HomeMy WebLinkAboutContract 58704-FP1FORT WORTH,
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
-FP1
City Secretary No. 58704
Date Received: 03/01/2024
City Project N!?: 104179
Regarding contract 58704 2023 Concreate Restoration Contract 2 for as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 11/29/2023 through
M&C 22-0983 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as
complete.
Original Contract Amount:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
Pair6ci L. WaA:
Patricia L. Wadsack (Feb 29, 202417:37 CST)
Recommended for Acceptance
Asst. Director, TPW - Capital Delivery
A. —
Lauren P ri e u r ( Feb 29, 202417:55 CST)
$1,449,450.00 Days 180
$ 184, 750.00 Ns 2 Days Added by CO 35
$ 1,634,200.00 Total Days 215
$ 1,217,005.29 Days Charged 215
Days @ $ / Day
$ 1,217,005.29
$ 1,156,155.03
$ 60,850.26
Feb 29, 2024
Date
Feb 29, 2024
Accepted
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. City Manager
Comments:
Date
Mar 1, 2024
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
C-620 Signature Page
Contractor's Application for Payment
Invoice No. 11-FINAL
To (Owner) City of Fort Worth Invoicing Period (From - To):
Invoice Date:
1/1/2024-1/30/2024
1/30/2024
P. O. FW020-009160 From (Contractor):
Remit to ( If Not Automatic Deposit):
Number: Makou Inc
Project: 104179 Contractor's CFW Vendor No.:
7000000265
City secretary Contract 58704 Contract
2023 Concrete Restoration 2
Number: Name: me:
Application For Payment
Change Order Summary
(Approved Change Orders
11. ORIGINAL CONTRACT PRICE..........................................................
$ $1,449,450.00
Number Additions Deletions
12. Net change by Change Orders.................................................................
$ $184,750.00
1 $634,750.00 $450,000.00
13. Current Contract Price (Line 1 t 2)........................................................
$ $1,634,200.00
2 $8,730.00 $8,730.00
14. TOTAL COMPLETED AND STORED TO DATE
3
I (Progress Estimate, Construction Allowance and Change Orders).......
$ $1,217,005.29
4
15. RETAINAGE:
5
I a. X $1,217,005.29 Work Completed..........
$
6
I b. X Not Used
$
7
I c. Total Retainage (Line 5a + Line 5b)................................
$
8
16. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c).............................
$ $1,217,005.29
TOTALS $643,480.00 $458,730.00
17. LESS PREVIOUS PAYMENTS (Line 6 from prior Application)........,
$ $1,156,155.03
NET CHANGE BY S184,750.00
8. AMOUNT DUE THIS APPLICATION .................................................
�9.
$ $60,850.26
CHANGE ORDERS
BALANCE TO FINISH, PLUS RETAINAGE
(Column G on Progress Estimate+ CA + Cos + Line 5 above) ..............
$ $417,194.71
Contractor's Certification
10. CONTRACT TIME:
The Contractor certifies with the submittal of this document and associated Payment Request Submittal
a. Days Awarded
180
on the City of Fort Worth Buzzsaw system that to the best of their knowledge: (1) all previous progress
b, Days Added by CO
35
payments received from Owner on account of Work done under the Contract have been applied on
Total Days
account to discharge Contractor's legitimate obligations incurred in connection with Work covered by
C.
215
prior Applications for Payment; (2) title of all Work, materials and equipment incorporated in said Work
or otherwise listed in or covered by this Application for Payment will pass to Owner at time of payment
d Days Charged
215
free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond
acceptable to Owner indemnifying Owner against any such Liens, security interest or encumbrances);
e, Days Remaining
and (3) all Work covered by this Application for Payment is in accordance with the Contract Documents
and is not defective.
Liquidated Damages $650.00 x day
Consent of Surety
vtAAS�C� � Affidavit of Bills Paid
magsoodthan (Feb 28, 202409:45 CST)
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Progress Estimate
IFor (contact)
2023 Concrete Restoration 2
AppfiounmPeriod
1/1/2024-1/30/2024
A
(teen
Bid Item No
Descnptmn
Specification
Unit of
Section No.
Measure
1
0135.0201 Remobilimbon
017000
EA
2
3471.0002 Portable Message Sk
3411 13
W K
9999.0000 Remove and Replace E" Concrete Dnveway
02411N 1213
3
20
SF
9999.0000 Remove and Replace 7" Concrete Pavement HES
024115/3213
4
13
SY
5
3123.0101 Unclassified
31 2316
CY
yExxcavation
GR-2
32 It 23
CY
7
.3�{2jg�1l11.01JJ2�2Corx0�pBretPpeHES (extra deoth)
32 13 13
CY
8
379R.8100 b'odre lacement
329213
SY
9
3211.0100 Toj�aan
329119
CV
10
3213.0700 Joint Sealant
32 13 73
LF
11
3305.111, Miscellaneous A stment/UhlNes)
'71A5')
3305 14
LS
I 12
9999.0000 GeSg Tensor Rl 1 or ADoroved equal
999900
BY
1 13
3217.2102 REFL Relsed suer TY l-C
321723
EA
14
3217.2103 REFL Relsed Marker TY II -A -A
3217 23
EA
15
3217.0002 8" White Solid Thermoplastic Lane Line
32 1723
LF
16
3441.1301 Loonn``°°..°D�etector, Cable S-ut
344110
LF
etect ble
3441 10
LF
18
3217.0001 44Double SolidDThermojaj'ashc IHAS) Center Lane Line
32 l7 23
LF
19
3217.0401 18" SLD Pvmt MmlldnNAE
32 l7 23
LF
1 20
3217.0501 24" SLD Pvml Marid HAE
32 1723
LF
1 21
3217.1001 Lane Legend RR
32 1723
EA
1 22
3217.1002 Lane Legend Arrow
32 1723
EA
3213.0501 Remove and Replace Banner Free Ramp, Type P-1/P-2
02 41 13/ 32 13
23
20
EA
3213,0501 Remove and Replace Banner Free Ramp, Type R-1
02 41 13/ 32 13
24
20
EA
9999.0000 Remove and Replace 4" Sdewalk
024113/32 13
25
20
SF
26
`3305.0106 Manhole Adiustment
3305 14
EA
27
'3217.5001 Curb Address Painting
321725
EA
28
3999.0096 Consbuclion Allowance
EA
City senretary 58704
Contract Nam:
Bid Quantity Unat Pnce
1.000000 $500.00
25.000006 $500.00
4500.000000 $13.00
10500.000000 $100.00
2511.000006 $30.00
3s0.000006 $65.00
wo 1/110006 $200.00
2000.000006 $10.00
120.000006 S40 00
3500.000006 $500
1.o00o06 $10.00000
1500.o00006 $500
150.000006 $700
150.000006 $700
150.000006 $1000
100.o00006 $3000
100.000006 $1500
4780 000006 $10 00
200.000006 $1500
200.000006 $1800
2.000006 $1.00000
2.000006 $1.00000
iQZZLLL�i3Ff
if�ZZLLL�3r7
27s0.000000_ $11 00
20.00000' $500 00
30.00000(f $75 00
1.00000(Z $30.000 00
B C D
Bid Value Estr...it Quantity Value
Installed
$1.050.000.00 4998.
$7.500.00 497.
$22.750.00
$20.000.00 497.
$20.000.00 529.
$4.600.00
$17 00 .00
$10.000.00 0.
$7.500.00
$1.050.00
$1.050.00
$1.500.00
$3.000.00
$1.500.00
$47.800.00 2634.
I
M
This do-. has been modified from its ongrual form as an E3CDC document and tic user did not highlight the
modificatrons You are encouraged m read the document carefully and consult Legal Counsel prior tons execu -
C-620 Unit Price Progress Estimate
Contractor's Application
Application Namber 11-FINAL
Applieation Date 1/30/2024
E F
G
Total Completed % Balance ro Fr uch
Previously hsstalled Value
Msently
Value TkNord rod Stored in Date (F)
(B - F)
(Pre
Shredtored (not to C)
(D+H) B
$500.00
$12,500.00
$7.387.38
$7,387.38 12.6%
$51,112.62
$499``�879.00
$499.879.00 47.6%
$550,12100
$14.925.90
$14.925.90 199.0.
$7,425.90
$22.750.00
$99�506.00
$99,506.00 497.5%
�79,50800
5 294.00
$5,294.00 26.5%
$14,706.00
$4,800 00
$17,500 00
$1.046.4
$1,04646 105%
$8,95354
$7,500 00
$1.050 00
$1.050 00
$1.500 00
$3.000 00
$1.500 00
$26.345.90
$26,34590 551%
$21.45410
$3.000 00
$817.d
$817 56 22 7%
$2.782 44
$2.000 00
$1.000.00
$1,00000 500%
$1,00000
$40.500.00
$40,50000 882%
$5,40000
$21.000.00
$21,00000 636%
$12,00000
$26 25.98
$26,225 98 86 7%
$4,024 02
si�bo.gJ
$2,1OO.dd
$1,50000 150%
$2, 10000 933%
$8,50000
$15000
$30,000 00
Progress Estimate
Fer (eOntlaC1) 2023 Concrete Restoration 2
Application Period 1/1/2024-1/30/2024
Item
Bid Item No Description
City Secretary 58704
Contract N—
A B
Specification Umt of Bid Quantity Umt Price Bid Value
Section No. Measure
C-620 Unit Price Progress Esfimate
Contractor's Application
Apphca[ion Number 11-FINAL
Application Date 1/30/2024
C D E F G
Total Completed / Balance m Fmish
Estimated Quantity Matenale Presently
Installed Value Previously h�stalled Value Value TkaPcriod Stored (not iv Q Stored to Date (B - F)
(D+E) B B
I I
I I I
I I I
I I I
I I I
I I
I I I
I I I
I I I
I I I
I I
I I I
I I I
I I I
I I I
I I
I I I
I I I
I I I
I I I
I I
I I I
I I I
I I I
I I I
I I
I I I
I I I
I I I
I I I
I I
I I I
I I I
I I I
I I I
I I
This documem has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged m read the document carefully and consult Legal Counsel prior m ns execution.
Progress Estimate
Fnr (`nntlaC1) 2023 Concrete Restoration 2
AppficationPeriod 1/1/2024-1/30/2024
Item
Bid I[em No Descnption
city secretary 58704
Contract Num:
A B
Specification Umt of Bid Quantity Umt Pnce Bid Value
Section No. Measure
C
Estimated Quantity
Installed
This documem has been modified from its ongival form as an EJCDC document and the user did not highlight the
modifications You are encouraged m read the document carefully and consult Legal Counsel prior tons execution.
Previously h�stalled Value
C-620 Unit Price Progress Estimate
Contractor's Application
Application Number 11-FINAL
Application Date 1/30/2024
E F G
Total Completed / Balance to Fmish
Value Tlns P—d M.,Presently and Stored to Date (F) (B - F)
Shred (mtm C) (D+E) B
Progress Estimate
Fet (eOntlaC1) 2023 Concrete Restoration 2
Appfication Period 1/1/2024-1/30/2024
Item
Bid I[em No Descnptton
Totals
City Secretary 58704
Contract N—
A B
Specification Umt of Bid Quantity Umt Pnce Bid Value
Section No. Measure
$1.449.450.00
C
Estimated Quantity
Installed
C-620 Unit Price Progress Esfimate
Contractor's Application
Application Number 11-FINAL
Application Date 1/30/2024
D E F G
Total Completed % Balance m Fmish
Matenals Presently
Value Previously hsstalled Value Value Tks Perod Stored(not,Q Storedto Date (B B-P)
(D+H)
This document has been modified from its onginal form as an EJCDC doemnent and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to ns execution.
$747.528.18 516% $701.921.82
C-620 Change Order
Progress Estimate Construction Allowance Usage
ADDITIONS
For (contract) 104179 2023 Concrete Restoration 2
Application Penod:
Item
Item Number Description
34 3217.4306 Remove 24" Pvmnt Markine
35 3217.0101 4" BRK Pvmvt Markine HAS (W)
Totals
A
Contractor's Application
City Seeretary 58704 Application Number 11-FINAL
Contact Num:
1/1/2024-1/30/2024 Application Date: 1/30/2024
B
C
D
E
F
Speoifioanon Unit of
Sectiov No. Measure
Quantiry to Add
Unit Price AddiKov Value
estimated Qoavtity
Installed
Valve
Previoasly Valve This
Installed Value Period
Materials Presently
Stored (not in C)
Total Completed %
suit Stored to Date (F)
(D I E) B
LF
117.00000000
$4.65 $544.051
117.00000000
$544.05
$544.05
1 $544.05 100.0%
$2.144A
320.00000000
$1600.00
$1,600.00
This document has been modified from ns original form as an E1CDC document and the user did not highlight the
modifications Yon are encouraged to read the document carefully and consult Legal Counsel prior to its execution
$2,144.05 100 0%
Balance to Finish
(B - F)
C-620 Change Order
Progress Estimate Construction Allowance Usage Contractor's Application
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
Fm (contract): 104179 2023 Concrete Restoration 2 Application Number: 11-FINAL
Application Period: I/I/2024-1/30/2024 Application Date: 1/30/2024
A B C D E F
Item
Bid Item Number Description Specification Unit of Quantity to Delete Unit Price Reduction Value Not Used Not Used Not Used Not Used Not Used Not Used Not Used Not Used
Section No. Measure
28 9999 0096 Construction Alloaznw EA 007146830 $30,000.00 $2,144 OS
Totals $2.144.04
This document has been modified from ns onginal form as on E1CDC document and the user did not highlight the
modifications Yon are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate Change Order Number 1 1
ADDITIONS
(Fen (comma d): 104179 2023 Concrete Restoration 2
(Application Period:
Item
Change Order Item Desenption
No
29 3213.0205 Remove and Replace 10" Cone Pvmt HES
30 3212.0401 HMAC Transition
Totals
A
Contractor's Application
City Secretary gg704 Application Number: 11-FINAL
Contract Nam:
1/1/2024-1/30/2024 Application Date: 1/30/2024
B
C
D
E
F
Section No. Unit of
Section No. Measure
CO Quandty to Add
Addition
Unit Price Change Order
Value
Estimated Quantity
Installed
Valac
Previously Valnc This
Installed Value Pored
Materials Presently
Stored (not to C)
Total Completed
and Stored to Data
� � E)
%
(F)
B
SY
5300.00000000
$119.00 $630.700.00
3803
1 $452.645.06
71.8%
TN
30.00000000
$135.00 $4.050.go
1 $3.780.00
93.3%
$634.750.01
.74000000
$452 645.06
$452,645.06
28.00000000
$3 780.00
$3,780.00
$456.425.06
$456,425.06
This document has been modified from ns original form as an E1CDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
S456,425.06 71.9%
Balance to Finish
(B - F)
$178.054.94
$270.00
6i"M1F.
C-620 Change Order
Progress Estimate Change Order Number 1 1
DELETIONS
Contractor's Application
For (commeh:
2023 Concrete Restoration 2
104179
Application Number:
11-FINAL
Apptieation Period
1/1/2024-1/30/2024
Amficaoon Date
1/30/2024
A
B C
D E
F
Item
Deletion
Change Order It
Specification Unit of CO D �ety to
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Descxipfion
Section No. Measure
Value
4
9999 0000 Remove and Replace 7" Concrete Pavement IES
SY 4500 00000000
$100.00 $450,000 00
Totals
This document has been modified from its ongin d form as an EJCDC document and the user did not highlight the
modifications You are encouraged m read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate Change Order Number 1 2
ADDITIONS
Contractor's Application
IFor (contmcl): 104179 2023 Concrete Restoration 2
City Secretary:
58704
Appheapon Nnmber:
11-FINAL
Contract Num
IApphcmon Period.
1/1/2024-1/30/2024
Apphcanon Date:
1/30/2024
A
B
C
D E
F
Item
Balance to Finish
Addition Change
Estimated Quantity
Previously Value This Materials Presently
Total Completed
% B
( P)
Change Order Item Desch lion
p
Spem1—on Una of CO Quantity to Add Unit Rice Order Value
InsW led
Value Installed Value Period Stored (not in C)
and Stored to Date
(P)
No.
