Hold flame a minimum of 6-inch from the sleeve surface. Periodically roll the coating on the pipe surface. Heat from the center of the sleeve to the outer edge until properly seated, then begin in the opposite direction. Monitor sleeve for color change, where appropriate, or with appropriate temperature gauges. 15021-17 June 2009 PIPING SYSTEM, STEEL PIPE FAprojects\0318\042-01\Specs\Part 3\TechlDivision 15\15021 Piping Systems, Steel.doc 0318-042-01 k. Completed joint sleeve shall be fully bonded to the pipe and existing coating surface, without voids, mastic beading shall be visible along the full circumference of the sleeve, and there shall be no wrinkling or excessive burns on the sleeves. Sleeves which do not meet these requirements shall be removed and the joint recoated as directed by the ENGINEER. Minor repairs may be repaired using heat shrink sleeve repair kits. I. Allow the sleeve to cool before moving, handling, or backfilling. In hot climates, provide shading from direct sunlight. Water quenching will be allowed only when permitted by the sleeve manufacturer. J. Protective Coating System for Welded Joints 1. General: a. Application of protective coating at the pipe joints will be as follows: apply .. a two layer field applied coating system (the factory applied 35 mil polyurethane coating shall be held back on the bell and spigot of the welded joint), a field applied 60 mil by 6-inch wide strip of CANUSA HCO _ Wrapid Tape heat resistant tape at the location of the welding, and a field applied 110 mil (full recovered thickness) by 18-inch wide CANUSA AquaWrap high shrink heat shrinkable joint sleeve. After the heat shrinkable joint sleeve is installed, the CONTRACTOR may backfill the trench, and then weld the joint. b. The CONTRACTOR is responsible for his operations so that they do not damage the factory applied coating system. C. When applying the two layer joint coating system for post welding the joints, the CONTRACTOR must show that his operation will not damage the joint coating system to the ENGINEER's satisfaction. The CONTRACTOR will be required to fully uncover a maximum of 10 joints, selected at random by the ENGINEER or OWNER to visually inspect and test the joint after. welding. Any damage must be repaired. If the .- CONTRACTOR's welding procedure damages the three layer joint coating system, the CONTRACTOR, at the direction of the ENGINEER, will be required to modify his welding procedure. L 2. Joint Coating (2 layer): a. Apply a three -layer joint coating system before welding the joints except cutback area. b. Pipe Manufacturing and Heat Tape -` 1) A 35 mil thickness polyurethane coating shall be applied over entire length of pipe. The CONTRACTOR shall field apply 60 mil thick by 6-inch wide strip of CANUSA HCO Wrapid Tape heat resistant tape to the exterior bell end of the pipe, centered on the location of the welding, over a 35 mil factory applied polyurethane coating. C. Surface Preparation and Installation for Heat Shrinkable Joint Sleeve: 1) Clean pipe surface and adjacent coating of all mud, oil, grease, rust, and other foreign contaminates with a wire brush in accordance with SSPC-SP2, Hand Tool Cleaning, or SSPC-SP3, Power Tool Cleaning. Remove oil or grease contamination by solvent wiping the pipe and adjacent coating in accordance with SSPC-SP1, Solvent cleaning. Clean the full circumference of the pipe and a minimum of 6 inches onto the existing coating. - 15021-18 June 2009 PIPING SYSTEM, STEEL PIPE F:\projects103181042-011Specs\Part 37echDivision 15\15021 Piping Systems, Steel.doc 0318-042-01 2) Remove all loose or damaged pipe coating at joint and either repair the coating as specified herein or increase the length of the joint coating, where reasonable and practical. 3) Complete joint bonding of pipe joints before application of joint coating. 4) Joint bonds shall be low profile bonds and all gaps and crevices around the bonds shall be filled with mastic sealant. 5) Store sleeves in shipping box until use is required. Keep dry and sheltered from exposure to direct sunlight. Store off the ground or concrete floors and maintain at a temperature between 60OF and 100OF as recommended by the sleeve manufacturer. 6) Metal surface shall be free of all dirt, dust, and flash rusting prior to sleeve application. 7) Preheat pipe uniformly to 140°F to 160°F or as recommended by the sleeve manufacturer. Monitor pipe temperature using a surface _ k temperature gauge, infrared thermometer, or color changing crayons. Protect preheated pipe from rain, snow, frost, or moisture with tenting or shields and do not permit the joint to cool. 8) Prime joint with specified primer and fill all cracks, crevices, and gaps with mastic filler in accordance with the manufacturer's recommendations for the full circumference of the pipe. 9) Apply heat shrink sleeve when it is at a minimum temperature or 60OF and while maintaining the pipe temperature above the preheat temperature specified. Apply sleeve in accordance with the manufacturer's instructions and center the sleeve over the joint to provide a minimum of 3 inches overlay onto the existing pipe coating. 10) Apply heat to the sleeve using either propane fire infrared heaters or wrap around heaters. Hold flame a minimum of 6 inches from the t . sleeve surface. Periodically roll the coating on the pipe surface. Heat from the center of the sleeve to the outer edge until properly seated, then begin in the opposite direction. Monitor sleeve for color change, where appropriate, or with appropriate temperature gauges. 11) Completed joint sleeve shall be fully bonded to the pipe and existing coating surface, without voids, mastic beading shall be visible along the full circumference of the sleeve, and there shall be no wrinkling or - excessive burns on the sleeves. Sleeves which do not meet these requirements shall be removed and the joint recoated as directed by the ENGINEER. Minor repairs may be repaired using heat shrink sleeve repair kits. 12) Allow the sleeve to cool before moving, handling, or backfilling. In hot climates, provide shading from direct sunlight. Water quenching will be allowed only when permitted by the sleeve manufacturer. d. Inspection, Testing, and Repairs 1) Holiday testing shall be performed using a wet sponge holiday tester �. at each joint after field application of heat shrinkable joint sleeve. If any holidays or cuts are detected, the sleeve shall be repaired using CANUSA Repair Patch Kit (CRPK) or approved equal. The damaged . area shall be covered with a minimum of 50 mm overlap around the damaged area. 15021-19 June 2009 PIPING SYSTEM, STEEL PIPE F:\projects\0318\042-01\Specs\Part 3\Tech\Division 15\15021 Piping Systems, Steel.doc 0318-042-01 K. Protection of Buried Metal 1. Buried ferrous metal such as bolts and flanges which cannot be protected with factory or field -applied polyurethane coatings or heat shrink sleeves shall be coated with two wraps of wax tape and encased in flowable fill. L. Repair and Field Touchup of Polyurethane Coating: — 1. Apply Madison GP II (E) Touchup Polyurethane Coating or equal Futura Coating for repair and field touch-up of polyurethane coating. 2. Repair Procedure - Holidays: a. Remove all traces of oil, grease, dust, dirt, etc. b. Roughen area to be patched by sanding with rough grade sandpaper (40 grit). L C. Apply a 35 mil coat of repair material described above. Work repair material into scratched surface by brushing or rolling in accordance with manufacturer's recommendations. d. Retest for Holiday. 3. Repair Procedure - Field Cuts or Large Damage: a. Remove burrs from field cut ends or handling damage and smooth out edge of polyurethane coating. b. Remove all traces of oil, grease, dust, dirt, etc. C. Roughen area to be patched with rough grade sandpaper (40 grit). Feather edges and include overlap of 2 inches of roughened polyurethane in area to be patched. d. Apply a 35 mil coat of repair material described above, in accordance with manufacturer's recommendations. Work repair material into scratched surface by brushing. Feather edges of repair material into prepared surface. Cover at least 1 inch of roughed area surrounding damage, or adjacent to field cut. e. Test repairs for Holidays. M. Patch of Lining (Plant or Field): 1. Repair cracks larger than 1/16-inch. Pipes with disbonded linings will be rejected. Excessive patching of lining shall not be permitted. Apply bonding agent to patch area. Patching of lining shall be allowed where area to be repaired does not exceed 100 square inches and has no dimension greater than — 12-inch. In general, there shall be not more than one (1) patch in the lining of any joint of pipe. 2. Wherever necessary to patch the pipe, make the patch with the mortar indicated. - Do not install patched pipe until the patch has been properly and adequately cured and unless approved by the ENGINEER. N. Quality Control of Field Applied Polyurethane Coating 1. Surface Preparation a. Visually inspect surface preparation to ensure cleanliness and dryness requirements have been met. Use Testex tape on at least one joint per day to ensure that adequate profile is being achieved. 2. Visual a. Visually inspect cured coating to ensure that the coating is completely cured with no blisters, "sticky" or "gooey" areas. Also check to ensure that the coating completely covers the steel and existing coating. 15021-20 June 2009 PIPING SYSTEM, STEEL PIPE F:%projects103181042-01\SpecslPart 31Tech\Division M15021 Piping Systems, Steel.doc 0318-042-01 3. Thickness a. Use a magnetic dry film thickness gauge on cured coating to ensure adequate thickness has been achieved according to SSPC PA2. 4. Holiday Testing a. Holiday testing shall be performed using a wet sponge holiday tester at each joint no sooner than one hour after field application of polyurethane ` coating. 5. Inspection at Welded Joints a. When applying the two -layer joint coating system for post welding the - joints, the CONTRACTOR must show that his operation will not damage the joint coating system to the ENGINEER's satisfaction. The CONTRACTOR will be required to fully uncover a maximum of 10 joints, selected at random by the ENGINEER or OWNER to visually inspect and test the joint after welding. Any damage must be repaired. If the CONTRACTOR's welding procedure damages the two layer joint coating system, the CONTRACTOR, at the direction of the ENGINEER, will be required to modify his welding procedure. .. END OF SECTION 15021-21 June 2009 PIPING SYSTEM, STEEL PIPE F:\orojectsX0318\042-01XSpecs\Part 3\TechTivision 15/15021 Piping Systems, Steel.doc 0318-042-01 SECTION 15022 PIPING SYSTEM, DUCTILE IRON PIPE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section provides requirements for ductile iron piping system for exposed and buried applications and includes: 1. Mechanical joint, push -on and flanged ductile iron pipe, sizes 4-inch through 24-inch. 2. Mechanical joint and flanged ductile iron and cast iron fittings, sizes 4-inch through 24-inch. 3. Gaskets and fasteners. 4. Protective coatings, linings and encasements. B. Related Sections: 1. This Section contains material requirements for pipe, fittings, specials, and appurtenances for the steel piping systems, as well as Part 1- General and Part 3- Execution additional requirements not specified in the above referenced Section. 1.3 REFERENCES A. American Water Works Association (AWWA): 1. C104/A21.4 - Cement -Motor Lining for Ductile -Iron Pipe and Fittings for Water. 2. C105/21.5 - Polyethylene Encasement for Gray and Ductile Cast -Iron Piping for Water and Other Liquids. 3. C110-C21.10 - American National Standard for Gray -Iron and Ductile -Iron Fittings, 3-inch through 48-inch for Water and Other Liquids. 4. C111/A21.11 - American National Standard for Rubber Gasket Joints for Ductile -Iron and Gray -Iron Pressure Pipe and Fittings. 5. C115/A21.15 - American National Standard for Flanged Cast -Iron and Ductile - Iron Pipe with Threaded Flanges. 6. C150/A21.50 - American National Standard for the Thickness Design of Ductile Iron Pipe. 7. C151/A21.51 - American National Standard for Ductile -Iron Pipe, Centrifugally Cast in Metal Molds or Sand -Lined Molds, for Water and Other Liquids. 8. C153/A21.10 - Ductile -Iron Compact Fittings for Water Service. 9. C600 - Installation of Ductile Iron Water Mains and Their Appurtenances. 10. C606 - Grooved and Shouldered Joints. 11. M41 - Manual Ductile Iron Pipe and Fittings. B. ASTM International, Inc. (ASTM): 1. A48 - Specification for Gray Iron Castings. 15022-1 PIPING SYSTEM, DUCTILE IRON PIPE July 2009 Clk3E:111paljl 2. A193 - Specification for Alloy -Steel and Stainless Steel bolting Materials for High Temperature or High Pressure Service and Other Special Purpose Applications. 3. A194 - Specification for Carbon and Alloy Steel Nuts for Bolts for High - Pressure or High -Temperature Service, of Both. 4. A307 - Specification for Carbon Steel Bolts and Studs, 60000 PSI Tensile Strength. 5. A320 - Specification for Alloy -Steel and Stainless Steel Bolting Materials for Low Temperature Service. 6. A536 - Specification for Ductile Iron Castings. 7. A563 - Specification for Carbon and Alloy Steel Nuts. 8. A674 - Standard Practice for Polyethylene Encasement for Ductile Iron Pipe for Water or other Liquids. 9. D1330 - Specification for Rubber Sheet Gaskets. C. National Science Foundation (NSF): 1. NSF/ANSI 61 - Drinking Water Components — Health Effects. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: 1. Pipe layout drawings shall include plan, elevations, sections, details, and attachments to other work. 2. Pipe layout schedule/drawings including pipeline stationing, elevation, and restrained joint locations. 3. Schedule of materials furnished. 4. Pipe layout drawings and data shall clearly indicate where pipe requiring special provisions are to be located, connections to equipment, valves, and related items. C. Material Certificates: 1. Certificate of Compliance with all applicable and appropriate reference standards certifying that all pipe, fittings, and specials, and other products and materials furnished, comply with the applicable provision of the Specification. 2. Certification of Adequacy of Design: The Certificate of Adequacy of Design shall show the necessary provisions required in the design of the pipe to comply with applicable sections of this Specification. A Professional Engineer registered in the state where the Project is located shall seal the Certificate of Adequacy of Design. D. Field quality -control test reports. 1.5 PROJECT REQUIREMENTS A. Restrained Pipe and Fitting Joints, Buried Piping: 1. Restrained joints shall be used for a sufficient distance from each bend, tee, elbow, plug, or other fitting to resist thrust that will develop at the design pressure. 2. CONTRACTOR shall provide restraint length calculations in accordance with AWWA M41 based on the laying conditions, soil conditions, depth of cover, and pressures to determine the number of restrained joints that will be required. 15022-2 July 2009 PIPING SYSTEM, DUCTILE IRON PIPE 0318-042-01 3. For the purposes of thrust restraint, design pressures shall be the working pressure shown, plus the additional surge allowance for potable water, service water, and pump discharge piping. The design pressure shall be 1.5 times the design test pressure indicated for all other piping. PART 2 - PRODUCTS 2.1 PIPE AND FITTINGS A. General: Ductile iron with a thickness design for the pressures and laying conditions complying with the requirements of AWWA C150 and the manufactured in accordance with AWWA C151. 1. Comply with the following minimum thickness class, unless otherwise indicated in the Pipe Schedule. a. Class 51, pipe 6-inch and smaller. b. Class 50, pipe 8-inch and larger. C. Class 53 for threaded flanged joints. d. Class 53 for grooved end pipe, grooved in accordance with AWWA C606. B. Mechanical -Joint, Ductile -Iron Pipe: AWWA C151, with mechanical joint bell and plain spigot end unless grooved or flanged ends are indicated. 1. Mechanical -Joint, Ductile -Iron Fittings: AWWA C110, ductile- or gray -iron standard pattern or AWWA C153, ductile -iron compact pattern. 2. Glands, Gaskets, and Bolts: AWWA C111, ductile- or gray -iron glands, rubber gaskets, and steel bolts. C. Push -on -Joint, Ductile -Iron Pipe: AWWA C151, with push -on -joint bell and plain spigot end unless grooved or flanged ends are indicated. 1. Push -on -Joint, Ductile -Iron Fittings: AWWA C110, ductile- or gray -iron standard pattern or AWWA C153, ductile -iron compact pattern. 2. Gaskets: AWWA C111, rubber. D. Grooved -Joint, Ductile -Iron Pipe: AWWA C151, with cut, rounded -grooved ends, conforms to AWWA C606, 250 psi minimum working pressure fittings. 1. Grooved -End, Ductile -Iron Pipe Appurtenances: a. May be used as an alternate to flanged joints for exposed locations. b. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1) Anvil International, Inc. 2) Victaulic Company of America. E. Flanged -Joint, Ductile -Iron Pipe: AMA C151, flanged ends. 1. Flange Joints: Comply with the requirements of AWWA C115. a. Class 150 or Class 250 as designated on Drawings or Pipe Schedule. 2. Bolting: �. a. Exposed: ASTM A307, carbon steel, Grade A hex head bolts; ASTM A563, Grade A hex head nuts; and ASTM F436 hardened steel washers. b. Submerged or Buried: ASTM A193 or ASTM A320, Type 316 stainless steel bolts; ASTM A194, Type 316, nuts; and washers of the same material as the bolts. C. Gaskets: 15022-3 July 2009 PIPING SYSTEM, DUCTILE IRON PIPE 0318-042-01 1) Flange, Flat Face: Full-faced, AWWA C111, 1/8-inch thick rubber, factory cut. 2) Flange, Raised Face: Use flat ring gasket. 2.2 SPECIAL PIPE FITTINGS A. Ductile -Iron, Flexible Expansion Joints: Compound fitting with combination of flanged and mechanical -joint ends complying with AWWA C110 or AWWA C153. Include 2 gasketed ball -joint sections and 1 or more gasketed sleeve sections, rated for 250-psi and for offset and expansion indicated. 1. Available Manufacturers: a. EBAA Iron Sales, Inc. b. Romac Industries, Inc. C. Star Pipe Products. B. Ductile -Iron Deflection Fittings: Compound coupling fitting with ball joint, flexing section, gaskets, and restrained joint ends complying with AWWA C110 or AWWA C153. Include rating for 250-psig minimum working pressure and for up to 15 degrees of deflection. 1. Available Manufacturers: a. EBAA Iron Sales, Inc. C. Ductile -Iron Expansion Joints: Three-piece assembly of telescoping sleeve with gaskets and restrained -type, ductile -iron bell -and -spigot end sections complying with AWWA C110 or AWWA C153. Include rating for 250-psig minimum working pressures and for expansion indicated. 1. Available Manufacturers: a. Dresser, Inc.; DMD Div. b. EBAA Iron Sales, Inc. C. JCM Industries. D. Flange adapter. For joining steel pipe to cast iron, provide Dresser Style 127 or equal. Gasket to be BUNA-S, Grade 27. E. Dismantling Joint: Double -ended flange adapter, allowing longitudinal adjustment in piping system, similar to Dresser Style 131 or equal. F. Reducing and Transition Coupling: Required for making reduction is sizes of piping; changing classes of piping; or joining steel and cast iron pipe, provide Dresser Style 62 or equal. 2.3 PROTECTIVE COATINGS, LININGS, AND ENCASEMENT A. Pipe and Fittings Interior: 1. Mortar: Unless otherwise specified in the Piping Schedule, all ductile iron pipe and fittings shall be provided with a cement -mortar lining in accordance with AWWA C104. A bituminous seal coat shall be applied over the cement -mortar lining in accordance with AWWA C104. 2. Epoxy: When specified in the Piping Schedule, apply a high build, fusion bonded epoxy lining per AWWA C116, minimum 16 mils dry film thickness, per AWWA C116. When pipe and fittings are used for potable water service for potable water service, epoxy lining shall be NSF 61 certified. 3. Glass Lining: 15022-1 July 2009 PIPING SYSTEM, DUCTILE IRON PIPE 0318-042-01 a. Consist of glass completely fused above 1,450 degrees F, with a thickness of 6 to 10 mils and defects, which exposed base metal not greater than 0.1 percent of total lined surface. b. Hardness shall be greater than 5 on the Mohs scale and lining bonded sufficiently to withstand a metal strain of 0.001-inch/inch without damage to the glass lining. C. Finished lined pipe shall not deviate more than 0.0125-inch per foot of length from a centerline perpendicular to the flange face or square end of the pipe. d. Available Manufacturers: Water Works Supply Co., Ferrock MEH-32; Ceramic Coating Co., SL-31; or Ervite Corp., SG-14. B. Pipe and Fittings Exterior: 1. Buried Piping: Provide shop applied 1-mil bituminous coating system per AWWA C151 for pipe and AWWA C110 for fittings. C. Encasement for Underground Metal Piping: ASTM A 674 or AWWA C105. 1. Form: Sheet or tube. 2. Material: LLDPE film of 0.008-inch minimum thickness or high -density, cross - laminated PE film of 0.004-inch minimum thickness. D. Color: Black. 2.4 VENT AND DRAIN VALVES A. Pipelines 2-1/2-Inch Diameter and Larger: 3/4-inch vent, 1-inch drain, unless indicated otherwise on the Drawings. B. Pipelines 2-Inch Diameter and Smaller: 1/2-inch vent, 1-inch drain, unless indicated otherwise on the Drawings. C. Install vents and drains at piping system high points (vents) and low points (drains) as required by final installation configuration. Provide line size ball valves for all vents and drains. 2.5 INSULATED CONNECTIONS A. Provide dielectric insulation kits, including gaskets, insulating sleeves and washers w for each bolt and nuts, where flanges are to be catholically insulated. Metal hardware such as backup washers shall be Type 316 stainless steel. Refer to Division 15 Section "Piped Utilities -Basic materials and Methods" for description and additional information. PART 3 - EXECUTION 3.1 INSTALLATION A. Laying Buried Pipe: 1. Install pipe to the lines, grades and elevations shown on the Drawings, complying with the requirements of AWWA C600. 2. Unless otherwise shown on the Drawings, within the plant site, bury piping with a minimum cover of 3-feet. Off -site, bury lines 12-inches and smaller with a minimum cover of 4-feet and lines 14-inches and larger with a minimum cover of 5-feet. 15022-5 July 2009 PIPING SYSTEM, DUCTILE IRON PIPE 0318-042-01 3. Do not lay pipe in water, or when the trench or weather is unsuitable for work. Keep water out of trench until jointing is complete. When work is not in progress, close ends of pipe and fittings securely so no trench water, earth or other substances will enter pipes or fittings. 4. Keep the inside of the pipe free from foreign matter during operations by plugging or other approved method. 5. Provide pipe bedding in accordance with the Drawings and Division 2 Section "Excavation and Backfilling Large Diameter Pipe." Place pipe so that the full length of each section rests solidly upon the pipe bed, with rece3sses a excavated to accommodate bells and joints. Take up and relay pipe when the +� grade or joint is disturbed after laying. 6. Lay pipe with bells facing the direction of the laying except when making enclosures. .� 7. Buried pipe and fittings shall be polyethylene wrapped in accordance with AWWA C105. Wrapping shall be purple in color per TCEQ Chapter 210 Regulations for reclaimed water systems. 8. Provide a restrained push -on joint or mechanical joint ten feet from outside face of structures. B. Restrained Joints: Unless otherwise indicated on the drawings, the CONTRACTOR shall use mechanical restrained pipe joints and fittings (no thrust blocks). The length of pipe requiring thrust restraint shall be calculated as described in Chapter 13 of AWWA M-11. 1. All joints requiring thrust restraint shall be welded (buried) in accordance with AWWA C-206 or restrained with mechanical systems (exposed). 2. CONTRACTOR shall design restrained joints based on the specked pressures as shown in the Piping Schedule or Drawings and in accordance with AWWA M-11. 3. The design for restrained joints, including the length necessary to resist the design thrust, for the embedded conditions, shall be performed and sealed by a Professional Engineer in the state where the Project is being constructed. 4. CONTRACTOR shall bear all costs for the design and will not receive reimbursement from the OWNER. 3.2 CLEANING A. All piping systems shall be thoroughly cleaned and flushed and all construction debris or foreign material removed. The CONTRACTOR shall provide all temporary connections, equipment and the like for cleaning. 3.3 FIELD QUALITY CONTROL A. Sterilization: Clean and sterilized potable water lines in accordance with City of Fort Worth standards. B. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. _ C. Hydrostatic Tests: Conduct testing in accordance with City of Fort Worth standards. D. Prepare reports of testing activities. 15022-6 July 2009 PIPING SYSTEM, DUCTILE IRON PIPE .. 0318-042-01 No .1 wr W i 3 3.4 PIPING SCHEDULE A. As shown on the Drawings. END OF SECTION 15022-7 July 2009 PIPING SYSTEM, DUCTILE IRON PIPE 0318-042-01 SECTION 15030 PIPING SYSTEM, POLYVINYL CHLORIDE (PVC) AND CHLORINATED POLYVINYL CHLORIDE (CPVC) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section provides requirements for PVC and CPVC piping systems for exposed and buried applications, pressure and gravity applications and includes: 1. Polyvinyl chloride (PVC) and chlorinated polyvinyl chloride (CPVC) pressure pipe and fittings in sizes 1/2-inch through 36-inch. 2. Polyvinyl Chloride (PVC) and chlorinated polyvinyl chloride (CPVC) pressure pipe and fittings. 3. Polyvinyl Chloride (PVC), Schedule 40 and 80, pressure pipe and fittings. B. Related Work: 1. Refer to Division 15 Section 15015 "Piped Utilities: Basic Materials and Methods" for information regarding submittals; coordination; material delivery, handling, and storage; projection conditions; design requirements; other materials; installation of piping systems; field testing; and related work. 2. This Section contains material requirements for pipe, fittings, specials, and appurtenances for PVC and CPVC piping systems, as well as Part 1- General and Part 3- Execution additional requirements not specified in the above referenced Section. 1.3 REFERENCES A. References: 1. American Waterworks Association (AWWA): a. C110 — Standard for Ductile -Iron and Gray -Iron Fittings, 3 In. Through 48 In. (76 mm Through 1,219 mm) for Water b. C111 - American National Standard for Rubber Gasket Joints for Ductile -Iron and Gray -Iron Pressure Pipe and Fittings C. C153 — Ductile -Iron Compact Fittings for Water Service d. C219 — Standard for Bolted, Sleeve -Type Couplings for Plain -End Pipe e. C900 — Standard for Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 in. — 12 in. (100 mm-300 mm) for Water Distribution f. C905 — Standard for Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14 in. —48 in. (350 mm-1,200 mm) g. C907 — Standard for Injection -Molded Polyvinyl Chloride (PVC) Pressure Fittings, 4 in. Through 12 in. (100 mm Through 300 mm) ... 2. ASTM International, Inc. (ASTM): a. D1785 — Specification for Poly(Vinyl Chlonde)(PVC) Plastic Pipe, Schedule 40, 80, and 120 15030-1 September 2009 PIPING SYSTEM, POLYVINYL CHLORIDE (PVC) AND CHLORINATED POLYVINYL CHLORIDE (CPVC) 0318-042-01 b. D2241 — Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Pressure -Rated Pipe (SDR Series) C. D2466 — Specification for Poly(Vinyl Chloride)(PVC) Plastic Pipe Fittings, Schedule 40 = d. D2467 — Specification for Poly(Vinyl Chloride)(PVC) Plastic Pipe Fittings, Schedule 80 e. D2564 — Specifications for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems f. D2846 — Specifications for Chlorinated Poly Vinyl Chloride) (CPVC) Plastic and Hot- and Cold -water Distribution Systems g. D3034 — Specification for Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and fittings h. F437 — Specification for Threaded Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80 = i. F438 — Specification for Socket -Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Fittings, Schedule 40 j. F439 — Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) - Plastic Fittings, Schedule 80 k. F441 — Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, Schedule 40 and 80 - I. F442 - Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe (SDR-PR) m. F477 — Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe n. F679 — Specification for Poly(Vinyl Chloride)(PVC) Large -Diameter Gravity Sewer Pipe and Fittings _ o. F794 — Specification for Poly(Vinyl Chloride)(PVC) Profile Gravity Sewer Pipe and Fittings Based on Controlled.lnside Diameter p. F891 Specification for Coextruded Poly(Vinyl Chloride)(PVC) Plastic Pipe With a Cellular Core q. F493 — Specification for Solvent Cements for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe and Fittings 3. National Science Foundation (NSF): a. NSF/ANSI 61 — Drinking Water Systems Components — Health Effects PART 2 - PRODUCTS 2.1 PVC PIPE AND FITTINGS, 4 THROUGH 12 INCH, PRESSURE A. PVC Pressure Pipe: AWWA C900., Class 150 and/or Class 200 (as shown on Drawings or in Pipe Schedule), with bell end with gasket, and with spigot end. 1. Comply with UL 1285 for fire -service mains if indicated. 2. PVC Fabricated Fittings: AWWA C900, with bell -and -spigot or double -bell ends. Include elastomeric gasket in each bell. 3. PVC Molded Fittings: AWWA C907, Class 150, with bell -and -spigot or double -bell ends. Include elastomeric gasket in each bell. 4. Push -on -Joint, Ductile -Iron Fittings: AWWA C110, ductile- or gray -iron standard pattern or AWWA C153, ductile -iron compact pattern. a. Gaskets: AWWA C111, rubber. - 5. Mechanical -Joint, Ductile -Iron Fittings: AWWA C110, ductile- or gray -iron standard pattern or AWWA C153, ductile -iron compact pattern. 15030-2 September 2009 PIPING SYSTEM, POLYVINYL CHLORIDE (PVC) AND CHLORINATED POLYVINYL CHLORIDE (CPVC) 0318-042-01 a. Glands, Gaskets, and Bolts: AWWA C111, ductile- or gray -iron glands, rubber gaskets, and steel bolts. • 2.2 PVC PIPE AND FITTINGS, 14 THROUGH 48 INCH, PRESSURE A. PVC Pressure Pipe: AWWA C905, Class 150 and/or Class 200 (as shown on Drawings or in Pipe Schedule), with bell end with gasket, and with spigot end. 1. PVC Fabricated Fittings: AWWA C905, with bell -and -spigot or double -bell ends. Include elastomeric gasket in each bell. 2. Push -on -Joint, Ductile -Iron Fittings: AWWA C110, ductile- or gray -iron standard pattern or AWWA C153, ductile -iron compact pattern. a. Gaskets: AWWA C111, rubber. 3. Mechanical -Joint, Ductile -Iron Fittings: AWWA C110, ductile- or gray -iron standard pattern or AWWA C153, ductile -iron compact pattern. 4. Glands, Gaskets, and Bolts: AWWA C111, ductile- or gray -iron glands, rubber gaskets, and steel bolts. 2.3 CPVC/PVC PIPE AND FITTINGS, 6-INCH AND SMALLER, PRESSURE A. PVC Pipe and Fittings: ASTM D 1785, Schedule 40 and Schedule 80 pipe, with plain ends for solvent -cemented joints or threaded ends conforming to ASTM D 2466, Schedule 40 or ASTM D 2467, Schedule 80, socket -type or threaded fittings. Use Schedule 80 for all pipes to be threaded. Use Schedule 80 for all pipes to be threaded. B. CPVC Pipe and Fittings: ASTM F441, Schedule 40 and Schedule 80 pipe, with plain ends for solvent -cemented joints or threaded ends conforming to ASTM F438, Schedule 40 or ASTM F439, Schedule 80, socket -type or threaded fittings. Use Schedule 80 for all pipes to be threaded. C. Solvent Cement: As recommended by the pipe and fitting manufacturer conforming to D2564 for PVC piping systems and ASTM F493 for CPVC piping systems. 2.4 PVC PIPE AND FITTINGS, GRAVITY SEWER AND DRAIN A. PVC Cellular -Core Pipe and Fittings: ASTM F 891, Sewer and Drain Series, PS 50 minimum stiffness pipe with ASTM D 3034, SDR 35, socket -type fittings for solvent - cemented joints. B. PVC Sewer Pipe and Fittings, NPS 15 and Smaller: ASTM D 3034, SDR 35, with bell -and -spigot ends for gasketed joints with ASTM F 477, elastomeric seals. C. PVC Sewer Pipe and Fittings, NPS 18 and Larger: ASTM F 679, T-1 wall thickness, with bell -and -spigot ends for gasketed joints with ASTM F 477, elastomeric seals. D. PVC Profile Gravity Sewer Pipe and Fittings: ASTM F 794 pipe, with bell -and - spigot ends; ASTM D 3034 fittings, with bell ends; and ASTM F 477, elastomeric seals. 2.5 JOINING MATERIALS A. Refer to Division 2 Section "Piped Utilities - Basic Materials and Methods" for commonly used joining materials. 15030-3 September 2009 PIPING SYSTEM, POLYVINYL CHLORIDE (PVC) AND CHLORINATED POLYVINYL CHLORIDE (CPVC) 0318-042-01 B. Plastic Pipe -Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated. 2.6 PIPING SPECIALTIES A. Transition Fittings: Manufactured fitting or coupling same size as, with pressure rating at least equal to and ends compatible with, piping to be joined. B. Tubular -Sleeve Pipe Couplings: 1. Description: Metal, bolted, sleeve -type, reducing or transition coupling, with center sleeve, gaskets, end rings, and bolt fasteners and with ends of same sizes as piping to be joined. a. Standard: AWWA C219. 2.7 CORROSION -PROTECTION PIPE FITTINGS ENCASEMENT A. Encasement for Underground Metal Pipe Fittings: ASTM A 674 or AWWA C105. 1. Form: Sheet or tube. 2. Material: LLDPE film of 0.008-inch minimum thickness or high -density, cross - laminated PE film of 0.004-inch minimum thickness. 3. Color: Black. PART 3 - EXECUTION 3.1 INSTALLATION, CLEANING, AND TESTING v, A. Comply with the requirements of Division 15 Section 15015 "Piped Utilities -Basic Materials and Methods." 3.2 PIPING SCHEDULE A. Piping Schedule shall either be as shown on the Drawings or after the 'END OF SECTION." END OF SECTION 15030-4 September 2009 PIPING SYSTEM, POLYVINYL CHLORIDE (PVC) AND CHLORINATED POLYVINYL CHLORIDE (CPVC) 0318-042-01 SECTION 15035 PIPING SYSTEM, HIGH DENSITY POLYETHYLENE (HDPE) PRESSURE PIPE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section provides for furnishing: 1. High Density Polyethylene (HDPE) pressure piping systems, %-inch through 60- inches. B. Related Work: y 1. This Section contains material requirements for pipe, fittings, specials, and appurtenances for HDPE piping systems, as well as Part 1- General and Part 3- Execution additional requirements not specified in the above referenced Section. 1.3 REFERENCES A. References: 1. American National Standards Institute: a. B16.1 — Specification for Piping Fittings of Wrought Carbon steel and Alloy Steel for Moderate and High Temperature Service 2. American Waterworks Association (AWWA): a. C207 — Standard for Dimensions for Fabricated Steel Water Pipe Fittings 3. ASTM International, Inc. (ASTM): a. A193 — Specification for Alloy -Steel and Stainless Steel bolting Materials for High Temperature or High Pressure Service and Other Special Purpose Applications b. A194 — Specification for Carbon and Alloy Steel Nuts for Bolts for High - Pressure or High -Temperature Service, or Both c. A307 — A307 — Specification for Carbon Steel Bolts and Studs, 60000 PSI Tensile Strength d. A563 — A563 — Specification for Carbon and Alloy Steel Nuts e. D3035 — Specification for Polyethylene (PE) Plastic Pipe (DR -PR) Based on _ Controlled Outside Diameter f. D3350 — Specification for Polyethylene Plastic Pipe and Fittings Materials g. F714 — Specification for Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter 4. National Science Foundation (NSF): a. NSF 14 — Plastics Piping System Components and Related Materials b. NSF 61 — Drinking Water Systems Components — Health Effects 15035-1 July 2009 PIPING SYSTEM, HIGH DENSITY POLYETHYLENE (HDPE) PRESSURE PIPE 0318-042-01 PART 2-PRODUCTS 2.1 PIPE AND FITTINGS A. General: Pipe lengths, fittings, and flanged connections to be joined by thermal butt - fusion shall be of the same type, grade, and class of polyethylene compound. B. NSF Certified: All surfaces and materials in contact with water or in contact with a chemical being applied to water that is being treated for potable water use and conveyance, shall conform to NSF-61 and certified by an organization accredited by ANSI. C. Pipe: 1. ASTM D3035, high density polyethylene, maximum allowable hoop stress 800 psi at 73.4°F. 2. Polyethylene resins shall conform to Type PE 3408/3608/4710 or better. The use of polyethylene resin designated Type PE 4710 may result in the use of HDPE pipe having a SDR rating higher than specified for Type PE 3208/3608. 3. Protection shall be provided against ultraviolet light degradation using carbon black, not less than 2 percent well dispersed in the resin. 4. Pipe wall thickness shall reflect required dimesnions, as shown in ASTM F714, Table 9. 5. Design Stress Rating: ASTM F714, 800 psi hydrostatic. a. Pressure Rating: As scheduled. b. Dimensions: Iron Pipe Size (I.P.S.) or Ductile Iron Pipe Size (D.I.P.S.) as scheduled. c. SDR: 11 D. Fittings: 1. 6-Inches and Smaller: Molded fittings, butt fusion joined, conforming to ASTM D3261. 2. 8-Inches and Larger: Same as pipe, butt fusion joined, conforming to ASTM D3350. Fittings shall have same pressure rating as pipe. E. Flanges: 1. Van Stone type, cast ASTM A351, stainless steel backing ring, IPP Deltaflex convoluted design, or equal, for bolting to ANSI B16.1, Class 125; ANSI B16.5, Class 150; and AMA C207, Class E. 2. Pressure performance of the backing ring equal to SDR rating of pipe with safety factor of two. Stub ends same grade HDPE and pressure rating of pipe. F. Bolting: 1. General Conditions: Stainless steel, ASTM A193, Grade 138M, studs and ASTM A194, Grade 8M, hex head bolts. 2. Washers of same material as bolts. G. Gaskets: Flat Ring, 1/8-inch ethylene propylene rubber (EDR). 15035-2 July 2009 PIPING SYSTEM, HIGH DENSITY POLYETHYLENE (HDPE) PRESSURE PIPE r. 0318-042-01 .. v .r 00 W& No PART 3 - EXECUTION 3.1 INSTALLATION, CLEANING, AND TESTING A. Comply with City of Fort Worth Standards. END OF SECTION 15035-3 July 2009 PIPING SYSTEM, HIGH DENSITY POLYETHYLENE (HDPE) PRESSURE PIPE 9" _1 0318-042-01 SECTION 15040 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) 1.00 GENERAL 1.01 SCOPE Furnish and install AWWA-C303 bar -wrapped concrete cylinder pipe and fittings, and specials, including connections and appurtenances completely as shown on the Plans and specified herein and perform hydrostatic test. 1.02 SUBMITTALS Submit the following information in accordance with the requirements of the Contract Documents setting forth the manufacturer's design data and record drawings to the ENGINEER before fabrication or shipment to the job site: A. Record Data for the following: 1. Pipe material 2. Fittings 3. Appurtenances 4. Adapters 5. Pipe layout schedule/drawings including pipeline stationing and elevations 6. All material furnished 7. Design performed by Texas Registered Professional Engineer All of the record drawings and data shall be complete and shall include a complete description of the pipe adaptors, fittings, appurtenances, etc. offered, including cuts, tabulated layout and all pertinent engineering design data sealed by CONTRACTOR's Texas Registered Professional Engineer. B. Prior to delivery of the pipe to the project site, the manufacturer shall furnish an affidavit certifying that all pipe, fittings, and specials, and other products and materials furnished, comply with the applicable provisions of this Specification. C. CONTRACTOR shall also submit a certificate of adequacy of design showing the we necessary provisions required in the design of the pipe to comply with the applicable sections of this Specification. The pipe layout drawings and data shall clearly indicate where pipe requiring special provisions is required. The certificate of adequacy of design shall be sealed by CONTRACTOR's Texas Registered Professional Engineer. 15040-1 July 2009 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) FAprojectsW3181042-011Specs\Part 31Tech\Division 15NI5070 Reinforced Concrete Cylinder Pipe (Bar-Wrapped).doc 0318-042-01 2.00 PRODUCTS 2'.01 GENERAL Bar -wrapped concrete cylinder pipe, fittings and specials shall be designed, fabricated and tested in accordance with the latest requirements of AWWA C-303, "Concrete Pressure Pipe Bar -Wrapped - Steel Cylinder Type" with additional requirements or modifications as described herein. Pipe fittings and specials shall also be designed in accordance with the applicable requirements of AWWA Manual M-11, "Steel Pipe, A Guide for Design and Installation", and with the requirements of AWWA Manual M-9, "Concrete Pressure Pipe", in particular relating to reinforcement of fittings, thrust restraints, anchor rings and joint harness lugs. Horizontal changes in pipe direction may be accomplished without the use of direction - changing fittings. Controlled horizontal longitudinal bending using deflected joints may be used and must be within the acceptable limits as recommended by the manufacturer. However, the joint deflection shall not exceed 50 percent of the manufacturer's written recommendation. Vertical changes in pipe direction shall be accomplished without the use of direction - changing fittings which require vertical thrust blocking and/or joint restraint. Controlled vertical longitudinal bending shall be accomplished using deflected joints and/or fabricated fittings resulting in a circular pipe arc where fabrication fittings do not require joint restraint. Controlled vertical longitudinal bending shall not exceed 50 percent of the manufacturer's written recommendation. 2.02 PIPE DESIGN CLASSES Design minimum pressure classes and sizes shall be as shown on the drawings. Fittings, specials and connections shall be same class as the associated pipe unless otherwise - indicated. All pipe and fittings shall be clearly marked with the pressure class and piece number to permit easy identification in the field. Pipe design shall be based on trench embedment and backfill requirements shown on the Drawings, and as specified herein. The select material in the pipe zone will be selected or processed material as specified in other sections of this Contract Document. Material will be _ consolidated or compacted to at least 95 percent of maximum density, Standard Proctor, as determined by ASTM D698, 'Test for Moisture -Density Relations for Soils." Pipe shall be designed for the trench depths indicated using a Soil Reaction Modulus E' of 700, and a maximum pipe deflection of D2/4,000, where D = Diameter. 15040-2 July 2009 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) Hprojects\0318\042-01 Opecs\Part 3\Tech\Division 15\15070 Reinforced Concrete Cylinder Pipe (Bar-Wrapped).doc 0318-042-01 2.03 SPECIAL REQUIREMENTS FOR CONCRETE CYLINDER PIPE A. Cement Cement for use on inside and outside mortar coating shall be Type I or Type II Portland Cement. B. Flanges Flanges shall have ANSI Drilling of class equal to or greater than the pipe class, unless otherwise specified, and shall match class of valves or appurtenances which are attached. C. Insulated Connections The pipe vendor shall furnish dielectric insulation gaskets and/or bushings at all places where concrete cylinder pipe connects to ductile and cast iron pipe and fittings. Where flanges are to be insulated, fumish and install "Insulket" flange gaskets, insulating sleeves and two plastic washers for each bolt. D. Special Banding Pipe to be laid in casing shall have two built-up rings of mortar each approximately 2 feet long and slightly higher than the pipe bell to prevent pipe being supported by the bell. Rings to be at the quarter points of the pipe section. 2.04 INSPECTION AND TESTING A. General The OWNER reserves the option to have an independent testing laboratory, at the OWNER's expense, inspect pipe and fittings at the pipe manufacturer's plant to ensure compliance with the applicable specifications. The OWNER's testing laboratory and ENGINEER shall have free access to those parts of the manufacturer's plant that are necessary to ensure compliance with the governing standard. The pipe manufacture shall notify the OWNER, in writing, at least two weeks ahead of pipe fabrication as to start of fabrication and fabricating schedule so that the OWNER can advise the manufacturer as to OWNER's decision regarding tests to be performed by an independent testing laboratory. In event the OWNER elects to retain an independent testing laboratory to make material tests and weld tests, it is the intent that the tests be limited to one spot testing of each category unless the tests do not show compliance with the Standard. If these tests do not show compliance, the OWNER reserves the right to have the laboratory make additional tests and observations to ensure compliance of the finished product with the Standard. In any event, the manufacturer shall perform the tests described in AWWA C303, and furnish the OWNER with a copy of the test reports as Record Data, if requested, at the expense of the pipe manufacturer. The pipe manufacturer shall furnish the OWNER with affidavit of Compliance as outlined in the Standard. 15040-3 July 2009 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) F:\projects\0318\042-01\Specs\Part 3\Tech\Division 15\15070 Reinforced Concrete Cylinder Pipe (Bar-Wrapped).doc so 0318-042-01 B. Special Fittings All welds for water tightness in special pipe and fittings that have not been hydrostatically tested may be examined by use of visible dye penetrant system meeting requirements of ASTM E165; however, collar reinforcement and all other -Y lapwelds shall be tested by introducing air under 10 psig pressure between the collar and cylinder and checking for leaks around and through the welds with soap solution. The area to receive the dye penetrant shall be cleaned free from contaminants that might interfere with the penetrant process. The temperature of the steel in the weld area shall be between 60 and 125 degrees Fahrenheit when the penetrant is applied. Dwell time of 6 hours shall be allowed after application of the penetrant and developer before interpreting the results. Defects that are found shall be repaired and the test repeated until all defects are eliminated. Colored penetrant shall be removed before fittings are lined. 3.00 EXECUTION 3.01 INSTALLATION A. Pipe Handling Pipe, fittings, valves and other accessories shall be hauled to and distributed at the site of the project by the CONTRACTOR; they shall at all times be handled with care _ to avoid damage. Before lowering into the trench, each joint of pipe shall be inspected, and any damaged pipe shall be rejected. The pipe shall be kept clean during the laying operation and free of all sticks, dirt, and trash, and at the close of each operating day, the open end of the pipe shall be effectively sealed against the entrance of all objects and especially water. No pipe shall be laid in water. Pipe shall be laid in accordance with manufacturer's instructions true to the line and grade elevations as shown on the Plans with excavated bell hole for each joint and adequate haunching support. B. Pipe Jointing 1. General: Before laying each joint of pipe, the bell and spigot rings shall be thoroughly cleaned by brushing and wiping. If any damage to the protective coating on the metal has occurred, it will be required of the CONTRACTOR to repair such damage in accordance with the manufacturer's recommendations before the pipe is laid. Chain hosts will not be allowed unless approved by the l manufacturer. Sections of pipe shall be tightly fitted together and care shall be exercised to secure true alignment and grade. When a joint of pipe is being laid, the gasket shall be placed on the spigot ring and the spigot end of the pipe shall then be 15040-4 July 2009 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) F:lprojects10318\042-01 \.Specs\Part 31Tech\Division 15115070 Reinforced Concrete Cylinder Pipe (Bar-wrapped).doc 0318-042-01 entered into the bell of the adjoining pipe and forced into position. The gasket and the inside surface of the bell shall be lubricated with an approved lubricant (flax soap) which will facilitate the telescoping of the joint. The inside joint recess between ends of the pipe sections shall be in accordance with ` manufacturer's recommendations. No "blocking up" of pipe or joints will be permitted, and if the pipe is not uniformly supported or the joint not made up properly, the joint shall be removed and the trench shall be properly prepared. For interior welded joints backfilling shall be completed before welding. For exterior field welded joints, adequate working room shall be provided under and beside the pipe. 2. Exterior Joint: The exterior joint shall be made by placing a joint wrapper around the pipe which will be held in place by means of two metal straps. The wrapper shall be 9 inches wide for pipe 36 inches and larger, and 7 inches wide for smaller pipe, and hemmed on each side. The wrapper shall be fiberglass reinforced or burlap cloth, of such length that it will encircle the pipe, leaving enough opening between ends to allow the mortar to be poured inside the wrapper to the joint. The wrappers shall be similar and equivalent to those manufactured by Mar -Mac Manufacturing Company. The grout used for pouring the joint shall consist of one part Portland Cement to two parts clean, fine, sharp sand, as specified for interior joints, and mixed to the consistency of thick cream. The joint shall be filled with this grout from one side in one continuous operation until the grout has flowed entirely around the pipe. During the filling of the joint, the sides of the wrapper shall be patted or manipulated as required to settle the mortar and expel any entrapped air. 3. Interior Joints: Upon completion of backfilling of the pipe trench, the inside joint recess shall be filled with a stiff cement mortar consisting of one part of cement to two parts of sand by a qualified workman working inside the pipe. Cement shall be ASTM C150, Type I or Type II. Sand shall conform to ASTM specification C144 (plaster sand). Pipe shall be installed in accordance with AWWA M-9 Manual and as recommended by the manufacturer. 4. Welded Joints: Joints to be welded shall be telescoped together with rubber gasket as specified above and aligned perfectly with the adjacent section of pipe. Welding for thrust restraint or for full welded joints shall be in accordance with AWWA M-9 Manual and manufacturer's recommendations. When the joint weld is completed, the exterior joint shall be poured with mortar as specified above. Sufficient time shall elapse to allow the mortar to set-up before skidding assembled sections into the casing. High early strength cement may be used for this purpose if desired. After all sections are in final position, the interior joint shall be filled as specified above. 15040-5 July 2009 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) F:Vrojects\03181042-01\Specs\Part 31Tech\Division 15\15070 Reinforced Concrete Cylinder Pipe (Bar-Wrapped).doc 0318-042-01 C. Protection of Exposed Metal All exposed ferrous metal shall be protected by a minimum of 1-inch coating of Portland Cement mortar consisting of one part cement, as specified for inside joints, and two parts sand. Exposed surfaces such as, but not limited to, flanges, bolts, caulked joints, threaded outlets, closures, etc., shall have coating reinforced with galvanized wire mesh. The surface receiving a cement mortar coating shall be thoroughly cleaned and wetted with water just prior to placing the cement mortar coating. After placing, care shall be taken to prevent cement mortar from drying out too rapidly by covering with damp earth or burlap. Cement mortar coating shall not be applied during freezing weather. D. Cathodic Protection Electrical bonding for cathodic protection shall be provided for the pipe. RCCP shall be provided with test leads and permanent test stations at intervals as shown on the Plans. Each joint of pipe shall have two mild steel shorting straps installed 180o apart. E. Patching Excessive patching of lining or coating will not be permitted. Patching of lining or coating will be allowed where area to be repaired does not exceed 100 square inches and has no dimensions greater than 12 inches. In general, there shall not be more than one patch on either the lining or the coating of any one joint of pipe. Wherever necessary to patch the pipe, patch shall be made with a mortar of one part Portland Cement and two parts clean sharp sand; all measures to be by weight. Pipe thus patched shall not be installed until the patch has been properly and adequately cured and approved for laying by the ENGINEER. F. Pipe Bedding Trench bottom shall be excavated below the pipe for installing pipe bedding. Pipe -- shall be laid on the bedding such that it is supported uniformly from end -to -end. G. Backfilling T As soon as the pipe joint has been complete, the joint mortar has set-up and all concrete blocking completed, the backfilling in the "pipe zone" to a point at least 12 inches above the pipe. - H. Restrained Joints Unless otherwise indicated on the drawings, the CONTRACTOR shall use restrained pipe joints and fittings. 15040-6 July 2009 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) F:\projects\0318\042-011SpecslPart 3\Tech\Division 15\15070 Reinforced Concrete Cylinder Pipe (Bar-Wrapped).doc 0318-042-01 All fittings shall be restrained using restrained joint pipe and fittings for a sufficient length to resist the design thrust. All joints requiring thrust restraint shall utilize a snap ring restrained joint system or an approved semi -flexible restrained joint, unless otherwise noted within or on the plans. Restrained joints within a casing pipe may be welded. — For designing restrained joints, the following minimum pressures shall be taken into account: Maximum test pressure = 150 psig Normal operating pressure = 120 psig Total Surge = 250 psig I. Installation On Grade Pipe shall be installed on constant grade between control depths as shown on the Plans, with minimum depth of cover maintained. 3.02 HYDROSTATIC TEST After the pipe has been laid and backfilled, newly laid pipe shall be subjected to a hydrostatic pressure test in accordance with City of Fort Worth standards_ END OF SECTION go VW or 15040-7 July 2009 REINFORCED CONCRETE CYLINDER PIPE (BAR -WRAPPED) F:\projects10318\042-01\Specs\Part 3\Tech\Division 15\15070 Reinforced Concrete Cylinder Pipe (Bar-Wrapped).doc V. 0318-042-01 SECTION 15070 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Provide all necessary labor, materials and equipment, including test pumps and gauges, as well as temporary valves and piping to perform the testing operations of piping systems as specified herein. -- 2. All piping systems will be tested. If demonstrated workmanship on one or more tests show that lines are sufficiently watertight, the ENGINEER may waive remaining testing on any given type or section of line. 3. CONTRACTOR'S Responsibility: a. Take such precautions as required to prevent damage to lines and appurtenances being tested. b. Repair any damage resulting from tests. c. Repair and retest all items which do not pass the tests as specified herein. d. Conduct all tests in the presence of the ENGINEER, and to the satisfaction of the ENGINEER and all State and local authorities having jurisdiction. - e. All necessary pumps, water, pipe connections, meters, gauges, and any necessary apparatus to perform and conduct the tests shall be furnished by the CONTRACTOR. CONTRACTOR shall furnish all necessary equipment and make all tests at CONTRACTOR'S expense without separate measurement and payment, but said expense shall be subsidiary to installation of pipe. 4. Test pressures are specified in Test Pressures for Pressure Lines in Part 3 of this Section. 5. Water used for testing purposes shall be potable water only. 1.3 DEFINITIONS AND REFERENCES A. Definitions: 1. Gravity lines: shall refer to PVC, clay pipe, reinforced concrete (non -cylinder -type) pipe, and other such pipes designed to normally operate in a partially full condition. 2. Pressure lines: shall refer to ductile iron, PVC, RCCP, steel, and other such pipes designed to operate in a full condition, with the system's energy grade line at or above the top of the pipe during normal operating conditions. 3. FRP: Fiberglass -reinforced plastic. 4. LLDPE: Linear low -density, polyethylene plastic. 5. PE: Polyethylene plastic. 6. CPVC: Chlorinated polyvinyl chloride plastic. 7. PVC: Polyvinyl chloride plastic. .. B. References: 1. American Water Works Association (AWWA): 15070-1 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 0318-042-01 v a. C 600 — Standard for Installation of Ductile -Iron Water Mains and Their — Appurtenances b. M 23 — PVC Pipe: Design and Installation 2. ASTM International (ASTM): - a. C 924 — Practice for Testing Concrete Pipe sewer Lines by Low -Pressure Air Test Method b. F 1417 — Test Method for Installation Acceptance of Plastic Gravity Sewer Lines Using Low -Pressure Air 3. Unibell PVC Plastic Pipe Association, "Handbook of PVC Pipe: Design and Construction, Fourth Edition" 1.4 SUBMITTALS A. Shop Drawings: 1. Submit a description of proposed testing methods, procedures, and apparatus for review prior to testing. 2. Submit description of weir and weir tables to be used in infiltration test, if applicable. B. Field Quality -Control Reports: 1. Submit a certified test report for each test to ENGINEER certifying the test pressures, duration of the test, leakage and pertinent observations and comments. PART 2-PRODUCTS 2.1 TEST EQUIPMENT A. Test equipment shall be selected, obtained, and maintained by the CONTRACTOR. All gauges shall be calibrated prior to beginning testing and as often as is necessary to provide accurate, reliable information. PART 3 - EXECUTION 3.1 GENERAL REQUIREMENTS A. Obtain the ENGINEER'S approval of proposed testing methods, procedures, and apparatus, before performing any test. Upon receipt of the ENGINEER'S approval, submit a schedule of testing dates and times at least 24-hours in advance of testing. B. Inspect interior of piping to determine whether line displacement or other damage has occurred. Inspect after approximately 24 inches of backfill is in place, and again at _ completion of Project. 1. Submit separate reports for each system inspection. 2. Defects requiring correction include the following: a. Alignment: Less than full diameter of inside of pipe is visible between structures. b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter. c. Crushed, broken, cracked, or otherwise damaged piping. d. Infiltration: Water'leakage into piping. e. Exfiltration: Water leakage from or around piping. 15070-2 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 0318-042-01 3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified. 4. Reinspect and repeat procedure until results are satisfactory. C. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects. 1. Do not enclose, cover, or put into service before inspection and approval. 2. Test completed piping systems according to authorities having jurisdiction. 3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice. 4. Submit separate report for each test. 5. Gravity -Flow Sewage and Drainage Piping: Test according, to requirements of authorities having jurisdiction, UNI-B-6, and the following: a. Exception: Piping with soil tight joints unless required by authorities having jurisdiction. b. Option: Test plastic piping according to ASTM F 1417. c. Option: Test concrete piping according to ASTM C 924. 6. Manholes: Test manholes in accordance with Division 2 Section "Manholes." 7. Force -Main and Pressure Piping: Perform hydrostatic test after thrust blocks, supports, and anchors have hardened. Test at pressure not less than 1-1/2 times the maximum system operating pressure, but not less than 150 psig. a. Ductile -iron Piping: Test according to AWWA C600, "Hydraulic Testing" Section. b. PVC Piping: Test according to AWWA M23, 'Testing and Maintenance" Chapter. - 3.2 CLEANING, TESTING, AND DISINFECTION OF POTABLE WATER LINES A. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Fill pipeline 24-hours before testing and apply test pressure to stabilize system. Use only potable water. B. Hydrostatic Tests: Test at not less than one -and -one-half times working pressure for two hours. 1. Increase pressure in 50-psig increments and inspect each joint between increments. Hold at test pressure for 1 hour; decrease to 0 psig. Slowly increase again to test pressure and hold for 1 more hour. Maximum allowable leakage is 2 quarts per hour per 100 joints. Remake leaking joints with new materials and repeat test until leakage is within allowed limits. 2. Prepare reports of testing activities. C. Clean and disinfect water -distribution piping as follows: 1. Purge new water -distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use. 2. Fire -protection water piping not connected to potable water supply: Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in NFPA 24 for flushing of piping. Flush piping system with clean, potable water until dirty water does not appear at points of outlet. 3. Fire -protection water piping connected to potable water supply: Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or do as follows: 15070-3 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 0318-042-01 a. Fill system or part of system with water/chlorine solution containing at least 50 ppm of chlorine; isolate and allow standing for 24 hours. b. Retain last subparagraph above or first subparagraph below. c. Drain system or part of system of previous solution and refill with water/chlorine solution containing at least 200 ppm of chlorine; isolate and allow standing for 3 hours. d. After standing time, flush system with clean, potable water until no chlorine remains in water coming from system. e. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedure if biological examination shows evidence of contamination. 4. Prepare reports of purging and disinfecting activities. 3.3 TESTING OF PRESSURE LINES (EXCEPT POTABLE WATER LINES) A. General: 1. Allow concrete blocking to cure for at least 28 days before testing. 2. Backfill and compact soil behind all blocking. T 3. Backfill over pipe to extent necessary to restrain the piping. Backfill shall extend to within 1-foot of proposed final grade. 4. Conduct water leakage test after completing hydrostatic pressure tests. 5. Lines which fail to hold the specified test pressure for at least two hours or which exceed an allowable leakage rate specified below, shall be repaired to the satisfaction of the ENGINEER and retested at the CONTRACTOR'S expense. 6. System shall be tested in sections between valves and shall not exceed 2,000 feet unless authorized by ENGINEER. B. Procedures for Hydrostatic Pressure Tests: 1. Slowly fill isolated section of line with water. 2. Insure that all air has been expelled through air and vacuum release valves, taps, or connections shown on Plans for permanent piping, valves, or accessories. Do not make additional taps solely for air expulsion purposes unless approved by ENGINEER. No additional compensation will be made for additional taps. 3. Apply specified test pressure based on the elevation of the lowest section of line under test and corrected to elevation of test gauge. Duration of test shall be two ` hours. 4. Allow concrete pipe to stand full of water at least 12-hours before starting leakage test. 5. At the end of the two hours of the test, the entire route of the pipeline shall be inspected to locate any leaks or breaks. Any defective joints, cracked or defective pipe, fittings, or valves discovered in consequence of this pressure test shall be removed and replaced with sound material in the manner provided and the test shall be repeated until satisfactory results are obtained. Any and all noticeable leaks shall be repaired regardless of whether the actual leakage is within the allowable. The pipe shall be retested over a period of two hours. 6. All piping systems shall be tested for leakage by a hydrostatic pressure test. Lines shall be filled slowly, with a maximum velocity of 1-foot per second, while venting all air. If permanent air vents have not been installed, the CONTRACTOR shall install corporation cocks at all high points to expel air during initial filling and testing of the lines. 7. The duration of each leakage test shall be two hours unless otherwise specified, and during the test the line shall be subjected to a continuous specified test pressure at the lowest elevation. 15070-4 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 0318-042-01 8. Leakage is defined as the net quantity of water that must be supplied into the newly laid pipe, or any valved section thereof, necessary to maintain pressure within 5-psi of the specified leakage test pressure after the pipe has been filled with water and the air in the pipeline has been expelled. No installation shall be accepted if the leakage is greater than that determined by the following formula: L = SD(P)0-5 133,200 Where: L = allowable leakage in gallons per hour D = nominal diameter of the pipe, inches P = average test pressure during the leakage test, psig S = length of pipe tested, in feet 9. The test pressure shall be applied by means of a pump connected to the pipe and to an approved water container, or other approved method, for accurate measurement. The test pressure shall be maintained (by additional pumping, if necessary) for the specified time. 10. While the line is under pressure, the system and all exposed pipe, fittings, valves, and hydrants shall be carefully examined for leakage. All defective elements shall be repaired or replaced and the test repeated until all visible leakage has been stopped and the allowable leakage requirements have been met. 11. On completion of tests, any newly installed, approved taps shall be tightly plugged with brass fittings. 12. Thoroughly purge all compressed air lines after testing. 3.4 TEST PRESSURES FOR PRESSURE LINES A. Piping shall be tested to pressures shown on Plans. If not shown, test as follows: 1. All process piping shall be tested to 75-psi. 2. Pump discharge and force main to 200-psi. 3. Chemical piping to 100-psi. 4. Plant water and potable piping to 150-psi. 5. Drain and sewage lines using pressure pipe to 50 psi. 3.5 TESTING OF DRAINS, SEWERS, AND OTHER GRAVITY LINES A. General: 1. For all pipe, the method of testing shall be an exfiltration test using either a hydrostatic test or a pneumatic test. For any flexible, non-metallic or non -concrete pipe, such as plastic (PVC, CPVC, PE, etc.) or fiber reinforced plastic pipe or similar flexible pipe materials, a deflection test shall also be performed. 2. CONTRACTOR may make first test promptly after first section of line is laid and backfilled. A section of pipe will normally be a run between two manholes, or _ between a structure and the first manhole. 3. Do not lay additional piping of the type being tested until test of first section is complete. 4. Do not perform any OWNER required leak test until backfill has been installed to grade for a minimum of 30 days. 5. Individual leaks will ordinarily be revealed by looking through sewer (larger than 24-inch diameter) with a light while ground water level is over sewer, during water 15070-5 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 0318-042-01 tamping operations, or immediately after water from exfiltration tests is emptied from sewer. 6. Settlement in backfill during exfiltration tests will be taken as an indication of leakage. B. Hydrostatic Exfiltration Test Procedure. 1. Seal ends of section being tested with watertight plugs. 2. Fill section with water 24-hours prior to start of test. 3. Vent line during filling so that no air is trapped in line. 4. Leave outlets of stacks, inlets, and service lines exposed and unplugged until after exfiltration test has been made. - 5. Outlets terminating below level of test water surface to be temporarily extended upward by installing lengths of pipe. 6. Measure leakage or exfiltration during test period by adding measured quantities of water to maintain water level in test structure. 7. Quantity of water added to maintain water level is amount of leakage or exfiltration. 8. Test for at least two hours with minimum head of four feet measured above top crown, inside pipe at upper end of section being tested. Allow for increase in height due to ground water level, if any. 9. Storm sewer leads to be tested with water level at gutter grade. 10. After completion of satisfactory test, remove lengths of pipe added for test. 11. Allowable Leakage: Allowable leakage for exfiltration test in any individual section or entire sewer line under construction shall not exceed 10 gallons per inch of inside diameter per mile of pipe per 24 hours. C. Hydrostatic Exfiltration Test Procedure for Agri Drain Structures and Associated Piping: Following installation of pipe, Agri Drain structures and backfill, all joints as a system shall be tested by the exfiltration test as follows: 1. Seal open ends of pipe upstream and downstream of the Agri Drain structure with watertight plugs. 2. Fill Agri Drain structure to the top with water. 3. Vent pipes during filling so that no air is trapped in line. 4. Measure leakage or exfiltration after a 24-hour period by observing the level of water from the top of the Agri Drain structure. 5. The difference in depth between the water level and the top of the Agri Drain structure is the amount of leakage or exfiltration. 6. Allowable Leakage: Allowable leakage for exfiltration test shall be a difference in depth less than 1.25 inches. D. Low Pressure Air Joint Test: u 1. All pipe joints shall be tested in accordance with this section. 2. Equipment shall be the product of manufacturers having more than five year's regular production of successful joint testers. Joint tester shall be as manufactured s by Chane Industrial, Inc., of Edina, Minnesota, or equal. 3. Testing shall be performed on all joints after backfill has been installed and properly compacted, and as installation progresses. At no time shall pipe installation exceed 100 feet beyond the last joint tested. 4. Joints failing to meet the requirements of this test should be repaired to the satisfaction of the ENGINEER or the defective pipe shall be replaced. Rejected pipe shall be removed from the project. Installation shall be stopped until defective - joints are repaired or replaced. 15070-6 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 0318-042-01 5. The testing equipment shall be assembled and positioned over the center of the pipe joint and the end element tubes inflated to a maximum of 25 psi. 6. Pressurize the center joint test area to 4.0 psig and allow the temperature and pressure to stabilize at the minimum of 2.5 psig for a period of 2.0 minutes prior to testing. 7. To test, adjust the pressure to 4.0 psig and measure the time required to decrease the pressure from 4.0 psig to 2.0 psig. 8. The joint is acceptable if the time for the pressure to drop from 4.0 psig to 2.0 psig is greater than 15 seconds. E. Pneumatic Test Method (Air Test): 1. Air tests shall be made by the pressure drop versus time method, in accordance with UNI-B-6, "Recommended Practice for Low -Pressure air testing of Installed Sewer Pipe." 2. Equipment: The equipment used shall meet the following minimum requirements: a. Pneumatic plugs shall have a sealing length equal to or greater than the - diameter of the pipe to be inspected. b. Pneumatic plugs shall resist internal test pressures without requiring external bracing or blocking. c. All air used shall pass through a single control panel. d. Three individual hoses shall be used for the following connections: 1) From the control panel to pneumatic plugs for inflation. 2) From the control panel to a sealed line for introducing the low-pressure air. _ 3) From a sealed line to control panel for continually monitoring the air pressure rise in the sealed line. e. Air compressor of adequate capacity for charging the system. 3. Procedures: All pneumatic plugs shall be seal -tested before being used in the actual test installation. One length of pipe shall be laid on the ground and sealed at both ends with the pneumatic plugs to be checked. Air shall be introduced into the plugs to 25 psig. The sealed pipe shall be pressurized to 5 psig. The plugs shall hold against this pressure without bracing and without movement of the plugs out of the pipe. - 4. After a manhole -to -manhole reach of pipe has been backfilled and the pneumatic plugs have been checked by the above -mentioned procedure, the plugs shall be placed in the line at each manhole and inflated to 25 psig. Low pressure air shall be introduced into this sealed line until the internal air pressure reaches 4 psig. Allow at least two minutes for the air temperature to stabilize, adding only the amount of air required to maintain pressure. 5. If the pipe to be tested is submerged in ground water, insert a pipe probe by boring or jetting into the backfill material adjacent to the center of the pipe, and determine the pressure in the probe when air passes slowly through it. This is backpressure due to ground water submergence over the end of the probe. All gauge pressure in the test should be increased by this amount. After the stabilization period (3.5 psig of minimum pressure in the pipe) start stopwatch. Determine time in seconds that is required for the internal air pressure to reach 2.5 psig. 6. Allowable Leakage: For sections of pipe less than 36-inch average inside diameter, the minimum time allowable for the pressure to drop from 3.5 pounds per square inch gauge to 2.5 pounds per square inch gauge shall be computed from the following equation: T = 0.0850(D)(K)/(Q) 15070-7 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 11 0318-042-01 Where: T = shortest time for pressure to drop 1.0 pound per square inch gauge in seconds K = 0.000419(D)(L), but not less than 1.0 D = average inside diameter in inches L = length of line in feet of same pipe size being tested Q = rate of loss, 0.0015 cubic feet per minute per square foot internal surface shall be used. 7. Since a K value of less than 1.0 shall not be used, there are minimum testing times for each pipe diameter as follows: Table No. 1 Minimum Testing Times Pipe Diameter Minimum Time Length for Time for (inches) (seconds) Minimum Time Longer Length (feet) (seconds) 6 340 398 0.855 (L) 8 454 298 1.520 (L) 10 567 239 3.374 (L) 12 680 199 3.419 (L) 15 850 159 5.342 (L) 18 1020 133 7.693 (L) 21 1190 114 10.471 (L) 24 1360 100 13.676 (L) 27 1530 88 17.309 (L) 30 1700 80 21.369 (L) 33 1870 72 25.856 (L) 3.6 PIPELINE REPAIR A. Leaks and loss in test pressure constitute defects that must be repaired. Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified. 3.7 MANHOLE TESTING A. Manholes shall be tested separately and independently of the wastewater lines in accordance with Division 2 Section 02090 "Manholes." Unless otherwise specified or determine by OWNER'S requirements manhole testing shall by Water ExfiItration Test. 3.8 QUALITY CONTROL A. The Pipe Testing report located after the END OF SECTION is part of this Section. END OF SECTION 15070-8 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS September 2009 0318-042-01 QUALITY CONTROL PIPE TESTING REPORT PROJECT: Contractor: Pipe Diameter: Location: Date: From Station: To Station: TEST MEDIUM (circle one) Water Air Other (specify) TEST EQUIPMENT: (list) SPECIFIED TEST PRESSURE: psi I Specified Duration: _ Time (gauge on): Pressure (start): Time (check): Pressure Drop: Pressure (check): Water Added: Time (check): Pressure Drop: Pressure (check): Water Added: r Time (check): Pressure Drop: Time (gauge off): i Pressure (check): Water Added: Pressure (finish): i1 REMARKS: WITNESSING SIGNATURES: Contractor: Signature Title Date Engineer: Signature Title Date 15070-9 September 2009 FIELD TESTING OF PLANT AND STATION PIPING SYSTEMS 0318-042-01 SECTION 15100 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following general -duty valves: 1. Ball Valves, Bronze, 2-112 inches and smaller. 2. Sampling valve. 3. Shear Gate Valve. 4. Pressure Reducing Valves. 5. Valve appurtenances. B. Related Sections: 1. Refer to Division 15 Section 15101 "Gate Valves" for AWWA gate valves, 3- inch and larger, and for iron body gate valves, 3-inches through 24-inches. 2. Refer to Division 15 Section 15105 "Air Release and AirNacuum Valves" for air release valves and combination air/vacuum release valves for water and sewerage service. 1.3 DEFINITIONS A. Following are standard abbreviations used for valves: 1. CWP: Cold working pressure. 2. EDPM: Ethylene-propylene-diene terpolymer rubber. �* 3. NRS: Nonrising stem. 4. OS&Y: Outside screw and yoke. 5. PTFE: Polytetrafluoroethylene plastic. 6. SWP: Steam working pressure. 7. WOG: Water, oil and gas (Cold working pressure) 8. TFE: Tetrafluoroethylene plastic. 1.4 SUBMITTALS A. Product Data: For each type of valve indicated. Include body, seating, and trim materials; valve design; pressure and temperature classifications; end connections; arrangement; dimensions; and required clearances. Include list indicating valve and its application. Include rated capacities; shipping, installed, and operating weights; .. furnished specialties; and accessories. B. Product Certificates: For each type of valve, from manufacturer. 1. Compliance with AWWA, ASTM, and ANSI standards including hydrostatic tests, operational tests and other testing required by the standards. 15100-1 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 4 C. Operation and Maintenance Data: Provide in accordance with Division 1 Section 01782 "Operation and Maintenance Data." D. Field Quality Control: Provide field testing and performance reports. 1.5 QUALITY ASSURANCE A. Obtain all valves of the same style and type, along with the associated manual operators, from a single manufacturer. B. NSF Compliance: NSF 61, "Drinking Water Systems Components — Health Effects" for valve materials for potable -water service. C. Valve manufacturer shall demonstrate a minimum of five years of experience is similar applications for size of valves furnished. References shall be provided upon request. D. Valve supplier shall maintain a complete stock of parts in the state where the Project is constructed or shall indicate that parts will be delivered upon 48-hour after receipt of request. 1.6 DELIVERY, STORAGE, AND HANDLING C. Prepare valves for shipping as follows: 1. Protect internal parts against rust and corrosion. 2. Protect threads, flange faces, grooves, and weld ends. 3. Set angle, gate, and globe valves closed to prevent rattling. 4. Set ball and plug valves open to minimize exposure of functional surfaces. 5. Set butterfly valves closed or slightly open. 6. Block valves in either closed or open position. D. Use the following precautions during storage: 1. Maintain valve end protection. 2. Store valves indoors and maintain at higher than ambient dew -point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures. 3. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, those listed in the valve descriptions. 2.2 GENERAL A. Valve to include operator, actuator, handwheel, chain wheel, extension stem, floor stand, worm and gear operator, operating nut, chain, wrench, valve boxes, and all accessories and related equipment for a complete operating system. Refer to P&ID Drawings for valves requiring limit switches, electric or pneumatic operators, and related controls. 15100-2 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 B. Comply with the following: 1. Service: Suitable for intended service, with valve pressure and temperature ratings not less than indicated and as required for the system pressures and temperatures. 2. Valve Sizes: Same size as connection to upstream piping, unless otherwise indicated. 3. Valve Ends (Unless otherwise specified): a. Compatible with adjacent piping or equipment connections. b. Bronze Valves: 2-inch and Smaller; threaded or soldered ends depending _ on application. c. Ferrous valves, 3-inch and Smaller: Threaded ends. d. Ferrous Valves, 3-inch and Larger: 1) Exposed Valves: Flanged ends. 2) Buried Valves: Mechanical joint ends. C. Valve Actuators: 1. Operator sized to operate valve for full range of pressures and velocities. 2. Open by turning counterclockwise, clockwise to close, unless otherwise specified. 3. Chainwheel: For attachment to valves, of size and mounting height, as indicated in the "Valve Installation" Article in Part 3. 4. Gear Drive Operator: For quarter -turn valves 8-inch and larger. 5. Handwheel: For valves other than quarter -turn types. 6. Lever Handle: For quarter -turn valves 6-inch and smaller. 7. Wrench: For valves with square heads. Furnish OWNER with one wrench for every 10 valves, for each size square plug head. D. Valves in Insulated Piping: Valves shall have 2-inch stem extensions and the following features: 1. Gate Valves: Shall be rising -stem type. 2. Ball Valves: Shall have extended operating handle of non -thermal -conductive material, protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation, and memory stops that are fully adjustable after insulation is applied. 3. Butterfly Valves: Shall have extended necks. E. Valve Flanges: ASME B16.1 for cast-iron valves, ASME B16.5 for steel valves and ASME B16.24 for bronze valves. F. Valve Grooved Ends: AWWA C606. .. G. Solder Joint: With sockets according to ASME B16.18. 1. Caution: Use solder with melting point below 840 deg F for angle, check, gate, and globe valves; below 421 deg F for ball valves. H. Threaded: With threads according to ASME B1.20.1. I. Valve Bypass and Drain Connections: MSS SP-45. J. Factory assemble valve with operator, actuator and accessories. K. Obtain all valves of the same type and materials of construction with associated .. manual operators from a single manufacturer 15100-3 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS r 0318-042-01 2.3 MATERIALS A. Brass and bronze valve components and accessories shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted. B. Approved alloys are of the following ASTM designations: 1. B61, B62, B98 (Alloy No. C65100, C65500, or C66100), B127, 8139 (Alloy No. C51000), B584 (Alloy UNS No. C90300 or C94700), B164, and B194. 2. Stainless steel, ANSI Type 316 may be substituted for bronze. 2.4 FACTORY FINISHING A. Interior Lining and Coating: 1. Interior ferrous metal surfaces of valve body, stem, actuator and related components shall be epoxy coated in accordance with AWWA C550 "Protective Epoxy Interior Coatings for valves and Hydrants", unless otherwise specified. 2. Epoxy coating material shall be NSF approved for use in potable water. 3. Either two-part liquid material or heat -activated (fusion) material except only heat -activated material if specified as "fusion" or "fusion bonded" epoxy. 4. Minimum 12-mil dry film thickness except where limited by valve operating tolerances. Epoxy coating shall be spark tested at the valve manufacturer's factory in accordance with AWWA C550 to verify uniform thickness. A certified test report on valve manufacturer's letterhead shall be supplied for each valve furnished. 5. Color to match adjacent piping. Coating application to be accomplished in accordance with Division 9 Section "Painting and Protective Coatings." 6. Safety isolation and lockout valves with handles, handwheels, or chain wheels "Safety Yellow." 7. Exposed valves, other than above, paint handles, handwheels, or chain wheels "Red." 2.5 BALL VALVE A. Bronze Ball Valves, General: MSS SP-110 and have bronze body complying with ASTM B 584, except for Class 250 which shall comply with ASTM B 61, full -depth ASME B1.20.1 threaded or solder ends, and blowout -proof stems. 1. Two -Piece, Full -Port, Bronze Ball Valves with Bronze Trim: Chrome -plated bronze ball and bronze stem and; reinforced TFE seats; threaded body packnut design (no threaded stem designs allowed) with adjustable stem packing, solder or threaded ends; and 150 psig SWP 600-psig CWP rating. a. Manufactures: 1) Crane Valve Group. 2) NIBCO. 3) Milwaukee Valve. 2.6 GATE VALVES A. Gate Valve, 4-Inches and Larger: Comply with the requirements of Section 15101 B. Gate Valve, Bronze, 3-inch and Smaller: 151004 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 0- 1. Class 150 bronze construction, union bonnet, solid wedge disc, non -rising stem with threaded ends, rated for 150-psi SWP, 300-psi CWP. Conforms to MSS SP-80, Type 1. 2. Use rising stem gate valves when piping is to be insulated. 3. Manufacturers: a. Crane Valve Group. b. NIBCO. C. Milwaukee Valve. 2.7 MISCELLANEOUS VALVES AND RELATED ITEMS A. Gauge Cock: 1. Description: 1/4-inch bronze body, hexagon end pattern, tee head, male ends, rated 125-psi CWP. 2. Manufacture and Product: United brass Works; Figure 973. B. Corporation Stop: 1. AWWA C800 type, tapere4d threade4d inlet, except when connecting to tapped fittings which require IPS tapered threads, outlet compression connection or IPS threads to suit connecting pipe, stop 1-inch and smaller rated 100-psi, larger stop rated 80-psi. 2. Manufacturers: a. Ford Meter Box Co. b. Mueller Co. C. Sampling Valve: 1. Description: Insertion type, Type 304 stainless steel bonnet, Type 316 stainless steel piston and stem, threaded end connections, hand crank, rated 600-psig CWP. 2. Manufactures and Products: a. Strahman; SV700. 2.8 SELF-CONTAINED AUTOMATIC VALVES A. Pressure -Reducing Valve, 2-1/2 Inches and Smaller. 1. Type: Direct diaphragm operated, spring controlled, bronze body. 2. Size(s) and Rating(s): As shown in valve Schedule. 3. Manufacturers and Products: a. Fisher; Type 75A. b. Mueller; Series H-93 10. B. Pressure -Reducing Valve, 3-inches and Larger: 1. Function: a. Automatically reduces a higher inlet pressure to a steady lower downstream pressure, regardless of changing flow rate and/or varying inlet pressure. b. Pilot -operated regulator capable of holding downstream pressure to a pre -determined limit. When downstream pressure exceeds the pressure setting of the control pilot, the main valve and pilot valve close bubble - tight. 2. Main Valve: Hydraulically operated, single diaphragm -actuated, pilot controlled, globe valve, consisting of: 15100-5 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 a. Ductile iron, ASTM A536, or cast steel, ASTM A216-WCB, body and bolted cover. All working parts shall be accessible without removal of the valve from the line. b. Disc Retainer and Diaphragm Washer: Cast Iron. C. Trim: Disc guide, seat and cover bearing, bronze or stainless steel. d. Disc: Buna-N rubber. e. Stem, Nut and Spring: Stainless steel. f. End Connections: Flange, 150 ANSI. g. Flows: See Valve Schedule. 3. Pilot Control System: Direct -acting, adjustable, spring -loaded, normally open, diaphragm valve, designed to permit flow when pressure is less than the spring setting. a. Pilot Control: Bronze, ASTM B62. b. Trim: Type 303 stainless steel. " C. Disc: Buna-N rubber. d. Adjustment Ranges: See Valve Schedule. 4. Manufacturers and Products: a. CLA-VAL; Model 90 b. Bermad; Model 720 C. GA Industries; C. Solenoid Valve, 2-Inch and Smaller: 1. Type: Two-way internal pilot operated diaphragm type, brass body, resilient seat suitable for air or water, solenoid coil molded epoxy, NEMA Class A, 120 volts ac, 60-Hz, unless otherwise indicated. Solenoid enclosure NEMA 250, Type 4, unless otherwise indicated. 2. Sizes and normal position (OPEN or CLOSED) as indicated. - 3. Minimum operating pressure differential no greater than 5-psig, maximum operating pressure differential not less than 125-psisg. 4. Manufacturers: a. ASCO b. Skinner D. Ball Valves, Electric Operated, 2-Inch and Smaller: 1. Type: Continuous duty rated true union ball valve with manual override and NEMA 4X nonmetallic housing over actuator, closure time 6 seconds for 900 cycle. - 2. Materials. a. Body: PVC or CPVC to match piping, minimum pressure rating 230-psi. b. Seals: EDPM or Vitron as applicable for intended service. M C. Motor: Heavy duty gear train, reversible motor with thermal overload switch, 120-volt, 60-Hz, with position indicator. 3. Manufactures and Products: , a. GF Model 346 ball valve with Type EA20 actuator and Type 126 bracket. 2.9 APPURTANCES A. Manual Operators: 1. Provide manual operators on valves, except those which are equipped with power actuated operators or designed for automatic operation. 15100-6 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 a. Operator force not to exceed 40 pounds under any operating conditions, including initial breakaway. Gear reduction operator when force exceeds 40 pounds. - b. Operator self-locking or equipped with self-locking devices. C. Position indicator on quarter -turn valves d. Worm and gear operators one-piece design worm -gears of gear bronze material. Worm hardened alloy steel with thread ground and polished. Traveling nut type operators threaded steel reach rods with internally bronze or ductile iron nut. _ 2. Exposed Operator: a. Galvanized and painted handwheels. b. Lever operators allowed on valves 6-inches and smaller. C. Cranks on gear operators. d. Chain wheel operator with tie backs, extension stem, floor stands, and other accessories to permit operation from normal operation level. e. Valve handles to take a padlock and handwheels a chain and padlock. f. Handwheels to comply with requirements of AWWA C500, Section 3.15 "Wrench Nuts and Handwheels." 3. Buried Valves: Wrench Nuts: a. Buried Valves: 2-1/2 Inch and Smaller: Provide cross handle for operation by a forked key. b. Buried Valves, 3-Inch and Larger: Provide wrench nuts on buried valves, on valves which are to be operated through floor boxes and where shown on Drawings. 1) Comply with requirements of AWWA C500, Section 3.15 "Wrench Nuts and Handwheels. 2) Furnish no less than two operating keys for operation of wrench nut operating valves. C. Provide concrete pad, 2 foot square by 6-inch thick concrete around valve box at ground surface. 4. Design buried service valves for quarter -turn valves to withstand 450 foot- pounds of input torque at the FULLY OPEN or FULLY CLOSED positions, grease packed and gasketed to withstand a submersion in water to 10-psi. 5. Buried valves shall have a valve box. Valve box and bonnet shall be cast iron. All components of shaft extensions shall be Type 316 stainless steel including .� nut shaft, shaft housing and guides. 6. Extension stem diameter shall be 1-inch or diameter of valve shaft, which ever is greater. •- 7. Stem guides made of cast iron with bronze bushings with adjustable offset. Provide stem guides at 5-foot intervals. B. Chain Wheel and Guide: Handwheel direct mounted, with galvanized or cadmium - plated chain. C. Operating Stands: 1. Provide fabricated steel or cast iron operating stands in locations shown on the Drawings. 2. Support handwheel or operator approximately 36-inches above finish floor. 3. Handwheel diameter will not be less than 8-inches. 4. Provide sleeve made for opening in floor beneath each operating stand. 5. Provide suitable thrust bearing in each operating stand to cant' weight of extension stem. 15100-7 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 D. Valve Boxes: 1. Cast iron, extension sleeve type, suitable for depth of cover required by Drawings. 2. Not less than 5-inches in diameter and minimum thickness at any point of 3/16- - inches; provide valve boxes with suitable cast iron bonnets, bases and covers. 3. Provide covers; cast thereon an appropriate name designating service for which valve is used. _- 4. When located in traffic areas, designed for H-20 loadings. 5. Set valves and valve boxes plumb; place each valve box directly over valve it serves, with top of box flush with finished grade. 6. As shown on Drawings, provide concrete pad around valve surface box at ground surface. E. Extension Stem: w 1. Provide extension stem when depth of valve is more than 3-feet below finish grade. 2. Provide extension stem with wrench nut locating the wrench nut 6-inches below ground surface and/or box cover. 3. Extension stem shall locate wrench nut in floor box. F. Floor Box and Stem: Plain type for support of non -rising type stem, complete with stem, operating nut, and stem guide brackets. Provide stainless steel guides with adjustable offset. Spaced such that stem L/R ratio does not exceed 200. Anchor bots to be Type 316 stainless steel. G. Torque Tube: Where operator for quarter -turn valve is located on floor stand, furnish extension stem torque tube of a type properly sized for maximum torque capacity of valve. H. Identification: Provide valve identification tags in accordance with Division 10 Section 10952"Identification, Stenciling, and Tagging" and as specified in the various Valve Schedules and as shown on the Drawings. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine piping system for compliance with requirements for installation tolerances and other conditions affecting performance. 1. Proceed with installation only after unsatisfactory conditions have been corrected. B. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling. C. Operate valves in positions from fully open to fully close. Examine guides and seats made accessible by such operations. D. Examine threads on valve and mating pipe for form and cleanliness. E. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage. 15100-8 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 F. Do not attempt to repair defective valves; replace with new valves. 3.2 INSTALLATION + A. General: 1. Install valves, floorstands, valve boxes, and appurtenances in accordance with the Drawings and manufacturers instructions. 2. Install valves and operators or actuators to provide for ease of access and operation. 3. Install buried valve B. Flanged Ends: 1. Bolt holes shall straddle vertical centerline of pipe. 2. Clean flange faces, insert gasket and bolts, and tighten nuts progressively and .. uniformly. C. Threaded Ends: .,, 1. Clean threads by wire brushing or swabbing. 2. Apply joint compound. D. Valve Installation: - 1. Piping installation requirements are specified in other Division 15 Sections. Drawings indicate general arrangement of piping, fittings, and specialties. 2. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown. 3. Locate valves for easy access and provide separate support where necessary. Provide access doors in finished walls and plaster ceilings for valve access. T 4. Install valves in horizontal piping with stem at or above center of pipe. a. Butterfly valves will be installed with stem horizontal to allow support for the disc and the cleaning action of the disc. b. Unless otherwise noted, install operating stem vertical in horizontal runs of pipe having centerline elevations 4-feet 6-inches or less above finished floor. C. Unless otherwise noted, install operating stem horizontal in horizontal runs of pipe having centerline elevation between 4-feet 6-inches and 7- feet above finish floor. 5. Install valves in position to allow full stem movement. 6. Install check valves for proper direction of flow and as follows: a. Swing Check Valves: In horizontal position with hinge pin level. b. Dual -Plate Check Valves: In horizontal or vertical position, between - flanges. C. Lift Check Valves: With stem upright and plumb. 7. Butterfly valves shall be installed with stems horizontal. 8. If a plug valve seat position is not shown, locate as follows: a. Horizontal low: The flow shall produce an "unseating" pressure; the plug shall open into the top half of valve. b. Vertical Flow: Install seat in the highest portion of the valve. 9. Install line size ball valve and union upstream of each solenoid valve, in -line flow switch, or other in -line electrical device, excluding magnetic flowmeters for isolation during maintenance. 10. Provide union or flanged connection within two feet of each threaded end valve unless valve can be otherwise easily removed from piping. w 15100-9 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 11. Install safety isolation valves on compressed air lines which have stored energy y in accordance with latest OSHA requirements. E. Valve Operators: 1. Manual Operators: a. Provide manual operators on valves, except those which are equipped with power actuated operators or designed for automatic operation. b. Unless otherwise specified in the various valve sections, provide handwheel or lever operators for valves, 6-inch and smaller, and gear operators for valves, 8-inch and larger. 