HomeMy WebLinkAboutContract 49024-A5CSC No. 49024-A5
AMENDMENT No . 5
TO CITY SECRETARY CONTRACT No. 49024
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates,
Inc. , (ENGINEER) made and entered into City Secretary Contract No. 49024,
(the CONTRACT) which was authorized by M&C C-28184 on the llth Day of
April , 2017 in the amount of $ 1,800,000.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $595,000.00 which was authorized by M&C # C-28764 on
June 26, 2018, Amendment Number 2 in the amount of $425,000.00 which was
authorized by M&C # 20-0334 May 19, 2020, Amendment No. 3 in the amount
of $99,020.00 which was administratviely authorized on March 19, 2021 and
Amendment No. 4 in the amount of $149,960.00 which as authorized by M&C
#22-0071 January 25, 2022.
WHEREAS, the CONTRACT involves engineering services for the following
project:
Harmon Road Task Order Contract (US 811287 to Golden Triangle
Blvd.) ; and
WHEREAS, it has become necessary to execute Amendment No. 5 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $38,160.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $3,107,140.00.
City of Fort Worth, Texas Harmon Road
Prof Services Agreement Amendment Template OFFICIAL RECORD City Project No. 100459
Revision Date: 12/08/2023
Page 1 of 4 CITY SECRETARY
FT. WORTH, TX
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
C>c9�1—�
Jesica McEachern
Assistant City Manager
DATE: Mar 8, 2024
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
ENGINEER
Kimley-Horn and Associates, Inc.
4%pa
Scott R. Arnold
Vice President
DATE: February 7, 2024
49.
Lauren Prieur (Feb 28, 202414:55 CST)
Lauren L. Prieur, P.E., PMP, CCM
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
,A�i�aac%uo .Ay�
AlejandOOra Ayala, PE
Senior Project Manager
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Harmon Road
City Project No. 100459
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Mar S, 202416:22 CST)
Douglas W. Black
Sr. Assistant City Attorney
M&C No. # : N/A
M&C Date: N/A
City of Fort Worth, Texas Harmon Road
Prof Services Agreement Amendment Template City Project No. 100459
Revision Date: 12/08/2023
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 49024
Amendment No. 5
Fund Dept ID Account Project CF1- CF2 - Bond Amount
ID Activity Reference
34018 0200431 5330500 100459 002330 18010199 38,160
Total: $38,160
City of Fort Worth, Texas Harmon Road
Prof Services Agreement Amendment Template City Project No. 100459
Revision Date: 12/08/2023
Page 4 of 4
Kimley»>Horn
February 6, 2024
Alejandra Ayala, P.E.
Transportation and Public Works
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Re: Amendment #5 — Harmon Road Improvements from Golden Triangle Boulevard to US 287
City Project No. 100459
City Secretary Contract No. 49024
Dear Alejandra:
Kimley-Horn and Associates, Inc. ("ENGINEER") is pleased to submit Amendment #5 in the amount of
$38,160 to the City of Fort Worth (City) for the Task Order design contract (CSN 49024) for Harmon
Road Improvements from Golden Triangle Boulevard to US Hwy 287. This amendment is to cover
additional services beyond the original scope, such as:
• Additional Topographic Survey for obtaining the LOMR than originally scoped
• Additional submittals to the City for review than originally scoped
We appreciate the opportunity to provide these services to you. Please contact me if you have any
questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
By: Dana Shumard, P.E.
Project Manager
Harmon Road
CPN 100459
ATTACHMENT B
COMPENSATION
Design Services for
Harmon Road Task Order (from Golden Triangle Boulevard to US 81/287)
City Project No. 100459
Amendment 5
Task Order Rate Schedule
Compensation
A. The ENGINEER shall be compensated in an hourly amount not -to -exceed
$38,160 for personnel time, non -labor expenses, and subcontract expenses in
performing services enumerated in Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
Labor Category
Rate
($/hour)
Project Director
$235
Project Manager
$235
Senior Project Engineer
$190
Project Engineer
$175
EIT
$140
CADD
$95
Administrative
$100
i. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
ii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iii. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Harmon Road
CPN 100459
Page 1 of 4
B-1
ATTACHMENT B
COMPENSATION
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Harmon Road
CPN 100459
Page 2 of 4
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Kimley-Horn and Engineering Services $9,160 24.00%
Associates, Inc.