Swim No. Measure
(DIE)
B
I 31 3217 0501 Famish/h ata1124" Pref ed The a -lactic Contrast LF 180.00000000 $22.00 $3.960.00
I 32 3213.0501 Remove and Replace bamer Free Ramp. Tvee M-3 EA 1.00000000 $3000.00 $3000.00
I 33 Rml—one. of IiAererouod Enclo ure of T affic Sienel Assembh LS 1 00000000 $1.770.00 $1.770.00
Addine 35 it —
Totals $8,730.00
279.00000000
$6138.00
$6,13800
1.00000000
$3,000.00
$3,000.00
100000000
$1770.00
$1,77000
S10,908.00
$10.908.00
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
$6.138.00 155 0%
42,178,
$3.000.00 100.0%
I
$1.770.00 1000%
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
�
�
�
�
�
�
�
�
�
�
$10.908.00 1249%
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-$2,178.001
C-620 Change Order
Progress Estimate Change Order Number 1 2 1 Contractor's Application
DELETIONS
For greamac0:
104179 2023 Concrete Restoration 2
Apphcatmn N—bec
11-FINAL
Application Period:
I/1/2024-1/30/2024
Applicatmn Date:
1/30/2024
A
B C
D E
F
Item
CO Quantity to
Deletion Change
Change Order Item
Desorption
Specification
Specification Unit of Delete
Unit Price
Order Value Not Used
Net Used Not Used Net Used Not Used
Not Used Not Used Not Used
No.
18
3217.0001 4" Double Solid Thermoplastic, (HAS) Center Lane Line
Section No. Measure
LF 213.00000000
$10.0d
$2,130.0d
20'217.0501
24" SLD Pvmt marking HAE
LF 200.00000000
$18.00
$3,600.00
24
�213.0501 Remove and Replace Barter Free Ramp, Type R-1
EA 1.00000000
$3,000.00
$3,000.00
Totals S8.730.00
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications Yon are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 3
Contractor's Application
ADDITIONS
IFar (contrect): 104179
2023 Concrete Restoration 2
City Secretary
55704
Application Number:
11-FINAL
Contract Num:
Appheation P-od:
1/1/2024-1/30/2024
Application Data
1/30/2024
A
B
C
D E
F
Item
Balance to Finish
Addition
estimated Quantity
Previously Value This Materials Presently
Total Completed %
(B - F)
Change Order Item
Descn tlon Specification Unit of CO Quantity to Add
Unit Price Change Order
Installed
Valuo Installed Value Period Stored (mt in C)
and Stored to Date (F)
No.
P SwimNo. Measure
Valne
(D+E) B
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Comsel prior to its .....firm
C-620 Change Order
Progress Estimate
Change Order Number 1 3
Contractor's Application
DELETIONS
For (commc0: 104179
2023 Concrete Restoration 2
Application Number
11-FINAL
Application Period:
I/1/2024-1/30/2024
Application Date:
1/30/2024
A
B C
D E
F
Item I
CO to
Deter -
Change Order Item
Deletety
Description Specification Unit of
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Section No. Measure
Value
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 4
Contractor's Application
ADDITIONS
IFm (tramact): 104179
2023 Concrete Restoration 2
City Secretary
55704
Application Number:
11-FINAL
Contract Num:
Application Period:
1/1/2024-1/30/2024
Application Dale:
1/30/2024
A
B
C
D E
F
Item
Balance to Finish
Addition
EstimatedQuantity
Previously Valueod Materials Presently
Total Completed
(g_p)
Change Order Item
Specification Unit of CO Quantity to Add
�Gf1pt1O°
Unit Pnce Change Order
installed
nsta
Value
installed Value Period Stored (not m C)
and Stored to Date (F)
No
Section No Measure
Value
(D I E) B
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 4
Contractor's Application
DELETIONS
For (commc0: 104179
2023 Concrete Restoration 2
Application Number
11-FINAL
Application Period:
I/1/2024-1/30/2024
Application Date:
1/30/2024
A
B C
D E
F
Item I
CO to
Deter -
Change Order Item
Deletety
Description Specification Unit of
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Section No. Measure
Value
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 5
Contractor's Application
ADDITIONS
IFm (tramact): 104179
2023 Concrete Restoration 2
City Secretary
55704
Application Number:
I l-FINAL
Contract Num:
Application Period:
I/I/2024-I/30/2024
Application Dale:
1/30/2024
A
B
C
D E
F
Item
Balance to Finish
Addition
EstimatedQuantity
Previously Value This Materials Pre sently
Total Completed
(g_p)
Change Order Item
Specification Unit of CO Quantity to Add
�Gf1pt1O°
Unit Pnce Change Order
Installed
nsta
Value
Installed Value Period Stored (not m C)
and Stored to Date (F)
No
Sodium No Measure
Value
(D I E) B
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 5
Contractor's Application
DELETIONS
For (commc0: 104179
2023 Concrete Restoration 2
Application Number
11-FINAL
Application Period:
I/1/2024-1/30/2024
Application Date:
1/30/2024
A
B C
D E
F
Item I
CO to
Deletion
Change Order Item
Deletety
Desm 0° Specification Unit of
�
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Section No. Measure
Value
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 6
Contractor's Application
ADDITIONS
IFar (contrect): 104179
2023 Concrete Restoration 2
City Secretary
55704
Application Number:
11-FINAL
Contract Num:
Appheation P-od:
1/1/2024-1/30/2024
Application Data
1/30/2024
A
B
C
D E
F
Item
Balance to Finish
Addition
estimated Quantity
Previously Value This Materials Presently
Total Completed %
(B - F)
Change Order Item
Descn tlon Specification Unit of CO Quantity to Add
Unit Price Change Order
Installed
Value Installed Value Period Stored (mt in C)
and Stored to Date (F)
No.
P Swim No. Measure
Valne
(D+B) B
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Comsel prior to its .....firm
C-620 Change Order
Progress Estimate
Change Order Number 1 6
Contractor's Application
DELETIONS
For (commc0: 104179
2023 Concrete Restoration 2
Application Number
11-FINAL
Application Period:
I/1/2024-1/30/2024
Application Date:
1/30/2024
A
B C
D E
F
Item I
CO to
Deter -
Change Order Item
Deletety
Description Specification Unit of
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Section No. Measure
Value
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 7
Contractor's Application
ADDITIONS
IFar (contrect): 104179
2023 Concrete Restoration 2
City Secretary
55704
Application Number:
11-FINAL
Contract Num:
Appheation P-od:
1/1/2024-1/30/2024
Application Data
1/30/2024
A
B
C
D E
F
Item
Balance to Finish
Addition
estimated Quantity
Previously Value This Materials Presently
Tots] Completed %
B _
( F)
Change Or d« Item
No.