2. Buried Service: t a. 2-1/2 inch and smaller: b. 3-inch and Larger (not installed in Valve Vault): 1) Provide stainless steel shaft extension and wrench nut. Minimum extension stem diameter shall be 1-inch or diameter of valve shaft, whichever is larger. 2) Provide valve box, bonnet and cover. C. Wrench nut, handwheel and gear operator shall comply with the requirements of applicable AWWA Standards. d. As shown on the Drawings, buried Valves, 8-inch and larger, shall rest on concrete pad. Pad shall extend full width of trench, from back-to-back of hub or flange. 3. Above Ground Service: a. 3-inch and Larger: gear operators all valves 8-inch and larger, unless otherwise noted. b. Chain Wheel Operators: Install chain wheel operators on valves 4-inch and larger and more than 84 inches above floor, unless otherwise noted. - Extend chains to 60 inches above finished floor elevation. Where chains hang in normally travel areas, use appropriate "L" type tie -back anchors. 4. Electric and pneumatic operators and actuators shall comply with the requirements of the applicable Division 15 operator section. 3.3 FIELD QUALITY CONTROL A. Perform Tests and Inspections: 1. Valve may be either tested while testing pipelines, or as a separate step. 2. Test that valve opens and closes smoothly with operating pressure on one side and atmospheric pressure on the other, in both directions for two-way valve and applications. 3. Count and record the number of turns to open and close valve; account for any _ discrepancies with manufacturer's data. 4. Set, verify, and record set pressures for all relief and regulating valves. 5. Automatic valves to be tested in conjunction with control system testing and as specified under Manufacturer's services. B. Prepare test and inspection reports. 3.4 MANUFACTURERS' SERVICES A. Manufacturer's Field Service: Engage a factory -authorized service representative to inspect components, assemblies, and valve installations, including connections, and to assist in testing. Provide in accordance with Division 1 Section 01640 "Manufacturers' Services." 15100-10 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS 0318-042-01 B. For every [three]<lnsert number> powered operated valves or gates, or less, provided on the Project, a qualified manufacturers' representative shall be present at the Project site for the minimum person -days, travel excluded, as indicated: Person-Days Activitv Description 1/2 Inspection of valve installation, functional testing, and certification valve assembly has been installed and tested in accordance with manufacturer's instructions and these specifications. 1/2 Plant startup. 1/2 Training of OWNER"S personnel in operation and maintenance. C. Startup Services; Comply with the requirements of Division 1 Section 01810 "Equipment Testing and Facility Startup." D. Training of OWNER"S Personnel: Comply with the requirements of Division 1 Section 01820 "Demonstration and Training." 3.5 VALVE SCHEDULE A. Refer to Drawings for type, size, end connections, and locations for all valves. END OF SECTION 15100-11 August 2009 VALVES: BASIC REQUIREMENTS AND MISCELLANEOUS PROJECT NUMBER 15100-12 Month Year VALVES AND RELATED ITEMS 0318-042-01 SECTION 15101 GATE VALVES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY +• A. Section Includes the following gate valves: 1. AWWA Resilient -seated gate valves, 3-inch and larger. PART 2 - PRODUCTS 2.1 GENERAL A. Valve to include operator, actuator, handwheel, chain wheel, extension stem, floor stand, worm and gear operator, operating nut, chain, wrench, valve boxes, and all accessories and related equipment for a complete operating system. Refer to P&ID Drawings for valves requiring limit switches, electric or pneumatic operators, and related controls. —B. Comply with the following: 1. Suitable for intended service. Renewable parts not to be of a lower quality than specified. ,. 2. Same size as adjacent piping. 3. Ends to suit adjacent piping. 4. Operator sized to operate valve for full range of pressures and velocities. 5. Open by turning counterclockwise, unless otherwise specified. 6. Factory mount operator, actuator and accessories. C. Obtain all valves and associated manual operators from a single manufacturer. aw D. Gate valves shall be of the resilient seated design unless otherwise noted in the Gate Valve Schedule. 2.2 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. ACIPCO American Flow Control 2. American R/D 3. Clow Valve Co. 4. Kennedy 5. Mueller. 15101-1 August 2009 GATE VALVES 0318-042-01 2.3 VALVE DESCRIPTION — A. AWWA Gate Valves, 3-inch and Larger, Resilient -Seated: 1. Construction: Iron body, bronze -mounted, non -rising stem (NRS), including tapping valves, 3-inch through 30-inch, and outside, screw and yoke (OSBY), 3-inch through 30-inch. 2. Seats: Resilient seats bonded to wedge for seating against a corrosion resistance surface. 3. Operating Pressure: a. 12-inch and smaller, 200 psig b. 16-inch thru 30-inch, 150 psig �- 4. Flange Ends (Unless otherwise specified): a. Meter: Flanged, ANSI B16.1, Class 250. b. Buried Service: Mechanical joints, ANSI/AWWA C111/A21.11. 5. Comply with requirements of AWWA C509 "Resilient -Seated Gate Valves for Water Supply Service." 2.4 OPERATORS A. Buried Service: 1. 3-inch and Larger. - a. Non -rising stem with stainless steel shaft extension and wrench nut. Minimum extension stem diameter shall be 1-inch or diameter of valve shaft, whichever is larger. b. Provide valve box, bonnet and cover. B. Wrench nut, handwheel and gear operator shall comply with the requirements of applicable AWWA Standard previously reference. PART 3 - EXECUTION 3.1 INSTALLATION A. Refer to Division 15 Section 15100 "Valves; Basic Requirements and Miscellaneous" for Execution requirements for the installation, field quality control, and manufacturer's services. 3.2 VALVE SCHEDULE A. Refer to Drawings for type, size, end connections, and locations for all valves. END OF SECTION 15101-2 GATE VALVES August 2009 0318-042-01 SECTION 15105 COMBINATION AIR AND VACUUM RELEASE AND AIR RELEASE VALVES PART 1 - GENERAL 1.1 WORK INCLUDED A. The CONTRACTOR shall furnish combination air and vacuum release and air release valves as delineated, complete, operational and installed at locations shown in the plans and as specified in these Contract Documents. 1.2 QUALITY ASSURANCE A. Referenced Standards: All materials of construction shall conform to ANSI and ASTM specifications. All air release and combination air and vacuum release valves shall be in accordance with AWWA Standard C512-92. ' B. Each valve shall have manufacturer's name plate in stainless steel showing the pressure ratings, serial and model numbers, year manufactured and other pertinent data. C. Manufactures of combination air and vacuum release valves shall demonstrate a minimum of 20 years of experience in similar applications for sizes of valves being fumished. References shall be furnished upon request. D. Valve supplier shall maintain a complete stock of spare parts in the State of Texas or shall indicate that parts will be delivered upon 48 hours of receipt of request. E. All surfaces and materials in contact with water, or in contact with a chemical being added to water that is being treated for potable use, shall conform to ANSI/NSF 61 and be certified by an organization accredited by ANSI, or shall meet the TCEQ requirements for contact with potable water. 1.3 SUBMITTALS A. Shop Drawings and Product Data: .. 1. Comply with the general requirements of Section 01301 and the supplemental requirements below. 2. Submit one drawing or illustration showing unit construction for each type and size valve used. 3. Submit the following information for each valve: a. Specific application in plant expressed in terms of service and contract drawing number where shown. .. b. Description including type of valve, type of mechanism and accessories included. C. Size and connection type. d. Maximum non -shock working pressure for which each component of valve is designed. e. Materials of construction and coatings for valves and accessories. f. Manufacturers' make and model. B. Operation and Maintenance Data: Comply with the requirements of Section 01301. ft 15105-1 August 2009 COMBINATION AIR AND VACUUM RELEASE AND AIR RELEASE VALVES FIprojects103181042-01 �SpecMPart 31Tech\Division 15\15105 Combination Air and Vacuum Release and Air Release Valves.doc 0318-042-01 1.4 DELIVERY, STORAGE AND HANDLING A. Comply with the requirements of the General Conditions and manufacturers recommendations. PART 2 - PRODUCTS 2.1 GENERAL A. Combination air and vacuum - air release valves shall be suitable for use in potable water application. B. Paint valves as specified in these Contract Documents. C. Fumish stainless steel ball valve for isolation at connection to pipeline. _ D. Provide 2-inch Schedule 80 PVC pipe from discharge of air valve and air release to drain as shown on plans. Furnish combination valves pre -assembled with all components factory piped and connected, for a single unit. — 2.2 COMBINATION AIR AND VACUUM - AIR RELEASE VALVES A. Valve Type: Slow closing combination air and vacuum - air release valve with isolation valve. 1. Acceptable manufacturers: a. Golden Anderson, Figure 905 Air Release, Figure 931-D Air and Vacuum. -• b. Or equivalent by APCO valves. C. Or equivalent by Valmatic. d. Or equivalent by Crispin Valve Co. 2. Operation: a. Automatically exhaust large quantities of air during filling at up to sonic velocity without blowing shut. b. Automatically release small amounts of accumulated air during operation. C. Automatically allow air to re-enter during negative pressure or draining. d. Surge check valve to minimize slam during closure and closes at transition from air to water (on pump discharge only). e. Floats shall be the only moving part in the air vacuum valve. f. Throttling device on discharge of air/vacuum valve regulates the discharge rate of air (on pump discharge only). 3. Materials of construction: (Low Pressure Plane) a. Body: Cast-iron. ASTM 126, Class B rated for 200 psi, tested to 300 psi maximum. _ b. Cover: Cast-iron. C. Non -Shock Working Pressure at 100oF: 150 psig. d. Gaskets: Manufacturer's standard. _ e. Seats: 316SS or Bunar N renewable. f. Cover Bolts: ASTM A307. g. Float: 304SS or Viton. h. Internals: 304SS or 18-8SS ASTM A-240. } i. Surge check seats, disc, and bushings — Bronze ASTM B-62. 4. Materials of Construction: (Upper Pressure Plane) a. Body: Cast-iron. ASTM 126, Class B rated for 300 psi, tested to 450 psi maximum. b. Cover: Cast-iron. 15105-2 August 2009 " COMBINATION AIR AND VACUUM RELEASE AND AIR RELEASE VALVES Hprojects\0318\042-01\Specs\Part 3\Tech\Division 15\15105 Combination Air and Vacuum Release and Air Release Valves.doc 0318-042-01 C. Non -Shock Working Pressure at 100°F: 240 psig. d. Gaskets: Manufacturer's standard. e. Seats: 316SS or Bunar N renewable. f. Cover Bolts: ASTM A307. g. Float: 304SS or Viton. h. Internals: 304SS or 18-8SS ASTM A-240. i. Surge check seats, disc, and bushings — Bronze ASTM B-62. 5. Connections: a. Air Release: 3/4-inch NPT inlet, 1/4-inch NPT outlet, 3/32-inch orifice. t. b. Air and Vacuum: 2-inch NPT inlet and outlet. PART 3 - EXECUTION 3.1 INSTALLATION A. Installation shall be in accordance with plans, approved shop drawings, and the manufacturer's instructions. 3.2 FIELD QUALITY CONTROL A. For start-up and testing, see Section 01650 for additional requirements_ END OF SECTION R 0" W. 15105-3 August 2009 COMBINATION AIR AND VACUUM RELEASE AND AIR RELEASE VALVES P\projectsW181042-01 \.Specs\Part 31Tech\Division 15\15105 combination Air and Vacuum Release and Air Release Valves.doc IV 0318-042-01 so t SECTION 15143 CONTROL VALVE, HYDRAULICALLY -ACTUATED PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Valve hydraulic operation, components, parameters, and accessories. B. Related Sections: 1. Refer to Division 15 Section 15100 "Valves: Basic Requirements and Miscellaneous" for information regarding submittals; coordination; material delivery, handling, and storage; projection conditions; design requirements; other - materials; installation; field testing; and related work. 1.3 PERFORMANCE REQUIREMENTS A. Function: When demand exceeds the flow settings, the valve shall limit the flow to the preselected maximum rate. B. Design Requirements: 1. Control valve, supports, anchors and fasteners shall be of adequate strength to withstand the forces and loads associated with opening, closing, turbulence, thrusts from liquid movement, thermal expansion and contraction and other loads encountered under normal operating conditions. 2. Fasteners and hardware shall be Type 316 stainless steel. Mounting brackets that are exposed to the water or to seal or packing leakage shall be Type 316 stainless steel or other acceptable non -corrosive material. 3. Control valve operating requirements are listed in Table 1. no Valve Identification Quantity Service 1 Location •. j Flow Range, clpm Temperature, F j Upstream Pressure, psi Max Flow Rate, gpm 1 Remarks Table 1 Control Valve Operating Conditions CV-049 1 Flow control, reclaimed water to member City D/FW Airport Meter Station 0 to 4,900 35 to 95 15 to 24 4,896 Within Vault Installation .. 15143-1 September 2009 CONTROL VALVE, HYDRAULICALLY -ACTUATED 0318-042-01 1.4 SUBMITTALS A. Product Data: Provide construction details material descriptions, dimensions of individual components and profiles, rated capacities, operating characteristics, and furnished specialties and accessories. B. Shop Drawings: Provide plans, elevations, sections, details, and attachments to other work. 1. Detail control valve assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. 2. Layout drawings including all proposed system components with dimensions, clearances required and sizes indicated, and arrangement and size of _ connections. 3. Provide a computerized cavitation chart which shows flow rate, differential pressure, percentage of valve opening, Cv factor, system velocity, and if there will be cavitation damage. 4. Submit a summary table including the following information for each valve and actuator: a. Description including type and size of valve, size of operator and accessories included. b. Size and end connections. C. Maximum non -shock working pressure, maximum allowable seating pressure, and burst pressure for which valve is designed. d. Valve K or Cv value. e. Manufacturers' make and model. 5. Specific design parameters for this project as specified herein. 6. Sequenced operational control description indicating adjustment ranges and set points for each device and resulting action for failure to complete the individual sequences. 7. Layout, sizes, types and materials for anchor bolts to be furnished. C. Operation and Maintenance Data: Provide in manufacture specified operation and maintenance data. D. Information Submittals: 1. Manufacturer's Certification of Compliance. 2. Special shipping, storage and protection, and handling instructions. 3. Manufacturer's instructions for installation. 4. Manufacturer's Certificate of Proper Installation. 5. Qualification Data:. For manufacturer and manufacturer's representative. 6. Location of nearest stocking distributor of spare parts. 7. Suggested spare parts list to maintain the equipment in service for a period of one year. Include a list of special tools required for checking, testing, parts replacement, and maintenance with current pricing information. 8. Coordination Drawings: Consisting of control valve, operator, mounting bracket, accessories, pressure guages, and other details, drawn to scale, on which all components of the system are shown and coordinated with each other. 9. Qualification Data: For qualified manufacturer and factory -authorized service representative. 10. Source quality -control reports. 15143-2 September 2009 CONTROL VALVE, HYDRAULICALLY -ACTUATED 0318-042-01 11. Field quality -control reports. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: 1. Control valves shall be the product of a manufacturer having at least ten (10) U.S. installations of the type being proposed, each with a minimum of 5 years of satisfactory service. 2. A list of similar installations shall be furnished with the shop drawing submittal, ,. including names and telephone numbers of contacts. B. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project. C. Source Limitations: Obtain valve and accessories from single system supplier. 1.6 PROJECT CONDITIONS A. NSF Certified: All surfaces and materials in contact with water or in contact with a chemical being added to water that is being treated for potable water use and conveyance, shall comply with the requirements of the Safe Drinking Water Act and shall conform to NSF-61. Product shall bear the mark or seal of an accredited testing .. laboratory. B. Environmental Conditions: 1. All equipment specified herein shall be specifically designed for this service and the environment encountered in this installation. 2. When installed in wastewater treatment areas, the environment will be moist and corrosive; exhibiting hydrogen sulfide and other corrosive gases encountered in municipal wastewater treatment plants. 3. Designed and capable of operation at ambient temperatures of 0°F to 110°F. 1.7 DELIVERY, STORAGE, AND HANDLING A. Deliver, handle and store system components in accordance with shop drawings and manufacturer's written instructions. 1.8 WARRANTY A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components that fail(s) in materials or workmanship within specified warranty period. wo 1. Warranty Period: Two (2) years from date of Substantial Completion. 2. Cost for the removal, shipment, repair and installation by CONTRACTOR shall be included in warranty, as well as correction of defective work. 15143-3 September 2009 CONTROL VALVE, HYDRAULICALLY -ACTUATED 0318-042-01 PART 2-PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. CLA-VAL 2. Or approved equal Bermad Control Valve 2.2 CONTROL VALVE ASSEMBLY A. Main Control Valve: 1. Description: Consist of a main valve assembly and a pilot system of hydraulic operated, completely assembled, tested, and ready for field installation. 2. Main Valve body: a. Materials of Construction: 1) Body: Ductile iron, ASTM A-536 2) Cover: Ductile iron, ASTM A-536. 3) Valve Trim: Type 316 stainless steel. 4) Valve Seat: Type 316 stainless steel. 5) Rubber Material: Buna "N". - b. Globe or angle style as designated, with integral flanges, faced and drilled per ANSI B16.1, Class as designated. C. Valve shall be full -ported, with a flow area through the valve no less than - the area of its nominal pipe size_ 3. Main Valve Operation: Operates on differential diaphragm principle as described below. - a. Diaphragm Type: 1) Provide a resilient, synthetic rubber disc, with a rectangular cross- section contained on three and one-half sides by a disc retainer, forming a tight seal against a single removable seat insert. 2) Disc guide shall be contoured type permitting smooth transition of flow holding the disc firmly in place. 3) Disc retainer shall be one-piece design capable of withstanding opening and closing shocks, having straight edge sides and a radius at the top edge to prevent excessive diaphragm wear. 4) Provide a non-magnetic Type 303 stainless steel stem of sufficient diameter to withstand high hydraulic pressures, fully guided at both ends by a bearing in the valve cover and an integral bearing in the valve seat. 5) Seat shall be a solid, one-piece design, with a minimum five -degree taper on the seating surface for a positive, drip -tight shut off. 6) Diaphragm shall consist of nylon fabric bonded with synthetic rubber compatible with the operating fluid. a) Withstand a Mullins Burst Test of a minimum of 600 psi per layer of nylon fabric and shall be cycle tested 100,000 times to insure longevity. 15143-4 September 2009 CONTROL VALVE, HYDRAULICALLY -ACTUATED 0318-042-01 b) Supported in the valve body and cover by machined surfaces which support no less than one-half of the total surface area of the diaphragm in either the fully open or fully closed position. 4. Cover: The valve cover shall be removable to allow access to all internal components. 5. Mounting: Provide an integral bottom pad or feet allowing the valve to rest on a pier. B. Pilot Control System ,,, 1. CONTRACTOR shall engage a factory -authorized service representative to assist in the installation of the Pilot Control System. 2. Pilot system shall be suitable for the working pressure range specified. 3. The pilot system shall contain a pressure reducing pilot designed to close when controlling pressure is above the adjustable spring setting. 4. The pilot system shall contain a differential pilot designed to close when controlling differential exceeds the adjustable spring setting. 5. The pilot control system shall contain a fixed orifice. No variable orifices shall be permitted. 6. Orifice plate flange assembly shall be included and mounted one to five pipe diameters downstream or as shown on the plans. 7. The CONTRACTOR shall connect the sensing line between the pilot system and the orifice plate. 8. Liquid to the pilot shall be filtered by means of an inline filter, and stainless steel cock valves shall be provided to isolate the control loop. 9. Piping: a. CONTRACTOR to provide 1-inch taps with stainless steel ball valves and connect the valve sensing/pilot supply connection to the main header with stainless steel tubing and fittings. b. Provide cock valves to isolate the control loop. C. Connection to Main Header: Connect the sensing/pilot supply to the main header using minimum 3/4-inch stainless steel (SS 316) tubing or of the size recommended by the valve supplier. d. Control Loop: Stainless steel (SS 316). e. Provide stainless steel tubing ball valves. f. Pressure Gauge: Provide a 4-inch diameter glycerin filled pressure gauge with isolation valve. 2.3 CONTROL VALVE OPERATION A. Valve Operation. 1. The CONTRACTOR shall seek the consultation of a factory -authorized service representative for proper valve operation. B. Valve Position Indication: Provide a visual indication of valve position. 2.4 FINISHES A. Select the finish coating for the equipment based on location, substrate, and environment. Refer to Division 9 Section 09910 "Painting and Protective Coatings" and Coating System Schedule for information. 15143-5 September 2009 CONTROL VALVE, HYDRAULICALLY -ACTUATED 0318-042-01 1. Exterior Coating: Provide polyurethane, pigmented (over epoxy zinc rich primer and high build epoxy. 2. Interior Coating: Provide fusion bonded epoxy, NSF 61 and WRAS approved. B. All cast iron and carbon steel components in contact with potable water shall receive surface preparation, shop primer coat, and one shop furnish coat of epoxy suitable for potable water services. C. Clean all stainless steel surfaces and provide glass bead blast or chemically treat all external non -wetted stainless steel to a uniform finish. D. Machined, polished, and non-ferrous surfaces shall be coated with a corrosion prevention compound. 2.5 ACCESSORIES A. Valve Identification Plate: A 16-gauge stainless steel identification plate shall be - securely mounted on the valve in a readily visible location. The plate shall bear 1/4- inch die -stamped valve identification number indicated in this Section and/or on the Drawings. B. Lifting Lugs: Individual equipment and/or each field disassemble part weighing over 100 pounds shall be provided with lifting lugs 2.6 SOURCE QUALITY CONTROL A. Factory Tests: Testing and inspection of factory assembled control valve shall be accomplished by manufacturer prior to shipment. Upon satisfactory completion of testing, the assembly will be disassembled into subcomponent assemblies for shipment and installation. At the manufacturer's option, the units may also be shipped to the site as complete assemblies, providing said assemblies can be installed as a complete assembly. Complete factory performance assurance testing shall be required prior to shipment. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine piping system for compliance with requirements for installation tolerances and other conditions affecting performance. 1. Proceed with installation only after unsatisfactory conditions have been corrected. B. Examine control valve assembly in accordance with the requirements of Division 15 Section 15100 "Valves: Basic Requirements and Miscellaneous." 3.2 INSTALLATION A. Install and adjust control valves in accordance with the Drawings, approved shop drawings, and the manufacturer's instructions. 15143-6 September 2009 CONTROL VALVE, HYDRAULICALLY -ACTUATED 0318-042-01 IN B. Comply with the requirements of Division 15 Section 15100 "Valves: Basic Requirements and Miscellaneous." 3.3 ASSEMBLY AND INSTALLATION A. Assemble and install control valve in accordance with the manufacturer's instructions. 1. Do not cut or weld any stainless steel component in the field. Violation of this requirement will result in rejection of affected components. 2. Remove temporary bracing supports and other construction debris that may damage valve and operator. 3. Remove protective coatings and oils used for protection during shipment and installation. 4. Check control valve for correct direction of rotation and freedom of moving parts. 5. Align control valve to Manufacturer's tolerances. Adjust clearances and torques. 6. Adjust or modify control valve to ensure proper operation. 7. Flush, fill, and grease lubricated systems in accordance with Manufacturer's instructions. B. Touch up scratches and scrapes in painted surfaces in accordance with Division 9 ^► Section 09910 "Painting and Protective Coatings." C. Check installation prior to start-up for conformance to manufacturer's instructions. MW Adjust or modify valve and operator to ensure proper operation. 3.4 Manufacturers' services A. Manufacturer's Field Service: Engage a factory -authorized service representative to inspect components, assemblies, and valve installations, including connections, and to assist in testing. 3.5 FIELD QUALITY CONTROL A. Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory -authorized service representative to inspect components, assemblies, and valve installations, including connections, and to assist in testing. B. Tests and Inspections: 1. Test that valve opens and closes smoothly with operating pressure on one side and atmospheric pressure on the other. 2. Each valve must perform in a manner acceptable to the ENGINEER before final acceptance will be made by the OWNER. 3. Prepare test and inspection reports. END OF SECTION 15143-7 September 2009 CONTROL VALVE, HYDRAULICALLY -ACTUATED Part F Bonds and Insurance Bond No: 022028921 PERFORMANCE BOND THE STATE OF TEXAS § COUNTY OF TARR.ANT § KNOW ALL MEN BY THESE PRESENTS: That we (1) conatser Construction TY, LP ,a (2) a Limited Partnership of Fort Worth, Tarrant Co, Tx, hereinafter called Principal, and (3) Liberty Mutual insurance Company a corporation organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called Owner, in the penal sum of Three Million, Two Hundred Eighty -Seven Thousand, Three Hundred Fifty & N01100 - - ($3,287,350.00 ) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the t day of c Q V 11 �� (, A.D. 14 a copy of which is hereto attached and made a part hereof, for the construction of: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 designated as Project No.(s) P275-705140021388 , a copy of which contract is hereby attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such .project and construction being hereinafter referred to as the "work". NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the work in accordance with the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and he shall satisfy all claims and demands incurred under the contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County, State of Texas. F-1 go AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no charge, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder, or the specifications accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN WITNESS WHEREOF, this instrument is executed in v counterparts each one of which shall be deemed an original, this the _ I� day of Lk-_ c e i n �o k, :P9�,L(!z)l ATTEST: (Principle) Secretary (SEAL) r Witness as to Principal }' • . ,3& 1 J441 6AL 7di�►� ICitf.1 I1n119 Address ATTEST: (Surety) Secretary (S E A L) ('ZA Wi ess as to Carolyn Ma les tY 4200 S. Hulen St., Ste. #330 Fnrt Wnrth_ TX 76109 UM (Address) go C on TX, LP BYY /// -- ` ppas, NrYcePresident of r Management Group, Inc., GP P. O.Box 15448 Fort Worth, TX 76119 (Address) T.ihe=y 141tiin1 Tn niranCe CCWm S B 1�./S(Attomie;-' n-fact) () Gl. Davis (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as the case may be (3) Correct name of Surety (4) If Contractor is Partnership, all Partners should execute Bond (5) A True copy of Power of Attorney shall be attached to Bond by Attorney -in -fact F-2 Bond No: 022028921 PAYMENT BOND THE STATE OF TEXAS § KNOW ALL BY THESES PRESENTS: COUNTY OF TARRANT § That we,(1) Conatser Construction Txw LP a (2)Limited Partnership Of Fort Worth, Tarrant County, Texas Liberty Y itual Insurance Company hereinafter called Principal and (3) , a corporation organized and existing under the laws of the State to and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called Owner, and unto all persons, firms, and corporations who may furnish materials for, or perform labor upon, the building or improvements hereinafter referred to in the penal sum of Three million, Two Hundred Eighty -Seven Thousand, Three r Fifty o�I ars ($ 3.287.350.00 ) in lawful money of the United States to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the day of A)e C e m b e�r- , _ 20�, a copy of which is hereto attached and made a part hereof, for the consideration of: VILLAGE CREEK RECLAIMED WATER . EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 designated as Project Number P275-705140021388 . a copy of which contract is hereto attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred to as the "work". NOW THEREFORE, the condition of this obligation is such that, if the Principal shall promptly make payment to all claimants as defined in Chapter 2253, Texas Government Code, supplying labor and materials in the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it shall remain in full force and effect. THIS BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and material in the prosecution of the work provided for in said Contract, as claimants are defined in said Chapter 2253, and all such claimants shall have a direct right of action under the bond as provided in Chapter 2253, Texas Government Code. F-3 PROVIDE FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas, State of Texas, and that the said Surety, for value received, hereby stipulates and agrees that no change extension of time, alteration or addition to the terms of the contract or to the work be performed thereunder or the specification accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or the specifications. PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder whose claim shall be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in ftisMterparts, each one of which shall be deemed an original, this ' YI 1, day of T (?�C Yn bX 20 -- ATTEST: (Principal) Secretary (SEAL) (;hne�ss st to Prin.cipal)-/ E,-fjo-i, (Sq4g Fo c�(L T as��lts ' (Address) ATTEST: (Surety) Secretary (SEAL) Witness as t urety Caro yn Maples 4200 S. Hulen Street, Ste. #330 Fort Worth. TX 76109 Address Conatser Construct'isdrt LP Principall Mar Pappas, Vice President of Conatser Management Group. Tncr... GP (Printed Name/Title) P. 0. Box 15448 Address Fort Worth, IX 76119 City/State/Zip Li'ber v M it-iml TnGitran� Compare (Surety) BY. Atto ey-in-Fact (5)" Gle�rmga. S .Dlavis Adtsn �Ae�2]g �rleet City/State/Zip Note: Date of bond must not be before the date of award of contract (1) Correct name of Contractor (2) A corporation, partnership, or individual as the case may be (3) Correct name of Surety (4) If Contractor is a partnership, the Contract must be executed by the managing or general partner of the partnership F-4 Bond No: 022028921 MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: That we (1) Conatser Construction Tx, LP as Principal, acting herein by and through (2) its duly authorized and (3) Libaxty Mutual Tnamace Company a corporation organized and existing under the laws of the State of MA , as surety, do hereby acknowledge themselves to be held and bound to pay unto the City.of Fort Worth, a Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at Fort Worth, in Tarrant County, Texas, the sum of Three Million, Two Hundred EiQhtv-Seven P� lars ($ 3.287.350.00 ), lawful money of the United States, for the paypous end o w'luCA sun well and truly be made unto said City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors, administrators, and assigns and successors, jointly and severally. This obligation is conditioned, however; that, WHEREAS, the Principal has entered into a certain contract with the City of Fort Worth, the Owner, dated m h,r �T for the performance of the following _ described public work and the construction of the following described public improvements: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 all of the same being referred to herein and in said contract as the Work and being designated as Project No.(s) P275-705140021388 , and said contract, including all of the specifications, conditions and written instruments referred to therein as contract documents being hereby incorporated herein by reference for all purposes and made a part hereof, the same as if set out verbatim herein; and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during the period two (2)v r s after the date of the final acceptance of the work by the City; and, WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of two (2) Years ; and, WHEREAS, sad Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it is necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need thereof to repair or reconstruct said work as herein provided. NOW THEREFORE, if said Contractor shall keep its said agreement to maintain, repair or reconstruct said work in accordance with all the termg and conditions of said F-5 contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall remain in full force and effect, and said City shall have and recover from the said Contractor and its surety damages in the premises as prescribed by said contract. This obligation shall be continuing one and successive recoveries may be had hereon for No successive breaches until the full amount hereof is exhausted. aft r w so WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas; and, IN WITNESS WHEREOF, this instrument is executed in seven (7) counterparts, each one of which shall be deemed an original, dated Dcc-e,n-, h e r C) Z C-0 ATTEST: (Principle) Secretary (S E A L.) J, 10 ti . L ness as to rincipal 15 44 F64 Address ATTEST: (Surety) Secretary (SEAL) Y Y \ 'n_ �ess as to Suurety Carolyn Maples 4200 S. Hulen Street, Ste. #330 Fort Worth, TK 761M (Address) RO OM (4) TX, -LP As,�Vice President of Management Group, Inc., GP P. 0. Box 15448 Fort Worth, TK 76119 (Address) Liberty Mutual Insurance Company Suretv By: U. Glenna S. >fAttorney-in-fact) (5) 175 Berkeley Street, Boston, MA 021P (Address) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as the case may be (3) Correct name of Surety (4) If Contractor is Partnership, all Partners should execute Bond (5) A True copy of Power of Attorney shall be attached to Bond by Attorney -in -fact no F-6 2589851 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company'), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint GREG A. WILKERSON, GLENNA S. DAVIS, CATHY VINSON, CAROLYN MAPLES, JOHN R. WILSON, ALL OF THE CITY OF FORT WORTH, STATE OF TEXAS .................... ................................................................. ......................................................................................................................,.......................................................... each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding TWENTY FIVE MILLION AND 00/100** ***************** DOLLARS ($ 25,000,000.00***** ) each, and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents. shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. MW That this power is made and executed pursuant to and by authority of the following By-iaw and Authorization: ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, I execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their i signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. .O Y 015 By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attomeys-in-fact: i C Pursuant to Article XIII, Section 5 of the By -Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby .. authorized to appoint such attorneys -in -fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. O1 r 7 That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. > IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 12th day of June 9009 .y LIBERTY MUTUAL INSURANCE COMPANY 0 � � 38:2 .p oN wit; s' BY r � , o 's Garnet W. Elliott, Assistant Secretary m:; COMMONWEALTH OF PENNSYLVANIA ss gl ` . U) COUNTY OF MONTGOMERY +• On this 1 2th day of June 2009 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged O that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above I L ai Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation. 1W t IN TESTIMONY WH V8,1{ unto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year V first above written. ooN & C (U at3g COMMONWEALTH OFPENNSYLVANIANe-r aswllaFSep y /•////� � ;cruse Paelal!a, Notary PiIDBc l OF Plynmth UP, Ma tgu r e Y �n y B My cowlimon'Ex{ares March 26, 2013 7er6sa Pastella, Notary Public CERTIFICATE�Yl RT I, the undersigned, Assistan ecretary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys -in -fact as provided in Article XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN T IMO/N�Y WHEREOF, l{%�J���ve hereunto subscribed my name and affixed the corporate seal of the said company, this day of � 5s By * * ' David M. Carey, Assigid6t Secretary d Li V ` rt v 1�'�� ttt�-Li Important Notice TO OBTAIN INFORMATION ABOUT THIS BOND OR TO MAKE A COMPLAINT: You may contact the Texas Department of Insurance to obtain information on -� companies, coverages, rights or complaints at: .. 800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Your notice of claim against the attached bond may be given to the Surety Company that issued the bond by sending it to the following address: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the claim office by telephone at: 610-832-8240 Premium or Claim Disputes . If you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. This notice is for information purposes only and does not become a part of or a condition of the attached document. It is given to comply with Section 2253.048, Government Code, and Section 53.202, Property Code, Effective September 1, 2001 W. CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTH, TEXAS DATE: NAME OF PROJECT: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 PROJECT NUMBER(S): P275-705140021388 THIS IS TO CERTIFY THAT f (Name and Address of Insured) is at the date of this certificate, insured by this Company with respect to the business operations hereinafter _ described, for the type of insurance and in accordance with the provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on the reverse side hereof. TYPE OF INSURANCE Policy No. Effective Expires Limits of Liability Worker's Compensation Comprehensive General Bodily Injury: Liability Insurance Ea. Occurrence: $ (Public Liability) Property Damage Ea. Occurrence $ Blasting _ Collapse of Buildings or structures adjacent Ea. Occurrence $ _ to excavations Damage to Underground Utilities Ea. Occurrence $ Builder's Risk Bodily Injury: Comprehensive Ea. Person $ _ Automobile Ea. Occurrence: $ Liability Property Damage Ea. Occurrence $ Bodily Injury: Contractual Liability Ea. Occurrence: $ Property Damage Ea. Occurrence $ Other Location covered: Description of Operations covered: .. The above policies either in the body thereof or by appropriate endorsement provide that they may not be charged or canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. Agency Fort Worth Address By Address Title .. No CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW �J aw Pursuant to Article 8308-3.23 of Veron's Annotated Civil Statues, Contractor Certifies that it provides worker's compensation insurance coverage for all of its employees employed on City of Fort Worth Project Village Creek Reclaimed Water Eastern Delivery System Distribution Main Part 3, Number P275-705140021388 STATE OF TEXAS § COUNTY OF TARRANT § -FYI LF CONTRACTOR 1-1-1 �" / ' v X-Jc--�-� Title Date /Wwx BEFORE ME, flue undersigned authority, on this day personally appeared wla,•k ��a 1(icx. ilr<A known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed ofl -&,24stA �,,,.r-!',,.,--h,-Ik P for the purpose and consideration therein expressed and in the capacity therein stated. .. GIVEN UNDER MY HAND AND SEAL OF OFFICE this $",- of N Public in and for the State of Texas JAMIE L BROWN NOTARY PUBLIC ate of Texas °F`�'� Comm.tExp.06-27-2012 Page 1 Of 1 -J J/ Part G Contract .. PART G - CONTRACT THE STATE OF TEXAS § COUNTY OF TARRANT § THIS CONTRACT, made and entered into VGC-C (Y-) h P_. � , 20_, by and between the City of Fort Worth, a home -rule municipal corporation located in Tarrant County. Texas, acting through its City Manager thereunto duly authorized so to do, Party of the Fast Part, hereinafter termed "OWNER" and 7_v� 1 X, L-P of the City of Fvr4 tO or4-L. , County of , TO Y r 4 and State of -Te- c s Party of the Second Part. Hereinafter termed "CONTRACTOR' WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second Part (Contractor) hereby agrees with the said Party of the First Part (Owner) to commence and complete certain improvements described as follows: VILLAGE CREEK RECLAIMED WATER EASTERN DELIVERY SYSTEM DISTRIBUTION MAIN PART 3 Construction Project No. P257-705140021388 and all extra work connected therewith, under the terms as stated in the Contract Documents, and at his (their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, bonds, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or other written explanatory matter thereon and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's Written Proposal and other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contract Documents and General Specifications, all of which are made a part hereof and collectively evidence and constitute the entire contract. [OFFICIAL RECORD CITY SECRETARY G-1 FT. WORTH, TX ; The Contractor hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete same within the time stated in the Proposal. The Owner agrees to pay the Contractor in current funds for the performance of the contract in accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents and all approved modifications therefor, and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in quadruplicate the year and the day first above written. ATTEST: a-ty Hendrix, City Se (SEAL)41��OOQOOpp� ,v o ° �a� 0 WITNESSES: ),.o 0 �1°°O ;moo �°o o 0 o / at li�°004000' 1�!' Citv of Fort Worth, Texas (Owner) Party of the First art By: Fe do Co Assistant City Manager Conatser Construction TX, LP (Contractor) Party of the S,-rnnA Part J ppas ice President 0 Lo Approved for the Fort Worth City Water Department: '4 C-a3ci. L, 3. Con `races �u...�;izatfo� S. Frank Crumb, P.E., Water Director Approved as to Form and Legality: Date Assistant City A rney OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX G-2 L Appendix A Storm Water Pollution Prevention Plan VI Engineers, Consultants, Surveyors And Construction Managers .. 0. .. March 4, 2008 Mr. Daniel Applegate Alan Plummer Associates, Inc. 1320 S. University Dr., Suite 300 .. Fort Worth, TX 76107 RE: Village Creek Reclaimed Water Eastern Delivery System Distribution Main — r Part 3 Dear Daniel: BDS Technologies, Inc. (BDS) is pleased to submit this Draft Storm Water Pollution Prevention Plan (SWP3) to Alan Plummer Associates, Inc. (APAI) for the above referenced project. This draft SWP3 provides an outline of Best Management Practices (BMPs) as well as the general location of Erosion Control Devices (ECDs) in order to assist in final planning and contractor selection. To comply with TPDES General Permit No. TXR150000, effective March 5, 2008, the following information will be required prior to filing a Notice of Intent (NOI): • Name and contact information of the Primary Operator (Contractor); • Name and contact information of any Secondary Operators (Sub -contractors); • Estimated Start date of the project; and ., • Locations of any vehicle staging areas, wash down areas, and offsite storage areas. so Upon obtaining the additional information, BDS will issue a final SWP3 including detail drawings indicating locations of all Erosion Control Devices (ECDs). BDS appreciates the opportunity to provide environmental services to Alan Plummer Associates, so Inc. If there are any questions regarding this SWP3, please call Dr. Taoreed Badmus, P.E. at (214) 747-2500. Sincerely Taoreed Badmus, Ph.D., P.E. ow President, BDS Technologies, Inc. air 11325 Pegasus St., Suite E200 Dallas, Texas 75238 (214)747-2500 Storm Water Pollution Prevention Plan (SWPPP) For Construction Activities For Village Creek Reclaimed Water Eastern Delivery System Distribution Main — Part 3 City of Fort Worth Water Department 908 Monroe Sreet Fort Worth, TX 76101 .. Permittees Prepared By: BDS Technologies, Inc. 11325 Pegasus Street Suite E-200 Dallas, Texas 75238 March, 2009 Contractor To Be Determined Table of Contents 1. Introduction A. Project Location B. Responsibilities of Operators C. Submittal of Notifications II. Project Description A. Nature of Construction Activities B. Construction Phase Sequence C. Area of Construction Activities D. Soil Type E. General Location Map F. Site Map 1- Drainage Patterns 2- Area of Soil Disturbance 3- Location of Structural Control and Stabilization Practices - 4- ON/Off-site location (Storage/Staging) 5- Surface Waters 6- Discharge of Storm Water 7- Discharge of Non -Storm Water G. Material Supplies to Construction Site H. Copy of TPDES III. Storm Water Pollution Measures and Controls A. Erosion Control Sequencing 1- Wastewater, Water and Storm Sewer Replacement 2- General Contractor B. Erosion Control Devices & Stabilization Measures C. Other controls 1- Waste Disposal 2- Dust Control 3- Water Source 4- Construction Phase 'Best Management Practice", (BMPs) 5- Sanitary Facilities 6- Collection of Trash and Debris •- D. Stabilization Practices E. Maintenance IV. Inspections and Record Procedures A. Inspections B. Inspection Reports 1. Introduction The purpose of this Storm Water Pollution Prevention Plan, hereinafter referred as (SWP3), is to provide guidelines for prevention of soil pollutants that originates on the construction site from flowing into natural or underground water systems. It is also to identify and address potential sources of pollution that are reasonably expected to affect the quality of discharge from the off -site material storage areas, overburden and stockpiles of dirt, borrow areas, equipment staging areas, vehicle repair and fueling areas. Federal and local regulations require construction contractors to implement plans; procedures and inspections to reduce the negative impact construction activities have on surface water and to minimize erosion. Therefore, the SWP3 should include all the elements necessary for compliance with the new requirements of the Texas Commission on Environmental Quality (TCEQ), Storm Water Program. A. Project location This SWP3 has been exclusively designed for the construction activities of the reclaimed water delivery system installation along the North of S Main St. from the Trinity Railway Express to S Pipeline Rd., East of S Pipeline Rd. from S Main St. to American Blvd, East of FAA Blvd. from American Blvd. to the end of FAA Blvd. and north through S.H. 183 (Part 3). GPS coordinates of a central location in the linear project are 32049'24.54" N, 97004'14.94" W. B. Responsibilities of Operators The Owner/Operator with control over the construction plans and specifications is City of Fort Worth. The Owner's responsibilities are the following: • The operational control over plans and specifications for all areas of this project. • To ensure that the project specifications will provide adequate best management practices (BMPs) to meet the requirements of the TPDES General Permit. • Owner will notify the Contractor in a timely manner if any modifications are necessary to remain in compliance with the general permit. The Contractor/Operator with day-to-day operational control of the construction activities ("Contractor') will be the General Contractor with whom the City contracts to construct the project. The Contractor's responsibilities are: To ensure that this project meets the requirements of the TPDES • Installation of approximately 17,900 LF of 24" and 20" (DIP, Steel Pipe, RCCP, HDPE) pipe for underground reclaimed water delivery system. • Installation of two (2) 24" resilient seated gate vales, three (3) 20" resilient seated butterfly vales, six (6) 1" combination air release valve and three (3) 6" blow off valves. • Re -pavement of disturbed roadways and sidewalks. • Replacement of herbaceous ground cover by seeding and/or sodding. C. Area of Construction Activities The total disturbed area is about 12.33 acres including disturbed right-of- way, staging and storage area. This Project is part of larger common plan totaling 40.36 acres of disturbance. Construction activities will not occur on any Indian Country Lands. D. Soil Type According to the USDA Soil Conservation Service Soil Survey of Tarrant County, Texas, the soils in the vicinity of the Property consist of the following: .. Bastsil fine sandy loam, Slope: 0 to 3 percent & Slope: 0 to 5 percent — This type of soil is made up of well drained, nearly level to gently sloping loamy soils. They are formed in old alluvium on old high stream terraces; have about 2% maximum calcium content are not frequently flooded. Birome-Aubrey-Rayex complex, Slope: 5 to 15percent — This type of soil are found on ridges. They are well drained, and are not frequently flooded. They are nonsaline. Crosstell fine sandy loam, Slope: 1 to 3 percent & Slope: 3 to 6 percent — This type of soil are found on ridges. They are well drained and are not frequently flooded. Gasi/ fine sandy loam, Slope: 1 to 3 percent & Gasil-Urban land complex, Slope: 1 to 8 percent — This type of soil are found on ridges. They are well drained and are not frequently flooded. Heiden clay, Slope: 1 to 3 percent —This type of soil are found on ridges and plains. They are well drained and are not frequently flooded. locations. Stabilization practices will include re -vegetation and/or replacement of concrete paving. Final stabilization must be achieved before the termination of the permit coverage. 4. On/Off-site Location (Storage/Staging) The Contractor will determine the locations for materials and equipments after the contract has been awarded. Upon completion of the construction, the contractor will fully restore these areas to their original conditions. 5. Surface Waters - West Fork of the Trinity River, an unnamed creek, Post Oak Creek, and Boyd Branch are in close proximity to the project site. No surface waters within the proximity of the construction activities are listed on the latest EPA -approved CWA 303(d) list of impaired waters. 6. Discharge of Storm Water Storm water discharge is conveyed through ditches and inlets along the sides of the streets to an unnamed creek, Post Oak Creek, Boyd Branch and eventually into the West Fork of the Trinity River. (water receiving body, outfall) The site also contains low lying areas where ponding occurs during heavy rains. Discharge of surface waters will be to Segment 0806 West Fork Trinity River below Lake Worth. 7. Discharge of Non -Storm Water The discharge of non -storm water, such as, fire hydrant flushing, dust control and potable water including waterline flushing, should be filtered through some type of filtration material (sift fence, or filtration socks) or into vegetated areas. G.Material Supplies to Construction Construction material supplies will be brought to the construction site. H. Copy of TPDES General Permit A copy of the TPDES General Permit TXR 150000 is attached in Exhibit B. in a manner consistent with the impact represented. • Concrete waste from ready -mix transport trucks (concrete slobbers) will be deposited in a shallow pit lined with impervious lastic sheeting (if applicable). Periodically, concrete waste from this pit will be broken up and hauled away. The contractor will determine the location of the disposal pit. The plastic sheeting is to be removed and the pit backfilled at the completion of construction. 2. Dust Control Water trucks should be used to reduce dust as needed. After construction, the site will be stabilized as described elsewhere in order to reduce dust. 3. Water Source Water used to establish and maintain grass, for dust control, and for other purposes during the construction phase must originate from a public water supply or private well approved by the Texas Department of State Health Services (TDSHS). 4. Construction Phase "Best Management Practice" (BMPs) During construction phase, the Operator/Contractor(s) will also implement the following measures: • The Operator will designate areas for equipment cleaning, maintenance and repair. All contractors and subcontractors shall utilize such areas for those purposes. This area will be located such that harmful substances will not be allowed to leach or runoff the site. • Equipment wash down (except for wheel washes) shall take place within an earth berm. Use of detergents is strongly discouraged. If utilized, they shall be collected for proper disposal. • Chemicals, paints, solvents, fertilizers and other toxic materials shall be stored in waterproof containers. Except during application, the containers shall be kept in trucks or within storage facilities. Run-off containing such materials shall be collected, removed from the site and disposed of at an approved solid waste or chemical disposal facility. 5. Sanitary Facilities Sanitary facilities shall be provided at the site throughout construction activities. They shall be utilized by construction personnel and serviced Sediment and erosion control measures identified in this SWP3 should be observed to ensure that they are operating correctly. Where discharge locations or points are inaccessible, they shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters. B. Inspection Reports Inspection reports summarizing the scope of the inspection shall be made part of the SWP3 for at least three years from the date the notice of termination (NOT) is submitted. The report should include the name(s) and qualifications of the personnel making the inspection, the date of the inspection and major observations relating to the implementation of the SWP3. The inspection report shall include the following: • Locations of discharges of sediment or other pollutants from the site. • Locations of Best Management Practices (BMPs) that need maintenance or fail to operate as designed or proved inadequate for the location. • Where additional BMPs are needed that did not exist at time of the inspection. • Identification of any incidents of non-compliance. • If there are no incidents of non-compliance, certification of compliance with storm water pollution prevention plan and this Permit should be provided. • The report will be signed in accordance with 30 TAC§ 305.128 (relating to signatories to Reports) by an owner or corporate officer or by a duly authorized representative and must contain the following statement. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." A sample inspection report is included in Exhibit D. C. Retention of Records Each permittee must retain the following records for a minimum period of three (3) years from the date that a NOT is submitted as required by Part 4- Storm Water Pollution Prevention Plan Operator Certification Form Date: Name of Contractor Name of Owner City of Fort Worth Water Department 908 Monroe Street Fort Worth, TX 76101 RE: SWP3Inspection Village Creek Reclaimed Water Eastern Delivery System Distribution Main — Part 3 A duly authorized representative of the Owner and Contractor must be identified and must sign the following certification statement: Certification Statement: "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." City of Fort Worth Water Department S. Frank Crumb, P.E., Director, Water Dept. Responsibility: Owner Contractor's Name Responsibility: Contractor Persons signing this certification must do so in compliance with the signatory requirements of the permit as found at CFR 122.22. For a corporation: by a responsible corporation officer. This means a President, Vice -President, Secretary, Treasurer, Manager as defined by 40 CFR 122.22 (07-01-00 Edition) attached to this version. For a partnership or sole proprietorship: by a general partner or the proprietor. For a Municipality, State, Federal or other public agency: a principal executive or ranking elected official. .. No .. %W .. Exhibit A General Location Map Exhibit 6 TPDES General Permit TXR 150000, Copy of Construction Site Notice, NOI, NOC, and NOT T TCEQ Docket No. 2007-1588-WO TPDES General Permit No. TXR150000 TEXAS COMMISSION ON ENVIRONMENTAL This is a renewal of TPDES QUALITY General Permit No. TXR150000, P.O. BOX 13087 . issued March 5, 2003. ,Austin, TX 78711-3087 GENERAL PERMIT TO DISCHARGE WASTES under provisions of Section 402 of the Clean Water Act and Chapter 26 of_the Texas Water Code Construction sites that discharge storm water associated with construction activity located in the state of Texas may discharge to surface water in the state only_according to effluent limitations, monitoring requirements and other conditions set forth in this permit, as well as the rules of the Texas Commission on Environmental Quality_(TCEQ), the laws of the State of Texas, and other orders of the TCEQ. The issuance of this general permit does not grant. to the permittee the right to use private or public property for conveyance of storm water and certain non -storm water discharges along the discharge route. This includes property belonging to but not limited to any individual, partnership, corporation or other entity. Neither does this permit authorize any invasion of personal rights nor any violation of federal, state, or local laws or regulations. It is the responsibility of the permittee to acquire property rights as may be necessary to use the discharge route. - This permit and the authorization contained herein shall expire at midnight on March 5,- 2013.... - _ . - ... - EFFECTIVE DATE: March 5, 2008 ISSUED DATE: FEB 15 2008 For the Comm ssion Construction General Permit TPDES General Permit TXR150000 TPDES GENERAL PERMIT NUMBER TXR150000 RELATING TO STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES Table of Contents Part I. Flow Chart and Definitions...................................................................................Page 3 Part II. Permit Applicability and Coverage.....................................................................Page 10 Part III. Storm Water Pollution Prevention Plans............................................................Page 25 Part IV. Storm Water Runoff from Concrete Batch Plants .............................................Page 37 Part V. Concrete Truck Wash Out Requirements........................................................... Page 42 Part VI. Retention of Records........................................................................ ....Page 42 Part VII. Standard Permit Conditions................................................................................Page 43 PartVIII. Fees...........................................................................................................Page 44 Appendix A. Automatic Authorization - Periods of Low Erosion Potential by County.... Page 45 Appendix B. Erosivity Index (EI) Zones in Texas.............................................................Page 46 AppendixC. Isoerodent Map.............................................................................................Page 47 Appendix D. Erosivity Indices for El Zones in Texas .......................................................Page 48 Attachment 1. Small Construction Site Notice: Low Potential for Erosion .........................Page 49 Attachment 2. Small Construction Site Notice.................................................:.....:.............Page 50 Attachment 3. Large Construction Site Notice: "Secondary Operator" Notice ...................Page 51 Attachment 4. Large Construction Site Notice: "Primary Operator" Notice .......................Page 52 Page 2 Construction General Permit TPDES General Permit TXR150000 Part I. Flow Chart and Definitions Section A. Flow Chart to Determine Whether Coverage is Required Itow much laud will be disturbed? (*1) I L—) /��C1< acret or more acres s1) (*i1 NO Do you ineet the YES Willore definition of acr"operator'.'"(*2) .. ,vv YES f ti Permit Coverage Required • Prepare and Implement SNVP3 • Post Site Notice Submit Copy of Site Notice to MS4 Operator >p � f tAre you a "primary ~ NO operator`'" 1*2) i YES Permit CoveraUe Not Required Permit Coverage Reauired ~` • Prepare and Implement SWP3 ' • Submit N41 to TCEQ • Posh NOI and Site Notice • Submit Copy of NOI to MS4 Operator (*I) To determine the size of the construction project, use the sire of the entire area to be disturbed, and include the ske of the larger common plan of development or salt, if the project is part ofa larger project (refer to PartLB., "Def►nidons, "for an explanation of "larger common plan of development or sale"). (*2) Refer to the definitions far "operator, " "primary operator," and "secondary operator" in Part L, Section It o, f this permit. .. Page 3 Construction General Permit TPDES General Permit TXRi 50000 Section B. Definitions Arid Areas - Areas with an average annual rainfall of 0 to 10 inches. ` Best Management Practices (BMPs) - Schedules of activities, prohibitions of practices, maintenance procedures, structural controls, local ordinances, and other management practices to prevent or reduce the discharge of pollutants. BMPs also include treatment requirements, operating procedures, and practices to control construction site runoff, spills or leaks, waste disposal, or drainage from raw material storage areas. Commencement of Construction - The initial disturbance of soils associated with clearing, grading, or excavation activities, as well as other construction -related activities (e.g., stockpiling of fill material, demolition) Common Plan of Development - A construction activity that is completed in separate stages, separate ,. phases, or in combination with other construction activities. A common plan of development (also known as a "common plan of development or sale") is identified by the documentation for the construction project that identifies the scope of the project, and may include plats, blueprints, 'marketing plans, contracts, building - permits, a public notice or hearing, zoning requests, or other similar documentation and activities. A common plan of development does not necessarily include all construction projects within the jurisdiction of a public entity (e.g., a city or university). Construction of roads or buildings in different parts of the jurisdiction would be considered separate "common plans," with only the interconnected parts of a project being considered part of a "common plan" (e.g., a building and its associated parking lot and driveways, airport runway and associated taxiways, a building complex, etc.). Where discrete construction projects occur within a larger common plan of development or sale but are located'/4 mile or more apart, and the area between the projects is not being disturbed, each individual project can be treated as a separate plan of development or sale, provided that any interconnecting road, pipeline or utility project that is part of the - same "common plan" is not included in the area to be disturbed. Discharge - For the purposes of this permit, the drainage, release, or disposal of pollutants in storm water and certain non -storm water from areas where soil disturbing activities (e.g., clearing, grading, excavation, stockpiling of fill material, and demolition), construction materials or equipment storage or maintenance (e.g., fill piles, borrow area, concrete truck washout, fueling), or other industrial storm water directly related to the construction process (e.g., concrete or asphalt batch plants) are located. Edwards Aquifer - As defined under Texas Administrative Code § 213.3 of this title (relating to the - Edwards Aquifer), that portion of an arcuate belt of porous, water -bearing, predominantly carbonate rocks known as the Edwards and Associated Limestones in the Balcones Fault Zone trending from west to east to northeast in Kinney, Uvalde, Medina, Bexar, Comal, Hays, Travis, and Williamson Counties; and composed of the Salmon Peak Limestone, McKnight Formation, West Nueces Formation, Devil's River Limestone, Person Formation, Kainer Formation, Edwards Formation, and Georgetown Formation. The permeable _ aquifer units generally overlie the less -permeable Glen Rose Formation to the south, overlie the less - permeable Comanche Peak and Walnut Formations north of the Colorado River, and underlie the less - permeable Del Rio Clay regionally. Edwards Aquifer Recharge Zone - Generally, that area where the stratigraphic units constituting the Edwards Aquifer crop out, including the outcrops of other geologic formations in proximity to the Edwards - Aquifer, where caves, sinkholes, faults, fractures, or other permeable features would create a potential for recharge of surface waters into the Edwards Aquifer. The recharge zone is identified as that area designated as such on official maps located in the offices of the Texas Commission on Environmental Quality and the Page 4 Construction General Permit TPDES General Permit TXR150000 appropriate regional office. The Edwards Aquifer Map Viewer, located at http://www.tceci.state.tx.us/compliance/field ops/eaw/mavdisclaimer.html, can be used to determine where the recharge zone is located. Edwards Aquifer Contributing Zone - The area or watershed where runoff from precipitation flows downgradient to the recharge zone of the Edwards Aquifer. The contributing zone is located upstream (upgradient) and generally north and northwest of the recharge zone for the following counties: all areas within Kinney County, except the area within the watershed draining to Segment 2304 of the Rio Grande Basin; all areas within Uvalde, Medina, Bexar, and Comal Counties; all areas within Hays and Travis Counties, except the area within the watersheds draining to the Colorado River above a point 1.3 miles ,. upstream from Tom Miller Dam, Lake Austin at the confluence of Barrow Brook Cove, Segment 1403 of the Colorado River Basin; and all areas within Williamson County, except the area within the watersheds draining to the Lampasas River above the dam at Stillhouse Hollow reservoir, Segment 1216 of the Brazos River Basin. The contributing zone is illustrated on the Edwards Aquifer map viewer at http://www.tceq.state.tx.us/compliance/field ops/eavv/mapdisclaimer.html. •. Facility or Activity— For the purpose of this permit, a construction site or construction support activity that is regulated under this general permit, including all contiguous land and fixtures (e.g., ponds and materials stockpiles), structures, or appurtances used at a construction site or industrial site described by this general permit. Final Stabilization - A construction site status where any of the following conditions are met: (a) All soil disturbing activities at the site have been completed and a uniform (i.e., evenly distributed, without large bare areas) perennial vegetative cover with a density of at least 70% of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures (such as the use of riprap, gabions, or geotextiles) have been employed. Ow (b) For individual lots in a residential construction site by either: (1) the homebuilder completing final stabilization as specified in condition (a) above; or (2) the homebuilder establishing temporary stabilization for an individual lot prior to the time of transfer of the ownership of the home to the buyer and after informing the homeowner of the need for, and benefits of, final stabilization. If temporary stabilization is not feasible, then the homebuilder may fulfill this requirement by retaining perimeter controls or other best management practices, and informing the homeowner of the need for removal of temporary controls and the establishment of final stabilization. • (c) For construction activities on land used for agricultural purposes (e.g. pipelines across crop or range land), final stabilization knay be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface water and areas that are not being returned to their preconstruction agricultural use must meet the final stabilization conditions of condition (a) above. Page 5 Construction General Permit TPDES General Permit TXR150000 (d) In arid, semi -arid, and drought -stricken areas only, all soil disturbing activities at the site have been completed and both of the following criteria have been met: (1) Temporary erosion control measures (e.g., degradable rolled erosion control product) are selected, designed, and installed along with an appropriate seed base to provide erosion control for at least three years without active maintenance by the operator, and (2) The temporary erosion control measures are selected, designed, and installed to achieve 70 percent vegetative coverage within three years. Hyperchlorination of Waterlines —Treatment of potable water lines or tanks with chlorine for disinfection purposes, typically following repair or partial replacement of the waterline or tank, and subsequently flushing the contents. Indian Country Land — (from 40 CFR 122.2) (1) all land within the limits of any Indian reservation under the jurisdiction of the United States government, notwithstanding the issuance of any patent, and, including rights -of -way running through the reservation; (2) all dependent Indian communities with the borders of the United States whether within the originally or subsequently acquired territory thereof, and whether within or without the limits of a state; and (3) all Indian allotments, the Indian titles to which have not been - extinguished, including rights -of -way running through the same. Indian Tribe - (from 40 CFR 122.2) any Indian Tribe, band, group, or community recognized by the Secretary of the Interior and exercising governmental authority over a Federal Indian Reservation. Large Construction Activity - Construction activities including clearing, grading, and excavating that result in land disturbance of equal to or greater than five (5) acres of land. Large construction activity also includes the disturbance of less than five (5) acres of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb equal to or greater than five (5) acres -' of land. Large construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the site (e.g., the routine grading of existing dirt roads, asphalt overlays of existing roads, the routine clearing of existing right-of-ways, and similar maintenance activities.) -- Municipal Separate Storm Sewer System (MS4) - A separate storm sewer system owned or operated by the United States, a state, city, town, county, district, association, or other public body (created by or pursuant to state law) having jurisdiction over the disposal of sewage, industrial wastes, storm water, or .. other wastes, including special districts under state law such as a sewer district, flood control or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, that discharges to surface water in the state. - Notice of Change (NOC) — Written notification to the executive director from a discharger authorized under this permit, providing changes to information that was previously provided to the agency in a notice of intent form. Notice of Intent (NOI) - A written submission to the executive director from an applicant requesting - coverage under this general permit. Page 6 MW Construction General Permit TPDES General Permit TXR150000 Notice of Termination (NOT) - A written submission to the executive director from a discharger authorized under a general permit requesting termination of coverage. Operator - The person or persons associated with a large or small construction activity that is either a primary or secondary operator as defined below: Primary Operator — the person or persons associated with a large or small construction activity that meets either of the following two criteria: (a) the person or persons have operational control over construction plans and specifications, .. including the ability to make modifications to those plans and specifications; or (b) the person or persons have day-to-day operational control of those activities at a construction •o site that are necessary to ensure compliance with a storm water pollution prevention plan (SWP3) for the site or other permit conditions (e.g., they are authorized to direct workers at a site to carry out activities required by the SWP3 or comply with other permit conditions). Secondary Operator — The person whose operational control is limited to the employment of other operators or to the ability to approve or disapprove changes to plans and specifications. A secondary operator is also defined as a primary operator and must comply with the permit requirements for primary operators if there are no other operators at the construction site. 0utfall - For the purpose of this permit, a point source at the point where storm water runoff associated with construction activity discharges to surface water in the state and does not include open conveyances connecting two municipal separate storm sewers, or pipes, tunnels, or other conveyances that connect segments of the same stream or other water of the U.S. and are used to convey waters of the U.S. Permittee - An operator authorized under this general permit. The authorization may be gained through submission of a notice of intent, by waiver, or by meeting the requirements for automatic coverage to discharge storm water runoff and certain non -storm water discharges. Point Source — (from 40 CFR § 122.2) Any discernible, confined, and discrete conveyance, including but not limited to, any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock concentrated animal feeding operation, landfill leachate collection system, vessel or other floating craft from which pollutants are, or may be, discharged. This term does not include return flows from irrigated agriculture or agricultural storm water runoff. Pollutant - Dredged spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, filter backwash, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, and industrial, municipal, and agricultural waste discharged into any surface water in the state. The term "pollutant" does not include tail water or runoff water from irrigation or rainwater runoff from cultivated or uncultivated rangeland, pastureland, and farmland. For the purpose of this permit, the term "pollutant" includes sediment. Pollution - (from Texas Water Code §26.001(14)) The alteration of the physical, thermal, chemical, or biological quality of, or the contamination of, any surface water in the state that renders the water harmful, detrimental, or injurious to humans, animal life, vegetation, or property or to public health, safety, or welfare, or impairs the usefulness or the public enjoyment of the water for any lawful or reasonable purpose. Page 7 6. Construction General Permit TPDES General Permit TXR150000 Rainfall Erosivity Factor (R factor) - the total annual erosive potential that is due to climatic effects, and is part of the Revised Universal Soil Loss Equation (RUSLE). Semiarid Areas - areas with an average annual rainfall of 10 to 20 inches Separate Storm Sewer System - A conveyance or system of conveyances (including roads with drainage systems, streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains), designed or used for collecting or conveying storm water; that is not a combined sewer, and that is not part of a publicly owned treatment works (POTW). Small Construction Activity - Construction activities including clearing, grading, and excavating that result in land disturbance of equal to or greater than one (1) acre and less than five (5) acres of land. Small construction activity also includes the disturbance of less than one (1) acre of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb equal to or greater than one (1) and less than five (5) acres of land. Small construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the site (e.g., the routine grading of existing dirt roads, asphalt overlays of existing roads, the routine clearing of existing right-of-ways, and similar maintenance activities.) Storm Water (or Storm Water Runoff) - Rainfall runoff, snow melt runoff, and surface runoff and drainage. Storm Water Associated with Construction Activity - Storm water runoff from a construction activity -- where soil disturbing activities (including clearing, grading, excavating) result in the disturbance of one (1) or more acres of total land area, or are part of a larger common plan of development or sale that will result in disturbance of one (1) or more acres of total land area. Structural Control (or Practice) - A pollution prevention practice that requires the construction of a device, or the use of a device, to capture or prevent pollution in storm water runoff. Structural controls and practices may include but are -not limited to: silt fences, earthen dikes, drainage swales, sediment traps, check dams, subsurface drains, storm drain inlet protection, rock outlet protection, reinforced soil retaining systems, gabions, and temporary or permanent sediment basins. Surface Water in the State - Lakes, bays, ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, wetlands, marshes, inlets, canals, the Gulf of Mexico inside the territorial limits of the state (from the mean high water mark (MHWM) out 10.36 miles into the Gulf), and all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt, navigable or nonnavigable, and including the beds and _ banks of all water -courses and bodies of surface water, that are wholly or partially inside or bordering the state or subject to the jurisdiction of the state; except that waters in treatment systems which are authorized by state or federal law, regulation, or permit, and which are created for the purpose of waste treatment are _ not considered to be water in the state. Temporary Stabilization - A condition where exposed soils or disturbed areas are provided a protective cover or other structural control to prevent the migration of pollutants. Temporary stabilization may include temporary seeding, geotextiles, mulches, and other techniques to reduce or eliminate erosion until either permanentstabilization can be achieved or until fiuther construction activities take place. Waters of the United States - (from 40 CFR, Part122, Section 2) Waters of the United States or waters of the U.S. means: Page 8 Construction General Permit TPDES General Permit TXR150000 MW (a) all waters which are currently used, were used in the past, or may be susceptible to use in �. interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide; (b) all interstate waters, including interstate wetlands; R (c) all other waters such as intrastate lakes, rivers, streams (including intermittent streams), mudflats, sandflats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds that the use, degradation, or destruction of which would affect or could affect Ow interstate or foreign commerce including any such waters: (1) which are or could be used by interstate or foreign travelers for recreational or other purposes; (2) from which fish or shellfish are or could be taken and sold in interstate or foreign MW commerce; or (3) which are used or could be used for industrial purposes by industries in interstate -� commerce; (d) all impoundments of waters otherwise defined as waters of the United States under this definition; UM (e) tributaries of waters identified in paragraphs (a) through (d) of this definition; (f) the territorial sea; and (g) wetlands adjacent to waters (other than waters that are themselves wetlands) identified in paragraphs (a) through (0 of this definition. Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of CWA (other than cooling ponds as defined in 40 CFR §423.11(m) which also meet the criteria of this definition) are not waters of the United States. This exclusion applies only to manmade bodies of water which neither were originally created in waters of the United States (such as disposal area in wetlands) nor resulted from the impoundment of waters of the United States. Waters of the United States do not include prior converted cropland. Notwithstanding the determination of an area's status as prior converted cropland by any other federal agency, for the purposes of the Clean Water Act, the final authority regarding Clean Water Act jurisdiction remains with EPA. Part II. Permit Applicability and Coverage Section A. Discharges Eligible for Authorization Storm Water Associated with Construction Activity Discharges of storm water runoff from small and large construction activities may be authorized under this general permit. Page 9 Construction General Permit TPDES General Permit TXR150000 2. Discharges of Stonn Water Associated with Construction Support Activities Examples of construction support activities include, but are not limited to, concrete batch plants, rock crushers, asphalt batch plants, equipment staging areas, material storage yards, material borrow areas, and excavated material disposal areas. Discharges of storm water runoff from construction support activities may be authorized under this general permit, provided that the following conditions are met: (a) the activities are located within one (I) -mile from the boundary of the permitted construction site and directly support the construction activity; (b) a storm water pollution prevention plan is developed according to the provisions of this general permit and includes appropriate controls and measures to reduce erosion and discharge of pollutants in storm water runoff from the construction support activities; and (c) the construction support activities either do not operate beyond the completion date of the construction activity or are authorized under separate TPDES authorization. Separate TPDES authorization may include the TPDES Multi Sector General Permit, TXR050000 (related to storm water discharges associated with industrial activity), separate authorization under this general permit if applicable, coverage under an alternative general permit if available, or authorization under an individual water quality permit. — 3. Non -Storm Water Discharges The following non -storm water discharges from sites authorized under this general permit are also eligible for authorization under this general permit: (a) discharges from fire fighting activities (fire fighting activities do not include washing of trucks, run-off water from training activities, test water from fire suppression systems, and similar activities); (b) uncontaminated fire hydrant flushings (excluding discharges of hyperchlorinated water, unless the water is first dechlorinated and -discharges are not expected to adversely affect aquatic life), which include flushings from systems that utilize potable water, surface water, or groundwater that does not contain additional pollutants (uncontaminated fire hydrant flushings do not include systems utilizing reclaimed wastewater as a source water); (c) water from the routine external washing of vehicles, the external portion of buildings or structures, and pavement, where detergents and soaps are not used and where spills or leaks of toxic or hazardous materials have not occurred (unless spilled _ materials have been removed; and if local state, or federal regulations are applicable, the materials are removed according to those regulations), and where the purpose is to remove mud, dirt, or dust; (d) uncontaminated water used to control dust; Page 10 Construction General Permit TPDES General Permit TXR150000 MW (e) potable water sources including waterline flushings (excluding discharges of RM hyperchlorinated water, unless the water is first dechlorinated and discharges are not expected to adversely affect aquatic life); (f) uncontaminated air conditioning condensate; (g) uncontaminated ground water or spring water, including foundation or footing drains .. where flows are not contaminated with industrial materials such as solvents; and (h) lawn watering and similar irrigation drainage. 4. Other Permitted Discharges Any discharge authorized under a separate NPDES, TPDES, or TCEQ permit may be combined with discharges authorized by this general permit, provided those discharges comply with the associated permit. Section B. Concrete Truck Wash Out The washout of concrete trucks associated with off -site production facilities may be conducted at regulated construction sites in accordance with the requirements of Part V of this general permit. Section C. Limitations on Permit Coverage Post Construction Discharges. Discharges that occur after construction activities have been completed, and after the construction site and any supporting activity site have undergone final stabilization, are not eligible for coverage under this general permit. Discharges originating from the sites are not authorized under this general permit following the submission of the notice of termination (NOT) for the construction activity. 2. Prohibition of Non -Storm Water Discharges IM Except as otherwise provided in Part H.A. of this general permit, only discharges that are composed entirely of storm water associated with construction activity may be authorized ., under this general permit. sr r 3. Compliance With Water Quality Standards Discharges to surface water in the state that would cause or contribute to a violation of water quality standards or that would fail to protect and maintain existing designated uses are not eligible for coverage under this general permit. The executive director may require an application for an individual permit or alternative general permit (see Parts II.H.2. and 3.) to authorize discharges to surface water in the state from any activity that is determined to cause a violation of water quality standards or is found to cause, or contribute to, the loss of a designated use. The executive director may also require an application for an individual permit considering factors described in Part H.H.2. of this general permit. Page i i Construction General Permit TPDES General Permit TXR150000 4. Discharges to Water Quality -Impaired Receiving Waters. New sources or new discharges of the constituents of concern to impaired waters are not authorized by this permit unless otherwise allowable under 30 TAC Chapter 305 and applicable state law. Impaired waters are those that do not meet applicable water quality _ standards and are listed on the EPA approved Clean Water Act Section 303(d) list. Constituents of concern are those for which the water body is listed as impaired. Discharges of the constituents of concern to impaired water bodies for which there is a total maximum daily load (TMDL) are not eligible for this permit unless they are consistent with the approved TMDL. Permittees must incorporate the limitations, conditions, and. j requirements applicable to their discharges, including monitoring frequency and reporting required by TCEQ rules, into their storm water pollution prevention plan in order to be eligible for coverage under this general permit. - 5. Discharges to the Edwards Aquifer Recharge Zone Discharges cannot be authorized by this general permit where prohibited by 30 Texas Administrative Code (TAC) Chapter 213 (relating to Edwards Aquifer). In addition, commencement of construction (i.e., the initial disturbance of soils associated with clearing, grading, or excavating activities, as well as other construction -related activities such as stockpiling of fill material and demolition) at a site regulated under30 TAC Chapter 213, may not begin until the appropriate Edwards Aquifer Protection Plan has been approved by the TCEQ's Edwards Aquifer Protection Program. (a) For new discharges located within the Edwards Aquifer Recharge Zone, or within that area upstream from the recharge zone and defined as the Contributing Zone, operators must meet all applicable requirements of, and operate according to, 30 TAC Chapter 213 (Edwards Aquifer Rule) in addition to the provisions and requirements of this general permit. (b) For existing discharges located within the Edwards Aquifer Recharge Zone, the requirements of the agency -approved Water Pollution Abatement Plan under the Edwards Aquifer Rules are in addition to the requirements of this general permit. _ BMPs and maintenance schedules for structural storm water controls, for example, may be required as a provision of the rule. All applicable requirements of the Edwards Aquifer Rule for reductions of suspended solids in storm water runoff are in _ addition to the requirements in this general permit for this pollutant. For discharges from large construction activities located on the Edwards Aquifer recharge zone or the Edwards Aquifer contributing zone, applicants must submit a copy of the NOI to the appropriate TCEQ regional office. For discharges from small construction activities located on the Edwards Aquifer recharge zone or the Edwards Aquifer contributing zone, and for discharges from large construction activities by operators not required to submit an NOI under this general permit, applicants must submit a copy of the construction site notice to the appropriate TCEQ regional office where required by the Edwards Aquifer Rules at 30 TAC Chapter 213: Counties: Contact: Page 12 Construction General Pen -nit TPDES General Permit TXR150000 RL ft .. .. Comal, Bexar, Medina, Uvalde, and Kinney Williamson, Travis, and Hays TCEQ Water Program Manager San Antonio Regional Office 14250 Judson Rd. San Antonio, Texas (210) 490-3096 TCEQ Water Program Manager Austin Regional Office 2800 South IH 35, Suite 100 Austin, Texas 78704-5712 (512) 339-2929 6. Discharges to Specific Watersheds and Water Quality Areas Discharges otherwise eligible for coverage cannot be authorized by this general permit where prohibited by 30 TAC Chapter 311 (relating to Watershed Protection) for water quality areas and watersheds. 7. " Protection of Streams and Watersheds by Other Governmental Entities IL This general permit does not limit the authority or ability of federal, other state, or local governmental entities from placing additional or more stringent requirements on construction activities or discharges from construction activities. For example, this permit does not limit the authority of a home -rule municipality provided by Texas Local Government Code §401.002. 8. Indian Country Lands Storm water runoff from construction activities occurring on Indian Country lands are not under the authority of the TCEQ and are not eligible for coverage under this general permit. If discharges of storm water require authorization under federal National Pollutant Discharge Elimination System (NPDES) regulations, authority for these discharges must be obtained from the U.S. Environmental Protection Agency (EPA). 9. Oil and Gas Production Storm water runoff from construction activities associated with the exploration, development, or production of oil or gas or geothermal resources, including transportation of crude oil or natural gas by pipeline, are not under the authority of the TCEQ and are not eligible for coverage under this general permit. If discharges of storm water require authorization under federal NPDES regulations, authority for these discharges must be obtained from the EPA. 10. Storm Water Discharges from Agricultural Activities Page 13 Construction General Permit TPDES General Permit TXR150000 11 Section D. 2. Section E. Storm water discharges from agricultural activities that are not point source discharges of stone water are not subject to TPDES permit requirements. These activities may include clearing and cultivating ground for crops, construction of fences to contain livestock, construction of stock ponds, and other similar agricultural activities. Discharges of storm water runoff associated with the construction of facilities that are subject to TPDES regulations, such as the construction of confined animal feeding operations, would be point sources regulated under this general permit. Other Nothing in Part II of the general permit is intended to negate any person's ability to assert the force majeure (act of God, war, strike, riot, or other catastrophe) defenses found in 30 TAC § 70.7. Deadlines for Obtaining Authorization to Discharge Large Construction Activities (a) New Construction - Discharges from sites where the commencement of construction occurs on or after the effective date of this general permit must be authorized, either under this general permit or a separate TPDES permit, prior to the commencement of those construction activities. (b) Ongoing Construction - Operators of large construction activities continuing to operate after the effective date of this permit, and authorized under TPDES general permit TXR150000 (issued March 5, 2003), must submit an NOI to renew authorization under this general permit within 90 days of the effective date of this general permit. During this interim period, as a requirement of this TPDES permit, the operator must continue to meet the conditions and requirements of the previous TPDES permit. Small Construction Activities (a) New Construction - Discharges from sites where the commencement of construction occurs on or after the effective date of this general permit must be authorized, either under this general permit or a separate TPDES permit, prior to the commencement of those construction activities. (b) Ongoing Construction - Discharges from ongoing small construction activities that commenced prior to the effective date of this general permit, and that would not meet the conditions to qualify for termination of this permit as described in Part H.E. of this general permit, must meet the requirements to be authorized, either under this general permit or a separate TPDES permit, within 90 days of the effective date of this general permit. During this interim period, as a requirement of this TPDES permit, the operator must continue to meet the conditions and requirements of the previous TPDES permit. Obtaining Authorization to Discharge Page 14 Construction General Permit TPDES General Permit TXR150000 ow 1. Automatic Authorization for Small Construction Activities With Low Potential for Erosion: If all of the following conditions are met, then a small construction activity is determined to occur during periods of low potential for erosion, and a site operator may be automatically authorized under this general permit without being required to develop a storm water pollution prevention plan or submit a notice of intent (NOI): (a) the construction activity occurs in a county listed in Appendix A; (b) the construction activity is initiated and completed, including either final or .. temporary stabilization of all disturbed areas, within the time frame identified in Appendix A for the location of the construction site; .. (c) all temporary stabilization is adequately maintained to effectively reduce or prohibit erosion, permanent stabilization activities have been initiated, and a condition of final stabilization is completed no later than 30 days following the end date of the No time frame identified in Appendix A for the location of the construction site; (d) the permitee signs a completed construction site notice (Attachment 1 of this general permit), including the certification statement; (e) a signed copy of the construction site notice is posted at the construction site in a "` location where it is readily available for viewing by the general public, local, state, and federal authorities prior to commencing construction activities, and maintained in that location until completion of the construction activity; «. (f) a copy of the signed and certified construction site notice is provided to the operator _ of any municipal separate storm sewer system (MS4) receiving the discharge at least two days prior to commencement of construction activities; .. (g) any supporting concrete batch plant or asphalt batch plant is separately authorized for discharges of storm water runoff or other non -storm water discharges under an individual TPDES permit, another TPDES general permit, or under an individual MW TCEQ permit where storm water and non -storm water is disposed of by evaporation or irrigation (discharges are adjacent to water in the state); and ., (h) any non -storm water discharges are either authorized under a separate permit or authorization, or are not considered to be a wastewater. .. Part II.G. of this general permit describes how an operator may apply for and obtain a waiver from permitting, for certain small construction activities that occur during a period with a low potential for erosion, where automatic authorization under this section is not available. •f 2. Automatic Authorization For All Other Small Construction Activities: Operators of small construction activities not described in Part II.E.1. above may be automatically authorized under this general permit, and operators of these sites shall not be required to submit an NOI, provided that they meet all of the following conditions: .. Page 15 Construction General Permit TPDES General Permit TXR150000 (a) develop a SWP3 according to the provisions of this general permit, that covers either the entire site or all portions of the site for which the applicant is the operator, and implement that plan prior to commencing construction activities; (b) sign and certify a completed construction site notice (Attachment 2 of this general permit), post the notice at the construction site in a location where it is safely and readily available for viewing by the general public, local, state, and federal authorities, prior to commencing construction, and maintain the notice in that location until completion of the construction activity (for linear construction activities, e.g. pipeline or highway, the site notice must be placed in a publicly accessible location near where construction is actively underway; notice for these linear sites may be relocated, as necessary, along the length of the project, and the notice must be safely and readily available for viewing by the general public; local, state, and federal authorities); and (c) provide a copy of the signed and certified construction site notice to the operator of any municipal separate storm sewer system receiving the discharge at least two days prior to commencement of construction activities. Operators of small construction activities as defined in Part I of this general permit shall not — submit an NOI for coverage unless otherwise required by the executive director. As described in Part I (Definitions) of this general permit, large construction activities include those that will disturb less than five (5) acres of land, but, that are part of a larger common plan of development or sale that will ultimately disturb five (5) or more acres of land, and must meet the requirements of Part H.E.3. below. 3. Authorization for Large Construction Activities: Operators of large construction activities that qualify for coverage under this general permit must meet all of the following conditions: (a) develop a SWP3 according to the provisions of this general permit that covers either the entire site or all portions of the site for which the applicant is the operator, and implement that plan prior to commencing construction activities; (b) primary operators must submit a Notice of Intent (NOI), using a form provided by T the executive director, at least seven (7) days prior to commencing construction activities, or if utilizing electronic submittal, prior to commencing construction activities. If an additional primary operator is added after the initial NOI is submitted, the new primary operator must submit an NOI at least seven (7) days before assuming operational control, or ifutilizing electronic NOI submittal, prior to assuming operational control. If the primary operator changes after the initial NOI is _. submitted, the new primary operator must submit a paper NOI or an electronic NOI at least ten (10) days before assuming operational control; (c) all primary operators must also post a copy of the signed NOI at the construction site in a location where it is readily available for viewing by the general public, local, Page 16 Construction General Permit TPDES General Permit TXR150000 no state, and federal authorities prior to commencing construction activities, and must maintain the NOI in that location until completion of the construction activity; (d) all operators of large construction activities must post a site notice in accordance with Part III.D.2. of this permit. The site notice must be located where it is safely and readily available for viewing by the general public, local, state, and federal authorities prior to commencing construction, and must be maintained in that �. location until completion of the construction activity (for linear construction activities, e.g. pipeline or highway, the site notice must be placed in a publicly accessible location near where construction is actively underway; notice for these .` linear sites may be relocated, as necessary, along the length of the project, and the notice must be safely and readily available for viewing by the general public; local, state, and federal authorities); and (e) all primary operators must provide a copy of the signed NOI to the operator of any municipal separate storm sewer system (MS4) receiving the discharge and to any secondary operator, at least seven (7) days prior to commencing construction activities, and must list in the SWP3 the names and addresses of all MS4 operators receiving a copy. (f) All persons meeting the definition of "secondary operator" in Part I of this permit are hereby notified that they are regulated under this general permit, but are not required to submit an NOI, provided that another operator(s) at the site has submitted an NOI, or is required to submit an NOI and the secondary operator has provided notification to the operator(s) of the need to obtain coverage (with records of notification available upon request). Any secondary operator notified under this provision may alternatively submit an NOI under this general permit, may seek coverage under an alternative TPDES individual permit, or may seek coverage under an alternative TPDES general permit if available. 4. Waivers for Small Construction Activities: Part H.G. describes how operators of certain small construction activities may obtain a waiver from coverage. 5. Effective Date of Coverage so (a) Operators of small construction activities as described in either Part H.E.1. or H.E.2. above are authorized immediately following compliance with the applicable conditions of Part II.E.1. or II.E.2. Secondary operators of large construction activities as described in Part II.E.3. above are authorized immediately following compliance with the applicable conditions in Part II.E.3. For activities located in areas regulated by 30 TAC Chapter 213, related to the Edwards Aquifer, this authorization to discharge is separate from the requirements of the operator's responsibilities under that rule. Construction may not commence for sites regulated under 30 TAC Chapter 213 until all applicable requirements of that rule are met. (b) Primary operators of large construction activities as described in Part II.E.3. above are provisionally authorized seven (7) days from the date that a completed NOI is Page 17 L , Construction General Permit TPDES General Permit TXR150000 postmarked for delivery to the TCEQ, unless otherwise notified by the executive director. If electronic submission of the NOI is provided, and unless otherwise notified by the executive director, primary operators are authorized immediately following confirmation of receipt of the NOI by the TCEQ. Authorization is non - provisional when the executive director finds the NOI is administratively complete and an authorization number is issued for the activity. For activities located in areas regulated by 30 TAC Chapter 213, related to the Edwards Aquifer, this authorization to discharge is separate from the requirements of the operator's responsibilities under that rule. Construction may not commence for sites regulated under 30 TAC Chapter 213 until all applicable requirements of that rule are met. (c) Operators are not prohibited from submitting late NOIs or posting late notices to obtain authorization under this general permit. The TCEQ reserves the right to take appropriate enforcement actions for any unpermitted activities that may have occurred between the time construction commenced and authorization was obtained. 6. Notice of Change (NOC) If relevant information provided in the NOI changes, an NOC must be submitted at least 14 days before the change occurs, if possible. Where 14-day advance notice is not possible, the operator must submit an NOC within 14 days of discovery of the change. If the operator becomes aware that it failed to submit any relevant facts or submitted incorrect information in an NOI, the correct information must be provided to the executive director in an NOC within 14 days after discovery. The NOC shall be submitted on a form provided by the executive director, or by letter if an NOC form is not available. A copy of the NOC must also be provided to the operator of any MS4 receiving the discharge, and a list must be -� included in the SWP3 that includes the names and addresses of all MS4 operators receiving a copy. Information that may be included on an NOC includes, but is not limited to, the following: the description of the construction project, an increase in the number of acres disturbed (for increases of one or more acres), or the operator name. A transfer of operational control from ` one operator to another, including a transfer of the ownership of a company, may not be included in an NOC. A transfer of ownership of a company includes changes to the structure of a company, such as changing from a partnership to a corporation or changing ` corporation types, so that the filing number (or charter number) that is on record with the Texas Secretary of State must be changed. An NOC is not required for notifying TCEQ of a decrease in the number of acres disturbed. This information must be included in the storm water pollution prevention plan (S WP3) and retained on site. 7. Signatory Requirement for NOI Forms, Notice. of Termination (NOT) Forms, NOC Letters, and Construction Site Notices NOI forms, NOT forms, NOC letters, and Construction Site Notices that require a signature must be signed according to 30 TAC § 305.44 (relating to Signatories for Applications). 8. Contents of the NOI Page 18 Construction General Permit TPDES General Permit TXR150000 No .. .. sk l J y The NOI forin shall require, at a minimum, the following information: (a) the TPDES CGP authorization number for existing authorizations under this general permit, where the operator submits an NOI to renew coverage within 90 days of the effective date of this general pen -nit; (b) the name, address, and telephone number of the operator filing the NOI for permit coverage; (c) the name (or other identifier), address, county, and latitude/longitude of the construction project or site; (d) the number of acres that will be disturbed by the applicant; (e) confirmation that the project or site will not be located on Indian Country lands; (f) confirmation that a SWP3 has been developed, that it will be implemented prior to construction, and that it is compliant with any applicable local sediment and erosion control plans; (g) name of the receiving water(s); (h) the classified segment number for each classified segment that receives discharges from the regulated construction activity (if the discharge is not directly to a classified segment, then the classified segment number of the first classified segment that those discharges reach); and (i) the name of all surface waters receiving discharges from the regulated construction activity that are on the latest EPA -approved CWA § 303(d) list of impaired waters. Section F. Terminating Coverage 1. Notice of Termination (NOT) Required Each operator that has submitted an NOI for authorization under this general permit must apply to terminate that authorization following the conditions described in this section of the general permit. Authorization must be terminated by submitting a Notice of Termination (NOT) on a form supplied by the executive director. Authorization to discharge under this general permit terminates at midnight on the day the NOT is postmarked for delivery to the TCEQ. If electronic submission of the NOT is provided, authorization to discharge under this permit terminates immediately following confirmation of receipt of the NOT by the TCEQ. Compliance with the conditions and requirements of this permit is required until an NOT is submitted. The NOT must be submitted to TCEQ, and a copy of the NOT provided to the operator of any MS4 receiving the discharge (with a list in the SWP3 of the names and addresses of all MS4 operators receiving a copy), within 30 days after any of the following conditions are met: Page 19 Construction General Permit TPDES General Permit TXR150000 2. 3. (a) final stabilization has been achieved on all portions of the site that are the responsibility of the permittee; (b) a transfer of operational control has occurred (See Section HYA below); or (c) the operator has obtained alternative authorization under an individual TPDES permit or alternative TPDES general permit. Minimum Contents of the NOT The NOT form shall require, at a minimum, the following information: (a) if authorization was granted following submission of an NOI, the permittee's site - specific TPDES authorization number for the construction site; (b) an indication of whether the construction activity is completed or if the permittee is simply no longer an operator at the site; (c) the name, address, and telephone number of the permittee submitting the NOT; (d) the name (or other identifier), address, county, and latitude/longitude of the construction project or site; and (e) a signed certification that either all storm water discharges requiring authorization under this general permit will no longer occur, or that the applicant to terminate coverage is no longer the operator of the facility or construction site, and that all temporary structural erosion controls have either been removed, will be removed on a schedule defined in the SWP3, or have been transferred to a new operator if the new operator has applied for permit coverage. Erosion controls that are designed to remain in place for an indefinite period, such as mulches and fiber mats, are not required to be removed or scheduled for removal. Termination of Coverage for Small Construction Sites and for Secondary Operators at Large Construction Sites Each operator that has obtained automatic authorization and has not been required to submit an NOI must remove the site notice upon meeting any of the conditions listed below, complete the applicable portion of the site notice related to removal of the site notice, and submit a copy of the completed site notice to the operator of any MS4 receiving the discharge (or provide alternative notification as allowed by the MS4 operator, with documentation of such notification included in the SWP3), within 30 days of meeting any of the following conditions: (a) final stabilization has been achieved on all portions of the site that are the responsibility of the permittee; (b) a transfer of operational control has occurred (See Section II.F.4. below); or Page 20 Construction General Permit TPDES General Permit TXR150000 (c) the operator has obtained alternative authorization under an individual or general TPDES permit. Authorization to discharge under this general permit tenninates immediately upon removal of the applicable site notice. Compliance with the conditions and requirements of this pen -nit is required until the site notice is removed. 4. Transfer of Operational Control Coverage under this general permit is not transferable. A transfer of operational control includes changes to the structure of a company, such as changing from a partnership to a corporation, or changing to a different corporation type such that a different filing (or charter) number is established with the Texas Secretary of State. When the primary operator of a large construction activity changes or operational control is transferred, the original operator must submit a Notice of Termination (NOT) within ten (10) days prior to the date that responsibility for operations terminates, and the new operator must submit an NOI at least ten (10) days prior to the transfer of operational control, in accordance with condition (a) or (b) below. A copy of the NOT must be provided to the ' operator of any MS4 receiving the discharge in accordance with Section II.F.1. above. Operators of regulated construction activities who are not required to submit an NOI must remove the original site notice, and the new operator must post the required site notice prior to the transfer of operational control, in accordance with condition (a) or (b) below. A copy of the completed site notice must be provided to the operator of any MS4 receiving the discharge, in accordance with Section H.F.3. above. A transfer of operational control occurs when either of the following criteria is met: (a) Another operator has assumed control over all areas of the site that have not been finally stabilized; and all silt fences and other temporary erosion controls have either been removed, scheduled for removal as defined in the SWP3, or transferred to a new operator, provided that the permitted operator has attempted to notify the new operator in writing of the requirement to obtain permit coverage. Record of this notification (or attempt at notification) shall be retained by the operator in accordance with Part VI of this permit. Erosion controls that are designed to remain in place for an indefinite period, such as mulches and fiber mats, are not required to be removed or scheduled for removal. .. (b) A homebuilder has purchased one or more lots from an operator who obtained coverage under this general permit for a common plan of development or sale. The homebuilder is considered a new operator and shall comply with the requirements •• listed above, including the development of a SWP3 if necessary. Under these circumstances, the homebuilder is only responsible for compliance with the general permit requirements as they apply to lot(s) it has operational control over, and the .w original operator remains responsible for common controls or discharges, and must amend its SWP3 to remove the lot(s) transferred to the homebuilder. Page 21 .. Construction General Permit TPDES General Permit TXR150000 Section G. Waivers from Coverage The executive director may waive the otherwise applicable requirements of this general permit for storm water discharges from small construction activities under the tenns and conditions described in this section. Waiver Applicability and Coverage Operators of small construction activities may apply for and receive a waiver from the requirements to obtain authorization under this general permit, where all of the following conditions are met. This waiver from coverage does not apply to non -storm water discharges. The operator must insure that any non -storm water discharges are either authorized under a separate permit or authorization, or are not considered to be a wastewater. (a) the calculated rainfall erosivity (R) factor for the entire period of the construction project is less than five (5); (b) the operator submits to the TCEQ a signed waiver certification form, supplied by the executive director, certifying that the construction activity will commence and be completed within a period when the value of the calculated rainfall erosivity R factor is less than five (5); and (c) the waiver certification form is postmarked for delivery to the TCEQ at least two (2) days before construction activity begins. 2. Steps to Obtaining a Waiver The construction site operator may calculate the R factor to request a waiver using the following steps: (a) Estimate the construction start date and the construction end date. The construction end date is the date that final stabilization will be achieved. (b) Find the appropriate Erosivity Index (EI) zone in Appendix B of this permit. (c) Find the EI percentage for the project period by adding the results for each period of the project using the table provided in Appendix D of this permit, in EPA Fact Sheet 2.1, or in USDA Handbook 703, by subtracting the start value from the end value to find the percent EI for the site. (d) Refer to the Isoerodent Map (Appendix C of this permit) and interpolate the annual isoerodent value for the proposed construction location. (e) Multiply the percent value obtained in Step (c) above by the annual isoerodent value obtained in Step (d). This is the R factor for the proposed project. If the value is less than 5, then a waiver may be obtained. If the value is five (5) or more, then a waiver may not be obtained, and the operator must obtain coverage under Part II.E.2. of this permit. Page 22 ,MW Construction General Pen -nit TPDES General Permit TXR150000 Alternatively, the operator may calculate a site -specific R factor utilizing the following online calculator: htti)://ei.tamu.edu/index.html, or using another available resource. The waiver certification form is not required to be posted at the small construction site. 3. Effective Date of Waiver .� Operators of small construction activities are provisionally waived from the otherwise applicable requirements of this general permit two (2) days from the date that a completed waiver certification form is postmarked for delivery to TCEQ. 4. Activities Extending Beyond the Waiver Period .. If a construction activity extends beyond the approved waiver period due to circumstances beyond the control of the operator, the operator must either: (a) recalculate the rainfall erosivity (R) factor using the original start date and a new projected ending date, and if the R factor is still under five (5), submit a new waiver certification form at least two (2) days before the end of the original waiver period; or (b) obtain authorization under this general permit according to the requirements delineated in either Part II.E.2. or Part II.E.3. at least two (2) days before the end of the approved waiver period. Section H. Alternative TPDES Permit Coverage Individual Permit Alternative Any discharge eligible for coverage under this general permit may alternatively be authorized under an individual TPDES permit according to 30 TAC Chapter 305 (relating to Consolidated Permits). Applications for individual permit coverage should be submitted at least three hundred and thirty (330) days prior to commencement of construction activities to ensure timely issuance. 2. Individual Permit Required The executive director may suspend an authorization or deny an NOI in accordance with the procedures set forth in 30 TAC Chapter 205 (relating to General Permits for Waste - Discharges), including the requirement that the executive director provide written notice to the permittee. The executive director may require an operator of a construction site, otherwise eligible for authorization under this general permit, to apply for an individual • ' TPDES permit in the following circumstances: (a) the conditions of an approved total maximum daily load (TMDL) limitation or TMDL implementation plan on the receiving stream; Page 23 Construction General Permit TPDES General Permit TXR150000 (b) the activity being determined to cause a violation of water quality standards or being found to cause, or contribute to, the loss of a designated use of surface water in the state: and (c) any other consideration defined in 30 TAC Chapter 205 (relating to General Permits for Waste Discharges) including 30 TAC §205.4(c)(3)(D), which allows the commission to deny authorization under the general permit and require an individual permit if a discharger "has been determined by the executive director to have been out of compliance with any rule, order, or permit of the commission, including non- payment of fees assessed by the executive director." Additionally, the executive director may cancel, revoke, or suspend authorization to discharge under this general permit based on a finding of historical and significant noncompliance with the provisions of this general permit, relating to 30 TAC §60.3 (Use of Compliance History). Denial of authorization to discharge under this general permit or suspension of a permittee's authorization under this general permit shall be done according to commission rules in 30 TAC, Chapter 205 (relating to General Permits for Waste Discharges). 3. Any discharge eligible for authorization under this general permit may alternatively be authorized under a separate general permit according to 30 TAC Chapter 205 (relating to General Permits for Waste Discharges), if applicable. Section I. Permit Expiration 1. This general permit is issued for a term not to exceed five (5) years. All active discharge authorizations expire on the date provided on page one (1) of this permit. Following public notice and comment, as provided by 30 TAC §205.3 (relating to. Public Notice, Public Meetings, and Public Comment), the commission may amend, revoke, cancel, or renew this " general permit. 2. If the executive director publishes a notice of the intent to renew or amend this general i permit before the expiration date, the permit will remain in effect for existing, authorized discharges until the commission takes final action on the permit. Upon issuance of a _ renewed or amended permit, permittees may be required to submit an NOI within 90 days following the effective date of the renewed or amended permit, unless that permit provides for an alternative method for obtaining authorization. _ 3. If the commission does not propose to reissue this general permit within 90 days before the expiration date, permittees shall apply for authorization under an individual permit or an alternative general permit. If the application for an individual permit is submitted before the expiration date, authorization under this expiring general permit remains in.effect until the issuance or denial of an individual permit. No new NOIs will be accepted nor new authorizations honored under the general permit after the expiration date. Part III. Storm Water Pollution Prevention Plans (SWP3) Storm waterpollution prevention plans must be prepared to address discharges authorized under Parts H.E.2. and II.E.3. that will reach Waters of the United States, including discharges to MS4s and privately owned Page 24 Construction General Permit TPDES General Permit TXR150000 separate storm sewer systems that drain to Waters of the United States, to identify and address potential sources of pollution that are reasonably expected to affect the quality of discharges from the construction site, including off -site material storage areas, overburden and stockpiles of dirt, borrow areas, equipment staging areas, vehicle repair areas, fueling areas, etc., used solely by the pennitted project. The SWP3 must -. describe the implementation of practices that will be used to minimize to the extent practicable the discharge of pollutants in storm water associated with construction activity and non -storm water discharges described in Part II.A.3., in compliance with the terms and conditions of this permit. .. Individual operators at a site may develop separate SWP3s that cover only their portion of the project, provided reference is made to the other operators at the site. Where there is more than one SWP3 for a site, "' permittees must coordinate to ensure that BMPs and controls are consistent and do not negate or impair the effectiveness of each other. Regardless of whether a single comprehensive SWP3 is developed or separate SWP3s are developed for each operator, it is the responsibility of each operator to ensure compliance with we the terms and conditions of this general permit in the areas of the construction site where that operator has control over construction plans and specifications or day-to-day operations. Section A. Shared SWP3 Development For more effective coordination of BMPs and opportunities for cost sharing, a cooperative effort by the different operators at a site is encouraged. Operators must independently obtain authorization, but may work together to prepare and implement a single, comprehensive SWP3 for the entire construction site. 1. The SWP3 must clearly list the name and, for large construction activities, the general permit authorization numbers, for each operator that participates in the shared SWP3_ Until the TCEQ responds to receipt of the NOI with a general permit authorization number, the SWP3 must specify the date that the NOI was submitted to TCEQ by each operator. Each operator participating in the shared plan must also sign the SWP3. 2. The SWP3 must clearly indicate which operator is responsible for satisfying each shared requirement of the SWP3. If the responsibility for satisfying a requirement is not described in the plan, then each permittee is entirely responsible for meeting the requirement within the boundaries of the construction site where they perform construction activities. The SWP3 must clearly describe responsibilities for meeting each requirement in shared or common areas. Section B. Responsibilities of Operators Secondary Operators and Primary Operators with Control Over Construction Plans and Specifications All secondary operators and primary operators with control over construction plans and specifications must: (a) ensure the project specifications allow or provide that adequate BMPs are developed to meet the requirements of Part III of this general permit; (b) ensure that the SWP3 indicates the areas of the project where they have control over r project specifications, including the ability to make modifications in specifications; Page 25 Construction General Permit TPDES General Permit TXR150000 (c) ensure all other operators affected by modifications in project specifications are notified in a timely manner so that those operators may modify their best management practices as necessary to remain compliant with the conditions of this general permit; and (d) ensure that the SWP3 for portions of the project where they are operators indicates the name and site -specific TPDES authorization numbers for permittees with the day-to-day operational control over those activities necessary to ensure compliance with the SWP3 and other permit conditions. If the party with day-to-day operational control has not been authorized or has abandoned the site, the person with control over project specifications is considered to be the responsible party until the authority is transferred to another party and the SWP3 is updated. 2. Primary Operators with Day -to -Day Operational Control Primary Operators with day-to-day operational control of those activities at a project that are necessary to ensure compliance with an SWP3 and other permit conditions must ensure that the SWP3 accomplishes the following requirements: (a) meets the requirements of this general permit for those portions of the project where they are operators; (b) identifies the parties responsible for implementation of best management practices (BMPs) described in the SWP3; (c) indicates areas of the project where they have operational control over day-to-day activities; and (d) includes, for areas where they have operational control over day -today activities, the name and site -specific TPDES authorization number of the parties with control over project specifications, including the ability to make modifications in specifications. Section C. Deadlines for SWP3 Preparation, Implementation, and Compliance The SWP3 must be prepared prior to obtaining authorization under this general permit, and implemented prior to commencing construction activities that result in soil disturbance. The SWP3 must be prepared so that it provides for compliance with the terms and conditions of this general permit. Section D. Plan Review and Making Plans Available 1. The SWP3 must be retained on -site at the construction site or, if the site is inactive or does not have an on -site location to store the plan, a notice must be posted describing the location of the SWP3. The SWP3 must be made readily available at the time of an on -site inspection to: the executive director; a federal, state, or local agency approving sediment and erosion plans, grading plans, or storm water management plans; local government officials; and the operator of a municipal separate storm sewer receiving discharges from the site. Page 26 Construction General Permit TPDES General Permit TXR150000 2. In addition to the requirement to post the NOI, a primary operator of a large construction activity must post the site notice provided in Attachment 4 of this permit near the main entrance of the construction site. An operator of a small construction activity seeking authorization under this general permit and a secondary operator of a large construction ,r activity must post the site notice required in Part H.E. l., 2., or 3. of this permit in order to obtain authorization (see Attachments 1, 2, and 3). If the construction project is a linear construction project (e.g. pipeline or highway), the notices must be placed in a publicly .. accessible location near where construction is actively underway. Notices for these linear sites may be relocated, as necessary, along the length of the project. The notices must be readily available for viewing by the general public; local, state, and federal authorities; and contain the following information: (a) the site -specific TPDES authorization number for the project if assigned; (b) the operator name, contact name, and contact phone number; .W (c) a brief description of the project; and (d) the location of the SWP3. 3. This permit does not provide the general public with any right to trespass on a construction site for any reason, including inspection of a site; nor does this permit require that permittees allow members of the general public access to a construction site. Section E. Revisions and Updates to SWP3s The permittee must revise or update the SWP3 whenever the following occurs: a change in design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants and that has not been previously addressed in the SWP3; 2. changing site conditions based on updated plans and specifications, new operators, new areas of responsibility, and changes in BMPs; or 3. results of inspections or investigations by site operators, operators of a municipal separate storm sewer system receiving the discharge, authorized TCEQ personnel, or a federal, state or local agency approving sediment and erosion plans indicate the SWP3 is proving ineffective in eliminating or significantly minimizing pollutants in discharges authorized under this general permit. Section F. Contents of SWP3 The SWP3 must include, at a minimum, the information described in this section. 1. A site or project description, which includes the following information: (a) a description of the nature of the construction activity; (b) a list of potential pollutants and their sources; Page 27 Construction General Permit TPDES General Permit TXR150000 (c) a description of the intended schedule or sequence of activities that will disturb soils for major portions of the site; (d) the total number of acres of the entire property and the total number of acres where construction activities will occur, including off -site material storage areas, overburden and stockpiles of dirt, and borrow areas that are authorized under the permittee's NOI; (e) data describing the soil or the quality of any discharge from the site; (f) a map showing the general location of the site (e.g. a portion of a city or county map); (g) a detailed site map (or maps) indicating the following: (i) drainage patterns and approximate slopes anticipated after major grading activities; (ii) areas where soil disturbance will occur; (iii) locations of all major structural controls either planned or in place; (iv) locations where temporary or permanent stabilization practices are expected to be used; (v) locations of construction support activities, including off -site activities, that are authorized under the permittee's NOI, including material, waste, borrow, fill, or equipment storage areas; (vi) surface waters (including wetlands) either at, adjacent, or in close proximity to the site; (vii) locations where storm water discharges from the site directly to a surface water body or a municipal separate storm sewer system; and (viii) vehicle wash areas. Where the amount of information required to be included on the map would result in a single map being difficult to read and interpret, the operator shall develop a series of maps that collectively include the required information. (h) the location and description of support activities authorized under the permittee's NOI, including asphalt plants, concrete plants, and other activities providing support to the construction site that is authorized under this general permit; (i) the name of receiving waters at or near the site that may be disturbed or that may receive discharges from disturbed areas of the project; Page 28 10 Construction General Permit TPDES General Permit TXR150000 (j) a copy of this TPDES general permit, and (k) the notice of intent (NOI) and acknowledgement certificate for primary operators of large construction sites, and the site notice for small construction sites and for .., secondary operators of large construction sites. 2. A description of the best management practices (BMPs) that will be used to minimize .. pollution in runoff. The description must identify the general timing or sequence for implementation. At a minimum, the description must include the following components: (a) General Requirements (i) Erosion and sediment controls must be designed to retain sediment on -site to the extent practicable with consideration for local topography, soil type, and rainfall. (ii) Control measures must be properly selected, installed, and maintained according to. the manufacturer's or designer's specifications. (iii) Controls must be developed to minimize the offsite transport of litter, construction debris, and construction materials. (b) Erosion Control and Stabilization Practices The SWP3 must include a description of temporary and permanent erosion control and stabilization practices for the site, including a schedule of when the practices will be implemented. Site plans should ensure that existing vegetation is preserved where it is possible. (i) Erosion control and stabilization practices may include but are not limited to: establishment of temporary or permanent vegetation, mulching, geotextiles, sod stabilization, vegetative buffer strips, protection of existing trees and vegetation, slope texturing, temporary velocity dissipation devices, flow diversion mechanisms, and other similar measures. (ii) The following records must be maintained and either attached to or referenced in the SWP3, and made readily available upon request to the .. parties listed in Part IH.D.1 of this general permit: (A) the dates when major grading activities occur, (B) the dates when construction activities temporarily or permanently cease on a portion of the site; and (C) the dates when stabilization measures are initiated. M.. Page 29 No Construction General Permit TPDES General Permit TXR150000 (Ili) Erosion control and stabilization measures must be initiated as soon as practicable in portions of the site where construction activities have temporarily ceased. Stabilization measures that provide a protective cover must be initiated as soon as practicable in portions of the site where construction activities have permanently ceased. Except as provided in (A) �. through (D) below, these measures must be initiated no more than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased: (A) Where the initiation of stabilization measures by the 14th day after construction activity temporarily or permanently ceased is precluded .. by snow cover or frozen ground conditions, stabilization measures must be initiated as soon as practicable. (B) Where construction activity on a portion of the site has temporarily ceased, and earth disturbing activities will be resumed within 21 days, temporary erosion control and stabilization measures are not required on that portion of site. (C) In and areas, semiarid areas, and areas experiencing droughts where the initiation of stabilization measures by the 14th day after construction activity has temporarily or permanently ceased or is precluded by and conditions, erosion control and stabilization measures must be initiated as soon as practicable. Where vegetative controls are not feasible due to and conditions, the operator shall install non -vegetative erosion controls. If non -vegetative controls are not feasible, the operator shall install temporary sediment controls as required in Paragraph (D) below. (D) In areas where temporary stabilization measures are infeasible, the operator may alternatively utilize temporary perimeter controls. The operator must document in the SWP3 the reason why stabilization measures are not feasible, and must demonstrate that the perimeter controls will retain sediment on site to the extent practicable. The operator must continue to inspect the BMPs at the frequency established in Section III.F.T(a) for unstabdized sites. (iv) Final stabilization must be achieved prior to termination of permit coverage. (c) Sediment Control Practices The SWP3 must include a description of any sediment control practices used to remove eroded soils from storm water runoff, including the general timing or sequence for implementation of controls. (i) Sites With Drainage Areas of Ten or More Acres — (A) Sedimentation Basin(s) Page 30 am Construction General Permit TPDES General Permit TXR150000 (1) A sedimentation basin is required, where feasible, for a common drainage location that serves an area with ten (10) or more acres disturbed at one time. A sedimentation basin may be temporary or permanent, and must provide sufficient _ storage to contain a calculated volume of runoff from a 2- year, 24-hour storm from each disturbed acre drained. When calculating the volume of runoff from a 2-year, 24-hour storm event, it is not required to include the flows from offsite areas and flow from onsite areas that are either undisturbed or have already undergone permanent stabilization, if these flows are -� diverted around both the disturbed areas of the site and the sediment basin. Capacity calculations shall be included in the SWP3. (2) Where rainfall data is not available or a calculation cannot be performed, the sedimentation basin must provide at least 3,600 cubic feet of storage per acre drained until final stabilization of the site. (3) If a sedimentation basin is not feasible, then the permittee shall provide equivalent control measures until final stabilization of the site. In determining whether installing a sediment basin is feasible, the permittee may consider factors such as site soils, slope, available area, public safety, precipitation patterns, site geometry, site vegetation, infiltration capacity, geotechnical factors, depth to groundwater, and other similar considerations. The permittee shall document the reason that the sediment basins are not feasible, and shall utilize equivalent control measures, which may include a series of smaller sediment basins. (B) Perimeter Controls: At a minimum, silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries of the construction area, and for those side slope boundaries deemed appropriate as dictated by individual site conditions. (ii) Controls for Sites With Drainage Areas Less than Ten Acres: •� (A) Sediment traps and sediment basins may be used to control solids in storm Water runoff for drainage locations serving less than ten (10) acres. At a minimum, silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries of the construction area, and for those side slope boundaries deemed appropriate as dictated by individual site conditions. (B) Alternatively, a sediment basin that provides storage for a calculated volume of runoff from a 2-year, 24-hour storm from each disturbed Page 31 Construction General Permit TPDES General Permit TXR150000 acre drained may be utilized. Where rainfall data is not available or a calculation cannot be performed, a temporary or permanent sediment basin providing 3,600 cubic feet of storage per acre drained may be provided. If a calculation is performed, then the calculation shall be included in the SWP3. 3. A Description of Permanent Storm Water Controls A description of any measures that will be installed during the construction process to control pollutants in storm water discharges that may occur after construction operations have been completed must be included in the SWP3. Permittees are only responsible for the installation and maintenance of storm water management measures prior to final stabilization of the site or prior to submission of an NOT. 4. Other Required Controls and BMPs (a) Permittees shall minimize, to the extent practicable, the off -site vehicle tracking of sediments and the generation of dust. The SWP3 shall include a description of controls utilized to accomplish this requirement. (b) The SWP3 must include a description of construction and waste materials expected to be stored on -site and a description of controls to minimize pollutants from these materials. (c) The SWP3 must include a description of potential pollutant sources from areas other than construction (such as storm water discharges from dedicated asphalt plants and — dedicated concrete batch plants), and a description of controls and measures that will be implemented at those sites to minimize pollutant discharges. (d) Permittees shall place velocity dissipation devices at discharge locations and along the length of any outfall channel (i.e., runoff conveyance) to provide a non -erosive flow velocity from the structure to a water course, so that the natural physical and T' biological characteristics and functions are maintained and protected. (e) Permittees shall design and utilize appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water from the site. 5. Documentation of Compliance with Approved State and Local Plans (a) Permittees must ensure that the SWP3 is consistent with requirements specified in + applicable sediment and erosion .site plans or site permits, or storm water management site plans or site permits approved by federal, state, or local officials. (b) SWP3s must be updated as necessary to remain consistent with any changes applicable to protecting surface water resources in sediment erosion site plans or site permits, or storm water management site plans or site permits approved by state or local official for which the permittee receives written notice. Page 32 Construction General Permit TPDES General Pen -nit TXR150000 (c) If the permittee is required to prepare a separate management plan, including but not .. limited to a Water Pollution Abatement Plan or Contributing Zone Plan in accordance with 30 TAC Chapter 213 (related to the Edwards Aquifer), then a copy of that plan must be either included in the SWP3 or made readily available upon request to authorized personnel of the TCEQ. The permittee shall maintain a copy of the approval letter for the plan in its SWP3. 6. Maintenance Requirements (a) All protective measures identified in the SWP3 must be maintained in effective 60 operating condition. If, through inspections or other means, the permittee detennines that BMPs are not operating effectively, then the permittee shall perform maintenance as necessary to maintain the continued effectiveness of storm water controls, and prior to the next rain event if feasible. If maintenance prior to the next anticipated storm event is impracticable, the reason shall be documented in the SWP3 and maintenance must be scheduled and accomplished as soon as practicable. Erosion and sediment controls that have been intentionally disabled, run -over, removed, or otherwise rendered ineffective must be replaced or corrected immediately upon discovery. (b) If periodic inspections or other information indicates a control has been used incorrectly, is performing inadequately, or is damaged, then the operator must replace or modify the control as soon as practicable after making the discovery. (c) Sediment must be removed from sediment traps and sedimentation ponds no later than the time that design capacity has been reduced by 50%. For perimeter controls such as silt fences, berms, etc., the trapped sediment must be removed before it reaches 50% of the above -ground height. (d) If sediment escapes the site, accumulations must be removed at a frequency that minimizes off -site impacts, and prior to the next rain event, if feasible. If the permittee does not own or operate the off -site conveyance, then the permittee must to work with the owner or operator of the property to remove the sediment. 7. Inspections of Controls (a) Personnel provided by the permittee must inspect disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Personnel conducting these inspections must be knowledgeable of this general permit, familiar with the construction site, and knowledgeable of the SWP3 for the site. Sediment and erosion control measures identified in the SWP3 must be inspected to ensure that they are operating correctly. Locations where vehicles enter or exit the site must be inspected for evidence of off -site sediment tracking. Inspections must be conducted at least -� once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater. Page 33 Construction General Permit TPDES General Permit TXR150000 Where sites have been finally or temporarily stabilized or where runoff is unlikely due to winter conditions (e.g. site is covered with snow, ice, or frozen ground exists), inspections must be conducted at least once every month. In and or semi -arid areas, inspections must be conducted at least once every month and within 24 hours after the end of a storm event of 0.5 inches or greater. �r As an alternative to the above -described inspection schedule of once every 14 calendar days and within 24 hours of a storm event of 0.5 inches or greater, the SWP3 may be developed to require that these inspections will occur at least once every seven (7) calendar days. If this alternative schedule is developed, then the inspection must occur on a specifically defined day, regardless of whether or not there has been a rainfall event since the previous inspection. The inspections may occur on either schedule provided that the SWP3 reflects the current schedule and that any changes to the schedule are conducted in accordance with the following _. provisions: the schedule may be changed a maximum of one time each month, the schedule change must be implemented at the beginning of a calendar month, and the reason for the schedule change must be documented in the SWP3 (e.g., end of "dry" season and beginning of "wet" season). (b) Utility line installation, pipeline construction, and other examples of long, narrow, linear construction activities may provide inspection personnel with limited access to the areas described in Part HI.F.8.(a) above. Inspection of these areas could require that vehicles compromise temporarily or even permanently stabilized areas, cause additional disturbance of soils, and increase the potential for erosion. In these circumstances, controls must be inspected at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches, but representative inspections may be performed. For representative inspections, personnel must inspect controls along the construction site for 0.25 mile above and below each access point where a roadway, undisturbed right-of-way, or other similar feature intersects the construction site and allows access to the areas described in Part III.F.8.(a) above. The conditions of the controls along each inspected 0.25 mile portion may be considered as representative of the condition of controls along that reach extending from the end of the 0.25 mile portion to either the end of the next 0.25 mile inspected portion, or to the end of the project, whichever occurs first. As an alternative to the above -described inspection schedule of once every 14 calendar days and within 24 hours of a storm event of 0.5 inches or greater, the SWP3 may be developed to require that these inspections will occur at least once every seven (7) calendar days. If this alternative schedule is developed, the inspection must occur on a specifically defined day, regardless of whether or not there has been a rainfall event since the previous inspection. The inspections may occur on either schedule provided that the SWP3 reflects the current schedule and that any changes to the schedule are conducted in accordance with the following ., provisions: the schedule may be changed a maximum of one time each month, the schedule change must be implemented at the beginning of a calendar month, and the reason for the schedule change must be documented in the SWP3 (e.g., end of "dry" season and beginning of "wet" season). Page 34 Construction General Permit TPDES General Permit TXR150000 (c) In the event of flooding or other uncontrollable situations which prohibit access to aw the inspection sites, inspections must be conducted as soon as access is practicable. (d) The SWP3 must be modified based on the results of inspections, as necessary, to ,. better control pollutants in runoff. Revisions to the SWP3 must be completed within seven (7) calendar days following the inspection. If existing BMPs are modified or if additional BMPs are necessary, an implementation schedule must be described in the . < SWP3 and wherever possible those changes implemented before the next storm event. If implementation before the next anticipated stone event is impracticable, these changes must be implemented as soon as practicable. (e) A report summarizing the scope of the inspection, the date(s) of the inspection, and major observations relating to the implementation of the SWP3 must be made and retained as part of the SWP3. Major observations should include: The locations of discharges of sediment or other pollutants from the site; locations of BMPs that need to be maintained; locations of BMPs that failed to operate as designed or proved inadequate for a particular location; and locations where additional BMPs are needed. Actions taken as a result of inspections must be described within, and retained as a part of, the SWP3. Reports must identify any incidents of non-compliance. Where a report does not identify any incidents of non-compliance, the report must contain a certification that the facility or site is in compliance with the SWP3 and this permit. The report must be signed by the person and in the manner required by 30 TAC § 305.128 (relating to Signatories to Reports). The names and qualifications of personnel making the inspections for the permittee may be documented once in the SWP3 rather than being included in each report. 8. The SWP3 must identify and ensure the implementation of appropriate pollution prevention measures for all eligible non -storm water components of the discharge, as listed in Part H.A.3. of this permit. 9. The SWP3 must include the information required in Part III.B. of this general permit. Part IV. Storm Water Runoff from Concrete Batch Plants Discharges of storm water runoff from concrete batch plants at regulated construction sites may he authorized under the provisions of this general permit provided that the following requirements are met for concrete batch plant(s) authorized under this permit. If discharges of storm water runoff from concrete batch plants are not covered under this general permit, then discharges must be authorized under an alternative general permit or individual permit. This permit does not authorize the discharge or land disposal of any wastewater from concrete batch plants at regulated construction sites. Authorization for these wastes must be obtained under an individual permit or an alternative general permit. Section A. Benchmark Sampling Requirements Operators of concrete batch plants authorized under this general permit must sample the storm water runoff from the concrete batch plants according to the requirements of this Page 35 Construction General Permit TPDES General Permit TXR150000 section of this general permit, and must conduct evaluations on the effectiveness of the SWP3 based on the following benchmark monitoring values: Benchmark Benchmark Sampling Sample Type Parameter Value Frequency Oil and Grease 15 mg/L 1/quarter (*1)(*2) Grab (*3) Total Suspended 100 mg/L 1/quarter (* 1)(*2) Grab (*3) Solids pH 6.0 - 9.0 1/quarter (* 1)(*2) Grab (*3) 1 Standard Units Total Iron 1.3 mg/L 1/quarter(* 1)(*2) Grab (*3) (* 1) When discharge occurs. Sampling is required within the first 30 minutes of discharge. If it is not practicable to take the sample, or to complete the sampling, within the first 30 minutes, sampling must be completed within the first hour of discharge. If sampling is not completed within the first 30 minutes of discharge, the reason must be documented and attached to all required reports and records of the sampling activity. (*2) Sampling must be conducted at least once during each of the following periods. The first sample must be collected during the first full quarter that a storm water discharge occurs from a concrete batch plant authorized under this general permit. January through March April through June July through September October through December For projects lasting less than one full quarter, a minimum of one sample shall be collected, provided that a storm water discharge occurred at least once following submission of the NOI or following the date that automatic authorization was obtained under Section H.E.2., and prior to terminating coverage. (*3) A grab sample shall be collected from the storm water discharge resulting from a storm event that is at least 0.1 inches of measured precipitation that occurs at least 72' hours from the previously measurable storm event. The sample shall be collected downstream of the concrete batch plant, and where the discharge exits any BMPs utilized to handle the runoff from the batch plant, prior to commingling with any other water authorized under this general permit. 2. The permittee must compare the results of sample analyses to the benchmark values above, and must include this comparison in the overall assessment of the SWP3's effectiveness. Analytical results that exceed a benchmark value are not a violation of this permit, as these values are not numeric effluent limitations. Results of analyses are indicators that modifications of the SWP3 should be assessed and may be necessary to protect water quality. The operator must investigate the cause for each exceedance and must document the results of this investigation in the SWP3 by the end of the quarter following the sampling event. Page 36 t- Construction General Permit TPDES General Permit TXR150000 .. $V The operator's investigation must identify the following: (a) any additional potential sources of pollution, such as spills that might have occurred, (b) necessary revisions to good housekeeping measures that are part of the SWP3, (c) additional BMPs, including a schedule to install or implement the BMPs, and (d) other parts of the SWP3 that may require revisions in order to meet the goal of the benchmark values. Background concentrations of specific pollutants may also .be considered during the investigation. If the operator is able to relate the cause of the exceedance to background concentrations, then subsequent exceedances of benchmark values for that pollutant may be resolved by referencing earlier findings in the SWP3. Background concentrations may be identified by laboratory analyses of samples of storm water ninon to the permitted facility, by laboratory analyses of samples of storm water run-off from adjacent non -industrial areas, or by identifying the pollutant is a naturally occurring material in soils at the site. Section B. Best Management Practices (BMPs) and SWP3 Requirements Minimum Storm Water Pollution Prevention Plan (SWP3) Requirements — The following are required in addition to other SWP3 requirements listed in this general permit (including, but not limited to Part III.F.7. of this permit): 1. Description of Potential Pollutant Sources - The SWP3 must provide a description of potential sources (activities and materials) that may reasonably be expected to affect the quality of storm water discharges associated with concrete batch plants authorized under this permit. The SWP3 must describe practices that that will be used to reduce the pollutants in these discharges to assure compliance with this general permit, including the protection of water quality, and must ensure the implementation of these practices. The following must be developed, at a minimum, in support of developing this description: (a) Drainage — The site map must include the following information: (1) the location of all outfalls for storm water discharges associated with concrete batch plants that are authorized under this permit; (2) a depiction of the drainage area and the direction of flow to the outfall(s); (3) structural controls used within the drainage area(s); (4) the locations of the following areas associated with concrete batch plants that -, are exposed to precipitation: vehicle and equipment maintenance activities (including fueling, repair, and storage areas for vehicles and equipment scheduled for maintenance); areas used for the treatment, storage, or disposal Page 37 wr Construction General Permit TPDES General Permit TXR150000 of wastes; liquid storage tanks; material processing and storage areas; and loading and unloading areas; and (5) the locations of the following: any bag house or other dust control device(s); recycle/sedimentation pond, clarifier or other device used for the treatment of facility wastewater (including the areas that drain to the treatment device); areas with significant materials; and areas where major spills or leaks have occurred. (b) Inventory of Exposed Materials — A list of materials handled at the concrete batch plant that may be exposed to storm water and that have a potential to affect the quality of storm water discharges associated with concrete batch plants that are authorized under this general permit- (c) Spills and Leaks - A list of significant spills and leaks of toxic or hazardous pollutants that occurred in areas exposed to storm water and that drain to storm water outfalls associated with concrete batch plants authorized under this general permit must be developed, maintained, and updated. (d) Sampling Data - A summary of existing storm water discharge sampling data must be maintained, if available. 2. Measures and Controls - The SWP3 must include a description of management controls to regulate pollutants identified in the SWP3's "Description of Potential Pollutant Sources" from Part N.B. L(a) of this permit, and a schedule for implementation of the measures and controls. This must include, at a minimum: (a) Good Housekeeping - Good housekeeping measures must be developed and implemented in the area(s) associated with concrete batch plants. (1) Operators must prevent or minimize the discharge of spilled cement, aggregate (including sand or gravel), settled dust, or other significant materials from paved portions of the site that are exposed to storm water. Measures used to minimize the presence of these materials may include regular sweeping or other equivalent practices. These practices must be conducted at a frequency that is determined based on consideration of the amount ' of industrial activity occurring in the area and frequency of precipitation, and shall occur at least once per week when cement or aggregate is being handled or otherwise processed in the area. (2) Operators must prevent the exposure of fine granular solids, such as cement, to storm water. Where practicable, these materials must be stored in enclosed silos, hoppers or buildings, in covered areas, or under covering. (b) Spill Prevention and Response Procedures - Areas where potential spills that can contribute pollutants to storm water runoff, and the drainage areas from these locations, must be identified in the SWP3. Where appropriate, the SWP3 must specify material handling procedures, storage requirements, and use of equipment. Page 38 Construction General Permit TPDES General Pen -nit TXR150000 Procedures for cleaning up spills must be identified in the SWP3 and made available to the appropriate personnel. (c) Inspections - Qualified facility personnel (i.e., a person or persons with knowledge of this general permit, the concrete batch plant, and the SWP3 related to the concrete batch plant(s) for the site) must be identified to inspect designated equipment and areas of the facility specified in the SWP3. The inspection frequency must be specified in the SWP3 based upon a consideration of the level of concrete production at the facility, but must be a minimum of once per month while the facility is in operation. The inspection must take place while the facility is in operation and must, at a minimum, include all areas that are exposed to storm water at the site, including material handling areas, above ground storage tanks, hoppers or silos, dust collection/containment systems, truck wash down and equipment cleaning areas. Follow-up procedures must be used to ensure that appropriate actions are taken in response to the inspections. Records of inspections must be maintained and be made readily available for inspection upon request. (d) Employee Training - An employee training program must be developed to educate personnel responsible for implementing any component of the SWP3, or personnel otherwise responsible for storm water pollution prevention, with the provisions of the SWP3. The frequency of training must be documented in the SWP3, and at a minimum, must consist of one training prior to the initiation of operation of the concrete batch plant. (e) Record Keeping and Internal Reporting Procedures - A description of spills and similar incidents, plus additional information that is obtained regarding the quality and quantity of storm water discharges, must be included in the SWP3. Inspection and maintenance activities must be documented and records of those inspection and maintenance activities must be incorporated in the SWP3. (f) Management of Runoff - The SWP3 shall contain a narrative consideration for reducing the volume of runoff from concrete batch plants by diverting runoff or otherwise managing runoff, including use of infiltration, detention ponds, retention ponds, or reusing of runoff. 3. Comprehensive Compliance Evaluation — At least once per year, one or more qualified ,. personnel (i.e., a person or persons with knowledge of this general permit, the concrete batch plant, and the SWP3 related to the concrete batch plant(s) for the site) shall conduct a compliance evaluation of the plant. The evaluation must include the following. ON (a) Visual examination of all areas draining storm water associated with regulated concrete batch plants for evidence of, or the potential for, pollutants entering the drainage system. These include but are not limited to: cleaning areas, material handling areas, above ground storage tanks, hoppers or silos, dust collection/containment systems, and truck wash down and equipment cleaning areas. Measures implemented to reduce pollutants in runoff (including structural controls and implementation of management practices) must be evaluated to determine if they are effective and if they are implemented in accordance with the terms of this permit Page 39 Construction General Permit TPDES General Permit TXR150000 and with the permittee's SWP3. The operator shall conduct a visual inspection of equipment needed to implement the SWP3, such as spill response equipment. (b) Based on the results of the evaluation, the following must be revised as appropriate within two weeks of the evaluation: the description of potential pollutant sources identified in the SWP3 (as required in Part IV.B.I., "Description of Potential Pollutant Sources"); and pollution prevention measures and controls identified in the SWP3 (as required in Part IV.B.2., "Measures and Controls"). The revisions may include a schedule for implementing the necessary changes. ` (c) The permittee shall prepare and include in the SWP3 a report summarizing the scope of the evaluation, the personnel making the evaluation, the date(s) of the evaluation, major observations relating to the implementation of the S WP3, and actions taken in response to the findings of the evaluation. The report must identify any incidents of noncompliance. Where the report does not identify incidences of noncompliance, the report must contain a statement that the evaluation did not identify any incidence(s), and the report must be signed according to 30 TAC Section 305.128, relating to Signatories to Reports. (d) The Comprehensive Compliance Evaluation may substitute for one of the required inspections delineated in Part IV.B.2.(c) of this general permit. Section C. Prohibition of Wastewater Discharges Wastewater discharges associated with concrete production including wastewater disposal by land application are not authorized under this general permit. These wastewater discharges must be authorized under an alternative TCEQ water quality permit or otherwise disposed of in an authorized manner. Discharges of concrete truck washout at construction sites may be authorized if conducted in accordance with the requirements of Part V of this general permit. Part V. Concrete Truck Wash Out Requirements This general permit authorizes the wash out of concrete trucks at construction sites regulated under Sections H.E.1., 2., and 3. of this general permit, provided the following requirements are met. Authorization is limited to the land disposal of wash out water from concrete trucks that are associated with off -site production facilities. Wash out water associated with on -site concrete production facilities must be authorized under a separate TCEQ general permit or individual permit. 1. Direct discharge of concrete truck wash out water to surface water in the state, including discharge to storm sewers, is prohibited by this general permit. 2. Concrete truck wash out water shall be discharged to areas at the construction site where structural controls have been established to prevent direct discharge to surface waters, or to areas that have a minimal slope that allow infiltration and filtering of wash out water to prevent direct discharge to surface waters. Structural controls may consist of temporary berms, temporary shallow pits, temporary storage tanks with slow rate release, or other reasonable measures to prevent runoff from the construction site. 3. Wash out of concrete trucks during rainfall events shall be minimized. The direct discharge Page 40 Construction General Permit TPDES General Permit TXR150000 of concrete truck wash out water is prohibited at all times, and the operator shall insure that its BMPs are sufficient to prevent the discharge of concrete truck washout as the result of rain. 4. The discharge of wash out water shall not cause or contribute to groundwater contamination. 5. If SWP3 is required to be implemented, the SWP3 shall include concrete wash out areas on the associated map. Part VI. Retention of Records The permittee must retain the following records for a minimum period of three (3) years from the date that a - NOT is submitted as required by Part iI.E.3. For activities in which an NOT is not required, records shall be retained for a minimum period of three (3) years from the date that the operator terminates coverage under Section II.F.3. of this permit. Records include: 1. A copy of the SWP3; 2. All reports and actions required by this permit, including a copy of the construction site w+ notice; 3. All data used to complete the NOI, if an NOI is required for coverage under this general permit; and 4. All records of submittal of forms submitted to the operator of any MS4 receiving the discharge and to the secondary operator of a large construction site, if applicable. Part VII. Standard Permit Conditions 1. The permittee has a duty to comply with all permit conditions. Failure to comply with any permit condition is a violation of the permit and statutes under which it was issued, and is grounds for enforcement action, for terminating coverage under this general permit, or for requiring a discharger to apply for and obtain an individual TPDES permit. 2. Authorization under this general permit may be suspended or revoked for cause. Filing a notice of planned changes or anticipated non-compliance by the permittee does not stay any permit condition. The permittee must furnish to the executive director, upon request and within a reasonable time, any information necessary for the executive director to determine whether cause exists for revoking, suspending, or terminating authorization under this permit. Additionally, the permittee must provide ,. to the executive director, upon request, copies of all records that the permittee is required to maintain as a condition of this general permit. 3. It is not a defense for a discharger in an enforcement action that it would have been necessary to halt or reduce the permitted activity to maintain compliance with the permit conditions. 4. Inspection and entry shall be allowed under Texas Water Code Chapters 26-28, Texas Health and Safety Code §§361.032-361.033 and 361.037, and 40 Code of Federal Regulations (CFR) § 122.41(i). The statement in Texas Water Code §26.014 that commission entry of a facility shall occur according to an establishment's rules and regulations concerning safety, internal security, and Page 41 Construction General Permit TPDES General Permit TXR150000 fire protection is not grounds for denial or restriction of entry to any part of the facility or site, but merely describes the commission's duty to observe appropriate rules and regulations during an inspection. 5. The discharger is subject to administrative, civil, and criminal penalties, as applicable, under Texas Water Code §§26.136, 26.212, and 26.213 for violations including but not limited to the following: a. negligently or knowingly violating the federal Clean Water Act (CWA), §§301, 302, 306, 307, 308, 318, or 405, or any condition or limitation implementing any sections in a permit issued under CWA, §402, or any requirement imposed in a pretreatment program approved under CWA, §§402(a)(3) or 402(b)(8); _ b. knowingly making any false statement, representation, or certification in any record or other document submitted or required to be maintained under a permit, including monitoring _ reports or reports of compliance or noncompliance. 6. All reports and other information requested by the executive director must be signed by the person and in the manner required by 30 TAC §305.128 (relating to Signatories to Reports). 7. Authorization under this general permit does not convey property or water rights of any sort and does not grant any exclusive privilege. Part VIII. Fees I. A fee of must be submitted along with the NOI: a. $325 if submitting a paper NOI, or b. $225 if submitting a NOI electronically. 2. Fees are due upon submission of the NOI. An NOI will not be declared administratively complete unless the associated fee has been paid in full. 3_ No separate annual fees will be assessed. The Water Quality Annual fee has been incorporated into the NOI fees as described above. Page 42 Construction General Permit TPDES General Permit TXR150000 s Appendix A: Automatic Authorization Periods of Low Erosion Potential by County - Eligible Date Ranges Andrews: Nov. 15 - Apr. 30 Kerr. Dec. 15 - Feb. 14 Archer: Dec. 15 - Feb. 14 Kimble: Dec. 15 - Feb. 14 +Armstrong: Nov. 15 - Apr. 30 King: Dec. 15 - Feb. 14 Bailey. Nov. 1 - Apr. 30, or Nov. 15 - May 14 Kinney: Dec. 15 - Feb. 14 Baylor. Dec. 15 - Feb. 14 Knox: Dec. 15 - Feb. 14 Borden: Nov. 15 - Apr. 30 Lamb: Nov. 1 - Apr. 14, or Nov. 15 - Apr. 30 4OBrewster: Nov. 15 - Apr. 30 Loving: Nov. 1 - Apr. 30, or Nov. 15 - May 14 Briscoe: Nov. 15 -Apr. 30 Lubbock: Nov. 15 - Apr. 30 Brown: Dec. 15 - Feb. 14 Lynn: Nov. 15 - Apr. 30 q,oCallahan: Dec. 15 - Feb. 14 Martin: Nov. 15 - Apr. 30 Carson: Nov. 15 - Apr. 30 Mason: Dec. 15 - Feb. 14 Castro: Nov. 15 - Apr. 30 Maverick: Dec. 15 - Feb. 14 Childress: Dec. 15 - Feb. 14 McCulloch: Dec. 15 - Feb. 14 WCochran: Nov. 1 - Apr. 30, or Nov. 15 - May 14 Menard: Dec. 15 - Feb. 14 Coke: Dec. 15 - Feb. 14 Midland: Nov. 15 - Apr. 30 Poleman: Dec. 15 - Feb. 14 Mitchell: Nov. 15 - Apr. 30 pCollingsworth: Jan. 1 - Mar. 30, or Dec. 1 - Feb. 28 Moore: Nov. 15 - Apr. 30 Concho: Dec. 15 - Feb. 14 Motley: Nov. 15 - Jan. 14, or Feb. I - Mar. 30 Cottle: Dec. 15 - Feb. 14 Nolan: Dec. 15 - Feb. 14 rane: Nov. 15 - Apr. 30 Oldham: Nov. 15 - Apr. 30 rockett: Nov. 15 - Jan. 14, or Feb. 1 - Mar. 30 Partner: Nov. 1 - Apr. 14, or Nov. 15 - Apr. 30 Crosby: Nov. 15 - Apr. 30 Pecos: Nov. 15 - Apr. 30 Fulberson: Nov. I - May 14 Potter. Nov. 15 - Apr. 30 *Oallam: Nov. 1 - Apr. 14, or Nov. 15 - Apr. 30 Presidio: Nov. 1 - Apr. 30, or Nov. 15 - May 14 Dawson: Nov. 15 - Apr. 30 Randall: Nov. 15 - Apr. 30 Deaf Smith: Nov. 15 - Apr. 30 Reagan: Nov. 15 - Apr. 30 Dickens: Nov. 15 - Jan. 14, or Feb. 1 - Mar. 30 Real: Dec. 15 - Feb. 14 "bimmit: Dec. 15 - Feb. 14 Reeves: Nov. 1 - Apr. 30, or Nov. 15 - May 14 Donley: Jan. 1 - Mar. 30, or Dec. 1 - Feb. 28 Runnels: Dec. 15 - Feb. 14 Eastland: Dec. 15 - Feb. 14 Schleicher. Dec. 15 - Feb. 14 ,4ctor: Nov. 15 - Apr. 30 Scurry: Nov. 15 - Apr. 30 Edwards: Dec. 15 - Feb. 14 Shackelford: Dec. 15 - Feb. 14 J Paso: Jan. I - Jul. 14, or May 15 - Jul. 31, or Jun. 1 - Aug. 14, Sherman: Nov. 15 - Apr. 30 or Jun. 15 - Sept. 14, or Jul. 1 - Oct. 14, or Jul. 15 - Oct. 31, or Stephens: Dec. 15 - Feb. 14 - Aug. 1 -Apr. 30, or Aug. 15 -May 14, or Sept. 1 - May 30, or Sterling: Nov. 15 - Apr. 30 Oct. 1 - Jun. 14, or Nov. 1 - Jun. 30, or Nov. 15 - Jul. 14 Stonewall: Dec. 15 - Feb. 14 isher. Dec. 15 - Feb. 14 Sutton: Dec. 15 - Feb. 14 , gloyd: Nov. 15 - Apr. 30 Swisher. Nov. 15 - Apr. 30 l~oard: Dec. 15 - Feb. 14 Taylor. Dec. 15 - Feb. 14 ines. Nov. 15 - Apr. 30 Terrell: Nov. 15 - Apr. 30 rza: Nov. 15 - Apr. 30 Terry: Nov. 15 - Apr. 30 lasscock: Nov. 15 - Apr. 30 Throckmorton: Dec. 15 - Feb. 14 Hale: Nov. 15 - Apr. 30 Tom Green: Dec. 15 - Feb. 14 �11: Feb. I - Mar. 30 Upton: Nov. 15 - Apr. 30 Njansford: Nov. 15 - Apr. 30 Uvalde: Dec. 15 - Feb. 14 Hardeman: Dec. 15 - Feb. 14 Val Verde: Nov. 15 - Jan. 14, or Feb. I - Mar. 30 rrartley: Nov. 15 - Apr. 30 Ward: Nov. 1 - Apr. 14, or Nov. 15 - Apr. 30 askell: Dec. 15 - Feb. 14 Wichita: Dec. 15 - Feb. 14 ilockley: Nov. 1 - Apr. 14, or Nov. 15 - Apr. 30 Wilbarger: Dec. 15 - Feb. 14 Howard: Nov. 15 -Apr. 30 Winkler. Nov. I - Apr. 30, or Nov. 15 - May 14 udspeth: Nov. 1 - May 14 Yoakum: Nov. 1 - Apr. 30, or Nov. 15 - May 14 uutchinson: Nov. 15 - Apr. 30 Young: Dec. 15 - Feb. 14 Mon: Dec. 15 - Feb. 14 Wheeler. Jan. I - Mar. 30, or Dec. 1 - Feb. 28 T-ff Davis: Nov. 1 - Apr. 30 or Nov. 15 - May 14 Zavala: Dec. 15 - Feb. 14 nes: Dec. 15 - Feb. 14 K%nt: Nov. 15 - Jan. 14 or Feb. 1 - Mar. 30 Page 43 .. Construction General Permit TPDES General Permit TXR150000 ft ►IF - 78 fir;■ .7 44 �-i IY •I■ 4 Appendix B: Erosivity Index (EI) Zones in Texas NO �i# +a!aiti�■■l la #Di f� T i i * • i 1 i..!li�. .., as — .. -- .:. a. r.. a.� a! .. "I w fw +W � • I.*.. ... a a . - _ lost w m- -= ' = W. ' ' A. ai•f lf: w og T• {{11 a■. �� as � r�fffi�rL r a � s . ♦ ! i f� i # � Jt rRs .'s! a!` alnf �' ■ r f � d i. • i �i � wrr � iww4w dm1 "�= i a a. rr.aa► a "" r �r �■ aar. .a ..s, a� � - 1:L a..m iw . i� !r r� ■■. i■ ■"+ � a � ww. w■.r�F ■rr• � 2� a s ■� a .stir we. n■■ sw. a �r�.w �s fli loww' lm �'ft' T a• a a .� do Adapted from Chapter 2 of USDA Agriculture Handbook 703: "Predicting Soil Erosion by Water: A Guide to Conservation Planning With the Revised Universal Soil Loss Equation (RUSLE), " U.S. Department of Agriculture, Agricultural Research Service so Vll! 'F ,r 2ra= qft 6 r 60 OF A — Ab 4w Aft Page 44 Construction General Permit TPDES General Permit TXR150000 40 M Appendix C: Isoerodent Map .r Adapted front Chapter 2 of USDA Agriculture Handbook 703: "Predicting Soil Erosion by Water: A Guide to Conservation Planning With the Revised Universal Soil Loss Equation (RUSLE), " U.S. Department of Agriculture, Agricultural Research Service • .. w Page 45 we Construction General Permit TPDES General Permit TXR 150000 Appendix D: Erosivity Indices for EI Zones in Texas Periods: 1/1 1115 2/1 2/15 3/1 3115 411 4115 511 5115 6/1 6115 7/1 7/15 8/1 8115 911 9115 10/1 10115 11/1 11115 1 ?/1 12/15 89 0 0 1 1 2 3 4 7 12 18 27 38 48 55 62 69 76 83 90 94 97 98 99 100 90 0 I 2 3 4 6 8 13 21 29 37 46 54 j 60 65 69 74 81 87 92 95 97 98 99 91 0 0 0 0 1 1 1 2 6 16 29 39 46 53 60 67 74 81 88 95 99 99 100 100 92 0 0 0 0 1 l 1 2 6 16 29 39 46 53 60 67 74 81 88 95 99 99 100 100 = W93 0 1 1 2 3 4 6 8 13 25 40 49 56 62 67 72 76 80 85 91 97 98 99 99 94 0 1 2 4 6 8 10 15 21 29 38 47 53 57 61 65 70 76 83 88 91 94 96 98 95 0 I 3 5 7 9 11 14 18 27 35 41 ' 46 51 57 62 68 73 79 84 89 93 96 98 96 0 2 4 6 9 12 17 23 30 37 43 49 54 58 62 66 70 74 78 82 86 90 94 97 97 0 I 3 5 7 10 14 20 28 37 48 56 61 64 68 72 77 81 86 89 92 95 98 99 106 0 3 6 9 13 17 21 27 33 38 44 49 55 61 67 71 75 78 81 84 86 90 94 97 * Each period begins on the date listed in the table above and lasts until the day before the following period. The final period begins on December 15 and ends on December 31. Table adapted from Chapter 2 of USDA Agriculture Handbook 703: Predicting Soil Erasion by Water. A Guide to Conservation Planning Witk the Revised Universal Soil Loss Equation (RUSLE), " U.S. Department of Agriculture, Agricultural Research Service Page 46 Construction General Permit TPDES General Permit TXR150000 Attachment 1 w •r�r ! low A Ll- k SMALL CONSTRUCTION SITE NOTICE: LOW POTENTIAL FOR EROSION FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program -- TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part II.E.I. of the TCEQ General Permit Number TXR150000 for discharges of storm water runoff from small construction sites automatically authorized based on low rainfall erosivity. Additional information regarding the TCEQ storm water permit program may be found on the internet at: http://www.tceq.state.tx.us/nav/permits/wq_construction.htmi 7. Operator Name: Contact Name and Phone Number: i Project Description: j '(Physical address or description of the site's location, . estimated start date and projected end date, or date i ' that disturbed soils will be stabilized) I For Small Construction Sites Authorized Under Part ILE.1., the following certification must be completed: W I (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an automatic authorization based on low rainfall erosivity under Part H.E.1. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit Construction activities at this site shall occur within a time period listed in Appendix A of the TPDES general permit for this county, that period beginning on and ending on . I understand that if construction activities continue past this period, all storm water runoff must be authorized under a separate provision of the general permit A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Title Attachment 2 Date Date Notice Removed MS4 operator notified per Part H.F.3. Page 47 Construction General Permit TPDES General Permit TXR150000 SMALL CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part H.E.2. of the TCEQ General Permit Number TXR150000 for discharges of storm water runoff from small construction sites. Additional information regarding the TCEQ storm water permit program may be found on the internet at: 4 hUp, itwww-leeq. state.tx.uslttavllaermitslwq. _construcIIoft-hint Operator Name: Contact Name and Phone Number: Project Description: Physical address or description of the site's location, estimated start date and projected end date, or date that disturbed soils will be stabilized Location of Storm Water Pollution Prevention Plan: Y For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge) the following certification must be completed: M I (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part ILD.2. of TPDES General Permit TXRI 50000 and agree to comply with the terms of this permit. A storm water pollution prevention plan _ has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Title Date Date Notice Removed _ MS4 operator notified per Pan II.F.3. Page 48 Construction General Permit TPDES General Permit TXR150000 Attachment 3 LARGE CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 "SECONDAR Y OPERA TOR " NOTICE This notice applies to secondary operators of construction sites operating under Part II.E.3. of the TPDES General Permit Number TXR 150000 for discharges of storm water runoff from construction sites equal to or greater than five acres, including the larger common plan of development. The information on this notice is required in Part III.E.2. of the general permit. Additional information regarding the TCEQ storm water permit program may be found on the internet at: htti)://www.tceo.state.tx.us/nav/vem-dts/sw nermits.html Site -Specific TPDES Authorization Number: Operator Name: Contact Name and Phone Number. Project Description: Physical address or description of the site's location, and estimated start date and projected end date, or date that disturbed soils will be stabilized= k- - - - - __ - Location of Storm Water Pollution Prevention Plan (SWP3): For Large Construction Activities Authorized Under Part II.E.3. (Obtaining Authorization to Dischargc) the following certification must be completed: I (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part H.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Title Date ,Cate Notice Removed MS4 operator not fled per Part II.F.3. Page 49 Construction General Permit TPDES General Permit TXR150000 Attachment 4 wr Ono" r LARGE CONSTRUCTION SITE NOTICE _ FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 "PRIMARY OPERA TOR " NOTICE This notice applies to construction sites operating under Part II.E.3. of the TPDES General Permit Number TXR 150000 for discharges of storm water runoff from construction sites equal to or greater than five acres, including the larger common plan of development. The information on this notice is required in Part HI.E.2. of the general permit. This notice shall be posted along with a copy of the signed Notice of Intent (NOl), as applicable. Additional information regarding the TCEQ storm water permit program may be found on the internet at: httv://www.tceq.state.tx.us/nav/vermits/sw nernuts.htnd Site -Specific TPDES Authorization Number: I Operator Name: Contact Name and Phone Number: Project Description: Physical address or description of the site's location, and estimated start date and projected end date, or date that disturbed soils will be stabilized. Location of Storm Water Pollution Prevention Plan: Page 50 TCEQ Office Use Only wo f - Notice of Intent (NOI) for Storm Water Permit No.: TXR15 �_ Discharges Associated with Construction RN: Activity under TPDES General Permit CN: TCEIQ (TXR150000) Ref No: Sign up now for ePermits NOI at www6.tceq.state.tx.us/steers Get Instant Permit Coverage and only pay a $225 application fee. If filing a paper NOT you can pay the application fee on line? Go to www.tceq.state.tx.us/eraav °9, .0 Select Fee Type: GENERAL PERMIT CONSTRUCTION STORM WATER DISCHARGE NOI APPLICATION If submitting a paper NOI, coverage under the general permit starts seven (7) days after the date postmarked for delivery to TCEQ. IIMPORTANT: •Use the INSTRUCTIONS to fill out each question in this form. -Use the attached CUSTOMER CHECKLIST to make certain all you filled out all required information. •Incomplete applications WILL delay approval or result in automatic Denial. Renewal of General Permit Is this NOI to renew an ACTIVE permit? 17Yes - What is your permit number? Permit No. TXR15 r7No - a permit number will be issued. Application Fee if mailing a paper NOI: i You must pay the $325 Application Fee to TCEQ for the application to be considered complete. Payment and NOI must be mailed to separate addresses. See instructions for correct mailing addresses. 7 Provide your payment information below, for us to verify payment of the application fee: ❑ Mailed: Check/Money Order No.: Company Name on checking account: F—JEPAY: Voucher No.: Is the Payment Voucher copy attached? ❑Yes ``A. OPERATOR (applicant) 1. If the applicant is currently a customer with TCEQ, what is the Customer Number (CN) issued to this entity? �( CN (Search Central Reeistro 2. What is the Legal Name of the entity (applicant) applying for this permit? (77te legal name must be spelled exactly as filed with the Texas Secretary of State, County, or in the legal document forming the entity) 3. What is the name and title of the person signing the application? (The person must be an official meeting signatory requirements in TAC 305.43(a).) Name: I Job Title: 4. What is the Operator's (applicant) mailing address as recognized by the US Postal Service? (verify at USPS.com) Address: I Suite No./Bldg. No_/Mail Code: City: I State: , ZIP Code: Country Mailing Information (if outside USA). Country Code: Postal Code: 5. Phone No.: ( ) I Extension: T6. Fax No.: ( ) I E-mail Address: 7. Indicate the type of Customer: ❑ Individual ❑Sole Proprietorship-D.B.A. Limited Partnership i ❑Corporation ❑Federal Government ElGeneral Partnership ❑ State Government OCounty Government City Government DOther Government ❑Other (describe): TCEQ-20022 (03/05/2008) Page 1 .r 8. Independent Operator: OYes C]No (If governmental entity, subsidiary, or part of a larger corporation, check "No".) 9. Number of Employees: ❑0-20; 021-100; 0101-250; ❑251-500; or 050] or higher 10. Customer Business Tax and Filing Numbers (This item is not applicable to Individuals, Government, GP or Sole Proprietor.) REQUIRED for Corporations and Limited Partnerships ( Verify the entity's status and filing no. with TX SOS at 512/463-5555 ) State Franchise Tax ID Number: Federal Tax ID: I TX SOS Charter (filing) Number. DUNS Number (if known): B. APPLICATION CONTACT If TCEQ needs additional information regarding this application, who should be contacted? �aI 1. Name: Title: I Company: 12. Phone No.: ( ) Extension: 3. Fax No.: E-mail Address: 4 C. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE 1 1. TCEQ Issued RE Reference Number (RN): RN (Search Central Reeistrv) 2. Name of Projector Site (the name as known by the community where this facility/project is located): (example: phase and name of subdivision or name of project that's unique to the site) 3. Does the site have a physical address? If Yes, complete Si� for a physical address. If No, complete , w' ;tiiti0 for site location information. Secho& A Enter the physical address for the site. (verify it with USPS.com or other delivery source) Street Number. Street Name: City: I ZIP Code: SebiU1B Enter the site location information. If no physical address (Street Number & Street Name), provide a written location access description to the site: (Ex.: phase 1 of Woodland subdivision located 2 miles west from intersection of Hwy 290 & IH35 accessible on Hwy 290 South) City where the site is located or nearest city to site: I ZIP Code where site is located: 47 1 4. Identify the county where the site is located: 5. Latitude: ' Longitude: 6. What is the primary business of this entity? In your own words, briefly describe the primary business of the Regulated Entity: (Do not repeat the SIC and NAICS code) 7. What is the mailing address for the regulated entity? Is the RE mailing address the same as the Operator? []Yes, address is the same as Operator nNo, provide the address tStreet Number: I Street Name: City: I D. GENERAL CHARACTERISTICS l . Is the site located on Indian Country Lands? []No Yes — If Yes, do not submit this NOI. Contact EPA, Region VI If the site is on Indian country lands, you must obtain authorization through EPA, Region VI. 2. What is the Standard Industrial Classification (SIC) code (see instructions for common codes): (Search Osha.Qov) Primary: Secondary: No State: I ZIP Code: TCEQ-20022 (03/05/2008) ■r Page 2 „.-j 3(a) What is the total number of acres disturbed? 3(b) Is the project site part of a larger common plan of development or sale? ❑Yes EJNo ,,, If Yes, the total number of acres disturbed can be less than 5 acres. If No, the total number of acres disturbed must be 5 or more. If the total number of acres disturbed is less than 5 then the project site does not qualify for coverage through this Notice of Intent. Coverage will be denied. See the requirements in the .,. general permit for small construction sites. 4. Discharge Information (all information MIDST be provided or the permit will be denied) 4(a) What is the name of the water body(s) to receive the storm water runoff or potential runoff from the site? 4(b) What is the segment number(s) of the classified water body(s) that the discharge or potential discharge will eventually reach? 4(c) Are any of the surface water bodies receiving discharges from the construction site on the latest EPA -approved CWA 303(d) list of impaired waters? Q Yes ❑ No If Yes, provide the name of the impaired water body(s). 4(d) Is the discharge into an MS4? QYes ❑No If Yes, what is the name of the MS4 Operator? Note: The general permit requires you to send a copy of the NOI to the MS4 Operator. �d 4(e) Is the discharge or potential discharge within the Recharge Zone, Contributing Zone, or Contributing Zone within the Transition Zone of the Edwards Aquifer? Yes r_1 No If the answer is Yes, please note that a copy of the agency approved Plan required by the Edwards Aquifer Rule (30 TAC Chapter 213) must be included or referenced in the Storm Water Pollution Prevention Plan. +� E. CERTIFICATION i Check "Yes” to the certifications below. Failure to certify to all items will result in denial. Yes I certify that I have obtained a copy and understand the terms and conditions of the izeneral permit (TXR150000). f Yes I certify that the full legal name of the entity (Operator) applying for this permit has been provided and is legally authorized to do business in Texas. Yes I understand that a Notice of Termination (NOT) must be submitted when this authorization is no longer needed. Yes I certify that a storm water pollution prevention plan has been developed and will be implemented prior to construction, and that is compliant with any applicable local sediment and erosion control plans, as required in the general permit TXR150000. Operator Certification: I I, Typed or printed name (Required &must be legible) Title (Required & legible) certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. I further certify that I am authorized under 30 Texas Administrative Code §305.44 to sign and submit this document, and can provide documentation in proof of such authorization upon request. IT Signature: (Use blue ink) Date: TCEQ-20022 (03/05/2008) s Page 3 .0 ar Did you complete everything? Use this checklist to be sure! Are you ready to mail your form to TCEQ? Go to the General Information Section of the Instructions for mailing addresses. Customer GP Notice of Intent Checklist TXR150000 �( This checklist is for use by the operator to ensure a complete application. Missing information may result in denial of coverage under the permit. (See NOI Process description in the Instructions) ❑ Application Fee of $325.00 was mailed separately to TCEQ's Cashiers's Office (separate from the NOI) or the EPAY payment voucher is attached. OPERATOR INFORMATION - Confirm each item is complete: d ❑ Customer Number (CN) issued by TCEQ Central Registry ❑ Legal Name as filed to do business in Texas (Call TX SOS 512/463-5555) ❑ Name and Title of person signing the application. This person must meet signatory requirements in 30 TAC Section 305.43 ❑ Operator Mailing Address is complete & verifiable with USPS. www.usns.com ❑ Phone Numbers/E-mail Address ❑ Type of Operator (Entity Type) ❑ Independent Operator ❑ Number of Employees j� For Corporations or Limited Partnerships — Tax ID and SOS Filing numbers are REQUIRED Application Contact person we can call for questions about this application. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE - Confirm each item is complete: 4' ❑ Regulated Entity Reference Number (RN) (if site is already regulated by TCEQ) ❑ Site/Project Name/Regulated Entity ❑ Site/Noject (RE) Physical Address Please do not use a rural route or post office box for a site location ❑ Or if no physical address, the location information that includes description, zip code and city is listed. ❑ Latitude and Longitude TCEO USGS Touoeranhic Mao Viewer or TerraServer-USA ❑ Business description Site Mailing Address (checked same as operator or complete & verifiable with USPS. www.usas.com) GENERAL CHARACTERISTICS - Confirm each item is complete: f ❑ Indian Country Lands —the facility is not on Indian Country Lands ❑ Standard Industrial Classification (SIC) code www.osha.eov/oshstats/sieser.html ❑ Acres Disturbed is provided and qualifies for coverage through a NOT. ❑ Common plan of development or for sale? ❑ Discharge Information: ❑ receiving water body ❑ segment number(s) is REQUIRED ❑ water body on the latest EPA -Approved Clean Water Act 303(d) list of impaired waters ❑ MS4 Operator jj Edwards Aquifer Rule CERTIFICATION ❑Certification statements have been checked indicating "Yes" Signature meets 30 Texas Administrative Code (TAC) U05.44 and is original and has been provided for the Operator. TCEQ-20022 Checklist (03/05/2008) Page l ow dw Notice of Intent (NOI) for Storm Water Discharges Associated with Construction Activity under TPDES General Permit (TXR150000) General Information and Instructions . GENERAL INFORMATION Where to Send the Notice of Intent (NOI) and other related forms: BY REGULAR U.S. MAIL BY OVERNIGHT/EXPRESS MAIL — Texas Commission on Environmental Quality Texas Commission on Environmental Quality Storm Water Processing Center (MC228) Storm Water Processing Center (MC228) P.O. Box 13087 12100 Park 35 Circle Austin, TX 78711-3087 Austin, TX 78753 TCEQ Contact list: Application Processing Questions relating to the status and form requirements: 512/239-3700, 512/245-0130 or swoermitaa tcea.state.tx.us Technical Questions relating to the general permit: 512/239-4671 or sweDatceo.state.tx.us Environmental Law Division: 512/239-0600 Records Management for obtaining copies of forms submitted to TCEQ: 512/239-0900 Information Services for obtaining reports from program data bases (as available): 512/239-DATA (3282) Financial Administration's Cashiers office: 512/239-0357 or 512/239-0187 -{ Notice of Intent Process: When your NOI is received by the program, the form will be processed as follows: 1. Administrative Review: Each item on the form will be reviewed for a complete response. In addition, the operators legal name must be verified with Texas Secretary of State as valid and active (if applicable). The address(s) on the form must be verified with the US Postal service as an address receiving regular mail delivery. Never give an overnight/express mailing address. `s 2. Notice of Deficiency: If an item is incomplete or not verifiable as indicated above, a notice of deficiency (NOD) will be mailed to the operator. The operator will have 30 days to respond to the NOD. The response will be reviewed for completeness. 3. Acknowledgment of Coverage: An Acknowledgment Certificate will be mailed to the operator. This certificate acknowledges coverage under the ' general permit. -or- Denial of Coverage: If the application is too incomplete to process, or the operator fails to respond to the NOD or the response is inadequate, coverage under the general permit may be denied. If coverage is denied, the operator will be notified. General Permit (Your Permit) If filing the NOI through ePermits online application, coverage under the general permit begins the day the NOI is submitted to TCEQ through epermits. Sign up now for on line NOI at https://www6.tceci.state.tx.us/steers/ If mailing a paper NOI, coverage under the general permit begins seven (7) days after a completed NOI is postmarked for delivery to the TCEQ. You should have a copy of your general permit when submitting your application. You may view and print your permit for which you are seeking coverage, on the TCEQ web site httD://www.tcea.state.tx.us/t)ermittine/water aualitv/stormwater/TXR15 AIR.html. General Permit Forms 1W The Notice of Intent (NOI). Notice of Termination (NOT), and Notice of Chance (NOC) #20391 with instructions are available in Adobe Acrobat PDF format on the TCEQ web site htID://www.tcea.state.tx.us/nermittine�water aualitv/st rmwaterrM15 AIR.html. Sign up now for on line Notice of Termination application at https://www6.tceq.state.tx.us/steers/ Change in Operator An authorization under the general permit is not transferable. If the operator or owner of the regulated entity changes, the present permittee must submit a Notice of Termination and the new operator must submit a Notice of Intent. The NOT and NOI must be submitted not later than 10 days prior to the ro change in Operator status. — TCEQ-20022 Instructions (03/05/2008) Page 1 so up TCEQ Central Registry Core Data Form The Core Data Form has been incorporated into this form. Do not send a core data form to TCEQ. After final acknowledgment of coverage under the general permit, the program will assign a Customer Number (CN) and Regulated Entity Number (RN). For Construction Permits, a new RN will be assigned for each Notice of Intent filed with TCEQ, since construction project sites can overlap with other Customers. The RN assigned to your construction project will not be assigned to any other TCEQ authorization. -^ You can find the information on the Central Registry web site at www4.tceu.state.tx.us/croub. You can search by the Regulated Entity (RN), Customer Number (CN) or Name (Permittee), or by your permit number under the search field labeled "Additional ID". Capitalize all letters in the permit number. The Customer (Permittee) is responsible for providing consistent information to the TCEQ, and for updating all CN and RN data for all authorizations as changes occur. For General Permits, a Notice of Change form must be submitted to the program area. Application Fees: $225.00 application fee if submitting the NOI through ePermits. $325.00 application fee if submitting a paper NOI for processing. The application fee is required to be paid at the time the NOI is submitted. Failure to submit payment at the time the application is filed will cause delays -- in acknowledgment or denial of coverage under the general permit. • Mailed Payments: DO NOT mail your check with the original Notice of Intent application. Use the attached Application Fee payment submittal form is mailing the payment. Do not include a copy of the NOI. BY REGULAR U.S. MAIL Texas Commission on Environmental Quality ow Financial Administration Division Cashiers Office, MC-214 P.O. Box 13088 Austin, TX 78711-3088 BY OVERNIGHT/EXPRESS MAIL Texas Commission on Environmental Quality Financial Administration Division Cashier's Office, MC-214 12100 Park 35 Circle Austin, TX 78753 • ePAY Electronic Payment: Go to www.tceq.state.tx.us/epay Select Water Quality, then select the fee category "GENERAL PERMIT CONSTRUCTION STORM WATER DISCHARGE NOI APPLICATION'. You must include a copy of the payment voucher with your NOI. Your NOI will not be considered -complete without the payment voucher. The Annual Water Quality Fee has been consolidated into the Application Fee effective March 5, 2008. An annual fee will not be assessed and billed to operators on 9/1/2008. This does not relieve the operator of fees due for prior fiscal year assessments. The operator will continue to receive an invoice for payment of any past due annual fee. A 5% penalty will be assessed if the payment is received by TCEQ after the due date. Annual fee assessments cannot be waived as long as the authorization under the general permit was active on September 1 of 1W the FY billed. sw .r ulj TCEQ-20022 Instructions (03/05/2008) Page 2 r No INSTRUCTIONS FOR FILLING OUT THE NOI FORM A. OPERATOR (As defined in the general permit.) " 1. TCEQ Issued Customer Number (CN) TCEQ's Central Registry will assign each customer a number that begins with "CN; followed by nine digits. This is not a permit number, registration number, or license number. • If this customer has not been assigned a Customer Reference Number, leave the space for the Customer Reference Number blank. 0 If this customer has already been assigned this number, enter the operator's Customer Reference Number in the space provided. 2. Legal Name Provide the legal name of the facility operator, as authorized to do business in Texas. The name must be provided exactly as filed with the Texas Secretary of State (SOS), or on other legal documents forming the entity, that is filed in the county where doing business. You may contact the SOS at 512/463-5555, or go to htto://www.sos.state.tx.us/corn/contact.shtml for more information related to filing in Texas. If filed in the county where doing business, provide a copy of the legal documents showing the legal name. 3. Name and Title of person signing the Notice of Intent application form. Signature meets 30 Texas Administrative Code (TA C) §305_44 4. Operator Mailing Address Provide a complete mailing address for receiving mail from the TCEQ. The address must be verifiable with the US Postal Service at www.usr)s.com, for regular mail delivery (not overnight express mail). If you find that the address is not verifiable using the USPS web search, please indicate the address is used by the USPS for regular mail delivery. 5. Phone Number This number should correspond to this customer's mailing address given earlier. Enter the area code and phone number here_ Leave "Extension" blank if this customer's phone system lacks this feature. 6. Fax Number and E-mail Address .� This number and E-mail address should correspond to operator's mailing address provided earlier. (Optional Information) 7. Type of Entity Check only one box that identifies the type of entity. Use the descriptions below to identify the appropriate entity type: Individual is a customer who has not established a business, but conducts an activity that needs to be regulated by the TCEQ. Sole Proprietorship— D.B.A. is a customer that is owned by only one person and has not been incorporated. This business may: • be under the person's name • have its own name ("doing business as," or d.b.a.) • have any number of employees Partnership is a customer that is established as a partnership as defined by the Texas Secretary of State's Office. Corporation the customer meets all of these conditions: • is a legally incorporated entity under the laws of any state or country • is recognized as a corporation by the Texas Secretary of State • has proper operating authority to operate in Texas. Government- Federal, state, county, or city government (as appropriate) ..r the customer is either an agency of one of these levels of government or the governmental body itself. Other is Estate, Trust, etc. the customer does not fit one of the above descriptions. Enter a short description of the type of customer in the blank provided. 8. Independent Operator Check "No' if this customer is a subsidiary, part of a larger company, or is a governmental entity. Otherwise, check "Yes." 9. Number of Employees Check one box to show the number of employees for this customer's entire company, at all locations. This is not necessarily the number of employees at the site named in the NOI. 10. State Franchise Tax ID Number Corporations and limited liability companies that operate in Texas are issued a franchise tax identification number. If this customer is a corporation or limited liability company, enter this number here. Federal Tax ID All businesses, except for some small sole proprietors, individuals, or general partnerships should have a federal taxpayer identification number (TIN). Enter this number here. Use no prefixes, dashes, or hyphens. Sole proprietors, individuals, or general partnerships do not need to provide a federal tax ID. TX SOS Charter (filing) Number Corporations and Limited Partnerships required to register with the Texas Secretary of State are issued a charter or filing number. You may obtain further information by calling SOS at 512/463-5555 http://www.sos.state.tx.us/corQ/contact.shtml. ow TCEQ-20022 Instructions (03/05/2008) Page 3 s w. DUNS Number Most businesses have a DUNS (Data Universal Numbering System) number issued by Dun and Bradstreet Corp. If this customer has one, enter it here. B. Application Contact aw Provide the name, title and communication information of the person that TCEQ can contact for additional information regarding this application. If the application is missing information and there is no contact person to call, the application may be denied. C. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE �.r 1. Regulated Entitv Reference Number (RN) This is a number issued by TCEQ's Central Registry to sites (a location where a regulated activity occurs) regulated by TCEQ. This is not a permit number, registration number, or Iicense number. • If this Regulated Entity has not been assigned a Regulated Entity Number, leave this space blank. • If this customer has been assigned this number, enter the operator's Regulated Entity Number. 2. Site/Project Name/Regulated Entity If the site is already regulated by TCEQ, use the same name as on the existing Re-aulated Entitv Reference Number (RN). +w If new, provide the name of the site as known by the public in the area where the site is located. The name you provide on this application will be used in the TCEQ Central Registry as the Regulated Entity. 3. Site/Project (RE) Physical Address Sectiol Enter the complete physical address of where the site is located. This must be a street number and street name for a complete physical address. This address must be validated through US Postal Service or your local police (911 service) as a valid address. Please confirm this to he a complete and valid address. In some rural areas, new addresses are being assigned to replace rural route addresses. Please do not use a rural route or post office box for a site location. Section If a site does not have an actual physical address that includes a street number and street name, then provide a complete written location access description, and the zip code and city where the site is located. For example: "The site is located 2 miles west from intersection of Hwy 290 & IH35, located on the southwest comer of the Hwy 290 South bound lane." w This includes authorizations for construction projects such as highways and subdivision. 4. Identify the County where the site is located. If the site covers more than one county, provide the county that is most affected by the authorized activity and list the additional county(s) as secondary. 5. Latitude and Longitude Enter the latitude and longitude of the site in either degrees, minutes, and seconds or decimal form. For help obtaining the latitude and longitude, go to: TCEQ USGS Topggrzphic Map Viewer or TerraServer-USA w 6. Description of Activity Regulated In your own words, briefly describe the primary business being conducted at the site. (A description specific to what you are doing that requires this authorization - Do not repeat the SIC Codc(s).) SITE MAILING ADDRESS Provide a complete mailing address to be used by TCEQ for receiving mail at the site. In most cases, the address is the same as the operator. If so, simply place a check mark in the box. If you provide a different address, please verify the address with USPS as instructed above for the operator address. D. GENERAL CHARACTERISTICS 1. Indian Country Lands If your site is located on Indian Country Lands, the TCEQ does not have authority to process your application. You must obtain authorization through EPA, Region VI, Dallas. Do not submit this form to TCEQ. -0 Indian Country means (1) all land within the limits of any American Indian reservation under the jurisdiction of the U.S. government, notwithstanding the issuance of any patent, and including rights -of -way running throughout the reservation; (2) all dependent Indian communities within the borders of the United States whether within the original or subsequently acquired territory thereof, and whether within or outside the limits of a State; and (3) all Indian allotments, the Indian titles which have not been extinguished, including rights -of -way running through the same. Indian Tribe means any Indian Tribe, band, nation, or community recognized by the Secretary of the Interior and exercising substantial governmental duties and powers. t� 2. Standard Industrial Classification (SIC) code Provide the SIC code that best describes the construction activity being conducted at the site. Common SIC Codes related to construction activities include: 1521 Construction of Single Family Homes; 1522 Construction of Residential Bldgs. Other than Single Family Homes; 1541 Construction of Industrial Bldgs. and Warehouses; 1542 Construction of Non-residential Bldgs. other than .� Industrial Bldgs. and Warehouses; 1611 Highway & Street Construction, except Highway Construction; 1622 Bridge, Tunnel, & Elevated Highway Construction; 1623 Water, Sewer, Pipeline & Communications, and Power Line Construction. For help with SIC codes, go to: www.osha.izov/osbstats/sicser.htmi No TCEQ-20022 Instructions (03/05/2008) Page 4 ow w. 3. Estimated Area of Land Disturbed 3(a). Provide the approximate number of acres that the construction site will disturb. 3(b). Indicate is the site is part of a common plan of development or for sale. .r Construction activities that disturb less than one acre, unless they are part of a larger common plan that disturbs more than one acre, do not require permit coverage. Construction activities that disturb between one and five acre, unless they are part of a common plan that disturbs five acres or more acres, do not require submission of an NOI. Therefore, the estimated area of land disturbed should not be less than five, unless the project is part of a larger common plan that disturbs five or more acres. "Disturb" means any clearing, grading, excavating, or other similar activities. If you have any questions about this item, please call the storm water technical staff at (512)2394671. 4. Discharge Information 4 (a). The storm water may be discharged directly to a receiving stream or through a MS4* from your site. It eventually reaches a receiving water body such as a local stream or lake, possibly via a drainage ditch. You must provide the name of the water body that receives the discharge from the site (a local stream or lake). ..e 4 (b). The classified segment number(s) is REQUIRED to get coverage. Go to the link to find the segment number of the classified water body where storm water will flow httu://www.teeo.state.tx.us/compliance/monitoring/water/ouality/data/wom/viewer/viewer.htmi . Call Water Quality Assessments at 512/2394671 for further assistance. Another source for segments is: http://www.tceq.state.tx.us/comm_exec/forms—pubs/pubs/gi/gi-316/index.htmi 4 (c). If any surface water body(s) receiving discharges from the construction site are on the latest EPA -approved CWA § 303(d) list of impaired waters, provide the name(s) of the water body(s). .. EPA approved CWA 303d list of impaired waters can be found at: Texas Water O_uality_ Inventory and 303(d) List - Texas Commission on Environmental Oualitv - www.tceo.state.tx.us 4 (d). Identify the MS4* Operator name if the storm water discharge is into an MS4. *MS4 is an acronym for Municipal separate storm sewer system. MS4 is defined as a separate storm sewer system owned or operated by a state, city, town, county, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, storm water, or other wastes, including special districts under state law such as a sewer district, flood control or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, that discharges to water in the state. For assistance, you may call the technical staff of the Water Quality Assessment & Standards Section at 512/2394671. 4 (e). Edwards Aquifer Rule No See maps on the TCEQ website to determine if the site is located within the Recharge Zone, Contributing Zone, or Contributing Zone within the Transition Zone of the Edwards Aquifer at httD://www.tcea.state.tx.us/comt)liance/field ops/eapp/viewer.html. If the discharge or potential discharge is within the Recharge Zone, Contributing Zone, or Contributing Zone within the Transition Zone of the Edwards Aquifer, a site specific authorization approved by the Executive Director under the Edwards Aquifer Protection Program (30 TAC Chapter 213) is required before construction can begin. The general permit requires the approved Contributing Zone Plan or Water Pollution Abatement Plan to be included as a part of the Storm Water ON Pollution Prevention Plan. The certification must be answered "Yes" for coverage under the general permit. E. CERTIFICATIONS Failure to indicate "Yes" to ALL of the certification items may result in denial of coverage under the general permit. w The certification must bear an original signature of a person meeting the signatory requirements specified under 30 Texas Administrative Code 5305.44 IF YOU ARE A CORPORATION: 1W The regulation that controls who may sign an NOI or similar form is 30 Texas Administrative Code §305.44(a)(1) (see below). According to this code provision, any corporate representative may sign an NOI or similar form so long as the authority to sign such a document has been delegated to that person in accordance with corporate procedures. By signing the NOI or similar form, you are certifying that such authority has been delegated to you. The TCEQ may request documentation evidencing such authority. 4W IF YOU ARE A MUNICIPALITY OR OTHER GOVERNMENT ENTITY: The regulation that controls who may sign an NOT or similar form is 30 Texas Administrative Code §305.44(a)(3) (see below). According to * s this code provision, only a ranking elected official or principal executive officer may sign an NOT or similar form. Persons such as the City Mayor or County Commissioner will be considered ranking elected officials. In order to identify the principal executive officer of your government entity, it may be beneficial to consult your city charter, county or city ordinances, or the Texas stamte(s) under which your government entity was formed. An NOT or N" TCEQ-20022 Instructions (03/05/2008) Page 5 v similar document that is signed by a government official who is not a ranking elected official or principal executive officer does not conform to §305.44(a)(3). The signatory requirement may not be delegated to a government representative other than those identified in the regulation. By signing the NOI or similar form, you are certifying that you are either a ranking elected official or principal executive officer as required by the administrative code. Documentation demonstrating your position as a ranking elected official or principal executive officer may be requested by the TCEQ. If you have any questions or need additional information concerning the signatory requirements discussed above, please contact the Texas Commission on Environmental Quality's Environmental Law Division at 512/239-0600. 30 Texas Administrative Code §305.44. Signatories to Applications. (a) All applications shall be signed as follows. (1) For a corporation, the application shall be signed by a responsible corporate officer. For purposes of this paragraph, a responsible corporate officer means a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision -making functions for the corporation; or the manager of one or more manufacturing, production, or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25 million (in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Corporate procedures governing authority to sign permit or post -closure order applications may provide for assignment or delegation to applicable corporate positions rather than to specific individuals. (2) For a partnership or sole proprietorship, the application shall be signed by a general partner or the proprietor, respectively. + (3) For a municipality, state, federal, or other public agency, the application shall be signed by either a principal executive officer or a ranking elected official. For purposes of this paragraph, a principal executive officer of a federal agency includes the chief executive officer of the agency, or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., regional administrator of the EPA). WO .v OW 1W ,w MW r MW TCEQ-200221nstructions (03/05/2008) Page 6 ... no Texas Commission on Environmental Quality General Permit Payment Submittal Form $325 for a paper Construction NOI Application Fee ... Use this form to submit your Application Fee only if you are mailing your payment. *Complete items 1 through 5 below: • Staple your check in the space provided at the bottom of this document. - *Do not mail this form with your NOT form. •Do not mail this form to the same address as your NOT. Mail this form and your check to: BY REGULAR U.S. MAIL BY OVERNIGHT/EXPRESS MAIL Texas Commission on Environmental Quality Texas Commission on Environmental Quality WW Financial Administration Division Financial Administration Division Cashier's Office, MC-214 Cashier's Office, MC-214 P.O. Box 13088 12100 Park 35 Circle Austin, TX 78711-3088 Austin, TX 78753 Fee Code: GPA General Permit: TXR150000 1. Check / Money Order No: 2. Amount of Check/Money Order: 3. Date of Check or Money Order: 4. Name on Check or Money Order: 5. NOI INFORMATION If the check is for more than one NOT, list each Project/Site (RE) Name and Physical Address exactly as provided on the NOT. DO NOT SUBMIT A COPY OF THE NOT WITH THIS FORM AS IT COULD CAUSE DUPLICATE PERMIT ENTRIES. See Attached List of Sites (If more space is needed, you may attach a list.) _ Project/Site (RE) Name: "N Project/Site (RE) Physical Address: w go 10 TCEQ-20134 (3/05/2008) Staple Check In This Space Page 1 ow Notice of Change (NOC) to an Authorization TCEQ Office Use Only Permit No.: for Storm Water Discharges Associated with RN: Construction Activity under TPDES General CN: TCEQ Permit (TXR150000) ***** IMPORTANT ***** PLEASE READ THE FOLLOWING INFORMATION AND INSTRUCTIONS BEFORE FILLING OUT THIS FORM. The form will be returned for one of the following reasons: 1) the permit number is not provided, invalid, or no longer active, r 2) a wet ink signature of person meeting signatory requirements for permittee is not provided, 3) the current permittee is not the applicant, and; 4) a requested change in operator name is not a legal name change. �r THIS FORM CANNOT BE USED FOR A CHANGE IN OPERATOR. REFER TO YOUR GENERAL PERMIT. { What is the Permit Number of the authorization to be changed? I TXR15 A. APPLICANT INFORMATION: Search Central Registry at www4.tcea,state.tx.us/croub 1. Operator (Permittee) a. What is the full Legal Name of the current Operator as on the authorization? .. I b. What is the TCEQ Central Registry Customer Number assigned to this Operator? I CN 2. Permitted Site (required) What is the TCEQ Central Registry Regulated Entity Number assigned for this permitted site? RN B. REQUESTED CHANGE TO PERMITTED INFORMATION What information has changed or needs corrected? (Check one or more of the sections being updated and enter the new information in the corresponding section of this form.) ©Operator Legal Name Change with Texas Secretary of State (TX SOS). Go to Section 1 &/or 2 as applicable. (Note: Permits are not transferable. If a change in entity has occurred, this NOC is not attainable.) F1 Address and contact information for Operator, Billing for Annual Fee, or Discharge Monitoring Report forms. © Site Information (Regulated Entity) (Note: Permits under a general permit are site specific. If a change in site location has occurred, this NOC is not attainable.) General Characteristics relating to the regulated activity. 1. OPERATOR LEGAL NAME CHANGE a. What is the NEW active Legal Name with TX SOS or on other legal document? INew Legal Name: b. What is the TX SOS Filing Number for us to confirm this official name change? (This is only applicable to Limited Partnership or Corporations.) 12. ADDRESS & CONTACT INFORMATION CHANGE a. What mailing address and/or contact information has changed? (check one or more as applicable) Operator for permit correspondence Site (RE) Mailing Address and contact information Billing address/contact for Receiving Annual Fee Reporting address/contact for Receiving Discharge Monitoring Statement Reports (DMRs) ' b. If you selected more than one, is the information to be updated the same for each selection? Yes — Provide the updated information in the fields below. No — Attachment 1 of the NOC is attached to this form, to provide the different addresses. ATTN or C/O: Address: I Suite No./Bldg. No./Mail Code: w� City: I State: I Zip Code: Country Mailing Information (if outside USA). Country Code: Postal Code: Phone No.: ( ) Ext: I Fax No.: ( ) I E-Mail: TCEQ- 20391 (07/13/2007) .o Page I 3. REGULATED ENTITY (RE) SITE INFORMATION CORRECTION a. Is this a change to the location of the pennitted activity? ❑Yes - this requested chance will not be processed since the authorizations are site specific. [:]No — go to next question. w b. New or Corrected Name of Project or Site c. Updated Physical Address (new 911 address): Street Number: I Street Name: I Bldg/Ste No. City: I ZIP Code: I County (Counties if >1): d. Update or Corrected location access description, if no physical address (Street Number & Street Name): e. Corrected Latitude: N Corrected Longitude: W 4. CHANGE IN CHARACTERISTICS PROVIDED ON ORIGINAL FORM ..� Identify the specific change and provide the updated information. If an attachment is need, please reference it below. W1 C. APPLICATION CONTACT If TCEQ needs additional information regarding this application, who should be contacted? 1. Name: Title: Company: 2. Phone No.: ( ) Ext: Fax No.: ( ) E-Mail: .. W. CERTIFICATION Operator Certification: Typed or printed name (REQUIRED) Title (REQUIRED) certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system 'w designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my ' knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. I further certify that I am authorized under 30 Texas Administrative Code §305.44 to sign and submit this document, and can provide documentation in proof of such authorization upon request. 1-0 Signature: (Use blue ink) (REQUIRED) .w •w Wd aW Date: (REQUIRED) TCEQ- 20391 (07/13/2007) .o Page 2 ao no Attachment 1 to a NOC Form for Providing Different Address & Contact Information Related to a Specific Permit under General Permit TXR150000 What is the Permit No.? TXR15 .. (REQUIRED) ADDITIONAL ADDRESS & CONTACT INFORMATION Fill in the changes as applicable. Incomplete and invalid addresses will not be used. Verify mailing addresses at USPS.com. .. Operator ATTN or C/O: .s I Address: Suite No./Bldg. No./Mail Code: { City. I State: I Zip Code: Country Mailing Information (if outside USA). Country Code: Postal Code: Phone No.: ( ) Ext: I Fax No.: ( ) I E-Mail: Billing Address for Receiving Annual Fee Statement ATTN or C/O: Address: City: I State: .� Country Mailing Information (if outside USA). Phone No.: ( ) Ext: I Fax No.: Site (RE) Mailing Address ATTN or C/O: Suite No./Bldg. No./Mail Code: Zip Code: Country Code: Postal Code: I E-Mail: Address: I Suite No./Bldg. No./Mail Code: *� City: I State: I Zip Code: ICountry Mailing Information (if outside USA). Country Code: Postal Code: IPhone No.: ( ) Ext: I Fax No.: ( ) I E-Mail: M .. ww wi TCEQ- 20391 NOC Attachment 1 (07/13/2007) Page I M Notice of Change (NOC) to an Authorization for Storm Water Discharges Associated with Construction Activity under TPDES General Permit (TXR150000) General Information and Instructions GENERAL INFORMATION Where to Send the Notice of Change (NOC): BY REGULAR U.S. MAIL BY OVERNIGHT/EXPRESS MAIL Texas Commission on Environmental Quality Texas Commission on Environmental Quality Storm Water Processing Center (MC228) Storm Water Processing Center (MC228) P.O. Box 13087 12100 Park 35 Circle Austin, TX 78711-3087 Austin, TX 78753 TCEQ Contact list: Application Processing Questions relating to the status and form requirements: 512/239-3700 or email swpermit@tceq.state.tx.us Technical Questions relating to the general permit: 512/239-4671 Environmental Law Division: 512/239-0600 Records Management for obtaining copies of forms submitted to TCEQ: 512/239-0900 Information Services for obtaining reports from program data bases (as available): 512/239-DATA (3282) Financial Administration's Cashier's office: 512/239-0357 or 512/239-0187 Notice of Change Process: When your NOC is received by the program, the form will be processed as follows: 1. Administrative Review: The form will be reviewed to ensure the request is from the permittee (operator) on the authorization, the permit is active and initial coverage was acknowledged. Each item on the form will be reviewed for a complete response that qualifies for a NOC. In addition, the operator's legal name change must be verified with Texas Secretary of State (if applicable). The address(s) on the form must be verified with the US Postal service as an address receiving regular mail delivery. Never give an overnight/express mailing address. If an item is incomplete or not verifiable as indicated above, the operator may be notified by letter, phone call or email. In some instances as noted at the beginning of the form, the request may simply be returned. 2. NOC Confirmation: An updated Acknowledgment Certificate will be mailed to the operator only if the NOC is to change information provided on the acknowledgment certificate. The original coverage effective date will not change. General Permit (Your Permit) You may view and print your general permit on the TCEQ web site www.tcea.state.tx.us. Enter the general permit number as the key word in the search box to locate the specific web page. General Permit Forms The Notice of Intent (NOI), Notice of Termination (NOT), and Notice of Change (NOC) with instructions are available in Adobe Acrobat PDF format on the TCEQ web site www.tceq.state.tx.us. Change in Operator An authorization under the general permit is not transferable. If the operator of the regulated entity changes, the present permittee must submit .n a Notice of Termination and the new operator must submit a Notice of Intent. The NOI must be submitted not later than 10 days prior to the change in Operator status. Note that the NOT is effective on the postmarked date. It may be necessary to not terminate the existing permit until coverage by the new entity is confirmed. TCEQ Central Registry Core Data Form ..r The Core Data Form has been incorporated into this form. Do not send a core data form to TCEQ. You can find the information on the Central Registry web site at www4.tcea.state.tx.us/cruub. You can search by the Regulated Entity (RN), Customer Number (CN) or Name (Permittee), or by your permit number under the search field labeled "Additional ID". .+ The Customer (Permittee) is responsible for providing consistent information to the TCEQ, and for updating all CN and RN data for all associated authorizations as changes occur. For General Permits, a Notice of Change form must be submitted to the program area for approval to update the CN and RN data in central registry. ow M TCEQ- 20391 NOC Instructions (07/13/2007) Page I .r no INSTRUCTIONS FOR FILLING OUT THE NOC FORM A. Applicant Information (Operator) 1. Provide the current permittee(s) full legal name as on the permit. b. Provide the TCEQ Issued Customer Number (CN) for the entity. Go to http://www4.tceq.state,tx.us/crpub/ to locate your CN. . w If the name(s) provided do not match the current permittee name(s), this form will be returned. It is the responsibility of the permittee(s) to comply with the general permit. Note: If a change is being made to the CN and the CN has other TCEQ authorization types, it is the entity's responsibility to update those authorizations .r at the same time. If an authorization has been cancelled or terminated, the name can not be changed on the permit. Because of this, a new CN may be issued for the new name. 2. Provide the TCEQ Issued Regulated Entity number assigned for this permitted activity. Go to http://www4.tceq.state.tx.us/crr)ub/ to locate your CN. If the site has changed or the information provided indicates a new location, this form will be returned. It is the responsibility of the (permittees) to comply with the general permit. B. REQUESTED CHANGE TO PERMITTED INFORMATION Check one or more of the available options indicating the information in the form that is to be updated. Provide the updated information in Section I for Legal Name Change, Section 2 for Address & Contact Information Change, Section 3 for Regulated Entity Site Information Change, or Section 4 for General Characteristics Change, as applicable. 1. LEGAL NAME CHANGE Provide the new legal name. If the entity is a Limited Partnership or Corporation, the name change must be verifiable with Texas Secretary of State. The TX SOS filing number must be provided to verify only a name change occurred. You may contact the SOS at 512/463-5555, for more information related to filing in Texas. If filed in the county where doing business, provide a copy of the legal documents showing the legal name change. Legal name changes of a Corporation and Limited Partnership will be verified with Texas Secretary of State. If the entity is filed as a new entity with a new filing number, then the change cannot be made through a NOC. The permits are not transferable. If the operator changes, the old entity must terminate their permit and the new entity must submit a form for a new permit. 2. ADDRESS & CONTACT INFORMATION CHANGE Indicate the type of address and contact information that has changed from the original NOI or last NOC submitted to TCEQ. If the address and/or contact information is the same for all types, then check each type and enter the information in the fields on the form. If some types have different information, then use the NOC ATTACHMENT 1. The permit number MUST be written on ATTACHMENT I to indicate it is a part of the NOC form for the permit being updated. The updates cannot be made without reference to the submitted NOC form. Mailing Address The address MUST BE verifiable with the US Postal Service at www.usps.com., for regular mail delivery (not overnight express mail). If you find that the address is not verifiable using the USPS web search, please indicate the address is used by the USPS for regular mail delivery. Failure to provide a valid mailing address will delay or prohibit us from updating the permit. Please note that address updates relating to a general permit authorization can ONLY be made through a Notice of Change. Address changes submitted through any other form can not be processed. 3. REGULATED ENTITY (RE) SITE INFORMATION CORRECTION The NOC form is only for use to update or correct information submitted on the original application or last NOC for the authorization. The authorization .w under a general permit is site specific. If this change is related to a new location, a Notice of Change is not attainable. Provide the updated site name, updated site addresses, and/or corrected latitude and longitude, as applicable to your NOC request. A new physical address for an existing location is usually the result of a newly assigned 911 address for emergencies. If providing a corrected latitude and longitude, enter the latitude and longitude of the site in either degrees, minutes, and seconds or decimal form. For help obtaining the latitude and longitude, go to: www.tceo.state.tx.us/ais/dr"iew.html or www.terraserver.microsoft.com/advflnd.asi)x. 4. GENERAL CHARACTERISTIC Indicate the change to information originally supplied. For example if the number of acreas of area disturbed has changed, then state: "The number acres of area disturbed has increase to 40 acres." C. Application Contact wma Provide the name, title and communication information of the person that TCEQ can contact for additional information regarding this application. TCEQ- 20391 NOC Instructions (07/13/2007) Page 2 A D. CERTIFICATIONS The certification must bear an original signature of a person meeting the signatory requirements specified under 30 Texas Administrative Code JAC) .r §305.44. IF YOU ARE A CORPORATION: The regulation that controls who may sign an NOI or similar form is 30 Texas Administrative Code §305.44(a)(1) (see below). According to "' this code provision, any corporate representative may sign an NOT or similar form so long as the authority to sign such a document has been delegated to that person in accordance with corporate procedures. By signing the NOI or similar form, you are certifying that such authority has been delegated to you. The TCEQ may request documentation evidencing such authority. "' IF YOU ARE A MUNICIPALITY OR OTHER GOVERNMENT ENTITY: The regulation that controls who may sign an NOT or similar form is 30 Texas Administrative Code §305.44(a)(3) (see below). According to this code provision, only a ranking elected official or principal executive officer may sign an NOT or similar form. Persons such as the City Mayor or County Commissioner will be considered ranking elected officials. In order to identify the principal executive officer of your government entity, it may No be beneficial to consult your city charter, county or city ordinances, or the Texas statute(s) under which your government entity was formed. An NOT or similar document that is signed by a government official who is not a ranking elected official or principal executive officer does not conform to §305.44(a)(3). The signatory requirement may not be delegated to a government representative other than those identified in the regulation. By signing vo the NOT or similar form, you are certifying that you are either a ranking elected official or principal executive officer as required by the administrative code. Documentation demonstrating your position as a ranking elected official or principal executive officer may be requested by the TCEQ. If you have any questions or need additional information concerning the signatory requirements discussed above, please contact the Texas Commission on Environmental Quality's Environmental Law Division at 512/239-0600. 30 Texas Administrative Code §305.44. Signatories to Applications. (a) All applications shall be signed as follows. (1) For a corporation, the application shall be signed by a responsible corporate officer. For purposes of this paragraph, a responsible corporate officer means a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision -making functions for the corporation; or the manager of one or more manufacturing, production, or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25 million (in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Corporate procedures governing authority to sign permit or post -closure order applications may provide for assignment or delegation to applicable corporate positions rather than to specific individuals. (2) For a partnership or sole proprietorship, the application shall be signed by a general partner or the proprietor, respectively. ..n (3) For a municipality, state, federal, or.other public agency, the application shall be signed by either a principal executive officer or a ranking electe4 official. For purposes of this paragraph, a principal executive officer of a federal agency includes the chief executive officer of the agency, or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., regional administrator of the EPA). an no so .o ow aw TCEQ- 20391 NOC Instructions (07/13/2007) UW Page 3 No on 'V_1_ Notice of Termination (NOT) TCEQ Office Use Only Permit No.: for Authorizations under RN: TPDES General Permit TXR150000 CN: TCEQ Sign up now for on line NOT at http://www.tceq.state.tx.us/permitting/steers/steers.htmi 7 Get your NOT Confirmation letter immediately after submitting the on line NOT form. What is the permit number to be terminated? ,,,Processing will be delayed without the permit number. TXR15 A. OPERATOR (applicant) ' 1. What is the Customer Number (CN) issued to this entity? CN 2. What is the full Legal Name of the current permittee? TThis must be the current permittee of the permit to be terminated. 3. What is the applicant's mailing address as recognized by the US Postal Service? TAddress: I Suite No./Bldg. No./Mail Code: City: { State: I ZIP Code: Country Mailing Information (if outside USA). Country Code: Postal Code: 4. Phone No.: ( ) Extension: T5. Fax No.: ( ) E-mail Address: B. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE 1. What is the TCEQ Issued RE Reference Number (RN)? RN j2. Name of Project or Site as currently permitted): (example: phase and name of subdivision or name of project that's unique to the site) fir& Physical Address of Project or Site as currently permitted: (enter in spaces below) Street Number: I Street Name: City: ZIP Code: I County (Counties if>1): If no physical address (Street Number & Street Name), provide the written location access description to the site: I C. REASON FOR TERMINATION ,Check the reason for termination: ❑ Final stabilization has been achieved on all portions of the site that are the responsibility of the Operator and all silt fences and other temporary erosion controls have either been removed, or scheduled for removal as defined in the SWP3. ❑ Another permitted Operator has assumed control over all areas of the site that have not been finally stabilized, and temporary erosion controls that have been defined in the SWP3 have been transferred to the new Operator. ❑ The activity is now authorized under an alternate TPDES permit. ❑ The activity never began at this site that is regulated under the general permit. D. CERTIFICATION Typed or printed name Title f,ertify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed o assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the ystern, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for cnowing violations. rfurther certify that I am authorized under 30 Texas Administrative Code §305.44 to sign and submit this document, and can provide documentation in roof of such authorization upon request. ,iignature: (Use blue ink) Date: TCEQ-20023 (02/0612007) ow Page I MW No Notice of Termination (NOT) for Authorizations under TPDES General Permit TXR150000 General Information and Instructions GENERAL INFORMATION Where to Send the Notice of Intent (NO[): _ BY REGULAR U.S. MAIL BY OVERNIGHT/EXPRESS MAIL Texas Commission on Environmental Quality Texas Commission on Environmental Quality Storm Water Processing Center (MC228) Storm Water Processing Center (MC228) P.O. Box 13087 12100 Park 35 Circle 9W Austin, TX 7871 1-3087 Austin, TX 78753 TCEQ Contact list: Application Processing Questions relating to the status and form requirements: 512/239-4671 .,, Technical Questions relating to the general permit: 5121239-4671 Environmental Law Division: 512/239-0600 Records Management for obtaining copies of forms submitted to TCEQ: 51'2/239-0900 Information Services for obtaining reports from program data bases (as available): 512/239-DATA (3282) mo Financial Administration's Cashier's office: 512/239-0357 or 512/239-0187 Notice of Termination Process: A Notice of Termination is effective on the date postmarked for delivery to TCEQ. ■e When your NOT is received by the program, the form will be processed as follows: 1. Administrative Review: The form will be reviewed to confirm the following: • the permit number is provided • the permit is active and has been approved • the entity terminating the permit is the current permittee • the site information matches the original permit record • the form has the required original signature with title and date 2. Notice of Deficiency: If an item is incomplete or not verifiable as indicated above, a phone call will be made to the applicant to clear the deficiency. A letter will not be sent to the permittee if unable to process the form. 3. Confirmation of Termination: A Notice of Termination Confirmation letter will be mailed to the operator. General Permit (Your Permit) Coverage under the general permit begins 48 hours after a completed NOI is postmarked for delivery to the TCEQ. You should have a copy of your ,W general permit when submitting your application. You may view and print your permit for which you are seeking coverage, on the TCEQ web site www. tcea.state. tx.us General Permit Forms The Notice of Intent (NOI), Notice of Termination (NOT), and Notice of Change (NOC) with instructions are available in Adobe Acrobat ti PDF format on the TCEQ web site www.tceastate.tx.us. Change in Operator An authorization under the general permit is not transferable. If the operator or owner of the regulated entity changes, the present permittee must submit a Notice of Termination and the new operator must submit a Notice of Intent. The NOT and NOI must be submitted not later than 10 days prior to the change in Operator status. TCEQ Central Registry Core Data Form The Core Data Form has been incorporated into this form. Do not send a core data form to TCEQ. After final acknowledgment of coverage under the general permit, the program will assign a Customer Number (CN) and Regulated Entity Number (RN). For Construction Permits, a new RN will be assigned for each Notice of Intent filed with TCEQ, since construction project sites can overlap with other Customers. The RN assigned to your construction project will not be assigned to any other TCEQ authorization. s You can find the information on the Central Registry web site at www4.tcea.state_tx.us/crmub. You can search by the Regulated Entity (RN), Customer Number (CN) or Name (Permittee), or by your permit number under the search field labeled "Additional ID". Capitalize all letters in the permit number. TCEQ-20023 Instructions (02/06/2007) Page 1 .r The Customer (Permittee) is responsible for providing consistent information to the TCEQ, and for updating all CN and RN data for all authorzations as changes occur. For General Permits, a Notice of Change form must be submitted to the program area. no Annual Water Quality Fee: This fee is assessed to operators with an active authorization under the general permit on September I of each year. The operator will receive an invoice for payment of the annual fee in November of each year. The payment will be due 30 days from the invoice date. A 5% penalty will be assessed if the payment is received by TCEQ after the due date. Annual fee assessments cannot be waived as long as the authorization no under the general permit is active on September 1. It's important for the operator to submit a Notice of Termination (NOT) when coverage under the general permit is no longer required. A NOT is effective on the postmarked date of mailing the form to TCEQ. It is recommended that the NOT be mailed using a method that documents the date a r mailed and received by TCEQ. • Mailed Payments: ..r You must return your payment with the billing coupon provided with the billing statement. • ePAY Electronic Payment: Go to www.tcecl.state.tx.us/evav You must enter your account number provided at the top portion of your billing statement. Payment methods include Mastercard, Visa, and electronic check payment (ACH). A transaction over $500 can only be made by ACH. INSTRUCTIONS FOR FILLING OUT THE NOT FORM A. OPERATOR (current permittee.) 1. TCEQ Issued Customer Number (CN) .r 2. Legal Name of Operator The operator must be the same entity as previously submitted on the original Notice of Intent for the permit number provided. 3.Operator Mailing Address Provide a complete mailing address for receiving mail from the TCEQ. Update the address if different than previously submitted in the Notice of Intent or Notice of Change. 4. Phone Number, Fax Number, and E-mail Address Provide updated contact information. B. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE 1. Regulated Entity Reference Number (RN) 2. Site/Project Name/Regulated Entity .r Provide the name of the site as previously submitted in the Notice of Intent for the permit number provided. 3. Site/Project (RE) Physical Address Provide the physical address or location access description as previously submitted for the permit number provided. C. REASON FOR TERMINATION Indicate the reason for terminating the permit by checking one of the options. If the reason is not listed then provide an attachment that explains the reason for termination. Please read your general permit carefully to determine when to terminate your permit. Permits will not be reactivated after submitting a termination form. The termination is effective on the date postmarked for delivery to TCEQ. D. CERTIFICATIONS The certification must bear an original signature of a person meeting the signatory requirements specified under 30 Texas Administrative Code JAC) §305.44. un IF YOU ARE A CORPORATION: r The regulation that controls who may sign an NOI or similar form is 30 Texas Administrative Code §305.44(a)(1) (see below). According to this code provision, any corporate representative may sign an NOI or similar form so long as the authority to sign such a document has been delegated to that person in accordance with corporate procedures. By signing the NOI or similar form, you are certifying that such authority has been delegated to you. The TCEQ may request documentation evidencing such authority. .o IF YOU ARE A MUNICIPALITY OR OTHER GOVERNMENT ENTITY: The regulation that controls who may sign an NOI or similar form is 30 Texas Administrative Code §305.44(a)(3) (see below). According to „r this code provision, only a ranking elected official or principal executive officer may sign an NOI or similar form. Persons such as the City Mayor or County Commissioner will be considered ranking elected officials. In order to identify the principal executive officer of your government entity, it may be beneficial to consult your city charter, county or city ordinances, or the Texas statute(s) under which your government entity was formed. An NOI or similar document that is signed by a government official who is not a ranking elected official or principal executive officer does not conform to 00 TCEQ-20023 Instructions (02/06/2007) MW Page 2 No §305.44(a)(3). The signatory requirement may not be delegated to a government representative other than those identified in the regulation. By signing the NOI or similar form, you are certifying that you are either a ranking elected official or principal executive officer as required by the administrative as code. Documentation demonstrating your position as a ranking elected official or principal executive officer may be requested by the TCEQ. If you have any questions or need additional information concerning the signatory requirements discussed above, please contact the Texas Commission on Environmental Quality's Environmental Law Division at 512/239-0600. �.r 30 Texas Administrative Code §305.44. Signatories to Applications. (a) All applications shall be signed as follows. (1) For a corporation, the application shall be signed by a responsible corporate officer. For purposes of this paragraph, a responsible corporate officer means a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision -making functions for the corporation; or the manager of one or more manufacturing, production, or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25 million (in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Corporate procedures governing authority to sign permit or post -closure order applications may provide for assignment or delegation to applicable corporate positions rather than to specific individuals. (2) For a partnership or sole proprietorship, the application shall be signed by a general partner or the proprietor, respectively. (3) For a municipality, state, federal, or other public agency, the application shall be signed by either a principal executive officer or a ranking elected official. For purposes of this paragraph, a principal executive officer of a federal agency includes the chief executive officer of the agency, or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., regional - administrator of the EPA). no MW no no so .r MW .o MW .n TCEQ-20023 Instructions (02/06/2007) Page 3 .. low _. .4 .. Completing the Notice of Termination for Storm Water Discharges Associated with Construction Activity under the TPDES Construction General Permit (TXR150000) Who May File a Notice of Termination (NOT) Form Permittees disturbing 5 acres or more (or part of a larger common plan of development or sale disturbing 5 acres or more) who are presently covered under the Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit must submit a Notice of Termination (NOT) when final stabilization has been achieved on all portions of the site that is the responsibility of the permittee; or another permitted operator has assumed control over all areas of the site that have not been finally stabilized and all silt fences and other temporary erosion controls have either been removed, scheduled for removal as defined in the SWP3, or transferred to a new operator if the new operator has sought permit coverage. Erosion controls that are designed to remain in place for an indefinite period, such as mulches and fiber mats, are not required to be removed or scheduled for removal. Final Stabilization occurs when either of the following conditions are met: (a) All soil disturbing activities at the site have been completed and a uniform (e.g, evenly distributed, without large bare areas) perennial vegetative cover with a density of 70% of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures (such as the use of riprap, gabions, or goetextiles) have been employed. (b) For individual lots in a residential construction site by either: (1) the homebuilder completing final stabilization as specified in condition (a) above; or (2) the homebuilder establishing temporary stabilization for an individual lot prior to the time of transfer of the ownership of the home to the buyer and after informing the homeowner of the need for, and benefits of, final stabilization. (c) For construction activities on land used for agricultural purposes (e.g. pipelines across crop or range land), final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to a surface water and areas which are not being returned to their preconstruction agricultural use must meet the final stabilization conditions of condition (a) above. A. TPDES Permit Number Provide the TPDES permit number assigned to the operator of the construction site. B. Construction Site Operator Information Customer Reference Number This number designates the operator's status as a TCEQ "customer" —in other words, an individual or business that is involved in an activity that we regulate_ We assign each customer a number that begins with "CN," followed by nine digits. This is not a permit number, registration number, or license number. In the remainder of this section, we will use "this customer" to mean the operator for Part B of the form. ■ If this customer has not been assigned a Customer Reference Number, leave the space for the Customer Reference Number blank. ■ If this customer has already been assigned this number, enter the operator's Customer Reference Number. ■ Do not enter a permit number, registration number, or license number in place of the Customer Reference Number. Name Enter the legal name of this customer as authorized to do business in Texas. Include any abbreviations (LLC, Inc., etc.). Mailing Address Enter a central and general mailing address for this customer to receive mail from the TCEQ. For example, if this customer is a large company, this address might be the corporate or regional headquarters. On the other hand, for a smaller business, this address could be the same as the site address. if this is a street address, please follow US Postal Service standards. In brief, these standards require this information in this order: ■ the "house" number —for example, the 1401 in 1401 Main St ■ if there is a direction before the street name, the one- or two -letter abbreviation of that direction (N, S, E, W, NE, SE, SW, or NW) ■ the street name (if a numbered street, do not spell out the number —for example, 6th St, not Sixth St) ■ an appropriate abbreviation of the type of street —for example, St, Ave, Blvd, Fwy, Exwy, Hwy, Cr, Ct, Ln ■ if there is a direction after the street name, the one - or two -letter abbreviation of that direction (N, S, E, W, NE, SE, SW, or NW) ■ if there is a room number, suite number, or company mail code City, State, and ZIP Code Enter the name of the city, the two -letter USPS abbreviation for the state (for example, TX), and the ZIP Code. (Enter the full ZIP+4 if you know it.) 4 TCEQ-20023-Instructions (09/02) Page 1 of 2 Country Mailing Information = If this address is outside the United States, enter the territory name, country code, and any non -ZIP mailing codes or other non—U.S. Postal Service features here. If this address is inside the United States, leave these spaces blank. Phone Number and Extension This number should correspond to this customer's mailing address given earlier. Enter the area code and phone number here. Leave "Extension" blank if this customer's phone system lacks this feature. Fax Number This number should correspond to this customer's mailing address given earlier. Enter the area code and fax number here. E-mail Address -- As with the mailing address, this should be a general address that is appropriate for e-mail to this customer's central or regional headquarters, if applicable. C. Project / Site Information Regulated Entity Reference Number This number designates this site's status as a TCEQ "regulated entity" —in other words, a location where an activity that we regulate occurs. We assign each regulated entity a number that begins with "RN," followed by nine digits. This is not a permit number, registration number, or license number. ■ If this site has not been assigned a Regulated Entity Reference Number, leave the space for the Regulated Entity Reference Number blank. ■ if this site has already been assigned this number, enter the Regulated Entity Reference Number. ■ Do not enter a permit number, registration number, or license number in place of the Regulated Entity Reference Number. Name Enter the name by which you want this site to be known to the TCEQ. Physical Address Enter the physical address of the site itself. TCEQ staff should be able to use this address to find the site. ` Location Description Enter a physical description of the location of the site based on highway intersections and/or permanent landmarks. City, County, and ZIP Code Enter the name of the city, the county, and the ZIP Code. (Enter the full ZIP+4 if you know it.) D. Contact Give all the relevant information for the person whom TCEQ can contact if there are questions about any of the information on this form —perhaps the same person who completed the form. E. Certification The operator must sign and date this statement to validate this NOL Be sure to enter the full legal name of the person signing the form and the relevant title —for example, "Operator," "Operator's attorney," or "Senior Site Manager." Use the "Prefix" blank for such titles as Dr., Mr., or Ms., as desired. Use the "Suffix" blank for such designations as Ph.D., Jr., Sr., III, or J.D., if applicable. For a corporation, the application shall be signed by a responsible corporate officer. A responsible corporate officer means a president, secretary, treasurer, or vice- president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision -making functions for the corporation; or the manager of one or more manufacturing, production, or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25 million (in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Corporate procedures governing authority to sign permit applications may provide for assignment or delegation to applicable corporate positions rather than to specific individuals. For a partnership or sole proprietorship, the application shall be signed by a general partner or the proprietor, respectively. For a municipality, state, federal, or other public agency, the application shall be signed by either a principal executive officer or a ranking elected official. For purposes of this application, a principal executive officer of a federal agency includes the chief executive officer of the agency, or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g. regional administrator of the United States Environmental Protection Agency). Questions? If you have questions about any of the information on this form, contact our Storm Water Program at 512/239-4671 or look for "Storm Water" on our Web site: www.tceq.state.tx.us .. TCEQ-20023-Instructions (09/02) Page 2 of 2 WO r WO no No no no no �.r r MW no No MW ur Exhibit C Storm Sewer Improvement and Erosion Control Plans 1- Inlet Protection 2- Silt Fence 3- Stabilized Construction Entrance 4- Erosion Control Plans WO Storm Drain Inlet Protection li Click here to comment on this fact sheet Minimum Measure: Construction Site Stormwater Runoff Control Subcategory: Sediment Control Description ~��* Storm drain inlet protection measures prevent soil and debris from Y` - v entering storm drain drop inlets. These measures are usually temporary and are implemented before a site is disturbed. r x There are several types of inlet protection: Excavation around the perimeter of the drop inlet: Excavating a a small area around an inlet creates a settling pool that removes .. sediments as water is released slowly into the inlet through small holes protected by gravel and filter fabric. Fabric barriers around inlet entrances: Erecting a barrier made of a porous fabric around an inlet creates a shield against sediment There are many different ways to while allowing water to flow into the drain. This barrier slows runoff prevent sediment from entering storm while catching soil and other debris at the drain inlet. drains. Block and gravel protection: Standard concrete blocks and gravel can be used to form a barrier to sediments that permits water runoff to flow through select blocks laid sideways. Sandbags can also be used to create temporary sediment barriers at inlets. For permanent inlet protection after the surrounding area has been stabilized, sod can be installed. This permanent measure is an aesthetically pleasing way to slow stormwater near drop inlet entrances and to remove sediments and other pollutants from runoff. Applicability All temporary inlet protection should have a drainage area no greater than 1 acre per inlet. Temporary controls should be constructed before the surrounding landscape is disturbed. Excavated drop inlet protection and block and gravel inlet protection are applicable to areas of high flow, where drain overflow is expected. Fabric barriers are recommended for smaller, flatter drainage areas (slopes less than 5 percent leading to the drain). Temporary drop inlet control measures are often used in sequence or with other erosion control techniques. Siting and Design Considerations With the exception of sod drop inlet protection, install these controls before any soil disturbance in the drainage area. Excavate around drop inlets at least 1 foot deep (2 feet maximum), excavating a volume of at least 35 yd3 per acre disturbed. Side slopes leading to the inlet should be no steeper than 2:1. Design the shape of the excavated area such that the dimensions fit the area from which stormwater is expected to drain. For example, the longest side of an excavated area should be along the side of the inlet expected to drain the largest area. .. Stake fabric inlet protection close to the inlet to prevent overflow onto unprotected soils. Stakes should be at least 3 feet long and spaced no more than 3 feet apart. Construct a frame for fabric support during overflow periods, and bury it at least 1 foot below the soil surface. It should rise to a height no greater than 1.5 feet above the ground. The top of the frame and fabric should be below the downslope ground elevation to keep runoff from bypassing the inlet. Block and gravel inlet barriers should be at least 1 foot high (2 feet maximum). Do not use mortar. Lay the bottom row of blocks at least 2 inches below the soil surface, flush against the drain for stability. Place one block in the bottom row on each side of the inlet on its side to allow drainage. Place 1/2-inch wire mesh over all block openings to prevent gravel from entering the inlet. Place gravel (3/4 to 1/2 inch in diameter) outside the block structure at a slope no greater than 2:1. Do not consider sod inlet protection until the entire surrounding drainage area is stabilized. Lay the sod so that it extends at least 4 feet from the inlet in each direction to form a continuous mat around the inlet. Lay the sod strips perpendicular to the direction of flows. Stagger them so that the strip ends are not aligned. The slope of the sodded area should not be steeper than 4:1 approaching the drop inlet. Limitations To increase the effectiveness of these practices, use them with other measures, such as small impoundments or sediment traps (USEPA, 1992). In general, stormwater inlet protection measures are practical for areas receiving relatively clean runoff that is not heavily laden with sediment. They are designed to handle drainage from areas less than 1 acre (CASQA, 2003). To prevent clogging, storm drain control structures must be maintained frequently. If sediment and other debris clog the water intake, drop inlet control measures can actually cause erosion in unprotected areas. Maintenance Considerations Check all temporary control measures after each storm event. To maintain the capacity of the settling pools, remove accumulated sediment from the area around the drop inlet (excavated area, area around fabric barrier or block structure) when the capacity is reduced by half. Remove additional debris from the shallow pools periodically. The weep holes in excavated areas around inlets can become clogged, preventing water from draining out of the pools. If that happens, it might be difficult and costly to unclog the intake. Effectiveness Excavated drop inlet protection can be used to improve the effectiveness and reliability of other sediment .. traps and barriers, such as fabric or block and gravel inlet protection. The effectiveness of inlet protection alone is low for erosion and sediment control, long-term pollutant removal, and habitat and stream protection. WO Cost Considerations The cost of implementing storm drain inlet protection measures varies depending on the control measure used. Initial installation costs range from $50 to $150 per inlet depending on the materials used, with an average cost of $100 (USEPA, 1993). Maintenance costs can be high (up to 100 percent of the initial construction cost annually) because of the frequent inspection and repair needs. The Southeastern Wisconsin Regional Planning Commission has estimated the cost of installing inlet protection devices at $106 to $154 per inlet (SEWRPC, 1991). References California Stormwater Quality Association ((-ASQA). 2003. Stormwater Best Management Practice Handbook: Construction. [http://www.cabmphandbooks.com/Construction,asp iP!JT.Pie ]. Accessed May 8, 2006. SEWRPC (Southeastern Wisconsin Regional Planning Commission). 1991. Costs of Urban Nonpoint Source Water Pollution Control Measures. Technical report no. 31. Southeastern Wisconsin Regional Planning Commission, Waukesha, WI. Smolen, M.D., D.W. Miller, L.C. Wyatt, J. Lichthardt, and A.L. Lanier. 1988. Erosion and Sediment Control Planning and Design Manual. North Carolina Sedimentation Control Commission; North Carolina '7 Department of Environment, Health, and Natural Resources; and Division of Land Resources, Land .. Quality Section, Raleigh, NC. USEPA (U.S. Environmental Protection Agency). 1992. Stormwater Management for Industrial Activities: Developing Pollution Prevention Plans and Best Management Practices. EPA 832-R-92-006. U.S. Environmental Protection Agency, Office of Water, Washington, DC. USEPA (U.S. Environmental Protection Agency). 1993. Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters. EPA 840-B-92-002. U.S. Environmental Protection Agency, Office of Water, Washington, DC. wM Silt Fences Click here to comment on this fact sheet Minimum Measure: Construction Site Stormwater Runoff Control Subcategory: Sediment Control Description s Silt fences are used as temporary perimeter controls around sites where construction activities will disturb the ra soil. They can also be used around the interior of the site. Auk - between 1... A silt fence consists of a length of filter fabric stretched, _ anchoring posts spaced at regular intervals along the site at low/downslope areas. The filter fabric -`- �K- `� should be entrenched in the ground between the support " w posts. When installed correctly and inspected frequently, silt fences can be an effective barrier to sediment leaving X . the site in stormwater runoff. Applicability E ` �n a Silt fences prevent offsite transport of sediment. Silt fences apply to construction sites with relatively small drainage areas. They are appropriate in areas where runoff will occur as low-level flow, not exceeding 0.5 cfs. The drainage area for silt fences should not exceed 0.25 acre per 100-foot fence length. The slope •• length above the fence should not exceed 100 feet (NAHB, 1995). M Siting and Design Considerations The material for silt fences should be a pervious sheet of synthetic fabric such as polypropylene, nylon, polyester, or polyethylene yam. Choose the material based on the minimum synthetic fabric requirements shown in Table 1. Table 1. Minimum requirements for silt fence construction (Sources: USEPA, 1992; VDCR, 1995) Physical property Requirements Filtering efficiency I75%-85% (minimum): highly dependent on local conditions Tensile strength at 20% (maximum) Elongation [Ultraviolet radiation Slurry flow rate Standard strength: 30 lb/linear inch (minimum) Extra strength: 50 lb/linear inch (minimum) 1190% (minimum) 110.3 gal/ft2/min (minimum) If a standard -strength fabric is used, it can be reinforced with wire mesh behind the filter fabric. This increases the effective life of the fence. The maximum life expectancy for synthetic fabric silt fences is about 6 months, depending on the amount of rainfall and runoff. Burlap fences have a much shorter useful life span, usually up to 2 months. MW The stakes used to anchor the filter fabric should be wood or metal. Wooden stakes should be at least 5 feet long and have a minimum diameter of 2 inches if a hardwood like oak is used. Stakes from soft woods like pine should be at least 4 inches in diameter. When using metal posts in place of wooden stakes, they should weigh at least 1.00 to 1.33 lb/linear foot. If metal posts are used, attachment points are needed for fastening the filter fabric with wire ties. ' ' Erect silt fence in a continuous fashion from a single roll of fabric to eliminate gaps in the fence. If a is r continuous roll of fabric is not available, overlap the fabric from both directions only at stakes or posts. Overlap at least 6 inches. Excavate a trench to bury the bottom of the fabric fence at least 6 inches below the ground surface. This helps to prevent gaps from forming near the ground surface. Gaps would make the fencing useless as a sediment barrier. The height of the fence posts should be 16 to 34 inches above the original ground surface. If standard - strength fabric is used with wire mesh, space the posts no more than 10 feet apart. If extra -strength fabric is used without wire mesh reinforcement, space the posts no more than 6 feet apart (VDCR, 1995). The fence should be designed to withstand the runoff from a 10-year peak storm event. Once installed, it should remain in place until all areas upslope have been permanently stabilized by vegetation or other r means. Limitations r. Do not install silt fences along areas where rocks or other hard surfaces will prevent you from uniformly anchoring the fence posts and entrenching the filter fabric. Installing fences in such an area greatly reduces their effectiveness and can create runoff channels leading offsite. Silt fences are not suitable for .. areas where large amounts of concentrated runoff are likely. Open, windy areas present a maintenance challenge, too, because high winds can make the filter fabric deteriorate faster. Do not install silt fences across streams, ditches, or waterways (Smolen et al., 1988). When the pores of the fence fabric become clogged with sediment, pools of water are likely to form on the uphill side of the fence. Siting and design of the silt fence should account for this. Take care to avoid unnecessarily diverting stormwater from these pools, causing further erosion damage. Maintenance Considerations .. Inspect silt fences regularly and frequently, as well as after each rainfall event, to make sure that they are intact and that there are no gaps where the fence meets the ground or tears along the length of the fence. If you find gaps or tears, repair or replace the fabric immediately. Remove accumulated sediments from the fence base when the sediment reaches one-third to one-half the fence height. Remove sediment more frequently if accumulated sediment is creating noticeable strain on the fabric and the fence might fail from a sudden storm event. When you remove the silt fence, remove the accumulated sediment as well. .. Effectiveness USEPA (1993) reports the following effectiveness ranges for silt fences constructed of filter fabric that are properly installed and well maintained: average total suspended solids removal of 70 percent, sand removal of 80 to 90 percent, silt -loam removal of 50 to 80 percent, and silt -clay -loam removal of 0 to 20 percent. Removal rates are highly dependent on local conditions and installation. Cost Considerations Installation costs for silt fences are approximately $6.00 per linear foot (USEPA, 1992). The Southeastern Wisconsin Regional Planning Commission estimates unit costs between $2.30 and $4.50 per linear foot (SWRPC, 1991). References r NAHB (National Association of Home Builders). 1995. Guide for Builders and Developers. National Association of Homebuilders, Washington, DC. am Smolen, M.D., D.W. Miller, L.C. Wyatt, J. Lichthardt, and A.L. Lanier. 1988. Erosion and Sediment Control Planning and Design Manual. North Carolina Sedimentation Control Commission; North Carolina Department of Environment, Health, and Natural Resources; and Division of Land Resources Land Quality r Section, Raleigh, NC. SWRPC (Southeastern Wisconsin Regional Planning Commission). 1991. Costs of Urban Nonpoint Source Water Pollution Control Measures. Technical report no. 31. Southeastern Wisconsin Regional Planning Commission, Waukesha, WI. USEPA (U.S. Environmental Protection Agency). 1992. Stormwater Management for Construction Activities: Developing Pollution Prevention Plans and Best Management Practices. EPA 832-R-92-005. U.S. Environmental Protection Agency, Office of Water, Washington, DC. USEPA (U.S. Environmental Protection Agency). 1993. Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters. EPA 840-13-92-002. U.S. Environmental Protection Agency, Office of Water, Washington, DC. VDCR (Virginia Department of Conservation). 1995. Virginia Erosion & Sediment Control Field Manual. 2nd ed. Virginia Department of Conservation, Division of Soil and Water Conservation, Richmond, VA. on aw rJ _-I Construction Entrances Click here to comment on this fact sheet Minimum Measure: Construction Site Stormwater Runoff Control Subcategory: Sediment Control - Description The purpose of stabilizing entrances to a construction site is to minimize the amount of sediment leaving the area as mud and sediment attached to vehicles. Installing a pad of gravel over filter cloth where construction traffic leaves a site can help stabilize a construction entrance. As a vehicle drives over the pad, the pad removes mud and sediment from the wheels and reduces soil transport off the site. The filter cloth separates the gravel from the soil below, keeping the gravel from being ground into the soil. The fabric also reduces the amount of rutting caused by vehicle tires. It spreads the vehicle's weight over a soil area larger than the tire width. Stabilized construction entrances allow dirt to be removed from tire treads and collected as trucks leave construction sites In addition to using a gravel pad, a vehicle washing station can be established at the site entrance. Using wash stations routinely can remove a lot of sediment from vehicles before they leave the site. Diverting runoff from vehicle washing stations into a sediment trap helps to make sure the sediment from vehicles stays onsite and is handled properly. .. Applicability Typically, stabilized construction entrances are installed where construction traffic leaves or enters an existing paved road. But site entrance stabilization should be extended to any roadway or entrance where .. vehicles enter or leave the site. From a public relations point of view, stabilizing construction site entrances can be worth the effort. If the site entrance is the most noticeable part of a construction site, stabilizing the entrance can improve both the appearance and the public perception of the construction project. Siting and Design Considerations .. Stabilize all entrances to a site before construction and further site disturbance begin. Make sure the stabilized site entrances are long and wide enough to allow the largest construction vehicle that will enter the site to fit through with.room to spare. If many vehicles are expected to use an entrance in any one day, make the site entrance wide enough for two vehicles to pass at the same time with room on either side of each vehicle. If a site entrance leads to a paved road, make the end of the entrance flared so that long vehicles do not leave the stabilized area when they turn onto or off the paved roadway. If a construction site entrance crosses a stream, swale, or other depression, provide a bridge or culvert to prevent erosion from unprotected banks. Make sure stone and gravel used to stabilize the construction site entrance are .. large enough so that they are not carried offsite by vehicles. Avoid sharp -edged stone to reduce the possibility of puncturing tires. Install stone or gravel at a depth of at least 6 inches for the entire length and width of the stabilized construction entrance. Limitations Although stabilizing a construction entrance reduces the amount of sediment leaving a site, some soil might still be deposited from vehicle tires onto paved surfaces. To further reduce the chance of these sediments polluting stormwater runoff, sweep the paved area adjacent to the stabilized site entrance. For sites that use wash stations, a reliable water source to wash vehicles before leaving the site might not be initially available. Water might have to be trucked to the site at additional cost. As Maintenance Considerations 40 Maintain stabilization of the site entrances until the rest of the construction site has been fully stabilized. You might need to add stone and gravel periodically to each stabilized construction site entrance to keep the entrance effective. Sweep up soil tracked offsite immediately for proper disposal. For sites with wash we racks at each site entrance, construct sediment traps and maintain them for the life of the project. Periodically remove sediment from the traps to make sure they keep working. .. Effectiveness Stabilizing construction entrances to prevent sediment transport offsite is effective only if all the entrances so to the site are stabilized and maintained. Stabilizing the site entrances might not be very effective unless a wash rack is installed and routinely used (Corish, 1995). This can be problematic for sites with multiple entrances and high vehicle traffic. "' Cost Considerations Without a wash rack, construction site entrance stabilization costs range from $1,000 to $4,000. On .. average, the initial construction cost is around $2,000 per entrance. Including maintenance costs for a 2- year period, the average total annual cost is approximately $1,500. If a wash rack is included in the construction site entrance stabilization, the initial construction costs range from $1,000 to $5,000, and the average initial cost is $3,000 per entrance. The total cost, including maintenance for an estimated 2-year life span, is approximately $2,200 per year (USEPA, 1993). References Corish, K. 1995. Clearing and Grading Strategies for Urban Watersheds. Metropolitan Washington Council of Governments, Washington, DC. no USEPA (U.S. Environmental Protection Agency). 1992. Stormwater Management for Construction Activities: Developing Pollution Prevention Plans and Best Management Practices. EPA 832-R-92-005. U.S. Environmental Protection Agency, Office of Water, Washington, DC. USEPA (U.S. Environmental Protection Agency). 1993. Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters. EPA 840-B-92-002. U.S. Environmental Protection Agency, Office of Water, Washington, DC. MW .. Seeding Click here to comment on this fact sheet Minimum Measure: Construction Site Stormwater Runoff Control -W Subcategory: Erosion Control Description .-._ Seeding is used to control runoff and erosion on disturbed areas by establishing perennial vegetative cover from seed. It reduces .R. .� erosion and sediment loss and provides permanent stabilization. �.:. This practice is economical, adaptable to different site conditions, and allows selection of a variety of plant materials., Applicability = i ''� `" 2 + Seeding is well -suited in areas where permanent, long-lived vegetative cover is the most practical or most effective method -� of stabilizing the soil. Use seeding on roughly graded areas that Hydroseeding is a popular technique will not be regraded for at least a year. Vegetation controls for applying seeds, fertilizer, and .. erosion by protecting bare soil surfaces from displacement by chemical stabilizers in a single raindrop impacts and by reducing the velocity and quantity of application (Source: Terra Firma overland flow. Seeding's advantages over other means of Industries, 2000) establishing plants include lower initial costs and labor needs. .R Siting and Design Considerations ., Seed or plant permanent vegetation in areas 1 to 4 months after the final grade is achieved unless temporary stabilization measures are in place. Maximize successful plant establishment with planning; considering soil characteristics; selecting plant materials that are suitable for the site; preparing, liming, and fertilizing the seedbed adequately; planting timely; and maintaining regularly. Major factors that dictate .. the suitability of plants for a site include climate, soils, and topography. Prepare and amend the soil on a disturbed site to provide sufficient nutrients for seed germination and seedling growth. Loosen the soil surface enough for water infiltration and root penetration. If soils are too acidic, increase the pH to between 6.0 and 6.5 with liming or choose plants that are appropriate for the soil characteristics at your site. Protect seeds with mulch to retain moisture, regulate soil temperatures, and prevent erosion during seedling establishment. Limitations The effectiveness of seeding can be limited by high erosion during establishment, the need to reseed .w areas that fail to establish, limited seeding times, or unstable soil temperature and soil moisture content during germination and early growth. Seeding does not immediately stabilize soils; therefore, use temporary erosion and sediment control measures to prevent pollutants from disturbed areas from being transported off the site. .. Maintenance Considerations Maintenance for seeded areas will vary depending on the level of use expected. Use long-lived grass perennials that form a tight sod and are fine -leaved for areas that receive extensive use, such as homes, industrial parks, schools, churches, and recreational areas. Whenever possible, choose native species that are adapted to local weather and soil conditions to reduce water and fertilizer inputs and lower maintenance overall. In and areas, consider seeding with non -grass species that are adapted to drought conditions, called xeriscaping, to reduce the need for watering. "0 Low -maintenance areas are mowed infrequently or not at all and do not receive lime or fertilizer regularly. .. Plants must be able to persist with minimal maintenance over long periods of time. Use grass and legume mixtures for these sites because legumes fix nitrogen from the atmosphere. Sites suitable for low - maintenance vegetation include steep slopes, stream or channel banks, some commercial properties, and "utility" turf areas such as road banks. Grasses should emerge within 4-28 days and legumes 5-28 days after seeding, with legumes following grasses. A successful stand has the following characteristics: Vigorous dark green or bluish green (not yellow) seedlings Uniform density, with nurse plants, legumes, and grasses well intermixed Green leaves that remain green throughout the summer --at least at the plant bases Inspect seeded areas for failure and, if needed, reseed and repair them as soon as possible. If a stand has inadequate cover, reevaluate the choice of plant materials and quantities of lime and fertilizer. Depending on the condition of the stand, repair by overseeding or reseeding after complete seedbed preparation. If timing is bad, overseed with rye grain or German millet to thicken the stand until a suitable time for seeding perennials. Consider seeding temporary, annual species if the season is not appropriate for permanent seeding. If vegetation fails to grow, test the soil to determine if low pH or nutrient imbalances are responsible. On a typical disturbed site, full plant establishment usually requires refertilization in the second growing season. Use soil tests to determine if more fertilizer needs to be added. Do not fertilize cool season grasses in late May through July. Grass that looks yellow might be nitrogen deficient. Do not use nitrogen fertilizer if the stand contains more than 20 percent legumes. Effectiveness so .w Perennial vegetative cover from seeding has been shown to remove between 50 and 100 percent of total suspended solids from stormwater runoff, with an average removal of 90 percent (USEPA, 1993). Cost Considerations aw Seeding costs range from $200 to $1,000 per acre and average $400 per acre. Maintenance costs range from 15 to 25 percent of initial costs and average 20 percent (USEPA, 1993). References FHWA (Federal Highway Administration). 1995. Best Management Practices for Erosion and Sediment Control. FHWA-SLP-94-005. Federal Highway Administration, Sterling, VA. Smolen, M.D., D.W. Miller, L.C. Wyall, J. Lichthardt, and A.L. Lanier. 1988. Erosion and Sediment Control Planning and Design Manual. North Carolina Sedimentation Control Commission; North Carolina Department of Environment, Health, and Natural Resources; and Division of Land Resources, Land Quality Section, Raleigh, NC. Terra Firma Industries. 2000. Hydroseeding. USEPA (U.S. Environmental Protection Agency). 1992. Stormwater Management for Industrial Activities: Developing Pollution Prevention Plans and Best Management Practices. U.S. Environmental Protection Agency, Office of Water, Washington, DC. USEPA (U.S. Environmental Protection Agency). 1993. Guidance Specifying Management Measures for aw Sources of Nonpoint Pollution in Coastal Waters. EPA 840-B-92-002. U.S. Environmental Protection Agency, Office of Water, Washington, DC .. �s Sodding Click here to comment on this fact sheet Minimum Measure: Construction Site Stormwater Runoff Control Subcategory: Erosion Control Description i Sodding is a permanent erosion control practice and involves ,Y`tww laying a continuous cover of grass sod on exposed soils. Sodding can stabilize disturbed areas and reduce the velocity of stormwater runoff. Sodding can provide immediate vegetative cover for critical areas and stabilize areas that cannot be readily vegetated by seed. .• It also can stabilize channels or swales that convey concentrated flows and reduce flow velocities. Applicability Sodding is appropriate for any graded or cleared area that might erode, requiring immediate vegetative cover. Locations that are Grass sod is laid on exposed soil well -suited to sod stabilization include: to stabilize the soil and to reduce the velocity of stormwater runoff • Residential or commercial lawns and golf courses where prompt (Source: Landscape USA, no date) .. use and aesthetics are important • Steeply sloped areas • Waterways and channels carrying intermittent flow • Areas around drop inlets that require stabilization Siting and Design Considerations Sodding eliminates the need for seeding and mulching. Sod can be laid during times of the year when seeded grasses are likely to fail. Water the sod frequently within the first few weeks of installation. Select a type of sod that is composed of plants adapted to the site conditions. Sod composition should reflect environmental conditions and the function of the area where it will be laid. Know the genetic origin of the .. sod, and make sure it is free of noxious weeds, diseases, and insects. Ensure that the sod is machine cut at a uniform soil thickness of 15 to 25 mm (not including top growth or thatch) at the time of establishment. If a soil test determines the need, prepare the soil and add lime and fertilizer. Lay the sod in strips perpendicular to the direction of waterflow and stagger it in a brick -like pattern. Staple the comers and middle of each strip firmly. Peg jute or plastic netting over the sod to protect against washout during establishment. In the area to be sodded, clear all trash, debris, roots, branches, stones and clods larger .. than 2 inches in diameter. Ensure that sod is harvested, delivered, and installed within a period of 36 hours. If it is not transplanted within this period, inspect and approve the sod before its installation. Limitations Compared to seed, sod is more expensive and more difficult to obtain, transport, and store. To ensure .,. successful establishment, prepare the soil and provide adequate moisture before, during, and after installation. If sod is laid on poorly prepared soil or an unsuitable surface, the grass will die quickly because it is unable to root. After installation, inadequate irrigation can cause root dieback or cause the sod to dry out. Maintenance Considerations To maintain adequate moisture in the root zone and to prevent dormancy, water the sod, especially within ri the first few weeks of installation. When mowing, do not remove more than one-third of the shoot. Maintain grass height between 2 and 3 inches. After the first growing season, determine if additional fertilization or ' liming is needed. Permanent, fine turf areas require yearly maintenance fertilization. Fertilize warm -season grass in late spring to early summer; fertilize cool -season grass in late winter and again in early fall. No Effectiveness NR Sod removes up to 99 percent of total suspended solids in runoff, but its sediment trapping efficiency is highly variable depending on hydrologic, hydraulic, vegetation, and sediment characteristics. Cost Considerations Average construction costs of sod average $0.20 per square foot and range from $0.10 to $1.10 per square foot; maintenance costs are approximately 5 percent of installation costs (USEPA, 1993). References FHWA (Federal Highway Administration). 