Proposed MBE/SBE Sub -Consultants
Gorrondona & 29,000 76.00%
Associates, Inc.
Non-MBE/SBE Consultants
TOTAL $38,160 100%
Project Number &Name Total Fee MBE/SBE MBE/SBEFee
100459 Harmon Road Amendment 5 $38,160 $0 76.00%
City of Fort Worth, Texas
Attachment B Harmon Road
PMO Official Release Date: 8.09.2012 CPN 100459
Page 3 of 4
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
To be included with each task order.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Harmon Road
CPN 100459
Page 4 of 4
C d
Task No. Task Description
Permittiry
Flood slam-FEMA, LOMR
Rate
Totals
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Harmon Road - Amendment 5
US81/287 to Golden Triangle Blvd.
City Project 100459
Project Project
Director Mana er
$235 $190
Labor(hours)
I Project
Engineer
ErrCADD
Administrative
I Expense
Total Labor Cost Subconsultant
MWBE Non-MWBE
Travel
Reproduction
Total Expense Cost
Task Sub Total
$175
$140
$95
$1001
MMMMI
11
8i
0i
0
$ 6,260.00
$ 29,000.00
$
$
$ 29,000.00
$ 35,260.00
4 8 26 $ 6,260.00
41 1 1 81 01 0 $ 6,260.00
$ 29,000.00
1
1
Is 29,000.00
$ 35,260.00
1 $ 29,000.00
$
$
$
$ 29,000.00
$ 35,260.00
Project Summer)
Total Hours 40
Total Labor $6,260
Total Expense $29,000
MBE/SBE Subconsultanf $29,000
Non-MBE/SBE Subconsultanf $0
10% Sub Mark $2,900
MBE/SBE Partic� atwn 76.0%
Total Proje�Cosi, $38,160
Harmon Road
CPN 100459
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Harmon Road - Professional Services
Agreement Amendment No. 5
M&C: CPN: 100459 CSO: DOC#:
Date:
To:
Name
Department
Initials
2.
Wendi Hedlund — Bus Sup.
TPW — Initial
3.
Alejandra Ayala
TPW - Signature
4.
Raul Lopez
TPW — Initial
,❑
5.
Lissette Acevedo
TPW — Initial
6.
Patricia Wadsack
TPW — Initial
7.
Lauren Prieur
TPW — Signature'
8.
Doug Black
Legal - signature
Wdwb
db
9.
Jesica McEachern
CMO - signature
a`
JM
10.
Jannette Goodall
CSO - signature
�
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE
ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps
NEEDS TO BE NOTARIZED: ElYes X No
RUSH: ❑ Yes X No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No
ROUTING TO CSO: X
Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
X Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Ale iand ra.Avala(dJortworthtexas.gov email executed document when completed.
CPN:
Project Name:
Consultant:
Contract
CSN 49024
M&C C-28184 4/11/2017
Amendment No. 1 CSN 49024-A1
M&C C-28764 6/26/2018
Amendment No. 2 CSN 49024-A2
M&C 20-0334 5/19/2020
Amendment No. 3 CSN 49024-A3
Administratively authorized 3/19/2021
Amendment No. 4 CSN 49024-A4
M&C 22-0071 1/25/2022
Amendment No. 5 CSN 49024-A5
Administratively authorized
JUSTIFICATION OF CONTRACT CHANGES
100459
Harmon Road
Kimley-Horn & Associates
Contract Change
$1,800,000.00
$ 595,000.00 $
$ 425,000.00 $
$ 99,020.00 $
$ 149,960.00 $
$ 38,160.00 $
Total to Date Justification
Original contract to PS&E
2,395,000.00
Added design of US 287 frontage road roundabouts (2),
roundabout landscaping along entire corridor.
2,820,000.00
Preparing CMAR RFP Documents and changed project to
CMAR resulting in design changes. Also included new
traffic signal at Fire Station and Interim roundabout
improvements at US 287.
2,919,020.00
Franchise utility coordination support, revisions to traffic
control based on sequencing change by CMAR, additional
survey.
3,068,980.00
Scope increased to design PS&E for the existing Harmon
Road.
3,107,140.00
Budget increase to cover the cost of additional
topographic survey needed to complete the LOMR and
additional submittal reviews from the City and contractor
needed for review.
3,107,140.00