Spemfic N.. Una of CO Quandry to Add
Desmptton Seaton No. Measure
unit Price change order
Valve
Installed
valve
Installed Valve Period Stored (not in C)
and Stored to Date (F)
(p+B) B
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its .....firm
C-620 Change Order
Progress Estimate
Change Order Number 1 7
Contractor's Application
DELETIONS
For (commc0: 104179
2023 Concrete Restoration 2
Application Number
11-FINAL
Application Period:
I/1/2024-1/30/2024
Application Date:
1/30/2024
A
B C
D E
F
Item I
CO to
Deter -
Change Order Item
Deletety
Description Specification Unit of
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Section No. Measure
Value
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 8
Contractor's Application
ADDITIONS
IFm (tramact): 104179
2023 Concrete Restoration 2
City Secretary
55704
Application Number:
11-FINAL
Contract Num:
Application Period:
1/1/2024-1/30/2024
Application Dale:
1/30/2024
A
B
C
D E
F
Item
Balance to Finish
Addition
EstimatedQuantity
Previously Valueod Materials Presently
Total Completed
(g_p)
Change Order Item
Specification Unit of CO Quantity to Add
�Gf1pt1O°
Unit Pnce Change Order
installed
nsta
Value
installed Value Period Stored (not m C)
and Stored to Date (F)
No
Section No Measure
Value
(D I E) B
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
C-620 Change Order
Progress Estimate
Change Order Number 1 8
Contractor's Application
DELETIONS
For (commc0: 104179
2023 Concrete Restoration 2
Application Number
11-FINAL
Application Period:
I/1/2024-1/30/2024
Application Date:
1/30/2024
A
B C
D E
F
Item I
CO to
Deter -
Change Order Item
Deletety
Description Specification Unit of
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Section No. Measure
Value
Totals
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications You are encouraged to read the document carefully and consult Legal Counsel prior to its execution
City of Fort Worth Summary of Charqes
City secretary Contract Num: 58704 I 2023 Concrete Restoration 2 I P. 0.: FW020-009160
Number:
pl
Application Period: 1/1/2024-1/30/2024 I Apumbr: I 11-FINAL
Funding Identification (FID) Total Completed Amt Remaining Gross
Original Contract
130100-0200431-5740010-104179-E03380-9999
to
10
10
10
10
10
10
10
10
10
I
I Change Order 1
130100-0200431-5740010-104179-E03380-9999
10
10
10
10
10
10
10
10
10
10
I
I Change Order 2
130100-0200431-5740010-104179-E03380-9999
10
10
10
10
10
10
10
10
10
10
I
$749,672.23
$456,425.06
$10,908.00
$699,777.77
($271,675.06)
($10,908.00)
Project Number: 104179
Application Date: 1/30/2024
Retainage Net
City Secretary Contract Num: 58704
Application Period:
Funding Identification (FID)
I Change Order 3
I30100-0200431-5740010-104179-E03380-9999
Io
to
Io
to
Io
to
Io
to
Io
10
I
I Change Order 4
I30100-0200431-5740010-104179-E03380-9999
Io
10
Io
10
Io
10
Io
10
Io
10
I
I Change Order 5
I30100-0200431-5740010-104179-E03380-9999
Io
10
Io
10
Io
10
Io
10
Io
10
I
City of Fort Worth Summary of Charqes
2023 Concrete Restoration 2 I P. 0.: FW020-009160
Number:
pl
1/1/2024-1/30/2024 I Apumb r: I 11-FINAL
Total Completed Amt Remaining Gross
$0.0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0 r
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Project Number: 104179
Application Date: 1/30/2024
Retainage Net
City Secretary Contract Num: 58704
Application Period:
Funding Identification (FID)
I Change Order 6
I30100-0200431-5740010-104179-E03380-9999
Io
to
Io
to
Io
to
Io
to
Io
10
I
I Change Order 7
I30100-0200431-5740010-104179-E03380-9999
Io
10
Io
10
Io
10
Io
10
Io
10
I
I Change Order 8
I30100-0200431-5740010-104179-E03380-9999
Io
10
Io
10
Io
10
Io
10
Io
10
I
City of Fort Worth Summary of Charqes
2023 Concrete Restoration 2 I P. 0.: FW020-009160
Number:
pl
1/1/2024-1/30/2024 I Apumb r: I 11-FINAL
Total Completed Amt Remaining Gross
$0.0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0 r
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Project Number: 104179
Application Date: 1/30/2024
Retainage Net
City of Fort Worth Summary of Charges
City Secretary ContractNum: 58704
2023 Concrete Restoration 2 �p. o.: FW020-009160
Project Number: 104179
Application Period:
1/1/2024-1/30/2024 Application 11-FINAL
Application Date: 1/30/2024
Number:
Funding Identification (FID)
Total Completed Amt Remaining Gross
Retainage Net
Totals
30100-0200431-5740010-104179-E03380-9999
$1,217,005.29 $417,194.71
0
0
0
0
0
0
0
0
0
0
Grand Total
$1,217,005.29 $417,194.71 $0.00
1 ($60,850.26)1 1 $60,850.26
FORTWORTH
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2023 CONCRETE RESTORATION CONTRACT 2
M&C; 23-0588 CPN; 104179 CSO # 58704 DOC# 1
Date:
To: Name Department Initials Date Out
1
Ann Estes
BSP
7#-
Jun 29, 2023
2
Magsood Khan
Vendor
k
Jun 29, 2023
3
Travis Strang
TPW
�
r5 .
Jul 5, 2023
4
Iretomiwa Otuyelu
TPW
4-5.
Jun 29, 2023
5
Omar Elbagalati
TPW
ilk-
Jul 5, 2023
6
Mary Hanna
TPW
m/r
Jul 6, 2023
6
Patricia Wadsack
TPW
1_w
Jul 6, 2023
7
Lauren Prieur
TPW
Jul 7, 2023
7
Doug Black
Legal
Jul 7, 2023
8
William Johnson
CMO
Jul 10, 2023
9
Janette Goodall
CSO
?-
Jul 13, 2023
10
TPW Contracts
TPW
CC: Program Manager, Sr.
CPO, TPW BSAP Recon Team, TPW Records Room, TPW Contracts
-Bus Sppt: Ann Estes;
-Prg Mgr• Omar Elbazalati;
-Sr. CPO:
Mary Hanna.
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes X No
RUSH: ❑ Yes X No SAME DAY: ❑ Yes X No NEXT DAY: ❑ Yes X No
ROUTING TO CSO: ❑ Yes ❑ No
Action Reauired:
❑ As Requested ❑ Attach Signature, Initial and Notary Tabs
❑ For Your Information
X Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please notify TPWContracts(a),fortworthtexas.gov for pickup when complete. Call ext. 7233 or
ext. 8363. Thank you!
CSC No. 58704-COI
FURT 1�4'O RTH
City of Fort Worth
Change Order Request
Project Name 2023 Concrete Restoration Contract 2 I City Sec # l 58704
Client Project #(s)l 104179
Project Repair and replacement of select concrete pavement panels on Meadowbrook Dr.
Description
Contractorl Makou Inc. Change Order#1 1 1 Date 6/29/2023
City Project Mgr.l Iretomiwa Otuyelu City Inspectorl Travis Strang
Dept.
TPW
Contract Time
Totals (CD)
Original Contract Amount
$1,449,450.00
$1,449,450.00 180
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$1,449,450.00
$1,449,450.00 180
Amount of Proposed Change Order
$184,750.00
$184,750.00
Revised Contract Amount
$1,634,200.00
$1,634,200.00 180
Original Funds Available for Change Orders
$200,000.00
$200,000.00
Remaining Funds Available for this CO
$200,000.00
$200,000.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
12.75%
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST + 25%)
$1,811,812.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This Change Order is to increase the contract amount in Construction Contract 58704.
During construction on Meadowbrook drive, it was discovered that the pavement thickness ranges from 8.5 inches to 11 inches, while the contract specifies 7 inches. Staff
negotiated an average of 10" with the contractor. Staff proposes to add 5300 SY of 10 inches concrete pavement (line item 29), and delete 4500 SY of 7 inches concrete
pavement (line item 4).
The concrete pavement transitions to asphalt pavement at varius sections on Meadowbrook Dr., the addition of HMAC Transition wil allow staff to repair asphalt pavement,
beyond the subsidiary 9 inches asphalt transition.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
OWContractor's Company Name ir Contractor Name Contract Signature Date
Makou Inc. Macsood Khan q d-„ ,g,,�,,,,, p, Jun 29, 2023
TMector/InspM
ass o
Date
Jul 5, 2023
Project and Contract Compliance Manager
Date
Jun 29, 2023
Program
Date
Senior Capital Project Officer
Date
Jul 5, 2023
Jul 6, 2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
PafriciaL waAsacK
Jul 6, 2023
Jul 7,2023
Assistant City Attorney
Date
Assistant City Manager
Date
9B t
Jul 7, 2023
Jul 10, 2023
Council Action if required
M&C Number l 23-0588 M&C Date Approved l 6/27/2023
ATTEST:
q- A ..&--
Jannette Goodall, City Secretary
TOM 4 W4014.1.31 City of Fort Worth
Change Order Additions
Project Name 1 2023 Concrete Restoration Contract 2 City Sec # 58704
Client Project# 1 104179 1
Conlractorl Makou Inc. I PMI Iretomiwa Otuyelu I Inspectorl Travis Strang l
Change Order Submittal # 0 Date j 6/29/2023
ADDITIONS
IIEM UESCHIPIION ULPI Uty Unit Unit Cost total
29 3213.020S Remove and Replace 10" Conc Pvmt HFS I PW S,JUU.000UUUUU 5y $119.UU $53U,/00.001
30 3212.0401 HMAC Transition TPW 30.00000000 TN $135.00 $4,050.001
TPW $634,750.001
1
1
1
Sub Total Additions $634,750.001
Change Order Additions Page 2 of 4
Krwuet"rl City of Fort Worth
Change Order Deletions
Project Name 1 2023 Concrete Restoration Contract 2 1 City Sec # 1 58704 1
Client Project # 1 104179 1
Contractorl Makou Inc. PMI Iretomiwa Oluyelu I Inspectorl Travis Strang
Change Order Submittal # Date 1 6/29/2023 1
DELETIONS
11 tM UtSl:Kll I IUN ULV 1
4 9yyy.000U Kemove and Keplace /" Uoncrele Pavement HL6 I Vvv
Unit Unit cost total
4,bUU. UUUUUUU JY y1UU.UU $45U,000.UU1
I
I
I
I
I
I
I
I
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
I
I
I
I
I
I
I
I
I
I
I
1
1
1
1
1
1
1
I
I
1
1
I
I
1
1
I
I
I
I
I
I
1
1
I
I
I
I
1
1
1
1
1
I
I
TPW $450,000.001
I
I
Sub Total Deletions $450,000.001
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE I AMOUNT
Total I $0.00 I
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 06/27/23 M&C FILE NUMBER: M&C 23-0588
LOG NAME: 202023 CONCRETE RESTORATION CONTRACT 2 CHANGE ORDER 1
SUBJECT
(CD 11) Authorize Execution of Change Order Number 1 in the Amount of $184,750.00 to a Construction Contract with Makou Inc. for the 2023
Concrete Restoration Contract 2 Project for a Revised Contract Amount of $1,634,200.00
G7 X0101 di I Lyi l=1 0 U7_1111I:el Z A
It is recommended that the City Council authorize the execution of Change Order Number 1 to a construction contract with Makou Inc. (City
Secretary Contract Number 58704) in the amount of $184,750.00 for the 2023 Concrete Restoration Contract 2 project at various locations on
Meadowbrook Drive for a revised contract amount of $1,634,200.00 (City Project No. 104179).
DISCUSSION:
On November 29, 2022, via Mayor & Council Communication (M&C) 22-0983, the City Council authorized execution of a contract with Makou Inc.,
in the amount of $1,449,450.00 for 2023 Concrete Restoration Contract 2 at various locations on Meadowbrook Drive.
Change Order Number 1 will provide for an additional 5300 square yards of 10 inch thickness concrete pavement to the contract and deletion
of 4500 square yards of 7 inch thickness concrete pavement from the contract. During construction on Meadowbrook Drive, it was discovered that
the pavement thickness ranges from 8.5 inches to 11 inches, while the contract specifies replacement to 7 inches of concrete. Staff negotiated an
average of 10 inches of concrete pavement with the contractor.
The concrete pavement transitions to asphalt pavement at various sections on Meadowbrook Drive. Staff recommends the addition of Hot Mix
Asphalt Concrete (HMAC) transitions which will allow staff to repair asphalt pavement beyond the subsidiary 9 inches of asphalt transition. Staff
has reviewed and verified the quantities for the additional work under this change order.
The following table summarizes previous contract action and change orders:
Construction Contract Date Amount
Original Contract Amount (M&C 22-0983) 11/29/2022 $1,449,450.00
Change Order No. 1 IThis M&C 1 $184,750.00
Revised Contract Amountll - I $1,634,200.00
This change order will have no impact on the Transportation and Public Works Department's annual operating budget. Funding is budgeted the
Transportation and Public Works Department's General Capital Projects Fund for the purpose of funding the 2023 Concrete Restoration Contract
2 project, as appropriated.
M/WBE OFFICE — Makou Inc. agrees to maintain its initial M/WBE commitment of 100% that it made on the original contract and extend and
maintain that same M/WBE commitment of 100% to this first change order. Therefore Makou Inc. remains in compliance with the City's M/WBE
Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized
representative of its company.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the General Capital Projects
Fund for the 2023 Concrete Restoration 2 project to support the approval of the above recommendation and execution of the change order. Prior
to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office bv: William Johnson 5806
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
104179-CNCO-2023 Concrete Restoration
Contract 2
Interim Agreement Report 2023-07-13
Created: 2023-06-29
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAA7raokGrnOSOo8o-ag2zOtgUO8cPVB441
Agreement History
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"104179-CNCO-2023 Concrete Restoration Contract 2" History
Document created by Andrea Munoz (Andrea. M u noz@fortworthtexas.gov)
2023-06-29 - 6:22:11 PM GMT- IP address: 204.10.90.100
Document emailed to ann.estes@fortworthtexas.gov for filling
2023-06-29 - 6:39:57 PM GMT
Document emailed to makouinc@gmail.com for signature
2023-06-29 - 6:39:57 PM GMT
Document emailed to travis.strang@fortworthtexas.gov for signature
2023-06-29 - 6:39:58 PM GMT
Document emailed to Iretomiwa.Otuyelu@fortworthtexas.gov for signature
2023-06-29 - 6:39:58 PM GMT
Email viewed by makouinc@gmail.com
2023-06-29 - 6:40:02 PM GMT- IP address: 66.249.80.234
Email viewed by travis.strang@fortworthtexas.gov
2023-06-29 - 6:40:13 PM GMT- IP address: 166.205.54.26
Email viewed by Iretomiwa.Otuyelu@fortworthtexas.gov
2023-06-29 - 6:40:14 PM GMT- IP address: 138.229.172.23
Signer makouinc@gmail.com entered name at signing as maqsood khan
2023-06-29 - 6:41:37 PM GMT- IP address: 68.206.95.156
FDRTWORTHs I Paw m"Y
Adobe
Acrobat Sign
Document e-signed by maqsood khan (makouinc@gmail.com)
Signature Date: 2023-06-29 - 6:41:39 PM GMT - Time Source: server- IP address: 68.206.95.156
&o Signer Iretomiwa.Otuyelu@fortworthtexas.gov entered name at signing as Iretomiwa Otuyelu
2023-06-29 - 6:42:44 PM GMT- IP address: 138.229.172.23
Document e-signed by Iretomiwa Otuyelu (Iretomiwa.Otuyelu@fortworthtexas.gov)
Signature Date: 2023-06-29 - 6:42:46 PM GMT - Time Source: server- IP address: 138.229.172.23
Email viewed by ann.estes@fortworthtexas.gov
2023-06-29 - 6:45:02 PM GMT- IP address: 204.10.90.100
Signer ann.estes@fortworthtexas.gov entered name at signing as Ann Estes
2023-06-29 - 6:47:58 PM GMT- IP address: 204.10.90.100
Form filled by Ann Estes (ann.estes@fortworthtexas.gov)
Form filling Date: 2023-06-29 - 6:48:00 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by travis.strang@fortworthtexas.gov
2023-07-05 - 1:54:53 PM GMT- IP address: 166.205.54.12
AQ Signer travis.strang@fortworthtexas.gov entered name at signing as Travis Strang
2023-07-05 - 1:56:22 PM GMT- IP address: 107.77.196.55
Jc Document e-signed by Travis Strang (travis.strang@fortworthtexas.gov)
Signature Date: 2023-07-05 - 1:56:24 PM GMT - Time Source: server- IP address: 107.77.196.55
Document emailed to omar.elbagalati@fortworthtexas.gov for signature
2023-07-05 - 1:56:26 PM GMT
Email viewed by omar.elbagalati@fortworthtexas.gov
2023-07-05 - 2:11:54 PM GMT- IP address: 172.59.233.117
Signer omar.elbagalati@fortworthtexas.gov entered name at signing as Omar Elbagalati
2023-07-05 - 2:22:09 PM GMT- IP address: 172.59.233.117
Document e-signed by Omar Elbagalati (omar.elbagalati@fortworthtexas.gov)
Signature Date: 2023-07-05 - 2:22:11 PM GMT - Time Source: server- IP address: 172.59.233.117
Document emailed to Mary.Hanna@fortworthtexas.gov for signature
2023-07-05 - 2:22:13 PM GMT
Email viewed by Mary.Hanna@fortworthtexas.gov
2023-07-06 - 4:20:55 PM GMT- IP address: 204.10.90.100
Signer Mary.Hanna@fortworthtexas.gov entered name at signing as Mary Hanna
2023-07-06 - 4:23:52 PM GMT- IP address: 204.10.90.100
FoRTWORTHs I Paw m"Y
Adobe
Acrobat Sign
Document e-signed by Mary Hanna (Mary.Hanna@fortworthtexas.gov)
Signature Date: 2023-07-06 - 4:23:54 PM GMT -Time Source: server- IP address: 204.10.90.100
Document emailed to patricia.wadsack@fortworthtexas.gov for signature
2023-07-06 - 4:23:56 PM GMT
Email viewed by patricia.wadsack@fortworthtexas.gov
2023-07-06 - 9:53:01 PM GMT- IP address: 204.10.90.100
Signer patricia.wadsack@fortworthtexas.gov entered name at signing as Patricia L. Wadsack
2023-07-06 - 9:54:44 PM GMT- IP address: 204.10.90.100
Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Signature Date: 2023-07-06 - 9:54:46 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Lauren.Prieur@fortworthtexas.gov for signature
2023-07-06 - 9:54:48 PM GMT
Email viewed by Lauren.Prieur@fortworthtexas.gov
2023-07-07 - 3:14:45 PM GMT- IP address: 108.209.194.42
AQ Signer Lauren.Prieur@fortworthtexas.gov entered name at signing as Lauren Prieur
2023-07-07 - 3:15:14 PM GMT- IP address: 108.209.194.42
Jo' Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2023-07-07 - 3:15:16 PM GMT - Time Source: server- IP address: 108.209.194.42
Document emailed to Priscilla.Ramirez@fortworthtexas.gov for approval
2023-07-07 - 3:15:18 PM GMT
Email viewed by Priscilla.Ramirez@fortworthtexas.gov
2023-07-07 - 3:29:29 PM GMT- IP address: 174.207.105.142
Signer Priscilla.Ramirez@fortworthtexas.gov entered name at signing as Priscilla Ramirez
2023-07-07 - 3:29:44 PM GMT- IP address: 174.207.105.142
Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov)
Approval Date: 2023-07-07 - 3:29:46 PM GMT - Time Source: server- IP address: 174.207.105.142
Document emailed to Douglas.Black@fortworthtexas.gov for signature
2023-07-07 - 3:29:48 PM GMT
Email viewed by Douglas.Black@fortworthtexas.gov
2023-07-07 - 9:55:23 PM GMT- IP address: 204.10.90.100
Cio Signer Douglas.Black@fortworthtexas.gov entered name at signing as DBlack
2023-07-07 - 9:56:20 PM GMT- IP address: 204.10.90.100
FDRTWORTHs I P°'"Y
Adobe
Acrobat Sign
Document e-signed by DBlack (Douglas.Black@fortworthtexas.gov)
Signature Date: 2023-07-07 - 9:56:22 PM GMT -Time Source: server- IP address: 204.10.90.100
Document emailed to William.Johnson@fortworthtexas.gov for signature
2023-07-07 - 9:56:23 PM GMT
Email viewed by William.Johnson@fortworthtexas.gov
2023-07-10 - 7:53:49 PM GMT- IP address: 204.10.90.100
Signer William.Johnson@fortworthtexas.gov entered name at signing as William Johnson
2023-07-10 - 7:54:12 PM GMT- IP address: 204.10.90.100
Document e-signed by William Johnson (William.Johnson@fortworthtexas.gov)
Signature Date: 2023-07-10 - 7:54:14 PM GMT - Time Source: server- IP address: 204.10.90.100
FDRTWORTHs I P°`4'y
Adobe
Acrobat Sign
FORTWORTH
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2023 CONCRETE RESTORATION CONTRACT 2
M&C; 23-0588 CPN. 104179 CSO # 58704 DOC# 2
Date:
To: Name Department Initials Date Out
1
Ann Estes
BSP
11�<
Oct 6, 2023
2
Magsood Khan
Vendor
kWk
Oct 5, 2023
3
Travis Strang
TPW
Oct 9, 2023
4
Iretomiwa Otuyelu
TPW
Oct 5, 2023
5
Omar Elbagalati
TPW-
Oct 9, 2023
6
Mary Hannah
TPW
Oct 9, 2023
6
Patricia Wadsack
TPW
PI-W
Oct 10 2023
7
Lauren Prieur
TPW
2
Oct 10, 2023
7
Doug Black
Legal
,��
Oct 11, 2023
8
William Johnson
CMO
Oct 15, 2023
9
Jannette Goodall
CSO
Z154
Oct 16, 2023
10
TPW Contracts
TPW
CC: Program
Manager, Sr. CPO, TPW BSAP Recon Team, TPW
Records Room, TPW Contracts
-Bus Sppt: -Prg Mgr:
-Sr. CPO:
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes X No
RUSH: ❑ Yes X No SAME DAY: ❑ Yes X No NEXT DAY: ❑ Yes X No
ROUTING TO CSO: ❑ Yes ❑ No
Action Reauired:
❑ As Requested
❑ For Your Information
X Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: Please notify TPWContractsra),fortworthtexas.uov for pickup when complete. Call ext. 7233 or
ext. 8363. Thankyou!
CSC No. 58704-CO2
Fom- oR'rl-l= City of Fort Worth
Change Order Request
Project Name 2023 Concrete Restoration Contract 2 I City Sec # l 58704
Client Project #(s)l 104179
Project Description) Repair and replacement of select concrete pavement panels on Meadowbrook Dr.
Contractorl Makou Inc. Change Order#1 2 1 Datel 9/25/2023 l
City Project Mgr.l Iretomiwa Otuyelu City Inspectorl Travis Strang
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$1,449,450.00
$184,750.00
Contract Time
Totals (CD�
$1,449,450.00 80
$184,750.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 12.75%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $1,811,812.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order is to add new bid items identified by staff, which require an additional scope after substantial completion of work. The new items are: (1) Crosswalk pavement
markings to include the black contrast markings. (2) ADA ramp type M-3 at the intersection of Meadowbrook & Stark due to the location of the bus shelter directly across the
ADA Ramp. (3) Replacement of underground enclosure of the traffic signal assembly.
