HomeMy WebLinkAboutContract 49049-A7City of Fort Worth, Texas VCWRF Grit Facility & South Influent Pump Station Prof Services Agreement Amendment Template 100075-1 Revision Date: 12/08/2023 Page 1 of 2 AMENDMENT No.7 TO CITY SECRETARY CONTRACT No. 49049 WHEREAS, the City of Fort Worth (CITY) and CDM Smith, Inc., (ENGINEER) made and entered into City Secretary Contract No. 49049, (the CONTRACT) which was authorized by M&C C-28213 on the 2nd day of May, 2017 in the amount of $1,570,965.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $885,755.00 which was authorized by M&C C-28857 on September 18, 2018, Amendment No. 2 in the amount of $71,993.00 administratively authorized February 7, 2019, Amendment No. 3 in the amount of $114,939.00 which was authorized by M&C 20-0159 on April 7, 2020, Amendment No. 4 in the amount of $705,000.00 which was authorized by M&C 20-0346 on May 19, 2020, Amendment No. 5 in the amount of $699,217.00 which was authorized by M&C 20-0700 on September 22, 2020 and Amendment No. 6 in the amount of $785,500.00 which was authorized by M&C 21-0356 on March 18, 2021; and WHEREAS, the CONTRACT involves engineering services for the following project: Village Creek Water Reclamation Facility Grit Facility and South Influent Pump Station, CPN 100075-1; and WHEREAS, it has become necessary to execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $60,802.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $4,894,171.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas VCWRF Grit Facility & South Influent Pump Station Prof Services Agreement Amendment Template 100075-1 Revision Date: 12/08/2023 Page 2 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City’s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER CDM Smith, Inc. Fernando Costa Assistant City Manager DATE: _______________ Stacy Barna, P.E. Associate DATE: _____________ ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: Chris Harder, P.E. Director,Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. _______________________________ Farida Goderya, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY:M&C No.#: _______N/A_________ M&C Date: _______N/A_________ Douglas W. Black Sr. Assistant City Attorney Form 1295 No.: _____N/A_______ 801 Cherry Street, Unit 33, Suite 1820, Fort Worth, Texas 76102 | tel: 817 332-8727 February 2, 2024 Farida Goderya, PhD, PE Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 Subject: Village Creek Water Reclamation Facility Grit Removal Facility Project Amendment 7 Proposal Additional Hydraulic Modeling during Startup and Additional Construction Phase Services Dear Farida: During startup of the grit removal facility in June 2023, the City requested CDM Smith and Freese & Nichols to complete additional hydraulic modeling efforts to evaluate various modified grit facility effluent weir elevations and flow scenarios. This amendment proposal is for compensating Freese & Nichols for the additional infoworks hydraulic modeling efforts, prepare exhibits for meetings, and attend meetings to discuss the modeling efforts they have completed to date. Any additional modeling requests beyond these services will be considered an Additional Service. Please see attached fee breakdown for Freese & Nichols. CDM Smith considers our time attending meetings as part of our construction phase services and is not requesting additional compensation for the additional hydraulic modeling. CDM Smith is 94% spent on our construction phase services budget with approximately $38,160 remaining based on our invoice dated January 25, 2024. We have been able to cover the additional 20 plus monthly construction progress meetings, additional 124 submittal/resubmittal reviews, additional 34 RFIs, 12 monthly Headworks shutdown meetings, and additional 34 weekly startup meetings (May thru December 2023), as part of our construction phase services budget to date. The remaining efforts for finish out the project include the following. 1. Attend monthly construction progress meetings February May 2024 2. Complete final construction project closeout (anticipated to be complete in May 2024) 3. Finalize SOPs after we receive comments from City (assuming comments are not significant) 4. Complete record drawings Our original budget allocated $40,838 for record drawings, which is slightly more than our remaining budget and we have the other items above to complete as well. All things considered, CDM Smith is requesting additional compensation to complete the remaining tasks above to close out our construction phase services for the VCWRF Grit Removal Facility project. Farida Goderya, PhD, PE January 26, 2024 Page 2 801 Cherry Street, Unit 33, Suite 1820, Fort Worth, Texas 76102 | tel: 817 332-8727 Additional Task CDM Smith Labor Hours CDM Smith Labor Cost Other Direct Cost Total Cost Grit Facility Hydraulic Modeling Efforts -- $31,536 $3,154 $34,690 Additional Construction Progress Meetings (February May 2024) 20 $3,158 $250 $3,408 Construction Project Closeout 40 $10,477 $500 $10,977 Finalize SOPs 10 $2,619 -- $2,619 Record Drawings 35 $9,108 $9,108 Total 105 $56,898 $3,904 $60,802 Total Project Cost for the Grit Removal Facility including this proposed amendment is summarized below. Original Contract Amount Amendment No. 1 Amendment No. 2 (Design) Amendment No. 3 (Design) Amendment No. 4 (Design & Construction) Amendment No. 5 Amendment No. 6 Amendment No. 7 $1,570,965 $71,993 $ $705,000 $60,802 Total Grit Design & Construction Services Fee $,, Sincerely, Amy Robinson, PE, BCEE, CCM Senior Project Manager CDM Smith Inc. cc: Jessi Veach, CDM Smith