HomeMy WebLinkAboutContract 54263-AD7CSC No. 54263-AD7
FORT WORTH SPINKS AIRPORT
MASTER PROFESSIONAL SERVICES AGREEMENT
ADDENDUM NO. 7
This Addendum No. 07 - Scope of Work (SOW) is made as of mar8,2024
under the terms and conditions established in the MASTER PROFESSIONAL
SERVICES AGREEMENT between the City of Fort Worth ("City") and Garver, LLC.
("Engineer"), the same being Fort Worth City Secretary Contract (CSC) No. 54263
(the "Master Agreement" or"MSA").
This Scope of Work is made for the following purposes, consistent with the
services defined in the Master Agreement: professional services for updates to the
capital development program at Fort Worth Spinks Airport. In particular, Engineer
shall perform those functions identified in EXHIBIT A: SCOPE OF SERVICES.
Section I. SCOpe of Services
The Scope of Services is attached as Exhibit A.
Section 2. Compensation. Reimbursable Expenses. and Billina Terms:
Processing and payment of Fees and Reimbursable Expenses, including the
structure of payments and invoicing therefor, shall be in accordance with the
Master Professional Services Agreement.
The total Fee that shall be paid to Engineer for the services within this Addendum
shall be an amount of $5,800.00 and will be paid accordance with Article 2(a) and
Article 3 of the Master Service Agreement which will leave $94,100.00 remaining
out of the $99,900 available for this year (Year 4 of 5) under the Agreement. If the
City requests additional documentation of expenses, the Engineer shall provide
such information if available.
A copy of the fee proposal is attached as Exhibit B.
Engineer shall submit invoices for Fees and Reimbursable Expenses to
Tvler Dale in the City's Aviation Department.
On full and final completion of the Services for this Scope of Work, the Engineer shall
submit a final invoice.
Section 3. Counterparts: Electronically Transmitted Sianature:
This SOW may be executed in one or more counterparts, each of which when so
executed and delivered shall be considered an original, but such counterparts shall
together constitute one and the same instrument and agreement. Any signature
delivered by a party by facsimile or other electronic transmission (including email
transmission of a portable document file (pdf) or similar image shall be deemed to
be an original signature hereto.
Addendum No. 7 to CSC No. 54263 OFFICIAL RECORD
Between the City of Fort Worth and CITY SECRETARY
Garver, LLC FT. WORTH, TX
Pagel of 7
Executed in multiple originals on Mar 8, 2024
CITY OF FORT WORTH, TEXAS:
VOL WA-1/t-
By: Valerie Washington (Mar8, 202406:56 CST)
Valerie Washington
Assistant City Manager
Date: Mar 8, 2024
APPROVAL RECOMMENDED:
By:
Roger Venables
Director, Aviation
ATTEST:
A
By:
Jannette Goodall
City Secretary
APPROVED AS TO FORM
AND LEGALITY:
By: _
Op` F
oopOORT �a
� Q°°
oo
~o
Gv1 oo o=�
�Il nEXA?oO0,0000
p
Jeremy Anato-Mensah
Assistant City Attorney
GARVER, LLC.
e /
r
By: 11A & A & V
Mitchell McAnally
Texas Aviation Director
Date: March 5, 2024
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
��
Tvler Dale (Mar 5, 2024 09:24 CSTi
Tyler Dale
Airport Project Coordinator
Addendum No. 7 to CSC No. 54263 OFFICIAL RECORD
Between the City of Fort Worth and
Garver, LLC CITY SECRETARY
Page 2 of 7 FT. WORTH, TX
CARR
VE
Addendum No. 7
City of Fort Worth, Texas
Fort Worth Spinks Airport (FWS)
This ADDENDUM ("Addendum") is made by and between the City of Fort Worth, Texas (hereinafter
referred to as "Client") and Garver, LLC, (hereinafter referred to as "Garver") in accordance with the
provisions of the MASTER SERVICES AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES executed on August 6, 2020 (the "Agreement").
Under this Addendum, the Client intends to have Garver perform engineering services in association with
the anticipated capital development program updates for Fort Worth Spinks Airport.
Garver will provide professional services related to these improvements as described herein. Terms
not defined herein shall have the meaning assigned to them in the Agreement.
1. SCOPE OF SERVICES
Garver's work and services to be provided and performed by Garver under this Agreement will include
assisting the Client in the following:
1.1. See attached Exhibit A for Scope of Services.
2. PAYMENT
The Client will pay Garver an amount not to exceed $5,800.00.
The Client will pay Garver the amount above in accordance with this section and Exhibit B under
the terms set out in accordance with the provisions of the Agreement.
3. APPENDICES
The following Appendices are attached to and made a part of this Addendum:
3.1.1 Exhibit A — Scope of Services
3.1.2 Exhibit B — Fee Spreadsheet
This Addendum may be executed in two (2) or more counterparts each of which shall be deemed an
original, but all of which together shall constitute one and the same instrument.
Approval and acceptance of this Addendum shall incorporate this document as part of the Agreement.
Garver is authorized to begin performance upon receipt of a copy of this Addendum signed by the
Client. The effective date of this Addendum shall be the last date written below.
Addendum No. 7
FWS On -Call Services
GARVER
EXHIBIT A
(SCOPE OF SERVICES)
Generally, the Scope of Services includes the following professional services at Fort Worth Spinks
Airport.
• Capital Development Program Updates
1. CAPITAL DEVELOPMENT PROGRAM UPDATES
1.1. Garver will serve as the Owner's representive for the Capital Development Program
preparation and furnish consultation and advice to the Owner during the performance of this
service. Garver will attend conferences along or with the Owner's representatives, local
officials, state and federal agencies, and others regarding the scope of the proposed project,
its general design, functions, and impacts.
2.2 Garver will assist with Capital Development Program updates that include the following:
1.1.1.Garver will provide updates to previously submitted Capital Improvement Plans (CIPs)
in order to restructure both the short term and long term plans to incorporate new
projects forthcoming based on the Airport's most recent Master Plan developement.
1.1.2.Garver will assist in cost estimate adjustments and verifications to associated projects
listed within the Capital Development Program so that construction costs are aligned
with current market values.
1.1.3.Garver will provide exhibits and/or presentation assistance related to associated Capital
Development Program updates as needed utilizing the most current AutoCAD Civil3D
or Miscrosoft programs.
Exhibit A — Scope of Services
FWS — On -Call Services — Addendum No. 7 Garver Project No. 20A11016
Exhibit B
SPINKS AIRPORT
ON -CALL SERVICES - ADDENDUM NO. 7
FEE SUMMARY
Title I Service
Capital Development Program Updates
Subtotal for Title I Service
Estimated Fees
$ 5,800.00
$ 5,800.00
L:\2020\20A11016 - FWS - On -Call 2020\Contracts\Client\Draft\Addendum No. 7 - Capital Development Program
Updates\Working Docs\FWS - Addendum No. 7 - Exhibit B - Garver Fee Spreadsheet
Exhibit B
SPINKS AIRPORT
ON -CALL SERVICES - ADDENDUM NO. 7
CAPITAL DEVELOPMENT PROGRAM UPDATES
WORK TASK DESCRIPTION
1, Project Administration
Capital Development Cost Estimate Adjustments & Verifications
Captital Development Presentation Exhibits
Powerpoint Presentation Updates
TxDOT CIP Meeting
Updates after TxDOT Meeting
Subtotal - Project Administration
Hours
SUBTOTAL - SALARIES:
DIRECT NON -LABOR EXPENSES
Office Supplies/Equipment
Computer Modeling/Software Use
Travel Costs
SUBTOTAL - DIRECT NON -LABOR EXPENSES:
SUBTOTAL:
SUBCONSULTANTS FEE:
E-4 E-3 D-2
hr hr hr
5
1
2
8
2
0 18 8
0 18 8
$150.00
$200.00
$226.00
$5,224.00
$576.00
$5,800.00
$0.00
TOTAL FEE: $5,800.00
FORT WORTH
Routing and Transmittal Slip
Aviation
Department
DOCUMENT TITLE: Addendum No. 7 for Spinks 5-Year Master Services Agreement
M&C CPN
DATE: 3/5/2024
TO:
1. Joe Hammond
2. Roger Venables
3. Jeremy Anato-Mensah
4. Valerie Washington
5. Jannette Goodall
59
CSO # 54263 DOC#
INITIALS
DATE OUT
Mar 5, 2024
R�
Mar 5, 2024
Mar 7, 2024
Mar 8, 2024
75
Mar 8, 2024
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes ❑x No
RUSH: ❑ Yes ❑X No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No
ROUTING TO CSO: ❑x Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
1 Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: Please call Tyler Dale at ext. 5416 for pick up when completed. Thank you.