1995. Best Management Practices for Erosion and Sediment •• Control. FHWA-SLP-94-005. Federal Highway Administration, Sterling, VA. Landscape USA. No date. Installing Sod for an Instant Lawn. [www.landscai)eusa.com/tips/turf.htm _ [exrr oisel�imer ]. Accessed November 10, 2005. Smolen, M.D., D.W. Miller, L.C. Wyall, J. Lichthardt, and A.L. Lanier. 1988. Erosion and Sediment Control Planning and Design Manual. North Carolina Sedimentation Control Commission; North Carolina Department of Environment, Health, and Natural Resources; and Division of Land Resources, Land Quality Section, Raleigh, NC. ... USEPA (U.S. Environmental Protection Agency). 1993. Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters. EPA 840-B-92-002. U.S. Environmental Protection Agency, Office of Water, Washington, DC. no USEPA (U.S. Environmental Protection Agency). 1992. Stormwater Management for Industrial Activities: Developing Pollution Prevention Plans and Best Management Practices. U.S. Environmental Protection Agency, Office of Water, Washington, DC .. r no .r nr No sP.R. i3a'iRltrcr'iP.R. f P.R.T.QT. P.R.T.QT. P.R.T.RT. P.R.T.C.T. ` AMY 106= WX WLA W HORSE MNDE Y/R`NN A M�1'NPAE7T I I \ ( I PAA wNtu I e tveM bleeEats I tvLEss AFEW nawRJs£it I s rut ,4Cd14M Lor z pRAIIrE EMM T7490-01 f � I f MM � 1405 I � E 6T 32 , LOT M , LOT 54 , LOT X , LOT X \ LOT 97 \ Lor m i I 401 S PA°EM RaW I 4AT & Ph -EYE RAID I 405 S Ph At RWD EAST I _ _407 S PARE M ROAD I I \ QQ E EKk £ 24� alma ARID fLoINOE EAVT. �/ BLA' E EKK E I< uSftPAffE d- I J�Ir �------------ —� ZCWMED �M�1TER LINEEO—�—� = �— \ --- -----_—_ uE 40•WS LOSW W Stok EM PRA N OPAV sp" A6. a _ O w i . l Ll-------1� _ — — ���-�<r •. -ems —� � PIPELINE ROAD ___ _ R. _ ria�i IMPF—z— —mac----j 3 - ( - W— / v ,p) y 2.0f � ar-Aft P12VAM&W p N T.CCLAB. 1112MA8483 DtR.Mr.. WeraT. LINING GLEN STREET 00 A � &VJ� , �' 1 aRrar. g ;u rya � � �� 4•YT A �,I.A dr' PA A —% J MATCHLINE !Or 7J !Or \ \ fix°a to � to — �- — - IN r A-awlMgt A PROPOSED 240 \ \ -RECLAIMED WATER LINE I 100 0 100 NOInONfN. am: t V - low I F.. - - — -- --- .I Q+ttts '�_. air - SECTION A v CONTRACT = •*•ENDS � 11325 PEGASUS STREET, SUITE E-200 Twi mlEs. me DALLAS, TEXAS 75238, TEL. 214-747-2500 EROSION CONTROL VILLAGE CREEK WATER UTILITIES DEPARTMENT LINE 3 CITY OF FORT WORTH, TEXAS DESIGN DRAW DATE I SCALE I OXI FILE BDSBDMAR 009 0' XXX XXX XXXXX 100 0 100 i NNIANNIX w" : V m low a It PROPOSED 2e RECLAIMED WATER LINE I / / L4S F—LONE 3— /y END OF PROPOSED 240 RECLAIMED WATERLINE CONTRACT = _ 11325 PEGASUS STREET, SUITE E-200 TE jW-o0TE8, INC DALLAS, TEXAS 75238, TEL. 214-747-2500 EROSION CONTROL VILLAGE CREEK WATER UTILITIES DEPARTMENT LINE 3 CITY OF FORT WORTH, TEXAS DBDISN I DBDSS I MAR 009 11=1SCALE I XXOXXX I XXXXX I XXXOXX rl- z 0 U LLI V) Ax n Lor I I I I \ &` D I Z \ LOT 7 LOT a Lor a Lor J LOT a m LOT Y BLK D B1K D BLK D AN D BLK D I I BLK E LOr J AN E !#x E ----fin— -------fir— —7AA STONE HOLLOW WAY I Lor J — — --/ etK E Lor e BLK £ :ZLOr7 n Lor a LOr 10 .KB E BLA' E BLAf E BLK E C) ov-- 44 _- �� tow..-t REMAIMED ?ER LINE Z 'USV \ \ �® F-------- — — — — — — I I 1 '100 0 100 NOIUMM SCALE: f - 1W s w:ll 1ff C 0 CONTRACT = +130[3s 111325 PEGASUS STREET, SUITE E-200 I momooms. c DALLAS, TEXAS 75238, TEL. 214-747-2500 EROSION CONTROL VILLAGE CREEK WATER UTILITIES DEPARTMENT LINE 3 CITY OF FORT WORTH, TEXAS DESIGN I DRANIN I DATE I SCALE I NOTES I FILE I NO. BDS I BDS I MAR 2009 1 1=100' I XXXXX I XXXXX I XXXXX f $ - m III I11 — g PaoPosEo 30 —I r 0 <�A_I -LorII -I —�I �a'o we<xgc RElCLJdMED WATER UNE c �&k B I I L°r s-e o II 4 o l l Z r �] [ LOr a -a I I 1� B<K A — — -.ft t-- — —I— A -J,L % o / CUM 1AU7 AMERICAN BLVD AMERICAN BLVD A awry MET !jqI Ste— _e �fie����®— ®___—e.� o—� ��{ 1 V�VaAfttu — — I�T,� — — , . i PROPOSED 24' I Z Q- RECLAIMED WATER UK I J 0 1 2 1< I' p� Ir N 1 I I r, &wr 7 1 AwmW 1 07 �- Pa a LOT 1, eLOCIr 7 P..arC.r. AAEEIrK'AlyMrcmQESAa717fi4✓ LOT f. &=r r 7 1 sa0- xa7 I swarAOGr7pN I AtOW.0 ,or-mn AvA7WRT O p PROPOSED 24 RECLAIMED WAR LE Z Ln � EC Z _J FAA BLVD FAA BLVD' FAA BLVD_ W p= p 1C) 1 I CONTRACT = 100 0 100 11325 PEGASUS STREET, SUITE E-200 i TWWooles, me � DALLAS, TEXAS 75238, TEL. 214-747-2500 _ _ I EROSION CONTROL IIOI�ONnIL �� �• low I VILLAGE CREEK WATER UTILITIES DEPARTMENT LINE 3 - I CITY OF FORT WORTH, TEXAS DESIGN DRAWN DATE SCALE NOTES FILE NO. BDS BD MAR 2009 I 1=100'I XXXXX ' XXXXX I XXXXX d N I _ CE I o o m 52, — z,meowr o e U I — — FAA BLVD Ld t � ®.� • (n oI PROP ®®� > I — I RECLAIM WATER TER IJNE Ld z J U Q I I �I I 1 1 � I l ws0 • ws Nw� ws �:w O CLff MR FAA B LVD O • • O Iff F- J 0 I ' All 40 q PROPOSED 2,C 1 t= RECLAIMED WATER LINE If FUTURE FAA BLVD. \ (�pAVEL PIE FOR CNFS�pFA PAD SRE — V\ FUTURE FAA BLVD. -% — � / 1 1 100 0 100 I HOI�ONIIIL •CAtd : 1' � 100r CONTRACT = 11325 PEGASUS STREET, SUITE E-200 TEQ1lDLOOIEB. !NC DALLAS, TEXAS 75238, TEL. 214-747-2500 EROSION CONTROL VILLAGE CREEK WATER UTILITIES DEPARTMENT LINE 3 CITY OF FORT WORTH, TEXAS DESIGN DRAW I SCALE, I NOTES I XLEIXO BDSBDMAR009OXXX XX MATCHLINE — SECTION 1 � � l i 12 In 3r M-m suR�r A-Qe1 / (J DIED WATER UNE s0i1 ACRE CNESAyEVfE E%'P,CORIDOK LLG QED AS DRHl. SRE At � 24� (IL (v W r.GGr.Jee t+aorJot,J� a1Lrar. WATER LK / I _ _ — — — — — — — — — ,�I I t •I � I I _ LOT. J. mnnv I � fSs7 ACRES MATCHLINE SECTION_ 14 _ co w5 8°i' C pROP06ED 2e f&"MED WATER LINE — a — �o — uo ar f Uco _ _ _ _ _ _ 16.47ACRES r P. ACRES J0 / ARVEIST LOT A SLA M I LOi P. SW 1 /J JFIGIS 1 20 L / / LSIB A SLa /TASf CAB A SW lPA?f ' T.GGL A#.rC% 'IJ P.R.T.GT. P.RT.GT. MATCHLINE — SECTION 13 100 0 100 I moyaow & mu: s CONTRACT = -- 111325 PEGASUS STREET, SUITE E-200 7— DALLAS, TEXAS 75238, TEL. 214-742500 EROSION CONTROL VILLAGE CREEK WATER UTILITIES DEPARTMENT LINE 3 CITY OF FORT WORTH, TEXAS D BDISN I D BDSS I MAR 2009 I SCALE1=1I XOxxx I LEl NO- S I XXXXX I I I I Lor A z asfJ7 ACRES TJ �, I Ir I m II MNX 7A%N� ADA7A7N r LOT z 0 L ��• D LOT /, nl N 11 I °'a StiA rae7 Lor z REMAIYED WATER LINE o P.RT.GT. I &K, A \ wr II I I I 1 4 �$ I I [•"" C O I I I ALor%KA a U '� I IIW` I I q W1 �u I -I T r T- - - S EULESS MAIN STREET S EULESS W ` mawMAIN STREET r wr \ _ Lor , I z ILOT 2; tS BLAf. Y s� I I Z I ILL z ° for z BcaoK ! I Lor z— MATCHLINE — SECTION 3 . . . more QAL'Q" s V - 100' PORACW Ur EYK f J,E. M670" ESTATE m M-4 AR IN P.Rr.Gr. J05E74/ A A(1IMM real[ . &Vl-xleee ARr.Gr. 100 I I Poffm OF BM I 40L Jee-J. PLC in .LE �NM DWSr E59A7E P.R.T.GT. I A SAE E I VZL Jee-L pa f-V 7W 7EXAs rpa ar Jua f'� AR. A LOT 27 tor YA \ LOT m \ LOT J7 \ LOr m \ LOr JJ \ LOr 34 \ LOT m \ Lor Je �) I MCI& am a� I � q� � T.GGLAb. DAMMD7a 130M 7yE /� . M.P.p�r 0.R.r.GT. AR.rar. oavnCrLOF77e -----� -� 11---------I--------J O Assral ft l I& Any T.GGLAA OT041QAae4 AR.T.GT. I - — —LOT Ya— \� i f1=UE aD' UE L.I cn PIPEUNg ��// ROAD PIPELINE ROAD 1 LLJ � --� Z a. orra! cc arrcw I w I PROKM 24 J I _ • A RECLNMED WATER UNE U s• uE: 1 1— cor f I z LOT 1 � j$ EECK. f I LAT Lz - r7.a' UE 4 O fJ Lor mLor is Lar fe LOT 17 LOT to I Q — $ PA pW L � (��p®® � J BLIL J aLIG J BUG J BM BLK. JI T.GGL r.Grf7 ARI—AC1BERrA AUE7V) IAMW \ `Lorr 7.3' UE-I i i eLor 3 I ku fYAJ� fas4 I . Lor J- � CONTRACT = _ a 11325 PEGASUS STREET, SUITE E-200 EG TIIOLo Es, 1NC DALLAS, TEXAS 75238, TEL. 214-747-2500 EROSION CONTROL VILLAGE CREEK WATER UTILITIES DEPARTMENT LINE 3 CITY OF FORT WORTH, TEXAS DESIGN I DN I A I SCALE XX I NOTES XX I XLXXX I BDSBDSMAR 009 XX XX Exhibit D Sample Inspection Reports SWPPP 14 DAY SITE INSPECTION REPORT Exhibit D 1/2 The following report was generated while inspecting all of the measures/areas addressed in the SWPPP or Erosion Control Plan. Project Name: Village Creek Reclaimed Water Eastern Delivery System Distribution Main — Part 3 Permit Number: Contractor: Inspector: Contractor will provide inspection. Site Conditions Erosion & Sediment Controls Construction Entrance Sediment Traps Inlet Protection Stabilization Sift Fence Rock Berm Vegetative Buffer Strips Storage Area Discharge Areas Concrete Wash Area Fuel Berm Was a copy of the permit language with the SWPPP? Reason for inspection: Installed Effective Notes/Locations of Maintenance Needs Is the TPDES construction sign posted at the entrance? Exhibit D 2/2 Village Creek Reclaimed Water Eastern Delivery System Distribution Main — Part 3 Construction Schedule: The site is approximately in the following construction stage: SWPPP Modifications: Describe any modifications necessary to the SWPPP: Describe locations of any new BMP's necessary: Any spills of reportable quantity: Violations to Report: F3 Recommended Actions: Comments: a If "yes," have proper authorities been notified and the SWPPP been noted accordingly? I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Inspector: Date: Exhibit E Delegation Letter am am Storm Water Pollution Prevention Plan (SWP3) , 2009 Storm Water Pollution Prevention Plan (SWP3) RE: Village Creek Reclaimed Water Eastern Delivery System Distribution Main — Part 3 To Whom It May Concern This letter is intended to inform all interested parties that Contractor Name has been assigned full responsibility to install, maintain and inspect all storm water pollution prevention measures required to ensure compliance with the terms and conditions stated in the TPDES General Permit 150000. Contractor Name will be responsible for installing, inspecting and maintaining all measures in accordance with the details shown in the accompanying Storm Water Pollution Prevention Plan (SWP3), and will maintain sufficient measures to prevent discharge of pollutants from the site boundaries set forth in the SWP3 for this project. 1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Sincerely, Contractor Name and Title r -W. W, Im Village Creek Reclaimed Water Project Pa reel # 3-1 Doe # P275-705140021330 3600 Block of South Euless Main Street Fort Worth, Texas 76040 STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE -- AND SALT -WATER LINE EASEMENT ow DATE: July 24, 2009 _ GRANTOR: T.J.L. GRAVEL COMPANY, L.P. GRANTOR'S MAILING ADDRESS (including County): • ROUTE 30 & COUGER Rfd2 JOLIET, KENDALL COUNTY, ILLINOIS 60432 rm GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): .. 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of no more than two water -transmission mains and related facilities —a reclaimed -water main and a salt -water main —on, under, across, and through the described property. EASEMENT PROPERTY: Being a portion of that certain tract situated in the Richard 00 H. Calloway Survey, Abstract No. 337, and being that same tract of land conveyed to T.I.L. Gravel Company, L.P., recorded in Tarrant County Deed Records Office, Instnunent Number D197036720, Tarrant County, Texas; and being more particularly No described in Exhibits "A" and "B", attached and incorporated for all pertinent purposes. (Property) r Grantor, for the considerations paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns an exclusive, perpetual easement on, under, across, and through the Property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of pipelines for (i) a reclaimed -water main and (ii) a salt -water main hereafter referred to as "Facilities." The Facilities include all incidental underground and aboveground _ attachments, equipment and appurtenances, connections, structures, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, junction boxes in, over, upon, under, along, through and across a portion of the Property, together with the w right and privilege at any and all times to enter Property, or any part thereof, for the purpose of installing, constructing, reconstructing, operating, maintaining, replacing, upgrading, and repairing the Facilities. Grantor (i) shall not use or allow use of the Property in any manner which _ interferes in any material way or is inconsistent with the rights granted hereunder, or (ii) erect or permit to be erected within the Property a permanent structure or building, including, but not limited- to, monument sign, pole sign, billboard, brick or masonry _. fences or walls or other structures that require a building permit. However, Grantor shall be permitted to maintain any existing concrete driveway or road on the Property. Grantee shall be obligated to restore the surface of the Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this easement. Grantor may grant other utility providers the right to cross the easement area only - (i) if the crossing is at an angle between 45' and 90° and (ii) if the crossing is below the reclaimed -water main and salt -water main pipelines with a clearance of five feet. At least 30 days before the date on which construction of an asphalt or concrete road or street that will be located wholly or partly on or over the reclaimed -water main _ and salt -water main pipelines is scheduled to begin, the Grantor or its successors and assigns must submit plans for the proposed construction to the Grantee. TO HAVE AND TO HOLD the above -described permanent exclusive easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee_, and Grantee's successors and assigns forever; and Grantor does herebv bind itself and its successor and assigns to warrant and forever defend all and singular the easement to Grantee, its successor and assigns, against everyperson whomsoever lawfully claiming or to claim the same,.or any part thereof. Permanent Rwlaimed-Water Pipeline Easement and Salt -water Pipeline Easement Page 2 When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] .. .. .o ur sr Uw r r Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 3 .. GRANTOR T.J.L. GRAVEL COMPANY, L-P. an Illinois limited partnership By: T.I.L. Materials, Inc., an Illinois corporation, its general partner By: Printed Name Title GRANTEE City of Fort Worth By: Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 4 so ACKNOWLEDGEMENT STATE OF TEXAS § -- COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of UW Texas, on this day personally appeared , known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of and that he/she executed the same as the act of said for the purposes and consideration therein expressed. and in the capacity therein stated - GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 20 UW No STATE OF TEXAS § COUNTY OF TARR.ANT § Notary Public in and for the State of Texas ACKNOWLEDGEMENT r^ BEFORE ME, "the undersigned authority, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose. name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of the City.of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 120 %W Notary Public in and for the State of Texas 0" Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 5 No EXHIBIT "A" Being a 25' wide permanent reclaimed water pipeline and salt water pipeline easement situated in the Richard H. Calloway Survey, Abstract Number 337, City of Fort Worth, Tarrant County, Texas and being a portion of those same tracts of land identified as "Tract One and Tract Two" as conveyed to T.J.L_ GRAVEL COMPANY, L.P. by special warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C.C.I.No.) D197036720, Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement .. being herein more particularly described by metes and bounds as follows: BEGINNING at a point on the south property line of the said Gravel Company tract, said point being located North 74012'51" East a distance of 55.12 feet from a PK Nair with shiner found at the southwest property corner of the said 'Tract Two" of the Gravel Company tract, said beginning point being on the north right-of-way line of a railroad right-of-way dedicated to the City of Fort Worth and the City of Dallas by deed as recorded in Volume 7726, Page 1848, D.R.T_C.T. THENCE North 00'06'45" West 118.78 feet to a point in a south chain link fence line; THENCE North 20n02'44" East, -generally along the said fence line, 72.55 feet to a point; THENCE South 00"06'45" East 179.86 feet to a point on the said south property line of the Gravel Company tract, same being the said north railroad right-of-way line; THENCE South 74'12'51" West, along the said property line and alongthe said right-of- way line, 25.97 feet to the Point of Beginning containing 0.086 acres (3,733.0 Sq. Ft) of land more or less. � 1 o F rF� 4 7cRF0 9 ER REVISED:6-23-09 ERIc SHAVN SPOON.. 9 0 S 1 OeT�R- PARCEL 3-1 Pg_ 'I of 8 r ill 111 'W1 1I.A, I l I. II ,111111. 1,1'1111.1.16 1-1. li11.11 II J11� .11111 ),III. 11, 11 1111.11111111, 11.L1,'I. i4 L.I „1 1. 111I1 1f 11,1 1 , 111 I1.11 lul, li. l.i�,l I; 111�111 I. 1ii1116111 i11. J, SMOKE TREE TRAIL 11 -" LOT 49 PLAT OF EXH[81Ts » » » u » n A B C — STONE CREEK ADD12701Y /2 /RF P. a e CAB A, SLD_ 5193 e a y EXHIBIT SEE A TTACHED LEGAL DESCRIP7701V C.T_ >,Y LOT- 46 PAGEs 5-8 OF EXH 91 JS ':4 B " B ' "C� IIERr 1N �J LOT 47 BLJC O BLK. D ION J I No. DIRECTION OIST- B L 1 NOO'06'45 "W 116.. 78' PROPERTY LINEEms. L2 N20'02'44 E 72.55' v L3 S00'06 45't 179-86' L 10 iL4 S74'12 51 W 25.97' 0 150' 300' � J L5 N74'12 51 E 55. 12' p L6 IV89'54 41 "IV 25. 49' GRAPHIC SCALE IN FEET L7 S03')846 E 74.73' I" = 150' try L8 N09'17 001V 57.37' L9 NO3-18'46 W 75.30' ' L 10 589'54 41 E 25. 04 EXHIBIT "B " L 11 N00'06 45 K' 26.68 PERMANENT 25' WIDE I L 12 S74' 12 51 'W 28. 18' no RECLAIMED WATER PIPELINE A,VU S-4L T WA7F.R PIPEUNE EASEMENT 0.288 ACRES (12, 551.1 SG? FT.) RICHARD H. CALLOWAY SURVEY = ABSTRACT No- 337 0 CALLED 45.744 ACRES (TAD) h & 0.474 ACRES (TRACT TWO) o T. u1L. GRAVEL COMPANY, L.P. T. C. C.LNo. D197036720 DR. T.C. T. u S001541081y 322.95' PROPERTY LINE R = 49R26' L = IM65' CH = S10'Do 23"W CL - 158.00 FT POR77ON OF TRACT B T4RR4NT IIVDUSIRIAL PARK VOL- 388-215 PG_ 69 P.R. TGT_ 5 459 ACRES (DEED) LEGACY HOLD/NLS, LL_C TGC_I No_ 0205052718 D- R• LC T PK N4/1- FNO. ` E1: CHAWLINK FENCE W/SHRWEN (J EX WIRE FENCE � l � EXHIBIT "A " UHF PERMANENT 25' WIDE R.O-w- PK tlbvL � % RECLAIMED WATER PIPELINE AND w/sJ1#mvER ; SALT WATER PIPELINE EASEMENT R = 297.56' 0. D86 ACRE_ S (3, 733. 0 SO. FT.) CH = N15-06'26 E L 12 " _ -a - PROPERTY LINE WAY =ALUS CL = 10334 Fr L I I RI�t,OFTH & D Y►'� 4� 0� FORT i8 NE w &WNNE-XdA R L� P.O.4 mERG,TM�° Of 1 1 R, t G T. R 0 w U EXHIBIT "C "/ EXHIRffs L1 TEMPORARY 25' WIDE A & C m R'0 U4GELN PPELINE COMPANY, LP 7INo_ 162 T.CONSTRUCTON EASEMENT D.R.C.7- 0.052 ACRES (2,284.8 SO. FT.) NOTE- ATE BASIS Of ' BEARINGS FUR 7MS SWW-Y 14 ESTABUS'AW MOM DEED BEARNGS AS -Sgoj / ON T. G GLNaa D1970.3672GL D.R. T. G T. BET7IEFJV AlOWUM£N7S Fouvvl ALavc THE COwaq UN£ 6 F• 7i7A4CT LW£ AND 7RACT THO OF TN£ SUBJECT TRACT. � � • O F T�. VMLAGE CREEK RECLAWED WATER DELWERY SYSTEM ........................... - ----• -- -• -- - ERIC SHAUN SPOONE PARCEL NO. 3-1 D-O.E. #P275-705140021330---__---_------- CN-•-- SURVEY: RIARD H_ CALLOWAY SURVEY, ABS- No. 337 -)CATION: CITY OF FORT WORTH, TARRANT COUNTY, -TEXAS PERMANENT RECLAIMED WATER PIPELINE -,HOLE PROPERTY ACREAGE. 46,218 ACRES PER (TAD) AND SALT WATER PIPaME EASEMENT S&A JOB NO.: 08-0085 DRAWN BY: E_S.S. p1HiBITs "A" "B" 'C" PAGE 8 OF B DATE: 2-2-09 CHECKED BY: E_S.S_ _ SPOONER do ASSOC_, INC. 309 BYERS STREET, #100, EULESS. TX 76039. PH 817-281-2355 FAX 817-685-8 B REV. 6--23-09 No .. Village Creek Reclaimed Water Project Parcel It 3-1 A Doe # P275-705140021330 3600 Block of South Euless Main Street Fort Worth, Texas 76040 STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE TEMPORARY CONSTRUCTION EASEMENT DATE: July 24, 2009 GRANTOR: T.J.L. GRAVEL COMPANY, L.P. GRANTOR'S MAILING ADDRESS (including County): ROUTE 30 & CODGER Rfd 2 r - JOLIET, KENDALL COUNTY, ILLINOIS 60432 GRANTEE: CITY OF FORT WORTH •r GRANTEE'S MAILING ADDRESS (including County): „ 1000 THROCKMORTON ST. FORT WORTH, TARRA.NT COUNTY, TX 76102 • CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT AREA: See Exhibits "A", "B" and "C", attached and incorporated for all pertinent purposes. Grantor, for the considerations paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns an exclusive temporary construction easement in, under, and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple pipelines for a reclaimed -water main. Upon completion of the construction of the reclaimed -water main, all rights granted within the temporary construction easement -shall cease, and all operations, maintenance and repair shall be confined to the permanent easement for the reclaimed -water main. TO HAVE AND TO BOLD the above -described temporary _ construction easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. When the context requires, singular nouns and pronouns include the plural. GRANTOR T.J.L. Gravel Company, L.P., am Illiinois limited partnership By: T.J.L. Materials; Inc., an Illinois corporation, its General Partner By: Printed Name: _. Title: GRANTEE City of Fort Worth By: Fernando Costa - Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Temporary Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 2 ACKNOWLEDGEMENT STATE OF ILLINOIS § COUNTY OF KENDALL § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared , of T.J L. Materials, Inc., an Illinois corporation, general partner of T J.L. Gravel Company,. L.P., an Illinois limited partnership, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of T.J.L. Gravel Company, L.P. and that he executed the same as the act of said limited partnership for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 2009. - Notary Public in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority; on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and — acknowledged to me that he executed the same as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein -expressed and in the capacity therein stated. No GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 12009. Notary Public in and for the State of Texas Temporary Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 3 EXHIBIT "A" Being a 25' wide permanent reclaimed water pipeline and. salt water pipeline easement situated in the Richard H. Calloway Survey, Abstract Number 337, City of Fort Worth, Tarrant County, Texas and being a portion of those same tracts of land identified as "Tract One and Tract Two" as conveyed to T.J.L. GRAVEL COMPANY, L.P. by special .� warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C-C.I.No.) D197036720, Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows: BEGINNING at a point on the south property line of the said Gravel Company tract, said point being located North 74"12'51" East a distance of 55.12 feet from a PK Nail with shiner found at the southwest property corner of the said "Tract Two" of the Gravel Company tract, said beginning point being on the north right-of-way line of a railroad right-of-way dedicated to the City of Fort Worth and the City of Dallas by deed as recorded in Volume 7726, Page 1848, D.R.T.C.T. THENCE North 00'06'45" West 118.78 feet to a point in a south chain link fence line; THENCE North 20'02'44" East, generally along the said fence line, 72.55 feet to a point; THENCE South 00°0645" East 179.86 feet to a point on the said south property line of the Gravel Company tract, same being the said -north railroad right-of-way line; THENCE South 74°12'51"West, along the said property line and along the said right-of- way line, 25.97 feet to the Point of Beginning containing 0.086 acres (3,733.0 Sq. Ft) of land more or less. ER REVISED: 6-23-09 Ric .s1iAUN_•sPOQN......... Ya1� LA PARCEL 3-1 Pg_ 1 of 8 : EXHIBIT "B. Being a 25' wide permanent reclaimed water pipeline and salt water pipeline easement situated in the Richard H. Calloway Survey, Abstract Number 337, City of Fort Worth, Tarrant County, Texas and being a portion of that same tract of land identified as "Tract One and Tract Two" as conveyed to T.J.L. GRAVEL COMPANY, L.P. by special warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C.C.I.No.) D197036720, Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows: BEGINNING at a point on the north property line of the said Gravel Company tract, said point being located North 89"54'41" West a distance of 25.49 feet from the northeast property comer of the said "Tract One" of the Gravel Company tract; THENCE South 03018'46" East, generally along an existing wire fence line, 74.73 feet to a point; THENCE South 000'54'08" West, continuing generally along the said fence line, 322.95 feet to a point at the beginning of a curve to the right having a radius of 499.26 feet; THENCE continuing generally along the said fence line in a Southerly direction along the said curve through an arc length of 158.66 feet and across a chord bearing South 10"00'23" West 158.00 feet to a point located North 09"17'00" West a distance of 57.37 feet from a PK Nail with shiner found; THENCE North 00°54'08" East 478.04 feet to a point-, THENCE North 03*18'46" West 75.30 feet to a point on the said north property, line of the Gravel Company tract; THENCE South 89°54'41" East, along the said property line, 25.04 feet to the Point of Beginning containing 0.288 acres (12,551.1 Sq. Ft) of land more or less. 0 F TF .� / S REVISED:6-23-09 ERIC SHAUN SPOONER .......................... 22 `9 .'£5• y you/ PARCEL 3-1 --- Pg_ 2 of 8 9. EXHIBIT "C" .. Being a 25' wide temporary construction easement situated in the Richard H. Calloway Survey, Abstract Number 337, City of Fort Worth, Tarrant County, Texas and being a portion of that same tract of land identified as "Tract One and Tract Two" as conveyed to T.J.L. GRAVEL COMPANY; L.P. by special warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C.C.I.No.) D197036720, Deed Records of Tarrant County, Texas (D_R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows. - BEGINNING at a point on the south property line of the said Gravel Company tract, said point being located North 74°12'51" East a distance of 55.12 feet from a PK Nail with shiner found at the southwest property corner of the said "Tract Two" of the Gravel Company tract, said beginning point being on the north right-of-way line of a railroad right-of-way dedicated to the -City of Fort Worth and the City of Dallas by deed as recorded in Volume 7726, Page 1848, D.R.T.C.T. THENCE South 74012'51" West, along the said south property line and along the said north railroad right-of-way line, 28.18 feet to a point in an existing chain link fence line; THENCE North 00°06'45" West, generally along the said fence line, 26.68 feet to a point at the beginning of a curve to the right having a radius of 297.56 feet; THENCE, generally along the said fence line, in a Northerly direction along the said curve through an arc length of 103.86 feet and across a chord bearing North 15°06'26" East 103.34 feet to a point, - THENCE South 00°06'45" East 118.78 feet to the Point of Beginning containing 0.052 acres (2,284.8 Sq. Ft.) of land more or less. tE o r r� �ERIC SHAUN SP60NER REVISED: 6-23-09 PARCEL 3-1 — Pg. 3 of 8 No no Mo ¢1.ao:1Jlub.. 11 J161.,J Jill liki1,.1- Y,.1 i1i I,!I, ��41Nii.1,IB,YY, n11 w,,. id 1II.J SMOKE TREE TR4/L STONE CREEK ADDITION CAB A SLO. 519J o O LOr 47 °p BLK. D PROPERTY LINE 0 150' 300' GRAPHIC SCALE IN FEET I" = 150' i l.i. 1.1111.111, 4liii.1 I-11-6611 LOT 49 1. li Ili 111_.III, 1111, 1I1+1d. Lill i,.IJ ,11:+11�1ed,l1llYi,. 11 11111i II.di11,111114i..A Ell. 1,1I ill .I. �.1 i1.. PLAT OFI.111 EXHIBITs A B C P.O.B. - EXHIBIT SEE A TTACHED LEGAL DESCRIP7701V = tO t 48 "B "' ON PACEs 5-8 OF EXHIBITS- "A " 6 " C " HEREUI �Yz !RF \ ' No L 6F, DIRECTION DIST_ ILI NOO.06 45 •W 118. 78' L2 N20.02 44 C 72.55' L3 SOO'06'45 •E 179.86' L 10 y L4 S74' 12 51 "W 25 97' L5 N74' 12 51 C 55.12' p L6 N89'54 41 "W 25.49' L7 S43'18'46'£ 74.73' L8 N09' 17 00'W 57 -37' L9 NO3'18'46'W 75-30' L 10 S89 54'41 C 25.04' EXHIBIT "S " L 11 N00706'45'W 26. 58' PERMANENT 25' WIDE I j L 12 S74'12 51 W 2, 18' rj) RECLAIMED WATER PIPELINE AND SALT WATER PIPELINE EASEMENT 0.288 ACRES (12, 551.1 SO. FT.) RICHARD H. CALLOWAY SURVEY -ABSTRACT No. .337 9 CALLED 45..744 ACRES (TAD) h do 0.474 ACRES (TRACT TWO) - o � T. JL GRAVEL COMPANY, L.P. T. C. C.I.No. D197OJ6720 D.R. T.C. T. PK MIL FND. S00 54'08 V `22- 95' PROPERTY LINE R = 499.26' L = 158.66' CH = S1 D'0023-W CL = 158.00 FT I/ EX. CHAINUNK FENCE PORTION OF 7)?ACT 8 TARRANT WBU577?A4L PARK VI7L 38Ci-215 PG- 69 P_R_T.C.T. 5.459 ACRES (DEED) LEGACY HOLDINGS, L.LC. LC.C.LNo. D205052118 D.R. T.C' T. EXHIBIT ",4 " L tjr PERMANENT 25' WIDE R o--�' �----RECLAIMED WATER PIPEUNE AND SALT WATER PIPELINE EASEMENT 0.086 ACRES (3, 733. 0 SO FT.) ' - PROPERTY LINE •r aLLAs Rof�TM� TAD 7 1348 PG .W LINE R��7 O P_OB1NE6l�Va-'pReR EXHIBIT C'" EXHfBYTs LINE TEMPORARY 25' WIDE A & C MAGELIAN PLo. D2 L;oAfPANY, LP R O.W. CONSTRUCTION EASEMENT 1NST No. .TCIT 1672 D.R T.GT. EX. YYIRE FENCE PK MIL FND. I W/SH/NNER j R = 29756' fr L = 10.3 86' L 12 A CH = N 15'06 26'E CL = 103. 34 FT L 1 1 PK Nei iii �' L5 W/SNINNiR 0.052 ACRES (2,284.8 SO. FT.) NOTE 771E 9AS7S a� 6EARwcs fo1z 7N15 szlRt�r Is EsrAeusnm IRrav ogo eFARuvcs .4sro�►ry onr T.L:C.dNa M9703672a DJi', EC L 8E7HEEN MONUMENTS FOUND ALONG 7RE COMMON LINE OF TRACT OW AND TRACT 7*0 OF 711Lr-%V.,ECT TRACT. T STr' F VILI AGE CREEK RECLAIMED WATER DELIVERY SYSTEM o y * • �' .......................... ERIC SHALIN SPOONER PARCEL NU 3-9 D.O.E. #P275-705140021330 .............. • ':- SURVEY: RICHARD H. CALLOWAY SURVEY, ABS- No- 337 T I.00AIION: CITY OF FORT WORTH. TARRANT COUNTY, TEXAS PERMANENT RECLAIMED WATER PIPEUNE SSIQ�- O TOLE- PROPERTY ACREAGE: 46.218 ACRES PER (TAD) AND SALT WATER PIPELINE EASEMENT RVF� S&A JOB NO.: 08-0085 DRAWN BY. E.S-S. DATE2-2-09 CHECKED BY: E-S_S_ EXH18ITS "A` "B" "C' PAGE 8 OF 8 : SPOONER do ASSOC- INC 309 BYERS STREET, r00. EULESS. TX 76039. PH 8i7-281-2355 FAX 817-685-6�568. REV. 6-23-09 �1: • '' .. .ai, .._ i _1 - :I . I . ..E. .i... .a. - il.. lI . 1. 1 — i 16 I.1 - 11,.1i ... ..111, il.l. r.I.:. .. Village Creek Reclaimed Water Project Parcel # 3-2 Doe # 6096 3900 Block of South Euless Main Street Fort Worth, Texas 76040 no STATE OF TEXAS COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE EASEMENT DATE: 4-21-2009 GRANTOR: CHAMPION OPERATING PARTNERSHIP, LTD. GRANTOR'S MAILING ADDRESS (including County): 8401 N. CENTRAL EXPRESSWAY, S410 DALLAS, DALLAS COUNTY, TEXAS 75225 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST. .. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($ l 0.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of .. no more than two water -transmission mains and related facilities —a reclaimed -water main and a salt -water main —in, under, and across the described property. EASEMENT PROPERTY: Being a portion of that certain tract situated in the Franklin Wood Survey, Abstract No. 1698, being part of the 1.336 acre tract as recorded in Tarrant _ County Clerk's Instrument Number D 1961 53777, Deed Records, Tarrant County, Texas, and being more particularly described in Exhibit "A" attached and incorporated for all pertinent purposes. (Property) Grantor; for the considerations Maid to Grantor quid other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns an exclusive, MW perpetual easement on, over and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple pipelines for (i) a reclaimed -water main and (ii) a salt -water main hereafter referred to as "Facilities." The Facilities -include all incidental underground and aboveground attachments, equipment and appurtenances, connections, structures, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, junction boxes in, over, upon, under, along, through and across a portion of the property and more fully described in Exhibit `°A" and depicted in Exhibit "A", attached and incorporated for all pertinent purposes, together with the right and privilege at -any and all times to enter property, or any part thereof, for the purpose of installing, constructing, reconstructing, operating, maintaining, replacing, upgrading, and repairing the Facilities. Grantor (i) shall not use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (11) erect or permit to be erected within the easement area a permanent structure or building, including, but not -. limited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to construct and maintain one or more paved and/or unpaved driveways on the Property. Grantee shall be obligated to restore the surface of the property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this easement. TO HAVE AND TO HOLD the above -described permanent easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever _ lawfully claiming or to claim the same, or any part thereof. When the context requires, singular nouns and pronouns include the plural. r Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement, Parcel 3-2 Page 2 GRANTOR Champion Operating Partnership, Ltd_, a Texas Limited Partnership By: Champion Interest, Inc., a Texas Corporation, its General Partner By: Name- ey L. Swope Titlef resident/Director GRANTEE City of Fort Worth By: Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Permanent' Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement. Parcel 3-2 Page 3 ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF DALLAS § 4 BEFORE ME, the undersigned authority; a Notary Public in and for the State of Texas, on this day personally appeared Jeffrey L_ Swope, President and Director of Champion interests. Inc., a Texas corporation, general partner of Champion Operating Partnership, Ltd., a Texas limited partnership, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Champion Operations Partnership, Ltd., and that he executed the same as the act of said limited partnership for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 5 day of MI 2009. 4 NotarPub for the State of Texas HOLLY B. JONES Notary Pubfic STATE OF TEXAS My Comm. Exp. Nov. 02, 2011 ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas; for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 120 Nolan' Public in and for the State. ofTeaas Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement. Parcel 3-2 Page 4 r EXHIBIT "A" Being 25' wide permanent reclaimed water pipeline and salt water pipeline easement situated in the Franklin Wood Survey, Abstract Number 1698, City of Fort Worth, Tarrant County, Texas and being a portion of that same 1.336 acre tract of land conveyed to CHAMPION OPERATING PARTNERSHIP, LTD. by special warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C.C.I.No.) D196153777 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.), said strip being herein more described by metes and bounds as follows: BEGINNING at a %" iron rod with cap -stamped "USA INC RPLS 2026" found at the northeast, property corner of the said Champion tract, same being the southeast oft property comer of a 3.874 acre tract of land conveyed to Mohammad F. Wazirali and Ashraf S. Wazirali by deed as recorded T.C.C.t.No. 0199247086 of the D.R.T.C.T., said beginning point being on the west right-of-way line of South Euless Main Street, being a wo variable width public right-of-way; THENCE, South 00°48'07" West, along the east property line of the said Champion tract, same being the said west right-of-way line of South Euless Main Street, 129.50 feet to a '/" iron rod found at the southeast property comer of the said Champion tract, - THENCE North 89°34'08" West, along the south property line of the said Champion tract, 25.00 feet to a point; THENCE North 00°48'07" East 129.45 feet to a point on the north property line of the so said Champion tract, same being the south property line of the said Wazirali tract; THENCE South 89'40'15" East, along the said property lines, 25-00 feet to the Point of Beginning containing 0.074 acres (3,236.8 Sq. Et.) of land more or less. OF .f- 1,� f 9 k s <ERiC SHAUN SPOONER Y no w REVISED: 2-23-09 .r PARCEL 3-2 -- Pg.. 5 of 6 PLAT OF EXHIBIT "A" ur 0 50' 100' SEE A rfA CHED LEGAL DESCRIP PON ON PACE 5 Of' E)0401 r -A HEREIN GRAPHIC SCALE IN FEET I" = 50, 0 82J ACRES (DEED) IRIAUTY & A"IN PAR774,rRS. L.P- 1874 ACRES (DEED) AS LOT J FCCZNa 02010JJ416 U014AAWAD F. WAZIRAU A5HR4f- S. WAZIRAII O.R TC: r rC.CZJVo. D199247086 P. 0. S D.R.r.C.r �2' " IRON ROD FOUND WfrH CAP STAMPED 7 PROPERTY UIVE USA INC-. RPLS 2026 (C. U-) EXHIBIT 'A PERMANENT 25' WDE RECLA&ED WATER PIPELINE AND CfRf- -WN- S4LT WATER PIPELINE EASEMENT 0 074 ACRES (J, 236.8 50 FT) 1.336 ACRES (DEED) FRANKLItV WOOD SURVEY ABSTRACT No. 1698 CHAMPION OPERA TING PARTNERSHIP, L TD. No. DIRECTION DIST TC.ClNo- D196153777 Ll N69-J4'08'W 25- 00' D.R. rc f L2 S89'40'15-E 25.00' PROPERTY LINE Ll IRON ROD FOUND (CM 75' ur N STONE CREEK ADDIT10A. C,48- A 5LD. 4044 6 112 ACRES (DEEO) p- R. T C, T. ALBfRrSOWS PVC AS '94C, ICC.fA-'o 0,?05219OZ5 tor 28 LO7 2-0 1 or -to kK. A 8L K A &K. A ORjrc.T f. 75' uf. — 1.571 ACRES (DEED) 7.5' V. E- Q AFMPOPARY ACCESS EASCA,(,rAf 20' POSE -V N & PROPOSED P. 0 W. AS TRACT 3 rcct.No. 02o621go25 njqTf•!- SffEET BAY DRIVE NOTE.- THE BASIS Of- SEAPWCS FOR THIS SURVEY fS ESTABU19CD fROU DEW BEARINGS AS -910141V ON r C. CLHa D196153777 6F PIE D.R. 7 C 7' 8E1P/FN LOF cAsT, LINE or 7w suBxcr TRACT ?f MONUAIENrS FOUM ALONG 7HE L VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM .......................... ERIC SHAUN SPOONER PARCEL. NO. 3-2 I D.O.E. -,aP275--705140021330 SURVEY: FRAWLIR WOOD SURVEY. AM No 1699 q- LOCATlait CPY-OF FAORT WORTH. TARRANT COZJ;%Fr. TEXAS I F'ERJ-.*.'f9r RZCJVED VIATER PiPEUNZ WHOLE PROPERTY AvPEAGZE: 1.336 ACRES PER Mil) I ANO SALT WAVER PIPUJNE EASEMENT .S&A JOB NO.: 08-0065 DRAM BY: E-S.S. DATE. -10-20-08. CHECKED BY. E.S.S.EXHIBIT "A" . PAGE 6 OF 6 SPOONER & ASSOC- INC. 309 BYERS STREET. J-100. ELUSS. TX 76039. PH 817-281-2355 FAX 817-685-85 REV. 2-23--09 so so ~ Village Creek Reclaimed Water Project Parcel #3-3 Doe 4 6096 3800 Block of South Euless Main Street Fort Worth, Texas 76040 STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT WATER LINE EASEMENT DATE: 6-23-2009 GRANTOR: MOHAMMAD F. WAZIRALI and wife, ASHRAF S_ WAZIRALI GRANTOR'S MAILI'_tiG ADDRESS (including County): 1421 INDIAN SPRINGS , CARROLLTON, DENTON COUNTY, TEXAS 75007 GRANTEE: CITY OF FORT WORTH GR.ANI-F.E'S MAILING ADDRESS (including County is 1000 THROCKMORTON ST_ FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dotiars ($10.00) and other good and valuable consideration. the receipt and sufficiency ofwhich is hereby acknowledged. for installation. construction, reconstruction, operation, maintenance, replacemectt, upgrade, and repair of no more than two water -transmission mains and related facilities --a reclaimed -water main and a salt -water main —in, under, and across the described property_ EASEMENT PROPERTY: Being a portion of that certain tract situated in the Franklin Wood Surrey, Abstract No- 1698, being part of the 3.874 acre tract as recorded in Tarrant County Clerk's Instrument Number D 190147086. Deed Records, Tarrant County, Texas_ and being more particularly described in Exhibit attached and incorporated for all pertinent purposes. (Property) Aw .. Grantor, for the considerations paid to Grantor and other good and valuabje consideration. hcrebv grants, sells- and core eys to Grantee, and its assigns an exclusive. perpetual easement on. over and through the property for the installation- construction, reconstruction, operation, maintenance. replacement. upgrade, and repair of multiple pipelines for (i) a reclaimed -«eater main and (ii) a salt -dater main hereafter referred to as 'Facilities." The Facilities include all incidental underground and aboveground attachments, equipment and appurtenances, connections. structures, including: but not limited to manholes, manhole vents, lateral line connections, pipelines, junction boxes in, over. upon, under, along, through and across a portion of the property and more full described in Exhibit "A" and depicted in Exhibit ' :A'-. attached and incorporated for all pertinent purposes, together with the right and privilege at any and all times to enter property, or any part thereof with 48 hour notice to Grantor, except in the case of an emergency, for the purpose of installing, constructing. reconstructing, operating. maintaining. replacing, upgrading, and repairing the facilities. Grantor (i) shall not use the Property in any manner which interfieres in any - material way or is inconsistent with the rights granted hereunder, or (ii) erect or pc -relit to be erected within the easement area a permanent structure or building, including. but not limited to. monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building; permit. Ilowever, Grantor shall be permitted to construct, replace, and -maintain any existing concrete driveway or road across - the Property- Grantee shall be obligated to restore the surface of the property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveiwa4s. or similar surface improvements located upon or adjacent to the Property which may have been removed, relocated_ altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this easement. TO HAVE AND TO HOLD the above -described permanent casement, together with all and singular the rights and appurtenances thereto in anyway belonging - unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby r, bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any pan thereof. When the context requires. singular nouns and pronouns include the plural. (SIGNATURES APPEAR ON THE FOLLOWING PAGE) i Permanent Reclaimed -Water Pipeline Easement and Wt-Water Pipeline Easement, Parcel 3-3 Pape 2 GRANTOR Mohatnrnad F. 'a-r_iraii and will. !�shraf S. Warirali. B�-: Name: ohatnmad F. Warirali Title: Owner By: _ -- — Name: Ash "bzirali t�`W Title: Owner GRANTEE City of Fort Worth By: Fernando Costa Assistant City- Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline_Ea.sent.^nt; Parce! 3-3 Page ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF DENTON § BEFORE ME. the undersigned authority, can this day personally appeared Mohammad F. Wazirati, known to me to be the person whose name is subuxibed to t)e foregoing instrument, and acknowledged to the that he executed the same for the purposes and consideration therein expressed. GIVEN UNDER MY I IAND AND SEA1, 01= OFFICE this day of B LOLA BELLE WEBSTEFf Nota .` I ublic to and for the State ofTexas My COMMISSION EXPIRES - Naismber27,2010 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF DENTON § BEFORE ME, the undersigned authority. on this day personally appeared Ashraf S. Wazirali, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that she executed the same for the purpos s and consideration therein expressed. GIVEN DER NIY HAND AND SEAL OF OFFICE this / day of 2009. - Notary Public in and for the State of 7-exas Mr COMMISSKM r`WWS NovM*27,2010 1 L 1, 111J1 I. 1,1.1 l k i llu i Permanent Reclaimed -Water Pipeline Fasernent and Salt-Watcr Pipeline Easement, Paru:] 3-3 Page 4 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRAN[' BEFORE ME; the undersigned authority. on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same dti the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas. for the purpose and consideration therein expressed and in the capacity therein stated. "R GIVEN UNDER MY HAND AND SEAL OF OFFICE thi.s day of Votary Public in and for the State of'ITexas Pennamm Reclauned-Water Pipeline Easement and Salt -Water Pipeline Easement, Parcel 3-3 Page w EXHIBIT "A" Being a 25' wide permanent water pipeline and salt water pipeline easement situated in the Franklin Wood Survey, Abstract Number 1698, City of Fort Worth, Tarrant County, Texas and being a portion of that same 3.874 acre tract of land conveyed to MOHAMMAD F. WAZIRALI and ASHRAF S. WAZIRALI. by warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C.C.I_No.) 0199247086 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.), said strip being herein more described by metes and.bounds as follows; BEGINNING at a !' iron rod with cap stamped `USA INC. RPLS 2026" found at the southeast property comer of the said Wazirali tract, same being the northeast property corner of a 1.336 acre tract of land conveyed to Champion Operating Partnership. Ltd. by deed as recorded T_C.C.I.No. D196153777 of the D.R.T.C.T_, said beginning point being on the west right-of-way line of South Euless Main Street, being a variable width public right-of-way, THENCE, North 89*40'15" West, along the south property tine of the said Wazirali tract, same being the north property line of the said Champion tract, 25.00 feet to a point; THENCE North OO°O8'31" Fast 375.42 feet to a point on the north -property line of the said Wazirali tract, same being the south right-of-way line of Trinity Boulevard, being a 120' wide public right-of-way; THENCE South 86"35'57" East, along the said property line and along the said *right-of- way tine, 25.04 feet to the northeast property comer of the said Wazirali tract, said point being located at the intersection of the said south right-of-way fine of Trinity Boulevard and the said west right-of-way line of South Euless Main Street; THENCE South 00'0931" West, along the east property line of the said Wazirali tract and along the said west right-of-way line of South Euless Main Street, 374.08 feet to the Point of Beginning containing 0.215 acres (9,368.8 Sq. Ft.) of land more or less. REVISED. 2-23-09 'PARCEL 3-3 -- Pg. 5 of 6 OF rR,L SHAU14 SPOOVER r mw 0 60' 120' GRAPHIC fn APHIC SCALE IN FEET 7WMIT -BLVD . I" == roo, 1190' R. 0, ly PLAT OF EXHIBIT "A" C4 PA ci, 5 OF EXT-101 r" A" Mcpf -,'IV i 0 w LIVE' E" -10 • PIPELINE PG. 869.* a,kir-,586'3557'E c_r EANIBI T 'A PERMANENT 25, wx - RECLNAIED WATER PIPELINE AND SALT WATER PIPELINE E4-'3jEV0V7- 0.215 ACRES (9,368.8 SO. FT) Zi J. 874 A CR-E 5 (DEEDS FRANKLIN WOOD SURVEY ABSTRACT No. 1698 MCHAMMAD F. WA27RAU & ASWAF S. WA27RALI T4'-'.C.ZNo- D199247086 D.R TC- T ..571 Ac.Mcs !rMf`OR.4R- ACCESS L45c-4(5V7 pp'--oosED q. 0 W. AS WCr 3 rac-fml-. 02052!90Z5 D. o Y: C. T 4G.428 ACRZ-S (M-ISQ) AS 7Mn" 2 !:C.C.t.N-- 0206219023 V, CPr -,rA'- z7 Oe2-1 ACRES (DCZ-0) U4A' P,4R'fACX5. L-F, AS LOT J Na D20.01j416 A R7. ; T. I-JJS ACRCS (DEW) CH4MMM OPEWAV PAR.rhrR.W.49• LTG. N.69-40'15 W P.0.8. TC-C-LiVa. D19675-25.00' NOW ROD FOUND 1777 �- TC.T A. O.R. *clA'0PD?TY LAVE I. WITH CAP STAMPED "USA INC- RPLS 2026" (C-A,() N07E- IW 8A2S Or BEAAWGS FOR T7#5 SLWWY IS ESTABLISHED FROM DEED BEARINGS AS SIDNM ON TC-CtAfo. D199247086 Cr "W O.R. rC- T. BEPrWrN F GF MOMfAfLW7S fWN0 ALCYV49 ME EAST LIME OF 7w sus.4scr mAtr 4i5TE4L\ ti VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM ............. EMC SHAJN SP&'.)ER) ....... .. .. PARCEL No. D.O.E. #P275-7C5140021330..... , SURVEY: FRANKLIN WOOD SLRWY. ABS. No. 1698 LOCATION: CITY OF FORT WORTK TARRAN7 COUNTY. —.--XAS FERMAhCiT WaAWED WATER PPELINE C6 - VMOLEPRCPERTY ACRUGE.- 3.874. ACRES PKR �7DAND SALT WATER Pf%-L&E EA ME - S&A. JOB NO.. 06-06R ORAYM 13Y,- __ss "A" F DATE: 10-20-Oa OiECKM BY- F-5.5. E X Hl 131T PAGE 6 O6 SPOCNER & ASSOC, imc. 309 GYERS 'SIREET.'#100. EULESS. TX 76039. PH 817-291-23Z5 FAX 817-1585-850 REV. 2-2.3-09 Electronically Recorded Tarrant County Texas Official Public Records 2009 Jun 12 09:44 AM Fee: $ 36.00 Village Creek FAQ � Submittec ACS INC Parcel tf 3-4.. r_J Doe It 6096 Suzanne Henderson �• 13108 South Pipeline Road Fort Worth, Texas 76040 �7 h STATE OF TEXAS § a § �$ COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE EASEMENT DATE: 4-21-2009 GRANTOR: SHIRLEY HIMES MELSON D209156626 6 Pages GRANTOR'S MAILING ADDRESS (including County): go 8605 CATO DRIVE FORT WORTH, TARRANT COUNTY, TX 76180 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): N 1000 THROCKMORTON ST. ., FORT WORTH, TARRANT COUNTY, TX 76102 Ch CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of no more than two water -transmission mains and related facilities —a reclaimed -water main and a salt -water main —in, under, and across the described property. EASEMENT PROPERTY: Being a portion of that certain tract situated in the G. W. Couch Survey, Abstract No. 279, being a part of that same tract conveyed to Shirley Himes Melson as recorded in Volume 721, Page 184, Deed Records, Tarrant County, Texas, and being more particularly described in Exhibit "A" attached and incorporated for all pertinent purposes. (Property) .s .a Grantor, for the considerations paid to Grantor and other good and valuable consideratioi, lierehy grants, sells, and conveys to Grantee, and its assigns an exclusive, perpetual easement on, over and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple .-. pipelines for (i) a reclaimed -water main and (ii) a salt -water main hereafter referred to as "Facilities." The Facilities include all incidental underground and aboveground attachments, equipment and appurtenances, connections, structures, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, junction boxes in, over, upon, under, along, through and across a portion of the property and more fully described in Exhibit "A" and depicted in Exhibit "A", attached and incorporated for all pertinent purposes, together with the right and privilege at any and all times to enter property, or any part thereof, for the purpose of installing, constructing, reconstructing, operating, maintaining, replacing, upgrading, and repairing the Facilities. ` Grantor (i) shall not use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (ii) erect or permit to be erected within the easement area a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit_ However, Grantor shall be permitted to maintain any existing concrete driveway or road on -the Property. Grantee shall be obligated to restore the surface of the property at Grantee's sole cost and "expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this easement. .� TO HAVE AND TO HOLD the above -described permanent easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever, and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof_ When the context requires, singular nouns and pronouns include the plural. ` (SIGNATURES APPEAR ON THE FOLLOWING PAGE] Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement, Parcel 34 Page 2 qw No GRANTOR Shirley Himcs Melso By: Name: Shirley mes Melson Title: Owne GRANTEE City of Fort Worth Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY t Assistant City Attorney Date: qt q Permanent Reclaimed -Water Pipeline. Easement and Salt -Water Pipeline Easement, Parcel 3-4 Page 3 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Shirley Himes Melson, known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that she executed the same for the purposes and consideration therein expressed. GIVEN UNDER MY HAND AND SEAL OF OFFICE this L014"' day of Pq 2009. -`- My M SIGN EXPRES STATE OF TEXAS § COUNTY OF TARR.ANT § Notary Public in -and for the State of Texas ACKNOWLEDGEMENT BEFORE ME, the undersigned authority, on this day personalty appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this ,,f'l 106/ day of , tETRE LANE 7 Mycotk�►+EKPIREs :�. , dy21L2 it Notary Public in and for the State of Texas Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement, Parcel 3-4 Page 4 s, EXHIBIT "A" Being a variable width permanent reclaimed water pipeline and salt water pipeline easement situated in the G.W. Couch Survey, Abstract Number 279, City of Fort Worth, Tarrant County, Texas and being a portion of that same tract of land conveyed to Y SHIRLEY HIMES MELSON by warranty deed as recorded in Volume 721, Page 184 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows: COMMENCING at a 518" iron rod with cap stamped "Carter and Burgess" found on the south property line of the said Melson tract, said commencing point being the northwest property comer of Lot 27, Block 1, Trinity Glen Addition, being an addition to the City of Fort Worth according to the plat recorded in Cabinet A, Slide 8623, Plat Records, Tarrant County, Texas, said commencing point also being on the east right-of-way line of South Euless Main Street, being a variable width right-of-way; THENCE South 89'32'52" West, along the said south property line, a distance of 27.06 feet to the southwest property corner of the said Melson tract; THENCE North 00'20'40" West, along the west property line of the said Melson tract and along the said right-of-way line, a distance of 150.98 feet to the POINT OF BEGINNING; THENCE North 00'20'40" West, continuing along the said west property line and along the said right-of-way line, a distance of 68.24 feet to the northwest property comer of the said Melson tract, said property comer being the intersection of the said east right- of-way line of South Euless Main Street and the South right-of-way line of South Pipeline Road, being a variable width right-of-way; THENCE North 89'41'15" East, along the north property line of the said Melson tract and along the said south right-of-way line of South Pipeline Road a distance of 26.70 feet to a point; THENCE South 00`26'26" East a distance of 41.78 feet to a point; THENCE South 45'00'00" West a distance of 37.63 feet to the Point of Beginning containing 0.034 acres (1,471.0 Sq. FL) of land more or less. 151 � = 4- 7f •_ �J1 ERIC SHAUN SPOONER 4 _REVISED: 2-23-09 PARCEL 3-4— Pg. 5 of 6 .. w PLAT OF EXHIBIT "A" _SEE ATTACHED LEGAL DESCRIPTION 011 PA CF 5 OF EXHIDI I' 'A" TIE YE J LZ N00720'40 "W 68.24' P.O.B. EXHIBIT A" I r% ./ rn h z a 0 R. Q W. LINE VARIABLE IYIDTH R. 0. W- R. 0 W LINE" EXHIBIT A' PERMANENT VARIABLE WID7H RECLAIMED WA7ER PIPELINE AND SALT WATER PIPELINE EASEMENT 0.034 ACRES (L 471. 0 SO. FT.) 1.100 ACRE (TAD) G W. COUCH SURVEY ASS No. 279 SHIRLEY HUES MELSON VOL 721, PG. 184 D.R. T.C. T. No. DIRECTION DIST. L 1 S89 J2'521Y 27. 06' L2 N89'4051E 26.70' L3 S00'2626E 41.78' L4 S45100100 "W - 37.63' P.O.C. EXH15fr A " S18" aRF CARTER & BURGESS' L 1 I PROPD?TY LINE 0 40' 80, LOT 27, BLK. 1 ® TRINITY GLEN ADD177ON GRAPHIC SCALE IN FEET CAB. A, SLD. 8623 = 40' P.R. T C. T- NOrt 7HE BASIS OF BEARINGS FOR 7HIS SURVEY IS ESTABLIShW fROM COORDINATES -WOW FOR CONTROL P01NT5 ON -5IEE75 4-5 OF THE 7RAN5?^S76VS a"S FOR ME 36- WA7D? MAIN OF EX7EJVSW0N ALLWG 7RIMIY RAXWAY EXPRESS ROW FROM GREFVBQT TO fM 157 COMACT 1. I �� - •• • T �P_���sreaFF-f• VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM •• .•=-•••-•.....--• -= -• ERIC SHAUN SPOONER PARCEL NO. 3-4 O.O.E- #P275-705140021330 SURVEY. G.W. COUCH SURVEY ABS. Na 279 9 LOCATION: CITY OF FORT WORTH, TARRANT COUNTY, TEXAS PERMANENT RECLAIMED WATER PIPELINE C ' 'c p?Al WHOLE PROPERTY ACREAGE: 1.100 ACRES (TAD) AND SALT WATER PIPELINE EASEMENT S&A JOB NO.: 08-OOBS DRAWN BY: J.W.C. EXHIBIT ��A" PAGE 6 OF 6 DATE: 01-31-09 CHECKED BY: E.S.S SPOONER & ASSOC., INC. 309 BYERS STREET, #100. EULESS. TX 76039. PH 817-281-2355 FAX 817 685-850REV. 2-23-09 -.Will �tlnil_Ielii i,a �lili Y�„,i,11111 Tsuii�ni.i_I_.�hi lu I, I. IIINli li 1.I .Julwn.Al I, illia.I+u.ILilI Ioi,i.i,ImdiJ:iuL G2 0 0 N 0 2 I,1 wo ■s Village Creek Reclaicned Water Delivery Project Parcel 43-5 DOE #6096 4601 State Highway 360 Fort Worth, Texas 76155 STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE EASEMENT DATE: 04-21-2009 GRANTOR: DALLAS-FORT WORTH REGIONAL AIRPORT BOARD GRANTOR'S MAILING ADDRESS (including County): POBOXD DALLAS, DALLAS COUNTY, TX 75205 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, •.. construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of no more than -two water -transmission mains and related facilities --a reclaimed -water main and a salt -water main ---in, under, and across the described property. EASEMENT PROPERTY: Being a portion of Lot 1, Block 1, American Airlines Addition, Fort Worth, Tarrant County, Texas, as recorded in Volume 388-45, Page 97, Plat Records; Tarrant County, Texas, and being more particularly described in Exhibit "A", attached and incorporated for all pertinent purposes. (Property) Grantor, for the considerations paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns an exclusive, .. perpetual easement on, over and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of: multiple pipelines for (1) a reclaimed -water main and (ii) a salt -water main hereafter referred to as "Facilities_" The Facilities include all incidental underground and aboveground 4 attachments, equipment and appurtenances, connections, structures, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, junction boxes in, over; upon, under, along, through and across a portion of the property and more fully described in Exhibit "A'', and depicted in plat of Exhibits "A" & "B" attached and incorporated for all pertinent purposes, together with the right and privilege at any and all tunes to enter property, or any part thereof for the purpose of installing, constructing, reconstructing, operating, maintaining, replacing, upgrading, and repairing the Facilities. Grantor '(i) shall not * use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (ii) erect or permit to be erected within the easement area a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shallbe permitted to maintain any existing concrete driveway or road on the Property. Grantee shall be obligated to restore the surface of the property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not -be obligated to restore'or replace irrigation systems or - other improvements installed in violation of the provisions and intended use of this easement. TO HAVE AND TO HOLD the above -described permanent easement, together with all and singular the rights and appurtenances thereto in anyway belonging _ unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person, whomsoever lawfully claiming or to claim the same, or any part thereof - When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline -Easement, Parcel 3-5 Page 2 _ GRANTEE City of Fort Worth By: Fernando Costa Assistant City Manager %_0 GRANTOR - Daitas-Fort Woich Rcgion<+l .A irj)ort Board By: Name: Title: APPROVED AS TO FORM AND LEGALITY 79� Assistant City Attorney - Date: «. C _J Permanent Reclaimed Water Pipeline Easement and Salt -Water Pipeline Easement, Parcel 3-5 Page 3 A0 10 AClCNC:INLEDGEi'vTENIT STATE OF TEXAS § .. COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared , ,. {tine} of Dallas -Fort Worth Regional Airport Board, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me- that the same was the act of Dallas -Fort Worth Regional Airport Board and that he/she executed the same as the act of said Dallas -Fort Worth Regional Airport Board for the purposes and consideration therein expressed and in the capacity therein stated_ GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 2009_ Notary Public in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of the City of Fort - Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. _ GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 20 •� Notary Public in and for the State of Texas' Permanent Reclaimed -Water Pipeline Easement and Salt -water pipeline Easement, Par oel 3-5 Page 4 00 EM-11131T "A„ Being a variable width permanent reclaimed water pipeline and salt water pipeline easement situated in the remainder of Lot 1, Block 1, American Airlines Addition, being an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Volume 388A5, Page 97, Plat Records, Tarrant County, Texas and being a portion of that same tract of land conveyed to DALLAS-FORT WORTH REGIONAL AIRPORT BOARD by warranty deed as recorded in Volume 6653,. Page 863, Deed Records of Tarrant County, Texas (D.R.T.C.T.), said strip being herein more described by metes and bounds as follows: BEGINNING at a Texas -Department of Transportation Aluminum Monument set in concrete found at the most southerly southeast property comer of the remainder of the said Lot 1, same being on the north right-of-way line of FAA Boulevard, being a variable width right-of-way conveyed to the State of Texas, by deed as recorded in- Volume 4379, Page 272, of the D.R.T.C.T.; THENCE South 89'01'00" West, along the south property line of the remainder of the said Lot 1 and along the said north right-of-way line of FAA Boulevard, a distance of 88.19 feet to a point being at the beginning of a curve to the left having a radius of 780.00 feet; THENCE continuing along the said south property line and along the said north right-of- way line in a Westerly direction along the said curve through an arc length of 3.38 feet and across a chord bearing South 88'53'32" West a distance of 3.38 feet to a point; THENCE North 45*24'42" East a distance of 43.25 feet to a point; THENCE South 8927'01" East a distance of 113.33 feet to a point on the southeast property line of the remainder of the said Lot 1, same being the northwest right-of-way line of of the said FAA Boulevard; THENCE South 62'13'00-West, along the said southeast property line and along the said northwest right-of-way line, a distance of 59.41 feet to the POINT OF BEGINNING containing 0.068 acres (2962.9 Sq. FL) of land more or less. REVISED 2-3-09 OF �= I P.•Gtsi£g1;F.t _...--•-----------•--- ERIC SHAUN SPOONER 5 22 ,{!-FsS�'! �De9I PARCEL 3-5 -- Pg. 5 of 7 ..w 0 50100' PLAT OF EXHIHITs ;I A" & 118" SEE' ATTACHED LEGAL OESCRIPTIONS GRAPHIC SCALE IN FEET ON PAGE 5 AND 6 OF EXHIBITS Ado B" HEREIN 1" = 50' LOT 1, BLOCK 1 AMERICAN AIRLINES ADDITION VOL. J88-45, PG_ 97 P-RTC.T. DALLAS--FOIRT PORTH REGIMAL AIRPORT BOARD VOL. 6653, PC. 863 D_R. T C, T. EXHIBIT "A " L-XHIRIT 8" PERMAAIENT VARIABLE WDTH 3 TEMPORAR Y VARIABLE FVID TN • RECL MVED WA7ER PIPEUM£ AND CONSTRUCTION EASEMENT SALT 07ER PIPELINE EASEMENT 0-213 ACRES (9,285.15 SC FT_) n ITRA A!'RF-S /9 4159 9 SD * FT_ ) e S89 2T'O1 "E 130.00' W N89 27'01- W o ' /ss9 27.01 E N4S24'42 113_.3.3'- Raw. uNE u� 43.25' z 1 'OD'W 562 59 k q a W_ iWE C2 S89 O '� R P_ O.8_ EXHIBIT 8- C 1 88.19 q 00 -AAA BOULEVARD P.O.C. EXHIBIT •B' YARLIBLE OWTH R_O_ Jr TXDOT AUAVIAl YOL. 4373, PG. 272, D_R T_ G T- HWY MON. F7VD (CAI) w � E4 ;o R.0 W_ £ TXDOT AtbUkVUV p HWY MON FAD GtiF NO. WIUS ARC CHORD DIR. •CHORD C 1 780.00 3.38 S88-53 J-91 3-38 %,,W AL UnIFiVD- - NFf'Y AION_ END_ CZ 780,00. 9S_93 S85*12'28I1Y 98.87 NOTE ME B4-9S OF BEAA%GS FOR iN/S .5WWY IS ESTARU-9' ED f??"i DEM I BEARIArCS AS SHOW4 AN K71L 5561 PD 369 OF ME P_ R Tr- T. BE7MEEN TXDOT O F 7 ALUMb1ILW AIANUAfDV - FOLWD ALCWG ME. WST R_D_W_ OF STATE "CH AY 360. �r ���sTEq� 4- VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM -- =•------"--"•' """ fJ21C SHAUN SPOON-- PARCEL NO. -1--5 I)-0_E_ #P275-705140021330 - =.A - 9 SUBDIM510FL• AMERICAN AIRLINES ADDITION O UJCATION: CITY OF FORT WORTH, TARRANT COUNTY. TEXAS PERIN+NENT RECLAIMED WATER PIPELINE f � � o _ all WHOLE PROPERTY ACREAGE 35.925 ACRES PER DEED AND SALT WATER PIPELINE EASOAEWt i S&A JOB N0.: 08-0085 DRAWN BY: E-S.S/R-CS EXHIBITS "�1'dt"Br FA(� % OF / DATE: 01-12-09 CHECKED Br E.S.S._ SPOONi32 & ASSOG, M 309 BYERS STREET. #100, G)LES5, TX 76039, PH 817-281-2355 FAX 817-685- REV 2-23--09 �1 III II.11. Ili,i. Plu ll.,lildn is I..i I: Ii,uL.,yi..W6�u6.u:a dJ Ihiidl.Ih Yd: Yr..a:Llia li d J141.-I:LN I,m Film u�l:lei inJni ii'.+au.ii.i nj.l iii: it iii Ji:111LJJl..ihnl L'I+i:41., .J16i IIr.JI:S:L'Loli 00 .w Village Creek Reclaimed Water Project Parcel # 3-SAI Doe # 60,6 .•• 4601 State Highway 360 Fort Worth, Texas 76155 .. STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE TEMPORARY CONSTRtTCTION EASEMENT DATE: 4-21-2009 GRANTOR: DALLAS-FORT WORTH REGIONAL AIRPORT BOARD GRANTOR'S MAILING ADDRESS (including County): POBOXD DALLAS, DALLAS COUNTY, TX 75205 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST_ FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. MW EASEMENT AREA: See Exhibits "A" and `B", attached and incorporated for all pertinent purposes. -= Grantor, for the considerations paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns an exclusive temporary construction easement in, under, and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple pipelines for a reclaimed -water main. Upon completion of the construction of the reclaimed -water main, all rights granted within the temporary construction easement shall cease, and all operations, maintenance and repair shall be confined to the permanent easement for the reclaimed -water main. ww No r TO LEAVE Alt, MI TO HOLD the above -described temporaq construction easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever, and Grantor does -hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against w. every person whomsoever lawfully claiming or to claim the same, or any part thereof When the context. requires, singular nouns and pronouns include the plural. GRANTOR Dallas -Fort Regional Airport Board By: Name: Title: GRANTEE City of Fort Worth By: Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Temporary Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 2 wo STATE OF TEXAS § COUNTY OF TARRANT § ACK T!�IOW LF,0GFPv!ENT BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared , (title) of Dallas -Fort Worth Regional Airport Board, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Dallas -Fort Worth Regional Airport Board and that he/she executed the same as the act of said Dallas -Fort Worth Regional Airport Board for the purposes and consideration therein expressed and in the capacity -+ therein stated - GIVEN UNDER MY HAND .AND SEAL OF OFFICE this day of 720 Notary Public in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANI' - § BEFORE ME, the undersigned authority, our this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to ire to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the .same as the act and deed of the City of Fort Worth., a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 20 Notary Public in and for the State of Texas vM TeMorsry Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 3 W Being a variable width temporary construction easement in the remainder of Lot 1. Block 1, American Airlines -Addition, being an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Volume 388-45, Page 97. Plat Records, Tarrant County. Texas and being a portion of that same tract of land conveyed to DALLAS-FORT WORTH REGIONAL AIRPORT BOARD by warranty deed as recorded in Volume 6653, Page 863, Deed Records of Tarrant County, Texas (D.R.T.C.T.), said strip being herein more described by metes and bounds as follows: COMMENCING at a Texas Department of Transportation Aluminum Monument set in concrete found at the most southerly southeast property comer of the remainder of the said Lot 1-,-same being on the north right-of-way tine of FAA Boulevard, being a variable width right-of-way conveyed to the ;state of Texas, by deed as recorded in Volume 4379, Page 272, of the D.RT.C.T.; THENCE South 89'01'00" West, along the south property line of the remainder of the said Lot i and along the said north right-of-way line of FAA Boulevard, a distance of 88.19 feet to a point being at the beginning of a curve to the left having a radius of 780.00 feet; THENCE continuing along the said south property line, along the said north right-of-way L line in a Westerly direction along the said curve through an arc length of 3.38 feet and across a chord bearing South 88°53'32" West a distance of 3.38 feet to the POINT OF BEGINNING; THENCE continuing along the said south property line and along the said north right-of- way line and in a Westerly direction along the said curve through an arc length of 96.93 feet and across a chord bearing South 85*12'28" West a distance of 96.87 feet to a point. - THENCE North 00'37'51" East a distance of 82-17 feet to a point; THENCE South 89D27'01" East a distance of 130..00 feet to a point; THENCE South 00`37'51" West a distance of 42.50 feet to a point; THENCE North 89"27'01" West a distance of 3.10 feet to a point; THENCE South 45*24`42" West a distance of 43.25 feet to the POINT OF BEGINNING containing 0.213 acres (9,285.6 Sq. Ft.) of land rinore or less. OF T - ER1C SHAUN SPQ t REVISED: 2-23-09 - -= P 22�� _a o _. PARCEL 3-5 -- Pg_ 6 of 7 ow ow .s win 0., 50' 100' PLAT OF EXHIBITS ` "A" & "g" SEE A TTACHED LEGAL DESCRIPTJLTNS GRAPHIC SCALE IN .FEET ON PAGE S ANO 6 OF EXH181TS A B" "CRE11"ll = 50' LOT[, BLOCK I AMERICAN AIRLINES AODI T/ON VOL. 388-45, PG. 97 P.R. T C. T i DALLAS—FORT 1WR7H REGIONAL AIRPORT BOARD VOL 6653, PC 853 d R r, c_ r. EXHIBIT ExNieir 'A' - B "" PQ4MANE�Ir VARIABLE f4r11DTN T£MPORAR Y VARIABLE WIDTH RECLAIMED fYA7ER P/PEZINE AND CO,NSTRUCIII)N EASEMENT SALT t4'ATER PJPEUN£ EASEA•/EIIrT 213 ACRES (9,2856 SO. FT) 0 068 ACRES (2,962. 9 SO. - FT-) S8927101 "E - 130. 00' 3 A 2 ij j 3.10 vW N892710I "W S89 27 D 1 E _InN45'24 42 E �,/ ! 13.33 -<�R.O. w. UNEcz rr: ?~� 4 25' ap0 >C2! �£ CZ S89"Ol'DO'W S -RO.w L 68.19" P.O-B. EXHIBIT B" C1 q P.O.B. EXH/BIT A" �. FAA BOULEVARD P 0.C. EXHIBIT 8` � � cb TX h' VARMBLE #7D.O- R: TXOOi AL 11MINUM VOL- EL 4373, PC- 272, D_KT C T. HWY MCAT. FND. (CU) R-0 µ= vNE TXVOT ALUMINUM Oy HWY MON_ FND_ 'Qo,� _ �yF A10_ RADIUS ARC CHORD 912 CHORD C1 780.00 3.38 S88'53'32 f' 3-38 iIII ALiidritiii�-f _ III MOH_ FNa go C2 780-00 96.93 S85'1228-W 95.87 NOTE ONE BA9'S Of BEARINGS fVR TMS SURLY IS ESTAbV57-f D FRW DEEV BEARINGS AS SHO{NV aV VIX. 5561 PC J3 t9 OF 1NE D-R TC % BEnffZN TXDOT 1 OF T Nor ACUMINUAI �IONUM£NTS FOUND ALONG THE WEST R. 0. W OF SM 7F HIGHWAY 360 �� ° s TE q f F4- VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM ERIC SHAUN SPOONER ......................... PARCEL N0. 3-5 D-O.E. #P275-705140021330 _ SUBMMSION: AMER/CAN AIRUNES ADDITION T' LOCKnOft. CITY OF FORT WORK TARRANT. COUNTY. TEXAS P111WENT REC QUED WATER PIPEME ,ILK-r- PROPERTY ACREAGE: 35-925 ACRES PER OECD AND SALT WATER PIPEiINE £ASEMIENT 1 �' `y ,&A roe NO.: 08-OWS (DRAWN BY. F-S.s/1LCS. f T F�IIBITS "A"dC`S` PAGE 7 OFATE- 01-12-09 ! CHECKED BY E-S.S_SPOONER & ASSOC., INC.309 BWtS STREET. J104 EULESS, TX 76039. PH 817-281-2355 FAX 817-685-8 WBii• I..,. ❑II IN, t ILL.lc Ill III, I i l u: 11:.,11. diluid.l .III JI-,._.1111,16-h1.1 l 11,141JI III I. Si. iiu..1 .1 11 111 111.ini.i a. Juildub.J. l.—Iiiii.: 111.1 REV 2-2.3-09 I--.'hu 1.1. uIII, n. mo .. .. Village Creek Reclaimed Water Delivery Project Parcel # 3 5A DOE # 6096 4500 Block of SH 360 Fort Worth, Texas 76155 STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE EASEMENT DATE: 08-06-2009 GRANTOR: CENTREPORT VENTURE, INC. GRANTOR'S MAILING ADDRESS (including County): 8115 PRESTON ROAD, SUITE 700 DALLAS, DALLAS COUNTY, TX 75225 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): .. 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of no more than two water -transmission mains and related facilities —a reclaimed -water main and a salt -water main —on, under, across, and through the described property. EASEMENT PROPERTY: Being a portion of that certain tract situated in the Vincent J. Hutton Survey, Abstract No. 681, being a part of that same 1.009 acre tract of land as recorded in Volume 10169, Page _ 1067, Deed Records, Tarrant County, Texas, and being more particularly described in Exhibit °A°, attached and incorporated for all pertinent purposes: (Property) IL Grantor, for the considerations paid to Grantor and other good and valuable consideration, hereby .grants, sells, and conveys -to Grantee, .and its assigns an' exclusive, perpetual. easement on, under, across, and through the Property for the .. am installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of pipelines for (i) a reclaimed -water main and (ii) a salt -water main hereafter referred to as "Facilities_" The Facilities include all incidental underground and aboveground attachments, equipment and appurtenances, connections, structures, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, junction boxes in, over, upon, under, along, through and across a portion of the Property, together with the right and privilege at any and all times to enter Property, or any part thereof, for the purpose of installing, constructing, reconstructing, operating, maintaining, replacing, upgrading, and repairing the Facilities. Grantor (i) shall not use or allow use of the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (ii) erect or permit to be erected within the Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to maintain any existing concrete driveway or road on the Property. s Grantee shall be obligated to restore the surface of the Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this easement. Grantor may grant other utility providers the right to cross the easement area only (i) if the crossing is at an angle between 450 and 900 and (ii) if the crossing is below the reclaimed -water main and salt -water main pipelines with a clearance of five feet. At least 30 days before the date on which construction of an asphalt or concrete road or street that will be located wholly or partly on or over the reclaimed -water main and salt -water main pipelines is scheduled to begin, the Grantor or its successors and -- assigns must submit plans for the proposed construction to the Grantee. TO HAVE AND TO HOLD the above -described permanent exclusive y easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever, and Grantor does hereby bind itself and its successor and assigns to warrant and forever — defend all and singular the easement to Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 2 .. r r uw CENTREPORT VENTURE, INC. By: Daniel Bradley Title No GRANTEE City of Fort Worth ..� By: Fernando Costa Assistant'City Manager KI 9" APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 3 r ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § ed BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Daniel Bradlev, , known to me to be the same person whose name is subscribed to -the foregoing instrument, _ and acknowledged to me that the same was the act of Centreport Venture, Inc., a corporation and that he executed -the- same as the act of said Centreport Venture, Inc. for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of , 2009. Notary Public in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned- authority, on this day personally appeared ~� Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and -officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of.the City of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 20 Notary Public in and for the State of Texas Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 4 go EXHIBIT "A" Being a 25' wide permanent reclaimed water pipeline and sail ,,niater pipeline easemen MW situated in the Vincent J. Hutton Survey, Abstract No. 681, City of Fort Worth, Tarrant County, Texas and. being a portion of that same 1.009 acre tract of -land conveyed to CENTREPORT VENTURE INC. by warranty deed as recorded in Volume 10169, Page 1067, Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows: BEGINNING at a point on the northeast property line of the said 1.009 acre tract, same being a west property line of the remainder of a tract of land conveyed to the City of Fort Worth by warranty deed as recorded in Volume 2037, Page 567 and Volume 2008, ow Page 243, D.R.T.C.T., said beginning point being located South 54°12'46" East a distance of 123.85 feet from a TXDOT highway aluminum disk survey marker found at a north property corner of the said 1.009 acre tract; .. "M .r .. THENCE South 54°12'46" East, along the said property lines, a distance of 127.96 feet to the east property corner of the said 1.009 acre tract, same being a west property comer of the said City of Fort Worth tract; THENCE South 31°47'14" West, along a southeast property line of the said 1.009 acre tract and along a west property line of the said City of Fort Worth tract, a distance of 25.06 feet to a point; THENCE North 54°12'46" West a distance of 120.47 feet to a point; THENCE North 89*49'16" West a distance of 135.28 feet to a point on the west property line of the said 1.009 acre tract, same being the east right-of-way line of State Highway No. 360, being a variable width right-of-way; THENCE North 09°36'29" East, along the said west property line and along the said east right -of -way -line, a distance of 26.06 feet to a point; THENCE South 89°49'16" East a. distance of 138.05 feet to the Point of Beginning containing 0.152 acres (6,618.9 Sq. Ft.) of land more or less. REVISED: 2-23-09 PARCEL 3-5A-- Pg. 5 of 6 S T rF � ...................... ERIC SHAUN SPOONER o I I PLAT OF EXHIBIT. "A" 0.04 ACRES SEE A TTA CUED LEGAL DESCRIP77ON Cli BY QUITCLAIM DEED ON PACE 5 OF EXHIBIT "A " HEREIN I CENTREPO.RT IiEN7U,'E, INC. " IQ` I ' 7: C. CJ. No. O208001 B3G D.R. T.C.T. fi TXDOT HIGHWAY ALUMINUM DISK 1\ SURVEY MARKER REMA/NDER OF CITY OF FORT WORTH FUTURE FAA BOULEVARD - ti G �� VOL. 2037, PG 567 RIGHT —OF WAY ►•�'+ c� I �' & VOL. 2008, PAGE 24J D.R. T.C.T. \ I 1 APPROX. LOCA77ON OF- A f7W WATER ESMT TC.C.1.No. D19075560J D.R. T.C. T P.O.B. APPROX. LOC477ON OF A 10' UNDERGROUND S89'49'16"E 138.05' s DCH/BIT A' TELEPHONE EASEMENT T C_C.1.No, D 190155605 `sue j D-R. T.C. T. 135.28' / L — _ — N89'49_1 B'�V / ----= /- - - - - - - - - - - - - --- EXHIBIT "A" 'a I l PERMANENT 25' WIDE 9 / RECLAIMED WATER PIPLLINE AND a' - 'Imp/ / SALT WATER PIPELINE E4SEMENT 0. 152 ACRES (6,618.9 SO. FT)No / 1.009 ACRES (DEED I l VINCENT J. HUTTON SURVEY •• l l ABS. No. 681 l CENTREPORT VENTURE INC. / / VOL.-10169, PG. 1067 *� D.R. T.C. T_ 0 40' _ 80, No. DIRECTION DIST. R.O. tY, LIVE — L 1 'S31'47 14 lY 25.06, — GRAPHIC SCALE 1N FEET 12 1V09736'291_ 26.06' 1 " = 40' - r NOTE• 7HE BASIS OF BEARINGS FAR WS SURVEY IS ESTABU-WED FROM COORDINATES 57TOWN FAR I CONTROL POINTS ON SIVEETS 4-5 OF THE TRANSYS7 W S PLANS FOR THE 36' WATER MAIN OF T _ EXTENSJONJ ALONG 7RINITY RAILWAY EXPRESS ROW FROM GREENBEZT T I FA( 157 OYVV7RACT L 5 iE - F s - VMLAGE CREEK RECLAIlvIED WATER DELIVERY SYSTEM •••...................... ERIC SHAUN SPOONER PARCEL NO. 3-5A D.O.E. #P275-705140021330 ��r92 SURVEY: VINCENT J. HUTTON SURVEY. ABS. Na 681 P r LOCATION: CITY OF FORT WORTH. TARRANT COUNTY, TEXAS PERMANENT RECLAIMED WATER PIPELINE F �' O� WHOLE PROPERTY ACREAGE 1.009 ACRES (DEED) AND SALT WATER PIPELINE EASEMENT S&A JOB NO.: 08-0085 DRAWN BY: J.W.C. -EXHIBIT "A" PAGE 6 OF 6 or DATE 02-01-09 ! CHECKED BY: ES.S_ !y _ SPOONER do ASSOC- INC 309 BYERS STREET. 1100, EULESS, TX 76039. PH 817-281-2355 FAX 817-685-850� -REV. 2-23-09 I _ . .. .16 _1 I.. 1. "— I a ❑� Ill i6 All i 11 —. di. i.11 I.,. I dl{i i_IIli� 1111.1 i—_ III. i _. wm UW EXHIBIT "A" - Being a 25' wide permanent reclaimed water pipeline and salt water pipeline easement situated in the Vincent J. Hutton Survey, Abstract Number 681, City of Fort Worth, Tarrant County, Texas and being a portion of the remainder of a tract of land conveyed to the CITY OF FORT WORTH by warranty deed as recorded in Volume 2037, Page 567 and Volume 2008, Page 243 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows: BEGINNING at a point on a southwest property line of the said City of Fort Worth tract, same being the northeast property line of a tract of land conveyed to Centreport Venture Inc. by warranty deed as recorded in Volume 10169, Page 1067, D.R.T.C.T., said beginning point being located South 54°12'46" East a distance of 243.66 feet from a TXDOT highway aluminum disk survey marker found at a west property comer of the said City of Fort Worth tract, same being a north property corner of the said Centreport tract, said beginning point being at the beginning of a curve to the left with a radius of 1011.50 feet; THENCE in an Easterly direction, along the said curve through an arc length of 541.48 feet and across a chord bearing North 72°36'15" East, a distance of 535.04 feet to a point; THENCE North 57032'00" East a distance of 572.66 feet to a point at the beginning of a curve to the right having a radius of 1488.50 feet; THENCE in a Northeasterly direction, along the said curve through an arc length of 313.53 feet and across a chord bearing North 63°34'02" East, a distance of 312.95 feet .. to an east property line of the said City of Fort Worth tract, same being the west right-of- way line of FAA Boulevard, being a variable width right-of-way dedicated by Centreport - Phase IIIA, being an addition to the City of Fort Worth according to the plat recorded in Cabinet A, Slide 12981, Plat Records, Tarrant County, Texas (P.R.T.C.T.), said point being at the beginning of a curve to the left having a radius of 50.00 feet; THENCE in a southwesterly direction, along the said east property line, along the said west right-of-way line and along the said curve through an arc length of 31.75 feet and across a chord bearing South 16002'27" West, a distance of 31.22 feet to a point at the -' beginning of a curve to the left having a radius of 1463.50 feet; THENCE in a Southwesterly direction, along the said curve through an arc length of 289.77 feet and across a chord bearing South 63'1212" West, a distance of 289.30 feet to a point; THENCE South 57°32'00" West a distance of 572.55 feet to a point at the beginning of a curve to the right having a radius of 1036.50 feet; PARCEL 3-6 - Pg. 5 of 10 1 f1 _l it M1 !: jIi ^ i�ILI 1 1 feet and across a chord bearing South 72°47'53" West, a distance of 554.91 feet to a point on a west property line of the said City of Fort Worth tract, Same being -on a southeast property line of the said Centreport tract; t-HENICE North 31'zi-_1 14" East, along Uie said prolbe)iy fides, a distance of 24.05 feet to the west property corner of the said City of Fort Worth tract, same being an east property corner of the said Centreport tract; " THENCE North 54°12'46" West, along the said southwest property line of the City of Fort'Worth tract, same being the said northeast property line of the Centreport tract, a distance of 8.15 feet to the POINT OF BEGINNING containing 0.815 acres (35,497.2 Sq. Ft.) of land more or less. ;�W_ OF T .......................... ERIC SHAUN SPOONER ...... ..... ......... 9 S \ ot4v-- REVISED: 2-23-09 f PARCEL 3-6 — Pg. 6 of 10 so Being a variable width temporary construction easement situated in the Vincent J. Hutton Survey, Abstract Number 681, City of Fort Worth, Tarrant County, Texas and being a portion of the remainder of a tract of land conveyed to the CITY OF FORT k-YO R'17H by warranty deed as recorded in Volume 2037, Page 567 and Volume 2008, Page 243 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows: BEGINNING at a point on a southwest property line of the said City of Fort Worth tract, same being the northeast property line of a tract of land conveyed to Centreport Venture Inc. by warranty deed as recorded in Volume 10169, Page 1067, D.R.T.C.T., said beginning point being located South 54°12'46" East a distance of 243.66 feet from a TXDOT highway aluminum disk survey marker found at a west property comer of the said City of Fort Worth -tract, same being a north property corner of the said Centreport tract; THENCE North 54°12'46" West, along the said property lines, a distance of 174.48 feet to a point; THENCE South 89°46'51" East a distance of 207.03 feet to a point; THENCE South 00'13'09" West a distance of 71.65 feet to a point at the beginning of a curve to the left having a radius of 986.50 feet; THENCE in an Eastedy direction, along -the said curve through an arc length of 461.87 feet and across a chord bearing North 70°40'39" East, a distance of 457.66 feet to a point; THENCE North 57°32'00" East a distance of 572.72 feet to a point at the beginning of a curve to the right having a radius of 1513.50 feet; IM THENCE in a -Northeasterly direction, along the said curve through an arc length of 371.15 feet and across a chord bearing North 64'33'30" East, a distance of 370.22 feet to a point; THENCE South 16°04'13" East a distance of 15.68 feet to a point on a south property line of the said City of Fort Worth tract, same being on the north right-of-way line of FAA •- Boulevard, being a variable width right-of-way dedicated by Centreport - Phase MA, being an addition to the City of Fort Worth according to the plat recorded in Cabinet A, Slide 12981, Plat Records Tarrant County, Texas (P.R.T.C.T.); THENCE South 71'38'17" West, along the said property line and along the said right--of- way line, a.distance of 21.23 feet to a point at the beginning of a curve to the left having a radius of 50.00 feet; PARCEL 3-6 -- Pg. 7 of 10 I . ii_1';c,i: '1 :a Ci!LIIi:Yi a 0, pilfer iiL?1?, ('-o!' 1(i [a! :� west right-of-way line and along the said curve through an arc length of 31.87 feet and `r across a chord.bearing South 52029'30" West, a distance_ of 31.33 feet to a point at -the beginning of a curve to the left having a radius of 1488.50 feet; THENCE in a Southwesterly direction, along the said curve through all are; lengih of 313.53 feet and across a chord bearing South 63°34'02" West, a distance of 312.95 feet to a point; THENCE South 57'32'00" West a distance of 572.66 feet to a point at the beginning of a curve to the right having a radius of 10 11. 50 feet; THENCE in a Westerly direction along the said curve through an arc length of 541.48 feet and across a chord bearing South 72036'15" West a distance of 535.04 feet to the POINT OF BEGINNING containing 1.114 acres (48,521.5 Sq. Ft.) of land more or less. eo —� OF T ERIC S U- N SPOONER PARCEL 3-6 -- Pg. 8 of 10 MW .r Being a 25' wide permanent reclaimed water pipeline and salt water pipeline easement situated in the Vincent J. Hutton Survey, Abstract _Number 681, City of Fort Worth, Tarrant County, Texas and being a portion of the remainder of a tract of land conveyed io the: CiP i 01F i'CIRY V� )"P. ! lit b- v arranty deed as fecotded in Volume 203r, Page 567 and Volume 2008, Page 243 of the Deed Records of Tarrant County, Texas (DR-T.C.T.), said easement being herein more particularly described by metes and bounds as follows: BEGINNING at an east property corner of the said City of Fort Worth tract, same being the southeast property comer of a tract of land conveyed to the Chesapeake Exploration, L.L.C., by warranty deed as recorded in Tarrant County Clerks Instrument No. (T.C.C.I.No.), D207309369, D.R.T.C.T., said beginning point being on the west property line of Lot 3, Block 113, Centreport — Phase 111A, being an addition to the City of Fort Worth according to the plat recorded in Cabinet A, Slide 12981, Plat Records Tarrant County, Texas (P.R.T.C.T.),; MW THENCE South 16°04'13" East, along the said west property line of Lot 3,same being an east property line of the said City of Fort Worth tract, a distance of 6.99 feet passing the southwest property corner of the said Lot 3, continuing in all a total distance of 17.48 feet to a south property comer of the said City of Fort Worth tract, said point being on the north right -of --way line of FAA Boulevard, being a variable width right-of-way dedicated by the said Centreport — Phase IIIA; r THENCE South 71'38'17" West along. a south property line of the City of Fort Worth tract and along the said north right-of-way line of FAA Boulevard, a distance of 25.02 feet to a point; THENCE North 16°04'13" West a distance of 18.28 feet to a point on a north property line of the said City of Fort Worth Tract, same being the south property line of the said Chesapeake tract, said point being at the beginning of a curve to the right with a radius of 1,505.00 feet; THENCE in an easterly direction along the said property lines and along the said curve through an arc length of 25.00 feet and across a chord bearing North 73027'27" East a distance of 25.00 feet to the POINT OF BEGINNING containing 0.010 acres (447.9 Sq. Ft.) of land more or less. a eAa s` OF T s Q S T E,pFo - ...............•.. ERIC SHAUN SPOONER 9.. REVISED: 2-23-09 �` . PARCEL 3-6 — Pg. 9 of 10 .r um .. rs No. DIRECTION L 1 NJ 47'14 - L2 N54'1246IV L4 S89-4651 E L5 S00.13 09'W L6 N16'04'IJIY L7 S16104'13E L8 571:38'17'W L9 S16'04'13E L10 S71'38'17W L 11 S54'12 46 E PLAT OF EXHIBITs "A","B"&'c"; SEE ATTACHED LEGAL DESCRIPTION ON PACEs 5-9 OF EXH/B/Ts 'A ; B & C" HEREIN 60' GRAPHIC ; . SCE IN FEET 16.47 ACRES' 40LOT 3, BLOCK 113 CENIREPORT - PHASE //14 CAB. A SLD. 12981 P R. T.C. T. DETAIL OF EXHIBIT 'C' % CIRF P.O.B. \ REMAINDER OF PA7E 554r/ aTY O!F FORT KW 7H CS � PG. 567 I Ci \ VOL. 2037, _ & VOL. 2008, PAGE 24J rn ADII ACREY D.R. T.C. T. ESIPEi1KE EXPLLK'ATIOYI( LL c 1 �8 L 1 DE 50?#MV AS DRaL SIX Al r.O hlb. D207-W569 \ g DI PERMANENT 25' WDE R ED WATER PIPELINE AND - EXHIBIT IS 51LT WA7ER PIPEZ/IVE EASEklEN7 0.010 ACRES (44X9 S8 FT) VARL48LE WIDTH TEMPORARY 7 T 1.409 ACRES (DEED) CONSTRUCTION EASEMENT CENTREPORT VENTURE INC. 1.114 ACRES � C2 T.CC.-LNa D208001896 (Al SO. FT.) ►" [ze21 D.R T_C- T. Damn- :4" PA7F 5647' C3 DIST 24.05' 8. 15' f7:7'-'ll- 207.0.3' 71.65' 18.28' 15.68' 21.23' 17.48' 25.02' 24,3.66' PERUWDVT 25' ► IDE 572.72' ' RECUV ' WATER P'PE7JNE AND {7� N57732 00 'E _ S4LT WATER PIPE7JNE EASEWDVr l y�2 ,•� 0.815 ACRES (35_,497.2 SO. f7:) 0fl �t BOULEVARD ��J� Dn T wT h6GHWAY P� 2 FAA BOULr I'ARD IA","� 'L 0� Sy? 3 VARIABLE #MTI1 R. O. w P.O.bL EX!!!B/Ts CAB. A, SLIDE 12981, C6 �y 2 yy P_R.T.C.T. C1 y� L 4 NO. RADIUS ARC CHORD DIR. CHORD <� C 1 1011.50 541.48 N72136'15 E 535.04 If C2 1488.50 313.53 N63'34'02 E 312.95 FUTURE FAA BOULEVARD C .3 50.00 31.75 S16102W IW 31.22 L1 xrcxT-oF WAYC4 1463.50 289.77 S63'12'12'W 289.30 1.009 ACRES (DEED) C5 1036.50 561.76 S7247 5.31W 554.91 A CENIREPORT VENTURE INC. 1 986.50 461.87 N70'40'39 E 457.66 VOL 10169, PG. 1067 1 1513.50 37L 15 N64'33'30 E 370.22 5/8- IRE D.R-T.C.T. C8 1505.00 25.00 N73'2727E 25.00 C9 50.00 JL37 S5229'30'W 31.33 NOTE THE BA57S OF BEARINGS FOR THIS SURVEY IS ESTABLISHED FROM COORDINATES &VO►!7V FOR _ CaV,TRCV PCYN75 ON ,SHEETS 4-5 OF THE TRANSYSTEV S PL AFS FOR THE 36' WATD? MAIN EXTENSION OF ALONG TRINITY RAILWAY EXPRESS ROW fROW GREDIII T TO FM 157 CCYVTRACT 1. C')- VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM ••= - = _ ERIC SHAUN SPOONER PARCEL NO. 3D.O.E. #P275-705140021330 5 2 -6 PERMANENT RECLAIMED WATER P1PEL1 o........ _ SURVEY VINCENT J. HUTTON SURVEY, ABSTRACT No. 681 •�..:Pa LOCATION: CITY OF FORT, WORTH, TARRANT COUNTY, TEXAS NF s WHOLE PROPERTY ACRE -AGE: AND SALT WATER PIPELINE EASEMENT � S&A JOB NO.: 08-0085 DRAWN BY J.W.C_ DATE 1-30-09 CHECKED BY E.S.S. EXHIBITS "A","8'!!c'C" PAGE 10 OF 10 SPOONER do ASSOC., INC. 309 BYERS STREET, 1100, EULESS, TX 76039. PH 817-281-2355 FAX 817-685-85 REV. 2-23-09 i,Y. !ail I. _ _ .I_ !ilL._!, ul WIIILL. V. JI iI _ III■ •• Village Creek Reclamation Parcel # 3-7 Doe It P275-705140021330 Vacant Land on FAA Boulevard Vincent J. Hutton Survey, Abst. No. 681 STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE EASEMENT DATE: July 24, 2009 GRANTOR: CHESAPEAKE EXPLORATION, L.L.C. - GRANTOR'S MAILING ADDRESS (including County): 6100 N. WESTERN AVENUE OKLAHOMA CITY, OKLAHOMA COUNTY, OK 73118 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair ^' of no more than two water -transmission mains and related facilities —a reclaimed -water main and a salt -water main —on, under, across, and through the described property. EASEMENT PROPERTY: Being a portion of that certain tract situated in the Vincent J. Hutton Survey Abstract No. 681, being part of the 6.011-acre tract as recorded in Tarrant County Clerk's Instrument Number D207309369, Deed Records, Tarrant County, Texas, and being more particularly described in Exhibit "A", attached and incorporated for all pertinent purposes. (Property) Grantor, for the considerations paid to Grantor and other -good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns an exclusive, perpetual easement on, under, across, and through the Property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of pipelines for (i) a reclaimed -water main and (ii) a salt -water main hereafter referred to as "Facilities-" The Facilities include all incidental underground and aboveground attachments, equipment and appurtenances, connections, structures, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, junction boxes in, over, upon, under, along, through and across a portion of the Property, together with the right and privilege at any and all times to enter Property, or any part thereof, for the purpose of installing, constructing, reconstructing, operating, maintaining, replacing, upgrading, and repairing the Facilities. Grantor (i) shall not use or allow use of the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (ii) erect or permit to be erected within the Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to maintain any existing concrete driveway or road on the Property. _ Grantee shall be obligated to restore the surface of the Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the - provisions and intended use of this easement. Grantor may grant other utility providers the right to cross the easement area only (i) if the crossing is at an angle between 450 and 900 and (ii) if the crossing is below the reclaimed -water main and salt -water main pipelines with a clearance of five feet. At least 30 days before the date on which construction of an asphalt or concrete road or street that will be located wholly or partly on or over the reclaimed -water main and salt -water main pipelines is scheduled to begin, the Grantor or its successors and assigns must submit plans for the proposed construction to the Grantee. TO HAVE AND TO HOLD the above -described permanent exclusive easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement to Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. When the context requires, singular nouns and pronouns include the plural. (SIGNATURES APPEAR ON THE FOLLOWING PAGE] y Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 2 GRANTOR CHESAPEAKE EXPLORATION, L.L.C. an Oklahoma lirnited liability company By: Name Title GRANTEE City of Fort Worth By: Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date. - Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement Page 3 ACKNOWLEDGEMENT STATE OF § COUNTY OF BEFORE ME, the undersigned authority, a Notary Public in and for the State of , on this day personally appeared , known to me to be the same person whose name is subscribed to. the foregoing instrument, and acknowledged to me that the same was the act ` of and that he/she executed the. same as the act of said for the purposes and consideration therein expressed and in the capacity therein stated. ` GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of , 20 ' Notary Public, State of ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared _ Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of , 20 Notary Public in and for the State of Texas Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline_ Easement Page 4 .. Village Creek Reclamation Parcel # 3-7 Doe 4 P275-705140021330 ... Vacant Land on FAA Boulevard Vincent J. Hutton Survey, Abst. No. 681 CITY OF FORT WORTH TEMPORARY RIGHT OF ENTRY DATE: July 24, 2009 GRANTOR: CHESAPEAKE EXPLORATION, L.L.C. GRANTOR'S MAILING ADDRESS (including County): 6100 N. WESTERN AVENUE OKLAHOMA CITY, OKLAHOMA COUNTY, OK 73118 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): c/o TPW/ROW&Easements Group 1000 Throckmorton Street Fort Worth, Texas 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. RIGHT OF ENTRY: GRANTOR, for the consideration paid to GRANTOR, hereby grants, sells, and conveys to GRANTEE, its successors and assigns, a temporary right of entry onto the property to construct an underground Permanent Water Reclamation Main .. ("Facility") in, upon, under, through, and across a 25-foot wide strip of land -more fully described in Exhibit "A", attached and incorporated ("Water Reclamation Main Property"), together with the right and privilege at any and all times to enter the Water Reclamation Main Property, or any part thereof, for the purpose of constructing and operating the Facility. GRANTOR covenants and agrees it will not use the Water Reclamation Main Property in a manner that interferes with the construction of the Facility. Upon execution .of this right of entry, GRANTOR will grant the GRANTEE and its .. employees, agents, representatives, and contractors access to the Water Reclamation Main Property to construct and operate the Facility until such time as the GRANTOR grants the GRANTEE a permanent water -main easement. TO HAVE AND TO HOLD the Water Reclamation Main Property, together with all ! and singular the rights and appurtenances the,—eto in airy«°ay belonging to GRANITE, and GRANTEE's successors and assigns forever; and GRANTOR does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the Water Reclamation Main Property to.GRNATEE, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. City shall restore GRANTOR'S Property to the same. or similar condition that existed immediately before it accesses the GRANTOR'S Property under this right of entry. Executed to be effective as of the date first written above. GRANTOR CHESAPEAKE EXPLORATION, L.L.C. an Oklahoma limited liability company By: Printed Name: Title: ACKNOWLEDGEMENT STATE OF § COUNTY OF BEFORE ME, the undersigned authority, a Notary Public in and for the State of , on this day personally appeared known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of , and " that he/she executed the same as the act of said for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 20- Notary Public, State of PA EXHIBIT "A" Being a 2'5' wide perrnarlent reclairrred water pipeline and salt water pipeline easement situated in the Vincent J. Hutton, Abstract Number 681, City of Fort Worth, Tarrant County, Texas and being a portion of that same 5.011 acre tract of land conveyed to CHESAPEAKE EXPLORATION, L.L.C. by warranty deed as recorded in Tarrant MW County Clerk's Instrument Number (T.C.C.I.No.) D207309369 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.), said strip being herein more described by metes and bounds as follows: BEGINNING at a 518" iron rod with cap stamped "PATE 5647" found at the northeast property comer of the said Chesapeake tract, same being an east property corner of the remainder of that tract of land conveyed to the City of Fort Worth, by deeds as recorded in Volume 2037, Page 567 and Volume 2008, Page 243, D.R.T.C.T., said comer being on the west property line of Lot 3, Block 113, Centreport — Phase IIIA, being an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat thereof recorded in Cabinet A, Slide 12981, Plat Records, Tarrant County, Texas; THENCE South 15028'57" East, along the east property line of the said Chesapeake tract, same being the said west property line of Lot 3, 489.00 feet to the southeast property comer of the said Chesapeake tract, same being a north property comer of the remainder of the said City of Fort Worth tract, said comer also being at the beginning of a curve to the left having a radius of 1505.00 feet; THENCE along the south property line of the said Chesapeake tract, a north property line of the remainder of the said City of Fort Worth tract and in a Westerly direction along the said curve through an arc length of 25.00 feet and across a chord bearing South 74002'42" West 25.00 feet to a point; THENCE North 15°28'57" West 489.05 feet to a point on the north property line of the said Chesapeake tract, same being a south property line of the remainder of the said City of Fort Worth tract, said point also being at the beginning of a curve to the right having a radius of 1994.00 feet; THENCE in a Easterly direction, along the said property lines and along the said curve .. through an arc length of 25.00 feet and across a chord bearing North 74'09'25" East 25.00 feet to the Point of Beginning containing 0.281 acres (12,225.4 Sq. Ft.) of land more or less. f 0 F TF' �P. E•G + � RFO -+9 tP ERIC SHAUN SPOONER ............... 5 2 9 �P° F t REVISED: 2-23-09 /fit PARCEL 3-7 — Pg. 5 of 6 PLAT OF EXHIBIT "A" c SEE ATTACHED LECAL DESCRIPTION ON PACE 5 OF EXHIBIT A " HEREIN / j RiSUAINDER OF o a CITY OF FORT WORTH VOL 2037, PC_ 567 I VOL 2008, PACE 243 D_R_T.0 T_ 513 " CIRF • "PATE 5647" EXHIBIT "A " PERMANENT 25' WIDE RECLAIMED WATER PIPELINE AND SALT WATER PIPELINE EASEMENT 0.281 ACRES (12,225.4 SO. FT.) CJ► �% Stl P_ O. B. EXHIBIT A " 518 " CIRF 'PATE 5647" LOT 3, BLOCK 113 CENTREPORT — PHASE //lA C46. A, SLO. 12981 P-R. T.C. T_ .. = KAICENT ✓. HUTTON SURVEY — _ ABSTRACT No. 681 = ' Z 5.011 ACRES (DEED) - - CHESAPEAKCE EXPLORA 710N, L.L.C. = DESCR/BED AS "DRILL SITE Al" v T- C. C. LNo. 0207309369, D.R. T- C. T- �t r .- m� 0 100' 200' r = GRAPHIC- SCALE IN FEET FAA BOULEVARD 1" = 100' S 3 " CIRF VARL9.BLE WMTH R. 0. ff. "PATE 5647" CAB. A, SLIDE 12981, P.RT.C.T. NUMBER RADIUS ARC LENGTH CHORD DIRECTION CHORD- LENGTH C1 1505.00 25.00 S74'02'42'W 25.00 C2 1994.00 25.00 N74'09'25 "E 25.00 NOTE THE BAS7S OF BEARINGS FOR THIS SURVEY lS ESTABLISHED fROM DEED BEARINGS AS _WOWN ON T.C.C-1-No. D207. O9369 DRILL_ SITE Al" D.R...TC. T. 6 -.SO. T . TF � I _ I �P�•G� ERFo � •:lip j VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM - •••=••• ••••- - ••--•-=-•• ERIC SHAUN SROON _. _ .. _ PARCEL No. 3-7 - D.O.E. #P275-705140021330- - SURVEY. VINCENT J. HUTTON SURVEY, ABS. No. 681 LOCATION: CITY OF FORT WORTH, TARRANT COUNTY, TEXAS PERMANENT RECWMED WATER PIPELINES .. 5 2 10 = p i„- - _4 WHOLE PROPERTY ACREAGE- 5.011 ACRES PER DEED AND SALT WATER PIPEUNE EASEMENT S&A JOB NO-: 08-0085 DRAWN BY: E.S.S. EXHIBIT "A" PAGE 6 OF 6 DATE 11-25-08 1 CHECKED BY: ES_S- SPOONER do ASSOC., INC_ 309 BYERS STREET 1100, EULESS. TX 76039, PH 817-281-2355 FAX 817-685-85Qd 1, . 11 1 tin._.. 1 1111 — .1 11 1 I. - 1611 . I i—A. h1 Y,AJI . I J._,. .A.6.1.I., i REV. 2-23-09 _JJJ LLB.... . . IN i,I: _. is Being a 25' wide permanent reclaimed water pipeline and salt water pipeline easement situated in .the Vincent J. Hutton Survey, Abstract Number 681, City of Fort Worth, 1-arrant Couniy, T*Cmas and being out of the rei.naindar of a tract of land conveyed to ffie CITY OF FORT WORTH by warranty deed as recorded in Volume 2037, Page 567 and Volume 2008, Page 243 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.), said easement being herein more particularly described by metes and bounds as follows: BEGINNING at a 5/8" iron rod with cap stamped "PATE SURVEYORS" found -at a north .. property corner of the said City of Fort Worth tract, same being the west property comer Lot 3, Block 113, Centreport — Phase IIIA, being an addition .to the City of Fort Worth according to the plat recorded in Cabinet A, Slide 12981, Plat Records Tarrant County, Texas (P.R.T.C.T.), said beginning point being on the south right-of-way line of State Highway 183 (Airport Freeway) being a variable width right -of --way; THENCE South 16°02'5.1" East, along an east property line of the said City of Fort Worth tract and along the west property line of the said Lot 3, a distance of 525.24 feet to a 518" iron rod with cap stamped 'PATE 5647", said point being an east property ^� corner of the said City of Fort Worth tract, same being the north property comer of a 5.011 acre tract of land conveyed to Chesapeake Exploration, L.L.C. by warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C.C.I.No.) D207309369, D.R.T.C.T., same being at the beginning of a curve to the left having a radius of 1,994.00 feet; THENCE along the north property line of the said Chesapeake Exploration, L.L.C_ tract and along a south property line of the said City of Fort Worth tract, in a Westerly direction along the said curve through an arc length of 25.00 feet and across a chord ' bearing South 73"34'10" West a distance of 25.00 feet to a point; THENCE North 16'0251" West a distance of 524.53 feet to a point on the north property line of the said City of Fort Worth tract, same being on the said south right-of- way line of State Hightway 183, said point being at the beginning of a curve to the right having a radius of 1879.91 feet; THENCE along the said north property line and along the said south right-of-way line in an Easterly direction along the said curve through an arc length of 25.01 feet and across a chord bearing North -71 "57'26" East a distance of 25.01 feet to the POINT OF BEGINNING containing 0.301 acres (13,122.1 Sq. Ft.) of land more or less. OF T a� .......................... ERIC SHAUN SPOONER ._........ REVISED: 2-23-09 PARCEL 3-8 — Pg. 5 of 6 A �g3 t�t" ig U,SV- ��� RIAgL IJNE - R�� 1o' U.E. PLAT OF EXHIBIT "A" P.O.B. SEE ATTACHED LEGAL DESCRIP7701V C2 ON PAGE 5 OF EXHIBIT A "' HEREIN "PATE SURVEYORS" � 1N `m 1647 ACRES / LOT A BLOCK 113 EXHIBIT "A " CENTREPORT - PHASE 1//A PERMANENT 25' WIDE ` CAR .TC 12981 P.R.T. C. T. RECLAIMED WATER PIPELINE AND SALT WATER PIPELINE EASEMENT' 1 0.301 ACRES (13,122.1 SO. FT) HA(CENT J. HUTTON SURVEY ABSTRACT No. 681 REMAINDER OF 1 CITY OF -FORT WORTH ' VOL. 2037, PG. 567 z 113 & VOL. 2008, PAGE 24J D.R. T. C. T- N 1� PROPERTY LINE 1 5/,6 " C/RF - NO. RADIUS ARC CHORD DIR. CHORD "PATE" 5647" Cl 1994.00 25.00 S7XJ4'10 "W 25.00 C2 1879.91 25.01 N715726 "E 25.01 C i �s' u.E P � 5.011 ACRES CHESAPEAKE EXPLORATION, 1 L LC. DESCRIBED AS DRILL SITE A 1 0 100' 200' SB " C/RF T.C.C.l.No. D207309369 PATE 5647" D.R.T.C.T. GRAPHIC SCALE IN FEET PROPERTY UNE = 1 OO' NOTE- 7HE BA95 OF BEARINGS FOR THIS SURVEY IS ESTABLISHED FROM COORDINATES SHOWN FOR COIV7Ra- PCVNTS ON SHEf7s' 4-5 OF THE TRANSYSTEMS PLANS FM 771E 36- WAIER MAIN ' OF EXIEN901V ALONG 7RWITY RAIL WA Y EXPRESS ROW FROM GREENBEL T 70 FM 157, CaVTRACT 1. F "' • - T P .•G15-TE VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM - • -- = ERIC SHAUN SPOONER D.O.E. ........................... PARCEL NO. 3-8 #P275-705140021330 ' ' -� SURVEY: VINCENT J. HUTTON SURVEY, ABS. No. 681 o 2�e. LOCATION: CITY OF FORT WORTH, TARRANT COUNTY,' TEXAS PERMANENT RECLAIMED WATER PIPELINE y E �. p WHOLE PROPERTY -ACREAGE AND SALT WATER PIPELINE EASEMENT E� S&A JOB NO.: 08-0085 DRAWN BY: J.W.C. EXHIBIT "A" PAGE 6 OF 6 DATE: 01-13-09 CHECKED BY: E.S.S. SPOONER do ASSOC., INC. 309 BYERS STREET. fIO0. EUUMS, TX 76039, PH 817-281-2355 FAX 817-685-8508` REV. 2-23-09 .141 i_ �o. �.ua_f � A._., ._,: .�uni d Ll.11 iWil iihi.itll'i_:.I i, �i: �li0neo:ha,_I: � I �:2'u iLi. fi�ui.�b el.i„n._i it .lu'��Lu.l r..�..n_�_aln .J�i LA, Ill = so » Vx is ge Creek Reelzimed EAazl'E4r -coject Parcel # 3-9 Doe # 6- 7�� - 701dDa 133Q 14500 Block of FAA Boulevard Fort Worth, Texas 76155 STATE OF TEXAS § COUNTY OF TARRANT § RE CLAUM ED-WATER LINE AND SALT -WATER LINE EASEMENT W DATE: 4-21-2009 GRANTOR: CENTREPORT DEVELOPERS, LLC GRANTOR'S MAILING ADDRESS (including County): P O BOX 49868 LOS ANGELES, LOS ANGELES COUNTY, CA 90049 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCHIVIORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, constriction, reconstruction, operation, maintenance, replacement, upgrade, and repair of no more than two water -transmission mains and related facilities —a reclaimed -,Water main and a salt -water main in, under, and across the described property. EASEMENT PROPERTY: Being a portion of Lot 3, Block 113, Centreport -Phase EDA, being an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat thereof recorded in Cabinet A, Slide 12981, Plat Records, Tarrant County, Texas, and being a portion of land conveyed to Centreport Developers, LLC by warranty deed as recorded in Tarrant County Clerk's Instrument Number D207455288, Deed Records of Tarrant County, Texas, and being more particularly described m Exhibiy "A"- attached and incorporated for all pertinent purposes. (Property) no Permanent RM&med-Water Pipe uwEn=cW and Sat WAta 1 ipelme Emit Peed 34 hp l I" Grantor, for the considerations paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns a non- exclusive, perpetual easement for underground pipes to be located over and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple pipelines for (i) a reclaimed -water maim and (ii) a salt -water main hereafter referred to as "Facilities_" The Facilities include all incidental underground attachments, equipment and appurtenances, connections, structures, including with one manhole and manhole vent, lateral line connections, pipelines, junction boxes under, through and across a portion of the property and more fully described in Exhibit "A" and depicted in the.pl , attached and incorporated for all pertinent purposes, together with the right and privilege at any and all times following, except in the case of emergency, five days advance written notice, to enter property, or any part thereof; for the purpose of installing, constructing, reconstructing, operating; maintaining, replacing, upgrading, and repairing the Facilities. The pipeline shall be placed at least 6 feet below the top of the existing adjacent curb on, throughout the length of the line with the exception of where the pipeline is adjacent to 3 Tx DOT inlet locations where the pipeline shall be 10 feet deep for a length of 50 feet centered at the parallel and adjacent inlet. Other than one manhole that is to be constructed at least 5 feet below the surface with a cover at the ground level, all items installed by Grantee shall be at least 6 feet below the top of the existing adjoining street curb. When the property is developed, Grantee shall adjust the location of the surface cover of the manhole to be consistent and level with the adjoining surface of the property_ All manholes shall be designed to accommodate traffic loading. Grantor (i) shall not - use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (ii) erect or permit to be erected within the easement area a permanent structure, building, monument sign or fence. Notwithstanding the foregoing, Grantor may install on the surface of the ground area driveways, including related curbs and gutters, paved parking areas with wheel stops and the like. Grantor may also install landscaping, including grass, trees and other shrubs and irrigation systems in the easement area. Grantor may install utilities including, but not limited to, gas lines, electric lines, water lines,- sewer lines, waste lines, communication lines, telephone lines, cable lines, storm drains and the like (collectively - "utilities") over the top of the pipes. Grantee shall comply with the terms of any easement previously granted with - respect to the Property as well as with all CC&Rs affecting the use, development and maintenance of the Property. Prior to commencing any work on the Property, Granteeshall locate all existing underground pipes and arrange with the user thereof to ` accommodate Cmantee's installation of its pipelines. Grantor shall not be required to move or relocate any existing improvements on the Property. Pumz=9R=ImwW ryas Page .n Vie plans for ivstaliatiom of the pipe lines are atiached heri�fo as Exhiblii C and ,r limit the use to which Grantee may use the Property. �• The installation of the pipe lines must be completed by December-31, 26M and the surface restored to the condition it was in when work on the Property commenced - All landscaping and other improvements on the Property when work on the Property commenced shall be replaced with like land or better landscaping and improvements_ Grantee shall be obligated to restore any damage Grantee does to the Property and the improvements thereon at Grantee's sole cost and expense including, but not limited to, the restoration of any landscaping, utilities, signs, fences, sidewalks, driveways, parking area and similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee sball not be obligated to restore or replace improvements installed in violation of the provisions and intended use of this easement. Following installation of the pipelines, Grantee shall be responsible for any interference with Grantor's, and its successors, business operations and use of the entirety of the premises resulting from Grantee's maintenance and use of its easement. TO HAVE AND TO HOLD the above -described permanent easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof When the context requires, singular nouns and pronouns include the plural, GRANTOR Centreport Developers, LLC, a Texas limited liability Company By: Name: Reza Soltanianzadeh Title: Manager Pem anent Reckum d Water Pipelme Fmcment and Sait-Water P4)eI= Easement; Parcel 3-9 Pave 3 GRi 1 ' 41 f EE City of Fort Worth By_ Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY e Assistant City Attomey Date: FemmeaRodar=d-waM Pfpctm East aad salt WsW P*dme Ess=ta Yard 3-9 Page 4 Ej ACIU40 V&EDGiV1L,IT STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) - On , 2009, before me, , a Notary Public, personally appeared Reza Soltanianzadeh, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) (is/are) subscribed to the within instrument and acknowledged to me that (he/she/they) executed the same in (his/her/their) authorized capacit(-y/-ies), and that by (his/her/their) siguatnre(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WCINESS my hand and official seal. Notary Public Permanent Reclaimed -Water Pipeline Easement and Salt -Water Pipeline Easement, Parcel 3-9 Page 5 ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing .instrument, and acknowledged to me that he executed the same -as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated - GIVEN UNDER MY HAND AND SEAT. OF OFFICE this day of 2009. Notary Public in and for the State of Texas P=man=tRcc =cd-Wzt=Pq dmc Em=czd and Snit WaW Pi x1= Easement. Parcel 3 9 ?W s EXHIBIT uA" Being a permanent 25' wide reclaimed water pipeline_ and salt water pipeline easement situated in Lot 3, Block 113, Centreport.= Phase IfK being an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 12981. Plat Records, Tarrant County, Texas and being a portion of that same tract of land conveyed to CENTREPORT DEVELOPERS, LLC. by warranty deed as recorded in Tarrant County Cleric's Instrument Number (T.C.C.I.No.) D207455288, Deed Records of Tarrant County, Texas (D.R.T.C.T.), said strip being herein more described by metes and bounds as follows: BEGINNING at a point on the east property fine. of the said Lot 3, same being the west property line of Lot 2. Block 113 of the said Centrepart -- Phase IM, said beginning point being on the south edge of an epMng 19 lttillty Easement as shown on the said Centrepod — Phase ILIA, said beginning point also being located South 00*1326' East 10.00 -feet from tiie northeast property corner of the said Lot 3; THENCE South 00°1326'.East, along the said property lines, 25.00 feet to a point; THENCE North 89"07W* Wed 254.27 fiaet to a point at the beginning of a curve to the left having a radius of 1844.91 feet THENCE in a Westerly direction along tine said curve through an arc length of 574.19 feet and across a chord bearing South 81 "58'08" West 571.87 feet to a point on the east edge of an existing T Utility Easement as shown on the said Centreport— Phase 111A THENCE North 15'28'57" West, along the said easement edge, 25.01 feet to a point on the said south edge of the existing 10' Utility Easement. said point being at the beginning of a curve to the right having a radius of 1869.91 feet; THENCE in an Easterly diredon along the said south easement edge and along the said curve through an arc length of 581.33 feet and across a chord bearing North 81 °5843" East 578.99 feet to a point; THENCE South 89"0T00" East, continuing along the said south easement edge, 253.78 feet to the Point of Beginning containing t1.477 acres (20,794.6 Sq. FL) of land more or less; ...................._ ERIC SHAUN SPOONS REVISED- 2-23-0.9 4 F 9 04� PARCEL 3-9 Pg. 5 of 7 ter._-.._,------- --------.--- - --- - -- --- - - --- - - _ - - _- — - - - _ - ,__.-_._.,...i. j PLAT OF EXHIBI Ts "A"&2J 8" STATE WG WAY 183 ,SEE- ATTACNED LEGAL 9ESCR7P7xw (Al PORT -REI NAr Y) ON PA6FF 5-6 vF EXVIRrs A 'ct B' I EMhV YARI, NS A7DT6' R-O-)r S'89107170 JE C t £x 1f!• u.£ s/e - IRF 25J 78 ro 00' r , jl Od 32s'E pis IPATE564 P,O.B. E(MgIr "A" " C2 N83 07YJ0 `W Z500' N1528'S7'W 254.27' 25.01 ' `^ £XH181T 'A " C PE&VANENT 25' WADE cfMNMED WYATcR PIPELINE -AND L.or z aocx 1rs SALT iYAMR PFEt NE EAS£MWT CEATAoctwr - PH45E X4 0 477 ACRES (20, 79-C,6 Ste. FT.)r29Br. PRT_GT. .. = LOT 3, BL-OCK 113 RJ ER OF CENTREPORT -- PHASE ILIA LIJ CffY T7 �� . CAB_ A, SM 12981 U & KW- 2" PACE 243 P-R. T. G T. o aRr.�r. pet--• IF- CE MEPORT aOPERS LLC L DEf PALE" 5647` T- C. C-LNo. 0207455288 t. D.R. T-C- T- o DrHlB1T "B" b � TEMPORARY 25' WIDE O (qj p CONSTRUCTION EASEWENT N :� Pf�OpE 1- 030 ACRES (44, 872.7 5-0 FT) v _ — � 1 S 011- ACRES CYj54PE4X£ EXPLORAM . t-LC. N No, IDIREMM I L►lSI: AESCR059 AS MU S E Al m m Lt S00'13:261 .26-DO � O :t 4 s/a'Y.IRF FAA BOUl"ARI) pRTE 564T ` VARIABLE J17DYH R- D- Jr CS ` CAN. A, SLIDE' 12981, PJtT.CT \ M &Ba RAL)IIUS• ' ARC CFALN CiJOW D7REC770N CH-WD LBW79 _ r8G9--91 581-jj N8T'S8'J'E STB99 REUNNDER OF C2 18"-91 574.19 58158 08 V - 571.87 j�d 'Car C17Y Q'' FORr NMTU C3 J PATE NOL- 2W. Pa 56? 844,91 579.19 A7BJ �3' 6768t dr LtX 2WA PAGE 24J C4 1819-91 54704 SB1"J6�'§v '.Sff99 ar-RT-t-r- L5 1M100 2400 ;'J3•.3 t7'W 2A100 NOTE MIC BASIS OF BEARINGS FOR IMS .SUVtf r IS ESTABU9�" FRaW PLAT $EJ{aws As -, wwv QN c4a ,t, StD_ 12981 G1q •lh'E P-k r-G T_- OF r C7. i S1rE.ft,O'.Y� i-VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM ;N S;TMZi PMCEL Na 1--9 D.O.E. IP275-705140021330 . -`-4 --- g SUB[1 V-SMW CEN'TREPORT - PHASE BA • ��= = LTTON_ aTY OF FORT WORK TARRANT COUNTY. TEXAS PffMMENT RECLAIMED WATER P1PE11NE _ < A(.A. 4s 1°. - 4D VAM E PROPERTY ACREA.'�-- 15.479 ACRES PER PLAT AND SALT WATER PJPMNE ERSEMENT �L S&A JOB- NO-, 08-0085 ORAW14 BY.. E.Ss EXF{181TS "A k 8- PAGE 7 OF 7 DA7L' IT-25-OB CHECKED BY_ ESS - SPOONER tc ASSOC., INC. 309 BYERS STREET. f104, E]UM& TX 76039. PH 817-281-2355 FAX 817 85a8 f REY. 2-23-09 + —I.iYi ll llii.i[I;,.i. :, .IIIIfI.I...i .i�.ii.uflilull ll_iII II llllil Ll,lll u,.YliJL lil.�il,41■41...la.III J\,i-I,I_Ii:.i.;JlCIiuIII J III 11111:IJ.II S.. , 11 D'I ."I kLu,JI.AII IIIL I,dIIILe,li-II LIi I I i I I ' t l 1 t I I r I I I 1 1 i It !tA IN.lf.Ji lour ndnt d•IIYIyypp ' Y. AM IJifdl 41A IN•YCD � • � kJ�.r �MIAur �ta• d[Ncln I ,[L MR v'ari 1-0KINY[Y yMA1�01�7Pr!'GJS sO `t\ G/OSM M l� � n �I101 M"M SOAK I I* ! i,N, 183 4 P wom !N I S _.� •-�a11Mr, S0.4S 1 f' . a ISn,10RD MiKd rK 1 M.OA/A i�Od�OAf --!•f" � " .r.. rrr-�•-- fJA htl . to d Ir 6 OAYI mil a nLL 1m M A2o./f q li7[ JONII Ac n n 1 pamil Ciro o ilrr fcA Of le( IWMAetA.wSRs ' OIA�Iw[ CCIIKdIW lid �10r(Il eeepr laA d.11'Jt•04' -^"�avf �, . _r.... ate_.._.i��l.'___....�•�^ __.___N L e01nIMCla1 r+u ►1ue xMe ^G- wC Iowa a,u + Oe. A , . • • r A- • • r r • lei s.mi.0 Mpt ro mffl mf!:T... !u 41a.A wrt m � - r 4- J.M/`;ter .f 1 _♦ ��.�..�.... .. ..�_r _.. �....rr_� r.. r.. S:rY*_ nw11i..I,r.1,r.lw Fwrr rt •iM� r IM�r =. �.• r _r.r. r. ....�. .. ". ..., ._ram •• ��Ar....�, ''w--..>:� r /�^�YLP✓ w •N rrr-rr.. �►. „r r^r �� .. 1� e~i.~�`aa �riw`.M-e w ..n �� r 1f• 1GL R !LL t77.HSe l w r ruw rww rwn�,r-r.rr r �T.i we/- ♦ xr ram'�� fit r.MelfowN ar r larrw m wirl..i s.rw .+.wrw..rf M1 tf. •1, t.l.IAA�,q M r n wru, .rrr rr Yrullr rwul rr..I1.lY.nr1 .K 1 R ' Say ' 1 560 op 8 MO► 20� R;INM[0 MNIKR UK 1 .QNR Ir + aso nlor m• p[eIAACA ' 'wAr1d AAIt .-+ILSlt 1 IA 1 5 a I S+0 � JI 14A10►.06 FrA � 'i Y' � :� PII1PbKG � erArAwr rrrrrwsr+rrri.rr. .rr.... IAw r..rr. A.l 1 Ilu 11) Y 6y�N�1p� M r eo I . *ART A lM 1Wb •e.11 lrr ! Sf, MY.K lI1A1 ��1�1I(11 MUR[ [.liKl(111 Ip. �-/ Iw W 1w1, ur..r•rwl.yw MM rrrrlJn.Ir.YY (IR r1W ' �a ir+•r,.wu I.rwrr r lrrr rwAa.er•Ir,•rwA Irn ✓.l Al ' Acew rsr rlewr, l4..Itw.-r.. � • ' rrr w♦r•.♦Ir•tw•Allr IAA/ awns Irver. IN Aureln,r r-rr..r) rr•we .n. Ir.rAe.A�,•r.Fl•w lrer w•Re.An.rhrw Pwn w..�� vs wJ,1•I,MW Celle rMl i ~%�-�Jti� r lr�ww t/IIr Iwrr.l.w►tY-,w. � �li � `iAl'' el►oo v, n 17d[II M nP. Lu " [v�son "L4..r.-V--.r_____--. to cro"lKl creme s Nr `r. -----. _-. ........... w ACCA. KC 10. I Peg1'ONO Tor Ill[ • .O.N,1 KQMAIO 1N1A 1/6 oWid -. rAA r' 530 w Y , g 11 y k Ftt F i� s30 1 166*00 161+00 36404 170400 171+00 177+00 173+00 174*00 k 115400 WAIN YAP 3132- 21 ! I I I—J 95Q j i 1 1 I OTY CF %CAT I1011Tet,. TKIIAS i WATER DEPARTMENT � VILLAGE CILEFIC MVLA1ME0 WATI'A £AST r,X)1 OKLIVISAY 4YS1 £N bISIYHAMUN -,IN PART) 1 �vuw AND POWILI dptiHioq.00 7 175.00 wr Ir Ir L �'r�ra,/`rt IM 1 t". iGoer ril. ^r 1c.,1 n,otc, r0. !IA r�. aw ITM.zoc Creek Reclzimecl Water Project Parcel # 3-9A rr ffhh Doe 4- n� 7S-7os/`fCl 14500 Block of FAA Boulevard Fort Worth, Texas 76155 STATE OF TEXAS § COUNTY OF TAR12ANT § RECLAI ED-WATER LINE AND SALT -WATER LINE TEMPORARY CONSTRUCTION EASEMENT DATE: 4-21-2009 GRANTOR CENTREPORT DEVELOPERS, LLC GRANTOR'S MAILING ADDRESS (including County): P.O. BOX 49868 - LOS ANGELES, LOS ANGELES COUNTY, CA 90049 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including Comity): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency ofv&ch is hereby acknowledged. ow EASEMENT AREA: See Exhiib' `mod "B' ; attached and incorporated for all pertinent purposes. Grantor, for .the considerations paid to Grantor and other good and valuable considei-ation, hereby grants, sells, and conveys to Grantee, and its assigns a non- exclusive temporary construction easement in, under, and through the property for the ,.. installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple pipelines for a reclaimed -water main. Upon completion of the construction of the reclaimed --water main, all rights granted within the temporary .. construction easement shall cease, and all operations, maintenance and -repair. shall be confined to the penua-uent easement for the reclaimed water -main. This easement shall terminate not later than December 31, AO J t , < CanstrnaioaXeeidmed-WercPjxfiae B aoeat and Salt Water Pipeline Essenmr, Patid 3-9 Page 1 TO HAVE AND TO HOLD the above -described temporary construction easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever, and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. When the context requires, singular nouns and pronouns include the plural. GRANTOR Centreport Developers, LLC, a Texas limited liability company By: Name: Reza Soltanianzadeh Title: Manager GRANTEE City of Fort Worth By: Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Constnuboo Redimed-Water P4xfm Eascmea mdSa1t-WwcrPipdi0cEVanen; ?a W 3A Per 2 A .n STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) On , 2009, before me , a Notary Public, personally appeared Reza Soltanianzadeh, who proved to me on the basis of satisfactory evidence to be the person(s) whose names) (islare) subscribed to the within instrument and acknowledged to me that (he/shelthey) executed the same in (his/her/their) authorized capacit(-y/-ies), and that by (his/her/their) signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument . I certify sunder PENALTY OF PERRTRY under the taws of the State of California that the foregoing paragraph is true and correct. V TINESS my hand and official seal. Notary Public C0nZW0Ctim Roal*"&WaWMPdiDe Eavauw- d Md Soh Wooer Pipdinc P Patin 3-9 Page 3 ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personalty appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of ,20 r_ Notary Public in and for the State of Texas ConWuctmRedm ved-WaurPVd=EmnamtandSalt-Wan"Pipd=Ew==z "3A Pop 4 .. .w EXHIBIT "B" Being a temporary 25' wide construction easement situated in Lot 3, Block 113, -" Centreport — Phase tilA, being an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 12981. Plat Records, Tarrant County, Texas and being a portion of that same tract of land conveyed to CENTREPORT DEVELOPERS, LLC. by warranty deed as recorded in Tarrant County Cleric's Instrument Number (T_C.C.I.No.) D207455288, Deed Records of Tarrant County, Texas (D-R_T_C-T.), said strip being herein . more described by metes and bounds as follows: BEGINNING at'a point on the east properiy-f aof the said Lot 3, same being the wrest property line of Lot 2, Block 113 of the said Centreport — Phase IIIA, beginning point also being located South 00`13'26" East 35.00 feet from the northeast property corner of the said Lot 3; THENCE South 00" 13'26- East, along the said property fines, 25.00 feet to a point; THENCE North 89'07UO' West 254.75 fleet to a point at the beginning of a curve to .the left having a radius of 1819.91 feet THENCE in a Westerly direction•aJong the said curve through an are Iength of 574.04 feet and across a chord bearing South 82016'25" West 544.99 feet to a point; THENCE South 1528`57" East. parallel and 25' adjacent to the west property line of the said Lot 3, 964.86 feet to a point on the south property line of the said Lot 3, same being the north right-of-way line of FAA Boulevard, being a variable width right-of-way as shown in the said Centreport — Phase IIIA, said point also being at the beginning of a curve to the left having a radius of 1505.00 feet THENCE in a Westerly direction, along the said property line, the said right-of-way line and along the said curve through an arc length of 25.00 That and across a chord bearing South 73035'3r West 25.00 feet to the southwest property corner of the said Lot 3; THENCE North 15-28.57"1 West, along the said west property line of the said Lot 3, 989-73 feet to a point at the beginning of a curve to the right having a radius of 1844-91 .. feet; THENCE in an Easterly direction along the said curve through an arc length of 579.19 feet and across a chord bearing North 81'5328" East 5T6.81 feet to a point. THENCE South 89'OT00" East 25427 feet to the Point of Beginning containing 1.030 acres (44,872.7 Sq. Ft) of land more or less. �C OF %STJ P •-� ► s Tr REVISED: 2 23-09 F _ ER SH SPOONER PARCEL 3-9 — P9. 6 of 7 _ A- _, "A"'&"B"1.' PLAI- OF EXHIBITs STATE' IffGHKAY 183 CC A MA CHED LEGAt DaMP;701V (A"ORT AW)FAY) ON PAGES 5-6 OF EXHAWTs 'A '&'B' HEREIN VARUBIN WDTH R. 0. IF 891071001E 61 EX 110- UE S/, IRF 25J- 76' 5/s 10.00 5,Q& U26 "E PATE 0.8� EM BIT A .5b47' .75 C4 C2 N89,07,00V 25.00' NIS' 8' NVII 155728 " 254,27' 25.0 EXHIBIT 'A PERMANENT 25' WDE RECLii WATD? PIPELINE AND. Lorz mocK ijrj V -S4LT WAFERPfPaINE Sili DVT MMAVICW7 - PMSE KA 0. 477 ACRES (20,794.6 SO. F7.) CAa A, SM 12SWI, P.ZFr-r. - LOT 3, BLOCK 113 fia"w" OF CENREPORT - PHASE 171A Crff Or -fW *VRM p t-m 2ay7 G 567 CAB- A, SLO. 12981 SVV- 2Wff, PAr-- 2,U P.R. TC. T. b -CfRF CENTNPORT DEWLacD7.5: UC t%r PATE 5,647" T-C-CI.Na D207455283 D-R. T-c T.CIA C) EXHIBIT 08 Li C4 z TP"RARY 25- WIDE 0 CONSTRUCTION EA5�W-ENT in 7 1.0.30 ACRES (44,872.7 SO. FT) a_ < 5.011 ACRES CHM4"FA"i FXPLORAMoV Lf-C AFDB?-C" J DST 0. DESCRI669-AS DAW-L -WEA I T C: C /Ab- D207JO936 D-kTC-r- Ste IMF 1 PATE 5647" FAA BOULWARD VARIABLE &M22r 1L0-ir CAB, A SUPS 12981, P-R-T-C-T- k AMbil9e Aii ARC L&X7H CHMEV77CW aW ChkWD LEWOH ,—J. cr 18159-41 581-u N81'51e4E 57&92 - RE44,11AVER OF cz 15".91 574-1.9 &31-56imv 527.67 cflr OF ROT VVRFH le ClRF KX -V-17 AA 567 cj 1844.91 579.1.9 mtw;?16 676.61 WC 2= PACC 2#J C4 F679.91 547X4 544.99 D.RTCK -. C5 F-V5.ZU 2iM $7.rZ'J71W ZTT 00 NOTE THE 8A37S c7' REARACS FOR LAOS SURWY IS jFSTASU-WW Aii PLAT &EAoli AS SHORN OV CAa A SW- t2981 OF ME PR rr- r- or G 1A It% of :0% ALP VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM . .............. ...... I ERIC WUN SPOONER ;A ---------- PARCEL NO. 3-9, SUMVtSIO& CEMIREPOST - PHASE VIA D.O.E- #P275-705140()21330 < LDCAT"C CITY OF FORT WORTI'L TARRWT COMITY. MUS PERIvi REC[AUED WTER PIP0,14E MOLE PROPERTY ACREAGE- 1EL470 ACRES MR PLAT AND SALT WATER PIPEUNE EASEMEW S" Jw fio-: CB-0065 DRAWN 13y- Ii 4 DATE. CWCXM BY: E-S-& EXHIBITS 'A do B' PAGE 7 OF 7 SP"ER & ASSOC- INC 3W ONUS STREET. #100. EMESS, TX 7609. PH 817-281-2355 FAX 617-685-435W REV- 2-23-4N AL. d I Usauou,a I 1 1. -4.6—1 y .IM-: -.1 ilm 61 6 1- J-dill --I aAI.Udllli 01.1-do ill. .11.41.111 w.will jLj.li, ill 'i J All.. A AM , lin i1q, 4W .. "W 10 no Viikage Crvak Rcc Limed Wzter Project Parcel 4 3-10 Doe 4 6WP a 75- - 7D 6100co 3 36 14500 Block of FAA Boulevard Fort Worth, Texas 76155 STATE OF TEXAS § COUNTY OF TARRANT § RECLAIMED -WATER LINE AND SALT -WATER LINE EASEMENT DATE: 4-21-2009 GRANTOR CENTREPORT DEVELOPERS, LLC Z" GRANTOR'S MAILING ADDRESS (including County): P O BOX 49868 LOS ANGELES, LOS ANGELES COUNTY, CA 90049 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKHORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and. other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, for installation, construction, reconstruction, operation, maktenance, replacement, upgrade, and repair of no more than two water -transmission mains and related facilities —a reclaimed -water main and a salt -water main —in, under, and across the described EASEMENT PROPERTY: Being a portion of Lot 2, Block 113, Centreport- phase MA, Fort Worth, Tarrant County, Texas, as recorded in Cabinet A, Slide 12981, Pint Records, 'Tarrant County, Texas, and being a portion of that same tract of land conveyed to Centreport Developers, LLC by warranty deed as recorded in Tarrant County Clerk's Instrument Number D207455288, Deed Records of Tarrant County, Texas, and being more particularly describer) in Exhibit "A", attached and incorporated for all pertinent purposes. (Property) P"mamat Rcrlam cd-Wafu Pi rc Easancnt &a Salt -Water PWukc Ew=mtk Parccl 3-30 Page 1 VW Grantor, for the considerations paid to Grantor, and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns a non- exclusive, perpetual easement for underground pipes to be located over. and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple pipelines for (i) a reclaimed -water main and (i.i) a salt -water main hereafter referred to as "Facilities_" The Facilities include all incidental underground attachments, equipment and appurtenances, connections, structures, including with one manhole and manhole vent, lateral line connections, pipelines, junction boxes under, through and across a portion of the property and more fully described in Exhibit "A" and depicted in the plat s' ", attached and incorporated for all pertinent purposes, together with the right and privilege at any and all times following, except in the case of emergency, five days advance written notice, to enter property, or any part thereof; for the purpose of installing, constructing, - reconstructing, operating, maintaining, replacing, upgrading, and repairing the Facilities. The pipeline shall be placed at least 6 feet below the top of the existing adjacent curb on, throughout the length of the line with the exception of where the pipeline is adjacent to 3 �- Tx DOT inlet locations where the pipeline shall be 10 feet deep for a length of 50 feet centered at the parallel and adjacent inlet Other than one manhole that is to be constructed at least 5 feet below the surface with a cover at the ground level, all items installed by Grantee shall be at least 6 feet below the top of the existing adjoining Street_ curb. When the property is developed, Grantee shall adjust the location of the surface cover of the manhole to be consistent and level with the adjoining surface of the property. ` All manholes shall be designed to accommodate traffic loading. Grantor (i) shall not use the Property in any manner which interferes in any material way or is inconsistent with the rights- granted hereunder, or (ii) erect or permit to be erected within the easement area a permanent structure, building, monument sign or fence. Notwithstanding the foregoing, Grantor may install on the surface of the ground area driveways, including related curbs and gutters, paved parking areas with wheel stops and the like. Grantor may also install landscaping, including grass, trees and other shrubs .� and irrigation systems in the easement area. Grantor may install utilities including, but not limited to, gas lines, electric lines, water lines, sewer lines, waste lines, communication lines, telephone lines, cable lines, storm drains and the like (collectively - "utilities') over the top of the pipes. Grantee shall comply with the terms of any easement previously granted with respect to the Property as well as with all CC&Rs affecting the use, development and maintenance of the Property. Prior to commencing any work on. the Property, Grantee shall locate all existing underground pipes and arrange with the user thereof to accommodate Grantee's installation of its pipelines. Grantor shall not be required to move or relocate any existing improvements on the Property_ Permanent Rataimc d-Wattr Pipe me Easeaxnt and sah-Wata Pgcline Easement Parcd 3-10 Page 2 U Th,,e plaus for installation of Lhe pipe hies are a laclt,ed hereto as ExidbIt C au d limit the use to which Grantee may use the Property. .� z Ol i The installation of the pipe lines must be completed by December 31, 3ft9 and the surface restored to the condition it was in when work on the Property commenced. All landscaping and other improvements. on the Property when work on the Property commenced shall be replaced. with like kind or better landscaping and improvements. Grantee shall be obligated to restore any damage Grantee does to the Property and the improvements thereon at Grantee's sole cost and expense including, but not limited to, .. the restoration of any landscaping, utilities, signs, fences, sidewalks, driveways, parking area and similar surface improvements located upon or adjacent to the Property which may have been removed, relocated, altered, damaged, or destroyed as a result of the - Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace improvements installed in violation of the provisions and intended use of this easement 4 Following installation of the pipelines, Grantee shall be responsible for any interference with Grantor's, and its successors, business operations and use of the entirety of the premises resulting from Grantee's maintenance and use of its easement. TO HAVE AND TO HOLD the above -described permanent easement, together with all andd singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever, and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. ..r When the context requires, singular nouns and pronouns include the plural. .. GRANTOR Centreport Developers, LLC, a Texas limited liability Company By: Name: Reza Soltanianzadeh Title: Manager Permanent Reclaimed -water Pipeline Easement and Salt -Water Pipeline Easement, Parcel 3-Io. Page 3 City of Fort Worth By: Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: Pamat Rcdwmc&Watw PTclmFas=ed and SaU weaa riame Ew=wt ruca 3-10 Page 4 We �r STATE OF CALIFORMA ) ss COUNTY OF LOS ANGELES ) On , 2009, before me, , a Notary Public, personally appeared Reza Soltanianza eh, who proved to me' on the basis of satisfactory evidence to be the person(s) whose name(s) (is/are) subscribed to the within instrument and acknowledged to me that (helsheJthey) executed the same in (his/her/their) authorized capacit(-yMes), and that by (hislherltheir) signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument I certify under PENALTY OF PERTURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Notary Public pennanat Rmlamwd- Water Pipeline Easement and salt watea PirJme Easement; Pa=13-10 PW 5 ACKNOWLEDGM NT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the person and officer whose name is subscribed to _ the foregoing instrument, and acknowledged to me_that he executed the same as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas, for the purpose and consideration therein expressed and in the capacity therein stated. GrVEN UNDER MY HAND AND SEAL OF OFFICE this day of , 2009_ Notary Public in and for the State of Texas Penneneat R=Uia -Watar Pipdroe Enemo t sad Salt -Weer Pipd Eases Parcel 3-10 Page 6 'M. 0 EXHIBIT "A" Being a permanent 25' wide reclaimed water pipeline and salt water pipeline easement ., situated in Lot 2, Block 113, Centreport - Phase 11 A, being an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 12981, Plat Records, Tarrant County, Texas and being a portion of that same tract of land conveyed to CENTREPORT DEVELOPERS, LLC_ by warranty deed as recorded in Tarrant County Clerk's Instrument Number (T_C.C.1 _No.) D2074552$8, Deed 'Records of Tarrant County, Texas (D.R.T.C.T.), said strip being herein more described by metes and bounds as follows. BEGINNINGata point on the west property line of the said Lot 2, same being the east property line oft of 3. Block 113 of the said Centreport - Phase IIIA, said beginning - point being on the south edge of an e)asbng 10' Utility Easement as shown on the said Centreport - Phase IIIA, said beginning point also being located South 00'13'26' East 10.00 feet from the northwest property corner of the said Lot 2; on THENCE South 89°07'00~ East, along the said south edge of the 10' Utility Easement; 247.13 .feet to a point on the west edge of an existing 30' wide Underground Pipeline Easement to Texas Midstream Gas Services, LLC. by deed as recorded in T.C_C.I.No. D208143245, D_R.T.C.L; THENCE South 00*50'10" West, along the said west edge of the Underground Pipeline Easement. 25.00 feet to a point; , THENCE North 89°0T00" West 246.67 feet to a point on the said west property Fine of Lot 2, same being the said east property line of Lot 3; THENCE North 00'4326" West, along the said property lines, 25_00 feet to the Point of Beginning containing 0.142 acres (6,172.6 Sq. Ft.) of land more or less; r-,L or;sp ,�(ERiC SHAt1N SPOONER RE ViSED. 2-23-09 PARCEL 3-10 - Pg. 5 of 7 .a ww ` sTA.TEGAY res PLAT OF EXHIBITs "A"&"B" (AfRPORT FRE' AY) p O.B. S£E ATTACHEO LEGAL D£SMIPTTON VARIARLE VDTH R.O. A. EXHIBIT ON PAGES 5-6 Of f-"18frs A do B' HEREIN A y S89 OT'00 "E S06-50'10 °rY 500'1326-E 24713' 25.00 10.D00' _ 3/e � IRF - � NOOV J 26'W- y" ' - - - L R- EX_ 10" U_E 25 00, ---L4! V89 07'00'bY----'� L2 246.67" 174.85' 30, INDE77GR'OUND P/PEUN£ E-wr EYNfB/T i4' TO TEXAS A4f9SM W CAS SFR�� L. e. - PERU4X&fT 25' f4%'JE TcctAo oza81s3zss , - _ oRrcr_ - RECLA UED WATD4- P1PE71NE AND- _ SALT WATER PIPSUNE EASEMENT 0. Y42 ACRES (6,172.6 SO. F7.) 100-00' Lori, BLACK 113 C0VTRFPORT - PHASE &4 2 2 CAB A SLD_ 12951 P_12r.GT LOT Jr. SLOCK 113 tat 41 0� avvnZ PORT - PHiISE A14i 1Z CAa A SdD. J2981• PJ2T.C--r 4J N EXff1BIT B _ o 7EMPORARY VARL48LE WDTH CONSTRUCWN E4SEMENr c> r- 2.304 ACRES (100, 3-582 50. FT.) _ a_ Q - L3 FAA ROULEVARV _ VARIABLE PLDTH R .O. r. CAB. A• SLFD6 IZ961, PJ�T. c 9' _ LOT 2, BLOCK 113 REUAMVER Of- CENTI?EPORT - PHASE 111A No. LV?EC77ON LII.ST_ cnY OF �r w nff CAB A, 51D. 72987, P-R. T. C_ T 1 L 1 500 50 f 0'w 20. 01 ' 'V' 2037 Pc SST L2 .589109'501E 29.28' - Hx 1a RAT c r c 2+3 �%V /I?EPOR7 1DEWLOPERS, UC I L3 589'46:34 'W 100- 42' T C. C.I.No. 0207455288. O.R T C. T J L4 NOO-1,3261Y 25-00' MOTE• 7HE BASIS a- BEA&MOS FOR THIS 5Wt;E_r 15 ESTABUSIYED FPOAI PLAT' BEARfNG5 A5 5110KN ON CAa A -T-a 129M OF 7HE PR T C T_ £ OF VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM PARCEL Na 3-10 D.O.E. JP275-705140021330 SUBDIVISION_ CENIREPORT - PHASE 11A LOCATION-- CRY OF FORT 1tORTH. TARRANT COUNTY. TEXAS PERMANENT RELLkWED WATER PIPEUNE 1NiME PROPERTY ACREAGE:.I 541 ACRES PER PLAT MO SALT WATER PWEI1 E EASEMENT S&A JOB. NO_ 08-0085 DAWN 8YS.- E.S. G DATE T1-25-08 Cl1EGKED.$Y: E.SS. UOW5 'A & 6y PAGE 7 OF 7 SPOONER & ASSOC., 1NG 309 BYERS Ski•. JIM EVLESS. TX 76059,, PH 817-28f-2355 FAX M7-6B5 Il�lSeli.Ul .I ,;ia IA.., Ii, I.I ll,llu.l.i I,1l li ii, �i_ ..i „I i :. .i .I •ni isill u+111 e:Bi��i. n�li�6h u61.611..111 lilt ,.�.iu bi llIi. :14141 f:YI.ii luih EPJC SHAUN 5POOMER _ L - -8 REY 2-23-09 EXHIBIT "A„ Being a permanent 25' wide reclaimed water pipeline and salt water pipeline easement situated in Lot 2, Block 113, Centreport — Phase 111A, being an addition to the City of Fort Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 12981, Plat Records, Tarrant County, Texas and being a portion of that same. tract .. of land conveyed to CENTREPORT DEVELOPERS, LLC. by warranty deed as recorded in Tarrant County Clerk's Instrument Number (T.C.C.I_No.) D207455288, Deed Records of Tarrant County, Texas. (D.R.T.C.T.), said strip being herein more described by metes and bounds as follows: BEGINNING at a point on the west property line of the said Lot 2, same being the east property line of Lot 3, Block 113 of the said Centreport — Phase IIIA, said beginning point being on the south edge of an existing 10' Utility Easement as shown on the said Centreport — Phase IIIA; said beginning point also being located South 00°13'26" East -10.00 feet from the northwest property corner of the said Lot 2; I- .. _ VW .o THENCE South 89007'00" East, along the said south edge of the 10' Utility Easement, 247.13 feet to a point on the west edge of an existing 30' wide Underground Pipeline Easement to Texas Midstream Gas Services, L.L.C. by deed as recorded in T.C.C.I.No. D208143245, D.R.T.C.T.; THENCE South 00°50'10" West, along the said west edge of the Underground Pipeline Easement, 25.00 feet to a point; THENCE North 89°07'00" West 246.67 feet to a point on the said west property line of Lot 2, same being the said east property line of Lot 3; THENCE North 00'1326" West, along the said property tines, 25.00 feet to the Point of Beginning containing 0.142 acres (6,172.6 Sq. Ft.) of land more or less; REVISED: 2-23-09 PARCEL 3-10 — Pg. 5 of 7 PLAT OF EXHIBITs "A &)'Blj STATE HIG A Y 183 (AIRPORT FREEWAY) Y) p_0.8. SEE ATTACHED LECAL DESCRIPTION VA R14BLE WD TH R 0. rf F,v,l-,I!gl 7- GV PA GFs 5-6 Of EXV,181 rs "A "&",3 HERChli 'A S89,01,00"t S00150,10-w SOO-0'26"E 247. 1J' , 25.00 10.00, 5/� 6 IRf - z NOD IJ'26V— LL I 25. 0,0 4� NfX. 10' U.E N89707100 1 L2 .246.67174.86' un .30' UNDERGROUND PIPELINE ESW EXH15 T -A" TO TEXAS MIDSTREAM CAS SEROCES, LLC_ TC.C,1.rVo_ D208143245 PERMANENT 25' WIDED-R. TC, T RECLAZAIED WATER PIPELINE AND SALT WATER PIPELINE EASEMENT 0.142 ACRES (6,172.6 SO. FT.) .100.00, LOTJ, OLOCK 113 CENTREPORT - P11ASE ffL4 �z CAS. A, SZO 12981, P-R-TC.T LOT 1, BLOCK IIJ taJ kr) to cq CENTREPORT - PH4SE 16A w r,48, A. SLIP. 12981, P.R.TC-T LL_ Kb w C-4 EXHIBIT "S' 0 <II TEMPORARY VARL48LE WIDTH 04 rn = CONSTRUCTION EASEMENT .2.304 ACRES (100.358.2 SO. FT) :F o L3 FAA BOUMVAIW VARIABLE HTWH F-0.r. 3 LOT 2, BLOCK IIJ CENTREPORT - PHASE 111A No. DIRECTION DIST. RE",VDER OF C17Y OF FORT WORTH CAB_ A, St A 12981, P.R. TC_ T L I S00150'10 IV 20.01' VOL 2037 PC. 567 L2 S89109 -*,50 It 29.28' VM 2. PAGE 243 D.R."TCT CENTREPORT DEVELOPERS, LLC LJ S89-46341W 100.42" TCCINo. D207455288, D.R.TCT L4 NOO'13:261Y 25. 00' NO 7E• THE BASIS OF BEARINGS FOR THIS SURVEY IS ESTABLI-WED f ROM PLAT BEARINGS AS SHOWN ON CAB. A SLD- 12981 OF THE P.R. T C_ T__ - G R.0. 1. VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM = =..................:... ERIC SHAUN SPOONER ................. ...... PARCEL NO. 3-10 ._ #P275-705140021330 9 SUBDIVISION: CENTREP09T -PHASE ILIADO PERMAN.E OCA RON: CITY OF FORT WORTH. TARRANT COUNTY, TEXAS. EW RECLAIMED WATER PIPELINE .-TOLE PROPERTY ACREAGE 12-541 ACRES PER PLAT AND SALT WATER PIPELINE EASEMENT S&A JOB NO.: 06-0085 DRAWN BY- E.S.S_ DATE- 11-25-08 CHECKED BY. E-S.S. EXHIBITS "A & 8" PAGE 7 OF 7 SPOONER do ASSOC.. INC. 309 BYERS STREET, 0100, ECILESS, TX 760:59. - PH 817-281-2.355 FAX 817-685-85oil"REV. 2-23--09 IN 61 Nil &ldl6 IJA�iii iaAN I lull a.:.l 1A.Li. iw,, NINN•Ill, '11"111 &1-11 -11uLLNN I AhAl-W lij 511 i d.b I X,l 1 1 I t.Cf. �etl�o wN , O ; 1 I 1 't , twAnglrrA c� k ' +�a•..�d: I I +I g lo. to , I •I �' � •� — /} d o 0 a .o 1 �SAb.TA I (�('� KMA9A S yldai li.n...� C l _ tOff<tt0 O.tt ..N 1 `• ; I I ' r «DhfiMtA SC I+ Ir 1' I i1A Itt.i1/!0 11 r '� (!Y A t rl 1 11 + J I I /11 U �� EPIC I .� i:.l \ Mf �• cal ,,� I..�•�'F1 I�If �•• MS �- WS--1f OAS -•+�• G.11 ••� KAiIG1 SGKC I 1'Y. /' 1 i _..i _._•... ....... rat � �r-' 1 n� 11t.t1AA •; • cui AAY AlAtOutlm, 1 1 1 l�S'-0 .I )FI•. Y MLLLI (1)vmt L'ewNMA1 WA. "S MC AM7 MO rnSMS VOLL 1VI K LAILAAft vLK I a M i v: ' i ; ; ' r�; • L t 0[tLGGTtD 101i Ifr,1 e= O M ra+o t, K.neexc cncc+lo, IMM/1lAt�rt 1 } p' 1 I i 0►.1M .; 1 i I� 1 I I�� I '' � [•fL1�1A61 r P •'41 f I . I I I' 1. mlltrna 9�u.G fSID KA/Y la('AtVN I - Ip W. � 1 1 � 9.H. 183 � �•.�`; nM°ial��tai.cio� � aoiw""�rmt I �^ I i i � ' i p/' � ' ' f ; 1 1 �., �� x el�t a-ao.• J 1 7RAr Me.1'/M,V 61f QRIKif. l.l.G ii ' ; 1 1 { �• 1 , • ' � .._`' ��ti^i„ ��. I � en f tWn IIA\L 1f1.LAl,•w.y M Y AAW_ rM rMNIA•._•.— tt! Lr. we eKil art hr, MLnIfU AIAI (Mp[M .... � � I a l v, n .aD nOD MOTE11 1 .hetl ev,<u..l.,nl A, / 1 e.uNre eu .nr..al +....n•ua.11. 650 � I 1 1' rt ■ :a e/pehlA:'reAf AYitbrAAl/h ,e 550 ur . r..,lR %ta`Il( L�ovl AEU Flf1L1O1 AA r,IWI-.I►H•-u,r I �-.,-.-•'___-- -- --- - I � I.a1t fe fwll d oameutfoL Ir.o, rl,,...w .Ile t � -••••• Y_- ♦r - ...—•L•r^~ ,`I !. <MICWW/Il Kp�,�Ata Yk1S (►�/� t .r e.R wl, Yr_.�-w•wr.TM, I SMlll K Ulte TO WMrI A W+AM .r..ww.An .r.ww I<n muy t whte,rlM et1e710Mq OASLI,O w r Inn a..f-r..l.ml p...Lerl T 5/5 5!5 ..r.r I.NRI wnea...�.•.n•,al /00 .lal Q I • � a TK�IW NLDR'�OMI�Ikp l ®I I Yc_I MnY Itrw� r..l.mr.r. c O.R. .l A/ SVI6OIItw f0 M �aIM1AtDp d ir[ r.rr rn..L11y...Y�� IYM rrp 1 •LtG ►a -0pow 20, I ) ,..mrar`".y 1 cwV wG. 540 Y I 540 a ADS wn 530 1 F� r .• pry �I 625 BOO' fAtof " 1" I •C J4. 5Z5 �u'=osRF.c -----I x A 1 WATER M I 2132-421 { S20 I I 1 I I + 520 •. 1 t I I I 1 fa I St I j 515 trr iyWD aprT a root WOR7M, EfIA3 G t W WATER DEPARTMENT p ! t I VILLAGE CRERK •3. �10 FECLAIMCD WATAIk Los K,4nF.IJY[RytvsuM i; ^? DISTALAUt10N r I`I PART 1 ' t 1 PtMI AMO POW111 s<k n-oo To 97A. I�7 sip n� • � �a d Q 5 � a � � a � A[CCw/[MOLA ' 500 l SI ■ tr R ql ! t Re V organ n. �•til DM ( �. �ti4l I /.. JA'L MtCI 1754-00 171+00 177+00 178400 171400 1/0400 111400 M2.00 117.06 ntnlCA (� 41 i; La it , X ;.r I EJ Village ; N-eek Reclaiwe'-1 w 4e, Projcc't Parcel # 3-10A Doe #6 Pd75— -.;7o5 /cloa a l330 14300 Block of FAA Boulevard Fort Worth, Texas 76155 STATE OF TEXAS § COUNTY OF TARRAN T § RECLAIMED -WATER LINE AND SALT -WATER LINE TEMPORARY CONSTRUCTION EASEMENT DATE: 4-21-2009 ow GRANTOR CENTREPORT DEVELOPERS, LLC GRANTOR'S MARJ NG ADDRESS (including County): P.O. BOX 49868 LOS ANGELES, LOS ANGELES COUNTY, CA 90049 GRANTEE: CITY OF FORT WORTH GRAMME'S MAILING ADDRESS (including County): 1000 THROCKHORTON ST. -FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good- and valuable consideration, the receipt and sufficiency of which is hereby acknowledged EASEMENT AREA: See' Exhibit f "B", attached and incorporated for all pertinent purposes. Grantor, for the considerations paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, and its assigns a non- exclusive temporary construction easement in, under, and through the property for the installation, construction, reconstruction, operation, maintenance, replacement, upgrade, and repair of multiple pipelines for a reclaimed -water main. Upon completion of the construction- of the reclaimed -water main, all rights granted within the temporary construction easement shall cease, and all operations, maintenance and repair shall be confined to the permanent easement for the reclaimed -water main. This easement shall terminate not later than December 31, . a 6 1 j C=trucjonEasanadasdSalt-Pi WTPipdinei=ssem t,Parcel 3-10 Pagel M A? TO 1:11, VE PXD TO fIIIOLD L1e above• -described temporary construction easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successor and assigns to warrant and forever defend all and singular the easement unto Grantee, its successor and assigns, against every person whomsoever lawfully claiming or to claim the same, or any pad thereof. When the context requires, singular nouns and pronouns include the plural_ GRANTOR Centreport Developers, LLC, a Texas limited liability company. By: Name: Reza Soltanianzadeh Title_ Manager GRANTEE City of Fort North By: Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY Assistant City Attorney Date: �mshvction Reclaimed WaDer Pipeline Eassoatt W Silt Watcrhpdme F.asr nwt. Pared 3-10 Page 2 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) On , 2009, before me a Notary Public, personally appeared Reza Sottanianzadeh, who proved to me on the basis of satisfactory evidence to be the person(s).whose name(s) (is/are) subscribed to the within instrument and acknowledged to me that (he/she/they) executed the same in (his/her/their) authorized capacit(-y/-ies), and that by (his/her/their) signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct WTINESS my hand and official seal. Notary Public Coasbvctian Reclaimed -Water Pipeline F.ascment and Salt -Water Pipeline Easement; Parcel 3-10 Pap 3 ACI&a4OWLM.BGT TNT STATE OF TEXAS § COUNTY OF TARRANr § BEFORE ME, the undersigned authority, on this day personalty appeared Fernando Costa, Assistant City Manager of the City of Fort Wortb, known to me to be the person and officer whose name is subscribed to the foregoing instrument; and acknowledged to me that he executed the same as the act an(I deed of the City of Fort North, a municipal corporation of Tarrant County, Texas, for the puzpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF -OFFICE this day of 20_ Notary Public in and for the State of Texas C=tuctioa Rrdainrd-Water Pi Pt5ncEasanaRand Sah WatcrP4n(iocEise uwt;Pa td3-10 Page F M EXHIBIT "B" Being -a temporary variable width construction easement situated in Lot 2, Block 113. ow. Centreport — Phase IIIA, being an addition to the City of Fart Worth, Tarrant County, Texas according to the plat thereof recorded in Cabinet A, Slide 12981, Plat Records, Tarrant County, Texas and being a portion of that same tract of land conveyed to .. CENTREPORT DEVELOPERS, LLC. by warranty deed as recorded in Tarrant County ClerKs Instrument Number (T.C.C.I.No.) D207455288, Deed Records of Tarrant County, Texas (D.R_T.C.T.), said strip being herein more described by metes and bounds as fellows: BEGINNING at a point on the west pn3perly line of the. said Lot 2, same being the east property line of Lot 3, Block 113 of the said Centreport — Phase MA, said beginning point being on the south edge of an existing 19 Utility Easement as shown on the said Centreport — Phase 11LA, said beginning point also being located South 00` 13'26" East 35.00 feet from the northwest property comer of the said Lot 2; THENCE South 89'OT00' East 246.67 feet to a point on #fie west edge of an existing 30' wide Underground Pipeline Easement to Texas Midstream Gas Services, LL.C. by deed as recorded in T.C.C.I.No. D208143245, D.R.T.C.T., THENCE South 0O`50'10" West, along the said west edge of the Underground Pipeline Easement, 20.01 feet to a point; THENCE South 89*09*50" East, along the south edge of the said Underground Pipeline Easement, 29.28 feet to a point; ... THENCE South 05'02'4.1" West 944.5-7 fleet to a point on -the south property line of the said Lot 2; THENCE South 89*4634" West, along the said property line, 100.42 feet to a point; THENCE North 05'0241 " East 941.49 feet to a point; No THENCE North 89°07'00" West 174.86 feet to a point on the said west property line of Lot 2, same being the said east property line of Lot 3; THENCE North 00'13'26" West, along the said property lines, 25.00 feet to a point containing 2.304 acres (100,358.2 Sq. Ft.) of land more or less. «. ...................... ++ REVISED; 2-23-09 ERIC SHAUN SPOONER 'e = �A� PARCEL 3-10 — Pg= 6- of 7 9 E .. 0. No 7 .51:4 TY Kf OR KA Y 183 PLAT OF EXHIBITs "A"&"B".1 (AIRPORT FREEN, p.o.,g SEE A rrACWO tE-GAL VE-5CR1Pn0v VARUME rM771 R- 0. ir EXH1,91T ON PACES 5-6 Or EXiJ191,rs -A -&"8',Y6VN S89'07WIE 247 IX Soo-50,10 1000, 25.00' 51 1,q, Ivoo.fj:26 "w Ex 10, U.E 25, 00, —L 4 j ow M69-0709,w L2 246.67' 30' tA%VD?67?0UAl0 PiMlfff L T EXKIBJT A" 7-0 TfX45 AUDSMSW CAS 5ZwcZs, U.C- lNo. 02OB14,Y245 PERMANOVr 25, *A9E rc-ca R- rC, r RE CLANEV WA TAER PIPELINE AND S4L7' WATER AP&JNE E4SEU,6Vr ow 0.142 ACRES (6,172-6 SO- FT) foo.00, LOT 4 .BLOCK 171 CDV7RCP0Rr - P94-Sil 014 CAA- A SW- I2981. PR.TCT tv tor 1. aocK I li CCNTR6-0Rr - fW4---- CAR A -5ia 12981- P.kr.C-.r C) ta cq EXHIBIT 16 MUPORNRY VARIABLE WIDTH CONSMUCRON EASEMENT 2304. ACRES (100,358-2 50 CT-) CL c, -3 F" BOUZEWD VARMBLE' 010T9 R.O.r ------CA.9- A, SUBW 12949.1, P-R T C. T. L07' 2. BLOCK 1113 No- DIRECROM — DIST Rf"iVIER OF CENTREPORT —PHASE 111A Ll SOO'50'fO"W 20.01' CITY OF FORr WCAMH C,4 B. A, St 0. 12981, P. R. F C. r vix 2as7 PC. 567 k PIX. 20M. PACE ?4J L2 -58970,9:501E 29.2,9' CEIVAREFORT DEIVELOPERS, LLC LJ S89-4,63M-W 100 42' r. 7. C. C.1 No. D207455288 D.R. T. C T. JL4 V00-13:?67W 2500' ATOM - THE BA57S Cr fi&W.VCS FOR 770S SW WY IS ESM&L9iLD f??CW PLAT aEAffiMS AS -9/0 W CW CAC t SW 12981 OF ThE PAT C Ior - --- -- VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM ---- ERIC SH-----AUN 'SPO-------- ONER PARCEL NO. 3-10 D-O.-E. #P275-70514()021330 5 2 SLMXgVVMW CEMIREPORT - PHASE 9RA LOCAnOt+ CITY OF FORT WORTH. TARRANT COUNTY, TEXAS PERMANENT RECLAIMED WATER PIPELINE VMOLE PROPERTY ACREAGE 12541 ACRES PER "T AND SALT WATER PIPUME EASS(ENT S&A J08 NO.: 03--0085 j DRAWN BY. LS.S- - DATE. 11-25-D8 J CHECKED B.yL E.S.S. EXHIBITS. -A do B- PAGE 7 OF 7. - SPOONERA ASSOC, INQ 309 BYERS STREET, #100. EULESS, TX 76039. PH 817-281-2365 FAX 617-685- REV. 2-23-09 Appendix C Geotechnical Bore Logs ( ► � 4 w k [ 1 1 1 I � # � � � � . S. H. 183 I ► r-----` e:t1 o��'�J 1 •�R\�\�� 8 B-2-5 B-2 6 B-2-3a 9 y� B-2.3 rrrrr tl`2-2 rr• TB-1 3 B-2-1 -r1 B-2-la 3 B-2-1h 1 B-2-10 _ t tJ1 1 V 1 1 1 1 B-1-2 e-1-1 GREEN OMS BLVD 1' 1 1'------------' 1 L.-- 1 w PLAN OF BORINGS VILLAGE CREEK RECLAIMED WATER SYSTEM FORT WORTH, TEXAS 1 N LEGEND: Boring Location 0 2000 4000 feet —j Apprommote Sco/e CMJENOWEEpiwo.WC. CMJ PRojEcr No. 425-09-15 � C.MJ ENGINEERNG INC - Project No Boring No Project Village Creek Reclaimed Water System 425-09-15 B-3-1 Fort Worth, Texas Location Water Observations • See Plate A.1 Seepage at 12' during drilling; water, at 12 1/2' at completion Completion Completion Depth 15.0' 1 Date 2-9-09 .r Surface Elevation Type 524.1 B-53-CFA IL N Q i C. N � 'C O N C LL W Cr > o Stratum Description o o Z ma 0 0 a W N o H0 c� a g� gx _m pV cnv w Ci om� D: mat= 40 mm 0-6 aE JJ a� as 2U �_ �Ua owo: SANDY CLAY, brown and reddish -brown, w/ 4.5+ 12 ironstone nodules, hard 4,5+ 13 - - grades w/ light brown, Z - 6' 4.5+ 16 "111 —1 .r u+ MW r .o 771 5181 SILTY CLAY, light brown, gray and reddish -brown, shaly, hard 5131 SAND/GRAVEL, brown and reddish -brown 5116 SAND, tan, cemented, very dense 5091 m 1 4 N v r � Z C O m LL O .. LOG OF BORING NO. B-3-1 4.5+ 12 4.5+ 52 17 35 13 4.5+ 17 4.5+ 15 117 6350 5014" 22 PLATE A.17 UM CMJ ENG>N�NG INC - Project No Boring No Project Village Creek Reclaimed Water System 425-09-15 1 B-3-2 Fort Worth, Texas Location Water Observations See Plate A.1 Dry at completion Completion Completion Date 2_10-09 Depth 20.0' 1 �. Surface Elevation Type 531.3 B-53-CFA ,n CL d >. UI � o N _. � LL. LL. U) o Stratum Description � m z �� - o m f z= 2 o o NULL t� N� �`- U�: 'A Ux dl m _a ym C 5 �V -' is 'c �U.0 U E 7 w C{ o m W ma.� m m av) cE �iD n.� � a 0 2L) am >� c o o MU(L SANDY CLAY, brown and tan, very stiff to hard, fill 3.25 17 - 4.0 59 17 42 15 -_ 5283 4.5+ 12 .. SAND, reddish -tan and brown cemented, very dense 1 50/1.5" 5 u 50/3" 5228 - SHALY CLAY, gray and brown, sandy, w/ ironstains 150/5.5" 52 21 31 23 —1 and silt seams, hard aw - - 518.8 - l SHALE, gray, w/ sand seams and occasional I! — sandstone seams, soft 4.5+ 17 105 9320 .. _ - - moderately hard to hard, 18' - 21Y j _ -- 511.3 00/135 ' —2D— —� ----------- -------------- ..r MW r a 8 0 0 c9 v r 'a q o� 0 �n N v .r 0 z 0 m LL 0 LOG OF BORING NO. B-3-2 PLATE A.18 � Project No. Boring No. Project Village Creek Reclaimed Water System ENGINEERIIJG INC - 425-09-15 I B-3-3 Fort worn,, Texas Location Water Observations See Plate A.1 Seepage at 8' during drilling; water at 8' at completion Completion Completion Depth 45 0' 1 Date 2-25-09 Surface Elevation Type 537.6 B-53-CFA u_ m r E a ` Ci 0 c'4 co ti Stratum Description Z\yN w Ci cZvi of Of ma.� Me cE a. co JJ AE my oa cM a-i a.5 2t> >� co10 Boa. .r SILTY CLAY, tan and brown wl ironstone nodules 1 3.5 1 1 1 1 191 ( 1 - firm to stiff 1 3.0 1 1 1 191 1 1 5346 1 2.5 1 I 1 201 1 1 CLAYEY SAND, dark brown 2.0 1 I 1 131 1 - tan and brown, 4' - 8 5' I 2.0 1 1 191 1 _ _5 1 4.0 1 1 I 18 1 - 5291 - SANDSTONE, tan and gray, very hard 1 11 ooro.5" 1 I 1 —10—= I 1 I I I 1 5261 _ CLAYEY SHALE, brown and gray, soft w J� -15� - 4.5t 1521 20 321 19 5216 1 _ _ - - CLAYEY SANDY SHALE, gray, w/ clayey sand - -, seams, soft -- 1.5 1 I 1 I 1 22 100 1040 t-- 515.6 1 I 1 1 I 1 1 I 1 1 "" _ -- SANDY SHALE, gray, moderately hard to hard 100/2" = 25J—' 'o _- _ 1100/1.&' 1 I 1 -30—- 1 I 1 1 OOP2" 1 1 1 I 1 -3 =1 ��- 1100/1.5" I I 1 I 1 I 1 Too i 1 1 I 492.6- - - - - - - - - - - - - - - 1100/1" I I 1 h N Q Z C O m LL 0 LOG OF BORING NO. B-3-3 PLATE A.19 Project No. I Boring No project Village Creek Reclaimed Water System CMJ 114M, G nac 425-09-15 B-3-4 Fort Worth, Texas Location Water Observations .. See Plate A.1 Seepage at 23' furing drilling; water at 18' at completion Completion Completion Depth 60.0' I Date 2-11-09 Surface Elevation Type 550.3 1 CME55-CFA Stratum Description SILTY CLAY. dark brown and brown w/ calcareous nodules and ironstone nodules very stiff to hard, fill 5 - 541 8 .. - SILTY CLAY, brown and reddish -brown, wl —1 calcareous nodules, hard - 5378 - SHALY CLAY, light reddish -brown and gray, w/ - ironstains and sift seams, hard 532.3 _ "W _ •..... SAND. light reddish -brown to tan, wt cemented _ 20— sand seams dense to very dense 5253 _ - a ' SANDSTONE, tan, extremely hard 522.8 � SHALY CLAY, light brown and gray, wl cemented sand and sand seams, hard .o No ow ow 5173 SHALY CLAY, dark gray, sandy w/ occasional sand seams, hard - firm to stiff 44' - 50' 500.3 — SANDY SHALE, dark gray, w/ occasional sand and _ sandstone seams moderately hard to hard 490 3_ — — m�0— _ ---------------------- U. 000 LOG OF BORING NO. B-3-4 o _ J lA o� N 0 . 3 C LL D2a a� �_ yp o0 =a4 U 0 �'C� y> 7'- iA= OJN E yC !'yj UE7 w d o ovi coal- o m ain QE J_, 5a a=l a5 o o 20 c� :S c o o BULL 3.25 1 1 1 201 1 I 1 4.5+ 1 1 1 1 231 1 { 1 4.5+ 1 1 151 t 1 4.5+ 1 1 1 151 1 4.5+ 611 23 38 17 4.5+ 18 1 4.5+ 11 1 1 191 I 1 1 2.75 1 1 i 1 1 261 99 2960 I 1 I 1 1 1 30 t 1 58 3.5 1 I 1 1 1 4.5+ 1 4.5+ 60 22 1 1 { I 1 2.0 1 I I 1 { I I I I 1 2.5 1 I 1 I 0 00/2.75' 1 I 1100/2.5" 10 I 23 1 231 18 I 1 I I 38 271 1 1 21 I 22 104 34601 I I 1 1 { I I 1 I t I ` PLATE A.20 %J Project No. Boring No Project V'II( Re 1 ' A W t S t CK ENGu�nvGINC. — age C k ree c atme a er ys em 425-09-15 8-3-5 Fort Worth, Texas Location Water Observations .. See Plate A.1 Seepage at 19' during drilling; water at 26' at completion Completion Completion Depth 45.0• 1 Date 2-10-09 Surface Elevation Type .. 549.1 1 B-53-CFA "s .o LL t � Q E E o Stratum Description CLAY, dark brown and brown, w/ calcareous nodules stiff to very stiff, fill 5466 SILTY CLAY, dark brown and brown w/ calcareous nodules, stiff to very stiff - w/ gravel, 4' - 5' - grades to light brown, 10' -13' 5361 CLAY, light brown, reddish -brown and gray, shaly, w/ ironstains, bentonite seams and sand lenses, siickensided, hard 5261 SHALY CLAY. light brown, reddish -brown and gray w/ calcareous deposits and sand lenses, stiff to hard —35—� 5141 SHALE, dark gray moderately hard to hard 401—,l —45--� 5041 0 4 N N V Z W O O o LOG OF BORING NO. 8-3-5 o _ Ol N Z \ gLL C LL N o o : -� e � Yl N C W d rr W omr/? Con. F- ,am 0-U) vE - D mE n. , my a S oo 20 cm D-i r-oo D U a 1 2.75 ( 23 1 ! 1 4.0 1 20 ! 1 4.5+ i I 121 I 1 4.0 1 1 23 1 i 1 3.0 1 I I 1 241 1 1 I 1 4.25 1 I 65 I 24 1 41 1 1 231 1 1 I 3.75 I I I ! 231 1 1 1 ! I 4.5+ 1 - 1 28 I ' 4.5+ 1 1 1 I I 1 1 I 1 A I 1 33 93 I 118901 1 4.0 +1 66 1 27 391 1 1 321 1 1 I 1 1 I 2.75 1 1 I 1 j1 1 1 1 I I 27 J 99 10870 1 1 3.75 ! ! 71 I 241 1 471 11 23 1 ( 1 1 1 I !! 110012.5" 1 1 1 1 I I I I I P 00/1,25-1 1 1 PLATE A.21 Project No, (coring No. Project Village Creek Reclaimed Water System CM ENGMEENG INC 425-09-15 B-3-6 Fort worth, Texas Location Water Observations .. See Plate A.1 Seepage at 23' daring drilling; dry at completion Mv Now Completion Completion Depth 40.0' I Date 2-26-09 Surface Elevation Type 536.3 B-53-CFA u- o w r a a a E E o N Stratum Description SILTY CLAY, brown and dark brown, w/ calcareous nodules, hard 532.3 SILTY CLAY, tan, w/ calcareous nodules, very stiff to hard 5293 SILTY SHALY CLAY, brown, tan, and gray w/ calcareous nodules, hard 5203 - Hd crystals, IS -1 & SHALY CLAY, gray and dark brown, w/ tan sand seams, stiff to very stiff 5093 -- SHALE, gray, hard - w/ sandstone seams, 29' - 32' .r —30—�— =� 5043 SANDY SHALE, gray, hard a -- 4963— — — — — — — — — — — — — — — —,q0-------------- 0 c� U a vi c; 0 e N Z Z LY O m LL 0 0 LOG OF BORING NO_ B-3-6 0 CA G13 N _ LL = LL Cr e LL m Z cn' N N Q y y> m— ui0 30 VZ -20 w d o m� m m >— vE E 9 a 00 ,� c.0 coiE� c o o o: o: 0D- drn .JJ aJ o- 2U >� �C.)CL 4.5+ 16 4.5+ i 19 I I 4.5+ I 1 I 161 I 1 4.5+ 1 16 1 1 4.5+ 1 17 1 1 4.5+ 80 271 53 231 1 • 4.5+ I I 1 I I 1 I 1 211 1 1 I 1 4.5+ I ' i i I .25 11 1 3.0 1 1 1 1 261 1 99 27401 I 1 1 4.0 1 i l 1 l I I 261 ' 1 I I 1 h 00/0.25-1 1 1 I I 1 00/1.25'I I 1 1 I 1 100/1" 1 PLATE A.22 Appendix D Subsurface Utility Engineering Reports SURFACE ELEVATION: 539.67 TOP OF UTILITY: U1.10 PAVEMENT THICKNESS AND TYPE:NG NG PROJECT NAME:VILLAGE CREEK 8.57' PROJECT No: 5JUE 09-022-07 OWNER: ALAN PLUMMER CSJ NO: N/A LOCATION: PIPELINE ROAD 8 SOUTH EULESS MAIN STREET CITY. COUNTY:FORT WORTH.TARRANT 6 " REFERENCE PLAN SHEET: - OF - TH#: L-2 DATE: 02-20-09 SOIL CONDITIONS: CLAY UTILITY OWNER: CITY OF EULESS UTILITY TYPE: WASTE WATER UTILITY SIZE: 6" UTILITY MATERIAL:CI COORDINATES SHOWN ARE NAD 83. WASTE WATER COORDINATES BROUGHT TO SURFACE BY MULTIPLYING TXDOT FORT WORTH SCALE FACTOR BY 1.00012 COORDINATES: N 6985882.51 E 2404309.52_ STA: OFFSET: ' ¢ t #: • t til � W......... _ . j.. a .,...q..� 1 .,`^".... ... 5 .. LAI S r.... t ! i ..... S 40 Z i y j i . fin....._.. ,._ ......_ s r�8 TAIK w '4 J ; BM: PNT#1000 N:6972597.772 j� E: 2411393.593 (5 NOT TO SCALE �•:gp : ' t ,hSEPH A. MURPHY ,.••• ............ 09796_ BM: PNT*t1003 N: 6968486.186 JOSEPH A. MURPHY, PE E: 2402378.676 DATE 03/06/09 SURFACE ELEVATION: 559.84 TOP OF UTILITY: 5M .04 PAVEMENT THICKNESS AND TYPE:Ng NG PROJECT NAME:VILLAGE CREEK 4.80' PROJECT No: 5_UE 09-022-07 OWNER: ALAN PLUMMER CSJ NO: N/A LOCATION: AMERICAN BOULEVARD & EAST FAA BLVD INTERSECTION CITY. COUNTY:FORT WORTH.TARRANT REFERENCE PLAN SHEET: - OF - 2-1.5" TELE TH#: 3-4 DATE: Q2-04-09 SOIL CONDITIONS: CLAY UTILITY OWNER: ATT UTILITY TYPE: TELE UTILITY SIZE: 2-1.5" UTILITY MATERIAL :P,E COORDINATES: N 6989531.27 E 2408499.49. STA: OFFSET: f NOT TO SCALE IA?' Wo \.. .......,..._. . _........... . ...... ..... ._. . ....... • , . w . r� t • TEST HOLE 3-4 • r, R 9 ' ... W; .. r.,,i rr, n 3 r _.. , . FAA BLVD : .. ..�.: uu ::..: ;..�., � �!' _ �.ik';'.m._............................... ....._ _c'�` .......... .11'!: .......................... ._........ _............. 04.fC—•.�....�......._......5..............._......._._!.:'lE man......,...., -a ..... r.. ; ,. s _ .............. ........... I�lf! am _�., ... ...........r........... _........... .......... t f/filtil i 1Vh` F:-r �rj N '* W W r LL < M W W yr �o BM: PNT#1000 N:6972597.772 E: 2411393.593 BM: PNT#1003 N: 6968486.186 E: 2402378.676 COORDINATES SHOWN ARE NAD 83. COORDINATES BROUGHT TO SURFACE BY MULTIPLYING TXDOT FORT WORTH SCALE FACTOR BY 1.00012 *. .......................... JOSEPH A. 1;6PHY ............................... JOSEPH A. MURPHY, PE DATE 03/06/09 SURFACE ELEVATION: TOP OF UTILITY: PAVEMENT THICKNESS PROJECT NAME:VILLAGE CREEK PROJECT No: SUE 09-022-07 OWNER: ALAN PLUMMER CSJ NO: N/A LOCATION: EAST OF GREENBELT ROAQ NORTH OF VCWWTP CITY. COUNTY:FORT WORTH.TARRANT REFERENCE PLAN SHEET: - OF - NG 7.30' 473.99 466.69 AND TYPE:NG 54" RAW WATER COORDINATES: N 6970127.21 E 2386792.85 STA: OFFSET: w w N M C W Vf I� WN 7 H N TH#: 4 -1 DATE: 01-30-09 SOIL CONDITIONS: aAY UTILITY OWNER: TRA UTILITY TYPE: RAW WATER UTILITY SIZE: 54" UTILITY MATERIAL:QI COORDINATES SHOWN ARE NAD 83. COORDINATES BROUGHT TO SURFACE BY MULTIPLYING TXDOT FORT WORTH SCALE FACTOR BY 1.00012 #; ;* ............................... JOSEPH A. IIJRPHY a•. 89796_ ,. V , ,�_ :�. ... _..._................... L �� __...._.......... t.x ... ..........._. . i BM: PNT#1000 N:6972597.772 BM: PNT#1003 N: 6968486.186 JOSEPH A. MURPHY, PE ww E: 2411393.593 E: 2402378.676 DATE 03/06/09 �o f w � SURFACE ELEVATION: 466.13 TOP OF UTILITY: 460.68 PAVEMENT THICKNESS AND TYPE:bj� PROJECT NAME:VILLAGE CREEK PROJECT No: SUE 09-022-07 OWNER: ALAN PLUMMER CSJ NO: N/A LOCATION: AADANDONDD TRAMMLL DAVIS ROAD CITY. COUNTY:FORT WORTH.TARRANT REFERENCE PLAN SHEET: - OF - NG 5.45' 72" WASTE TH#: DATE: ?-04-09 SOIL CONDITIONS: SAY UTILITY OWNER: TRA UTILITY TYPE: WASTE WATER UTILITY SIZE: 72" UTILITY MATERIAL:CONC COORDINATES SHOWN ARE NAD 83. WATER COORDINATES BROUGHT TO SURFACE BY MULTIPLYING TXDOT FORT WORTH SCALE FACTOR BY 1.00012 COORDINATES: N 6971191.53 E 2388688.08 STA: OFFSET: i NOT TO SCALE o O TEST HOLE w,. ........ p..... .. - ,...... ......... ....... ............ g i I f i .. ....�.,. .... .. m ..... .... Q ).ass• ��(�7 tvt ....... .. y [y , 10 I .� �..7. �....lYt .. 1''( i : i... ...... ... w.. .. t i. I. BM: PNT#1000 N:6972597.772 BM: PNT#1003 N: 6968486.186 ww E: 2411393.593 E: 2402378.676 LZo F ' ..::. JOSEPH A. MURPHY ........................... Q••. 89796_ :4k JOSEPH A. MURPHY. PE DATE 03/06/09 Appendix E Texas Department of Transportation Permit "M Approval Form Online version 11/2005 To Tom White City of Fort Worth 1320 University drive, suite 300 Fort Worth, TX 76107 APPROVAL Date 4/13/2009 Application No. FTW20090223112602 District App. No. 220-W-122-09 Highway SH 0360 Control Section 226602 Maintenance Section North Tarrant. County Tarrant TxDOT offers no objection to the location on the right-of-way of your proposed utility installation, as described by Notice of Proposed Utility Installation No. FTW20090223112602 (District Application No. 220-W-122-09) dated 4/13/2009 and accompanying documentation, except as noted below. Conventional dry bore only unless approved in writing by the Area Engineer or Inspector. - Buzz When installing utility lines on controlled access highways, your attention is directed to governing laws, especially to Texas Transportation Code, Title 6, Chapter 203, pertaining to Modernization of State Highways; Controlled Access Highways. Access for serving this installation shall be limited to access via (a) frontage roads where provided, (b) nearby or adjacent public roads or streets, (c) trails along or near the highway right-of-way lines, connecting only to an intersecting roads; from any one or all of which entry may be made to the outer portion of the highway right-of-way for normal service and maintenance operations. The Installation Owners rights of access to the through -traffic roadways and ramps shall be subject to the same rules and regulations as apply to the general public except, however, if an emergency situation occurs and usual means of access for normal service operations will not permit the immediate action required by the Utility Installation Owner in making emergency repairs as required for the safety and welfare of the public, the Utility Owners shall have a temporary right of access to and from the through -traffic roadways and ramps as necessary to accomplish the required emergency repairs, provided TxDOT is immediately notified by the Utility Installation Owner when such repairs are initiated and adequate provision is made by the Utility Installation Owner for convenience and safety of highway traffic. The installation shall not damage any part of the highway and adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. In the event the Installation Owner fails to comply with any or all of the requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance. It is expressly understood that the TxDOT does not purport, hereby, to grant any right, claim, title, or easement in or upon this highway; and it is further understood that the TxDOT may require the Installation Owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. If construction has not started within six (6) months of the date of this approval, the approval will automatically expire and you will be required to submit a new application. You are also requested to notify this office prior to commencement of any routine or periodic maintenance which requires pruning of trees within the highway right-of- way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, type of cuts, painting cuts and clean up. These specifications are intended to preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming. Special Provisions: UIR SPECS JAN 09 Notice to be sent to applicants You are required to notify TxDOT 48 hours (2 business days) before you start construction to allow for proper inspection and coordination of work days and traffic control plans. Use the UIR website for the 48-hour notification. DO NOT start construction until you have coordinated the construction start date and inspection with TxDOT. You are also required to keep a copy of this Approval, the Notice of Proposed Installation, and any approved amendments at the job site at all times. Texas Department of Transportation By Buzz Kyler Title Project Coordinator District Fort Worth ,.. Approval Form •.c Approval Form Online version 11/2005 To Tom White City of Fort Worth .M 1320 University drive, suite 300 Fort Worth, TX 76107 APPROVAL Date 3/19/2009 Application No. FTW20090223132435 District App. No. 220-W-076-09 Highway SH 0183 Control Section 009402 Maintenance Section North Tarrant County Tarrant Page I of 1 TxDOT offers no objection to the location on the right-of-way of your proposed utility installation, as described by Notice of Proposed Utility Installation No. FTW20090223132435 (District Application No. 220-W-076-09) dated 3/19/2009 and accompanying documentation, except as noted below. Conventional dry bore only unless approved in writing by the Area Engineer or Inspector. - Buzz When installing utility lines on controlled access highways, your attention is directed to governing laws, especially to Texas Transportation Code, Title 6, Chapter 203, pertaining to Modernization of State Highways; Controlled Access Highways. Access for serving this installation shall be limited to access via (a) frontage roads where provided, (b) nearby or adjacent public roads or streets, (c) trails along or near the highway right-of-way lines, connecting only to an intersecting roads; from any one or all of which entry may be made to the outer portion of the highway right-of-way for normal service and maintenance operations. The Installation Owner's rights of access to the through -traffic roadways and ramps shall be subject to the same rules and regulations as apply to the general public except, however, if an emergency situation occurs and usual means of access for normal service operations will not permit the immediate action required by the Utility Installation Owner in making emergency repairs as required for the safety and welfare of the public, the Utility Owners shall have a temporary right of access to and from the through -traffic roadways and ramps as necessary to accomplish the required emergency repairs, provided TxDOT is immediately notified by the .. Utility Installation Owner when such repairs are initiated and adequate provision is made by the Utility Installation Owner for convenience and safety of highway traffic. The installation shall not damage any part of the highway and adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. In the event the Installation Owner fails to comply with any or all of the requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance. It is expressly understood that the TxDOT does not purport, hereby, to grant any right, claim, title, or easement in or upon this highway; and it is further understood that the TxDOT may require the Installation Owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. If construction has not started within six (6) months of the date of this approval, the approval will automatically expire and you will be required to submit a new application. You are also requested to notify this office prior to commencement of any routine or periodic maintenance which requires pruning of trees within the highway right-of- way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, type of cuts, painting cuts and clean up. These specifications are intended to preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming. Special Provisions: UIR SPECS JAN 09 Notice to be sent to applicants You are required to notify TxDOT 48 hours (2 business days) before you start construction to allow for proper inspection and coordination of work days and traffic control plans. Use the UIR website for the 48-hour notification. DO NOT start construction until you have coordinated the construction start date and inspection with TxDOT. You are also required to keep a copy of this Approval, the Notice of Proposed Installation, and any approved amendments at the job site at all times. Texas Department of Transportation By Buzz Kyler Title Project Coordinator no District Fort Worth aw https:Happs.dot.state.tic.uslUIRPR011ibINoticeApproval.asp?ApproverID=DOT20070622123013 &Permit... 3/19/2009 No I" TAW wo ow "0 "a "a ow ow Texas Ot D AOf Trall9pOlUb-011 l. of - No Al AV Specir,ications -for TAW Uti/ity 110 Insta//ations uw f 0 r t Mot 67. Ds&c t (re mo no me Im Specifications for Ui iiity I.nstaliadons Fort Worth District ROOT[iireetory Far Utilities 3,4 TxDOT's Mission Statement - 5 Safety Protection of-HighWay.Faciiitie$ 5 5 Use of Explosives 5 Protection of Existing Facilities - 5 +* C}evriati liY F-rori Approved Plans _ _ _ _ . - - _ - -- ---- .. _. 5. Staking :of Utility Lines .in Advance ofpnstnrctin _Y ._ _-- --- - _ - 5 _ Full Tune Supervision aFtd los"pection 5 +" lociorn of Jafa: -tarC 5 - : _ - -- TxDOT Laiates 6 Stockpiles on TXOC T ROU1N - - - - — -- - -- - 6 Coordination. of HIV rk With Highway �GantradoC or Sla, Fors 6 'Illfor[c Day( Res-ttciorts_ - 6 Incleitie_ nt Weatitef �. Pits _ ....,_ ...... - - - — — - --- - -- - -- •-- - — 6 Bore-ar'd Tunneling Qperations. -- ---- --- Wrkers _ 7 Above-Grb7und, ►pp Urleaanoos- 8 Ba&-F ll of Utility Trenches 8 Site Clean -lip .71: ------�:--_- - - ;� -. RepaV,and Repiaperr r>f of i ip-dap ifl EaM Slopes Special Precautions For Erosion-► Contrbl 8 Seeding $pecifioations 9 [Aesthetics. - 10 Requiced Prbninq Pradtbes - - 10 Pruning Suggestions ,. Spay #C0 tart trwiit 00C 2- N" worm-awries in so MA wo "w ow ow an No so mo me "w wo m lw 1w . jX00T. DIRECTORY 50K UTILITIES 05-10 I D. GREENHILL UTILITY AGREEMENT .1 PERMIT COORDINATOR W22 KYLER UTILITYCOORDINATOR PAUL-012-11RO UTILITY COORDINATOR jOSF_PH,BtNNET'T UTILITY COORDINATOR JIMMY vA-uGHA-'N UTILITY- 613SEAVEit 6TACY CLACK UTILITY OiittRVEA. CLARAELLioTT UTILITY'PtAmifs for N. I BRENDAWATTS PARKER. FAIM PwT0f 00KNOSE, S. TARRMT, JOHNSON-, ERATH. HOOD, SOMWELL. RONALD ROBINSON AREA ENGINEER RANDY BOWERS ASSISTANT AREAENGINEER JERRYSTOUT QTILFTY COORDINATOR IL NELSON AREA ENGIN ER _REr DIL '0 ASSISTANT JANET DAVIS UTILITY R COORDI ATO � N - - � RALPH BROWNE AREA ENGINEER OSCAR CHAVEZ APST AREA, ENGINEER JOE FOSISETT AREA ENGINEER ALBERT DURANT ASSISTANT AREA ENGINEER 817-370-6588 817-370�827 81,7-370-6865 81.7-370-6883 817-307-1617 817313-3873 817-370-6585- 81147- . 0-0W 417402 2900 817-e202-_2900 13 0-M-166 -0 W-626-3400 646-626-39�Iti- 940-626-3400 .817-399-4302 817-399-4302 ,817=370-6638 41747 38 f0twalrib olmdiii MARC Mc FENDREE AREA ENGINEER 264-966- 3_5 11 DAVID 13ULLARD ASST AREA ENG. /UT[UT-Y COORD. 254-965-3511 JOHN CORDARY AREA ENGINEER 817Z96-9834 VACANT ASST AREA two.. W(LITY COORD-: 811-506-9934 lift W MAINTENANCE:SUPERVISOR 817:2022900 BRYAN ANDERSON UTILITY OBSERVE 611-202-2905 R(CKYTOMPKINS. MAINTtNANCESUPERVISOR 940=6264400 KEITH PROCHNOW UTILITY OBSERVER (WISE) JANA 1`061080N Ot" OBSERVE -_ (JACK) 00-56,7 i. MAINTENANCE SUPERVISOR 81-7-2832731 PA!Ry PHILLIP$ NOTE: UTILITY PERMIT OBSERVER FROM AREA OFFICE VKOY CLACK 817-313-3873 MAINTENANCE SUPERM1,SOR RALPRGARZA- NOTE-;. UTIjLj_7Y _PERM Y OBSERVER-FROM.AREA OFFICE JIMMY VAUGHAN 817-307-16V JAMES PARKER MAIM 1 �=E SUPERVISOR 25"972647 Tplly'mplIW, UTILITY OBSERVER 2S4897-2647 EL1RfEMITCHELL 018SIONW 2644674847 --'MAINTENANCE SUPERVISOR 817-596-9298 ALAN DONALDSON WAYNE FRAfZEk .. - I J, ER' UTILITY OBSERVER AW 817-896-9298 BRYAN RIGGS ,(P4 UTILITYVASEWYER tFAL-0 Pl"TQ): 940425-2414 IN CASE QrZWEROF-PIP r AC7'__4'A r. - - 0-6 LIGHTS AND IQ,CW AT41,727 A iRAAAC CONTROL DEVICES CES SMALLALWAYSAAN , V WILL 9E IN ftpocT ACCORDANCE WIN THE eGUIOELINES OF71fE TMUtCD, 4*0ftsom- hw 4 m w No TXDOT'S MISSION STATEMENT 7ba miss%n cif the Teuas. Department bf Transpmtatloh .ia. to provide safe, effective and efficient movement of people i�.goods. SAFETY Please refer to the Texas Manual on Worm Traffic C9r1E_►'9) D�liees for' que& ps rn'ing. traffic eontroC, While worlcing on -rXDOT right of way hard hats and fluaresgenf-safe r vest arq required at ipif times, PROTECTION OF .HIGHWAY FACILITIES All constru(#ion operabom relative to mstalleiion of the Utility shalt be :conducted in such manner as #o protect hlGjhway facilities from damage at: all times. .In addEvoni .ail work must be done In strict accordance with all applicable regulations of the occupational Safety and Health .Ad'mu►►straation (QSIiA) of the US Depart►nent of Labor. USE .OF EXPLOSIVES Ng expbsivea shall be usad within limits gf� ighway: ftM=of Vkffiout written pernaissiori. .+ PROTECTION OF EXISTING UTILITIES Prior to 6egirvJrg actual cortsuclrori apeiations rite Unity shall rioUfy aN other.fJtU(iy Cvniganies who may have facilities. in the a►ea sa carr:det®rrnine if the pcopased constn. djW vAq s onflict;t tth or othei me 4pi a9a tfieir "' fadlitles REMEMBER; f4064A64ttS QSVIATION FROM APPROYSD PLANS No i a�ffges :st, bd. 'Hasid th ftie apinoYted T�oh' of u6Qties tivittioi�t 'a4itbssiizaixiri flf TzDOT. Th4 tJtNity ST%H. rfia7GR a„� _� ,:ai::.le we..ott.ow Ut11r4 Owners for movingtriim- fasiGGe;# arx>for siapportiiig sa3ne during _ -... 9 oReMR Any piles, aiictiors, etc, refoca%d to dear the 'proposed undegriiurid utlliCy time .shall be moved Toward the: Y tsghi- 4ay phe end location small be sulsjecttgTxfi�OT a�pcovai . All ublii)r tines ir►eortgetly �Cusitalled'shali be rerr�ovext and told, [t1 propel rotation at the emtte=pense of the tltultX STAKING OF !UTILITY LINES- IN ADVANCE OF CONSTRUCTION Utility Cups shad be staked we is advance of construcgon so that TxDOT can inspect sicking to verify that the .. alignmed. conforms to requirements sd out herein and diat_ftwe Is no -cwtict;with,'highway faoili ies. FULL TIME SUPERVISION AND INSPECTION Tt►e �iIity shall provide pomiaeterituil-¢ma supervisors or=inspec&iFs for all utility installations. NOTIFICATION OFJOB, START -48.Hour notification is required for utitityimtagaix: Please haveAbe fbilawing-ktfomwffonr+eady-.w tm you rya b APPROVeopEfilt+(IT NIX a STATE tHlGlilltlA *. UMITY COMPAW s LMLITY.SUPERWSOR OR INSPEOTOR'S tJAliilE. and: UTUTY MOBILENO. GEWf ALCONTRACTOR'S NAME • NAMEOF MM crud tyfOt31(. DHOW NQ. S`FRRrt:�l�7'>s', .r Spod&-xd**, tareir:*b atsnafiaw+ 5. F16ft suft�ta .r TXDOT LOCATES 48 Hour notification Is required for TXDOT locates, BE AVHAREi1 TXDOT has a considemble.investtnent in traffic sigrrak lighting, and traffic management system. These systems include underg► t;nd ei r. and We optic lines. If any of the bWve facr1itles are wit hTh the.linrat of the utility project, Effie utility is required to call the phone numbers fisted below: SOWS and llghUng. Pfibne:# (8t7)370-6671 Traffid' ' anagerneil . Phone—fl&1'T) 37"745 AERIAL CROSSINGS 12 Hour (3'busihess days) notlficatlon is required for aerial crossings. Crossings on controlled access highways and/or high volume roadways can jordy be. performed on Sunday, between.the hours of 3 a.m. to 7 a.m..with.police assistance arid, traf6o confib(.• Crossings on non-con"ed access nays and/or tow volume roadways tart ti pdr WtW.anytlnie d.UdV-the, — week Monday ffiru Frrdair, betwedh Wio(as bf 9 iL*LA 4 p_in: With pre _ trootiCrol. LINE CLOSURES 72.( purr(3.busfness days) notification is required for lane c(ssures prior to the. afterkd6 ♦ of t 4fficfCows. if a tarre closure is'required-due ;to an unforeseen situation and after a utality perMlt h beers appreavod,. it Wit be necessary to call the TxDQT Ufflityr Permi�lDffice at 8:171370-6647. A Vaft`iC carbof plap.rr u t be.sribti ded end approved byTxDOT prior to lane closures- Note- An 'Engineer's seat �rnay be required toc lane clo§Ve6 oil: �eritrol[ed access hicjhwaj('s 6'W tilgh voluiiue roadways_ STOCKPILES ON TXDOT -ROW SOckplifig V ill be allowed -WO permisslon from Tx13OT- -Oncei permission.tvs been granted; stockpiling can start forty-eight hours pnorto construction. The stockpile shall be placed on the right at way lice or as close as possible wit idut obstructing the curb, pavement, or line of site. All materials must bremoved from TXDOT right of way r completion of the city project. COORDINATION OF WORT OWN HIGHWAY CONTRACTOR OR ST►TE. FORGES Al( work related to tie installation bf, utilities shaam. be cwtitt Ceds . to - i ai manoor [uit tb arrt in anY Y trrghway cons Wctioi or TzDUT mbinie nce b ttorts- WORK DAY RESTRICTIONS Except in casesof emergency, pa workwill be allowed on 'Saturdays°,, Sundays, Federal' or Slate Holidays or at night EXCEPTIONS WAY BE CA41MD RY 'TX00T IF the Utility shows that `off day' work is 666"t* to aiioid service 1n6errtiptioris to.the lciubdc and the. Utility agrees t+sfhe foitoN 199=With=: Obtain TxDOT approval at least, 488 hours in, advanm The Contractor is requBed to .tree stiffii e iPOAonrid and = e�qufpmeni on the jots to efficiently execute, the -wiork. The u0ty wiit..ham �a :S.UperYlsor br t ar ,Rrsssrit of i -"the job at all times while the wak is in progress. INCLEMENT WEATHER T9 ertsure .ttie eafety of the Vaveling pQbtic, as well as tl a -cor>6 cot aril hug 'and TOOT ages no work "0 -NO shall be all"ed . during[ InclOment Weather such as, but W limited to rain, fogi snow and -sleet effects vfsjwlfty and/or traction: PITS Ali pits shalt be excavated and closed -within .48 houit. If -the Utility vAshes to leave pits open overnight, reflective barricades must be eftiploged. BORE AND TUNNELING OPERATIONS GENERAL IREOUMMENft utiotle; crossing -under surfaced roads moln theshall be placed by w" bore or _y i.`lgh�-drmy IjM4. qf h unless otha*4e W tunnetrneth6o _edfic4ly, author zed.,by T Bores or tunnels shall be placed ai dep ths Wow the roadway structure which are sodent ,for 'supeemp6sed five and dead loads and also prevent collapse of su -so hole- and m0way. . - - - ppomv, - tweeri BorkV and-tuneft operationsshall extend outside ofthe front *tope and clearzone of#* 11,1911"Y. Bores Where material beneath payeTept is candy qf, ww" and will be: su caving, the holei1offffe casing- -- to c.. 1��_ 0 4 i6m in- " 4 --- *iah be bored and 0 sim augeror used ;;-y aild, bored materiel 4a 1' -cutt _g drill .not pr-o-e Pa. '010 vmah at 10-- *w six "x" jo—ja �O�eW of casing arid no water aWl be -used In coiin6dion with dnlffing. Where ere MateiW- beneath OaVernenrisjstablwand not subject to caVirio, xOOT, the tide for the h and On 6- Wed by T_ cas Im bored W and casfrig ins&W in thd hold knniediately titer d6mplet166 of bonfig. If allowed by TxQOT, waW may be used in COFqUncTon w1b boft bWhar br Wn- Jeft4perab— -ded.." #W jijy __ n _ "." beWC possible stud h* of sides of pit will 0* ecitarier slamsX�paw- *W-SO #* barricaded Oah be Placed - s specified inft d TMUTCD. Borel,pft 4 ld at Watit ftly feettiVith-ft Odife bf the :fide d ftbuglh OW6 lane arid root less thary twenty - feet from ffle-edge cif pbvement.ort ramps. On W traffla-madWays and frontage Mads, bore pYs should lvt. 00-1qwtheinlen feet -from thq*dq'O of pavement or five feet from fdceof curb, Tunnift - WhilO h616 is being Wrinded, casing Shall AdhfiAlly'be jdaW Into place as operations progress. Workh face 30t 01*400wo� .did of cw&Q by'mam Vlan tw,�indone half (2a) feet, _ .ng t uiileS4 Oorp�riseOQWO by' droutthg All voids around casing shall be,pressur6 grouted- The grout shall consisting of Portland Cemdrit and washed Sarld-a rid, pontaJong -q:kk*s than. twp.(2 Norial i*ment sacks JP� C MOi Dr rl� ent xibld yard . W , em- 'W� - N of grout shall be, If-wprkabTAy and/or stability cannot, be obtained. An ?OW also 40 added' tothe , grout.mWuro to facilitate NW k neoftsairy. OjWft 440 be dam immediately, -after casing'has been instAlLed in hole th order to avold, eW,4hpam-gof Awl and setfiementct aver Nroqn-above, casing. Means shall be prav4d not letvoid4 4;Mln in ed for prow Ov., � *,�prwfil und .24" ev Itipre casings _en to mmoyolqp Is,some, doubt by. TxWT. TxDQI* may require the _1yqs-atin*"t§ lniloO the:;R* No holbi "I be drilled in pavement or shoukWm foForoutinig operations: MARKERS The: Utility hall pjAca readily Wenlabe *,siabld, roarief t 0n4*see foe' hh0-owaycrudslnos-. Ow Spe"EmIfiats ForLY" FniWI&O"i 7 am so 11tirittes, si sal para j1el the right of vm a] y shall place g marker every .1600 feet at intersecting streets, and highway drainage Wlvqrts. ABOVEGROUND APPURTENANCES Above -ground appurtenginces...sudli as Pedestals. fire hydrants, meters, etc.shall be krated at the right -off line- BACKFILL OF UTILITY TRENCHES aStRlpirlolsl This specification -C beers opened fbr the removal.;adjustrneh� tw 099 shall govern ba"I of trenches, whkh have installation oftrOlitylines within the -limits ofhighw2yright-of-may, Excep.twtienpermrsalo--nisgranted, - - pacL*d dom back4f.-wiff. be used for utility installations. Bac"ll shag consist of compacted mabiwial'obbT66d ftbrri suitable soil excavated fro . m- used or f rom, sources outside the highway dghb44,iy, 'Mat" stioll b'Orbe dfrock lumps, or clods that will not break down under compacdom Bac"ll material shall be placed in ft trench in :layers hot -to 4x-c% akd ir In depth -and corn -pa-- Cted. Water shall be added as requIrW to facilitate compaction: two Compaction shall be done -with rollers or mectiat" tamps Use of mllem win be allowed only wheq - such use is not believed lieved detrimental; to arty highway 4ad i rdy. z Th ei kw of it ol leF used m'-.0tt_ b 6 occeotab(e to Tx rollers are used, rneshanldal tamps stuff used along''thee.skles of-t—rench tq c"papt anii6ckml 00'i c4M readied vAth r6flens. Compacting shari be continued until a ba cOil. #6rWM( 10 OcWo to lh4 of t pdj. �-' undts3urbed material Where tretichds Be wtlhIA the limb of dfairM-e ditches and channels, which are irtsolid ro6K TxDOT MaVrequir03 Vof concre16ba'111, stru Wbth -too of. rocky SITE CLEAN UP ON thejity io, pP1109 for s&dean up at the and of eacWworkday koadways mdjat exit-tothe Oily- *uciion site -shall be five from debris, corishictim materials and mid. Ati kept w end of each, day, construction equi n . roadway materials shall be moved as far from the asfeaslille -,Pme.! the sdeiv rutqs.� If mudding of the Wway roadway all eaned ed e 6 a- occurs at any time; the ysh bed inith i5t Uy. When- thefte� Aof utility installation Ts- comol the 6 KI -way shall be -reshaped to its original condfttw 46d the area reseeded or re -sodded to reduce eivosim.. Shpuld settionjetit or ergsion q utility. lnstalWicn, TxWT may s prompt - occur Voithin qqq f the, 40 pecify tepjprampntat the utility's § p"n§@ * b_nri&g ft po u siti saffstsictoryconditiom TxDQT WR restore sites that are left at an unsatisfactory condition after notification- has been sent to thk utility, these sites will be- re stared to condition. The utility shall fully reimburse all costs incurred Mj-TxQ0T W.ak repairs. made t4fiMT, These costs include:.- but are fH:A_Iimited'to matters of traffic taftl!Y, Nht-bf ji*'_cbnWMfr restoration -and. repairs to an hIghwaystructuresAncluding, but not ffmited,to roaft,46VOwayi leftnUM dscapikV, fences;:etc. REPAIR AND RE LACEM.EN-T- OF RIPRAP AND EARTH SLOPES, Any axis" rWap cut bytrenching operations shall be_replaced and 5teace9f , new.rom #n(stled ip match that orexisting i1prgp . . Concrete rfpMp shall contain, not less than three (3). packs of cmW4 per cubid yard ofconcrete. , - ReinfOrc6ag steel shall epriform to that of existing. rilara SPECIAL- POROAMNS FOR MS ON CONTROL. SpecialprecauOons should :he tAeA, -, durUig Wily JhsfW es (arldni �b avoid tPstuftq wdstirig drainage courses, in add% soil erosion should be held to it hilrifinuffi -brid,iedifnefitfrom the constryption $ft_Q.jkhpkkd be kept away from roroadway and drain Weis. During construction the coadt*d arils ditches; shallbo M*d*red .in $uch,condition 0 ikSW4 MM r4j_age _211 p d Ps at Orned Diftes, and, ribld shall be dWIMa1fvedt0- es. diamge. tothe ,roadway , SPftirlcafig#groeuwky To aNbidlioil ard6ibn, it W WV[sedarid dmoutAwti1at ft- utility Cdhtractoe use All appllc4We t6ears (Le- silt -fences, hayb#ft, tod*t1terclams, rdadway, ditches, bfidadfi- lacen prup SEEDING SPECIFICATIONS RURAL AREA WARMr S-EAS. ON SEEDING RATE In pounds, Pur6.Lhrd Seed. (PLS-.). Mixture, for Clay or Tight'S904 Mixture for Sandy: Soils Dates Eastem Section Wastem Section All Sections Feb 1: - qr. SP '0.6 Qoowst�. 0.6 Green Spratqlleton 0.7 To =am Reno) T.8 SWdoats Grama (Haskel or El Raw) 1.8 SidbooU Qama (Haskell) 22 May I ft BMee gingia`(Lomeim :V1.A4 aU.f 11f or CW*wm) UsetIrme50egms KAPloostem 0.7 K-A Okmstem 0.7 Send Dropseed 02- swWwass 1.2 dwiltdVast (Alamo or Eliackwell) 1,2 Totam. Total 6.9 ow URBAN AREA WARM -SEASON SEEDING RATE In Pounds, Pura Live Seed (PLS) lay or Tight Sol- Mixtureralrd its Mixture for !�aMy, So it, Date* EmstemSectibri- western S66tion AD Sections 4at Grew Sj"nqWbp -op I q.g Gieen Som- - 11 Grew letop, To Bermudegrass 114 K�qluestwn 1113 K.A may K-R BkmsWm 110 &dh*— 16.7 Eluffalegw& ow 8.0 Total 11-4 Total. 111 Total 3.9 TEMPORARY COOL -SEASON SEEDING RATE aw --lapounds, Pure. Live Seed (PLS) All Sections: 4.0 To t.6 ow may 1 Wheg(Red , Wintqr) 30.0 Total 39.0 ;TEMPORARY COOL --SEASON LEGUME SEEDING RATE In Pounds, Pure Live Seed (PLS) Dates Ali Sections AUC15- cftsonciamr Novfo 30 Tatal 7.0 TEMPORARY WARM-UASON SEEDING, RATE Impounds, Pure Live Seed (PLS) Dates All Sections May 1 FoAd Millet ie Nov 30 Total Nq*- N*ym in pamildwsis 0 repmentWnprove07-varWes of the species show spodflnft- for Imnv W4&dlow 9 30.0 30.0 Forowrlb filst"a 0 AESTHETICS To preserve and protect: trees sbrubpery, eui 4othw ther aesc features on the highway right-of-way, TxDOT may specify the extent and methods 4-tree xenroval, (fee trimmfng, or their replacemenL TxDOT may also specify the installatlort methods of the vndgrgrqund or overhead utility in order to protect and preserve trees and other aesthetic features. REQUIRED .PR.VNING PRACTICES 4 PRIOR TO CUTnNG L-.ocate etllity limes with the least possible interference with trea"s. • Amount of cieargnce should be determined by the rate of tree growth. ~ Remove mintrturrl number of branches to proyide adequate clearance. • Maintain adequate ciearatice Mriahes, NOT EXCESSIVE 6CEARANCE. • ALL pruning, shallaonfdrni io iei;ognized tree.sur{teryji aeW-. Pteserve natural character of tree: 1liIH.ERi 16 fl1T Iti rei tthg ?a Itmfr, tkte wit Flou)d. tte made at a fork where. the remaining branch will be at least one tfiird t}he diarnetef of the one Mmgwpd Lilwa [oiov" 1. In W"Ong, pngh" tie. €ut sttor�ld be made at a forte with !the rerrraining branch at teas! one-third the diarti�� of the.o�+'errt>r!ed: .. 2 . Undercut 1l3'130he igraYthrQu0.vthelimb, 8 to 't2 inches from the main stem. 3... Aeit limb 4 to 6 inches outf from the A-steuL Remch stub with an even out so,:that a tract= {raised a `collar' st,n_protruc}e§ {about incFi)_ Si All cuts two (2).inches or over shall be painted with an approved tree dressing &paint I See pg.11, pCM-NOS and Brush must be removed tfom the right of way :and disposed :of 46 accordance with the- taws and'regulations of the community, couai<y and state. - Disease branches .(espeacially those infected with tick wWQ, nidst tie properly AisposW of to. prevent the further spread of the disease. :�xt%,�nh��r rils�ri� 10 � wu�}k©ihrrra vo opw so aw 2w ow w sm aw go PRUNIN(3 SUGGESTION$ Ak 1 PRESER"No SY V mvnro latt "MMAMaks- ;04 oi4rs.trpfll# o"064004 C%,"AIO,Lf alstRAIRIX 6imly ioulbawas -11 NO WPI*PW44� go W Please be responsible and notify TXDOT 48 hours prior to starting construction, and be prepared to provide the following information. 1. Permit and Highway numbers • Z. The name of the Utility Company, a contact person's name and phone number. 3. The name of the Construction Company, a contact person's name.and phone number. 4. A start date 5. Date to be staked, if applicable. Note: A copy of the attached ADproval f includinci all attachments) shall be on the iob site at all times. IF CONSTRUCTION IS FOUND TO HAVE COMMENCED WITHOUT 48 HOURS CALL IN NOTICE, THE JOB SHALL BE SHUT DOWN UNTIL PROPER PROCEDURES ARE COMPLETED. ,. .. No no MW No wo .. am IM am go .. .. Appendix F THE Permit ow ,-...-....���-.:a�.�r�rarm --w_'•.- �w".�s-rJ--ten,-..,u.-.,►----�I''1 t. �__ ..z wc- QTY4-7 Lh'TERT-0C.L. AGR:EE?vf1 NT Bets een THE CITY OF DALLAS, THE CITY OF FORT'NOk-T.H. DALLAS AREA RAPID Vf ANSIT .. T1xE'FORT WOI�'TH T'RAI+SS•"PORTATION AL.�TI- ORrFY ' V REAS, liars-uantto dx Imerlo A Cooperation Act, Chapter 79"1, Texas Govzefni M-11' 'w Code,. tie- T�` OF FORT VkC3RTE and the CITY Of DALLASi.'rirdi4ixlualiy the ":Off'..' A ill to �th&'d-e "Citi'es") adting by- and th-rough 01FW R•ailti-aa ('*Ra ltrarr'� a comm.- nri admjnietr z0-1:6-. - ag; 'n�cy-eksat3fished and. otga tize.d by the- Citits-• parse ant to Smi-on, 7.9'�1:.0:1.3 b r IA6 . u �'.•: Oovtr- r�en . Code.. DA- LAS AREA RAPID- TFkIS-I`i MA}�T"} atxd 1h-e P6PT- T. TRA,NSt &TA.T'i N AUTROPUTY (Elie "T"I, bath rebianal tr..anspartatioa aui:la existing pursuant to Chapter 452 of the Texas Tr:,ans- puvation Code: `"C`r: Authorities'), mayjointfy exercise the power to prnvade gOY�rrimenra"1 ser'Ices'sr'thP' .. bwalth, safety and general welfare and, WHEREAS, pursuant to Articie 1182k . Texaa.Re' used Civil Statutes, a-ILa iteatLi�j; r .`•''` :" activities carried out by public entities joindy or severally., Are pabl-io and, goveiaim tad I fti ; ; :;.::t:s. ;` ` �* and,1:�: VOMREA-% on- or about J-anagry 23 198 Thz:C•iiaes a i t?z :`1 • ri3i' d; tear; O � • �n l:tfwo� r—a •F: SI raI Transit Afl ittast tf n an ' � TX� 3'=C�Og li r. � it; IIfii en 4 C �. PATS t , ..'t� .s.., :Gr i3t ); eiluri d= tdin" railrAatl- 'i�ht-of wad rprev'it�csly �'.�c n 1�y:2fiii G`#%cabo Rta�`k�s u}� Y catineclirig;:tlii'=iCitiEs' (tire-'Gorridor` ;< atxd, • C 5•- ''iV.-r a. ..Su. wj Ag: an .orr about Jove 10 4 1�:�RI'.ad-: � r a 1.99a �! -die' .'F ' e-ri':%r� � 11�(Q aIIit71}�.;��pi;?El�': � �'" r_'� . � •,;;. _ �'t�bper 1�e=m � yr- tFc��et�el�pmentt?mtO '-66r, dj`C'o ra:e taiF:Senrrc a s1 iis�ii ' .. C' �1ut#iorlues-:11A"}��ad; _.,.. : ,;� - •.r : x.; ow : ASS, -on rvr•a"bout vlay 26, l ;: e. :!� FEa :`1`Parisi:G�irit#iOT:itleSariitiz�'O''-i er1�'et`.d-'�r _'���'-�•-`�_'�`-' E6iSL`ui" �' w-Mi,eris ve the �t�i-0it ea rl p of y fi h lirzti (3 ratlort i✓vriim-ttrer 2 oil Set a, —:A;,i •• WKEREAS;..o •DeceTrtber.3d :.1�. 95� n 9- r a�t :s:;: 5: '' rr�i�'e�i=•�.:.:�r:. S' �'•�n3�j+:R�airvvav'�xpTess•.1" '1`�},:igi�i'arerl.'iite�rst>Rla�.se~of:coi�x;ur�'rail:'sei°1�ic��:d`iit;#l�•�dt(ii3Y�r-:�. {.r:<,, r��:�. _,.; lief'vc��e�i�'�e:�ity;,�i£•�•ng an•�Y:fbe'•Cit�''ofDalJ��• •�zd; : :`�= _ ~~~�r.=r.;,�w y "Rpm�*{.a ...«• :r - :tr: . S d-an;the Gust e- f t p- � pfi�. ,f'�'Iie ')?��:csfi�uter rail s,.r-�-iee�.�i'a.s`-e,�'c�e'i1 ` • � "�"` rastg?thral;s�llias:pto�ex��ae�nlsusstt],'2Ad; W ZJ—M. thl; `ix•-'a&tewiwd: full':ft�-� %r-ibt-co .;<..'�_gry ... „ rlsi a. f: d'l p,.a..rl'r� _: = �,` . •, tb Q iaU seraic�ion-lfrei Co t t�or "b eeti / i h• tom' zci ems: -� end<da�vifrF,di��' ;A, fie Tra�rt' 1atlloYrxies ttAe dertro»sttatF bd$•a cQ-WOM ems;::-:•„ .r t* se iGe iC ab fL fo 11?aii'a Lf; at��, ; �.�} . ;;t,. • :t �.: r= ' A , ri�e'tiaris er of tl�e Cttie�' tet st in the --Or-fr t�"'tfi� T'rms.-ii''•A 10r::i aria#u4t;=cti die iWfflnr Operation 1 atlinirntrtiori:v thG COrYi�r anii:cdnriittti3F'r; ;sAde iai3lii the Catridpi: and•. :;:" , : •, ow 3i0 ":4A*.yvv+'.�• "max_-,^:b %�. . ...-`i':r�"w:''Sr;^_-"r!3... s'".�a:.:tY•"a. ^�.':we�.w�., �' sw.:y.;, may: ,Y'�o. s: no am .. W1'EREAS, the parties desire to enter into this Interlocal Agreemem t-ibis ".4ar enreaC . to effect the transfer of all of the Cities' right& title, inte_ests, obligations wid responsibilities in and to the: Corridor to the Transit Authorities subject to the terms hereof: NOW THEREFOR-E, WITNESSETH: For and in consideration of the performance of the mutual covenants and agreements contained herein, and other good and valuable �.:onsideration, the parties agree as follows: 1 . Conveyance of the Corridor. The Cities shall convey to the Teara-sit- Authorities a full undivided ownership in and to all of the Cities' right, title and interest in the; teal .. property constituting the Corridor by a. deed without warranty in the form ..ctached hereto as, Exhibit T. and incorporated herein for all pertinent purposes. Such conveyance shall be on -an "as is" basis, subject to the provisions of this Agreement, which- shall survive closing. This conveyance is subject to the approval of the Federal Transit Administration. 2. Assignment of Non -Real Property Assets, OHiga-tiorrs apja. Responsibiiities. By their execution of this Agreement, the Cities hereby T1t.AN. SFEM- �i-d ASSIGN all of their beneficial right, title and interest in and to any and all assets, agreemetitt antt accounts related to the Corridor as set forth in Exhibit H attached hereto and incorporated herzih for. , all pertinent purposes (the "Assignment"), subject, however, to the Transit Autlibritfes acCep.Gi% and performing all of the Cities' obligations and responsibilities in coim=ion therewith; in-c4tid- hk .. but not limited to, the obligations and responsibilities imposed upon the Cities. pursuant to thc=Fa"- Grant. The cash balance (except for an amount. if any, which must be retained in aQcard-anctxwI(h.- '� e .142 the Cities standard accounting procedures) shall be transferred to the Transit Authorities the safffle'- dav the Transit tluthoriti.es transfer the ,property declared surplus as described in Seciiou 4.0601' x J -. by Deed without Warranty as shown in Exhibit 111 attached hereto. This transfer of ftmds,-vd Ih-6- execution of the two deeds in substanti.aily the form as attached hereto -shall occur rto.later *A Thursday, December 34, 1999. The retained funds shall continue to earn interest until such.dvit - that the funds are transferred The retained amount plus accrued interest shall be transferred to the = Transit Authorities no later than January 31, 2000. 3. Acceptance of ObI gations and Respontsilriliti:es. By their exec�;i4c�.:of- chis Agreement, the Transit Authorities jointly accept the Assignment and COVENANT- Ahd- .. AGREE to comply in all respects with the terms and conditions contained in the ass , agreements, and further agree to assume all of the Cities' obligations and responsifrifiVA; t�L connection with the assigned assets, agreements and accounts. 4. Adffl.Votzal Consider2ti;on for the Conveyance, Assignverit -ow* Transfer. As further consideration for the conveyance described in Section 1 and :the Tr ; •.�-t} �+ and Assignment descried in Section 2, DART and the T, jointly and severally agree as fclllcs. 4-.01. Existfoo Corridor Uses. Each City's use of portions of the Cori;&' existing as of the date of the transfer ("Existing Facilities") is ACCEPTED -and APPROVED. 4.02. Future Use of Existing Fiber Optic Capacity. Existing tr` y-upric ;l agreements negotiated by the Cities prior to the conveyance provide for future use by eac-b4cizy- fiber optic capacity at no further cost to the Cities. Each City sltall have the condbuilig righr& _ sueir fiber optic capacity for its municipal purposes at no additional cost for suet, access rid"t_9, .., 2 i - MW am WW so W WW dpo a itotice fronJ thei City's manager to the Transit Authorities: provided. however, -char eachCify must bazir the foil costs of activation and connection to the existing fiber optic condi-rit. 4.03. C--orridor Use- and. Crossing RigNsi. Frnvduk�es-. Sach C-iiy. shal-V - -S. kave 0.1e ri and to crass gght. to terse portions of the. Corridor a the Corridor With sttereis, u other i-n-frast-ruCt-11're (the "New Facilities"), at no• cas:t t& the C q- Other than cods A- e,cificed in this Agreemt-7it; provided, however, that such use an-d- arossiagxigh S, vhre."POT�abiy- inter-lere with. dart or futuxt Transit' Ajjthofiiks` ri$hts and usses. 0 fast' 4w.r Purpose-S. Tli -e e xe rcis e of such us a get and cm s -h iivg r igi i ts- s ka--I-I be carried - . the -afa!,barity of th -s Ag-neemet-it, and to thr f-6flowine procedures: and no offte---r do .[i licesse-ior casetne-titj strait be necessary or required 'either Ciq.., (a) M such dame, as either City desires to use or cross the Corridot its Nell'. Facilities, it shg11 submit its proposal, including pl4fi and profile sheets. to S7 by the Transit A--jithorities- (the -R-e-viewing Office,). Each prod sal sft-R*c�o Tayk ift -!�u ffi3,.tTb-*- information and. d e tai-I to enable tine Reviewing 0 ffici.--z to- d ete-riiiirc -6he event an4, fop ati- a ri,o A. C-Ity'sproposed use. The Reviewing Officer shat, provide comments to the ".-. Ispro a reason -able time. Upon approval of the proposat by the R-evivMwg-.-Of-fker of the Vmait Authorities, the City may begin work on the proposed: prMjML S.UCII approval MIRf-I WOfjb6- urkreasonably with -hold or delayed, and shall be 'give-r-I w4fbatif tiro. adoessity of th-eL Citypexeb-p any additional docurnefiz or the payment of additional coilAderadon. sigA (b) Eyccpt. wif-h regard to exisdng the entire cost a:n-d- expense of designing, imaffli;vg jw7asfiruz -f-n-- -ttm—iisanu oprating - oving o- #nd ra-aintai-niff &its N'r-W gimm ropl"acing -'.3 rdason-abit-r-osts-ass,miated wiib-the necessary rei4otat-joff bf an4 othersfvAiiti-es- caused by such C-ity W-*n:st.t.ticti-*.�a ow alai nrM. wee -WVO tbe--Car ider shall be do ft- irf,&!trood and.-OGr, m-N�Dihermtu,bu A, nd -in such marmor. so, as to mini-ni-miza- inte-6hrarWe v-iA'-tft'6 Tt-fthdAbIb-45 ibii (c) Cosm associated with reconm. red-faa: of. e)ft-w�ngg at-graile- crm-Sibgs.. shared-equdly byfh-efeqaest-m-g City (d). In. all'AmUnces -whore axantrrztor is-atflimd, the contracs the:CIty:zad the -Ttidnsit-Authedties, ciroffcers aLtdfEr pit3yees, shyfl lie named thv.-c- contractor and as aird'Idonni., named. Insureds- an rha-cantra r's reqaired. V� a-@itJI-Ji),.--I t-'; poltcie-s. % (-e) En th t z vzav the C it Y, s IN& W. Fa 61isfe s. mu st b e r-zl oc a ted a I -.a- fu tv re i t �g:., e.: ,b COW* I& =-tiadaxe- P an. -6.4; :.g6b. d-i b t r.'a' ftsi t- M�-,Gid de S, W-W s it Eaeiud es, stt'&- re. We.= a shal I b e ac Amb-6ifties-•, however thr Ttfan!k-A�idro mi�,s- sirall take reas-one .6&1 00fig M-Won -steps.to:ftihitrdze, the City. A, (*Tba.pro-vigiaos,of Section 4.03 JI a gpf-Laa b fe; - ro a -City. s refit. St tar Corr dot: seercessCeW Fa0iddgvR stwap GIj:M*&to this- gre .4 :T- ons. 4,06(4)- and 4-,06(0 Of Lhis Mt. AMP re'eLl fir.. d, F.,ari#&s in affect tat dle-time this Aguftmdat is- e K.-C 0-tiffed-ol S described - in Sectiom-t 4.66(b)-iftd 4.06(c) that.-hay. -,e-bew A §G,Ytqg.-- s -ai 11 .4 .be dome at the - Transit it A tho ges expense. m Pi 3 lot -.0 zk MW 4. 64. Sarplus Corridor Property. Portions of the Corridor, fficki-dInTe. fivezr. ow 6 -d sections not necessary for transit use and declared surplus by the Transit A-Atho-d iw, txlayl -37 cost. subject. however. to any ap req, J by either City for municipal purposes witbout c v4ts u -T-.c e front the Federal Transit Adminlitradon VTTA") or the State of Texas. Any sucl.T use "INy eirntr City sliall be without --ost to the Tritasit Authorities. aw MW 4.05. A-bandonmetit of Corrvidor. In the cveat transit i-ail passemonr sc-r-Oce, is disc_- upon the Corridor for a period of mrenty fbor (24) cohsecative Mon t6gefhe'h rnay request the Tracts -it Authorities to re-tram-fer the Corridor at rro cost to 1,b'e drf4T-" upon. receip. t of such request, a re -transfer will be affected, subject to the approval of th-d'". f7rAll,: 4.06. Specific Restrictions, Reyervattons a-trd Eas.m�el)ts-. Ri addide J-1 the general restrictions, conditions and reseivafiobs to which the transfer of the RMU"tran Ca-rourt, subject. the folfowuig specific provisions shall apply: (a) Restrictions on W-d1bx)a-r-ds-. As a corfdltiotr of fhg' tran.,q(e!F of the Railtran Corridor property provided for herein, the parties agree as follows: (i) In addition to any permit or permits, required by. the. Fort Worth City Codeg, DART aivd'*e T shaft-;qAt.-a billboards to be placed an or reibnt.ed -to the jlballwza -without the express writteTf. coxreazreirrcc Of Managrem. nt Director of the City*of OaAz (for Railtran Corridor ib tee DaNa .cfty. linufs-y -or:thr Marrage r (for the potti-orr of 6e giai-lttrait Co =--dor. cityor limits); and in any event, tho WM f�r, ' dry:new-OT billboard shall -be on- a zzottprerTuonto Ugsis, A, kozax 8xisti:ng biffDoard—sball- b-&4wmgd-a-xtN:v &AbMdVd:, peql afbrotieriden&d wilitrn pqu agre=ent for or arry renewal qrlfeA'o�.v be orr a m. onth-ta-mont-h. basis. (B) DART aifa. the t-ackal.amledig -t-hatt -the Het 's es - billboards lacew-fa Tb11wg_y, j.rrDa:ffas,,w.-1ifiidtb.e asdgued -:tar DMZTo,r the T. (-b) Mdfas -C-onvdvRVm.C*of BxpdO Rgkma CorplJor is spemiflo4y subject to tfta- bty .off *b;alt�-,'*'� Ix �u" ' ' ':' " n .I .portip'n-s. .of the- Co r-ridor rig it -of --way adjact M.- to the Dallas. GoVvent.w 0,6n-teiv" 4&ef 1U.- gad, TV, -q.d.e&-d for ae 4xpawion of the -Bail as Con1v 141 WMg;'-rfta-,- oopv.-eyauce of the Railtrarr - Gom-Mor te:dio Traritir.A.uttociti es. by the, Q TInsit Autkot;iti�sr ghaft eoh'areq rol-b-6: that cox ="-TDJM- .�-rrwhei.h as, c-ozemptarad. in. DAkk_TVw-s.ohAi% liae. R., z . 'I it -",b lu P'.xdp P-ass-o'" mqdbiar 1-6i 1999 congerni'ag &e: Derlkifmg-- 6f S' p a -'Ay in 4M ibir i5allis- Aroma. and Go 0-vention Pxqjirfvp &it Aufhotfflfi's. h-a-6e,10i Cjtv dfbaft-& Gial-re-nt-pPaTm for tho Dallas wz.00.'-ho.w.a ha. Exbib t. W, and agree. is coaeept %Athft. phly 46kfirs"VVIA". 1. - 41 .MPrq-V6n1aa at this right-of-way lounioll any. Rpce4sary ftmvp did-riog construction) shall be approved by the Tranml Molrorit-iis' 2eviieMiTig OfficenplrbNvl 4 . r, •{�•.• yT._ nw - 3> �•, .T' •-T'. - •... y; •u7.r •.G? •- •. t>rr�• -•>• • yea 1 - L •g '"'. WORTH; £+�� �kf(3$��k��T� TJO''34-6r 13ifi`oZi?r} C�i*T -A-, L4;1A!. Q�-: b 't ;, • ��ort=r'V��'�r:Tll','"��?"�S' >IC�(Tl�=fi?�1;:1. _ ;�r��:�, LAS ;�. •'i(a�arl eit'izoss�iii uialird,cdpyl fV.--Afefiirrry - C;'+�: of D`:1>S {.gin }r FD? ?t7 51IC'�l� y�,, * 'B�L�:` S'29 Y � � 'l:�t";�?3'= �Ciji� 14� `='_aC <"�JL" �r7 -y�'t� �` " _�y'-G'S. -' ` •_ • �`: • `-•i r�1jj 'liLTi�.- s '� �l$ ffP D'1 t�:•'1••'•�."•�•1-�1,�..,J,LTiC-tr.'•}Fyt�CL� :• -y, zY• �1ti{'Q133LSwi�ti£52� • _ _ .'sue ..',• ... :: .. . � . • __ ::• ::. '�!=:'3;?''�a=� •:•. .•ii' .s ,iy ,LY.L's '4 S - Y _) f;�,�T�,� ;Q�,.'e) .rG' . �'ti.. •, j'~ ' yar . _ _ g_ . 3F' _ :i:� +�a' �._.v %�.1r:1 r+. +a:4r ...;y�x3, r?.r [riAJISS-r: ••-T , • •A.:'+.:.�7.5+p1',•.'}z;�;»p=.Tw.�yty".+� :s`r�"]a b:' {:t. ifi s.- •.?p�,yj.C}sT.�.�G�.�7: y.9rp•G5"T �p,� ••.>o�s . {.yjq:.',.-;f. f s • ,y-•�,(S��.Gi>'�w i• ,i+�'}�{'` %}'N;.ti,''ri>y'.'ydp`•s�:.p•H.: -3p?'. tF�.r. <'i j,afi.,,, •t'•,) �Ytr'�h,'••),L,ll.]fr,,•i4•"f-l.D.{•���w•VV'�.r O� li�19W tU Y1p��i•,� •-C •'�•: • 1f:i-.A1r'. :1••'+-�a�T.�%i: "'sc+-rT •'i.aV`.�W iFa a_'•'+p`,�'"•+.�'n.j t s F�•.:.a' ,.. .es•ar s^:n. !''L"..•N,., �.t•:. "•s^ . nef_'; n*i'J�v.:L+s`t�efmalrx% _ ncic �. .�.:..-:Skac'�. 'a>rr••4. v.•=•' -'f•X .;r. r?:.` •'.-c.,.� r: ss.,- �o s.•,.; �:` c��s^'^ >., st.'• 1 .�•7}-��.•.���G•.:. .F': S(+•[:' '_'-?�s�•. "''-'1}+'1i1�31.i' JJl•3J^T' _liYlj:l l_SJ.',+.,}•'hu iia.c v,:,:l,ii":-::y - •.i _ .f a ,L 'S,: ;.Gy_ k,,_ ,:,T::• :.,.1:=:;.-i dV: i r Wit:... 's::i:;:s.':•"'• •-.+eis•:;Sv 't;; 't'• :ix4: '��i �'-' •;?T,t 4v i�F. n, -•�': "b-'. •t � .ty=r 3L- 2:;• ., ry# _ Y'• 4,; - a- -K• t- a•• - =x'*.A, .sac �e'� $0.10,r�e ra � `e �cn mg: ;rsn l axit�_�` a ii ,. '. ..:r•`, „-%r i'.^ G'.,x''.-. a: �•t1 ..-;i>'%3_:.�.. +,,'.-: X'• i'.,..-+A:�.;•y�:I'+•v .2?r: _,. Y¢=:-�faeeciisaasir p�c;se'3rrlsSn fi; :.r,:-'.,. ,Yti� ayes;: _ .:.Y.'- ...M„fi?t�...,C..^.v.;:�!., _`•J: --r':,'G't« .T: v.r:y'� S/,1 i. •';�•.r.'e _ '�:S ' ~� +, `�_)!i: :.'f)r:°;i'' .'sue -);::� %'a.• ..r;, c-;,.»'-:`�:e'",', �: ' C•" yl - �' �:5.•r_ i:',K:a. ..�•: _ �. �'i,sa .. ::Ci..�- _ - ?�'':. w'+5 •:i,n ::f:+-::• :a:',: •J�.�,;;` :.t5-s'r `+f,,c.-. -i.. .,. 'r''D'a:Y : .•r," "S}.:- .:�: .•f•:.:--5::!i.+,.. l'r.� J _;, ci _ :;} s. �-+q... : ' `' is Y ;.:,'s;.• •fti..L'. >y._`ta.1 fi. G:a--. _: .aC`r'- Y_f -• a�f^,�+,1, "tdertrtkz��'i=lee v.yY^•--r'.'•>i. ,..:w •'r•+J"'':ems`': `;3:!�s•r'^�.-''>.:-: .••ar„ 't°asµ-,lyiR. ^r,r:'uy"�sh=. 9 ;c;lsei�u� n:other�r�rn. `�: Eni; sY'�_}?inLT_ !.p_r}�ai ,a:fr` w •' 'Alb i «e ; :i_{`',C. - ;`v,,� ,.,7•• _ •:;. .� _ .F-::':':;.,� :.'i'.$.:, •.ire•;,•% ':%'}.� �: _ �.i�••`-.=•;y'S :`ti•3,- ,T,) •L-• .�, i.,i. • :p•X- - -} .yi. '��• ;� F L,•3+,•r 1'S'.,: ''4 •, ,<,: }-• s� +�q+f � t -.Lr, -,�y70`1eta# . :i•• _ � q':ti•` ',_>w'`5'+'•pr..�„?-.: 7,: • : ^•,s'+•,�<'' "i'=,oS��.GG,."«•. e� iez�t l - e fio tng> h r .9, J A �� a ' =) zea lio rt ••:i3: ,,�+z�'+'" :r;1''•''.. rY..�. t�...r .• - .!'-.•�"."i:C..ri?:;` ^a,_s.�,, .+ . - , , - - - C} '• -•hut,.;^,%J"p-: n • '�'jA. -. {:�J •rt'. :fy�'�'33FC i=:r'._ ,.1— gyp=•^•• •ui -t : �.. x 'S ♦ ' �^ C, Li C� Si1t " 3`d� Cl Cal. Q`y 'rP;m Myy�'� e�erlr r ' s.j "•`• .:k'•:': •-f _ `ti •� rr•1 : _ .f , .- 'itt � :..:. c - : �,vR .Ynv .:�, ?i_ r'' i,- :¢._ .'i J':'. i-,'>.:�s_,, sM1" .:, �� Y iar..u' �.,f.: �� :f'•.. '�r C+-2.2�` *. _ { •Y . _r'r'LF :,._;y l: n. , 'S:r;:: '�•:, r ••"k.,.+-^y` "'tr:.;=•`.'`<::. .;t•.-•.-?3:. ,?��v�.��'C�y,:.w • tl. r.rsi., • I:'•'C : "{:1 ;^`S f •�~' - .. •. F: J +,Y7 : yi, '• , �v<:�,r=•:•'-. •,%F-�` ' 'r • ,,' 1' ':,,-ni,. f;b: 7._ f �.y�`.;:i , :•) ,X., t, •.:?';i.i'� ...:j,_„d•,�,tyf':L:.?_: •t„y,Lt"•Q3. '�,�c��. •` ti � '`�� ..', .ryv,_ :.Sf'.'.: _ _..... _ �s'j••7�•'G'� : Y �" iFi� ::i?t.. ik' :' :'x:.�� ;r• t - t�x:f )1A•'�• - .. •% �- �� .f --I.r.:> _ :-r-�^'-`'!';:', i.; �i.}..a�-. �. tf�� ••x � j-�.,�• _. -+�,X ' 7_�<• '.� -t1 •.•. -.y+ :7 -rM v's %• ..- .,• �••'...,.1=::%2`-:` �•f, •• :=�ir�'�.�.�.'-�y _.�i.i. `• .y+.r% �:, _ ••��1,.}'- ✓�.: ij'. iyF'_ a r ;.i..':.:,:.;i :� is .. •Y•�•i•'.- `�'w:I�i'�%}�r �i.`•i' • + '7�'�+•`• ' •� � ri � ., j� ���rtii,'Si'y`^�*: • ��-•'•'�^H'�;f,�•''' - ^T w2;+a.?'.,i79�:i^r••••s _ •/ •,i .., :; ":. ,:�., �.; '•.�'I:a. •W0?•r 1 ��' F��'s��•Y�isr. at .' _, r •. •• � - `.4L� - _ r: •� +�`:',E�.o•3•�{,,.� .i i.t� "/T +ty .t, FJ :.:.:-'•- .i::'.« _'.N:'. .e'+•r ���'�t•`'•_::.i �'. �>.-.y-,Gf ii: �.�u�'.- �I «:5:: :" _ •• ''C u.. •,� �•.15� �ii:•�' �y,:tti-.�'' - . ••4�:}`yYr�y' i.�.yt ':;rix:. • t..i �:'.:t• :. �:i.,:t:=.�ri;y :�;,• '.G :'%+'&-',�w,;. }' •:?7'r'. •t- rG=:1.= :7.Y.,.::.:G:;;i' •.C'.Y4=1'•L••.. - ,jam. e n�= rr•.x':L�' a.f'ti: ... .. •:�.�' .tr!'t, :'� . i �:: _.3•�+'5.:�= !. '«,.w�,b: �: •t _a__.}'i.,_...r?E;�'a::!_,.._. '': :-r••:. 7u. •� _........_.. _.G..r._:.f _.__.. t,c y,_, _.:•__ _.__ .___.. _. .ffi3rra: �'�:;.7t:;a. ..� m dftao`k iorriey A5 is P-0 -T WG.Pi R- CS CiTtOP-P AS, Olt" bok A.-T.-Tts, IT ..... . . . . . . —J.-K VR i kad FERREE ffig Y.,TJ Slq3gp-rq-,-, AN; Lgn 'ATM S-R-G �P-00-' -MM Appendix G Additional Permits .. .. no U.S. Army Corps of Engineers — 404 Permit r IM no ur No .. ` Environmental Permits 'E7 UW .. No D1 PA-RTAIENT OF "rnL? AR.'bty j y ti j FORT WORTH DISTRICT, CORPS OF ENGINEERS WORTH, P.O. BOX 17300 t ` FORT TEXAS 76102 -0 300 MAR 3 010 tV TO eN Ilah OF March 27, 2009 Planning, Environmental, and Regulatory Division Regulatory Branch SUBJECT: Project Number SWF-2009-00124, Tti'vDB Fort Worth Village Creek Project, Tarrant Mr. Jason Voight Alan Plummer Associates, Incorporated 1320 South University Drive, Suite 300 Fort Worth, TX 76107-5737 Dear Mr. Vois ht: Thank you for your letter received March 12, 2009, Your request has been assigned Project Number SWF-2009-00124. Please refer to this number in all future correspondence to avoid delays. Mr. Scott Kelly has been assigned as the regulatory project manager for your request and will be evaluating it as expeditiously as possible, However, because of our permit workload it may take a - while for us to respond. You may be contacted for additional information about your request. For your information, please reference the tort Worth District Regulatory Branch homepage at http:Uwww.swf.usace.army.miVrcgulatory and particularly guidance on submittals at http://wwxv.sw£usace.army.miLrpubdate/environ/regalatory/introdL,ctionisubmital.pdf, and mitigation at http://w�vw.swf usace.anny.m4pubdata/entironiregulatory/pernitting/mitigationlfwmitb ld.pdf that may help you supplement your current request or prepare future requests. If you have any questions about the evaluation of your submittal or would like to request a copy of one of the documents referenced above, please contact Mr. Scott Kelly at the address above or telephone (817) 886-1662 and refer to your assigned project number. Please note that it is unlalvftil to start work without a Department of the Army perrnit if one is required. Stephen L Brooks Chief, Regulatory Branch )RI- I i L)1'";'rR'CT, CC. 11 p S #fir - ;r i`'C.CP FORT 'NORTH, T X.kS "a 1 Jun: 3, *2009 Plarmin 2, Envionm-cnlal, and Regula+ory Di -vision -- fl e-L' y Brych SUBJECT: Project 'Number SWF-2009-124, TC,-DL Ville Creek Rrc;ain.ed `~Fatter 'M Deliver} Sys:.cm Pipelin:, C IN of Fort `Vorth. Tarrant County, Mr. dasoaVoiaht Alan Plummer Associates, Iuco-'Porate'3 13'0 5.3uthUniversity Drive, Saite 300 Fort N orth, TX 761 G7-5 7 3 7 Der Nxf. . V i,ht. Thai you for you letter of March 12; -1009, cnncerr� 3 proposal by the City of Fort Worth to constr ct the grillage Creek Reclaim��ved ater Delivery System Pipeline Project. The project on-igin2tes &one the Village Creek tN"astevv er Treatment Plant in '0 eastern Fort Worth and terminates at the Dallas Fort Worth IriLemarional Airport in Tarrant Co-.inty, Texas. This project has beet assigned Project Number SWF-2009- 010124_ Please include this number in all feare co_lespordence concerning this project. F aiIttre to rote:once the project n-smb:,rrnayresult in a de'ay. 1'sre have revie% ed this project in accorJanca wi'ih Section 404 of the C-lean. Water Act .. &id Section 10 of the R.iv_�rs and Harbors !act of 1599. Under Section 404, the US. Army Corps of Engineers (USACE) regulates the dischar,e of dry ed and all =tcrial .to w ters of the United Si2`_s✓s, including ., eetlands. Our responsibility un_dcr Section 10 is to reD la;.e anvtvork, in, or af.cdna nZvig3ble titers of the United Siates. Eased cn our descrption of the proposed work, and other inkirmation available to us, -we have _ determined that this project will involve activities; subiect to the requirements of Section 10 and to the requirements of Section 404. Thera=ore, it ;N7P_ require Department of the ,-my authorization. r We have reviewed this project unde_ tbn preconst-uction nolificaion (P'CN) procedures of Naaornvide Permit Gereral Cc-ndittion 27 ffedzra'_ Re«ister, Vol. 72, No. 47,-N4oaday, IN,Zarch 1?, 2007). We have deter -fined that this project is aut-horized by nationwide permit 12 for Utility Line activities_ T o use this pe.-rnit, tl,c per; r,n r sponsibl-• for the project mut Ensure that the vvo k is in crmn lance Nvith the r specifications and conditions listed on the enclostires and the special condLtiva listed belo vv. The special condition for this permit is as follows: s 4- 1. �11 cu, l_ura_ resaerces a17Y Eo cc)rlt:)! with 33 CpR 3•?5 (Appendix C) nd ^ %-:FR. ,_10 siyl'f l;� cclrrl.el"1 gi�cr l_, nc� nit; i c! a�1 : rU'�rA-r istr.i:i'in' Z);AivjIics In tho- pc,TTIt a;�:a. A -tep art of all GC 1:15UM �; properties cornpllanc:; ,Voles sba:l be appr o,,:ed by the USACE prier ro cons'ntcZo-i. This K W-P is sAi�duled to expire on Niarch 18, 2012. It is incumbent on you to rcn_aii inforned o chan��s to tee \M- 7P. T.ae US ACE issue a public notice announcing _tic chan-es as they occur. Furthermore, f you con. mence, or are under can-ract to conunance, tse actii i`ty before the da.e the N`vkT i_ :nodiftyd or revoked, your , ill have 12 rnonths Erom the date of :he mod•, z-catioa or re` ocarion .c coriplcte tba activity under the p=-serlt `e<nts and concLtions of this I\T�Vp, Our re..-ieA° of this project also 33dressYd its effects on tlifeat. a'd and endangered species. Based on Lhe information provided, -,4_ bx,-e do--n-mined fined -hat this projc;,t `will not atiect any species listed as threaten' cr cndanyered. by-tlic L.S. Fish and Wilulik Scn-ice -" ithi:t our permit area. Rio ever, pleasa rote that ,you are responsible fo= meeting the requiicments of ge:terzl condition l 7 on.--adangereri sp��&-m Th pernaittce Must sign and st-,bmi't to tIs die enclosed certir_cation that the v.ork, including any -required mitigation, was completed in minpli-ance virith rbe nationvzde permmit. You should suoa t your ccruf-cation within 30 days cf the completion of v ork. '~ This pert should not be considzrtd as an approval of the design fe=x-es of any activity authorized or an implication that such construction is considered adequate for the purpose L-atcuded. It does not aud-iori?e any damage to private property, invasion of private rights, or any infringement of federal, state, or 1•ccal law's or ramrtations. The USACE based this decision on a pre _-,ninasy j j1isdi4tional determination (JD) eta: there are xvatcrs of the Uaired Stag on the prcjec-t site. This prelim. inary 1D is valid _ for a period of no more than five years trim tlae dzr of this letter u less new infonrnatiun warrants revision of the delincrtian before tic expiration date. It is incumbent upon the arplicant to remain informed of changes in the Deparrmcnt of tll_ _'Army regulations. Thank yo:a for your int.,rest in oLr nation's water resources. If yyu bane any questions concerning our revelatory pro,, pl:,ase refer to our a e3sitc at !_LSD: % %iNi:�%.r. Swf.a.13�C8.cl'C1'jr.i?111�1•-cul�4�ry or con3G1?:�I•. �CGit�etly 3t the add,-ess zbove or teiephane (.317) 856-1662. Sincerely, Stephen L Brooks Chief, Regula_ory Branch ++ E,nclos`::r'-s w F.IAI IOM"' JIDE PEERNii 12 UtHRY UnaC?`f;i hs5 2i;uc:Lv-3 C:etc: l.iu+cli its (NV.`P Final 72 FIR 11132. para. 12) _ Utility Line Activities. Activities required for the construction, rnain;ar=,Ce, repair, and removal of utilivi lines and associated facilities in waters of tie United States, provided :he actiAli y does not result in the loss of greeter than %z acre of waters Gf the United Stabs. Ua lily lines: This NV1P auihorizes the c r~st action, mair.tenahze, or -zpair of ut iry lines, including our al; and .. intake structures, and the associated excavation, backfiill, or bedding fcr the utility lines, in all ;eaters of the United States, proviced V-.are is no chance in pre -construction contours. A "utility line" is defined as any pipe or piperne fz�r the transportation cf any gaseous, liquiid, liquescent, cr slur.^, substance, for any purpose, and any cable, line, or wire for the transmission for any purpose of electrica! eneroy, telephone, and telegraph messaces, and radio and television corn rnunl:ation. The terry "utility line" does not include activities tt�at drain a avatar of the United States, such as dra:saga file or french drains, but It does apply to pipes conveyin5 drainage from another area. ldlaterial rasu'Ung from trench excavation ray be temporarily sidecast into waters of tie United Sta:Ys for no .w more than three mcrths, provided the material is not placed in such a manner that it is dispersed by currents or other forces- The district engineer may extend tine period of temporary side casfing for no more than a total of l op days, where appropriate. in -wetlands, the top 6 to 12 inches cf the trench should normally be back: -filled Vith topsoil r-om the tmnen. The trench cannot be constructed or tjazkfilfed in suc.i 2 nanner as to drain v;aisrs of tare w United St ites (e-g., bad filling with extensive gravel layers, casting a french drain effact). Any exposed slopes and streann banks must be stabilized immed'.ately upon completion of :he utiliy line crossing of each wat_rbcdy. Utility line substations: This NWP author'zes the construction, maintenanca, or expa^lion of subs'.atlon facaities associated with a power line or i.6ti`y lire in non -tidal waters of tine United Slates, provided the activity, in combination with all other activities included n one single and complete project, does not result in the loss of g-eater than 112 acre of waters of the Ur'ted Stags. i nis lgkVP does no: authorze discharges into non -tidal wetlands adjacent to Lida) waters of the United States to construcL maintain, or expand substation facilillies, Foundations for ovafiead uViity line taVvers, poses, and aria' --,ors: This NWP autho izes the construction or maintenance o: iourdatiors for overhead utility line tovrers, poles, and anchors in all waters of Erb Unit -ad States, provided the foundations are the minimum size necessary and separate footings for each trwsr leg (rattler than la; gar single pad) are used where feasible. .� Foundations for overhead utility line towers, poles, and anchors: This Wv? authorizes the.constriction or maintenance of foundations for overhead utility line towers, poes, and ancf,.ors in all vnters of the United States, provided the foundations are the minimum size n cessary and separate footings for each tower leg (rather than a larger sing!e Gad) ara used whs a feasible. w Access roads: This NVVP authorizes the construction of acCefiS reads fzrr the constriction and mairtien2nce cf u ill y series, including overhead power lines and uliftwy line s;jbstatar,s, in non -tidal vwaters of the United Sites, prcvidzd the total discharge from a single and complete project does not cause : ;a less of greatar than 112-acre of non -tidal wavers of the United States. This NWP does riot authorize discharges into non -tidal wetlands adjacent to tidal waters for access roads. A;xess roads must be tine miriimum width necessary (see Mote 2, bylaw). Aczess roads must be corst- cted so that the lenol�h o* the road minimizes any adverse effects on waters of he United Strtas and :rust S= as near as possible to pre -construction contours and elevations (e.g., at grade corduroy roads w Or Ce0tBrtlie1graVEl rcEds). Access roads cohstr:.'cted above pre -construction CoirtoLrs and elevations in -w_=tors of she United States must be properly bridged. or culverted to maintain surface flows. This NWP may authorize utility lines in or affecting navigable raters of tine United States evei if there is no associated discharge of dredged 4' fll mate.ial (See 33 CFR part 322). Overhead ufili'y lines constructed ove- �+ section '0 waters and utility fines that are routed in or Jnder section 10 v-sters Nit~rout 3 discharge of dredged os fall rr eterial require a section 10 perr,iit. This NVdP also authcrzes temporary structures, fills, and wc� rk necessary to conduct the utility line activity. A,pprolanata measures must be taken to maintair, normal dcwrstrearr flows a. id minimize flooding 10 :he w maximum extent practic t-le, when temporary simcLires, work, and discharges, including ce, erdans, ara necessary for construction activilizas, access fills, or dewa`tering Of construe -ion sites. Temporary rills must consist of ma:_ria's, and be placed in e r,,2nner, that will not be eroded by expeztvad high .,, flows. Terporary fill must be remaved in t;Qir entiraty and the affected areas returned to pre•construcLoa e!evations. The ai eas 3171ac'ed by te4npwary fills must be reveget3ted, as appropriate: hlotir'ication: The permittee must submit a pre -construction notification to the distrct engineer prier tc nnimencing t:-a activity:f any of the follov4ing criteria are met, (1) The activity involves mechanized land clearing in a lore: star," we'!and for the uffty line right-of-way; (2) a section 10 permit is required; .r am (3) the uti'ity line in :vat`rs of the Ur.itrd S:a:as, exc:udirg cverhe3d :Ines. exceeds 500 foz,i; (.111 the utr ky line is r.IacLu Ina liurst;ir Iionol rca ±i e., weer of tl,e Lriled Stales), clld is 171rs -:. Itcl to a i tjro _e I that is ,� fit ial ti:2i ,ur';;0icii nai 3a (5) dig:; .areas L';st r,st.lt in ;tie lcss of greater than 111 y-acre! of waters of .'e United States: (o) permarent access roads are cons`:ructed above grade in waters of tle )whited States fOr a r.,lst3rice of r ice -- thar. 5M feet; or (7) permarent access roads are constructed in seaters cf :he United States .with impar-ious materials. (Sera general condition 2T.) (Sections 10 and 404) No--1: Wiare tla proposed u.ilitj line is constricted or Installed in navigable wavers of the United Slates (i.e., section 10 esters), copies of the pro -construction notificalion and N,rJP verification w-itl be sent by the Corps to the National Oceanic a^,d Atmcspteric AdmI.nistraGon (NOA.AI, *,latirnal Oceai Servlce (NOS), for char'.ing She .. utility lire.to protect navigation. Nolte 2. Access roads used for both construction and maintenance may be authorLad, provided •rteay meat the tarrns and conditic:ns of this 1\1141P. ncc_ss roads used solely for cons- uction of the utiiity lisle must be renoved upcn co mplal:on of J-e work, accordance with 6`e requirements for tenpor ary fills. h:ote 3: Pipes or pipelines us -ad to trarspor caseous, liquid, liquescent, or slurry substances over navigable waters of tlla United States are considered to be bridges, rot u5tity lines, and may require a permit from the U.S. Coast Guard pursuant to Section 9 of the Rkvers and Harbors Act of 1899. However, any discharges of dredged or fill rnaterial.into waters of the United States asesocia:ed wi.h.such pipelines will require a section 404 p~rnit (see R151'urp 15) f'ATI(if 4WlGE PERrOITGEit=_:' 'L Cot4DITtON113 General Conditions: The 17.11ovjing general conditicns must be follow -ad in crder fx any auJlor:zz` an by a N%VP to be valid: 1. Navigation. (a) No activity may cause more than a minirnal adverse z;iect on ravi_alon. (b) Any safety lights and signals prescribed by the U.S. Coast Guard, tihra igh regulations or otnenvise, must: be installed and maintained at the pernittes' s expense on authored facifities in navigable weters of the United States. W (c) me per-mitee understands and agrees that, if future •operctions by the United States require the terioval, relocation, or cther alteration, of the structure or wort herein authorred, or if, in the opinion of the Secretary of the Arrily or his authari: ed representative,'said structure or wo-k shall c_=use unreasonab:e obstructon to the free _ ravica on of the navigable waters, tt1A parr;ittae will be required, upon dua notica from the Corps of Engineers, to remove, locate, or alter tie structural work or cbstructicns caused tlheraby, ,Mthout expense to the United States. No claim shall be made arairst the United States on account of any such renoval or alteration. 2. Aquatic Lifie Movements. No activity may substan`iafiy disrupt the necessary life cycle movements of those species of aquatic life indigenous to the iaaterbody, inciiding those species ghat normal!.y migrate thro;jg.h the area, unless the activity's primar,+ purpose is to inpeund :water. CutveRs eluded in streams must be installed to tn?intain lour fiavr condiiia�ls. 3. Spawning Areas. Acttviti:.s in spawning areas during spavrriing seasons must be avoided to the maxiricri extent praca-cable. Activities that resuit in the physical destruction (e.g., through excavaton, fill, or dovtnstrezrrt _ snnotherng by subs:rntial turbidity) of an important spawning area are not authoftzed. -1. Migratory laird Breeding Areas: Activities in esters of the United Sates that serve as bn?eding a.=3s for migratory birds must be avoided to the rrwxirnurr extent practicable. 5. Slie Ilflsh Beds. No activity may occur in areas of concentrated shellfish populations, unless the act:v:ty is directly related to a shellfish harvesting activity author'zs-d by I WPs 4 and 48. 3. Suitable Material. No activi'y may uss unsuitable material (e.g., tra3h, debris, car bodies, asphalt, etC.). Material used for constrt.ction e. discharged must be free from toxic pollut4nts in toxic amounts (see Section 307 of the Clean Water Act). .� 7. Water Supply Intakes. No activity may oc::-ur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public veatar supply intake s! uctures or adjacent L�ar:k sla5ilization. .r g, Adverse EEI J' cts From Irnpoui:drnents. if tra activ;cy .^iGS an of water, ;�d VarS eft cis to the aquatic sysberl due to acceIera'_)7g die p=_ssa0:�: t'f .,'8tcr, 3n61icr;?5inicling IS ilc�!:' m.ust 17ie rn'.n:rr =d to Vlz G, 19--r.agament of V-1ater Flohvs. To the maximum ax;ent c.',9•^-.iicable, the r�1f? Ge;,5trl ct.0i1 course, ccndi~.ion, capa`,rty. End location, of open v ra=ers must be rza in!ained for sac-i activity, incluc'.nq stream cnar,nel!_ation and storn water manager -gent activities, except as provided below. The activity must ke constructed to � rithstand expected high flows. The a.^Civity rust not restrict or impede the passage of nor, :al cr high flows, unless the primary+ purpose of the activity is to impound water or manage hig flows. The act3vi'.y ,;,Ey alter the pre - construction course, crndillon, capacity, and iocction of opsm v,,at rs if it benefits the aquatic erwircrmert (e.g., stream restcrtion or relocation activities). 1G. Fills t"trii:hin 100-Year Floodplzins. True activity+ mus: corrply •.0th applicable FEI A approved s:E.`:e or local .• flccdplai,n nnanagemerl reau:rem_nis. 11. Equipment. dez,p eGuiNnent working in ;vetlands or mudlats must be placed on mats, or other measures must be taken to minimize sail, disturbance. 12. Sail Erosion End Sedimant Controls. Appropriate soil erosion and sedirnenE ccnt.ols must be used and ,r.airitairied in efieciive operating condition during construction, and sli exposed soil and other tills, as yell as _ny wodk below the cridinary Nigh water mar; or high tide line, :rust be perrnanently stabilized at tie earliest practicaole data. Pemittees are encouraged to perfa„ it ,.-Yor'k vritiin waters of the Urited States dur ng periods of low -flow or no-tiovr. 2. Remcvzl of Temporary Fills. Tarrporary fills must be removed in their entirety and the affected areas returned ic pre-.onsuu.tion sIavaSor._. Thee affected areas must be rave,etated, as _ppropriata. 14. Proper Maintenance. Any aut orized Stu-ucture or fill shall be properly maintained. including mainte nanca to MW ensure public safety. i 5, t1fld and Scenic RivErs. No activity may occur in a component of the National 1Vild and Scenic ,4iver System, or in a river of<rdslly designated by Gongress as a "study river" for pcssibl3 Inclusion in the system while the river is in an official study stabs, unless the appropriate Federal agency with direct management responsbility for such river, has determined in writing that he p: cposed zr-livi'y %will nci adversely affect the V61ld and Scenic River dasignation or study status. Information on V, ild and Scenic RIver may be obtained from the appropriate do Feda:al land management agency in L`:e area (e.g., National Park Serrf:e. U,S. Forest Service, sureau of Land ftitanagelr,_nt, U.S. Fish and liVildlife Service). 16. Tribal Rights. No activity or its operation rr.ay impair reserv�d tribal rights, it eluding, but no: limited to, raserved water rights and treaty fi� ring and hunting rights. 17. Endangered Species. (a) No activity is aL..hori=ed urd-ar any N'ddP which is likely to jecpardize the conbnued exist=nce of a threatened authorized under any WVVP "may affect" a fisted or andangered spies or a species proposed for s_ch designation, as identiaed under the Federal -Endangered Species Act (5-SA), or whic`i will destroy or adversely modify the critical habitat of such species. No activity is species or critical habitat, unless Seci:on 7 consultation addrssing the effects cf the proposed octivity has been comMeted, .. (b) Federa! agencies should follow their own procedures forcc=!ying v;ith the requirement_ of the ESA. Federal pernittees must provide the district engineer,,viih the approprla:e documents lion to demonstrate compliance with those requirexenS. _ (c) hJpn-federal permittecs shall notify the disict engineer if any I'sied specias or designated &Wcz: habitat .. micht be affected or is in the vicinity of the project, cr if Lia project is located ir, designated critical habitat, and shall not begin work or the aclivi�y until notified by the district engineer i .at the requirernen:s of the ESA have been satisfied and that the acl'rrity is auth,orizad, For acth4ties i`iat might a;-fect Federally -'listed Endangered or threatened species or designated critical habital, the pre -construction notification must inc!udeTie name(s) of the endangered or lhrcataned s�,ecies tl :at may be affected by the proposed work or that uti'.ize the designated c itical habitat that may be affected by fie pr-oaosed -work. The district engineer will determine whether the proposed acavii'y "may affect" or will have "no affect" to listed species and designated critics; habits! and' will molly the .. rori-Fed4:.rel npplicant of the Corps' deteminatinn ,,iLhin 4.5 days of receipt of a complete pre-consuction n.otl icaL•on. In cases :•rh5fe l3 r�.on-Federal applicant has identi;'ed iisted species or critical 'nabt:at ,"al :`light be 11111111 affected cr Is in the via: ity of Vie p:otec', a,d has sc noUried he Cops, the applicant shall not begin ,koik ijn_:1 I17•�Corps has pro-Jid-adnoiliicc ion a opni �t.i a ,a 'no 'nr'is:3dSpecl � +- il- ;r ad a viti s will h.�.1 u leis_ � es or ri' 3 ll it;Lli==i. i-• Lr!i; Cclicll % I_ie-, cl.rr,li'f:,;L. (cl) AS a r=_s ult Grlux mal cr riforn:yl ccn-nultation'i di ilia F!;V$ or Wk FS '.n3 diai�'ct angificer ;nay acd r saecias-specific regional endangered _pec:es conditions m the MVPs. (e) Authc:;_t:aon of an acti.. iby by a NW;3 does ,lot aL'thoiza the "take" of a threatened or endarcerad Species zs defined under the ESA.An the absence of separa:e authorization (e.g.. an ESA Section 10 Permit, a Biological Opinion wilt Inc:dental tak?" provisions, etc.) from the J.S. i' YS or the N!v1FS, both lethal and non- lettial 'Makes" of protected species are ir. •violation of th•a ES.k information cn the location of threatened and endangered species and their cnif-cal, habitat an be obtained diractly from the offices of the US, FWS er.d NIMFS or !toff 1'1•prld:'lid? tifleb pzges at 3'.Cl i'r�: rY:+�J+�.S1da2.QQ'�!ii517$f125.ilirTil respectively. ,r 8. H2st:oric Properiias. (a) In cases vrl-_r: the d-t.-ict engineer deter-'anes that tree acsvity May sffe-" proasrties listI3d, or eligible for listng, in the Naioral Ragisicr of Histor.c Places; the ac vity is rot authorized, until' the rrouirenerts of Section 105 of 'Jie iJa(ional F:istcric Pressrvatior, ;,ct (NHPA) have been saiisfied. . (b) Federal pe.,ni:t as should follow their err pr cedures for complying w th the requiraments of Section 106 of tf e Na'Jona( Historic Preservstion Act. F=_deral permittees must provide ',he district enyineerwilh';.e ap mprlote documeri ation to demons7ate compliance witii [has, recuiremen:s. Cc) Non-federal permittees must submit a pre -construction notification to the district engineer if the authorized aclvity may (rave t p:,ieztial to ca.t:se effects tc any historic peoperes listad, determined to be eligible for fisting cn, or potentially eligible for listing or. the Nationa: F.egistear of Historic Places, includ;ng previously unidentified proferdes. For such activities, the pre-:onstruc:ion notricatiosn must state At-ich histx:c properties may be = affected by'h: proposed work or jr-Jude a vicinity map indi=atsng the loca7on of tre histcric properties or the potential for the presence of his(oric pr penes. Resistance regarding inforraticn on the location of or pctea6al for the presence of historic resources can be sought from the Slate Historic Praservadon Officer or Tribal Historic Preservation Officer, as appropriate, and the National Register of Historic Places (see 33 CFR 330.'.(g)). The •— district engineer shall make a reasonable and good f_ith effort to carry out appropriate identification efforts, which may include background research, =SLltatian, oral history interviews, srmmple field investigation, and field survey. 132secl on the infer rz ion submitted and these ellb0s, the district engineer shall daterrrine wheth..sr the proposed activity has the potential to cause an effect on the historic proper'Jes. 1'Jtsere the non -Federal _ppl cant has id=n:;fied historic properties which the activity may have tine potential to cause effects and so notified the Corps. the non -Federal applicant shall not begin the activity until notified by the district engineer either that Vne actiAty has no potan}al to cause effects or tat consultation unddr Section 103 of the NHPA has bean co„iplated. _ (d) The district engineervdl notify tine prospective pernittea witnir. /-5 days of receipt of a complete_ pra- ccnstructior nc,tlflCafon whether Wk Secflcn 166 consultation is recuirad. Section 106 consultation is not required when the Corps da_ermires that the activity does not have tie potent a! to c_use effects on historic properties (see 36 CFR 600.3(a)). 11,\.1-lPA section 106 consultation is required and •.'rill occur, tt.e= district engineer,Alll notify t; ,z non -Federal applicant that he or -he cannot begin work until Section 1,06 consultation is ccrlote tad. (e) Prospective per.^nii,ees should 5e aware that section 110k of the NHPA; (16 U.S.C. 47rGh-2•;Ic)) prevents the Corps from granting a permit or older assistarce to an appf cant who. vviul intent to avoid the requirements of Section 106 c•f the NHPA, has intenfionplly significantly adversely affected a historic property to which fie permit would relate, or having lagal power to ?regent it, allowed such signirican: adverse affect to occur, unless she Corps, a`ter consu°ta ion Yilh the Advisory Council on Historic Preservation (ACHP), cetermines Lha circumst_nces L1sdf,y granting such assistance despite the adverse erect creatad or pernitted by the applicant If circumstances jus,ify granting the assistance, the Corps is required to notify :he r.CHP and orev:da docurnertaUcri specifying the circumstances, explaining Die degree cf dsmaga to the integrity of any historin properties affected, and proposed mitigation. This doct.,mentation n ust nc(ude any viers obtained from the = applicant, SHPO/THPO, appropriate Indian tribes if the undertaking cccu:s on or affects historic properies on t: ibal lands or sffacts p,-operties of is Merest to these Gibes, and other parties knCw i to have a iegidrnata interest in t: a impa,ts to the pen-nitted activity on histc1c properties. 19. Designated Critical Resource Waters. Critical resource walnrs include, NOAA-designated mar'.r.e sar,cL,anes, rational Estuarine Re^carch'eserves, state natural ne,i,age sites, and outstanding natio:.at resource waters or other waters o ficially designated by a state as hzv?ng particular enVronrnental .cr ecolooical significance and identified by the district engineer after notice and opportunity for public comment. 1 he district engineer may 31Sa designate acditional critical resource waters after nonce end opportunity far comment. 4 w no (;-3} Discharges of Giadced or Ell mate;:al int vvz eis of the Urr*Od State; are riot authhori=ec' by NIMPs 7. 12, �! 1 . 17. 21. 29. 21. �5, 9, 40. 42, 43, .14, 49, and r0 for ?:y. ^�,'ti;•i''tr .."!i' r. t !i `1r1r7, i _ ..,. -: .hhn. f di-Fr;il;. : � la i.? ;.I (n; Far f-T ;'s 3, 3, 10, 13, 15, 13, 19. 22, 23. ?a, 27, _'S, 3u, .t', "�� jib, 37, art+J 38: nolf:catio�n is required in .acccrdan:e :��ilh o,,enc l condi`:Gn 27, fcr aay acti,•iby proposed tits .. desig na`.ed c.1tical resoirce waters including v?etlands adj=cent to those w-alers. The district engineer rrzy c,,U,Gri'e acthitie3 under these N1,hrPS only a ter ii is determined t io. the impacts to the «rit;cGl resource waters grill biE:� no mor than minimal. 20, Wrt:igation. The cisYct e.iginearvrill consider the ;ollmJr,-g f2:toi`s when determining appropriate and practi catdla mitigation necessary to ensure that adversa tfiects on the aquatic environment are nlinlm3;- (-a) The acti°iit'J must be desicned and censtri:cl:d to avoid and n inirn. = adverse enacts, botn tempJrary and .r permanent, tc Y:a-- rs r!Lne United states I•:) the rh8ximum e tent prarticab'e at —�,e project site (Le., oil She), (ID) A;.itigation in ad its forms (avoiding, mirimiz.nc, ;act-.'�iing, reducing, or cor.,censating) v./]l be required to the extent necessary to ensure that the c_verse eft.ects to till aruattc environment are nimirnal. (e} Camp:nsat�rj mitigation at a minimum one-for-cne rho voila be required 'or =1; v✓vt;ard fosse: t gat excaed :11C acre and regUire-pre-construction rectification, uniess the d.stric: --nOineer determines in writing that score other fo,'1ll of mitigation vcruid be more envir,.!r.m-:-ially 2ppropriate and provides a proiact-specific waiver of this r_quirerrent. For we•L'and tosses of li10 acre or iess Lhat require pre c-onst-ucion notification, the distdct anginaer may date:m;na on a case -by case basis u`lat ccirnpensatory mitigation :s required to ensure that the ac;iviy results in mininal adverse efects on the aquatic environment. Since the lihacihcod of success Is greater and the irr.,:act to potentially valuable uplands are r-d read, wetland restoration should be the ;irst compensatory mitigation option considered. (d) For lasses of s r=a„ts or other open �t�atsr3 that r_tiuire pr�const, action rati=icatiah, t �e d;L. eneirC-er may require compensatory mitigation, suet; as stream restoraton, to ensure that t`le activity result in minimal adverse effects or, the aquatic enviror iment. (a) Co,npensatory mi5g3tc•r v:ill not be used to ins eas} the aim cage losses cllol-:.d by the acreage f;nuts of the NV VPs. For exanple, if an NWP has an acreage Emit cf 1,,2 a:.re, it cannot 5e used to au horiza any project resulting in the Icss of greater O-Lail 1/2 acre of waters of lh•e United States, even ff canpensatory-miticaftn is provided that replaces or rsstares some of tt;e lost waters. However, cornpansatory ;,litigation can and should t used, as ,ne essary, to ansure that a project a;ready meeting the established acreage Iirh is also satls-ies the minimal i,mip3a reSu'ement associated -odt'1 the INWPs. (T) Cornpansatory nliticiation olans For projects in or nsa- =t,eams or other open waters will no.."atly incl:ide a requirement for the establishlment, maintenance, and fecal protection (e.g., conservation assemelts) of nparian a: -,as new to cpen waters. to some cases, riparian are2s m2y 5e the only compensatory midca`ion required. Ow Riparian araas sl-ould ccns3t cif nali'✓e spezies. The w dth of the required :iparian area atilt address cocjrnented water qual:bj or aquatic habit2t lass concerns. Normally, the riparian area will be 25 to 5'0 feet wide on =_aeh side of the stream, but the district engineer may require slignty Mder r )aran areas to address documented water quality or habitat lose concerns. Where both we`lands and open :vatters exist on the project site, &,e distect engineer %ill cl, tAarrnine the sppropnste ccmoensatory miti7ation (e.g., riparian an7as andlor wet:a; ids compensation) based on vAat is best for Che aquatic enviroamart or, a wats-mrshert basis. In caF;es where rip3hat eras are de:smtircd to be the most appropriate form of compensatory rmt aabon, the district en.gsneer may waive .. or reduce the rroquirament to provide wegand compensatory mitica::ion for u:aCand losses. (g) Permitiees may Oropose the use of mitigation banks, in -lieu °_e arrangerneims or senara:e acfivitl-specific ccmpensaLwy rnitig3�on. In all cases, the mitigation ,crovisions will specify 11he party responsible for a. rcmplishi-:g anther complying whu tha n-.itication p'.an. (h) wl-.,ere certain furGtlon.e and seNices of Waters of the United States are permanently adver5ei.,y affected, such as ti^te conv_r;ion of a forested or scrub -shrub wetland to a herbaceous wedand in a Ferrnarnently maintained utii,y line ri;1-it-cf-v:2y, mitigatiai may be required b raduca L`ie acvarse effects of the priest to the minimal level. 21. Vdater Quality. ihlhere States and authorized Tribes, or ;PA n'here applicable, have not previously ce`tifisd ccrnpliance of an NIA? .v!'th C'°:r,k Seciion 401, ind:'•;idual 401 ''later Qua:itv Certification crust be obtained or •• �Nra ved (see 33 CFR 330.4(c)). The district engineer or State or Tribe may require additic•nal '.'rater qLaltty rnenagernt-nt treasures to ansure t:at the authorized zC vity does not rsult;n more than minimal de_rda.ion of Water quality. r 7.2. Co2_t21 Zone fana3dment. In an ttJO has net :.re-.'rereceived a ;tat e rcastaff zcne managarzent consistency concurrence, an individual state coastal zona nanag .mer.l consistency con.--c-irre'ice dust oblained, or a prasumplion of concurrnca must occur (see 33 CFP 330,40;). i ne district rl,girzeer or r. SWc; mr-y rCa_;irC z6fitiri � t r � a t -, th reed � t y r� n_ is t h star r. gas r s o G^ arc ilia! �� ^lift- is -ane r+'r:_i: =. ?ia reg0,-] e:"lts- 23, Ezegional and Csse-By-Case Ccinditions. The "a=twity crust comply .riti any regional conditions that may hake been adde_ try the Division Engineer (sae 33 CPR 330.4(e)) and ,,vith any, case spaci is conditions added by 1,11a Corps or by the 3:at�, Jndiar, Tribe, or U.S. EPA in its sac:icyn 401 :•grater �uviity Certi-kaJon, cr b%1 the stare in its Coastal zone W.aragement Act cons-stency detannina vi. 24. tlse of f:,ultiple it' stion ilde Permits. The ! �ss of more than one N.,713 for a sincie and complete project is prol.ibited, a Mept when the acreage loss of vralsrs of the United States a:ithorize; by tt-e NVYPs does not exceed tl:a acreage irn:t of :he MAP v<ih the highest speci5ad acreage limit. For example, it a road crossing, over Lida] waters is construcLrd under N IAP 14, with as_oda'ed bank strbili-alIon authorized. by NVVP 13, the maximum acreaG.e loss of tiv_!ers of the united States for the total project cannot exceed 1,1Z-acre. 25. Transfer of blauornrAci_ P=writ irerin"cations. 1;"the pErmi fete eel's a pro?efi,, Gssoaated s%Itti the riaticnwiee perm;t veriifi:3iion, the psrmittae may transfer the nation.&+ide permit verification to the new ciitner by submitti-g a latter to U-5 appropriate Ccrps distrrict cffiice tc catidate tie transfer. A copy of t`,e nwionvrde permit ved-5scattion dust be a::acned to the fetter, and the to ter must contain the following statement ar--d signature: "',dhen to stvctures or%,ork authorized by this pe.-n. it are still in existence at hz. time the property is transfarrerl,_ tie terms and condidor.s of this rationwide permit, including any special conditions, -rill conrnut to be binding on the new owner(s) of the proper'yy. To valuate the transfer of this natiorrxide permit, and tie �. associated liabilities associated vv izh compliance -with its terms and conditions, hale the traisferae sign and date below." (Transferee) (Cate) 26. Carnptiance Certirica ion. Each permitt?e who received the hn;VP verification f �m lisp Corps r.`r�:st submit a signed certification regarding _he completed -sons and any required mitigation. The cartific ation form must be �rwarded by the Corps with the Nt+'trP verifrcaton leyar and will include: (a) A stste:-nent that the -3ut ionized work was done ir. accordance with t1.a NWP auftriz;_Afrn, inc.ading any girneral or specific conditions; (b) A sl2_ errpnt that any required mitigation was cwnp'Ltsd in accordance with he permit condiioor s; and (c) The signature cif the permiGsc certifying the completion of she .work and mitigation. 27. Pre -Construction Notif i :stion. (a) Tiring. Where required, by :`;e terms of the NWR, the parnitl.e i must no0y tie district Engineer by submitting a pre -construction nobficaGar. (PCN) as aa-ly as passible. Tile distecl engineer must determine if Lie PCN is complete within 30 calendar days of Gha date of receipt and, as a general ri.:le, will ra.;uest addidoral infonriatior, necessary to make tie PCH cornp.vte only once, He ever, if the pros; ective perrli:tea does not provide all of the requested infornnation, .hen the dis; �ict engineer will notifyLie .r prospective permitte? hat the PCN is still incompt=_te and Lhe PC14 revievr process will not commence until all cf the requested iniomation has been received �y the district engineer. The prospective permitze shall not begin r the actl%Ar+ until either: 01 He cr she is notified in writing by tea district engineer that the activity inay proceed under the NWA with any.spec.al conditions imposed by the district or division engineer, or (2) Forty-five calendar days have passed from ;ha cis!rict ongineer s receipt of -Lie co nplete PCN and Ime prospective oarmitjee has not received writ:en notice fron the district or di•vrision engineer. Hvwever, if tha permit -.as was required to notiry the Corps pursuant to general co:,)dition 17 2hat lit Ce4 species or critical habitat might affected or in the vicinity of tha project, or-_r, notify the Corps pursuant to general condition 1,8 that the activifiy may have the potential to cause effects to historic properties, tha permittea cannot begin :he arliviy until receiving mr-Men noti cation horn the Corps that is "no `Pfect" on listed species or "no potential t: cause affects' on historic properties, or that any consultation required under Section 7 of the Endangered Species Act (see 33 CFR 330.4(f)) andlor Section 106 cf ti:p National Historic Preservation ;see 33d CPR 330A(g)) is completed. Als3, ,vor% cannot begin render NUJ Ps 21. 49, or 53 until :one permitteo has received twril:en approval ftorn the Corps. if the pr=osed 3ctivit requires a written :waiver to exceed specrtled limits of an t' VVP, ;he permittee carinct, begin .r no C:; iN until :he ciisi(zl enoineer issue-3 t.)a •: aivar . if thia "istrict or , � e. P o" es rr .ea to ti'r• �-� d:'..1n 'l�yl%cif r: till the p?f� Ill �1 :','r'iing that as .ndivid-i- pemit i5 required :.ithln 1 ca:z.r-*ar d; ys of r ocei )t of a cixiipl�te PCH. f^Q ?C_ill'.ileun.Vzo'rd!.'.'1J°-=1pelc-1i.a-,.-ll:li, pruc_—Lal t:Rder tl INV0 inay be mo_ifl•cd, susperded, orrevokad only ir'. 3CCJ`derlr]g :vith 11he pr.,xedu"e set forth in 33 CFR 330.5(d)(2). (b) Contents of Pr_-Corsiriction Nioliacatior.: T:,e PCN ;rust be it vvridnrg and include the fof:enir.g inforrn ajar.: (1) Name, address and telephone numbers of the prespec:iv. perm:tt-e; (2) Locatior of the proposed project: (3) A description of t;')e pro?os=d project, tha purpose; direct and indirect adverse environmental effects tha project would cause; any o°rer NLtiP(s), reg,onal ganaral permit(s ), or individual Ferr,:it(s) ::sed or i,� end ec is be used t; autiha ize any part of t',e proposed p' 'ect or any rala=ed activity. The description shou:d .w be sLfTrc:en y deviled to allowthe district sng near to dstermire that the adverse effevts of the project %i! be minimal and to determine the need for camFansatcry milication. Si:'atches should be: provided :,-than necessary to show that the activiy complies with are terms of _he !` rJ'. P_ (Sketch2s usuaiiy clari5j the project and wh-r,'provided result in a quicker decision.); up (4) The PCN must irc6Jde a delineation of spacial aquatic sites and other waters of tare United States on the project sire. Wetlwd da!irieations must be prepared in accordance with the current mr:: d ,equited by the Corps. The p:mittee nay 4sk toe Corps to delineate the special aquatic sites and o:herwatC-s of the United Sta:=_s, but Dare may be a delay if the Corps does :he delineation. especially f ;ne.project site is large or cunt_ ins 'M many wavers of J: United States. Furhern-ccre, the 45 day period will not start until ore delineation: has been submitted to cr completed by Lie Corps, were 2Pprop late; (5) if the proposed activity will result in the loss of greater than 1110 acre ofw=ttands and a PCN is wr raquirod, the prospective pernittea must submit a staierrent describing how the mifigaticn requirement v,ill be sstisfie?d. As an al:emative, the prospect:vs permitzee may submit a cork.-eptual or cat=_i1_d mitigatior. plan. (5•) tf any ested species or designated crtical hati—at might be affected -or is in the vicinity of the project, or if a project is located in designated cri5c-1 habitat, for non -Federal a:cpk nts the FCN must in -dude tile name(s) Wo of those endBigerad cr thre=_teased species that might be affected by the proposed work or utilize the designated critical habitat Chat may be of>ectad by the proposed wor'r,. Federal applicanis must provide documentation donnonstrating compliant_ vdith the Endangered Species Act; and (7) For an actNiy that may affect a historic property fisted on, dstz-, mined to be eligible for listing on, or 40 pctentiefly efg ble 'er [feting on, the National Register of Historic Places, for nor, -Federal applicants the PCt•J must state which historic areper y :ray be affected by Oe proposed work or include a vicinity map indicating the location of the historic property. Federal applicants must provide d=.,man[;'ion demonstrating compliance wit;, Saction 106 of the Natonal Historic Preservation Act. s.r ^ " - (c) Form of pre-Cor.s,r.�ciicn Nof.in�iion: The standard individual permit applic..tior ficm {Form E[��., 43=c1 may be used, but the completed app;ic2tion form must clearly indicate that it is a PCN and must include all of the information re:u:red in :,aragraphs (b)(1) through (i) of this g-neral cend°tian. A letter containirg the required infcr,mation ri,3y also be used. (d) Agency CcordiriaUon: (1) 1-ne district Engineer veil[ consider any comrnen's from Federal and state agencies concerning the proposer; activity's compliance w4h the terms and conditions of the NWPs and the need for mitigatiori :o redace tl-e project's adverse environmental affects to a r irimal Ia•:e1. (_) For all i -WP 48 acV ities regviring pre -construction notification and for other NWP activities requirng p,re-constructfoln nati:lcaiion to the district engineer that re.'till in the loss of greater than 1t2-acre of watef5 of he United States, the distict engineer will immedialesy provide (e g., via facsimile trarsmission, avemicht mail, or cL ter expeditious mariner) a ccoy of Lhe PCN to tt a appropriate Federal or state offices (U.S. FINS, sLa__ natural "" resource or v: ater quality agency, EPA, State Historic Preservation Officer (SHPO) cr Tribal Hist,_ric Preservation Office (THPO), and, if appropriate, de !NVFS). With the exception o` NWP 37, geese agencies will then have 13 calendar Gays from toe date the malarial is trfisrr.itted to telephcrie or fax [he district engine ,erno:ice that :hay MW intend to provide substantive, s.; -specific corminents. If so contactL-d by an agency, tt,e district engineer vvill wait an additional' 15 calendar days before making a decision on the pry onsiriction notification. The district engineer ,gill sully consider agent' comments ,�ceived within :he spec;iad time frame, but w_II provide no response to the resource agency, except as provided bc4vw. The district erginaer will indicate in the administ-ative record "' associated with each pre -construction ri_=ficatcn that the resource agenzies' concerns were considered. Fc•r tJWP 37, Une emergency :vatershed protection and re^abiii:atien activity may proceed immediately in oasis w~sere there is an unacceptable hazard to life or a significant loss of pr opery or economic hardship will occur. The �. district engineer will consider any commerts received to decide whe: her J.a.NVVP 37 authori:a cn shoeld be r, oJriod, uspuhdc d, o revo[:od in accordance v"ill', th:a err ced::res at 33 Cr=P, 330.5. MI 4- a- (",I) In Cases cf where tt.e pr^S;cCif' perr1=e is not Federal agensy, Gne d.st-ict eneircer .ai! cro iCr to'%!iJFS ^:iti`ir. �aO c 3lena�Dr d ":s cf mcl.71ipl of any rsser.l'a Fsh H b;tal rt :i w .mind 3.;tflS, :isri,e;t'i:.,r ;/ _ _ ,Ul i ! } I L j(?-i! u) ;f :'.� :� h1 J�:YJ��,' p i[ 4'� f. �1 I ii '¢ i.U1 i a:. ! i .:r'tJ F.;aI!a.S-,Tent ^,c- (4) Applicants are enccLrged t;, provide the Corps n ultiple copir:s of per-ccnstruc:i'on noGficatiohs to expedita agency coor,ination. (5) For NWP 48 activities that require reporting, the district engineer will provide a copy of each report ► :whim to c3landar days of raceipt is the appnopria:te regional office cf the NAFFS. (a) District Engineer's Dacision; in revievring the PCN f--r the proposed activity, the district ergina&-r will daterrnine whether ;.he activity au:hor:z_d by fine N%,V ,.AAl1 result in more than minimal ir•dividLai or cumulative adverse crvironmenml effects ?r may be c_,rira:y to : ,e pjbl'-c interest. V the proposed AcdVity requires a PCN and vrill result in a loss of greater then 1,10 sere of vietlands, the prospective pemirma should submit a mitigation; proposal with the PCN. Applicants may also prcrosa compensatoy niticztion for projects witi smaller impacts. The d istrict engineer will cop side: my pro;), -.zed compensator, mitigation tine app icant has included in the proposal in determ:ni :g :whether the net adverse environnenta( efiacU to the aquatic environment or the proposed work are ninirnal. T i-e conipensatcry mitigation propcsal may be ei,ner conceo tal cr detai:ed. If the dis!::ct engineer de'wtlii,^,es Lh-=' the activity complies mtn the ;errs and conditions cf the NVVP and that the adverse eFscts on the aquatic environment are minima', a'tar considering rr:ifigaticn, the district ensi peer wil! -• ncti;y the Fe!mittee and include any conditions the district engir:aer deems necessary. The district engineer must approve any compensatorymitigation proposal bEfore the permittee commences work. If the prospective pennitte- elects to submit a cor„pensatory rritigation plan with the ?CN. the district engineer will e,:pPdifious,y reviev1 the prcposed compensatory mistigation plan. The district engineer must review the plan with' A ca!e:,car ' days of racai�r'ng a complete PCN and deiemine .hater rhe prapos_d rnifigaton would e ;sure no mor _ th^r, minimal adverse affects on the aquatic emironment. if u,a net advei-se effects of dhe project cn IN-,- aquatic environment (a�ler coasiders-_lion of the ccmpersatorf mitica:ion prcp;,saf) are determined by the district engineer to be mirirral, the district engineer will provide a tim ':y wiri�L-n responss tc the applicant. The response will sty e that (he project can proceed ,undar'the terms and conditions of the NWP. If tine district engineer determines that the advarsa effects of the proposed wort, are more than rnir--imal, then the district engineer will notify tl:a applicant either: (1) That the project does nct qualify fur author zatfon under the NWID and instruct the applicant on tea procedures tie seek authorization cinder an inclMdual pern'.t; (2) that the project is authorized under tl-e NWP subject to the applicant's submission art a mi:iaatior, plan that would r-_duce the adverse affects en the aquatic environment to tie minimal ievel; or (3) that the project is authorized Murder 7e h'r"s'P M:h specific modifications or ccndi ions. tVhera the district Engineer dleterviines that mitigaJon is required to enure no more than minimal adverse --Pacts cccur to the aquatic environment, tie az INity urill to authofed within the 45- dzy PCN period. The authori Mien will include Vie necessary conceptual or specific rrit3gation or a r equirenent that the applicant submit a mitiga?ion plan tha!would reduce the adve.,e elf Cts on tht aquatic environment to the minimal level. V:'ten mitigation is rbl;uired, no work in ti tilers a :he United States may occur untl the disLicf engineer has apnreved a specific mitigation plan, 28. Sing;e anal Complate Project. The activity must be a single and complete project. The sarre NWP cannot be used rnora than once for the same single and comple=-- project Further infor nation 1. Dis;rici Engineers have authoriry to dvermine if an activity corn plies with the terns and condijons zf an NVIVFI. 2. NV,/Ps do nc: obviate 'ihs need to obbin o;hEr federal, state, or local permits, approvals, or author_at;or:s required by law. 3. N1VVPs do not grant any property rights or excilsive privileges. 4. NVVPs do no' authorize any injury to the prcpar*y or rights of others. .,• 5. NVVPs do no: aulhoriza interference with; any existino or p'opos=_d F ewers! pro ect_ Deflnitipn5 Best rnanagernont practices (3;[Ps); Policies, practices, prCx;edures, orst.-uct:res implzmwrlted to mitigate the adverse ervironm-• ntal eifacts on surface walar gcal:ty resuiting from deveiopr'ner:t_ Bta?s are r ateconzed 2s stnjctural or nor.-s:ructurat. ,_ .s .. Comr-ensntory tnitlgc,tlon: Tee restcraUcn, e3121--;ishnnent (cr_3:IC enl",.)moment, orpres2r;-t;oil of eyL'a';L r cu r ces .or the ptirpC C of LG'Ti�i llwiial'� !l tl'. `101i�dt�l? �ij:CfS. iiTl: 7C :'eh:C:l rent' in flv r c-ll ppr-rri7tr Cblc �1?. '..i7r' JI d„ :i':! i'rl ll:'.„' it' G___ Jc• e 1 jL,l,i �f r,�� r,dy $�t ;h, Mae. UsekL,e $S IS of •,dish A;i,il? 1Y13:nt= a.-IG , t)L:I'.O; 0 Ce a v4=d i O C-SSenti ij iegliaC recon SL-Ucjcn. s Dischar Coe: The tern "discharge" means any discharge of dredged or till material. Enha incenant: The nanipulak.-I of the physical, cnemice€. or biological characterstcs cf an aquatic resou'ce to hrytghten, intensify, or improve a spec: is c•.;ivadc-esource function(s). cnhar,•cerient results in the gain of sela,cied aquatic rescu`ce funcaon(s), but may also lead to a decline in other aquatic rescu-ce func:ion(s). Enhancement �r dces not:asult in a gain in aquatic reso'Jrce area. Epheir►cral stre m:.-n ephemeral stream. has flo:':i;:g u'at=— only during, and for a short duration a"ter, precipitation evens in a typical year. Eph_rr:aral stream beds era !,ocated above the ',Water table year-round. GrounOvj-= er is not a soures of water iCr t.ie s i eErn. Runoff ircrn rainfall is the primary source of avatar for strea .nl flow. Esta I-- 11shrnsnt (creation, : The manicula11on o` tha ph.ysicsl, chnimir,al, c•,- ciologi: aA chGrsct=r'stics pre sant to develop an squat c resource :hat did not previously exist at an upland si'•--,a_ Establisnment results in a gain in aquatic resovrca area. Historic Property. Any prshistorc cr histo-ic distict, s::e (inducing archaeolc3ical sta), building, s r rUu'e, or ether object i'tcluded inn, or eligible for inclusion in, the National Reg. -star or Historic Places paint-ilad by tie Secretary of the Interior. This te-n; i^cedes er�ffacts, records, and remains that are ralated to and located within•, ., Such properties. The tern includes properties oftradibonal religious and cultural irrportance to sn Inc:an Iribe or Native l ;awaiian organization and that meet the tlaticral Register critera (3a C-R Part 50). Indespendent utility. A Zest to- determine what constitutes a single and complete project in t<lie Corps regulatory program. A project is ca-isiderd to have independent utili if itwould bz constrxcted absent the construction of c` other proje.s in the project aret ) a. Foins of a mutt -phase project that depend upon otne- phases of the prciect do not have independent uUty. Phases of a project that `uc'.ild be const ucred even !f the other phases v:are not built can d•a considered as separate single and complete projec-ts fxi:h independent utility. I; itermi`_tent stream: An intermittent stream has flowing water during certain tines of the year, F'✓hen ground:=atar ' provides 4tioter for streanlow. During dry periods, intarmittent streams rnzy not have lcv:ing water. Runofr'ro^n rainfall is a supplemental source of water for stream flow. Loss of craters of the United States: Wa'ers of -the United States that are permanently adversely affected by filing, flooding, excavation, or drainage because of ;he rewlated activity. Permanent acverse of ec;s include per,:.anent discharges of dredged or fill material that chance an aquatic aria to dry :irnd. increase fie bottorn elevation of a water -body, or ct:ange the Lisa of a waterbcdy. The acreage of loss of waters of the United States is a threst-;bind measurement of tl,e impact to jurisdictional waters for deteiminirg whether a project may qua ify for s an h:NP: it is not a riet threshold that is calcu!ated eft=-r ccr isidering compensatory mitiaat`cn that ray be used to offset losses of aquatic functions and services, The loss of stream Led nclLdc-S the linear feet of stream tied :hat is `illed or excavated. Waters of the united States temporarily tilled, flooded, excavated, or drained, but restored to pre -construction contours and slevaTOns after const u licin, are nct ind.uded it the mecasuremc-M of lass cf rs of the United States. irrpacts resulting Iron nc:iviJes eligiole for exemptions :ender Se:.ticn 404(fi cf the C'Ean Water Act are not considered w:,en calculating &,e loss of waters of tine United States, M-zin-tic!al wetland: A non -tidal :vedand is a wetland that is not subject to ih= ebb and flow of tidal :eaters. The definition of a wetland can be found at 33 CFR 328.3(b). Non -tidal w. _Hands cortiguous to tidal :raters are loca'ad lancvrard of the high tide iine (_e_, spring high tide line), Open v rater. For purposes of the MAIN, an open -:cater is 3-1y area that it a year `✓rith normal patterns of precipitation has F'✓ater flowing or s andirg above ground tv the •sxten: that zn ordinary high Leaser rr.ark can be .. determined. Agt.adc vega Ction :'? thin the area of Stan ';r.g or flowirig water is E!iJ er -ior.-emarcert, sparse. ar absent. Vegetated sha!la`,as are norsidered to be open waters. Exarplas of "open waters" include revevrs, streams, lakes, and ponds. Ordinary High Water Mark: An crcirarf high water nark is a lira on the shore estut• ;shed by tine flu_:iations of ' water and indicated by physical characlarisfrs, or by cther appra.:Hat; means that consider tI, r c^,ar cteristics ,of the surrounding areas ,see 33 CFR 328.31e)). Perennial stream: A perennial SL'8cm : jS fl0wtrg t, -a:eryear-round curing a Npic_I year. The Water tSb E 15 located above the stream bed for moss of th•_ year. Groundwal,cr s Lhe primary source of water for s;;earn flow. Runoff from rainfatl :s a svpp:sr enlal source of water for stream flat✓. Practicable: Avamtable and capa5fe, os beirg core after i king into ccr isida, ation cast, exis ng technoiogy, and logistics in light of overall project purr4ses• Pre -construction netincation:.A requesl slibmitter! by :he project proponent to the Corps for eenGrm=_tion het a par..ivular activity is a,.Jhor`zed ty ra;ian%vide per -nit. The request may bA a permit app;ics;ion, latter, or sir,ila: MI 9 docunl-srt 11'31:ndudes HiOrin2dc-n Zbout the proposed wcr'.< and its anliripaled an'a' m."Ifrent21 .Tf:c:s, Pra- rl5 bu rcC+.l;f�+� t l II'i: tcrrra ��d c0'id!tl';n.i Of 2 !1 :�,: tti-�!C•r:F,":-�'i7�-:J:'SL:+tit::11U11'tiili:'.-'il:il `ll•.-r t-:i FC'I'�I:.,..::�tif �,Ui.m'LI:Ct 1;; ..-..;.:.1'.•17ci,_ rc.lr.;�'il'14�1�... nc j r�-Jjon iS 1Q7 raq'Jlfed enc th+? prrje:a. f4nvpnRFmwr nt s con iirmajon !hat the 2ctreity is au.)on?ca-; by na�on=• ide p rnit. +=f25�: Vai14n: I !1? raho.'al cf a threat cam, or preverting the decl:Pie of. aquatc rescw-ces by a. � 2srcn :n or near -hose aquatic resources. This term. includes activities commonly associated v.=ith the pmlaction and rna;nlenance cf 2gLjsSc reseurcx,-s tarougin the implementation of appropriate le-oal and physical mechanisms. Preser•,__ion does not result :n a gain, of cquatic resourca area or fu'ncti-ans. R.-e�tiabtishmen:.' Tie rranipufabon of the p'^.ysica% &iemical, or biologicai chsr_c sristics of a si`= wit.'� :he goal of returning natural,`:nistoric functio :s to a former aquatc resburcE. Re-eatablishrient results in r.-l-huilding a former aquatic resou-ca and results in a gain in aquatic resc'ume area. Psha z,ill:ation: The rnanipulafon of tt'•e ri'rysfcal, chamicst, or bieloai:;al characterMcs of a si'-e =r~it`l the co_I or repair-ir.g natUfa1,1his-olc functions to a do-,aded a ua`ic .'C-source. RGI hi;"11i1 t.O l TF3ults in a gain n aquati« � resource function, 7+.lt Goes not result in a gain in aquatic resource, area, Res.s�ratio n: The nanipuladon of the p�ysical, cher_lcal, or biologics] characterstics of =_ site ve!t`t the goal of returning naturallhist0d:; func'iIns Lo a former or degraded aquatic resour-ce. For the purpose of L-acking net gains in ag:.;atic rC-saurce area, resto:elion is divided into two caisgories: Pe-esiabPshment and re;,3bili'ation. Riffle and pool cornplax: Rifle and pool complexes are specal aquatic si`ms under the 404(b)(1) Guib:lines. Riff'e and pool cci'pieyes sometimes chcracier•:=? steep gradient sections of stresrns. Such sLrEz l sectlars are raccgrnizabl- b'y their hydrZutic chsr.cterisGcs. The rapid movement of water over a cow -se subs rLe in ri:l1es r•ssults in a rough few, a turoule,nt surface, and high dissolved ogy+gen levels in the water. Pools are cesper areas asSocia`.ed with r:files. A slower stream velocity, a SLreaming fvm, a smooth surface. and a finer subs`.'atB characteri`e'pools. aipar:_n areas: P.iparian areas ar lands adjacent to streams, lakes, and estuarine -marine shorelines. R:parien areas are i:.rslticnal between !errestrial a;,d aquatic ecosystems, through which surface and subsur`ace hydrology connects waterbodies iAth their adjam-r uplands. P.iparian a: pas provide a variety of ecclogical functions and servic.s and help improve or maintain local w .-r quality. (See general condition 20.) Shellflish seeding: The placement of shellfish seed andior s'ui3;.)1,e substrate to increase shell,.,sh production. Shellfish seed corsists of immature individual sheCfish or individual shellfish attached to shells or shell fragments (i.e., spat cn &,`tell), Suitable substc-`.e may consist c s,hellaVh shells, shell fragments, or other appropriate materials placed into waters for shellfish habitat. Single and comaleta project The term 'single and completa project" is defined at 33 CFR 330.27(i) as the total project proposed or accomplished by one evmeddeveloper or partnersh p or other' also: ation of ownersldel elopers. A single and cornalate project must have independent utility (see der„hiti+on): i=or.'i ear projects, a "single and compiate project" is all crossincs of a single v.a-L8-r of the United Stases (i.e., a single vat rbody) at a specific location. For"li.lezr projects crossing a single waierbody savcral tirnas at separate and d:Sta3t left -ions, e_ctt crossing is considered a single and complete projeck Howt%,er, individual channels in a b-aided stream or river, or individual arms of a large, irreg'u:ariy shaped w-:!Uznd or lake, ctc•. are not s=_pasta v:ata-bodies, and cr: ysiny^s of such features cannot be considered separately. Storrnvvater management: Sto :nwater nan2gemant is the macrianism for controlling siorrnwa_er mirror,' for the purposes of reducing downstream erosion. Water qua, try degradation, and flooding and miticating tie adve-se effec,s of changes in land use on the aquatic envirorment. Stormvvater management iaciRies: Stormwater marager rent facilities era those facilities, inc:uding but not limited to, stormwater r Manion and detention ponds and best manaaerr_ant practices, which retain avatar for a period of time to certrcl runoff ar nor improve tie quality (i.e., by reducing tha concentration cf r!utren s, sediments= dous substances and other pollutants) of stcrrnh2Ler runoff. Strasr n bed: The substrate of the stream channel bet:vesn the ordinary high water marks, The substrate may be bs&ock or iriorgaric particles ttnat range in size from clay to bouiders. Wetlands contigucus to the ;tr_3m bed, but outside cf the ordinaryiigh %'valor marks. are not considered part of tine stream bad. StraSrn channetization: -Frie manipulation of a sirearn's course, condition, ca;-,wity, or locatlo'1 that cakes rncn-a dizn mirU;Tbl interruption of n3rmal stream processes. A channellzed stroam remains a'wate_r cif the tlnired ltatiS. Structure: ?.n ob act tlh2t is arrdn2sd in a defir:its pat_em of organization. Examples of structures inch -de, without limitation, any pier, boat dock, 5oat ramp, wharf, dolohin, weir, boom, brea'�+aeater, bulkhead, rev- timer, = dprap, jetty, artificial is:and. art.;f!cial reef, permanent mooring structure, power transmission line, permanerlly rnoored floaling vesse', piling, aid to nay.gaunn, or any odter marinade obstacle or obstr.jct:on. Tidal wetland: A tidal -.relland is (Le-, %:'aler of the Un-ited States) that is inundated by tidal ',va'ers. Th ? — defin;tions cf a eii_rd a:td tidal waters can be found at 33 CFR 329.3(t:) and 33 CFR 32a,3(f), respectively. Tidal 10 1 1 go aw waters rise aril Iati in 3 predicTible an,r rncasurable rhythrin or cycle rue to t' i � grn-.'Itational "U1I5 of the rincon anc' t'U TiJal n.' rs cnd :'her• '.he Tina and '-'I of tto w3t2r a'---!rface can no long -r be 1)f3CL'.31iy MeaSUre- :n 3 w e;__�i_t-:1-1rlr;t]-t,.i r'i•r- I�i nC:::':.�t:� :! to ..:r ...._.,. .vi,' _..".�" ..�ie�:.,_ 7i:�.;1 •. �'i;_.._.. 5i=, i�,C •'.� r ,��u :h�; =rJ t�l ii j. yy� s.^. tine, :vi:ch �s :iiairi�d �t .i CFF: • 1�.0(,.). vaget=%- d shallows- Vegelatad s;-a'Iows aye special aYJ3iic $i[$s under this 404(b;�t) Guire'.ines. -f ney a. -a areao that ars pen- isn-Intly inu'nc.a ed and Under norrial circurns:=noes lave footed acua[ic vegeta:ion, sue^ �* seegrasses in morale and estu3. ine systems and a variety of vascular rooted plants in f-esh-water sy stars. ula:erbbdy: Fcr purposes of the NIA -Ps, a waterLody i_ a':urisdict onai water of the U-nied St3:es tat, du r� a y ear with normal .atterns of preciaitation,has water flowing or sianding a�cva ground to the exter.t t hat rn ordi-iory high water ; Bd( (i1PI VI'd) or other indicators of Jurisds t:on can ba determined, as well Es =ny !'dalla: d 8r3a (S2;. 33 CFR Js...J( )), if jUr:s..,tCtiGrc we;ard :s adjacent —meaning b.;Qdaring, ContigUCu_, or neigh boring —to a f u..sd cuonal %vaterbody displaying n, Gl ,10,61M or ol.her indicators of Juns:,'k;tion, �-ist .vaterbody and its adi'acert t'+r_ttards are consida:ed mcather as a single aquatic unit {s e 332 C,=F i=::4:r-npl=s of 1.'a:Brbo(fies" ilclu""?e Strearns, rivers, lakes, ,Ion-3, Yr;d vvstlands. UN This i laflon A1,4a p?r f:it:S ciiaciive March 19, 2007, ar d ax-pires on Marca ia. 2012. ~ information a�out the U.S. Amy Co:-)s of Srgineus regulator; program, including natiz .-Vide perm;►s, may also ed I n afi a a a% + [ s be cCC.-ss,. at ht'o:/tire M.S�..i:�.2CE._rrnV.ri II1�l:��J3t.,.�nJlfGn:fc3Ulc Ofvl(nd_:CcSD or h ttD fi tiN:"•'aY.UaaGE.3rfPV-r-1111i�'d/ �C S G/fCa No um so no ww r A .. Ili: Ih:c:::) li ;L:,ctl r'.hit:, G`.ri: :an %•� ?".'• .:.� -rt� F.SS!2 d, fir.-...:sru,:=r i Tr r� C01tiL=LLSIO�.r OZ EPr�'~r?a Cltti���E:�T� ; QUALITY ;"C`?S by Aedi'n'w and rJ: r_.J i:;; F-C-3 ;iic;n i A?ril 26,211,07 I I 1'.Z.. Denise, Skmn U.S. A.r:ry Carps ofEaecrs =nDissict GES WG ?E-P.E P.O. Bo:: 12- 9 GJ. vnton. Tons 77S53-12229 Re,: SR'. C-lsitio-I'A3ePe-11� D=Wis. Star- Tris h-d--r is is iemcut to yoiz Aprt13, 2,307, letu-,.mquest ng Clra.i N ater Act Sectior_ 401 ccrtzf.c Lon of Urittd Sm -ha--y Cc --pa of Egg Fce_-s (Corps) Naticn Wide Pcmaits ;1� ►tiTs). 'De Fir --A Notic: of Reis.-j=ca of Nati=,iids ?Grmits eras publited in the FeA al Reznistar (Pat Il ',Do- 72, N0. 47, cages 11092-11198) cn . •� -March 12, 20107..T.ap3aed =caionz1 ror-d-tions for Iti tiVPs in Texaa were proposed in an Cfctoba 1,1 20L►o cub entice. 1-1z_ T--ma Caramissicn on Qua1-:fif (I'! SQ) hzs nvie-wed t2e ;ring: Nji ce of Rein maze of T,TgtiUau is Iler iL, :nd tat -reposed rea-ional core-Iiom. Oil i:ch:lf of to E:ecLris e L;sector a d based or_ our eyal-m on ni the info,•.-na :an contaiiml in t:3n-"- :oc-jm_rIs, rye TCEQ c:l:i;es tl. he acii;ztes autSori=d by Ir VRs 1, 2, 4, 5, 9, 9, '10, 11, 20, 23, 24, 23, 34, 35, and 4-3should got mm-2t in. 3-&bifion of ma�lisbed i ex=- Siarf _ W a cr Q•.i;aiy SLmdaids ns rzqr�--3 by S--, tru 441 of -dr- Fede-O CL:.ao W' 2:.bct ---.d pu3mat i to Tila 31), T ms Admi=t- ' m C'odv, i :3?ter 279. Tnt TCEQ ccndit'Draady owes a,a he acl"tiz:ics a ±-Dr�,--d'i f !. VVTs 3, 6, 7, 3, •13, 14, 15, 17, 18, ' `, 21, -'2, r 29, 30J ! 1 1 3233J 34`J 37, 3839] !�! -^.A`�� �.7 43ti ar, -"r5o 40 �9 d °id :+�Oi:1Q not result 1P 3 `h 1 J 47 J J ^�l ��al;aliizn cif s-aSii Jeg Turn Sudan TVatar Qualit;i S.-mdards as:=uuc+dby Section-401 of the Feder~t Ctean- %'vat_ A:A snd FmLia,zt to Ti`L 30, Texas A n:nist-ai e Code, Chapter 279. Conditions for -,a.i;-N;V''i are defined LZ T-iulosz e 1 and nira dotal ens _ , sta• - i p_.,tn� ccrl�to�ts �� discLs� .. belo��v Tnc TCrQ lraerSt3. - that a p,rorlbitim against me,'?=C 6r N�'tTP5 IP CC83t31 ULa1-° S,vrles tr?t1 Ce III�IU�C�u_ �,° rd 2007 T=as Rv ona1 Condi:ic:is 4Pegioral Conditions) for cert2m Mv-Ps eorsist=± iSiffi tae 2302 Terns 1<egioaal con3 t oaa. of a prore3ition of usi g N ryTs in ccgs:al d!y-le s-valcs is a co:]dt5os of d-vs 401 TCEQ cz-,t'..-1L'c177zz,L T - pro b'_ticia of sici:x 3tb- of ma-ri;'s vi!.°.s Tr,rcvCd from 2-IM-P 171 it Jit -2VO/ J, ,!! Noven be,: 28, 20,05 TC1:Q =c=er_i :ct cr to `h-. Cons rcg reing i is R_ *ona Conditims for'N,;T 41, trc }' TGE-Q r::qucste.d t::Y pro}:_t•Jur_ ?.£c[TISt tb!! p=-ma_Cr:t s!Cle=3ting a. excv=iQ into "+r1c�.� of the 1 t. - i. k{ P.O."lox 13Ct37 ° A=tini,7Ei:Zs737'-1-3Q1? ° 112-Z39-1000 4lnt`arr:Ct21Ci?.S:N•H:9.tL��.si�t[:X:� 1s. D-- nisi S10- i --prL' 26, 200 i 'J.S. ,,c iZG1 G! a5 a regional co -=Eon. Tic TCEQ rccer m-minded .hat _f tie sid-cr-- `.:!$ fexa*libircn is r:: t irc'uded i.n'l:_ R.Z' nal Cor_ditioos, &t L, a 1•�-t car. e amcure of ,.z-�r�s o ib.: US. !hat :_n be impac`--A by -ac stdFc t!=!g, an3 �r-qlv= cent for t mt g�Cr_ o_ hJse izr�C`a os u.cl lded as a ree -cm-al con- �io .. Is d-.- cwpp chocm to :m'Jt ;nc1uac a pr ortbibun aga:ast sm� cpss" rla7;= roc ial ? 1 me Regional r -C:dons, i1-- TClr�� conCiticnal o= ri;'? 41 is tat foc arca :TC"mated by Inn s-,d=astiaa shouE not ==cd 3 acre3 or 1500 li:c fset For cc calc::O;z-6mL -L;.e thresl.old ore acre of irrliaet is con-idercd ccr-ml to 5CO iincar f.-:.: Ilic7usian arm L rShib?um =i n`t th3 ncrt ij_',a rig o: that impacts r mol-- then I ac.:a or 1� 00 lrl a feet �acL> h 4A'? 41 :--,,a con;:Etion of tuffs 401 T�M Q cmrfifkation. Ln h: h'b:=m cr 2'S, ?GGS TCEY cau m-e le sr io the Carps- rep rding the R.crion3l Cou-ittons for NWP 46 ,pmviousl 1 '? pi, tia� Q rmq!.-, t a rzgior:I ea�d an =ar ItiT,,T 46 it�.ar ee,-�s zz Lpper EuL ern great-: tL- 1,501 li,i:a= f`4t ++ crosiaa of a Emit rip geai=. 1,an. 1,500 linear fev: u-,der `r.,VP 'S i; a ai:-aaa ofth s AOI TCEQ=dficatior. TCEQ warms to .,Iarfy 5c application of 11 iNT 16 � Tee. NVY i6 =bald be &I cd to flee ret mm ;=.ra.er from uulmd contained. dredged al dis..,osal arms. It is ;rmortamt to emp-=i--- the intent for d_-�_d?ged' rar-.-m-rizal dmposal. 116 TCEQ und.. s diedged � teal m be associ�`� 1=,H r:�ipforal dr-�d& :ctici�m; not c=,,,-:cia1m�imir:g activities. To avoid ron5nion the TCEQ rz-qff uezts tia red c,al cd nditim bm acded that oW fris the use of IN`ibT 16 for azti- ics that would be reg ated -,mckr Stmda_•d Indl:a-:1 Clamcanon (BIC)coal ' �d l ; -6 ( dustrial and cmstrt acz sand and gmv:1 rdin-g5- • This G3aiitioz As also included ss oat C5L t;Re 401 cmt f i mtim ofN N—P 16. TI-c -al YW" 16 st-tes th; f thz quaity of tom. relax eater s conticlici by fee state ihmLghL 1i,- 401 = etzicazHm prortd=s. ConsiEtznt wfih pre rwus N7JiTs ce-t-fcadon. decisions the TCEQ 'is eo=tian._l c if}icg h` 16 for to zetr= .•� iron conmsd LTI rd disposal act fo �;we3 a 3G4 szZ Tue? Susper_dol Sa>i::s 1I'SS) ccr.�c---YL-ation —d re?!st 7LIAe Ccr_ps to inclu&, Ous cmi dhicn is the : Tonal Ccacisor s. Tne TCi✓Q rc� oam -ems ife usefulness of hav`. --g z, inst�-.eous ere hod to c'mtd'a-, me eomplismr +wife+ r}e 300 mtT- TS-S NmE awa-per, exl:� ,ng ite'at-.urc and =01ysis of pained sam ies of t=biftj andTSS from ih.� Texas Sur:::_-- WE= Quality Dam indicate iris r..lationship gnus: be a si'w--P=E.c cl;i?racta irytioa of the actcal scdbnmi; to be di-: deed. To addmss this approach we have included zeuw im?aaae i-i f'ne I� ►VT 16 conditio21 cc-Ucafaon that a`•;ows r1embliy .o use an i.st-mb:meous rnetrod in :rap'.=ergo the TSS !irri: :vhea a site spcc6c cal -elution c=-e for _r- idity Chcp loruetric t=bidiiy =s (%`ILA) vcrs s !SS, has b:�n approved by TGQ. Toe TCEQ remzizs i it=ester -in >r4r: 'its' vmh rbe Corps in. C7e drueloprr t of thv%� Zy e mcow~aze time Corps To a-x�.t the conditi-+ sl ce tin: alien of i�'� 16 as P.wg-io:,� Condition and t t )� , ivmk to;eCher to -find the bast r: e_.-,ads to im- ple-ne--t .hs lilni:. i ev:-JUa- iL; t:'tis caadiaon for the Rc: ,maj Conditions or \'r:'Ps 21e TCEQ encourages Cie Corps to consicr:r tat TSS ErEts are prornulg" ^.:, cslucnt 1.=l s =d= Title 40 of the Code of Federal Rzg.La4iczs. -c TCEQ r. quir-'neat to con_ al rztum wmr iota corned Z.Tiand disposal -not to excmd a 300 mg-,;; TSS 1-.!L.- ais-n 'b=n ita_lud.3 in i- diM!.m ^� 1= pa'mits. It is ��o intro:ant to note fmat :; - TCEQ eff c4)•e'y imnosas �' mw US ACE I Fa:i a:lvids rc r✓ Page 3 Ar:il''6, 2007 'TaS c:nacnt 1rm4ts i7 ,,.cep , 33 of �.i`u"Ctiif9T� 6sch3rgt pC-nzz iisa,:.' L Tcu. s undc: JeCrycn 4-021 of tEe fedend C11. can. TWA r AcL UO Tie TCEQ :5 r-G-dit_mT -, ly Ccrd:N-mp 1\�T' t ;�.'.^.e,.3i Condition. 412 Sbfi Frosion r''"ia1 SedLfi v Coro oZ;, a d Gcn:ral Can; tion #11 W--,--r Ou324). 1Le conditions addrem urce wC,,3 c: tego.-im a= ;Suter :7ua.ily =wgw-nezt v,i:b Spwiic : c o _en; Win; fx 2e.st Managerxnt?raciic:z tI.?;tTs) for eae_ ategur _ T:=-. i;hLPs arJ into d zd :o call,sce !he v,ater craiity Fioi2:Yaon cf ]L.:se rer,er.? Cenditiccs. A ;isr cf TCEQ- reu�rza: aced BNTis iielu,3ed a; Enc1•oaU , 2. ^mloszc 3 is e6--cd a: a quick refcmnc- for a!! N'?Ts. A do tz-.ilcJ &-scriotior. a1 d,-. Blv - is im-c-vided T_ � rA 4, i'.i` n a� n nr -, .., _ � ,�.i„ frcr grid,_ d_c'.� nr., be_n .emtt..� ;n:D theregru='--L7ent f_rpas: c :I3tn 'iun solids (TSS) contrc:s umder G_nc.a1 Condition 21. As stayd in oL-r April 3,10071e1�to thz Cops, -Q world Ii^-c to �cladc t+'�r;� BI'��s o: s� arDfcc`:en m %�-ztvr; in 5l:tL sp=inc t0 ea;u Nt'.T a par` of tier a or.�1 conditio._s fc T exms. Tat T C--�Q --a- con-iWo-n iy c_mf+ in, Ny,,,Ts 13, ??, 39, 40, 41, �'?, 43 to r_qui_c. It Ccn: to co.•y TCEQ can all ."Tittcn Fppra-V Is of Tvlivtm fa_ i=pa= b--phame. ', in±e7ni�:cn or percm--al stem. Tlie TCEQ is condit-maIly :-r Lung 1`�'�'? 36 to recui:c tL•c Cons to copy TCEQ on ati n-ft-M Waivers for dix,b r;n Urcunr flian 6z 50 crisis yzd limit o- boat :-,.antis !zr=te: tr.:n 20 fee: in v Add = nc TCEQ is ahm conditionally "' c .-tif}�1; Ge_r=l Conrancn 20 Iz mgii-e i�c Cos o copy TCEQ on a•-y vm:ten nonfica nom of a natimitiaa ;va vcr. :-i addirio , TCEQ nr_3erss tt2t a region al condition wil tie added *"mat :cg'.±es =iacaticn for sn-an s and specia_� acuaac sites, SUC13 2; noolskiffics, scams=, aad .Ludes sty That �11 xdect=tcly conpessale for their and v alta. Tlz T`-EQ is rc.q`. st n g uis mfcm-1-aon to f=- its rtspaosibiii:v to cask water of din sate is apprnpriatcly pro e. t:d *:Yy und=.tmdmg taz irmact of Ava v s bating wanted in T -:; =—dficadcr. c_c>sion is Rni:c9 to toe activ tics under f-hr- ' _=isdictica 3f c TCEQ. For act hi es ,--latcd m kie pod=aon z,*-,a =plo atioa of o1 and g2s a Teas" PZroa-d -=-td-9cz6cw. is mquir:d a+ �. pro -tided in a e Texas ti,r_te_ Code s26:131. Tat: TCEQ -%as rrvi;A"! 6 Notice of P.eisEuan-- of Xatoa-Mdc Pea i fir cnnsi3-Ency tivi a the aoals an po ici=S 0 d= T=mas Ccast:-I M' .mago-m ni Program in ar,cordan0t: 4Y:-Ih 6c TCg1Iatifllas of"I'm Coas a, Coo. ri.mtior. Crlmcil, 31 MC 505.30, and has det _-n --m-1 chat Ore actioa is cons"irimi wi b lrc app jcabl-- j CI IT goals and: This :w'ii7Yat oa "vas rerdewad fo- cor:z:atcncy ,,v_+L- t'.-:e l lt1P's development in critic:d ar s pos4y (31 TkC Ow §5C1.14(a;) and a'ed;i:,; and material c'osal and nlac.L. e_a_ poli`q (31 TAC §501,14�j). T,:s eriicarar e$ 7 n ct�rn_ 1i" :thse CIv1P Ba's (31 T.PC , ,1ppiicabiv to =se poL ies. he r scr.-cs the ri a: is ma it fqi-- ..crtificatioa aeltio „ d'.. fi meci --a as I L TCEQ � 3 ' d =y � if n:.: iVfol-m_.ioa � Vn feS .1 Sc ss v,h 5:{S]L1G1P::Rlx^li, 171C1uG!n-- c-im. l.a` vc or Eccorl.--y 1=c' z's, 7.- QC':L]SL�, i:I d C7= use o; Ch--s!!, i '.3'ou1C be r"1p. r -pn= IAW i i r j ?��is. i�ri113E Sl,�an . T � ~..till �: (_ ^(l;."a ..: 1-'ln: �•� • fj y<,CE 1's cr.�:, i��c Yia.Y:iu; Lai' 4 m� April 261 2C,) 7 No mview of proa=.rty :, lcca_oa of pr:. c.t}•• lino, Zor I-- cis!imcrioa -c 2itzn publii m' pi vs e ounersnip #.s b_ n ma^ , a d this --=tL2 a'd,,a may n6t bt w-�d in ;may way with tag:-d to qucstt.is of Q i•�r!rrsL'lp. - rf you rc ;circ fi-En s<sistm-, alcase ContactLa 1lami'.bn, NVatcr Quzlity Assn tct SYc-o_., ►Wafer + L-j-L:y Di:vsion fI<<C-15+1), at (512) 239-105S3. Sir,caely, ' j,�'atx �saL=ty D? ,p Sian • Texas Cor,� -.-Aou en Eavimmsn*al .-Qu?Li t Ea: loaztS. c s: U.S.Ammy-Cans cf EaBn=s SoCti:��t�Ditikion - A1i1: lvfs. Vicki Db= 1100 Co=, =Cc Si:eet Dallas. T�,.as 75242-02 i 6 U-S. ',ray Corps ofFmx1 n-=:s P.cguiatxy LBncll CESVa IF -OD 2, S ii71, ilyi. Wayne Lm P.O. -Rxc 17330 FQt-Warth, Tty.-S ;6102-0 00 U_S. 4._-*-iy Corps of EL�Ie` -s ATTN-: Rep ?ato~f SYction 1643 Scudi l0I East kveaut Tul.ml Oldahma 7=:123--".609 TJ.S..A-my Corps 0:Ein=3 Albuauc--que DLquic 101 Jearsaz Pl , , ? Ibuq�_ergee, :yeti; c,1co 3 (1109 VIA rJ m CcLdi'_:i?ns o_'Stciicli Tj�jl Cer��llcatot] for ide =e -nits az, &-neral Con io-s GenerJ Condi'.irm 12 fSoil Erosic,'1 and S:ririen_ Controls) Erosion c- f._ol :.nd sed -nent contr:l ylVlps 6escribed in Attachmlrt I are required with the Le of its c nar:1 cond3 ion. If the ap-+licar;t does not choose one of :he EMPS lisled =Z=riackrced.,iaq .. General Conditiop. 2 - ii7,1atsr Ouali:.) .s - ?cs :ars+uction total mispendtl d so, -ids (TSS) Eh-Dis describes in r=-twhment 1 ace r-q,Jlred =:,nth file use of this general comEition. If he applicant does not choo3e one of !bAz 3's listed in fi ttachm- ant 1, an individmal 1-01 ccnL7cation is Teq%dred. Eridga dock ex---.upf .mom tllus Teq'?irL-mmt; Gera:j Condiiiun 20 aw IvE a on -rill be rerriLrd for strea.-m aad s eei:1 ap:=tic sites, such as poeisr``iiles, sea;rass, �d mudlats, that N,,7].1. adecruately compensate for tbe:t r ench- s and S�alucs ::,-Less fae Co -Ts provides a rio ect,me z. The F )?' l cc ��,..iv, r of ``ris rzgi_irent. h„ U.S. Army Corps ofEn&em v.U. copy the TCEQ or, all mitiz4- on waivers sent to app Ucants. NI 'VV?s 13, 29. 9. 40.41. /-2. 43 The U.S. Amy corps of Endears t;r_'1 vapy the TCEQ oa all ;writtan kaproval3 of +•� waivers for impacts to ephemeral, interm_tteat or perarnial streams. 1V,Rs 7. 12, 14. 35. 17. 18. 19.' 2. 25. 29, 30. 31. 32. 33. 36. 37. 39. --w, 41.42. 4-30, 44, i lies- _, 7Ps are not authorised for use in coastal dine s-t*ales in Texas. ar . '%TW-P 3 ("A-Isirtsna-,-cn So:-' Erosion and Sedim.eat Contrcls iimder General Condition 12 are required.. NVYP 6 iSur ev:'act;lv tie:s� .n Soil Brbsi= iud Sedmnen t Contro_s under General Condition 12 are required_ \.�?,'p 7 i Outtall St:tctixes and �socia ed :nt_ce SLrjr- u-as1 .. Soil F osion and Sedi_mmiit Cor_1rcls untie_ Genre) ConLtiicn 12 :r:, required .. ■. 4w m ,T IN? ^ -- 1=4_f.�-il.t;neAriit1;rics'; Sort Emsioi7, and Sedi_imt Controls under GmeIall Conditm 12 bra re-TaLr:d. constnict:on TES contralti under Gere.J Condition 21 Te regair:d.. NIVP 13 (E -.n S to itizatlon) Soil Erosion and Sceira t Ccntr::ls »nftr Ge:zeta] Condition 12 aie requ red. 14 -A7P 14 (' gear Tra-mr- rrt Lion Pro!-cu) SoilEros'_on and S :dimes: Coatt-e1s mde: General Condition 12 are required. Post- constniction TSS controls t nd Y= G-Meml Condo on 21 a_ $ requircd. '1TP 15 (U. S. Cc, ast Guzd Aunroved �: da.5i Soil Erosion and S-:diment Cant, oL atdc_ General Condition 12 are _agvired. NI M? 16 G3 R-turs Wad--, From Upland Contained Di5aosal Awns) Actnities that would be regulated under Standard IndesLial C.ass�fication (SIC) -codes 1442 and 1446 Cind-untrie and usnstraction laud acd -a-m' mining are not eli=iple for thys MR. Ef_rluent irom -an ualand ccnta•med. disposal area sha'l not exceed a TSS con=u2bo:i of 300 moll. unless a. 3iLe-specific, TSS lima, or a Sit: 5p —c co=elation cum for turbicity (nerhelomctdc rr: aidity it di; (VITj} i* Te-sus (iSS ) has been approved by TCEQ. 7` IWIP 17 (F-Wro¢o wer Proiects) Soil Erosion ai.el Std mart Controls under Co: dition 12 are requreci Post- e nstruction TSS controb- rmder Gm.--ral C ondi:ion 21 are required. 1\NvP 18 rAf hior Dis-chcanie s) S it Erosion and Sedtmeet Gmtsols under G neral Condit+an 12 are mquiml Pcsf c:�rsiracLon TSS con c•is pincer General Cony tio-a 21 ara required N\Iv P 19 ( inor Dmdeina) Soil.Erosion and Sedi_-mcnt Controls ucde; Gea:ral Condition 12 are required. NNVP 21 ('Sur_ac'0oarat'►_rr,$) So11 Erosion -and Scd�_3mt Con:rob ur)4cr Ccner;l Condon L'• arc rcgtdred. Poat- constnicsoa TSS oontro!B under General Condition 21 are required. ow w Ci Lc4�:un zna S�aia,rnc C��:_[Lrr1=:cur Li�i:..rc.i Coi_•ai:ion l- are _�qv:e_. N7+z? ?5 (St?ctural isc?�ara�sl Soil E,-osion and Srdiir_cst Controls a der Gcn oral Condition 12 arc T--TIr d. N W'? 27 (A-aulaticHabi4t R!--3tora:ion. Estabiis'i ent znd Enhan_ ^ent 11cti �iresl .. Soil Erosion �qnd SeLimez_ Coatzols uLd-Ir Gmcral Condition 12 -L-,t r:.qul-:td. lITVv? 29 De elomr,ents) Soil Erosion and Sr--dimunt Controls under Gtsenil Cnndi ion 12 ar-. n: cuired. Post- cors rrcricn T-SS controls under G :neral Condit on 21 --mc rcq lire3. N V? 30 (viols` SCL fx —RdHfe) ` Soil Erosion and Sedil:ert Consols under Geaeral Canditi:on 12 arc --zq rid, N -r? 31 C344tinten `•ca of ixistina Fiobd CoLtrol raciEticsl Sod scsian 'aad Sediment Controls under General Condition 12 , ra reqi red. Post- con-tu.ction TSS aVn= ois under General Cone: on 21 s*z required. INMT 32 Xom:)Iete l Enforcement Actions) Soil Erosion and Se6irrcnt Controls uneer Gene: al Condition 12 are NW? 33 (Tem. no-LN Cornstruct-io::. A=t:ss and Dewattrn?) Soil Erosion and Seamen: Controls rzdcr Gcn�-ral Condition 12 are required. N-T,-P 35 Port -3-a-n-3sl The U.S. A=- y Corps of E.ngi ace_s :.ill copy the TCEQ on all wr_ttm for discharzes e-:eatar Oham the 50 cu�dc ;-.;rd Iiitit or boat ramps d ea er than 20 feet :y Width. 'Soil E_aslon and Sedirnent Controls under Ganvral Condition 12 are raqt�red. Post-coamz;tion TSS cc-�t a?s u;:der Graeral Cor_dit=on 21 `re required.. ., ti )VP 3; Cr !zgencvWatershe i ?rrttection and Rehabilitation) Soil Erosion and Sediment Cootrc's u.udfz General Condition 12. are requr_-:.d No nt as .-mloim :dr'Ci T(.1__��v.,%iT,st0 ScL Lrnsirm �11 Sc.dim4r�t CcL'-ols � �d�r Cenral Condibon 12 a•e rtg1jJrea N' ,rP ?; (Corpmercial and Insiitur;-mal Dc� alovm.er_ts) Soil Erc.son ar_d Contr iz rider General Cond_tionn 12 are requsm-d. Pos`- cLmstm_-: n TSS controls t_.-tder General Condition 21 are regvsed. Nr 7P 40 rkrv1_ti:ral Aziri e,l Soil Erosion and Sediment Controls un•3er General Condition 12 a;e _equke3. L'ost- mr.•smaction TSS =L=ais under G'..neral Condition 21 aze rcgirr-d. f i 4 VP 41 (Rnhav_nt? FxistirlF D-a �aza +7itches`? Tze ��ea Lmpe:.red by the siceeasting should net e:�cced 3 acres or l �0 ling 'eet. FJ.' pupeses of cal:.rlating the threshold_ one acre of impact is considtzed ecuzzl to frC141*z= f et of impact. Soil Erosion a -ad Sediment Ca troll tm :er GeTz!_al. Condition 12 am reauimL Past-comtrucdmn TSS conz.o3s wider General Concision 21 a-e requred. I N-Vv'2 42 (Recreational Facilities) Soil Erosion and aed;ment Controls under General Conk Eon 12 are Post- corstruction TSS consols under General CondiTiou 21 are-couinspi MT 43. (Storrt�vvatb- VI�:3r-e-�ent Fac=Liiesl Soil Erosion sand Sediracni Controls Ll dcr General Cenmtion 12 a_e regnir ed. i - NeT 44 (?,1i==2 j Gtivities l ion' Erosion and Selimtat Conuols t dcr Gmer=1 Condition 12 arc required- Post - co m-sucdan TS3 controls under Grne:al Condition 21 are required. h'NVP L•: Reaa_r o; Gv'ands DamaEed bit �ris� ete Events) ..,. Soil Erasion and Sediment Controls under General Co:iddtion 12 are requ r-ad. Post - construction TSS eont:-ois under Ger_cral Condition 21 are rzTiired. ± S I *'? 47 L Ditchts) S The area imacted by dischaTses ii1 d:tcl=es should no. exceed 15'00 Lin -car :t. Soil Erosion and Sudirneat Cont_013 uuc'er Genc-ral a-2--d.ition 12 are zequired. r TOA? 47 Tir+::line Safet-r ;-::^T.am D- atd 1,'r {'. t'rl:lt::'e 7-lSii��t1Cn5 a:;1 'cf l_'iinI Soil I :r[ zicir, a�.: Si dire rlt Corutro'. ; ' ndi G i:'�ral Concii em 1 _ ZcUiril ed. .. \�W 49 (Coal ?ezininz zcusities', Soil Emsic.n and Sediment Gm cls under 0--nu=1 'Cor-AiJon 12 ara recaired- Pas:- .+ const_actio:i TSS con ols under General Condition 21 arc rNuired. ;, VVP SLR r�Undcrzroutld Coal Nfmne Actirniml .. Scil Emsica aLd Sedinnnt Cont.-Is >sder General Condition 12 are re4 ?ised. Post- const:-a-d'o - i SS controls trod' Omer.. CcL&t;cn 21 2:e r tbuired. Aw vow Table 1 Reference to Nationwide Permits Best :MIaaageruent Praci-:lces Requiren2ents .. NrV P Per_nitDcsciiption Erosion Control Sed4mentControl Post Construction TES 1 Aids to'avigation 2 Stnrct ucs in Artificial Cawls 3 MAr-t=ancc x x r 4 Fish and +VV-R lif Fan -!)sting. En1;,^.acer,-ient and A=Zction Deices and Activities Sci=tinc Devices G Survey Acdvitics x x .. 7 OLt AU-04uctures and'Assoclatnd x x TI1ta1CG �tI71CL`IItS ,., 8 Oil znd Gas Stracnrres on tae Outer Con;intntz! Shtif 9 Stiucmres inFieeting and Anchorage .. } Arras 10 Mocmg Buoys wi 11 ! extporary Re=-.ational Structmes 112 Utility Line Activities x x r 13 Bank Stab li: a -don x x 14 - • Linear Transportation Projects X X io is U.S. Coast Guard Appi-md Brides x x 16 Ret am Water From Upland Conta ncd Disposal Areas �r x x 17 Hydropower Projects is Minor Discharges x x OW x s: 19 ?Minor Diedgina 20 Oil Spill Cleanup x x 21 Su:face Cca111imL—g Operations 2-7 Reno v al of Vessc3s x x _ 23 Approved Categorical Exclusions &avis:d April 2. 2007 s Pagc 1 c: 3 Table 1 Reference to Natieww'de Permits 73cst ReRtiiremenr�s 14WP Permit Description Erosion Control Sediment Con_ol Post Constmctiou TSS 24 indim Tribe or State Administered Section 404 Programs 25 S=tural Discharges x X 26 [Reserved] 27 Agaatic Haft Restoration, X X EsiabL hrrient, and Eah3ricernerit Acti Mies 23 Modifcatious of Existing Marinas 29 ResideatiElDevelopments x _.. _.. x X 30 Moist Soil Manzgement for WR(nife X x 31 Maintenance ofExistinta7ood X X X Control Faci:ities 32 Cor=lctedE fbr=meat Actions 33 Temporary Const<ection, Access and Y X - Dewater-Ing 34 Cnznber yProduciion Ac&rides 35 MaiML--Ma a Dredging of Basins 1'36 Boat Ramps x x X 37 Emm—gicncy Wrtwshed Protection and x _. X , F babili ation 33 Cleanup ofHazardous and Toxic Jrrxstc - 39 Co mmercial Institutional x x , X Developments 40 A.gncul to al ActiviLes X X X _ M-14 4i Reshaping Existing Drainage Ditrh:s x X x 43. Re tional Facihties X X X 43 Stormwates Managt.:r�t Faczitics. X x - 44 I M_in:ng A cdtiities j R.cvis:d April 2, 2=7 Paoe 2 of 3 i - aw Table 1 Reference to Nationwide Permjt3 Best ManageacrA Practices Requirements N If? permit Description Exosion Contol StQiment Control Post Construction TSS 45 R�,-air of Uplands Damaged by x X x Discrete Evenrs , 46 I Discharges in Ditches x x 47 Pipeline Safety program Designated x x Time Sensitivt Lmedions aad ' •• R.enzi;s 49 E) sting C=racmial ShcM? n Agoa=11ture Activities + 49 Coal iteminin Activiti.s x x x 50 I Underground Coal l+Iining Aciviiies x x x Ow y go Revised Ap.ii 2, 20- V Pa,_ 3 o[ 3 f. f. Enclo me 4 9w Of B`iv-s LL IV EROSION CONTROL BMPs Temr)orary Vegetation Description: Vegetation can be used as a tarnporaryor permanent stabilization technique for areas disturbed by construction. Vegetation effectively reduces erosion in s%kales, stockpiles, berms, mild medium slopes, and along roadways. Other tachniquas such as rutting, mulches, and grading may be required to assist in the establishment of vegetation. Materials: The type cf temporary vegetation used on a site is a "unction of the season and the availability of wa`er for irrigation. Temporay vegetation should be selected appropriate!yforthe area. • County agricultural extension agents area good source for suggastiom ,orternporary vegetation. -• All seed should be high quality, U.S.-Dapt. of Agriculture certified seed. Installation: • Grading must be completed prior to seeding. • Slopes should be minimized. • Erosion control structures should be installed. -- * Seedbeds should be Well pulverized, loose, and uniform. Fertilizers should be applied at appropriate rates. • Seeding rates shculd be applied as recommended by the county agricultural extension agent. • The seed should be applied uniformly. • Steep slopes should be -covered with appropriate soil stabilization matting. Blankets and Nlattinq Description: Blankets and rnat-ang material can be used as an aid to control erosion on critical. sites during the estabiishmen't period of protecthre vegetation. The -nost common uses are in channels, interceptor swales, diversicn dfkes, short, steep slopes; and on tidal or stream flanks. ,1 1tev1=d Apnl 2. 2CM Pagc i of 32 aw Materials: New typeas of blankets and matting materials are continuously being developer+. The Texas DQparsnent of Transportation (TY00 T) has de lned the critical performance factors for.these types of products and has established minimum performanca standards which must be met for any product seeking to be approved for usa within any of TxDOT's construction or maintenance activities. T ha product; that have been approded by TxDO T are also appropriate for general construction site stabili-ation. i x70T maiitains a web site . at hti'p:l/%%m%v.dotstate.tx.usiinsdtdotlorrcharUcmd/enosion/cont=-nts,l,ttm which is updated as new products are evaluated. Installatioh: • Install in accordance v.71 the manufacturer's reco:nmenda3ons. • Proper anchoring of the material. ' ■ Prepare a friable seed bed relatively free frori clods and rocks and any for ign material. • Fertilize and ssed in accordance with seeding or other type of planting plan. • Erosion stops should extend beyond the c ;annel liner to full design cross-section of the channel. - • A uniform trench perpendicular to line of flow maybe dug with a spade or a necnanicai tran char. . Erosion stops should be deep enough to penetrate solid mazrial or below level of ruling in sandy soils. • Erasion stop mats should be wide enough to allow turnover at bottom of trench for stapling, while maintaining the top edge flush vrith chanral suffa•ce. Mulch Description: Mulching is the process of applying a material o the exposed soil surface to protect it from erosive forces and to conserve soil moisture until plants can become established. When seeding critical sites, Sites with adverse soil conditions or seeding on other than optimum seeding dates, mulch material should be applied immediately after seeding. Seeding during optimum seeding dates and with favorable soils and site conditions Adil not need to be mulched. Materials: • Mulch may be sm-all grain straw which should be applied uniformly. • On slopes 15 percent or greater, a- binding chemical' must be applied to the surace. • Wood fiber or paper -fiber mulch may be applied by hydroseeding. • Mulch. neitings may be used. • Wood chips may be used where appropriate. Rov.7Sa Aar.12,2C01 PaaZ 2 of 32 C. .. � l:'.�iallltsoil: Mulch anchoring should be accomplished immediately ester mulch placement_ This may be done by one of the following mett-�ods: peg ar.d t.t�7ne, mulch netting, rnufch anchoring tool, or liquid mulch birders. Sod Description: Sod is appropriate fordisturhed areas which require immediatevegetative covers, or whar' sodding is preferred to other means of grass establishment. l-ocations particularly suited to stabilization with. sod are waterways caryinc intermittent flow, areas. around drop inlets or in grassed swaies, and residential or corrmercial,lawns where quick use or aesthetics are iactprs. Sod is composed of living plants and those plants must receNe adequate care in order to provide vegetative stabilizaticn on a disturbed area. Materials: • Sod should be machine cut at a uniform soil thickness. r • Pikes of sod should be cut to the supplier's standard width and I9ngth. Tom or unaven pads are not accepL.ble. • Sec:tipns of sod should be strong enough to support their own weight and retain their slze and _ shape when.suspended from a firm grasp. • Sod should be harvested, delivered, and installed wi4 iin a period of 35 hours. Installation: • Areas to be sodded should be brought to final grade. • i he surface s5ould be cleared of atf trash and debris. • Fe-tii'ize according to soil tests. • FQ.rtifzer should be worked into the soil _ + Sod should not: be cut or laid in excessively wet or dryweather. • Sod should not be laid on soil surfaces that are frozen. .. • During periods of high temperature, the soil should be lightly irrigated. • The first roves of sod should be laid in a straight line with subsequent rows placed parallel to and buffing tightly against Bach other. • Lateral joints should he staggered to promote more uniform growth and strength. �• • Wherever erosion m2y be a problem, sod should be laid with staggered joints and secured. Rcvi cd Api ii 2. 2007 Page 3 of 32 • Sod shculd be installed with the length perpendicular to ahe slope (on the contour). Sod should be rolled cr.tarnped. • Sod should be irrigated to a suNcient depth. • Watering should be performed as often as necessary to maint in soil moisture. • 7 he ;first movdrig should not be attempted until the sod is firrily rooted_* • Not more than one third of the grass leaf should be removed at any one Gutting. Interceptor Swale Interceptor swalas are used to shorten the la�gth of exposed slope by intercepting runoff, prevent off=site runoff from entering'the disturbed area. and prevent sediment -laden runoff from leaving a disturbed site. They may have a v-shape or be trapezoidal vdtn z flat bottom and side slopes of 3:1 �- or flatter. i hs outflow from a swale s1-iould be' directed to a stabilized autiet or sediment trapping device. The swabs should remain in place until the disturbed area is permanently stabilized. Materials: • Stabilization should consist of a layer of crushed sbne three inches thick, riprap or high velocity erosion control mats. • Stone stabilizaton should be used when grades exceed 2% or velocities exceed 6 feet per second. - Stabilization should extend across the bcttorn of the swale and up bcLh sides of fine channel to, a ninimurt height of truce inches abrve the design water surface elevation based on a 2-year, 24- hour storm. Installation: CJ • An interceptor swals should be Installed across exposed slopes during construction and should intercept no more than S acres of rinon. • All earth remeyed and not needed in construction shoi:ld be disposed of in an approved spoils site so that it v.411 no interfere with the functioning of the swale or contribute to siltation in other areas of the site. • All tress, brush, stumps, obstructions and other rnstarial should be removed and disposed o; so as not to interfere.with the proper functioning of the swale. • Swales should have a maximum depth of 1.5 feetwith side slopes of 3:1 or. fiatter. Swales should have positive drainage for the en`ira length to an outlet. • When the slope exceeds 2 pament, or velocl:ies exceed 6 feet per seco:,d (regardl?.ss of slope), stabilization is required. Stabilization should be crushed stone placed in a layer of at least3 in67es thick or may be high velocity arosion contras matting. Check dams arc also recommended to 2cviscd Apra 2. 2,007 :'mac 4 of 32 Mri dUC�; vo:D:;i.Ls 4i ilia 15-%vales Fossaniv rcducnill me arno'unt o� .L..cl:illir•a:101 r.ece-,iS-airy. • i-Ainimum compaction far the swale should be 90°o standard proctor density. '" Diversion Dikes A temporary diversion dike is a barrier created by the placement of an earUien embankment to .. reroute the flow of runol-T to an erosion control device or awayfron an open, easily erodible area. A diversion dike in`ercepts runoff from small upland areas and diverts it awayfrom exposed slopes to a stsbilizAd outle4 such as a rock berm, sandbag berm, orstone outlet structure. These centrals can be used cn the perirne:ar of the site to prevent runoff from entering the construction. area. Dikes are generally used for the duration of construction to intercept and reroute runcF,, from disturbed areas to- prevent excessive erosicri until permanent drainage features are installed andfor slope-$ are stabilized. Materials: - Stone stabili ration (required for velocities in excess of 6 fps) should consist of riprap placed in a layer at least 3 inches thick and should extend a minimum height of 3 inLhes above the design water surface up the existing slope and to upstream'ace of the dike. •• • Geotextile fabric should be a non -woven polypropylene fabric designed specifically for use as a soil filtration media ti:•ith an approximate weight of 6 oJyd�, a Mullen burst raiing of ►4a psi, and haAng an equivalent opening sizaa (EOS) greater than a #SO sieve. .. Installation: Diversion dikes should be installed prior to and maintained For the duration of construction and •• should intercept no more than 10 acres of runoff_ • Dikes should have a minimum top width of 2 feet and a- minimum height of compacted ill of 1 a inLhes measured form the top of the existing ground at the upsiope toe to top ofthe dike and have .. side slopes of 3:1 or hatter. • The soil for the dike should be placed in lifts of c inches or less and be compacted to 95 % .. standard proctor density. • The channel, which is formed by the dike, must have pos;iive d-ainage for its entire length to an _ Outlet • / 5 exceeds a et a a a c_ Vt tien the slope exc.,..ds 2 percent, as v_'aciii�s exceed 6 feet per second (r�ardie_� of slope), stabilizat-on is rawired, in situations where velocities do not exceed 6 feet per second,. •■ , veget?tien may be used to control erosion. Erosion Control Compost Description; Erosion control compost (ECC) can be used as an aid to control erosion on critical Silas during the establishrnent period afprotective vagetation. Trig mast com-non uses are on steep slopes, swales, diversion dikes. and on tidal or strewn banks. Acril2. 2co7 Page 5 of 32 Materials:. Nevi hypes of erosion control compost are continuously being developed, The Texas Department of Transportation (TxDOT) has established minimum performance standards which must be mat for any products seeking to be approved for use within any of TxDOT's construction or r„aintanance acti tes. Material used within any TxDOT construction or maintenance -activities must meet material specifications in accordance witn current TxDOT specifications.. TxDOT maintains a ... website at http:/fwww.dotstate.t.,us/des!landscapelcompost/specifications.htm that provides info-mation on compost specification data. This wet -site also contains information on areas where the Texas Comm;ssion on Environmental Quality (TCEQ) restricts the use 'of certain compost products. EGC used far projects not related to TOOT should also be of qualii,/ materials by meting parformcnce standards and compostspecfcation data. To ensure the quality of compost used as an ECC, products should meet all applicable state and federal reculatlons, including but not limited to the United States Environmental Protection cency (USEPA) Code of Federal Regulations (Ct=R), Titre 40, Part 503 Standards for Class A biosolids and Texas Natural Resource Conservation Commission (now named TCEQ) Health and Safety Regulations as dinned in the Texas i Administration Code (TAC), Chapter 332, and all other relevant requirements for compost -products outlined In TAC, Chapter 332. Testing requirements required by the TCEQ are defined in TAC Chapter 332, including Sectigns §332.71 Sampling and Analysis Requirements for Final Products and §332.72 Final Product Grades. Compost specification data approved by TxDOT are appropriate to use for ensuring the use of quality compost materials or for guidance-. - Testing s.andar ds are dependent upon the intended use for the compost and ensures product safety, and product pedDrmance regarding the produc's specific use. The appropriate compost sampling and tasting protocols included in the United States Composting Council (USCG) Test Methods for the Examination of Composting and Compost (TMECC) should be conducted on compost products used for ECC.to ensure that the products used will not impact public health, safety, and the environment and to promote production and marketing of quality composts that meet analy" standards, T rVIECC is a laboratory manual that provides protocols for the composting industry and test methods for compost analysis. TMECC provides protocols to sample, monitor, and analyze materials during all stages or the composting process. Numerous parameters thatmight be of concern in compost can be tested by allowing protocols or test meuiods listed in TMECC. 7,AECC information can be found at hdp-l/wAw.trn=cc.org/tmacclindex.htmi. The USCC Seal of y Testing Assurance (STA) program contains information regarding compost STA certification- S TA program information can be found at httpl/tmecc.orglsta/STA_program_description.htmi. installation: • Install in accordance with currentTxDOT specie non. • Use on slopes 3:1 a flatter. • Apply a 2 inch uniform layer unless otherwise shown on the plans or as directed, • When rolling is specified, use a light cdf-rugated drum roller. R� is'r1 l.pril 2, �'07 Pzoc b of 32 UIP ` rriulch Frier E9ern,s and Socks Description: Mulch Triter berms and socks a,-c used to intercept and detain sediment laden run-off •• from unprotected areas. When properly used, mulch filter beans and socks can be highly effective at controlling sedirrent f rom disturbed areas. They cause runoff to pond which allows heavier solids to settle. !Aulcn filter berms and socks are used during the period of construction near the pa7imatsr of a disturbed area to intercept sediment while allowing water to percolate through, The berm or sock should rernain in place until the area is permanently stabilized. (Mulch filter berms should not be used when there is a concentration of water in a channel or drainage way. if concentrated flows oc :ur after irst3'.lat;on, corrective a0on must be taken. Mulch fitter socks; may be installed in const-uction areas and temporarily movsd during the day to allow construction activity provided it is replaced and properly anchored at the end of the day. Mulch filter berms and socks may be seed d `o allow for quick vegetative growth and reduction in run-off velocity. f aterials: New types of ,mulch fitter beans and socks are continuously being developed. The Texas .. Department of Transportation (TxDOT) has established minimum performance standards which must be metfor any products seeking to be approved for use within any of TxDOT's construction or maintenance activifies, Mulch filter berms and socks used within any TxDOT construction or maintenance acdvffies must meet material specifications in accordance With current TOOT specifications. TxDOT maintains a wabsite at httpJ/www.dot.state,bc.usJdesAandscapa/composVspeaficaboris.htm that provides information on compost specification data. This wabsite also contains Information on areas where the Texas •• Comn'Ission on Environmental Quality (TCEQ) restricts the use of certain compost products. Mulch filter berries and socks used for projects not related to TOOT should also be of quality materials by meeting performance standards and compost specMcaiion d'afa. To ensure the quality of compost used for mulch filter berms and socks, products should meat all applicable state and federal regulations, including but not limited to the United States Environmental Protection Agency (USEPA) Code of Federal Regulations (C1=R), Title 40, Part 503 Standards for Class A hiosolids and .. Texas Natural Resource Conservation Commission Health and Safety Regulations as defined in the Texas Administa;ion Code (TAC), Chapter 332, and all other relevant requirements for compost products outlined in TAC, Chapter 332. Testing requirements required by the TCEQ are defined in TAC Chapter 332, including Sections §332.71 Sampling and Analysis Requirements for Final Products and §332.72 Final Product Grades. Compost specification data approved by TxDOT are -appropriate to use for ensuring the use of quality compost materials or for guidance. Testing standards are dependent upon the intended use for the compost and ensures product safety, and product performance regarding the product's specific use. The appropriate compost sampling and testing protocols included in the United States Composting Council (USCG) Test Methods for the Exarnination of Composting and Compost (TIVIECC) should be conducted on compost products used for mulch filte, berms and socks to ensure that the products used will not irrmpact public health, safety, and the environment and to prornota production and marketing of quality composts that meet analytical standards. TAAECC is a laboratory manual that provides protocols for the compostr;g industiy and test methods for compost analysis. Trv9ECC provides protocols to sample, monitor, and analyze materials during all stages of the composting process_ Numerous pararne`ers feat might be of concern h compost can be tested by following protocols or test methods listed in ThdECC. ThtECC lnforrnation can be found at .. http:llwwv.,.tmecc.org/tmec,clindex.htrnl. The USCC Seal of Testing Assurance (S TA) program ` PnLwd Apri 12, 2007 Page 7O: 3Z eon:-Oins infor,ration regarding compost STa, certification. STA program information can be found at Ei �a:fltmecc.orglsWSTArprogrann dEsc-iptiort.htm[. Installation: install in accordance with current TxD.OT specification. Mulch fitter berms should be constructed at 1-112 feet high and 3 foot wide at locations shown on plans. ■ Ro utively inspect and maintain filter berm in a functional condition at all times. Correct deficiencies immedately. install additional filter berm material as directed. Remove sediment after It has -eached 1l3 of the height of the berm: Disperse flltar berm or leave in place as directed. e Mulch filter socks should be in 8 inch, l2 inch or 18 inch or as directed. Sock materials should be designed to allow for proper percolation through. Compost Filter Berms and Socks Description: Compost filter berms and socks are used to intercept and detain sediment laden run- off from unprotected arias. When propariy used, compost .filter berms and spoke can be highly effective at controlling sediment from disturbed areas. They cause runoff to pond which allows heavier solids to settle. Compost filter berms and socks are used during the period of construction near the perimeter of a disturbed area to intercept sediment while allowing water to percolate _ through. The berm or sock should remain in place until the area is permanently stabiEized. Compost Titter berms should not be used when there is a concentration of water in a channel or drainage way. If -concentrated flows occur after installation-, corrective- action must be taken. Compost filter socks may be installed in construction areas and temporality moved during the coy to allow construction - activity, provided it is replaced and properly anchored at the and of the day. Compoetfilter terns and socks may be seeded to allow for quick vegetative growth and reduction in run-off velocity. Materials: New types of compost filter berms and socks are continuously being developed. The Texas Department of Transportation (TxDOT) has established minimum performance standards which must be metfor any products seeking to be approved for use within any of T xDOT's construction -or maintenance activities. Compost filter berms and -socks used within any ?xDOT oonstruct an or rnai..rtenance activities must meet material specifications in accordance with TxDOT specification R 1059. TxDOT maintains a website at http://,A w.dotstate.bLus/des/Ian; lscapelcompostispecifications.him that provides information on compost specification data. This website also contains ivn;ormetion on areas where the Texas Commission on Environmental Quality (TCEQ) restricts the use of certain compost products. Compost filter berms and socks used for projects not related to TxDOT shcutd also be of quality materials by meeting performance standards and compost specitimtion data. To ensure the quality of compost used as compostfiiter berms and socks, products should meet all applicable state. and federal regulations, Including but not limited to the United States=nvironmontal Protection Agency (USEPA) Code of Federal Regulations (CFR), Ti:1a 40, Part 503 SM:ndards for Class A biosolids and Texas Natural Resource Conservadon Commission (now naiad TGEQ) Health and Safety Regulations as defined in the Texas Administration Code (TAC), Chapter332, and all other relevant Rcvi-dApr32.2001 ;?aae 8 of 32 .r requderllarAs fcr comp�5t products out ined I:-, TAG, Chapter332. 1 L+ the TCEQ are defined in TAC Chapter 332, including Sections 5332.71 Sampling and Analysis Requirements for Final Products and §332.72 Final Product Grades. Compost specific bon data approv&J by Tr.DOT are appropriate to use or ensuring the :use of quaiity compost materials or for. _ guidance. Testing standards are dependent upon the intended use for the cbrrlpost and ensures product •• safety, and product performarr:e regarding the product's specific use. The appropriate compost sampling and testing protocols included in the United States Composting Council (USCG) Test Methods for the Eyarninaticn of Compcsting and Compost (TMECC) should be conducted on compost products used for compost filter berms and socks to ensure that file products used will not Impact public health, safeti, and the environment and to promote production and marketing of quality composts that meat ana'y'.icai standards. TM -:--CC is a laboratory manual that provides protocol; for the composting industry and test meb` ods for compost analysis. TMECC provides protocols to sample, monitor, and analyze materials during all stages of the composting process. Numerous parameters that might be of concern in compost can be tested by following protocols or +est methods listed in TMECC. TMECC information can be found at hitp:IlvNxi.tmecc.orgibneeclindex__htrni. The USGC Sea] of Testing Assurance (S T A) pr'og. am contains information regarding compostSTAcerfdfication. STA.program Information can be found at htto:lltmecc.orglstalS T A _progr am_descriptior..htmi. -� Installation: • Install in accordance with TxD0T Special Sp Vclficatlon 1059. .. • Compost filter berms shall be constructed at 1-112 feet high and 3 foet wide at locations shown en pLns. .. - Routinely inspect and maintain niterberm in a functional -condition at all times. Correct deficiencies immediately. install adaibonal filter berm material as directed.. Remove $eddrnant after it has raac red 113 of the height of the berm. Disperse Miter berm or leave in place as directed. • Compost filter socks shall be In 3 inch, 12 inch or 13 inch or as directed, Sock materials shall be designed allowing for proper percolation through. SEDIMENT CONTROL BMPS Sand Baq Berm Description: The purpose of a sandbag berm is to detain sedi-nen:.carried in runofffrom disturbed areas. i his objective is actor npiished by intercepting runoff and causing it to pool behind the sand •• bag berm. Sediment carried in the runoff Is deposit -ad on the upstream side of the sand bag berm due tc the reduced flock velocity. Excess runoff volumes are allowed to flow over the top of the sand bag berm. Sand bag berms are used only during construction activities in streambeds when the _ contributing drainage area is between 5 and 10 acres and the slope is less than 15%, i.e., uditl y construction in channels, temporary channel crossing for cohstruction equipment, :to. Plastic facing should be installed on the upstream side and the berm should be anchored to the streambed by 015ng into the rood; and driving In "T" posts or rebar (#5 or#S) spaced appropriately. Revised pip z, 2007 Page 9 of 32 .. Materials: • The sand bag material should be polypi glens, polyethylene, polyamide or cotton bur:apwoven fabric, minimum unit weight 4 czlyd 2, mullen burst st. engtl� exceeding 300 psi and ultraviolet stab," y exceeding 70 percent. • The bag lengt , should be 24 to 30 inches, width .should be 16 to 13 inches and thicpmess should be 6 to 8 incites. • Sandbags should be filled with co re grade sand and free from delsterious material. All sand should pass through a No. 10 sieve. The filled bag shoud have an approximate weight of 40 pounds. Outlet pipe should be schedule 40 or stronger polyvin�4 chloride (PVC) having a nominal internal d;arneter of 4 lnches. Installation: The berm should be a minimum height of 18 inches, measured from the tnp of the existing ground at the upslape toe to the top oe the berm. is The berm should be sized as shown in tits plans but should have a minirnum width of 43 inches measured at the bottom of the berm and t 6 inches measured at the top of the berm. • Runoff water should flow over the tars of the sandbags or through 4-winch diameter PVC pipes embedded below the top layer of bags. 4 When a sandbag is filled Vri.h material, the open and ofthe sandbag should•be stapled oraed with nylon or poly cord. • Sandbags should -be stacked in at least three rows abutting each other, and in staggered arrangement. — • The base of the berm should have at least 3 sandbags. These can be reduced to 2 and 1 bag in the second and third rows respect.1vely. • For each cdditlonai B inches of height, an additional sandbag .mus: be added to each raw Yvidth. A bypass pump -around system, or similar alternative, should be used on conjunction with the r berm for ef=ective dewateriny of the work area. Silt Fence _ Description: A silt fance is a barrier consisting Qf geotextile fabric supported by metal posts to i prevent soil and sediment loss from a site. When properly used, silt fences can be highly effective ail controlling sediment from disturbed areas. T f?ey cause runoff to pond which allows heaviersoOds to settle. If no praperhy installed, silt fences are not likely to be effectve. The purpose or a silt fence ! is to intercept and detain water -borne sediment from unprotected areas of a limited extent. Silt fence is used during the pariod of construction clear tie perimeter of a disturbed area to int--rcept eedinent while allowing water to percolate through. This fence should remain in place until the ( -disturbed area is permanently stabilized. . Silt fence should not be used where t -ere is. a k Ee.•i;_d April 2, 20n pap 10 of 32 w=c7�In2]�Vny. is GOnCrc7i)+GCCUr� after fl corrective action must be taken such as placing a rock berm in the areas of concentrated flow. Silt fencing within tit slta may be temporadly moved during t',a day to allow construction activity .. provided it is raplaced and properly anchored to the ground atthe :e end of `he day. Silt fences on the pedrleter of the sits or around drainage ways should not be rncvat at any time. Materials: • Sil:fence maeeria: should be poly+propylnne, polyethylene orpolyamide woven ornonvvoven fabric. The fabric width should be 36 inches, with a minimum unit weight of 4.5 czryd, mullen burst .. strength exceeding 190 ib, �n 2, ultraviolet stability exceeding 70%, and minimum apparent opening size of U.S. Sieve No. -- Fence poste should be made of hot rolled steel, at least 4 feet long with Tea or Y-bar cross section, surface painted or galvanized, minirnum nominal weight 1125 IbA2, and 6rindell hardness exceeding 145.' .. • Woven v&4re backing to support the fabnlc should be galvanized 2" x 4' welded wire, 12 gauge mullmUrrr. Installation: • Steel posts, which support the silt fence, should be installed on a slight angle toward the anticipated nunoti source. Post must be embedded a minimum of 1 foot deep and spaced not .. more than 8 faet on center. Where vrater concentrates, the maximum spacing should be 6 feet. • Lay out fancing down -slope of disturbed area, following the contour as closely as possible. The fence should be sited so that the naximum drainage area is 1A acre/1 DO feet of fence. • T he toe of the sift fence should be trenched in w ih a spade or mechanical trencher, so that the down -slope facs of the trench is flat and perpendicular to the line of flow. Where fence cannot be .. trenched in (e.g., pavement or rock outcrop), weight fabric flap with 3 inches of pea gravel on uphill side to prevent flow f;-om seeping under fence, The tren:,h must be a minimum of 6 inches deep and 6 inches wide to allow forthe silt fence fabric to be laid in the ground and backfillec with compacted material. • Silt fence she LId be securely fastened to each steel support post or to woven wire, which is in tum .. at,ached to the steel fence post. There should be a 3-font over:ap, securely fastened where, ends of fabric meet Trianquiar Filter Dike no Description: The purpose of a triangular sedimentfilter dike is to intercept and detain water-bome sedimentfrom unprotected areas of limited extent. The triangular sediment fiiterdiice is used where t'iere is no concentration of water in a channel or other drainage gray above the barrier and the contributing drainage area is less than one acre. if the uphill slope above the dike ex,:;aeds 10%, the length of the slope above the dike should be less than 50 feet. if concentrated tlrw occurs after thstalla ion, corrective action should be taken such as placing rock berm in the areas of concentrated fow. This measure is effeAve on paved areas whaia installation of sittfence is not possible orwhere vshicie access must be maintained. The advan+.age of these controls is the ease w ad Apr] 2.2037 Pace 11 of 32 with which they :an he moved to allaw vehicle traffic end then reinstalled tc maintain sediment Materials: • Silt fen cemale, al should be polypropylene, polyethylene orpohfarnidewcven ornGnvfovenfabric. The faSLi;. width should be 36 inches, wilt a minimum unit weight of 4.5 ozlyd, mullen burst stiangth exceeding 190 lb/in 2 , ultraviolet stability exceeding 700,14, and minimum apparent opening size of U.S. Sieve No. 30. • The dike st-zimure should :`,: e 6 gauge 6" x 61'wire mesh folded into trangular form being eight---1-2�n (18) inches on each s?da. lnstallati on: • The franca of t ie triangular sediment filter dilze should be constricted of 6" x 6%6 gauge welded wire mesh, ' 8 inches per side, and wrapped with geotextile fabric the sarna composition as that used for salt fences- , �i!'✓r ma`.eral should lap over ends six (6) Inches to cover dike to dike junetion; each junction should be secured by shoat rings. • Position dii<e parailei to the contours, with the and of Each section closely abutting the adjacent sections. ■ There a, a several'options forfsstening the filter dike to the ground. The fabric; sk rt-may be toed -in with 5 inches of compacted material, or 12 inJies of the fabric skirt should extend uphill and be secured with a minimum of 3 inches of open graded rack, or vft staples or nails. If these two options are not feasible the dike structure may be trenched in 4 inches. ■ Triangular sediment niter¢ikes should be installed across exposed slopes during construction vAth ends cf the dike tied into existing grades to prevent failure anti should intercept no more than one acre of runoff. -- • When mcved to allow vehicular access, the dikes should be reinstalled as soon as possible, but always at the end of tie workday. Rock Berm Description: i ne purpose of a rock berm Is to sarve as a check dam in arras of concentrated flow, to intercept sedir ienHaden runo11, detain tine sediment and release tine water in sheet flow. The rock berm should be used when the contribu`.ina drainage area is less than 5 acres. Frock berms are used in areas where the volume of runoff is too great for a sift fence to contain. They are lc—,s _ effective for sediment removal than silt fences, particularly for fine particles, but are able to' Aithstand highertiows than a silt fence: As subh, rock berms are oftan used,in areas of channel flows (ditches, gullies, etc.). Rock b.errrs are most effective at reducing bed load in channels and should not be substituted for odharerosicn and sadiinent control measures fustier up the watershed. — Materials: ■ i tie barn, structure should he secured tiv to a woven wire sheathing 'raving maximum opening of 1 Lich and a minimum wire diameter of 20 gauge galvanized and should be secured with shoat rings. R:,�,_d April 2.2007 Page 12 of32 • Clean, open graded 3- to 5-inch diameterrock should be used, except in areas where high 'velocities or large volumes of row are expectad, where 5- to 8-inch diameter rocks may be used. wo Installation: • Lay cut the woven wire sheathing perpendicular to `he flow lire. Tile she a1,ring should be 20 gauge woven wire mesh with 1 inch openings. • Berm should have a top width of 2 feet minimum vhtn side slopes being 2:1 (H:V) or flatter. • Place uie rock along t-he sheathing to a height nct less than 18•. • Wrap the wire sheathing arcund the rock and secure with tie wire so that the ends of the sheathing overlap at least 2 inches, and the bemm retains its shape when walked dpon- • Berm should he built along the conlvur at zero percent grade or as near as possible. no a The ends of the bean should Le `pied into existing upsiope grade and the berm should be buried in a trench approxh—nateiy 3 to 4 inches deep to prevent failure of the control. Hav Bale Dike Description: The purpose of a hay or straw bale dike is to intercept and detain small'amounts of sediment -laden runoff from relatively small unprotected areas. Straw bales are to be used when it is not feasible to install other, more effective measures or when the construction phase is expected to last less than 3 months. Straw bales should no_ be used on areas where rock or other hard surfaces prevent the fill and uniform anchoring of the barrier. Ftitaterials: Straw: ► he best quality straw mulch comes from wheat, oats or barley and should be free of weed and grass seed which may not be desired vegetation for the area to be protacted. Straw mulch is light and therefore must be properly anchored to the ground. Hay: This is very simliar to straw with the exception t'�at it is made of Grasses and weeds and not grain stems. This form of mulch is very inexpensive and is widely available but does introduce weed and grass seed to the area. Like straw, hay is light and must be anchored. • Straw bales should weigh a minimum of 513 pounds and should he at least 33 inches long. • Sales should be composed entirely of vegetable matter and be free of sends. • Bindind should be eitiner wire or nylon string, jute or cotton binding is unacceptable. Bales should be used for not Wore than two months before being replaced. Installation: • Sales should L-a embedded a minimum of 4 inches and securely anchored using 2" x 2" wood stakes or 3,18° clameter reh•ar driven through the bales into the ground a m 6murn of 6 inches. • Bales are to be placed cirecty adjacent to one another leaving no gap between them. Rcyked April 2, 2007 .r Page 13 of 32 All bales should be placed on the contour. The first stake in each bale should be angled toward the previously laid bale to force the bales together. Brush Berms Organic fit er and spoil material, from site c4earing operatichs is usually burned or hauled away to be durnpad elsawhere.1,06ch ofthis matenal can be used ertecbvely on the construction site itself. The key to constructing an efficient brush berm is in the method used to cbta n and place the brush. It will not be acceptable to simply take a bulldozer and push whole trees into a pile. This method does not assure continuous ground contact w'h ► the berm and drill alloy uncontrolled flows under the berm. Brush berms may be used where there is little or no concentration of water in a channel or othar _ drainage way above the berm. The size of the drainage area should be no greater than one-raurth of an acre per 100 feet of barrier length; the maximum slope length behind the barrier should not Exceed 100 ;eat; and the maximum s`:ope gradient, behind the barriershould be less than 50 percent Materials: The brush should consist of woody brush and branches, preferably less than 2 Inches in diameter. a The filter fabric should conform to the specifications for f71t?r fance fabric. a The raps should be 1/4 inch polypropylene or nylon rape. T he anchors should be 3J84nch diameter rebar stakes that are 18-inches long. li istzllation: e Lay out the brush berm following the contour as closely as possible. s he juniper limbs should be cut and hand placed wkh the vegetated part of the limb in close contsctwith the ground. Each subsequent branch should overlap the previous branch providing a shingle ef-sect. • The brush, berm should be constructed in lifts with each layer extending the entire length of the , ,arm before the naxt layer is sta; Esd. A trench should be excavated 6-inches wide and 44nches deep along the langth.of the barrier and irnvnediate'y uphill frorn the barrier. The fiiterfabrc should be cut into lengths suff cient to lay aorss the barrierfr✓m its up -slope base to just beyond its peak. The lengths of filter fabric should be draped across the width of the barrier With the uphill edge placed in tie trench and the edges of adjacent piecez overlapping ea; h other, Where joinfs are necessary, the fabric should be spliced together with a minimum 6-inch overlap flcvacd.ar-;J 2,2307 Pane 14 of 32 and securely sea.'ed_ • The trench should be backfilled and the soil compacted over the ;ilt r fah-ric. • Set stakes into the ground along the downhill edge of the brush barrier, and anchor the fabric by tying rope from the fabric to the stakes. Drive the rope anchors into the ground at approxima'�iY a 45-degree angle to the ground on 6-fzot centers. • Fasten the rope to the anchors and tighten berm securely to the ground with a minimum tension of 50 pounds. • The height of the brush berm should be a minimum of 24 inches after this seourng ropers have been tightened. Stone Outlet Sediment Traps A stone outi=t sedir vent trap is an impoundment created by the placement of an earthen and stone .. erabankmeit to prevent soil and sadimant loss from a size. The purpose of a sediment trap is to intercept sediment -laden runoff and t-ap the sediment in order to prowctdrainage waysi properties and rights of way below the sedimentL-ap from sedi:,ientation. A sedimenttrap is usually installed at points of discharge from disturbed areas. The drainage area for a sedimenttrap is recommender; to be less than 5 acres. Larger areas should be treated using a sediment basin. A sediment trap differs from a sediment basin mainly in the type of discharge structure. T he trap should be Iocated to obtain the maximum storage benefit from the terrain, for ease of clean ou` and disposal o; .he trapped sediment and to minimize interference with construction activities. The volume of the trap"should be at least 3600 cubic feet per acre of drainage area, Materials: • All aggregate should be ,at lest 3 inches in diam:ter and should not exceed a volume of 0.5 cubic foot • The ceotextile ►abric specification should be woveh polypropylene, polyethylene or poiyamide geotextile, minimum unit weight of 4.5 ozlyd 2, mullen burst strength at least 250 ibrn 2, ultr a•vrio et stability exceeding 70%. and equivalent opening size exceeding 40. N, Installation: • Earth Embankment: Place f11 material in layers not more than 8 incnas in iobse depth. Before compaction, moisten oraerate each iayer as necessaryto provide the optimum moisture content of the material. Gompact each laver to c5 percent standard -Proctor density, po not place material on surfaces that are muddy or frozen. Side 95opes for0a embankment are to be 3,1. The minimum wider, of the embankment should be 3 feel. A gap is to be left in the embankment in the locaton where t'ne natural confluence of runoff crosses the embankment line, The gap is to have a YAM in feet equal to B times the drainage area in acres. �• Rvns-d Apid2,2U']7 Paoc 15 b*_"32 Geo:exiile Govered Pack Ccr!�,: A cure of filter s -ir,e hati,ing a m nimurn height of 1.5 feet and n minimum width at the base of 3 feet should be placed across the opening of t-earth embankment and should be coverad_by geot6xtile fabric wlfiich should extend a minimum distance of 2 feet in either direction from the base of the Ntar stone core. • Filter Stone Embankment: Fitter stone should be placed over to geotextile and is to have a side slope which matches that of the earth embankment of 3:1 and should cover the geotextile;rock _ core a minimum of 6 inches when installation is complete. The crest of the outlet should be at least 1 fool below the top of the embankment.. Sediment Basins: The purpose of a sediment basin is to intercept sediment -laden runoff and trap the s.-imentin order io protect drainage v--ys, properies and rights orv,iay below Yee sediment basin from sedimentEtion. A sediment basin is usually installed at points of discharge from disturbed areas. The drainage area for a sediment basin is recommended to be less than 100 acres. Sediment basins are effective for capturing and slowly releasing the runoff from larder disturbed areas thereby EIlowing sedimentation to take place. A sediment basin can be created where a permanent pond BMP is being constructed. Guidelines for construction of the permanent BMP should be followed, but revagetation, placement of underdrain piping, and installation of sand or other fitter media should not be carried out until Te site constriction phase is complete, Materials: P. ser should be corrugated metal or reinforced concrete pipe or box and should hsys watertight frainas or end to end connections of sections. • .An outlet pipe of corvigated metal or reinforced concrate should be atached to the riser and should have positive flow to a stabilized outlet on the downstream side of the embankment:. • An anti -vortex device and rubbish screen should be attached 'Lo the tnp of the riser and should be made of polyvinyl chloride or corrugat-ad metal. Basin Design and Construction: For common drainage locations fat serve an area with tenor more acres disturbed atone time, a sediment basin should provide stor=ge for a volume of runoff from a two-year, 2 hour storm from each disturbed acre drained. • `rhe basin length to Yidth ratio should be at least 2:1 to improve trapping s-I�'iciancy. The shape may be attained by excavation or the use cf ba les. 1 fie lengths should be measur-d at the elevation of the riser de-vrratering hole. Pace fill material in layers not more than 8 inches in loose depth. Before compaction, moisten or aerate each layer as necessary to provide The optimurn moisture content of the material. Compact each layer to 95 percent standard proctor density. Do not placs material on surfaces that and muddy or frozen. Side slopes for the embankment should be 3:1 (H:1). • An emergency spillway should be installed adracent to the ambankment on undisturbed soil and �• should be sized to carry the full. --mount of flow generated by a 10-year, 3-hour storrn V%ith 1 foot Rsvisrd Apdi 2, 2Co7 Pagc 16 of a? aw aw 's of freeboard I. ss I`s:e arnounl «,Kcii r:a 1 be carried by the era cipal oufiet ccrnirol device. • The emergency spillway should be lined Mth dprap as should the swore leading from the spillway to the normal, Nvater:,eurse at tine base of the embankment. • The principal outlet cone of device sho.tld consist of a rigid vertically oriented pipe or box of corrugated metal•or reinforced concrete. attached to this strict ire should be a horizontal pipe, which s ould extend through the embar+icr,xent to the toe of fill to provide a de -watering outletfor the basin. An anti -vortex device should be a zchad to Uie inlet potion of tine principal outlet control device to serve as a rubbish screen. • A concrete base should be used to anchor the prinL#al outlet' control device and should be sized to provide a safety factor of 1.5 (downward forces = 1.5 buoyant forces). The basin should include a permanent stake to indicate the sediment level in the pool and .. marked to indicate when the sadirnent occupies 50% of fie basin volume (not the top of the stake). • i he top ofthe riserpips s�ould remain open and be guarded with a trash rack and anti -vortex device. The top of the riser should be 12 inches below the elevation of :he emergency spillway. The riser should be stied to convey the runoff fron the 2-year, 3-hour storm when the water surface is at the emergency spillway elevation. For basins with no spillway the riser must be ,r sLed to convey the runoff from th5 1Q yr, 3-hour storm. • Ant;-seeo-collars should be included v,,hen soil conditions or length of service crake piping• through the ba :itfill a possibility. • The 42-hour drawdown time will be achieved by using a riser pipe perforated at the point measured from the bot<om of the riser pipe equal to /2 the volume of the basin. This is the maximum sediment storage elevation. The size of the perforation, may be calculated as follrnnrs: As 2h Alp Cdx980,OG4 VVhere: A,, = Area of the de-waterng hole, % 2 As = Surface aria of the basin, ft 2 .. Cd = Coefficient of cont-action, appro»mately 0.6 h = head of water above the hole, ft Perforating the riser with multiple- holes with a combined surace area ,d equal to A,, is acceptable. Erosion Control CornRost aw Description: Erosion control compost (ECC) can be us -ad as an aid to coa`sol erosion on critical P.criscdApr;12,2007 Peg:17 of 32 MW Wn sites during the esLablishrneni parJd of protocfwe vegetadon.-Th a most common uses a,-e on steep slopes, swales, diversion dikes, and on tidal or st aam banks. Materials: New types of erasion control compost are continuously being developed. The Texas Departmentof, Transportation (TxDOT) has estab!ishe-d minimum performance standards which must be met for any products seeking to be approved for use tiyitnin any of T, xDOT'S construction or maintenance activities. Material used within any TxDOT construction or_ maintenance activities must meet mate�:al specifications in accordance with current T xD0T specifications. TxDOT maintains a website at htfpalwvAv-dot.state.tx.usldesllandscapee/corlpost-ispecirications.htm that provides infonmation on compost specification data. This wabsile also contains information on arras where the Texas Commission on EnAronrnentai Quality (Tt CEO) restricts the use of certain compost products. ECC used for projects not related to TxDOT should also be of quality materials by meeting performance standards and compost specifimbon data. To ensure the quality of compost used as an ECC, products should meet all a*ppticable stata and federal regulations, including but_not limited to tha United States Environmental Protection Agency (USEPA) Code of Federal Regulations (CFR), T itie 40, Part 503 Standards for Class A biosoiids and Texas Natural Resource Conservation Commission (now naned TCEQ) Health and Safety Regulations as defined in the Texas Administration Code (TAC), Chapter332, and all other relevant requirements for coin, post products outlined in T AC, Chapt✓r 332, Testing requirements required by the TCEQ are defined in TAC Chapter332, including Sections §332.71 Sampling and Analysis Requirements for Final Products and §332.72 Final Product Grades. Com; cst specification data approved- by TxDOT are appropriate `o use for ensuring the use of quality compost materials or for guidance. Testing standards are dependent upon: the Intended use for the compost and ensures product sa-;eta+, and product perform, ance regarding the product's specific use. The appropriate compost sampling and testing protocols included in the United States Composting Council (USCC) Test Methods for tie Examination of Composting and Compost (T NIECC) should ba conducted on compost products used. for FCC to ensure that the products used will not impact pu4fle health, safety, and the environment and to Promote praduction and marketing of quaritycomposts that maot analytical standards. TivI=CC is a laboratory -manual that provides protocols for the composting . industry and tast methods for co,-,npczt analysis. T 0ECC provides protocols to sampke, monitor, and analyze materials during all stages of `die composti-,g process. Numerous parameters that might be of concern in compost can be tested by following protocols or test methods listed in T iAECC. T MECC information can be round at The USCC Seal of Testing Assurance (STA) program contains information regarding compost STA ceciification. STA program information can be found at http:&macc.org1sta1STA�rogram description.html. Installation: • Install in accordance with current TxDOT specification. Use on slopes 3:1 or flatter. Agpty a 2 inch uniform layer unless othert-!isa shown or, the plans or as directed. u When -rolling is specif-ted, Lase a light corrugated dram roller. �avc!d APM s, 407 Pagc l 3 of 32 .. Mulch Filter Berms and Socks Description: Mulch filter berms and socks are used to intercept and detain sediment laden run-off from unprotected areas. When properly used, mulch alter berms and socks can be highly effective at controlling sediment iom disturbed areas- They cause runoff to pond which allows heaviersoliids to settle. rvtulch filter berms ar-A socks a. a used during the period of construction near the perimeter of a disturbed area to intercept sedlrnent while ailovAng vi-ater to percolate through. The berm or sock should remain in place until the-araais pa-mananfly stabilized. Mulch filter berms should not be used when there is a concentration of water in a channel or drainage way. If concentratad flows ,r occur after instillation, correclive action must be taken. Mulch filter socks may be installed in construction areas and temporarily moved during i3-e day to aliow construction acttvity provided it is replacsd and properlyancbord at the end of the day. Mulch filterbe-ms and socks maybe seeded to allow for quink vegetative growth and reduction in run-off velocity. Materials: New types of mulch filter berms and socks ar= continuously being developed. The Texas Department of Transportation (TxDOT) has established minimum performance standards which mustba metforany products seeking to be approved for use �hftin any gfTxDOT's construction or maintenance activities. Mulch filter berms and socks used within any TxDOT construction or maintenance activities must meet material specifications in accordance with current- TxDOT spacifications. TxDOT maintains a website at httpJi4"vw.dot.statz.bLus/des/landscapelcomposUspeciflcabons.ht4m that provides info i ation on compost specification data. This website also contains information on areas where the Texas Commission on Environmental Quality (TCEQ) restricts the use of certain compost products. Mulch filter berms and socks used for projects not r_iaed to TxDOT should also be of quality materials by meeting performance standards and compost specifcauori data. To ensure the quality of compost used for nulch fiiter berms and socks, products should meet all applicable state and federal regulations, including but nol limited to the United States Environmental Protection Agency (USEPA) Code of Federal Regulations (CFR), Tee 40, Part 503 Standards for Class A biosoiids and i exas Natural Resource Conservation Commission Health and Safety Regulations as defined in the Texas Administration Code (TAC), Chapter 332, and all other relevant requirements for compost products outined in TAC, Chapter 332. Testing requirertients required by the TCcQ are defined in Will TAC Chapter 332, including Sections §332.71 Sainp[ing and Analys.s Requirements for Final Prodacfs and §332.72 Final Product Grades. Gonnpcst specification data approved by TxDOT arG appropriate to use for ensuring the use of quality compost materials or for guidance. Tasting standards ara dependent upon the intanded use for the carnpost and ensures product safety, and product performance regarding the product's specific use. The appropriate compost sampling and -sting protocols included in the United States Cornposting Council (USCC) Test Methods for the Examination of Composting and Compost (TMECC) should be conducted on compost p oducts used for mulch filter berms and socks to ensure that the products used will not impact public health, safaty, and the environment and to promote production and marketing of .. quality composts that meet analytical star:da Ls. TMECC is a la5oratory manual that provides protot-ols for the compostng industry and test methods for compost analysis. T rAECC prov das pro;oaats to sample, monitor, and analyze materials during all stages of the composting process_ Numerous parameters that might be of concern in compost can be tested by following protocols or test methods fisted in TMECC. TMECC information can be found at •• Pa-vised k' prJ 2,207 Fags 19 of 32 h«p ;ifvmy.tr,�acc.orgATecc/index. tml. T by USCC Seal of Testing Assurance (STA) program contains information regarding compost S T.A certification. STA program information can be found at http:/r`tr,ecc.org/staiSTA_program_descriptlon.html. Installation: • install In accordance with current TxDOT scacificati.on. • Mulch filter beets should be constructed at 1-112 feet high and 3 footviide at locations shown on plans. • Routinely inspect and maintain filter berm in a functional condition at all times. Correct deficiencies immediately. Install additional filter berm material as directed. Remove sediment after it has ranched 113 of the heig']-it of the berm. Disperse filter berm or leave in place as directed. Mulch fi.�r socks should be in 8 Inch, 12 inch or 18 inch cr as directed. Sock materials should be designed to allow for proper percolaton tl Trough. Compost Filter Berms and Socks Description: Compost riper barms and socks are used to intercept and detain sediment laden run- cf-I from unprotected areas. When properly used, compost filter berms and socks can be highly effective at controlling sediment from distu. bed areas. They cause runoff to pond which allows haavier solids to settle. Compost lifter berms and socks are used during the period of construction near the perimeter of a disturbed area to intercept sediment while allowing water to percolate through. The term or sock should ramaiin in piece until the area is permanently stabilized. Compost filter berms should not be used when there is a concentration of water in a channel or drainage way. If concentrated flows occur after installation , carractive action must be taken, Compost 71ter socks may be installed In construction areas and temporality moved during the dayto allow construction activity provided it is replaced and property anchored at the end of the day. Compostfilter berms and socks may to seeded to allow for quick vegetative growth and reduction in run-off velocry. Materials: New types of compost filter berms and socks are continuously being developed. The Texas Depar�rnent of Transportation (TOOT) has established minimum performance standards which must be met for any products seeking to be approved for use withr, any ofTxDOT~s construction or maintenance activities. Compost filter berms and socks used Amain any TxOO T construction or maintenance activities must meet material specificabor:s in accordance witTxDOT specification 1059. TOOT maintains a website at hL p:/Iw%w.dotstate.taus/dasllandscapelcornpostlspecificaaons.htm that provides Information on compost specification data. This websits also Contains information on areas where the Texas Commission on Environmental Quality (TCEQ) restricts the use of certain compost producis, . Com-nost fi,tLr berms and Soct:s used for projects not related to TxDOT should a'.so bet}f quality materials by meeting performance standards and composi sprcricatian data. To ensures the q uaiity of compost used as compost filter berms and socks, products should meet all applicable state and •feciem reculations, inducting bit not limited to the United States Environmental Protection Agency (USEPA) Code of F4d5ral Regulations (CFR), Title 40, Part 503 Standards for Class A biosolids and Texas Natural Resource Conservation Commission (now named TCEQ) Healti and Safety RevistdApr:! 2, 2M7 'age 20 or 32 l?equiations as dieflned :n ih:e: i ccas hdmirnistraJon Cod � ;T,,G), Ghapiaar332, end .a(I ctherrllerant requirements for cornpost products outlined in TAC, Chapter332. 1-esiing requirements r=quired by tl:e TCEQ are defined in T.SC Chapter 332, including Sections §332.71 Sampling and Analysis Requirements for Final Products and §332.72 Final Product Grades. Compost specification data approved by T xDOT are appropriate to use for ensuring the use of gl4afity compost materials orfor guidance. Testing standards are dependent upon the intended use for the corripost and ensures product safety, and product perform ante regarding the product's specific use. The appropriate compost sampling and testing protocols included in the United States Composting Council (USCG) Test Methods for ttie Exarninatinn of Composting and Compost (TMECC) should be conducted on compost products used for ::ompestfilter berms and socks to ansure that the products used will not impact public health, safety, and the environment and to promote production and marketing of quality compcs� that meet analytical standards. TMECC is a laboratory manual that provides protocols for the composting industry and test methods for compost analysis_ TMECC provides protocols tL sample, mo:nitor, and analyze materials during all stages of the composting process. Numerous paramaters that might be of concern in compost can be tested by fallowing protocols or ,. trs; methods listed in Ti4 EM TMECC information can by found at hitp:/Avv.w.tmecc.orgltmecclindex.html. The USCC Seal of Testing Assurance (STA) program contains information regarding compost STA certiication. STA program information can be found at ht p:/ftecc.orglsta/S i A program_description.html. lnstallaiion: ,. Install in accordance with TxDOT Special Specification 1 Q52. . Compost filter bermis shall be constructed at 1-1/2 feet high and 3 foot wide at locations shown on plans. Routinely inspect and mzintaih filter berm in a f inctional condition at_ all times. co, —,act deficiencies immediately. Install additional fl Ver berm material as directed. Remove sediment after it has reached 1/3 of the height of K berm. Disperse filter berm or leave in place as di-ecfad. Compost filter socks shall be in 8 inch,12 inch or 18 inch or -as directed. Sock materials shall be designed allowing for proper percolation through. POST -CONSTRUCTION TSS CONTROLS Retention/Irriciation Systems Description: Retentiunfrrigation systems re erto tt'.e capture of runoff in a holding pond, then use of the captured water for irigation of appropriate landscape areas. Retentio nArriga don systYrns are cha-actedzed by the captor and disposal of runoff without direct release of captured flow to .. receiving streams. Retention systems exhibit excellent poliiatant r=_noval but scan require regular, proper maintenance. Collection 'of roof runoff for subsequent use (rainv;a`uar harvesting) also qualifies as a ratenticnfiirrigation pract'ce, but should be operated and sited to provide adequate volune. This technology, which emphasizes beneficial use of stormwater runoff, is particularly appropriate for and regions because of increasing demands on water supplies for agricultural irrigation and urban water supply. Rc-+istdApril 2, 207 Pagc 21 of 32 Design Considerations: Re ten tionlirriga tion practices achieve 100% remove efriciercy of total suspended solids ' contained 1within the volume of .eater captured. Design elements of retentlonlirrigation systems include runoff storage facility con igurafion and sizing, pump and wet well system components, basin lining; basin detention time, and physical and operational components of Tie irrigation system: Ra entionTrrigation systems are appropriate for large drainage areas tvith low to moderat-e slopes. The ratanuon capacity should be sufficient considering the average rainfall event for the area. Maintenance Requirements: hla,,nterance requirements for retentionkrigation systems include routine inspections, sediment removal, moxing, debris and litter ramoval, erosion control, and nuisance control. Extended Detention Basics Description: Extended detention facilities are basins Oat temporarily store a portion of storrnwatar runoff Vowing a storm event: Extended detention basins are normally :used to remove particulate pollutants and to reduce maximum rutiefr rates associated with development to their pre - development levels. The water quality benefits am the removal of sediment and buoyant materials_ Furthermore, nutrients, heavy metals, toxic materials, and'oxygen-demanding materials associated with the particles also are removed. The control of this maximum runoff rates serves to protect — drainaYa channels below the device from arosion and to reduce downstream flooding. Although detention facil!tlas designed for flood control have different design requiraments than those used for water quality enhancement, ii is possible to achieve these two objectives in a single facility. Design Considerations: Extended da}antion basins can,remove approAmately 75% of the total suspanacd solids contained within the volume of runoff captured in the basin.. Design eiemen+u; of extended detan'aon basins include basin suing, basin configuration, basin side slopes, basin lining, inletioutlet structures, and arosion contro!s. Extended detention basins are .appropriate for large drainage arsas wiu t low to moderate slopes. Tha retention capacity should be suficent considering the average rainfall event for the area. Maintenance Requirements: fvlaintenance requirements for extended detention basins include routine ir_spe rations, mowing, debris and litter removal, erosion control, structural repairs,-ralisar.ce control, and sediment removal. _. Vegetative Fil-er Strips Description: Fii'ter strips, also known as vegetated buffer strips, are vegetated sections of land S. milar tc Grass'I swates except they are essentially flat with lour slopes, and are designed only td accept runoff as overland sheet flow. They may appear in any vegetated form from gressland to forest, and are designed to intercept upstr--am flow, laver cline velocity, and spread water out as sheet9ow. The dense vegetative coverfacilit3`.es conventional pollutant removal through detention, fi! Gtion by vegetation, and infiltration. Filter strips cannot treat high velocity flows, and do not provide enough storage or infiltration to effectively reduce peak discharges to ?redevelopment levels far design starry. This lac;k'of quantity control favors use in rural or low-wensity development; however, they can provide ester quality teencfits even where the impervious cover is as high as 50%. The primary highway application for = vegetative fll:er strips is aiorg rurl roadways where runoff ihatwouid othenviise dlsc.�iarge directlyto RevivA J.p,7 2,201 Page 22 of 32 a raceivin No =_r 'G!;es through the 11;1 to befwra enteiin a ron.c n�c: tam. Properly �., � 9 ti P� J s p �, -� � 3 ,..y� sys p- y designed roadway medlars and shoulders maks efisctive bufferstIps. These devices also can be used on other types of developmant where ! r;d is available and hydraulic conditions are appropeste. Flat slopes and low to fair permeability of natural subsoil are required for effective performance of alter strips. Xthough an inexpensive control measura, they are most ussful in contributing watershed .. areas where peat: runoff velocities are low as they are unable io treat the high flow velocities . typically associated wiJi high impervious cover. Successful performance of filter sx;.ps relias heavily on maintaining shallow unconcentrated flow. To avoid flow channeli_aton and maintain performance, a filter strip should: • Be equipped with a level spreading device for even distribution of runoff • Contain dense vegetation with a mix of erosion resistant, soil binding species Be gr€ded to a uniform, even and relatively low slope a Lataaliy traverse t,�,e contribuUng runoff area ilerstrips can be used upgradientfrorn watercourses, wetlands, or other water bodies along toes and tops of slopes ar,d at outlets cf other stormwa`er rnanagznent structures. They should be incorporated into street drainage and rnas-1--r drainage planning. The most important criteria for selection and use of this 8MP are soils, space, and slope. Design Considerations: Vegetative fi ter strips can remove approximately 85% of the total suspended solids contained within the volume of runoff captured. Design elarrients oc vegetative 711ter strips include uniform,-shalloSN overland flow across the entire filter strip area, .hydraulic loading rztr, inlet structures, slope, and vegetative cover. The area should be free of quilies or cilia which can concentrate Plow. Vegetative il`ear strips are appropriate Tor small drainage areas with moderate s slopes. Other design elements include tie following: • Soils and moisture are adequate to crow relatively dense vegetative stands Sufficient space is available • Slope is less than 1201;; Comparable performance to more expensive structural controls .. Maintenance Requirements: Maintenance requirements for vegetative filter strips include pest management seasonal mowing and lawn care, routine inspections, debris and litter removal, sediment removal, and grass reseeding and mulching_ Constructed Wetlands - Description; -Constructed wetands provide physical, cl emic3l, and biological water quality Rrvlcd a jnI z, =7 Page 23 of 32 f. f. im treatment of stonmwater runofL Physical trea�n; zr.t occ=ars as a result of decreasing dove v.,o•ities in the wetland, and is present in the form of evaporation, sed;menation., adsorption, and/or r►ltation. Chernicai processes include chelation, precipitation, and chemical adsorption. Biological processes inclu�a decomposition, plant uptake and rnoval of nutrients, plus biological transformation and degradation. Hydrology is one of the most intiuen ia! factors in pollutant removal due to its efffecLs on sedimentation, aeration, biological transformation, and adsorption onto bottom sediments. he weland should be designed such that a minimum amount of maintenance is required. The natural surroundings, including siurch things as the potential energy of a stream or flooding river, should be utilized as much as possible. The Nvetland should approximate a natural situation and unnatural atrributes, such as re�atangu;ar snaps or rgid chann?f, should be avoided. — Site considerations should include the water table depth, soillsubst ate, and space requirements. Because the watland must have a source of flow, it Is desirable that the water table is at or near the surface. If rumor is the only source of inflow for the wetland, the water level often fluctuates and establlshrnent of vegetation, may be difficult. The soil or substrate of an, artificial wetland should be loose loam to -clay. A perennial basaTlow must be present to sustain the artificial wetland. The presence of organic material is often halplul in increasing pollutant removal and retention. A greater -- amount of space is required fora wetland system than is required fcc a detention facility -treating the same amount of arcs. Design Considerations: Constrictedwetlands wends can remove over 90% of, the total suspended solids contained within the volume of runo;i captured in the wetland'. Design elernenis of constructed wetlands include wetland sizing, wetland =nfiguration, sediment iorebay, vegetation, outflow structure, depth of inundation during storm everts, depth of micropools, and aeration. Constructed wetlands are appropriate for large drainage areas with low to moderate slopes. Maintenance Requirements: Maintenance requirements for constructed wetlands include mowing, routine inspections, debris and litter removal, erosion control, nuisance control, structural repairs, sediment removal, harvesting, an: maintenance of water levels. Wet Basins Description: Wet basins are runoff control ;aniliiaes that maintain a permanent wet pool and a standing crop of energent iitloral vegetation. ► hese facilities „gay vary in appearance from natural ponds toeni~rged, bermed (rnarimade) sections of drainage systems and mayfunction ascnl`he or ! offl:,ne facilities, although offline configuration is preferablen. Gffline designs can prevent scour and other damage to free wat pond and minimize costly outflow structure elements needed to accommodate extrene runoz events. During storm events, runoff inflow;, displace part or all of the existing basin volume and are retained and treated in the facility until t'ha next storm event. The pollutant removal mechanises are settling .. of solids, vveJand plant uptake, and microbial degradation. When the wet basin is adequately sr=d, pollutant removal performance can t>e excellent, especially for the dissolved. fraction. Wet basins also help provide erosion protection for the receiving cannel by Ilmiting peak flovrs during larger storm events. Wet basins are oft -an perceived as a positive aesthetic -element in a community and offer significant opportunity for creative pond configuration and landscape design. Participation of an experienced wetland dcsigrer is suggested. A significant potential drafjback for wat ponds in and climates is that the contributing watershed for these facilities is often incapable of pro�riding an adequate water supply to maintain the pe„anent pool, especially during the summer months. Ma'• s-up water (i.e., welt water or municipal drinking water) is sometimes used to supplement the Rc is--d hp.7 2, 20a7 Paoc 24 of 32 .. rain'all;runoff prccess f:jr v!"A basin fac:illies t,ea:inr v;cat;;rs�ieds :hit generate iF'(sufficient runoff. v 0as, gn Considerations: Wet basins can remove ove-r 90 ro of the total suspended solids contained within the volume of runoff captured in the basin. Design elemants of wet basins include basin sung, basin cor-figuraEort, basin side slopes, sediment forebay, Infow and auttlow strtctures, vegetation, depth of permanent pool, aeration, and arosion control. Wet basins are appropriate for -� large drainage areas with low to maderata slopes. Maintenance Requirements: Mainlenanca requirements for wet basins include mowing, routine inspections, debris and littar rerTo,;31, erosion control, nuisance Control, structural repairs, sediment removal, and harvesting. Grassy Swales Grassy swales are vegeta--d channels that convey stonnwater and remove pollutants by filtration through crass and infiltration through soil. They require shallow slopes and soils that drain well. PoflutanC removal capability is related to channel dimensions, longitudinal slope, and type of vegatation. apt -mum design of Giese components will in,,:rease contact time of runoff through the swale and improve pollutant removal rates. Grassy swales are primarily stormwater conveyance systems. They can provide sufficient control under fight to moderate runoff conditions, but their ability to control large storms is limited. Therefore, they are most applicable in low to moderate sloped areas or along highway medians as an alternative to ditches and curb and gutter drainage.Tnefr parformance diminishes -sharply in highly urbanized settings, and they are generally not effective en^ugh to receive construction stage runoff where high sediment loads can overwhelm the system. Grassy swales can be used as a pretreatment measure for other downstream EMPs,.such as extended detention basins. Enhanced -• grassy swales cridllze check dams and wide depressions to increase runoff storage and promote greater settling of pollutants. Grassy swales can be more a�Lheticalfy pleasing than convrete or rock -lined drainage systems and .r are generally less expe.ns"rre to constru-t and maintain. Swales can slightly reduce impervious area and reduce the pollutant accumulation and delivery associated with curbs and gutters. The disadvantages of this technique include the possibilityof erosion and channelization overfirne, and the need for more right-of-way as compared to a storm drain system. When properly constructed, inspected, and maintained, the fife expectancy of a swale is estimated to be 20 years. .. Design Considerations: Comparable performance to we# basins • Limited to treating a few acres • Availability of water during d•ry periods to mains in vegetation Y Sufficient available land area i he suitabilityof a swaie at a site w:tl depend on land use, si-e of the area serviced, soil type, slope, imperiousness of the contributing watershed, and dimensions and slope of the swale system. In ow o.viScd Ap:i 2, 2D07 page 25 of 32 generai, &.,vales can be used to , e -,re a-eas of less than 10 acre], with slopes no greater than 5 %. The seasonal high water table should be at least 4 fiat below the surf. -ace. Use or natural topographic lows is encouraged, and natural drainage courses should be regarded as significant local resources to be kept in use. Maintenance Requirements: RQsea ch in the Austin area indicates that vag?ta€ed controls are eifabtive at r-em, oving pollutants e,,en v.han dormant Therefore, irrigation is not required to maintain growth during dry -periods, but may by necessary only to prevent the vegetation from dyrng. Veaetation Lined Drainage Ditche-s Vegetation lined drainage ditches are similar to grassy sn+aies. These drainage ditches are — vegetated channals that convey storm crater and remove pollat<nts by nitration through grass and infiltraSon through soil. They require soila ttiat drain well. Pollutant rerun. oval capa5ilit} is related to channel dimensions, longitudinal slope, and t tpe of vegetation. Optimum design of these components will increase contact tine of runoff through the ditch and improve polit tart removal rates. Vegetation lined drainage ditches are primarily story, h water convayan cesystems. They have vegetation lined in the low flow channel and may include vegetated shelves. Vegeta5on in drainage ditches reduces.erosion and removes pollutants by lowering water velocity over the soil surface, binding soil particles with roots, and by filtration through grass and infiltration through soil. Vegetation lined drainage ditches can be used where: a A vegetative lining can Provide sumcient stability for•the channel grade by increasing maximum permissible velocity Slopes are generally less ft' ;a n 5%, with protection frorn sheer stress as neede A through the use of E3MPs, such as erosion control biankets site mndltions required to establish vegetation, i.e. climate, soils, topography, are present -4 Design Griteria: The suitability of a vegetation lined drainage ditch at a site will depend on land use, sire of the area serviced, sD11 type, slope, imperviousness of the contributing watershed, and dimensions and slope of the ditch syetern. The hydraulic capacity of the drairace ditch and other sierents such as erosion, siltation, and pollutant rernova! capability; must he taken into cansideraflon.-Use of natir31 topographic lows is encouraged, end natural drainage courser; shoo',d be regarded a.- significant local resources to be kept in use. Other iterrs to consider include the following: d Capacity, cross-section shape, side slopes, and grade Selact appropriate native vegetation Construct in stable, low areas to confom. avi h the nahiral drainage system. To reduce erosion potential, design he channel to avoid sharp bends and 5teap grades. d Design and build drainage ditches with appropriate scour and erosion protection. Surface water should be able to enter ever the vegetated banks without erosion occurring. PaCC 26 of 32 analYJCai i3 c c=uGra tjrY nl'antzal 1,hai pro,4iBs fcx t ii,- ccrl,;•osting industry and test metrcds for ccmposta,nalysis. TPYIECC prov:de_: plotocolsto sampla, monitor, and analyze matter ia:s during all stages of the composting process. Numerous parameters that might be of conger: In ;orr-post can be tested by fcllovving proiocols or test meJ,ods iisted in TMECC. TMECC' information can be found at htta:ll�vwvr.trnecc.orgltmecatindex.htrnl. The USCC Seat of Tes`jngAssurance (STA) program, contains information regarding compost STA certO cation. STA program information can be found at hftp:/1tmecc.org/sta1STA_prog am_desc; ipticn.hlml. Installation: Install in accordancc with cure-2nt TxDOT spacincatian. Use on slcoas 3:1 or latter. Apply a 2 inch uniform layer unless otherwiss shown on the plans or as directed. When rolling is specified, use alight corrugated drum roller. Mulch Fitter Berms and Socks Description: Mulch filter berms and socks are used to in�lercept and detain sediment laden run-off fron unprotactsd arias. When property used, mulch flter berms and socks can be highly effective at controlling sedimentfmrrl disturbed areas. Theycause rinoffto pond which allows haaviersolidsto settle. Mulch filter berms and socks are used during the period of construction near the perimeter of a disturbed area to intercept sediment white allowing water to percolate through. The berm or sock should remain in place until the area is permanently stabilized. Mulch niter berms should not be used when there is a concentration of water in a channel or drainage way. If concentrated flows occur after installation, corrective action must be taken. MLIch filter socks may be installed in construction areas and tempora-ily r; moved during the dayto allow construction activity provided it is replaced and properly anchored at the end of the day. Mulch filter berms and socks may be seaded to allow for quick vagetafive growth and reduction in run-off velocity. Mater;als: New types of mulch filter berms and socks are continuously being developed_ The Texas Department cf Tmnsportatian (TxDOT'1 his established minimum performance standards whizh crust b e met for ary products seeking to be approved i"or use within arty otTxDOT's construction or maintenance activities. N'lulch filter berms and socks used within any TxDOT construction or maintenance actvities must meet rrlaterial speciflcaiions in accordance with c:lrrent TxDOT specifications. T xDOT maintains a wabsite at h,_pJ/unr,w.dotstake.tx.usldesllandscapelcompaslspecifications.htm that provides information on compost specification data. This vrnbsite also contains information on areas where the Texas Commi3sion or, Environmental Quality (TC_Q) restricts the u&Y.of certain compost products. Nlu-ich fiitar barns and socks used for projects not related to TxDOT should 2iso be of quality materials by meeting performance standards and compost specification data. To ensure the quality .. of compost used for mulch Miter barmy and socks, products should meet all appCcable state and f'ederai regulations, irciuding but not Iimited to the United States Environmental Protection Agency ;USEPA) Code of Federal Regulations (CFR), Title 40, Part 503 Standards for Class A biosolids and -� Texas Natural Rescurca Conse.vation Oommisslon (now named TCEQ)Health and Safety 7:11eculations as dsfined in theTex?s Administration Cade (TAC), Chapter332, and all other relevant no ,-n- sd kpr:l2, 2007 .gage ?J of 32 no rLK;uir emc,nts for cowPo:it p :;ducts cut,in7 :1 in TAC. Testing rcqui,ements required by lthe TCEQ are defi-ted in TAC Chapter 332, inducing Sections §332.71 Sampling and Analysis Requirements for Final Products and §332.72 Final Product Grades. Compost specification data approved byTxDOT are appropriate to use=or ensuring the use of quajitycompost materials orfor auidarce. i esiing standards are dependent u; en the intended use for the compost and ensures product safety, and product performance regarding the products specific use. i he appropriate compost — sampling and testing pr otoco.s included in t;-re United St=tes Composting Council (USCG) Tsst Methods for the Examination of Gompcs,iag and Compost (TMEECC) should be conducted on cornpcst products used for mulch filter berms and socks to ensure that the products L,"— will not ., impact public health, safety, and the environmeni and to promote prodacjon and r; arketing of quality composts that meet analytical standards. TIVIECC is a laboratory manual that provides protocols for the composting industry and test' nWtnods for compost ai;alysI . TAA-CC pravidcs protocols to sample, monitor, and ar,a152e materials during all stages of the composting proCBss. Numarous parameters that might be of concern in corrWi st can bi testad by follmving protocols or test methods listed in TMECC. T MECC information can be found at http:fl�twrv.tm--cc.orgftmecxlindex-htmi. The iJSCC Seal of Testing Assurance (STA) program _ contains infonnabon regarding compost STA cer<iilcGaon. S T A program infani-.a8on can ba fauna at http:/ltme-=orgfstafSTA�rogram descriptiar .haul. Installation: 9 Install in accordance ordance with currant TOOT spacmcation. Much filter berms should be c-onstructsd at 1-1/2 feet high and 3 foot wide at locatibns shown on plans. rRoutlnely inspect and maintain filter berm in a functional condition at all times. Correct -- deficiencies immediately. Install additional niter berm rnaterial as directed. Remove sediment after it has reached 113 of the height of -the berm. Disperse filter ben-n or leave in place us directed. V Mulch filter socks should be in 3 inch, 12 inch or 18 inch or as directed. Sock materials should be designed to allow for propar perc:flatlon through. Cornoost Filter Berms and Socks Description: Compostfifter berms and socks are used to intercept and detain sadiment laden rJn- off from unprotected areas. When properly used, compost filter beams and socks can be highly effective at controlling sediment from disturbed areas. They cause runoff to pond which allows heavier solids to settle. Compost filter berms and sacks are used during the period of consa-uction near the perimeter of a disturbed area to intercept sediment while allowing water to percolate —} through. The bean or sock should remain in place unti, the area is permanently staWized. Compost miter bears shoc:ld not be used when thare is a concent,�ttcn of water in a channel or drainage way. J, concentrated bows occur after installation , corrective aedon must be taken. Compost filter socks may be installed in construction areas and temporality moved during the day to allow construction activity provid=d it is replaced and property anchored at the end of the da'y. Compost filter berms and socks may be seeded to al o,av rar quick vegetative growth and reduction in ruri-off velocity. Materials: Rveir.ed April2, 20V rage 30 of 32 •• New tapes of compost 'riper beans and socks ara-cantinuousiy LEirig deveicperj. T h o- Tcite; Department o" Transport=lion (TxDOT) has established minimum performance standards which gust be met for any products saeking to be approved for use %Nith in any of T xDOT's construction or no maintenance activities. Compost filter berms and socks us -ad iv!thin any TxDOT construction or maintenance actrvities must meet raterial specifications in accordance with TxDOT specification 10�?. TOOT maintains a websits at htp:i/r&tivw.dot.staL.bc.usldrillarrdscapelcompost/specificadons.htm that provides information an compost speciffica`ion data. T his website also contains information an areas where the Texas Commission on Environmental Quality (TOEQ) rastricts the use of certain compost products. Compost pater berms and socks used for prciects not related to TxDOT should also be of qua, ty materials 5y meeting performancs standards -and Mrrrpost specification data. To ensure the quality of cornpost used as compost fiber berms and socks, products should rreet all applicable state and federal regu{alions, including but not limited to the United States EnvironmanW Protection Agency (USEPA) Code of Federal Ragulabons (CPR), Title 40, Part 503 Standards for Class A biosolids and i exas Natural Resoump, Conservation Commission (now named TCEC) health and Safety Regulations as deer ied in the Texas Administ:afion Code (i AC), Chapter 332, and all other r elevant ;aquirements forcorrpost products outlined in TAC, Chapter 332. Testingrequirements required by the T CEQ are defined in TAO Ghapt:r 332, including Sections §332.7i Sampling and Analysis Requirements for Final Products and §332.72 Final Product Grades. Compost specification data approved by TAROT are appropriate to use for ensuring the use pc qualitycompost materials or for guidance. i esting stanuards are dependent upon 4-te ins—andad case fo, the compost and ensures product safety, and product performance regardng the product's specific use. i ne appropriate compost sampling and testing proto: ols included in the United States Composting Council (USCC) Test NIM-thods for the Examination of Composang and Compost (TIAECC) should be conducted on compost products used for compost filter berms and socks to ensure that the products used will not .. impact public health, safety, and the environment and to promote production and marketing of quaMy composts that meet analytical standards. T 10ECC is a laboratory manual that provides protocols for the comosting industry and test methods for compost analysis. TMECC provides protocols to sample, monitor, a;rd anbly�_ rn_t�rials during all stages of the composting process. .. Numerous parameters 'that might be of concern in compost can be tested byfolicrwing protocols or test methods listed ir, Tiv1ECC. TidIECC information can be found at http:/MvAv.tmecc.orgftm?cc,'indexhtml. The USCC Seal of Testing Assumnce (STA) program .. contains information regarding compost S T n ceriitication. STA program information can be foundat h,tp:/,t'Lmecc.org/sta/STA_prDgra,-,l—descr.ption.htrni, installation. Insto-1; In accordance with TOOT Special Specification 1059. Compost filter bares shail be constructed at 1-1/2 feet high and 3 foot wide at locations shown on plans, Routitsly inspect and maintain filter berm in a funciSonal condition at all tunes. Correct daficiencies immediately. lastall abditional :filter berm material as directed. Remove sediment of er it has reached 113 of the height of the berm. Disperse filter berm cr leave in Place 25 directed. R: •i:cd Ap:71 Z 200T Page 31 of 32 No Cumpost 51 c:rsc.(:i:s shall be in 8 inch,12 inch or Is inch or as ciracted_ Sock rnater&s shall be designed allowing for proper percolation through. Sedimentation Chambers (only to be used when there is no space available for other approved SMP`s) Description: Sediment=lion 6' anbars are storm:tiatertreatment structures Chat can be usad when space is limited such as urban sattings. These structures are often tied into stormwater drainage sys`.arni for treatment of stormwater prior to entering state waters. The water qua lily benefits are the rernoval o; sediment and buoyant materials. These structures are not designed as a catch basin or detention basin and not typically usad for floodwater attenuation. Design Considerations: Average rainfall and surface area should b-- considered when following manufacturer's rec*mrnendations for cslarnber sizing and/or number of units needed to achieve effective TSS ramfl.ol. If properly sized, 50-80% removal of TS�S can be expected, Maintenance Requirements: Maintenance requirements include routine inspections, sediment, debris aad liter removal, erosion control and nuisance control. F.Gvis-ed Apr] 2, NOV Page 32 o- 32 I" no PIEl::AM C O NIPf, -NCE CERTIFICATION- U.S. Army Carps of Engineers Projc--t rvunber; Permit Number: Name of Perrctee: ~ Date of Issuance: Upon cornpletieri of the activity authorized by this permit and any mitigation required by the pen -nit, sign iEs certi cation a nd return it to the; Mowing address: Regulatory Branch CESVdF-PER-R U.S. Army Corps of Engineers P.A. Box 17300 Fort Worth, Texas 76102-0300 Please note that your permitted activity is subject to a compliance iusp+ection by a U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit was completed in accordance with the terms and conditions of the said permit, and required mitigation lwas completed in accordance with the permit conditions. Signature of Pent tree Date Md .. r