Loading...
HomeMy WebLinkAboutContract 59571-CO1FORT WORTH City of Fort Worth — CSC No. 59571-COI _vll— Change Order Request Project Name: I Additional Gas Line for Biosolids Drying Facility City Sec No.: 1 59571 Project No.(s):I 56002/0700430/5740010/103011 I M&C: I 23-0410 CityProj. No.: l 103011 Biogas pipeline that conveys digester gas from the Village Creek Water Reclamation Project Description: Facility to the Biosolids Management and Beneficial Reuse Facility. Contractor: I R Construction Civil, LLC Change Order # 1 Date: 2/26/2024 City Project Mgr.J Suzy Abbe City Inspector: Nathan Gray Phone Number] 817-392-8209 Phone Number.1 817-392-4961 Dept. Sewer Totals Contract Time (Calender days) Original Contract Amount $4,828,791.50 $4,828,791.50 360 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $4,828,791.50 $4,828,791.50 360 Amount of Proposed Change Order $96,790.00 $96,790.00 150 Revised Contract Amount $4,925,581.50 $4,925,581.50 1510 Original Funds Available for Change Orders $193,152.00 $193,152.00 —J Remaining Funds Available for this CO $193,152.00 $193,152.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2,00% MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1$6,035,989.38 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 1 provides for the following: Additional 407 square yards (SY) of removal and replacement of the east drainage channel to account for larger widths toward the end of the channel. 38 additional exploratory excavations that were shown in the plans but not included in the bid proposal. Staff concurs with the contractor's request for an additional 150 calendar days on the project for the change order. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Gontr Signature Date R Construction CivilLLC I Brody Maedgen I 102/29/24 Inspector Date Project Manager Date 3/4/2024 ,«;%Y:� �. J —r % 5 / 24 Director (Water Dt�r Date Construction Supervisor (Water Dept) Date Mar 5, 2024 9-11- 3/5/2024 Senior Assistant City Attorney . Date Assistant City Manager Date Mars, 2024 Mar 5, 2024 I [ -' Council Action (If Required M&C Number N/A M&C Date Approved 7— N/A FORT WORTH City of Fort Worth Change Order Additions Project Name Additional Gas Line for Biosolids Drying Facility City Sec No.: 1 59571 Project No.(s): 56002/0700430/5740010/103011 1 DOE No.1 23-041q City Proj. No.: 1 103011 Project I Biogas pipeline that conveys digester gas from the Village Creek Water Reclamation Facility to the Biosolids Description Management and Beneficial Reuse Facility. Contractor R Construction Civil, LLC Change Order: 1 Date: 1 2/26/2024 City Project Mgr. Suzy Abbe City Inspector I Nathan Gray ADDITIONS I I tM , UESUKIF I IUN DEPT Q�j( Unit Unit Cost Total 15 Remove and Replace Concrete Channel Sewer 407.00 SY $170.00 $69,190.00 26 Exploratory Excavation of Existing Utilities Sewer 38.00 EA $2,700.00 $102,600.00 Sewer $171,790.00 1 Page 2 of 4 Additions Sub Total $171,790.00 F_ ORT WORTH City of Fort Worth Change Order Deletions Project Name Additional Gas Line for Biosolids Drying Facility City Sec No.: 59571 Project No.(s): I 56002/0700430/5740010/103011 1 DOE No. 1 23-041 City Proj. No.: 103011 Project Description I Biogas pipeline that conveys digester gas from the Village Creek Water Reclamation Facility to the Biosolids Management and Beneficial Reuse Facility. Contractor I R Construction Civil, LLC Change Order: F-11 Date I 2/26/2024 City Project Mgr. Suzy Abbe City Inspector: I Nathan Gray DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 35 Construction Allowance Sewer 0.9375 LS $80,000.00 $75,000.00 Sewer $75,000.00 Page 3 of 4 Deletions Sub Total $75,000.00 MIWBE Breakdown for this Change Order MWBE Sub I Type of Service I Amount for this CO Total $0.00 Previous Change Orders co# I DATE I AMOUNT Total $0.00 1 Page 4 of 4 2/26/2024 CPN 103011 Additional Gas Service to Biosolids Drying Facility Chance Order 1 Notes • Additional 407 square yards (SY) of removal and replacement of the east drainage channel. The bid quantity was based on an average 12-foot width along the length of the channel. However, the channel starts at a width of 10 feet and increases to 17 feet. • 38 additional exploratory excavations. The plans call out a total of 59 locates, but only 15 were included in the bid proposal. • 150 days of additional contract time. Start up and commissioning of this project will depend on the new hydrogen sulfide scrubbers and new gas dryers in the Digester Mixing, Flare, and Dome Improvements project being operation (moisture and hydrogen sulfide removal is required before the gas can be used to fuel the biosolids dryer). The anticipated completion date for the hydrogen sulfide scrubbers and new gas dryer is November 21, 2024. The additional contract time will move the final completion date of this project to December 19, 2024 which will better align the completion dates of these two projects. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title �p4vapq� as FORT �O a° op°°° °° °°. a�'o °09dd ATTEST: ago o=$ d0, * o°° °°°icy no EXA5oa�. Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX