Loading...
HomeMy WebLinkAboutContract 35497-A4 AMENDMENT NO. 4 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 5 - p (M&C Needed) 1 COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and TranSystems Corporation Consultants, (Engineer) made and entered into City Secretary Contract No. 35497, (the Contract) which was authorized by the City Council by M&C C-22159 on the 5th day of June 2007; and WHEREAS, the Contract involves engineering services for the following project: Drainage Improvements to Kermit-Bonnie Channel and Culvert, 4600 Block Merida Avenue, Sarita Channel and Waverly Park, Project No. 00484 WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in M&C C-24767,adopted by the City Council on the 8th day of March 2011 and further amplified in a proposal letter dated November 30, 2010, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $57,006.00 . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that_the City of Fort Worth,Texas OFFICIAL RECORD! Amendment to Engineering Agreement CITY S L'C R F T PMO Official Release Date 6 18 2010 Page 1 of 2 v_ ...FT w- total fee paid by the City for all work and services shall not exceed the sum of $319,047 .00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the Q�� day of 2011, in Fort Worth, Tarrant County, Texas. �Q.ob��nnn ATTEST: 117 O� o��op�o f�L ado WO Marty Hendri " 24�-to�-' t3o aY0 City Secretary Contract Authorization " *o o° �c d 3 f (! ► ► a�� 000 4' Date a a��1111U�.���a APPROVAL RECOMMENDED: APPROVED: Gr S ' ns, P.E. , Fernando Costa Ac erector, Assistant City Manager Transportation and Public Works TranSystems Corporation Consultants ENGINEER 4 ^ By: Name: Raul Pena III, P.E. Regional Vice President 500 West Seventh Street, Suite 1100 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney City of Fort Worth,Texas 1 Amendment to Engineering Agreement OF��w � Y� �D± PMO Official Release Date 6 18 2010 Page 2of2 CITY SECRETARY FT WWQRT4, TX S(' TranSystems ystems \ Bank of America Building 500 West 71h Street Suite 1 100 Fort Worth,TX 76102 Tel 817 339 8950 Fax 817 336 2247 www.transystems.com AMENDMENT NO. 4 SUMMARY OF DESIGN FEE November 30,2010 Mr. Rick Shaffer, P.E. City of Fort Worth-Integrated Program Management 900 Monroe St., Ste.201 Fort Worth,TX 76102 RE: Amendment No.4 Storm Water Utility Projects—Kermit/Bonnie, Merida Avenue, Sarita Channel,and Waverly Park DOE# 5424 Storm Water Project No. P228-531200 2032800484 83 Dear Mr. Shaffer, Per your request,this amendment revises the previously approved Storm Water Utility Projects, City Secretary Contract No.35497 design plans and contract documents. Specifically,this amendment includes the preparation of plans and details associated with the Sarita Channel access ramp,channel wall reconstruction and stilling basin modifications. The specific work to be included is as follows: • Site Analysis—Site visit to gather information including city installed stilling basin grate,location of alternate access ramp location and existing channel wall conditions. _$ 1,020 • Stilling Basin—Prepare construction plans and details for modifying the stilling basin for a sump pit,access ladders and channel bottom for an open trench to replace a portion of the existing stilling basin drain pipe. _$ 7,790 • Access Ramp—Prepare construction plans and details for the Pierce property access ramp and drive approach to the channel and stilling basin. Include fencing altemative and landscape plan. Design and detail of paver access drive. _$ 17,740 • Channel Design—Prepare construction plans and details for reconstructing the channel sidewall. _$ 5,210 • Storm Drain Design—Prepare construction plans and details for storm drain to relieve street runoff on Pierce property. =$ 11,670 OFFIs iAL RECORD CITY -CRFTARY FT. WJ+ORTH, TX SySte111S�` Page 2 of 2 __ November 5,2010 • Meetings—Attend 2 design review meetings. _$ 1,020 • Bid Phase—Prepare electronic files and uploads to Buzzsaw. =$ 1,580 • Easement—Determine easement limits,prepare easement documents and easement exhibit, =$ 2,770 • Survey—Topographic survey approximately 750 linear feet. =$ 3,150 • Construction Administration services including: • Pre-Construction Meeting • RFI Review and Response • Review of Change Order Requests • Review of Shop Drawing Submittals • Site Visits during Construction(2 per location) • Final Site Walk through and development of Punch List • Record Drawing Preparation =$ 4,520 Total Contract Amendment No.4 Value: S 57.006 Contract value revisions are as follows: Original Contract Fee: $132,305.00 Amendment No. 1: $ 87,006.00 Amendment No.2: $ 24,915.00 Amendment No. 3: $ 17,815.00 Amendment No.4: $ 57.006.00 TOTAL CONTRACT $319,047.00 Thank you for your consideration. Please contact me should you require any additional information. Sincerely, TranSystems Corporation Consultants Cffaig P. Schellbach, P.E. �+lunicipal Services Manager Attachments OFFICIAL RECORD' owwoeas ffwdmWCLe+t►AmendmeM_4_2010-11-30_R2.doc CITY SECRETARY FT. WORTH, TX City of Fort Worth Stormwater Utility Project D.O.E. 5424 Santa Channel-Amendment 4 City Project No.:00484 Amendment 4 --- HOURLY RATE WORK Total Estimated Manhours Cost Proj. Proj. Design CADD Estimate Prinicipal Mgr. Engr. Engr. Tech. Clerical ($) 260.00 150.00 120-00 105.00 85.00 55.00 A Site Anal sis Site Visit and Data Collection 4 4 $ 1.020.00 Sub-Total 1,020.00 B Stilling Basin Ladder and Sump Pit Design 4 8 $ 1 100.00 Open Trench Design to Replace Pi 2 16 28 $ 4 360.00 Details 6 20 $ 2 330.00 Sub-Total 7 790.00 C Access Ram Ram Design&Drive Approach 1 24 32 S 5,390.00 Details(Including One Fencing Alternative 1 16 32 $ 4 550.00 Landscape Plan 1 4 8 $ 1 250.00 Cost Opinion on Design Alternatives 1 8 8 $ 1.430.00 Paver Access Drive Design and Details 2 20 32 $ 5,120.00 Sub-Total 17 740.00 D Channel Side Wall Design 1 12 28 $ 3,790.00 Details 1 4 10 $ 1420-00 Sub-Total 5.210.00 E Stormdrain Design for Pierce Property Drainage Area Map 1 4 8 $ 1.250.00 Runoff Calculations 1 6 $ 780.00 Hydraulic Calculation Sheet 1 16 4 $ 2.170.00 Stormdrain Design 1 2 24 40 $ 6,220.00 Details 1 1 4 8 $ 1,250.00 Sub-Total 11,670, 0 I F meetings Desi n Review Meetings 4 4 $ 1.020.00 Sub-Total 1,020.00 G Bid Phase BuzzSaw Electronic File Creation and Uploads 2 8 1 8 1 $ 1,5n00 Sub-Totall $ 1,580.00 H Easement Preparation Determine Limits of Easement 1 4 $ 570.00 RPLS Prepare Permanent Easement(Sarita) $ 750.00 RPLS Prepare Temporary Easement(Sarita) $ 750.00 Prepare Temp Easement Exhibit(Waverly) 1 2 4 $ 700.00 Sub-Tolail $ 2,770.00 1 Survey Additional Survey-A prox 750 LF $ 3.150.00 S 3,150.00 J Construction Administration Record Drawings 1 4 8 $ 1.220.00 Meetinas 2 2 $ 540.00 She Visits 2 2 $ 540.00 RA Review and Resoponce 1 2 4 $ 810.00 Review Shop Drawings 2 6 $ 870.00 Final Walk Through 2 2 54000 --.--_-_ —__ Sub-Total L RECORD Tota n 3 11 0 2Qa n0 270 00 1F n ECRETARY ; FT. gjDRTH, TX 9 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 3/8/2011 DATE: Tuesday,March 08,2011 REFERENCE NO.: **C-24767 LOG NAME: 20AMEND4 KERMIT BONNIE SUBJECT: Authorize Amendment No.4 in the Amount of$57,006.00 to City Secretary Contract No. 35497,an Engineering Agreement with TranSystems Corporation Consultants, for the Storm Water Utility Project Kermit—Bonnie Drainage Improvements,4600 Block of Merida Avenue, Sarita Channel and Waverly Park, thereby Revising the Total Contract Cost to$319,047.00(COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No.4 in the amount of$57,006.00 to City Secretary Contract No. 35497 with TranSystems Corporation Consultants,for the storm water utlitiy project Kermit—Bonnie drainage improvements,4600 block of Merida Avenue, Sarita Channel and Waverly Park,thereby revising the total contract cost to$319,047.00. DISCUSSION: The Storm Water Management Program was established to reduce flooding in Fort Worth,preserve streams, minimize water pollution and to operate the storm water system in a more effective manner to fully comply with state and federal regulatory requirements. This will be accomplished by infrastructure reconstruction and system maintenance,master planning, enhanced development review and increased public education and outreach. The scope of this project includes preparation of plans and specifications for drainage improvements at four locations: the Kermit—Bonnie channel and culvert;4600 Block of Merida Avenue;Sarita Channel; and Waverly Park.At the Kermit—Bonnie channel, an undersized culvert has caused residential and roadway flooding. Culvert improvements are needed to convey the 100—year storm flow.At the 4600 Block of Merida Avenue,residential flooding has occurred and a storm drain extension is needed.At the Sarita Channel, residential flooding has occurred and access ramps to the channel bottom for maintenance and improvements to the stilling basin are needed.At Waverly Park,the storm drain system is undersized causing residential and roadway flooding,and culvert improvements are needed to convey the 100—year storm flow. A Request for Qualifications (RFQ)to provide drainage design was issued by the City in January of 2006 and 24 design consultants submitted statements of qualifications, including TranSystems Corporation Consultants (TranSystems).TranSystems was selected to study the drainage in the project areas and to provide design services for any identified drainage improvements for the Kermit—Bonnie/4600 Merida Avenue/Sarita Channel/Waverly Park Drainage Improvements project(City Project No.00484). On June 5, 2007,the City Council authorized the City Manager,via M&C C-22519,to execute an engineering agreement with TranSystems Corporation Consultant(City Secretary Contract No. 35497)in the amount of$132,305.00 for the design of drainage improvements at the four sites. On October 16, 2007, (Ordinance No. 17840-10-2007)the City Council authorized t4 RWA4P* t) $25,000,000.00 in revenue bonds for the Storm Water Capital Project Revenue Bond�7�,k4 fju>u a.ta�c year Storm Water Capital project program. _ »�: AAA T. 0V-X T'H, TX On July 8, 2008,the City Council authorized the City Manager, via M&C C-22886, to execute Amendment No. 1 with TranSystems(City Secretary Contract No. 37334) in the amount of$87,006.00 for additional survey,design and FEMA—level studies of the Kermit—Bonnie drainage channel; additional survey and design at the 4600 Block Merida Avenue; and additional survey,design and FEMA—level studies at Sarita Channel. On January 27, 2009,the City Manager executed administratively Amendment No. 2 with TranSystems(City Secretary Contract No. 35497—A2)in the amount of$24,915.00 for sub—surface utility engineering services to determine the exact location of existing utilities. On September 22,2009, (Ordinance No. 18838-09-2009)the City Council approved the issuance and sale of$45,000,000.00 in revenue bonds for the Storm Water Capital Project Bond 2009 Fund to fund a two—year storm water capital project program. On June 17, 2010,the City Manager executed administratively Amendment No. 3 with TranSystems(City Secretary Contract No. 35497—A3)in the amount of$17,815.00 for the preparation of a drainage easement and for the provision of construction phase services for the Kermit—Bonnie, 4600 Block Merida Avenue, and Waverly Park drainage improvements. The need for additional design scope has been identified. Amendment No.4 will provide the following: additional survey and design at the Sarita Channel, and the provision of construction phase services for the Sarita Channel drainage improvements. TranSystems proposes to perform the additional services for a lump sum fee of$57,006.00. City staff considers the fee to be fair and reasonable for the scope of services proposed. TranSystems is in compliance with the City's MWWBE Ordinance by committing to eight percent MWWBE participation.The City's goal on the project is eight percent. This project is located in COUNCIL DISTRICT 3,Mapsco 73V, 89F, 89G and 90K. FISCAL INFORMATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated,of the Storm Water Capital Projects Bond 2009 Fund. ND CENTERS TO Fund/Account/Centers FROM Fund/Account/Center P227 531200 203280048433 $52.486.00 P227 531200 203280048483 $4,520.00 CERTIFICATIONS: Submitted for City Manager's Office by* Fernando Costa (6122) Originating Department Head: William Verkest (7801) Additional Information Contact: Rick Shaffer (682 1) ATTACHMENTS 1. 00484 MWBE Comoliance.pdf OFFICIAL RECORD 2. FAR-00484-00008—A4.Wff 3. fundingverification.doc GITYaaTAHY 4. MC 00484 SaritaRehab.pdf FT. WORTH. TX I