This change order will also add 35 calendar days to contract days due to these delays: (1) Delays due to scheduling conflict (15 days): The Contractor sent the notice of
substantial completion on 08/2512023, but due to scheduling conflicts, the pre -final inspection was not scheduled until 09/07/2023. (2) Additional scope (21 days): the additional
scope that was added after substantial completion, which included the installation of two R-1 Ramps, one M-3 Ramp, the revised crosswalk pavement markings, and a driveway
removal and replacement at 5160 Meadowbrook Dr. This delay includes the time it took to make the decisions (which was ongoing till 09/13/2023) and the time to execute this
change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Fontractor Name 1111W jr Contract Si nature Date
Makou Inc Maqsood Khan t oodz Oct 5, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
a -
Oct 9, 2023
Oct 5, 2023
Program Manager
Date
Senior Capital Project Officer
Date
r—
Oct 9, 2023
Oct 9, 2023
Assistant Director (Dept)
Date
Director, Contracting Department Dept
Date
v
Oct 10, 2023
XR�
Oct 10, 2023
sistant City Attorney
Date
lAssistant City Manager
Date
Oct 11, 2023 w Oct 15, 2023
Council Action if required)
M&C Number l I M&C Date Approved l
ATTEST:
Jannette Goodall, City Secretary
Kr'ile' �r City of Fort Worth
Change Order Additions
Project Name 1 2023 Concrete Restoration Contract 2 City Sec # 58704
Client Project# 1 104179 1
Contractorl Makou Inc. I PMI Iretomiwa Otuyelu I Inspectorl Travis Strang
Change Order Submittal # 0 Date j 9/25/2023
ADDITIONS
I I EM UESCRIP I ION UEP I Oty Unit Unit Cost I otal
31 3211.001 Furnish/Install 24" Preformed I hermoplasbc Contrast I PW 18U.000UUUUU LF $22.UU $3,98U.UUl
32 3213.0501 Remove and Replace barrier Free Ramp, Type M-3 TPW 1.0000000U EA $3,000.UU $3,000.001
33 Replacement of Underground Enclosure of Traffic Signal Assembly TPW 1.00000000 LS $1,770.00 $1.770.001
TPW $8.730.001
1
1
1
Sub Total Additions $8,730.00 1
Change Order Additions Page 2 of 4
Krwuel"rl City of Fort Worth
Change Order Deletions
Project Name 1 2023 Concrete Restoration Contract 2 1 City Sec # 1 58704 1
Client Project # 1 104179 1
Contractorl Makou Inc. PMI Iretomiwa Oluyelu I Inspectorl Travis Strang
Change Order Submittal # Date 1 9/25/2023 1
DELETIONS
11 LM UL6UKll I IUN UtV I
18 321 /.0007 4' Uouble 6010 1 hermoplastic (KAJ) Center Lane Line I Vvv
2u M t.USU1 24" SLU Pvmt marlang HAt I PNl
24 3213.0501 Remove and Replace Barrier Free Ramp, Type R-1 TPW
Unit unit cost total I
213. UUUUUUU LF $1U.UU $2,'13U.UU1
200.0001JUUUU LF $18.0u $3,Uuu.UU1
1.00000000 EA $3,000.OU $3,000.001
TPW $8,730.001
1
1
Sub Total Deletions $8,730.001
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE I AMOUNT
6/29/2023 $184, 750.00
Total I $184,750.00
FORT WORTHe
ald
TRANSPORTATION AND PUBLIC WORKS
February 7, 2024
Makou, Inc
7100 S Cooper st
Suite #15
Arlington TX 76001
RE: Acceptance Letter
Project Name: 2023 Concreate Restoration Contract 2
Project Type: Paving
City Project No.: 104179
To Whom It May Concern:
On December 1, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on December 18, 2023. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on December 19, 2023, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at
Otuyelu, Iretomiwa S (817)392-7372.
Sincerely,
Iretomiwa Ctuyelu (Feb 29, 202413:48 CST)
Otuyelu, Iretomiwa S, Project Manager
Cc: Travis Strang, Inspector
Don Watson, Inspection Supervisor
Aaron Ybarra, Senior Inspector
Omar Elbagalati , Program Manager
Click here to enter text., Consultant
Makou, Inc, Contractor
Click here to enter text., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
[;p;,,[p t+: 1024222
CONSENT OF SURETY
TO FINAL PAYMENT
Afro Document G707
�lnsiruction.5gn mvcrse side)
TO VIX ER:
!A'unir andwmGr.,sr
City of Fud Worth
1000 Tl mokinortoil St.
Fort Worth, TX 76102
PROJECT.
f-vuRw ondAkrr—)
2023 Cancrelc restoration contract 2
0WNER
ARCHITECT C�
CONTRACTOR ❑
SURETY d
OTHER 13
ARCIUTECrS PROJECT NO -
CONTRACT FOR:
CONTRACP DATED:
In nccardamee with the provisions of the Comma beta rrn the Ovbmer and the Contractor as ind kited above, i4c -
(Insert namr and address of Surety)
Oklahoma $tu'etycompany
1437 SUltih Boulder, Suite 200
Tulsa, OK 741151
- SURETY,
on bond of
fjr,—rRa—d.&&—f{." rynyor�
Makots, Irlc-
833 Simi ❑r
Arlington, TX 76001 -
hereby appruvtm of the final payment to the Contractor, and arcs that final payment to ibr ContractoT shall not relieve the surety of
any of itsobhgalinm to
frmj jl"e ao-d ad wimFf7n,rrN
City of Fort Worth
I OOD Throckmu ton St.
Fart Worth, TX 76102
OWNER,
as set forth in said surety's hand,
IN W"ESS WHEREOF, the SUreiy has hcrcunta sot its hand o11 this date: Januaw 16. 2024
{h—Y k,• &ig Me on anrrr fodonwrd fntAe mi—fe abre rruoF-�z.vJ
Oklahoma Surety Company
fSPTh1 -
{try raturr ofrr�orL�ref r prcrr�irari,r�
Ancl; � -~ -
X-5
(Seal): Angie s >7 _ -- Brent M. Blonigan, Attorney -in -fact
fJ'rr,arr.! Rowe aniflrh'r}
CAUTION; You should sign an original AIA document Unit has this cautlon printed to red. An'
t + original assures that changes will not be obscured as may occorwhen documents are reproduced.
See lnstructian Sheet for Limited Ucanso for Reproduction of this document.
AIA DOCUMENT 1371?7 • CuNSENT UP 3UkETY TO FINAL PAYVEw7- 19M EVITION - AL-L P.S. 1 nr2
Iv7a-T}. xt.WrCA'v R%'STTTUTE OF ARCNITE.Cr3, i 735.1"M Vokle AVRA-F,Kw, Wr%511-
MOTO'%. Q.C. 29066-5292-WARMIN13: Unti...—1 phol—p&g y1n14tes U.B. Copy- G747-1994
dphl 61w! end will suDjnot th* vlolalal tb repel praseGujion.
INSTRUCTION SHEET
FOR AIA DOCUMENT G707, CON OF SURETY TO FINAL PAYMENT
A. GENERAL INFORMA71ON
7, Purpose
'this docunicrLt is in[ended Fur use as a cotttpanion to AIA Por;ument G706, Contrntot'g Affidavit of Payinerki ofDobts end
Claims, on cumstruction projects where the Contractor 3s required tO furnish a bond. 8y ObtAjning the StLect} s approval of final
paymem to the Conrraetnr and its agreement that final payment will not relieve the Surety of any of its obligations, the Owner
may praxerve itS nghis under the bond.
2. Related Documents
"Phis document may be w&cd with most of the AWs Owner.ContructoT agreenwje Wand general conditions, such as A201 a.7d its
re liocd family of daCulne]]78. As noted abate, M Isis a compen.ion dW Urnent to AIA Does injetYt G706.
3. Use ofCurrenk Documents
Prior to using Alley ALA document, the user should consult the AIA, un AIA component chapter or a current AIA Documents List to
determine the currerlc edi7ion of each doeuiTkonL.
4. Limited license for Reproduction
ALA Document G707 is a copyrighted work and may not be reproduced or excerpled from i n substitrttial Pais without the expross
wPjtfeTt permission of III A.IA. The G107 document is inlended te. be used as A 4;Qr1S1LmabIc-tIjat is, the original dOCUITIent pLLr-
chased by the user is iniendcd to be consumed in the ccmrsc of being aged. There is no hilplied permission to rgvrodttte this
docitlne-nk. nur dues mmnbership in The Ameriran Institute of Architects confer any fUtiher rights to re prnduCe G 707.
A catilionary notice is printed in red on the origina I of this document. This notice distitlgtLishes an original ATA document from
copies end cougterreits. To ensure accuracy attd uniformity of Isnguagc. punhawra should use Only au original AIA document or
one that huts been reproduced from nil original under a spec ial limiled license froFn the ALA.
A I imiled liceme is heresy gvinted to retail pure hasers to reproduce a maximum of ten tupics of a campleted Ot executed G707, but
only for use in Connection with a partictltar project. Further reprp$ucliOng are prohibiled without the expre" permission of the AIA_
B_ CHANGES FROM THE PREVIOUS EDITION
chnuges in Lhc location ofvatioua items of infotnwvon were madq, without revision No the sukstanec of the document.
C. COMPLETING THE G707 FORM
GENERAL; The bund form is the usual gonrca of required information sucl4 qc the con1=1 date and the names Ind addresses of the
SLIFety, iDWnor, ContTaCtGr and Project_
ARCELITECT'S PkOJECY No.: Ibis infonttation is lypivatly supplied by the Architect and entered on the form by the Contractor.
CONTRACT FOR: This refers w the scope vfthe contract. Such as "General Construction" or "Mechanical. Work".
D. EXECUTION OF THE DOCUMENT
I"Ito 0707 fonn requires bnlls the Surety's sonl and the signature of the Surety's aurl,prtgd Toptrsentativc.
4194
INSTRUC HON SHEET FIDR AIA DOCI' wiENT CM ::CON3104T CW S RETYTo FTNAL PAYMEVF -.19N Page 2 Of 3
1:OITICIK.:AJA$K THE AMERICAN INSTITUTE OF ARCHITECT'S, L735 NER' YORK AVENUE, N..W.,
\YASHINGTON. Q.C. 2DO06-1292 G707- L?04
OKLAH MA SURETY COMPANY
1437 South Boulder, Suite 200, Tulsa, Oklaharnal 74119 - Ph: 91B-597-72211 ' Fax: 918-5$8.1236
POUTER OF ATTQRNr:Y
11NONALL MEN BV THESE PRESENTS: Tnaa Ir:a Gkrahama Surety Company. a ccra,r ;.or or3ar:iregand ams�ng �-ce• =-3
uy ,rir;,,e or the larr5 Of the Ssa-e of 106 . dcea hereby norrinate. cor,surule ara appertt 3.s persnr, c- _ =--sons M1amed below. earlh inJw v',tI
more lean Orlt is named. its L+ue and lawful at crnef- r!-,2ri fwr , ara i. As narr.$ pace and Srea 7 c .USR Ln teh aK 4f L'te s24 GCr g-} t
wety. an-y arr}all! bar4s. uldertakir Ua?-rd CBntraC tS -,f Sure4y cr OIhOr'r, ver owicia#,jnr �� -_ -r-s;; re 1r.erec:: Brent M alonigan P�..:
F Carnpa Rob breifing. Debbie Palmer Kara Pierze all ofRICHARDSON TX.
IN k3MIESS WHEREthe Oklaharrra Surety Company ra5 caused ah.ese PresertS ro Ce srgna,a and nested
its applopfiars ifricars R410 its crrporB;o seal hPi-eur.I:r af='r<ed this 20 day of September 2021
:4= JSEAL ;t?
ATTEST
fr
SharGn Hackl, Assistant Secretary
OKLAHOMA SURETY COMPANY
T....
Todd Baaata,Vlce Peesiderlt
On Ibis 2f} dar of September, 2021 oefara ma persarlally 3t:Aeared Todd 6aiata to me known, Being duty iwom. deposes and
sayg Iha! she resides In DrcAen Arrow--, Nlahglria, ihat she IS a YIC9 Presidani of Oklahoma Surety Cor parry the company dsscnbed In arid
whio exgeuted the aln-we instrument that 9r'ha knows the seal of tnB s317 Gonkp5r%y that the seal affr2d to the Said instrunwj vs Bush
corlmi-ate seal; that it was sa affirred by auirprity of herrhi9 OmFe under the Sy -Laws of s --e C.arap-apy and that sfhe Signed hps name theretu ty
like aurhrlity
N*[Zr ,"Ac Commission b 1 1008 53
STATE OF OKLAHOddh y Sara aI Oklahoma — --
JUVE CALLAHAN
TUL&A CUUHrr F.i r C, Aii 3n Err;•rss
COUNTY OP Ti,ILSS COW WON I-I30{7S] —
�x CPU 2M
Juhp Callahsr, Nr}tarr pul;lii
Tni, P—mar al Attorney s gr8,+!ad by 3-1I000ty Qf 1116 i]If4rrr :, ur",rl 3:190+ 4: , Te 6oa'd f O,ra.^.t rs rl 0kI.1hOr'na Surety
Company 6y Ln3ri-mi;US-A'rtter CCrsiiihi3fed Septerrhh•er 25 Zug
PCSOLti,ED That this Pxes:drat thBE *cut`je V'C: PresiC6r•; I -- .. - -=x,d9rtt5 and-
tr� re a-d rereby iS a. lheezed from tore to tlrrg to appitwl One w ----lore ' `sct : - =w,,te on Mlhalf of tt,,
ens drld al brines undbmak•ngs and -❑ntraGt49f sclreryship, Mr other wrill1w: n; L TO C2i.7e 4herecf la prer--r1[� -
and the rasprrcriva lirpils of Mew au!hnnty, and to reuGka any such appcmtm,�: _ an, ! :e
RESOLkoED FURTHER That IM Cgrnpany seal' and the Sigivilur- : ! ,ny or the afaFeaa: OffiCr'r5 Fl . .
�!KrVt-]ri 24 the CCr;pknV ma{ b•a arfrxed by facsimile to any por«er sf att F z : cerl-ricaie ``--i"er grtisn Irr _ .,...
k.ri4q GTkirg Cunha[[jf svr"j.g1,rG. err other h,lteDobItgarK:n it me n3lure thereFi ::`h ei,•� : .. -.-,d gdNN1 near, s�
t}y thi- 1*cm;>xny as !FA cr,ginal s gralure cf sur.h :r i ..,,, arcs rrF� ,r nor ggai nt r
rre ;.3 ••.. f:..> >r•a elfact ds though r��nua�{i = - __.. '
CERTIFICATION
I Sharon Hackl Assistant SeCretafy Uf Oklahoma Surety Comj,any d ing f r2g=i: F._titie' f
z=, x -,2 a arl or of SLan!Bri,f L.. r'25 P -- _.. - r:.
71 LL-d
:t
v'hg off/
&Karon Hacki As;5i32an1 Secretary
/kill\
MID-CONTINENT ONTINENT ROUP Surety Bond Seal Addendum
Mid -Continent Gasualty I Wallow surety.
Oklahoma Surety Company
During the COVID-19 pandemic, the use of traditional raised corporate seals has
been made impractical due to government stay-at-home Qfders and social
distancing guidelines. As a resu It, Oklahoma Surety Company has authorized its
Attorneys -in -Fact to affix Oklahoma Surety Company's corporate seal to any bond
or related wstrurnents executed on behalf of Oklahoma Surety Company by any
such Attorney -in -Fact by attaching this Addendum to said bond or related
instrument.
To the extent this Addendum Is attached to a bond or related instrument that is
executed on behalf of Oklahoma Surety Company by its Attorney -in -Fact,
Oklahoma Surety Company agrees that the seal below shall be deemed affixed to
said bond or related instrument to the same extent as if its ra45ed corporate seal
were physically affixed to the face of the bond or related instrument
Dated this 1' day of April, 2020
t5'6-
=L.•,.'
:,.,fir' :_
LA�f
j
�l �ll•�
iyx•r
Todd 8aza'a
VjC2 Presilenr
MID- NTI_E,n1- CASUALTY COMPA-Ny
OKLAHOMA SLI ETV CONIPANY
STATE; OF TEXAS
in ar-ccrdancc With 5eeiiut[ 2253.02r (1) of the Te.Nas CFOs=ment Code diid SeCL10t:
53.20 (6) of the Tex a, Pmpert% Code. any noticlam to the narrt4ci ;urc[} undGf tEtiis
bu;3d(s) s}; juid be sett to:
P f a. 90X, 11[)t3
F-4IMI FI 1l1,4.= %U,G]N5 "o11i
I'h►sitial, 1-4;— S B01 I DFri
SUITE 21-0
T[ 1 1 i W t o Y.(Ik$ 4 1
XV1 Ali -1 EIES NOTICE: TO YM_R BOND
ITON ExF,cu CIDN OF `1-11F BOND
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TA.RRANT
Before me, the undersigned authority, a notary public in the State and
County aforesaid, on this day personally appeared Magsood Khan, Owner
of MAKQU INC., known to me to be credible person, who being duly
sworn upon his oath deposed and said
That all persons, firms, associations, corporations, or other organizations
furnishing labor and or materials have been paid in full, for City of Fort
Worth Conc. Rest. 2023-2 Project# 104179
That the wage scale established by the City Council in the City of Fort
Worth has been paid in full.
That there are no clairns pending for personal injury and /or property
damages
BY--------- -------------------_------------�---
MAQSDDD , PRICIPAL, MAKOU INC.
SUBSCIBED & SWORN BY ME ON THIS DATE
NOTARY PUBLIC
TEXAS
•`""Yr"''r CeSAR SAAVMRA
Notary?ubho, State of Yaxas
Cpmm- Exp,res 0E-20-Z027
f'�er";yti x� Notary ID 93205$262
MAKOU Inc,
7100 S. Cooper St. Sure 015 Arlington, TIC 76001